Loading...
HomeMy WebLinkAboutGalveston County HMP_Appendices_APA2022 Multi-Jurisdictional2022 Multi-Jurisdictional Hazard Mitigation PlanHazard Mitigation Plan Galveston County Appendices May 2022 Appendix A. Adoption Resolutions Galveston County, TX | Hazard Mitigation Plan A-1 2022 Update APPENDIX A. ADOPTION RESOLUTIONS Galveston County adoption resolution will be included in this appendix upon receipt of the Federal Emergency Management Agency (FEMA) Approval Pending Adoption (APA) status. This appendix also includes an example resolution to be submitted by Galveston County authorizing adoption of the Galveston County Hazard Mitigation Plan Update. Appendix A. Adoption Resolutions Galveston County, TX | Hazard Mitigation Plan A-2 2022 Update RESOLUTION NO. XXXX-XX A RESOLUTION OF THE Governing Body OF THE Jurisdiction Name AUTHORIZING THE ADOPTION OF THE 2022 GALVESTON COUNTY, TX HAZARD MITIGATION PLAN UPDATE WHEREAS, all jurisdictions within Galveston County, Texas have exposure to natural hazards that increase the risk to life, property, environment, and the County and local economy; and WHEREAS; pro-active mitigation of known hazards before a disaster event can reduce or eliminate long-term risk to life and property; and WHEREAS, The Disaster Mitigation Act of 2000 (Public Law 106-390) established new requirements for pre and post disaster hazard mitigation programs; and WHEREAS; a coalition of Galveston County municipalities with like planning objectives has been formed to pool resources and create consistent mitigation strategies within Galveston; and WHEREAS, the coalition has completed a planning process that engages the public, assesses the risk and vulnerability to the impacts of natural hazards, develops a mitigation strategy consistent with a set of uniform goals and objectives, and creates a plan for implementing, evaluating and revising this strategy; NOW, THEREFORE, BE IT RESOLVED that the [jurisdiction name]: 1) Adopts in its entirety, the 2022 Galveston County, TX Hazard Mitigation Plan Update (the “Plan”) as the jurisdiction’s Natural Hazard Mitigation Plan and resolves to execute the actions identified in the Plan that pertain to this jurisdiction. 2) Will use the adopted and approved portions of the Plan to guide pre - and post-disaster mitigation of the hazards identified. 3) Will coordinate the strategies identified in the Plan with other planning programs and mechanisms under its jurisdictional authority. 4) Will continue its support of the Mitigation Planning Committee as described within the Plan. 5) Will help to promote and support the mitigation successes of all participants in this Plan. 6) Will incorporate mitigation planning as an integral component of government and partner operations. 7) Will provide an update of the Plan in conjunction with the County no less than every five years. PASSED AND ADOPTED on this Xst, Xnd, Xrd, Xth day of MONTH, YEAR, by the following vote: AYES: NOES: Appendix A. Adoption Resolutions Galveston County, TX | Hazard Mitigation Plan A-3 2022 Update ABSENT: ABSTAIN: ______________________________ Mayor, Town/Village of _____________ ATTEST: _________________________ Clerk, Town/Village of ________ Appendix B. PARTICIPATION MATRIX Galveston County, TX | Hazard Mitigation Plan B-1 2022 Update APPENDIX B. PARTICIPATION MATRIX The matrix in Appendix B is intended to give a broad overview of FEMA, the State of Texas, county, municipal and stakeholder personnel that participated in the Galveston County HMP update planning process. Meeting attendees and input provided are also included. All participants were encouraged to attend the kick-off meeting and mitigation workshop. During the planning process the consultant contacted each participant to offer support, explain the process, and facilitate the submittal and review of critical documents. The participating jurisdictions agreed to abide by the Planning Partner Expectations and Planning Committee Guidelines which established a Steering Committee. The Steering Committee served as the core of the working group. Participation is defined as having input to the hazard analysis (providing critical facility, hazard event, vulnerability data), and as having participated in the mitigation workshop or alternate annex meetings as described in the HMP for the purpose of creating a mitigation strategy to be included in each municipalities annex in Section 9. A list of participating jurisdictions and representatives is found in Table B-1. A number of stakeholders were invited to participate in the planning process. Stakeholders were invited to meetings, asked to complete a stakeholder survey, requested to provide input on their involvement in Galveston County, and review and comment on the draft plan. However, due to the limitations on participation posed by the pandemic starting in 2020 and the strains on time and resources for many local governments and other community organizations, participation of stakeholders at the municipal level was limited. In accordance with FEMA guiding principles for inclusive participation at various levels, the planning team will place a high priority on an expanded effort on stakeholder participation with local planning committees in future plan updates. A list of stakeholders and their participation is found in Table B-2. A Strengths, Weakness, Obstacles and Opportunities exercise (SWOO) was completed by the planning partnership. Participants were asked to fill out the SWOO for each of the hazards of concern for the 2022 HMP update. The results were compiled and presented to the planning partnership at the risk assessment presentation. The results were also used by the participants to help identify capabilities and potential mitigation actions. The results from this activity are found in Table B-3. In preparation for the draft plan public review, each jurisdiction was asked to have their ‘mitigation team’ review their annex to ensure it was complete and accurate for posting to the Galveston County Office of Emergency Management website. APPENDIX B: PARTICIPATION MATRIX Galveston County, TX | Hazard Mitigation Plan B-2 2022 Update Table B-1. Participation Matrix Jurisdiction Name Title / Position Attended Pre-Kick Off Meeting Attended SC #1 (9/16/21) Attended PP #1 (9/28/21) Attended SC #2 (11/18/21) Attended Risk Assessment (12/21/21) Attended MAW (12/2/21) Attended Draft Plan Presentation (1/25/22) Feedback Provided? Steering Committee Member Designated Project Point of Contact Galveston County James Gentile Director of Contract Services, County Contract Services X X X X Galveston County Julie Diaz Director, Parks and Cultural Services X X Galveston County Laura Norman Deputy Emergency Management Coordinator X X X X X X X X X Galveston County Lee Crowder Road Administrator, County Roads and Bridges X X X X X Galveston County Martha Lee Assistant Director, Parks and Cultural Services X X X X X Galveston County Michael Shannon County Engineer, Engineering & Right of Way X X X X X Galveston County Randy Valcin Director of Public Health Surveillance, Galveston County Health District X X Galveston County William Riordan Facilities Director, County Facilities X X X Galveston County Scott Tafuri Emergency Management Coordinator X X X Galveston County Joey Brower Homeland Security Planner X X Galveston County Alyssa Young Finance/Administration Coordinator X X Bayou Vista (C) Jimmie Gillane Emergency Management Coordinator X X Bayou Vista (C) John Bocquet Police Sargent X X Bayou Vista (C) Russel Buhler Building Inspector X Clear Lake Shores (C) Brent Spiers City Admin/EMC X X X X Clear Lake Shores (C) Kevin Harrell Building Official X X Dickinson (C) Greg Trantham Co-Emergency Mgt Coordinator X X X X Dickinson (C) Derek Hunt Co-Emergency Mgt Coordinator X X X Dickinson (C) Selmer Ray Burgess, CBO, CFM Building Official X Friendswood (C) Steven Simmons Deputy Fire Marshal X X X X X Friendswood (C) Niki Bender X X APPENDIX B: PARTICIPATION MATRIX Galveston County, TX | Hazard Mitigation Plan B-3 2022 Update Jurisdiction Name Title / Position Attended Pre-Kick Off Meeting Attended SC #1 (9/16/21) Attended PP #1 (9/28/21) Attended SC #2 (11/18/21) Attended Risk Assessment (12/21/21) Attended MAW (12/2/21) Attended Draft Plan Presentation (1/25/22) Feedback Provided? Steering Committee Member Designated Project Point of Contact Friendswood (C) Brian Rouane Building Official X Hitchcock (C) Arnie Cross Director of Community Development X Hitchcock (C) Wilmon Smith Police Chief X X X Hitchcock (C) Jeff Evans Police Captain X X Hitchcock (C) Ruth Ann Sorrell City Secretary X Hitchcock (C) Leroy Thomas Public Works X Jamaica Beach (C) Brad Heiman Police Chief X X Jamaica Beach (C) Ana Mondragon Director of Operations X X X X Kemah (C) Walter Gant Emergency Management Coordinator X X La Marque (C) Kyle Hunter Emergency Management X X X X League City (C) Ryan Edghill Emergency Management X X X X X X League City (C) Kristin Gauthier Emergency Management X X X League City (C) Kris Carpenter Planning Manager X Santa Fe (C) Bobby Shores Police Captain X X X X Santa Fe (C) Butch Pean Detective X X Tiki Island (V) Graham George Emergency Management Coordinator X X Tiki Island (V) Steven Broussard Emergency Management Coordinator X X APPENDIX B: PARTICIPATION MATRIX Galveston County, TX | Hazard Mitigation Plan B-4 2022 Update Table B-2. Stakeholder Participation Matrix Organization/Title Stakeholder Type Notified of Planning Process Invited to Meetings Attended Meetings Invited to Take Survey Completed Survey Notified of Posting of Draft Plan Clear Creek Independent School District Academic X X X X X Dickinson Independent School District Academic X X X X X X Friendswood Independent School District Academic X X X X Galveston College Academic X X X X Galveston Independent School District Academic X X X X High Island Independent School District Academic X X X X Hitchcock Independent School District Academic X X X X Santa Fe Independent School District Academic X X X X Texas A&M University at Galveston Academic X X X X X Texas City Independent School District Academic X X X X X University of Texas Medical Branch Academic X X X X Port of Galveston Business/Commerce X X X X Port of Texas City Business/Commerce X X X X Galveston County Emergency Communications District Emergency Services X X X X Galveston County Emergency Communications District #2 Emergency Services X X X X X X Port of Texas City Security Council Emergency Services X X X X San Leon Volunteer Fire Department Emergency Services X X X X Santa Fe Fire and Rescue Emergency Services X X X X X NWS Federal Government X X X X X X NOAA Federal Government X X X X TX DOT Highway/DPW X X X X Galveston County Health District Hospital/Health Care X X X X X X APPENDIX B: PARTICIPATION MATRIX Galveston County, TX | Hazard Mitigation Plan B-5 2022 Update Organization/Title Stakeholder Type Notified of Planning Process Invited to Meetings Attended Meetings Invited to Take Survey Completed Survey Notified of Posting of Draft Plan Gulf Coast Center Hospital/Health Care X X X X X X Brazoria County Neighbor X X X X Chambers County Neighbor X X X X Harris County OEM Neighbor X X X X Bolivar Peninsula Special Utility District Utilities X X X X X X Gulf Coast Water Authority Utilities X X X X Galveston County Water Control and Improvement District #1 Utilities X X X X X X Galveston County Water Control and Improvement District #19 Utilities X X X X Table B-3. Strengths, Weaknesses, Opportunities, and Obstacles Exercise Hazard Strengths Weaknesses Obstacles Opportunities Erosion (Coastal and Inland) • Long History of grant programs and awards to identify off shore sand sources. • The inland portion of the County is not susceptible to coastal erosion. Beach replenishment programs are routinely undertaken by coastal communities. • R&B performs maintenance on lateral drainage ditches, rip rap erosion control shoreline, all weather roads. • Based on my experience, there is a spirit of cooperation and partnership between units of government. • Bulkhead Ordinance in force. • Construct an engineer beach and dune • Any community along the Gulf or Bay is vulnerable. • R&B continues to build or maintain roads in areas regularly inundated by tide water. • Based on my limited experience, evacuation tracking and tracing. Though my city does not have an issue with this, others do and I hear about it frequently. • No routine visible inspections of all bulkheads are actually performed. Most are complaint based or noticed while an • Funding, permitting, financing. • Private property owners need access to private property. • Lack of interest by some partners, an attitude of malaise. There are many residents and partners who benchmark all storm events (what we seem to focus on) to those past. They say, "It's not like Ike" or "we rode it out last time" or "I left and nothing happened , I won't do that again." Persistent messaging, concise information, not overloading • Protect the evacuation route of Bolivar Peninsula • The time is now to sharpen your ax, not when you need to use it. Time hinders and time prepares. Need to utilize our preparation and planning process, now in the 'off-season' in prep for what may be coming. APPENDIX B: PARTICIPATION MATRIX Galveston County, TX | Hazard Mitigation Plan B-6 2022 Update Hazard Strengths Weaknesses Obstacles Opportunities inspection of something else is being performed. folks too early is a concern of mine. Dam/Levee Failure • Excellent maintained hurricane and seawall system • R&B performs excellent maintenance of Federal sponsored levee projects, i.e. TC LM Hurricane Protection Levee, Galveston Seawall. • Age of some equipment, needs update. • Most of the County, none. Texas City is the most vulnerable. • Limited level of protection of the levee or seawall • I wonder about inspections of facilities and possible encroachments. • Funding • Financial, cost to improve the current project. • Public officials not interested in taxing the public for infrastructure improvements. • Provide better response to events. • Education , communication of levee capabilities, warning systems etc. • Opportunities to educate public and private on the importance of this and the affect it has on other communities not immediately protected - that consideration should weigh heavily in the decision process. Drought • The County averages high rainfall rates and high humidity during the year. • R&B has the opportunity to provide increase maintenance on lateral ditches and storm-water system. • We message a lot based on NWS and other official sources. • Water Conservation rules. • Start a program for the desalinization of seawater, store more surface water • The region is susceptible to drought. • Soil disturbance during construction • Funding, permitting, regulatory etc. • Construction maintenance is needed for proper functioning drainage system. • Convincing people that green grass or clean dust-free car vs drinking water should not be considered a choice. • Reduce dependency on surface water, and demand on Brazos River.? • To conserve or reserve storm water in drainage ponds or reservoirs. • Education, when needed. Expansive Soils • Engineer to build in known conditions • Modern construction techniques help to limit foundation damage due to soil movement. • Many older structures are prone to foundation damage. Extreme rainfall followed by dry spells can cause issues. • Adoption of more stringent codes causes higher building costs. • Explain what this is and how it could impact me or my city. Extreme Temperature • Available shelters • Residents are well adapted to the regions heat and have ample places to go to cool off, such as the beach. • Messaging and early communication. • Can't provide shelters for 100% of population • Winter weather can wreak havoc on the state's power grid causing cascade failures within infrastructure systems. Buildings are poorly insulated for cold weather within the region. • Lack of public buy in as it being a real issue (extreme weather winter storm Uri changed perceptions earlier this year) • Financial • Winterization of infrastructure can be expensive. • Energy consumption is increased in either event. Something outside the purview of most cities, as they are not providers. • Emergency generators at public facilities • Public support for better winterization is at an all-time high due to the 2021 freeze. • Education of public, providing possible solutions to survival if power is lost, importance of preparation. APPENDIX B: PARTICIPATION MATRIX Galveston County, TX | Hazard Mitigation Plan B-7 2022 Update Hazard Strengths Weaknesses Obstacles Opportunities Expansive Soils • Engineer to build in known conditions • Modern construction techniques help to limit foundation damage due to soil movement. • Many older structures are prone to foundation damage. Extreme rainfall followed by dry spells can cause issues. • Adoption of more stringent codes causes higher building costs. • Explain what this is and how it could impact me or my city. Flood • Developing a master drainage plan. • Communities within the county are well equipped to respond to floods. • Early messaging, accurate forecasting, public and private partners that understand • CFR program and building codes • Low lying coastal elevations, subsidence, and conflicts • The region is prone to flooding. Many new buyers seem to ignore floodplains and don't purchase insurance. • You cannot change elevation of coastal communities. • Funding, environmental, geographical • Flood control is very expensive and often requires the purchase of residential homes. • My city is in the direct line of storm water run-off from Houston and others located upstream on clear creek watershed. Their concern is getting water quickly to the drain and flowing into the receiving waters. We have the same issue but are heavily influenced by not only our own water but that comes from others and impacts our ability to drain. • Proactive engineering strategies • Public interest in flood control is high following Harvey and federal funding is available through various mitigation grants. • Improved seawall/bulkhead construction techniques. Having upstream designers consider impacts on those downstream, with increased flows, velocity and delivery. Hail • N/A • N/A • N/A • Keep sending the message Hurricane/ Tropical Storm • Strong EOC, planning, staff, experienced response • Most jurisdictions within the County have planned and prepared for hurricane response with experience through various storms. • Early forecasting, good predictions, early season preparation for citizens to prepare • Constant community contact and updates through a community call out system. • Communication with public • There has been turnover within several jurisdictions which will cause a learning curve for staff. • Apathy on part of some in population, inability to make messages meaningful to them, resistance by some in public to take things seriously. • Citizens who won't heed the warnings or advice. • Geography, education • Financing and support for EM programs during slow periods. • Comparisons to other storms and a prevailing attitude of "I'm staying, I stayed for Rita/Harvey/Ike/etc. And I lived." Too bad there is no one who could speak from Bolivar when it was wiped clean and many lives lost. • Social media, news media, volunteer programs • Harvey, the Winter Storm, and other events have occurred recently which cause support for various preparedness initiatives. • Education, Preparation, Execution for all county and state partners. Continued partnership meetings and updates, this is our consistent event that we plan for annually. Continued public messaging and alerts that are of substantive importance to the public. APPENDIX B: PARTICIPATION MATRIX Galveston County, TX | Hazard Mitigation Plan B-8 2022 Update Hazard Strengths Weaknesses Obstacles Opportunities Land Subsidence • GHSD to permit water wells, monitor water levels and control discharges • The regional subsidence district tracks ground water usage and issues permits only as necessary. • Permit the departments ground water wells. • Establishing a district and working to advocate subsidence issues. • Increased need for water • Disruptions in surface water can cause increased pumping on water wells. • Most people are unaware of the existence of the district and issues it champions. • Regulatory, geographical, environmental, financial • Usage of water wells can be difficult to enforce or monitor. • Environmental, financial • It is a multi-faceted problem and relies on many specialized disciplines to identify root causes and formulate solutions. Water pumping from commercial, public and private water wells, coastal erosion, geologic formations, commercial extraction activities, weather can play a role, and help find an answer. Liability is a concern and they are • Restrict or limit use of ground water • To better understand the program, and identify feasible solutions. Lightning • Building codes and engineering to ground strikes. • New technology allows for rapid messaging by the NWS. • Lightning tracking through NWS and good forecasting based on storm behavior. • Structures built before newer codes • Regulatory, financial • N/A Pandemic • Recently provided a response, UTMB • Local jurisdictions are very aware of pandemic protocols due to COVID-19. • A county health department and emergency management team that took control and did a FANTASTIC job offering COVID shots that were timely, easy to get and convenient. Figuring that out 'on-the-fly' was a huge task. Many hours devoted and many lives saved. I was not a proponent of the vaccine, but when I decided to get my two • Communication • The Health District does not communicate well with local jurisdictions. • Environmental, financial • Political will for pandemic control measures can fade quickly. • Changes above the local and state level. Mixed messages from federal government. Changes in approach and vulnerable populations. Vaccine availability, vaccine efficacy, and drug company numbers. An unrealistic accounting system of active, deaths, recovered, etc. People want information but sometimes too much is too • Assist UTMB • Better streamline updates and communications from the County to jurisdictions. • If it should come to pass again, dust off the plan, change the name and run again. I thought it was a good process/program. APPENDIX B: PARTICIPATION MATRIX Galveston County, TX | Hazard Mitigation Plan B-9 2022 Update Hazard Strengths Weaknesses Obstacles Opportunities shots I got them at the Walter Hall drive-through. No complaints were heard from those working and putting the time and effort. I'm sure there was challenges and grumbling but the strength of promoting a unified and professional image went a long way with everyone who witnessed. • Community outreach and communication including prohibiting gatherings and entry to city owned facilities without proper PPE procedures. much and it fuels a lot of fear and anxiety. Severe Winter Weather • With the February 2021 winter storm, locals have a better idea of what to expect. • Provide response to icing road conditions, including traffic control and sanding bridges. • We had adequate warning that the storm and cold front were approaching based on temperatures experienced behind the front. NWS did a fine job. • Community outreach and communication. • The power grid and critical infrastructure is still susceptible to extreme cold. • Low experience for operators in icing conditions. • Not prepared for something that we've not seen. • Citizens who don't need advice • Winterizing all facilities and infrastructure can be costly. • Rare opportunities to respond and contribute to these conditions. • Energy delivery, that is outside our purview and control. ERCOT issues, outside our control. Aging Electrical Infrastructure - outside our control. Building methods don't adequately cover cold events. • Open mitigation funding for potential projects. • Improve planning, exercise winter weather procedures, test equipment • Improve building methods and codes to include insulation against extreme cold. Exposed water lines, sprinklers and the like do fine in extreme hot weather - not the same during a cold event. Tornado • Many of the planning and preparedness measures for tornado's are the same for other types of incidents. The region tends to have weak and short lived tornadoes when compared to others. • Already built to windstorm requirements in most cases. NWS is doing great job. • Community outreach and communication. • Many in the region associate warning sirens with chemical emergencies. • Older structures may be lacking adequate structural support and materials to withstand impacts and high winds. • Already build out to Hurricane force winds. Tornados are less likely (in most people's minds) and don't get the same attention, preparation or warning. • Educate persons specifically to the dangers of tornados and when they can be expected and how quickly the develop. Tsunami • Many of the digital warning systems could also be used for Tsunamis • The region does not prepare for or communicate tsunami dangers to the public. • Tsunamis are seen as low risk or unlikely on the Gulf Coast. Siren systems for • N/A APPENDIX B: PARTICIPATION MATRIX Galveston County, TX | Hazard Mitigation Plan B-10 2022 Update Hazard Strengths Weaknesses Obstacles Opportunities beach and bay communities would be expensive. • Convincing people it could happen here. Utility Failure • Communities maintain backup generators for critical facilities and many have standby contracts to obtain additional equipment. • Using generators on residential homes, large building and municipal/public safety buildings. Quick reporting. Responsive utilities with information available to public via internet or app. • Large grid failures can make it difficult to obtain additional equipment. • Most people can't afford a generator set-up or two-three days without power. Consumers have some unrealistic expectations. • Spare generators are expensive to maintain. • Education. • Open mitigation grant opportunities. • Educating public on processes and efforts to restore. Wildfire • County wide, mutual aid agreements allow for responses to larger fires. The region has a low risk of wildfire due to typically high humidity levels, high annual rainfall, and urbanization. • Local fire departments do not have a lot of experience in responding to large urban- wildland interface fires. • N/A • N/A Wind Storms • The region has a lot of experience in planning for and responding to windstorms. • NWS does a great forecasting job. We are used to the potential hurricane and the winds it may bring. • Community outreach and communication. Building code adherence. • N/A • Sometimes with extended anticipation, interest wanes and people discount the importance of the message. • Education of public. I think it is an on-going issue and one we cannot simply discount. APPENDIX C. MEETING DOCUMENTATION Galveston County, TX | Hazard Mitigation Plan C-1 2022 Update APPENDIX C. MEETING DOCUMENTATION Appendix C includes meeting agendas, sign-in sheets and minutes (where applicable and available) for meetings convened during the development of the Galveston County Hazard Mitigation Plan 2022 Update. Galveston County, TX Hazard Mitigation Plan 2022 Update Steering Committee Meeting #1 September 16, 2021 | 1:00 pm CT Planning Partnership Meeting #1 | Agenda PAGE | 1 Virtual Meeting Join by Computer: https://bit.ly/3zeJyR1 Or Dial-in Number (toll): 832-856-3579 | Conference ID: 984 648 808# 1. Welcome and Introductions 2. In-Kind Services Tracking 3. Benefits of Hazard Mitigation and Overview • Purpose and expected outcomes of the Hazard Mitigation Plan • 2022 enhancements 4. Project Organization • Key Agencies • Municipal Participants • Stakeholders 5. Steering Committee Roles and Responsibilities 6. Public and Stakeholder Outreach • Strategy – press releases, social media posts, capture of miscellaneous outreach, HMP website • Tracking 7. Data Collection Status 8. Hazards of Concern Identification 9. Critical Facilities and Lifelines 10. Goals and Objectives 11. Schedule • Overview and Milestones • Meeting Schedule 12. Questions / Wrap-Up Galveston County, TX Hazard Mitigation Plan 2022 Update Steering Committee Meeting #1 September 16, 2021 | 1:00 pm CT Steering Committee Meeting #1 | Minutes PAGE | 1 Purpose of Meeting: Steering Committee Meeting #1 Location of Meeting: Microsoft Teams Date/Time of Meeting: September 16, 2021 – 1:00 pm to 2:00 pm Attendees: ☒ Laura Norman, County OEM ☒ Michael Shannon, County Engineer ☒ Lee Crowder, County Roads and Bridges ☒ Martha Lee, County Parks ☒ Will Riordan, County Facilities ☐ James Gentile, County Contract Services ☐ Julie Diaz, County Parks & Cultural Services ☐ Randy Valcin, County Health ☒ Heather Apgar, Tetra Tech ☒ Kate Long, Tetra Tech Agenda Summary: Introduce Steering Committee to the HMP update process, discuss mitigation planning, project organization, roles and responsibilities, data collection, hazards of concern, and schedule of plan. Item No. Description Action By: 1. Welcome and Introductions • Tetra Tech started the meeting by introducing themselves and asking everyone to document their attendance in the meeting chat and introduce themselves. N/A 2. In-Kind Tracking • With this being a federally-funded project, the County is responsible to match their share of the grant. In order to do, we are asking each of you to track your time spent working on the HMP. • We will provide several tools to use to help you keep track of your time. This includes attending meetings, completing surveys, filling out worksheets, etc. Steering Committee to keep track of time; Tt will provide tools to do so 3. Benefits of Hazard Mitigation and Overview • Hazard mitigation is part of the emergency management cycle – it’s any sustained action(s) taken to reduce or eliminate long-term risk to life and property from hazards. • This is the required 5-year update to the 2017 HMP; participating and adopting the HMP allows you to remain eligible for FEMA pre- and post-disaster mitigation funding. • 2022 Update enhancements – annex approach and will work with the County and participating municipalities to create/update their chapter of the plan. N/A 4. CRS Integration • Several municipalities participate in the CRS program; therefore, to help those municipalities, the HMP update will follow both FEMA requirements and the CRS Coordinator’s Manual. N/A 5. Project Organization and Overview • Steering Committee – responsible for providing guidance and leadership throughout the planning process; oversee the planning process and act as points of contact for the municipalities and stakeholders. • Planning Partnership – made up of the Steering Committee and participating municipalities • Stakeholders - play an important role in the planning process; help us learn about more specific topics and provide input from their points of view Tt to send the list of stakeholders to the Steering Committee for their review and comment 6. Public and Stakeholder Outreach • Public outreach is a key element in the HMP process and one of the requirements of the planning process. Tt will send social media text and graphics to the Galveston County, TX Hazard Mitigation Plan 2022 Update Steering Committee Meeting #1 September 16, 2021 | 1:00 pm CT Steering Committee Meeting #1 | Minutes PAGE | 2 • Tetra Tech will be sending social media text and graphics to the Steering Committee to post on their websites and social media accounts. Steering Committee 7. Project Scope • Risk Assessment • Capabilities • Mitigation Strategy • Other Sections of HMP • Submit to TDEM for review/comment • Submit to FEMA for review/comment/approval • Plan adoption • Implement the plan N/A 8. Hazards of Concern Identification • The list of hazards from the last plan was presented to the Steering Committee and then the list of suggested hazards for the 2022 update. Tetra Tech will develop a survey to collect input from the Committee to finalize the list of hazards of concern. Tt to send hazard of concern survey; Steering Committee to complete by 10/1/21 • 2022 proposed hazards: o Flood (Coastal and Inland) o Drought o Hurricane/Tropical Storm o Extreme Temperature (Heat and Cold) o Tornado o Windstorm o Hailstorm o Wildfire (Urban and Rural) o Dam/Levee Failure o Severe Winter Weather o Coastal and Inland Erosion o Expansive Soils o Lightning o Land Subsidence o Tsunami o Pandemic o Utility Failure 9. Critical Facilities and Lifelines • Tetra Tech asked the Steering Committee what types of facilities should we include as critical facilities. Once the critical facility list is put together, the Committee will be asked to review and add facilities as needed. Steering Committee to review critical facility lists after Tt sends out. 10. Goals and Objectives • The Steering Committee will need to review the goals and objectives from the 2017 HMP and update as needed. Tetra Tech will send out a survey to collect input and finalize the goals and objectives for the 2022 update. Tt to send goals and objectives survey; Steering Committee to complete survey by 10/1/21 8. Schedule • Organize resources now through late-September 2021 • Risk assessment October-November 2021 • Mitigation strategy – December 2021 • Maintenance strategy – December 2021 • Public draft (14 days public review period) early January 2022 • TDEM – mid-January 2022 • FEMA – mid-February 2022 • Adoption – late-March 2022 N/A 9. Questions/Wrap Up N/A 9/16/2021 1 Galveston County, Texas Hazard Mitigation Plan – 2022 Update Steering Committee Kick-Off Meeting | September 16, 2021 Agenda •Welcome and Introductions •In-Kind Services Tracking •Benefits of Hazard Mitigation •Hazard Mitigation Planning Overview •Project Organization •Steering Committee Responsibilities •Public and Stakeholder Outreach •Update Hazards of Concern and Risk Assessment •Critical Facilities and Lifelines •Goals and Objectives •Schedule •Questions/Next Steps/Wrap Up 3 2 3 9/16/2021 2 Introductions •Tell us… What’s your name? Where you are from? What is your mitigation experience? What do you want to focus on during this process or what is your area of expertise? What are your resilience concerns for Galveston County? 4 In-Kind Tracking 5 4 5 9/16/2021 3 Hazard Mitigation – What is it? Mitigation is a sustained action taken to reduce or eliminate long-term risk to life and property from a hazard event -or- Any action taken to reduce future disaster losses 6 “provides the blueprint for reducing the potential losses identified in the risk assessment, based on existing authorities, policies, programs and resources, and local ability…” (CFR). “provides the blueprint for reducing the potential losses identified in the risk assessment, based on existing authorities, policies, programs and resources, and local ability…” (CFR). Prepare / Prevent ResponseRecovery Mitigation Event Hazard Mitigation Works! •According to the January 2019 National Institute of Building Sciences Natural Hazard Mitigation Saves: 2018 Interim Report, federal mitigation grants save $6 for every $1 spent! 7 6 7 9/16/2021 4 Why Update? •The mitigation plan update will: Help the County prepare for and mitigate the effects of disasters Continue to allow the County and participating partners to be eligible for pre- and post-disaster mitigation funding Support CRS participation/rating of municipalities 8 Hazard Losses (1950 – May 2021) Coastal Flood $700,000 Drought $1 million (property) $109.6 million (crop) Excessive Temperature - Flash Flood $10+ billion (property) $10,000 (crop) Hail $3.023 million High Wind $20,000 Hurricane/Tropical Storm $1.258 billion Lightning $3.529 million Thunderstorm $53.133 million (property) $8,500 (crop) Tornado/Funnel Cloud $36.212 million Wildfire $0 Winter Storm (Cold/Wind Chill) $12 million TOTAL $11,367,617,000 (property) $109,618,500 (crop) Source: NOAA-NCEI 2021 What’s at Risk? •FEMA Disaster Declarations 9 8 9 9/16/2021 5 CRS Integration •HMPs qualify for CRS points as “Floodplain Management Plans” through Activity 510 •To achieve a Class 4, specific outreach requirements inActivity 510 must be met •Tetra Tech will structure and document meetings to meet prerequisites for CRS Class 4 and achieve as many points as possible through Activity 510. We will also work with the communities to help them throughout the process. •Communities still need to meet the other Class 4 prerequisites (e.g., watershed management plan, Activity 610) and present the documentation of participation during individual verifications to meet Class 4. •All meetings must be open to the public •All meetings must be publicized and documented on theCounty’s website 10 CRS Communities: •Dickinson – Class 8 •Friendswood – Class 7 •Jamaica Beach – Class 8 •Kemah – Class 8 •League City – Class 5 •Tiki Island – Class 7 Meeting Name CRS Step Steering Committee Kick-Off - Planning Partnership Kick-Off - Public Kick-Off Step 2 – held in floodprone areas within 2 months of partnership kick-off Risk Assessment Presentation and SWOO Step 4 – Asses the Hazard Step 5 – Assess the problem Goals and Objectives Meeting Step 6 – Set Goals Mitigation Strategy Workshop Step 7 – Review possible activities Plan Review Meeting Step 8 – Draft an action plan Project Organization 11 Steering Committee Planning Partnership All municipalities, Steering Committee members Stakeholders Texas Division of Emergency Management (TDEM) Core Planning Team Galveston County OEM Tetra Tech 10 11 9/16/2021 6 Steering Committee Roles and Responsibilities 12 PROVIDE GUIDANCE AND LEADERSHIP THROUGHOUT THE PLANNING PROCESS OVERSEE THE PLANNING PROCESS ACT AS THE POINT OF CONTACT FOR ALL PARTNERS AND STAKEHOLDERS Planning Process Overview 13 ImplementationPhase 1 Organize the Resources Phase 2 Risk Assessment Phase 3 Public Involvement Strategy Phase 4 Update Mitigation Strategy Phase 5 Update Maintenance Strategy Phase 6 Assemble the Plan Phase 7 Plan Review and Adoption Phase 8 Project Management Stakeholder and Public Input 12 13 9/16/2021 7 Project Scope 14 Risk Assessment Capability Assessment Mitigation Strategy Update Other Sections of HMP Submit HMP to TDEM and FEMA Adopt the HMP Implement the HMP Update Risk Assessment •Update assets •Examine previous impacts •Analyze risks •Review with Steering Committee and Planning Partnership •Risk assessment meeting – open to the public 15 14 15 9/16/2021 8 2016 Hazards of Concern •Flood (Coastal and Inland) •Drought •Hurricane/Tropical Storm •Extreme Heat •Tornado •Windstorm •Hailstorm •Wildfire (Urban and Rural) •Dam/Levee Failure •Severe Winter Weather •Coastal Erosion and Retreat •Expansive Soils •Lightning •Land Subsidence •Tsunami 16 Potential 2022 Hazards of Concern •Flood (Coastal and Inland) •Drought •Hurricane/Tropical Storm •Extreme Temperature (Heat and Cold) •Tornado •Windstorm •Hailstorm •Wildfire (Urban and Rural) •Dam/Levee Failure •Severe Winter Weather •Coastal Erosion and Retreat •Expansive Soils •Lightning •Land Subsidence •Tsunami •Pandemic •Utility Failure •Inland Erosion ? 17 16 17 9/16/2021 9 EXERCISE – Identifying Hazards of Concern •Looking at the hazards included in the 2017 plan… Have additional hazards impacted the County since 2017? Have hazard been mitigated and no longer cause damage? Should hazards be regrouped to align with the 2019 State HMP? Should additional hazards be included? •How have hazards affected the county? Where are your problem areas? •Quick survey! We will send around a quick online survey to get your input on the hazards of concern for the 2022 HMP – Stay tuned! 18 Community Lifelines •Review 2017 critical facility inventory to ensure complete •Crosswalk and identify lifelines Lifelines provide indispensable service that enables the continuous operation of critical business and government functions, and is critical to human health and safety, or economic security Critical Facilities are those facilities considered critical to the health and welfare of the population and that are especially important following a hazard. As defined for this HMP, critical facilities include essential facilities, transportation systems, lifeline utility systems, high-potential loss facilities, and hazardous material facilities. Essential facilities are a subset of critical facilities that include those facilities that are important to ensure a full recovery following the occurrence of a hazard event. For the County risk assessment, this category was defined to include police, fire, EMS, schools/colleges, shelters, senior facilities, and medical facilities. 19 18 19 9/16/2021 10 Community Lifelines •To be reviewed: Critical infrastructure Bus Stops Bus Routes EMS sites Fire departments Police departments Rail lines Roadways Healthcare Facilities Long Term Care Facilities Lakes/streams Trails Green Acres Open Space Parcels Parks Preserved Farms Recreation and Open Space Inventory (ROSI) Schools 20 Community Lifelines •What additional facilities and lifelines should we add? Types to consider: Utility locations – substations, pump stations, treatment plants Critical food establishments – food pantries, grocery stores, senior nutrition COVID-19 locations – testing and vaccination sites Others? 21 20 21 9/16/2021 11 Mitigation Strategy •Goals What outcomes do you want to achieve? •Actions What specific actions will be taken to reduce risk from hazards? •Action Plan How will the actions be prioritized and implemented? 22 Goals Actions Action Plan Goals and Objectives Review and Update 23 Goal 1: Minimize loss of life, injury, damage to property, the economy, and natural systems Objective 1.1: Protect the life, health and safety of residents Objective 1.2: Protect existing/new critical facilities and infrastructure Objective 1.3: Provide protection for future/existing developments Objective 1.4: Provide backup power to critical facilities/infrastructure Objective 1.5: Minimize impacts from all hazards Goal 2: Maintain and enhance emergency management/mitigation capabilities Objective 2.1: Update/develop plans, studies, and mapping for all hazards Objective 2.2: Incorporate/improve hazard mitigation strategies into ordinances, plans and polices Objective 2.3: Conduct/develop drills/training for all hazards Objective 2.4: Implement and maintain the Galveston County Multi‐Jurisdictional Hazard Mitigation Plan Objective 2.5: Participate in programs that promote hazard mitigation strategies Objective 2.6: Build, obtain, and maintain critical facilities and equipmentGoal 3: Maintain public education and awareness activities Objective 3.1: Expand Public Outreach Campaigns for all hazards Objective 3.2: Promote disaster preparedness planning for families 22 23 9/16/2021 12 Public and Stakeholder Outreach •Social Media Posts •Press Release •HMP website – will work with the County to set this up •Planning Partnership meetings open to the public •Stakeholder Survey •Public Survey •Neighboring County Outreach Notified of planning process Survey 24 Next Steps / Upcoming Schedule •Take online survey to update goals –to be distributed via email •Confirm access to OneDrive –access to be provided in separate email •Planning Partnership Kick-Off (Steering Committee and Municipalities) – September 29th •Steering Committee Meeting to discuss goals/objectives– mid-October •Risk Assessment Meeting – October/November (tentatively) •Mitigation Strategy Workshop – December (tentatively) 25 24 25 9/16/2021 13 Questions? 26 Galveston County Project Contacts Laura Norman, Deputy Emergency Management Coordinator (856) 307-7100 | dmcnulty@co.gloucester.nj.us Tetra Tech Project Contacts Heather Apgar, CFM, Project Manager (973) 630-8046 | heather.apgar@tetratech.com Kate Long, Lead Planner (607) 216-6901 | kate.long@tetratech.com Thank You! This Photo by Unknown Author is licensed under CC BY-SA 26 27 Galveston County, TX Hazard Mitigation Plan 2022 Update Planning Partnership Meeting #1 September 29, 2021 | 2:00 pm CT Planning Partnership Meeting #1 | Agenda PAGE | 1 Virtual Meeting Join by Computer: https://bit.ly/3hyYX8I Or Dial-in Number (toll): 832-856-3579 | Conference ID: 159 723 362# 1.Welcome and Introductions 2.In-Kind Services Tracking 3.Benefits of Hazard Mitigation and Overview Purpose and expected outcomes of the Hazard Mitigation Plan 2022 enhancements 4.Project Organization Key Agencies Municipal Participants Stakeholders 5.Public and Stakeholder Outreach Strategy – press releases, social media posts, capture of miscellaneous outreach, HMP website Tracking 6.Planning Partnership – Responsibilities and Expectations 7.Updating Annexes Mitigation Team Capability Assessment Community Lifelines Hazards of Concern Risk Assessment 8.Mitigation Strategy 9.Schedule Overview and Milestones 10.Questions / Wrap-Up Galveston County, TX Hazard Mitigation Plan 2022 Update Planning Partnership Meeting #1 September 29, 2021 | 2:00 pm CT Planning Partnertship Meeting #1 | Minutes PAGE | 1 Purpose of Meeting: Planning Partnership Meeting #1 Location of Meeting: Galveston County Office of Emergency Management/Microsoft Teams Date/Time of Meeting: September 29, 2021 – 2:00 pm to 3:00 pm Attendees: ☒Galveston County ☒ Bayou Vista (C) ☒ Clear Lake Shores (C) ☒ Dickinson (C) ☐ Friendswood (C) ☒ Hitchcock (C) ☐ Jamaica Beach (C) ☐ Kemah (C) ☒ La Marque (C) ☒ League City (C) ☒ Santa Fe (C) ☒ Tiki Island (V) ☒ Tetra Tech SEE SIGN-IN SHEET FOR NAMES Agenda Summary: Introduce Planning Partnership to the HMP update process, discuss mitigation planning, project organization, roles and responsibilities, data collection, hazards of concern, HMP update process and municipal worksheets, and schedule of plan. Item No. Description Action By: 1. Welcome and Introductions • Tetra Tech started the meeting by introducing themselves and asking everyone to document their in-person attendance on the provided sign-in sheets. N/A 2. In-Kind Tracking • With this being a federally-funded project, the County is responsible to match their share of the grant. In order to do, we are asking each of you to track your time spent working on the HMP. • We will provide several tools to use to help you keep track of your time. This includes attending meetings, completing surveys, filling out worksheets, etc. All to keep track of time spent on HMP: https://www.surveymonkey.com/r/Galveston_InKind 3. Benefits of Hazard Mitigation and Overview • Hazard mitigation is part of the emergency management cycle – it’s any sustained action(s) taken to reduce or eliminate long-term risk to life and property from hazards. • This is the required 5-year update to the 2017 HMP; participating and adopting the HMP allows you to remain eligible for FEMA pre- and post-disaster mitigation funding. • 2022 Update enhancements – annex approach and will work with the County and participating municipalities to create/update their chapter of the plan. N/A 4. CRS Integration • Several municipalities participate in the CRS program; therefore, to help those municipalities, the HMP update will follow both FEMA requirements and the CRS Coordinator’s Manual. N/A 5. Project Organization and Overview • Steering Committee – responsible for providing guidance and leadership throughout the planning process; oversee the planning process and act as points of contact for the municipalities and stakeholders. N/A Galveston County, TX Hazard Mitigation Plan 2022 Update Planning Partnership Meeting #1 September 29, 2021 | 2:00 pm CT Planning Partnertship Meeting #1 | Minutes PAGE | 2 • Planning Partnership – made up of the Steering Committee and participating municipalities • Stakeholders - play an important role in the planning process; help us learn about more specific topics and provide input from their points of view 6. Project Scope • Risk Assessment • Capabilities • Mitigation Strategy • Other Sections of HMP • Submit to TDEM for review/comment • Submit to FEMA for review/comment/approval • Plan adoption • Implement the plan N/A 7. Hazards of Concern Identification • The list of hazards from the last plan was presented to the Steering Committee and then the list of suggested hazards for the 2022 update. Tetra Tech will develop a survey to collect input to finalize the list of hazards of concern. All to complete hazard of concern survey by 10/8/21: https://forms.gle/uHTfkHW1KtGDJ17K8 • 2022 proposed hazards: o Flood (Coastal and Inland) o Drought o Hurricane/Tropical Storm o Extreme Temperature (Heat and Cold) o Tornado o Windstorm o Hailstorm o Wildfire (Urban and Rural) o Dam/Levee Failure o Severe Winter Weather o Coastal and Inland Erosion o Expansive Soils o Lightning o Land Subsidence o Tsunami o Pandemic o Utility Failure 8. Municipal Annexes and Worksheets • To meet FEMA requirements, all participating municipalities will need to review how hazard mitigation is incorporated into municipal planning mechanisms and capabilities; how their community has been impacted by hazard events since the last update; and review the completion of mitigation actions included in the last HMP: o Worksheet A – Hazard Event History o Worksheet B – Capability Assessment o Worksheet C – NFIP Floodplain Administration o Worksheet D – Mitigation Action Review o Worksheet E – Building Permit Information Participating Municipalities to complete Worksheets A-E by 10/8/21 9. Critical Facilities and Lifelines • Tetra Tech asked the Steering Committee what types of facilities should we include as critical facilities. Once the critical facility list is put together, the Planning Partnership will be asked to review and add facilities as needed. All to review critical facility lists after Tt sends out. 10. Goals and Objectives • The Steering Committee will need to review the goals and objectives from the 2017 HMP and update as needed. Tetra Tech All to complete goals and objectives survey by 10/8/21: https://forms.gle/yJwyhm2hM4HTCVER9 Galveston County, TX Hazard Mitigation Plan 2022 Update Planning Partnership Meeting #1 September 29, 2021 | 2:00 pm CT Planning Partnertship Meeting #1 | Minutes PAGE | 3 will send out a survey to collect input and finalize the goals and objectives for the 2022 update. 11. Public and Stakeholder Outreach • Public outreach is a key element in the HMP process and one of the requirements of the planning process. • Tetra Tech will be sending social media text and graphics to the Steering Committee to post on their websites and social media accounts. Tt will send social media text and graphics to the Steering Committee 12. Schedule • Organize resources now through late-September 2021 • Risk assessment October-November 2021 • Mitigation strategy – December 2021 • Maintenance strategy – December 2021 • Public draft (14 days public review period) early January 2022 • TDEM – mid-January 2022 • FEMA – mid-February 2022 • Adoption – late-March 2022 N/A 13. Questions/Wrap Up/Next Steps • Municipal Worksheets due to Tetra Tech or County OEM by October 8th • Risk Assessment Meeting: October/November 2021 (date TBD) • Mitigation Strategy Workshop: December 2021 (date TBD) N/A 9/29/2021 1 Galveston County, Texas Hazard Mitigation Plan – 2022 Update Planning Partnership Kick-Off Meeting | September 29, 2021 Agenda •In-Kind Services Tracking •Benefits of Hazard Mitigation •Hazard Mitigation Planning Overview •Project Organization •Planning Partnership Responsibilities •Public and Stakeholder Outreach •Completing Worksheets •Critical Facilities and Lifelines •Goals and Objectives •Schedule •Questions/Next Steps/Wrap Up 2 1 2 9/29/2021 2 In-Kind Tracking 3 Hazard Mitigation – What is it? Mitigation is a sustained action taken to reduce or eliminate long-term risk to life and property from a hazard event -or- Any action taken to reduce future disaster losses 4 “provides the blueprint for reducing the potential losses identified in the risk assessment, based on existing authorities, policies, programs and resources, and local ability…” (CFR). “provides the blueprint for reducing the potential losses identified in the risk assessment, based on existing authorities, policies, programs and resources, and local ability…” (CFR). Prepare / Prevent ResponseRecovery Mitigation Event 3 4 9/29/2021 3 Hazard Mitigation Works! •According to the January 2019 National Institute of Building Sciences Natural Hazard Mitigation Saves: 2018 Interim Report, federal mitigation grants save $6 for every $1 spent! 5 Why Update? •The mitigation plan update will: Help the County prepare for and mitigate the effects of disasters Continue to allow the County and participating partners to be eligible for pre- and post-disaster mitigation funding Support CRS participation/rating of municipalities 6 Hazard Losses (1950 – May 2021) Coastal Flood $700,000 Drought $1 million (property) $109.6 million (crop) Excessive Temperature - Flash Flood $10+ billion (property) $10,000 (crop) Hail $3.023 million High Wind $20,000 Hurricane/Tropical Storm $1.258 billion Lightning $3.529 million Thunderstorm $53.133 million (property) $8,500 (crop) Tornado/Funnel Cloud $36.212 million Wildfire $0 Winter Storm (Cold/Wind Chill) $12 million TOTAL $11,367,617,000 (property) $109,618,500 (crop) Source: NOAA-NCEI 2021 5 6 9/29/2021 4 What’s at Risk? •FEMA Disaster Declarations 7 CRS Integration •HMPs qualify for CRS points as “Floodplain Management Plans” through Activity 510 •To achieve a Class 4, specific outreach requirements in Activity 510 must be met •Tetra Tech will structure and document meetings to meet prerequisites for CRS Class 4 and achieve as many points as possible through Activity 510. We will also work with the communities to help them throughout the process. •All planning partnership meetings must be open to the public •All meetings must be publicized and documented on the County’s website 8 CRS Communities: •Dickinson – Class 8 •Friendswood – Class 7 •Jamaica Beach – Class 8 •Kemah – Class 8 •League City – Class 5 •Tiki Island – Class 7 Meeting Name CRS Step Steering Committee Kick-Off - Planning Partnership Kick-Off - Public Kick-Off Step 2 – held in floodprone areas within 2 months of partnership kick-off Risk Assessment Presentation and SWOO Step 4 – Asses the Hazard Step 5 – Assess the problem Goals and Objectives Meeting Step 6 – Set Goals Mitigation Strategy Workshop Step 7 – Review possible activities Plan Review Meeting Step 8 – Draft an action plan 7 8 9/29/2021 5 Project Organization 9 Steering Committee Emergency Management Contract Services Roads and Bridges Parks and Cultural Services Engineering County Facilities Health District Planning Partnership All municipalities, Steering Committee members Bayou Vista (C) Clear Lake Shores (C) Dickinson (C) Friendswood (C) Hitchcock (C) Jamaica Beach (C) Kemah (C) La Marque (C) League City (C) Santa Fe (C) Tiki Island (V) Stakeholders School Districts Colleges/Universities Emergency Services NOAA Port of Galveston State DOT Texas Division of Emergency Management (TDEM) Core Planning Team Galveston County OEM Tetra Tech Planning Partnership Roles and Responsibilities •As the municipal representative for your community, you need to actively participate throughout the process in order to be included in the plan. This includes: Coordinate and facilitate local efforts Attend meetings Provide information and feedback (e.g., complete municipal worksheets) Involve the public and community stakeholders in the planning process Identify mitigation actions for your community Adopt the plan Implement the plan and monitor its progress •All participation will be documented in the HMP 10 9 10 9/29/2021 6 Participation Tracker 11 Jurisdiction Name Requirements Met (Y/N) Planning Process Hazard Identification and Risk Assessment Mitigation Strategy Plan Review, Evaluation, and Implementation Plan Adoption State Requirements Galveston County Bayou Vista (C) Clear Lake Shores (C) Dickinson (C) Friendswood (C) Hitchcock (C) Jamaica Beach (C) Kemah (C) La Marque (C) League City (C) Santa Fe (C) Tiki Island (V) Planning Process Overview 12 ImplementationPhase 1 Organize the Resources Phase 2 Risk Assessment Phase 3 Public Involvement Strategy Phase 4 Update Mitigation Strategy Phase 5 Update Maintenance Strategy Phase 6 Assemble the Plan Phase 7 Plan Review and Adoption Phase 8 Project Management Stakeholder and Public Input 11 12 9/29/2021 7 Project Scope 13 Risk Assessment Capability Assessment Mitigation Strategy Update Other Sections of HMP Submit HMP to TDEM and FEMA Adopt the HMP Implement the HMP Update Risk Assessment •Update assets •Examine previous impacts •Analyze risks •Review with Steering Committee and Planning Partnership •Risk assessment meeting – open to the public 14 13 14 9/29/2021 8 2016 Hazards of Concern •Flood (Coastal and Inland) •Drought •Hurricane/Tropical Storm •Extreme Heat •Tornado •Windstorm •Hailstorm •Wildfire (Urban and Rural) •Dam/Levee Failure •Severe Winter Weather •Coastal Erosion and Retreat •Expansive Soils •Lightning •Land Subsidence •Tsunami 15 Potential 2022 Hazards of Concern •Flood (Coastal and Inland) •Drought •Hurricane/Tropical Storm •Extreme Temperature (Heat and Cold) •Tornado •Windstorm •Hailstorm •Wildfire (Urban and Rural) •Dam/Levee Failure •Severe Winter Weather •Coastal Erosion and Retreat •Expansive Soils •Lightning •Land Subsidence •Tsunami •Pandemic •Utility Failure •Inland Erosion ? 16 15 16 9/29/2021 9 Worksheet A – Hazard Event History 17 Update the Capability Assessment •Capabilities Planning and Regulatory Capability Administrative and Technical Capability Financial Capability Education and Outreach 18 17 18 9/29/2021 10 Worksheet B – Capability Assessment 19 Worksheet C – NFIP FPA Questionnaire 20 19 20 9/29/2021 11 Worksheet E – Building Permits 21 Update the Mitigation Strategy •Review the goals and objectives – we will send out a survey link to provide input •Determine status of mitigation actions •Identify new mitigation actions/projects Focus on specific, implementable and achievable actions! Look at your list of critical facilities and lifelines – what do they need to be operational during a disaster? •Conduct Mitigation Strategy Workshop 22 Goal #2022 HMP Goal Statement 1 Minimize loss of life, injury, damage to property, the economy, and natural systems 2 Maintain and enhance emergency management/mitigation capabilities 3 Maintain public education and awareness activities 21 22 9/29/2021 12 Worksheet D – Action Review 23 Community Lifelines •Review 2017 critical facility inventory to ensure complete •Crosswalk and identify lifelines Lifelines provide indispensable service that enables the continuous operation of critical business and government functions, and is critical to human health and safety, or economic security Critical Facilities are those facilities considered critical to the health and welfare of the population and that are especially important following a hazard. As defined for this HMP, critical facilities include essential facilities, transportation systems, lifeline utility systems, high-potential loss facilities, and hazardous material facilities. Essential facilities are a subset of critical facilities that include those facilities that are important to ensure a full recovery following the occurrence of a hazard event. For the County risk assessment, this category was defined to include police, fire, EMS, schools/colleges, shelters, senior facilities, and medical facilities. 24 23 24 9/29/2021 13 Update Other Sections of Plan •County Profile Taking the previous profile from the last plan and updating it accordingly •Planning Process Documentation of the update process •Plan Maintenance Incorporation into other plans as well as identifying way to incorporate other plans into the updated HMP Identify a game plan for annually reviewing and updating the HMP 25 Submit HMP for Review •Review Draft with Planning Team •14-day Public Comment Period •Conduct Public Meeting to Review the Draft •Submit for Texas Division of Emergency Management (TDEM) Review 30 days •Submit for Federal Emergency Management Agency (FEMA) Review 45 days •“Approvable Pending Adoption” Status 26 25 26 9/29/2021 14 Adopt the HMP •Galveston County and at least one participating municipality need to adopt the HMP •Once FEMA approves the plan, adoption can begin •Adoption deadline – TBD 27 Implement the HMP •Regular Planning Team meetings •Stakeholder meetings •Implement mitigation actions and projects Integrate actions where appropriate Public and Stakeholder Outreach •Social Media Posts •Press Release •HMP website – will work with the County to set this up •Planning Partnership meetings open to the public •Stakeholder Survey •Public Survey •Neighboring County Outreach Notified of planning process Survey 28 27 28 9/29/2021 15 Next Steps / Upcoming Schedule •Take online survey to update goals –to be distributed via email •Planning Partnership Kick-Off (Steering Committee and Municipalities) – Today! •Complete Municipal Worksheets Due back to the County and/or Tetra Tech by October 8, 2021 •Steering Committee Meeting to discuss goals/objectives– mid-October •Risk Assessment Meeting –November (tentatively) •Mitigation Strategy Workshop – December (tentatively) 29 Questions? 30 29 30 9/29/2021 16 Galveston County Project Contacts Laura Norman, Deputy Emergency Management Coordinator (281) 309-5013| laura.norman@co.galveston.tx.us Tetra Tech Project Contacts Heather Apgar, CFM, Project Manager (973) 630-8046 | heather.apgar@tetratech.com Kate Long, Lead Planner (607) 216-6901 | kate.long@tetratech.com Thank You! This Photo by Unknown Author is licensed under CC BY-SA 31 Galveston County, TX Hazard Mitigation Plan 2022 Update Steering Committee Meeting #2 November 18, 2021 | 2:00 pm CT Steering Committee Meeting #2 | Agenda PAGE | 1 Galveston County, Texas – 2022 Hazard Mitigation Plan Update Steering Committee Meeting #2 | November 18, 2021 | 2:00 pm CST Virtual Meeting Join by Computer: https://bit.ly/3x1l0LK Or Dial-in Number (toll): 832-856-3579 | Conference ID: 285 583 569# 1. Welcome and Introductions 2. Project Schedule and Status Review • Municipal Participation Status Update • Data Collection Status Update • Stakeholder and Public Outreach Strategy 3. Hazards of Concern Review 4. Critical Facilities and Lifelines 5. Confirmation of Goals and Objectives 6. Strengths, Weaknesses, Obstacles, and Opportunities (SWOO) Assessment • Purpose and Examples • Discussion • Complete SWOO survey - https://forms.gle/Ei6s8Srj2Trv8WQ46 (due December 1st) 7. Next Steps • As hazard profiles are complete, we will post on OneDrive for your review and input • Continued public outreach • Complete surveys (due December 3rd) → Problem Areas – https://arcg.is/0Sfeb8 → New Development – https://arcg.is/by0G8 → Critical Facilities - https://arcg.is/brDzv • Mitigation Workshop – December 2nd @ 2:00 pm • Risk assessment meeting – December 9th @ 2:00 pm Galveston County, TX Hazard Mitigation Plan 2022 Update Steering Committee Meeting #2 November 18, 2021 | 2:00 pm CT Steering Committee Meeting #2 | Minutes PAGE | 1 Purpose of Meeting: Steering Committee Meeting #2 Location of Meeting: Microsoft Teams Date/Time of Meeting: November 18, 2021 – 2:00 pm to 3:00 pm Attendees: ☒ Laura Norman, County OEM ☐ Michael Shannon, County Engineer ☒ Lee Crowder, County Roads and Bridges ☒ Martha Lee, County Parks ☐ Will Riordan, County Facilities ☒ James Gentile, County Contract Services ☐ Julie Diaz, County Parks & Cultural Services ☐ Randy Valcin, County Health ☒ Tyler Tipton, PHEP Manager, GCHD ☒ Heather Apgar, Tetra Tech ☒ Megan Brotherton, Tetra Tech Agenda Summary: Review project schedule and status, hazards of concern, critical facilities and lifelines, goals and objectives, SWOO exercise and next steps. Item No. Description Action By: 1. Welcome N/A 2. Project Schedule and Status Review • Municipal Participation Status Update o Worksheets have been received from everyone, except Bayou Vista is missing one worksheet o Annexes are being developed based on the worksheets received o Surveys on new development and problem areas will be sent to planning partners this week o December 3rd – Mitigation strategy workshop will focus on identifying mitigation action for the County and the planning partners o December 9th – Risk assessment presentation • Data Collection Status Update o Data is being collected o The list of Critical Facilities needs to be reviewed and updated • Stakeholder and Public Outreach Strategy o Public outreach materials have been developed by Tetra Tech for use by the planning partners o List of suggested stakeholders was previously sent to the Steering Committee • January 2022 – Draft plan will be available for planning partner review o Hazard Profile sections will be posted on OneDrive as they are completed for review and input • February 2022 – Final draft will be submitted to TDEM and FEMA Tt to send out list of Critical Facilities for planning partner and Steering Committee input and updates. Tt to send public outreach materials for County approval. Tt to send approved outreach materials to the Steering Committee. Steering Committee to document outreach efforts and send to Tt. Steering Committee to review and revise stakeholder list. Galveston County, TX Hazard Mitigation Plan 2022 Update Steering Committee Meeting #2 November 18, 2021 | 2:00 pm CT Steering Committee Meeting #2 | Minutes PAGE | 2 3. Hazards of Concern Review • Added Pandemic and Utility Failure to the previous list • No other additions N/A 4. Critical Facilities and Lifelines • List of critical facilities was developed from County GIS data • FEMA-defined lifelines enable the continuous operation of critical government and business functions that are essential to human health and safety and/or economic security. Tt to send list of critical facilities. Steering Committee to remove facilities if not needed for risk assessment. Update lifeline categories as needed. 5. Confirmation of Goals and Objectives • Three goals were confirmed at the last meeting. • New Goal #4 was added to address vulnerabilities from high-hazard dams. • Objectives were updated to align with the State HMP and other recent county plans in Texas. • Objectives include language to reflect FEMA lifelines. N/A 6. Strengths, Weaknesses, Obstacles, and Opportunities (SWOO) Assessment • Purpose and Examples o Helps with the identification of mitigation actions • Discussion • Complete SWOO survey - https://forms.gle/Ei6s8Srj2Trv8WQ46 (due December 1st) Tt to send out link. Planning partners to complete the SWOO exercise. 7. Next Steps • As hazard profiles are complete, we will post on OneDrive for your review and input • Continued public outreach • Complete surveys (due December 3rd) o Problem Areas – https://arcg.is/0Sfeb8 o New Development – https://arcg.is/by0G8 o Critical Facilities - https://arcg.is/brDzv • Mitigation Workshop – December 2nd @ 2:00 pm • Risk assessment meeting – December 9th @ 2:00 pm Planning partners to submit completed surveys by 12/3. 11/18/2021 1 Galveston County, Texas Hazard Mitigation Plan – 2022 Update Steering Committee Meeting #2| November 18, 2021 Agenda •Welcome and Introductions •Project Schedule and Status Review •Hazards of Concern •Mission Statement, Goals and Objectives •Strengths, Weaknesses, Obstacles, and Opportunities •Next Steps 3 2 3 11/18/2021 2 Project Schedule 4 Schedule •Overview and Milestones Planning Process Currently working on reviewing plans, studies, and codes/ordinances Steering Committee Meeting #2 – TODAY! Risk Assessment and Hazard Ranking Meeting – December 9th •Update Risk Assessment Hazard profiles and vulnerability assessment are underway •Public Involvement Strategy – ongoing throughout the planning process Need your help to get the word out about the HMP – post on your website and social media. Tetra Tech will send out graphics to use. •Mitigation Strategy Mitigation Strategy Workshop with FEMA and TDEM– December 2nd •Draft Plan to Steering Committee by January 2022 •Final draft plan to TDEM and FEMA by February 2022 4 5 11/18/2021 3 Project Status 6 Phase 1 Organize the Resources Phase 2 Risk Assessment Phase 3 Public Involvement Strategy Phase 4 Update Mitigation Strategy Phase 5 Update Maintenance Strategy Phase 6 Assemble the Plan Phase 7 Plan Review and Adoption Phase 8 Project Management Data Collection – In Progress •Plan Collection – In progress •General Building Stock –Update in Progress •Critical Facility Inventory -In Progress Risk Assessment - In Progress •Hazard Profile Drafts – In progress •Vulnerability Assessment – In progress •Risk Assessment Meeting – December 9th Public Involvement - In Progress •Public Survey •Stakeholder Surveys •Public Outreach –Tetra Tech to provide materials Mitigation Strategy •Confirm Goals And Objectives - Today •SWOO - Today •Municipal Annex Updates - In Progress •Identify Problem Areas - In Progress •Develop Mitigation Strategy – Pending •Mitigation Workshop – December 2nd Participation Status •Annex updates are in progress •Info gathering worksheets were sent out to everyone; we received worksheets from everyone Need to follow-up with: –Bayou Vista – missing one worksheet •Next Steps Review and identify critical facilities – December 3rd –Tetra Tech will send out list of facilities and survey for review and input Review and confirm risk ranking – December 9 th Identify mitigation actions – December/January 7 6 7 11/18/2021 4 Public and Stakeholder Outreach •Press Release and Social Media Tetra Tech to provide sample press release and social media posts for your use •Survey (public and stakeholder) County is reviewing surveys before we distribute Next step – distribute and advertise survey links and brochure Stakeholders begin to complete survey Municipalities to post an HMP project link and flyer on their website; press release sent to newspapers •Outreach – present key info on the HMP process at local meetings Tetra Tech can provide some talking points if needed 8 Hazards of Concern 9 8 9 11/18/2021 5 2022 Hazards of Concern •Flood (Coastal and Inland) •Drought •Hurricane/Tropical Storm •Extreme Temperature (Heat and Cold) •Tornado •Windstorm •Hailstorm •Wildfire (Urban and Rural) •Dam/Levee Failure •Severe Winter Weather •Coastal Erosion and Retreat •Expansive Soils •Lightning •Land Subsidence •Tsunami •Pandemic •Utility Failure 10 Critical Facilities and Lifelines 11 10 11 11/18/2021 6 Critical Facilities and Community Lifelines •To be reviewed: Airport Bank Bridge Bus Facility Childcare Facility Communication Facility County Building Dam DMV Drainage Ditch Electric Power Facility Electric Substation EMS Energy Facility EOC Farmers Market Ferry Fire Station Food Bank Gas Station Grocery Store HazMat Superfund HazMat TRI Heliport Homeless Shelter Hospital Major Employer Military Municipal Building Nursing Home Police Station Polling Site Port Facility Post Office Post-Secondary Education Potable Water Pump Station Potable Water Tank Potable Water Treatment Plant Potable Water Well Primary Education Prison Public Health Department Public Works Building Radio Tower Secondary Education Train Station Transportation Wastewater Lift Station Wastewater Pump Station Wastewater Tank Wastewater Treatment Plant Wastewater Wet Well 12 Critical Facilities and Lifelines •What are lifelines? A lifeline enables the continuous operation of critical government and business functions and is essential to human health and safety or economic security. Lifelines are the most fundamental services in the community that, when stabilized, enable all other aspects of society to function. When disrupted, decisive intervention (e.g., rapid re-establishment or employment of contingency response solutions) is required to stabilize the incident. •Tetra Tech conducted a preliminary review of the critical facilities and assigned the lifeline categories to each •We will be distributing a list of facilities for your review and input. We will also be using an online survey to collect new facilities to be included. All input is due December 3rd! 13 12 13 11/18/2021 7 Critical Facilities and Lifelines 14 Finalize Goals and Objectives 14 15 11/18/2021 8 Goals and Objectives Review and Update 16 Goal 1: Minimize loss of life, injury, damage to property, the economy, and natural systems from natural and human-caused hazard events Objective 1.1: Protect the life, health and safety of residents Objective 1.2: Protect existing/new critical facilities and community lifelines Objective 1.3: Enforce regulatory measures to ensure that current and new development will not put people in harm’s way or increase threats to existing properties. Objective 1.4: Provide backup power to critical facilities and community lifelines Objective 1.5: Minimize impacts from all hazards Objective 1.6: Build, enhance, and support partnerships to continuously become less vulnerable to hazards Goal 2: Maintain and enhance emergency management/mitigation capabilities Objective 2.1: Update/develop plans, studies, and mapping for all hazards of concern for the County Objective 2.2: Incorporate/improve hazard mitigation strategies into ordinances, plans and polices Objective 2.3: Conduct/develop drills/training for all hazards of concern for the County Objective 2.4: Implement and maintain the Galveston County Multi-Jurisdictional Hazard Mitigation Plan Objective 2.5: Participate in programs that promote hazard mitigation strategies Objective 2.6: Build, obtain, and maintain critical facilities, community lifelines,and equipment Goal 3: Enhance and Maintain public education and awareness activities Objective 3.1: Expand Public Outreach Campaigns for all hazards Objective 3.2: Promote and encourage disaster preparedness planning of appropriate hazard mitigation measures for families Goal 4: Address long-term vulnerabilities from high hazard dams *NEW* Objective 4.1: Ensure dam infrastructure is routinely inspected and maintained. Objective 4.2: Ensure Emergency Action Plans are developed and updated. Objective 4.3: Support the identification and access to funding to repair, replace, or decommission dams. Strengths, Weaknesses, Obstacles, and Opportunities (SWOO) 16 17 11/18/2021 9 Strengths, Weaknesses, Obstacles, and Opportunities The purpose of the SWOO is to identify mitigation strategies and capabilities that will meet the goals and objectives of the plan update. It is also used to develop potential mitigation actions for the participating jurisdictions. •Strengths – what we do well •Weaknesses – what could we do better •Obstacles – things that stand in the way, and either prevents you from doing something or something that need to be overcome •Opportunities – used to develop mitigation strategies 18 SWOO Exercise Thinking about the 2017 hazards of concern and any new hazards for this update…what are some strengths, weaknesses, obstacles and opportunities the Planning Area has for each? Complete the online form (https://forms.gle/Ei6s8Srj2Trv8WQ46) 19 Hazard: Severe Winter Storm S Not a frequent occurrence W Not a frequent occurrence and may not have the resources to respond Ob Funding; limited staff for prolonged events Opps Shared services Hazard: Flood S Minimal exposure to flood risk W Silt and debris buildup in streams can lead to localized flooding Ob Funding for culvert and catch basin maintenance Opps Installing stream gages Hazard: Severe Storms S Tree trimming programs are in place W Aging infrastructure; lack of underground utilities Ob Cost to retrofit existing utility infrastructure Opps Underground utilities; enhance public outreach program Here are some examples to help brainstorm: 18 19 11/18/2021 10 2022 SWOO Discussion/Example 20 Hazard Strengths Weaknesses What do the Planning Area do well in  terms of: Plans and Regulations Codes, Ordinances, Planning  Studies, Comprehensive Plans,  Adaptation and Resiliency Plans Structure and Infrastructure Projects Natural Systems Protection Education and Awareness Programs? Preparedness Others? What can the Planning Area do better or what  are identified gaps in terms of: Plans and Regulations Codes, Ordinances, Planning Studies,  Comprehensive Plans, Adaptation and  Resiliency Plans Structure and Infrastructure Projects Natural Systems Protection Education and Awareness Programs? Preparedness Others? 2022 SWOO Discussion/Example 21 Hazard Obstacles Opportunities What is preventing the Planning Area to  implement: Plans and Regulations Codes, Ordinances, Planning  Studies, Comprehensive Plans,  Adaptation and Resiliency Plans Structure and Infrastructure Projects Natural Systems Protection Education and Awareness Programs? Preparedness Others? What can the Planning Area implement terms  of: Plans and Regulations Codes, Ordinances, Planning Studies,  Comprehensive Plans, Adaptation and  Resiliency Plans Structure and Infrastructure Projects Natural Systems Protection Education and Awareness Programs? Preparedness Others? 20 21 11/18/2021 11 Next Steps 22 Next Steps •Review Hazard Profiles •Review Risk Assessment Results •Identify Problems and Problem Areas •Develop Mitigation Strategy •Review Draft Plan •Submit Draft Plan for TDEM/FEMA Review •Adopt FEMA - Approved Plan •Implement Projects and Maintain the Plan Increase Resilience! 23 22 23 11/18/2021 12 Questions? 