Loading...
HomeMy WebLinkAbout12.21.1998 Customer Information System Implementation'l'O: RCR04 CITY!-IALL Roger C. Roecker MLM30 CITYHALL Melvin L. Meinecke CSE04 CITYHALL Cindy S. Edge KAZ30 CITYHALL Kaz Hamidian FROM: LJB04 CITYHALL Lynn J. Bucher DATE: December 21, 1998 SUBJECT: Customer Information System Implementation The Customer Information System (CIS), referred to as application CX, training sessions 174ve been rescheduled as follows:(v-��7 lr-e. 11.,d/r�-* First 2/22/99 * ** -2/26/99 Codes *Second 5/10/99 -5/14/99 Maintenance *Third 6/07/99 6/11/99 Transaction Processing ** Fourth 8/02/99 -8/06/99 Go Live ** Fifth 9/21/99 -9/23/99 Follow Up The first thru third se3sions will be four days beginning on Monday, 1:00p and ending on Friday, 12:30p. Tuesday, Wednesday and Thursday times will be 8:30a -5:00p with a 1.5 hour lunch period. The fourth and fifth sessions will be 8:30a -5:00p all days with a 1.5 hour lunch period. All training will be in the City Hall upstairs conference room unless otherwise notified. Unlike our previous HTE applications, an HTE project manager has been assigned to oversee the CX implementation. The project manager assigned to Friendswood is Paulette Mier, formerly City of Pearland Utility Billing supervisor. I talked at length with Paulette this morning regarding our implementation. She has tentatively scheduled an implementation team meeting for: 1/25/99 Monday 9:00a -5:00p. City Hall upstairs conference room This meeting will review the implementation process in general and codes in particular. All those responsible for development of CODES for the CX system MUST be present. In addition, she has requested we do the following homework before the 1/25/99 meeting: Read the INSTALLATION section of the implementation manual. Read any associated appendix sections. Be thinking of the kinds of codes we will want to implement. Write down any questions we have. The meeting may not last all day, it will depend on issues brought up during the morning session; however, we need to be prepared to commit all day if it becomes necessary. I gave her a brief overview of our system as follows: The number of customers (estimate close to 9000 by go live date) Our billing cycles and periods (4 and bi-monthly, 15th/31st) Contract meter reading (implementing 1/15/99) and the need to interface with the Neptune meter reading system. If there is a scheduling conflict with any of the above dates, please let me know as soon as possible. Thank you. COPY LIST: REM04 CITYHALL Robert E Matlock Paulette Mire Application Specialist ( 407)304-3235(800)727-8088 £060pmire@hteinc.coni · HTE Utility Systems 1000 Business Center Drive Lake Mary, FL 32746 www.hteinc.com CIS IMPLEMENTATION WORK PLAN TASKS Client HTE Resource Task Task Assigned 1 IMPLEMENTATION PLAN 2 Initial Meeting to Discuss Implementation Plan X X 3 Training Schedule X X 4 Conversion Meeting X X 5 TECHNICAL ENVIRONMENT 6 Load Application Software X 7 Set Up Training Security and Conduct Keyboard Training X 8 GUI Training X 9 CONVERSION REQUIREMENTS 10 Deliver All Pre-training Conversion Requirements to HTE X 11 PREREQUISITES FOR FILE MAINTENANCE TRAINING 12 Prepare For 1st Training Visit 13 Most Recent Application Code I PTF's Loaded X 14 Prepare Training Schedule (rooms and times) X 15 Appropriate Personnel Available X 16 Read Sections 1 and 5 of the CIS Training Guide X 17 Modifications 18 Prepare Draft of All Modification Specifications X 19 Forward Draft of Modification Specifications to HTE X 20 Deliver Modification Specifications X 21 Review and Approve All Modification Specifications X 22 HTE 1st VISIT TRAINING 23 File Maintenance 24 Conduct Training on File Maintenance X 25 POST TRAINING REQUIREMENTS FOR FILE MAINTENANCE 26 Complete CIS code files X 27 Complete Cash Receipts code files X 28 Complete Work order/facility management code files X 29 Complete Land/Parcel Management code files X 30 Deliver all remaining conversion requirements X 31 Procedures 32 Write New Procedures X 33 Forms 34 Determine forms requirements: X 35 Bill Forms X 36 1st Delinquent Notice X frwdcx.xls HTE Proprietary Need by Date NOTES Date Complete Via conference call or on site. Depending on the