Loading...
HomeMy WebLinkAboutHarrisCounty-Vol2_Planning_Partner_AnnexesHarris County Multi-Hazard Mitigation Action Plan Volume 2 — Planning Partner Annexes April 2020 PREPARED FOR PREPARED BY Harris County Office of Homeland Security and Emergency Management Tetra Tech 6922 Katy Road Houston, Texas 77024 1999 Harrison Street Suite 500 Oakland, CA 94612 Phone: 510.302.6300 Fax: 510.433.0830 www.tetratech.com Tetra Tech Project #103S5992 HarrisCounty-Vol2_ FINAL_2020-04.docx v CONTENTS Introduction .......................................................................................................................... xvii Background ..................................................................................................................................................... xvii The Planning Partnership ................................................................................................................................ xvii Annex-Preparation Process .............................................................................................................................. xix Mitigation Action Plan Development ................................................................................................................xx Compatibility with Previous Approved Plans ................................................................................................ xxiii Final Coverage Under the Plan ........................................................................................................................xxv Acronyms ...................................................................................................................................................... xxvii 1. Harris County .................................................................................................................... 1-1 1.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 1-1 1.2 Jurisdiction Profile ..................................................................................................................................... 1-1 1.3 Current Trends ........................................................................................................................................... 1-3 1.4 Capability Assessment ............................................................................................................................... 1-3 1.5 Integration with Other Planning Initiatives .............................................................................................. 1-10 1.6 Jurisdiction-Specific Natural Hazard Event History ................................................................................ 1-10 1.7 Hazard Risk Ranking ............................................................................................................................... 1-11 1.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 1-11 1.9 Status of Previous Plan Actions ............................................................................................................... 1-11 1.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 1-13 1.11 Review and Incorporation of Information for This Annex .................................................................... 1-16 2. City of Baytown ................................................................................................................ 2-1 2.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 2-1 2.2 Jurisdiction Profile ..................................................................................................................................... 2-1 2.3 Current Trends ........................................................................................................................................... 2-3 2.4 Capability Assessment ............................................................................................................................... 2-6 2.5 Integration with Other Planning Initiatives .............................................................................................. 2-12 2.6 Jurisdiction-Specific Natural Hazard Event History ................................................................................ 2-12 2.7 Hazard Risk Ranking ............................................................................................................................... 2-13 2.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 2-14 2.9 Status of Previous Plan Actions ............................................................................................................... 2-15 2.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 2-19 2.11 Review and Incorporation of Information for This Annex .................................................................... 2-23 2.12 Future Needs to Better Understand Risk/Vulnerability ......................................................................... 2-24 3. City of Bellaire .................................................................................................................. 3-1 3.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 3-1 3.2 Jurisdiction Profile ..................................................................................................................................... 3-1 3.3 Current Trends ........................................................................................................................................... 3-3 3.4 Capability Assessment ............................................................................................................................... 3-4 3.5 Integration with Other Planning Initiatives ................................................................................................ 3-9 3.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 3-9 3.7 Hazard Risk Ranking ................................................................................................................................. 3-9 3.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 3-10 3.9 Status of Previous Plan Actions ............................................................................................................... 3-10 Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes vi 3.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 3-10 3.11 Review and Incorporation of Information for This Annex .................................................................... 3-14 4. City of Bunker Hill Village ................................................................................................ 4-1 4.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 4-1 4.2 Jurisdiction Profile ..................................................................................................................................... 4-1 4.3 Current Trends ........................................................................................................................................... 4-2 4.4 Capability Assessment ............................................................................................................................... 4-3 4.5 Integration with Other Planning Initiatives ................................................................................................ 4-8 4.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 4-9 4.7 Hazard Risk Ranking ................................................................................................................................. 4-9 4.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 4-10 4.9 Status of Previous Plan Actions ............................................................................................................... 4-10 4.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 4-10 4.11 Review and Incorporation of Information for This Annex .................................................................... 4-10 5. City of Deer Park ............................................................................................................... 5-1 5.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 5-1 5.2 Jurisdiction Profile ..................................................................................................................................... 5-1 5.3 Current Trends ........................................................................................................................................... 5-2 5.4 Capability Assessment ............................................................................................................................... 5-3 5.5 Integration with Other Planning Initiatives ................................................................................................ 5-9 5.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 5-9 5.7 Hazard Risk Ranking ................................................................................................................................. 5-9 5.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 5-11 5.9 Status of Previous Plan Actions ............................................................................................................... 5-11 5.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 5-13 5.11 Review and Incorporation of Information for This Annex .................................................................... 5-18 6. City of El Lago .................................................................................................................. 6-1 6.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 6-1 6.2 Jurisdiction Profile ..................................................................................................................................... 6-1 6.3 Current Trends ........................................................................................................................................... 6-2 6.4 Capability Assessment ............................................................................................................................... 6-2 6.5 Integration with Other Planning Initiatives ................................................................................................ 6-8 6.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 6-8 6.7 Hazard Risk Ranking ................................................................................................................................. 6-9 6.8 Jurisdiction-Specific Vulnerabilities .......................................................................................................... 6-9 6.9 Status of Previous Plan Actions ............................................................................................................... 6-10 6.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 6-11 6.11 Review and Incorporation of Information for This Annex .................................................................... 6-15 7. City of Friendswood ......................................................................................................... 7-1 7.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 7-1 7.2 Jurisdiction Profile ..................................................................................................................................... 7-1 7.3 Current Trends ........................................................................................................................................... 7-2 7.4 Capability Assessment ............................................................................................................................... 7-3 7.5 Integration with Other Planning Initiatives ................................................................................................ 7-9 7.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 7-9 7.7 Hazard Risk Ranking ............................................................................................................................... 7-10 Contents vii 7.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 7-10 7.9 Status of Previous Plan Actions ............................................................................................................... 7-11 7.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 7-12 7.11 Review and Incorporation of Information for This Annex .................................................................... 7-14 8. City of Galena Park ........................................................................................................... 8-1 8.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 8-1 8.2 Jurisdiction Profile ..................................................................................................................................... 8-1 8.3 Current Trends ........................................................................................................................................... 8-2 8.4 Capability Assessment ............................................................................................................................... 8-3 8.5 Integration with Other Planning Initiatives ................................................................................................ 8-9 8.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 8-9 8.7 Hazard Risk Ranking ................................................................................................................................. 8-9 8.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 8-10 8.9 Status of Previous Plan Actions ............................................................................................................... 8-10 8.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 8-10 8.11 Review and Incorporation of Information for This Annex .................................................................... 8-14 8.12 Future Needs to Better Understand Risk/Vulnerability ......................................................................... 8-15 9. City of Hedwig Village ...................................................................................................... 9-1 9.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 9-1 9.2 Jurisdiction Profile ..................................................................................................................................... 9-1 9.3 Current Trends ........................................................................................................................................... 9-2 9.4 Capability Assessment ............................................................................................................................... 9-2 9.5 Integration with Other Planning Initiatives ................................................................................................ 9-8 9.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 9-8 9.7 Hazard Risk Ranking ................................................................................................................................. 9-9 9.8 Jurisdiction-Specific Vulnerabilities .......................................................................................................... 9-9 9.9 Status of Previous Plan Actions ............................................................................................................... 9-10 9.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 9-11 9.11 Review and Incorporation of Information for This Annex .................................................................... 9-13 10. City of Hilshire Village .................................................................................................. 10-1 10.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 10-1 10.2 Jurisdiction Profile ................................................................................................................................. 10-1 10.3 Current Trends ....................................................................................................................................... 10-2 10.4 Capability Assessment ........................................................................................................................... 10-2 10.5 Integration with Other Planning Initiatives ............................................................................................ 10-8 10.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 10-8 10.7 Hazard Risk Ranking ............................................................................................................................. 10-8 10.8 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 10-9 10.9 Status of Previous Plan Actions ............................................................................................................. 10-9 10.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 10-9 10.11 Review and Incorporation of Information for This Annex ................................................................ 10-15 11. City of Humble .............................................................................................................. 11-1 11.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 11-1 11.2 Jurisdiction Profile ................................................................................................................................. 11-1 11.3 Current Trends ....................................................................................................................................... 11-2 11.4 Capability Assessment ........................................................................................................................... 11-3 Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes viii 11.5 Integration with Other Planning Initiatives ............................................................................................ 11-8 11.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 11-8 11.7 Hazard Risk Ranking ............................................................................................................................. 11-8 11.8 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 11-9 11.9 Status of Previous Plan Actions ............................................................................................................. 11-9 11.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 11-9 11.11 Review and Incorporation of Information for This Annex ................................................................ 11-12 12. City of Hunters Creek Village ...................................................................................... 12-1 12.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 12-1 12.2 Jurisdiction Profile ................................................................................................................................. 12-1 12.3 Current Trends ....................................................................................................................................... 12-2 12.4 Capability Assessment ........................................................................................................................... 12-2 12.5 Integration with Other Planning Initiatives ............................................................................................ 12-9 12.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 12-9 12.7 Hazard Risk Ranking ........................................................................................................................... 12-10 12.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 12-10 12.9 Status of Previous Plan Actions ........................................................................................................... 12-10 12.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 12-11 12.11 Review and Incorporation of Information for This Annex ................................................................ 12-14 13. City of Jersey Village .................................................................................................... 13-1 13.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 13-1 13.2 Jurisdiction Profile ................................................................................................................................. 13-1 13.3 Current Trends ....................................................................................................................................... 13-2 13.4 Capability Assessment ........................................................................................................................... 13-3 13.5 Integration with Other Planning Initiatives ............................................................................................ 13-9 13.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 13-9 13.7 Hazard Risk Ranking ........................................................................................................................... 13-10 13.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 13-10 13.9 Status of Previous Plan Actions ........................................................................................................... 13-11 13.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 13-12 13.11 Review and Incorporation of Information for This Annex ................................................................ 13-16 14. City of Katy .................................................................................................................... 14-1 14.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 14-1 14.2 Jurisdiction Profile ................................................................................................................................. 14-1 14.3 Current Trends ....................................................................................................................................... 14-2 14.4 Capability Assessment ........................................................................................................................... 14-3 14.5 Integration with Other Planning Initiatives ............................................................................................ 14-9 14.6 Jurisdiction-Specific Natural Hazard Event History ............................................................................ 14-10 14.7 Hazard Risk Ranking ........................................................................................................................... 14-10 14.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 14-11 14.9 Status of Previous Plan Actions ........................................................................................................... 14-11 14.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 14-13 14.11 Review and Incorporation of Information for This Annex ................................................................ 14-17 15. City of La Porte ............................................................................................................. 15-1 15.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 15-1 15.2 Jurisdiction Profile ................................................................................................................................. 15-1 Contents ix 15.3 Current Trends ....................................................................................................................................... 15-2 15.4 Capability Assessment ........................................................................................................................... 15-4 15.5 Integration with Other Planning Initiatives ............................................................................................ 15-9 15.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 15-9 15.7 Hazard Risk Ranking ............................................................................................................................. 15-9 15.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 15-11 15.9 Status of Previous Plan Actions ........................................................................................................... 15-11 15.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 15-13 15.11 Review and Incorporation of Information for This Annex ................................................................ 15-17 16. City of Missouri City ..................................................................................................... 16-1 16.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 16-1 16.2 Jurisdiction Profile ................................................................................................................................. 16-1 16.3 Current Trends ....................................................................................................................................... 16-2 16.4 Capability Assessment ........................................................................................................................... 16-3 16.5 Integration with Other Planning Initiatives ............................................................................................ 