24 Galveston County Project Contacts Laura Norman, Deputy Emergency Management Coordinator (856) 307-7100 | dmcnulty@co.gloucester.nj.us Tetra Tech Project Contacts Heather Apgar, CFM, Project Manager (973) 630-8046 | heather.apgar@tetratech.com Thank You! This Photo by Unknown Author is licensed under CC BY-SA 24 25 Galveston County, TX Hazard Mitigation Plan 2022 Update Mitigation Strategy Workshop December 2, 2021 | 2:00 pm CT Meeting Location | 1353 FM 646 – Suite 201; Dickinson, TX Mitigation Strategy Workshop| Agenda PAGE | 1 1. Opening Remarks 2. In-Kind Tracking • Use the Word tracker or online tracker to document time spent working on the HMP https://www.surveymonkey.com/r/Galveston_inKind 3. Project Overview and Status • Where we are in the process, participation status, public outreach, survey discussions 4. Mitigation Strategy • Focus on the hazards of highest concern to your community • At least one mitigation per each hazard of concern • Filling out Action Worksheets 5. Updating Your Mitigation Strategy • Review goals and objectives 6. Next Steps 7. Questions Galveston County, TX Hazard Mitigation Plan 2022 Update Mitigation Action Workshop December 2, 2021 | 2:00 pm CT Mitigation Action Workshop| Minutes PAGE | 1 Purpose of Meeting: Mitigation Action Workshop Location of Meeting: 1353 FM-646 Suite 201, Dickinson, TX or Microsoft Teams Date/Time of Meeting: December 2, 2021 – 2:00 pm to 3:00 pm Attendees: ☒ Laura Norman, County OEM ☒ Galveston County ☒ Galveston County Engineering Department ☐ Bayou Vista ☐ Clear Lake Shores ☐ Dickinson ☒ Friendswood ☐ Hitchcock ☒ Jamaica Beach ☐ Kemah ☒ La Marque ☒ League City ☒ Santa Fe ☐ Tiki Island ☒ Heather Apgar, Tetra Tech ☒ Megan Brotherton, Tetra Tech Agenda Summary: Review project schedule and status, hazards of concern, critical facilities and lifelines, goals and objectives, SWOO exercise and next steps. Item No. Description Action By: 1. Welcome N/A 2. In-Kind Tracking • Keep track of your time spent working on the HMP. This will help the County meet their local match requirement for the grant used to update the plan. • Use the Word tracker or online tracker https://www.surveymonkey.com/r/Galveston_inKind Jurisdictions continue to track time 3. Project Overview and Status • What is mitigation? o Mitigation describes actions taken to help reduce or eliminate the long-term risks/damages cause by hazards o Developing an HMP is one of several steps to take to mitigate hazards o Mitigation helps us: ▪ Plan for the future ▪ Recovery quickly after disasters ▪ Identify mitigations ▪ Access FEMA funds • Why are we updating the plan? o The HMP needs to be updated every 5 years to: ▪ Prepare for and mitigate the effects of hazards ▪ Allow the County and municipalities to be eligible for pre disaster funding ▪ Supports CRS participation – helps your municipality’s CRS rating • Why are you spending time on this? o In order to stay eligible for funding, you need to participate in and adopt the County’s HMP N/A Galveston County, TX Hazard Mitigation Plan 2022 Update Mitigation Action Workshop December 2, 2021 | 2:00 pm CT Mitigation Action Workshop| Minutes PAGE | 2 o For every $1 spent on hazard mitigation, the U.S. saves $6 on future disaster costs o Many jurisdictions have been leveraging FEMA funding for years including elevations, flood control measures, and updating the HMP • Schedule o All annex worksheets need to be returned to Tt by December 29th. We will get them send out to you as part of the meeting follow-up. Tt will be available to help you identify projects and complete the worksheets. o Draft plan review with the Steering Committee and Planning Partners will be in January – public review January and plan submitted to TDEM/FEMA by the end of January • Annex Progress o The SWOO, critical facilities, problem areas, and new development surveys are due by 12/3. o After our 12/21 meeting, you will need to confirm your hazard ranking. o Next is identify mitigation actions to include in the 2022 plan o Annexes will need to be finalized by January 4th (before public review period) 4. Mitigation Strategy • Focus on the hazards of highest concern to your community • At least TWO mitigation actions per each hazard of concern o Dam and Levee Failure o Drought o Earthquake o Erosion o Expansive Soils o Extreme Temperatures o Flood o Hail o Hurricane and Tropical Storm o Land Subsidence o Lightning o Pandemic o Severe Winter Storm o Thunderstorm Wind o Tornadoes o Wildfire • One action may cover all hazards and will count toward one of the two actions for each hazard. • Reduce risk by: o Manipulating the hazard – flood control projects, levees o Reducing or eliminating exposure – property acquisitions o Reducing vulnerability – floodproof structures, elevations, install hurricane shutters o Increasing capability – develop plans, codes/ordinances to help address hazards (prevent building in floodplain, increase code requirements for wind) • Risk reduction measures can be turned into mitigation actions • Requirements for the Mitigation Strategy o TDEM and FEMA want creative/big projects that would work well under the BRIC grant program ▪ Flood control measures, multi-jurisdictional projects Jurisdictions to begin developing mitigation actions Galveston County, TX Hazard Mitigation Plan 2022 Update Mitigation Action Workshop December 2, 2021 | 2:00 pm CT Mitigation Action Workshop| Minutes PAGE | 3 o 2017 actions – remove general ones and make them more specific; remove maintenance (this should be an ongoing capability) o Minimum of TWO projects per hazard of concern • Mitigation actions to consider: o Local debris management plan o Repetitive loss/severe repetitive loss properties– mitigate through elevations or acquisitions. o Public education and outreach programs o Generators at critical facilities o Actions to address high hazard dams • Connect to the Mitigation Strategy o The risk assessment, capability assessment, hazards of concern, and problem areas will be used to identify the best projects and actions for your community. o Make a clear connection between vulnerability and proposed mitigation actions. o The results of the capability assessment may alert you to plans and ordinances that need to be updated. Include an action to update the plan and incorporate the HMP. Or update an ordinance to include higher freeboard for properties in the floodplain. o Provide a factual basis for the proposed projects and activities in your plan. Tie the actions to vulnerability reduction. • Focus on: o Connecting the risk assessment to the mitigation strategy o Actions that you can achieve in the next five years – whether you have the funding now or will need grant funding o Diverse actions – identify a variety of actions that cover all hazards and action types (structural, natural systems protection, etc.) 5. Updating Your Mitigation Strategy • Review goals and objectives - think about how the projects you identify will meet the goals and objectives of the HMP • Start with your problems o Turn challenges into mitigation actions o Look at your historic impacts – are certain areas always damaged by storm events? o Do you have repetitive loss or severe repetitive loss properties? Areas that are always flooding? o Do you have stormwater flooding issues? What can be done to reduce or eliminate? o Do you have critical facilities that need backup power? Are they located in hazard areas? o Have you submitted FEMA grant applications for projects that were not funded? • Use the actions from the last plan that you did not complete as actions for this plan. If needed, modify those to be more specific or address different aspects of the original problem. • Cover at least one of the FEMA mitigation types with each action o Plans and regulations o Structure and infrastructure o Natural systems protection o Education and awareness programs Tt to send proposed action table and instructions Jurisdictions to begin developing mitigation actions Galveston County, TX Hazard Mitigation Plan 2022 Update Mitigation Action Workshop December 2, 2021 | 2:00 pm CT Mitigation Action Workshop| Minutes PAGE | 4 • Complete the proposed action table for each action you will be including in the plan, focusing on highlighted areas 6. Next Steps • Actions and annexes – identify actions and return worksheets to Tt by 12/29 • Risk assessment and hazard ranking – TBD at the 12/21 meeting • Review draft annex by 1/4 (before public review) 7. Questions None 12/6/2021 1 Galveston County, Texas Hazard Mitigation Plan – 2022 Update Mitigation Strategy Workshop| December 2, 2021 Agenda •Introduction •In-Kind Tracking •Project Overview and Status – where we are in the process •Development of: Mitigation Strategy/Actions/Projects Action Worksheets using the Mitigation Action Development Worksheets •Next Steps •Questions 2 1 2 12/6/2021 2 In-Kind Tracking Reminder •Document your time working on the HMP (e.g., attend meetings, complete worksheets and surveys, emails, etc.) •Use the Word tracker or online tracker https://www.surveymonkey.com/r/Galveston_i nKind 3 What is Hazard Mitigation? 4 Plan for the future Recovery quickly after disasters Identify mitigation actions Access to FEMA funding Prepare / Prevent ResponseRecovery Mitigation Event 3 4 12/6/2021 3 Why Update? •Every five years, FEMA requires a County’s HMP to be updated. •The mitigation plan update will: Help the County prepare for and mitigate the effects of disasters Continue to allow the County and participating communities to be eligible for pre- and post-disaster mitigation funding Support CRS participation/rating of municipalities 5 Why are you spending time on this? Because mitigation works! •For every $1 spent on hazard mitigation, the U.S. saves $6 in future disaster costs! •The County has been leveraging FEMA funding for years – receiving money to prepare and update this plan, install generators at critical facilities, etc. 6 5 6 12/6/2021 4 Project Schedule Review 7 ✓September 2021 Kick-Off Meetings ✓September-October 2021 Data Collection ❏October-December 2021 Update Hazard Profiles – in progress ✓December 2, 2021 Mitigation Strategy Workshop –TODAY! ❏December 21, 2021 Risk Assessment Presentation ❏December 2021 Develop Mitigation Actions – due to Tetra Tech by 12/29 ❏Now – January 2022 Plan Development ❏December - January Review Draft Plan ❏January 4, 2022 Draft Plan Review Meeting ❏January 5-19, 2022 Public Review Period ❏Late-January 2022 Submit plan to TDEM and FEMA Annex Progress •Looking ahead… Complete the surveys sent out on 11/22 –SWOO – due TODAY! –Critical Facilities – due 12/3 –Problem Areas – due 12/3 –New Development – due 12/3 Confirm hazard ranking Status updates on previous mitigation actions Identify new mitigation actions for the 2022 update Complete action worksheets Finalize annexes by January 2022 •Orange municipalities – missing a worksheet •Green municipalities – annex in good shape; need to identify mitigation actions 8 Status (12/2/2021) Galveston County Annex in progress Bayou Vista (C)Annex in progress; missing Worksheet A (event history) Clear Lake Shores (C)Annex in progress Dickinson (C)Annex in progress Friendswood (C)Annex in progress Hitchcock (C)Annex in progress Jamaica Beach (C)Annex in progress Kemah (C)Annex in progress La Marque (C)Annex in progress League City (C)Annex in progress Santa Fe (C)Annex in progress Tiki Island (V)Annex in progress 7 8 12/6/2021 5 Mitigation Strategy 9 2022 Hazards of Concern •Coastal Erosion and Retreat •Dam/Levee Failure •Drought •Expansive Soils •Extreme Temperature (Heat and Cold) •Flood (Coastal and Inland) •Hailstorm •Hurricane/Tropical Storm •Land Subsidence •Lightning •Pandemic •Severe Winter Weather •Tornado •Tsunami •Utility Failure •Wildfire (Urban and Rural) •Windstorm 10 9 10 12/6/2021 6 Risk Reduction •How do you reduce risk for a hazard? Manipulate the Hazard –Structural flood control Reduce/Eliminate Exposure –Acquire floodprone properties Reduce Vulnerability –Retrofit (floodproofing) Increase Capability –$, preparation, technical assistance, planning enforcement 11 Using Your Mitigation Strategy to Reduce Risk •What is a Mitigation Strategy? A group of projects or actions to reduce the impacts of the hazards of concern on your community –Plans and Regulations –Structure and Infrastructure Studies and Projects –Natural Systems Protection Studies and Projects –Education and Awareness Programs •Terms to describe the Mitigation Strategy include: Mitigation Action Plan or Action Plan Mitigation Projects or Initiatives or Actions 12 Your Mitigation Strategy table is included in your annex. We will use action worksheets to collect details on the actions you will include in the 2022 Update. 11 12 12/6/2021 7 Requirements for the Mitigation Strategy Update •TDEM and FEMA would like to see more creative/big projects that would work well under the BRIC grant program •2017 projects If a project is not finished and still a priority, include in 2022 HMP Remove general projects or make more specific Remove routine maintenance Remove ongoing capabilities •Minimum of 2 mitigation actions for EACH hazard of concern One action can cover multiple hazards and jurisdictions. For example, education program on mitigation technics you can implement – applies to all hazards and all jurisdictions. 13 Other Mitigation Actions to Consider •Local Disaster Debris Management Plans •Actions to address high hazard or significant hazard dams •Public education and outreach programs •Generators at critical facilities •Floodproofing critical facilities •Addressing repetitive and severe repetitive loss properties 14 13 14 12/6/2021 8 Connecting to the Mitigation Strategy •Need a clear connection between vulnerability and proposed mitigation actions. •Capability assessment provides insight into challenges and opportunities for the mitigation strategy. •Provides the factual basis for activities proposed in the mitigation strategy. Mitigation Strategy Risk Assessment Capability Assessment Hazards of Concern Problem Areas in Community 15 Where do you need to focus? •Stronger connection between the risk assessment and mitigation strategy •More specific, achievable actions Specific projects, in specific locations, in a specific timeframe •Diverse actions You need at least 2 actions per hazard of concern. Think about actions that can cover multiple hazards. Include a variety in the types of actions 16 15 16 12/6/2021 9 Update the Mitigation Strategy Action Types Initiative Table – actions and projects 17 Update the Mitigation Strategy •Review the Goals and Objectives of the HMP •Start with problems Turn challenges/obstacles/gaps into mitigation actions Examine historic impacts Review the risk and capability assessment results RL/SRL properties Stormwater/urban flooding areas Critical facilities and lifelines located in a hazard area (if feasible) Additional areas of vulnerability Previous FEMA HMA submitted projects – awarded/unawarded •Identify new Mitigation Actions/Projects/Strategies •REMEMBER – 2 actions for every hazard of concern! •Modify ‘carry-over’ projects from the 2017 HMP More specific or to address different aspects of the original problem 18 17 18 12/6/2021 10 Mitigation Action Types 19 Range of Mitigation Actions •Primary types of mitigation actions to reduce long-term vulnerabilities include: •Zoning codes •Ordinances •Open space plan •Debris management plan Local Plans and Regulations •Elevation •Drainage improvements •Property acquisitions •Stormwater improvements Structural Projects •Stream and wetland restoration •Erosion control •Water quality improvement •Environmental corridors Natural Systems Protection •Public awareness •Education programs •Real estate disclosure •Map information •Environmental education Education and Outreach 20 19 20 12/6/2021 11 Proposed Action Table •Each municipality will need to complete the Proposed Hazard Mitigation Initiatives table in your annex •Each column needs to be filled in. Tetra Tech will assist you with completing each cell. •Action Worksheets will need to be completed for all projects. Initiative Number Mitigation Initiative Name Description of the Problem and Solution New or Existing Assets? Hazard(s) to be Mitigated Goals Met 2021- Your Town-001 Repetitive Loss Property Outreach Problem: There are 100 repetitive loss properties located in the Borough. According to NFIP claims records, these properties have experienced extensive flood damage through the years. Without proper mitigation, the structures will continue to experience flood damages. Existing Flood, Severe Storm, Hurricanes/ Tropical Storms All Solution: Conduct outreach to the property owners to inform them of their repetitive loss designation and provide mitigation options to protect the structures. If the property owners choose elevation or acquisition, the Borough will develop a grant application to fund acquisitions or elevations of the properties. Lead and Support Agencies Potential Funding Sources Estimated BenefitsEstimated CostTimelinePriorityMitigation Category CRS CategoryMunicipal Floodplain Administrator, Property Owner Borough Budget for outreach; FEMA FMA or HMGP for mitigation measures Increase resilience of structure and Borough; decrease flood damages <$10,000 for outreach; mitigation costs vary depending on project One year for outreach; 5 years for mitigation measures High EAP, SIP PP, PI 21 How do you fill in the Action Worksheets? •The entire worksheet needs to be filled in; however, Tetra Tech will assist with this. We ask that each municipality fill in (at least) the highlighted cells. •We need one worksheet for each action. •Focus on providing highly detailed: Description of the Problem Description of the Solution 22 21 22 12/6/2021 12 Next Steps •Actions and Annexes Tetra Tech will reach out to help you with identify mitigation actions We will be sending out a worksheet to help capture additional problem areas. Complete the online survey to identify areas as well. •Review your hazard ranking and adjust as needed (to be discussed at our 12/21 meeting) •Review your draft annex prior to posting for public review. 23 Questions? 24 23 24 12/6/2021 13 Galveston County Project Contacts Laura Norman, Deputy Emergency Management Coordinator (281) 309-5013|laura.norman@co.galveston.tx.us Tetra Tech Project Contacts Heather Apgar, CFM, Project Manager (973) 630-8046 | heather.apgar@tetratech.com Thank You! This Photo by Unknown Author is licensed under CC BY-SA 25 Galveston County, TX Hazard Mitigation Plan 2022 Update Risk Assessment Presentation December 21, 2021 | 2:00 pm CT Meeting Location | 1353 FM 646 – Suite 201; Dickinson, TX Risk Assessment Presentation| Agenda PAGE | 1 1. Opening Remarks 2. In-Kind Tracking • Use the Word tracker or online tracker to document time spent working on the HMP https://www.surveymonkey.com/r/Galveston_inKind 3. Project Status – • Where we are in the process, participation status, public outreach, survey discussions 4. Risk Assessment Overview – • Hazards of concern risk ranking • Results of each risk assessment for each hazard • How will this information be used in the HMP 5. Using the Risk Assessment in Developing Mitigation Actions 6. Next Steps 7. Questions Galveston County, TX Hazard Mitigation Plan 2022 Update Risk Assessment Presentation December 21, 2021 | 2:00 pm CT Risk Assessment Presentation | Minutes PAGE | 1 Purpose of Meeting: Risk Assessment Presentation Location of Meeting: 1353 FM-646 Suite 201, Dickinson, TX or Microsoft Teams Date/Time of Meeting: December 21, 2021 – 2:00 pm to 3:00 pm Attendees: ☒ Galveston County OEM ☐ Bayou Vista ☐ Clear Lake Shores ☐ Dickinson ☐ Friendswood ☐ Hitchcock ☐ Jamaica Beach ☐ Kemah ☐ La Marque ☐ League City ☐ Santa Fe ☐ Tiki Island ☒ Heather Apgar, Tetra Tech ☒ Megan Brotherton, Tetra Tech Agenda Summary: Review project schedule and status, present risk ranking, and go over how to review and provide input Item No. Description Action By: 1. Welcome N/A 2. In-Kind Tracking • Keep track of your time spent working on the HMP. This will help the County meet their local match requirement for the grant used to update the plan. • Use the Word tracker or online tracker https://www.surveymonkey.com/r/Galveston_inKind Jurisdictions continue to track time 3. Project Schedule: • Hazard Profiles are underway • Mitigation Action Worksheets are due December 29 o Two actions are required for each hazard • Draft plan to TDEM by the last week in January N/A 4. Public Outreach and Engagement • Public and Stakeholder outreach surveys will be distributed today o Post outreach materials to social media and jurisdictional websites o Send Tt copies of the posts to include in the plan Tt and Jurisdictions 5. Risk Assessment Overview Risk is defined as: • A function of hazard, exposure, and vulnerability. We are also looking at capabilities and climate change. Combining all of these things gives us the risk of each hazard of concern. The risk assessment: • Gives us a better understanding of the risks the Planning Area faces • Initial results are based on best available data at the time of the plan update • Some hazards we did a qualitative assessment (e.g., disease outbreak, extreme heat). The hazards that do not have defined mapping or extents were the ones where the qualitative assessment was done. • Other hazards we performed a quantitative assessment where we were able to use N/A Galveston County, TX Hazard Mitigation Plan 2022 Update Risk Assessment Presentation December 21, 2021 | 2:00 pm CT Risk Assessment Presentation | Minutes PAGE | 2 mapping to determine the number of people and structures exposed, along with estimated structural damages. This was done for hurricane/wind and flood. 6. Ranking the Hazards of Concern This shows the overall ranking for the County for each hazard, with the highest ranked on top and the lowest on bottom. Rankings were done for the County and for each municipality. Some of the rankings different from 2017: • We used best available data and looked at population, economy, property (buildings), capabilities to respond to or address the hazard, climate change projections, and probability of occurrence. • We also used different thresholds for the impacts listed above. • We incorporated your capabilities to respond/address the hazard and the potential for climate change impacts This shows the different levels assigned to each hazard and what was used to calculate the risk factor ranking. Overall output for each hazard of concern: • Coastal and Inland Erosion - Low • Dam/Levee Failure - Low • Drought - Medium • Expansive Soils - High • Extreme Temperatures (Heat and Cold) - Medium • Flood (Coastal and Inland) - Medium • Hailstorm - Low • Hurricane/Tropical Storm - High • Land Subsidence - Low • Lighting - Low • Pandemic - Low • Severe Winter Storm - Low • Tornado - Medium • Tsunami - Low • Utility Failure - Medium • Wildfire (Urban and Rural) - Low • Windstorm - Medium N/A 7. Questions and Comments • Dam & Levee Failure: Galveston Seawall is categorized as a levee and upgrades are currently under construction. Provide updated info to Tt. • Sinkholes can be categorized under expansive soils. • Erosion map? The entire coastline is subject to erosion. Tt to get clarification from GIS. • Events that occurred in non-participating jurisdictions can be included. • Expansive Soils may need to be adjusted to a lower ranking. • Flood should be changed to high. Tt and Jurisdictions 8. Next Steps • Mitigation Action Worksheets due by Wednesday, December 29 • Risk Assessment finalization due by Wednesday, December 29 • Draft Plan Review, January 4, 2022 • Public Review Period, January 5-19, 2022 12/27/2021 1 Galveston County, Texas Hazard Mitigation Plan – 2022 Update Risk Assessment Presentation| December 21, 2021 Agenda •Welcome •In-Kind Tracking •Project Overview and Status – where we are in the process •Risk Assessment Overview •Review Calculated Hazard Ranking •Next Steps 2 1 2 12/27/2021 2 In-Kind Tracking Reminder •Document your time working on the HMP (e.g., attend meetings, complete worksheets and surveys, emails, etc.) •Use the Word tracker or online tracker https://www.surveymonkey.com/r/Galveston_i nKind 3 Project Schedule Review 4 ✓September 2021 Kick-Off Meetings ✓September-October 2021 Data Collection ❏October-December 2021 Update Hazard Profiles – in progress ✓December 2, 2021 Mitigation Strategy Workshop ❏December 21, 2021 Risk Assessment Presentation –TODAY! ❏December 29, 2021 Mitigation Action Worksheets due to Tetra Tech – two actions per hazard! ❏December 29, 2021 Hazard Ranking Review due to Tetra Tech ❏Now – January 2022 Plan Development ❏January 2022 Review Draft Plan ❏January 4, 2022 Draft Plan Review Meeting ❏January 10-24, 2022 Public Review Period ❏January 28, 2022 Submit plan to TDEM and FEMA 3 4 12/27/2021 3 Annex Progress •Looking ahead… Confirm hazard ranking Status updates on previous mitigation actions Identify new mitigation actions for the 2022 update Complete action worksheets Finalize annexes by January 7, 2022 •Orange municipalities – missing a worksheet •Green municipalities – annex in good shape; need to identify mitigation actions 5 Status (12/2/2021) Galveston County Annex in progress Bayou Vista (C)Annex in progress; missing Worksheet A (event history) Clear Lake Shores (C)Annex in progress Dickinson (C)Annex in progress Friendswood (C)Annex in progress Hitchcock (C)Annex in progress Jamaica Beach (C)Annex in progress Kemah (C)Annex in progress La Marque (C)Annex in progress League City (C)Annex in progress Santa Fe (C)Annex in progress Tiki Island (V)Annex in progress Public and Stakeholder Outreach •Surveys are ready to distribute! •We will send out different tools to use to help with public outreach – please share! Social media – Facebook, Twitter Let Tetra Tech know when you post so we can grab screen shots to include in the plan 6 5 6 12/27/2021 4 Risk Assessment Overview 7 What is Risk? Risk is defined as a function of : Hazard •Source of potential danger or adverse condition Exposure •Manmade or natural features that are exposed to the hazard Vulnerability •Damage susceptibility of the exposed features 8 7 8 12/27/2021 5 Purpose of the Risk Assessment •To get a better understanding of the risks you face •Initial results based on available data •Quantitative data (population/structures exposed, structural damages within hazard zones) used when available •Qualitative community input (such as unmapped flood areas) integrated to adjust results •Local community input to adjust relative rankings 9 Spatial Hazard Data County Specific Building Data Scientific Modeling (HAZUS v5 & ArcGIS) Historic Data Comprehensive List of Expected Damages ($$$) Ranking the Hazards of Concern How are the rankings calculated? What is the preliminary ranking? 10 9 10 12/27/2021 6 2022 Hazards of Concern •Coastal Erosion and Retreat •Dam/Levee Failure •Drought •Expansive Soils •Extreme Temperature (Heat and Cold) •Flood (Coastal and Inland) •Hailstorm •Hurricane/Tropical Storm •Land Subsidence •Lightning •Pandemic •Severe Winter Weather •Tornado •Tsunami •Utility Failure •Wildfire (Urban and Rural) •Windstorm 11 Preliminary Hazard Ranking Formula 12 Probability of Occurrence (30%) Impacts (30%) Adaptive Capacity (30%) Climate Change (10%) Preliminary Hazard Ranking Impact to Economy Impact to Population Impact to Property Local community input to adjust preliminary rankings Local community input to adjust preliminary rankings 11 12 12/27/2021 7 Ranking the Hazards of Concern What information plays a role in determining the risk rankings? Preliminary Hazard Ranking 14 13 14 12/27/2021 8 Preliminary Hazard Ranking 15 Hazard of Concern 2017 Countywide Ranking 2022 Countywide Preliminary Ranking Dam and Levee Failure Low Low Drought Low Medium Erosion Low Low Expansive Soils Low High Extreme Temperature Low Medium Flood Low Medium Hail Low Low Hurricane and Tropical Storm Medium High Land Subsidence Low Low Lightning Low Low Pandemic Not profiled Low Severe Winter Storm Low Low Tornado Low Medium Tsunami Low Low Utility Failure Not profiled Low Wildfire Low Low Windstorm High Medium Municipal Preliminary Rankings 16 Clear Lake Shores (C)Dickinson (C)Friendswood (C) Hitchcock (C) Jamaica Beach (C) Kemah (C) La Marque (C) League City (C) Santa Fe (C) Bayou Vista (V) Tiki Island (V) Erosion Low Low Low High Low Medium Low Medium High Low High Dam and Levee Failure Low Low Low Low Low Low Low Low Low Low Low Drought Low Low Low Low Low Low Low Low Low Medium Medium Expansive Soils Low High High High Low Low High High Low High Low Extreme Temperature Medium Medium Medium Medium Medium Medium Medium Medium Medium Medium Medium Flood High High Low High High High Low Low Low High High Hail Low Low Low Low Low Low Low Low Low Low Low Hurricane High High Medium High High High High High Medium High High Land Subsidence Low Low Low Low Low Low Low Low Low Low Low Lightning Low Low Low Low Low Low Low Low Low Low Low Pandemic Low Low Low Low Low Low Low Low Low Low Low Severe Winter Storm Low Low Low Low Low Low Low Low Low Low Low Tornado Medium Medium Medium Medium Medium Medium Medium Medium Medium Medium Medium Tsunami Low Low Low Low Low Low Low Low Low Low Low Utility Failure Medium Medium Medium Medium Medium Medium Medium Medium Medium Medium Medium Wildfire Low Low Low Low Low Low Low Low Low Low Low Windstorm Medium Medium Medium Medium Medium Medium Medium Medium Medium Medium Medium 15 16 12/27/2021 9 Why are the rankings different from the last plan? •We used a different methodology for the 2022 HMP Population Property Economy Capabilities to respond to/address the hazard Climate change projections Probability of occurrence •We used different thresholds for the impacts listed above •We incorporated your capabilities to respond/address the hazard and the potential for climate change impacts 17 Hazard Ranking Input – 2022 HMP 18 Impact on Population – Function of population exposed Low – 14% or less population exposed Medium – 15%-29% population exposed High – 30%+ population exposed Impact on property – Function of structures exposed Low – 14% or less structures exposed Medium – 15%-29% structures exposed High – 30%+ structures exposed Impact on economy – Function of damages to building stock Low – 9% or less loss estimate of total replacement cost Medium – 10%-19% loss estimate of total replacement cost High – 19%+ loss estimate of total replacement cost Capability – Function of level of planning, policies, enforcement Low – outdated policies; limited to no deployable resources; limited capabilities to respond; long recovery Medium – minimum requirements; mitigation strategies identified but not implemented; moderate county capabilities High – exceed requirements; mitigation/protective measures in place; county/jurisdiction has ability to recover quickly because resources are readily available, and capabilities are high Climate Change – Function of climate predictions Low - No local data is available; modeling projects are uncertain on whether there is increased future risk; confidence level is low (inconclusive evidence) Medium - Studies and modeling projections indicate a potential for exacerbated conditions due to climate change High - Studies and modeling projections indicate exacerbated conditions/increased future risk due to climate change 17 18 12/27/2021 10 Coastal and Inland Erosion •Previous events include erosion along beaches as a result of coastal storms Any significant events in the last 5 years? •Looked at both coastal and inland erosion impacts Coastal – 100-ft shoreline buffer Inland – K factor >0.49 (susceptibility to erosion) 19 Probability - Occasional Population - Low Property - Low Economy - Medium Capacity – Medium Climate Change – High Ranking - Low 20 19 20 12/27/2021 11 Dam and Levee Failure •One dam and six levee systems Galveston County Water Industrial Reservoir Dam – high hazard Galveston County Industrial Water Reservoir Levee System Old Fort San Jacinto Levee System Pelican Island Levee 4 Pelican Island Levee System Shoal Point Levee System Texas City Hurricane Flood Protection •No reported failures or incidents in the County Are they any in the last five years we should include? 21 Probability - Rare Population - Medium Property - Medium Economy - Low Capacity – Medium Climate Change – Medium Ranking - Low Drought •Previous Events Between 1996 and 2021, 9 reported drought events in Galveston County; however, this may not represent all drought events that impacted the area. The County was included in 7 USDA Declarations for drought events between 2012 and 2021. •Exposure Entire Planning Area is vulnerable Increased vulnerability to populations at higher risk (65+ / <5 years old) •Potential impacts: Increased wildfire/brush fire risk Impacts to agriculture/farms Drinking water supply (groundwater and surface water) 22 Probability - Occasional Population - Medium Property - Medium Economy - Medium Capacity – Medium Climate Change – High Ranking - Medium 21 22 12/27/2021 12 Expansive Soils •Little to no information on expansive soil incidents in the County. Expansive soils cause structures to move unevenly and crack and cause roads and sidewalks to buckle. •Impacts People and structures located in areas with >6% extensibility (shrink-swell potential of soils) – high is anything over 6% 23 Probability - Rare Population - High Property - High Economy - High Capacity – Medium Climate Change – Medium Ranking - High Extreme Temperature •Previous Events Looked at both hot and cold events Between 2000 and 2021, the County had 67 days with temperatures over 90°F and two days with temperatures below 32°F •Exposure Entire Planning Area is vulnerable Increased vulnerability to populations at higher risk (65+ / <5 years old) 24 Probability - Frequent Population - Medium Property - Low Economy - Low Capacity – Medium Climate Change – High Ranking - Medium 23 24 12/27/2021 13 Flood •Previous Events Looked at riverine, coastal, flash, and stormwater flooding 10 FEMA disaster declarations since 1973 specific to flooding; 113 reported flood events since 1996 •Exposure People and property located in the 1% annual chance flood area 25 Probability - Frequent Population - Medium Property - Low Economy - High Capacity – Medium Climate Change – High Ranking - Medium 26 25 26 12/27/2021 14 Hail •Previous Events 120 hail events since 1957 causing over $3 million in property damage (as reported to NOAA). Largest hail diameter – 4.5 inches in Hitchcock on April 2, 2013 •Exposure Entire population and building stock vulnerable 27 Probability - Occasional Population - Low Property - Low Economy - Low Capacity – Medium Climate Change – Medium Ranking - Low Hurricane and Tropical Storm •Previous Events 4 events since 2017; 16 FEMA disaster declarations related to hurricanes and tropical storms Most recent event to hit the County – Hurricanes Laura and Nicholas •Exposure Population and property exposed to storm surge Used Category 4 storm surge to develop ranking 28 Probability - Occasional Population - High Property - High Economy - High Capacity – Medium Climate Change – High Ranking - High 27 28 12/27/2021 15 29 Land Subsidence •Previous Events No record of subsidence incidents since 2017; however, it is a continuous hazard, and its effects are often combined with other events Rates of decreased over time, but the effects are still a risk •Exposure Limited exposure to population and buildings 30 Probability - Rare Population - Low Property - Low Economy - Low Capacity – Medium Climate Change – Medium Ranking - Low 29 30 12/27/2021 16 Lightning •Previous Events Three recorded lightning strike since 2017; over $900,000 in property damage •Exposure All people and property exposed and vulnerable; however, damage from lightning strikes are considered minimal 31 Probability - Occasional Population - Low Property - Low Economy - Low Capacity – Medium Climate Change – Medium Ranking - Low Pandemic •Previous Events Looked at COVID-19, Flu, and West Nile Virus •Exposure Entire County is exposed and vulnerable; however, not occurring multiple times a year with significant impacts Severe events can lead to staffing and bed shortages in hospitals 32 Probability - Occasional Population - Medium Property - Low Economy - Low Capacity – Medium Climate Change – Medium Ranking - Low 31 32 12/27/2021 17 Severe Winter Storm •Previous Events Snow event in December 2017 Most recent event occurred February 2021 – below- freezing temperatures, power outages •Exposure All people and property in the Planning Area are vulnerable Populations of 65+ and <5 may be more at risk 33 Probability - Rare Population - Medium Property - Low Economy - Low Capacity – Medium Climate Change – Medium Ranking - Low Tornado •Previous Events 15 reported tornadoes/funnel clouds since 2017; over $780,000 in property damage •Exposure All people and property in the Planning Area exposed and vulnerable 34 Probability - Occasional Population - Medium Property - Medium Economy - Medium Capacity – Medium Climate Change – Medium Ranking - Medium 33 34 12/27/2021 18 Tsunami •Previous Events No recorded tsunamis in Galveston County or Texas •Exposure Looked at population and buildings located in the tsunami hazard area – evacuation areas plus high tide (322 ft from mapped shoreline) Only 0.4% of population exposed and 0.8% of buildings exposed 35 Probability - Rare Population - Low Property - Low Economy - Low Capacity – Medium Climate Change – Medium Ranking - Low Utility Failure •Previous Events Looked at power outages and events that downed power lines and utility poles •Exposure Entire County is exposed and vulnerable; however, overall impacts or low to medium 36 Probability - Frequent Population - Medium Property - Low Economy - Medium Capacity – Medium Climate Change – Medium Ranking - Medium 35 36 12/27/2021 19 Wildfire •Previous Events No events identified during our research Any events to include? •Exposure People and property located in the Wildland-Urban Interface/Intermix (WUI) areas WUI is the area where houses meet or intermingle with undeveloped wildland vegetation. 37 Probability - Rare Population - Low Property - Low Economy - Low Capacity – Medium Climate Change – Medium Ranking - Low 38 37 38 12/27/2021 20 Windstorm •Previous Events Wind-related events associated with thunderstorms Since 2017, 22 wind-related events (associated with thunderstorms); $63,000 in property damage and $6,500 in crop damage •Exposure Looked at population and property exposed to a 500-year event (Category 4 wind gusts – 130-156 mph) 39 Probability - Occasional Population - Medium Property - Medium Economy - Medium Capacity – Medium Climate Change – High Ranking - Medium 40 39 40 12/27/2021 21 Next Steps 41 Next Steps •Mitigation Actions – worksheets due Wednesday, December 29th If you need help completing, please reach out to Tetra Tech •Finalize risk assessment – due to Tetra Tech by Wednesday, December 29th •Finalize annexes by January 7, 2022 •Submit Draft Plan for TDEM/FEMA Review •Adopt FEMA - Approved Plan •Implement Projects and Maintain the Plan Increase Resilience! 42 41 42 12/27/2021 22 Questions? 43 Galveston County Project Contacts Laura Norman, Deputy Emergency Management Coordinator (281) 309-5013|laura.norman@co.galveston.tx.us Tetra Tech Project Contacts Heather Apgar, CFM, Project Manager (973) 630-8046 | heather.apgar@tetratech.com Thank You! This Photo by Unknown Author is licensed under CC BY-SA 43 44 Galveston County, TX Hazard Mitigation Plan 2022 Update Draft Plan Presentation January 25, 2022 | 2:00 pm CT Meeting Location | 1353 FM 646 – Suite 201; Dickinson, TX Draft Plan Presentation| Agenda PAGE | 1 1. Opening Remarks 2. In-Kind Tracking • Use the Word tracker or online tracker to document time spent working on the HMP https://www.surveymonkey.com/r/Galveston_inKind 3. Project Status – • Where we are in the process, participation status, public outreach, survey discussions 4. Draft Plan Overview – • What’s new • Review each section • Plan Maintenance • Finalizing the Plan 5. Section Contents of HMP 6. Next Steps 7. Questions 2/2/2022 1 Galveston County, Texas Hazard Mitigation Plan – 2022 Update Draft Plan Presentation| January 25, 2022 Agenda •In-Kind Tracking •Draft Plan Review What’s New Section-by-section content overview Review guidelines Finalizing the plan •Next Steps •Questions 2 1 2 2/2/2022 2 In-Kind Tracking Reminder •Document your time working on the HMP (e.g., attend meetings, complete worksheets and surveys, emails, etc.) •Use the Word tracker or online tracker https://www.surveymonkey.com/r/Galveston_i nKind 3 What’s New in the 2022 Update? •Critical facilities – updated inventory and included community lifelines •Hazards of concern – incorporated new hazards, concise hazard profiles, included recent events •Climate change impacts and adaptive capacity to reduce vulnerability used in hazard ranking •Jurisdictional annexes – each municipality and the County have their own ‘chapter’ Enhanced capability assessment including integration Mitigation actions for every hazard of concern 3 4 2/2/2022 3 Section Contents •Volume I Section 1 – Introduction –Mitigation planning overview –Participating jurisdictions –2022 updates and summary of changes since last plan Section 2 – Planning Process –Plan participants (committees, stakeholders, etc.) –Activities –Ongoing process Section Contents •Section 3 – County Profile History & Physical Setting Major Hazard Event History Population and Demographics General Building Stock Land Use and Population Trends Critical Facilities & Lifelines 5 6 2/2/2022 4 Section Contents •Section 4 – Risk Assessment Methodology and Tools – –Describes the various procedures and tools used to complete the risk assessment. –Steps to do so included identifying and profiling each hazard of concern; determine exposure to each hazard; and assess the vulnerability of exposed population/buildings/economy. Identification of Hazards of Concern –Process to go through all potential hazards and identify the hazards that have the potential to impact Galveston County Hazard Profiles –Created individual sections for each hazard of concern. –Each section includes: –Hazard Profile – description, location, extent, worst-case scenario, previous occurrences, climate change projections, and probability of future events –Vulnerability Assessment – impact on life/health/safety, impact on building stock and critical facilities, impact on economy, impact on the environment, future changes that may impact vulnerability, and changes in vulnerability since the last plan Hazard Ranking –Provides a preliminary ranking (high, medium, low) of each hazard to show the County and municipalities hazards of greatest risk 7 Section Contents •Section 5 – Capability Assessment Capability Assessment –Available plans, programs, & resources –Administrative and technical capabilities –Fiscal capabilities •Section 6 - Mitigation Strategies Past accomplishments Goals and Objectives Mitigation strategy development and update –Action identification –Evaluation and prioritization –Benefit/cost review 2022 Goals 1. Minimize loss of life, injury, damage to property, the economy, and natural systems from natural and human-caused hazard events 2. Maintain and enhance emergency management/mitigation capabilities 3. Enhance and Maintain public education and awareness activities 4. Address Long-Term Vulnerabilities from High Hazard Dams 7 8 2/2/2022 5 Section Contents •Section 7 – Plan Maintenance HMP Coordinator Ongoing Planning Partnership – meet annually to discuss HMP Monitoring Continuous evaluation and progress reports –FEMA action worksheets and BATool℠ Updating Integrating the HMP with existing and future programs Continued public involvement BAToolSM •Online progress reporting for individual mitigation actions – pre-populated by Tetra Tech Galveston County 9 10 2/2/2022 6 Plan Maintenance Review 11 Section Contents •Volume II Section 8 – Planning Partnership –Participating jurisdictions –Introduction to jurisdictional annexes Section 9 – Jurisdictional Annexes –Points of Contact and Who Participated –Municipal Profile –Capabilities –Risk Assessment –Status of Past Mitigation Actions –Current Mitigation Actions 11 12 2/2/2022 7 Section Contents - Appendices •Appendices Appendix A Plan Adoption Appendix B Participation Documentation Appendix C Meeting Documentation Appendix D Public and Stakeholder Outreach Documentation Appendix E Mitigation Strategy Supplementary Data Appendix F Plan Maintenance Tools Appendix G Linkage Procedures Appendix H Critical Facilities Review the Draft Plan •The entire plan will be posted on the Galveston County website for a 14-day review period (starting Monday, January 31st) You can review sections of the plan during the public review, and we will incorporate any applicable revisions into the final deliverable to the State and FEMA •TDEM will begin their review concurrently with the public review period. This will help with their review/approval process and submittal to FEMA. •Public feedback to be incorporated as appropriate prior to submittal to TDEM/FEMA for their review. If needed, we will hold a brief meeting to discuss public comments and how to incorporate – date TBD 13 14 2/2/2022 8 Next Steps •Draft Posted for Public Review and Comment – 14 Days •Submit to TDEM – January 31st •Submit to FEMA – once TDEM reviews and approves the HMP •Estimated 45-day FEMA review period •BAToolSM Webinar to Review Plan Maintenance •Plan Adoption by County and Participating Municipalities •Leverage the plan to create mitigation principles in Galveston County! 15 Questions? 16 15 16 2/2/2022 9 Galveston County Project Contacts Laura Norman, Deputy Emergency Management Coordinator (281) 309-5013|laura.norman@co.galveston.tx.us Tetra Tech Project Contacts Heather Apgar, CFM, Project Manager (973) 630-8046 | heather.apgar@tetratech.com Thank You! This Photo by Unknown Author is licensed under CC BY-SA 17 APPENDIX D: PUBLIC AND STAKEHOLDER OUTREACH Galveston County, TX | Hazard Mitigation Plan D-1 2022 Update APPENDIX D. PUBLIC AND STAKEHOLDER OUTREACH This appendix provides documentation of public and stakeholder outreach. Stakeholder involvement in this planning process was broad and productive as discussed and further documented in Section 3 (Planning Process). Public and stakeholder input has been incorporated throughout this HMP as appropriate, as identified in Section 3 and the References section. D.1 Website and Social Media Posts The following provides screenshots of websites, news articles, and social media posts. Figure D-1. County Postings About HMP APPENDIX D: PUBLIC AND STAKEHOLDER OUTREACH Galveston County, TX | Hazard Mitigation Plan D-2 2022 Update Figure D-2. Municipal Postings About HMP D.2 Stakeholder Surveys This section contains information and results gathered from the Galveston County Stakeholder Survey. Unlike steering committee or planning partnership members, stakeholders may not be involved in all stages of the planning process, but they may have information or input to provide. In order to gather that information, the surveys were sent to the following stakeholders that provide various services to the County (emergency APPENDIX D: PUBLIC AND STAKEHOLDER OUTREACH Galveston County, TX | Hazard Mitigation Plan D-3 2022 Update services, academic/research, public works, utility providers, business/commerce, hospitals/medical services, and transportation). Results of the surveys are provided below, with personal information redacted. D.1.1 Stakeholder Survey The stakeholder survey was designed to help identify general needs for hazard mitigation and resiliency within Galveston County from its perspective, as well as to identify specific projects that may be included in the mitigation plan. It was distributed to identified stakeholders, including the various county and municipal departments and agencies in the county. As of January 28, 2022, 8 stakeholders completed the survey, 40% of which in the emergency services category, 20% in academic/research, 20% in public work, and 20% in utilities. Hazard and Damage Identification Half of respondents said the buildings/facilities/structures they have worked in and/or are responsible for have been impacted by a hazard; 25% said no and 25% were unsure. Those that experienced damage stated that the structures had wind and flood damage from hurricanes, with some reporting complete destruction of buildings. When asked what areas are most vulnerable to hazards in the County, answers included storm surge flooding, hazardous material releases, flooding from heavy rainfall, structures not built to withstand hurricane impacts, exposed water lines, and road/underpass flooding. Over 60% of respondents believe the facilities and infrastructure for their organization are equipped to handle a disaster and/or are resilient to damages; 25% said no; and 12/5% says maybe. Community Preparedness A majority of respondents (75%) stated that their organization has an emergency operations plan. Half of the respondents stated they are covered by a Continuity of Operations Plan, a Continuity of Government Plan. One respondent indicated that they have risk and vulnerability assessments and one was unsure of what plans are available in their organization. Figure D-3. Stakeholder Category APPENDIX D: PUBLIC AND STAKEHOLDER OUTREACH Galveston County, TX | Hazard Mitigation Plan D-4 2022 Update Figure D-4. Plans of Stakeholders Project Identification Respondents identified the following projects or programs that could reduce their organization’s vulnerability to damages, including operation of service: • Reduce vulnerability to water systems • Storage and emergency operations building to place equipment and materials prior to a hurricane or other event to allow for access during the event • Relocating water lines to reduce risk of line being severed during a storm • Improvements to drainage systems The following were identified as recently implemented projects that reduced vulnerabilities to hazard events: • Elevated operations center in Dickinson • Elevated 1 million gallon storage tank to provide drinking water during power outages or damages Respondents were also asked to detail how their organization has been involved in response to the ongoing COVID-19 pandemic. Respondents detailed the following: • Weather briefings to support outdoor testing and vaccination operations • Testing, vaccinations, contact tracing, and data collection • Providing potable water throughout the pandemic • Testing center for fire, police, EMS, and municipal employees • Emotional support and resources The following services and infrastructure needs were identified by respondents as needing to be built or improved upon within their communities in order to mitigate damages experienced by the pandemic: • Crew living quarters • Air filtration systems • Water and wastewater operations D.1.2 Neighboring County Survey The neighbor survey was sent to the surrounding counties of Galveston County due to their proximity to and because effects of hazard events that impact Galveston County would be similar to that of their neighbors. As of January 28, 2022, one county completed the survey. The respondent stated Galveston County is involved in APPENDIX D: PUBLIC AND STAKEHOLDER OUTREACH Galveston County, TX | Hazard Mitigation Plan D-5 2022 Update their county’s comprehensive emergency operations planning. Together, they are part of UASI, HGAC, MACC and various hurricane and evacuation plans. During emergency operations and disaster response, the counties communicate through conference calls, MACC, and mutual aid requests. They are also part of an evacuation hub plan. D.3 Galveston County Public Survey Results This section contains information and results gathered from the Galveston County Public Survey. The main objective of this survey was to gather information from citizens regarding their level of knowledge regarding hazard vulnerability and knowledge of hazard mitigation information for their local communities. 144 respondents completed this survey over a period of two months during the planning process. The survey was available on Galveston County OEM website (https://gcoem.org/) and several municipalities posted a link to the survey through their social media accounts. Survey responses are provided at the end of the appendix. D.3.1 Public Survey Results Demographically, survey respondents were from six of the participating municipalities within Galveston County, with 34% having lived in the county for 20 years or more, and the vast majority (96.5%) in their own home. The most common (38.9%) age of respondents was over the age of 60. Residents were asked the ways in which they receive their information concerning a natural disaster. The majority (71.3%) of respondents rely on the internet to receive information concerning natural disasters. Over half (59.1%) receive information through TV news and slightly under half (46.1%) receive information through municipal websites. Survey respondents were asked how concerned they were about 21 different hazards, on a scale of not concerned to extremely concerned. Respondents were most concerned (reporting “concerned”, “very concerned”, or “extremely concerned”) about hurricanes/tropical storms, flooding, and severe storms. About 57% of respondents’ properties are not located in the floodplain, with 36.5% within a floodplain and 6% are unsure. A majority of those have flood insurance (85%), 13% do not have flood insurance, and 1.7% are unsure if they have flood insurance. Residents were then asked what types of projects they believe local, county, state, or federal government agencies could be doing in order to reduce the damage and disruption of disasters in Galveston County including: • Improve and strengthen infrastructure, such as elevating roadways and improving drainage systems (82.6%) • Work on improving the damage resistance of utilities (electricity, communications, water/wastewater facilities etc.) (75.9%) • Buy out flood prone properties and maintain as open-space (47.1%) • Install or improve protective structures, such as bulkheads, floodwalls or levees to protect against flooding (41.3%) • Strengthen codes, ordinances and plans to require higher hazard risk management standards and/or provide greater control over development in high hazard areas (40.3%) • Assist vulnerable property owners with securing funding to mitigate their properties (30.7%) • Replace inadequate or vulnerable bridges and causeways (28.8%) • Inform property owners of ways they can mitigate damage to their properties (25.0%) • Provide better information about hazard risks and high-hazard areas (25.0%) • Improve and strengthen critical facilities such as police, schools, hospitals (22.1%) • Enhance dune restoration and beach nourishment projects/programs (18.2%) APPENDIX E: MITIGATION STRATEGY SUPPLEMENT Galveston County, TX | Hazard Mitigation Plan E-1 2022 Update APPENDIX E. MITIGATION STRATEGY SUPPLEMENT This appendix summarizes additional activities and resources provided to plan participants to support the update of the mitigation strategy. E.1 Mitigation Strategy Workshop Resources On December 2, 2021 a Mitigation Strategy Workshop was held for all plan participants. The workshop was conducted as a hybrid meeting due to current coronavirus pandemic. The workshop was led by the contract consultant and supplemented by emails and phone calls between jurisdictions and the contract consultant, for all participating jurisdictions to support the development of mitigation strategies. Resources available at the workshop and follow up discussions included the following to assist with the identification of mitigation alternatives and the development of the mitigation strategy workshops found in Section 9 (Jurisdictional Annexes). 1.FEMA Local Mitigation Handbook 2.Strengths, Weaknesses, Obstacles and Opportunities exercise results 3.Public survey results 4.Galveston County Potential Mitigation Actions 5.FEMA Mitigation action types (Table E-1) 6.FEMA Mitigation Ideas 7.FEMA Region 6 Funding Sources for Texas E.1.1 Types of Mitigation Actions A mitigation action is a specific action, project, activity, or process taken to reduce or eliminate long-term risk to people and property from hazards and their impacts. Implementing mitigation actions helps achieve the plan’s mission and goals. The actions to reduce vulnerability to threats and hazards form the core of the plan and are a key outcome of the planning process. The primary types of mitigation actions to reduce long-term vulnerability are: •Local Plans and Regulations (LPR) •Structure and Infrastructure Projects (SIP) •Natural Systems Protection (NSP) •Education and Awareness Programs (EAP) Table E-1. FEMA Mitigation Action Types Mitigation Type Description Examples Local Plans and Regulations These actions include government authorities, policies, or codes that influence the way land and buildings are developed and built. •Comprehensive plans •Land use ordinances •Subdivision regulations •Development review •Building codes and enforcement •NFIP Community Rating System •Capital improvement programs •Open space preservation •Stormwater management regulations and master plans Structure and Infrastructure Projects These actions involve modifying existing structures and infrastructure to protect them from •Acquisitions and elevations of structures in flood prone areas APPENDIX E: MITIGATION STRATEGY SUPPLEMENT Galveston County, TX | Hazard Mitigation Plan E-2 2022 Update Mitigation Type Description Examples a hazard or remove them from a hazard area. This could apply to public or private structures as well as critical facilities and infrastructure. This type of action also involves projects to construct manmade structures to reduce the impact of hazards. Many of these types of actions are projects eligible for funding through the FEMA Hazard Mitigation Assistance program. •Utility undergrounding •Structural retrofits •Floodwalls and retaining walls •Detention and retention structures •Culverts •Safe rooms Natural Systems Protection These are actions that minimize damage and losses and also preserve or restore the functions of natural systems. •Sediment and erosion control •Stream corridor restoration •Forest management •Conservation easements •Wetland restoration and preservation Education and Awareness Programs These are actions to inform and educate citizens, elected officials, and property owners about hazards and potential ways to mitigate them. These actions may also include participation in national programs, such as StormReady or Firewise Communities. Although this type of mitigation reduces risk less directly than structural projects or regulation, it is an important foundation. A greater understanding and awareness of hazards and risk among local officials, stakeholders, and the public is more likely to lead to direct actions. •Radio or television spots •Websites with maps and information •Real estate disclosure •Presentations to school groups or neighborhood organizations •Mailings to residents in hazard-prone areas •StormReady •Firewise Communities Galveston County HMP Suggested Mitigation Actions 2022 The General Mitigation Actions tab contains ideas for actions to address each hazard. The Jurisdictional tabs identify actions to address capability gaps that were identified in each jurisdiction's capability assessment worksheets. Actions can be reworded to more accurately fit jurisdictional needs. Risk can be reduced through mitigation by manipulating the hazard, reducing exposure to the hazard, reducing the vulnerability and/or increasing capability. And, where mitigation is not yet possible, the risk can be reduced through preparation, response and/or recovery. These lists are not meant to be exhaustive, but to inspire thought. Not every potential action needs to be included in your plan. General Mitigation Action Coastal & Inland Erosion Dam & Levee Failure Drought Expansive Soils Extreme Temperatures Flood Hail Hurricane & Tropical Storm Land Subsidence Lightning Pandemic Severe Winter Storm Thunderstor m Wind Tornadoes Tsunami Utility Failure Wildfire Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.X X X X X X X X X X X X X X Purchase generators for critical facilities and infrastructure that lack adequate backup power.X X X X X X X X X X X X Replace earthen dams and levees with hardened structures X X Consider open space land uses in identified hazard areas X X X X X X X Ground water recharge through stormwater management X X Develop a public education program on drought resilience X Utilize drought-resistant landscapes on community-owned facilities X Construct regional stormwater control facilities X Educate the public on land instability hazards and appropriate risk reduction alternatives.X X X Develop a regular tree maintenance program to remove growth from utility lines.X X X Harden infrastructure by locating utilities underground.X X X X X X X X Establish evacuation sanctuaries within areas of potential tsunami inundation zones.X Develop and communicate evacuation routes.X X X X X Clear fuels such as dry brush and diseased trees on public land.X Create and maintain defensible space around structures and infrastructure.X Develop public awareness campaigns on illness prevention.X Stock sufficient amounts of PPE and other supplies or materials needed for staff to function during a pandemic outbreak.X Retrofit public buildings to meet social distancing and contactless service guidelines.X Galveston County Capability Gap Addressed Potential Actions - Galveston County Planning and Regulatory Gaps Develop and adopt a Zoning/Land Use Code Planning and Regulatory Gaps Develop and adopt a Subdivision Ordinance Planning and Regulatory Gaps Develop and adopt a Site Plan Ordinance Planning and Regulatory Gaps Develop and adopt a Growth Management Ordinance Planning and Regulatory Gaps Develop and adopt a Wellhead Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Climate Change Ordinance Planning and Regulatory Gaps Develop and adopt a Comprehensive Plan Planning and Regulatory Gaps Develop and adopt a Capital Improvement Plan Planning and Regulatory Gaps Develop and adopt an Open Space Plan Planning and Regulatory Gaps Develop and adopt an Urban Water Management Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt an Economic Development Plan Planning and Regulatory Gaps Develop and adopt a Community Wildfire Protection Plan Planning and Regulatory Gaps Develop and adopt a Community Forest Management Plan Planning and Regulatory Gaps Develop and adopt a Transportation Plan Planning and Regulatory Gaps Develop and adopt a Climate Action/ Resiliency/Sustainability Plan Planning and Regulatory Gaps Develop and adopt a Tourism Plan Planning and Regulatory Gaps Develop and adopt a Business/ Downtown Development Plan Planning and Regulatory Gaps Develop and adopt a Strategic Recovery Planning Report Other Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community. Development and Permitting Gaps Develop an inventory of buildable land Administrative and Technical Gaps Organize a Planning Board Administrative and Technical Gaps Organize a Zoning Board of Adjustments Administrative and Technical Gaps Organize an Open Space Board/Committee Administrative and Technical Gaps Hire staff with expertise or training in benefit/cost analysis Administrative and Technical Gaps Hire a Resilience Officer Community Classification Gaps Determine feasibility of joining or improving the current classification of the Community Rating System (CRS) Determine feasibility of the Building Code Effectiveness Grading Schedule (BCEGS) Community Classification Gaps Determine feasibility of becoming a Firewise community NFIP Gaps Maintain a list of properties that have been damaged by flooding NFIP Gaps Maintain a list of property owners interested in flood mitigation (elevation or acquisition). NFIP Gaps Develop RiskMAP projects NFIP Gaps Develop flood hazard maps to adequately address the flood risk NFIP Gaps Develop resources to determine possible future flooding conditions from climate change. NFIP Gaps Assist/train floodplain management staff to support the floodplain management program. NFIP Gaps Overcome the barriers to running an effective NFIP program. NFIP Gaps Address outstanding NFIP compliance violations. NFIP Gaps Amend the flood damage prevention ordinance. NFIP Gaps Develop local ordinances, plans or programs (e.g. site plan review) that support floodplain management and meeting the NFIP requirements. For instance, the planning board or zoning board could consider efforts to reduce flood risk when reviewing variances such as height restrictions. Other Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: •Enforce the flood damage prevenon ordinance. •Parcipate in floodplain idenficaon and mapping updates. •Provide public assistance/informaon on floodplain requirements and impacts. Bayou Vista Capability Gap Addressed Potential Actions - Bayou Vista Planning and Regulatory Gaps Develop and adopt a Zoning/Land Use Code Planning and Regulatory Gaps Develop and adopt a Subdivision Ordinance Planning and Regulatory Gaps Develop and adopt a Site Plan Ordinance Planning and Regulatory Gaps Develop and adopt a Stormwater Management Ordinance Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery/ Reconstruction Ordinance Planning and Regulatory Gaps Develop and adopt a Growth Management Ordinance Planning and Regulatory Gaps Develop and adopt an Environmental Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Wellhead Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Emergency Management Ordinance Planning and Regulatory Gaps Develop and adopt a Climate Change Ordinance Planning and Regulatory Gaps Develop and adopt a Comprehensive Plan Planning and Regulatory Gaps Develop and adopt a Capital Improvement Plan Planning and Regulatory Gaps Develop and adopt a Stormwater Management Plan Planning and Regulatory Gaps Develop and adopt an Open Space Plan Planning and Regulatory Gaps Develop and adopt an Urban Water Management Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt an Economic Development Plan Planning and Regulatory Gaps Develop and adopt a Shoreline Management Plan Planning and Regulatory Gaps Develop and adopt a Community Wildfire Protection Plan Planning and Regulatory Gaps Develop and adopt a Community Forest Management Plan Planning and Regulatory Gaps Develop and adopt a Transportation Plan Planning and Regulatory Gaps Develop and adopt an Agriculture Plan Planning and Regulatory Gaps Develop and adopt a Climate Action/ Resiliency/Sustainability Plan Planning and Regulatory Gaps Develop and adopt a Tourism Plan Planning and Regulatory Gaps Develop and adopt a Business/ Downtown Development Plan Planning and Regulatory Gaps Develop and adopt a Comprehensive Emergency Management Plan Planning and Regulatory Gaps Develop and adopt a Continuity of Operations Plan Develop and adopt a Strategic Recovery Planning Report Planning and Regulatory Gaps Develop and adopt a Threat & Hazard Identification & Risk Assessment (THIRA) Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery Plan Planning and Regulatory Gaps Develop and adopt a Public Health Plan Other Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community. Development and Permitting Gaps Develop a database to track building permits in hazard areas Administrative and Technical Gaps Organize a Planning Board Administrative and Technical Gaps Organize a Zoning Board of Adjustments Administrative and Technical Gaps Develop a Planning Department Administrative and Technical Gaps Develop a Mitigation Planning Committee Administrative and Technical Gaps Organize an Environmental Board/Commission Administrative and Technical Gaps Organize an Open Space Board/Committee Administrative and Technical Gaps Organize an Economic Development Commission/Committee Administrative and Technical Gaps Develop a Public Works/Highway Department Administrative and Technical Gaps Develop maintenance programs to reduce risk Administrative and Technical Gaps Hire planners or engineers with knowledge of land development and land management practices Administrative and Technical Gaps Hire engineers or professionals trained in building or infrastructure construction practices Administrative and Technical Gaps Hire planners or engineers with an understanding of natural hazards Administrative and Technical Gaps Hire personnel skilled or trained in GIS and/or HAZUS – Multi-Hazards (MH) applications Administrative and Technical Gaps Hire scientist familiar with natural hazards Administrative and Technical Gaps Hire surveyor(s) Administrative and Technical Gaps Hire an Emergency Manager Administrative and Technical Gaps Hire grant writer(s) Administrative and Technical Gaps Hire a Resilience Officer Education and Outreach Gaps Develop citizen boards or commissions that address issues related to hazard mitigation Education and Outreach Gaps Develop natural disaster/safety programs for outreach in schools Community Classification Gaps Determine feasibility of joining or improving the current classification of the Community Rating System (CRS) Community Classification Gaps Determine feasibility of the Building Code Effectiveness Grading Schedule (BCEGS) Community Classification Gaps Determine feasibility of becoming a StormReady community Community Classification Gaps Determine feasibility of becoming a Firewise community NFIP Gaps Develop RiskMAP projects NFIP Gaps Hire a certified floodplain manager. NFIP Gaps Develop resources to determine possible future flooding conditions from climate change. NFIP Gaps Assist/train floodplain management staff to support the floodplain management program. NFIP Gaps Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: •Enforce the flood damage prevenon ordinance. •Parcipate in floodplain idenficaon and mapping updates. •Provide public assistance/informaon on floodplain requirements and impacts. Clear Lake Shores Capability Gap Addressed Potential Actions - Clear Lake Shores Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery/ Reconstruction Ordinance Planning and Regulatory Gaps Develop and adopt a Growth Management Ordinance Planning and Regulatory Gaps Develop and adopt an Environmental Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Wellhead Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Climate Change Ordinance Planning and Regulatory Gaps Develop and adopt a Comprehensive Plan Planning and Regulatory Gaps Develop and adopt a Capital Improvement Plan Planning and Regulatory Gaps Develop and adopt an Open Space Plan Planning and Regulatory Gaps Develop and adopt an Urban Water Management Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Shoreline Management Plan Planning and Regulatory Gaps Develop and adopt a Community Wildfire Protection Plan Planning and Regulatory Gaps Develop and adopt a Community Forest Management Plan Planning and Regulatory Gaps Develop and adopt a Transportation Plan Planning and Regulatory Gaps Develop and adopt an Agriculture Plan Planning and Regulatory Gaps Develop and adopt a Climate Action/ Resiliency/Sustainability Plan Planning and Regulatory Gaps Develop and adopt a Tourism Plan Planning and Regulatory Gaps Develop and adopt a Continuity of Operations Plan Planning and Regulatory Gaps Develop and adopt a Strategic Recovery Planning Report Planning and Regulatory Gaps Develop and adopt a Threat & Hazard Identification & Risk Assessment (THIRA) Planning and Regulatory Gaps Develop and adopt a Public Health Plan Other Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community. Administrative and Technical Gaps Develop a Planning Department Administrative and Technical Gaps Develop a Mitigation Planning Committee Administrative and Technical Gaps Organize an Environmental Board/Commission Administrative and Technical Gaps Organize an Open Space Board/Committee Administrative and Technical Gaps Develop mutual aid agreements Write and implement a Human Resources Manual Administrative and Technical Gaps Hire planners or engineers with knowledge of land development and land management practices Administrative and Technical Gaps Hire engineers or professionals trained in building or infrastructure construction practices Administrative and Technical Gaps Hire planners or engineers with an understanding of natural hazards Administrative and Technical Gaps Hire staff with expertise or training in benefit/cost analysis Administrative and Technical Gaps Hire scientist familiar with natural hazards Administrative and Technical Gaps Hire surveyor(s) Administrative and Technical Gaps Hire grant writer(s) Administrative and Technical Gaps Hire a Resilience Officer Education and Outreach Gaps Develop citizen boards or commissions that address issues related to hazard mitigation Education and Outreach Gaps Develop natural disaster/safety programs for outreach in schools Community Classification Gaps Continue working to join the Community Rating System (CRS) Community Classification Gaps Determine feasibility of the Building Code Effectiveness Grading Schedule (BCEGS) Community Classification Gaps Determine feasibility of becoming a StormReady community Community Classification Gaps Determine feasibility of becoming a Firewise community NFIP Gaps Maintain a list of property owners interested in flood mitigation (elevation or acquisition). NFIP Gaps Develop RiskMAP projects NFIP Gaps Develop resources to determine possible future flooding conditions from climate change. NFIP Gaps Overcome the barriers to running an effective NFIP program. NFIP Gaps Address outstanding NFIP compliance violations. NFIP Gaps Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: •Enforce the flood damage prevenon ordinance. •Parcipate in floodplain idenficaon and mapping updates. •Provide public assistance/informaon on floodplain requirements and impacts. Dickinson Capability Gap Addressed Potential Actions - Dickinson Planning and Regulatory Gaps Develop and adopt a Growth Management Ordinance Planning and Regulatory Gaps Develop and adopt a Wellhead Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Climate Change Ordinance Planning and Regulatory Gaps Develop and adopt a Disaster Debris Management Plan Planning and Regulatory Gaps Develop and adopt an Urban Water Management Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt an Economic Development Plan Planning and Regulatory Gaps Develop and adopt a Shoreline Management Plan Planning and Regulatory Gaps Develop and adopt a Community Wildfire Protection Plan Planning and Regulatory Gaps Develop and adopt a Community Forest Management Plan Planning and Regulatory Gaps Develop and adopt a Climate Action/ Resiliency/Sustainability Plan Planning and Regulatory Gaps Develop and adopt a Tourism Plan Planning and Regulatory Gaps Develop and adopt a Business/ Downtown Development Plan Planning and Regulatory Gaps Develop and adopt a Continuity of Operations Plan Planning and Regulatory Gaps Develop and adopt a Strategic Recovery Planning Report Planning and Regulatory Gaps Develop and adopt a Threat & Hazard Identification & Risk Assessment (THIRA) Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery Plan Planning and Regulatory Gaps Develop and adopt a Public Health Plan Other Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community. Administrative and Technical Gaps Organize an Environmental Board/Commission Administrative and Technical Gaps Organize an Open Space Board/Committee Administrative and Technical Gaps Write and implement a Human Resources Manual Administrative and Technical Gaps Hire personnel skilled or trained in GIS and/or HAZUS – Multi-Hazards (MH) applications Administrative and Technical Gaps Hire scientist familiar with natural hazards Administrative and Technical Gaps Hire surveyor(s) Administrative and Technical Gaps Hire grant writer(s) Administrative and Technical Gaps Hire a Resilience Officer Hire personnel skilled or trained in website development Education and Outreach Gaps Add hazard mitigation information to website Education and Outreach Gaps Begin using social media for hazard mitigation education and outreach Community Classification Gaps Determine feasibility of the Building Code Effectiveness Grading Schedule (BCEGS) Community Classification Gaps Determine feasibility of becoming a StormReady community Community Classification Gaps Determine feasibility of becoming a Firewise community NFIP Gaps Maintain a list of properties that have been damaged by flooding NFIP Gaps Maintain a list of property owners interested in flood mitigation (elevation or acquisition). NFIP Gaps Develop RiskMAP projects NFIP Gaps Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: •Enforce the flood damage prevenon ordinance. •Parcipate in floodplain idenficaon and mapping updates. •Provide public assistance/informaon on floodplain requirements and impacts. Friendswood Capability Gap Addressed Potential Actions - Friendswood Planning and Regulatory Gaps Develop and adopt a Wellhead Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Climate Change Ordinance Planning and Regulatory Gaps Develop and adopt an Open Space Plan Planning and Regulatory Gaps Develop and adopt an Urban Water Management Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt an Economic Development Plan Planning and Regulatory Gaps Develop and adopt a Shoreline Management Plan Planning and Regulatory Gaps Develop and adopt a Community Wildfire Protection Plan Planning and Regulatory Gaps Develop and adopt a Community Forest Management Plan Planning and Regulatory Gaps Develop and adopt an Agriculture Plan Planning and Regulatory Gaps Develop and adopt a Climate Action/ Resiliency/Sustainability Plan Planning and Regulatory Gaps Develop and adopt a Tourism Plan Planning and Regulatory Gaps Develop and adopt a Strategic Recovery Planning Report Other Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community. Development and Permitting Gaps Develop an inventory of buildable land Administrative and Technical Gaps Organize an Environmental Board/Commission Administrative and Technical Gaps Organize an Open Space Board/Committee Administrative and Technical Gaps Write and implement a Human Resources Manual Administrative and Technical Gaps Hire scientist familiar with natural hazards Administrative and Technical Gaps Hire surveyor(s) Administrative and Technical Gaps Hire a Resilience Officer Education and Outreach Gaps Develop citizen boards or commissions that address issues related to hazard mitigation Education and Outreach Gaps Develop natural disaster/safety programs for outreach in schools Community Classification Gaps Determine feasibility of improving the current classification of the Community Rating System (CRS) Community Classification Gaps Determine feasibility of becoming a Firewise community NFIP Gaps Address outstanding NFIP compliance violations. NFIP Gaps Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: •Enforce the flood damage prevenon ordinance. •Parcipate in floodplain idenficaon and mapping updates. •Provide public assistance/informaon on floodplain requirements and impacts. Hitchcock Capability Gap Addressed Potential Actions - Hitchcock Planning and Regulatory Gaps Develop and adopt a Site Plan Ordinance Planning and Regulatory Gaps Develop and adopt a Stormwater Management Ordinance Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery/ Reconstruction Ordinance Planning and Regulatory Gaps Develop and adopt a Growth Management Ordinance Planning and Regulatory Gaps Develop and adopt an Environmental Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Wellhead Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Climate Change Ordinance Planning and Regulatory Gaps Develop and adopt an Open Space Plan Planning and Regulatory Gaps Develop and adopt an Urban Water Management Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt an Economic Development Plan Planning and Regulatory Gaps Develop and adopt a Shoreline Management Plan Planning and Regulatory Gaps Develop and adopt a Community Wildfire Protection Plan Planning and Regulatory Gaps Develop and adopt a Community Forest Management Plan Planning and Regulatory Gaps Develop and adopt a Transportation Plan Planning and Regulatory Gaps Develop and adopt an Agriculture Plan Planning and Regulatory Gaps Develop and adopt a Climate Action/ Resiliency/Sustainability Plan Planning and Regulatory Gaps Develop and adopt a Tourism Plan Planning and Regulatory Gaps Develop and adopt a Business/ Downtown Development Plan Planning and Regulatory Gaps Develop and adopt a Continuity of Operations Plan Planning and Regulatory Gaps Develop and adopt a Strategic Recovery Planning Report Planning and Regulatory Gaps Develop and adopt a Threat & Hazard Identification & Risk Assessment (THIRA) Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery Plan Planning and Regulatory Gaps Develop and adopt a Public Health Plan Other Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community. Development and Permitting Gaps Develop an inventory of buildable land Administrative and Technical Gaps Develop a Mitigation Planning Committee Organize an Environmental Board/Commission Administrative and Technical Gaps Organize an Open Space Board/Committee Administrative and Technical Gaps Write and implement a Human Resources Manual Administrative and Technical Gaps Hire planners or engineers with knowledge of land development and land management practices Administrative and Technical Gaps Hire engineers or professionals trained in building or infrastructure construction practices Administrative and Technical Gaps Hire planners or engineers with an understanding of natural hazards Administrative and Technical Gaps Hire staff with expertise or training in benefit/cost analysis Administrative and Technical Gaps Hire professionals trained in conducting damage assessments Administrative and Technical Gaps Hire personnel skilled or trained in GIS and/or HAZUS – Multi-Hazards (MH) applications Administrative and Technical Gaps Hire scientist familiar with natural hazards Administrative and Technical Gaps Hire surveyor(s) Administrative and Technical Gaps Hire an Emergency Manager Administrative and Technical Gaps Hire grant writer(s) Administrative and Technical Gaps Hire a Resilience Officer Education and Outreach Gaps Hire personnel skilled or trained in website development Education and Outreach Gaps Add hazard mitigation information to website Education and Outreach Gaps