contracted level of project management. (*) (*) (*) see notes for requirements Recommend Core Group for 8/4/98 for this codes set up training see·notes for requirements (**) .,., ,,.., . ·, �f : .. y% ''.::',·�, cP -��-�� Page 1 CIS IMPLEMENTATION WORK PLAN TASKS Client HTE Resource Need by Date NOTES Task Task Assigned Date Complete 37 2nd Delinquent Notice X 38 3rd Delinquent Notice X 39 4th Delinquent Notice X 40 1st Final Delinquent Notice X 41 2nd Final Delinquent Notice X 42 3rd Final Delinquent Notice X 43 4th Final Delinquent Notice X 44 Order required forms X 45 Test Plan 46 Design test data base X ('"") 47 Train personnel on test data base X (**) 48 Prepare system test conditions X (**) 49 Review and approve test plan documents X X (**) 50 Documents Required by HTE: (minimum) Section 4 / CIS training guide 51 Delinquency setup document X 52 Parallel processing verification checklist X 53 Rate group verification checklist X 54 Update processing date document X 55 Forms checklist X 56 Conversion verification worksheet X 57 Parallel verification worksheet X 58 Execute Tests 59 Set up test environments X 60 UTILITY CONVERSION 61 Design Work: 62 Design General Account Information Conversion X 63 Design Bill/Payment History and NR Conversion X 64 Design Readings/Consumption History Conversion X 65 Complete and Finalize Conversion Document X 66 Review and Approve Conversion Document X 67 Code/Test Work: 68 Code/Test General Account Information Conversion X 69 Code/Test Bill/Payment History and NR Conversion X 70 Code/Test Readings/Consumption History Conversion X 71 Conversion Reviews and Data Integrity Testing X X 72 Modifications 73 Deliver Modification Specifications X frwdcx.xls HTE Proprietary Page2 CIS IMPLEMENTATION WORK PLAN TASKS Client HTE Resource Need by Date NOTES Task Task Assigned Date Complete 74 Review and Approve All Modification Specifications X 75 Interfaces 76 Prepare Draft of All Interface Specifications X 77 Hand Held Meter Reading Download and Upload Interfaces X 78 General Ledger Interface (if NOT using HTE GIL application) X 79 Cash Receipts Lock Box Interface (if needed) X 80 Forward Draft of Required Interface Specifications to HTE X 81 Deliver Interface Specifications and/or Required Programs X 82 Review and Approve All Interface Specifications X 83 PREREQUISITES FOR CUSTOMER MAINTENANCE TRAINING 84 Prepare For 2nd Training Visit 85 Most Recent Application Code I PTF's Loaded X 86 Assignments From 1st Training Visit Complete X 87 Complete the 1st Run of Conversion X 88 Conversion Balancing Confirmed Prior to Visit (Deposits and AIR) X 89 Review and Identify Data Issues on Conversion Exception Reports X 90 Report Data Issues to Conversion Analyst X 91 Prepare Training Schedule (rooms and times) X 92 Appropriate Personnel Available X 93 Read Sections 2 and 4 of the CIS Training Guide X 94 HTE 2nd VISIT TRAINING 95 Customer Maintenance 96 Conduct Train the Trainers on Customer Maintenance X 11/10/98 97 Conduct End-User Training on Customer Maintenance X 98 POST TRAINING REQUIREMENTS for CUSTOMER MAINTENANCE 99 Procedures 100 Continue to Update New Procedures (RE: Customer Maintenance) X (**) 101 Conversion 102 Conversion Reviews and Data Integrity Testing X 103 Post Conversion Checklists Complete X Section 4 / CIS training guide 104 Review and Identify Data Issues on Conversion Exception Reports X 105 Report Data Issues to Conversion Analyst X 106 Parallel Testing 107 Execute Tests 108 Execute system test X 109 Correct problems and re-test X 110 Modifications frwdcx.xls HTE Proprietary Page 3 CIS IMPLEMENTATION WORK PLAN TASKS Client HTE Resource Need by Date NOTES Task Task Assigned Date Complete 111 Test and Approve All Modifications for Customer Maintenance X 112 PREREQUISITES FOR TRANSACTION PROCESSING TRAINING 113 Prepare For 3rd Training Visit 114 Most Recent Application Code / PTF's Loaded X 115 Assignments From 2nd Training Visit Complete X 116 Complete the 2nd Run of Conversion X X 117 Conversion Balancing Confirmed Prior to Visit (Deposits and AIR) X 118 Review and Identify Data Issues on Conversion Exception Reports X 119 Report Data Issues to Conversion Analyst X 120 Prepare Training Schedule (rooms and times) X 