16-9 16.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 16-9 16.7 Hazard Risk Ranking ............................................................................................................................. 16-9 16.8 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 16-9 16.9 Status of Previous Plan Actions ........................................................................................................... 16-11 16.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 16-12 16.11 Review and Incorporation of Information for This Annex ................................................................ 16-16 17. City of Morgan’s Point .................................................................................................. 17-1 17.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 17-1 17.2 Jurisdiction Profile ................................................................................................................................. 17-1 17.3 Current Trends ....................................................................................................................................... 17-2 17.4 Capability Assessment ........................................................................................................................... 17-2 17.5 Integration with Other Planning Initiatives ............................................................................................ 17-9 17.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 17-9 17.7 Hazard Risk Ranking ........................................................................................................................... 17-10 17.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 17-10 17.9 Status of Previous Plan Actions ........................................................................................................... 17-11 17.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 17-12 17.11 Review and Incorporation of Information for This Annex ................................................................ 17-15 18. City of Nassau Bay ....................................................................................................... 18-1 18.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 18-1 18.2 Jurisdiction Profile ................................................................................................................................. 18-1 18.3 Current Trends ....................................................................................................................................... 18-2 18.4 Capability Assessment ........................................................................................................................... 18-3 18.5 Integration with Other Planning Initiatives ............................................................................................ 18-8 18.6 Jurisdiction-Specific Natural Hazard Event History ............................................................................ 18-10 18.7 Hazard Risk Ranking ........................................................................................................................... 18-10 18.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 18-11 18.9 Status of Previous Plan Actions ........................................................................................................... 18-11 18.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 18-13 18.11 Review and Incorporation of Information for This Annex ................................................................ 18-17 19. City of Pasadena ........................................................................................................... 19-1 Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes x 19.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 19-1 19.2 Jurisdiction Profile ................................................................................................................................. 19-1 19.3 Current Trends ....................................................................................................................................... 19-2 19.4 Capability Assessment ........................................................................................................................... 19-2 19.5 Integration with Other Planning Initiatives ............................................................................................ 19-9 19.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 19-9 19.7 Hazard Risk Ranking ........................................................................................................................... 19-11 19.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 19-12 19.9 Status of Previous Plan Actions ........................................................................................................... 19-12 19.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 19-15 19.11 Review and Incorporation of Information for This Annex ................................................................ 19-18 20. City of Piney Point Village ........................................................................................... 20-1 20.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 20-1 20.2 Jurisdiction Profile ................................................................................................................................. 20-1 20.3 Current Trends ....................................................................................................................................... 20-2 20.4 Capability Assessment ........................................................................................................................... 20-2 20.5 Integration with Other Planning Initiatives ............................................................................................ 20-8 20.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 20-8 20.7 Hazard Risk Ranking ............................................................................................................................. 20-8 20.8 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 20-9 20.9 Status of Previous Plan Actions ............................................................................................................. 20-9 20.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 20-9 20.11 Review and Incorporation of Information for This Annex ................................................................ 20-11 21. City of Seabrook ........................................................................................................... 21-1 21.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 21-1 21.2 Jurisdiction Profile ................................................................................................................................. 21-1 21.3 Current Trends ....................................................................................................................................... 21-2 21.4 Capability Assessment ........................................................................................................................... 21-4 21.5 Integration with Other Planning Initiatives ............................................................................................ 21-9 21.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 21-9 21.7 Hazard Risk Ranking ........................................................................................................................... 21-10 21.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 21-10 21.9 Status of Previous Plan Actions ........................................................................................................... 21-11 21.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 21-14 21.11 Review and Incorporation of Information for This Annex ................................................................ 21-17 21.12 Future Needs to Better Understand Risk/Vulnerability ..................................................................... 21-18 22. City of Shoreacres ........................................................................................................ 22-1 22.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 22-1 22.2 Jurisdiction Profile ................................................................................................................................. 22-1 22.3 Current Trends ....................................................................................................................................... 22-2 22.4 Capability Assessment ........................................................................................................................... 22-3 22.5 Integration with Other Planning Initiatives ............................................................................................ 22-8 22.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 22-8 22.7 Hazard Risk Ranking ............................................................................................................................. 22-8 22.8 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 22-9 22.9 Status of Previous Plan Actions ............................................................................................................. 22-9 22.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 22-12 Contents xi 22.11 Review and Incorporation of Information for This Annex ................................................................ 22-16 23. City of Spring Valley Village ........................................................................................ 23-1 23.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 23-1 23.2 Jurisdiction Profile ................................................................................................................................. 23-1 23.3 Current Trends ....................................................................................................................................... 23-2 23.4 Capability Assessment ........................................................................................................................... 23-3 23.5 Integration with Other Planning Initiatives ............................................................................................ 23-9 23.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 23-9 23.7 Hazard Risk Ranking ........................................................................................................................... 23-10 23.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 23-11 23.9 Status of Previous Plan Actions ........................................................................................................... 23-11 23.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 23-14 23.11 Review and Incorporation of Information for This Annex ................................................................ 23-17 24. City of Stafford .............................................................................................................. 24-1 24.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 24-1 24.2 Jurisdiction Profile ................................................................................................................................. 24-1 24.3 Current Trends ....................................................................................................................................... 24-2 24.4 Capability Assessment ........................................................................................................................... 24-3 24.5 Integration with Other Planning Initiatives ............................................................................................ 24-9 24.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 24-9 24.7 Hazard Risk Ranking ........................................................................................................................... 24-10 24.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 24-11 24.9 Status of Previous Plan Actions ........................................................................................................... 24-11 24.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 24-12 24.11 Review and Incorporation of Information for This Annex ................................................................ 24-15 25. City of Taylor Lake Village ........................................................................................... 25-1 25.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 25-1 25.2 Jurisdiction Profile ................................................................................................................................. 25-1 25.3 Current Trends ....................................................................................................................................... 25-2 25.4 Capability Assessment ........................................................................................................................... 25-2 25.5 Integration with Other Planning Initiatives ............................................................................................ 25-8 25.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 25-8 25.7 Hazard Risk Ranking ............................................................................................................................. 25-9 25.8 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 25-9 25.9 Status of Previous Plan Actions ........................................................................................................... 25-10 25.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 25-10 25.11 Review and Incorporation of Information for This Annex ................................................................ 25-12 26. City of Tomball .............................................................................................................. 26-1 26.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 26-1 26.2 Jurisdiction Profile ................................................................................................................................. 26-1 26.3 Current Trends ....................................................................................................................................... 26-2 26.4 Capability Assessment ........................................................................................................................... 26-3 26.5 Integration with Other Planning Initiatives ............................................................................................ 26-9 26.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 26-9 26.7 Hazard Risk Ranking ........................................................................................................................... 26-10 26.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 26-10 Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes xii 26.9 Status of Previous Plan Actions ........................................................................................................... 26-11 26.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 26-11 26.11 Review and Incorporation of Information for This Annex ................................................................ 26-14 26.12 Future Needs to Better Understand Risk/Vulnerability ..................................................................... 26-15 27. City of Webster ............................................................................................................. 27-1 27.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 27-1 27.2 Jurisdiction Profile ................................................................................................................................. 27-1 27.3 Current Trends ....................................................................................................................................... 27-2 27.4 Capability Assessment ........................................................................................................................... 27-3 27.5 Integration with Other Planning Initiatives ............................................................................................ 27-9 27.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 27-9 27.7 Hazard Risk Ranking ............................................................................................................................. 27-9 27.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 27-10 27.9 Status of Previous Plan Actions ........................................................................................................... 27-10 27.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 27-10 27.11 Review and Incorporation of Information for This Annex ................................................................ 27-13 28. City of West University Place ...................................................................................... 28-1 28.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 28-1 28.2 Jurisdiction Profile ................................................................................................................................. 28-1 28.3 Current Trends ....................................................................................................................................... 28-3 28.4 Capability Assessment ........................................................................................................................... 28-4 28.5 Integration with Other Planning Initiatives .......................................................................................... 28-10 28.6 Jurisdiction-Specific Natural Hazard Event History ............................................................................ 28-10 28.7 Hazard Risk Ranking ........................................................................................................................... 28-10 28.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 28-10 28.9 Status of Previous Plan Actions ........................................................................................................... 28-12 28.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 28-13 28.11 Review and Incorporation of Information for This Annex ................................................................ 28-17 29. Houston Independent School District ......................................................................... 29-1 29.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 29-1 29.2 Jurisdiction Profile ................................................................................................................................. 29-1 29.3 Capability Assessment ........................................................................................................................... 29-2 29.4 Integration with Other Planning Initiatives ............................................................................................ 29-6 29.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 29-6 29.6 Hazard Risk Ranking ............................................................................................................................. 29-7 29.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 29-7 29.8 Status of Previous Plan Actions ............................................................................................................. 29-8 29.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 29-8 29.10 Review and Incorporation of Resources for This Annex ................................................................... 29-10 29.11 Future Needs to Better Understand Risk/Vulnerability ..................................................................... 29-11 29.12 Additional Comments ........................................................................................................................ 29-11 30. Huffman Independent School District ......................................................................... 30-1 30.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 30-1 30.2 Jurisdiction Profile ................................................................................................................................. 30-1 30.3 Capability Assessment ........................................................................................................................... 30-2 30.4 Integration with Other Planning Initiatives ............................................................................................ 30-6 Contents xiii 30.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 30-6 30.6 Hazard Risk Ranking ............................................................................................................................. 30-7 30.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 30-7 30.8 Status of Previous Plan Actions ............................................................................................................. 30-7 30.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 30-8 30.10 Review and Incorporation of Resources for This Annex ..................................................................... 30-9 31. Pasadena Independent School District ...................................................................... 31-1 31.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 31-1 31.2 Jurisdiction Profile ................................................................................................................................. 31-1 31.3 Capability Assessment ........................................................................................................................... 31-2 31.4 Integration with Other Planning Initiatives ............................................................................................ 31-5 31.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 31-5 31.6 Hazard Risk Ranking ............................................................................................................................. 31-5 31.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 31-5 31.8 Status of Previous Plan Actions ............................................................................................................. 31-5 31.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 31-6 31.10 Review and Incorporation of Resources for This Annex ..................................................................... 31-7 31.11 Future Needs to Better Understand Risk/Vulnerability ....................................................................... 31-7 32. Houston Community College ...................................................................................... 32-1 32.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 32-1 32.2 Jurisdiction Profile ................................................................................................................................. 32-1 32.3 Capability Assessment ........................................................................................................................... 32-3 32.4 Integration with Other Planning Initiatives ............................................................................................ 32-6 32.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 32-7 32.6 Hazard Risk Ranking ............................................................................................................................. 32-7 32.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 32-8 32.8 Status of Previous Plan Actions ............................................................................................................. 32-8 32.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 32-8 32.10 Review and Incorporation of Resources for This Annex ................................................................... 32-11 33. Lone Star College ......................................................................................................... 33-1 33.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 33-1 33.2 Jurisdiction Profile ................................................................................................................................. 33-1 33.3 Capability Assessment ........................................................................................................................... 33-2 33.4 Integration with Other Planning Initiatives ............................................................................................ 33-4 33.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 33-6 33.6 Hazard Risk Ranking ............................................................................................................................. 33-6 33.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 33-7 33.8 Status of Previous Plan Actions ............................................................................................................. 