Begin using social media for hazard mitigation education and outreach Education and Outreach Gaps Develop citizen boards or commissions that address issues related to hazard mitigation Education and Outreach Gaps Develop warning systems for hazard events Education and Outreach Gaps Develop natural disaster/safety programs for outreach in schools Community Classification Gaps Determine feasibility of joining or improving the current classification of the Community Rating System (CRS) Community Classification Gaps Determine feasibility of the Building Code Effectiveness Grading Schedule (BCEGS) Community Classification Gaps Determine feasibility of becoming a StormReady community Community Classification Gaps Determine feasibility of becoming a Firewise community NFIP Gaps Maintain a list of property owners interested in flood mitigation (elevation or acquisition). NFIP Gaps Develop RiskMAP projects NFIP Gaps Develop flood hazard maps to adequately address the flood risk during heavy rain events. NFIP Gaps Hire a certified floodplain manager. NFIP Gaps Develop resources to determine possible future flooding conditions from climate change. NFIP Gaps Increase floodplain management staff to support the floodplain management program. NFIP Gaps Overcome the barriers to running an effective NFIP program. NFIP Gaps Address outstanding NFIP compliance violations. NFIP Gaps Amend the flood damage prevention ordinance last dated April 21, 2008. NFIP Gaps Develop local ordinances, plans or programs (e.g. site plan review) that support floodplain management and meeting the NFIP requirements. For instance, the planning board or zoning board could consider efforts to reduce flood risk when reviewing variances such as height restrictions. NFIP Gaps Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: •Enforce the flood damage prevenon ordinance. •Parcipate in floodplain idenficaon and mapping updates. •Provide public assistance/informaon on floodplain requirements and impacts. Jamaica Beach Capability Gap Addressed Potential Actions - Jamaica Beach Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery/ Reconstruction Ordinance Planning and Regulatory Gaps Develop and adopt a Wellhead Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Climate Change Ordinance Planning and Regulatory Gaps Develop and adopt a Capital Improvement Plan Planning and Regulatory Gaps Develop and adopt a Disaster Debris Management Plan Planning and Regulatory Gaps Develop and adopt a Floodplain Management or Watershed Plan Planning and Regulatory Gaps Develop and adopt an Open Space Plan Planning and Regulatory Gaps Develop and adopt an Urban Water Management Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt an Economic Development Plan Planning and Regulatory Gaps Develop and adopt a Community Wildfire Protection Plan Planning and Regulatory Gaps Develop and adopt a Community Forest Management Plan Planning and Regulatory Gaps Develop and adopt a Transportation Plan Planning and Regulatory Gaps Develop and adopt an Agriculture Plan Planning and Regulatory Gaps Develop and adopt a Climate Action/ Resiliency/Sustainability Plan Planning and Regulatory Gaps Develop and adopt a Tourism Plan Planning and Regulatory Gaps Develop and adopt a Business/ Downtown Development Plan Planning and Regulatory Gaps Develop and adopt a Continuity of Operations Plan Planning and Regulatory Gaps Develop and adopt a Strategic Recovery Planning Report Planning and Regulatory Gaps Develop and adopt a Threat & Hazard Identification & Risk Assessment (THIRA) Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery Plan Planning and Regulatory Gaps Develop and adopt a Public Health Plan Other Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community. Administrative and Technical Gaps Develop a Planning Department Administrative and Technical Gaps Develop a Mitigation Planning Committee Administrative and Technical Gaps Organize an Environmental Board/Commission Administrative and Technical Gaps Organize an Open Space Board/Committee Organize an Economic Development Commission/Committee Administrative and Technical Gaps Develop an Emergency Management/Public Safety Department Administrative and Technical Gaps Develop Warning Systems / Services Administrative and Technical Gaps Hire staff with expertise or training in benefit/cost analysis Administrative and Technical Gaps Hire personnel skilled or trained in GIS and/or HAZUS – Multi-Hazards (MH) applications Administrative and Technical Gaps Hire scientist familiar with natural hazards Administrative and Technical Gaps Hire surveyor(s) Administrative and Technical Gaps Hire grant writer(s) Administrative and Technical Gaps Hire a Resilience Officer Education and Outreach Gaps Hire personnel skilled or trained in website development Education and Outreach Gaps Develop warning systems for hazard events Education and Outreach Gaps Develop natural disaster/safety programs for outreach in schools Community Classification Gaps Determine feasibility of improving the current classification of the Community Rating System (CRS) Community Classification Gaps Determine feasibility of the Building Code Effectiveness Grading Schedule (BCEGS) Community Classification Gaps Determine feasibility of becoming a StormReady community Community Classification Gaps Determine feasibility of becoming a Firewise community NFIP Gaps Maintain a list of property owners interested in flood mitigation (elevation or acquisition). NFIP Gaps Develop RiskMAP projects NFIP Gaps Develop resources to determine possible future flooding conditions from climate change. NFIP Gaps Assist/train floodplain management staff to support the floodplain management program. Re-certify Director of Operations as a floodplain manager. NFIP Gaps Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: •Enforce the flood damage prevenon ordinance. •Parcipate in floodplain idenficaon and mapping updates. •Provide public assistance/informaon on floodplain requirements and impacts. Kemah Capability Gap Addressed Potential Actions - Kemah Planning and Regulatory Gaps Develop and adopt a Subdivision Ordinance Planning and Regulatory Gaps Develop and adopt a Site Plan Ordinance Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery/ Reconstruction Ordinance Planning and Regulatory Gaps Develop and adopt a Growth Management Ordinance Planning and Regulatory Gaps Develop and adopt an Environmental Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Wellhead Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Climate Change Ordinance Planning and Regulatory Gaps Develop and adopt a Capital Improvement Plan Planning and Regulatory Gaps Develop and adopt a Disaster Debris Management Plan Planning and Regulatory Gaps Develop and adopt an Open Space Plan Planning and Regulatory Gaps Develop and adopt an Urban Water Management Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Shoreline Management Plan Planning and Regulatory Gaps Develop and adopt a Community Wildfire Protection Plan Planning and Regulatory Gaps Develop and adopt a Community Forest Management Plan Planning and Regulatory Gaps Develop and adopt a Transportation Plan Planning and Regulatory Gaps Develop and adopt an Agriculture Plan Planning and Regulatory Gaps Develop and adopt a Climate Action/ Resiliency/Sustainability Plan Planning and Regulatory Gaps Develop and adopt a Tourism Plan Planning and Regulatory Gaps Develop and adopt a Business/ Downtown Development Plan Planning and Regulatory Gaps Develop and adopt a Continuity of Operations Plan Planning and Regulatory Gaps Develop and adopt a Strategic Recovery Planning Report Planning and Regulatory Gaps Develop and adopt a Threat & Hazard Identification & Risk Assessment (THIRA) Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery Plan Planning and Regulatory Gaps Develop and adopt a Public Health Plan Other Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community. Administrative and Technical Gaps Organize a Planning Board Organize a Zoning Board of Adjustments Administrative and Technical Gaps Develop a Planning Department Administrative and Technical Gaps Develop a Mitigation Planning Committee Administrative and Technical Gaps Organize an Environmental Board/Commission Administrative and Technical Gaps Organize an Open Space Board/Committee Administrative and Technical Gaps Hire scientist familiar with natural hazards Administrative and Technical Gaps Hire surveyor(s) Education and Outreach Gaps Develop natural disaster/safety programs for outreach in schools Community Classification Gaps Determine feasibility of improving the current classification of the Community Rating System (CRS) Community Classification Gaps Determine feasibility of becoming a StormReady community Community Classification Gaps Determine feasibility of becoming a Firewise community NFIP Gaps Maintain a list of property owners interested in flood mitigation (elevation or acquisition). NFIP Gaps Develop RiskMAP projects NFIP Gaps Develop resources to determine possible future flooding conditions from climate change. NFIP Gaps Train floodplain management staff (CFM) to support the floodplain management program. NFIP Gaps Develop local ordinances, plans or programs (e.g. site plan review) that support floodplain management and meeting the NFIP requirements. For instance, the planning board or zoning board could consider efforts to reduce flood risk when reviewing variances such as height restrictions. NFIP Gaps Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: •Enforce the flood damage prevenon ordinance. •Parcipate in floodplain idenficaon and mapping updates. •Provide public assistance/informaon on floodplain requirements and impacts. La Marque Capability Gap Addressed Potential Actions - La Marque Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery/ Reconstruction Ordinance Planning and Regulatory Gaps Develop and adopt a Growth Management Ordinance Planning and Regulatory Gaps Develop and adopt a Wellhead Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Climate Change Ordinance Planning and Regulatory Gaps Develop and adopt a Comprehensive Plan Planning and Regulatory Gaps Develop and adopt a Stormwater Management Plan Planning and Regulatory Gaps Develop and adopt an Open Space Plan Planning and Regulatory Gaps Develop and adopt an Urban Water Management Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt an Economic Development Plan Planning and Regulatory Gaps Develop and adopt a Shoreline Management Plan Planning and Regulatory Gaps Develop and adopt a Community Wildfire Protection Plan Planning and Regulatory Gaps Develop and adopt a Community Forest Management Plan Planning and Regulatory Gaps Develop and adopt a Transportation Plan Planning and Regulatory Gaps Develop and adopt a Comprehensive Emergency Management Plan Planning and Regulatory Gaps Develop and adopt a Continuity of Operations Plan Planning and Regulatory Gaps Develop and adopt a Strategic Recovery Planning Report Planning and Regulatory Gaps Develop and adopt a Threat & Hazard Identification & Risk Assessment (THIRA) Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery Plan Planning and Regulatory Gaps Develop and adopt a Public Health Plan Other Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community. Development and Permitting Gaps Develop a database to track building permits in hazard areas Administrative and Technical Gaps Develop a Mitigation Planning Committee Administrative and Technical Gaps Organize an Environmental Board/Commission Administrative and Technical Gaps Organize an Open Space Board/Committee Administrative and Technical Gaps Develop maintenance programs to reduce risk Administrative and Technical Gaps Hire planners or engineers with knowledge of land development and land management practices Hire engineers or professionals trained in building or infrastructure construction practices Administrative and Technical Gaps Hire staff with expertise or training in benefit/cost analysis Administrative and Technical Gaps Hire personnel skilled or trained in GIS and/or HAZUS – Multi-Hazards (MH) applications Administrative and Technical Gaps Hire scientist familiar with natural hazards Administrative and Technical Gaps Hire surveyor(s) Administrative and Technical Gaps Hire an Emergency Manager Administrative and Technical Gaps Hire grant writer(s) Administrative and Technical Gaps Hire a Resilience Officer Education and Outreach Gaps Begin using social media for hazard mitigation education and outreach Education and Outreach Gaps Develop citizen boards or commissions that address issues related to hazard mitigation Education and Outreach Gaps Develop natural disaster/safety programs for outreach in schools Community Classification Gaps Determine feasibility of joining or improving the current classification of the Community Rating System (CRS) Community Classification Gaps Determine feasibility of the Building Code Effectiveness Grading Schedule (BCEGS) Community Classification Gaps Determine feasibility of becoming a StormReady community Community Classification Gaps Determine feasibility of becoming a Firewise community NFIP Gaps Maintain a list of properties that have been damaged by flooding NFIP Gaps Maintain a list of property owners interested in flood mitigation (elevation or acquisition). NFIP Gaps Develop RiskMAP projects NFIP Gaps Support efforts for staff to become a certified floodplain manager. NFIP Gaps Obtain funding to assist/train floodplain management staff to support the floodplain management program. NFIP Gaps Determine funding options to overcome the staffing cost barriers to running an effective NFIP program. NFIP Gaps Address outstanding NFIP compliance violations. NFIP Gaps Amend the flood damage prevention ordinance of 2014. NFIP Gaps Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: •Enforce the flood damage prevenon ordinance. •Parcipate in floodplain idenficaon and mapping updates. •Provide public assistance/informaon on floodplain requirements and impacts. League City Capability Gap Addressed Potential Actions - League City Planning and Regulatory Gaps Develop and adopt a Stormwater Management Ordinance Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery/ Reconstruction Ordinance Planning and Regulatory Gaps Develop and adopt a Growth Management Ordinance Planning and Regulatory Gaps Develop and adopt an Environmental Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Wellhead Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Climate Change Ordinance Planning and Regulatory Gaps Develop and adopt a Floodplain Management or Watershed Plan Planning and Regulatory Gaps Develop and adopt a Stormwater Management Plan Planning and Regulatory Gaps Develop and adopt an Open Space Plan Planning and Regulatory Gaps Develop and adopt an Urban Water Management Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt an Economic Development Plan Planning and Regulatory Gaps Develop and adopt a Shoreline Management Plan Planning and Regulatory Gaps Develop and adopt a Community Wildfire Protection Plan Planning and Regulatory Gaps Develop and adopt a Community Forest Management Plan Planning and Regulatory Gaps Develop and adopt a Transportation Plan Planning and Regulatory Gaps Develop and adopt an Agriculture Plan Planning and Regulatory Gaps Develop and adopt a Climate Action/ Resiliency/Sustainability Plan Planning and Regulatory Gaps Develop and adopt a Tourism Plan Planning and Regulatory Gaps Develop and adopt a Strategic Recovery Planning Report Planning and Regulatory Gaps Develop and adopt a Public Health Plan Other Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community. Development and Permitting Gaps Develop a database to track building permits in hazard areas Development and Permitting Gaps Develop an inventory of buildable land Administrative and Technical Gaps Develop a Mitigation Planning Committee Administrative and Technical Gaps Organize an Environmental Board/Commission Administrative and Technical Gaps Organize an Open Space Board/Committee Hire scientist familiar with natural hazards Administrative and Technical Gaps Hire surveyor(s) Education and Outreach Gaps Develop citizen boards or commissions that address issues related to hazard mitigation Education and Outreach Gaps Develop natural disaster/safety programs for outreach in schools Community Classification Gaps Determine feasibility of improving the current classification of the Community Rating System (CRS) Community Classification Gaps Determine feasibility of becoming a StormReady community Community Classification Gaps Determine feasibility of becoming a Firewise community NFIP Gaps Maintain a list of property owners interested in flood mitigation (elevation or acquisition). NFIP Gaps Develop RiskMAP projects NFIP Gaps Develop flood hazard maps to adequately address the flood risk NFIP Gaps Assist/train floodplain management staff to support the floodplain management program. NFIP Gaps Overcome the barriers to running an effective NFIP program. NFIP Gaps Develop local ordinances, plans or programs (e.g. site plan review) that support floodplain management and meeting the NFIP requirements. For instance, the planning board or zoning board could consider efforts to reduce flood risk when reviewing variances such as height restrictions. NFIP Gaps Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: •Enforce the flood damage prevenon ordinance. •Parcipate in floodplain idenficaon and mapping updates. •Provide public assistance/informaon on floodplain requirements and impacts. Santa Fe Capability Gap Addressed Potential Actions - Santa Fe Planning and Regulatory Gaps Develop and adopt a Zoning/Land Use Code Planning and Regulatory Gaps Develop and adopt a Subdivision Ordinance Planning and Regulatory Gaps Develop and adopt a Site Plan Ordinance Planning and Regulatory Gaps Develop and adopt a Stormwater Management Ordinance Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery/ Reconstruction Ordinance Planning and Regulatory Gaps Develop and adopt a Growth Management Ordinance Planning and Regulatory Gaps Develop and adopt an Environmental Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Flood Damage Prevention Ordinance Planning and Regulatory Gaps Develop and adopt a Wellhead Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Emergency Management Ordinance Planning and Regulatory Gaps Develop and adopt a Climate Change Ordinance Planning and Regulatory Gaps Develop and adopt a Comprehensive Plan Planning and Regulatory Gaps Develop and adopt a Capital Improvement Plan Planning and Regulatory Gaps Develop and adopt a Disaster Debris Management Plan Planning and Regulatory Gaps Develop and adopt a Floodplain Management or Watershed Plan Planning and Regulatory Gaps Develop and adopt a Stormwater Management Plan Planning and Regulatory Gaps Develop and adopt an Open Space Plan Planning and Regulatory Gaps Develop and adopt an Urban Water Management Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt an Economic Development Plan Planning and Regulatory Gaps Develop and adopt a Shoreline Management Plan Planning and Regulatory Gaps Develop and adopt a Community Wildfire Protection Plan Planning and Regulatory Gaps Develop and adopt a Community Forest Management Plan Planning and Regulatory Gaps Develop and adopt a Transportation Plan Planning and Regulatory Gaps Develop and adopt an Agriculture Plan Planning and Regulatory Gaps Develop and adopt a Climate Action/ Resiliency/Sustainability Plan Planning and Regulatory Gaps Develop and adopt a Tourism Plan Develop and adopt a Business/ Downtown Development Plan Planning and Regulatory Gaps Develop and adopt a Comprehensive Emergency Management Plan Planning and Regulatory Gaps Develop and adopt a Continuity of Operations Plan Planning and Regulatory Gaps Develop and adopt a Strategic Recovery Planning Report Planning and Regulatory Gaps Develop and adopt a Threat & Hazard Identification & Risk Assessment (THIRA) Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery Plan Planning and Regulatory Gaps Develop and adopt a Public Health Plan Other Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community. Development and Permitting Gaps Develop a database to track building permits in hazard areas Development and Permitting Gaps Develop an inventory of buildable land Administrative and Technical Gaps Organize a Planning Board Administrative and Technical Gaps Organize a Zoning Board of Adjustments Administrative and Technical Gaps Develop a Planning Department Administrative and Technical Gaps Develop a Mitigation Planning Committee Administrative and Technical Gaps Organize an Environmental Board/Commission Administrative and Technical Gaps Organize an Open Space Board/Committee Administrative and Technical Gaps Organize an Economic Development Commission/Committee Administrative and Technical Gaps Develop a Public Works/Highway Department Administrative and Technical Gaps Develop a Construction/Building/Code Enforcement Department Administrative and Technical Gaps Develop an Emergency Management/Public Safety Department Administrative and Technical Gaps Develop Warning Systems / Services Administrative and Technical Gaps Develop maintenance programs to reduce risk Administrative and Technical Gaps Develop mutual aid agreements Administrative and Technical Gaps Write and implement a Human Resources Manual Administrative and Technical Gaps Hire planners or engineers with knowledge of land development and land management practices Administrative and Technical Gaps Hire engineers or professionals trained in building or infrastructure construction practices Administrative and Technical Gaps Hire planners or engineers with an understanding of natural hazards Administrative and Technical Gaps Hire staff with expertise or training in benefit/cost analysis Administrative and Technical Gaps Hire professionals trained in conducting damage assessments Administrative and Technical Gaps Hire personnel skilled or trained in GIS and/or HAZUS – Multi-Hazards (MH) applications Administrative and Technical Gaps Hire scientist familiar with natural hazards Administrative and Technical Gaps Hire surveyor(s) Administrative and Technical Gaps Hire an Emergency Manager Administrative and Technical Gaps Hire grant writer(s) Administrative and Technical Gaps Hire a Resilience Officer Education and Outreach Gaps Hire personnel skilled or trained in website development Education and Outreach Gaps Add hazard mitigation information to website Education and Outreach Gaps Begin using social media for hazard mitigation education and outreach Education and Outreach Gaps Develop citizen boards or commissions that address issues related to hazard mitigation Education and Outreach Gaps Develop warning systems for hazard events Education and Outreach Gaps Develop natural disaster/safety programs for outreach in schools Community Classification Gaps Determine feasibility of joining or improving the current classification of the Community Rating System (CRS) Community Classification Gaps Determine feasibility of the Building Code Effectiveness Grading Schedule (BCEGS) Community Classification Gaps Determine feasibility of becoming a StormReady community Community Classification Gaps Determine feasibility of becoming a Firewise community NFIP Gaps Maintain a list of properties that have been damaged by flooding NFIP Gaps Maintain a list of property owners interested in flood mitigation (elevation or acquisition). NFIP Gaps Develop RiskMAP projects NFIP Gaps Hire a certified floodplain manager. NFIP Gaps Assist/train floodplain management staff to support the floodplain management program. NFIP Gaps Overcome the barriers to running an effective NFIP program by increasing public awareness of the program. NFIP Gaps Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: •Enforce the flood damage prevenon ordinance. •Parcipate in floodplain idenficaon and mapping updates. •Provide public assistance/informaon on floodplain requirements and impacts. Tiki Island Capability Gap Addressed Potential Actions - Tiki Island Planning and Regulatory Gaps Develop and adopt a Zoning/Land Use Code Planning and Regulatory Gaps Develop and adopt a Site Plan Ordinance Planning and Regulatory Gaps Develop and adopt a Stormwater Management Ordinance Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery/ Reconstruction Ordinance Planning and Regulatory Gaps Develop and adopt a Growth Management Ordinance Planning and Regulatory Gaps Develop and adopt a Flood Damage Prevention Ordinance Planning and Regulatory Gaps Develop and adopt a Wellhead Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Emergency Management Ordinance Planning and Regulatory Gaps Develop and adopt a Climate Change Ordinance Planning and Regulatory Gaps Develop and adopt a Comprehensive Plan Planning and Regulatory Gaps Develop and adopt a Capital Improvement Plan Planning and Regulatory Gaps Develop and adopt a Disaster Debris Management Plan Planning and Regulatory Gaps Develop and adopt a Floodplain Management or Watershed Plan Planning and Regulatory Gaps Develop and adopt a Stormwater Management Plan Planning and Regulatory Gaps Develop and adopt an Open Space Plan Planning and Regulatory Gaps Develop and adopt an Urban Water Management Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt an Economic Development Plan Planning and Regulatory Gaps Develop and adopt a Shoreline Management Plan Planning and Regulatory Gaps Develop and adopt a Community Wildfire Protection Plan Planning and Regulatory Gaps Develop and adopt a Community Forest Management Plan Planning and Regulatory Gaps Develop and adopt a Transportation Plan Planning and Regulatory Gaps Develop and adopt an Agriculture Plan Planning and Regulatory Gaps Develop and adopt a Climate Action/ Resiliency/Sustainability Plan Planning and Regulatory Gaps Develop and adopt a Tourism Plan Planning and Regulatory Gaps Develop and adopt a Business/ Downtown Development Plan Planning and Regulatory Gaps Develop and adopt a Comprehensive Emergency Management Plan Develop and adopt a Continuity of Operations Plan Planning and Regulatory Gaps Develop and adopt a Strategic Recovery Planning Report Planning and Regulatory Gaps Develop and adopt a Threat & Hazard Identification & Risk Assessment (THIRA) Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery Plan Planning and Regulatory Gaps Develop and adopt a Public Health Plan Other Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community. Administrative and Technical Gaps Develop a Mitigation Planning Committee Administrative and Technical Gaps Organize an Environmental Board/Commission Administrative and Technical Gaps Organize an Open Space Board/Committee Administrative and Technical Gaps Organize an Economic Development Commission/Committee Administrative and Technical Gaps Develop a Public Works/Highway Department Administrative and Technical Gaps Write and implement a Human Resources Manual Administrative and Technical Gaps Hire planners or engineers with knowledge of land development and land management practices Administrative and Technical Gaps Hire engineers or professionals trained in building or infrastructure construction practices Administrative and Technical Gaps Hire planners or engineers with an understanding of natural hazards Administrative and Technical Gaps Hire staff with expertise or training in benefit/cost analysis Administrative and Technical Gaps Hire professionals trained in conducting damage assessments Administrative and Technical Gaps Hire personnel skilled or trained in GIS and/or HAZUS – Multi-Hazards (MH) applications Administrative and Technical Gaps Hire scientist familiar with natural hazards Administrative and Technical Gaps Hire surveyor(s) Administrative and Technical Gaps Hire grant writer(s) Administrative and Technical Gaps Hire a Resilience Officer Education and Outreach Gaps Hire personnel skilled or trained in website development Education and Outreach Gaps Begin using social media for hazard mitigation education and outreach Education and Outreach Gaps Develop citizen boards or commissions that address issues related to hazard mitigation Community Classification Gaps Determine feasibility of improving the current classification of the Community Rating System (CRS) Community Classification Gaps Determine feasibility of becoming a StormReady community Community Classification Gaps Determine feasibility of becoming a Firewise community NFIP Gaps Develop RiskMAP projects NFIP Gaps Assist/train floodplain management staff to support the floodplain management program. NFIP Gaps Overcome the staffing barriers to running an effective NFIP program. NFIP Gaps Amend the flood damage prevention ordinance. NFIP Gaps Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: •Enforce the flood damage prevenon ordinance. •Parcipate in floodplain idenficaon and mapping updates. •Provide public assistance/informaon on floodplain requirements and impacts. All Gaps Capability Gap Addressed All Potential Actions Planning and Regulatory Gaps Develop and adopt a Zoning/Land Use Code Planning and Regulatory Gaps Develop and adopt a Subdivision Ordinance Planning and Regulatory Gaps Develop and adopt a Site Plan Ordinance Planning and Regulatory Gaps Develop and adopt a Stormwater Management Ordinance Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery/ Reconstruction Ordinance Planning and Regulatory Gaps Develop and adopt a Growth Management Ordinance Planning and Regulatory Gaps Develop and adopt an Environmental Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Flood Damage Prevention Ordinance Planning and Regulatory Gaps Develop and adopt a Wellhead Protection Ordinance Planning and Regulatory Gaps Develop and adopt a Emergency Management Ordinance Planning and Regulatory Gaps Develop and adopt a Climate Change Ordinance Planning and Regulatory Gaps Develop and adopt a Comprehensive Plan Planning and Regulatory Gaps Develop and adopt a Capital Improvement Plan Planning and Regulatory Gaps Develop and adopt a Disaster Debris Management Plan Planning and Regulatory Gaps Develop and adopt a Floodplain Management or Watershed Plan Planning and Regulatory Gaps Develop and adopt a Stormwater Management Plan Planning and Regulatory Gaps Develop and adopt an Open Space Plan Planning and Regulatory Gaps Develop and adopt an Urban Water Management Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt a Habitat Conservation Plan Planning and Regulatory Gaps Develop and adopt an Economic Development Plan Planning and Regulatory Gaps Develop and adopt a Shoreline Management Plan Planning and Regulatory Gaps Develop and adopt a Community Wildfire Protection Plan Planning and Regulatory Gaps Develop and adopt a Community Forest Management Plan Planning and Regulatory Gaps Develop and adopt a Transportation Plan Planning and Regulatory Gaps Develop and adopt an Agriculture Plan Planning and Regulatory Gaps Develop and adopt a Climate Action/ Resiliency/Sustainability Plan Planning and Regulatory Gaps Develop and adopt a Tourism Plan Develop and adopt a Business/ Downtown Development Plan Planning and Regulatory Gaps Develop and adopt a Comprehensive Emergency Management Plan Planning and Regulatory Gaps Develop and adopt a Continuity of Operations Plan Planning and Regulatory Gaps Develop and adopt a Strategic Recovery Planning Report Planning and Regulatory Gaps Develop and adopt a Threat & Hazard Identification & Risk Assessment (THIRA) Planning and Regulatory Gaps Develop and adopt a Post-Disaster Recovery Plan Planning and Regulatory Gaps Develop and adopt a Public Health Plan Other Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community. Development and Permitting Gaps Develop a database to track building permits in hazard areas Development and Permitting Gaps Develop an inventory of buildable land Administrative and Technical Gaps Organize a Planning Board Administrative and Technical Gaps Organize a Zoning Board of Adjustments Administrative and Technical Gaps Develop a Planning Department Administrative and Technical Gaps Develop a Mitigation Planning Committee Administrative and Technical Gaps Organize an Environmental Board/Commission Administrative and Technical Gaps Organize an Open Space Board/Committee Administrative and Technical Gaps Organize an Economic Development Commission/Committee Administrative and Technical Gaps Develop a Public Works/Highway Department Administrative and Technical Gaps Develop a Construction/Building/Code Enforcement Department Administrative and Technical Gaps Develop an Emergency Management/Public Safety Department Administrative and Technical Gaps Develop Warning Systems / Services Administrative and Technical Gaps Develop maintenance programs to reduce risk Administrative and Technical Gaps Develop mutual aid agreements Administrative and Technical Gaps Write and implement a Human Resources Manual Administrative and Technical Gaps Hire planners or engineers with knowledge of land development and land management practices Administrative and Technical Gaps Hire engineers or professionals trained in building or infrastructure construction practices Administrative and Technical Gaps Hire planners or engineers with an understanding of natural hazards Administrative and Technical Gaps Hire staff with expertise or training in benefit/cost analysis Administrative and Technical Gaps Hire professionals trained in conducting damage assessments Administrative and Technical Gaps Hire personnel skilled or trained in GIS and/or HAZUS – Multi-Hazards (MH) applications Administrative and Technical Gaps Hire scientist familiar with natural hazards Administrative and Technical Gaps Hire surveyor(s) Administrative and Technical Gaps Hire an Emergency Manager Administrative and Technical Gaps Hire grant writer(s) Administrative and Technical Gaps Hire a Resilience Officer Education and Outreach Gaps Hire personnel skilled or trained in website development Education and Outreach Gaps Add hazard mitigation information to website Education and Outreach Gaps Begin using social media for hazard mitigation education and outreach Education and Outreach Gaps Develop citizen boards or commissions that address issues related to hazard mitigation Education and Outreach Gaps Develop warning systems for hazard events Education and Outreach Gaps Develop natural disaster/safety programs for outreach in schools Community Classification Gaps Determine feasibility of joining or improving the current classification of the Community Rating System (CRS) Community Classification Gaps Determine feasibility of the Building Code Effectiveness Grading Schedule (BCEGS) Community Classification Gaps Determine feasibility of becoming a StormReady community Community Classification Gaps Determine feasibility of becoming a Firewise community NFIP Gaps Maintain a list of properties that have been damaged by flooding NFIP Gaps Maintain a list of property owners interested in flood mitigation (elevation or acquisition). NFIP Gaps Develop RiskMAP projects NFIP Gaps Develop flood hazard maps to adequately address the flood risk NFIP Gaps Hire a certified floodplain manager. NFIP Gaps Develop resources to determine possible future flooding conditions from climate change. NFIP Gaps Assist/train floodplain management staff to support the floodplain management program. NFIP Gaps Overcome the barriers to running an effective NFIP program. NFIP Gaps Address outstanding NFIP compliance violations. NFIP Gaps Amend the flood damage prevention ordinance. NFIP Gaps Develop local ordinances, plans or programs (e.g. site plan review) that support floodplain management and meeting the NFIP requirements. For instance, the planning board or zoning board could consider efforts to reduce flood risk when reviewing variances such as height restrictions. NFIP Gaps Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: •Enforce the flood damage prevenon ordinance. •Parcipate in floodplain idenficaon and mapping updates. •Provide public assistance/informaon on floodplain requirements and impacts. REGION 6 TEXAS MITIGATION ASSISTANCE RESOURCE GUIDE NOVEMBER 2020 About the Texas Mitigation Assistance Resource Guide November 2020 ii PURPOSE OF THE GUIDE According to the National Institute of Building Sciences 2019 Natural Hazard Mitigation Saves report, every federal grant dollar invested in mitigation results in $6 saved, on average, during disaster recovery. However, finding those initial dollars to invest, and determining the best way to spend them, can pose a challenge for communities across the nation. Many resources exist, but they can be difficult to access and may not fit the needs of the community. This guide aims to fill that gap by providing an initial list of federal and state resources, including grants, technical assistance, loans, and other means of support. It will help state, local and tribal officials determine a possible source(s) of funding and technical assistance for their potential mitigation projects. For more information on available federal grants, visit grants.gov. DEVELOPMENT OF THE GUIDE The federal assistance resources were compiled by a FEMA contract provider. The information was verified from each agency/organization’s website. The state-specific resources are referenced in the State Hazard Mitigation Plan. GUIDE ORGANIZATION This guide provides information about federal and state resources that are currently available in Texas. The guide is organized alphabetically by agency/department. HOW TO USE THIS GUIDE Each resource includes information such as the name of the program, resource type, hazards addressed, and type of mitigation, as well as practical details on cost-sharing and eligibility requirements. The guide also provides state- specific information on where to find the next steps for applying and additional details. The icons at the top of each page display key information: RESOURCE TYPE Grants Resources that provide financial support, often with a cost-share requirement Loans Resources that provide initial financial support, often for low or no interest Technical Assistance Resources that provide guidance and key information for success MITIGATION TYPE Education and Outreach Sustained programs to educate residents and community leaders about risks, vulnerabilities, and mitigation opportunities Planning and Regulations Policies or codes that influence the way land is developed and buildings are constructed Natural Systems Protection Actions that minimize damage and losses through preservation or restoration of natural systems Structure and Infrastructure Actions modifying existing structures/infrastructure to remove them from a vulnerable area, or construction of new structures to protect existing development November 2020 iii FEDERAL, STATE, AND PRIVATE / NOT -FOR-PROFIT RESOURCES Some of the resources are funded by the federal government, some by the state, and others are a combination. A small sample of not-for-profit resources, at the national level, are included in this guide. The “Next Steps” section for each resource provides information about how to access the resource. QUESTIONS? Communities are generally encouraged to contact their State Hazard Mitigation Officer for hazard mitigation assistance. They may also contact their FEMA regional office or find contact information for each program through the websites included in this guide. FEMA Region 6 Office: https://www.fema.gov/about/organization/region-6 November 2020 iv Table of Contents Department or Organization Program Name Page United States Department of Agriculture (USDA) Conservation Reserve Program (CRP) 1 Conservation Stewardship Program (CSP) 1 Emergency Watershed Protection Program (EWPP) 2 Environmental Quality Incentives Program (EQIP) 3 Forest Legacy Program (FLP) 4 Forest Stewardship Program 5 Housing Preservation Grants 6 Source Water Protection Program (SWPP) 7 USDA Disaster Assistance Programs 7 Water and Environmental Programs 8 Wetland Mitigation Banking Program 9 Climate Adaptation Knowledge Exchange Climate Adaptation Knowledge Exchange 9 Department of Commerce Coastal and Marine Habitat Restoration Grants 10 Coastal Resilience Grants 11 Disaster Loan Assistance 11 EDA Disaster Recovery 12 EDA Disaster Supplemental Funding 12 Department of Defense – Army Corps of Engineers Continuing Authorities Program 13 Ecosystem Restoration 14 Emergency Operations 14 Floodplain Management Services (FPMS) Program 15 Inspection of Completed Works Program 16 Silver Jackets 16 Small Flood Control 17 Environmental Protection Agency Brownfields Program Grant Funding 18 Clean Water State Revolving Loan Fund 18 Drinking Water State Revolving Fund 19 Environmental Finance Centers 20 Environmental Justice Grants and Technical Assistance 20 Greening America's Communities 21 Nonpoint Source Water Quality (Section 319) Grants 21 Smart Growth Support 22 Water Infrastructure and Resiliency Finance Center 22 Wetlands Protection Program Development Grants 23 Georgetown Climate Center Georgetown Adaptation Resources 23 November 2020 v Department or Organization Program Name Page Department of Homeland Security – Federal Emergency Management Agency (FEMA) Building Resilient Infrastructure and Communities (BRIC) 24 Emergency Management Performance Grants 25 Flood Mitigation Assistance Program 26 Hazard Mitigation Grant Program 26 National Dam Safety Program 27 Public Assistance 404 and 406 Program 28 Department of Housing and Urban Development Community Development Block Grant - Disaster Recovery 29 Community Development Block Grant - Mitigation 29 Section 108 Loan Guarantee Program 30 Department of Interior Disaster Recovery Grants 31 Housing Improvement Program 31 National Coastal Wetlands Conservation Grants 32 North American Wetland Conservation Fund 33 Tribal Resilience Program 33 WaterSMART Programs 34 National Fire Prevention Association Firewise 35 National Fish and Wildlife Foundation Five Star and Urban Waters Restoration Grant Program 35 National Coastal Resilience Fund 36 Resilient Communities Program 37 Texas A&M Forest Management 37 Water Resources Outreach and Training Program 38 Wetland Restoration Program 38 Texas General Land Office Texas Coastal Management Program 39 Texas State Soil and Water Conservation Board Water Quality and Flood Control Programs 39 Texas Water Development Board Agricultural Water Conservation Grants Program 40 Agricultural Water Conservation Loan Program 40 Flood Infrastructure Fund, Loan, and Grant 41 Regional Water Plans/Planning Group Grants 41 State Participation Program 42 State Water Implementation Fund for Texas (SWIFT) 43 Texas Water Development Fund (DFund) 43 Department of Transportation Emergency Relief Program 44 Department of Treasury Disaster Assistance and Emergency Relief for Individuals and Businesses 45 Wildlife Conservation Society Climate Adaptation Fund 45 November 2020 1 Conservation Reserve Program (CRP) Grant Department or Organization Farm Service Agency (FSA), United States Department of Agriculture (USDA) Type of Mitigation Action Natural Systems Protection Hazard Addressed Erosion, Flood Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Generally, to be eligible for CRP enrollment, a farmer must have owned or operated the land for at least 12 months prior to the previous CRP sign-up period. The land must be either be: cropland (including field margins) that was planted to an agricultural commodity for 4 of the previous 6 crop years, and which is physically and legally capable of being planted in a normal manner to an agricultural commodity; or certain marginal pastureland that is suitable for use as a riparian buffer or for similar water quality purposes. Funding Available Variable annually Cost Sharing The rental payment does not require a cost share. Restrictions See eligible applicants Website fsa.usda.gov/programs-and-services/conservation- programs/conservation-reserve-program/index Next Steps for Texas Communities This is a federal program, administered by local offices. Find your local USDA representative’s contact information here: farmers.gov/service- center-locator. Additional USDA conservation programs can be found at nrcs.usda.gov/wps/portal/nrcs/main/national/programs/. About the Resource The Conservation Reserve Program (CRP) is a voluntary program for agricultural landowners to receive rental payments when they convert marginal farmlands to vegetated cover. Participants enroll in CRP contracts for 10 to 15 years. This reduces soil erosion, supports farmers, reduces sedimentation and pollution in water sources, and establishes wildlife habitat. The wetland enhancement, shoreline protection, and riparian buffer practices enhance resilience by reducing downstream flooding during storm events. One effort of the CRP is the Floodplain Wetlands Initiative, which restores the functions and values of wetland ecosystems that had been devoted to agricultural use. Wetland restoration reverses the degradation of the wetland areas on what is often marginal soil. For farmers and landowners facing crop damage from flooding, restoring wetlands to receive floodwaters can also increase flood storage capacity – while significantly reducing farming risks. Conservation Stewardship Program (CSP) Grant, Technical Assistance Department or Organization Natural Resources Conservation Service (NRCS), United States Department of Agriculture (USDA) Type of Mitigation Action Natural Systems Protection Hazard Addressed All November 2020 2 Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Applicants may include individuals, legal entities, joint operations, or tribes that meet the stewardship threshold for at least two priority resource concerns when they apply. They must also agree to meet or exceed the stewardship threshold for at least one additional priority resource concern by the end of the contract. Producers must have effective control of the land for the term of the proposed contract. Funding Available Payment rates vary by state Cost Sharing Farmers receive a payment for conservation practices. Restrictions Unknown Website nrcs.usda.gov/wps/portal/nrcs/main/national/programs/financial/csp Next Steps for Texas Communities This is a federal program, administered by local offices. Find your local USDA representative’s contact information here: farmers.gov/service- center-locator. Additional USDA programs can be found at nrcs.usda.gov/wps/portal/nrcs/main/national/programs/. About the Resource The Conservation Stewardship Program (CSP) helps agricultural producers maintain and improve their existing conservation systems and adopt additional conservation activities to address priority resource concerns. CSP pays participants for conservation performance— the higher the performance, the higher the payment. Many conservation practices (riparian forest buffers, cover crops, etc.) reduce runoff and erosion, reducing flooding downstream. CSP provides two possible types of payments through 5-year contracts: annual payments for installing new conservation activities and maintaining existing practices, and supplemental payments for adopting a resource-conserving crop rotation. Emergency Watershed Protection Program (EWPP) Grant, Technical Assistance Department or Organization Natural Resources Conservation Service (NRCS), United States Department of Agriculture (USDA) Type of Mitigation Action Natural Systems Protection Hazard Addressed All Specific to Recovery Yes National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants EWP - Recovery: Applicants may include individuals, legal entities, joint operations, or tribes that meet the stewardship threshold for at least two priority resource concerns when they apply. They must also agree to meet or exceed the stewardship threshold for at least one additional priority resource concern by the end of the contract. Producers must have effective control of the land for the term of the proposed contract. EWP - Floodplain Easements: Landowners can apply directly for assistance at the local NRCS office when project funding for floodplain easements become available. Funding Available Variable depending on the scope of the project November 2020 3 Cost Sharing NRCS can pay up to 75% of the cost for eligible emergency recovery projects. Local sponsors must acquire the remaining 25% in cash or in-kind services. Contact NRCS for more information for funding of floodplain easement projects. Restrictions The EWP Program cannot be used: • To address problems that existed prior to the disaster. • To improve the level of protection above the existing level at the time of the disaster. • For projects’ operation and maintenance. • To repair private or public transportation facilities or utilities. • To install non-essential restoration work that will not reduce or eliminate adverse impacts from the natural disaster. • To restore projects installed by another federal agency. Website nrcs.usda.gov/wps/portal/nrcs/main/national/programs/landscape/ewp p Next Steps for Texas Communities This is a federal program, administered by local offices. Find your local USDA representative’s contact information here: farmers.gov/service- center-locator. Additional USDA programs can be found at nrcs.usda.gov/wps/portal/nrcs/main/national/programs/. About the Resource Congress established the Emergency Watershed Protection (EWP) program to respond to emergencies created by natural disasters. The EWP program offers technical and financial assistance to help local communities mitigate imminent hazards to life and property caused by floods, fires, windstorms, and other natural occurrences that impair a watershed. The Natural Resources Conservation Service (NRCS) administers the EWP program, which consists of two options: EWP – Recovery, and EWP – Floodplain Easement (FPE). NRCS offers financial and technical assistance for various activities under EWP – Recovery, including: • Removing debris from stream channels, road culverts, and bridges. • Reshaping and protecting eroded streambanks. • Correcting damaged or destroyed drainage facilities. • Establishing vegetative cover on critically eroding lands. • Repairing levees and structures. • Repairing conservation practices. In addition to recovery projects, NRCS may purchase EWP floodplain easements instead of trying to recover damaged floodplain lands if it proves to be more cost-effective than recovery. Environmental Quality Incentives Program (EQIP) Grant, Technical Assistance Department or Organization Natural Resources Conservation Service (NRCS), United States Department of Agriculture (USDA) Type of Mitigation Action Natural Systems Protection Hazard Addressed All Specific to Recovery Yes National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Agricultural producers, owners of non-industrial private forestland, and tribes are eligible to apply for EQIP. Eligible land includes cropland, November 2020 4 rangeland, pastureland, non-industrial private forestland, and other farm or ranch lands. Socially disadvantaged, beginning and limited resource farmers, tribes, and veterans are eligible for an increased payment rate and may receive an advance payment of up to 50% to purchase the materials and services needed to implement the conservation practices included in their EQIP contract. Funding Available Varies by state Cost Sharing 75% federal, 90% in certain cases (socially disadvantaged, veterans, beginning farmers, etc.) Restrictions Applicants must: • Control or own eligible land. • Comply with adjusted gross income limitation (AGI) provisions. • Comply with the highly erodible land and wetland conservation requirements. • Develop an NRCS EQIP plan of operations. Additional restrictions and program requirements may apply. Website nrcs.usda.gov/wps/portal/nrcs/detail/sc/programs/financial/eqip/?cid=n rcseprd1384284 Next Steps for Texas Communities This is a federal program, administered by local offices. Find your local USDA representative’s contact information here: farmers.gov/service- center-locator. Additional USDA programs can be found at nrcs.usda.gov/wps/portal/nrcs/main/national/programs/. About the Resource The Environmental Quality Incentives Program (EQIP) provides financial and technical assistance to agricultural producers to address natural resource concerns and deliver environmental benefits such as improved water and air quality, conserved ground and surface water, reduced soil erosion, and sedimentation, or improved or created wildlife habitat. While not designed to be an emergency response or hazard mitigation program, EQIP can play a vital role in helping producers prevent the worst impacts of and recover from natural disasters like floods, hurricanes, wildfires, and drought. Through EQIP, NRCS provides financial assistance to repair and prevent the excessive soil erosion caused or affected by natural disasters. These practices include activities like stream bank restoration, grassed waterways, and buffers. NRCS-funded conservation practices protect the land from erosion, support disaster recovery, and repair, and can help mitigate loss from future natural disasters. Forest Legacy Program (FLP) Other- Purchase Department or Organization Forest Service, United States Department of Agriculture (USDA) Type of Mitigation Action Natural Systems Protection Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants A proposed project is eligible if it meets federal requirements as well as minimum eligibility: • It is within, or partially within, a designated forest legacy area. November 2020 5 • It has a minimum of 75% forestland or a documented plan that includes sufficient landowner capacity to reforest to at least 75% forestland. • It can be managed in ways consistent with the purpose for which it was acquired by FLP. • The landowner is willing to sell or donate the interest in perpetuity. • The landowner acknowledges that the conservation easement will be held by a government entity if federal funds are used for the acquisition. Funding Available States can submit up to three projects which cannot exceed $10 million, or $7 million for individual projects. Cost Sharing At least 25% of the total project cost Restrictions Project selection is based on national priorities Website fs.fed.us/managing-land/private-land/forest-legacy/program Next Steps for Texas Communities This is a federal program, administered by local offices. Find your local USDA representative’s contact information here: farmers.gov/service- center-locator. Additional USDA programs can be found at nrcs.usda.gov/wps/portal/nrcs/main/national/programs/. About the Resource The purpose of the Forest Legacy Program is to identify and conserve environmentally important forest areas that are threatened by conversion to non-forest uses. Providing economic incentives to landowners to keep their land as forests encourage sustainable forest management and supports strong markets for forest products. Forest protection can be a valuable tool for natural resource conservation and can reduce flooding and hazard risk downstream within a watershed. Landowners may participate in the Forest Legacy Program by either selling their property outright or by retaining ownership and selling only a portion of the property’s development rights; both are held by state agencies or another unit of government. The use of a conservation easement, a legal agreement between a landowner and a non-profit land trust or governmental agency allows the land to remain in private ownership while ensuring that its environmental values are retained. Forest Stewardship Program Technical Assistance Department or Organization Forest Service, United States Department of Agriculture (USDA) Type of Mitigation Action Natural Systems Protection Hazard Addressed All Specific to Recovery Yes National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Non-industrial private forest landowners Funding Available N/A Cost Sharing N/A Restrictions Participants must agree to manage their property following an approved Forest Stewardship Management Plan Website fs.fed.us/managing-land/private-land/forest-stewardship Next Steps for Texas Communities This is a federal program, administered by local offices. Find your local USDA representative’s contact information here: farmers.gov/service- center-locator. Additional USDA programs can be found at nrcs.usda.gov/wps/portal/nrcs/main/national/programs/. November 2020 6 About the Resource The Forest Stewardship Program encourages long-term stewardship of important state and private forest landscapes by helping landowners more actively manage their forest and related resources. Protected forests can reduce flooding and hazard risk downstream within a watershed, and well-managed forests can reduce wildfire risk. The program provides assistance to owners of forest land and other lands where good stewardship, including agroforestry applications, will enhance and sustain the long-term productivity of multiple forest resources, and produce healthy, resilient forest landscapes. Special attention is given to landowners in landscape areas identified by State Forest Action Plans and those new to, or in the early stages of, managing their land in a way that embodies multi-resource stewardship principles. The program provides landowners with the professional planning and technical assistance they need to keep their land in a productive and healthy condition. Assistance offered through the Forest Stewardship Program also provides landowners with enhanced access to other USDA conservation programs, forest certification programs, and forest product and ecosystem service markets. Housing Preservation Grants Grant Department or Organization Rural Development, United States Department of Agriculture (USDA) Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants State, tribal, and local governments, and nonprofit organizations. Eligible areas include rural towns with 20,000 or fewer people and federally recognized tribal lands. Funding Available $15.3 million in 2020 Cost Sharing Up to 100% federal Restrictions Applicants must have the necessary background and experience, with a proven ability to perform the repair and rehabilitation of low-income housing. Website rd.usda.gov/programs-services/housing-preservation-grants Next Steps for Texas Communities Contact your local USDA representative to get started on applying for the grant. Their information can be found at: rd.usda.gov/contact- us/state-offices About the Resource The Housing Preservation Grant (HPG) program provides grants to sponsoring organizations for the repair or rehabilitation of low- and very low-income housing. The grants are competitive and are made available in areas where there is a concentration of need. Those assisted must own very-low- or low- income housing, either as homeowners, landlords, or members of a cooperative. Very low income is defined as below 50% of the area median income (AMI); low income is between 50 and 80% of AMI. Applicants provide grants or low-interest loans to repair or rehabilitate housing for low- and very-low- income homeowners. Rental property owners may also receive assistance if they agree to make units available to low- and very-low-income families. Eligible expenses include: • Repairing or replacing electrical wiring, foundations, roofs, insulation, heating systems, and water/waste disposal systems. • Accessibility features. November 2020 7 • Labor and materials. • Administrative expenses. Eligible homeowners can apply for funding to repair damages caused by natural hazards or to harden their structures against future hazard events. Source Water Protection Program (SWPP) Technical Assistance Department or Organization Farm Service Agency (FSA), United States Department of Agriculture (USDA) Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Open; producers in participating states are encouraged to take part in SWPP by using suggested conservation practices and becoming a member of the local team responsible for developing the SWPP Funding Available N/A. This a technical assistance program. Cost Sharing N/A. This a technical assistance program. Restrictions Must be in a participating state. Contact your local FSA office for more information. Website fsa.usda.gov/programs-and-services/conservation-programs/source- water-protection/index Next Steps for Texas Communities This is a federal program, administered by local offices. Find your local USDA representative’s contact information here: farmers.gov/service- center-locator. Additional USDA programs can be found at nrcs.usda.gov/wps/portal/nrcs/main/national/programs/. About the Resource The Source Water Protection Program (SWPP) is a joint project of the U.S. Department of Agriculture (USDA) Farm Service Agency (FSA) and the National Rural Water Association (NRWA), a non-profit water and wastewater utility membership organization. The SWPP is designed to help prevent pollution of surface and groundwater used as the primary source of drinking water by rural residents. Water quality projects often meet flood mitigation goals and vice versa. SWPP funds can be used for flood mitigation when the projects also improve water quality. USDA Disaster Assistance Programs Grant Department or Organization Farm Service Agency (FSA), United States Department of Agriculture (USDA) Type of Mitigation Action Natural Systems Protection Hazard Addressed All Specific to Recovery Yes National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Eligible applicants vary depending on the specific sub-program November 2020 8 Funding Available Amount of funding available varies based on sub-program Cost Sharing Cost-sharing requirements vary depending on the sub-program. Restrictions Restrictions vary based on sub-program Website fsa.usda.gov/programs-and-services/disaster-assistance- program/index Next Steps for Texas Communities This is a federal program, administered by local offices. Find your local USDA representative’s contact information here: farmers.gov/service- center-locator About the Resource The Farm Service Agency provides several disaster assistance programs. These include the Emergency Conservation Program, Emergency Forest Restoration Program, Emergency Loan Program, and Tree Assistance Program, as well as a mix of other programs aimed at specific agricultural sectors. While focused on recovery, many of these programs provide funding for conservation practices that enhance resilience. Water and Environmental Programs Grant, Technical Assistance Department or Organization Rural Development, United States Department of Agriculture (USDA) Type of Mitigation Action Structure and Infrastructure Hazard Addressed Flood Specific to Recovery No National Mitigation Framework Core Capability Community Resilience Eligible Applicants Details vary by program, but most programs are open to state, local, and federally recognized tribes Funding Available Amount of funding available varies based on sub-program Cost Sharing Cost-sharing requirements vary depending on the sub-program. Restrictions Restrictions vary based on sub-program Website rd.usda.gov/programs-services/all-programs/water-environmental- programs Next Steps for Texas Communities Your local USDA representative can help you apply for this program. Find their contact information here: farmers.gov/service-center-locator. Additional USDA programs can be found at nrcs.usda.gov/wps/portal/nrcs/main/national/programs/. About the Resource The USDA's Rural Development Water and Environmental Programs (WEP) provide technical assistance, loans, grants, and loan guarantees for drinking water, sanitary sewer, solid waste, and storm drainage facilities in rural areas and cities and towns of 10,000 or less. WEP also makes grants to non-profit organizations to provide technical assistance and training to help rural communities with their water, wastewater, and solid waste problems. Water quality projects often meet flood mitigation goals and vice versa. WEP includes Emergency Community Water Assistance Grants, Grants for Rural and Native Alaskan Villages, Water & Waste Disposal Loans & Grants, and more. November 2020 9 Wetland Mitigation Banking Program Other - Credit Department or Organization Natural Resources Conservation Service (NRCS), United States Department of Agriculture (USDA) Type of Mitigation Action Natural Systems Protection Hazard Addressed Flood Specific to Recovery No National Mitigation Framework Core Capability Operational Coordination Eligible Applicants • City or township governments. • Public and State-controlled institutions of higher education. • Nonprofits that do not have a 501(c)(3) status with the IRS, other than institutions of higher education. • Federally recognized tribal governments. • State governments. • Special district governments. • County governments. • Private institutions of higher education. • For-profit organizations other than small businesses. Funding Available $5 million (2020 round) Cost Sharing Banking programs that are strictly In-Lieu Fee are not eligible for the NRCS Wetland Mitigation Banking Program. Restrictions There are no specific restrictions for this program Website nrcs.usda.gov/wps/portal/nrcs/detail/national/programs/farmbill/?cid=nr cseprd362686 Next Steps for Texas Communities Applications for this federal program can be submitted at Grants.gov during the open application period. About the Resource The Wetlands Mitigation Banking Program helps establish wetland mitigation banks to help producers meet their wetland conservation compliance responsibilities. Producers must comply to maintain eligibility for many USDA programs administered by the FSA and NRCS and to maintain eligibility for the federal crop insurance premium subsidy administered by the Risk Management Agency. This program assists with establishing the banks, not with securing the wetlands. Climate Adaptation Knowledge Exchange Technical Assistance Department or Organization Climate Adaptation Knowledge Exchange Type of Mitigation Action Natural Systems Protection Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Threats and Hazard Identification Eligible Applicants N/A – this is a technical assistance resource. Anyone can access the materials, which are targeted to local governments and organizations. Funding Available N/A November 2020 10 Cost Sharing N/A Restrictions Available to all Website cakex.org Next Steps for Texas Communities This not for profit resource is an international online forum to share information. Access the website to learn more. About the Resource The Climate Adaptation Knowledge Exchange is the world’s largest and most used source of climate adaptation case studies and resources. The materials can be filtered by scale (community to national/international); sector addressed (conservation, land use planning, infrastructure, etc.); hazards (flood, erosion, sea level rise, etc.); region; and more. Refer to the materials or upload your own to share lessons, ideas, and opportunities with others in the field. Coastal and Marine Habitat Restoration Grants Grant Department or Organization National Oceanic and Atmospheric Administration, Department of Commerce Type of Mitigation Action Natural Systems Protection, Structure and Infrastructure, Education and Outreach Hazard Addressed Erosion, Sea Level Rise, Storm Surge, Flood Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Institutions of higher education, non-profits, commercial (for profit) organizations, U.S. territories, and state, local, and tribal governments. Funding Available $4 million in Community-based Restoration Program funding available for coastal and marine habitat restoration in 2020. Cost Sharing None is required, but applicants are encouraged to demonstrate a 1:1 non-federal match for the NOAA funds requested to conduct the proposed project. Restrictions The FY2020 funding opportunity required a pre-proposal application and an invitation-only proposal application. Land acquisition and marine debris removal are ineligible. Website fisheries.noaa.gov/grant/coastal-and-marine-habitat-restoration-grants Next Steps for Texas Communities Application information for this federal program is available on the website. Application periods will include explanatory webinars. About the Resource The National Oceanic and Atmospheric Administration (NOAA) Community-Based Restoration Program recognizes that habitat protection and restoration are essential elements of a strategy for sustainable commercial and recreational fisheries. Investing in habitat restoration projects leads to real, lasting differences for communities, businesses, and the environment. The program grants support restoration projects that use a habitat-based approach to rebuild productive and sustainable fisheries, contribute to the recovery and conservation of protected resources, and promote healthy ecosystems and resilient communities. Restoration includes activities that return degraded or altered marine, estuarine, coastal, and freshwater, migratory fish habitats to functioning conditions, and techniques that return NOAA trust species to their historic habitats. These projects support economic recovery. They can also prevent future hazards and hazard losses by protecting natural resources in critical areas of the coastal floodplain. November 2020 11 Coastal Resilience Grants Grant Department or Organization National Oceanic and Atmospheric Administration, Department of Commerce Type of Mitigation Action Natural Systems Protection Hazard Addressed Erosion, Sea Level Rise, Storm Surge, Flood Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Institutions of higher education, nonprofit, and for-profit organizations, U.S. territories and states, tribes, and local governments including counties, municipalities, and cities Funding Available In 2018, NOAA granted roughly $9 million Cost Sharing Federal funds awarded under this program must be matched with non- federal funds at a 2:1 ratio. For a project requesting $500,000 in federal funding, for example, the award recipient would need to provide $250,000 in non-federal matching contributions, for a total project budget of $750,000. Restrictions Past funding opportunities have included a pre-proposal application and an invitation-only proposal application. Website fisheries.noaa.gov/grant/noaa-coastal-resilience-grants Next Steps for Texas Communities Application information for this federal program is available on the website. Application periods will include explanatory webinars. About the Resource The NOAA Coastal Resilience Grants program, jointly administered by NOAA’s National Ocean Service and NOAA Fisheries, implements projects that build resilient U.S. coastal communities and ecosystems. Resilience is the ability to prepare and plan for, absorb, recover from, and more successfully adapt to adverse events such as extreme weather or long-term changing environmental conditions. This program is intended to build resilience through projects that conserve and restore sustainable ecosystem processes and functions and reduce the vulnerability of coastal communities and infrastructure from the impacts of extreme weather events, climate hazards, and changing ocean conditions. Disaster Loan Assistance Loan Department or Organization Small Business Administration, Department of Commerce Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery Yes National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Businesses, private non-profit organizations, homeowners, and renters Funding Available Businesses may borrow up to $2 million. Homeowners may borrow up to $200,000 to repair/replace a disaster-damaged private residence or $40,000 for a homeowner or renter to repair/replace damaged personal property. November 2020 12 Cost Sharing Loan Restrictions Varies by applicant type Website disasterloan.sba.gov/ela/Information/Index Next Steps for Texas Communities Decisions are made based on individual disaster declarations. Refer to the SBA website for more information. About the Resource The Small Business Administration (SBA) provides low-interest disaster loans to businesses of all sizes, private non-profit organizations, homeowners, and renters. SBA disaster loans can be used to repair or replace the following items damaged or destroyed in a declared disaster: real estate, personal property, machinery and equipment, and inventory and business assets. EDA Disaster Recovery Grant Department or Organization Economic Development Administration, Department of Commerce Type of Mitigation Action Structure and Infrastructure, Education and Outreach Hazard Addressed All Specific to Recovery Yes National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Varies by disaster Funding Available Varies by disaster $587 million was available in FY 2019. Cost Sharing Up to 80% federal Restrictions Varies by disaster Website eda.gov/programs/disaster-recovery Next Steps for Texas Communities This federal program is administered through the state. More information can be found on the Texas EDC website at texasedc.org About the Resource The Economic Development Administration (EDA) has a long history of successfully supporting disaster recovery and resiliency efforts. EDA's role in disaster recovery is to facilitate the timely and effective delivery of federal economic development assistance to support long-term community economic recovery planning and project implementation, redevelopment, and resiliency. EDA coordinates regional disaster recovery efforts in partnership with its extensive network of Economic Development Districts (EDDs), University Centers, institutions of higher education, and other partners in designated impact areas. EDA Disaster Supplemental Funding Grant Department or Organization Economic Development Administration, Department of Commerce Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery Yes National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Varies by disaster Funding Available Varies by disaster Cost Sharing Varies by disaster Restrictions Varies by disaster November 2020 13 Website eda.gov/disaster-recovery/supplemental Next Steps for Texas Communities This federal program is administered through the state. More information can be found on the Texas EDC website at texasedc.org About the Resource Congress often appropriates supplemental funds for economic recovery after significant disasters. Between Fiscal Years 2018 and 2019, EDA received $1.2 billion in supplemental disaster appropriations ($600 million each year) from Congress to help regions recover from the economic harm and distress resulting from natural disasters in 2017-2019. With the support of these funds, American regions and communities hard hit by major disasters are rebuilding stronger, more resilient economies. Continuing Authorities Program Technical Assistance Department or Organization U.S. Army Corps of Engineers (USACE), Department of Defense Type of Mitigation Action Structure and Infrastructure Hazard Addressed Erosion, Flood, Sea Level Rise, Storm Surge Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants State, regional, and local governments, tribes, and other non-federal public agencies Funding Available Varies by sub-program Cost Sharing Varies by sub-program, but many programs follow the following guidelines: Feasibility Study: 100%/0% for initial $100,000; 50%/50% remaining cost Implementation: 75% federal Restrictions Varies by sub-program (streambank and shoreline protection, hurricane and storm damage reduction projects, and flood damage reduction projects) Website nae.usace.army.mil/Missions/Public-Services/Continuing-Authorities- Program Next Steps for Texas Communities There are 4 USACE districts that cover Texas, the Dallas District, the Fort Worth District, the Galveston District, and the Albuquerque District. Find your district here: swf.usace.army.mil/Locations About the Resource The Continuing Authorities Program (CAP) allows the USACE to plan, design, and implement certain types of water resources projects without additional project-specific congressional authorization. Under CAP, the USACE can plan and implement projects of limited size, cost, scope, and complexity. Projects include streambank and shoreline protection, hurricane and storm damage reduction projects, and flood damage reduction projects. All projects in this program include a feasibility phase and an implementation phase. November 2020 14 Ecosystem Restoration Technical Assistance Department or Organization U.S. Army Corps of Engineers (USACE), Department of Defense Type of Mitigation Action Natural Systems Protection Hazard Addressed Erosion, Flood Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Communities and local governments Funding Available Variable by project type Cost Sharing Variable with project type, but generally: Feasibility: 100%/0% for initial $100,000; 50%/50% remaining cost ($100,000 limit does not apply for dredging projects) Implementation: 75% federal for project modifications; 65% federal for dredging and aquatic ecosystem restoration projects Restrictions $10 million federal project limit Website nae.usace.army.mil/Missions/Public-Services/Ecosystem-Restoration- Authorities Next Steps for Texas Communities There are 4 USACE districts that cover Texas, the Dallas District, the Fort Worth District, the Galveston District, and the Albuquerque District. Find your district here: swf.usace.army.mil/Locations About the Resource Ecosystem Restoration is one of the primary missions of the USACE. The purpose of the USACE ecosystem restoration activities is to restore significant ecosystem function, structure, and dynamic processes that have been degraded. Ecosystem restoration efforts involve examining the problems contributing to the system degradation and developing alternative means to solve these problems. The intent of restoration is to partially or fully re-establish the attributes of a natural, functioning, self-regulating system. Restoration opportunities associated with wetlands, riparian, and other floodplain and aquatic systems are likely to be most appropriate for USACE involvement. The three ecosystem restoration authorities within the program are Project Modifications for Improvements to the Environment, Beneficial Use of Dredged Materials, and Aquatic Ecosystem Restoration. Emergency Operations Technical Assistance Department or Organization U.S. Army Corps of Engineers (USACE), Department of Defense Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery Yes National Mitigation Framework Core Capability Operational Coordination Eligible Applicants State and local governments Funding Available N/A Cost Sharing N/A Restrictions Disaster response and recovery program November 2020 15 Website swg.usace.army.mil/Business-With -Us/Emergency-Management- Office Next Steps for Texas Communities There are 4 USACE districts that cover Texas, the Dallas District, the Fort Worth District, the Galveston District, and the Albuquerque District. Find your district here: swf.usace.army.mil/Locations About the Resource Emergency preparedness and response are primarily state and local responsibilities. However, when the nature of the disaster exceeds the capabilities of state and local interests, the USACE may provide help to save human life, prevent immediate human suffering, or mitigate property damage. The USACE participates in the National Response Framework as the primary agency for planning, preparedness, and response under Emergency Support Function (ESF) #3, Public Works and Engineering. The purpose of ESF #3 is to provide lifesaving or life-protecting assistance to augment efforts of the affected state(s) and local response efforts following a major or catastrophic disaster. The USACE's Rehabilitation and Inspection Program provides the inspection of flood control projects, the rehabilitation of damaged flood control