121 Appropriate Personnel Available X 122 Read Sections 3 and 4 of the CIS Training Guides X 123 HTE 3rd VISIT TRAINING ,124 Transaction Processing 125 Conduct Train the Trainers on Transaction Processing X 12/8/98 126 Conduct End-User Training on Transaction Processing X 127 POST TRAINING REQUIREMENTS FOR TRANSACTION PROCESSING 128 Procedures 129 Continue to Update New Procedures (RE: Transaction Processing) X (*-) 130 Develop Transition Plan for System Activation X (**) 131 Develop Post Implementation Plan X (**) 132 Conversion 133 Conversion Reviews and Data Integrity Testing X 134 Post Conversion Checklists Complete X Section 4 / CIS training guide 135 Review and Identify Data Issues on Conversion Exception Reports X 136 Report Data Issues to Conversion Analyst X 137 Parallel Testing 138 Execute Tests Refer to test plan & section 139 Execute system test X 4 of the CIS training guide 140 Correct problems and re-test X 141 Execute Full Parallel Test X 142 Documents Required by HTE: (minimum) 143 Delinquency setup document X 144 Parallel processing verification checklist X 145 Rate group verification checklist X 146 Update processing date document X 147 Forms checklist X frwdcx.xls HTE Proprietary Page4 CIS IMPLEMENTATION WORK PLAN TASKS Client HTE Resource Need by Date NOTES Task Task Assigned Date Complete 148 Conversion verification worksheet X 149 Parallel verification worksheet X 150 Interfaces 151 Test and Approve All Interfaces X 152 Hand Held Meter Reading Download and Upload Interfaces X 153 General Ledger Interface (if NOT using HTE GIL application) X 154 Cash Receipts Lock Box Interface (if needed) X 155 Modifications 156 Test and Approve All Modifications fo r Transaction Processing X 157 PREREQUISITES FOR HTE CIS SYSTEM ACTIVATION 158 Prepare For Live Visit 159 All Personnel Trained X 160 Most Recent Application Code / PTF's Loaded X 161 Assignments From 3rd Training Visit Complete X 162 All Parallel Testing Complete X 163 Execute Transition Plan for System Activation X 164 Complete the Final Run of Conversion X X 165 Financial Balancing Document Completed and Signed X Section 4 / CIS training guide 166 Appropriate Personnel Available X 167 SYSTEM ACTIVATION/POST IMPLEMENTATION 16$ Activate System X 169 Complete First Week of Go-Live Worksheet X Section 4 / CIS training guide 170 Execute Post Implementation Plan X 171 HTE Application Specialist On-site for Assistance X 3/8/99 172 HTE POST LIVE TRAINING X Opt.: 3-4 weeks post live 173 174 175 NOTES: 176 (*) HTE Technical SeNices offers this seNice, see contract for responsible party. 177 (**) HTE Professional SeNices offers this seNice, see contract for responsible party. frwdcx.xls HTE Proprietary Page 5 CIS IMPLEMENTATION WORK PLAN TASKS Client HTE Resource Need by Date NOTES Task Task Assigned Date Complete 178 CONVERSION REQUIREMENTS 179 These requirements should be met prior to your first CIS training visit. 180 181 1.Prepare explanations of fields in the current billing system: 182 -Include code values and functions as appropriate. 183 -If fields have more than one use, explain all uses and the conditions 184 under which they occur. 185 -Screen prints. 186 187 2.Provide balancing information: 188 -How to determine a customer's account balance? Is it in one field or a 189 combination of fields? 190 -Send a copy of current system's Trial balance report. 191 (totals or summary page only) 192 193 3.Define billing cycles and reading routes (billing schedule) 194 195 4.Provide a small sample (less than 300 accounts) of your current customer 196 information on tape. The tape should have the following characteristics: 197 -Unlabeled 198 -1600 BPI (6250 is also acceptable) 199 -Fixed block (block length must be a multiple of record length) or unblocked 200 -Fixed field lengths 201 -Contain fixed length records 202 -Packed data, in most cases, should be unpacked 203 -Signed numeric fields should have a trailing sign 204 -File layouts (hard copy) corresponding to the tape must be included 205 206 A test tape may be prepared to confirm readability before all data is sent. 207 208 These requirements should be met after your first CIS training visit. 