33-7 33.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 33-10 33.10 Review and Incorporation of Resources for This Annex ................................................................... 33-14 34. University of Houston .................................................................................................. 34-1 34.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 34-1 34.2 Jurisdiction Profile ................................................................................................................................. 34-1 34.3 Capability Assessment ........................................................................................................................... 34-4 34.4 Integration With Other Planning Initiatives ........................................................................................... 34-6 34.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 34-7 Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes xiv 34.6 Hazard Risk Ranking ............................................................................................................................. 34-7 34.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 34-8 34.8 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 34-8 34.9 Review and Incorporation of Resources for This Annex ..................................................................... 34-11 35. Harris County Flood Control District .......................................................................... 35-1 35.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 35-1 35.2 Jurisdiction Profile ................................................................................................................................. 35-1 35.3 Capability Assessment ........................................................................................................................... 35-2 35.4 Integration with Other Planning Initiatives ............................................................................................ 35-7 35.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 35-9 35.6 Hazard Risk Ranking ............................................................................................................................. 35-9 35.7 Jurisdiction-Specific Vulnerabilities .................................................................................................... 35-10 35.8 Status of Previous Plan Actions ........................................................................................................... 35-10 35.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 35-21 35.10 Review and Incorporation of Resources for This Annex ................................................................... 35-46 36. Harris County Emergency Service District No. 12 ..................................................... 36-1 36.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 36-1 36.2 Jurisdiction Profile ................................................................................................................................. 36-1 36.3 Capability Assessment ........................................................................................................................... 36-2 36.4 Integration with Other Planning Initiatives ............................................................................................ 36-5 36.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 36-6 36.6 Hazard Risk Ranking ............................................................................................................................. 36-6 36.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 36-6 36.8 Status of Previous Plan Actions ............................................................................................................. 36-7 36.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 36-7 36.10 Review and Incorporation of Resources for This Annex ..................................................................... 36-9 37. Harris Health System .................................................................................................... 37-1 37.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 37-1 37.2 Jurisdiction Profile ................................................................................................................................. 37-1 37.3 Capability Assessment ........................................................................................................................... 37-4 37.4 Integration with Other Planning Initiatives ............................................................................................ 37-7 37.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 37-7 37.6 Hazard Risk Ranking ............................................................................................................................. 37-7 37.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 37-8 37.8 Status of Previous Plan Actions ............................................................................................................. 37-8 37.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 37-11 37.10 Review and Incorporation of Resources for This Annex ................................................................... 37-14 38. Texas Medical Center ................................................................................................... 38-1 38.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 38-1 38.2 Jurisdiction Profile ................................................................................................................................. 38-1 38.3 Capability Assessment ........................................................................................................................... 38-3 38.4 Integration with Other Planning Initiatives ............................................................................................ 38-7 38.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 38-8 38.6 Hazard Risk Ranking ............................................................................................................................. 38-8 38.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 38-9 38.8 Status of Previous Plan Actions ........................................................................................................... 38-10 Contents xv 38.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 38-10 38.10 Review and Incorporation of Resources for This Annex ................................................................... 38-12 38.11 Future Needs to Better Understand Risk/Vulnerability ..................................................................... 38-13 38.12 Additional Comments ........................................................................................................................ 38-13 Appendices Appendix A. Planning Partner Expectations Appendix B. Procedures for Linking to Hazard Mitigation Plan Appendix C. Annex Instructions and Templates xvii INTRODUCTION BACKGROUND The Federal Emergency Management Agency (FEMA) encourages multi-jurisdictional planning for hazard mitigation. All participating jurisdictions must meet the requirements of Chapter 44 of the Code of Federal Regulations (44 CFR): “Multi-jurisdictional plans (e.g. watershed plans) may be accepted, as appropriate, as long as each jurisdiction has participated in the process and has officially adopted the plan.” (Section 201.6(a)(4)). For the Harris County Multi-Hazard Mitigation Action Plan, a planning partnership was formed to leverage resources and to meet requirements of the federal Disaster Mitigation Act for as many eligible local governments as possible. The Disaster Mitigation Act defines a local government as follows: “Any county, municipality, city, town, township, public authority, school district, special district, intrastate district, council of governments (regardless of whether the council of governments is incorporated as a nonprofit corporation under State law), regional or interstate government entity, or agency or instrumentality of a local government; any Indian tribe or authorized tribal organization, or Alaska Native village or organization; and any rural community, unincorporated town or village, or other public entity.” Two types of planning partners participated in this process for the Harris County Multi-Hazard Mitigation Action Plan, with distinct needs and capabilities: • Incorporated municipalities (Cities and the County) • Special purpose districts who have junior taxing authority Each participating planning partner prepared a jurisdiction-specific annex to this plan. These annexes, as well as information on the process by which they were created, are contained in this volume. THE PLANNING PARTNERSHIP Initial Solicitation and Letters of Intent The planning team solicited the participation of all eligible municipalities and special purpose districts at the outset of this project. A kickoff meeting was held on September 18, 2018 to identify potential stakeholders and planning partners for this process. The purpose of the meeting was to introduce the planning process to jurisdictions in the County that could have a stake in the outcome of the planning effort. All eligible local governments in the planning area — 54 in total including prior and potential planning partners — were invited to attend. The goals of the meeting were as follows: • Provide an overview of the Disaster Mitigation Act • Review the Harris County Hazard Mitigation Plan and planning partnership Introduction xviii • Outline the work plan for this hazard mitigation plan • Describe the benefits of multi-jurisdictional planning • Outline planning partner expectations • Solicit planning partners • Solicit volunteers/recommendations for the steering committee Local governments wishing to join the planning effort were asked to provide the planning team with a “letter of intent to participate” that agreed to the planning partner expectations (see Appendix A) and designated a point of contact for their jurisdiction. In all, the core planning team (CPT) received formal commitment from 42 planning partners including the County. Eleven of the letters were from new planning partners not covered under the County’s previous hazard mitigation plan, approved in 2015: • City of Friendswood • Cypress Fairbanks Independent School District • Houston Independent School District • Huffman Independent School District • Pasadena Independent School District • Texas Southern University • Lone Star College • Texas Medical Center/Texas Children’s Hospital • Houston Community College • Harris County ESD 12 • University of Houston Maps for each fully participating city are provided in the individual annex for that city in this volume. Maps showing the location of participating special purpose districts by district type are provided at the end of this introduction. Planning Partner Expectations The planning team developed the following list of planning partner expectations, which were provided and discussed at the kickoff meeting (see Appendix A for details): • Complete a “letter of intent to participate.” • Designate a lead point of contact for this effort. • Support and participate in the selection and function of the Steering Committee. • Provide support required to implement the public involvement strategy. • Participate in the process through opportunities such as:  Steering Committee meetings  Public meetings or open houses  Workshops and planning partner specific training sessions  Public review and comment periods prior to adoption. • Attend the mandatory jurisdictional annex workshop. • Complete the jurisdictional annex. • Perform a “consistency review” of all technical studies, plans and ordinances specific to hazards. • Review the risk assessment and identify hazards and vulnerabilities specific to the jurisdiction. • Review and determine if the mitigation recommendations chosen in Volume 1 will meet the needs of the jurisdiction. Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes xix • Create an action plan that identifies each project, who will oversee the task, how it will be financed, and when it is estimated to occur. • Formally adopt the hazard mitigation plan. By adopting this plan, each planning partner also agrees to the plan implementation and maintenance protocol established in Volume 1. Failure to meet these criteria may result in a partner being dropped from the partnership by the Steering Committee, and thus losing eligibility under the scope of this plan. Linkage Procedures Eligible local jurisdictions that did not participate in development of this multi-jurisdictional plan may comply with Disaster Mitigation Act requirements by linking to this plan following procedures outlined in Appendix B. ANNEX-PREPARATION PROCESS Templates Templates were created to help the planning partners prepare their jurisdiction-specific annexes. Separate templates were created for both types of jurisdictions participating in this plan, municipalities and districts. The templates were created so that all criteria of Section 201.6 of 44 CFR would be, based on the partners’ capabilities and mode of operation. Separate templates were available for partners updating a previous hazard mitigation plan and those developing a first-time hazard mitigation plan. These templates were deployed in three phases during the course of this plan update process. These phases are described as follows: • Phase 1 — Profile, Trends, Previous Plan Status, and Information Sources  Deploy: November 26, 2018  Due: December 31, 2018 • Phase 2 — Capability Assessment and Information Sources  Deployed: Mid-January 2019  Due: End of February 2019 • Phase 3 — Risk Ranking, Action Plan, and Information Sources  Deployed: Mandatory Phase 3 Workshops, July 16-18, 2019  Due: August 9, 2019 The templates were set up to lead all partner through steps to generate Disaster Mitigation Act-required elements specific to their jurisdictions. The templates and their instructions are included in Appendix C of this volume. Tool Kit Each planning partner was provided with a tool kit to assist in completing the annex template and developing an action plan. The tool kits contained the following: • 2015 Plan • Action Plan  Mitigation Best Practices Catalog  Mission Statement, Goals and Objectives Introduction xx  Action identification resources • Grant Information  General HMA Guidance  Climate Resilient Guidance • Hazard Maps • Hazard Event History • Phase 3 Annexes, including templates and instructions • Plan Integration Guidance from FEMA • Risk Assessment Results  Loss estimate matrix — includes hazard risk assessment information broken down by jurisdiction and hazard type, with risk ranking results. • Survey Results • Workshop Presentation Phase 3 Workshop All partners were required to participate in a technical assistance workshop, where key elements of the template were discussed, and the templates were subsequently completed by a designated point of contact for each partner and a member of the planning team. Six workshops were held during the week of July 16-18, 2019. Attendance to at least one of these workshops by each planning partners was mandatory, to meet “participation” as defined by this planning process. These workshops addressed the following topics: • The templates and the tool kit • Natural events history • Jurisdiction-specific issues • Risk ranking • Status of prior actions • Developing your action plan • Cost/benefit review • Prioritization protocol • Next steps. MITIGATION ACTION PLAN DEVELOPMENT Risk Ranking In the risk-ranking exercise, each planning partner was asked to review the ranked risk specifically for its jurisdiction, based on the impact on its population and/or facilities. Municipalities based this ranking on probability of occurrence and the potential impact on people, property and the economy. Special purpose districts based this ranking on probability of occurrence and the potential impact on their constituency, their vital facilities and the facilities’ functionality after an event. The methodology followed that used for the countywide risk ranking presented in Volume 1. The objectives of this exercise were to familiarize the partnership with how to use the risk assessment as a tool to support other planning and hazard mitigation processes and to help prioritize types of mitigation actions that should be considered. Hazards that were ranked as “high” and “medium” for each Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes xxi jurisdiction as a result of this exercise were considered to be priorities for identifying mitigation actions, although jurisdictions also identified actions to mitigate “low” ranked hazards, as appropriate. Information Reviewed to Develop Action Plan The tool kits were used during the workshops and in follow-up work conducted by the planning partners. A large portion of the workshop focused on how the tool kit should be used to develop the mitigation action plan. Planning partners were specifically asked to review the following to assist in the identification of actions: • The Jurisdiction’s Capability Assessment — reviewed to identify capabilities that the jurisdiction does not currently have but should consider pursuing or capabilities that should be revisited and updated to include best available information; also reviewed to determine how existing capabilities can be leveraged to increase or improve hazard mitigation in the jurisdiction. • The Jurisdiction’s National Flood Insurance Program Compliance Table — reviewed to identify opportunities to increase floodplain management capabilities. • The Jurisdiction’s Review of Its Adaptive Capacity for Climate Change — reviewed to identify ways to leverage or continue to improve existing capacities and to improve understanding of other capacities. • The Jurisdiction’s Identified Opportunities for Future Integration — reviewed to identify specific integration actions to be included in the mitigation strategy. • Jurisdiction-Specific Vulnerabilities — reviewed to identify actions that will help reduce known vulnerabilities. • The Mitigation Best Practices Catalog — reviewed to identify actions that the jurisdiction should consider including in its action plan. • Public Input — reviewed to identify potential actions and community priorities. Selection of Recommended Actions The Planning Partners reviewed the catalogs of hazard mitigation alternatives presented in Volume 1 and selected actions to be included in a hazard mitigation action plan. The selection of actions was based on the risk assessment of identified hazards of concern and the defined hazard mitigation goals and objectives. Each annex lists the recommended hazard mitigation actions that make up the action plan. The timeframe indicated in the tables is defined as follows: • Short Term = to be completed in 1 to 5 years • Long Term = to be completed in greater than 5 years • Ongoing = currently being funded and implemented under existing programs. Prioritization 44 CFR requires actions identified in the action plan to be prioritized (Sections 201.6(c)(3)(iii)). The planning team and steering committee developed a methodology for prioritizing the action plans that meets the needs of the partnership and the requirements of 44 CFR. All identified actions were prioritized in two categories — implementation and grant pursuit — as defined by the following criteria: • Implementation priority  High Priority — an action that meets multiple objectives, has benefits that exceed costs, and has a secured source of funding. Action can be completed in the short term (1 to 5 years).  Medium Priority — an action that meets multiple objectives, has benefits that exceed costs, and is eligible for funding though no funding has yet been secured for it. Action can be completed in the Introduction xxii short term (1 to 5 years), once funding is secured. Medium-priority actions become high-priority actions once funding is secured.  Low Priority — an action that will mitigate the risk of a hazard, has benefits that do not exceed the costs or are difficult to quantify, has no secured source of funding, and is not eligible for any known grant funding. Action can be completed in the long term (1 to 10 years). Low-priority actions are generally “wish-list” actions. They may be eligible for grant funding from programs that have not yet been identified. • Grant pursuit priority  High Priority — an action that meets identified grant eligibility requirements, has high benefits, and is listed as high or medium implementation priority; local funding options are unavailable or available local funds could be used instead for actions that are not eligible for grant funding.  Medium Priority — an action that meets identified grant eligibility requirements, has medium or low benefits, and is listed as medium or low implementation priority; local funding options are unavailable.  Low Priority — an action that has not been identified as meeting any grant eligibility requirements. These priority definitions are dynamic and can change from one category to another based on changes to a parameter such as availability of funding. For example, a project might be assigned a medium priority because of the uncertainty of a funding source, but be changed to high priority once a funding source has been identified. The 2010 plan used the same method of prioritization for implementation priority as was used in this plan update. The grant pursuit priority is a newly added prioritization schedule. The prioritization schedule for this plan will be reviewed and updated as needed annually through the plan maintenance strategy. Benefit/Cost Review 44 CFR requires the prioritization of the action plan to emphasize a benefit/cost analysis of the proposed actions. Because some actions may not be implemented for up to 10 years, benefit/cost analysis was qualitative and not of the detail required by FEMA for project grant eligibility under the Hazard Mitigation Assistance (HMA) grant program. A review of the apparent benefits versus the apparent cost of each project was performed. Parameters were established for assigning subjective ratings (high, medium, and low) to benefits and costs as follows: • Benefit ratings:  High — the action will have an immediate impact on the reduction of risk exposure to life and property.  Medium — the action will have a long-term impact on the reduction of risk exposure to life and property or will provide an immediate reduction in the risk exposure to property.  Low — long-term benefits of the action are difficult to quantify in the short-term. • Cost ratings:  High — existing funding levels are not adequate to cover the costs of the proposed action; implementation would require an increase in revenue through an alternative source (for example, bonds, grants, and fee increases).  Medium — the action could be implemented with existing funding but would require a re- apportionment of the budget or a budget amendment, or the cost of the action would have to be spread over multiple years.  Low — the action could be funded under the existing budget. The action is part of or can be part of an existing, ongoing program. Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes xxiii Using this approach, projects with positive benefit versus cost ratios (such as high over high, high over medium, medium over low, etc.) are considered cost-beneficial and are prioritized accordingly. For many of the strategies identified in this action plan, funding might be sought under FEMA’s HMA program. This program requires detailed benefit/cost analysis as part of the application process. These analyses will be performed on projects at the time of application preparation. The FEMA benefit-cost model will be used to perform this review. For projects not seeking financial assistance from grant programs that require this sort of analysis, the Partners reserve the right to define “benefits” according to parameters that meet their needs and the goals and objectives of this plan. Analysis of Mitigation Actions All planning partners reviewed their recommended actions to classify each action based on the hazard it addresses and the type of mitigation it involves. Mitigation types used for this categorization are as follows: • Prevention — government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. • Property Protection — modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter-resistant glass. • Public Education and Awareness — actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school-age and adult education. • Natural Resource Protection — actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. • Emergency Services — actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. • Structural Projects — actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms. • Climate Resilient — actions that incorporate methods to mitigate and/or adapt to the impacts of climate change. Includes aquifer storage and recovery activities, incorporating future-conditions projections in project design or planning, or actions that specifically address jurisdiction-specific climate change risks, such as sea level rise or urban heat island effect. • Community Capacity Building — actions that increase or enhance local capabilities to adjust to potential damage, to take advantage of opportunities, or to respond to consequences. Includes staff training, memorandums of understanding, development of plans and studies, and monitoring programs. These categories include categories identified in the Community Rating System (CRS) 2017 CRS Coordinators Manual (OMB No. 1660-0022, Figure 510-4). The CRS categories expand on the four categories in FEMA’s 2013 Local Mitigation Handbook. They provide a more comprehensive range of options, thus increasing integration opportunities. COMPATIBILITY WITH PREVIOUS APPROVED PLANS Thirty-three of the planning partners who participated in this plan were previously covered under the 2015 Harris County Multi-Hazard Mitigation Plan. Table 1 lists all the initial partners and the role this multi-jurisdictional plan will play in achieving compliance and the CRS status, if applicable. Introduction xxiv Table 1. Prior Plan and Planning Partner Status Covered by 2015 Plan? FEMA Approval Date Letter of Intent Date Attended Workshop? Completed Template? CRS Community (Yes or No) Covered by this Hazard Mitigation Plan? Harris County Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes City of Baytown Yes 7/26/2015 9/21/2018 Yes Yes Yes Yes City of Bellaire Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes City of Bunker Hill Village Yes 7/26/2015 10/18/2018 Yes Yes No Yes City of Deer Park Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes City of El Lago Yes 7/26/2015 3/8/2019 Yes Yes No Yes City of Friendswood No N/A 9/14/2018 Yes Yes Yes Yes City of Galena Park Yes 7/26/2015 10/18/2018 Yes Yes No Yes City of Hedwig Village Yes 7/26/2015 10/18/2018 Yes Yes No Yes City of Hilshire Village Yes 7/26/2015 10/18/2018 Yes Yes No Yes City of Humble Yes 7/26/2015 9/6/2018 Yes Yes No Yes City of Hunters Creek Village Yes 7/26/2015 10/18/2018 Yes Yes No Yes City of Jacinto City Yes 7/26/2015 10/18/2018 Yes No No No City of Jersey Village Yes 7/26/2015 10/16/2018 Yes Yes No Yes City of Katy Yes 7/26/2015 10/18/2018 Yes Yes No Yes City of La Porte Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes City of Missouri City Yes 7/26/2015 8/16/2018 Yes Yes Yes Yes City of Morgan’s Point Yes 7/26/2015 10/18/2018 Yes Yes No Yes City of Nassau Bay Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes City of Pasadena Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes City of Piney Point Village Yes 7/26/2015 10/18/2018 Yes Yes No Yes City of Seabrook Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes City of Shoreacres Yes 7/26/2015 10/17/2018 Yes Yes Yes Yes City of Southside Place Yes 7/26/2015 N/A No No No No City of Spring Valley Yes 7/26/2015 10/18/2018 Yes Yes No Yes City of Stafford Yes 7/26/2015 10/17/2018 Yes Yes No Yes City of Taylor Lake Village Yes 7/26/2015 2/21/2019 Yes Yes Yes Yes City of Tomball Yes 7/26/2015 10/18/2018 Yes Yes No Yes City of Webster Yes 7/26/2015 10/18/2018 Yes Yes No Yes Cypress Fairbanks ISD No N/A 9/26/2018 Yes No No No City of West University Place Yes 7/26/2015 9/29/2018 Yes Yes Yes Yes Harris County Flood Control District Yes 7/26/2015 9/19/2018 Yes Yes No Yes Harris County ESD #12 No N/A 9/20/2018 Yes Yes No Yes Harris County Hospital District dba Harris Health System Yes 7/26/2015 10/9/2018 Yes Yes No Yes Houston Community College No N/A 11/6/2018 Yes Yes No Yes Houston ISD No N/A 10/9/2018 Yes Yes No Yes Huffman ISD No N/A 10/18/2018 Yes Yes No Yes Pasadena ISD No N/A 10/9/2018 Yes Yes No Yes Lone Star College Yes 7/26/2015 10/17/2018 Yes Yes No Yes Texas Medical Center No N/A 10/19/2018 Yes Yes No Yes Texas Southern University No N/A 10/18/2018 Yes Yes No Yes University of Houston No N/A 10/18/2018 Yes Yes No Yes Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes xxv FINAL COVERAGE UNDER THE PLAN Of the 42 local governments that submitted letters of intent to participate, 39 fully met the participation requirements specified by the Steering Committee. The principal requirement not met by the other partners was completion of the jurisdictional annex template following the workshops. Only the 39 partners that submitted completed templates are included in this volume and will seek DMA compliance under this plan. The remaining jurisdictions will need to follow the linkage procedures described in Appendix B of this volume. Table 1 lists the jurisdictions that submitted letters of intent and their ultimate status in this plan. Harris County HMP Project Area Planning Partners - Special Districts Independent School Districts Cypress Fairbanks ISD Houston ISD Huffman ISD Pasadena ISD College Districts Houston Community College District Lone Star College System District Emergency Service Districts Har ris County ESD 12 Harris County 0 4 82Miles ± Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes xxvii ACRONYMS The following acronyms are used throughout the annexes in this volume: • BAWA — Baytown Area Water Authority • BBFFDRP — Buffalo Bayou Flood Damage Reduction Project • BFE — base flood elevation • CDBG — Community Development Block Grant • CFM — Certified Floodplain Manager • CLOMR — Conditional Letter of Map Revision • CRS — Community Rating System • CWOP — Citizen Weather Observer Program • CWPP — Community Wildfire Protection Plan • EAS/iPAWS — Emergency Alert System/Integrated Public Alert and Warning System • EHLS — Environmental Health and Life Safety • EMC — Emergency Management Coordinator • EMCID — East Montgomery County Improvement District • ENG — Engineering Department • EOC — emergency operations center • EOP — emergency operations plan • EPA — U.S. Environmental Protection Agency • ETJ — extraterritorial jurisdiction • FDC — fire department connection • FDPO — flood damage prevention ordinance • FDRP — flood damage reduction project • FEMA — Federal Emergency Management Agency • FF&E — furniture, fixtures and equipment • FIRM — Flood Insurance Rate Map • FIS — Flood Insurance Study • FMA — Flood Mitigation Assistance Grant Program • GCWA — Gulf Coast Water Authority • HCED — Harris County Engineering Department • HCFCD — Harris County Flood Control District • HCP — Habitat Conservation Plan • H-GAC — Houston-Galveston Area Council • HGSD — Harris-Galveston Subsidence District • HMA — Hazard Mitigation Assistance • HMGP — Hazard Mitigation Grant Program • HMP — hazard mitigation plan • IBC — International Building Code • IECC — International Energy Conservation Code • ISD — independent school district • IT — information technology department • KBDI — Keetch-Byram Drought Index • LEPC — local emergency planning committee • LERRD — land, easements, rights-of-way, relocation, and disposal areas • LiMWA — limit of moderate wave action • LMI — low to moderate income Introduction xxviii • LOMA — letter of map amendment • LOMR — letter of map revision • MEP — mechanical, engineering and plumbing • MSDS — material safety data sheets • MVPD — Memorial Villages Police Department • NFIP — National Flood Insurance Program • NOAA — National Oceanic and Atmospheric Administration • O&M — operations and maintenance • OHSEM — Office of Homeland Security and Emergency Management • OHWM — ordinary high-water mark • PA — Public Assistance • PDM — Pre-Disaster Mitigation • PHES — Harris County Public Health and Environmental Services • PLNG — Planning Department • PW — public works department • RL — repetitive loss • SBFDRP — Sims Bayou Flood Damage Reduction Project • SDS — State Dam Safety • SERLEPC — Southeast Regional Local Emergency Planning Committee • SETRAC — Southeast Texas Regional Advisory Council • SFHA — special flood hazard area • SJRA — San Jacinto River Authority • SMP — shoreline management plan • SRL — severe repetitive loss • SWQMP — surface water quality master plan • TCEQ — Texas Commission on Environmental Quality • TDECU — Texas Dow Employees Credit Union • TDEM — Texas Division of Emergency Management • THIRA — threat & hazard identification & risk • TIRZ — tax increment reinvestment zone • UASI — urban area security initiative • ULDC — Unified Land Development Code • WCID — water control and improvement district • WTP — Water treatment plant • WWTP — Wastewater treatment plant 1-1 1. HARRIS COUNTY 1.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Brian Murray, Public Information Officer 6922 Katy Road Houston, TX 77024 Telephone: 713-881-3100 E-mail Address: brian.murray@oem.hctx.net Bill Wheeler, Deputy EMC 6922 Katy Road Houston, TX 77024 Telephone: 713-881-3100 E-mail Address: bill.wheeler@oem.hctx.net 1.2 JURISDICTION PROFILE 1.2.1 Location Harris County, which covers 1,703 square miles (U.S. Census Bureau, 2014), is located on the upper Gulf Coast in Southeast Texas. It is bordered by Waller County on the northwest side, Montgomery County on the north side, Liberty and Chambers Counties on the eastside, Galveston and Brazoria Counties on the south side, and Fort Bend County on the west side. Harris County’s southern half is level coastal prairie and the northern half touches the rolling East Texas timberlands. Central Harris County is 55 feet above sea level (The Handbook of Texas Online). The land rises gradually to higher than 200 feet on the northern border (The Handbook of Texas Online). Small bluffs around upper Galveston Bay descend to sea level. The soil is heavy black coastal clay in the south and sandy loam north of Buffalo Bayou (The Handbook of Texas Online). Native trees include pine and hardwoods such as oak, ash, and hickory (The Handbook of Texas Online). The average annual rainfall in Harris County is 48.19 inches (The Handbook of Texas Online), and the mean temperature is 69.1 Fahrenheit. (The Handbook of Texas Online). 1.2.2 History According to the Handbook of Texas Online, Archeological sites in Harris County reveal the presence of human beings 6,000 years ago. The oldest contains a previously undisturbed deposit of bone remains and dart points dating from 4000 to 1000 B.C. A site on Clear Lake features a shell midden and cemetery with early ceramics dating between 1400 B.C. and A.D. 950. The first Anglo-Americans to explore Harris County were members of the various filibustering expeditions launched from New Orleans between 1815 and 1820 to aid the Mexican Republicans rebelling against Spain. Using Galveston Island and Bolivar Peninsula as a base, the men belonging to the expeditions and encampments of Louis Michel Aury, Francisco Xavier Mina, Jean Laffite, and James Long looked around the San Jacinto estuary for future homesites, their expected reward for freeing Mexico from Spain. Some of these men were among the pioneer settlers arriving by boat from Louisiana in early 1822, just after the Mexican War of Independence. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 1-2 Responding to Stephen F. Austin’s advertisements, the families wrongly assumed that the San Jacinto estuary was part of his empresario grant. Some moved to the Brazos River in 1824, but merchants and boatmen remained to exploit what turned out to be the best transportation system in Texas and to petition successfully for inclusion in the Austin grant. Since Galveston Island and the Gulf shore were forbidden to Anglo settlement, Harris County was the southeastern border of the colony. The pioneers found no Indians living in the future Harris County. In July 1824 a state land commissioner, the Baron de Bastrop, arrived and spent two months issuing twenty-nine titles to settlers, even though surveys were incomplete. The pioneers, including Nathaniel Lynch, William Scott, and John R. Harris, chose sites along Buffalo Bayou, the San Jacinto River, and the San Jacinto estuary. Between 1828 and 1833, when Austin’s colonization effort virtually ended, twenty-three more families secured titles elsewhere in the county, usually along watercourses. In 1826, John R. Harris laid out Harrisburg on his league where Brays Bayou joined Buffalo Bayou, the head of navigation. Harrisburg County was formed by the First Congress on December 22, 1836. The lawmakers also named Andrew Briscoe chief justice and the infant city of Houston the county seat and national capital. The county encompassed the territory of the old municipality plus Galveston Island (the mainland was attached to Brazoria County) until May 1838, when its modern boundaries were established. In December 1839, Congress changed the name to Harris County, in honor of John R. Harris. Between 1903 and 1907 oil was discovered on the eastern shore of the San Jacinto estuary at Goose Creek and Tabbs Bay. Migrant roughnecks and their families moved to the area and established a temporary boomtown amid the derricks between 1915 and 1917. The development of Harris County as an industrial power began in 1911, when voters approved the formation of the Harris County Ship Channel Navigation District. In 1914 the United States Army Corps of Engineers finished deepening the existing fifty-mile-long channel to twenty-five feet from the Gulf through Galveston Bay and up the San Jacinto River and Buffalo Bayou to the district’s turning basin at the Port of Houston. By 1918 petroleum refineries began locating along Buffalo Bayou and the San Jacinto River, as did various other industries. Since that time, the channel has been deepened to fifty feet and widened to accommodate larger vessels. Exports from the port include rice, wheat, grain sorghums, cotton, caustic soda, cement, and petroleum products. Imports include crude oil, iron ore, molasses, coffee, gypsum, and automobiles. Though the area was increasingly urbanized, in 2002 the county had 2,452 farms and ranches covering 304,868 acres, 51 percent of which were devoted to pasture, 41 percent to crops, and six percent to woodlands. 1.2.3 Climate The climate of Harris County is described as humid subtropical. The general temperature range, according to the National Oceanic and Atmospheric Agency is 84.6 F in August and 53.1 F in January. Annual rainfall averages 49.77 inches on 104 days. Accumulating snow events are unusual; freezing rain or sleet are more common in the winter months. The most common weather related threat is flooding but the Gulf Coast region is susceptible to tropical cyclones and tornadoes. 1.2.4 Governing Body Format Texas cities of more than 5,000 citizens adopt home-rule charters and are governed by city councils and either city managers, city administrators, or mayors. Cities having fewer than 5,000 residents, or “general law” cities, have powers and duties specifically granted by the Texas Constitution and state law. A city manager or city administrator plan can be adopted in any general law city. Some home rules cities now have fewer than 5,000 residents because their population has declined since they adopted their home rule charters. Harris County 1-3 Counties’ powers and duties are specifically granted and limited by the Texas Constitution and state law. Each county has a commissioner’s court, which consists of four commissioners, each elected from the Commissioner’s Precinct, and the County Judge elected from the entire county. In smaller counties, the County Judge retains judicial responsibilities in probate and insanity cases. Special Districts are created to perform a specific function. 1.2.5 Local Mitigation Planning Team Members This annex was developed over the course of several months with input from many county departments including the Office of Homeland Security and Emergency Management, County Engineer, Building Management, Budget Management, Public Health, and other county departments. All departments were asked to contribute to the annex development through reviewing and contributing to the capability assessment, reporting on the status of previously identified actions, and participating in action identification and prioritization. An action development meeting was held on February 20, 2019 and was attended by representatives from all previously listed departments. Once actions had been identified and compiled in the annex, a draft was internally circulated for comment. 1.3 CURRENT TRENDS 1.3.1 Population According to U.S. Census Bureau 2017 Population Estimate, the population of Harris County was 4,652,980. Since 2010, the population has grown by 13.7 percent. It is the third largest county by population in the United States; the population exceeds that of 24 states. 1.3.2 Development Table 1-1 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. 1.4 CAPABILITY ASSESSMENT Harris County performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 1-2. • Development and permitting capabilities are presented in Table 1-3. • An assessment of fiscal capabilities is presented in Table 1-4. • An assessment of administrative and technical capabilities is presented in Table 1-5. • An assessment of education and outreach capabilities is presented in Table 1-6. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 1-7. • Classifications under various community mitigation programs are presented in Table 1-8. • The community’s adaptive capacity for the impacts of climate change is presented in Table 1-9. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 1-4 Table 1-1. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A Are any areas targeted for development or major redevelopment in the next five years? No • If yes, briefly describe, including whether any of the areas are in known hazard risk areas N/A How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 12,090 10,571 10,235 10,430 10,710 Multi-Family 273 222 61 60 250 Other (commercial, mixed use, etc.) 1092 965 957 767 939 Total 13,455 11,758 11,253 11,257 11,899 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: Approximately 6% of permits issued are in the SFHA • Landslide: N/A • High Liquefaction Areas: N/A • Tsunami Inundation Area: N/A • Wildfire Risk Areas: N/A Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. Unincorporated Harris County is growing rapidly with residential and commercial development, but there is still a large percentage of agricultural and undeveloped properties. Harris County 1-5 Table 1-2. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code No No No No Comment: Zoning Code No No No No Comment: Subdivisions Yes Yes Yes Yes Comment: Regulations of Harris County, Texas for the Approval and Acceptance of Infrastructure, July 9, 2019 Stormwater Management Yes Yes Yes Yes Comment: Regulations of Harris County, Texas for Stormwater Quality Management, September 1, 2016 Post-Disaster Recovery Yes Yes Yes Yes Comment: Annex J of the Harris County’s Basic Plan, 2014 Real Estate Disclosure No Yes Yes Yes Comment: Growth Management No No No Yes Comment: Site Plan Review Yes Yes Yes Yes Comment: Regulations of Harris County, Texas for the Approval and Acceptance of Infrastructure, July 9, 2019 Environmental Protection Yes Yes Yes Yes Comment: Regulations of Harris County, Texas for Stormwater Quality Management, September 1, 2016 Flood Damage Prevention Yes Yes Yes Yes Comment: Regulations of Harris County, Texas for Floodplain Management, July 9, 2019 Emergency Management Yes Yes Yes Yes Comment: Texas Gov Code, Title 4. Chapter 418. Emergency Management, 1975 Climate Change No No No Yes Comment: Planning Documents General Plan Yes No Yes Yes Comment: Harris County Basic Plan, 2015 Capital Improvement Plan Yes No Yes Yes How often is the plan updated? each fiscal year Comment: FY 2019 Interim Capital Improvements Program, February 26, 1019 Disaster Debris Management Plan Yes Yes Yes Yes Comment: Annex K of the Harris County Basic Plan, 2015 Floodplain or Watershed Plan Yes Yes Yes Yes Comment: Policy, Criteria & Procedure Manual, July 9, 2019 Stormwater Plan Yes Yes Yes Yes Comment: Policy, Criteria & Procedure Manual, July 9, 2019 Urban Water Management Plan No No No Yes Comment: Habitat Conservation Plan No No No Yes Comment: Economic Development Plan No No No Yes Comment: Shoreline Management Plan No Yes No Yes Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 1-6 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Community Wildfire Protection Plan Yes Yes Yes Yes Comment: Harris County Community Wildfire Protection Plan, August 2011 Forest Management Plan No No No Yes Comment: Climate Action Plan No Yes No Yes Comment: Comprehensive Emergency Management Plan Yes Yes Yes Yes Comment: Harris County Basic Plan, 2015 Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes Yes Yes Comment: A regional THIRA is conducted on annually for UASI and HGAC. Post-Disaster Recovery Plan Yes Yes Yes Yes Comment: Annex J of the Harris County Basic Plan, 2014, Also, Harris County Public Health (HCPH), Recovery Plan, Appendix 20.0, July 2019 Continuity of Operations Plan Yes Yes Yes Yes Comment: Continuity of Operations Plans are developed and maintained by county departments Public Health Plan Yes Yes Yes Yes Comment: Annex H of the Harris County Basic Plan, 2018. Also, Harris County Public Health has completed Texas public health risk assessment which details the top hazards looking at health and medical affects. Table 1-3. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Harris County Permits Office Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? No Table 1-4. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes Harris County 1-7 Table 1-5. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Harris County Engineering, and others Engineers or professionals trained in building or infrastructure construction practices Yes Harris County Engineering, and others Planners or engineers with an understanding of natural hazards Yes Multiple county departments Staff with training in benefit/cost analysis Yes Multiple county departments Surveyors Yes Harris County Engineering, and others Personnel skilled or trained in GIS applications Yes Multiple county departments Scientist familiar with natural hazards in local area Yes Multiple county departments Emergency manager Yes Harris County OHSEM Grant writers Yes Multiple county departments Table 1-6. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. Current local hazard mitigation plan is online Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. Publicizing previous plan; future dedicated website Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Public outreach events, Ready Harris website Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. EPI notification system Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 1-8 Table 1-7. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? HC Engineering Department Who is your floodplain administrator? (department/position) Jonathan Steiber / HCED, Floodplain Administrator Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? January 1, 2018 Does your floodplain management program meet or exceed minimum requirements? Exceeds • If exceeds, in what ways? Regulate 500-yr floodplain, exceed minimum freeboard When was the most recent Community Assistance Visit or Community Assistance Contact? 2003 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? Yes • If so, state what they are. Preliminary Flood Maps Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? Yes – unlikely to occur • If no, is your jurisdiction interested in joining the CRS program? How many flood insurance policies are in force in your jurisdiction?a 120,396 • What is the insurance in force? $36,024,666,100 • What is the premium in force? $54,432,470 How many total loss claims have been filed in your jurisdiction?a 46,830 • How many claims are still open or were closed without payment? 7,151 • What were the total payments for losses? $2,462,159,673 a. According to FEMA statistics as of March 31, 2019 Table 1-8. Community Classifications Participating? Classification Date Classified Community Rating System Yes 7 10/1/2017 Building Code Effectiveness Grading Schedule No N/A N/A Public Protection No N/A Date Storm Ready Yes N/A 2016 Firewise Yes N/A Date Harris County 1-9 Table 1-9. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Medium Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 1-10 1.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 1.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Disaster Recovery Plan • Floodplain Management Plan • Stormwater Management Plan • Basic Plan and Annexes • Continuity of Operations Plan • Radiological Emergency Plan • Transportation Plan • Community Rating System • Regional Planning 1.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Capital Improvements Plan • Historic Preservation Plan 1.