projects, and the rehabilitation of federally authorized and constructed hurricane or shore protection projects. Floodplain Management Services (FPMS) Program Technical Assistance Department or Organization U.S. Army Corps of Engineers (USACE), Department of Defense Type of Mitigation Action Local Planning and Regulations Hazard Addressed Erosion, Flood Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants State, regional, and local governments, tribes, and other non-federal public agencies Funding Available N/A Cost Sharing None. State and local governments can receive technical assistance free of charge. Restrictions This program provides studies only. Design and construction are not included. Website nae.usace.army.mil/Missions/Public-Services/Flood-Plain- Management-Services Next Steps for Texas Communities There are 4 USACE districts that cover Texas, the Dallas District, the Fort Worth District, the Galveston District, and the Albuquerque District. Find your district here: swf.usace.army.mil/Locations About the Resource The USACE provides the full range of technical services and planning guidance needed to support effective floodplain management. General technical assistance efforts under this program include determining site-specific data on obstructions to flood flows, flood formation, and timing; flood depths, stages, or floodwater velocities; the extent, duration, and frequency of flooding; information on natural and cultural floodplain resources; and flood loss potentials before and after the use of floodplain management measures. The types of studies conducted under the FPMS program include floodplain delineation/hazard, dam failure analyses, hurricane evacuation, flood warning, floodway, flood damage reduction, stormwater management, flood-proofing, and inventories of flood-prone structures. November 2020 16 Inspection of Completed Works Program Technical Assistance Department or Organization U.S. Army Corps of Engineers (USACE), Department of Defense Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Communities with critical infrastructure completed by the USACE Funding Available Not applicable. This is a technical assistance program. Cost Sharing N/A Restrictions Only for previously completed projects Website mvp.usace.army.mil/Missions/Civil-Works/Programs-Project- Management/District-Programs/Inspection-of-Completed-Works Next Steps for Texas Communities There are 4 USACE districts that cover Texas, the Dallas District, the Fort Worth District, the Galveston District, and the Albuquerque District. Find your district here: swf.usace.army.mil/Locations About the Resource The USACE's Inspection of Completed Works Program is designed to ensure that non-federal owners of federally built critical infrastructure, such as a flood damage reduction project, perform essential maintenance in accordance with the operation and maintenance manuals. Annual compliance inspections identify maintenance deficiencies, operational problems, and corrective actions. When necessary, the USACE provides technical assistance before, during, and after each flood emergency. Through these compliance inspections, the USACE ensures that the project will operate and function as designed. Silver Jackets Technical Assistance Department or Organization U.S. Army Corps of Engineers (USACE), Department of Defense Type of Mitigation Action Structure and Infrastructure, Education and Outreach Hazard Addressed All Specific to Recovery Yes National Mitigation Framework Core Capability Operational Coordination Eligible Applicants N/A. The Silver Jackets offer technical assistance to communities. Funding Available N/A. The Silver Jackets offer technical assistance to communities. Cost Sharing N/A Restrictions There are no restrictions. Website silverjackets.nfrmp.us Next Steps for Texas Communities Learn more about the Texas Silver Jackets at silverjackets.nfrmp.us/State-Teams/Texas About the Resource Silver Jackets teams across the United States bring together multiple state, federal, and sometimes tribal and local agencies, to learn from one another about reducing the risk of floods and other natural disasters. The collaboration, shared knowledge, and relationships enhance response and recovery efforts when hazard events do occur. Each state Silver Jackets team is unique. Common state agency November 2020 17 participants include those with mission areas of hazard mitigation, emergency management, floodplain management, natural resources management or conservation, etc. Federal participation typically includes the USACE, FEMA, and often others such as the National Weather Service and the U.S. Geological Survey. Small Flood Control Technical Assistance Department or Organization U.S. Army Corps of Engineers (USACE), Department of Defense Type of Mitigation Action Structure and Infrastructure Hazard Addressed Flood Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants State and local governments Funding Available N/A. This a technical assistance program. Cost Sharing Feasibility Study: 100%/0% for initial $100,000; 50%/50% remaining cost Design and implementation: 65% federal/35% non-federal. At least 5% must be in cash; the rest may be in kind. Restrictions Projects must pass a cost/benefit analysis Website mvp.usace.army.mil/Missions/Civil-Works/Programs-Project- Management/District-Programs/Small-Flood-Control-Projects Next Steps for Texas Communities There are 4 USACE districts that cover Texas, the Dallas District, the Fort Worth District, the Galveston District, and the Albuquerque District. Find your district here: swf.usace.army.mil/Locations About the Resource Under the Small Flood Control Program, the USACE works with communities to plan, design, and construct certain small flood control projects that have not already been specifically authorized by Congress. Both structural (levees, channels, or dams, for instance) and nonstructural (floodproofing or evacuation, for example) solutions are considered. Studies are required to evaluate potential projects. Each project selected must be economically justified; that is, the benefits resulting from a project must exceed the cost incurred to construct the project. It also must be environmentally acceptable and complete within itself. In addition, each separate project is limited to a total federal cost of not more than $10 million, including studies, design, and implementation. November 2020 18 Brownfields Program Grant Funding Grant, Technical Assistance Department or Organization Environmental Protection Agency Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Communities Funding Available Amount available varies based on the funding program. Cost Sharing Cost-sharing varies depending on the funding program. Restrictions Grant programs are available for assessment, cleanup, environmental job training, and more. Restrictions vary based on the specific grant program. Website epa.gov/brownfields/types-brownfields-grant-funding Next Steps for Texas Communities Grant applications for these federal programs vary based on the sub- grant. Detailed information is available on the website. About the Resource The EPA's Brownfields Program provides direct funding for brownfields assessment, cleanup, revolving loans, and environmental job training, and it provides technical information on brownfields financing matters. Separate grant programs are available for assessment, cleanup, environmental job training, and more. While not envisioned as a mitigation program, brownfield cleanup can prevent toxic materials from spreading during a hazard event. Clean Water State Revolving Loan Fund Loan Department or Organization Environmental Protection Agency Type of Mitigation Action Natural Systems Protection, Structure and Infrastructure Hazard Addressed Flood Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Funding is provided to states, and states distribute it to local communities. Tribal and territorial funding is also available. Funding Available Varies by state Cost Sharing Loan Restrictions Varies by state Website epa.gov/cwsrf Next Steps for Texas Communities This federal program is administered by the state. More information can be found at twdb.texas.gov/financial/programs/CWSRF/index.asp About the Resource The EPA's Clean Water State Revolving Fund (CWSRF) program is a federal-state partnership that provides communities a permanent, independent source of low-cost financing for a wide range of water quality infrastructure projects. CWSRF can fund a wide variety of water quality protection efforts. The November 2020 19 program’s flexibility and broad range of project eligibilities enable states to target CWSRF funds to their specific water quality priorities. Water quality projects often meet flood mitigation goals and vice versa. States are responsible for the operation of their CWSRF program. Under the CWSRF, states may provide various types of assistance, including loans, refinancing, purchasing, or guaranteeing local debt and purchasing bond insurance. States may also set specific loan terms, including interest rates from 0% to market rate and repayment periods of up to 30 years. States have the flexibility to target financial resources to their specific community and environmental needs. Drinking Water State Revolving Fund Loan Department or Organization Environmental Protection Agency Type of Mitigation Action Natural Systems Protection, Structure and Infrastructure Hazard Addressed Flood Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Funding is provided to states, and states distribute it to local communities. Tribal and territorial funding is also available. Funding Available Varies by state Cost Sharing Loan Restrictions Varies by state Website epa.gov/drinkingwatersrf Next Steps for Texas Communities This federal program is administered by the state. More information can be found at twdb.texas.gov/financial/programs/DWSRF/index.asp About the Resource Under the Drinking Water State Revolving Fund (DWSRF), the EPA provides grants to all 50 states plus Puerto Rico to capitalize state DWSRF loan programs. The states contribute an additional 20% to match the federal grants. The program also provides direct grant funding for the District of Columbia, U.S. Virgin Islands, American Samoa, Guam, and the Commonwealth of Northern Marianas. Water quality projects often meet flood mitigation goals and vice versa. The 51 DWSRF programs function like infrastructure banks by providing low-interest loans to eligible recipients for drinking water infrastructure projects. As money is paid back into the state’s revolving loan fund, the state makes new loans to other recipients. These recycled repayments of loan principal and interest earnings allow the state's DWSRF to “revolve” over time. States are responsible for operating their DWSRF programs. Under the DWSRF, states may provide various types of assistance, including: • Loans. • Refinancing. • Purchasing. • Guaranteeing local debt. • Purchasing bond insurance. States may also set specific loan terms, including interest rates from 0% to the market rate, and repayment periods of up to 30 years. November 2020 20 Environmental Finance Centers Technical Assistance Department or Organization Environmental Protection Agency Type of Mitigation Action Local Planning and Regulations Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Community Resilience Eligible Applicants States, tribes, local governments, and the private sector Funding Available N/A Cost Sharing N/A Restrictions N/A Technical assistance Website epa.gov/waterfinancecenter/efcn Next Steps for Texas Communities The Region VI Water Finance Center is housed at the University of New Mexico: southwestefc.unm.edu About the Resource The EPA's Environmental Finance Centers (EFCs) deliver targeted technical assistance to, and partner with states, tribes, local governments, and the private sector in providing innovative solutions to manage the costs of environmental financing and program management. Potential environmental projects may include hazard mitigation projects. Environmental Justice Grants and Technical Assistance Grant Department or Organization Environmental Protection Agency Type of Mitigation Action Local Planning and Regulations Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Community Resilience Eligible Applicants Incorporated non-profit organizations— including, but not limited to, environmental justice networks, faith-based organizations and those affiliated with religious institutions; federally recognized tribal governments—including Alaska Native Villages and tribal organizations Funding Available $1.5 million in 2019 Cost Sharing None. The grant is 100% federal. Restrictions 1-year projects Website epa.gov/environmentaljustice/environmental-justice-grants-funding- and-technical-assistance Next Steps for Texas Communities Grant opportunities for this federal program are posted on grants.gov. Refer to EPA's website for more information about application periods and requirements. About the Resource The EPA's Environmental Justice Small Grants (EJSG) program awards grants that support community- driven projects designed to engage, educate, and empower communities to better understand local November 2020 21 environmental and public health issues and develop strategies for addressing those issues, building consensus in the community, and setting community priorities. The grants can be used for education and outreach about hazard mitigation efforts. Greening America's Communities Technical Assistance Department or Organization Environmental Protection Agency Type of Mitigation Action Local Planning and Regulations Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Cities and towns Funding Available Technical assistance provided in kind Cost Sharing Unknown Restrictions Technical assistance Website epa.gov/smartgrowth/greening-americas-communities Next Steps for Texas Communities Grant opportunities for this federal resource are posted on grants.gov. Refer to EPA's website for more information about application periods and requirements. About the Resource Greening America's Communities (formerly known as Greening America's Capitals) is an EPA program that helps cities and towns develop an implementable vision of environmentally friendly neighborhoods that incorporates innovative green infrastructure, hazard mitigation, and other sustainable/resilient design strategies. EPA provides design assistance to help support sustainable communities that protect the environment, economy, and public health and to inspire local and state leaders to expand this work elsewhere. Nonpoint Source Water Quality (Section 319) Grants Grant Department or Organization Environmental Protection Agency Type of Mitigation Action Natural Systems Protection Hazard Addressed Erosion, Flood Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Funding is provided to states, and states distribute to local communities. Tribal 319 funding is also available. Funding Available Varies by state; total funds in 2019: $165.4 million Cost Sharing Each state receives different funding per year Restrictions Varies by state Website epa.gov/nps Next Steps for Texas Communities This federal program is administered through the state. More information can be found at tceq.texas.gov/waterquality/nonpoint- source/grants. November 2020 22 About the Resource Clean Water Act Section 319(h) funds are provided only to designated state and tribal agencies to implement their approved nonpoint source management programs. State and tribal nonpoint source programs include a variety of components, including technical assistance, financial assistance, education, training, technology transfer, demonstration projects, and regulatory programs. Water quality projects often meet flood mitigation goals and vice versa. Each year, EPA awards Section 319(h) funds to states in accordance with a state-by-state allocation formula that EPA developed in consultation with the states. Tribal funding is also available under Clean Water Act Section 319(h). Smart Growth Support Grant, Technical Assistance Department or Organization Office of Sustainable Communities, Environmental Protection Agency Type of Mitigation Action Local Planning and Regulations, Education and Outreach Hazard Addressed All Specific to Recovery Yes National Mitigation Framework Core Capability Planning Eligible Applicants Eligible applicants vary depending on the specific sub-program Funding Available Amount of funding available varies based on sub-program Cost Sharing Cost-sharing requirements vary depending on the sub-program Restrictions Restrictions vary based on sub-program Website epa.gov/smartgrowth/about-smart-growth Next Steps for Texas Communities Grant opportunities are posted on grants.gov. Refer to EPA's website for more information about application periods and requirements. About the Resource The Environmental Protection Agency's (EPA) Office of Community Revitalization works on smart growth issues by: • Conducting research. • Producing reports and other publications. • Providing examples of outstanding smart growth communities and projects. • Working with tribes, states, regions, and communities through grants and technical assistance. Smart growth can incorporate elements of green infrastructure and/or land preservation and can create more resilient communities. Water Infrastructure and Resiliency Finance Center Technical Assistance Department or Organization Environmental Protection Agency Type of Mitigation Action Local Planning and Regulations Hazard Addressed Erosion, Flood, Sea Level Rise, Storm Surge Specific to Recovery No National Mitigation Framework Core Capability Community Resilience November 2020 23 Eligible Applicants Communities Funding Available N/A. This a technical assistance program. Cost Sharing N/A. This a technical assistance program. Restrictions Technical Assistance Website epa.gov/waterfinancecenter Next Steps for Texas Communities N/A - no application necessary About the Resource The Water Finance Center provides financing information to help local decision-makers make informed decisions about drinking water, wastewater, and stormwater infrastructure, to protect human health and the environment. Water quality projects often meet flood mitigation goals and vice versa. Wetlands Protection Program Development Grants Grant Department or Organization Environmental Protection Agency Type of Mitigation Action Local Planning and Regulations, Education and Outreach Hazard Addressed Erosion, Flood Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Funding is provided through each EPA region Funding Available Variable by EPA region Cost Sharing 75% federal Restrictions Variable by EPA region Website epa.gov/wetlands/wetland-program-development-grants-and-epa- wetlands-grant-coordinators Next Steps for Texas Communities Application information is available at epa.gov/wetlands/region-6- wetland-program-development-grant-request-applications About the Resource Wetlands Protection Development Grants (WPDGs) provide eligible applicants an opportunity to conduct projects to strengthen wetland protection programs. Eligible projects promote the coordination and acceleration of research, investigations, experiments, training, demonstrations, surveys, and studies relating to the causes, effects, extent, prevention, reduction, and elimination of water pollution. Wetland protection is an important type of natural resource protection hazard mitigation project. Georgetown Adaptation Resources Technical Assistance Department or Organization Georgetown Climate Center Type of Mitigation Action Local Planning and Regulations, Education and Outreach Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Threats and Hazard Identification Eligible Applicants Technical assistance is available to all Funding Available N/A November 2020 24 Cost Sharing N/A Restrictions None Website georgetownclimate.org/adaptation/featured.html Next Steps for Texas Communities More resources are available at the website About the Resource The Georgetown Climate Center provides resources to policymakers and others helping communities adapt to climate change. Building Resilient Infrastructure and Communities (BRIC) Grant Department or Organization Federal Emergency Management Agency, Department of Homeland Security Type of Mitigation Action Structure and Infrastructure, Natural Systems Protection, Local Planning and Regulations Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants States and territories that have had a major disaster declaration under the Stafford Act in the 7 years prior to the annual application period start date are eligible to apply to FEMA for federal assistance under BRIC as applicants. Local governments and tribes are elibible to apply to states and territories as subapplicants. Funding Available On an annual basis, FEMA will assess the amount of funding set aside for BRIC and determine what portion of that amount will be available during the following application period for the BRIC program. FEMA will announce its determination in the annual Notice of Funding Opportunity for the BRIC program. Cost Sharing Unknown at this time. Cost sharing requirements will be provided with the annual Notice of Funding Opportunity. Restrictions More information on ineligible activities can be found in the HMA Guidance, located here: fema.gov/media-library-data/1424983165449- 38f5dfc69c0bd4ea8a161e8bb7b79553/HMA_Guidance_022715_508. pdf Website fema.gov/grants/mitigation/building-resilient-infrastructure- communities Next Steps for Texas Communities The first NOFO will be available in fall 2020. States, territories, and federally recognized tribes are potential applicants. Local governments, tribal governments, state agencies, and tribal agencies are potential sub-applicants. The State Hazard Mitigation Officer can provide more information. About the Resource BRIC supports states, local communities, tribes, and territories in pre-disaster mitigation projects to reduce long-term risk from natural hazards. The BRIC program's guiding principles are supporting communities through capability- and capacity-building; encouraging and enabling innovation; promoting partnerships; enabling large projects; maintaining flexibility; and providing consistency. BRIC is a new FEMA pre-disaster hazard mitigation program that replaces the Pre-Disaster Mitigation (PDM) program and is a result of amendments made to Section 203 of the Robert T. Stafford Disaster November 2020 25 Relief and Emergency Assistance Act (Stafford Act) by Section 1234 of the Disaster Recovery Reform Act of 2018 (DRRA). The Notice of Funding Opportunity for the first funding round is anticipated in fall 2020. Emergency Management Performance Grants Grant Department or Organization Federal Emergency Management Agency, Department of Homeland Security Type of Mitigation Action Local Planning and Regulations Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Community Resilience Eligible Applicants States or territories. May make available to subgrantee communities. Funding Available $350 million (FY19) Cost Sharing The recipient's contribution can be cash (hard match) or third-party in- kind (soft match). Eligible EMPG program applicants agree to make available non-federal funds to carry out an EMPG award in an amount not less than 50% of the total project cost. Restrictions Grant funds may not be used for: • Prohibited equipment. • Weapons systems and ammunition. • Costs to support the hiring of sworn public safety officers for the purposes of fulfilling traditional public safety duties or to supplant traditional public safety positions and responsibilities. • Activities and projects unrelated to the completion and implementation of the EMPG Program. Website fema.gov/grants/preparedness/emergency-management-performance Next Steps for Texas Communities Reach out to your State Hazard Mitigation Officer for more information. About the Resource The purpose of the Emergency Management Performance Grant (EMPG) Program is to provide federal funds to states to assist state, local, territorial, and tribal governments in preparing for all hazards. Title VI of the Stafford Act authorizes the Federal Emergency Management Agency (FEMA) to make grants for providing a system of emergency preparedness for the protection of life and property in the United States from hazards. It vests responsibility for emergency preparedness jointly in the federal government, states, and their political subdivisions. The federal government, through the EMPG Program, provides the necessary direction, coordination, guidance, and assistance to support a comprehensive all-hazards emergency preparedness system. The EMPG Program will provide federal funds to assist state, local, tribal, and territorial emergency management agencies to obtain the resources required to support the National Preparedness Goal’s associated mission areas and core capabilities. November 2020 26 Flood Mitigation Assistance Program Grant Department or Organization Federal Emergency Management Agency, Department of Homeland Security Type of Mitigation Action Natural Systems Protection, Structure and Infrastructure Hazard Addressed Flood Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Applicants must be states, U.S. territories, or federally recognized tribes. Local governments may apply as sub-applicants under their states or territories. Funding Available $210 million (FY19) Cost Sharing Federal funding is available for up to 75% of the eligible activity costs. Restrictions Applying communities must be members of the National Federal Insurance Program. Website fema.gov/grants/mitigation/floods Next Steps for Texas Communities This federal program is administered through the state. Tribes can apply directly. More information can be found at twdb.texas.gov/flood/grant/fma.asp About the Resource The goal of FEMA's Flood Mitigation Assistance (FMA) Program is to reduce or eliminate claims under the National Flood Insurance Program (NFIP). FMA provides funding to states, territories, federally recognized tribes, and local communities for projects and planning that reduce or eliminate the long-term risk of flood damage to structures insured under the NFIP. FMA funding is also available for management costs. Funding is appropriated by Congress annually. Hazard Mitigation Grant Program Grant Department or Organization Federal Emergency Management Agency, Department of Homeland Security Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants In general, individuals, businesses, and private nonprofits via local governments, can apply for HMGP funding. Individuals must be sponsored through an appropriate subapplicant such as a local government, state agency, tribe or tribal agency, or private nonprofit. Applications are submitted to the state, eligible tribe, or territory, which receives HMGP funds from FEMA. Funding Available The available funding is determined based upon the disaster declaration. Cost Sharing Matching requirements are up to 75% for a federal match and a minimum of 25% for a non-federal match. Note that funding from other November 2020 27 federal sources cannot be used for the 25% share with one exception: funding provided to states, tribes, or territories under the Community Development Block Grant (CDBG) program from the Department of Housing and Urban Development (HUD) can be used to meet the non- federal share requirement. Restrictions To be considered for funding under HMGP, a project must: • Conform with the approved state and local mitigation plan • Benefit the disaster area • Conform with environmental regulations • Solve a problem and be technically feasible • Meet all applicable state and local codes and standards • Demonstrate cost-effectiveness • Consider a range of alternatives Website fema.gov/grants/mitigation/hazard-mitigation Next Steps for Texas Communities This federal program is administered through the state. Tribes can apply directly. More information can be found at tdem.texas.gov/hazard-mitigation About the Resource The purpose of the Hazard Mitigation Grant Program (HMGP) is to help communities implement hazard mitigation measures following a Presidential Major Disaster Declaration in the areas of the state, tribe, or territory requested by the Governor or Tribal Executive. The key purpose of this grant program is to enact mitigation measures that reduce the risk of loss of life and property from future disasters. The primary guidance document for this program is the Hazard Mitigation Assistance Guidance. The HMGP is authorized under Section 404 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act. National Dam Safety Program Grant, Technical Assistance Department or Organization Federal Emergency Management Agency, Department of Homeland Security Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Non-federal dams that (i) are in a state or territory with a state or territorial dam safety program; (ii) are classified as having "high hazard potential" by the dam safety agency in the dam's state or territory ; (iii) have an emergency action plan approved by the state or territory's dam safety agency; and (iv) the state or territory in which the dam is located determines either of these criteria – the dam fails to meet minimum dam safety standards public. An "eligible high hazard potential dam" does not include: (i) a licensed hydroelectric dam; or (ii) a dam built under the federal authority of the Secretary of Agriculture. Funding Available $10 million Cost Sharing Non-federal cost share requirement of not less than 35%, which may be partially or fully in-kind. Restrictions Dams on tribal lands are not eligible to receive HHPD grant funding. The Indian Dam Safety Act of 1994 establishes a Dam Safety Maintenance and Repair Program within the Bureau of Indian Affairs. Website fema.gov/emergency-managers/risk-management/dam-safety November 2020 28 Next Steps for Texas Communities Grant funds go to states. Technical assistance is available to everyone. About the Resource For 30 years, the federal government has used the National Dam Safety Program (NDSP) to protect Americans from dam failure. The NDSP is a partnership of states, federal agencies, and other stakeholders that encourages and promotes the establishment and maintenance of effective federal and state dam safety programs to reduce the risks to human life, property, and the environment from dam- related hazards. Public Assistance 404 and 406 Programs Grant Department or Organization Federal Emergency Management Agency, Department of Homeland Security Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery Yes National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Eligible applicants include states, federally recognized tribal governments (including Alaska Native villages and organizations, as long as they are not privately owned), U.S. territories, local governments, and certain organizations. Funding Available Mitigation funding limits are determined based on a benefit-cost analysis or as a sage of the damaged facility's repair cost. Cost Sharing The federal share of assistance is not less than 75% of the eligible cost. Restrictions Mitigation funding is generally only available for eligible disaster- damaged facilities. Projects must directly reduce the potential of similar damage to the facility and must be cost-effective, technically feasible, and compliant with environmental and historic preservation laws, regulations, and Executive Orders. Website fema.gov/assistance/public Next Steps for Texas Communities Contact your State Hazard Mitigation Officer for more information. About the Resource The FEMA Public Assistance (PA) program provides grants to state, local, tribal, and territorial governments, and certain types of private non-profit (PNP) organizations, so that communities can quickly respond to and recover from major disasters or emergencies declared by the President. Through the program, FEMA provides supplemental federal disaster grant assistance for debris removal; life-saving emergency protective measures; and the repair, replacement, or restoration of disaster- damaged publicly owned facilities, and the facilities of certain PNP organizations. The PA program also encourages protection of these damaged facilities from future events by providing assistance for cost- effective hazard mitigation measures during the recovery process. November 2020 29 Community Development Block Grant - Disaster Recovery Grant Department or Organization Department of Housing and Urban Development Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants State and local governments act as grantees. Those who receive funding include state agencies, non-profit organizations, economic development agencies, citizens, and businesses. Funding Available Varies depending on the disaster Cost Sharing Varies depending on the cost type More information on costs can be found here: hudexchange.info/resources/documents/CDBG-DR-Cost -Types- Summary.pdf Restrictions Each activity must be CDBG-eligible, address a disaster-related impact in a Presidentially declared county, and meet a national objective. Eligible grantees are states, units of general local government, tribes, and insular areas. Website hudexchange.info/programs/cdbg-dr/ hudexchange.info/programs/cdbg-dr/cdbg-dr-grantee-contact- information/#all-disasters Next Steps for Texas Communities More information can be found at: texasagriculture.gov/GrantsServices/RuralEconomicDevelopment/Rur alCommunityDevelopmentBlockGrant(CDBG).aspx About the Resource The Department of Housing and Urban Development (HUD) provides flexible grants to help cities, counties, and states recover from Presidentially declared disasters, especially in low-income areas, subject to availability of supplemental appropriations. In response to Presidentially declared disasters, Congress may appropriate additional funding for the CDBG Program as Disaster Recovery grants, to rebuild the affected areas and provide crucial seed money to start the recovery process. Since this Disaster Recovery assistance may fund a broad range of recovery activities, HUD can help communities and neighborhoods that otherwise might not recover due to limited resources. Community Development Block Grant - Mitigation Grant Department or Organization Department of Housing and Urban Development Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery See CDBG-DR National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants States Funding Available Variable by year and opportunity Cost Sharing Variable by year and opportunity November 2020 30 Restrictions Restrictions may vary, depending on the specific opportunity. Website hudexchange.info/programs/cdbg-mit Next Steps for Texas Communities This federal resource is administered through the state. More information can be found at: texasagriculture.gov/GrantsServices/RuralEconomicDevelopment/Rur alCommunityDevelopmentBlockGrant(CDBG).aspx About the Resource The Community Development Block Grant- Mitigation Program is designed to provide assistance to areas affected by recent disasters through funding high-impact activities aimed at reducing future losses from natural hazards. Section 108 Loan Guarantee Program Loan Department or Organization Department of Housing and Urban Development Type of Mitigation Action Local Planning and Regulations Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Community Resilience Eligible Applicants States, metropolitan, cities, and urban counties (i.e., CDBG entitlement recipients), non-entitlement communities that are assisted in the submission of applications by states that administer the CDBG program, non-entitlement communities eligible to receive CDBG funds under the HUD-administered small cities CDBG program. The public entity may be the borrower, or it may designate a public agency as the borrower. Activities eligible under Section 108 include: • Acquisition of real property. • Rehabilitation of publicly owned real property. • Housing rehabilitation eligible under CDBG. • Construction, reconstruction, or installation of public facilities (including street, sidewalk, and other site improvements). • Related relocation, clearance, and site improvements. • Loan to for-profit businesses for economic development purposes. • Payment of interest on the guaranteed loan and issuance costs of public offerings. • Debt service reserves. • Finance fees. • Public works and site improvements. • In limited circumstances, affordable housing construction. Funding Available Current availability of funding can be found here: hudexchange.info/resource/5197/current-availability-of-section-108- financing-cdbg-entitlement-and-State-grantees/ Cost Sharing N/A Restrictions All projects must benefit low-moderate income persons, aid in the elimination of slums and blight, or meet the urgent needs of the community. Website hudexchange.info/programs/section-108 November 2020 31 Next Steps for Texas Communities More information can be found at: texasagriculture.gov/GrantsServices/RuralEconomicDevelopment/Tex asAgriculturalFinanceAuthority/AgriculturalLoanGuaranteeProgram.as px About the Resource The Section 108 Loan Guarantee Program (Section 108 of the Housing and Community Development Act of 1974) provides communities with financing for economic development, housing rehabilitation, public facilities, and other physical development projects, including improvements to increase their resilience against natural disasters. The flexibility of the program makes it one of the most important public investment tools that HUD offers to state and local governments. Section 108 offers state and local governments the ability to transform a small portion of their CDBG funds into federally guaranteed loans large enough to pursue physical and economic revitalization projects capable of revitalizing entire neighborhoods. Disaster Recovery Grants Grant Department or Organization National Park Service, Department of Interior Type of Mitigation Action Natural Systems Protection Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Dependent on Congressional authorization specific to disaster; must be affected by specific disaster Funding Available Varies depending on the disaster Cost Sharing N/A Restrictions Must be affected by specific disaster Website nps.gov/preservation-grants/disaster-recovery/index.html Next Steps for Texas Communities Funds are made available for specific disasters. Refer to the NPS website for more information. About the Resource Congress responds to some major disasters by appropriating Emergency Supplemental funding from the Historic Preservation Fund (ESHPF) for recovery, allowing state and tribal Historic Preservation Offices to work on various recovery projects, including compliance activities, survey and inventory of historic resources in areas impacted by the disaster, recovery, and repair of historic properties damaged during the disaster, and other activities related to disaster recovery, as approved by the National Park Service (NPS). All funded repair work must substantially mitigate the threat and include steps to mitigate future damages. Housing Improvement Program Grant Department or Organization Bureau of Indian Affairs, Department of Interior Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery No November 2020 32 National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Member of a federally recognized tribe or an Alaska Native; live in an approved tribal service area; have an income that does not exceed 150% of the U.S. Department of Health and Human Services (DHHS) Poverty Guidelines; have present housing that is substandard, as defined by the regulations; have no other resource for housing assistance; and have not acquired the present housing through a federally sponsored housing program that includes such housing assistance. Funding Available Interim Improvements: Provides up to $7,500 in housing repairs for conditions that threaten the health and/or safety of the occupants. Repairs and Renovation: Provides up to $60,000 in repairs and renovation to improve the condition of a homeowner’s dwelling to meet applicable building code standards. Replacement Housing: Provides a modest replacement home if a homeowner’s dwelling cannot be brought to applicable building code standards. New Housing: Provides a modest new home. People who do not own a home may be eligible if they own or lease land suitable for housing and the lease is for not less than 25 years when assistance is received. Cost Sharing No cost-share required Restrictions Consult the eligibility guidelines found here: bia.gov/bia/ois/dhs/housing-improvement-program Website bia.gov/bia/ois/dhs/housing-improvement-program Next Steps for Texas Communities Contact your local BIA representative. Their information can be found at: bia.gov/sites/bia.gov/files/assets/bia/ois/Region%20Contact%20list%2 0rev%205.1.20.docx About the Resource The Housing Improvement Program (HIP) is a home repair, renovation, replacement and new housing grant program administered by the Bureau of Indian Affairs (BIA) and by federally recognized tribes. It is aimed at American Indians and Alaska Native (AI/AN) individuals and families who have no immediate resources for standard housing. Repairs can include those required as part of recovery or to reinforce the structure. National Coastal Wetlands Conservation Grants Grant Department or Organization Fish and Wildlife Service, Department of Interior Type of Mitigation Action Natural Systems Protection Hazard Addressed Flood, Sea Level Rise, Storm Surge Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants State agencies, coastal states only Funding Available $20 million in 2019 Cost Sharing Open to applicants who have established a fund that is used for acquiring coastal wetlands, other natural areas, or open space, at a 75% grant share of total project costs, up to the maximum award of $1,000,000. Open to others at a 50% cost Restrictions Must meet cost-share Website fws.gov/coastal/CoastalGrants/index.html November 2020 33 Next Steps for Texas Communities Contact the Southeast Region of the US Fish and Wildlife Service: fws.gov/southeast/about/ About the Resource The National Coastal Wetlands Conservation Grants (NCWCG) program annually provides grants of up to $1 million to coastal and Great Lakes states and territories to protect, restore, and enhance coastal wetland ecosystems and associated uplands. The grants are funded through the Sport Fish Restoration and Boating Trust Fund, which is supported by excise taxes on fishing equipment and motorboat fuel. Wetland conservation is an important type of natural resource protection hazard mitigation project. North American Wetland Conservation Fund Grant Department or Organization Fish and Wildlife Service, Department of Interior Type of Mitigation Action Natural Systems Protection Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants A list of eligible and ineligible activities can be found in Eligibility Criteria & Processes: fws.gov/migratorybirds/pdf/grants/EligibilityCriteria.pdf Funding Available $23.9 million in 2019 Cost Sharing 1:1 matching. Restrictions According to the NAWCA website, projects must provide long-term conservation for wetlands-associated migratory birds and other wetlands-associated wildlife. Coastal Wetlands Planning, Protection and Restoration Act-derived funds eligible for NAWCA projects may be used only in U.S. coastal wetlands ecosystems. Website fws.gov/birds/grants/north-american-wetland-conservation-act.php Next Steps for Texas Communities Contact the Southeast Region of the US Fish and Wildlife Service: fws.gov/southeast/about/ About the Resource The North American Wetland Conservation Fund Program provides matching grants to wetlands conservation projects in the United States, Canada, and Mexico. It includes a Standard Program and a Small Grants Program. Wetland conservation is an important type of natural resource protection hazard mitigation project. Tribal Resilience Program Grant Department or Organization Bureau of Indian Affairs, Department of Interior Type of Mitigation Action Local Planning and Regulations, Education and Outreach Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Federally recognized tribes November 2020 34 Funding Available $8,731,454 awarded in FY2019 Cost Sharing Not required Restrictions Proposals should be for projects that can be completed within 2 years. Because funding is limited, awards shall not exceed $150,000 for any one proposal for Categories 1-2, 4, and 7 (training, planning, ocean and coastal management, relocation); $15,000 for any one proposal in Categories 3 and 5 (travel); and $65,000 for any one proposal in Category 6 (capacity-building support for scoping efforts). Website bia.gov/bia/ots/Tribal-resilience-program Next Steps for Texas Communities This is a federal program. Apply to the BIA during open Request for Proposal windows. About the Resource The BIA's Tribal Resilience Program (TRP) provides grants to tribes to build capacity and resilience for tribally designed resilience training, adaptation planning, vulnerability assessments, supplemental monitoring, capacity building, and youth engagement. WaterSMART Programs Grant, Technical Assistance Department or Organization Bureau of Reclamation, Department of Interior Type of Mitigation Action Structure and Infrastructure Hazard Addressed Drought, Flood Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants States, tribes, and local entities in western states Funding Available Between $1,000 and $20,000,000 Cost Sharing Not required Restrictions Western states: Washington, Oregon, Idaho, Montana, North Dakota, South Dakota, Nebraska, Wyoming, California, Nevada, Utah, Colorado, Kansas, Oklahoma, Texas, New Mexico, and Arizona Website usbr.gov/watersmart Next Steps for Texas Communities Information can be found on the USBR website, and applications may be submitted during open application periods through grants.gov. About the Resource Through WaterSMART, the Bureau of Reclamation will continue to work with states, tribes, and local entities as they plan for and implement actions to increase their water supply through investments to modernize existing infrastructure and attention to local water conflicts. WaterSMART is an umbrella for a variety of programs, including water and energy efficiency grants, drought planning grants, and watershed management planning grants. November 2020 35 Firewise Technical Assistance Department or Organization National Fire Prevention Association Type of Mitigation Action Education and Outreach Hazard Addressed Wildfire Specific to Recovery No National Mitigation Framework Core Capability Public Information and Warning Eligible Applicants Communities Funding Available N/A Cost Sharing N/A Restrictions None Website nfpa.org/Public-Education/Fire-causes-and-risks/Wildfire/Firewise- USA Next Steps for Texas Communities More resources from this non-profit organization are available at the website About the Resource Firewise USA is a voluntary program that provides a framework to help neighbors get organized, find direction and take action to increase the ignition resistance of their homes and community. Five Star and Urban Waters Restoration Grant Program Grant Department or Organization National Fish and Wildlife Foundation Type of Mitigation Action Natural Systems Protection Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Community Resilience Eligible Applicants Local governments or organizations Funding Available Awards range from $20,000 to $50,000 with an average size of $30,000 and 40-50 grants awarded per year Cost Sharing Matching required Restrictions All projects must have: • On-the-ground activities such as wetland, river, or coastal habitat restoration and/or targeted green infrastructure creation and monitoring. • Community partners united to achieve ecological and educational outcomes. • Integrated education, outreach, and training on the restoration project through broad community engagement activities or participation and integration with K-12 environmental curriculum. • Measurable ecological, educational, and community benefits. Website nfwf.org/fivestar/Pages/home.aspx Next Steps for Texas Communities More information on this not for profit resource is available at the website November 2020 36 About the Resource The Five Star and Urban Waters Restoration Program seeks to develop nationwide-community stewardship of local natural resources, preserving these resources for future generations and enhancing habitat for local wildlife. Projects seek to address water quality issues in priority watersheds, such as erosion due to unstable streambanks, pollution from stormwater runoff, and degraded shorelines caused by development. National Coastal Resilience Fund Grant Department or Organization National Fish and Wildlife Foundation Type of Mitigation Action Natural Systems Protection Hazard Addressed Storm Surge Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Eligible applicants include non-profit 501(c) organizations, state and territorial government agencies, local governments, municipal governments, tribal governments, educational institutions, or commercial (for-profit) organizations. Tribal governments include both federally recognized tribes and tribes that are not federally recognized. Funding Available $30 million (2019) Cost Sharing Matching required Restrictions Financial Assistance Website nfwf.org/programs/national-coastal-resilience-fund Next Steps for Texas Communities More information on this not for profit resource is available at the website About the Resource The National Coastal Resilience Fund restores, increases, and strengthens natural infrastructure to protect coastal communities while also enhancing habitats for fish and wildlife. Established in 2018, the National Coastal Resilience Fund invests in conservation projects that restore or expand natural features such as coastal marshes and wetlands, dune and beach systems, oyster and coral reefs, forests, coastal rivers and floodplains, and barrier islands that minimize the impacts of storms and other naturally occurring events on nearby communities., The National Coastal Resilience Fund restores, increases, and strengthens natural infrastructure to protect coastal communities while also enhancing habitats for fish and wildlife. Established in 2018, the National Coastal Resilience Fund invests in conservation projects that restore or expand natural features such as coastal marshes and wetlands, dune and beach systems, oyster and coral reefs, forests, coastal rivers and floodplains, and barrier islands that minimize the impacts of storms and other naturally occurring events on nearby communities. The National Coastal Resilience Fund is supported by NOAA, Shell Oil Company, and TransRe. November 2020 37 Resilient Communities Program Grant Department or Organization National Fish and Wildlife Foundation Type of Mitigation Action Local Planning and Regulations Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Community Resilience Eligible Applicants Local governments or organizations Funding Available $12 million, plus additional local funding to $24 million Cost Sharing Matching required Restrictions Grants will be offered once a year to support priority projects in select states and communities Website nfwf.org/resilientcommunities/Pages/home.aspx Next Steps for Texas Communities More information on this not for profit resource is available at the website About the Resource The program focuses on water quality and quantity declines, forest health concerns, and sea-level rise. The program will emphasize community inclusion and assistance to traditionally underserved populations in vulnerable areas. Forest Management Technical Assistance Department or Organization Forest Service, Texas A&M Type of Mitigation Action Natural Systems Protection Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-term Vulnerability Reduction Eligible Applicants Texas A&M Forest Service provides technical assistance to landowners and communities throughout the state. Funding Available N/A Cost Sharing N/A Restrictions None identified Website https://tfsweb.tamu.edu/LandownerAssistance/ Next Steps for Texas Communities More information on this state resource is available on the website. About the Resource The Forest Service provides technical assistance to landowners and communities to better manage their forests, protect water resources, and prevent the worst impacts of wildfire. November 2020 38 Water Resources Outreach and Training Program Technical Assistance Department or Organization Texas Water Resources Institute, Texas A&M Type of Mitigation Action Natural Systems Protection Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Community Resilience Eligible Applicants The Water Resources Outreach and Training Program is targeted at interested citizens, students, and water professionals. Funding Available N/A Cost Sharing N/A Restrictions None identified Website twri.tamu.edu/ Next Steps for Texas Communities More information on this state resource is available on the website. About the Resource The Water Resources Outreach and Training Program provides workshops and technical resources for citizens, students, and water professionals. One popular course is the Texas Watershed Planning Program, which trains attendees in sustainable, proactive approaches to managing water quality throughout the state. Water quality projects can often mitigate against flooding. Wetland Restoration Program Technical Assistance Department or Organization AgriLife Extension, Texas A&M Type of Mitigation Action Natural Systems Protection Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Community Resilience Eligible Applicants The Wetlands Restoration Program focuses on public lands. Education classes are also provided for adults and children. Funding Available N/A – Restoration services are provided directly. Cost Sharing N/A Restrictions None identified Website tcwp.tamu.edu/wetland-restoration/ Next Steps for Texas Communities More information on this state resource is available on the website and in the weekly newsletter About the Resource The Wetlands Restoration Program is focused on providing resources to the Houston-Galveston region by helping to restore wetlands to their natural state and by providing hands-on education to students and adults through volunteer experiences. Restoring these wetlands can support flood risk reduction. November 2020 39 Texas Coastal Management Program Grant Department or Organization Coast, Texas General Land Office Type of Mitigation Action Natural Systems Protection, Local Planning and Regulations Hazard Addressed Coastal Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Cities, counties, state agencies, public universities, regional governments, and nonprofit organizations Funding Available The amount available depends on the project type. Cost Sharing Construction and administrative projects require a 40% applicant match. Projects of special merit do not require a match. Restrictions Projects must be in the coastal zone. The program requires a competitive pre-application and then a full application by invitation only. Website glo.texas.gov/coast/grant-projects/funding/index.html Next Steps for Texas Communities More information on this state resource is available on the website. About the Resource The Texas Coastal Management Program grants are designed to address environmental concerns in the coastal zone. Project types include public access enhancement, data collection, coastal hazard and resiliency planning, coastal resource improvement or enhancement, and projects of special merit. Projects must implement a previously approved local, regional, state, or federal plan. Water Quality and Flood Control Programs Grant, Technical Assistance Department or Organization Texas State Soil and Water Conservation Board Type of Mitigation Action Natural Systems Protection, Structure and Infrastructure Hazard Addressed Flood, Drought Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Varies by program. Reach out to your local Soil and Water Conservation District for more information. Funding Available Varies by program Cost Sharing Varies by program Restrictions Varies by program Website tsswcb.texas.gov/index.php/programs Next Steps for Texas Communities More information on this state resource is available on the website or through your local Soil and Water Conservation District. About the Resource The Texas State Soil and Water Conservation Board maintains water-related programs, including the Flood Control Program, which funds dam construction and maintenance; Water Quality Management Planning Program, which funds site-specific water quality planning; Texas Nonpoint Source Management November 2020 40 Program to protect water pollution from nonpoint sources; and the Water Supply Enhancement Program, which assists with water management given drought. Agricultural Water Conservation Grants Program Grant Department or Organization Texas Water Development Board Type of Mitigation Action Natural Systems Protection, Structure and Infrastructure, Local Planning and Regulations, Education and Outreach Hazard Addressed Drought, Erosion, Flood Specific to Recovery No National Mitigation Framework Core Capability Community Resilience (may vary based on annual solicitation criteria) Eligible Applicants State agencies and political subdivisions Funding Available Varies; current program funding authorization is $1,200,000 per fiscal year Cost Sharing Varies; local match is always encouraged and sometimes required Restrictions Funding is only available for agricultural water conservation projects and programs, as defined by statute. Funding may also be restricted to projects within regional water planning areas that have identified Irrigation Conservation as a goal in their regional water plans. Website twdb.texas.gov/financial/programs/AWCG/index.asp Next Steps for Texas Communities Applications for this state resource can be found on the grant website. About the Resource The grant program offers funding to state agencies and local communities to support agricultural irrigation conservation and water conservation. Types of fundable projects include technical assistance, demonstrations and technology transfer, equipment cost share, and research and education. Agricultural Water Conservation Loan Program Loan Department or Organization Texas Water Development Board Type of Mitigation Action Natural Systems Protection, Structure and Infrastructure, Local Planning and Regulations, Education and Outreach Hazard Addressed Drought, Erosion, Flood Specific to Recovery No National Mitigation Framework Core Capability Community Resilience (may vary) Eligible Applicants Political subdivisions Funding Available Varies; contact TWDB staff to determine funding availability Cost Sharing N/A Restrictions Funding is only available for agricultural water conservation projects and programs, as defined by statute. Website twdb.texas.gov/financial/programs/AWCL/index.asp Next Steps for Texas Communities Applications for this state resource can be found on the grant website November 2020 41 About the Resource The loan program allows for conservation projects or programs, including those that fund political subdivisions or individual persons. Flood Infrastructure Fund Grant, Loan Department or Organization Texas Water Development Board Type of Mitigation Action Natural Systems Protection, Structure and Infrastructure, Education and Outreach Hazard Addressed Flood Specific to Recovery No National Mitigation Framework Core Capability Community Resilience Eligible Applicants Cities, counties, and any district or authority created under Article III, Section 52 or Article XVI, Section 59 of the Texas Constitution Funding Available Varies Cost Sharing Structure of financial assistance can be found in the Flood Intended Use Plan. Restrictions See program website for specific requirements Website http://www.twdb.texas.gov/financial/programs/FIF/index.asp Next Steps for Texas Communities Applications for this state resource can be found on the website. About the Resource The Flood Infrastructure Fund provides grants and loans to cities, counties, and other governmental districts and authorities for a wide range of flood mitigation projects. The projects include structural, nonstructural, and nature-based projects. Funding is available for planning/engineering and construction/rehabilitation phases, as well as education and outreach, stream guages, and warning systems. Regional Water Plans/Planning Group Grants Grant Department or Organization Texas Water Development Board Type of Mitigation Action Local Planning and Regulations, Education and Outreach Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Planning Eligible Applicants Regional Water Planning Groups. These groups include individuals representing at least 12 interest groups. Funding Available Varies Cost Sharing N/A Restrictions Funds may not be used for activities which the Board determines sufficient data exist, activities related to the preparation of applications for permits or other approvals, administration costs, or cost/benefit analysis. November 2020 42 Website twdb.texas.gov/financial/programs/RWPG/index.asp Next Steps for Texas Communities Applications for this state resource can be found on the grant website About the Resource The Planning Group Grants allows for communities in a regional group to develop a water plan, including determining water needs, supplies available during drought conditions, sites for reservoir construction, regulatory/legislative recommendations for improving water management, and other elements. The plan will contain specific water management strategies, including conservation, identified needs with no feasible solutions, and alternative strategies. The plans address concerns around drought and may also relate to other hazards, such as floods. State Participation Program Other Department or Organization Texas Water Development Board Type of Mitigation Action Structure and Infrastructure Hazard Addressed Flood Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Political subdivisions of the state and non-profit water supply corporations Funding Available Funding is dependent on legislative appropriations. No maximum funding limit. Cost Sharing N/A Restrictions Program funding dependent upon legislative appropriations or available funds. Water supply projects must be consistent with the current state water plan. Reservoir funding must be segmented or phased; permitting is required prior to a construction commitment. Limited to funding of excess capacity portion; up to 80% of total water project costs and 50% for wastewater costs. Entities receiving assistance greater than $500,000 must adopt a water conservation and drought contingency plan. U.S. Iron and Steel requirements. No maximum funding limit. Website twdb.texas.gov/financial/programs Next Steps for Texas Communities Twice-a-year funding cycle (February 1/August 1); includes a prioritization process. For specific questions on the program, please contact Financial_Assistance@twdb.texas.gov. About the Resource The State Participation Program assists local communities by allowing the state to take on a temporary ownership interest in a regional water, wastewater, or flood control project. November 2020 43 State Water Implementation Fund for Texas (SWIFT) Loan Department or Organization Texas Water Development Board Type of Mitigation Action Structure and Infrastructure Hazard Addressed Drought Specific to Recovery No National Mitigation Framework Core Capability Planning Eligible Applicants Political subdivisions and nonprofit water supply corporations with a project included in the state water plan Funding Available No maximum funding limit Cost Sharing N/A Restrictions Projects must be recommended water management strategies included in the state water plan. Communities must complete an Infrastructure Financing Survey and meet other requirements. Website twdb.texas.gov/financial/programs/SWIFT/index.asp Next Steps for Texas Communities Applications for this state resource can be found on the website About the Resource This program helps communities develop cost-effective water supplies with low-interest loans. Eligible projects include conservation and reuse, desalinating groundwater and seawater, building new pipelines, developing reservoirs and well fields, and purchasing water rights, as well as numerous other strategies. Projects may incorporate hazard mitigation elements, especially around flood and drought. Texas Water Development Fund (DFund) Loan Department or Organization Texas Water Development Board Type of Mitigation Action Natural Systems Protection, Structure and Infrastructure Hazard Addressed Flood, Drought Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Political subdivisions and nonprofit water supply corporations Funding Available No maximum funding limit Cost Sharing N/A Restrictions Water supply projects must be consistent with the current state water plan, and entities receiving assistance greater than $500,000 must adopt a water conservation and drought contingency plan. There may be other requirements specific to different project types. Website twdb.texas.gov/financial/programs/TWDF/index.asp Next Steps for Texas Communities Applications for this state resource can be found on the website November 2020 44 About the Resource The loan program offers assistance for water supply, wastewater, and flood control. Flood control may include both structural and nonstructural protection solutions and improvement, including modifying stream channels and flood warning systems. Emergency Relief Program Grant Department or Organization Federal Highway Administration, Department of Transportation Type of Mitigation Action Structure and Infrastructure Hazard Addressed All Specific to Recovery Yes National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants States may request ER funds, which can be used for either “emergency repairs” or “permanent repairs.” Funding Available $100 million is authorized annually under 23 U.S.C. 125. Congress has periodically provided additional funds for the ER program through supplemental appropriations. MAP-21 eliminated the cap of $100 million per state event. Cost Sharing For Interstate highways, the federal share is 90%. For all other highways, the federal share is 80%. The federal share for permanent ER repairs may amount to 90% if the combined eligible ER expenses incurred by the state in a federal fiscal year exceeds the annual apportionment of the state under 23 U.S.C. section 104 for the fiscal year in which the disasters or failures occurred. Restrictions Must be in affected disaster areas Website fhwa.dot.gov/programadmin/erelief.cfm Next Steps for Texas Communities States apply to FHWA. Contact the Texas Department of Transportation for more information. About the Resource The Federal Highway Administration's (FHWA) Emergency Relief (ER) Program provides grants for the repair or reconstruction of federal-aid highways and roads on federal lands that have suffered serious damage as a result of either natural disasters or catastrophic failures from an external cause. The program supplements the commitment of resources by states, their political subdivisions, or other federal agencies to help pay for unusually heavy expenses resulting from extraordinary conditions. The applicability of the ER program to a natural disaster is based on the extent and intensity of the disaster. Damage to highways must be severe, occur over a wide area, and result in unusually high expenses to the highway agency. Applicability of ER to a catastrophic failure due to an external cause is based on the criteria that the failure was not the result of an inherent flaw in the facility, but was sudden, caused a disastrous impact on transportation services, and resulted in unusually high expenses to the highway agency. November 2020 45 Disaster Assistance and Emergency Relief for Individuals and Businesses Other - Tax Relief Department or Organization Internal Revenue Service, Department of Treasury Type of Mitigation Action Local Planning and Regulations Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants U.S. taxpayers, including individuals and businesses affected by federally declared disasters Funding Available N/A (tax relief) Cost Sharing N/A Restrictions Varies by specific program; must be affected by disaster Website irs.gov/businesses/small-businesses-self-employed/disaster- assistance-and-emergency-relief-for-individuals-and-businesses Next Steps for Texas Communities Decisions are made based on individual disaster declarations. Refer to the IRS website for more information about your community's situation. About the Resource Special tax law provisions may help taxpayers and businesses recover financially from the impact of a disaster, especially when the federal government declares their location to be a major disaster area. Depending on the circumstances, the Internal Revenue Service (IRS) may grant additional time to file returns and pay taxes. Both individuals and businesses in a federally declared disaster area can get a faster refund by claiming losses related to the disaster on the tax return for the previous year, usually by filing an amended return. The IRS also offers audio presentations on planning for disaster. These presentations discuss business continuity planning, insurance coverage, record keeping, and other tips to stay in business after a major disaster. Climate Adaptation Fund Grant Department or Organization Wildlife Conservation Society Type of Mitigation Action Natural Systems Protection Hazard Addressed All Specific to Recovery No National Mitigation Framework Core Capability Long-Term Vulnerability Reduction Eligible Applicants Conservation nonprofits Funding Available The WCS Climate Adaptation Fund provides a total of $2.5 million in grant awards (between $50,000 and $250,000 each) to conservation non-profit organizations each year. Cost Sharing Unknown Restrictions Project proposals must: • Focus on the functionality of ecosystems, rather than conserving individual species. November 2020 46 • Be designed for long-term conservation impact. • Create the potential for impact at a landscape scale. • Use strategic, targeted communication activities to amplify adaptation outcomes. • Be designed with climate adaptation for wildlife and ecosystems as a core goal or outcome of the work. • Propose conservation goals and actions that are grounded in the best available science. • Conduct on-the-ground implementation, not research, planning, or tool development. Website wcsclimateadaptationfund.org/program-information Next Steps for Texas Communities More resources from this nonprofit program are available at the website. About the Resource The Wildlife Conservation Society's (WCS) Climate Adaptation Fund provides grant awards to conservation non-profits across the United States to catalyze innovative, science-driven projects responding to the impacts of climate change on wildlife and people. Mitigation Ideas A Resource for Reducing Risk to Natural Hazards January 2013 01024.13 2 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Acknowledgements FEMA’s Risk Analysis Division funded the development of this document, which updates Mitigation Ideas: Possible Mitigation Measures by Hazards Type created by FEMA Region V in 2002. The primary authors and project managers were Julie Baxter and Karen Helbrecht from FEMA and Stacy Franklin Robinson, Sara Reynolds, Adam Reeder, and Hilary Kendro from the Strategic Alliance for Risk Reduction (STARR). Laura Coventry (STARR) provided layout and design support. Special thanks to the following FEMA program areas for their contributions to this project: Hazard Mitigation Planning, Building Sciences, Environmental and Historic Preservation, Flood Mitigation and Insurance, and Hazard Mitigation Assistance. 3 Table of Contents Introduction ....................................................................................................................................................4 Drought............................................................................................................................................................5 Earthquake ......................................................................................................................................................9 Erosion ............................................................................................................................................................15 Extreme Temperatures ................................................................................................................................19 Flood ...............................................................................................................................................................21 Hail ..................................................................................................................................................................33 Landslide ........................................................................................................................................................35 Lightning ......................................................................................................................................................39 Sea Level Rise ................................................................................................................................................41 Severe Wind .................................................................................................................................................45 Severe Winter Weather ...............................................................................................................................51 Storm Surge ..................................................................................................................................................55 Subsidence ....................................................................................................................................................59 Tornado ..........................................................................................................................................................63 Tsunami .........................................................................................................................................................65 Wildfire ..........................................................................................................................................................69 Multiple Hazards ..........................................................................................................................................75 FEMA Resources/Publications ..................................................................................................................83 FEMA Contacts .............................................................................................................................................88 Table of Contents 4 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Introduction The purpose of this document is to provide a resource that communities can use to identify and evaluate a range of potential mitigation actions for reducing risk to natural hazards and disasters. The focus of this document is mitigation,which is action taken to reduce or eliminate long-term risk to hazards.Mitigation is different from preparedness,which is action taken to improve emergency response or operational preparedness. Ideas for mitigation actions are presented for the following natural hazards: ▪Drought ▪Earthquake ▪Erosion ▪Extreme temperatures ▪Flood ▪Hail ▪Landslide ▪Lightning ▪Sea level rise ▪Severe wind ▪Severe winter weather ▪Storm surge ▪Subsidence ▪Tornado ▪Tsunami ▪Wildfire Actions that may mitigate multiple hazards are presented in the last section,entitled “Multiple Hazards.” The suggested mitigation actions are summarized into four types:(1)Local Planning and Regulations,(2)Structure and Infrastructure Projects,(3)Natural Systems Protection,and (4) Education and Awareness Programs.Examples of activities that can be used to accomplish each mitigation goal are identified,as well as the relevant FEMA publications or resources, if applicable. This document is intended to be a starting point for gathering ideas and should not be used as the only source for identifying actions.Communities should seek innovative and different ideas for reducing risk that meet their unique needs.The actions listed are not necessarily eligible for Federal assistance programs.Users should review specific program guidance and contact their State Hazard Mitigation Officer (SHMO)or regional FEMA office for more information. Examples of mitigation actions are planning and zoning, floodplain protection, property acquisition and relocation, or public outreach projects. Examples of preparedness actions are installing disaster warning systems, purchasing radio communications equipment, or conducting emergency response training. Introduction Drought A drought is a period of unusually constant dry weather that persists long enough to cause deficiencies in water supply (surface or underground). Droughts are slow-onset hazards, but, over time, they can severely affect crops, municipal water supplies, recreational resources, and wildlife. If drought conditions extend over a number of years, the direct and indirect economic impacts can be significant. High temperatures, high winds, and low humidity can worsen drought conditions and also make areas more susceptible to wildfire. In addition, human actions and demands for water resources can accelerate drought-related impacts. 6 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations D-1 Assess Vulnerability to Drought Risk To better understand and assess local vulnerability to drought, consider actions such as: ▪Gathering and analyzing water and climate data to gain a better understanding of local climate and drought history. ▪Identifying factors that affect the severity of a drought. ▪Identifying available water supplies. ▪Determining how the community and its water sources have been impacted by droughts in the past. D-2 Monitor Drought Conditions Monitoring drought conditions can provide early warning for policymakers and planners to make decisions through actions including: ▪ Identifying local drought indicators, such as precipitation, temperature, surface water levels, soil moisture, etc. ▪ Establishing a regular schedule to monitor and report conditions on at least a monthly basis. Monitoring the water supply and its functions can save water in the long run through actions such as: ▪Regularly checking for leaks to minimize water supply losses. ▪Improving water supply monitoring. D-3 Monitor Water Supply D-4 Plan for Drought Plan for future drought events in your area through actions such as: ▪Developing a drought emergency plan. ▪Developing criteria or triggers for drought-related actions. ▪Developing a drought communication plan and early warning system to facilitate timely communication of relevant information to officials, decision makers, emergency managers, and the general public. ▪Developing agreements for secondary water sources that may be used during drought conditions. ▪Establishing an irrigation time/scheduling program or process so that all agricultural land gets the required amount of water. Through incremental timing, each area is irrigated at different times so that all water is not consumed at the same time. Spacing usage may also help with recharge of groundwater. 