209 210 5.Prepare cross-reference tables 211 After you have completed all of your CIS code files: 212 -List out all CIS code files 213 -Using the HTE CIS code file listings, identify your current system codes to 214 the corresponding HTE CIS codes frwdcx.xls HTE Proprietary Page 6 CIS IMPLEMENTATION WORK PLAN TASKS Client HTE Resource Need by Date NOTES Task Task Assigned Date Complete 215 -Identify field name where current system code is used frwdcx.xls HTE Proprietary Page 7 ID " 1 !3 2 8 3 i3 4 3 ' !3 8 7 fil! •13•15 10 13(§). 11 6 12: 13 .. . G!j 14 15 1• 8$ 17 � ta 8 11 8 20 9 21 i3 22 !3 22 9 24 !3 25 3 I Tukllame a1yo1Pn� ! klckol'f Meeting lmplementa!la, &hedule �on Reql.irem«ita Training Claes lnterfaeo Requlrl0m«'lt3 Report!r-Q Kerarchy Conversion Oenenll Tub Identify and create a aami:le d3ta base Pros4de data mQppng ot ein•ntflt- 1 Oe-.elop • cross reference table of curent coc!es and H. T l'cw,Qrchlampedllta base, d:atafll• mapping, and ood= I . ·-r I .;ci,ocuo 00"1\,Cl"Slor, cert� c:all I Re-.i�aidfinaliZ'err,CU31:11"idi�ccr.MSia,i-I CeYelop convereion pr0Qr'2m( •) Siatus Rcpcrt(on slle) 1st 'Training Vl:ft 0--•CIIII ol codes�� req.Arement Set up ex system eonlrcl files Elcplai'! and re\liewcodes Set up Ooneric cedes Set�receivablecodas Set up _..,;c;e codes CiSCUIS9 ccnvenicn requrements Mods and 1/'ierfaceQ I arY OF l"RIENOSWOOO IMPl..eMeNT"AilON SCHl!OUU! DuratlOn start Finish Pred1 llctea fte&OtJri» Nam• 1 day Tu. 8/27/96 ! Tue 8127196 I COFJH..T.E 1 day Mon1/2S/99 Mon1� BUQ1ERIMRE 1 day Mon 1/25199 Mon 1/25/99 1 day Mon1/25M Mon 112.5/99 1 day Mon1�/99· Mm1/2.S/'i19. 1 d:ay 1Aon1� Mon1/25M 1 day Mon 1/25199 Mon1/25/99 3Sdays Mon1f15/S9 Fri 3112199 1..tdays Men 11'2!!i,/gQ Thu 2/11198 eucHeR/MATLCCK 1c:1a,,.I Mai 112S/88 Tue2/.2/99 Fields aince 1gas 8t.JCtiER/MA. TLOCK 10 da19 Men 2122m I Fri 3'5.'89 i 15UCHERMt\TLCCK :2 clay:s Mxl�,Tue:319199 11 &JCH!:RNATLOCK 1 day' Wed 3/101991 Wed 3/10/99 12 l BUCME�REIMATLOCK/CONV PROGAAMW!R 2da:,os Thu 3111199 I Fr1 3/12199 I 13 I 15\JCHERIMATLOCK/M!RE ' 0 v.k,, Non3/15199 Fr1-4/ZW9 14 H.T.E 1 day Non 2122199 Mon :2/Z2Jg9 Meeing 11:00AM !SUCHe!RIMATLOCl<IMJRE 4 d4lys 'TUe:/23198 P'f12121118t1 Mori.1p.rn./Fr1.Noon BUCHEIVROBERTS 4days 1ue2/23139 Fri '2l28f39 4days Tu&2/23,99 Fri2mm 4da� Tuc2/23199 P'H 2126199 4days Tue 2!.23199 P'ri'2asm 4 dayo Tue� l"H�m 4 dayo Tue2/23/99 ,.ri2l28'39 4 days Tue:2a3/99 Fri2!2S.'09j Tue2/23m·1 Tu.; 2a3/99 j r . ·-·. ----1 day I Task r:.,;;l-HhH·· ··';:JH Sl.mmary • • RalledUp� Spit . .. , .. ,.,., ,., ...Project: REVNTOHMPSCH0127.MP? [:_;//<;'.:(::,+(I fw����t��fi Prt>gresa RolllOd UpTuk ei.temal Ta91<3 Ro.led Up Spfit Cate; Tue 1,2;,'9; .... ,., ....... ,.,.Uilestone ♦ Rolled Up MIiestone ◊ Project Summary �,.. •• a.,»--., Page1 � i t.., Qj :::, N en CD CD N .. 0 ... .,, .,, N ID n Talk Name 9{;;. StatJs Report(� call) Z1 9·$, S1atus fiteport (en aim) 28 19$ stauJa Report (on n) 29 l P'et1a'm lnlalll run Of conversion io le! R.,.,;ewco�on data and reports 31 ri!! Report all iau• tc H. T . .E ;2 ,� 2d Training Visit• customer maintenance = !E Rm gro<Jpsl M 3 Loc:aUon Information 31 8 CUalomec-accou,t irf01TT1ati on u 8 Na,,;iµt,e 1hrough CXuaingf�on kDys S7 [3 ex Werk arders 38 -=,-..__ .. � -� -....--- 21 18 I Third p;llty nolfflcaton 40 @3 Meter lnfonnation l 41 13 Miscellaneo<a c:hQrgos CITY CF FRIENOSVIIOOO IMPLEMENTATION SCH!!OULe Duration 1 dllly s:�91 Pllllllh I l'l'edt Fri 315199 1 day Mon ◄/61891 Mon099 I , day MonS/3/98 Ma,5/3199 4 dayis MonS/3198 ThuS/6199 3 <bya Mcn513,'99 WedS/5/99 , day Thu5M9 TruS/6199130 -4daya TueC/11/91 P'rf S/141'9 4days TueS/11199 P'ri 5/14/99 ◄days Tue 5/1 1/99 Pri 5/1-4/SSI 4day. Tue6/11m Pri 5114189 4days TueS/11199 Frf 5/1 <l/!39 4da:,s TueS/11m Fr1 5114199 <:days_ riest11/99 ! --· Fri 5114199 4da)'3! Tue5n1/98 1 PnS/14199 4 d:aya Tue5/11/g9 Fri 5/14199 4 day.I Tua5n1/99 Frf 5114/99 Notes I "--ca Names C«t. Call 8:00A.M ! eucHl!!MIIATL.OCX/MIR.e llleedng9:00AM I etJCHERMA.TLOCKJMRE lllee!irg 9:00A.M I BUCHER/MA Tt.OCl<JM RE BUCltEMMTLOCKICONV. PROCR.M1MER Mcn.1p.mJl'l'Ufoon I H.T.li ex Trainer --------ir---------------------i � 9 Odcrmino o-.esrhtes forloc:aUon and customera 4 cb)'II Tu&S/11/gll Fri 5/14/99 � � I Deposit m:al"llena,ce .... is� T ormlnatonheai::twUai 48 I fill Creal histr:ry " 1.9 Initial baling 47 18 !!udget billing 48 1: I Meter lr'lllffliory -48 Mo!l::r ins!alldon IO PJ.emr .