HomeMy WebLinkAboutP&Z Minutes 1967-12-11 Regular[ 1
l
l i
MINUTES OF PLANNING COMMISSION MEETING J 12-11-67
A regular meeting of the Planning Commission was held and was attended by:
Tom Grace Tony Banfield Dean Saurenman Harol d Barr
Mr. Ba rr of Bovay Engineering presented the work accomplished on the Phase I of the comprehensive plan under contract with the city. The attached information gives this status.
The major efforts or principle product of the Phase I portion of the contract is basic and accuracy maps of the Friendswood Area, The Phase I report is due March l J 1968.
It is with regret that the resignation of Mr. Wilbur Boyle was received. Mr. Boyle has served the city loyal ly for a long time and his experience has guided the Planning Commission through many uncertain times.
Mr. Boyle's decision (for health reasons) was made known to the City Council. A replacement to Mr. Boyle's position will be made as soon as possible.
Respectfully submitted )
Tom -Grace