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 1-11 lists past occurrences of natural hazards for which specific damage was recorded in Harris County. Other hazard events that broadly affected the entire planning area, including Harris County, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 1-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 $3 Billion Severe Storms and Flooding 4269 DR 2016 $35 Million Severe Storms and Flooding 4272 DR 2016 $25 Million Severe Storms, Tornadoes, Straight Line Winds and Flooding 4245 DR 2015 $12 Million Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR 2015 $5 Million Harris County 1-11 1.7 HAZARD RISK RANKING Table 1-12 presents a local ranking for Harris County of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 1-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 5 Coastal Erosion 6 Low 5 Dam Failure 6 Low 5 Drought 6 Low 4 Earthquake 16 Medium 2 Flooding 36 High 5 Mass Movement 6 Low 1 Severe Weather 51 High 1 Hurricane 51 High 5 Tsunami 6 Low 3 Wildfire 24 Medium NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 1.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 1.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 5,316 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 702 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 1,102 1.8.2 Other Noted Vulnerabilities No additional vulnerabilities specific to this jurisdiction have been identified. 1.9 STATUS OF PREVIOUS PLAN ACTIONS Table 1-12 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 1-12 Table 1-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update Install generators for critical county facilities in order to sustain essential services and critical operations during and after a disaster. x HC-1 Comment: Not Started Harden critical County Facilities and Offices with hurricane shutters. x HC-2 Comment: Not started Install landscaping with drought resistant plants and trees for shading around County facilities to reduce exposure from extreme heat. x HC-3 Comment: Not Started Implement a Clear cut dead brush and tree limbs program around county facilities that could be a burn agent to wildfires. x HC-4 Comment: Not started Develop, improve and implement an enhanced mass public warning and alert system (iPAWS) within the Harris County Joint Information Center to provide warning capability throughout unincorporated Harris County to mitigate the risk of natural hazards and disasters impacting critical infrastructure and residents. x Comment: Not started Install enhanced and improved lightning and surge protection devices/systems in the Harris County Emergency Operations Center x Comment: Not started Develop a mitigation strategy to acquire personnel and funding to revise the Harris County Multi-jurisdictional Local Mitigation Plan. x Comment: Not started Develop/construct shelter for critical vehicles/equipment to minimize damage x HC-5 Comment: Not started Identify new studies and improved assessment methods for analysis of High Risk dams and assess possible risk of other low or moderate risk dams/levees. x HC-6 Comment: Not started Develop, enhance and implement mitigation strategies with Emergency Service Districts and local jurisdictions to limit the adverse impact of Toxic Releases/HAZMAT and Energy Pipeline Failures. (Fire Marshall) x HC-7 Comment: Not started Enhance the total CRS rating/score for the next three years through various CRS activities, such as flood risk reduction and drainage improvements. x Comment: Complete Harris County 1-13 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update Develop a mitigation strategy to install and implement a Wildfire/Drought Warning System to determine KBDI and provide the County and residents with advance warning of severe drought conditions and wildfire hazards. (Fire Marshall) Comment: Initialed studies in a portion of these Subdivision. x HC-8 Modify or replace critical County buildings prone to flooding with resilient technologies Comment: FEMA Mitigation (Sec 406) is currently being pursued for some County buildings Comment: Not started x HC-9 Study for future Evacuation Routes for various areas in Harris County Comment: Not started x HC-10 1.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 1-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 1-15 identifies the priority for each action. Table 1-16 summarizes the mitigation actions by hazard of concern and mitigation type. Table 1-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HC-1 — Install generators for critical county facilities in order to sustain essential services and critical operations during and after a disaster. Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement, Severe weather, Tsunami and Wildfire New and Existing 1, 3, 10, 11, 12, 13, 14, 15 Emergency Management Engineering Medium HMGP, PDM Short-term Action HC-2 — Harden critical county facilities and offices with hurricane shutters. Hazards Mitigated: Sever Weather, Hurricane New and Existing 1, 3, 6, 8, 10, 13, 15 Emergency Management Engineering Low Staff Time, General Funds Short-term Action HC-3 — Install landscaping with drought resistant plants and trees for shading around County facilities to reduce exposure from extreme heat. Hazards Mitigated: Drought, Wildfire New and Existing 2, 3, 5, 6, 8, 11 Engineering Fire Marshall Low Staff Time, General Funds Short-term Action HC-4 — Implement a clear cut dead brush and tree limbs program around county facilities that could be a burn agent to wildfires. Hazards Mitigated: Drought, Wildfire New and Existing 2, 3, 5, 6, 8, 11 Engineering Fire Marshall Low Staff Time, General Funds Short-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 1-14 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HC-5 — Develop/construct shelter for critical vehicles/equipment to minimize damage Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement, Severe weather, Tsunami and Wildfire New 3, 6, 9, 11, 12, 13, 15 Engineering Emergency Management Medium HMGP, PDM, FMA Short-term Action HC-6 — Identify new studies and improved assessment methods for analysis of High Risk dams and assess possible risk of other low or moderate risk dams/levees. Hazards Mitigated: Dam Failure, Flooding, Severe Weather, Hurricane New 1, 3, 5, 7, 8, 9, 10, 11, 12, 13, 14, 15 Emergency Management As Required Medium HMGP Short-term Action HC-7 — Develop, enhance and implement mitigation strategies with Emergency Service Districts and local jurisdictions to limit the adverse impact of Toxic Releases/HAZMAT and Energy Pipeline Failures. Hazards Mitigated: Earthquake, Flooding, Mass Movement, Hurricane, Severe Weather New 1, 3, 5, 6, 7, 8, 9 Fire Marshall Emergency Management Low Staff Time, General Funds Short-term Action HC-8 — Develop a mitigation strategy to install and implement a Wildfire/Drought Warning System to determine KBDI and provide the County and residents with advance warning of severe drought conditions and wildfire hazards. Hazards Mitigated: Drought, Wildfire Existing 1, 2, 3, 4, 6, 7, 9, 10, 11, 12 Fire Marshall Emergency Management Medium HMGP, PDM, FMA Short-term Action HC-9 — Modify or replace critical County buildings prone to flooding with resilient technologies Hazards Mitigated: Flooding, Severe Weather, Hurricane New and Existing 3, 6, 8, 10, 11, 12, 15 Engineering Emergency Management Medium HMGP, PDM, FMA Short-term Action HC-10 — Study for future Evacuation Routes for various areas in Harris County Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement, Severe weather, Tsunami and Wildfire New and Existing 3, 10 Emergency Management As Required Low HMGP, PDM, FMA Short-term Action HC-11 — Develop and implement technological solutions to provide efficient emergency public information in up to six spoken languages and American Sign Language. Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement, Severe weather, Tsunami and Wildfire Existing 1, 3, 4, 11, 14 Emergency Management As Required Low Staff Time, General Funds, or HMGP Short-term Action HC-12 — Obtain funding to hire a contractor to annually sustain the Harris County Local Hazard Mitigation Plan through the 2025 update. Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement, Severe weather, Tsunami and Wildfire Existing 2, 3, 4, 5, 7, 8, 9, 10, 11, 13, 14, 15 Emergency Management As Required Low Staff Time, General Funds, or HMGP Short-term Action HC-13 — EOC Expansion Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement, Severe weather, Tsunami and Wildfire New and Existing 14 Emergency Management As Required Medium General Funds, HMGP, PDM, FMA Long-term Harris County 1-15 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HC-14 — Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement, Severe weather, Tsunami and Wildfire New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Harris County HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 1-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya HC-1 8 Medium Medium Yes Yes No Medium High HC-2 7 Medium Low Yes No Yes Medium Low HC-3 6 Low Low Yes No Yes Medium Low HC-4 6 Medium Low Yes No Yes Medium Low HC-5 7 High Medium Yes Yes No Medium Medium HC-6 13 Medium Medium Yes Yes No Medium Medium HC-7 7 Medium Medium Yes No Yes Medium Low HC-8 10 Medium Medium Yes Yes No Medium Medium HC-9 7 High High Yes Yes No Medium Medium HC-10 2 Medium Low Yes Yes No Medium Medium HC-11 5 High Low Yes Yes No High High HC-12 12 Medium Low Yes Yes No Medium Medium HC-13 1 Medium Medium Yes Yes No Medium Medium HC-14 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 1-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather HC-5, HC-14 HC-2, HC-8 HC-5, HC-14 HC-1, HC-2, HC-6, HC-8, HC-10, HC-12, HC-14 HC-2, HC-6, HC-8, HC-12 HC-7, HC-13 Hurricane HC-5, HC-9, HC-14 HC-2, HC-8, HC-9 HC-5, HC-14 HC-9 HC-1, HC-2, HC-6, HC-8, HC-12, HC-14 HC-2, HC-6, HC-8, HC-12 HC-7, HC-13 Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 1-16 Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building Flood HC-5, HC-9, HC-12, HC-14 HC-9 HC-5, HC-14 HC-9 HC-1, HC-12, HC-14 HC-12 HC-7, HC-13 Medium-Risk Hazards Wildfire HC-3, HC-4, HC-5, HC-14 HC-3, HC-4, HC-11 HC-5, HC-11, HC-14 HC-3, HC-4 HC-1, HC-11, HC-14 HC-3, HC-4 HC-7, HC-13 Low-Risk Hazards Earthquake HC-5, HC-14 HC-5, HC-14 HC-1, CH-6, HC-10, HC-14 HC-7, HC-13, HC-14 Tsunami HC-5, HC-14 HC-5, HC-14 HC-1, HC-14 HC-7, HC-13, HC-14 Drought HC-3, HC-5, HC-14 HC-3, HC-11 HC-5, HC-11, HC-14 HC-1, HC-11, HC-14 HC-3 HC-7, HC-13, HC-14 Mass Movement HC-5, HC-14 HC-5, HC-14 HC-1, HC-14 HC-7, HC-13, HC-14 Dam Failure HC-5, HC-9, HC-14 HC-9 HC-5, HC-14 HC-9 HC-1, HC-14 HC-7, HC-13, HC-14 a. See the introduction to this volume for explanation of mitigation types. 1.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed for this annex. • Regulations of Harris County, Texas for Floodplain Management Flood Damage Prevention Ordinance — the flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • FEMA Flood Insurance Study for Harris County, TX (FEMA 2017). This outlined the principal flood problems and floodplains in Harris County • Harris County Fire Code (March 2015). These regulations adopt the latest edition of the uniform fire code. • Regulations of Harris County, Texas for the Approval and Acceptance of Infrastructure (January 2019). These regulations require stormwater and detention system design. • Regulations of Harris County, Texas for Stormwater Quality Management (September 2016). These regulation require minimum standards for prevent pollution in stormwater discharge. • Harris County Community Wildfire Protection Plan (August 2011). This plan provides recommendations for mitigating the threat to property from wildland fires. • Harris County Flood Control District Policy Criteria & Procedure Manual for Approval and Acceptance of Infrastructure (October 2018). Provide policies and criteria for land development and infrastructure projects that are effective, consistent and practical. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • State of Texas Hazard Mitigation Plan (October 2018) — This plan, prepared by the Texas Department of Public Safety, was used to ensure that the County’s HMP was consistent with the State’s Plan. Harris County 1-17 Hazard maps for Harris County are provided in Volume 1 of this hazard mitigation plan 2-1 2. CITY OF BAYTOWN 2.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Jamie Galloway, Emergency Management Coordinator 205 E. Wye Drive Baytown, TX 77521 Telephone: 2810-422-1129 e-mail Address: Jamie.Galloway@baytown.org David Alamia, Deputy Emergency Management Coordinator 205 E. Wye Drive Baytown, TX 77521 Telephone: 281-422-1168 e-mail Address: David.Alamia@baytown.org 2.2 JURISDICTION PROFILE 2.2.1 Location The City of Baytown is located just 30 miles east of downtown Houston, Baytown is the third largest city in Harris County, and is easily accessible via Interstate 10, Highway 146, and the Grand Parkway (Hwy 99). Baytown is also located in both Harris County and partially in Chambers County. The current boundaries generally extend along Interstate 10 from the mouth of the San Jacinto River to Cedar Bayou with Goose Creek running through the middle of the city. The city is roughly bordered along the north by Interstate 10. Baytown is also bordered by water on three sides. Along the south and west is Galveston Bay. On the east is Cedar Bayou. Portions of the city to the east of Cedar Bayou lie in Chambers County. Baytown currently encompassing an area of approximately 34 square miles 2.2.2 History Originally three separate towns, the City of Baytown combined Goose Creek (dating back to before 1850), and oil boom towns Pelly (established in the late 1910s), and East Baytown (early 1920s) when it incorporated in 1948. The City of Baytown’s strategic location has encouraged a successful and diverse blend of employment opportunities and recreational activities centered near the area’s waterways. Located in the Texas Independence Trail region, Baytown is rich in history. General Sam Houston was an early resident, and the area played a significant role in the Battle of San Jacinto in 1836. The region was also home to the Karankawa Indians; their artifacts can still be found at the Baytown Nature Center. The following is a timeline of Baytown’s history: • 1822 — Nathaniel Lynch sets up the Lynch Ferry at the junction of the San Jacinto River with Buffalo Bayou. • 1824 — William Scott receives land grant of over 9,000 acres covering much of what is now present day Baytown. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 2-2 • 1847 — Ashbel Smith purchased a plantation, known as Evergreen, on Tabbs Bay (outbreak of Civil War, he organized the Bayland Guards for confederate service). • 1864 — A shipyard established at the mouth of Goose Creek in the early 1850s by John and Thomas S. Chubb built one ship, the Bagdad, which was launched in 1864 and had to run a Yankee blockade at Galveston to escape. • 1866 – 1867 — Ashbel Smith and several associates founded the Bayland Orphans’ Home for Children of Confederate soldiers. • June 2, 1908 — Successful oil strike near Tabbs bay by Goose Creek Production Company. • August 23, 1916 — Opening of Goose Creek Oilfield when contractor Charles Mitchell brought in a 10,000-barrel gusher at 2,017 feet. • 1917 — Humble Oil and Refining Company founded by Ross S. Sterling. • August 17, 1917 — The largest well of the field was Sweet 16 of the Simms-Sinclair Company gushing 35,000 barrels a day from a depth of 3,050 feet. This well stayed out of control for three days before the crew could close it. • January 1919 — Goose Creek residents vote to consolidate. • 1919 — Construction beings of Humble Oil and Refining Company. • 1920 — Pelly residents vote to consolidate. • April 21, 1921 — Humble Oil and Refinery construction completed. • 1923 — Humble laid out the streets, provided utilities and sold lots for the community development. • December 1945 — Pelly annexes the area known as Baytown which had never incorporated. • February 1946 — Pelly and Goose Creek vote to consolidate and choose the name “Baytown”. • January 24, 1948 — ”Tri-Cities” Unite as Baytown (Baytown Goose Creek and Pelly) when a city charter is approved. 2.2.3 Climate Baytown’s climate is classified as humid subtropical. Prevailing winds from the south and southeast bring heat from the deserts of Mexico and moisture from the Gulf of Mexico. Summer temperatures typically have highs near 90 °F (32 °C) though higher temperatures are not uncommon. The city’s proximity to the bay and the winds that it generates moderate the area’s temperatures and ease the effects of the humidity, creating a more pleasant climate than inland communities like Houston. Winters in the area are temperate with typical January high of 61 °F (16 °C) and lows are near 42 °F (6 °C). Snowfall is rare. Annual rainfall averages exceed 49 inches (124 cm), with an annual average of 82 precipitation days. The average elevation of Baytown is approximately 34 feet above sea level. 2.2.4 Governing Body Format The City of Baytown is a Home Rule City operating under the Council-Manager form of government, with a City Council composed of a Mayor (elected at large) and six single district Council members. The City Council appoints a City Manager to act as the chief administrative and executive officer of the City. The City Council assumes responsibility for the adoption of this plan; the Baytown Fire Department, Emergency Management Division will oversee its implementation. Development of this annex was carried out by the members of the City of Baytown Local Mitigation Planning Team, whose members are listed in Table 2-1. City of Baytown 2-3 Table 2-1. Local Mitigation Planning Team Members Name Title Jamie Galloway Emergency Management Coordinator David Alamia Deputy Emergency Management Coordinator Ronald Roberts Assistant Fire Chief – Planning Ajay Shakyaver Director Engineering / Floodplain Administrator Tiffany Foster Director, Planning Russell Davidson Chief Building Official Frank Simoneaux Director, Public Works Dana Dalbey Assistant Fire Chief – Administration Tony Gray Director, Health 2.3 CURRENT TRENDS 2.3.1 Population According to Texas Home Town Locator, the population of Baytown as of July 2018 was 81,229. Since 2015, the population has grown at an average annual rate of 2.4 percent. 2.3.2 Development The economic impact of continued expansion in the industrial, logistic, and wholesale distribution sectors in and around Baytown has translated into significant valuation growth in the City’s tax roll. In spite of negative appraisals resultant from some 4,500 homes flooded by Hurricane Harvey, the Harris County Appraisal District’s preliminary 2018 appraisal roll data indicate roll values have increased 6% over the prior year. Much of this is from residential home values, resultant from incremental appraised values recognized in the prior year but subject to a ten percent annual limit under State code restrictions. Private sector investment within the City of Baytown has increased significantly over the past few years, with substantial investment in areas such as health care centers, grocery stores, restaurants, and other large scale retail developments, including the multi-million dollar redevelopment of the San Jacinto Mall. Additionally, the City of Baytown, in partnership with a private development company, is in the preliminary stages of developing a large- scale hotel/convention center on Bayland Island. Major road projects recently completed or in progress include: ongoing construction of the 1.6 mile, four lane San Jacinto Boulevard; expansion of Hunt Road from two lanes to four lanes beyond the new H-E-B grocery super center, and extending it west to John Martin Road; extending Santavy Road both east and west; design and widening of Garth Road to six lanes from its current four lane configuration; entrance and exit ramp rebuilds at I- 10 and Garth Road; the complete reconstruction of the two lane, 2.3 mile Evergreen Road; and the ongoing installation of sidewalks throughout the City. One of the most noticeable effects of the ongoing expansions in the industrial, logistic and wholesale distribution enterprises in and around Baytown is the remarkable growth in residential, multi-family and commercial development. New residential and commercial permit activity continues to be strong year-over-year. Over 2,000 multi-family units in seven new complexes, and nearly 2,000 single- family homes included as part of four new neighborhoods is expected over the next two years. Population and associated ancillary economic expansion is anticipated to increase steadily for some time. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 2-4 Table 2-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Table 2-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? Yes • If yes, give the estimated area annexed and estimated number of parcels or structures. 2,612 acres, 350 parcels Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. NA • If yes, who currently has permitting authority over these areas? NA Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas • San Jacinto Marketplace (~111 acres) — redeveloped commercial, not in hazard risk area • John Martin & I-10 (~45 acres) — new commercial and housing, not in hazard risk area • San Jacinto Boulevard (~400 acres) new commercial and housing, some in hazard risk area • Evergreen & Trinity Oaks (~200 acres) — new commercial and housing, some in hazard risk area • Chambers Commons (~146 acres) — new commercial, multifamily, some in hazard risk area How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 193 187 293 251 291 Multi-Family 1 1 1 0 0 Other (commercial, mixed use, etc.) 186 277 252 278 339 Total 380 465 546 529 630 Provide the number of new- construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: Unable to accurately provide • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. The city is a place with two identities — ”Old Baytown” and “New Baytown”. Thus, there is an aged building stock and a newer building stock. Within the city limits of Baytown, there is a medium density suburban development character with some large rural pockets. There are several commercial corridors developed with strips of retail that serve the many neighborhoods. The neighborhoods normally have lot sizes between 5,000 and 10,000 square feet. Additionally, Baytown has a significant industrial presence and those uses are on larger tracts of land with fewer addressed buildings. Although the data does not give an acreage assessment, there are approximately 34,800 out of 38,900 parcels with addresses have vertical development on them. A visual assessment indicates that there is significant building opportunity within the city limits of Baytown. Please Figure 2-1. City of Baytown 2-5 Figure 2-1. Developed and Vacant Lots Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 2-6 2.4 CAPABILITY ASSESSMENT The City of Baytown performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 2-3. • Development and permitting capabilities are presented in Table 2-4. • An assessment of fiscal capabilities is presented in Table 2-5. • An assessment of administrative and technical capabilities is presented in Table 2-6. • An assessment of education and outreach capabilities is presented in Table 2-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 2-8. • Classifications under various community mitigation programs are presented in Table 2-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 2-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Table 2-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No Yes Yes Comment: Code of Ordinances, Chapter 18 Buildings and Building Regulations Zoning Code Yes No No Yes Comment: Unified Land Development Code, Article II Use Districts, Division 2 Zoning Districts Subdivisions Yes No No Yes Comment: Code of Ordinances, Subpart B Land Development Code, Chapter 126 Subdivisions Stormwater Management Yes Yes Yes Yes Comment: Code of Ordinances, Chapter 98 Utilities, Article VI. Stormwater Post-Disaster Recovery Yes Yes No Yes Comment: Annex J — Recovery and post-disaster permitting and code enforcement regulations. Real Estate Disclosure No No No No Comment: Growth Management Yes No Yes Yes Comment: Code of Ordinances Ch. 126 & ULDC Site Plan Review Yes No No Yes Comment: Code Ch. 18 & ULDC Environmental Protection Yes Yes No Yes Comment: Code of Ordinances, Chapter 34 — Environment Flood Damage Prevention Yes No Yes Yes Comment: Code of Ordinances, Subpart B Land Development Code, Chapter 110 “Floods Emergency Management Yes No Yes Yes Comment: Code of Ordinances, Chapter 22 — Civil Emergencies, Texas Government Code 418 Climate Change No Yes No Yes Comment: City of Baytown 2-7 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Planning Documents General Plan Yes No Yes Yes Comment: Comprehensive Plan, May 2007 Capital Improvement Plan Yes No No Yes How often is the plan updated? Annual basis. Comment: Disaster Debris Management Plan Yes Yes No Yes Comment: Contracts are reviewed on an annual basis and the plan is updated every five years. Floodplain or Watershed Plan Yes Yes No Yes Comment: The City of Baytown adopted a Flood Mitigation Plan in 2005 meeting the CRS Floodplain Management Planning criteria. Stormwater Plan Yes Yes Yes Yes Comment: Stormwater Management Plan prepared by the Baytown Health Department in 2014. Drainage Plan Yes No No Yes Comment: The City of Baytown adopted a Master Drainage Plan in 2010. Habitat Conservation Plan No Yes No Yes Comment: The City of Baytown does not have an HCP implemented. However, there is a Gulf-Houston Regional Conservation Plan that implements nature-based infrastructure projects and components of flood mitigation/resiliency. Economic Development Plan No No No Yes Comment: The Baytown and West Chambers County Economic Development Foundation coordinates economic development. Shoreline Management Plan No Yes No No Comment: SMPs are required for power generating entities operating under a FERC license and is not applicable to the City of Baytown. Community Wildfire Protection Plan Yes Yes No Yes Comment: The City of Baytown does not have its own CWPP implemented. Harris County has completed a county-wide CWPP; which includes all incorporated jurisdictions within Harris County. Forest Management Plan No Yes No No Comment: Climate Action Plan No Yes No Yes Comment: Emergency Operations Plan and Annexes Yes Yes Yes Yes Comment: Annex P — Hazard Mitigation and Hazard Summaries in Basic Plan. Threat & Hazard Identification & Risk Assessment (THIRA) No Yes Yes Yes Comment: A regional THIRA is conducted on annually for UASI and HGAC. The City participates in the development of the THIRA. Post-Disaster Recovery Plan Yes Yes No Yes Comment: Annex J — Recovery is required for local jurisdictions to address local recovery programs, damage assessments, Public Assistance and Individual Assistance programs. The City of Baytown is in the process of developing a Pre-Disaster Recovery Plan to assist in the transition from response to recovery for future incidents. Continuity of Operations Plan Yes No No Yes Comment: Government Code 418 grants political subdivisions the option to adopt plans for continuity of functions but is not mandated. The City of Baytown does have department Continuity of Operations Plans. Public Health Plan Yes Yes Yes Yes Comment: Annex H — Health and Medical is a component of the Emergency Operations Plan and addresses public health, environmental health, and medical response capabilities. The City does not maintain a standalone Public Health Plan. Parks Plan Yes No No Yes Comment: Playbook 2020: The Strategic Parks and Recreation Master Plan was adopted in 2010. The plan creates a vision for the Parks over ten years by providing recommendations that encompass the many varied components of Baytown’s park systems, from parks, athletic and aquatic facilities, to trails, nature facilities, and the preservation of open space. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 2-8 Table 2-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Planning and Development Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? No (Can create) Table 2-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes – Water and Sewer Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes Table 2-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Planning and Development Engineers or professionals trained in building or infrastructure construction practices Yes Planning and Development Planners or engineers with an understanding of natural hazards Yes Planning and Development Staff with training in benefit/cost analysis Yes BFD-EMD/ EMC and Deputy EMC Surveyors No City Engineering has staff that have the ability to conduct surveys, but are not licensed. These services are contracted. Personnel skilled or trained in GIS applications Yes PW, ENG, PLNG, and IT Scientist familiar with natural hazards in local area Yes Several local research institutes, colleges, and universities have research scientist available to the City as a resource. Emergency Management Coordinator Yes EMC and Deputy EMC Grant writers Yes CMO – Grant Coordinator City of Baytown 2-9 Table 2-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. Engineering Department is responsible for floodplain management and public outreach efforts regarding flooding hazards for CRS participation. The BFD-EM Division also provides public outreach regarding hazard information. Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. BFD EM Division hosts Skywarn and Floodaware courses and shares events on social media. City also provides updates on weather information and hazard information facts. Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. n/a Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Community Rating System, utility bill pamphlets, Social Media accounts, and Engineering/Emergency Management websites. City Hall and Library can be a source of printed material on hazard mitigation and flooding. Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Outdoor Warning Sirens, Mass Notification System, Alertus Beacons, and AM Radio System. Table 2-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Engineering Department Who is your floodplain administrator? (department/position) City Engineer Are any certified floodplain managers on staff in your jurisdiction? Yes Engineering maintains a CFM on staff. What is the date that your flood damage prevention ordinance was last amended? 4/9/2015 Does your floodplain management program meet or exceed minimum requirements? Meets and Exceeds FEMA minimum requirements. • If exceeds, in what ways? FDPO currently requires freeboard – 2 feet above BFE. City is exploring options to adopt similar standards required by Harris County; i.e. 2 feet above the 500 year. When was the most recent Community Assistance Visit or Community Assistance Contact? 9-15-2015 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 2-10 Criterion Response Are any RiskMAP projects currently underway in your jurisdiction? Yes • If so, state what they are. Chambers County – Lower Trinity Flood Risk Report 2013. Harris County – Flood Insurance Study, revised preliminary November 13, 2018. Coastal flood mapping – TXCHART, Preliminary March 29, 2013. Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Map revisions will be made based on the most recent precipitation frequencies in Texas through the NOAA Atlas 14 study. Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? n/a Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? Yes • If no, is your jurisdiction interested in joining the CRS program? N/A How many flood insurance policies are in force in your jurisdiction?a 4,683 • What is the insurance in force? $1,393,324,000 • What is the premium in force? $2,364,402 How many total loss claims have been filed in your jurisdiction?a 3,343 • How many claims are still open or were closed without payment? Opened Losses: 6 CWOP Losses: 705 • What were the total payments for losses? $148,338,730.27 a. According to FEMA statistics as of September 30, 2018 Table 2-9. Community Classifications Participating? Classification Date Classified Community Rating System Yes 6 5/1/2006 Building Code Effectiveness Grading Schedule Yes Class 5 – Residential Class 4- Commercial 12/20/2017 Public Protection Yes Class 1 2018 Storm Ready Yes Storm Ready 2019 Firewise No N/A N/A City of Baytown 2-11 Table 2-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 2-12 2.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 2.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Basic Plan — The Basic Plan provides a summary on the hazards and threats in the community. • Annex P — Hazard Mitigation is assigned to the Engineering Department and addresses the hazards and threats in the community. The Annex also identifies the various hazard mitigation related programs implemented in the City of Baytown and which agencies are responsible for administration. • Master Drainage Plan — The City of Baytown developed a drainage plan in 2010 that identifies several drainage projects related to flood mitigation and the identified projects have been integrated into prior Hazard Mitigation Action Plans. • Flood Mitigation Plan — The City of Baytown developed a flood mitigation plan in 2005 that followed the CRS floodplain management planning process and several of the identified projects have been integrated into prior Hazard Mitigation Action Plans. 2.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Capital Improvement Plan — The City of Baytown updates the CIP on an annual basis and can integrate the goals, objectives, and projects identified in the Hazard Mitigation Action Plan into the CIP process. • Comprehensive Plan — The Planning and Development Department will develop a new overall plan to document existing conditions and establish goals to replace the existing plan. In 2007, the City Council adopted the 2025 Comprehensive Plan which includes base studies, vision and goals, growth capacity, mobility, land use, economic opportunity, quality of life, and implementation strategies. • Downtown Master Plan — The Downtown Master Plan was adopted by City Council on September 9, 2004, to capture the overall vision for Baytown’s downtown area. • Mobility Plan — The Baytown Mobility Plan was adopted by City Council on January 24, 2013 to capture the City’s goals as expressed in the 2007 Comprehensive Plan and 2008 Vision Statement. This document contains infrastructure improvement projects, funding strategies and mechanisms, and mobility policies, plans and maps to help mold our future. • Master Parks Plan — The parks plan creates a vision for the city’s park system and makes recommendations for improvements and open-space preservation. 2.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 2-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Baytown. Other hazard events that broadly affected the entire planning area, including City of Baytown, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. City of Baytown 2-13 Table 2-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Thunderstorm Wind, Hail, Flood N/A May 9 – 11, 2019 $65,000.00 Hurricane Harvey 4332 DR 2017 $26,000,000.00 Flood N/A March 29, 2017 Not Available Flood N/A January 19-20, 2017 Not Available Severe Storm & Flooding 4272 DR 2016 Not Available Severe Storm & Flooding 4269 DR 2016 Not Available Flood N/A June 1, 2016 Not Available Severe Storm & Flooding 4223 DR 2015 $35,000.00 Tornado N/A October 31, 2015 $20,000 Flood N/A July 14, 2015 Not Available Hail N/A February 20, 2014 $1,000 Flood N/A October 31, 2013 Not Available Flood N/A January 9, 2009 Not Available Flood N/A April 18, 2009 Not Available Hurricane Ike 1791 DR September 2008 $ 50,800,000.00 Flood N/A June 17, 2008 Not Available Funnel Cloud N/A June 16, 2007 Not Available Flash Flood N/A October 26, 2006 $ 50,000 Funnel Cloud N/A May 4, 2006 Not Available Tornado N/A April 30, 2006 Not Available Hurricane Rita 1606 DR 2005 Not Available Hail N/A July 6, 2005 $ 15,000 Thunderstorm Wind N/A November 23, 2004 $ 50,000 Thunderstorm Wind N/A April 10, 2004 $ 75,000 Tornado N/A November 17, 2003 $ 50,000 Funnel Cloud N/A June 26, 2003 Not Available Hail N/A April 3, 2003 $ 5,000 Flood N/A September 7-8, 2002 Not Available TS Allison 1379 DR 2001 Not Available Hurricane Alicia 689 DR 1983 Not Available Tornado N/A October 29, 1974 Not Available 2.7 HAZARD RISK RANKING Table 2-12 presents a local ranking for City of Baytown of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 2-14 Table 2-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 2 Hurricane 34 and 32 High 3 Flooding 12 and 28a High 4 Wildfire 30b Medium 5 Dam Failure 12 Low 6 Coastal Erosion 6 Low 6 Drought 6 Low 6 Mass Movement N/A Low 6 Earthquake 14c N/A 6 Tsunami N/A N/A NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. a. flooding is the city’s primary natural hazard and the methodology utilized does not adequately reflect actual risk outside the floodplain from sheet-flow, run-off, and limited drainage capacity caused from flash flooding and urban flooding. b. Development within Baytown has eliminated many areas once highly vegetated and the wildland-urban interface has been reduced. In addition, Texas Forest Service TXWARP Fire Intensity Scale indicates most of the area in Baytown is considered to be in Class 1: Very Low and Class 2: Low range for small wildfires. c. Minimal impacts and negligible level of risk from this hazard in the community 2.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 2.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: None • Number of FEMA-identified Severe-Repetitive-Loss Properties: None • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: None 2.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • The City of Baytown is vulnerable to maritime threats and hazards since it is located along the Port of Houston and the Houston Ship Channel. • The City of Baytown is vulnerable to hazardous material incidents and chemical accidents from surrounding petrochemical industries, chemical manufacturers, and chemical storage facilities. Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. City of Baytown 2-15 2.9 STATUS OF PREVIOUS PLAN ACTIONS Table 2-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 2-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update 2014BAYTWN001 — Create Regional 75 Stormwater Retention Ponds X BAY5 Comment: 2 regional ponds are in-process of being constructed within the city due to new development. Combine MAI 2010BAYTWN005. 2014BAYTWN002 — Upgrade City Code Chapter 110 to Require Increased Freeboard (500-year + 2 feet) for Construction in Floodplain X X BAY6 Comment: The City updated codes requiring a 2-foot freeboard for new construction and included higher standards, LOMA and LiMWA. 2014BAYTWN003 — Elevate Electronic Controls for Sewer Lift Stations 24” above 500-year NFIP Floodplain X BAY7 Comment: This project is approximately 30% complete. The City has 87 lift stations, with 23 completed. Additional projects are currently ongoing during 2017. 2014BAYTWN004 — Establish Single Family Home Wind Retrofit Assistance Grant Program X Comment: Not Started and dependent upon future grant opportunities. 2014BAYTWN005 — Establish low-to-moderate income Multi-family Home Wind Retrofit Assistance Grant Program X Comment: Not Started and dependent upon future grant opportunities. 2014BAYTWN006 — Public Education Program for Safe Room Determination and Awareness and appropriate actions to reduce residential property damages from high-wind impacts X Comment: Not Started and dependent upon future grant opportunities. 2014BAYTWN007 — Upgrade to City Code Requiring Community Safe Rooms to be Constructed in every New Recreational Vehicle Park. X Comment: No update at this time. The action item is not feasible. 2014BAYTWN008 — Update City Code of Ordinances to Require Emergency Generators at Local Gas Stations X Comment: Action Item is Completed. 2014BAYTWN009 — Install Early Warning lightning detection system for critical infrastructure (EOC, 911 Communications, and Pirates Bay Water Park). X BAY8 Comment: Action Item is in-process with EOC and 911 Communications Center weather stations. Pirates Bay Weather Station is installed. 2014BAYTWN010 — Establish low-to-moderate income Single-family Home Cooling System Retrofit Assistance Grant Program X Comment: Not Started and dependent upon future grant opportunities. 2014BAYTWN011 — Modify Chapter 126 of City Code to encourage the use of Texas Native, Xeriscaping materials for Landscaping. X Comment: City has adopted landscaping requirements, but not sure if Xeriscaping is included. 2014BAYTWN012 — Improve Building Code to protect Buildings from hail damages X Comment: Remove Action Item. No longer feasible. City already has a requirement addressing wind-borne debris protection. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 2-16 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update 2014BAYTWN013 — Amend City Policy to require city carports and city vehicle shelters to be constructed of materials and processes to mitigate against hail damages to equipment currently parked in the open. X BAY9 Comment: Modify action item description to specify city carports and city vehicles. This action item is not intended to address residential structures. 2014BAYTWN014 — Develop defensible space for protection around existing and future natural/man-made water bodies. X Comment: No update at this time. 2014BAYTWN015 — Develop a Community Urban Wildfire Prevention Program to educate citizens on how to reduce damages to residential property from wildfires. X BAY10 Comment: No update at this time. 2014BAYTWN016 — Develop Community Warming Centers X Comment: Combine with Cooling Center Action Item and complete with Library as location. 2014BAYTWN017 — Establish low- to moderate-income Single family Home Heating Retrofit Assistance Grant Program X Comment: Not Started and dependent upon future grant opportunities. 2014BAYTWN018 — Conduct dam/levee failure flood inundation study and GIS mapping. X Comment: REMOVE action item. This item is not feasible since the City is not directly at risk from dam/levee failures. Lake Houston and Trinity River structures and other levees are managed by SJRA or other entities. 2014BAYTWN019 — Conduct a Hazardous Materials Commodity Flow Study X Comment: 2014BAYTWN020 — Determine the Need and Standards for a buffer zone around large scale Tier II Facilities X Comment: At this time industry is regulated by Texas Rail Road Commission and industry already acquires lands to create buffers as a way to minimize risks and meet other regulatory standards. City Code does require structures in the Industrial Districts to meet certain setback requirements. 2014BAYTWN021 — Conduct a Community Emergency Communications Survey to Determine Effectiveness of Haz Mat Release Emergency Warning Sirens. X Comment: No update at this time. 2014BAYTWN022 — Update City Code Chapter 62 to Require Transfer Pipes from Oil Wellheads to Storage Tanks to be buried at least three feet underground. X Comment: Work on this project began 18 months ago, but the requirement to bury will need to be reviewed 2014BAYTWN023 — Update City Haz Mat Underground Pipeline Regulations Ordinance X Comment: Remove Action Item. No longer feasible and regulated by State and Federal agencies. 2014BAYTWN024 — Harden 9‐1‐1 Communication Center X Comment: Action Item is Complete. New 911 Dispatch Center was built and hardened. 2014BAYTWN025 — Develop public education program for home owners on flood hazards and flood mitigation techniques to reduce flood damages to property. X BAY11 Comment: No update at this time. Dependent upon grant funding. City of Baytown 2-17 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update 2014BAYTWN026 — Improve Area Stormwater Retention Ponds to increase storage capacity. X BAY5 Comment: Area or individual retention ponds are developed as required. Regional and sub-regional ponds are practical, but expensive projects to implement. Combine with other Retention Pond projects. 2014BAYTWN027 — Improve Underperforming Stormwater System Collection/Conveyance Components to ensure system functions in accordance with design to mitigate flooding. X BAY12 Comment: Several projects have been completed and are scheduled on an on‐going basis. Installation of submersible pumps for facilities susceptible to flooding. 2014BAYTWN027 — Acquisition of Repetitive Flood Loss Property identified in the Regional Stormwater Master Plan. X BAY13 Comment: City coordinates with HCFCD and Chambers County on acquisition of properties. 2014BAYTWN029 — Install Emergency Power Generators for Pumping At All Sewer Lift Stations X Comment: In‐Process. Back generator power is installed during major repair to lift stations 2014BAYTWN030 — Improve City of Baytown CRS Classification from Class 7 to Class 6 by end of 2018 X BAY14 Comment: City is waiting for CRS score and findings from verification visit. 2014BAYTWN031 — Develop a hardened Potable Water Treatment Plant to provide an alternate water source during drought conditions. X BAY15 Comment: Design is complete and being reviewed by TCEQ and should be online by 2018. Cost of project has increased to $40 million. 2014BAYTWN032 — Convert Water Treatment Plant From Surface Water to Desalination Source X BAY16 Comment: WTP is set‐up to convert to desalination, if necessary 2010BAYTWN001 — Structural Mitigation Remove existing culverts and increase the size of the culverts to allow for more stormwater flow. X Comment: Action Item is Complete. 2010BAYTWN003 — Elevate Repetitive Flood Properties X Comment: The Floodplain Administrator is working on reducing the numbers of SRL properties with approximately 47. REMOVE action item. Elevation is not a feasible mitigation measure for Baytown. 2010BAYTWN005 — Develop 60 regional detention ponds as identified in the Community‐Wide Master Drainage Plan X BAY5 Comment: Combine this action item with the action item # 2014BAYTWN001. 2010BAYTWN006 — Expand Community Warning System (sirens, reverse 911, EAS/iPAWS, radio) to increase coverage to residents in flood‐prone areas of the community. X BAY17 Comment: Siren Project near completion with approximately $200,000 of the project cost remaining. COMBINE into a single all‐hazards warning and alert projects. 2010BAYTWN007 — Hardening of critical public infrastructure against hurricane wind hazards. X Comment: Action Item Completed. Shutters installed at critical facilities. 2010BAYTWN009 — Installation of generators/power back‐up systems on Critical Public Infrastructure X BAY18 Comment: Action Item Completed with generators installed at all critical facilities. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 2-18 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update 2010BAYTWN011 — Expand Community Warning System (sirens, reverse 911, EAS/iPAWS, radio) to increase coverage of the community’s population. [tornado] X BAY17 Comment: COMBINE into a single all‐hazards warning and alert project. 2010BAYTWN012 — Expand Community Warning System (sirens, reverse 911, EAS/iPAWS, radio) to increase coverage of the community’s population. [thunderstorm] X BAY17 Comment: COMBINE into a single all‐hazards warning and alert projects. 2010BAYTWN013 — Install lightning and surge protection measures for critical infrastructure. X BAY19 Comment: Some city facilities, such as OEM, PW, and City Hall, have lightening arresting systems installed, but may not be certified due to expense of certifying. PW will add this as a project. Combine with other project. 2010BAYTWN014 — Develop/implement Public Cooling Shelter program. X Comment: Combine with Warning Center Action Item. Library acts as location. 2010BAYTWN019 — Expand Community Warning System (sirens, reverse 911, EAS/iPAWS, radio) to increase coverage of the community’s population. [hail] X BAY17 Comment: COMBINE into a single all‐hazards warning and alert project. 2010BAYTWN021 — Clean‐up of heavy wildfire fuel areas (abandoned buildings, abandoned lands, etc.). X BAY20 Comment: 38 structures were demolished in 2015 and 57 in 2016. 2010BAYTWN022 — Develop/implement home heating safety public education/outreach program to inform citizens on how to reduce damages from winter storms to residential property. X BAY21 Comment: No update at this time. 2010BAYTWN023 — Expand Community Warning System (sirens, reverse 911, EAS/iPAWS, radio) to increase coverage of the community’s population. [winter storm] X BAY17 Comment: COMBINE into a single all‐hazards warning and alert project. 2010BAYTWN025 — Expand Community Warning System (sirens, reverse 911, EAS/iPAWS, radio) to increase coverage to the community’s population. [dam/levee failure] X BAY17 Comment: COMBINE into a single all‐hazards warning and alert project. 2010BAYTWN026 — Upgrade and test Hazmat emergency plan X Comment: The action should remain on the list. 2010BAYTWN027 — Expand Haz Mat Release Community Warning System (sirens, reverse 9‐1‐1, EAS/iPAWS, radio) to increase coverage to the community’s population. X BAY17 Comment: COMBINE into a single all‐hazards warning and alert project. 2010BAYTWN028 — Establish/Expand GIS Mapping/Identification of Pipeline Risk Areas. X BAY22 Comment: The City has an ongoing process to update maps. 2010BAYTWN029 — Expand Community Warning System (sirens, reverse 911, EAS/iPAWS, radio) to increase coverage to the community’s population. [energy pipeline failure] X BAY17 Comment: COMBINE into a single all‐hazards warning and alert project. 2005BAYTWN001 — Increase hazards information at public library X Comment: The City distributes information at public library and this is an on‐going action item. City of Baytown 2-19 2.