·erro·,af fuo:tlons Pro,'ect REVNTCHIMPSCH0127.MPP Date: Tue 1126.m9 Task Progress .... ,es10n& 4da� Tue5/11/99 l""ri 5/14139 4daya Tue sn1199 P"ri S/14199 4day. TueS/11,/;II P'ri 5/14199 4 days TUe5/11/98 l"ri 5/14199 4 cbya Tue 6/11,9& l'ri 511-4199 4 days TUe 5/11/99 Fri 5'1-4139 I 4 days I Tue 5/11199 I Fri 5(141991 I 44111)'81 T ... 6111/;91 l'ri5.l14199l I [.".:.;_;_:.;_:_: __ :; ... :::_j summary • • Rol..:lUp� Roled Up Task f�;ip;1;�t:;:;:;:;:;:�';:;:;f l!!>demal ra..ic, r ---------------------i Spit �J§J:�·:If.3t5� Roled Up Split Rolled Up Mileetone ◊ Project Summary q;;,zcii ,1 t,111!� Pag.1 I- t... ai � I\) CJ) (.0 (.0 ID tt Taalc Name 11 Preparation for M.T.& 2rd V!ttlt. P..-a 82 13$ O<dino teot pan IS 8 Concu:t find -hiring -l :applioablo u (3 Ccmpoti:,2nd IV'l ct conversla, 18 8$ statua Repxt (on lite) 88 � . 3nf Training visit -procaalng li1 !3 Meter-reading tranaac::jons 18 8 Bllling�cnoalicn u 13 l"lnal billo and I.QITOdled bllls IO 8 Entierlng paymorta 81 B fnli:rlng adjl.lll1ments 82 13 Delinquency procasslng s: "'":I I� '!' .. 'ri� � {=!=-"":.-.. ] ;:�i'itf s Cally l.lpdn, p. ocese4 Iii ·---· Pandlel Tutlng 88 8 Parallel Testing Commences tr1 13 Comploter'doc:umcnt test aatpts ea 8 Verify bill prirt is acan.te .. 13 Verify bill• are cafC\Jlatine c:om,c;11y 70 � l'anlllet Chect-Tralnlng Vlalt 71 8 Re-.i<!MI Parallel Cocumentat! on 12 Co Live Praperetlon � Pr.ep;ratlonfor G0 Uw-SeeTrwwi�on Pim 74 8 Run final convenian I Be12nce cornersia, I i I CITY CF FRJ!NCS\11.00C IMPLEMSNT ATION SCHEOUL!: &tart 11 days MDlll/17199 14 days Mon 5117/&G 1◄da� Mon 5/17.199 2 daya Thu!/3Al9 1 cay Mcne/7198 4day3 Tllell/llt91 4 days TueSNQ9 ◄days Tue� ◄days Tuea/a/99 ◄daya Tu.818199 ◄days TueS/!/99 ◄ d:ay.. T��J 4 .. r-s I Tuoe/a/9'3' ◄da)S' Tuo818199 I :lOdays Moll8HAIW ev.b Mon e/14199 80/lb Mon8/1,4Jg9 8v,ks Mon en '4199 6V'ob Mcn8/14,99 %days 1\.1♦711:191 2days TUo 7/13199 16da\lB Mon7112/91 15 days Mon 7'12/99 1 day Fri 7f'J0/99 I 1 d:ay I Mon812J�, Pll!ish Preck fr1814191 Thuet:,,99 Thu 6/3/il9 Fri 614139. Mcne/7199 frl8'11J99 l"ri 8111"9 l"rie/11199 l"ri 611 1199 1"ri 8111199 Fri 6/11/99 Fr1 e.111189 Fri 6111193 Fri 6/11199 P'r1 71%311» Fri 7123199 Fri 7123199 Fri 7/23/99 Fri 7123199 Wed7Ho419it Wed 7/14/aS Monll/2/M Fri 7/30199 Fri 7/3tJ/99 Mon 0/2/99 j 7 4 I •etas Kesource Namaa IIUCHlil'tlMATLOCK R�ew Parallel Test 6UCHERMATI.OCKJECGeMRe SUCHERJW.TLOCI< .BUCH�TLOCKICCN\I. PROORAl,1UER Moetirg 9:00A.M BUCHERmlATLOCK/MRE Mon.1p.mJPrl.Noon. 11.T.I ex Train« I BUCHER/MATLOCK Mon.1p.m.1Wed.lf00n H.T.6 ex Trainer BUOiERIMATL.OCKIMRE --.. .... _. .. r ---- 1/:.:::::::(:):'�:}(:):,:i] ' •Ta:sk SUmmary Roll.dUp� Split ., ...... ,., ., ....Projoct: �C1'11MPSCHD127.MP? Progress Rolled Up Task r.:.:.�:.:.:.:.{.:.:.:.:.:.:.1Cate: Tue 1/2e,'99 Mllestcne •Rolled UpMIN10no ◊ Flag<,3 E)aemalTnka �����Projoct SUtnm:iry � �!� Roled Up Split ,1111111111,1,,,, c.....1'.11 :J N en c.oc.o 0 .... "ll � CITY CF FRIENCSWOOO JMRJ:MENTAT!ON SCHeDUt.e 10 ft Tait,._ Durlltlan a.rt l'Nldl lloCaa �...,.. OOLM ldaya MonatZtlll 1'11MIN 77 13 AcflwteSy.em-Qo.U-.e Sdayl Mon8/2JIIQ l"rlMW9 78 � Go-{Jve Trainer en lit8 s daya Mcnat2J98 FrfSMe H.T.E CxTralner ,. 13 Compalo 1• vwolc r:#Oo-U'fewrt .,_ 5day9 Mcn812199 Fri !N99 ao � ADDmOIIAL TftADIINQ Sdaya Tuell21JN Tltulll:t/N Pft&J"Ma A13aNDA &UCH;RJMA'T1..0CK 81 8:i RlNew?cstGoUw 1-3 days Tuo 91211911 Thu9123199 H. T .I! ex T1'111ner Tulc � Mleamne mt1i1�)1��1�1�1���@m SJramary •• RdledUpProg.-Spilt Pl"ojoct: REVNTCHIMPS010127 M"P Oltll: Tua 112e/99 • RolledUpTaak r_·_·_·_-_-;·.·_-_"/.".".".J Rolled UpMl...ixr. ◊ Flage4 �--w••mn'l� Tam ;::::, ��-'ll Project Summary • ' • Relied Up Split c... 0, � I'll 0) c.o c.o 0 I'll .,, .,, CJ1 ----..::.::.::·.::.::.::.:::::.::�-=:..:..:..-:...=------------_-_----�"""""'.::----------=-=-=...::_--------:----- Jan 26 99 12:03p CITY OF FRIENDSWOOD CIS IMPLEMENTATION MEETING JANUARY 25, 1999 Attendee's: HfE Jl'aulette Mire, Project Manager FRffiNDSWOOD Lynn Bucher, Finance Officer Bob Matlock, MIS Manager Melvin Meineck, Public Works Director Roger Roecker, Dir. of Administrative Ser. Cindy Edge, Accounting & Utilities Services Supv. Kaz Hamidi an, Utilities Supt. Karen Keeslar, Utility Billing Clerk Renee Wilkerson, Utility Billing Clerk Topics of Discussion: 1. 