7DroughtMitigation Ideas: A Resource for Reducing Risk to Natural Hazards D-5 Require Water Conservation During Drought Conditions Require mandatory water conservation measures during drought emergencies,including: ▪Developing an ordinance to restrict the use of public water resources for non-essential usage, such as landscaping, washing cars, filling swimming pools, etc. ▪Adopting ordinances to prioritize or control water use, particularly for emergency situations like fire fighting. D-6 Prevent Overgrazing Prevent overgrazing,which has been linked to drought vulnerability, through actions such as: ▪Establishing a grazing policy or permitting program to prevent overgrazing. ▪Reducing the number of animals and improving range management. Structure and Infrastructure Projects D-7 Retrofit Water Supply Systems Improve water supply and delivery systems to save water through actions such as: ▪Designing water delivery systems to accommodate drought events. ▪Developing new or upgrading existing water delivery systems to eliminate breaks and leaks. D-8 Enhance Landscaping and Design Measures Natural Systems Protection Encourage drought-tolerant landscape design through measures such as: ▪Incorporating drought tolerant or xeriscape practices into landscape ordinances to reduce dependence on irrigation. ▪Providing incentives for xeriscaping. ▪Using permeable driveways and surfaces to reduce runoff and promote groundwater recharge. 8 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Education and Awareness Programs D-9 Educate Residents on Water Saving Techniques Encourage citizens to take water-saving measures,such as the following: ▪Installing low-flow water saving showerheads and toilets. ▪Turning water flow off while brushing teeth or during other cleaning activities. ▪Adjusting sprinklers to water the lawn and not the sidewalk or street. ▪Running the dishwasher and washing machine only when they are full. ▪Checking for leaks in plumping or dripping faucets. ▪Installing rain-capturing devices for irrigation. ▪Encouraging the installation of graywater systems in homes to encourage water reuse. D-10 Educate Farmers on Soil and Water Conservation Practices Encourage farmers to implement soil and water conservation practices that foster soil health and improve soil quality to help increase resiliency and mitigate the impacts of droughts.Potential conservation practices include the following: ▪Rotating crops by growing a series of different types of crops on the same fields every season to reduce soil erosion. ▪Practicing contour farming by farming along elevation contour lines to slow water runoff during rainstorms and prevent soil erosion, allowing the water time to absorb into the soil. ▪Using terracing on hilly or mountainous terrain to decrease soil erosion and surface runoff. ▪Planting “cover crops,” such as oats, wheat, and buckwheat, to prevent soil erosion. ▪Using zero and reduced tillage to minimize soil disturbance and leave crop residue on the ground to prevent soil erosion. ▪Constructing windbreaks to prevent evaporation from reclaiming salt-affected soil. ▪Collecting rainwater and using natural runoff to water plants. D-11 Purchase Crop Insurance FEMA Resources/Publications FEMA 20, P-85, 361, 453 Preserve economic stability during a drought by encouraging agricultural interests to obtain crop insurance to cover potential losses due to drought. Other drought-related mitigation actions may also apply to other hazards. See the sections entitled “Extreme Temperatures” and “Multiple Hazards” for other possible ideas. Earthquake An earthquake is a sudden release of energy that creates a movement in the earth’s crust. Most earthquake-related property damage and deaths are caused by the failure and collapse of structures due to ground shaking. The level of damage depends upon the extent and duration of the shaking. Other damaging earthquake effects include landslides, the down-slope movement of soil and rock (in mountain regions and along hillsides), and liquefaction. 10 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations EQ-1 Adopt and Enforce Building Codes FEMA Resources/Publications FEMA 83, 224, 232, 254, 266, 313, 349, P-749, P-750 EQ-2 Incorporate Earthquake Mitigation into Local Planning FEMA Resources/Publications FEMA 83, 224, 254, 266, 313, 349 Building codes reduce earthquake damage to structures.Consider actions such as: ▪Adopting and enforcing updated building code provisions to reduce earthquake damage risk. ▪Adopting the International Building Code (IBC) and International Residential Code (IRC). Earthquake risk can be reduced through local planning,codes,and ordinances,including: ▪Creating a seismic safety committee to provide policy recommendations, evaluate and recommend changes in seismic safety standards, and give an annual assessment of local and statewide implementation of seismic safety improvements. ▪Developing and distributing guidelines or passing ordinances that require developers and building owners to locate lifelines, buildings, critical facilities, and hazardous materials out of areas subject to significant seismic hazards. ▪Incorporating structural and non-structural seismic strengthening actions into ongoing building plans and activities in the capital improvement plan to ensure that facilities remain operational for years to come. ▪Supporting financial incentives, such as low interest loans or tax breaks, for home and business owners who seismically retrofit their structures. EQ-3 Map and Assess Community Vulnerability to Seismic Hazards FEMA Resources/Publications FEMA 83, 154, 366, ROVER To better understand and assess local vulnerability to earthquakes, consider actions such as: ▪Developing an inventory of public and commercial buildings that may be particularly vulnerable to earthquake damage, including pre-1940s homes and homes with cripple wall foundations. ▪Collecting geologic information on seismic sources, soil conditions, and related potential hazards. ▪Creating an earthquake scenario to estimate potential loss of life and injuries, the types of potential damage, and existing vulnerabilities within a community to develop earthquake mitigation priorities. ▪Using Hazus to quantitatively estimate potential losses from an earthquake. ▪Maintaining a database to track community vulnerability to earthquake risk. ▪Using GIS to map hazard areas, at-risk structures, and associated hazards (e.g., liquefaction and landslides) to assess high-risk areas. 11EarthquakeLocal Planning and Regulations Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards EQ-4 Conduct Inspections of Building Safety FEMA Resources/Publications FEMA 154, 155, 202, 221, 224, 225, 226, 233, 306, 307, 395, ROVER Inspections can be used to assess earthquake risk,such as: ▪Establishing a school survey procedure and guidance document to inventory structural and non-structural hazards in and around school buildings. ▪Using rapid visual screening to quickly inspect a building and identify disaster damage or potential seismic structural and non-structural weaknesses to prioritize retrofit efforts, inventory high-risk structures and critical facilities, or assess post-disaster risk to determine if buildings are safe to re-occupy. ▪Consulting industry standard publications such as American Society of Civil Engineers (ASCE) 31 - Seismic Evaluation of Existing Buildings, ASCE 41 - Seismic Rehabilitation of Existing Buildings, and Applied Technology Council (ATC) 20 - Procedures for Postearthquake Safety Evaluation of Buildings. 12 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Structure and Infrastructure Projects EQ-5 Protect Critical Facilities and Infrastructure Reduce potential damage to critical facilities and infrastructure from future seismic events through actions such as: ▪Conducting seismic retrofitting for critical public facilities most at risk to earthquakes. ▪Requiring bracing of generators, elevators, and other vital equipment in hospitals. ▪Identifying and hardening critical lifeline systems (i.e., critical public services such as utilities and roads) to meet “Seismic Design Guidelines and Standards for Lifelines” or equivalent standards such as American Lifelines Alliance (ALA) guidance. This may distinguish a manageable earthquake from a social and economic catastrophe. ▪Reviewing construction plans for all bridges to determine their susceptibility to collapse and retrofitting problem bridges. ▪Using flexible piping when extending water, sewer, or natural gas service. ▪Installing shutoff valves and emergency connector hoses where water mains cross fault lines. EQ-6 Implement Structural Mitigation Techniques FEMA Resources/Publications FEMA 307, 320, 345, 356, 361, 395, 396, 412, 453, 547, P-774 Use structural mitigation measures to reduce damage from future seismic events,such as: ▪Strengthening and retrofitting non-reinforced masonry buildings and non-ductile concrete facilities that are particularly vulnerable to ground shaking. ▪Retrofitting building veneers to prevent failure. ▪Building a safe room to provide protection during an earthquake. ▪Installing window film to prevent injuries from shattered glass. ▪Anchoring rooftop-mounted equipment (i.e., HVAC units, satellite dishes, etc). ▪Constructing masonry chimneys greater than 6 feet above a roof with continuous reinforced steel bracing. 13EarthquakeMitigation Ideas: A Resource for Reducing Risk to Natural Hazards Education and Awareness Programs EQ-7 Increase Earthquake Risk Awareness FEMA Resources/Publications FEMA E-74, 474, 526, 527, 528, 529, 530, P-811; EMI IS-22 There are many ways to increase awareness of earthquake risk,including: ▪Working with insurance industry representatives to increase public awareness of the importance of earthquake insurance. Residential structural improvements can be factored into the process of obtaining insurance coverage or reduced deductibles. ▪Developing an outreach program about earthquake risk and mitigation activities in homes, schools, and businesses. ▪Educating homeowners on safety techniques to follow during and after an earthquake. ▪Offering GIS hazard mapping online for residents and design professionals. EQ-8 Conduct Outreach to Builders,Architects, Engineers,and Inspectors FEMA Resources/Publications FEMA 232, 313, 389, P-420, 454 Building susceptibility to earthquake damage can be improved if design professionals are made aware of proper design and building requirements.Outreach activities include: ▪Conducting information sessions or other forms of outreach on seismic code provisions for new and existing buildings to enhance code use and enforcement by local architects, engineers, contractors, and code enforcement personnel. ▪Training building department staff and officials on Form ATC-20 for post-earthquake building evaluation. The ATC-20 report and addendum, prepared by the Applied Technology Council, provide procedures and guidelines for making on-the-spot evaluations and decisions regarding continued use and occupancy of earthquake- damaged buildings. 14 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Education and Awareness Programs Property owners can retrofit existing structures to reduce damage from seismic events.Potential actions include the following: ▪Educating homeowners about structural and non-structural retrofitting of vulnerable homes and encouraging retrofit. ▪Developing a technical assistance information program for homeowners. Teaching them how to seismically strengthen their houses can be an effective mitigation activity. The program can include providing local government building departments with copies of existing strengthening and repair information for distribution. ▪Developing an outreach program to encourage homeowners to secure furnishings, storage cabinets, and utilities to prevent injuries and damage. Examples include anchoring tall bookcases and file cabinets, installing latches on drawers and cabinet doors, restraining desktop computers and appliances, using flexible connections on gas and water lines, mounting framed pictures and mirrors securely, and anchoring and bracing propane tanks and gas cylinders. ▪Establishing a library of technical documents on structural and non-structural mitigation options as well as model ordinances and procedures that have been used by other jurisdictions to reduce earthquake risk. Other earthquake-related mitigation actions may also apply to other hazards. See the section entitled “Multiple Hazards” for other possible ideas. EQ-9 Provide Information on Structural and Non-Structural Retrofitting FEMA Resources/Publications FEMA E-74, 412, 413, 414, 530, 547 Erosion Erosion is the wearing away of land, such as loss of riverbank, beach, shoreline, or dune material. It is measured as the rate of change in the position or displacement of a riverbank or shoreline over a period of time. Short-term erosion typically results from periodic natural events, such as flooding, hurricanes, storm surge, and windstorms, but may be intensified by human activities. Long-term erosion is a result of multi-year impacts such as repetitive flooding, wave action, sea level rise, sediment loss, subsidence, and climate change. Death and injury are not typically associated with erosion; however, it can destroy buildings and infrastructure. 16 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations ER-1 Map and Assess Vulnerability to Erosion Erosion risk can be better assessed and monitored with mapping techniques,including the following: ▪Using GIS to identify and map erosion hazard areas. ▪Developing and maintaining a database to track community vulnerability to erosion. ▪Using GIS to identify concentrations of at-risk structures. ▪Improving mapping of hazard areas to educate residents about unexpected risks. ER-2 Manage Development in Erosion Hazard Areas Erosion damage can be mitigated by regulating how development occurs in hazard areas,such as the following: ▪Adopting sediment and erosion control regulations. ▪Adopting zoning and erosion overlay districts. ▪Developing an erosion protection program for high hazard areas. ▪Employing erosion control easements. ▪Prohibiting development in high-hazard areas. ▪Developing and implementing an erosion management plan. ▪Requiring mandatory erosion surcharges on homes. ▪Locating utilities and critical facilities outside of areas susceptible to erosion to decrease the risk of service disruption. ER-3 Promote or Require Site and Building Design Standards to Minimize Erosion Risk Development can be designed to minimize damage due to erosion using the following techniques: ▪Constructing open foundation systems on buildings to minimize scour. ▪Constructing deep foundations in erosion hazard areas. ▪Clustering buildings during building and site design. ▪Designing and orienting infrastructure to deter erosion and accretion. Structure and Infrastructure Projects ER-4 Remove Existing Buildings and Infrastructure from Erosion Hazard Areas FEMA Resources/Publications FEMA P-55 To prevent damage to buildings and infrastructure from erosion, consider acquiring and demolishing or relocating at-risk buildings and infrastructure and enforcing permanent restrictions on development after land and structure acquisition. 17ErosionMitigation Ideas: A Resource for Reducing Risk to Natural Hazards Natural Systems Protection ER-5 Stabilize Erosion Hazard Areas To stabilize slopes susceptible to erosion,consider options such as: ▪Preventing erosion with proper bank stabilization, sloping or grading techniques, planting vegetation on slopes, terracing hillsides, or installing riprap boulders or geotextile fabric. ▪Stabilizing cliffs with terracing or plantings of grasses or other plants to hold soil together. ▪Prohibiting removal of natural vegetation from dunes and slopes. ▪Planting mature trees in the coastal riparian zone to assist in dissipation of the wind force in the breaking wave zone. ▪Using a hybrid of hard/soft engineering techniques (i.e., combine low-profile rock, rubble, oyster reefs, or wood structures with vegetative planting or other soft stabilization techniques). ▪Implementing marine riparian habitat reinstatement or revegetation. ▪Using a rock splash pad to direct runoff and minimize the potential for erosion. ▪Using bioengineered bank stabilization techniques. 18 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Education and Awareness Programs ER-6 Increase Awareness of Erosion Hazards Consider ways to help citizens become more aware of specific erosion risks in your area,such as: ▪Notifying property owners located in high-risk areas. ▪Disclosing the location of high-risk areas to buyers. ▪Developing a brochure describing risk and potential mitigation techniques. ▪Offering GIS hazard mapping online for residents and design professionals. Other erosion-related mitigation actions may also apply to other hazards. See the sections entitled “Subsidence,” “Landslide,” and “Multiple Hazards” for other possible ideas. Extreme Temperatures Extreme heat and extreme cold constitute different conditions in different parts of the country. Extreme cold can range from near freezing temperatures in the southern United States to temperatures well below zero in the northern states. Similarly, extreme heat is typically recognized as the condition where temperatures consistently stay ten degrees or more above a region’s average high temperature for an extended period. Fatalities can result from extreme temperatures, as they can push the human body beyond its limits (hyperthermia and hypothermia). 20 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations ET-1 Reduce Urban Heat Island Effect As urban areas develop and buildings and roads replace open land and vegetation,urban regions become warmer than their rural surroundings,forming an “island”of heat.Several methods for reducing heat island effects include: ▪Increasing tree plantings around buildings to shade parking lots and along public rights-of-way. ▪Encouraging installation of green roofs, which provide shade and remove heat from the roof surface and surrounding air. ▪Using cool roofing products that reflect sunlight and heat away from a building. Education and Awareness Programs ET-2 Increase Awareness of Extreme Temperature Risk and Safety The impacts of extreme temperatures on public health can be lessened if citizens know how to prepare and protect themselves. Ideas for increasing awareness include the following: ▪Educating citizens regarding the dangers of extreme heat and cold and the steps they can take to protect themselves when extreme temperatures occur. ET-3 Assist Vulnerable Populations Measures should be taken to ensure vulnerable populations are adequately protected from the impacts of extreme temperatures, such as: ▪Organizing outreach to vulnerable populations, including establishing and promoting accessible heating or cooling centers in the community. ▪Requiring minimum temperatures in housing/landlord codes. ▪Encouraging utility companies to offer special arrangements for paying heating bills, if not already required by state law. ▪Creating a database to track those individuals at high risk of death, such as the elderly, homeless, etc. ET-4 Educate Property Owners Extreme cold may cause water pipes to freeze and burst, which can About Freezing Pipes cause flooding inside a building. Ideas for educating property owners include the following: ▪ Educating homeowners and builders on how to protect their pipes, including locating water pipes on the inside of building insulation or keeping them out of attics, crawl spaces, and vulnerable outside walls. ▪ Informing homeowners that letting a faucet drip during extreme cold weather can prevent the buildup of excessive pressure in the pipeline and avoid bursting. Other extreme temperature-related mitigation actions may also apply to other hazards. See the sections entitled “Severe Winter Weather,” “Drought,” and “Multiple Hazards” for other possible ideas. Flood A flood is the partial or complete inundation of normally dry land. The various types of flooding include riverine flooding, coastal flooding, and shallow flooding. Common impacts of flooding include damage to personal property, buildings, and infrastructure; bridge and road closures; service disruptions; and injuries or even fatalities. 22 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations F-1 Incorporate Flood Mitigation in Local Planning FEMA Resources/Publications FEMA 100, 268, 473 Comprehensive planning and floodplain management can mitigate flooding by influencing development.Strategies include: ▪Determining and enforcing acceptable land uses to alleviate the risk of damage by limiting exposure in flood hazard areas. Floodplain and coastal zone management can be included in comprehensive planning. ▪Developing a floodplain management plan and updating it regularly. ▪Mitigating hazards during infrastructure planning. For example, decisions to extend roads or utilities to an area may increase exposure to flood hazards. ▪Adopting a post-disaster recovery ordinance based on a plan to regulate repair activity, generally depending on property location. ▪Passing and enforcing an ordinance that regulates dumping in streams and ditches. ▪Establishing a ”green infrastructure” program to link, manage, and expand existing parks, preserves, greenways, etc. ▪Obtaining easements for planned and regulated public use of privately-owned land for temporary water retention and drainage. F-2 Form Partnerships to Support Floodplain Management Partnerships between local,state,and regional entities help expand resources and improve coordination.Consider the following actions: ▪Developing a stormwater committee that meets regularly to discuss issues and recommend projects. ▪Forming a regional watershed council to help bring together resources for comprehensive analysis, planning, decision-making, and cooperation. ▪Establishing watershed-based planning initiatives to address the flood hazard with neighboring jurisdictions. ▪Forming a citizen plan implementation steering committee to monitor progress on local mitigation actions. Include a mix of representatives from neighborhoods, local businesses, and local government. 23Flood Local Planning and Regulations Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards F-3 Limit or Restrict Development in Floodplain Areas FEMA Resources/Publications FEMA 100, 268, 473 Flooding can be mitigated by limiting or restricting how development occurs in floodplain areas through actions such as: ▪Prohibiting or limiting floodplain development through regulatory and/or incentive-based measures. ▪Limiting the density of developments in the floodplain. ▪Requiring that floodplains be kept as open space. ▪Limiting the percentage of allowable impervious surface within developed parcels. ▪Developing a stream buffer ordinance to protect water resources and limit flood impacts. ▪Prohibiting any fill in floodplain areas. The use of building codes and development standards can ensure structures are able to withstand flooding.Potential actions include: ▪Adopting the International Building Code (IBC) and International Residential Code (IRC). ▪Adopting ASCE 24-05 Flood Resistant Design and Construction. ASCE 24 is a referenced standard in the IBC that specifies minimum requirements and expected performance for the design and construction of buildings and structures in the flood hazard areas to make them more resistant to flood loads and flood damage. ▪Adding or increasing “freeboard” requirements (feet above base flood elevation) in the flood damage ordinance. ▪Prohibiting all first floor enclosures below base flood elevation for all structures in flood hazard areas. ▪Considering orientation of new development during design (e.g., subdivisions, buildings, infrastructure, etc.). ▪Setting the design flood elevation at or above the historical high water mark if it is above the mapped base flood elevation. ▪Using subdivision design standards to require elevation data collection during platting and to have buildable space on lots above the base flood elevation. ▪Requiring standard tie-downs of propane tanks. F-4 Adopt and Enforce Building Codes and Development Standards FEMA Resources/Publications FEMA 100, 268, P-762 24 Local Planning and Regulations Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards F-5 Improve Stormwater Management Planning Rainwater and snowmelt can cause flooding and erosion in developed areas.Stormwater management practices to prevent this include: ▪Completing a stormwater drainage study for known problem areas. ▪Preparing and adopting a stormwater drainage plan and ordinance. ▪Preparing and adopting a community-wide stormwater management master plan. ▪Regulating development in upland areas in order to reduce stormwater run-off through a stormwater ordinance. ▪Linking flood hazard mitigation objectives with EPA Stormwater Phase II initiatives. ▪Developing engineering guidelines for drainage from new development. ▪Requiring a drainage study with new development. ▪Encouraging the use of Low Impact Development techniques F-6 Adopt Polices to Reduce Stormwater Runoff In addition to stormwater management,techniques to reduce rain runoff can prevent flooding and erosion,such as: ▪Designing a “natural runoff” or “zero discharge” policy for stormwater in subdivision design. ▪Requiring more trees be preserved and planted in landscape designs to reduce the amount of stormwater runoff. ▪Requiring developers to plan for on-site sediment retention. ▪Requiring developers to construct on-site retention basins for excessive stormwater and as a firefighting water source. ▪Encouraging the use of porous pavement, vegetative buffers, and islands in large parking areas. ▪Conforming pavement to land contours so as not to provide easier avenues for stormwater. ▪Encouraging the use of permeable driveways and surfaces to reduce runoff and increase groundwater recharge. ▪Adopting erosion and sedimentation control regulations for construction and farming. 25Flood Local Planning and Regulations Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards F-7 Improve Flood Risk Assessment FEMA Resources/Publications FEMA 416, 467-1, B-797 Heighten awareness of flood risk with the following: ▪Incorporating the procedures for tracking high water marks following a flood into emergency response plans. ▪Conducting cumulative impact analyses for multiple development projects within the same watershed. ▪Conducting a verification study of FEMA’s repetitive loss inventory and developing an associated tracking database. ▪Regularly calculating and documenting the amount of flood-prone property preserved as open space. ▪Requiring a thorough watershed analysis for all proposed dam or reservoir projects. ▪Developing a dam failure study and emergency action plan. ▪Using GIS to map areas that are at risk of flooding. ▪Obtaining depth grid data and using it to illustrate flood risk to citizens. ▪Incorporating digital floodplain and topographic data into GIS systems, in conjunction with Hazus, to assess risk. ▪Developing and maintaining a database to track community exposure to flood risk. ▪Revising and updating regulatory floodplain maps. F-8 Join or Improve Compliance with NFIP FEMA Resources/Publications FEMA 100, 209, FIA-15A, NFIP Technical Bulletins The National Flood Insurance Program (NFIP)enables property owners in participating communities to purchase insurance protection against flood losses.Actions to achieve eligibility and maintain compliance include: ▪Participating in NFIP. ▪Adopting ordinances that meet minimum Federal and state requirements to comply with NFIP. ▪Conducting NFIP community workshops to provide information and incentives for property owners to acquire flood insurance. ▪Designating a local floodplain manager and/or CRS coordinator who achieves CFM certification. ▪Completing and maintaining FEMA elevation certificates for pre-FIRM and/or post-FIRM buildings. ▪Requiring and maintaining FEMA elevation certificates for all new and improved buildings located in floodplains. 26 Local Planning and Regulations Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards F-9 Manage the Floodplain Beyond Minimum Requirements FEMA Resources/Publications FEMA 100, 209, 213, 268, 480; FIA-15A In addition to participation in NFIP,implementing good floodplain management techniques that exceed minimum requirements can help minimize flood losses.Examples include: ▪Incorporating the ASFPM’s “No Adverse Impact” policy into local floodplain management programs. ▪Revising the floodplain ordinance to incorporate cumulative substantial damage requirements. ▪Adopting a “no-rise” in base flood elevation clause for the flood damage prevention ordinance. ▪Extending the freeboard requirement past the mapped floodplain to include an equivalent land elevation. ▪Including requirements in the local floodplain ordinance for homeowners to sign non-conversion agreements for areas below base flood elevation. ▪Establishing and publicizing a user-friendly, publicly-accessible repository for inquirers to obtain Flood Insurance Rate Maps. ▪Developing an educational flyer targeting NFIP policyholders on increased cost of compliance during post-flood damage assessments. ▪Annually notifying the owners of repetitive loss properties of Flood Mitigation Assistance funding. ▪Offering incentives for building above the required freeboard minimum (code plus). F-10 Participate in the CRS FEMA Resources/Publications FEMA 100, 209, 213, 268, 480; FIA-15A The Community Rating System (CRS)rewards communities that exceed the minimum NFIP requirements.Depending upon the level of participation,flood insurance premium rates are discounted for policyholders.Potential activities that are eligible to receive credit include: ▪Advising the public about the local flood hazard, flood insurance, and flood protection measures. ▪Enacting and enforcing regulations that exceed NFIP minimum standards so that more flood protection is provided for new development. ▪Implementing damage reduction measures for existing buildings such as acquisition, relocation, retrofitting, and maintenance of drainageways and retention basins. ▪Taking action to minimize the effects of flooding on people, property, and building contents through measures including flood warning, emergency response, and evacuation planning. F-11 Establish Local Funding Mechanisms for Flood Mitigation Potential methods to develop local funding sources for flood mitigation include: ▪Using taxes to support a regulatory system. ▪Using impact fees to help fund public projects to mitigate impacts of land development (e.g., increased runoff). ▪Levying taxes to finance maintenance of drainage systems and capital improvements. 27FloodMitigation Ideas: A Resource for Reducing Risk to Natural Hazards Structure and Infrastructure Projects F-12 Remove Existing Structures from Flood Hazard Areas Communities may remove structures from flood-prone areas to minimize future flood losses by acquiring and demolishing or relocating structures from voluntary property owners and preserving lands subject to repetitive flooding. F-13 Improve Stormwater Drainage System Capacity Rainwater and snowmelt can cause flooding and erosion in developed areas.Structural stormwater management projects that prevent this include: ▪Installing, re-routing, or increasing the capacity of a storm drainage system. ▪Increasing drainage or absorption capacities with detention and retention basins, relief drains, spillways, drain widening/dredging or rerouting, logjam and debris removal, extra culverts, bridge modification, dike setbacks, flood gates and pumps, or channel redirection. ▪Increasing capacity of stormwater detention and retention basins. ▪Increasing dimensions of drainage culverts in flood-prone areas. ▪Using stream restoration to ensure adequate drainage and diversion of stormwater. ▪Requiring developers to construct on-site retention basins for excessive stormwater and as a firefighting water source. ▪Providing grassy swales along roadsides. F-14 Conduct Regular Maintenance for Drainage Systems and Flood Control Structures Regular maintenance will help drainage systems and flood control structures continue to function properly.Potential activities include: ▪Performing regular drainage system maintenance, such as sediment and debris clearance, as well as detection and prevention of discharges into stormwater and sewer systems from home footing drains, downspouts, or sewer pumps. ▪Implementing an inspection, maintenance, and enforcement program to help ensure continued structural integrity of dams and levees. ▪Routinely cleaning debris from support bracing underneath low-lying bridges. ▪Routinely cleaning and repairing stormwater drains. ▪Regularly clearing sediment build-up on riverbanks near aerial lines. ▪Inspecting bridges and identifying if any repairs or retrofits are needed to prevent scour. ▪Incorporating ice jam prevention techniques as appropriate. 28 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Structure and Infrastructure Projects F-15 Elevate or Retrofit Structures and Utilities FEMA Resources/Publications FEMA 54, P-85, 114, P-259, 347, P-348, P-499 Structures and utilities can be elevated to reduce flood damage,including: ▪Elevating structures so that the lowest floor, including the basement, is raised above the base flood elevation. ▪Raising utilities or other mechanical devices above expected flood levels. ▪Elevating and anchoring manufactured homes or, preferably, keeping manufactured homes out of the floodplain. ▪Relocating utilities and water heaters above base flood elevation and using tankless water heaters in limited spaces. F-16 Floodproof Residential and Non-Residential Structures FEMA Resources/Publications FEMA P-55, 114, P-259 Floodproofing techniques may protect certain structures from flood damage,including: ▪Wet floodproofing in a basement, which may be preferable to attempting to keep water out completely because it allows for controlled flooding to balance exterior and interior wall forces and discourages structural collapse. ▪Encouraging wet floodproofing of areas above base flood elevation. ▪Using water resistant paints or other materials to allow for easy cleanup after floodwater exposure in accessory structures or in a garage area below an elevated residential structure. ▪Dry floodproofing non-residential structures by strengthening walls, sealing openings, or using waterproof compounds or plastic sheeting on walls to keep water out. 29FloodMitigation Ideas: A Resource for Reducing Risk to Natural Hazards F-17 Protect Infrastructure FEMA Resources/Publications FEMA P-259, 345, 543, B-797 Mitigation techniques can be implemented to help minimize losses to infrastructure from flood events, such as: ▪ Elevating roads and bridges above the base flood elevation to maintain dry access. In situations where flood waters tend to wash roads out, construction, reconstruction, or repair can include not only attention to drainage, but also stabilization or armoring of vulnerable shoulders or embankments. ▪ Raising low-lying bridges. ▪ Floodproofing wastewater treatment facilities located in flood hazard areas. ▪ Floodproofing water treatment facilities located in flood hazard areas. ▪ Depending on its infrastructure capabilities, using check valves, sump pumps, and backflow prevention devices in homes and buildings. ▪ Using bioengineered bank stabilization techniques. Techniques to protect critical facilities from flood events include: ▪ Requiring that all critical facilities including emergency operations centers (EOC), police stations, and fire department facilities be located outside of flood-prone areas. ▪ Requiring all critical facilities to meet requirements of Executive Order 11988 and be built 1 foot above the 500-year flood elevation. ▪ Installing/upgrading stormwater pumping stations. ▪ Raising electrical components of sewage lift stations above base flood elevation. ▪ Raising manhole openings using concrete pillars. ▪ Installing watertight covers or inflow guards on sewer manholes. ▪ Installing flood telemetry systems in sewage lift stations. ▪ Installing back-up generators for pumping and lift stations in sanitary sewer systems along with other measures (e.g., alarms, meters, remote controls, and switchgear upgrades). ▪ Building earthen dikes around flood-threatened critical facilities. ▪ Using bioengineered bank stabilization techniques. F-18 Protect Critical Facilities FEMA Resources/Publications FEMA P-259, 345, 543, B-797 F-19 Construct Flood Control Measures Small flood control structures can be built to prevent flood damage. Examples include: ▪Using minor structural projects that are smaller and more localized (e.g., floodwalls or small berms) in areas that cannot be mitigated through non-structural activities or where structural activities are not feasible due to low densities. ▪Using revetments (hardened materials placed atop existing riverbanks or slopes) to protect against floods. ▪Using bioengineered bank stabilization techniques. Structure and Infrastructure Projects 30 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Natural Systems Protection F-20 Protect and Restore Natural Flood Mitigation Features FEMA Resources/Publications FEMA 100, 268 Natural resources provide floodplain protection,riparian buffers,and other ecosystem services that mitigate flooding.It is important to preserve such functionality with the following: ▪Protecting and enhancing landforms that serve as natural mitigation features (i.e., riverbanks, wetlands, dunes, etc.). ▪Using vegetative management, such as vegetative buffers, around streams and water sources. ▪Protecting and preserving wetlands to help prevent flooding in other areas. ▪Establishing and managing riparian buffers along rivers and streams. ▪Retaining natural vegetative beds in stormwater channels. ▪Retaining thick vegetative cover on public lands flanking rivers. F-21 Preserve Floodplains as Open Space FEMA Resources/Publications FEMA 100, 268 Preserving natural areas and vegetation benefits natural resources while also mitigating potential flood losses.Techniques include: ▪Developing an open space acquisition, reuse, and preservation plan targeting hazard areas. ▪Developing a land banking program for the preservation of the natural and beneficial functions of flood hazard areas. ▪Using transfer of development rights to allow a developer to increase densities on another parcel that is not at risk in return for keeping floodplain areas vacant. ▪Compensating an owner for partial rights, such as easement or development rights, to prevent a property from being developed. F-22 Increase Awareness of Flood Risk and Safety Ideas for increasing flood risk awareness include the following: ▪Encouraging homeowners to purchase flood insurance. ▪Annually distributing flood protection safety pamphlets or brochures to the owners of flood-prone property. ▪Educating citizens about safety during flood conditions, including the dangers of driving on flooded roads. ▪Using outreach programs to advise homeowners of risks to life, health, and safety. ▪Offering GIS hazard mapping online for residents and design professionals. ▪Establishing a Program for Public Information (PPI) with a PPI committee (as suggested by Activity 332 of the CRS Coordinator’s Manual). 31FloodMitigation Ideas: A Resource for Reducing Risk to Natural Hazards Education and Awareness Programs F-23 Educate Property Owners about Flood Mitigation Techniques FEMA Resources/Publications FEMA Building Code Tool Kit (FEMA CD) Educate property owners regarding options for mitigating their properties from flooding through outreach activities such as: ▪Using outreach activities to facilitate technical assistance programs that address measures that citizens can take or facilitate funding for mitigation measures. ▪Encouraging homeowners to install backflow valves to prevent reverse-flow flood damages. ▪Encouraging residents in flood-prone areas to elevate homes. ▪Educating the public about securing debris, propane tanks, yard items, or stored objects that may otherwise be swept away, damaged, or pose a hazard if picked up and washed away by floodwaters. ▪Asking residents to help keep storm drains clear of debris during storms (not to rely solely on Public Works). Other flooding-related mitigation actions may also apply to other hazards. See the sections entitled “Storm Surge,” “Erosion,” and “Multiple Hazards” for other possible ideas. 32 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards This page was left intentionally blank Hail Hailstorms are a potentially damaging outgrowth of severe thunderstorms. Hailstorms frequently accompany thunderstorms, so their locations and spatial extents overlap. Hail can cause substantial damage to vehicles, roofs, landscaping, and other areas of the built environment. U.S. agriculture is typically the area most affected by hail storms, which cause severe crop damage even during minor events. 34 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Structure and Infrastructure Projects HA-1 Locate Safe Rooms to Minimize Damage FEMA Resources/Publications FEMA 320, 453 Locate tornado safe rooms inside or directly adjacent to houses to prevent hail-induced injuries that may occur when taking shelter during a severe thunderstorm. HA-2 Protect Buildings from Hail Damage For new construction as well as retrofitting existing buildings, techniques to minimize hail damage include: ▪Including measures such as structural bracing, shutters, laminated glass in window panes, and hail-resistant roof coverings or flashing in building design to minimize damage. ▪Improving roof sheathing to prevent hail penetration. ▪Installing hail resistant roofing and siding. ▪Contacting the Insurance Institute for Business and Home Safety (IBHS) to learn more about the most appropriate type of roof covering for your geographic region. Education and Awareness Programs HA-3 Increase Hail Risk Awareness Conduct outreach activities to increase public awareness of hail dangers,including: ▪Mailing safety brochures with monthly water bills. ▪Posting warning signage at local parks, county fairs, and other outdoor venues. ▪Teaching school children about the dangers of hail and how to take safety precautions. Other hail-related mitigation actions may also apply to other hazards. See the section entitled “Multiple Hazards” for other possible ideas. Landslide The movement of a mass of rock, debris, or earth down a slope by force of gravity is considered a landslide. Landslides occur when the slope or soil stability changes from stable to unstable, which may be caused by earthquakes, storms, volcanic eruptions, erosion, fire, or additional human-induced activities. Slopes greater than 10 degrees are more likely to slide, as are slopes where the height from the top of the slope to its toe is greater than 40 feet. Slopes are also more likely to fail if vegetative cover is low and/or soil water content is high. Potential impacts include environmental disturbance, property and infrastructure damage, and injuries or fatalities. 36 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations LS-1 Map and Assess Vulnerability to Landslides Improve data and mapping on specific landslide risks in the community by: ▪Studying areas where riparian landslides may occur. ▪Completing an inventory of locations where critical facilities, other buildings, and infrastructure are vulnerable to landslides. ▪Using GIS to identify and map landslide hazard areas. ▪Developing and maintaining a database to track community vulnerability to landslides. ▪Assessing vegetation in wildfire-prone areas to prevent landslides after fires (e.g., encourage plants with strong root systems). LS-2 Manage Development in Landslide Hazard Areas Landslide risk can be mitigated by regulating development in landslide hazard areas through actions such as: ▪Creating a plan to implement reinforcement measures in high-risk areas. ▪Defining steep slope/high-risk areas in land use and comprehensive plans and creating guidelines or restricting new development in those areas. ▪Creating or increasing setback limits on parcels near high-risk areas. ▪Locating utilities outside of landslide areas to decrease the risk of service disruption. ▪Restricting or limiting industrial activity that would strip slopes of essential top soil. ▪Incorporating economic development activity restrictions in high-risk areas. 37LandslideMitigation Ideas: A Resource for Reducing Risk to Natural Hazards Structure and Infrastructure Projects LS-3 Prevent Impacts to Roadways To prevent roadway damage and traffic disruptions from landslides, consider options such as: ▪Implementing monitoring mechanisms/procedures (i.e., visual inspection or electronic monitoring systems). ▪Applying soil stabilization measures, such as planting soil- stabilizing vegetation on steep, publicly-owned slopes. ▪Using debris-flow measures that may reduce damage in sloping areas, such as stabilization, energy dissipation, and flow control measures. ▪Establishing setback requirements and using large setbacks when building roads near slopes of marginal stability. ▪Installing catch-fall nets for rocks at steep slopes near roadways. LS-4 Remove Existing Buildings and Infrastructure from Landslide Hazard Areas FEMA Resources/Publications FEMA 182 To help mitigate landslide hazards,communities can acquire and demolish or relocate at-risk buildings and infrastructure and enforce permanent restrictions on development after land and structure acquisition. Other landslide-related mitigation actions may also apply to other hazards. See the sections entitled “Erosion,” “Subsidence,” and “Multiple Hazards” for other possible ideas. 38 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards This page was left intentionally blank Lightning Lightning is a discharge of electrical energy that results from the buildup of positive and negative charges in a thunderstorm, which creates a “bolt” when the buildup of charges becomes strong enough. On average, 55 people are killed and hundreds are injured each year by lightning strikes in the United States. Lightning can strike communications equipment (e.g., radio or cell towers, antennae, satellite dishes, etc.) and hamper communication and emergency response. Lightning strikes can also cause significant damage to buildings, critical facilities, and infrastructure, largely by igniting a fire. Lightning can also ignite a wildfire. 40 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Structure and Infrastructure Projects L-1 Protect Critical Facilities and Equipment Protect critical facilities and infrastructure from lighting damage with the following measures: ▪Installing lightning protection devices and methods, such as lightning rods and grounding, on communications infrastructure and other critical facilities. ▪Installing and maintaining surge protection on critical electronic equipment. Education and Awareness Programs L-2 Conduct Lightning Awareness Programs Use outreach programs to promote awareness of lightning dangers. This could include ideas such as: ▪Developing a lightning brochure for distribution by recreation equipment retailers or outfitters in mountainous areas. ▪Mailing safety brochures with monthly water bills. ▪Posting warning signage at local parks. ▪Teaching school children about the dangers of lightning and how to take safety precautions. Other lightning-related mitigation actions may also apply to other hazards. See the section entitled “Multiple Hazards” for other possible ideas. Sea Level Rise Sea level rise causes land loss in low-lying coastal areas, such as coastal wetlands and barrier islands, and occurs at the highest rates where land is already subsiding. Sea level rise also exacerbates erosion and flooding as new areas become vulnerable to storm surge, wave action, and tides.1 Climate change models predict that sea level risk will accelerate in the next century. This could result in billions of dollars in losses. 1 Adapting to Climate Change:A Planning Guide for State Coastal Managers, National Oceanic and Atmospheric Administration Office of Ocean and Coastal Resource Management,2010. 42 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations SLR-1 Map and Assess Vulnerability to Sea Level Rise To better understand and assess local vulnerability to sea level rise, consider actions such as: ▪ Modeling various “what-if” scenarios to estimate potential vulnerabilities in order to develop sea level rise mitigation priorities. ▪ Using GIS to map hazard areas, at-risk structures, and associated hazards (e.g., flood and storm surge) to assess high-risk areas. ▪ Developing an inventory of public buildings and infrastructure that may be particularly vulnerable to sea level rise. ▪ Adding future conditions hydrology and areas that may be inundated by sea level rise to Digital Flood Insurance Rate Maps (DFIRM). SLR-2 Manage Development in High-Risk Areas Local governments can mitigate future losses resulting from sea level rise by regulating development in potential hazard areas through land use planning,including: ▪Using zoning, subdivision regulations, and/or a special sea level rise overlay district to designate high-risk areas and specify the conditions for the use and development of specific areas. ▪Promoting conservation and management of open space, wetlands, and/or sea level rise boundary zones to separate developed areas from high-hazard areas. ▪Prohibiting the redevelopment of areas destroyed by storms or chronic erosion in order to prevent future losses. ▪Encouraging compact community design in low-risk areas. ▪Establishing setbacks in high-risk areas that account for potential sea level rise. SRL-3 Prevent Infrastructure Expansion in High-Risk Areas Future development can be protected from damage resulting from sea level rise through the following: ▪Setting guidelines for annexation and service extensions in high-risk areas. ▪Locating utilities and critical facilities outside of areas susceptible to sea level rise to decrease the risk of service disruption. ▪Requiring all critical facilities to be built 1 foot above the 500-year flood elevation (considering wave action) or the predicted sea level rise level, whichever is higher. 43Sea Level RiseMitigation Ideas: A Resource for Reducing Risk to Natural Hazards Structure and Infrastructure Projects SRL-4 Protect Buildings and Infrastructure Existing structures,infrastructure,and critical facilities can be protected from sea level rise through the following: ▪Acquiring and demolishing or relocating structures located in high-risk areas. ▪Retrofitting structures to elevate them above potential sea level rise levels. ▪Retrofitting critical facilities to be 1 foot above the 500-year flood elevation (considering wave action) or the predicted sea level rise level, whichever is higher. ▪Replacing exterior building components with more hazard- resistant materials. Natural Systems Protection SLR-5 Preserve High-Hazard Areas as Open Space Preserve open space to benefit natural resources and to reduce risk to structures from potential sea level rise.Techniques include: ▪Developing an open space acquisition, reuse, and preservation plan targeting hazard areas. ▪Developing a land banking program for the preservation and management of the natural and beneficial functions of flood hazard areas. ▪Adopting rolling easements along the shoreline to promote natural migration of shorelines. ▪Using transfer of development rights to allow a developer to increase densities on another parcel that is not at risk in return for keeping floodplain areas vacant. ▪Compensating an owner for partial rights, such as easement or development rights, to prevent a property from being developed. 44 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Natural Systems Protection SLR-6 Protect and Restore Natural Buffers Natural resources provide floodplain protection,riparian buffers,and other ecosystem services that mitigate sea level rise.It is important to preserve such functionality with the following: ▪Examining the appropriate use of beach nourishment, sand scraping, dune-gap plugs, etc., for coastal hazards. ▪Implementing dune restoration, plantings (e.g., sea oats), and use of natural materials. ▪Examining the appropriate use of sediment-trapping vegetation, sediment mounds, etc., for coastal hazards. ▪Planting sediment-trapping vegetation to buffer the coast against coastal storms by collecting sediment in protective features such as dunes or barrier islands. ▪Performing sand scraping—using bulldozers to deposit the top foot of sand above the high-tide line—to reinforce the beach without adding new sand. ▪Using sediment mounds to act as artificial dunes or plugs for natural dune gaps in order to slow the inland progress of storm- related wind and water. Education and Awareness Programs SLR-7 Increase Awareness of Sea Level Rise Improve public awareness of risks due to sea level rise through outreach activities such as: ▪Encouraging homeowners to purchase flood insurance. ▪Using outreach programs to facilitate technical assistance programs that address measures that citizens can take or facilitate funding for mitigation measures. ▪Annually distributing flood protection safety pamphlets or brochures to the owners of property in high-risk areas. ▪Educating citizens about safety during flood conditions, including the dangers of driving on flooded roads. ▪Using outreach programs to advise homeowners of risks to life, health, and safety. ▪Offering GIS hazard mapping online for residents and design professionals. ▪Disclosing the location of possible sea level rise areas to potential buyers. Other sea level rise-related mitigation actions may also apply to other hazards. See the sections entitled “Flood,” “Storm Surge,” “Erosion,” and “Multiple Hazards” for other possible ideas. Climate change is likely to exacerbate the effects of other hazards as well. See the other sections for possible ideas. Severe Wind Severe wind can occur alone, such as during straight- line wind events and derechos, or it can accompany other natural hazards, including hurricanes and severe thunderstorms. Severe wind poses a threat to lives, property, and vital utilities primarily due to the effects of flying debris or downed trees and power lines. Severe wind will typically cause the greatest damage to structures of light construction, particularly manufactured homes. 46 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations SW-1 Adopt and Enforce Building Codes FEMA Resources/Publications FEMA P-85, P-804 Adopt regulations governing residential construction to prevent wind damage.Examples of appropriate regulations are: ▪Adopting the International Building Code (IBC) and International Residential Code (IRC). ▪Adopting standards from International Code Council (ICC)-600 Standard for Residential Construction in High-Wind Regions. ▪Reviewing building codes and structural policies to ensure they are adequate to protect older structures from wind damage. ▪Requiring or encouraging wind engineering measures and construction techniques that may include structural bracing, straps and clips, anchor bolts, laminated or impact-resistant glass, reinforced pedestrian and garage doors, window shutters, waterproof adhesive sealing strips, or interlocking roof shingles. ▪Requiring tie-downs with anchors and ground anchors appropriate for the soil type for manufactured homes. ▪Prohibiting the use of carports and open coverings attached to manufactured homes. ▪Requiring the use of special interlocking shingles designed to interlock and resist uplift forces in extreme wind conditions to reduce damage to a roof or other structures. ▪Improving nailing patterns. ▪Requiring building foundation design, braced elevated platforms, and protections against the lateral forces of winds and waves. ▪Requiring new masonry chimneys greater than 6 feet above a roof to have continuous reinforced steel bracing. ▪Requiring structures on temporary foundations to be securely anchored to permanent foundations. SW-2 Promote or Require Site and Building Design Standards to Minimize Wind Damage FEMA Resources/Publications FEMA P-499, 550 Damage associated with severe wind events can be reduced or prevented if considered during building and site design.Examples include the following: ▪Using natural environmental features as wind buffers in site design. ▪Incorporating passive ventilation in the building design. ▪Incorporating passive ventilation in the site design. Passive ventilation systems use a series of vents in exterior walls or at exterior windows to allow outdoor air to enter the home in a controlled way. ▪Encouraging architectural designs that limit potential for wind-borne debris. ▪Improving architectural design standards for optimal wind conveyance. ▪Encouraging wind-resistant roof shapes (e.g., hip over gable). 47Severe WindLocal Planning and Regulations Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards SW-3 Assess Vulnerability to Severe Wind In order to better understand and assess local vulnerability to severe wind,consider actions such as: ▪Developing and maintaining a database to track community vulnerability to severe wind. ▪Using GIS to map areas that are at risk to the wind hazard associated with different hurricane conditions (e.g., Category 1, 2, 3, etc.) and to identify concentrations of at-risk structures. ▪Creating a severe wind scenario to estimate potential loss of life and injuries, the types of potential damage, and existing vulnerabilities within a community to develop severe wind mitigation priorities. ▪Using Hazus to quantitatively estimate potential losses from hurricane wind. SW-4 Protect Power Lines and Infrastructure The regular maintenance and upkeep of utilities can help prevent wind damage.Possible strategies are: ▪Establishing standards for all utilities regarding tree pruning around lines. ▪Incorporating inspection and management of hazardous trees into the drainage system maintenance process. ▪Preemptively testing power line holes to determine if they are rotting. ▪Inspecting utility poles to ensure they meet specifications and are wind resistant. ▪Burying power lines to provide uninterrupted power after severe winds, considering both maintenance and repair issues. ▪Upgrading overhead utility lines (e.g., adjust utility pole sizes, utility pole span widths, and/or line strength). ▪Avoiding use of aerial extensions to water, sewer, and gas lines. ▪Using designed-failure mode for power line design to allow lines to fall or fail in small sections rather than as a complete system to enable faster restoration. ▪Installing redundancies and loopfeeds. 48 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Structure and Infrastructure Projects SW-5 Retrofit Residential Buildings FEMA Resources/Publications FEMA 320, 361, 453, P-499, P-804 The following types of modifications or retrofits to existing residential buildings can reduce future wind damage: ▪Improving the building envelope. ▪Installing hurricane shutters or other protective measures. ▪Retrofitting gable end walls to eliminate wall failures in high winds. ▪Replacing existing non-ductile infrastructure with ductile infrastructure to reduce their exposure to hazardous events. ▪Retrofitting buildings with load-path connectors to strengthen the structural frames. ▪Installing safe rooms. ▪Reinforcing garage doors. ▪Inspecting and retrofitting roofs to adequate standards to provide wind resistance. SW-6 Retrofit Public Buildings and Critical Facilities FEMA Resources/Publications FEMA 361, P-499, 550 Public buildings and critical facilities can be retrofitted to reduce future wind damage with the following actions: ▪Improving roof coverings (e.g., no pebbles, remove ballast roof systems). ▪Anchoring roof-mounted heating, ventilation, and air conditioning units. ▪Retrofitting buildings with load-path connectors to strengthen the structural frames. ▪Retrofitting or constructing the emergency operations center to FEMA 361 standards. ▪Avoiding placing flag poles or antennas near buildings. ▪Upgrading and maintaining existing lightning protection systems to prevent roof cover damage. ▪Requiring upgrading of reused buildings that will house critical facilities. ▪Protecting traffic lights and other traffic controls from high winds. ▪Converting traffic lights to mast arms. 49Severe WindMitigation Ideas: A Resource for Reducing Risk to Natural Hazards Education and Awareness Programs SW-7 Increase Severe Wind Risk Awareness FEMA Resources/Publications FEMA P-431, P-804 Improve public awareness of severe wind through outreach activities such as: ▪Informing residents of shelter locations and evacuation routes. ▪Educating homeowners on the benefits of wind retrofits such as shutters, hurricane clips, etc. ▪Ensuring that school officials are aware of the best area of refuge in school buildings. ▪Instructing property owners on how to properly install temporary window coverings before a storm. ▪Educating design professionals to include wind mitigation during building design. Other severe wind-related mitigation actions may also apply to other hazards. See the sections entitled “Multiple Hazards” and “Tornadoes” for other possible ideas. 50 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards This page was left intentionally blank Severe Winter Weather Severe winter storms may include snow, sleet, freezing rain, or a mix of these wintry forms of precipitation. Severe winter weather can down trees, cause widespread power outages, damage property, and cause fatalities and injuries. 52 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations WW-1 Adopt and Enforce Building Codes Buildings and infrastructure can be protected from the impacts of winter storms with the following regulations: ▪Adopting the International Building Code (IBC) and International Residential Code (IRC). ▪Ensuring the development and enforcement of building codes for roof snow loads. ▪Discouraging flat roofs in areas that experience heavy snows. Structure and Infrastructure Projects WW-2 Protect Buildings and Infrastructure Buildings and infrastructure can be protected from the impacts of winter storms with the following techniques: ▪Adding building insulation to walls and attics. ▪As buildings are modified, using new technology to create or increase structural stability. ▪Retrofitting public buildings to withstand snow loads and prevent roof collapse. WW-3 Protect Power Lines Power lines can be protected from the impacts of winter storms with the following techniques: ▪Establishing standards for all utilities regarding tree pruning around lines. ▪Burying overhead power lines. ▪Using designed-failure mode for power line design to allow lines to fall or fail in small sections rather than as a complete system to enable faster restoration. ▪Installing redundancies and loopfeeds. WW-4 Reduce Impacts to Roadways The leading cause of death during winter storms is from automobile or other transportation accidents,so it is important to consider ways to lessen roadway impacts.Potential strategies include: ▪Planning for and maintaining adequate road and debris clearing capabilities. ▪Using snow fences or “living snow fences” (e.g., rows of trees or other vegetation) to limit blowing and drifting of snow over critical roadway segments. ▪Installing roadway heating technology to prevent ice/snow buildup. 53Severe Winter WeatherMitigation Ideas: A Resource for Reducing Risk to Natural Hazards Education and Awareness Programs WW-5 Conduct Winter Weather Risk Awareness Activities Public awareness of severe winter storms can be improved through the following efforts: ▪Informing the public about severe winter weather impacts. ▪Producing and distributing family and traveler emergency preparedness information about severe winter weather hazards. ▪Including safety strategies for severe weather in driver education classes and materials. ▪Encouraging homeowners to install carbon monoxide monitors and alarms. ▪Educating citizens that all fuel-burning equipment should be vented to the outside. WW-6 Assist Vulnerable Populations Protect vulnerable populations from the impacts of severe winter storms through the following efforts: ▪Identifying specific at-risk populations that may be exceptionally vulnerable in the event of long-term power outages. ▪Organizing outreach to vulnerable populations, including establishing and promoting accessible heating centers in the community. Other winter weather-related mitigation actions may also apply to other hazards. See the sections entitled “Extreme Temperatures” and “Multiple Hazards” for other possible ideas. 54 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards This page was left intentionally blank Storm Surge A storm surge is a large dome of water, often 50 to 100 miles wide, that rises anywhere from 4 to 5 feet in a Category 1 hurricane and up to more than 30 feet in a Category 5 storm. Storm surge arrives prior to a hurricane’s landfall, and the greater the hurricane’s intensity, the sooner the surge arrives. Storm surge can be devastating to coastal regions, causing flooding, severe beach erosion, and property damage along the immediate coast. Furthermore, water can rise very rapidly due to storm surge, posing a serious threat to people remaining in inundation areas. 56 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations SS-1 Adopt Building Codes and Development Standards Building codes and development standards can be established to mitigate storm surge damage.Possible regulations include: ▪Adopting the International Building Code (IBC) and International Residential Code (IRC). ▪Adopting ASCE-24-05 Flood Resistant Design and Construction. ASCE 24, created by the American Society of Civil Engineers, is a referenced standard in the IBC that specifies minimum requirements and expected performance for the design and construction of buildings and structures in flood hazard areas to make them more resistant to flood loads and flood damage. ▪Establishing design standards for buildings located in areas susceptible to storm surge. ▪Implementing V-zone construction requirements for new development located in coastal A-zones. ▪Adopting building requirements for higher elevation in inundation zones. ▪Requiring open foundations (e.g., piles or piers) in coastal areas. ▪Requiring deep foundations in order to avoid erosion and scour. SS-2 Improve Land Use Planning and Regulations Land uses should be planned and regulated to minimize the impact of storm surge.Possible measures to implement include: ▪Developing and maintaining a beach management plan. ▪Adopting shoreline setback regulations and establishing coastal setback lines. ▪Adopting coastal zone management regulations. ▪Eliminating all obstructions in areas along the coast subject to inundation by the 1-percent-annual-chance flood event with additional hazards associated with storm-induced waves (also known as the V-zone). ▪Planning for future storm surge heights due to sea level rise. ▪Limiting or prohibiting development in areas along the coast subject to inundation by the 1-percent-annual-chance flood event with additional hazards associated with storm-induced waves (referred to as the V-zone on Flood Insurance Rate Maps). ▪Adopting coastal A-zones, areas of special flood hazard that extend inland and are subject to breaking waves between 1.5 and 3 feet, and ensuring that they are mapped accurately. ▪Adopting and enforcing coastal A-zones in A-zones. SS-3 Minimize Risk to New Facilities and Infrastructure FEMA Resources/Publications FEMA P-55, P-499, B-797 Infrastructure and critical facilities can be protected from storm surge damage through the following: ▪Locating future critical facilities outside of areas susceptible to storm surge. ▪Requiring that all critical facilities meet requirements of Executive Order 11988 and be built 1 foot above the 500-year flood elevation (considering wave action). 57Storm SurgeLocal Planning and Regulations Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards SS-4 Map and Assess Vulnerability to Storm Surge Storm surge risk can be better assessed and monitored with mapping techniques,including the following: ▪Using GIS to map areas that are at risk to inundation by storm surge. ▪Developing and maintaining a database to track community vulnerability to storm surge. Structure and Infrastructure Projects SS-5 Construct Structural Control Techniques Structural controls can be used to lessen the impact of storm surge. Examples include the following: ▪Constructing groins to capture material along the shoreline in order to trap and retain sand. ▪Installing geotextile sand tubes to trap sand or protect beachfront properties. ▪Building a coastal berm to absorb waves and protect the shoreline from erosion. ▪Building a storm berm to keep rock protection in place and provide a slow supply of sediment to the coastal system. SS-6 Protect Infrastructure and Critical Facilities FEMA Resources/Publications FEMA P-55, P-499, B-797 Infrastructure and critical facilities can be protected from damage by storm surge through the following: ▪Reorienting near-shore roads so they are parallel (not perpendicular) to the beach to prevent the channelization of storm surge and wind inland. ▪Constructing seawalls or other structures to protect critical facilities located on the shoreline. ▪Relocating existing vulnerable critical facilities outside of high-risk areas. 58 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Natural Systems Protection SS-7 Protect and Restore Natural Buffers Natural resources provide floodplain protection,riparian buffers, and other ecosystem services that mitigate storm surge risk.It is important to preserve such functionality with the following: ▪Examining the appropriate use of beach nourishment, sand scraping, dune-gap plugs, etc., for coastal hazards. ▪Implementing dune restoration, plantings (e.g., sea oats), and use of natural materials. ▪Evaluating the appropriate use of sediment-trapping vegetation, sediment mounds, etc., for coastal hazards. ▪Planting sediment-trapping vegetation to make the coast more resistant to coastal storms by collecting sediment in protective features such as dunes or barrier islands. ▪Performing sand scraping—using bulldozers to deposit the top foot of sand above the high-tide line—to reinforce the beach without adding new sand. ▪Using sediment mounts to act as artificial dunes or plugs for natural dune gaps in order to slow the inland progress of storm-related wind and water. Education and Awareness Programs SS-8 Provide Information on High-Risk Areas Increase public awareness of storm surge risk through the following actions: ▪Offering GIS hazard mapping online for residents and design professionals. ▪More accurately mapping problem areas to educate residents about unanticipated risks. Upgrading maps provides a truer measure of risks to a community. ▪Educating property owners in high-risk areas about mitigation options. ▪Educating the public about risks, preparedness measures, and evacuation procedures. Other storm surge-related mitigation actions may also apply to other hazards. See the sections entitled “Flood” and “Multiple Hazards” for other possible ideas. Subsidence Subsidence is the gradual settling or sudden sinking of the Earth’s surface due to subsurface movement of earth materials. The level of subsidence ranges from a broad lowering to collapse of land surface. Most causes of subsidence are human-induced, such as groundwater pumpage, aquifer system compaction, drainage of organic soils, underground mining, hydrocompaction, natural compaction, sinkholes, and thawing permafrost. Areas located above or adjacent to karsts topography have a greater risk of experiencing subsidence. Sudden collapses of surface areas can damage and destroy buildings and infrastructure. 60 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations SU-1 Map and Assess Vulnerability to Subsidence Some areas with subsidence risk may not be fully identified in your community.Consider actions such as: ▪Using GIS to map areas that are susceptible to subsidence. ▪Identifying and mapping old mining areas or geologically unstable terrain so that development can be prevented or eliminated. ▪Using ground-penetrating radar to detect lava tubes and map their location. ▪Supporting mapping efforts to identify areas of existing permafrost. ▪Improving accuracy of hazard area maps to educate residents about unanticipated risks. Upgrading maps provides a truer measure of risks to a community. SU-2 Manage Development in High-Risk Areas Development regulations should consider areas with poor soil conditions,including the following: ▪Prohibiting development in areas that have been identified as at-risk to subsidence. ▪Restricting development in areas with soil that is considered poor or unsuitable for development. SU-3 Consider Subsidence in Building Design If subsidence is considered during building design,future damage may be prevented.Potential actions include: ▪Educating design professionals about where to locate information on subsidence rates and maps. ▪Incorporating structural designs that can resist loading associated with subsidence. ▪Adopting an ordinance promoting permafrost sensitive construction practices. ▪Including potential subsidence in freeboard calculations for buildings in flood-prone areas. SU-4 Monitor Subsidence Risk Factors Several risk factors can be monitored to help predict subsidence, such as the following: ▪Monitoring areas at risk to subsidence by remaining aware of changes in groundwater levels. ▪Monitoring areas where natural resources are removed from underground. ▪Filling or buttressing subterranean open spaces, as with abandoned mines, to prevent or alleviate collapse. 61SubsidenceMitigation Ideas: A Resource for Reducing Risk to Natural Hazards Structure and Infrastructure Projects SU-5 Remove Existing Structures from Subsidence Hazard Areas FEMA Resources/Publications FEMA 20, P-85, 361, 453 To prevent property loss,acquire and demolish or relocate buildings and infrastructure in high-risk areas. Education and Awareness Programs SU-6 Educate Residents about Subsidence Increase residents’knowledge of subsidence through the following: ▪Promoting community awareness of subsidence risks and impacts. ▪Offering GIS hazard mapping online for residents and design professionals. Other subsidence-related mitigation actions may also apply to other hazards. See the sections entitled “Landslide,” “Erosion,” and “Multiple Hazards” for other possible ideas. 62 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards This page was left intentionally blank Tornado A tornado is a violently rotating column of air that has contact with the ground and is often visible as a funnel cloud. The destruction caused by tornadoes ranges from light to catastrophic depending on the intensity, size, and duration of the storm. Typically, tornadoes cause the greatest damage to structures of light construction, including residential dwellings and particularly manufactured homes. Tornadoes are more likely to occur during the months of March through May and tend to form in the late afternoon and early evening. 64 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations T-1 Encourage Construction of Safe Rooms FEMA Resources/Publications FEMA 20, P-85, 320, 361, P-431, 453 Promote the construction and use of safe rooms by: ▪ Requiring construction of safe rooms in new schools, daycares, and nursing homes. ▪ Encouraging the construction and use of safe rooms in homes and shelter areas of manufactured home parks, fairgrounds, shopping malls, or other vulnerable public structures. ▪ Encouraging builders and homeowners to locate tornado safe rooms inside or directly adjacent to houses to prevent injuries due to flying debris or hail. ▪ Developing a local grant program to assist homeowners who wish to construct a new safe room. ▪ Consulting guidance from FEMA P-320 - Taking Shelter From the Storm: Building a Safe Room For Your Home or Small Business and International Code Council (ICC)-500 Standard for the Design and Construction of Storm Shelters. T-2 Require Wind-Resistant Building Techniques FEMA Resources/Publications FEMA P-804 Require or encourage wind engineering measures and construction techniques that may include the following: ▪Structural bracing ▪Straps and clips ▪Anchor bolts ▪Laminated or impact-resistant glass ▪Reinforced pedestrian and garage doors ▪Window shutters ▪Waterproof adhesive sealing strips ▪Interlocking roof shingles Also,improve the selection of building materials so that wind- resistant materials are more readily available to the public.Consult guidance from ICC-600 Standard for Residential Construction in High-Wind Regions. Education and Awareness Programs T-3 Conduct Tornado Awareness Activities FEMA Resources/Publications FEMA 182 Conduct outreach activities to increase awareness of tornado risk. Activities could include the following: ▪ Educating citizens through media outlets. ▪ Conducting tornado drills in schools and public buildings. ▪ Teaching school children about the dangers of tornadoes and how to take safety precautions. ▪ Distributing tornado shelter location information. ▪ Supporting severe weather awareness week. ▪ Promoting use of National Oceanic and Atmospheric Administration (NOAA) weather radios. Other tornado wind-related mitigation actions may also apply to other hazards. See the sections entitled “Severe Wind” and “Multiple Hazards” for other possible ideas. Tsunami A tsunami is a series of great waves that are created by undersea disturbances, such as earthquakes or volcanic eruptions. As opposed to typical waves that crash at the shoreline, tsunamis bring a continuously flowing “wall of water” that has the potential to cause devastating damage in coastal areas immediately along the shore. Areas at greatest risk are less than 50 feet above sea level and within 1 mile of the shoreline. Most deaths that occur during a tsunami result from drowning. Associated risks include flooding, polluted water supplies, and damaged gas lines. 66 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations TSU-1 Map and Assess Vulnerability to Tsunami FEMA Resources/Publications FEMA P-646, 646-A Tsunami risk can be better assessed and monitored with mapping techniques,including the following: ▪Using GIS to map areas that are vulnerable to inundation by tsunamis. ▪Developing and maintaining a database to track community vulnerability to tsunamis. ▪Offering GIS hazard mapping online for residents and design professionals. ▪Educating map users on the appropriate uses and limitations of maps. ▪More accurately mapping problem areas to educate residents about unanticipated risks. Upgrading maps provides a truer measure of risks to a community. TSU-2 Manage Development in Tsunami Hazard Areas FEMA Resources/Publications FEMA P-55 Planning and regulations can mitigate tsunami damage in many ways,such as: ▪Adopting and enforcing building codes and design standards that contain requirements for tsunami-resistant design. ▪Limiting new development in tsunami run-up areas. ▪Encouraging new development that is configured to minimize tsunami losses by using site planning strategies that slow water currents, steer water forces, and block water forces. TSU-3 Protect Against Fire Following Tsunami Communities can encourage wildfire mitigation measures (i.e.,tree breaks)in tsunami-prone areas to reduce impacts of fires that may occur after a tsunami hits the coastline. 