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 2-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 2-15 identifies the priority for each action. Table 2-16 summarizes the mitigation actions by hazard of concern and mitigation type. Table 2-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action BAY1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Flooding, Hurricane, Severe Weather, Dam Failure Existing 12, 13, 14, 15 ENG EM, PLNG, PW High HMGP, PDM, FMA, CDBG-DR Long-term Action BAY2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including Capital Improvement Programs, Master Plans, and Strategic Plans. Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement, Severe weather, and Wildfire New and Existing 3, 5, 7, 9, 10 EM ENG, PLNG, PW Low Staff Time, General Funds Ongoing Action BAY3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement, Severe weather, and Wildfire New and Existing 3, 5, 7, 9, 10 EM ENG, PLNG, PW Low Staff Time, General Funds Short-term Action BAY4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Flooding, Hurricane, Severe Weather, Dam Failure New and Existing 2, 8, 9, 11, 14 ENG EM, PLNG, PW Low Staff Time, General Funds Ongoing Action BAY5 — Create 75 Stormwater Retention Ponds to increase storage capacity as identified in Master Drainage Plan. Hazards Mitigated: Flooding, Hurricane, Severe Weather New and Existing 12, 13, 14, 15 ENG PW, PLNG Med General Funds, Bonds, and HMA Long-Term Action BAY6 — Upgrade City Code Chapter 110 to Require Increased Freeboard (500-year + 2 feet) for Construction in Floodplain Hazards Mitigated: Flooding, Hurricane, Severe Weather, Dam Failure New and Existing 12, 13, 14, 15 ENG PW, PLNG Low General Funds Short-Term Action BAY7 — Elevate Electronic Controls for Sewer Lift Stations 24” above 500-year NFIP Floodplain Hazards Mitigated: Flooding, Hurricane, Severe Weather New and Existing 13 PW ENG High General Funds, Bonds, HMA, PA Short-Term Action BAY8 — Install Early Warning lightning detection system for critical infrastructure (EOC, 911 Communications, and Pirates Bay Water Park). Hazards Mitigated: Flooding, Hurricane, Severe Weather New and Existing 1, 13 City Departments PW, ENG, FM Med General Funds Long-Term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 2-20 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action BAY9 — Amend City Policy to require city carports and city vehicle shelters to be constructed of materials and processes to mitigate against hail damages to equipment currently parked in the open. Hazards Mitigated: Hurricane, Severe Weather New and Existing 13, 15 City Departments PW, ENG, FM Med General Funds Long-Term Action BAY10 — Develop a Community Urban Wildfire Prevention Program to educate citizens on how to reduce damages to residential property from wildfires. Hazards Mitigated: Wildfire New and Existing 1, 3, 4, 6, 10 BFD EM, PLNG Low General Funds, HMA Short-Term Action BAY11 – Develop public education program for home owners on flood hazards and flood mitigation techniques to reduce flood damages to property. Hazards Mitigated: Flooding, Hurricane, Severe Weather, Dam Failure New and Existing 1, 2, 3, 4, 10 EM and ENG PLNG Low General Funds, HMA Short-Term Action BAY12 – Improve Underperforming Stormwater System Collection/Conveyance Components to ensure system functions in accordance with design to mitigate flooding; including installation of submersible pumps. Hazards Mitigated: Flooding, Hurricane, Severe Weather New and Existing 2, 13, 15 Action BAY13 – Acquisition of Repetitive Flood Loss Property identified in the Regional Stormwater Master Plan. Hazards Mitigated: Flooding, Hurricane, Severe Weather New and Existing 12, 13, 14, 15 ENG PLNG, EM High General Funds, Bonds, HMA, CDBG-DR Long-Term Action Bay 14 – Improve City of Baytown CRS Classification from Class 7 to Class 6 Hazards Mitigated: Flooding, Hurricane, Severe Weather, Dam Failure New and Existing 12, 13, 14, 15 ENG PLNG, EM, PW Low General Funds, HMA Short-Term Action BAY15 – Develop a hardened Potable Water Treatment Plant to provide an alternate water source during drought conditions. Hazards Mitigated: Drought, Mass Movement New and Existing 13 PW ENG High General Funds, Bonds, HMA Long-Term Action BAY16 – Convert Water Treatment Plant from Surface Water to Desalination Source Hazards Mitigated: Drought, Mass Movement New and Existing 13 PW ENG High General Funds, Bonds, HMA Long-Term Action BAY17 – Expand Community Warning System (sirens, reverse 911, Mass Notification, EAS, iPAWS, radio) to increase coverage to residents in hazard‐prone areas of the community. Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement, Severe weather, and Wildfire New and Existing 1, 3, 4 EM Communications, Information Technology Services Med General Funds Short-Term Action BAY18 – Installation of generators/power back‐up systems on Critical Public Infrastructure Hazards Mitigated: Flooding, Hurricane, Severe Weather, Dam Failure New and Existing 11, 13, 15 City Departments PW, FM Med General Funds, HMA Short-Term Action BAY19 – Install lightning and surge protection measures for critical infrastructure. Hazards Mitigated: Severe Weather New and Existing 11, 13, 15 City Departments PW, FM Med General Funds Short-Term City of Baytown 2-21 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action BAY20 – Implement hazard fuel reduction and fire prevention measures such as clean-up and debris removal of abandoned buildings, abandoned lands, etc. Hazards Mitigated: Wildfire New and Existing 2, 13, 14, 15 BFD and PLNG PW, ENG, EM Low General Funds, HMA Short-Term Action BAY21 – Develop/implement home heating safety public education/outreach program to inform residents on how to reduce damages from winter storms to residential property. Hazards Mitigated: Severe Weather New and Existing 1, 3, 4 EM BFD Low General Funds Short-Term Action BAY22 – Create and establish a hazard risk profile database and GIS mapping of Pipeline Risk Areas. Hazards Mitigated: Pipeline Failure, HAZMAT New and Existing 1, 6, 13 EM BFD Low General Funds, LEPC Short-Term Action BAY23 – Enhance air monitoring capabilities to mitigate chemical releases and exposures. Hazards Mitigated: Pipeline Failure, HAZMAT New and Existing 1, 6, 13 EM BFD Low General Funds, LEPC Short-Term Action BAY24 – Develop an updated Commodity Flow Study and inventory of chemical facilities within the community to understand risk profile and implement appropriate mitigation measures. Hazards Mitigated: Pipeline Failure, HAZMAT New and Existing 1, 6, 13 EM BFD Low General Funds, LEPC Short-Term Action BAY25 – Implement appropriate Water Conservation and Drought Contingency measures to mitigate drought and subsidence. Hazards Mitigated: Drought and Mass Movements New and Existing 7, 8, 9, 14 BAWA PW, ENG, PLNG, EM Low General Funds Short-Term Action BAY26 – Implement drainage and infrastructure improvement projects to mitigate flooding and protect residential property through the CDBG-DR Program. (Julia Ann Villa, Lincoln Cedars, East WWTP, and South Main Street, etc.) Hazards Mitigated: Flooding, Hurricanes, Severe Weather. New and Existing 12, 13, 14, 15 PLNG PW, ENG, EM High CDBG-DR, HMA, PA Long-Term Action BAY27 — Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement, Severe weather, and Wildfire New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Baytown HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date Acronyms: EM-Emergency Management, BAWA-Baytown Area Water Authority, PLNG-Planning, PW-Public Works, ENG-Engineering, BFD-Baytown Fire Dept., FM-Facilities Maintenance Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 2-22 Table 2-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya BAY1 4 High High Yes Yes No Medium High BAY2 5 Medium Low Yes Yes Yes Medium Low BAY3 5 Medium Low Yes Yes Yes Medium Low BAY4 5 High Medium Yes No Yes High Low BAY5 4 High High Yes Yes No Medium Medium BAY6 4 High Low Yes No Yes High Low BAY7 1 High High Yes Yes No High High BAY8 2 Medium Medium Yes Yes No High High BAY9 2 High High Yes Yes No Low Low BAY10 5 Medium Low Yes No Yes Low Low BAY11 5 Medium Low Yes Yes Yes Medium Low BAY12 3 High High Yes Yes No High High BAY13 4 High High Yes Yes No Medium Low BAY14 4 Medium Medium Yes No Yes Medium Medium BAY15 1 High High Yes No Yes High Low BAY16 1 High High Yes No Yes High Low BAY17 3 Medium Medium Yes No Yes High Low BAY18 3 High Medium Yes Yes Yes High Medium BAY19 3 Medium Medium Yes No Yes Low Low BAY20 4 High High Yes Yes No Low Low BAY21 3 Low Low Yes No Yes Low Low BAY22 3 High Low Yes No Yes Medium Medium BAY23 3 High Medium Yes No Yes High High BAY24 3 High Low Yes Yes Yes Medium Low BAY25 4 Medium Low Yes No Yes Low Low BAY26 4 High High Yes Yes No High High BAY27 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. City of Baytown 2-23 Table 2-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Flooding BAY 2, 3, 4, 6, 11, 14, 27 BAY 1, 6, 13, 18 BAY 4, 11, 27 BAY 1 BAY 8, 17, 27 BAY 5, 7, 12, 26 BAY 2, 27 Hurricane BAY 2, 3, 4, 6, 11, 14, 27 BAY 1, 6, 13, 18 BAY 4, 11, 27 BAY 1 BAY 8, 17, 27 BAY 5, 7, 9, 12, 26 BAY 2, 27 Severe Weather BAY 2, 3, 4, 6, 11, 14, 27 BAY 1, 6, 13, 18, 19 BAY 4, 11, 21, 27 BAY 1 BAY 8, 17, 27 BAY 5, 7, 9, 12, 26 BAY 2, 27 Medium-Risk Hazards Wildfire BAY 2, 3, 10, 14, 20, 27 BAY 20 BAY 10, 27 BAY 17, 27 BAY 10, 20 BAY 2, 27 Low-Risk Hazards Dam Failure BAY 2, 3, 4, 11, 14, 27 BAY 1, 18 BAY 4, 11, 27 BAY 1 BAY 17, 27 BAY 2, 27 Drought BAY 2, 3, 27 BAY27 BAY 17, 27 BAY 15, 16 BAY 15, 16, 25 BAY 2, 27 Earthquake BAY 27 N/A BAY27 N/A BAY27 N/A N/A BAY27 Mass Movement BAY 2, 3, 27 BAY27 BAY 17, 27 BAY 15, 16 BAY 15, 16, 25 BAY 2, 27 Tsunami N/A N/A N/A N/A N/A N/A N/A N/A a. See the introduction to this volume for explanation of mitigation types. 2.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX 2.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • City of Baytown Code of Ordinances — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • City of Baytown Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • Lower Trinity Flood Risk Report — The FEMA RiskMAP program conducted several workshops and produced a technical report on key flood risk analysis data for the lower Trinity River area including a small portion of the City of Baytown. • TXCHART and Coastal Physical Map Revision — Areas in Harris County impacted by coastal flooding were included in the Coastal Physical Map Revision update to the FIRM, which includes the City of Baytown. • Cedar Bayou Flood Risk Reduction Study – The Harris County Flood Control District is conducting a report that will recommend flood risk reduction projects throughout the Cedar Bayou watershed and provide associated cost estimates for the recommended projects. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 2-24 The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. 2.11.2 Staff and Local Stakeholder Involvement in Annex Development This annex was developed over the course of several months with input from many city departments including Engineering, Emergency Management, Fire, Health, Planning and Development and Public Works. All departments were asked to contribute to the annex development through reviewing and contributing to the capability assessment, reporting on the status of previously identified actions, and participating in action identification and prioritization. An action development meeting was held on December 12, 2018 and March 12, 2019 and was attended by representatives from all previously listed department as well as the City Manager’s office. Once actions had been identified and compiled in the annex, a draft was internally circulated for comment. 2.12 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY The City of Baytown needs the following to better understand future risks and vulnerabilities from natural hazards and to better plan for the future: • Updated and revised flood maps and flood hazard areas. • Develop an updated Drainage Plan and Study to better understand local drainage issues, run-off, sheet- flow, and ponding. • Develop an enhanced outreach program on flood insurance and wind insurance. • Build capacity and strategies for resilience to cope with future impacts from natural hazards. • Develop local community planning, development, and building design standards that address impacts from natural hazards to build a safer and stronger city. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«146¬«225¬«146¬«146§¨¦10§¨¦10§¨¦10§¨¦10HoustonHoustonMont BelvieuDeerParkPasadenaLa PorteMorgan'sPointCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County0120.5Miles±Baytown ¬«146 ¬«225 ¬«146 ¬«146 §¨¦10 §¨¦10 §¨¦10 §¨¦10 Houston Houston Mont Belvieu Deer Park Pasadena La Porte Morgan's Point FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 1 20.5 Miles ± Baytown ¬«146 ¬«225 ¬«146 ¬«146 §¨¦10 §¨¦10 §¨¦10 §¨¦10 Houston Houston Mont Belvieu Deer Park Pasadena La Porte Morgan's Point Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 1 20.5 Miles ± Baytown ¬«146 ¬«225 ¬«146 ¬«146 §¨¦10 §¨¦10 §¨¦10 §¨¦10 Houston Houston Mont Belvieu Deer Park Pasadena La Porte Morgan's Point 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 1 20.5 Miles ± Baytown ¬«146 ¬«225 ¬«146 ¬«146 §¨¦10 §¨¦10 §¨¦10 §¨¦10 Houston Houston Mont Belvieu Deer Park Pasadena La Porte Morgan's Point 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 1 20.5 Miles ± Baytown ¬«146 ¬«225 ¬«146 ¬«146 §¨¦10 §¨¦10 §¨¦10 §¨¦10 Houston Houston Mont Belvieu Deer Park Pasadena La Porte Morgan's Point Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 1 20.5 Miles ± Baytown ¬«146 ¬«225 ¬«146 ¬«146 §¨¦10 §¨¦10 §¨¦10 §¨¦10 Houston Houston Mont Belvieu Deer Park Pasadena La Porte Morgan's Point Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 1 20.5 Miles ± Baytown 3-1 3. CITY OF BELLAIRE 3.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Deacon Tittel, Fire Chief/EMC 7008 S. Rice Bellaire, TX 77401 Telephone: 713-662-8201 e-mail Address: dtittel@bellairetx.gov ChaVonne Sampson 7008 S. Rice Bellaire, TX 77401 Telephone: 713-662-8243 e-mail Address: csampson@bellairetx.gov 3.2 JURISDICTION PROFILE 3.2.1 Location The City of Bellaire is located in the southwest portion of the Harris County, surrounded by the Cities of Houston, West University Place, and Southside Place. The city covers 3.6 square miles, with borders consisting of West Park to the north, Beechnut to the south, railroad tracks to the east and Chimney Rock to the west. I-610 runs directly through the middle of the City. Bellaire Boulevard and Bissonnet travel east and west through the City as well. Bellaire is primarily residential but has some commercial along with 17 mid- to high-rise structures. 3.2.2 History Bellaire, on Interstate Loop 610, is surrounded by Houston, West University Place, and Southside Place in southwest Harris County. William Wright Baldwin, acting as president of the South End Land Company, founded Bellaire and Westmoreland Farms after purchasing the 9,449-acre Rice Ranch in 1908. Baldwin was a native of Iowa and nationally known as vice president of the Burlington Railroad. The development was six miles from Houston on the eastern edge of the Rice Ranch, so named for former owner William Marsh Rice. Promotional advertising in 1909 explained that Bellaire was named for the area’s Gulf breezes, but Baldwin may have named it for Bellaire, Ohio, a town served by his railroad. By 1910 Baldwin had invested over $150,000 in capital improvements to turn the treeless prairie into an attractive location for residences and small truck farms. From the site to Main Street in Houston he constructed Bellaire Boulevard. He also incorporated the Westmoreland Railroad Company to build an electric streetcar line down the center of the boulevard. The streetcar, known as the “Toonerville Trolley,” operated from December 12, 1910, until bus service replaced it on September 26, 1927. In 1910 horticulturist Edward Teas was induced to move his nursery from Missouri to Bellaire Boulevard to implement landscaping plans drawn by landscape architect Sid Hare. A Bellaire post office opened in 1911. The South End Land Company advertised nationwide to attract Midwestern farmers and others who were eager to escape harsh winters. Bellaire was promoted as an exclusive residential neighborhood and agricultural trading center with the conveniences of city living and reliable access to Houston. On June 24, 1918, with a population of about 200, Bellaire obtained a general-law city charter. The population reached 1,124 by 1940. Houston’s expansion after World War II transformed Bellaire into a popular suburb, but geographical growth was halted when Houston annexed the surrounding land on December 31, 1948. In April 1949 Bellaire adopted a home-rule Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 3-2 charter with a council-manager government. The city had 10,173 residents in 1950. The Swedish general consul’s office opened in Bellaire in 1953. At one point, the city was also home to the consulate general of Honduras. However, both offices had relocated to Houston by 2009. Bellaire is zoned for residential, commercial, and light industrial sections. High-rise office buildings are located along Loop 610, but Bellaire is largely known as a residential city. Zoning and land-use controversies, long the stuff of Bellaire politics, led to a recall of the mayor and three councilmen in 1977. A resurgence in new residential construction began in the late 1980s following a liberalization of the city’s traditionally strict zoning policies. By 1968 Bellaire had fifteen churches and one synagogue. Leading community organizations included the Bellaire-Southwest Houston Chamber of Commerce (now part of the Houston Metropolitan Chamber of Commerce), the Bellaire Historical Society, Friends of the Bellaire Library, Friends of Bellaire Parks (now Patrons for Bellaire Parks), and the Bellaire Women’s Civic Club. In 2017 there were three private schools and several public schools operated by the Houston Independent School District. Local publications included the Bellaire Examiner, the Village & Southwest News, and Bellaire Buzz magazine. City management is noted for its police and fire protection, library, public works, parks and recreation facilities, and an office for senior services. The population was 19,872 in 1960, 13,842 in 1990, and 16,855 in 2010. (by Jeffery Dunn) 3.2.3 Climate The climate of the City of Bellaire is your typical Southeast Texas weather. Winters do not truly start until January when consist cold temperatures are normal. Snow and ice are hit or miss for the area. The spring brings beautiful weather but also strong thunderstorms. Summers are typically hot with high humidity. The area experiences humidity throughout the year. Autumn is nice, with average temperatures in the mid 60s. Tropical weather occurs, but not typically until September. 3.2.4 Governing Body Format Bellaire is city charter and calls for a council-manager form of government. There is a seven-member City Council, which includes a Mayor. The City Managers is responsible for the daily operations of the City. The City consists of nine different departments – Fire, Police, Finance, Development Services, Human Resources, Public Works, Library, Parks, Recreation, Facilities, and Information Technology. The City Council will assume responsibility for the adoption of this plan; The City Manager and the Fire Chief/Emergency Manager will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 3-1. Table 3-1. Local Mitigation Planning Team Members Name Title Deacon Tittel Fire Chief/EMC ChaVonne Sampson Director of Development Services Paul Hofmann City Manager Paula Ryan Assistant City Manager Mike Leech Director of Public Works Terrence Beaman Chief Financial Officer William Davidson Building Official Karl Miller Director of Parks and Recreation Cheryl Bright Community Relations Administrator City of Bellaire 3-3 3.3 CURRENT TRENDS 3.3.1 Population According to Census Bureau, the population of the City of Bellaire as of 2016 was 18,140 Since 2015, the population has grown at an average annual rate of 1.52 percent. 3.3.2 Development The City of Bellaire continues to have new residential construction taking place. The majority of the residential construction consists of tearing down the old single story structures and replacing them with new 2 story single family dwellings. Some limited redevelopment in the commercial area mainly consists of renovations to existing structures. Table 3-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Table 3-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? NO • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A Is your jurisdiction expected to annex any areas during the performance period of this plan? NO • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A Are any areas targeted for development or major redevelopment in the next five years? NO • If yes, briefly describe, including whether any of the areas are in known hazard risk areas N/A How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 125 98 73 87 76 Multi-Family 0 0 0 0 0 Other (commercial, mixed use, etc.) 4 3 1 3 2 Total 129 101 74 90 78 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 472 • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. City of Bellaire is 100% built out Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 3-4 3.4 CAPABILITY ASSESSMENT The City of Bellaire performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 3-3. • Development and permitting capabilities are presented in Table 3-4. • An assessment of fiscal capabilities is presented in Table 3-5. • An assessment of administrative and technical capabilities is presented in Table 3-6. • An assessment of education and outreach capabilities is presented in Table 3-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 3-8. • Classifications under various community mitigation programs are presented in Table 3-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 3-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Table 3-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No Yes Yes Comment: Chapter 9, Article 2 adopts the current version of the IBC, 10/6/2014 Zoning Code Yes No No Yes Comment: Chapter 24, Article 1, Planning and Zoning, 11/16/2009 Subdivisions Yes No Yes Yes Comment: Chapter 25, Articles I, II and II, 10/8/2001 Stormwater Management No No No No Comment: Post-Disaster Recovery No No No No Comment: Real Estate Disclosure No No Yes No Comment: Growth Management No No No No Comment: Site Plan Review Yes No No Yes Comment: Chapter 23.5, Article II, 7/2/2012 Environmental Protection No No Yes No Comment: Flood Damage Prevention Yes No No Yes Comment: Chapter 9, Article 2A, 10/6/2014 Emergency Management Yes Yes Yes Yes Comment: Chapter 11, 3/5/1984 Climate Change No No No No Comment: City of Bellaire 3-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Planning Documents General Plan Yes No Yes Yes Comment: Chapter 24, Article 1, section 24-104, 11/16/2019 Capital Improvement Plan Yes No Yes Yes How often is the plan updated? Yearly Comment: Disaster Debris Management Plan Yes No No Yes Comment: Floodplain or Watershed Plan Yes No No Yes Comment: The Flood Hazard Mitigation Plan was finalized and then approved by Council on March 19, 2018. Stormwater Plan Yes Yes No Yes Comment: Urban Water Management Plan No No No No Comment: Habitat Conservation Plan No No No No Comment: Economic Development Plan No No No No Comment: Shoreline Management Plan No No No No Comment: We do not have any shorelines in our jurisdiction Community Wildfire Protection Plan No No No No Comment: No areas in need of this type of plan Forest Management Plan No No No No Comment: We have no forest in our jurisdiction Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes No Yes Yes Comment: Threat & Hazard Identification & Risk Assessment (THIRA) Yes No Yes Yes Comment: Post-Disaster Recovery Plan No No No No Comment: Continuity of Operations Plan No No No No Comment: Public Health Plan No No No No Comment: Other No No No No Comment: Table 3-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Development Services Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 3-6 Table 3-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants No Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes No User Fees for Water, Sewer, Gas or Electric Service Yes Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs No Development Impact Fees for Homebuyers or Developers No Other No Table 3-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Development Services Engineers or professionals trained in building or infrastructure construction practices No Development Services Planners or engineers with an understanding of natural hazards Yes Development Services Staff with training in benefit/cost analysis Yes Development Services Surveyors No N/A Personnel skilled or trained in GIS applications Yes Development Services Scientist familiar with natural hazards in local area No N/A Emergency manager Yes Fire Department / Fire Chief Grant writers Yes Development Services Other No N/A Table 3-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. Documents Center Page Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. Updated Information as to what he City is doing Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes • If yes, briefly describe. Flood Hazard Board Do you have any other programs already in place that could be used to communicate hazard-related information? No • If yes, briefly describe. N/A Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Everbridge City of Bellaire 3-7 Table 3-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Development Services Who is your floodplain administrator? (department/position) Development Services Director Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? 