2. 3. 4. Conversion- The conversion topics discussed. were Cross Reference Table, Data Mapping Sample DataBase and Conversion Specification Document. FRWDhas sent a samp le database to R T.E programming staff and was advised by Jenn y McAlister that the file was readable. There was also a len gthy discusnion regardmg what infonnation was maintained on FRWD's current system and what will be converted. Environments- A decision was made and agreed to by all present that FRWD would maintain a Production and Testing Environment. FRWD staff will create and maintain the test environment. Modifications and lnterf.aces- The only interface that was identified during this meeting was for the handheld device. Friendswood is currently contracted to a third party, Echo Resources, for meter reading. Echo Resources is using the Schlumburger Hand.held device. l advised the client that I would determine if an SCR is required for the handheld interface. Training- A decision was made and agreed to by all present that H T.E would train the end users. FR WD was advised that tl1e training facility would require an overhead projector, n flip chart and a white board. FRWD agreed to limit training to 6 individuals for all hands on training sessions and 8 individuals for codes training. The training s11bj� matter for each training session was reviewed with the client. I recommended an additional visit be scheduled for the purpose of parallel review The client agreed to allow me to schedule a 2-day training visit for this purpose. p.6 \ Jan 26 S9 12:04p 5.Implementation Plan- nm Impleme�tation Plan was·reviewed with the client. Bob Matlock was selected as the contact person for FRWD. All FRWD tasks on the implementation plan were assigned to Lynn Bucher and Bob Matlock jointly. This assignment was agreed to by the client. The client requests that I include the Status Report Meetings on the plan as well. 6.Testing- The client is tmsure on the testing method that will best fit FRWD's requirements and resources. Tue decision was made to review RT.E's Parallel Test Plan and meet to discuss and finalize this issue. p.7 File: Copy To: Lynn Bucher -CX Implementation Roger Roecker Melvi n Meinecke Cindy Edge Kaz Hamidian Bob Matlock , I DATE: 01/25/99 FRIENDSWOOD KICK OFF MEETING AGENDA INTR ODUCTION C ONVERSION OVERVIEW C ONVERSION CHECKLIST C ODES CROSS REFERENCE TABLE DATA FILE MAP PING ✓SAMPLE DATA BASECONVERSION SPECIFICATION DOCUMENTRECOMMENDED ENVIROMENTSCONVERSION DATALOCATION INFORMATION CUSTOMER INFORMATION METER INF ORMATION FINANCIAL INFORMATION INITIAL CONVERSION FULL DATA BASE C ONVERSION 9:00AM - 9:30AM 9:30AM-10:30AM MODIFICATIONS/INTERFACES l!1 10:30 AM�l :00 PM ... Determine requirements for Friendswood � • �� U4.-cL z SCR SPECIFICATIONS (Sy.sfel'\1 6'a.rt9<!. J?�(lB�'i) TRAINING DISCUSSION 11 :00 PM -12:00PM , DEFINITION OF FRIENDSWOOD'S TRAINING NEEDS: �� � � -T��R 1 n _a.-.. (:�TRAINING �l�) }vl DEFINITI ON OF HTE'S ON SITE TRAINING r ;JM;i · r �<Vl r ,/ )( Nar(Define each visit and disc»ss atten1��� .. 7,;.. 0A�� rv{� � f '1IJ.:. �(L \J,¾\ ��"t.5cODES VISIT - / ("(!. -r Vo'� '"""r .. -; J(,Af' <r O (e' \\ \ .t"�t �AINTENANCE TRAINING \ .f¼ROCESS TRAINING -f'�.s J�S GO -LIVE VISIT Jd-yJPOSTGO-LIVE,VISIT -'7/�c>�Q./�__,,� '---J;;:;� LUNCH 12:00 PM - 1 :00PM I RESUME 1RAINING DISCUSSIONDEFINITION OF RESOURSE REQUIREMENTS I :00 PM -1:30PMRES OUR.SES/BOTH .-..