67TsunamiStructureandInfrastructureProjects TSU-4 Build Tsunami Shelters Ensure the population is adequately protected from tsunami inundation by constructing tsunami shelters. TSU-5 Protect Buildings and Infrastructure FEMA Resources/Publications FEMA P-646, 646-A Ensure buildings and infrastructure are adequately protected from tsunami inundation with the following: ▪Requiring coastal structures to be built to standards that allow for proper vertical evacuation and to be specially designed and constructed to resist both tsunami and earthquake loads. ▪Locating new and relocating existing infrastructure and critical facilities outside of the tsunami hazard area. ▪Elevating existing buildings above the inundation level. ▪Relocating fire-prone infrastructure such as electrical lines or case tanks. Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Education and Awareness Programs TSU-6 Increase Public Awareness of Tsunami Hazard FEMA Resources/Publications FEMA P-646, 646-A Improve public awareness and better prepare citizens for evacuation during a tsunami by the following: ▪Educating citizens regarding the dangers of tsunami and inform them of emergency procedures and routes to use should a tsunami warning be issued. ▪Conducting tsunami drills. ▪Designating tsunami inundation zones and marking evacuation routes. ▪Developing maps showing possible tsunami inundation areas and steering developers away from high-risk areas. ▪Participating in NOAA’s TsunamiReady Community program. Other tsunami-related mitigation actions may also apply to other hazards. See the sections entitled “Flood,” “Storm Surge,” and “Multiple Hazards” for other possible ideas. 68 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards This page was left intentionally blank Wildfire A wildfire is any outdoor fire that is not controlled, supervised, or arranged. Wildfire probability depends on local weather conditions; outdoor activities such as camping, debris burning, and construction; and the degree of public cooperation with fire prevention measures. Wildfires can result in widespread damage to property and loss of life. 70 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations WF-1 Map and Assess Vulnerability to Wildfire FEMA Resources/Publications FEMA P-754 The first step in local planning is to identify wildfire hazard areas and assess overall community vulnerability.Potential actions include: ▪Using GIS mapping of wildfire hazard areas to facilitate analysis and planning decisions through comparison with zoning, development, infrastructure, etc. ▪Developing and maintaining a database to track community vulnerability to wildfire. ▪Creating a wildfire scenario to estimate potential loss of life and injuries, the types of potential damage, and existing vulnerabilities within a community to develop wildfire mitigation priorities. WF-2 Incorporate Wildfire Mitigation in the Comprehensive Plan Communities can review comprehensive plans to ensure wildfire mitigation has been addressed. The comprehensive plan may include the following: ▪ Recognizing the existence of wildfire hazards and identifying areas of risk based on a wildfire vulnerability assessment. ▪ Describing policies and recommendation for addressing wildfire risk and discouraging expansion in the wildland-urban interface. ▪ Including considerations of wildfire hazards in land use, public safety, and other elements of the comprehensive plan. WF-3 Reduce Risk through Land Use Planning Local governments can mitigate future losses by regulating development in wildfire hazard areas through land use planning,including: ▪Using zoning and/or a special wildfire overlay district to designate high-risk areas and specify the conditions for the use and development of specific areas. ▪Addressing density and quantity of development, as well emergency access, landscaping and water supply. ▪Promoting conservation of open space or wildland-urban boundary zones to separate developed areas from high-hazard areas. ▪Setting guidelines for annexation and service extensions in high-risk areas. 71WildfireLocal Planning and Regulations Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards WF-4 Develop a Wildland- Urban Interface Code Communities can develop regulations for safer construction and incorporate mitigation considerations into the permitting process. Potential actions include: ▪ Developing specific design guidelines and development review procedures for new construction, replacement, relocation, and substantial improvement in wildfire hazard areas. ▪ Addressing fire mitigation through access, signage, fire hydrants, water availability, vegetation management, and special building construction standards. ▪ Involving fire protection agencies in determining guidelines and standards and in development and site plan review procedures. ▪ Establishing wildfire mitigation planning requirements for large scale developments or planned unit developments. WF-5 Require or Encourage Fire-Resistant Construction Techniques FEMA Resources/Publications FEMA P-737, P-754 A local government can encourage fire-resistant construction or may choose to require it through local regulations.Examples include: ▪Encouraging the use of non-combustible materials (i.e., stone, brick, and stucco) for new construction in wildfire hazard areas. ▪Using fire resistant roofing and building materials in remodels, upgrades, and new construction. ▪Enclosing the foundations of homes and other buildings in wildfire-prone areas, rather than leaving them open and potentially exposing undersides to blown embers or other materials. ▪Prohibiting wooden shingles/wood shake roofs on any new development in areas prone to wildfires. ▪Encouraging the use of functional shutters on windows. Structure and Infrastructure Projects WF-6 Retrofit At-Risk Structures with Ignition-Resistant Materials Existing structures in wildfire hazard areas can be protected through the use of non-combustible materials and technologies,including: ▪Installing roof coverings, sheathing, flashing, skylights, roof and attic vents, eaves, and gutters that conform to ignition-resistant construction standards. ▪Installing wall components that conform to ignition-resistant construction standards. ▪Protecting propane tanks or other external fuel sources. ▪Purchasing and installing external, structure-specific water hydration systems (sprinklers); dedicated power sources; and dedicated cisterns if no water source (e.g., lake, river, or swimming pool) is available. 72 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards WF-7 Create Defensible Space Around Structures and Infrastructure Local governments can implement defensible space programs to reduce risk to structures and infrastructure, including: ▪ Creating buffers around residential and non-residential structures through the removal or reduction of flammable vegetation, including vertical clearance of tree branches. ▪ Replacing flammable vegetation with less flammable species. ▪ Creating defensible zones around power lines, oil and gas lines, and other infrastructure systems. WF-8 Conduct Maintenance to Reduce Risk Local governments can implement maintenance procedures to reduce wildfire risk,including: ▪Performing arson prevention cleanup activities in areas of abandoned or collapsed structures, accumulated trash or debris, and with a history of storing flammable materials where spills or dumping may have occurred. ▪Preventing or alleviating wildfires by proper maintenance and separation of power lines as well as efficient response to fallen power lines. ▪Routinely inspecting the functionality of fire hydrants. ▪Requiring and maintaining safe access for fire apparatus to wildland-urban interface neighborhoods and properties. Natural Systems Protection WF-9 Implement a Fuels Management Program A fuels management program may be implemented to reduce hazardous vegetative fuels on public lands,near essential infrastructure,or on private lands by working with landowners.The program can include the following: ▪Performing maintenance including fuel management techniques such as pruning and clearing dead vegetation, selective logging, cutting high grass, planting fire-resistant vegetation, and creating fuel/fire breaks (i.e., areas where the spread of wildfires will be slowed or stopped by the removal of fuels). ▪Using prescribed burning to reduce fuel loads that threaten public safety and property. ▪Identifying and clearing fuel loads created by downed trees. ▪Cutting firebreaks into public wooded areas in the wildland-urban interface. ▪Sponsoring local “slash and clean-up days” to reduce fuel loads along the wildland-urban interface. ▪Linking wildfire safety with environmental protection strategies (i.e., improving forest ecology, wildlife habitat, etc.). ▪Developing a vegetation management plan. Structure and Infrastructure Projects 73WildfireMitigation Ideas: A Resource for Reducing Risk to Natural Hazards Education and Awareness Programs WF-10 Participate in Firewise Program The Firewise program provides a series of steps that individual residents and their neighbors can take to keep their homes and neighborhoods safer from fire.Consider actions such as: ▪Joining the “Firewise Communities/USA” recognition program sponsored by the National Wildlife Coordinating Group (firewise.org). ▪Sponsoring Firewise workshops for local officials, developers, civic groups, and neighborhood/homeowners’ associations. ▪Consulting Firewise guidance and encouraging or requiring best practices in your community. WF-11 Increase Wildfire Risk Awareness Education and outreach programs can target citizens,businesses, developers,landscapers,and insurers among others to increase awareness of wildfire risk and strategies for protecting homes and infrastructure.Consider actions such as: ▪Offering GIS hazard mapping online for residents, developers, and design professionals. ▪Organizing a local fire department tour to show local elected officials and planners the most vulnerable areas of the community’s wildland-urban interface and increase their understanding of risks. ▪Working with insurance companies, utility providers, and others to include wildfire safety information in materials provided to area residents. ▪Developing partnerships with neighborhood groups, homeowners’ associations, and others to conduct outreach activities. ▪Using local fire departments to conduct education programs in schools. ▪Informing the public about proper evacuation procedures. ▪Forming a citizen plan implementation steering committee to monitor progress of local mitigation actions. Include a mix of representatives from neighborhoods, local businesses, and local government. 74 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Education and Outreach Programs WF-12 Educate Property Owners about Wildfire Mitigation Techniques Educate property owners on actions that they can take to reduce risk to property,such as the following: ▪Installing fire mitigation systems such as interior and exterior sprinkler systems. ▪Performing safe disposal of yard and household waste rather than open burning. ▪Removing dead or dry leaves, needles, twigs, and combustibles from roofs, decks, eaves, porches, and yards. ▪Creating a defensible space or buffer zone cleared of combustible materials around property. ▪Installing and maintaining smoke detectors and fire extinguishers on each floor of their homes or other buildings. ▪Safely using and storing necessary flammable materials, including machine fuels. Approved safety cans should be used for storing gasoline, oily rags, and other flammable materials. Firewood should be stacked at least 100 feet away and uphill from homes. ▪Keeping flammables, such as curtains, secured away from windows or using heavy fire-resistant drapes. Other wildfire-related mitigation actions may also apply to other hazards. See the section entitled “Multiple Hazards” for other possible ideas. Multiple Hazards The actions presented here are general actions that mitigate multiple hazards. 76 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations MU-1 Assess Community Risk FEMA Resources/Publications FEMA 366, 543 Understanding community vulnerability and level of risk is important to identify and prioritize mitigation alternatives.Improve risk assessment through the following: ▪Obtaining local data including tax parcels, building footprints, critical facility locations, and other information for use in risk analysis. ▪Developing and maintaining a database to track community vulnerability (i.e., exposure in known hazard areas). ▪Establishing a process to coordinate with state and Federal agencies to maintain up-to-date hazard data, maps, and assessments. ▪Keeping aerial photography current, especially in rapidly developing areas. ▪Identifying the most at-risk critical facilities and evaluating potential mitigation techniques. MU-2 Map Community Risk Maps are an important tool for communicating risk.Consider the following for developing GIS capabilities: ▪Developing a coordinated GIS Department. Find out who uses GIS, determine how it is used, and identify other potential uses. ▪Incorporating a GIS system/management plan for tracking permitting, land use patterns, etc. ▪Obtaining hazard data and using GIS to map risk for various hazards. 77Multiple HazardsLocal Planning and Regulations MU-3 Prevent Development in Hazard Areas FEMA Resources/Publications FEMA 476 Limit or prohibit development in high-hazard areas through the following types of actions: ▪Encouraging clustering of residential lots outside of hazard areas in subdivision design/review. ▪Prohibiting or limiting public expenditures for capital improvements in known hazard areas. ▪Organizing a managed retreat from very high-risk areas. ▪Purchasing the “right of first refusal” for hazard-prone parcels targeted for public acquisition. ▪Purchasing land and title in the name of a local governing body to remove structures and enforce permanent restrictions on development. ▪Acquiring and using easements (e.g., conservation) to prevent development in known hazard areas. ▪Using conservation easements to protect environmentally significant portions of parcels from development. ▪Acquiring hazardous areas for conservation or restoring as functional public parks. ▪Acquiring safe sites for public facilities (e.g., schools, police/fire stations, etc.). ▪Prohibiting new facilities for persons with special needs/mobility concerns in hazard areas. ▪Prohibiting animal shelters in known hazard areas. Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards MU-4 Adopt Development Regulations in Hazard Areas Regulate development in hazard areas.Examples include: ▪Using subdivision and development regulations to regulate development in hazard-prone areas. ▪Evaluating the use of performance/impact zoning to set risk-based standards for land development. ▪Requiring setbacks from delineated hazard areas (e.g., shorelines, wetlands, steep slopes, etc.). ▪Requiring conditional/special use permits for the development of known hazard areas. ▪Offering expanded development rights to developers/businesses for performing mitigation retrofits. ▪Incorporating restrictive covenants on properties located in known hazard areas. ▪Designating high-risk zones as special assessment districts (to fund necessary hazard mitigation projects). 78 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations MU-5 Limit Density in Hazard Areas Limit the density of development in the hazard areas through the following techniques: ▪Increasing minimum lot size for development in known hazard areas. ▪Designating “agricultural use districts” in the zoning ordinance to limit densities in known hazard areas. ▪Ensuring the zoning ordinance encourages higher densities only outside of known hazards areas. ▪Requiring clustering for planned unit developments (PUD) in the zoning ordinance to reduce densities in known hazard areas. ▪Establishing a local transfer of development rights (TDR) program for risk in known hazard areas. ▪Establishing a process to use floating zones to reduce densities in damaged areas following a disaster event. MU-6 Integrate Mitigation into Local Planning Hazard mitigation can be integrated into local planning efforts through the following: ▪Incorporating risk assessment and hazard mitigation principles into comprehensive planning efforts. ▪Incorporating a stand-alone element for hazard mitigation into the local comprehensive (land use) plan. ▪Incorporating hazard mitigation into broader growth management (i.e., Smart Growth) initiatives. ▪Incorporating a hazard risk assessment into the local development and subdivision review process. ▪Adding hazard mitigation measures to existing adequate public facilities (APF) tests and programs. ▪Ensuring natural hazards are considered in all land suitability analyses (LSA). ▪Determining and enforcing acceptable land uses to alleviate the risk of damage by limiting exposure in such hazard areas. ▪Developing a post-disaster reconstruction plan to facilitate decision making following a hazard event. ▪Involving citizens in comprehensive planning activities that identify and mitigate hazards. 79Multiple HazardsMitigation Ideas: A Resource for Reducing Risk to Natural Hazards Local Planning and Regulations MU-7 Strengthen Land Use Regulations FEMA Resources/Publications FEMA 100, 268 Land use regulations can reduce hazard risk through the following: ▪Using bonus/incentive zoning to encourage mitigation measures for private land development. ▪Using conditional use zoning to require or exact mitigation measures for private land development. ▪Establishing a process to use overlay zones to require mitigation techniques in high-hazard districts. ▪Adopting a post-disaster recovery ordinance based on a plan to regulate repair activity, generally depending on property location. ▪Adopting environmental review standards. ▪Incorporating proper species selection, planting, and maintenance practices into landscape ordinances. MU-8 Adopt and Enforce Building Codes FEMA Resources/Publications FEMA 421,P-762 Building codes and inspections help ensure buildings can adequately withstand damage during hazard events.Effective actions include: ▪Adopting the International Building Code (IBC) and International Residential Code (IRC). ▪Increasing the local Building Code Effectiveness Grading Schedule (BCEGS) classification through higher building code standards and enforcement practices. ▪Incorporating higher standards for hazard resistance in local application of the building code. ▪Providing advanced training to local building inspectors. ▪Considering orientation of new development during design (e.g., subdivisions, buildings, infrastructure, etc.) ▪Requiring standard tie-downs of propane tanks. ▪Requiring tie-downs for all manufactured housing. ▪Establishing moratorium procedures to guide the suspension of post-disaster reconstruction permits. ▪Revising fire codes to limit hotel room occupancy to ensure timely evacuation of high-use and multi-floor structures. ▪Establishing “value-added” incentives for hazard-resistant construction practices beyond code requirements. MU-9 Create Local Funding Mechanisms for Hazard Mitigation Local funding resources can be developed through the following measures: ▪Establishing a local reserve fund for public mitigation measures. ▪Using impact fees to help fund public hazard mitigation projects related to land development (i.e., increased runoff). ▪Requiring a development impact tax on new construction to mitigate the impacts of that development. ▪Recruiting local financial institutions to participate in “good neighbor” lending for private mitigation practices. ▪Providing local match to Federal funds that can fund private mitigation practices. 80 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards MU-10 Incentivize Hazard Mitigation Incentives and disincentives can be used to promote hazard mitigation through the following measures: ▪ Using special tax assessments to discourage builders from constructing in hazardous areas. ▪ Using insurance incentives and disincentives (i.e., incentives for best practices). ▪ Providing tax incentives for development of low-risk hazard parcels. ▪ Waiving permitting fees for home construction projects related to mitigation. ▪ Using tax abatements, public subsidies, and other incentives to encourage private mitigation practices. ▪ Reducing or deferring the tax burden for undeveloped hazard areas facing development pressure. ▪ Encouraging infill development through tax incentives, streamlined approval processes, etc. MU-11 Monitor Mitigation Plan Implementation Monitoring the implementation of the local mitigation plan can ensure that mitigation actions are being completed through: ▪Forming a plan implementation steering committee to monitor progress on local mitigation actions. Include a mix of representatives from neighborhoods, local businesses, and local government. ▪Preparing a plan implementation monitoring schedule and outlining roles for those responsible for monitoring (i.e., local departments, agencies, and committees). ▪Preparing and submitting an annual plan implementation progress report to the local elected body. Structure and Infrastructure Projects MU-12 Protect Structures FEMA Resources/Publications FEMA 577,P-798 Damage to structures can be prevented through the following actions: ▪Acquiring or relocating structures located in hazard areas. ▪Moving vulnerable structures to a less hazardous location. ▪Relocating or retrofitting public buildings located in high-hazard areas. ▪Relocating or retrofitting endangered public housing units in high- hazard areas. ▪Retrofitting fire and police stations to become hazard resistant. ▪Identifying and strengthening facilities to function as public shelters. Local Planning and Regulations 81Multiple HazardsMitigation Ideas: A Resource for Reducing Risk to Natural Hazards MU-13 Protect Infrastructure and Critical Facilities FEMA Resources/Publications FEMA 345,476 Infrastructure and critical facilities can be protected from damage by the following: ▪Incorporating hazard mitigation principles into all aspects of public-funded building. ▪Incorporating mitigation retrofits for public facilities into the annual capital improvements program. ▪Engineering or retrofitting roads and bridges to withstand hazards. ▪Relocating or undergrounding electrical infrastructure. ▪Designing and building water tanks or wells for use in times of water outage. ▪Installing quick-connect emergency generator hook-ups for critical facilities Education and Awareness Programs MU-14 Increase Hazard Education and Risk Awareness FEMA Resources/Publications EMI IS-22 Hazard education and awareness activities that address multiple hazards include: ▪Developing and implementing a multi-hazard public awareness program. ▪Providing information on all types of hazards, preparedness and mitigation measures, and responses during hazard events. ▪Establishing a “hazard awareness week” in coordination with the media to promote hazard awareness (seasonal). ▪Establishing an interactive website for educating the public on hazard mitigation and preparedness measures. ▪Annually hosting a public hazards workshop or exposition for all residents. ▪Establishing hazard information centers. ▪Creating a speakers bureau for disaster-related topics that focus on mitigation and preparedness measures. ▪Enhancing hazard awareness of the private sector, particularly lenders, insurance agents, and realtors. ▪Scheduling an annual “what’s new in mitigation” briefing for the local governing body (possibly with SHMO, etc.). Structure and Infrastructure Projects 82 Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards Education and Awareness Programs MU-15 Improve Household Disaster Preparedness FEMA Resources/Publications EMI IS-22 Educate the public on how to prepare for hazards and disasters, including the following: ▪Encouraging property owners to purchase hazard insurance not as an alternative to mitigation, but rather to add financial protection if damage does occur. ▪Encouraging residents to prepare by stocking up the necessary items and planning for how family members should respond during a disaster. Publicized information about household preparedness can be found at www.ready.gov. ▪Providing hazard vulnerability checklists for homeowners to conduct their own inspections. ▪Promoting the purchase and use of NOAA weather radios by residents. ▪Encouraging citizens to secure loose items (i.e., patio furniture). ▪Participating in Nation Weather Service StormReady Program. ▪Purchasing and installing NOAA weather radios in schools, government buildings, parks, etc. ▪Storing digital or hard copies of public records in low-risk, offsite locations. MU-16 Promote Private Mitigation Efforts FEMA Resources/Publications EMI IS-22 Encourage private mitigation efforts that address multiple hazards through the following: ▪Using outreach programs to: 1) advise homeowners of risks to life, health, and safety; 2) facilitate technical assistance programs that address measures that citizens can take; or 3) facilitate funding for mitigation measures. ▪Establishing, maintaining, and publicizing a library section on hazard mitigation techniques for local residents. ▪Identifying and recruiting civic groups and volunteer agencies for community mitigation projects. ▪Establishing a network for a business-to-business mitigation mentoring program. ▪Offering hazard susceptibility audits of local small businesses. ▪Completing a “demonstration model” showing use of hazard mitigation techniques for public display. ▪Establishing a technical assistance program for residents to access data or resources for mitigation purposes. ▪Educating the public on tradeoffs associated with multi-hazard design. FEMA Resources/Publications 84 FEMA Resources/Publications Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards 1. FEMA 20 FEMA Publications Catalog http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=2894 2. FEMA 54 Elevated Residential Structures http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1670 3. FEMA P-55 Coastal Construction Manual: Principles and Practices of Planning, Siting, Designing, Constructing, and Maintaining Residential Buildings in Coastal Areas (4th ed.) http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1671 4. FEMA E-74 Reducing the Risks of Nonstructural Earthquake Damage: A Practical Guide. Fourth Edition http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=4626 5. FEMA 83 Seismic Considerations for Communities at Risk http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1575 6. FEMA P-85 Protecting Manufactured Homes from Floods and Other Hazards http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1577 7. FEMA 100 Unified National Program for Floodplain Management http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1626 8. FEMA 114 Design Manual for Retrofitting Flood-prone Residential Structures http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1414 9. FEMA 154 Rapid Visual Screening of Buildings for Potential Seismic Hazards: A Handbook. Second Edition http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=3556 10. FEMA 155 Rapid Visual Screening of Buildings for Potential Seismic Hazards: Supporting Documentation. Second Edition http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=3557 11. FEMA 182 Landslide Loss Reduction: A Guide for State and Local Government Planning http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1417 12. FEMA 202 Earthquake Resistant Construction of Electric Transmission and Telecommunication Facilities Serving the Federal Government http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1635 13. FEMA 209 Flood: Are You Protected From the Next Disaster http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1726 14. FEMA 213 Answers to Questions About Substantially Damaged Buildings http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1636 15. FEMA 221 Collocation Impacts on the Vulnerability of Lifelines during Earthquakes with Applications to the Cajon Pass, California: Study Overview http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1637 16. FEMA 224 Seismic Vulnerability and Impact of Disruption of Lifelines in the Conterminous United States http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1518 17. FEMA 225 Inventory of Lifelines in the Cajon Pass, California http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1746 18. FEMA 226 Collocation Impacts on the Vulnerability of Lifelines during Earthquakes with Applications to the Cajon Pass, California http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1748 19. FEMA 232 Homebuilders’ Guide to Earthquake-Resistant Design and Construction http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=2103 20. FEMA 233 Earthquake Resistant Construction of Gas and Liquid Fuel Pipeline Systems Serving or Regulated by the Federal Government http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1639 85FEMA Resources/PublicationsMitigation Ideas: A Resource for Reducing Risk to Natural Hazards FEMA Resources/Publications 21. FEMA 254 Seismic Retrofit Incentive Programs: A Handbook for Local Governments http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1523 22. FEMA P-259 Engineering Principles and Practices of Retrofitting Flood-prone Residential Structures, Third Edition http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1645 23. FEMA 266 Creating a Seismic Safety Advisory Board: A Guide to Earthquake Risk Management http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1646 24. FEMA 268 Protecting Floodplain Resources - A Guidebook for Communities http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1419 25. FEMA 306 Evaluation of Earthquake Damaged Concrete and Masonry Wall Buildings: Basic Procedures Manual http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1651 26. FEMA 307 Evaluation of Earthquake Damaged Concrete and Masonry Wall Buildings: Technical Resources http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1652 27. FEMA 313 Promoting the Adoption and Enforcement of Seismic Building Codes: A Guidebook for State Earthquake and Mitigation Managers http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1421 28. FEMA 320 FEMA P-320 -Taking Shelter From the Storm: Construction Plans and Specifications http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=5788 29. FEMA 345 Hazard Mitigation Grant Program Brochure-Desk Reference http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1472 30. FEMA 347 Above the Flood: Elevating your Flood-prone House http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1424 31. FEMA P-348 Protecting Building Utilities from Flood Damage http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1750 32. FEMA 349 Action Plan for Performance Based Seismic Design http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1656 33. FEMA 356 Prestandard and Commentary for the Seismic Rehabilitation of Buildings http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1427 34. FEMA 361 Design and Construction Guidance for Community Safe Rooms http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1657 35. FEMA 366 HAZUS-MH Estimated Annualized Earthquake Losses for the United States http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=3265 36. FEMA 389 Communicating with Owners and Managers of New Buildings on Earthquake Risk http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1431 37. FEMA 395 Incremental Seismic Rehabilitation of School Buildings (K-12) : Providing Protection to People and Buildings http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1980 38. FEMA 396 Incremental Seismic Rehabilitation of Hospital Buildings : Providing Protection to People and Buildings http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1981 39. FEMA 412 Installing Seismic Restraints for Mechanical Equipment http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1557 40. FEMA 413 Installing Seismic Restraints for Electrical Equipment http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1436 41. FEMA 414 Installing Seismic Restraints for Duct and Pipe http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1437 86 FEMA Resources/Publications Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards 42. FEMA 416 Using GIS to Demonstrate Successful Floodplain Management http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1850 43. FEMA P-420 Engineering Guideline for Incremental Seismic Rehabilitation http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=3792 44. FEMA 421 Planning for Post-Disaster Recovery and Reconstruction http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1558 45. FEMA P-431 Tornado Protection: Selecting Refuge Area in Buildings, Second Edition http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1563 46. FEMA 453 Safe Rooms and Shelters - Protecting People Against Terrorist Attacks http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1910 47. FEMA 454 Designing for Earthquakes: A Manual for Architects http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=2418 48. FEMA 467-1 Floodplain Management Bulletin on the Elevation Certificate http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1727 49. FEMA 473 Technical Manual for Dam Owners: Impacts of Animals on Earthen Dams http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1441 50. FEMA 474 Promoting Seismic Safety: Guidance for Advocates http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1662 51. FEMA 476 Preparing for Disaster for People with Disabilities and other Special Needs http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1442 52. FEMA 480 National Flood Insurance Program, Floodplain Management Requirements, A Study Guide and Desk Reference for Local Officials, Federal Emergency Management Agency http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1443 53. FEMA P-499 Home Builder’s Guide to Coastal Construction http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=2138 54. FEMA 526 Earthquake Safety Checklist http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1664 55. FEMA 527 Earthquake Safety Activities for Children and Teachers http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1665 56. FEMA 528 Earthquake Home Hazard Hunt Poster http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1666 57. FEMA 529 Drop, Cover and Hold Poster http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1667 58. FEMA 530 Earthquake Safety Guide for Homeowners http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1449 59. FEMA 543 Design Guide for Improving Critical Facility Safety from Flooding and High Winds: Providing Protection to People and Buildings http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=2441 60. FEMA 547 Techniques for the Seismic Rehabilitation of Existing Buildings http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=2393 61. FEMA 550 Recommended Residential Construction for Coastal Areas: Building on Strong and Safe Foundations http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1853 87FEMA Resources/PublicationsMitigation Ideas: A Resource for Reducing Risk to Natural Hazards FEMA Resources/Publications 62. FEMA 577 Design Guide for Improving Hospital Safety in Earthquakes, Floods, and High Winds: Providing Protection to People and Buildings http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=2739 63. FEMA 646-A Vertical Evacuation from Tsunamis: A Guide for Community Officials http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=3808 64. FEMA P-646 Guidelines for Design of Structures for Vertical Evacuation from Tsunamis http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=3463 65. FEMA P-737 Home Builder’s Guide to Construction in Wildfire Zones http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=3646 66. FEMA P-749 Earthquake-Resistant Design Concepts: An Introduction to the NEHRP Recommended Seismic Provisions for New Buildings and Other Structures http://www.fema.gov/library/viewRecord.do;jsessionid=8BCBB8D4C6C901175A81648298D5380E.WorkerLibrary?fromSearch=fr omsearch&id=4711 67. FEMA P-750 NEHRP Recommended Seismic Provisions for New Buildings and Other Structures. 2009 Edition http://www.fema.gov/library/viewRecord.do;jsessionid=8BCBB8D4C6C901175A81648298D5380E.WorkerLibrary?fromSearch=fr omsearch&id=4103 68. FEMA P-754 Wildfire Hazard Mitigation Handbook for Public Facilities (P-754) http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=3723 69. FEMA P-762 Local Officials Guide for Coastal Construction http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=3647 70. FEMA P-774 Unreinforced Masonry Buildings and Earthquakes: Developing Successful Risk Reduction Programs http://www.fema.gov/library/viewRecord.do;jsessionid=8BCBB8D4C6C901175A81648298D5380E.WorkerLibrary?fromSearch=fr omsearch&id=4067 71. FEMA B-797 Hazard Mitigation Field Book - Roadways http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=4271 72. FEMA P-798 Natural Hazards and Sustainability for Residential Buildings http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=4347 73. FEMA P-804 Wind Retrofit Guide for Residential Buildings http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=4569 74. FEMA P-811 QuakeSmart Toolkit http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=4958 75. FEMA NFIP Technical Bulletins http://www.fema.gov/national-flood-insurance-program-2/nfip-technical-bulletins 76. FEMA ROVER Rapid Observation of Vulnerability and Estimation Risk (ROVER) Tool http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=4616 77. FIA-15A National Flood Insurance Program Community Rating System Coordinator’s Manual http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=1741 78. EMI IS-22 Are You Ready? An In-Depth Guide to Citizen Preparedness http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=2314 79. HMA EHP at-a-Glance Guide:Project Planning with Considerations for EHP Compliance http://www.fema.gov/library/viewRecord.do?fromSearch=fromsearch&id=5904 80. Building Code Tool Kit (FEMA CD, available in December 2012) http://www.fema.gov/earthquake FEMA Contacts Federal Emergency Management Agency (FEMA) U.S.Department of Homeland Security 500 C Street SW Washington,DC 20472 General Operator:(202)646-2500 Website:http://www.fema.gov/ FEMA Region I 99 High Street 6th Floor Boston,MA 02110 Phone:(617)223-9540 FEMA Region II 26 Federal Plaza Suite 1337 New York,NY 10278 Phone:(212)225-7209 FEMA Region III 615 Chestnut Street Philadelphia,PA 19106 Phone:(215)931-5608 FEMA Region IV 3003 Chamblee-Tucker Road Atlanta,GA 30341 Phone:(770)220-5200 FEMA Region V 536 South Clark Street Chicago,IL 60605 Phone:(312)408-5500 FEMA Region VI Federal Regional Center 800 North Loop 288 Denton,TX 76209 Phone:(940)898-5399 FEMA Region VII 2323 Grand Boulevard Suite 900 Kansas City,MO 64108 Phone:(816)283-7061 FEMA Region VIII Building 710 Box 25267 Denver,CO 80225 Phone:(303)235-4800 FEMA Region IX 1111 Broadway Suite 1200 Oakland,CA 94607 Phone:(510)627-7100 FEMA Region X 130 228th Street SW Bothell,WA 98021 Phone:(425)487-4600 APPENDIX F: PLAN MAINTENANCE TOOLS Galveston County, TX | Hazard Mitigation Plan F-1 2022 Update APPENDIX F. PLAN MAINTENANCE TOOLS This appendix includes tools and worksheets to facilitate plan maintenance and review by the Galveston County Steering and Planning Committees. In the first year of the performance period, an online performance progress reporting system, the BAToolSM will provide municipal and county representatives direct access to their mitigation initiatives to easily update the status of each project, document successes or obstacles to implementation, add or delete projects to maintain mitigation project implementation. This online program will capture information and roll all input into a report to summarize mitigation strategy progress. The FEMA 386-4 guidance worksheets are also available to assist with progress reporting. These worksheets are provided below for ease of access to the HMP Coordinator and Planning Partnership to maintain the 2022 HMP throughout its period of performance. A-35 Task 3 Create an Outreach Strategy Mitigation Action Progress Report Form Progress Report Period From Date: To Date: Action/Project Title Responsible Agency Contact Name Contact Phone/Email Project Status o Project completed o Project canceled o Project on schedule o Anticipated completion date:_______________________________________________________ o Project delayed Explain _________________________________________________________________________ Summary of Project Progress for this Report Period 1. What was accomplished for this project during this reporting period? _____________________________________________________________________________________________________ _____________________________________________________________________________________________________ 2. What obstacles, problems, or delays did the project encounter? _____________________________________________________________________________________________________ _____________________________________________________________________________________________________ 3. If uncompleted, is the project still relevant? Should the project be changed or revised? _______________________________________________________________________________________ ___________________________________________________________________________________________ 4. Other comments _______________________________________________________________________________________ ________________________________________________________________________________________ Worksheet 7.1 Mitigation Action Progress Report Form A-36 Local Mitigation Planning Handbook Task 3 Create an Outreach Strategy Worksheet 7.1 Mitigation Action Progress Report Form This page intentionally left blank. A-37 Task 3 Create an Outreach Strategy Plan Update Evaluation Worksheet Plan Section Considerations Explanation Planning Process Should new jurisdictions and/or districts be invited to participate in future plan updates? Have any internal or external agencies been invaluable to the mitigation strategy? Can any procedures (e.g., meeting announcements, plan updates) be done differently or more efficiently? Has the Planning Team undertaken any public outreach activities? How can public participation be improved? Have there been any changes in public support and/or decision- maker priorities related to hazard mitigation? Capability Assessment Have jurisdictions adopted new policies, plans, regulations, or reports that could be incorporated into this plan? Are there different or additional administrative, human, technical, and financial resources available for mitigation planning? Are there different or new education and outreach programs and resources available for mitigation activities? Has NFIP participation changed in the participating jurisdictions? Risk Assessment Has a natural and/or technical or human-caused disaster occurred? Should the list of hazards addressed in the plan be modified? Are there new data sources and/or additional maps and studies available? If so, what are they and what have they revealed? Should the information be incorporated into future plan updates? Do any new critical facilities or infrastructure need to be added to the asset lists? Have any changes in development trends occurred that could create additional risks? Are there repetitive losses and/or severe repetitive losses to document? Worksheet 7.2 Plan Update Evaluation Worksheet A-38 Local Mitigation Planning Handbook Task 3 Create an Outreach Strategy Plan Section Considerations Explanation Mitigation Strategy Is the mitigation strategy being implemented as anticipated? Were the cost and timeline estimates accurate? Should new mitigation actions be added to the Action Plan? Should existing mitigation actions be revised or eliminated from the plan? Are there new obstacles that were not anticipated in the plan that will need to be considered in the next plan update? Are there new funding sources to consider? Have elements of the plan been incorporated into other planning mechanisms? Plan Maintenance Procedures Was the plan monitored and evaluated as anticipated? What are needed improvements to the procedures? Worksheet 7.2 Plan Update Evaluation Worksheet August 2003 FEMA 386-4 STATE AND LOCAL MITIGATION PLANNING how-to guide implementing the hazard mitigation plan STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life foreword introduction STEP ONE adopt the mitigation plan task A brief local leadership task B demonstrate the support of partner organizations task C have the plan adopted by the proper legislative or executive authorities task D submit your plan for approval task E publicize the adoption and approval of the plan STEP TWO implement the plan recommendations task A confirm and clarify responsibilities task B begin to integrate mitigation actions throughout government operations task C monitor and document the implementation of your projects and actions task D establish indicators of effectiveness or success worksheet #1 task E celebrate success i v 1-1 1-2 1-2 1-3 1-3 1-3 2-1 2-3 2-6 2-11 2-12 2-13 2-16 Contents 1 2 Version 1.0 August 2003 STEP THREE evaluate your planning results task A evaluate the effectiveness of the planning process worksheet #2 task B evaluate the effectiveness of your actions worksheet #3 task C determine why the actions worked (or did not work) task D keep the community updated and involved, and celebrate your successes STEP FOUR revise the plan task A review those factors that affect your community’s planning context worksheet #4 task B analyze your findings and determine whether to revise your planning process or mitigation strategy task C incorporate your findings into the plan worksheet #5 afterword appendix a glossary appendix b library appendix c worksheets 3-1 3-2 3-3 3-5 3-6 3-10 3-16 4-1 4-2 4-4 4-5 4-6 4-7 a-1 b-1 c-1 3 4 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life the hazard mitigation planning process Hazard mitigation planning is the process of determining how to re- duce or eliminate the loss of life and property damage resulting from natural and manmade hazards. As shown in this diagram, the hazard mitigation planning process consists of four basic phases. For illustration purposes, this dia- gram portrays a process that ap- pears to proceed sequentially. How- ever, the mitigation planning process is rarely a linear process. It is not unusual that ideas developed while assessing risks should need revision and additional information while de- veloping the mitigation plan, or that implementing the plan may result in new goals or additional risk assess- ment. foreword iVersion 1.0 August 2003 foreword The Federal Emergency Management Agency (FEMA) has developed this series of mitigation planning “how-to” guides to assist states, tribes, and communities in enhancing their hazard mitigation planning capabilities. These guides are designed to provide the type of information states, tribes, and communities need to initiate and maintain a planning process that will result in safer and more disaster-resistant communities. These guides are applicable to states, tribes, and communities of various sizes and varying ranges of financial and technical resources. This how-to series is not intended to be the last word on any of the subject matter covered; rather, it is meant to provide easy to under- stand guidance for the field practitioner. In practice, these guides may be supplemented with more extensive technical data and the use of experts when necessary. mit-i-gate\ 1: to cause to be- come less harsh or hostile; 2: to make less severe or painful. As defined by DMA 2000— hazard mitigation\ : any sustained ac- tion taken to reduce or eliminate the long-term risk to human life and prop- erty from hazards. plan-ning\ : the act or process of mak- ing or carrying out plans; specif: the es- tablishment of goals, policies and procedures for a social or economic unit. The Disaster Mitigation Act of 2000 State governments have certain responsibilities for implement- ing Section 322, including: Preparing and submitting a standard or enhanced state mitigation plan; Reviewing and updating the state mitigation plan ev- ery three years; Providing technical assistance and training to local gov- ernments to assist them in developing local mitigation plans and applying for HMGP grants; and Reviewing and approving local plans if the state has an approved enhanced plan and is designated a man- aging state. DMA 2000 is intended to facilitate cooperation between state and local authorities. It encourages and rewards local, tribal, and state pre-disaster planning and promotes sustainability as a strategy for disaster resistance. This enhanced planning network will better enable local, tribal, and state governments to articulate their needs for mitigation, resulting in faster allo- cation of funding and more effective risk reduction projects. To implement the new DMA 2000 requirements, FEMA pre- pared an Interim Final Rule, published in the Federal Regis- ter on February 26, 2002, at 44 CFR Parts 201 and 206, which establishes planning and funding criteria for states, tribes, and local communities. In the past, federal legislation has provided fund- ing for disaster relief, recovery, and some hazard mitigation planning. The Disaster Mitigation Act of 2000 (DMA 2000) is the latest legislation to improve the haz- ard mitigation planning process. DMA 2000 (Public Law 106- 390) was signed by the President on October 30, 2000. The new legislation reinforces the importance of mitigation plan- ning and emphasizes planning for disasters before they oc- cur. As such, DMA 2000 establishes a pre-disaster hazard mitigation program and new requirements for the national post-disaster Hazard Mitigation Grant Program (HMGP). Section 322 of DMA 2000 specifically addresses mitigation planning at the state and local levels. This section identifies new requirements that allow HMGP funds to be used for plan- ning actions, and increases the amount of HMGP funds avail- able to states that have developed a comprehensive, enhanced mitigation plan prior to a disaster. States, tribes, and communities must have an approved mitigation plan in place before receiving HMGP funds. Local and tribal mitiga- tion plans must demonstrate that their proposed mitigation actions are based on a sound planning process that accounts for the risk to and the capabilities of the individual communi- ties. ii STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life The how-to guides cover the following topics: Getting started with the mitigation planning process, includ- ing important considerations for how you can organize your efforts to develop an effective mitigation plan (FEMA 386-1); Identifying hazards and assessing losses to your community, tribe, or state (FEMA 386-2); Setting mitigation priorities and goals for your community, tribe, or state and writing the plan (FEMA 386-3); Implementing the mitigation plan, including project funding and maintaining a dynamic plan that changes to meet new developments (FEMA 386-4); Evaluating and prioritizing potential mitigation actions through the use of benefit-cost analysis and other techniques (FEMA 386-5); Incorporating special considerations into hazard mitigation planning for historic structures and cultural resources (FEMA 386-6); Incorporating mitigation considerations for manmade haz- ards into hazard mitigation planning (FEMA 386-7); Using multi-jurisdictional approaches to mitigation planning (FEMA 386-8); and Finding and securing technical and financial resources for mitigation planning (FEMA 386-9). Why should you spend the time to read these guides? It simply costs too much to address the effects of disasters only after they happen; State and federal aid is usually insufficient to cover the extent of physical and economic damages resulting from disasters; You can prevent a surprising amount of damage from hazards if you take the time to anticipate where and how they occur, and then take the appropriate action to minimize damages; You can lessen the impact of disasters and speed the response and recovery process for both natural and manmade hazards; and foreword iiiVersion 1.0 August 2003 The most meaningful steps in avoiding the impacts of hazards are taken at the state, tribal, and local levels by officials and community members who have a personal stake in the out- come and the ability to follow through on a sustained process of planning and implementation. The guides show how mitigation planning: Can help your community become more sustainable and disas- ter resistant through selecting the most appropriate mitigation actions, based on the knowledge you gained in the hazard identification and loss estimation process; Can be incorporated as an integral component of daily govern- ment business; Allows you to focus your efforts on the hazard areas most important to you by determining and setting priorities for mitigation planning efforts; and Can save you money by providing a forum for engaging in part- nerships that provide the technical, financial, and staff re- sources in your effort to reduce the effects, and hence the costs, of natural and manmade hazards. These guides present a range of approaches to preparing a hazard mitigation plan. There is no one right planning process; however, there are certain central themes to planning, such as engaging citi- zens, developing goals and objectives, and monitoring progress. Select the approach that works best for your state, tribe, or commu- nity. The process used to develop a suc- cessful hazard miti- gation plan is just as important as the plan itself. This how-to guide focuses on the fourth phase of the hazard mitigation planning process and will help you develop a miti- gation plan that meets DMA 2000 re- quirements. introduction vVersion 1.0 August 2003 introduction Your community now has a plan that is a result of the planning team’s effort and work with stakeholders concerned about re- ducing losses from hazards in your community. This plan resulted from a process that included a risk assessment, capability assess- ment, and the development of a mitigation strategy that features prioritized mitigation actions based upon your goals and objec- tives. The implementation process puts your planning team’s hard work into motion and focuses on the actions necessary to establish and maintain the effectiveness of the plan as a fundamental tool for risk reduction. An added benefit of having a plan is that its printed form is famil- iar, even reassuring, to citizens who have been part of a compre- hensive planning process or, even more importantly, have suffered losses due to a hazard. In addition, those new to the community, as well as non-residents, will have easy access to this information as well. The text and accompanying graphics concisely and coher- ently document the hazards faced by the community, their location and extent, previous losses, actions to mitigate future hazards, and goals for a sustainable future. The development of the plan by community members increases the likelihood of hazard mitigation becoming, like transportation and education, one of the standard considerations in the evolution and growth of the community. Once the plan has been adopted and the recommendations imple- mented, your accomplishments, issues, programs, policies, and project results should be accurately documented. This documenta- tion will be very useful when it is time to evaluate, update, or revise the plan. Plans are living documents that require adjustments to maintain their relevance. You and the planning team prepared the mitigation plan to articulate your community’s values and strate- gies at a particular point in time, but like every other plan, it must be reviewed periodically to remain a useful tool to guide growth and change in your community. Updates and revisions may be necessary to incorporate changes in your community or tribe, new hazard information, new tribal, com- munity, or state priorities, or lessons learned as mitigation projects are completed. It is recommended, but not required, that you com- This series of guides shows how to identify, plan, and implement cost-effective actions through a compre- hensive approach known as Hazard Mitigation Planning. The process consists of four basic phases: Organize resources involves organizing resources, mobilizing the community, and getting started with the planning process; Assess risks identifies hazards and estimates the losses associated with these hazards; Develop a mitigation plan de- scribes how to identify, plan, and ini- tiate cost-effective actions; and Implement the plan and monitor progress, the topic of this guide— Bringing the Plan to Life: Implement- ing the Hazard Mitigation Plan (FEMA 386-4)—leads communities and states through the formal adop- tion of the plan and discusses how to implement, monitor, and evaluate the results of mitigation actions to keep the mitigation plan relevant over time. vi STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life plete an internal review of the plan annually and revisit your plan after all hazard events. DMA 2000 regulations require updates ev- ery three years for state plans, and every five years for local plans, in order for states, tribes, and communities to remain eligible for disaster-related grants and assistance. This guide will help you de- termine when and how to review and revise your mitigation plan. How do you use this how-to guide? This guide will help you address the following questions: 1. How can we make sure the plan is officially recognized? Proof of formal adoption is required under DMA 2000 regulations. Getting the plan adopted ensures the support and approval of the governing authority in your jurisdiction. Step 1, Adopt the Mitigation Plan, discusses ways of securing the adoption of the plan by your governing body. 2. What is the most effective mechanism to implement each recommenda- tion? What resources are available? How can we keep the public in- formed and actively involved now that initiatives are underway? Your mitigation strategy probably contains various short- and long- term recommendations. While you identified potential sources of funding in the plan, the actual sources of funding, staff time, and staffing needs may change before project implementation gets un- derway. The planning team always must be on the lookout for alter- native sources of funding, new opportunities, and new partnerships through which to carry out the recommendations. Determining who will bear responsibility for implementing planned actions is key to getting the implementation phase off to a successful start. Ensuring that there are appropriate authorities to implement actions is covered in Step 2, Implement the Plan Recom- mendations. 3. How will we know if our mitigation strategy is working? Monitoring and evaluating the outcomes of the mitigation actions are essential to knowing whether to stay the course or change it. Step 3, Evaluate Your Planning Results, discusses how to determine whether or not the planned course of action has had the desired effect. The successes and limitations of your efforts should be documented as part of the evaluation process. Celebrating successes, and keeping citizens actively involved and informed of the progress of the hazard mitigation initiatives, are The implementa- tion and evaluation processes ensure that you accomplish the mitiga- tion actions in a timely way and provide the foundation for an on- going mitigation program. This allows you to: Ensure that the mitigation strategy is implemented in an effective man- ner; Provide for the long-term institution- alization and monitoring of hazard mitigation practices so that the plan remains relevant in the face of change; Establish new protocols. The plan- ning process educates community officials on their roles (and those of their departments) in reducing risks. Local officials will need to develop protocols for integrating mitigation principles into their daily job respon- sibilities; and Maintain momentum. The imple- mentation phase is a good time to renew the spirit of cooperation among all partners in the planning process, particularly now that ac- tions to reduce risk are imminent. States should con- tinually work with local jurisdictions to ensure that local plans are in conformance with state guidelines and complement the goals and strategies outlined in the state haz- ard mitigation plan, particularly as state priorities change. introduction viiVersion 1.0 August 2003 just as important in the adoption, implementation, and revision phases as in any other phase. Keeping everyone up to date on progress also will help sustain support for mitigation as a local, tribal, or state priority. During the implementation phase, the me- dia will become an especially important tool in communicating the progress of the mitigation plan. 4. When should we reexamine the plan? As has been noted throughout the how-to series, the community and its assets are constantly changing, requiring the mitigation plan to be updated periodically. While DMA 2000 regulations re- quire a formal review and revision of the community plan once every five years for local jurisdictions and every three years for states, the planning team should reevaluate its implementation strategy as new opportunities, unforeseen challenges, and disasters arise. Additionally, as mitigation issues are resolved, the plan should be reexamined to determine whether there is a need to re- prioritize, add, or reconfigure actions in light of what has been accomplished. Step 4, Revise the Plan, addresses how to incorporate new knowledge about the community, tribe, or state and ongoing mitigation efforts into your strategy. Type of information found in the how-to series The how-to series contains a wide variety of information, some of which is highlighted with icons. Additional information can be found in Appendix B, Library. To illustrate how the guide can be used, newspaper articles from the fictional Town of Hazardville are provided. Icons Guidance focused solely on the role of states and tribes that serve as grantees under HMGP is identified as a sidebar with the “States” icon. Tribes that choose to serve as grantees under HMGP should follow the state icons. Although much of the information will be the same for lo- cal, tribal, and state governments, there are different requirements for state and local mitigation plans. Furthermore, states have addi- tional responsibilities to assist local entities in their planning ef- forts. For tribes that choose to serve as subgrantees under HMGP, guidance focusing on local governments applies to these entities as well. Under DMA 2000 regulations, local gov- ernments may be defined in many different ways. A local government may be defined by a political boundary, such as an in- corporated city, county, parish, or town- ship, or it may not have a distinct political boundary, for example, a watershed or metropolitan region. “Local govern- ment” is formally defined in 44 CFR §201.2 of DMA regulations. Be sure to allow sufficient time to com- plete Phase 4. If you decide to revise the plan, or if you are required to revise it as described under DMA 2000, consider the time it will take to do the following: Include the public and identify any new stakeholders in the evalua- tion process; Gather and evaluate data; Brief the public and political lead- ership; Incorporate changes into plan- ning documents; and Adopt the new plan. viii STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life The “Advanced” icon indicates an additional step you can take or when specialists may be needed. The “Caution” icon alerts you to important information and ways to avoid sticky situations later in the planning process. The “DMA” icon provides information relating to the mitigation planning requirements outlined in the Disas- ter Mitigation Act of 2000 (DMA 2000). The “Glossary” icon identifies terms and concepts for which a detailed explanation is provided in the Glossary included in Appendix A. The “Tips” icon identifies helpful hints and useful in- formation that can be used in the planning process. Library A mitigation planning “Library” has been included in Appendix B. This library has a wealth of information, including Web addresses, reference books, and other contact information to help get you started. All of the Web sites and references listed in the how-to guide are included in the library. Town of Hazardville articles Applications of the various steps in the mitigation planning process are illustrated through a fictional community, the Town of Hazardville, located in the State of Emergency. Hazardville, a small community with limited resources and multiple hazards, is in the process of developing a multi-hazard mitigation plan. Newspaper accounts illustrate the various steps in the mitigation planning pro- cess. Worksheets Finally, to help track your progress, worksheets have been devel- oped that correspond with the structure of this guide. Worksheets have been completed with Hazardville examples to illustrate the introduction ixVersion 1.0 August 2003 The Hazardville Post Vol. CXIII No. 28 Tuesday, January 28, 2003 Public Responds to Hazardville Mitigation Plan Howard, an advocate for the town's less privileged citizens in the Rag- ing River Views Park was perhaps the most outspoken opponent of the plan. At first, Howard worried that the benefits of this plan might not help the people he felt needed it the most. "I have tried for years to get the community to help the poor resi- dents in the low-income neighbor- hood who get flooded out every spring when the snow begins to melt. The town never knew how they could help the residents other than to assist in clean-up and de- bris removal. The residents could not afford to relocate on their own. All of the houses that are affected year after year were identified in the hazard identification and risk as- sessment as being in a 10-year flood zone, and are very vulnerable to any sort of flash floods or even a heavy rain." (A 10-year flood has a 10 per- cent chance of occurring in any one year.) "While I was deeply saddened by this information," Howard said, "I was relieved to see that it turned out to be a good thing after all. Once the town and the Council learned what a dangerous area that was, the entire neighborhood was prioritized for buyouts, which will allow these residents to get fair market value for their home and help them move out of harm's way." In an interview, THORR's outreach coordinator, Charity Jones, who works for the Hazardville Depart- ment of Health and Human Services, said, "The citizens of Hazardville should feel good about what they did to develop this plan. I know I am proud of all the work that THORR and Hazardville community mem- bers have put into its creation. This is truly a plan driven by the community's concerns and needs." [Hazardville, EM] The Town of Hazardville Organization for Risk Reduction (THORR) has received over 50 comments regarding the Hazardville Mitigation Plan. The plan was created to help reduce the community's risk to hazards such as flooding, earthquakes, and other natural hazards. Joe Norris, lead planner for THORR, said the team has been working closely with citizens, busi- nesses, and other community rep- resentatives to develop a plan that would create a safer, more resilient Hazardville. THORR was commit- ted to having community input throughout the planning process. "At first, we had a hard time get- ting the community interested. The citizens didn't know what to expect," Norris said. Many in the community were skeptical of exactly what the plan was supposed to accomplish. Riley type of information to include. Blank worksheets are included in Appendix C. You can photocopy the worksheets to record your progress as you undertake the processes of implementing and evaluating the mitigation plan. step 1-1Version 1.0 August 2003 1 adopt the mitigation plan Overview C ongratulations! You have reached Phase 4 of the planning process. After organizing resources, assessing risks, and devel- oping a mitigation plan, you are now ready to take the first step in Phase 4—guiding the plan through a formal adoption process. Completion of this step will establish the plan’s authority and legiti- macy. In order to meet DMA 2000 regulations, your jurisdiction’s governing body must formally adopt the plan in accordance with state and local laws. Their involvement and support of the process all along should help gain approval, as you will see below. Local plans are adopted by the lead governing body (City Council, Board of Supervisors, etc.) and state plans are usually submitted to the state director of emergency management for approval and signa- ture. Adopting the mitigation plan is the final challenge for the planning team before plan implementation can begin. The rela- tionships you have already established with stakeholders, elected officials, and government agencies, as well as the thorough nature of your work thus far, will be important assets during the adoption process. In addition to being required by DMA 2000, adoption of the plan is necessary because: It lends authority to the plan to serve as a guiding document for all local and state government officials; It gives legal status to the plan in the event it is challenged in court; It certifies to program and grant administrators that the plan’s recommendations have been properly considered and ap- proved by the governing authority and the jurisdiction’s citi- zens; and It helps ensure the continuity of mitigation programs and policies over time because elected officials, staff, and other community decision-makers can refer to the official document when making decisions about the community’s future. Linking the plan’s policies to those in other land development tools en- sures that development de- cisions are made in consideration of the loss reduction goals of the community. Formal adoption of the plan lets public or private funding sources know that the plan has the sup- port of citizens, elected officials, and business owners. For example, land developers should use the adopted plan to make informed decisions about their ventures with respect to mitigation poli- cies and potential hazards. Before you seek adoption of the plan, check with your State Haz- ard Mitigation Officer (SHMO) on administrative procedures for reviewing plans under DMA 2000 requirements. The SHMO may have established a procedure with the FEMA Regional Office to review the draft plan to make sure you included all elements for meeting the DMA 2000 or other program requirements. This may include reviewing the planning process and your documentation before you ask the governing body to adopt the plan, a step to ensure that you have to submit the plan only once to the governing body for formal adoption. A tribal jurisdiction that submits a plan as a state-level en- tity works directly with the appropriate FEMA Regional Office. 1-2 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Procedures & Techniques Task A. Brief local leadership. An excellent way to facilitate adoption of the plan is to periodically brief community decision makers and elected officials on the progress of your planning efforts. This is a great opportunity to demonstrate to the governing body that the plan is sound and has broad support. Plan adoption should not be difficult if the plan- ning team has conducted activities throughout the planning pro- cess that have lent credibility to the team, the plan, and the planning process. The briefings will also allow you to address any concerns of elected officials, and to obtain their input. Having the planning team recognized, garnering public input, and communi- cating the progress and successes of the team will help get the plan adopted. Task B. Demonstrate the support of partner organizations. One way to ensure the credibility and eventual passage of the miti- gation plan is to present the adopting body with letters of support from organizations and agencies on the planning team, as well as those not on the team. The community’s governing body may view the plan more favorably if it has the support of neighborhood and civic organizations. Some organizations may show their commit- ment to implementing the plan by passing a resolution supporting it and outlining specific responsibilities that they will assume. Fur- thermore, supporting organizations should be encouraged to pro- vide testimony if the plan will be adopted at a public hearing. This testimony should provide specific information on the benefits that the mitigation plan will bring to the organization’s constituencies. Such testimony becomes part of the public record of the hearing. For example, if a member of a community watershed advocacy group was part of the planning team, that group might review the plan and give its full support to the plan by outlining the group’s commit- ment to sponsor an annual watershed clean-up day or to plant native vegetation in the open space that resulted from the acquisition of flood-prone structures. See Getting Started (FEMA 386-1) for more de- tails on garnering community support. Partners in Mitigation Citizens, businesses, and technical experts in southwest Tulsa are partnering with the City of Tulsa and the National Park Service in the development of a greenway plan for a local creek (Mooser Creek). Flood mitigation, preservation of natural resources, recreation, and sustainable development are part of a com- munity vision shared by both citizens and government. Community lead- ers got involved by forming committees and identifying issues important to them. The Mooser Creek Greenway Citizens and Technical Commit- tees agreed upon a vision statement in an effort to preserve the natural functions and beauty of Mooser Creek and to create recreational and educational opportunities. Ensuring Plan Adoption The planning team has al- ready performed activities that will help ease passage of the plan: Recognizing the Committee. As de- scribed in Getting Started (FEMA 386-1), the team is formally recognized by the community’s governing body as the local authority on mitigation, and has been entrusted to make recommenda- tions about mitigation on behalf of the community. This formal recognition by elected officials extends to the planning team’s scope of work as well. Garnering Public Input. As covered in Getting Started (FEMA 386-1) and De- veloping the Mitigation Plan (FEMA 386-3), the planning team identified stakeholders to join the planning team, briefed elected officials, informed the public of the team’s progress and find- ings, and involved the public in its work. By including the citizens of the commu- nity throughout the planning process, you can expect that the adoption and implementation of the plan will be broadly supported by the public and elected officials. Communicating Information. By keep- ing citizens involved in the planning pro- cess and informed of progress, the planning team can maintain the community’s interest in mitigation. The community now knows and understands that there is a significant risk of losing assets because of hazards, that several alternatives are being considered, and that projects and initiatives will soon be underway. adopt the mitigation plan 1 1-3Version 1.0 August 2003 Task C. Have the plan adopted by the proper legislative or executive authorities. The mitigation plan will be adopted through your government’s normal legal process. Depending on the laws in your state and ju- risdiction, adoption of the plan will give the jurisdiction legal au- thority to enact ordinances, policies, or programs to reduce hazard losses and to implement other mitigation actions. Generally, most local governing bodies will adopt a hazard mitigation plan by reso- lution. Build time into your planning schedule to meet federal and state deadlines for submitting the plan. Make sure you allow sufficient time for formal adoption procedures. Your local governing body may meet only once a month and may require agenda items to be submitted well ahead of time. Task D. Submit your plan for approval. Once your local governing body has approved the plan, it must be submitted to the State Hazard Mitigation Officer (SHMO). The SHMO should already be familiar with your plan because he or she should have reviewed a draft to determine if the plan meets DMA 2000 and other state program requirements. Someone should be designated as the point of contact with the state to answer any questions about the plan. For multi-jurisdictional plans, each juris- diction requesting approval of the plan must document that it has been formally adopted by its respective governing body. The SHMO is responsible for forwarding the plan to the FEMA Re- gional Office for review. Task E. Publicize the adoption and approval of the plan. Once the plan has been approved, stakeholders should be in- formed of your success. You may want to package the message dif- ferently to reach various audiences. This can be accomplished by sending a press release to your local newspaper, holding a press conference with important civic leaders, sending a mailing, or post- ing a notice on the community’s Web site. You may also want to celebrate your success by beginning a project immediately. For ex- ample, after the plan is approved, you may request that the govern- ing body vote on a resolution or ordinance that is important to accomplishing your mitigation goals, or to authorize funding to undertake a highly visible project, such as flood-proofing City Hall or some other important public facility. 44 CFR §201.4(c)(6) and §201.6(c)(5) of the Interim Final Rule require plans to be adopted before being sub- mitted to FEMA for formal review and final approval. A copy of the resolution of adoption must be included with the plan. Resolutions are ex- pressions of a governing body’s opinion, will, or inten- tion and can be legally bind- ing or not. Most planning documents must undergo a legally bind- ing council resolution, which, in order to be adopted, must be supported by an official vote of the majority of mem- bers. Formal adoption of the state plan will vary according to state protocols. Generally, states should ob- tain the signature of the state emergency management director as approval of the plan. The plan also can be distributed to members of the state legislature to broaden support for the plan and to potentially pave the way for any new legislation or budget items that may be necessary to carry out the plan recommendations. States must submit plans to their FEMA Regional Office for review and approval. Depend- ing upon regional procedures, states also may opt to submit the results of the risk assessment or draft plan to FEMA for an informal review before officially adopting it and sending it to FEMA for official review and approval. Once any necessary changes have been made, the state can proceed with formal adop- tion and final FEMA review. If a tribal organization has developed a state-level plan, it should be submitted directly to the FEMA Regional Office. 