� _ /J ../? /J • ;, /J . • 1. /}TRAINING MATERIALS - , � � rca..ve � �� TRAINING FACILITIES 7 fv(_f r lA-42 � � •IMPLEMENTATION PLANREVIEW IMPLEMENTATION PLANTESTINGTEST CRITERIATEST SCRIPTSTEST TEAMPARALLEL TESTINGDISCUSSION I :30PM -2:30PM2:30PM-3:30PM3:30PM-5:00PM APPLICATION TEST SCRIPT CATEGORY:MISCELLANEOUS CHARGES SUBCATEGORY: MISCELLANEOUS CHARGE ENTRY TASK: MISCELLANEOUS CHARGE ENTRY, LIST & POST SCRIPT NO. F401 DESCRIPTION: Test the addition of both System- Generated and Manually Generated Miscellaneous Charges to a Customer Account. PURPOSE OF THIS SCENARIO: Verify that a Miscellaneous Charge entryadded to a Customer Account is processed correctly, appears correctly on tl1e Miscellaneous Charge Listings and the Miscellaneous Charge Posting Report and finally that the account is updated appropriately TEST ACCOUNT SPECIFICATION AND, IF APPLICABLE, TEST CASE VOLUME (If not specified, Tester should fill in account number(s) used.) ***Ensure that there are at least three system generated miscellaneous charges waiting to be listed and posted prior to executing this test. Account Numbers: Select three Active Accounts and detennine the type and amount of the miscellaneous charges to be added to each account. Account Number Miscellaneous Miscellaneous Charge Type Charge Amount Financial Test ScriptF401.doc 09/01/98 1 TEST STEPS: ***STEP 1 -Select three Active Accounts and document the account numbers in area provided above. Also document the type and amount of each miscellaneous charge to be added manually. Run a Miscellaneous Charge listing to ensure that there are system generated charges waiting to be listed and posted-if not, refer to test coordinator to ensure that action is taken to make this possible. Document the account numbers, miscellaneous charge type and amount from the system generated charges. STEP 2 -Enter the miscellaneous charges to accounts selected in Step 1. STEP 3 -Run the Miscellaneous Charge Listing report for All transactions. STEP 4 -Review the Miscellaneous Charge Listing to ensure that all miscellaneous charge transactions entered and all system generated miscellaneous charges are included on the listing for the appropriate amounts STEP 5 -Post the Miscellaneous Charges. STEP 6 -Verify that the Miscellaneous Charge activity is visible in pending transactions on the accounts listed in Step 1. The transactions will appear in pending transactions as status T after posting. ***STEP 7 -Refer to Test Coordinator to ensure that all accounts listed in step 1 are billed during an update. Remember that miscellaneous charges remain in a posted pending status until the account is billed. STEP 8 -Upon return from the Test Coordinator -verify that the balances on the accounts are increased by the amount of the miscellaneous charge and that the miscellaneous charge is reflected as a transaction on the Combined History Inquiry Screen 09/01/9R 2 RESULTS TO EXPECT: Both system generated and manually entered Miscellaneous Charges are reflected on the listing report. Both system generated and manually entered Miscellaneous Charges are reflected on the posting report The Miscellaneous Charge transaction is reflected in pending as status T after posting is completed and prior to update. Miscellaneous Charge transactions appear on the combined history screen and the account balance has been updated to include the amounts charged. Fimmci:il Test ScriotF401.doc 09/01/98 3 APPLICATION TEST SCRIPT CATEGORY:MISCELLANEOUS CHARGES · -SUBCATEGORY: MISCELLANEOUS CHARGE ENTRY TASK: MISCELLANEOUS CHARGE ENTRY, LIST & POST SCRIPT NO. F401 RESULTS: _____ .PASS 4 of4 ___ FAIL Less than 4 IfFAIL, check of the Severity Code level: ___ 1 Defect causes system crash and impedes all production and development. Requires immediate correction. ___ 2 Defect causes failure of application function. Correction required before go-live. ___ 3 Defect causes incorrect action or result to occur, but the application continues to operate. Correction required before go-live. ___ 4 Defect is cosmetic in nature, and may be corrected after go-live. IDENTIFY THE SCREEN ON WHICH THE FAIL URE IS DISPLAYED BY NAME AND NUMBER. ATIACH A COPY OF THE SUPPORTING DOCUMENTATION. COMMENTS: For any test that does not meet the expected results exactly, describe the failure in the comments area. Date Test Performed __ / __ / __ Tester's signature: ______________________ _ HT E Project Manager's Signature _________________ _ Fimmcial Test ScriotF401.doc 09/01/98 4 TASK# 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CITY OF FRIENDSWOOD TRANSITION PLAN RESOURCE DATE TASK DESCRIPTION ASSIGNED ASSIGNED TWO WEEKS BEFORE: Verify any outstanding billing issues have been resolved Verify bill forms are on site Verify resources are assigned Verify parallel testing is complete Verify mods/interfaces are complete & tested(if applicable) Identify a date of closure for public access and ensure customer notification(if applicable) Verify meter reading schedule with any necessary changes due to changes in billing methodology Ensure last conversion has been completed, reviewed and documented Review go-live list Obtain list of phone numbers for key personnel Establish when all interruption of services will be placed on hold Review and update post go live list of tasks Establish a process to collect manual work that will be entered upon completion of final conversion ONE WEEK BEFORE: Verify any outstanding billing issues have been resolved Review meter reading schedule and plan which routes will be downloaded prior to/after conversion(if applicable) Confirm that mods & interfaces are complete(if applicable) Ensure that billing (through bill print) is working correctly Last day to open any work orders Page 1 1/25/99 DATE COMPLETED COMMENTS TASK# 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 CITY OF FRIENDSWOOD TRANSITION PLAN RESOURCE DATE TASK DESCRIPTION ASSIGNED ASSIGNED THREE DAYS BEFORE: Plan/schedule with MIS for inquiry only mode for day of conversion Plan/schedule with MIS for close out on current system and cut of final tape for conversion Verify that latest PTF's for O/S 400 and NS 400 are loaded Confirm withFriendswood's Conversion Programmer and HTE's Conversion Programmer on call status during conversion Ensure that HTE Project Manager and Trainer are scheduled for on-site visit during go-live Verify any outstanding issues that will prevent billing are resolved Ensure that printer setup is correct for bill printing Verify connectivity to all remote locations-if applicable Meet with resources to schedule and make assignments to verify final conversion Identify cycle/routes to be downloaded for read after final conversion(if applicable) Schedule entry of all manual transactions TWO DAYS BEFORE: Verify any outstanding billing issues have been resolved Verify all tasks assigned and status thereof Obtain.time table from MIS for day of final conversion Last day for meter reading uploads/download Last day to complete all open work orders Ensure all reverse pay items are completed Establish and confirm cut off time for all customer payments and adjustments Page 2 1/25/99 DATE COMPLETED COMMENTS TASK# 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 CITY OF FRIENDSWOOD TRANSITION PLAN RESOURCE DATE TASK DESCRIPTION ASSIGNED ASSIGNED One day before: Verify any outstanding billing issues have been resolved Double check that the most recent PTF's for the OS/400 and AS400 have been loaded Environments can be reduced to two or the appropriate number for ongoing testing and/or training Confirm that project is on track for final conversion CONVERSION DAY: Verify any outstanding billing issues have been resolved Confirm time for current system to be in inquiry mode only Confirm cash entry cut off time Recheck manual transaction gathering process Complete full back up of current system Obtain authorization from Friendswood and HTE Project Managers to proceed with conversion HTE Project Manager will call the conversion programmer and authorize conversion to begin Friendswood conversion personnel will monitor conversion to completion HTE conversion personnel will monitor conversion to completion Verify emergency/contact phone numbers for the following: Paulette Mire H.T.E Trainer Lynn Bucher Verify appropriate personnel from HTE and Friendswood have assess to conversion site if required Page 3 1/25/99 DATE COMPLETED COMMENTS TASK# 53 54 55 56 57 58 59 60 61 62 TASK DESCRIPTION UPON COMPLETION OF CONVERSION Notify key personnel to reconvene at conversion site within a two hour window Verify final conversion and sign Balancing document Complete all conversion documents Begin entry of all manual transactions Begin entry of Post go-live tasks Ensure down load for meter reading Perform update/NO BILL 1st Day Live CITY OF FRIENDSWOOD TRANSITION PLAN RESOURCE DATE ASSIGNED ASSIGNED Review update reports i.e. billing register, printed bills, etc. Submit a cycle for billing Report any outstanding issues to HTE Page 4 1/25/99 DATE COMPLETED COMMENTS