1-4 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Summary By the time you finish Step 1, you will have a plan that has the sup- port of the community, state, tribe, and elected officials. Adoption of the plan gives the plan greater authority, fulfills certain FEMA program eligibility requirements, and will ease implementation of your mitigation actions. Once the mitigation plan has been adopted, your state, tribe, or community is ready to begin imple- menting the mitigation strategy. Consider develop- ing an executive summary of the plan for use in publicizing it with other government agencies or partners. A brochure may be appro- priate for citizens while you also make the executive summary or entire plan available to them. adopt the mitigation plan 1 1-5Version 1.0 August 2003 The Hazardville Post Vol. CXIII No. 45 Friday, February 14, 2003 Town of Hazardville Adopts THORR’s Plan (Part 1 of a 4-Part Series on the Hazard Mitigation Implementation Process) [Hazardville, EM] The Hazard- ville Town Council adopted the Hazardville Hazard Mitigation Plan on Thursday by resolution (included below) to serve as the town’s guide in reducing risks to citizens and property. Marion Jackson, Chair- person of the Town Council, an- nounced that “in light of the community’s involvement and ob- vious support for the plan, indicated by citizen turnout at the hearing and letters of support submitted for the record by respected community organizations, the Council unani- mously voted to adopt the Hazardville Hazard Mitigation Plan as an official plan of the Town of Hazardville.” The plan will take ef- fect immediately. The Town of Hazardville Organi- zation for Risk Reduction (THORR) was instrumental in developing the plan and marshaled its forces to sup- port adoption of the plan through written support from the commu- nity. “This plan is one of the few community initiatives that is rela- tively unopposed, no doubt due to THORR’s diligent public outreach efforts,” Jackson said. Resolution #2003-53 WHEREAS the Town of Hazardville has experienced se- vere damage from hurricanes, flooding, earthquakes, wildfires, landslides, and tornadoes on many occasions in the past century, re- sulting in property loss, loss of life, economic hardship, and threats to public health and safety; WHEREAS a Hazard Mitiga- tion Plan (the Plan) has been de- veloped after more than one year of research and work by the Town of Hazardville Organization for Risk Reduction and the people of the Hazardville community; WHEREAS the Plan recom- mends many hazard mitigation actions that will protect the people and property affected by the natu- ral hazards that face Hazardville; WHEREAS a public meeting was held to review the Plan as re- quired by law; NOW THEREFORE BE IT RE- SOLVED by the Mayor and Town Council of the Town of Hazardville that: 1.The Hazard Mitigation Plan is hereby adopted as an official plan of Hazardville. 2.The respective town officials iden- tified in the strategy of the Plan are hereby directed to implement the recommended actions as- signed to them. These officials will report quarterly on their activi- ties, accomplishments, and progress to the Town of Hazardville Organization for Risk Reduction. 3.The Town of Hazardville Organi- zation for Risk Reduction will pro- vide annual progress reports on the status of implementation of the plan to the Mayor and Town Council. This report shall be submitted to the Town Council by February 28th of each year. PASSED by the Town Council of Hazardville, this 13th day of Feb- ruary 2003. Council Chairperson APPROVED by me this 13th day of February 2003. Mayor ATTESTED and FILED in my of- fice this 13th day of February 2003. Clerk step 2-1Version 1.0 August 2003 2 implement the plan recommendations Overview C itizens and officials who participated in creating the plan will expect to see results from their hard work and effort. This step describes how to place the recommendations of the plan within the administrative framework of your state, tribe, or commu- nity. The section presents ideas on how the planning team can get the recommendations implemented on schedule and, over time, integrate mitigation actions into the day-to-day operations of gov- ernment agencies. It will also show how to bring action items within the mitigation strategy to fruition through creative use of available resources. When implementing the plan, various stakeholders will have distinct roles and responsibilities: The Planning Team. During the implementation of the mitigation strategy, the planning team’s role may change to one of overseer. As the developers of the mitigation plan, the planning team should also regularly monitor its progress. The planning team can help ensure that the spirit of the plan is not sidetracked by political or personal concerns, and keep the community energized so citizens can hold the government accountable for the legitimate performance of the plan. The team can also alert officials to issues that may affect emergency management and hazard mitigation. Elected Officials and Local Administrators. The executive or delegated administrator may be a likely candidate for keeping all participating local agencies or departments on track. Elected officials play a unique role in the implementation of the plan. They will be pressured by those opposed to the plan as well as those who expect to see it enacted as intended. Furthermore, elected officials have the capacity and responsibility to distribute resources among competing interests. The planning team will have identified supportive elected officials not only when organizing to prepare the plan (Phase 1, Getting Started, FEMA 386- 1), but also when evaluating the relevant political factors of potential mitigation actions (see Developing the Mitigation Plan, FEMA 386-3, Step 2). Elected officials and local administrators should provide: Oversight. Officials not only can assign staff and provide incentives to implement planning initiatives, they also can support the hard work of the professional staff and volunteers. Visibility. Community leaders must keep the spotlight on the identified hazard-related problems and opportunities and make sure that problems are not overlooked by any relevant department or office—community planning, emer- gency services, zoning, public service, and economic development, for example. Budgets. Elected officials and local administrators must ensure that the community’s annual budget includes fund- ing to implement previously adopted long-term actions. This includes commitments that the community has made to cost-share, maintain, operate, repair, or otherwise bear the burden for activities that may have been undertaken with outside assistance. (continued on page 2-2) 2-2 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life In the third phase of the planning process, the planning team identified mitigation actions and implementation strategies that included target dates for the completion of projects and assigned responsibilities to agencies, departments, organizations, or specific people (see Steps 2 and 3 of Developing the Mitigation Plan, FEMA 386-3). This information should help the planning team meet the objectives of the plan on time and provide indicators by which the implementation will be monitored and evaluated. It is important to decide how success will be determined before implementation and evaluation occur. From an administrative standpoint, success may be simply a measure of whether the project was finished on time, and within budget. On the other hand, even projects that are well thought out and executed may not be completed for a long period of time due to the nature of the project, the lack of available funding, or other reasons beyond the control of the community. In this case, it is important to iden- tify successes in the short-term, even if completion is not in sight. For example, if a community decides to pursue zoning changes in flood hazard areas, the actual changes may not occur for years due to administrative procedures that must be followed within the con- text of local and state zoning and land use law. However, successes (in the form of completion of milestones) can and should be iden- tified along the timeline that is appropriate for that type of mitiga- tion action. In this zoning example, short-term successes can include key meetings or briefings held to present risk information to support zoning changes. (continued from page 2-1) Partners–Nonprofit Organizations and Businesses. Throughout implementation of the plan, the planning team should consider innovative ways for its partners to facilitate the implementation of projects. The nonprofit and private sectors can help in a number of ways, including lending expertise, discounted materials, staff or volunteer time, or meeting space. The planning team can, in turn, offer the private organizations an opportunity for greater public exposure, and thus greater name recognition. The planning team can also offer tips and expertise in mitigation; businesses often do not realize the danger that their proper ty or sources of income face from hazards. The planning team can inform partners about the hazards they potentially face, the ways they can mitigate these hazards, and how their staff can mitigate hazards at home. Citizens. Citizens have an ongoing role to play in project implementation. The planning team should actively seek volunteers to help implement programs and activities. Knowledgeable citizens also can be recruited to provide expertise in specific subject areas. The more you involve people in implementing the plan, the greater the support it will receive. State Agencies. State agencies can lend their time, expertise, and funds to the implementation of hazard mitigation projects. Make sure your list of state contacts is very broad, as the resources of one state agency may be unknown to another. Academic Institutions. Colleges and universities can provide technical expertise to projects that may require Geographic Information System (GIS), engineering, planning, or other technical assistance. They can also provide meeting space, labora- tories, and other logistical support. 2-3Version 1.0 August 2003 implement the plan recommendations 2 In Step 3, you will also measure the effectiveness of your mitigation actions. It will be therefore important in Step 2 to establish indica- tors of effectiveness. The planning team should also determine the manner in which plan implementation will be monitored. In any incorporated com- munity, there are elected or appointed officials who have the ulti- mate responsibility for carrying out specific community policies and programs. The planning team should continue to serve as a resource to the community by helping its leaders identify, measure, and publicize successes, and mobilize community members to con- tribute and participate where appropriate. The planning team can also work to secure funding to implement the plan. Your team may decide that frequent meetings are no longer practi- cal. It may consider an alternative, such as periodically issuing a memorandum to keep team members informed of progress in implementing the plan. An annual internal review of progress by the planning team is also a good monitoring method. Keep in mind that the need for maintaining sustained communication is more important than the form of communication selected. Procedures & Techniques Task A. Confirm and clarify responsibilities. In Step 3 of Developing the Mitigation Plan (FEMA 386-3), the plan- ning team identified who would be involved in implementation of the mitigation actions. Now is the time to revisit those assignments and confirm that the responsible parties understand their duties. One way to communicate your expectations to public agencies and other organizations with specific responsibilities is to draw up a Memorandum of Agreement (MOA) among the different agencies and organizations. An MOA is a non-binding statement that de- fines the duties, responsibilities, and commitment of the different parties or individuals as established by the hazard mitigation strat- egy developed in Phase 3. It provides a clear statement of values, principles, and community hazard mitigation goals, and establishes an organizational structure to assist in measuring and evaluating the plan’s progress. The MOA should include: A vision or goal statement; An organizational structure to maintain the effort over time; 2-4 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life A statement that specifies the duration of the MOA and how it will be reviewed or revised; A statement indicating how decisions will be made to con- tinue the MOA; A statement describing the circumstances under which part- ners should consult each other; A statement requiring the organization to submit periodic or annual reports on the progress of its projects or programs; A statement regarding responsibility for actions; and A resource commitment statement on the staffing, technical resources, and funding that the department, agency, or orga- nization is expected to provide. Example of a Memorandum of Agreement Agreement is made this 4th day of March 2003 by these parties: The Town of Hazardville (the Town) and its local corporate and nonprofit partners, and the State of Emer- gency and its partners WHEREAS the parties: Strive to create sustainable communities that are resistant to the human and economic costs of disasters; Recognize that actions taken in advance of disasters are effective in reducing losses; that partnerships among government agencies, private companies, voluntary and professional associations, educational institutions, and community organizations are essential for the success of these efforts; Recognize that vulnerable conditions exist in public and private facilities, and the utility and transportation systems that serve them; that increasing population growth and diversity, escalating disaster costs, and other factors increase the Town’s vulner- ability to disaster; Recognize that financial support is necessary to enable the expansion and integration of public and private mitigation efforts; Agree to continue to receive and encourage the input of stakeholders with the State, Town, businesses and nonprofit organi- zations in Hazardville, neighboring communities, citizens, and other appropriate partners; NOW, THEREFORE, it is mutually agreed that the parties voluntarily enter into this non-binding Agreement to establish the Town of Hazardville Partnership for Disaster Mitigation (the Partnership). The principal objective of this Agreement is to further develop private, volunteer, and public-sector capabilities (people, poli- cies, resources, working relationships, long-term plans, and a schedule for accomplishments) necessary to carry out projects that will reduce vulnerability to risk and minimize losses. 1. MEMBERSHIP. Membership in the Partnership is open and can be expanded to include new (additional) partners in the future. The Partnership will work together to advise the Town and participate in the implementation of the Town of Hazardville Hazard Mitigation Plan to further mutual loss-reduction goals subject to the terms and conditions recited below. 2. TERM. The respective duties, responsibilities, and commitments of the parties hereto shall commence on the date this Agreement is signed by the parties and may be periodically renewed or revised at the option of the parties. (continued on page 2-5) 2-5Version 1.0 August 2003 implement the plan recommendations 2 (continued from page 2-4) 3. CONSULTATIONS. The Partners shall make their representatives available to consult with the Town of Hazardville on ways in which the Hazard Mitigation Initiative (see Appendix A below) can be improved and applied successfully. The Partners, in consultation and conjunction with other public-sector entities and related community-wide initiatives, shall consult with each other on: Identification and delineation of natural and manmade hazards within the Town; Assessment of risk to and vulnerability of buildings, facilities, utilities, communications, and transportation systems in the public and private sectors; Techniques to plan for, reduce, and manage expected losses; and Technical and financial assistance and incentives to facilitate loss reduction projects. 4. ANNUAL EVALUATION. The parties shall annually review the Partnership created by this Agreement to determine and document successes achieved over the past year and discuss actions to be undertaken in the following year. The Partnership will prepare an Annual Report describing accomplishments resulting from the Hazardville Hazard Mitigation Initiative and implementation of the Hazardville Hazard Mitigation Plan. The Partnership shall also make recommenda- tions for improving this Agreement and other disaster mitigation/recovery strategies. 5. RESOURCE COMMITMENT. The parties will consider committing human, technical, and financial resources, coordi- nate with current and future partners, and carry out the fundamental actions of this voluntary, non-binding Agreement. 6. THE HAZARD MITIGATION INITIATIVE. This Agreement includes two Appendices. Appendix A offers an overview of the Hazardville Hazard Mitigation Initiative. Appendix B lists commitments made by the parties to be included as part of the Hazardville Hazard Mitigation Plan that will be acted upon after execution of this Agreement. These actions will constitute steps toward accomplishing the loss-reduction goal. The period of time for completing defined actions will be set and reported by the Partnership. IN WITNESS WHEREOF, each party has caused this Agreement to be executed by its duly authorized representatives on the date first mentioned above. Appendix A – Hazardville Hazard Mitigation Initiative – Proposed Actions: The Hazardville Hazard Mitigation Initiative is an element of this Memorandum of Agreement. In summary, the Initiative ad- dresses the following: A. Reducing flood hazards to low-income, residential structures. The Town of Hazardville Emergency Management Agency, the Hazardville Department of Planning, and the Hazardville Habitat for Humanity are working to acquire flood- prone, low-income housing in the manufactured-housing park and other low-income areas in the floodplain, and to find appropriate, affordable housing for displaced residents. B. Establishing public education and outreach projects. The Partnership will cooperate to inform the public about the accomplishments of the Hazardville Hazard Mitigation Initiative, progress of projects, and upcoming public planning efforts. Working with Hazardville Hardware, the Partnership will also educate the public on insurance, family disaster preparedness planning, and other safety tips to protect houses from natural and technological hazards. C. Strengthening the community’s resistance to seismic and landslide hazards by retrofitting vulnerable struc- tures. This project component will strengthen the community’s housing stock to resist damage from earthquakes by (1) developing a consistent, sustainable retrofit capability among local builders, contractors, and homeowners; (2) seismically retrofitting vulnerable structures in the downtown business district; and (3) incorporating standardized retrofit practices into home and downtown commercial rehabilitation programs. Under this component, the Partnership will also strive to find additional funding to complete the retrofit of the Town’s lighthouse, threatened by coastal erosion. Appendix B – Hazardville Hazard Mitigation Initiative – Resource Commitments: The Town of Hazardville will: 1. Provide leadership for the Partnership and serve as the point of contact for the Hazardville Hazard Mitigation Initiative. (continued on page 2-6) 2-6 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life (continued from page 2-5) 2. Provide financial management of the grant funds provided to the Town for hazard mitigation projects, including Hazard Mitigation Grant Program funds, Flood Mitigation Assistance funds, Pre-Disaster Mitigation funds, etc. 3. Procure the support and assistance of appropriate Town departments and agencies to further the objectives of the Hazardville Hazard Mitigation Initiative. 4. Supply meeting space and other logistical support for Partnership meetings. The State of Emergency will: 1. Supply peer review of plans, planning processes, and project implementation to identify potential problems, recommend solutions, or procure appropriate State support. 2. Attend project review meetings to meet with partners implementing the projects. 3. Facilitate Federal grants applied for by the Town and the Partnership. Hazardville Department of Planning will: 1. Supervise the acquisition and demolition of vulnerable structures in the floodplain. 2. Designate the resultant publicly owned open space as an area precluded from future development. Hazardville Department of Housing will: 1. Support the acquisition and demolition of the flood-prone houses of low-income residents by providing additional fund- ing for replacement housing in non-hazardous areas. Hazardville Habitat for Humanity will: 1. Solicit its corporate and other partners to supply building materials for new, affordable housing. 2. Organize volunteers to build new, affordable housing in non-hazard areas for current residents of the manufactured home park and other low income areas in the floodplain. Hazardville Hardware will: 1. Design and fund public education brochures advising the public about hazard mitigation for homeowners, safety during hazard events, and the importance of purchasing insurance. 2. Develop a marketing display for the Hazardville Hardware store advertising hazard mitigation for homeowners and related products that can be purchased at the store. Task B. Begin to integrate mitigation actions throughout government operations. The planning team should work with chief administrative officials to begin to integrate the newly adopted hazard mitigation goals and actions into the general operations of its government and part- ner organizations. By initially working within existing administra- tive mechanisms, communities and states can quickly and efficiently implement and finance their hazard mitigation projects and programs, and incorporate them into their governing systems. The following sections discuss several options to consider. 1. Use processes that already exist. A good initial strategy is to take advantage of tools and procedures that were identified in your capability assessment in Step 2 of Capability Assessment Results In completing your capabil- ity assessment in Phase 3 of the plan- ning process, you identified policies, programs, practices, and procedures that could be modified to accommodate hazard mitigation actions. Consider de- veloping an implementation strategy that addresses recommendations that can be easily implemented first, fol- lowed by those that need to be modi- fied, and last, those that require the adoption of new regulations or policies or infusion of outside funding sources for implementation. 2-7Version 1.0 August 2003 implement the plan recommendations 2 Developing the Mitigation Plan, FEMA 386-3. Your research of So- cial, Technical, Administrative, Legal, Economic, and Environ- mental (STAPLEE) criteria for mitigation activity should have uncovered information on the administrative, financial, or legal mechanisms in your state, tribe, or community. These mecha- nisms are already in use and familiar to the governmental de- partments and organizations. This will give the planning implementation phase a strong initial boost, especially if your plan calls for expanding existing agency mandates or depart- mental funds, or creating new programs later on. Administrative Departmental or organizational work plans, policy, and pro- cedural changes. Updating the work plans, policies, or pro- cedures to include hazard mitigation concepts and activities can help integrate the plan into daily operations. These changes can include how major development projects and subdivision reviews are addressed in hazard- prone areas or ensure that hazard mitigation concerns are considered in the approval of major capital improvement projects. Job descriptions. Working with department or agency heads to revise job descriptions of government staff to in- clude mitigation-related duties could further institutional- ize hazard mitigation. This change would not necessarily result in great financial expenditures or programmatic changes. Budgetary Capital and operational budgets. Instead of solely relying on funding from hazard mitigation programs or other ex- ternal sources of grant monies, states, tribes, and communi- ties might consider a line item for mitigation project funding in their capital or operational budgets. Having a line item in these budgets may not guarantee funding every year, but it is certainly easier to get the money allocated if it is already there. Examples include a revolving fund to fi- nance a buyout program or a low-interest program to fund retrofits. Examples of using existing resources to accomplish mitigation: The Department of Public Works could adopt more rigorous procedures for in- specting and cleaning debris from streams and ditches. Instead of clean- ing only after storms or complaints from citizens, the Department could require inspections of streams and ditches at least semi-annually. The Planning Department could add hazard vulnerability to subdivision and site plan review criteria and incorporate any necessary actions at the planning stage. A community conservation society or other interested voluntary organization could perform inventories of his- toric sites in hazard areas that might require special treatment to protect them from specific hazards. You may want to add some or all of the following lan- guage into job descriptions for a community planner, floodplain manager, emergency manager, building code official, or water resources en- gineer in the Public Works Department: Knowledge, Skills, and Abilities Knowledge. Knowledge of the principles of emergency management, specifically hazard mitigation. Knowledge of the prin- ciples and practices of sustainable devel- opment and how it is incorporated into hazard mitigation planning. Knowledge of FEMA’s pre- and post-disaster mitigation programs, as well as other federal agency programs (HUD, EPA, SBA) that provide technical and/or financial assistance for implementing pre- or post-disaster mitiga- tion planning. Knowledge of private/non- governmental programs that can support reconstruction and mitigation strategies. Skills. Consensus building and team build- ing, communication (verbal and written)/in- terpersonal skills. Abilities. Ability to apply planning principles and tools to the goals of hazard loss reduc- tion. 2-8 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Regulatory Executive Orders, ordinances, and other directives. The gov- erning body or local executive often has the authority to issue directives to require departments and agencies to carry out certain hazard mitigation actions. Using one of these mecha- nisms, the governing body or executive can direct department heads to provide progress reports to the planning team on the hazard mitigation initiatives that the departments are respon- sible for carrying out. Comprehensive planning. Adding a hazard element to the comprehensive plan is one of the most effective mechanisms to institution- alize hazard mitigation for new construction. For communities with a comprehensive plan, Getting Started (FEMA 386-1) listed several reasons why a community should integrate mitigation planning and comprehensive planning. A primary benefit of combining these processes is that they both influence the location, type, and characteristics of physical growth, specifically buildings and infrastructure. While planning in and of itself may not be regulatory, it uses regulatory mechanisms (zoning, development ordi- nances, etc.) for implementing goals and ob- jectives. Additionally, in many parts of the country, the comprehensive planning process is an established activity that is already famil- iar to the public, and it usually generates a great deal of interest and public participa- tion. 2. Secure traditional sources of financing. In Phase 3 of the planning process, potential sources of funding to implement the priorities in your mitigation strategy were identified. Now that the plan has been adopted, you have a strong basis for obtaining these resources. Com- munities and states have a range of tools to fi- nance projects. Use of fees, taxes, bonds, and loans to finance projects are options if there is proper state enabling legislation, local author- See Developing the Mitigation Plan (FEMA 386-3) for more information on using the fol- lowing implementation tools for hazard mitigation: Building Codes Zoning Ordinances Subdivision Ordinances Special Hazard Area Regulations Integrating Hazard Elements into Comprehensive Planning For guidance on what to include in a local hazard element, see the American Planning Association’s Growing Smart Legislative Guidebook at www.planning.org/growingsmart. In July 2002, the Institute for Business & Home Safety (IBHS) published a report entitled Summary of State Land Use and Natural Hazards Planning Laws. This report focused on the relationship between state planning laws and other statutes that addressed natural hazards and their effect on local-level comprehensive planning and land-use regulations. More in- formation about the results of this report is available at http:/ /www.ibhs.org/research_library/view.asp?id=302. Oregon has long been recognized as a pioneer in local plan- ning for natural hazards. In 1969, Oregon adopted Senate Bill 10, which required every city and county in the state to have comprehensive land use plans that met state require- ments. This mandate, however, did not grant any authority to enforce the requirement or provide for any technical support or training to the communities. Subsequently, Senate Bill 100 was passed to address these issues, creating the Land Con- servation and Development Commission (LCDC). Among its responsibilities, the LCDC was charged with establishing statewide planning goals that were to be congruent with re- gional, county, and city concerns; preparing statewide plan- ning guidelines, model ordinances, and regulations; and ensuring widespread citizen involvement and input through- out all phases of the planning process. One of the state planning goals requires Oregon communi- ties to inventory known natural hazards and to implement appropriate safeguards for development in hazard areas. On behalf of the LCDC, the Department of Land Conservation and Development (DLCD) developed Planning for Natural Hazards: Oregon Technical Resource Guide to help com- munities appraise and potentially improve the effectiveness of the natural hazard planning element in their comprehen- sive plans. The guide also provides useful information on how to identify and plan for a variety of natural hazards, and implement programs to address them. The publication is avail- able online at http://www.lcd.state.or.us/hazhtml/ Guidehome.htm. 2-9Version 1.0 August 2003 implement the plan recommendations 2 ity, and enough political will. Once the plan has been adopted, there is a legitimate basis for initiating the process required to use these financial tools. All of your plan’s mitigation recommendations probably cannot be implemented using local funding sources. Furthermore, it may take some time to work through the legal and administrative pro- cesses to use proceeds from bond issues and similar vehicles. To supplement local funds, communities can apply for grants from federal or state governments, nonprofit organizations, and founda- tions, as well as seek funding from other private sources. The ad- vantage of applying for grants is that they do not have to be paid back or generate long-term debt; however, most federal grants re- quire state and/or local governments to provide some matching funds. State and federal grants are a logical source of funding for some of the larger, more costly mitigation initiatives. Many federal grant mechanisms allow local “in-kind services” as a match for federal dollars, as well as the possibility of using state grant funds to meet the local match requirements. Review your capability assessment from Phase 3 and consider looking to regional planning agencies, universities, or economic development districts, if present and ac- tive in your state, for research or grant-writing technical assistance. The adjacent sidebar describes three major FEMA mitigation grant programs. Don’t forget the potential of other federal grant pro- grams for community development, even if they are not specifically disaster or mitigation related—the U.S. Department of Housing and Urban Development’s Community Development Block Grant (CDBG), for example. For more on funding sources, see Planning for a Sustainable Future: The Link Between Hazard Mitigation and Sustainability (FEMA 364), and the Mitigation Resources for Success CD (FEMA 372). 3. Develop creative partnerships, funding, and incentives. Incentives that minimize financial or administrative burden can stimulate momentum to undertake mitigation initiatives. For ex- ample, states and communities can provide tax rebates for code upgrades, offer reduced property taxes and insurance premiums for citizens and businesses that take steps to lower their exposure to hazards, or provide low interest loans for retrofit projects. Some states, tribes, and communities have developed creative ways to get things done without spending a lot of their money. These Three FEMA pro- grams that provide fund- ing for hazard mitigation actions are the Pre-Disas- ter Mitigation Program (PDM), Flood Mitigation Assistance Program (FMA), and the Hazard Miti- gation Grant Program (HMGP). Web access to information on these pro- grams is available at www.fema.gov/ fima/. PDM, authorized under DMA 2000, provides pre-disaster funding to states, tribal, and local governments, and tribal organizations for mitigation planning and projects through a com- petitive process. A FEMA- approved mitigation plan is required to receive project funding. Check with your FEMA Regional Office or SHMO for the latest information on availability of funds. FMA provides annual grants to com- munities, tribes, and states to reduce the risk of flood damage to structures with flood insurance coverage. This funding is available for mitigation planning, implementation of mitiga- tion actions, and technical assis- tance. An approved flood mitigation plan is required to receive project grants, but is not required for plan- ning or technical assistance grants. Interim final regulations implement- ing this program can be found at 44 CFR Part 78. HMGP provides post-disaster grants to states, tribes, and local govern- ments to implement long-term haz- ard mitigation actions after a major disaster declaration. FEMA can fund up to 75% of the eligible costs of each project, and up to 7% of HMGP funds available per state may be used for planning. An approved mitigation plan is required to receive project funding. See Interim Final Rules at 44 CFR §201 and §206. 2-10 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Some examples of different types of partnerships that can provide funding or other resources to implement hazard mitigation actions are provided below. See Mitigation Resources for Success (FEMA 372) for additional examples and a more detailed discussion of funding mitigation actions. Public-Private Partnerships. Partnership agreements between local governments and businesses or organiza- tions can be advantageous for all parties involved. Private organizations and businesses routinely offer discounted or free goods and services to local governments in exchange for publicity or other benefits. In the end, the governments, organiza- tions, businesses, and the public can all benefit from working together. Examples of successful public/private partnerships include the following: In Houston, Texas, FEMA and two prominent home improvement stores teamed up to provide information and advice on cleaning up and rebuilding after flooding caused by Tropical Storm Allison. FEMA Hazard Mitigation Teams staffed booths at both stores for three days, providing information on mitigation methods and techniques and the importance of flood insurance. By providing space, the stores played an important role in promoting community awareness of flooding hazards and helped foster public involvement in recovery. In Kinston, North Carolina, affordable housing was disproportionately affected by Hurricanes Fran and Floyd. The Per- manent Housing Initiative, a partnership between the North Carolina Division of Emergency Management, the North Carolina Department of Corrections, and private sector home improvement companies, was formed to help address the housing shortage and subsequent housing acquisitions. Using a Habitat for Humanity housing model, energy efficient and hazard-resistant affordable housing was constructed in already established neighborhoods. Homes were con- structed by volunteers using prefabricated wall panels (made by prison labor experienced in construction) and other donated tools and materials. The foundation, electrical system, and ductwork were done by certified professionals. In an effort to promote awareness of hurricanes and flooding in the coastal community of Virginia Beach, Virginia, the city held a Home Safety and Preparedness Exposition that included a section devoted to building disaster-resistant communities. More than 20 local businesses and organizations and the Virginia Department of Emergency Manage- ment sponsored the event. In return, sponsors were given display booths at the event to promote their goods and services. Community Volunteers. State and local governments rely upon their citizens to perform work that might otherwise have to be paid for by money from government coffers. Some governments have institutionalized volunteerism by requiring students to contribute volunteer hours to local and regional initiatives. Others have partnered with nonprofit agencies, organizations, schools, and businesses to give their time and energy to help further community goals. Citizen Corps is a program within the USA Freedom Corps that promotes several initiatives to engage volunteers in Homeland Security efforts, including mitigation actions, across the country. These community-based efforts include Community Emergency Response Teams (CERTs), Neighborhood Watch, Volunteers in Police Service, Operation TIPS, and the Medical Reserve Corps. Following flooding in 1993, the City of Petersburg, Illinois, bought out riverfront property that had been flooded and engaged a group of high school students, the Community Problem Solvers (CmPS), to formulate a creative solution for rehabilitating the area as perpetual open space. The CmPS developed a garden and a preschool playground, a solution that was responsive to the needs of the neighborhood, city government requests, and federal government requirements. To fund the project, the CmPS team applied the same initiative and creativity that they had used to design it. The team organized a “Decorate an Abe” contest in honor of former Petersburg resident Abraham Lincoln. Area businesses sponsored and decorated Abe silhouettes, and residents paid to vote for their favorites. The “Abes” were later auctioned off to raise additional funds. In addition, the team designed and sold Historic Petersburg placemats. Volunteers from civic organizations donated funds to sponsor specific pieces of playground equipment, and a local business donated Lincoln Bears to be sold. Preschool children participated in a clean-up day at the site. Overall, many Petersburg residents governments have engaged untapped resources by developing rela- tionships with businesses, nonprofit organizations, and volunteers. Time spent earlier in the planning process developing relation- ships with citizens, businesses, and other communities can really pay off at this point in the process (see Getting Started, FEMA 2-11Version 1.0 August 2003 implement the plan recommendations 2 contributed their funds, talents, and energy to make the project successful. The CmPS members not only helped minimize its community’s vulnerability to flooding, they did it in a way that promoted community pride and civic involve- ment. Oakland, California, developed a community partnership called Safety and Future Empowerment (SAFE). Two initia- tives, the Week of Caring and Spring Break, brought together city firefighters, corporate employees, students, the California Office of Emergency Services, and AmeriCorps members to make homes in the community safer and less vulnerable to earthquakes and fire. Four volunteer teams spread out across the city for a week to make the homes of elderly and low-income residents more disaster resistant. The teams installed smoke alarms and cupboard latches, strapped water heaters and free-standing cabinets to house frames, and rigged safety releases on window security bars. Local businesses donated or provided supplies at reduced costs in support of the effort. State cooperation. Local governments often underestimate the wealth of resources that their states can provide. States are excellent sources of funding, support, and technical assistance. State geological surveys, water resources agencies, and departments of planning or natural resources often have useful data related to hazard identification and risk assessments. Your state may also have a GIS department that can provide data and support. Unfortunately, localities sometimes pay for studies that have already been conducted by the state. You can avoid these duplications by inviting your state officials to participate in the planning process to help ensure that studies or reports can be compiled from readily available sources. State fairs and other state-sponsored events can be great places for displays on hazard reduction techniques and hazard awareness campaigns. States can further help publicize awareness and generate interest by declaring a Hazard Awareness Week and promoting related local events on their Web sites. In-kind resources. Federal or state grants often require the awarded locality to provide matching funds to cover a percentage of hazard mitigation project costs. In-kind resources, however, substitute monetary outlay with services that the community can perform. For example, HMGP pays up to 75% of the eligible costs of a hazard mitigation project, but the remaining amount must also be contributed to the project by non-federal sources. A municipality without sufficient resources can ask the state to help fund the match through state or Community Development Block Grant funds, or it can use in-kind resources. In-kind resources can be labor or salaries contributed toward the implementation of the project (such as technical or administrative support from community officials and personnel). The dollar value of the resource must be calculated, and those costs must be allowable under the grant. Communities can have quite a bit of leeway in developing sources of in-kind resources; however, your state’s specific program requirements must be verified first. Federal regulations regarding in-kind matches for FEMA’s grant programs can be found at 44 CFR §13.24. 386-1). For more details on funding and creatively using planning resources, see FEMA 372, Mitigation Resources for Success. Task C. Monitor and document the implementation of your projects and actions. As mentioned earlier, the planning team must continuously moni- tor and document the progress of the plan’s recommended ac- tions. This documentation is essential for determining the progress made on the hazard mitigation initiatives. The planning team may decide to ask the agencies, departments, organizations, or people with duties identified in the mitigation strategy to periodically submit a work progress report on those projects being implemented. This report will come in handy at evaluation time. If there is a problem with the project or program, the planning team will be better able to pinpoint where the prob- 2-12 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life lem lies. An example of the report agencies could use should in- clude the following information: The hazard mitigation action’s objectives; Who the lead and supporting agencies responsible for imple- mentation are; How long the project should take, including a delineation of the various stages of work along with timelines (milestones should be included); Whether the resources needed for implementation, funding, staff time, and technical assistance are available, or if other arrangements must be made to obtain them; The types of permits or approvals necessary to implement the action; Details on the ways the actions will be accomplished within the organization, and whether the duties will be assigned to agency staff or contracted out; and Current status of the project, identifying any issues that may hinder implementation. Requiring the responsible parties to explain exactly how and when the project or programs will be carried out helps determine the extent of the project’s progress. It also helps break the implemen- tation process into smaller, more manageable tasks. The respon- sible agency, department, or organization can decide the particulars of incorporating these additional considerations into their daily operations, while the planning team will know what to expect and when to expect it. See Worksheet #1: Progress Report to help you monitor progress. Task D. Establish indicators of effectiveness or success. In Step 3, you will measure or evaluate the effectiveness of your mitigation project and initiatives. It will be important to establish measurable indicators of effectiveness now so that those involved in the projects understand how their actions contribute to the success of the projects. Indicators should be tied to the goals and objec- tives of the plan and its projects. They are often expressed as nu- merical representations of planning objectives. For example, if an objective of the planning process is to increase community participation in risk reduction, and a related initiative includes an outreach program to introduce new partners to 2-13Version 1.0 August 2003 implement the plan recommendations 2 Worksheet #1 Progress Report step Progress Report Period:_________________ to ___________________________________________________ (date) (date) Project Title:_________________________________________ Project ID#:____________________________ Responsible Agency:_________________________________________________________________________ Address:__________________________________________________________________________________ City/County:________________________________________________________________________________ Contact Person:_______________________________________Title:_________________________________ Phone #(s):____________________________email address:_______________________________________ List Supporting Agencies and Contacts: _________________________________________________________________________________________ _________________________________________________________________________________________ Total Project Cost:___________________________________________________________________________ Anticipated Cost Overrun/Underrun:_____________________________________________________________ Date of Project Approval:_________________________Start date of the project:_________________________ Anticipated completion date:___________________________________________________________________ Description of the Project (include a description of each phase, if applicable, and the time frame for completing each phase):___________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ October 1, 2003 December 31, 2003 Raging River Views Park Flood Acquisition Project HVMP-2003-01 Hazardville Department of Planning 1909 Burnham Way Hazardville, Emergency Eunice Euclid Grants Administrator (555) 555-8473 eeuclid@town.hazardville.em Hazardville Department of Housing: Noah Hudson (555) 555-8465 Hazardville Habitat for Humanity: Carter Goodman (555) 555-9432 $360,000 $N/A July 21, 2003 November 15, 2003 Summer 2005 Acquire and demolish 14 structures located at the Raging River Views Park. Work with Habitat for Humanity and the Department of Housing to construct new housing or rehabilitate existing housing for displaced low-income residents. The Department of Housing will also provide funds for temporary housing to displaced residents. senotseliM etelpmoC detcejorP foetaD noitelpmoC snoitaveleroolf-tsrifdnadnuorgfosyevrustcudnoC srenwoybtnetnIfosecitoNniatbO slasiarppaerutcurtstcudnoC srenwoemohotreffofosretteldneS 40/13/1 kroweltitmrofreP 40/03/3 serutcurtseriuqcA 40/03/6 stnediserdetacolerrofgnisuohgnitsixefonoitcurtsnocerrognisuohwenfonoitcurtsnocnigeB 40/03/6 sretnerotnoitacolerroftnemyapdneS 40/03/9 noitilomedroftcartnocezilaniF 50/21/1 serutcurtshsilomeD 50/62/4 slecrapnepoepacsdnaL 50/03/6 Page 1 of 3 2-14 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Plan Goal(s)/Objective(s) Addressed: Goal:_____________________________________________________________________________________ Objective:__________________________________________________________________________________ Indicator of Success (e.g., losses avoided as a result of the acquisition program): In most cases, you will list losses avoided as the indicator. In cases where it is difficult to quantify the benefits in dollar amounts, you will use other indicators, such as the number of people who now know about mitigation or who are tak- ing mitigation actions to reduce their vulnerability to hazards. _________________________________________________________________________________________ _________________________________________________________________________________________ Status (Please check pertinent information and provide explanations for items with an asterisk. For completed or canceled projects, see Worksheet #2 — to complete a project evaluation): Minimize losses to existing and future structures within hazard areas. Reduce potential damages to the manufactured home park in the floodplain. Losses Avoided. After a major flood (100-year), the Department of Economic Development will assist the Planning Department in calculating the losses avoided. Summary of progress on project for this report: A. What was accomplished during this reporting period? _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ B. What obstacles, problems, or delays did you encounter, if any? _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ C. How was each problem resolved? _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ Project Cost Status Cost unchanged Cost overrun* *explain:___________________________________ _________________________________________ Cost underrun* *explain:___________________________________ _________________________________________ Project Status Project on schedule Project completed Project delayed* *explain:___________________________________ _________________________________________ Project canceled The Department of Planning contacted the owners of the properties vulnerable to floods to determine their willingness to sell their properties. Of the 14 property owners contacted, 10 agreed to have their homes acquired. An appraiser contracted by the Department of Planning estimated the value of the 10 properties. The owners of four properties refused to sell. There has been some limited neighborhood opposition to various suggestions for the community open space created by the acquisitions. The Department of Planning has proposed to the residents a design charrette to develop alternatives for the open space that would be created, with the understanding that no permanent structures can be constructed on the open parcels after acquisition and demolition has been completed. Recreational activities will be limited to passive uses such as trails and bike paths. Page 2 of 3 2-15Version 1.0 August 2003 implement the plan recommendations 2 Next Steps: What is/are the next step(s) to be accomplished over the next reporting period? _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ Other comments: _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ Adapted from the North Carolina HMGP Progress Report Form at http://www.dem.dcc.state.nc.us/mitigation/document_index.htm. 1. Send offer letters to homeowners. 2. Do title work. 3. Work with the Department of Housing and Habitat for Humanity to identify existing housing for rehabilitation and viable vacant parcels to construct new housing for the displaced residents. None Page 3 of 3 2-16 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life mitigation, an indicator could be the number of organizations that are on the planning team. Task E. Celebrate success. It is important to maintain community support throughout the implementation process. One particularly effective technique is to simply keep the community informed about the incremental progress and success of the program. Sharing the findings of progress reports with interested organizations, neighborhood groups, elected officials, and citizens keeps stakeholders up-to-date on your accomplishments and possible setbacks. Posting these find- ings on your local Web site or including them in your newsletter will help everyone stay informed of your progress. Consider hold- ing events to recognize key milestones to keep the public inter- ested. Step 3 contains more information about how to maintain this important part of the overall effort. Summary Implementation is the culmination of the initial planning process. Monitoring progress and maintaining momentum is key to ensur- ing success of the planning process. Through the implementation of your plan, you will draw upon the diverse resources of your state, tribe, or community. While many of the tools you use already exist in one form or another, your team should try to use as much creativity and resourcefulness as possible to advance your plan’s goals and objectives. 2-17Version 1.0 August 2003 implement the plan recommendations 2 The Hazardville Post Vol. CXV No. 252 Friday, September 9, 2005 Hazardville Partnership Completes First Home (Part 2 of a 4-Part Series on the Hazard Mitigation Implementation Process) [Hazardville, EM] “Yep, that’s my new house,” Susan Harris grinned. “I can’t believe how great it looks!” As Mrs. Harris showed off the inte- rior of the nearly completed house, she noted where her furniture would go. “I would have put my mother’s sideboard over here,” frowning as she pointed to a spot in the dining room, “but it was ruined in the flood in 2002. It had been passed down from her mother, and I had wanted to pass it down to my daughter.” Mrs. Harris is just one of the resi- dents of Hazardville affected by flooding in 2002. She and nine of her neighbors have had their homes bought by the town and are work- ing with town, state, and federal officials to build new homes out of the floodplain. “My house really wasn’t worth very much, and I don’t have enough income to handle a big mortgage payment,” Mrs. Harris said, “but the town has been work- ing with the Hazardville Habitat for Humanity to help me build a new one.” Habitat for Humanity requires contributions of “sweat equity” in order to be eligible for participation in their program. Mrs. Harris claims that thanks to her contribution she is now quite capable of fixing just about everything in her new home. “Since my husband passed away almost 10 years ago, I have had to rely on my friends to help out with even simple repairs. Now that I have helped with the construction of sev- eral of my neighbor’s houses I am very comfortable using all kinds of tools!” Mrs. Harris is so comfortable with her new skills that she is think- ing about building her own shed after she gets settled. “The process is working!” beamed Joe Norris, lead planner for Hazardville. Norris, referring to the hazard mitigation plan adopted by the town in 2003, pointed to the emphasis the Town of Hazardville Organization for Risk Reduction (THORR) had placed on reducing flooding and disaster-related dam- ages to existing structures while recognizing the needs of residents with limited resources. Part of that emphasis was on creating and fol- lowing through with community partnerships. The Town of Hazardville Partner- ship for Disaster Mitigation is a partnership of nonprofits, busi- nesses, and local, state, and federal agencies. The Partnership is an ini- tiative that Hazardville established in 2003, following adoption of the hazard mitigation plan. Each part- ner contributed something to the effort. Funding from the FMA pro- gram was used to purchase ten re- petitive loss structures. Local busi- nesses contributed to the project by donating building materials and supplies. Community volunteers worked throughout the summer to make this a reality for Mrs. Harris and the other homeowners. step 3-1Version 1.0 August 2003 3 evaluate your planning results Overview The evaluation step of the planning process allows the planning team to review the plan, the planning process, and the results of implemented actions. The evaluation assesses whether the plan- ning process and actions have been effective, if the community’s goals are being reached, and whether changes are needed. The planning team should periodically evaluate the community’s progress in implementing the plan. Regular evaluation keeps the community informed of the plan’s status and, ideally, keeps those responsible for implementing the mitigation actions motivated. These periodic evaluations may reveal the need for small changes that may not be necessary to incorporate into the plan annually, but that accumulate over time until large-scale revision to the plan is needed (see Step 4, Revise the Plan). Communities that commit to conducting periodic evaluations give themselves the opportunity to determine the effectiveness of their procedures and recommendations, identify new areas of concern, and renew enthusiasm for the cause of hazard mitigation. This step will show you how to keep the planning team, the planning pro- cess, and the implementation actions effective. The result is a haz- ard mitigation process that people have confidence in, and are willing to support. What you learn in this evaluation will be used to determine whether or not to revise the plan document, to be described in Step 4. By looking impartially at what took place the previous year, the planning team will create a foundation on which to base its revision of the plan and a trigger to re-invigorate the cause for haz- ard mitigation in the community. DMA 2000 requires communities to evalu- ate their hazard mitigation plan at least every five years. The way in which this is to be done must also be documented in the plan. By including a provision in the adoption mechanism to evaluate the plan and the implementation process, you have a built-in mechanism to insti- tutionalize and sustain the mitigation ini- tiative beyond the creation of the original document. Communities that want credit for their hazard mitigation plan under the Community Rating Sys- tem (CRS) must evaluate their plan annually. The plan should also be evaluated and re- vised following disasters, to determine if the recom- mended actions are appro- priate given the impact of the event. The risk assessment should also be revis- ited to see if any changes are neces- sary based on the pattern of disaster damages. According to DMA 2000 requirements, states that want to be eligible for the 20% share of HMGP funds must develop a pro- cess to assess the effectiveness of a mitigation activity after its completion. 3-2 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Procedures & Techniques Task A. Evaluate the effectiveness of the planning process. To evaluate the results of your planning efforts, begin by stepping back and looking at the big picture. Governments must be highly accountable to their citizens and able to defend their decisions. Evaluating the planning process is a good way to discover if the plan is working for the good of your state, tribe, or community. A review of the planning process will give you an idea of how success- fully mitigation has been integrated into your normal administra- tive processes so far, and what procedural areas may need to be refined or changed. The first year of the planning process is the most critical because you are beginning to implement the plan. While the energy and momentum generated during this phase of planning are still present, your state, tribe, or community may have established an annual review process at the time of adoption to address the unan- ticipated problems that may affect the success of your planning efforts. An annual review is also a good opportunity to reflect on whether certain relationships developed during the process should be enhanced, and to initiate new partnerships based on experi- ences from developing and implementing the plan. The planning team should take this opportunity to reflect on the processes used so far to engage partners and the public, to develop loss reduction priorities, and to finance projects. 1. Reconvene the planning team. The first step in evaluating the plan is to reconvene the planning team. Ideally, the planning team was established as a permanent working group within your state, tribe, or community to oversee the development and implementation of the mitigation strategy. Even after the plan is adopted, the planning team should meet at least semi-annually to review the progress of the mitigation plan- ning efforts. At this point, however, your team may want to think about inviting new stakeholders to join during the evaluation. These meetings are a good opportunity to bring new members up to speed on the planning team’s history, mitigation strategy, and planning process. Use Worksheet #2: Evaluate Your Planning Team to assist you in this task. DMA 2000 regula- tions do not require an- nual evaluations. The recommendations pre- sented here will help you to meet the five-year local update require- ments. The evaluation phase should not be anticipated with anxiety. If the planning team, citi- zens, government, and other stakeholders have diligently implemented the recommendations, the evaluation phase will give the community reasons to celebrate the success of its mitigation efforts. 3-3Version 1.0 August 2003 evaluate your planning results 3 noitisopmocstissessaerdluohsmaetgninnalpeht,noitaulavenalpehtrofpugniraegnehW :snoitseuqgniwollofehtksadna SEY ON gninnalpehtotsrebmemtnereffidgnitivnitnarrawdluowtahtsegnahcgniffatslacolneeberehtevaH ?maet :noitcAdesoporP/stnemmoC AN tcejorpotrossecorpgninnalpehtotelbaulavnineebevahtahtsnoitazinagroerehterA ?maetgninnalpehtnodetneserperebdluohstahtnoitatnemelpmi noitcAdesoporP/stnemmoC :remroffonoitacolerehtgnitsissanielbaulavnineebsahytinamuHroftatibaHellivdrazaH .RROHTnietapicitrapotdetivniebdluohsnoitazinagroehT.stnediserkraPsweiVreviRgnigaR ehtnidetapicitrapylluftonevahohwsnoitazinagrolaitnessefosevitatneserperynaerehterA ottimmocnoitazinagrosihtmorfesleenoemosnac,osfI?snoitcafonoitatnemelpmidnagninnalp ?maetgninnalpeht noitcAdesoporP/stnemmoC :esuacebgniteemhcaetadetneserperebskroWcilbuPfotnemtrapeDehttahtlaitnessesitI sgniteemdnettaotelbanuneebevahtnemtrapedehtmorfsevitatneserper,revewoH.mehtevlovnisnoitcanoitagitimynamos evitca,tnetsisnocdnifotrotceridstnemtrapedehthtiwkrowlliwRROHT.nalpehtfotnempolevedehtecnisyltnetsisnoc .noitatneserper gnitubirtsid,stroperssergorpdettimbusnognitnemmoc,sAOMfogningis,.g.e(serudecorperehterA ?yltneiciffeeromenodebnactaht).cte,setunimgniteem noitcAdesoporP/stnemmoC :stroperssergorpylemitedivorpotelbanuneebsahskroWcilbuPfotnemtrapeDeht,niagA neebsahtnemtrapedehtecnisskcarcehthguorhtnellafevahkrowrepapdnaseitudevitartsinimdA.snoitcanoitagitimstifo ,RROHThtiwpihsrentrapni,tnemtrapedehtspahreP.stroffenoitagitims'ellivdrazaHniseitudwensuoremundengissa .ffatstnemtrapederomrofgnidnufroflicnuoCnwoTehthcaorppadluohs noitarepoocdaerpsediwdnaesrevideromniagotsyawerehterA? noitcAdesoporP/stnemmoC :eromrenraglliwsnoitcanoitagitimtuobayticilbuprettebtahteveilebsrebmemRROHT .seicnegaetatsdna,snoitazinagrodetseretni/detceffa,cilbupehtmorftseretni rofelbaliavawonerataht)namuhdna,lacinhcet,laicnanif(secruoserlanoitiddarotnereffiderehterA ?gninnalpnoitagitim :noitcAdesoporP/stnemmoC snoitcidsirujlacoltahtdeksasahetatsehT.gnidnufMDPwentuobadenraelsahRROHT seidutsstnemssessaksirdnastcejorpratromdnakcirbrofsnoitacilppatimbus. If the planning team determines the answer to any of these questions is “yes,” some changes may be necessary. Worksheet #2 Evaluate Your Planning Team step 3-4 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life 2. Review your planning process. One of the first areas for the planning team to assess is the plan- ning process itself. With a year of hindsight, you can now step back and see what you would have done differently had you known what you know today. Look at each of the key elements of your planning process, such as building the planning team, engaging the public, gathering data to conduct your risk and capability assessments, and coordinating with other agencies, and determine how well they worked. The following are some suggested questions to ask: a. Building the Planning Team. In continually building your planning team, have you left anyone out? Are there roles that need to be clarified or better defined? Has the plan- ning team met as agreed upon? Have meetings been pro- ductive? Are procedures for implementing, monitoring, and evaluating the plan being followed? Are the lead agency and staff still able to play the lead? Again, Worksheet #2 will help with this task. b. Engaging the Public. When looking at public involve- ment, you may need to conduct a survey to gauge how the public perceived your planning effort. Determine whether stakeholders and citizens felt that they had enough opportunities to provide input; the extent to which they are now aware of their hazards and are willing to support your efforts; what they think of the progress you are making; and whether outreach efforts—public meetings, workshops, Web site, newspaper notices, etc. were effective. Ask them what they would like to see done differently to involve them or keep them informed. In many cases, this may be a matter of simply asking resi- dents if they now understand what hazards they are sus- ceptible to, and what “hazard mitigation” means to them. c. Data Gathering and Analysis. Are data gathering proce- dures working? Did someone follow up with the local uni- versity or other agencies to obtain research findings or reports that were not available during the planning pro- cess? Have team members provided copies of studies that their agencies or organizations completed? Are there more efficient methods of collecting data and maintain- ing up-to-date information from established sources? Evaluating Public Involvement in Hazard Mitigation Surveys are a good tool to assess how well your public education and outreach projects are working, how the community perceives your hazard mitigation planning efforts, and to ob- tain feedback on proposed mitigation ac- tions. Following are a few sample questions to ask: Do you have a greater under- standing of the hazards to which you are susceptible? On a scale of 1-5 (1=very little; 5=a great deal), how much more do you know than you knew before plan- ning efforts began? Do you now have a greater un- derstanding of what you and your community can do to lessen the effects of natural hazards? (1=very little; 5=a great deal) 3-5Version 1.0 August 2003 evaluate your planning results 3 d. Coordinating with other Agencies. How well did coordi- nation work? Did agencies have sufficient notice for meetings? Did they have enough time to review the draft plan? Have agreements been followed? Do MOAs need to be revised, due to changes in funding, priorities, staffing, or other events? Look at what worked and what didn’t as you prepared and imple- mented the plan, and identify ways to improve the process. Task B. Evaluate the effectiveness of your actions. Measuring the effectiveness of your programs, policies, practices, and projects is another important element of your evaluation. If your plan called for strategies with a relatively short implementa- tion time frame, their overall success can be evaluated if they have been completed. Additionally, you can assess actual losses avoided as a result of projects implemented following a disaster. Most miti- gation projects, however, are done gradually, as resources and con- ditions allow. The progress to date of these projects can therefore be evaluated by reviewing whether the project is on time, in line with the budget, and moving ahead as planned. Now is the time to gather data to assess your progress toward meeting your objectives, and ultimately meeting your plan goals. This is also a good time to pull together the progress reports agencies submitted to you peri- odically. These will enable you to answer the questions that follow and help your planning team evaluate how effective the mitigation projects and actions have been. Use Worksheet #3: Evaluate Your Project Results to assist you in completing this task. 1. What were the results of the implemented actions? Did the results achieve the goals/objectives outlined in the plan? Did the actions have the intended results? Review the goals and objectives of your plan. Be able to show how (or whether) the project met the objective it was designed to achieve. This is where you can measure the results of the project against the identified indicator of success. Sometimes projects have unintended results, which can be good if they provide an extra benefit to the state or community, or not as good if they did not achieve or protect everything to the extent planned. Examples of unintended results can extend to environ- mental, social, or economic impacts. If you received fed- eral funds for the project, you have been sub- mitting quarterly reports to the responsible agency on its progress. These quarterly reports will be very helpful in showing the project’s current status, such as percentage com- plete, total project costs obligated ver- sus amount spent, problems with implementation, and anticipated completion date. 3-6 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life IF YES IF NO Project Name and Number: Raging River Views Park Flood Acquisition Project (HVMP-2003-01) Project Budget: $360,000 Project Description: Acquisition and demolition of 14 flood-prone structures Associated Goal and Objective(s): Goal:Minimize losses to existing and future structures within hazard areas Objective:Reduce potential damages to the manufactured home park in the floodplain Indicator of Success (e.g., losses avoided): Losses avoided by acquisition and demolition of flood-prone structures Worksheet #3 Evaluate Your Project Results step Was the action implemented?YES NO What were the results of the implemented action? Of the 14 proposed properties, 10 were acquired. The benefit-cost ratio is 2.19, based on project benefits of $789,000 and costs of $360,274. Benefits are based on the net present value of the avoided damages over the project life. Furthermore, about 40 people are no longer in the path of a potential flood, making emergency rescue operations in that area less likely and evacuation easier. Why not? Was there political support for the action? Were enough funds available? Were workloads equitably or realistically distributed? Was new information discovered about the risks or community that made implementation difficult or no longer sensible? Was the estimated time of implementation reasonable? Were sufficient resources (for example staff and technical assistance) available? YES NO page 1 of 2 evaluate your planning results 3 3-7Version 1.0 August 2003 Date: Prepared by: SEY ON :nialpxeesaelp,oNfI?detcepxesasemoctuoehtereW .margorptuoyubehtnietapicitrapottnawtondidsrenwo41ehtforuoF.seitreporp41eriuqcaottuotesyllanigirotcejorpehT :wohnialpxE?)s(evitcejbodnalaogehteveihcastluserehtdiD .stnemmoclanoitiddaeeS.temylegralneebsahevitcejboeht,yaws'mrahnillitsseitreporpruofetipseD :tonwohrowohnialpxE?evitceffe-tsocnoitcaehtsaW morfdetcellocsawsisylanaehtrofataD.sisylanatsoc-tifenebehtmrofrepotdesusaweludomataDdetimiLAMEFehT noitagitimretfasegamadehT.sisylanaehtfonoitcesnoitagitimerofebehtniskramhcnebsadesudnaataddoolflacirotsih ehT.yletelpmocdevomerksircimonoceehtdna,deriuqcayltnenamrepgniebseitreporpehtoteud,knalbtfelsawnoitces .seitreporp01rof000,987$gnilatotstifenebhtiw,91.2fooitartsoc-tifenebanidetlusersisylana ?tcejorpehtdetelpmocgnivahretfadediovasessolehterewtahW .)sraey001tadetamitse(tcejorpehtfoemitefilehtrevo000,987$erasessoldediovalatoT ?eliforpdrazahehtegnahctididwoh,tcejorplarutcurtsasawtifI A/N :semoctuorehtorostnemmoclanoitiddA .snoitpognifoorp-doolfrehtognitaulavenisrenwoemohruofgniniamerehthtiwkrowotdeergasahtnemtrapeDgninnalPehT October 12, 2005 Hazardville Department of Economic Development Hazardville Department of Planning page 2 of 2 3-8 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Sample Indicators to Measure Progress in Reducing Risk There are a variety of ways to measure effectiveness of mitigation actions. You can look at dollar amounts in losses avoided, both ex- pected (prior to implementing a project) and actual (following a disaster). You can also look at how the mitigation actions have changed the number of households, businesses, critical facilities, and environmental assets that are at risk. Some other indicators are listed below. For more on indicators, see the publication Hazard Mitigation in North Carolina: Measuring Success, Chapter 6 available online at http://www.dem.dcc.state.nc.us/ Mitigation/Library/Success_Stories/Measuring_Success_Vol2/Chapter6.pdf. gnisuoH ssenisuB nignivilsdlohesuohforebmuN .saeraefasnu efasnunisessenisubforebmuN .saera nignivilsdlohesuohforebmuN otelbarenluveratahtserutcurts .sdrazahlarutan efasnunisessenisubforebmuN .serutcurts degamadylevititeperforebmuN .sesuoh foegatnecreprorebmuN desahcrupevahtahtsessenisub revocotecnarusnietauqeda ssol,ytilibail,erif,ytlausacytreporp .egamaddoolfdna,euneverfo ehtfotluserasadediovasessoL .snoitisiuqcafonoitatnemelpmi ehtfotluserasadediovasessoL .ecalp-ni-snoitavelefonoitatnemelpmi sessenisubfotnecreprorebmuN ssenisubadetcudnocevahtaht evahdna,sisylanatcapmi adetnemelpmidnadepoleved .nalpnoitcuderksirssenisub seitilicaFlacitirCdnaerutcurtsarfnI tnemnorivnE –stnemeleerutcurtsarfniforebmuN ,segdirb,sdaor,ylppusretaw trop,snoitacinummocelet,egarewes saeranidetacolerataht–seitilicaf .enorp-drazaherataht esudnalefasnuforebmuN ehtniecalpekattahtseitivitca nironialpdoolfraey-001 .saeraevitisnesyllatnemnorivne degamadylevititeperforebmuN .stnemeleerutcurtsarfni –seitilicaflacitircforebmuN snoitarepoycnegreme,slatipsoh ,snoitatserifdnaecilop,sretnec saeranidetacolerataht–sloohcs .enorp-drazaherataht rolaicremmocforebmuN raey-001ehtniseitilicaflairtsudni nekatrednuevahtahtnialpdoolf larutcurts-nonrolarutcurts .serusaemnoitagitim degamadylevititeperforebmuN .seitilicaflacitirc ,sseccuSgnirusaeM:aniloraChtroNninoitagitiMdrazaH:ecruoS .0002yraurbeF 3-9Version 1.0 August 2003 evaluate your planning results 3 Cost-effectiveness is a key evaluation crite- rion for federal grant pro- grams. Cost-effectiveness has several possible defini- tions, although for grant-making pur- poses FEMA defines a cost-effective project as one whose long-term ben- efits exceed its costs. An easier way to say this is that a project should prevent more expected damages over the course of its effective “life” than it costs to fund the effort. This is done to ensure that limited public funds are used in the most efficient manner possible. Benefit- cost analysis is one way to illustrate that a project is meritorious and deserves funding. 2. Were the actions cost-effective? Did (or would) the project result in the reduction of potential losses? It is not always enough to say whether an action was generally effec- tive or not, especially when considering publicly funded projects. This is particularly true for mitigation actions that may require a subsequent hazard event to truly determine effectiveness. Absent an event, the potential losses avoided can be estimated for most “brick and mortar” mitigation projects. The term “brick and mor- tar” mitigation actions in this context refers to projects such as ret- rofit, acquisition, demolition, or relocation, and flood works such as levees, dams, and floodwalls. One of the most important indicators to evaluate the effectiveness of mitigation actions undertaken by the state, tribe, or community is Losses Avoided. This indicator provides a dollar value estimate of the structural, content, and displacement costs that would have occurred if the mitigation action were not taken. The losses avoided are most easily estimated for structural mitigation actions. Surveys and qualitative statements may have to suffice as indicators for educational or regulatory actions and to address other objec- tives that may be associated with specific mitigation actions. If the cost-effectiveness of the hazard mitigation projects imple- mented was originally determined by benefit-cost analyses (BCA), the planning team may consider reviewing the old BCA to deter- mine whether the costs and benefits were close to what was esti- mated, or whether there were unforeseen costs or benefits. The point of revisiting the BCA is to re-calculate what losses would actu- ally be reduced if the event were to occur. If possible, repeat rel- evant portions of the risk assessment to see if the project reduced potential losses. If HAZUS was used to develop the initial loss esti- mate, you may want to re-run it using the post-project results. An initiative that did not have a BCA performed still can be objec- tively evaluated for its cost-effectiveness. Projects that do not lend themselves to benefit-cost analyses (e.g., education and outreach campaigns) or those projects where public values and ethical con- siderations ended up weighing more heavily on the final selection of an action than the results of a BCA, may require other methods, such as surveys, to gauge their effectiveness. Whether you used BCA or other defensible methods to determine the cost-effectiveness of your actions, remember to document your results. Citizens, as well as state, local, and federal officials, will want to know of the losses avoided or benefits gained from your Be sure to stay in touch with your state on a regular basis to ensure that you remain aware of any changes to state mitiga- tion goals or priorities. Similarly, states must communicate such changes to all localities. Displacement Costs The dollar amount it would cost for a function (busi- ness or service) to be relocated to another structure because of a haz- ard event. In the case of residents, this would be the cost to relocate individu- als or families to temporary housing. 3-10 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life implemented actions. Let them know that their tax dollars are be- ing well spent. 3. Document actions that were slow to get started or not implemented. It is important to include a discussion of why certain actions were slow in getting underway, never finished, or didn’t get started at all. The project may have been delayed or removed from the list of actions because of an unforeseen problem with the implementa- tion. In the case of an elevation, acquisition, or relocation project, for example, the voluntary nature of the program gives the home- owner or business the right to change their minds at any time, all the way up to just before the physical work on the project begins or any financial compensation has been received. Task C. Determine why the actions worked (or did not work). After verifying that an action was or was not implemented and its overall results, the planning team should try to document why the action worked or did not work. If a mitigation activity or project was unsuccessful, it is important to ascertain why so that more ap- propriate alternatives can be developed next time. If a mitigation project ends up being only partially implemented, it is important to get to the root cause, such as exceeding the budget. On the other hand, be sure to evaluate and document what did work suc- cessfully, and why. Understanding the factors that contributed to the success of a project, program, or policy is particularly impor- tant when you want to replicate or expand it. Use Worksheet #3 to complete this task. Several considerations to examine include: Availability of resources; The political or popular support for or against the action; The availability of funds; The workloads of the responsible parties; and The actual time necessary to implement the actions. Be sure to publicize this information to other communities within the state. Don’t be shy about it, either—let other states and FEMA know about your successes! If possible, also communicate caveats and warnings as a result of less posi- tive outcomes. Everyone will benefit from lessons learned. 3-11Version 1.0 August 2003 evaluate your planning results 3 After a Disaster Strikes If a disaster strikes after you have completed your hazard mitigation plan, don’t let the document sit on the shelf—it is a valuable resource for the long-term recovery and reconstruction of your community. The initial period following a disaster can be very chaotic. So many issues require attention that any thoughts of long-term recovery are crowded out by immediate recovery efforts. Critical life and safety issues come first: search and rescue operations, treating the injured, re-establishing vital public services, and providing emergency shelter. But once the task of clearing debris is well underway, community decision-makers need to shift their attention to long-term recovery. This is the opportunity to recon- vene the mitigation planning team and evaluate the list of hazard mitigation priori- ties in light of the recent disaster. Critical policy issues that emerge following disasters require local governments to make difficult decisions about how best to rebuild. Disaster victims have an inher- ent desire to rebuild rapidly and return to normal—to the way things were before the disaster. Communities, however, must balance this need against the objective of building back better and stronger, and use the opportunity of the disaster to improve the community’s disaster resilience. Pressure to restore normalcy can be so strong that safety, hazard mitigation, and community improvement goals can be compromised or abandoned. Communities have a very short period of time to introduce, and gain acceptance of, new approaches to reconstruction. The mitiga- tion plan will provide an excellent foundation for introducing these new approaches. The diagram on the following page shows how a disaster triggers the need to re- evaluate all aspects of the mitigation planning process to determine if changes are now warranted. 1. What opportunities for hazard mitigation are presented in light of the disaster damages? If the hazard mitigation plan included a post-disaster recovery and reconstruction component to the implementation strategy, this section of the plan should be the initial focus for the recovery task force. Did the plan anticipate the type and inten- sity of disaster damages that actually occurred? Are there “off-the-shelf” mitigation actions that are relevant for this recovery effort? Are there other priority hazard mitigation actions that have not been implemented due to a lack of available re- sources? Identifying potential miti- gation projects in a post-disaster scenario is the highest priority task for the planning team or recovery task force and the most time sensitive one. In a major disaster that has a presi- dential declaration, make sure that the SHMO and FEMA mitigation staff working out of the Disaster Field Of- fice (DFO) have a copy of the hazard mitigation plan and have a clear un- derstanding of community priorities for potential mitigation actions. State and federal mitigation planning staff can provide technical assistance to your community if neces- sary. (continued on page 3-13) 3-12 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life After a Disaster: Re-evaluate Your Mitigation Plan and the Planning Process evaluate your planning results 3 3-13Version 1.0 August 2003 2. Following the initial recovery phase, re-evaluate the hazard profiles and vulnerability assessment. Did the hazard information presented in the plan reflect the location, intensity, and duration of the recent event? There may be a need to collect additional data regarding the event and incorporate that information into the vulnerability assess- ment. 3. Following a disaster is a good time to evaluate the results of implemented projects. How well did your mitigation actions perform? The best time to measure losses avoided is in the aftermath of a recent disaster, when you can actually see the difference that mitigation actions made. For example, if a house was protected from a flood because it was elevated above the Base Flood Elevation (BFE) before a disaster occurred, it should be relatively easy to obtain the actual flood height and determine what kind of damages would have occurred if the house had not been raised. Louisa County, Iowa, and Long Beach, Mississippi, illustrate the losses avoided due to flood mitigation actions implemented after floods in 1993 and 1998, respectively. Federal and state agencies may have collected enough informa- tion from various sources to determine the reoccur- rence interval for the recent event. This indicates the severity or degree of magnitude of the event. Technical assistance may be available to sur- vey high-water marks (in the case of flooding) or to conduct a building per- formance assessment. Knowing the reoccurrence interval for the hazard will help you reevaluate the accuracy of the hazard information in the cur- rent plan. To do this for a flood, for example, you would compare the ex- tent of the actual flooding to existing flood maps to determine whether the maps accurately portray the true haz- ard scenario. Applying for HMGP Funding The purpose of the HMGP is to reduce the loss of life and property from natural disasters and enable mitigation actions to be implemented during the recovery process following a presidential disaster declaration. Eligibility. Individual homeowners and businesses are not eligible, but a community may apply on their behalf. State governments, tribes and other tribal organizations, and certain nonprofit organizations are eligible, in addition to local governments. Project possibilities. All eligible projects must provide a long-term mitigation solution. Additionally, a project’s potential savings must be more than the cost of implementation. Funds may be used to protect either public or private property. Examples of possible projects include, but are not limited to: property acquisition and relocation/demolition, retrofitting of structures to minimize damage from natural hazards, elevation of flood-prone structures, and development and initial implementation of vegetative management programs. In addition, hazard mitigation planning initiatives are also eligible. States prioritize and select project applications; however, all potential projects must meet certain minimum criteria ad- dressing five issues: 1. Does the project conform to your State’s Hazard Mitigation Plan? 2. Will the project beneficially impact the disaster area? 3. Does the application meet federal environmental requirements? 4. Does the project solve a problem independently? 5. Is the project cost-effective? After a disaster declaration, the state will advertise the availability of HMGP funding and provide guidance on eligibility criteria. If you are interested in applying, you should contact the SHMO to find out about the application deadline and about the state’s funding priorities. Choosing a project and submitting your application. Consider your list of potential projects, and then choose the project that conforms to the state’s priorities, meets all of the minimum criteria, and can be adequately funded (25% of the total cost). For additional information, contact your SHMO or the FEMA Mitigation Division in your Region, or visit FEMA’s Web site at http://www.fema.gov/fima/hmgp. FEMA 345 (Hazard Mitigation Grant Program Desk Reference) contains more information as well. (continued on page 3-15) (continued from page 3-11) 3-14 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Louisa County, Iowa In 1993, a severe flood occurred in Louisa County, located along the Mississippi River, resulting in damage to more than 275 homes and the evacuation of nearly 200 families. Following this flood event, the County used both acquisition and relocation of affected properties to mitigate future flooding problems. In May 2001, the flood pattern of 1993 repeated itself, and the Mississippi River and its tributaries flooded Louisa County yet again. By comparing calculated damages from the 1993 flood to the 2001 flood, the effectiveness of the acquisition and relocation program could be measured. As shown in Tables 1 and 2 below, significant reductions in emergency shelter, family assistance, and public assistance expenditures were realized in 2001 as a result of the acquisitions and housing reloca- tions that occurred in the aftermath of the 1993 flooding. Furthermore, Table 3 shows the losses avoided as a result of the housing acquisitions that occurred. If Louisa County had chosen not to take any action following the 1993 flood, potential property damage to these structures in the 2001 flood would have exceeded one million dollars. Calculation of reduction in public assistance expenditures and losses avoided as a result of proactive mitigation can further highlight the value of hazard mitigation planning efforts to concerned citizens, local and federal governments, and potential funding agencies. ytnuoCasiuoLniecnatsissAylimaFdnaretlehSycnegremE.1elbaT 3991 1002 tnemecalpsidoteudderetlehsyliraropmetdnadetaucaveseilimafforebmuN 002 11 )ecnatsissaretsasid-tsopgnitseuqerslaudividni(sesacssorCdeRforebmuN 008 3 )AMEF(ecnatsissAgnisuoHretsasiD 005,247$0$ )dehsilbupnu(3002AMEF,sseccuSgnirusaeM:awoIninoitagitiMdrazaH:ecruoS )seulav1002(1002dna3991,serutidnepxEecnatsissAcilbuP.2elbaT 3991 1002 A ecnaraelCsirbeD 512,245$0$ B serusaeMevitcetorPycnegremE 763,44$0$ C sehctiD,strevluC,segdirBdnasdaoR 149,2$0$ D seeveL&seitilicaFlortnoCretaW 0$0$ E stnetnoC&sgnidliuBcilbuP 0$0$ F smetsySnoitubirtsiDytilitU 0$0$ G skraPcilbuP 0$0$ H ecnatsissAcilbuPlatoT 325,985$0$ )dehsilbupnu(3002AMEF,sseccuSgnirusaeM:awoIninoitagitiMdrazaH:ecruoS ,ytnuoCasiuoLniseitreporPenorP-doolFfonoitisiuqcAmorfdediovAsessoL.3elbaT )7631-RD(doolF1002,gnirpSehtroflatoTdna,tnemecalpsiD,stnetnoC,gnidliuBybdetagerggA gnidoolFfohtpeD )teeF( otsessoLdediovA sgnidliuB otsessoLdediovA stnetnoC dediovA stsoCtnemecalpsiD latoT 0 276,42$301,11$0$577,53$ 1 335,913$097,341$005,28$328,545$ 2 088,683$690,471$005,621$674,786$ latoT 580,137$989,823$000,902$470,962,1$ )dehsilbupnu(3002AMEF,sseccuSgnirusaeM:awoIninoitagitiMdrazaH:ecruoS 3-15Version 1.0 August 2003 evaluate your planning results 3 Long Beach, Mississippi Located along the Gulf of Mexico, the coastal city of Long Beach, Mississippi, has been affected by seven hurricanes and repetitive flooding, often as a result of spring storms. In addition to its vulnerability to flooding because of its coastal location, the City also suffered from poor drainage, resulting from three poorly maintained drainage channels. While these channels were better managed in the 1980s, the City, and particularly the areas around the canals, is still plagued by poor drainage. Following Hurricane Georges in 1998, the City began to take a proactive approach to flood damages, and identified 95 properties, many of them repetitive loss properties located adjacent to the canals, for an acquisition and demolition program. This long-term acquisition project had an estimated cost of $7.7 million (see Table 1), with a portion of the funding coming from the Hazard Mitigation Grant Program. In 2001, midway through the acquisition and demolition project, Tropical Storm Allison struck the Gulf Coast. The storm caused an overflow from the drainage system, which flooded the neighborhoods located near the ca- nals. Because 44 homes had already been purchased and demolished prior to the storm, the losses avoided from this single flood event were estimated to be $690,033 (see Table 2). This fig- ure only represents the losses avoided to houses, their contents, and dis- placement costs. It does not include the additional savings to the local gov- ernment in emergency services and disaster assistance costs that would have been incurred had families re- mained in the floodplain. By combin- ing much-needed improvements to its drainage system with the acquisition of many repetitive loss properties, the City of Long Beach shows that miti- gation projects can lead to substan- tial savings for the local government and affected communities. niseitreporP59fonoitisiuqcArofstsoCdetamitsE:1elbaT nalPdehsretaWretsaMehtrofhcaeBgnoLfoytiCeht metI tsoClatoT seitreporPfonoitisiuqcA 429,875,6$ stnaneTotyaPnoitacoleR 000,25$ seitreporPfonoitilomeD 560,819$ ecnatsissAlageLdnaslasiarppArofseeF 000,171$ latoT 989,917,7$ :ecruoS3002AMEF,sseccuSgnirusaeM:ippississiMninoitagitiMdrazaH )dehsilbupnu( morfnosillAmrotSlaciporTgniruddediovAsessoL:2elbaT gnoLfoytiCehtniseitreporPenorP-doolF44fonoitisiuqcA SM,hcaeB metI tsoClatoT sgnidliuBotsessoLdediovAdetamitsE 719,205$ stnetnoCotsessoLdediovAdetamitsE 628,58$ stsoCtnemecalpsiDdediovAdetamitsE 092,101$ latoT 330,096$ :ecruoS3002AMEF,sseccuSgnirusaeM:ippississiMninoitagitiMdrazaH )dehsilbupnu( 4. Depending upon the severity of the recent disaster, it may be necessary to re-evaluate the range and priority given to specific hazard mitigation ac- tions. Should the priority ranking of mitigation actions be re-evaluated given the type and intensity of the recent event? If the hazard event was not anticipated or given a low priority as a goal or objective, there may be a need to go through another round of identifying and prioritizing hazard mitigation actions for your community. 5. Consider including a special section in your mitigation plan devoted to post-disaster issues. Many mitigation policies or projects are not politically or economically viable until after a disaster. Thinking through post-disaster operational and policy issues in the pre-disaster time frame enables your community to delve into these often emo- tional subjects in the relative luxury of a non-disaster scenario. FEMA 321, Plan- ning for Post-Disaster Recovery and Reconstruction, provides more details. (continued from page 3-13) 3-16 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Task D. Keep the community updated and involved, and celebrate your successes. Project implementation brings the community’s hard work to frui- tion. The planning team should be sure to keep all stakeholders in the community informed of the progress of the projects. Ways to engage the community may include staging events to showcase your accomplishments or taking advantage of media opportunities to publicize the completion or significant steps of specific projects. Refer to Getting Started (FEMA 386-1) for additional ways to com- municate your success to the community. Summary The evaluation phase of the planning process helps your planning team determine whether its planning process and recommenda- tions have been effective, and if your community’s goals are being reached. Systematically evaluating the plan keeps your community informed and hopefully motivates those responsible for imple- menting the mitigation actions. After you have evaluated your actions to determine what worked and did not work, go to Step 4, Revise the Plan, in which you will use the evaluation results to revise the hazard mitigation plan. Local and state agencies should keep in contact with each other about the progress of their mitigation actions. Each entity should update its risk assess- ment data using this information. Agen- cies responsible for maintaining the state and local plans should update their plans accordingly, as well. Methods of communicating with con- stituents during implementation of the recommended projects and programs include: Write a newsletter to provide de- tails on projects; Create 15- or 30-second public service announcements and send them to local broadcasters; Work with your local news or public access cable station fea- ture a news story about your ef- forts; Hold an annual event honoring local people who have contrib- uted to hazard mitigation projects; Develop a Web site to post news articles, meeting notices, and event notices; and Establish a speaker’s bureau to talk to schools, business groups, and other organizations about mitigation. 3-17Version 1.0 August 2003 evaluate your planning results 3 The Hazardville Post Vol. CXVI No. 272 Friday, September 29, 2006 Town Hall Retrofit Called a “Money Pit” (Part 3 of a 4-Part Series on the Hazard Mitigation Implementation Process) [Hazardville, EM] In response to a complaint about the progress of the seismic retrofit project of the historic Hazardville Town Hall, the Hazardville Board of Supervisors recently held an informal hearing on the matter. The retrofit, begun under Hazardville’s initiative to become more disaster resistant and overseen by the Town of Hazardville Organization for Risk Reduction (THORR), is now estimated to have cost taxpayers about double the original projected cost. When asked about the escalating costs, Joe Norris, lead planner of THORR, commented that the over- runs could be attributed to misjudg- ments THORR had made about the extent of repairs that the building needed. “We didn’t realize the ex- tent of work that would have to be done to bring the building up to cur- rent code, much less to be seismically resistant.” Norris ex- plained that much of the work had nothing to do with seismic stan- dards. “Not only did the contractor discover asbestos-based insulation and ceiling tiles on the first floor where most of the work was to be done, but he also found lead-based paint on pipes that had not been removed during renovation in the late 1960s. These factors were not considered in our original project estimates, but they had to be ad- dressed in the retrofit in order to comply with local, state, and federal laws,” Norris said. Board of Supervisors Chairperson Seymour Hale likened the building retrofit to a “money pit,” saying that THORR should have done its home- work. Norris agreed, “As soon as we found out about these unexpected costs for the project, we began to re- evaluate all of our other projects to keep this from happening again. It seems that we placed a huge amount of work on our local building inspec- tor. He had a tremendous work load, and did not have enough time to do in-depth investigation into some of the buildings before work began.” When asked how THORR planned to remedy this problem, Norris re- plied, “We are still in the process of evaluating our other hazard mitiga- tion projects and will submit our findings to the Board by the end of the month.” step 4-1Version 1.0 August 2003 4 revise the plan Overview The final step in the mitigation planning process is to determine whether you need to make changes to the planning process or the mitigation plan. You will start with an evaluation of the factual underpinnings of the mitigation strategy: the risk assessment and the capability assessment. Using the results of the evaluations of the process and projects completed in Step 3, and taking into con- sideration the factors to be discussed under Task A below, you will determine whether you need to revise or update your mitigation plan or planning process. The frequency of conducting a plan evaluation depends upon the speed and the intensity at which changes are occurring. For ex- ample, if your community is experiencing significant growth, or if you have experienced recent or frequent hazard or disaster events, this evaluation may have to be conducted more frequently. Keep in mind, however, that DMA 2000 regulations require that local plans be re- viewed and updated at least every five years, and state plans at least every three years, for a state or jurisdiction to remain eligible for assistance. Procedures & Techniques Planning is an ongoing process, and your plan should be treated as a living document that must grow and adapt in order to keep pace with the community's growth and change as these issues affect haz- ard vulnerability, and with changes that may be external to the community but that affect the planning process. An annual "scan of the horizon" should be done, so that emerging trends in data availability or collection, land use and development, technology, and other factors can be documented. Just prior to the three- or five-year point, these annual observations should be evaluated to determine what types of changes should be made to your planning process and to the plan document. The results of your evaluations should be re-programmed back into each phase of the planning process and should yield decisions on how (or whether) to update each section of your plan. 4-2 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Task A. Review those factors that affect your community's planning context. Evaluating the following factors will help you determine what changes to the plan document are warranted. Extensive or wide- spread changes in any one of these categories may signal a need to reconsider some or all of your plan's fundamental assumptions. 1. Revisit the risk assessment to incorporate updated estimates of cost of living and replacement costs, new scientific data on hazard areas, the effect of hazards on the community, changes in growth patterns, and, par- ticularly, reductions in vulnerability due to completion of projects. Use Worksheet #4: Revisit Your Risk Assessment to complete this task. See Understanding Your Risks (FEMA 386-2) to review informa- tion on hazards and estimating losses. Shifts in development. The planning team should determine whether there are changes in development patterns that could influence the effects of hazards in your community or create additional risks. One common example of this is when upstream growth in a given watershed affects flood character- istics downstream in your community. For example, in Hazardville, coastal development caused the Planning Depart- ment to undertake a coastal development plan. The effects of erosion, wave action, and tidal surge hazards will be consid- ered in this development plan, and corresponding policies and/or mitigation projects should be considered. Areas affected by recent disasters. Recent hazard events or disasters can provide new information about the ways in which your community can be affected. Compare the effects of the event against what the loss estimation analysis led you to ex- pect. New studies or technologies. What have recent hydrologic, watershed, traffic, or demographic studies revealed about your community? Studies such as these may provide additional information about your community. You already should be continually researching mitigation techniques to discover whether new technologies or methods are being used. 4-3Version 1.0 August 2003 revise the plan 4 Re-estimate losses. For projects that have not yet been imple- mented, any new information the planning team has gathered should be used to recalculate losses or revise the benefit-cost analysis originally prepared. See Understanding Your Risks (FEMA 386-2) for the methodologies and considerations used to estimate losses. 2. Revisit your capability assessment to determine changes in laws, au- thorities, community and state resources, and availability of financial and technical tools that may affect what you can do. Additionally, political will and priorities can change with the elec- tion cycle. See Developing the Mitigation Plan (FEMA 386-3) for more information on how to update your capability assessment. Changes in community, state, or federal laws, policies, plans, or funding. The strengthening, relaxing, or addition of land use, environmental, or other government regulations may present additional challenges or opportunities to the community. Changes in the socioeconomic fabric of the community. Broad social transformations often have repercussions on the community's sequence of mitigation priorities and the imple- mentation of projects. Recessions, booming economies, cost of living increases, changes in the political climate, demographic shifts, or environmental justice issues may have some influence on the way mitigation is executed in your community. On a smaller scale, changes within the community, such as the depar- ture of a large employer, may alter the socioeconomic balance. Other changing conditions. Have the successes achieved over the past few years created a political environment that may al- low the planning team to propose a new mitigation initiative that would not have had the political support necessary earlier? The review process can be easier if you keep up with annual reports. 4-4 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life tnemssessAksiR spetS snoitseuQ SEY ON STNEMMOC sdrazahyfitnedI nactahtsdrazahwenerehterA ?ytinummocruoytceffa drazaheliforP stneve sdrocerlacirotsihwenerA ?elbaliava drazahwenrospamlanoitiddaerA ?elbaliavaseiduts seidutsdnaspamdetelpmocyltneceR latsaocwenehtfoytilibarenluvgniwohs eraegrusladitdnanoisoreottnempoleved .elbaliava stneveerutuffosecnahcevaH ,tnetxe,edutingamriehthtiwgnola( ?degnahc).cte tnempolevederutufdnatnecerevaH rofdekcehcneebytinummocehtni ?saeradrazahnotcefferieht stessayrotnevnI gnitsixefoseirotnevnievaH neebsaeradrazahniserutcurts ?detadpu tnempoleveddnalerutufsI ?seirotnevniehtnirofdetnuocca agniraperpsitnemtrapeDgninnalPehT tahterusneotnalptnempolevedlatsaoc rafkcabtessitnempolevederutufyna senoznoisoreehtedistuoebothguone tnerruC.saeradrazahhgihlatsaocehtdna eboslalliwsnoitarugifnocdaorerutufdna noitaucaveetauqedaerusneotdeiduts .stneveenacirruherofebsemit ksir-hgihlaicepswenynaerehterA ?snoitalupop .srenwossenisubdnastnediserlatsaoC sessoletamitsE detadpuneebsetamitsessolevaH ?segnahctnecerroftnuoccaot Worksheet #4 Revisit Your Risk Assessment step If you answered “Yes” to any of the above questions, review your data and update your risk assessment information accordingly. 4-5Version 1.0 August 2003 revise the plan 4 Task B. Analyze your findings and determine whether to revise your planning process or mitigation strategy. The planning team should use its new knowledge to identify the areas of the plan or planning process that should be changed. Some aspects of the planning process may warrant a briefer treat- ment the second time around, while others, because of additional knowledge or more readily available technical assistance, may war- rant a more in-depth treatment. Consider updating the goals, objectives, and actions in the plan. One of the most important steps in plan revision is to update or refine the community’s goals, objectives, and actions, particularly in light of experiences gained from implementing mitigation ac- tions in the current plan. The planning team has undoubtedly learned something new about the state or community, the adminis- tration of government, or the value that the community places on certain objectives—all of which need to be included in a reevalua- tion of the strategies. As with every step in the planning process, updating goals and strategies should use consensus building and community-driven prioritization methods, which are explained in Getting Started (FEMA 386-1) and Developing the Mitigation Plan (FEMA 386-3). Using the information gleaned in Step 3, and your results from Task B, the planning team should discuss what actions should be undertaken, reconsidered, or even eliminated, to further the plan’s goals. This discussion should result in a preliminary list of alternative mitigation actions to incorporate into the update of the plan. As in any other step of the planning process, the community should be engaged in reviewing these alternatives. The planning team may choose to present these alternatives in a public forum at this stage or as part of the plan review process discussed in Task C. For more details on researching alternatives, see Phase 3, Step 2 of Developing the Mitigation Plan (FEMA 386-3). Important questions to discuss with the team include the following: 1. Are the goals and objectives still applicable? Have any changes in the state or community made the goals or objectives obsolete or irrelevant? Review the findings of changes in the community, including changes that your mitigation initiatives have brought, to determine whether you have met your goals and if they remain consistent with current conditions. If you determine that you need to add new 4-6 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life goals to the plan, see Phase 3, Step 1 of Developing the Mitigation Plan (FEMA 386-3) for formulating goal statements. 2. Do the plan’s priorities correspond with state priorities? Where applicable, make sure your actions are consistent with any changes to state priorities. You will continue to be aligned with state goals and priorities by doing this. 3. Do existing actions need to be reprioritized for implementation? Now that you have implemented some of the actions, learned what works and doesn’t, developed new actions, and discovered that some aspects of your community may have changed, you may need to reprioritize your actions. See Developing the Mitigation Plan (FEMA 386-3) for prioritizing methods. 4. Are actions appropriate for available resources? Make sure that the community or state has enough resources to carry out the actions. You probably will have to research to find out what is currently available. Are past sources of funds still available? Are there new sources of funding that can be tapped? Are there new partnerships with nonprofit organizations or businesses that can be developed? What creative ways of implementing similar ac- tions have other communities used? Securing Resources for Mitigation Planning (FEMA 386-9) covers these topics in greater detail. Task C. Incorporate your findings into the plan. Include your most recent findings about the community, tribe, or state, your hazards and vulnerabilities, as well as the applicable original actions of the plan, into a revised plan. Update your de- scription of the planning process to include the steps you took to revise the plan document and how you involved the public. Update the implementation strategy to identify who will be responsible for the new or revised actions, the time frame, and funding sources. The revised plan must be reviewed by all stakeholders in the com- munity for its validity, and proceed through a formal adoption pro- cess as required by local or state laws. Use Worksheet #5: Revise the Plan to help you keep track of where the plan document may require revisions. In order to remain eligible for disaster re- lated funding, your updated local plan must be re-sub- mitted to your state and/or FEMA Regional Office for review and approval every five years. State plans must be re-submitted to the FEMA Re- gional Office for review and approval every three years. 4-7Version 1.0 August 2003 revise the plan 4 Worksheet #5 Revise the Plan step Prepare to update the plan. When preparing to update the plan: Check the box when addressed: Consider the results of the evaluation and new strategies for the future. When examining the community consider: Check the box when addressed: .1 detaler,seiduts,stroperssergorp,steehskrownoitaulavetcejorpgnidulcni,noitamrofnirehtaG .cte,snalp :stnemmoC maertsdnastroperssergorpriehtetadpuotskroWcilbuPfotnemtrapeDehthtiwkrowtsumRROHT dnettaotelbanuneebsahti,seitudwenriehtgnitcudnocylevitceffeneebsahtnemtrapedehtelihW.snalpecnanetniam gnitarepodradnatsstignitadpuyllamrofdnastroperssergorpgniraperpsahcuskrowrepapevitartsinimdaot .serudecorp .2 stluserees(yrassecensanoitisopmocmaetehtotsegnahcgnikam,maetgninnalpehtenevnoceR .)2#teehskroWmorf :stnemmoC .RROHTnietapicitrapotytinamuHroftatibaHdetivnI .1 .stroffehcaertuodnagninnalpehtfostluserehT :stnemmoC tnemtrapeDehtybnotupetterahcngisedehtdednettastnediserkraPsweiVreviRgnigaRehtehtfoenotubllA .gninnalPfo gnitelpmocyllautcanehW.ediugsihtnidethgilhgihtcejorpenoehtotsniatrepylnoerehnoitamrofniehT:etoN[ ].stcejorpllanotcelferlliwuoy,teehskroweht .2 .stroffenoitagitimehtfostluserehT :stnemmoC ehtfonoitarepoocehtniatbootelbanusawmaetehttpecxe,dennalpsaenogevahstroffenoitagitimehT .stnediserkraPsweiVreviRgnigaRgniniamer gnitelpmocyllautcanehW.ediugsihtnidethgilhgihtcejorpenoehtotsniatrepylnoerehnoitamrofniehT:etoN[ ].stcejorpllanotcelferlliwuoy,teehskroweht page 1 of 4 4-8 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life .3 .sdnerttnempolevednistfihS :stnemmoC ehT.eussinaeboteunitnoclliwgninozdesab-drazahtpodaotlicnuoCehtfossengnilliwnudeunitnocehT tnempolevedtneceR.saeradrazahnitnempolevedsegaruocnemargorptnempolevedcimonoceehtfognidnufdnanoitazirohtuaer .sdrazahmrotslatsaoctnuoccaotninekattonsahtsaocehtgnola .4 .sretsasidtnecerybdetceffasaerA :stnemmoC esuohthgilehtgnidnuorrusedisllihehtedoreotdeunitnocevahsmrotsdniwlatsaoC. .5 .retsasidrodrazahtnecertsomehtfoepytdna,noitacol,edutingamtnecerehT :stnemmoC detareleccadnalavretniecnerrucerraey-52aevahotAAONybdetamitsesaw2002fomrotslatsaocgnirpsehT .saeralarevesninoisorehcaeb .6 .seigolonhcetroseidutsweN :stnemmoC niserutcurtscirotsihgnittiforterrofsdohtemnoitagitimtsebenimretedotydutsagnitcudnocyltnerrucsiRROHT .tcirtsidnwotnwodeht .7 .gnidnufro,seitiroirp,snalp,seicilop,swallaredefro,etats,lacolnisegnahC :stnemmoC .3#eeS page 2 of 4 4-9Version 1.0 August 2003 revise the plan 4 Incorporate your findings into the plan. When examining the plan consider: Check the box when addressed: .1 .tnemssessaksirehttisiveR teehskroWeeS(#)4 :stnemmoC ytilibarenluV.sessoldoolflaitnetopehtsesaercedkraPsweiVreviRgnigaRehtniserutcurtsfonoitisiuqcA .nalpehtotnidetaroprocnieblliwatadssoldnatnemssessa .2 .seigetartsdnaslaogruoyetadpU :stnemmoC A/N .3 .smetinoitcaezitiroirpotstcejorpfosesylanatsoc-tifenebetaluclaceR :stnemmoC A/N .8 .ytinummocehtfocirbafcimonoceoicosehtnisegnahC :stnemmoC .aeraehtotweneradnaslanoisseforpderitereratsaocehtgnolastnediserwentsoM .9 .snoitidnocgnignahcrehtO :stnemmoC enoN page 3 of 4 4-10 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Use the following criteria to evaluate the plan: Comments: _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ None airetirC SEY ON noituloS ?elbacilppallitsslaogehterA etatsehtnisegnahcynaevaH slaogehtedamytinummocro ?tnavelerriroetelosbo ebotdeensnoitcagnitsixeoD rofdezitiroirper ?noitatnemelpmi .ytiroirphgihasiskroWcilbuPfotnemtrapeDehttagniffatS seitiroirps'nalpehtoD etatshtiwdnopserroc ?seitiroirp detnemelpmiebsnoitcanaC ?secruoserelbaliavahtiw cilbuPfotnemtrapeDehttaffatslanoitiddarofgnidnufyfitnediotdeeN .skroW page 4 of 4 4-11Version 1.0 August 2003 revise the plan 4 The Hazardville Post Vol. CXVII No. 16 Thursday, January 16, 2007 The Hazard Mitigation Planning Cycle Set to Begin Again (Part 4 of a 4-Part Series on the Hazard Mitigation Implementation Process) [Hazardville, EM] A strategic planning meeting to update the Hazardville Hazard Mitigation Plan was held Wednesday at the Town Hall. The Town of Hazardville Or- ganization for Risk Reduction (THORR), continuing in its plan- ning capacity, led the strategy ses- sion by explaining to the community the changes the town has under- gone since the initial adoption of the plan in 2003. The first meeting was to review the results of the community per- ception survey and to discuss the status of the mitigation actions that were prioritized in the town’s miti- gation plan. “Overall, our residents now seem to be more aware of the hazards to which the town is vul- nerable, and a large majority of the survey respondents knew what they could do to reduce their own vul- nerability,” said Joe Norris, lead planner for THORR. “With the ex- ception of the Town Hall seismic retrofit project, we are proud to in- form the community that our Summary In order for the plan to remain a viable tool for your state, tribe, or community, you must regularly review your planning process and mitigation strategy. Communities are rarely static and new chal- lenges will arise during every revision of the plan. Disasters also present a window of opportunity to evaluate the relative success of the mitigation plan. States, tribes, and communities should take advan- tage of funding that becomes available as a result of these events. Revising the plan ensures it remains up-to-date and relevant, providing a good return on the time and resources invested in developing it. projects are all progressing as sched- uled and under budget.” “We promised to make this com- munity a safer place to live and work, and we will continue to strive to achieve this for our community,” Mayor McDonald said at a press briefing yesterday. “That promise means we must diligently prepare for and mitigate against the many hazards our community is vulner- able to. Accountability and diligence are key to making this a reality.” afterword afterwordVersion 1.0 August 2003 afterword You have a mitigation plan. Now what? The first plan your state, tribe, or community adopts establishes a baseline from which to measure progress. As you implement and evaluate actions, your knowledge of hazards and how to best reduce your vulnerabilities increases tremendously. In order to ef- fectively monitor your progress, it is important to take advantage of the worksheets provided in the how-to series. Over time, new part- ners will become involved in the planning process, providing addi- tional reservoirs of experience and support. Since the political and social arenas, as well as the natural environment, are continually changing, you must periodically revisit and update your plan. As your plan evolves over time, you should see a corresponding im- provement in your state, tribe, or community’s resilience to the damaging effects of disasters. appendices a-1Version 1.0 August 2003 appendix a glossary Acquisition of hazard-prone structures Base Flood Elevation (BFE) Benefit Benefit-Cost Analysis (BCA) Building Capability assessment Coastal zone Community Emergency Response Team (CERT) Community Rating System (CRS) Local governments can acquire lands in high hazard areas through conserva- tion easements, purchase of development rights, or outright purchase of property. Elevation of the base flood in relation to a specified datum, such as the National Geodetic Vertical Datum of 1929. The Base Flood Elevation is used as a standard for the National Flood Insurance Program. Net project outcomes, usually defined in monetary terms. Benefits may include direct and indirect effects. For the purposes of conducting a benefit- cost analysis of proposed mitigation measures, benefits are limited to specific, measurable risk reduction factors, including a reduction in expected property losses (building, contents, and function) and protection of human life. A systematic, quantitative method of comparing the projected benefits to projected costs of a project or policy. It is used as a measure of cost-effective- ness. A structure that is walled and roofed, principally above ground and perma- nently affixed to a site. The term includes a manufactured home on a permanent foundation on which the wheel and axles carry no weight. An assessment that provides a description and analysis of a community or state’s current capacity to address the threats associated with hazards. The capability assessment attempts to identify and evaluate existing policies, regulations, programs, and practices that positively or negatively affect the community or state’s vulnerability to hazards or specific threats. The area along the shore where the ocean meets the land as the surface of the land rises above the ocean. This land/water interface includes barrier islands, estuaries, beaches, coastal wetlands, and land areas with direct drainage to the ocean. CERT is the mechanism to establish, train and maintain a local cadre of residents to act as first responders in the event of an emergency. A CERT team is especially critical in the first three days following a disaster when conditions may prevent access by emergency response personnel. CRS is a program that provides incentives for National Flood Insurance Program communities to complete activities that reduce flood hazard risk. When the community completes specified activities, the insurance premiums of these policyholders in communities are reduced. a-2 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Comprehensive plan Cost-effectiveness Critical facilities Debris Disaster Mitigation Act of 2000 (DMA 2000) Earthquake Elevation of structures Emergency response services Federal Emergency Management Agency (FEMA) Flood Hazard Area Flood Insurance Rate Map (FIRM) A document, also known as a “general plan,” covering the entire geographic area of a community and expressing community goals and objectives. The plan lays out the vision, policies, and strategies for the future of the commu- nity, including all of the physical elements that will determine the community’s future development. This plan can discuss the community’s desired physical development, desired rate and quantity of growth, commu- nity character, transportation services, location of growth, and siting of public facilities and transportation. In most states, the comprehensive plan has no authority in and of itself, but serves as a guide for community deci- sion-making. Cost-effectiveness is a key evaluation criterion for federal grant programs. Cost- effectiveness has several possible definitions, although for grant- making purposes FEMA defines a cost-effective project as one whose long- term benefits exceed its costs. That is, a project should prevent more expected damages than it costs initially to fund the effort. This is done to ensure that limited public funds are used in the most efficient manner possible. Benefit-cost analysis is one way to illustrate that a project is cost- effective. Facilities vital to the health, safety, and welfare of the population and that are especially important following hazard events. Critical facilities include, but are not limited to, shelters, police and fire stations, and hospitals. The scattered remains of assets broken or destroyed in a hazard event. Debris transported by a wind or water hazard event can cause additional damage to other assets. DMA 2000 (Public Law 106-390) is the latest legislation to improve the planning process. Signed into law on October 30, 2000, this legislation reinforces the importance of mitigation planning and emphasizes planning for disasters before they occur. A sudden motion or trembling caused by a release of strain accumulated within or along the edge of the earth’s tectonic plates. Raising structures above the base flood elevation to protect structures located in areas prone to flooding. The actions of first responders such as firefighters, police, and other emer- gency services personnel at the scene of a hazard event. The first responders take appropriate action to contain the hazard, protect property, conduct search and rescue operations, provide mass care, and ensure public safety. Agency created in 1979 to provide a single point of accountability for all federal activities related to disaster mitigation and emergency preparedness, response, and recovery. FEMA is now part of the Department of Homeland Security. The area on a map shown to be inundated by a flood of a given magnitude. Map of a community, prepared by FEMA, which shows both the special flood hazard areas and the risk premium zones applicable to the community under the National Flood insurance Program. appendix a – glossary a-3Version 1.0 August 2003 A program created as part of the National Flood Insurance Reform Act of 1994. FMA provides funding to assist communities and states in implement- ing actions that reduce or eliminate the long-term risk of flood damage to buildings, manufactured homes, and other NFIP insurable structures, with a focus on repetitive loss properties. Any land area, including watercourse, susceptible to partial or complete inundation by water from any source. Actions that prevent or minimize future flood damage. Making the areas below the anticipated flood level watertight or intentionally allowing flood- waters to enter the interior to equalize flood pressures are examples of flood-proofing. A geographical area shown on a Flood Insurance Rate Map (FIRM) that reflects the severity or type of flooding in the area. General guidelines that explain what you want to achieve. They are usually broad policy-type statements, long term in nature, and represent global visions. A source of potential danger or adverse condition. A specific occurrence of a particular type of hazard. The process of identifying hazards that threaten an area. Information booth, publication kiosk, exhibit, etc. that displays information to educate the public about hazards that affect the jurisdiction and hazard mitigation activities people can undertake. Sustained actions taken to reduce or eliminate long-term risk from hazards and their effects. Authorized under Section 404 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act, HMGP is administered by FEMA and provides grants to states, tribes, and local governments to implement hazard mitiga- tion actions after a major disaster declaration. The purpose of the program is to reduce the loss of life and property due to disasters and to enable mitigation activities to be implemented as a community recovers from a disaster. A description of the physical characteristics of hazards and a determination of various descriptors, including magnitude, duration, frequency, probability, and extent. In most cases, a community can most easily use these descriptors when they are recorded and displayed as maps. A GIS-based, nationally standardized, loss estimation tool developed by FEMA. HAZUS-MH is the new multi-hazard version that includes earth- quake, wind, hurricane, and flood loss estimate components. Flood Mitigation Assistance (FMA) Program Floodplain Flood-proofing Flood Zone Goals Hazard Hazard event Hazard identification Hazard information center Hazard mitigation Hazard Mitigation Grant Program (HMGP) Hazard profile HAZUS, HAZUS-MH a-4 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Hurricane Infrastructure Landslide Loss estimation Memorandum of Agreement (MOA) Mitigate Mitigation actions Mitigation plan National Flood Insurance Program (NFIP) Objectives Open space preservation Ordinance An intense tropical cyclone, formed in the atmosphere over warm ocean areas, in which wind speeds reach 74 miles per hour or more and blow in a large spiral around a relatively calm center or “eye.” Hurricanes develop over the north Atlantic Ocean, northeast Pacific Ocean, or the south Pacific Ocean east of 160ºE longitude. Hurricane circulation is counter-clockwise in the northern hemisphere and clockwise in the southern hemisphere. Refers to the public facilities of a community that have a direct impact on the quality of life. Infrastructure includes communication technology, such as phone lines or Internet access; vital services, such as public water supplies and sewer treatment facilities; and an area’s transportation system: airports, heliports, highways, bridges, tunnels, roadbeds, overpasses, railways, bridges, rail yards, depots; and waterways, canals, locks, seaports, ferries, harbors, drydocks, piers, and regional dams. Downward movement of a slope and materials under the force of gravity. Forecasts of human and economic impacts and property damage from future hazard events, based on current scientific and engineering knowl- edge. A non-binding statement that defines the duties, responsibilities, and commitment of the different parties or individuals; provides a clear state- ment of values, principles, and goals; and establishes an organizational structure to assist in measuring and evaluating progress. To cause something to become less harsh or hostile; to make less severe or painful. Activities or projects that help achieve the goals and objectives of a mitiga- tion plan. The document that articulates results from the systematic process of identify- ing hazards and evaluating vulnerability, identifying goals, objectives, and actions to reduce or eliminate the effects of identified hazards, and an implementation plan for carrying out the actions. Federal program created by Congress in 1968 that makes flood insurance available in communities that enact minimum floodplain management regulations found in 44 CFR §60.3. Objectives define strategies or implementation steps to attain the identified goals. Unlike goals, objectives are specific and measurable. Preserving undeveloped areas from development through any number of methods, including low-density zoning, open space zoning, easements, or public or private acquisition. Open space preservation is a technique that can be used to prevent flood damage in flood-prone areas, land failures on steep slopes or liquefaction-prone soils, and can enhance the natural and beneficial functions of floodplains. A term for a law or regulation adopted by a local government. appendix a – glossary a-5Version 1.0 August 2003 Planning Policy Post-disaster mitigation Post-disaster recovery ordinance Post-disaster recovery planning Preparedness Probability Public education and outreach programs Recovery Regulation Regulatory power Relocation out of hazard areas Resources Response The act or process of making or carrying out plans; the establishment of goals, policies, and procedures for a social or economic unit. A course of action or specific rule of conduct to be followed in achieving goals and objectives. Mitigation actions taken after a disaster has occurred, usually during recov- ery and reconstruction. An ordinance authorizing certain governmental actions to be taken during the immediate aftermath of a hazard event to expedite implementation of recovery and reconstruction actions identified in a pre-event plan. The process of planning those steps the jurisdiction will take to implement long-term reconstruction with a primary goal of mitigating its exposure to future hazards. The post-disaster recovery planning process can also involve coordination with other types of plans and agencies, but it is distinct from planning for emergency operations. Actions that strengthen the capability of government, citizens, and commu- nities to respond to disasters. A statistical measure of the likelihood that a hazard event will occur. Any campaign to make the public more aware of hazard mitigation and mitigation programs, including hazard information centers, mailings, public meetings, etc. The actions taken by an individual or community after a catastrophic event to restore order and lifelines in a community. Most states have granted local jurisdictions broad regulatory powers to enable the enactment and enforcement of ordinances that deal with public health, safety, and welfare. These include building codes, building inspec- tions, zoning, floodplain and subdivision ordinances, and growth manage- ment initiatives. Local jurisdictions have the authority to regulate certain activities in their jurisdiction. With respect to mitigation planning, the focus is on such things as regulating land use development and construction through zoning, building codes, subdivision regulations, design standards, and floodplain regulations. A mitigation technique that features the process of demolishing or moving a building to a new location outside the hazard area. Resources include the people, materials, technologies, money, etc., required to implement strategies or processes. The costs of these resources are often included in a budget. The actions taken during and immediately after an event to address immedi- ate life and safety needs and to minimize further damage to properties. a-6 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Resolutions Risk Stafford Act Stakeholder State Hazard Mitigation Officer (SHMO) Structural retrofitting Subdivision Subdivision and development regulations Tornado Vulnerability Expressions of a governing body’s opinion, will, or intention that can be executive or administrative in nature. Most planning documents must undergo a council resolution, which must be supported in an official vote by a majority of representatives to be adopted. Other methods of making a statement or announcement about a particular issue or topic include proclamations and declarations. The estimated impact that a hazard would have on people, services, facilities, and structures in a community; the likelihood of a hazard event resulting in an adverse condition that causes injury or damage. Risk is often expressed in relative terms such as a high, moderate, or low likelihood of sustaining damage above a particular threshold due to a specific type of hazard event. It also can be expressed in terms of potential monetary losses associated with the intensity of the hazard. The Robert T. Stafford Disaster Relief and Emergency Assistance Act, PL 100-107 was signed into law November 23, 1988 and amended the Disaster Relief Act of 1974, PL 93-288. The Stafford Act is the statutory authority for most federal disaster response activities, especially as they pertain to FEMA and its programs. Stakeholders are individuals or groups, including businesses, private organi- zations, and citizens, that will be affected in any way by an action or policy. The state government representative who is the primary point of contact with FEMA, other state and federal agencies, and local units of government in the planning and implementation of pre- and post-disaster mitigation activities. Modifying existing buildings and infrastructure to protect them from hazards. The division of a tract of land into two or more lots for sale or development. Regulations and standards governing the division of land for development or sale. Subdivision regulations can control the configuration of parcels, set standards for developer-built infrastructure, and set standards for minimiz- ing runoff, impervious surfaces, and sediment during development. They can be used to minimize exposure of buildings and infrastructure to haz- ards. A violently rotating column of air extending from a thunderstorm to the ground. Describes how exposed or susceptible an asset is to damage. Vulnerability depends on an asset’s construction, contents, and the economic value of its functions. Like indirect damages, the vulnerability of one element of the community is often related to the vulnerability of another. For example, many businesses depend on uninterrupted electrical power—if an electric substation is flooded, it not only affects the substation but a number of businesses as well. Often, indirect effects can be much more widespread and damaging than direct ones. appendix a – glossary a-7Version 1.0 August 2003 The extent of injury and damage that may result from a hazard event of a given intensity in a given area. The vulnerability assessment should address the effects of hazard events on the existing and future built environment. An uncontrolled fire spreading through vegetative fuels, exposing and possibly consuming structures. The division of land within a local jurisdiction by local legislative regulation into zones of allowable types and intensities of land uses. Designation of allowable land use and intensities for a local jurisdiction. Zoning ordinances consist of two components: a zoning text and a zoning map. Vulnerability assessment Wildfire Zoning Zoning ordinance b-1Version 1.0 August 2003 appendix b library Federal Emergency Management Agency (FEMA) FEMA Publications Warehouse FEMA Mitigation Publications Library General Contact Information http://www.fema.gov FEMA Headquarters: 500 C Street, SW, Washington, D.C. 20472 202-646-4600 800-480-2520 http://www.fema.gov/library/prepandprev.shtm http://www.planning.org http://www.planning.org/growingsmart http://www.cfda.gov http://www.fema.gov/nfip/crs.shtm http://www.pro.gov.uk/recordsmanagement/eros/ framework.pdf http://www.allhandsconsulting.com/ERI_books.htm http://www.esri.com/news/arcuser/0100/firetools.html http://www.atlantahighered.org/memberservices/shelter/ literature.asp http://www.pmel.noaa.gov/~bernard/hazard3.pdf http://training.fema.gov/EMIWeb http://www.fema.gov/rrr/inassist.shtm http://www.fema.gov/fima/planning.shtm http://www.fema.gov/rrr/pa American Planning Association (APA) APA, Growing Smart Legislative Guidebook, 2002 Catalog of Federal Domestic Assistance Programs Community Rating System Developing the Implementation Strategy Emergency Management Institute Federal Emergency Management Agency Individual Assistance Program FEMA Mitigation Planning FEMA Public Assistance Program Web sites b-2 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Flood Mitigation Assistance Program Habitat for Humanity Hazard Mitigation Grant Program Hazard Mitigation in North Carolina: Measuring Success HAZUS and HAZUS-MH HMGP Progress Report Form Institute for Business & Home Safety (IBHS), Summary of State Land Use and Natural Hazards Planning Laws Institute for Local Self Government Mitigation Success Stories Multi-hazard Mapping Initiative National Association of Regional Councils National Flood Insurance Program National League of Cities North Carolina Division of Emergency Management, Tools and Techniques for Mitigating the Effects of Natural Hazards Oregon Department of Land Conservation and Development (DLCD), Planning for Natural Hazards—Oregon Technical Resource Guide Pre-Disaster Mitigation Program Small Business Administration State Guidebook for Developing Partnerships U.S. Army Corps of Engineers U.S. Department of Agriculture U.S. Department of Agriculture, Natural Resources Conservation Service http://www.fema.gov/fima/planfma.shtm http://www.habitat.org/ http://www.fema.gov/fima/hmgp http://www.dem.dcc.state.nc.us/Mitigation/Library/ Success_Stories/Measuring_Success_Vol2/Chapter6.pdf http://www.fema.gov/hazus/index.shtm http://www.dem.dcc.state.nc.us/mitigation/ document_index.htm http://www.ibhs.org/research_library/view.asp?id=302 http://www.ilsg.org/ http://www.fema.gov/fima/success.shtm http://www.hazardmaps.gov/atlas.php http://www.narc.org http://www.fema.gov/nfip http://www.nlc.org http://www.dem.dcc.state.nc.us/mitigation/Library/ Full_Tools_and_Tech.pdf http://www.lcd.state.or.us/hazhtml/Guidehome.htm http://www.fema.gov/fima/pdm http://www.sba.gov/disaster_recov/index.html http://www.ibhs.org/research_library/downloads/280.pdf http://www.usace.army.mil http://disaster.fsa.usda.gov http://www.nrcs.usda.gov appendix b – library b-3Version 1.0 August 2003 U.S. Department of Housing and Urban Development U.S. Department of Transportation U.S. Environmental Protection Agency U.S. State and Local Government Gateway http://www.hud.gov/offices/cpd/communitydevelopment/ programs/dri/driquickfacts.cfm http://www.fhwa.dot.gov/programadmin/erelief.html http://www.epa.gov http://www.firstgov.gov/Government/State_Local.shtml NOTE: The World Wide Web is an ever-changing source of information. Web addresses and the information they contain can change over time. Publications American Planning Association Federal Register FEMA Capital Improvement Programming, PAS Report No. 151, 1961. Capital Improvements Programs: Linking Budgeting and Planning, PAS Report No. 442, 1993. Selecting and Retaining a Planning Consultant: RFPs, RFQs, Contracts, and Project Management, PAS Report No. 443, 1993. 44 CFR Parts 201 and 206 (The Disaster Mitigation Act of 2000), February 26, 2002. Developing the Mitigation Plan: Identifying mitigation actions and implementation strategies (FEMA 386-3), 2003. Getting Started: Building support for mitigation planning (FEMA 386-1), 2002. Hazard Mitigation Grant Program Desk Reference (FEMA 345), 1999. Hazard Mitigation in Iowa: Measuring Success, 2003, unpublished to date. Hazard Mitigation in Mississippi: Measuring Success, 2003, unpublished to date. Integrating Historic Property and Cultural Resource Considerations into Mitigation Planning (FEMA 386-6), unpublished to date. Integrating Human-Caused Hazards into Mitigation Planning (FEMA 386-7), 2002. Mitigation Resources for Success (FEMA 372), 2000. Multi-jurisdictional Approaches to Mitigation Planning (FEMA 386-8), unpublished to date. Planning for a Sustainable Future: The Link Between Hazard Mitigation and Livability (FEMA 364), 2003. b-4 STATE AND LOCAL MITIGATION PLANNING how-to guide: Bringing the Plan to Life Gianakis, Gerasimos A. and McCue, Clifford P., 1999 Schwab, Jim et al., 1998 Tyler Norris Associates, 1997 Rebuilding for a More Sustainable Future: An Operational Framework (FEMA 365), 2000. Securing Resources for Mitigation Planning (FEMA 386-9), unpublished to date. Understanding Your Risks: Identifying hazards and estimating losses (FEMA 386-2), 2001. Using Benefit-Cost Analysis in Mitigation Planning (FEMA 386-5), unpublished to date. Local Government Budgeting: A Managerial Approach. Planning for Post-Disaster Recovery and Reconstruction, PAS Report Nos. 483/484. Community Indicators Handbook: Measuring Progress Toward Healthy and Sustainable Communities. c-1Version 1.0 August 2003 appendix c worksheets Worksheet #1 Progress Report Worksheet #2 Evaluate Your Planning Team Worksheet #3 Evaluate Your Project Results Worksheet #4 Revisit Your Risk Assessment Worksheet #5 Revise the Plan Worksheet #1 Progress Report step Progress Report Period:_________________ to ___________________________________________________ (date) (date) Project Title:_________________________________________ Project ID#:____________________________ Responsible Agency:_________________________________________________________________________ Address:__________________________________________________________________________________ City/County:________________________________________________________________________________ Contact Person:_______________________________________Title:_________________________________ Phone #(s):____________________________email address:_______________________________________ List Supporting Agencies and Contacts: _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ Total Project Cost:___________________________________________________________________________ Anticipated Cost Overrun/Underrun:_____________________________________________________________ Date of Project Approval:_________________________Start date of the project:_________________________ Anticipated completion date:___________________________________________________________________ Description of the Project (include a description of each phase, if applicable, and the time frame for completing each phase):___________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ senotseliM etelpmoC detcejorP foetaD noitelpmoC Page 1 of 3 Plan Goal(s)/Objective(s) Addressed: Goal:_____________________________________________________________________________________ Objective:__________________________________________________________________________________ Indicator of Success (e.g., losses avoided as a result of the acquisition program): In most cases, you will list losses avoided as the indicator. In cases where it is difficult to quantify the benefits in dollar amounts, you will use other indicators, such as the number of people who now know about mitigation or who are tak- ing mitigation actions to reduce their vulnerability to hazards. _________________________________________________________________________________________ _________________________________________________________________________________________ Status (Please check pertinent information and provide explanations for items with an asterisk. For completed or canceled projects, see Worksheet #2 — to complete a project evaluation): Summary of progress on project for this report: A. What was accomplished during this reporting period? _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ B. What obstacles, problems, or delays did you encounter, if any? _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ C. How was each problem resolved? _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ Project Cost Status Cost unchanged Cost overrun* *explain:___________________________________ _________________________________________ Cost underrun* *explain:___________________________________ _________________________________________ Project Status Project on schedule Project completed Project delayed* *explain:___________________________________ _________________________________________ Project canceled Page 2 of 3 Next Steps: What is/are the next step(s) to be accomplished over the next reporting period? _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ Other comments: _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ Adapted from the North Carolina HMGP Progress Report Form at http://www.dem.dcc.state.nc.us/mitigation/document_index.htm. Page 3 of 3 If the planning team determines the answer to any of these questions is “yes,” some changes may be necessary. Worksheet #2 Evaluate Your Planning Team step noitisopmocstissessaerdluohsmaetgninnalpeht,noitaulavenalpehtrofpugniraegnehW :snoitseuqgniwollofehtksadna SEY ON gninnalpehtotsrebmemtnereffidgnitivnitnarrawdluowtahtsegnahcgniffatslacolneeberehtevaH ?maet :noitcAdesoporP/stnemmoC tcejorpotrossecorpgninnalpehtotelbaulavnineebevahtahtsnoitazinagroerehterA ?maetgninnalpehtnodetneserperebdluohstahtnoitatnemelpmi noitcAdesoporP/stnemmoC : ehtnidetapicitrapylluftonevahohwsnoitazinagrolaitnessefosevitatneserperynaerehterA ottimmocnoitazinagrosihtmorfesleenoemosnac,osfI?snoitcafonoitatnemelpmidnagninnalp ?maetgninnalpeht noitcAdesoporP/stnemmoC : gnitubirtsid,stroperssergorpdettimbusnognitnemmoc,sAOMfogningis,.g.e(serudecorperehterA ?yltneiciffeeromenodebnactaht).cte,setunimgniteem noitcAdesoporP/stnemmoC : noitarepoocdaerpsediwdnaesrevideromniagotsyawerehterA? noitcAdesoporP/stnemmoC : rofelbaliavawonerataht)namuhdna,lacinhcet,laicnanif(secruoserlanoitiddarotnereffiderehterA ?gninnalpnoitagitim :noitcAdesoporP/stnemmoC IF YES IF NO Project Name and Number:_______________________________ ____________________________________________________ Project Budget:________________________________________ ____________________________________________________ Project Description:_____________________________________ ____________________________________________________ ____________________________________________________ Associated Goal and Objective(s):__________________________ ____________________________________________________ ____________________________________________________ Indicator of Success (e.g., losses avoided):___________________ ____________________________________________________ ____________________________________________________ Worksheet #3 Evaluate Your Project Results step Was the action implemented?YES NO What were the results of the implemented action?_____________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ Why not? Was there political support for the action? Were enough funds available? Were workloads equitably or realistically distributed? Was new information discovered about the risks or community that made implementation difficult or no longer sensible? Was the estimated time of implementation reasonable? Were sufficient resources (for example staff and technical assistance) available? YES NO Insert location map. Include before and after photos if appropriate. page 1 of 2 SEY ON :nialpxeesaelp,oNfI?detcepxesasemoctuoehtereW :wohnialpxE?)s(evitcejbodnalaogehteveihcastluserehtdiD :tonwohrowohnialpxE?evitceffe-tsocnoitcaehtsaW ?tcejorpehtdetelpmocgnivahretfadediovasessolehterewtahW ?eliforpdrazahehtegnahctididwoh,tcejorplarutcurtsasawtifI :semoctuorehtorostnemmoclanoitiddA page 2 of 2 Date: Prepared by: tnemssessAksiR spetS snoitseuQ SEY ON STNEMMOC sdrazahyfitnedI nactahtsdrazahwenerehterA ?ytinummocruoytceffa drazaheliforP stneve sdrocerlacirotsihwenerA ?elbaliava drazahwenrospamlanoitiddaerA ?elbaliavaseiduts stneveerutuffosecnahcevaH ,tnetxe,edutingamriehthtiwgnola( ?degnahc).cte tnempolevederutufdnatnecerevaH rofdekcehcneebytinummocehtni ?saeradrazahnotcefferieht stessayrotnevnI gnitsixefoseirotnevnievaH neebsaeradrazahniserutcurts ?detadpu tnempoleveddnalerutufsI ?seirotnevniehtnirofdetnuocca ksir-hgihlaicepswenynaerehterA ?snoitalupop sessoletamitsE detadpuneebsetamitsessolevaH ?segnahctnecerroftnuoccaot Worksheet #4 Revisit Your Risk Assessment step If you answered “Yes” to any of the above questions, review your data and update your risk assessment information accordingly. Worksheet #5 Revise the Plan step Prepare to update the plan. When preparing to update the plan: Check the box when addressed: Consider the results of the evaluation and new strategies for the future. When examining the community consider: Check the box when addressed: page 1 of 4 .1 detaler,seiduts,stroperssergorp,steehskrownoitaulavetcejorpgnidulcni,noitamrofnirehtaG .cte,snalp :stnemmoC .2 stluserees(yrassecensanoitisopmocmaetehtotsegnahcgnikam,maetgninnalpehtenevnoceR .)2#teehskroWmorf :stnemmoC .1 .stroffehcaertuodnagninnalpehtfostluserehT :stnemmoC .2 .stroffenoitagitimehtfostluserehT :stnemmoC .3 .sdnerttnempolevednistfihS :stnemmoC .4 .sretsasidtnecerybdetceffasaerA :stnemmoC .5 .retsasidrodrazahtnecertsomehtfoepytdna,noitacol,edutingamtnecerehT :stnemmoC .6 .seigolonhcetroseidutsweN :stnemmoC .7 .gnidnufro,seitiroirp,snalp,seicilop,swallaredefro,etats,lacolnisegnahC :stnemmoC page 2 of 4 .8 .ytinummocehtfocirbafcimonoceoicosehtnisegnahC :stnemmoC .9 .snoitidnocgnignahcrehtO :stnemmoC page 3 of 4 Incorporate your findings into the plan. When examining the plan consider: Check the box when addressed: .1 .tnemssessaksirehttisiveR )4#teehskroWeeS( :stnemmoC .2 .seigetartsdnaslaogruoyetadpU :stnemmoC .3 .smetinoitcaezitiroirpotstcejorpfosesylanatsoc-tifenebetaluclaceR :stnemmoC Use the following criteria to evaluate the plan: Comments: _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ page 4 of 4 airetirC SEY ON noituloS ?elbacilppallitsslaogehterA etatsehtnisegnahcynaevaH slaogehtedamytinummocro ?tnavelerriroetelosbo ebotdeensnoitcagnitsixeoD rofdezitiroirper ?noitatnemelpmi seitiroirps'nalpehtoD etatshtiwdnopserroc ?seitiroirp detnemelpmiebsnoitcanaC ?secruoserelbaliavahtiw August 2003 FEMA 386-4 Appendix H. Critical Facilities Galveston County, TX | Hazard Mitigation Plan H-1 2022 Update APPENDIX H. CRITICAL FACILITIES Due to the sensitive nature of this information, details of each have been redacted for the public document. A full list of critical facilities identified for the vulnerability analysis is available at the Galveston County Office of Emergency Management. Contact the Deputy Emergency Management Coordinator, Laura Norman, to view the list. APPENDIX H: LINKAGE PROCEDURES Galveston County, TX | Hazard Mitigation Plan H-1 2022 Update APPENDIX H. LINKAGE PROCEDURES This Appendix contains the linkage procedures for the Galveston County Hazard Mitigation Plan 2022 Update. H.1 Administrative Process for “Linkage” to the Galveston County Hazard Mitigation Plan The 2022 Galveston County HMP update (the Plan) included 12 planning partners and not all eligible local governments within the defined planning area are included in this plan. Completed jurisdictional annexes are presented in Section 9. Any non-participating local governments and other local jurisdictions such as Fire Districts, Utility Districts, School Districts and any other eligible local government as defined in 44 CFR 201.2 within the Galveston County planning area can join this plan as a participating jurisdiction and to ultimately achieve approved status by following the linkage procedures defined in this appendix It is assumed that some or all these non-participating local governments may choose to "link" to the Plan at some point in time to gain eligibility for programs under the DMA. In addition, some of the current partnership may not continue to meet eligibility requirements due to the lack of active participation as prescribed by the plan. These "linkage" procedures will define the requirements established by the Galveston County HMP Planning Committee and all planning partners for dealing with the increase or decrease in planning partners linked to this plan. It should be noted that currently non-participating jurisdictions within the defined planning area are not obligated to link to this plan. These jurisdictions can choose to do their own “complete" plan that addresses all required elements of section 201.6 of 44CFR. H.1.1 Increasing the Partnership Through Linkage Eligibility Eligible jurisdictions located in the planning area may link to this plan at any point during the plan’s performance period. Eligible jurisdictions located in the planning area may link to this plan at any point during the plan’s performance period (5 years after final approval). Eligibility will be determined by the following factors: • The linking jurisdiction is a local government as defined by the Disaster Mitigation Act. • The boundaries or service area of the linking jurisdiction is completely contained within the boundaries of the planning area established during the 2022 Hazard Mitigation Plan development process. • The linking jurisdiction’s critical facilities were included in the critical facility and infrastructure risk assessment completed during the 2022 Plan development process. Requirements It is expected that linking jurisdictions will complete the requirements outlined below and submit their completed template to the lead agency Galveston County Office of Emergency Management for review within six months of beginning the linkage process: 1. The Galveston County Hazard HMP Planning Committee has established an annual window for which linkage to the plan can occur. Linking jurisdictions are instructed to complete the following procedures during this time frame. APPENDIX H: LINKAGE PROCEDURES Galveston County, TX | Hazard Mitigation Plan H-2 2022 Update 2. The current non-participating jurisdiction contacts the Galveston County Hazard Mitigation Planning Coordinator for the Plan and requests a "Linkage Package". The Galveston County Hazard Mitigation Project Contact is: Laura M. Norman, Deputy Emergency Management Coordinator Galveston County Office of Emergency Management 281-309-5013 | Laura.Norman@co.galveston.tx.us 3. The Galveston County Hazard Mitigation Planning Coordinator will provide a linkage packages that includes: • Copy of Volume 1 and 2 of the Plan (CD-ROM or flash drive). • Planning Partner's Expectations Sheet. • A Sample "Letter of Intent" to Link to the Plan. • A Jurisdictional Template and Instructions. • Catalog of Hazard Mitigation Alternatives or the Mitigation Catalog. • A copy of Section 201.6 of Chapter 44, the Code of Federal Regulations (44CFR), which defines the federal requirements for a local hazard mitigation plan. 4. The new jurisdiction will be required to review both volumes of the Plan which includes the following key components for the planning area: • The Galveston County risk assessment; • The plan’s goals and objectives; • Plan implementation and maintenance procedures; • Catalog of potential mitigation actions; and • County-wide initiatives. Once this review is complete, the jurisdiction will complete its specific jurisdictional annex by following the template and its instructions for completion provided by the Galveston County Hazard Mitigation Planning Coordinator. Technical assistance can be provided upon request by completing the request for technical assistance (TA) form provided in the linkage package. This TA may be provided by the Galveston County Hazard Mitigation Planning Coordinator or any other resource within the Planning Partnership such as a member of the HMP Planning Committee or a currently participating jurisdiction. The Galveston County Hazard Mitigation Planning Coordinator will determine who will provide the TA and the possible level of TA based on resources available at the time of the request. 5. The new jurisdiction will also be required to develop a public involvement strategy that ensures their public's ability to participate in the plan development process. At a minimum, the new jurisdiction must try to solicit public opinion on hazard mitigation at the onset of this linkage process and a minimum of one public meeting to present their draft jurisdiction specific annex for comment, prior to adoption by the governing body. The Planning Partnership will have available resources to aid in the public involvement strategy such as the Plan website. However, it will be the new jurisdiction’s responsibility to implement and document this strategy for incorporation into their annex. It should be noted that the Jurisdictional Annex templates do not include a section for the description of the public process. This is because the original partnership was covered under a uniform public involvement strategy that covered the operational area that is described in volume 1 of the plan. Since the new partner was not addressed by that strategy, they will have to initiate a new strategy, and add a description of that strategy to their APPENDIX H: LINKAGE PROCEDURES Galveston County, TX | Hazard Mitigation Plan H-3 2022 Update annex. For consistency, new partners are encouraged to follow the public involvement format utilized by the initial planning effort as described in Volume I of the Plan. 6. Once their public involvement strategy is completed and they have completed their template, the new jurisdiction will submit the completed package to the Galveston County Hazard Mitigation Planning Coordinator for a pre-adoption review to ensure conformance with the regional plan format. 7. The Galveston County Hazard Mitigation Planning Coordinator will review for the following: • Documentation of public involvement and mitigation action development strategies; • Conformance of template entries with guidelines outlined in instructions; • Chosen actions are consistent with goals, objectives, and mitigation catalog of Galveston County Hazard Mitigation Plan; and • Designated point of contact. The Galveston County Hazard Mitigation Planning Coordinator may utilize members of the HMP Planning Committee or other resources to complete this review. All proposed linked annexes will be submitted to the HMP Planning Committee for their review and comment prior to submittal to the TDEM. 8. Plans approved and accepted by the HMP Planning Committee will then be forwarded to TDEM for review with cover letter stating the forwarded plan meets local approved plan standards and whether the plan is submitted with local adoption or for criteria met/plan not adopted review. 9. The TDEM will review plans for state and federal compliance. Non-compliant plans are returned to the jurisdiction for correction. Compliant plans are forwarded to FEMA Region VI office for review with annotation as to the adoption status. 10. FEMA Region VI reviews the new jurisdiction's plan in association with the approved plan to ensure DMA compliance. Region VI notifies new jurisdiction of results of review with copies to the TDEM and approved planning authority. 11. New jurisdiction corrects plan’s shortfalls (if necessary) and resubmits to the TDEM through the approved plan lead agency. 12. For plans with no shortfalls that have not been adopted from the Region VI review or outstanding corrected shortfalls, the new jurisdiction governing authority adopts the plan (if not already accomplished) and forwards adoption resolution to Region VI with copies to lead agency and the TDEM. 13. Region VI Director notifies new jurisdiction governing authority of plan approval. The new jurisdiction plan is then included with the Galveston County HMP 2022 update, and the linking jurisdiction is committed to participate in the ongoing plan implementation and maintenance identified in Volume 1 of the HMP.