3-18-2019 Does your floodplain management program meet or exceed minimum requirements? Exceeds • If exceeds, in what ways? 1 foot above BFE When was the most recent Community Assistance Visit or Community Assistance Contact? 12-15-19 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. N/A Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. N/A Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes • If so, what type of assistance/training is needed? Ongoing Training Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? Yes • If no, is your jurisdiction interested in joining the CRS program? N/A How many flood insurance policies are in force in your jurisdiction?a 5,070 • What is the insurance in force? $ N/A • What is the premium in force? $4,461,572.00 How many total loss claims have been filed in your jurisdiction?a 3099 • How many claims are still open or were closed without payment? N/A • What were the total payments for losses? $249,117,073.00 a. According to FEMA statistics as of July 19, 2018 Table 3-9. Community Classifications Participating? Classification Date Classified Community Rating System Yes 7 10-01-2014 Building Code Effectiveness Grading Schedule Yes 4 1-31-2019 Public Protection Yes 2 04/10/2017 Storm Ready No Firewise No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 3-8 Table 3-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Bellaire 3-9 3.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 3.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • City of Bellaire Flood Mitigation Plan March 2018- A plan that outlines the implementation of activities that will efficiently use public and private resources to reduce flood losses and encourage support for hazard mitigation activities among the public. 3.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Comprehensive Plan — The City of Bellaire is conducting a comprehensive plan update. The opportunity to incorporate additional mitigation and abatement measures will be contemplated for inclusion into the Code. 3.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 3-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Bellaire. Other hazard events that broadly affected the entire planning area, including City of Bellaire, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 3-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 N/A Severe Storms and Flooding 4269 DR 2016 N/A Severe Storms and Flooding 4272 DR 2016 N/A Hurricane Ike N/A 2008 N/A Tropical Storm Allison 1379 DR 2001 N/A 3.7 HAZARD RISK RANKING Table 3-12 presents a local ranking for City of Bellaire of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 3-10 Table 3-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Flooding 51 High 2 Severe Weather 48 High 2 Hurricane 48 High 3 Earthquake 14 Low 4 Wildfire 11 Low 5 Drought 6 Low 5 Mass Movements 6 Low 6 Coastal Erosion 0 (No Exposure) None 6 Tsunami 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 3.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 3.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 183 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 9 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 10 3.8.2 Other Noted Vulnerabilities No additional vulnerabilities specific to this jurisdiction have been identified. 3.9 STATUS OF PREVIOUS PLAN ACTIONS Table 3-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. 3.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 3-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 3-15 identifies the priority for each action. Table 3-16 summarizes the mitigation actions by hazard of concern and mitigation type. City of Bellaire 3-11 Table 3-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update 2014BELARE001 — Tree Trimming Program X BEL5 Comment: Still a Work in progress 2014BELARE002 — Hardening new City Hall and Police Department X Comment: Will be completed in January of 2019 2014BELARE003 — Develop new drainage ordinance to require on-site detention for future development and redevelopment X Comment: 2014BELARE004 — Adopting Community Canopy Action Plan (C-Cap) to reduce sick and diseased trees that impact roadways and vehicles under that canopy X BEL8 Comment: Investigating to see the status 2014BELARE005 — Create and enforce ordinance to reduce fuel loads and ignition sources by unmaintained and delinquent private right of way. X BEL9 Comment: Investigating to see the status 2014BELARE006 — Harden water supply piping with non-corrosive, drought resistant material to prevent loss of water due to breaks X BEL6 Comment: Investigating to see the status 2014BELARE007 — Expand Mass Notification Warning System increase coverage and to communicate hazard potential with Citizens X Comment: 2014BELARE008 — Install a backup generator for the emergency cooling center in the event of loss of power X BEL10 Comment: Investigating to see the status 2014BELARE009 — Create Ordinance to mandate safe zone around any new commercial site having reportable quantities of a Hazardous Material X BEL11 Comment: Energy Pipeline needs to be removed from previous action item verbiage 2014BELARE010 — Implement a Public Education Program to educate residents on drought trigger-points that will cause water restrictions to be enforced and to reduce water shortages. X BEL7 Comment: Investigating to see the status Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 3-12 Table 3-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action BEL1 — Where appropriate, support retrofitting, or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Dam Failure, Flooding, Hurricane and Severe Weather New 3, 10 City of Bellaire TX Water Board / TDEM High HMGP, PDM, FMA Short-term Action BEL2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including comprehensive plan, and zoning ordinance. Hazards Mitigated: Drought, earthquake, flooding, severe weather, hurricanes, New 3, 6, 7, 9, 10, 11, 12, 13, 14, 15 City of Bellaire TBD Low Staff Time, General Funds Ongoing Action BEL3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Flooding, Severe Weather, Hurricane, Earthquake, Wildfire, Drought and Mass Movements New All Objectives City of Bellaire TBD Low Staff Time, General Funds Ongoing Action BEL4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirement • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Flooding, severe weather, and hurricanes New and Existing 1, 3, 7, 9, 10, 11, 12, 13, 14, 15 City of Bellaire TBD Low Staff Time, General Funds Ongoing Action BEL5 — Tree Trimming Program Hazards Mitigated: Flooding, severe weather, hurricanes, and Drought Existing 8, 9, 11 City of Bellaire TBD Low Staff Time, General Funds Seasonal Action BEL6 — Harden water supply piping with non-corrosive, drought resistant material to prevent loss of water due to breaks Hazards Mitigated: Drought Existing 3, 6, 7, 11 City of Bellaire TBD Medium Staff Time, CIP Funds Ongoing Action BEL7 — Implement a Public Education Program to educate residents on flooding, severe weather, hurricanes, and drought trigger-points that will cause potential restrictions to be enforced and to reduce resource shortages Hazards Mitigated: Flooding, severe weather, hurricanes, and drought New and Existing 1, 3, 4, 9, 10 City of Bellaire TBD Low Staff time, general Funds Ongoing Action BEL8 — Adopting Community Canopy Action Plan (C-Cap) to reduce sick and diseased trees that impact roadways and vehicles under that canopy Hazards Mitigated: Severe weather, hurricanes, wildfire and drought Existing 2, 8, 11 City of Bellaire TBD Medium General and grant funds Ongoing Action BEL9 — Create and enforce ordinance to reduce fuel loads and ignition sources by unmaintained and delinquent private right of way. Hazards Mitigated: Wildfire Existing 2, 8, 11 City of Bellaire TBD Low General funds Ongoing Action BEL10 — Install a backup generator for the emergency cooling center in the event of loss of power Hazards Mitigated: Severe weather, hurricanes, earthquake New 4, 10 City of Bellaire TBD Medium Grant funds Short term City of Bellaire 3-13 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action BEL11 — Create Ordinance to mandate safe zone around any new commercial site having reportable quantities of a Hazardous Material Hazards Mitigated: Flooding, severe weather, hurricane, wildfire New 6, 10, 11, 12, 13, 14, 15 City of Bellaire TBD Low Staff time, general funds Short term Action BEL12— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Flooding, Severe Weather, Hurricane, Earthquake, Wildfire, Drought and Mass Movements New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Bellaire HCOHSEM Low General Funds Ongoing Action BEL13 — Evaluate the conversion of Bellaire’s wastewater treatment plant, dog park, and soccer fields along Edith into detention areas. Evaluate the conversion of the trash transfer station at Beltway 8 to a reservoir for Brays Bayou. Hazards Mitigated: Flooding, severe weather, hurricane New and Existing 3, 7, 9 City of Bellaire City of Houston, Harris County Flood Control High Staff funds, CIP funds, and grant funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 3-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya BEL1 2 High High Yes Yes No Medium High BEL2 10 High Low Yes No Yes High Low BEL3 15 Medium Low Yes No Yes Medium Low BEL4 10 High Medium Yes No Yes High Low BEL5 3 Low Low Yes No No Low Low BEL6 4 High Medium Yes Yes Yes High Medium BEL7 5 High Low Yes Yes Yes Medium Low BEL8 3 Medium Low Yes No Yes Medium Medium BEL9 3 Medium Low Yes No Yes Medium Medium BEL10 2 High High Yes Yes No High High BEL11 7 Medium Low Yes No Yes Medium Medium BEL12 8 Medium Low Yes Yes Yes High High BEL13 3 High High Yes Yes No High High a. See the introduction to this volume for explanation of priorities. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 3-14 Table 3-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Flooding BEL1, 2, 4, 5, 7, 11, 12, 13 BEL1, 5, 11, 13 BEL4, 7, 12 BEL4, 5, 8 BEL3, 4, 10, 12 BEL1 BEL1 BEL1, 2, 4, 10, 12 Severe Weather BEL1, 2, 4, 5, 7, 11, 12, 13 BEL1, 4, 11, 13 BEL4, 7, 12 BEL4, 5, 8 BEL3, 4, 10, 12 BEL1 BEL 8 BEL1, 2, 4, 10, 12 Hurricane BEL1, 2, 4, 5, 11, 12, 13 BEL1, 5, 11, 13 BEL4, 7, 12 BEL4, 5, 8 BEL3, 4, 10, 12 BEL1 BEL8 BEL1, 2, 4, 10, 12 Medium-Risk Hazards N/A Low-Risk Hazards Earthquake BEL2, 11, 12 NO BELK12 BEL5 BEL3, 12 NO NO BEL1, 2, 12 Wildfire BEL1, 2, 5, 9, 11, 12 BEL5, 9 BEL9, 12 BEL5, 8, 9 BEL9, 12 NO BEL8, 9 BEL1, 2, 12 Drought BEL1, 2, 5, 6, 7, 12 BEL5, 6, 11 BEL7, 12 BEL5, 8 BEL3, 12 BEL6 BEL6, 8 BEL1, 2, 6, 12 Mass Movements BEL12 BEL12 BEL12 BEL12 a. See the introduction to this volume for explanation of mitigation types. 3.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • City of Bellaire Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(§¨¦610§¨¦610§¨¦69§¨¦69HoustonWestUniversityPlaceSouthsidePlaceCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.250.50.125Miles±Bellaire §¨¦610 §¨¦610 §¨¦69 §¨¦69 Houston West University Place Southside Place FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.25 0.50.125 Miles ± Bellaire §¨¦610 §¨¦610 §¨¦69 §¨¦69 Houston West University Place Southside Place Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.25 0.50.125 Miles ± Bellaire §¨¦610 §¨¦610 §¨¦69 §¨¦69 Houston West University Place Southside Place 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.25 0.50.125 Miles ± Bellaire §¨¦610 §¨¦610 §¨¦69 §¨¦69 Houston West University Place Southside Place 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.25 0.50.125 Miles ± Bellaire §¨¦610 §¨¦610 §¨¦69 §¨¦69 Houston West University Place Southside Place Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.25 0.50.125 Miles ± Bellaire §¨¦610 §¨¦610 §¨¦69 §¨¦69 Houston West University Place Southside Place Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.25 0.50.125 Miles ± Bellaire 4-1 4. CITY OF BUNKER HILL VILLAGE 4.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Karen H. Glynn, P.E., City Administrator 11977 Memorial Drive Houston, Texas 77024 Telephone: 713-467-9762 e-mail Address: kglynn@bunkerhilltx.gov Steve Smith, Director of Public Works 11977 Memorial Drive Houston, Texas 77024 Telephone: 713-467-9762 e-mail Address: ssmith@bunkerhilltx.gov 4.2 JURISDICTION PROFILE 4.2.1 Location The City of Bunker Hill Village is a municipality in southwestern Harris County. The current boundaries generally are Blalock Road on the east, Memorial Drive on the south, Taylorcrest Road on the north, and, on the west, a part of the Tealwood area west of Gessner Road. The City encompasses an area of 1.5 square miles. 4.2.2 History The City of Bunker Hill Village was incorporated in 1954. The City consists of approximately 1,250 single-family dwellings; one privately owned recreational center, two elementary schools, four churches, and one retreat center. Through the years, the City has adopted ordinances establishing zoning regulations to preserve the characteristics of Bunker Hill Village and the five other surrounding “Memorial Villages.” The six Memorial Villages are independent cities that operate autonomously of Houston. All are served by the Village Fire Department. The Memorial Villages Police Department serves Bunker Hill Village, Piney Point Village, and Hunters Creek; the other Memorial Villages have independent police agencies. The six villages have executed an inter-local agreement and developed an emergency management guide for emergency needs. 4.2.3 Climate The climate of the City of Bunker Hill Village is characterized by relatively high temperatures and evenly distributed precipitation throughout the year with high humidity. 4.2.4 Governing Body Format The City of Bunker Hill Village is a Type-A General Law City governed by a Mayor and five Council Members elected at large. A Type-A General Law City is one that had 600 or more inhabitants at the time of its incorporation. General Law Cities have a population less than 5,000 and are authorized to do only what the state constitution or Legislature has authorized. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 4-2 The City Council assumes responsibility for the adoption of this plan; the City Administrator will oversee its implementation. Table 4-1 lists members of the joint local mitigation planning team. Howard Miller, emergency management coordinator for the Village Fire Department, also participated in planning for the six Memorial Villages. Table 4-1. Local Mitigation Planning Team Members Jurisdiction Name / Title Phone Email City of Bunker Hill Village Karen Glynn, City Admin. Steve Smith, PW Director/Building Official 713-467-9762 KGlynn@bunkerhilltx.gov ssmith@bunkerhilltx.gov City of Hedwig Village Kelly Johnson, City Admin./Secretary 713-465-6009 kjohnson@hedwigtx.gov City of Hilshire Village Susan Blevins, City Admin/Secretary Efrain Him, City Engineer 713-973-1779 Susan.blevins@hilshirevillagetexas.com Efrain.him@hdrine.com City of Hunters Creek Village Tom Fullen, City Admin. 713-465-2150 tfullen@cityofhunterscreek.org City of Piney Point Village Roger Nelson, City Admin. 713-230-8703 cityadmin@pineypt.org City of Spring Valley Village Julie Robinson, City Admin. Arthur Faiello, PW Director 713-465-5306 832-910-8576 jrobinson@springvalleytx.com afaiello@springvalleytx.com Memorial Villages Police Department Ray Schultz, Chief of Police Rschultz@mvpdtx.org Village Fire Department Howard Miller, Emergency Management Coordinator David Foster, Fire Chief 4.3 CURRENT TRENDS 4.3.1 Population According to the 2010 Census Data, the population of the City of Bunker Hill Village was 3,633. Since the 1990 Census, the population has been relatively stable. 4.3.2 Development The City of Bunker Hill Village is continuing to experience residential redevelopment of new, larger homes. City of Bunker Hill is landlocked by other municipalities; therefore there is no growth opportunity. Table 4-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Table 4-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? NO • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A Is your jurisdiction expected to annex any areas during the performance period of this plan? NO • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A City of Bunker Hill Village 4-3 Criterion Response Are any areas targeted for development or major redevelopment in the next five years? yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas The City of Bunker Hill Village is continuing to experience residential redevelopment of new, larger homes. How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 20 12 27 19 21 Multi-Family N/A N/A N/A N/A N/A Other (commercial, mixed use, etc.) N/A N/A N/A N/A N/A Total 20 12 27 19 21 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: #N/A • Landslide: # N/A • High Liquefaction Areas: # N/A • Tsunami Inundation Area: # N/A • Wildfire Risk Areas: # N/A Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. Bunker Hill Village continues to experience redevelopment of their residential lots; older homes are demolished and new homes constructed. 4.4 CAPABILITY ASSESSMENT The City of Bunker Hill Village performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 4-3. • Development and permitting capabilities are presented in Table 4-4. • An assessment of fiscal capabilities is presented in Table 4-5. • An assessment of administrative and technical capabilities is presented in Table 4-6. • An assessment of education and outreach capabilities is presented in Table 4-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 4-8. • Classifications under various community mitigation programs are presented in Table 4-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 4-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 4-4 Table 4-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No Yes Yes Comment: Chapter 4 Development, Building and Construction Zoning Code Yes No Yes Yes Comment: Appendix A – Zoning Subdivisions Yes No Yes Yes Comment: Chapter 14 – Subdivision Stormwater Management Yes No Yes Yes Comment: Chapter 4 Development, Building and Construction; TCEQ Post-Disaster Recovery Yes Yes Yes No Comment: Harris County; FEMA Real Estate Disclosure No No No No Comment: Growth Management Yes Yes Yes Yes Comment: Harris Co. Flood Control Site Plan Review Yes Yes Yes No Comment: Chapter 4 Development, Building and Construction; Village Fire Dept – Fire Marshall Environmental Protection No Yes Yes No Comment: TCEQ; EPA Flood Damage Prevention Yes No Yes Yes Comment: Chapter 4 Development, Building and Construction Emergency Management Yes Yes Yes No Comment: Harris Co; Village FD; Memorial Villages PD Climate Change No No No No Comment: Other No No No No Comment: Planning Documents General Plan – City’s Zoning Ordinance Yes No Yes Yes Comment: N/A Capital Improvement Plan Yes No No Yes How often is the plan updated? Annually Comment: The City maintains a rolling 5 year CIP (Water, Wastewater, Water Production, Streets and Drainage Updated annually) Disaster Debris Management Plan Yes Yes No No Comment: By Contract with Harris County Floodplain or Watershed Plan No Yes No No Comment: Harris Co Flood Control Stormwater Plan Yes Yes Yes Yes Comment: TCEQ – MS4 Permit Urban Water Management Plan Yes Yes Yes No Comment: Harris – Galveston Subsidence District – Ground Water Reduction Plan Habitat Conservation Plan No Yes No No Comment: TX Parks & Wildlife; TCEQ; EPA Economic Development Plan Yes No Yes No Comment: The City is 100% Zoned Residential City of Bunker Hill Village 4-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Shoreline Management Plan No No No No Comment: Community Wildfire Protection Plan No No No No Comment: Forest Management Plan No No No No Comment: Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes Yes Yes No Comment: Harris County Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes Yes No Comment: Harris County Hazard Mitigation Plan Post-Disaster Recovery Plan Yes Yes Yes No Comment: Harris County Emergency Management Plan Continuity of Operations Plan No No No No Comment: Public Health Plan No No No No Comment: Harris Co. Public Health Other No No No No Comment: Table 4-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? City’s Building Official Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? No Table 4-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants No Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes -- Water and Sewer Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Other N/A Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 4-6 Table 4-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes City Admin; Building Official; By Contract Engineers or professionals trained in building or infrastructure construction practices Yes City Admin; Building Official; Contract Inspectors; Fire Marshall Planners or engineers with an understanding of natural hazards Yes By Contract Staff with training in benefit/cost analysis Yes By Contract Surveyors Yes By Contract Personnel skilled or trained in GIS applications Yes By Contract Scientist familiar with natural hazards in local area No Emergency manager Yes Village Fire Dept; Memorial Villages PD Grant writers Yes By Contract Other N/A Table 4-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No • If yes, briefly describe. Do you use social media for hazard mitigation education and outreach? No • If yes, briefly describe. Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes • If yes, briefly describe. City’s Drainage Committee Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Email notification system (vlinc) Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Email notification system (vlinc) Table 4-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? City’s Building Official Who is your floodplain administrator? (department/position) City’s Building Official Are any certified floodplain managers on staff in your jurisdiction? No – By Contract What is the date that your flood damage prevention ordinance was last amended? 2017 Does your floodplain management program meet or exceed minimum requirements? Exceeds • If exceeds, in what ways? Added minimum foundation elevation based on sanitary sewer and calculate hydraulic grade line for 100 year event When was the most recent Community Assistance Visit or Community Assistance Contact? 2017 City of Bunker Hill Village 4-7 Criterion Response Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? N/A • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? No • If no, is your jurisdiction interested in joining the CRS program? No How many flood insurance policies are in force in your jurisdiction?a 756 • What is the insurance in force? $ 257,767,500 • What is the premium in force? $ 312,000 How many total loss claims have been filed in your jurisdiction?a 276 • How many claims are still open or were closed without payment? 58 • What were the total payments for losses? $8,115,100.66 a. According to FEMA statistics as of December 2018 Table 4-9. Community Classifications Participating? Classification Date Classified Community Rating System No Date Building Code Effectiveness Grading Schedule (ISO) Yes 4 2019 Public Protection Village Fire Dept (ISO) Yes 1 2015 Storm Ready No Date Firewise No Date Table 4-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 4-8 Criterion Jurisdiction Ratinga Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. 4.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 4.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • City of Bunker Hill Village Stormwater Management Plan • City of Bunker Hill Finance and Infrastructure Management Plan • City of Bunker Hill Code of Ordinances – Building Codes, Drainage Ordinance, etc. City of Bunker Hill Village 4-9 • Bunker Hill Village Code of Ordinances Chapter 4 – Development, Building, and Construction (City’s Drainage Ordinance) • City of Bunker Hill Village – Drainage Master Plan Update 2017 • Harris County Hazard Mitigation Plan 4.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: 4.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 4-11 lists past occurrences of natural hazards for which specific damage was recorded in Bunker Hill Village. Other hazard events that broadly affected the entire planning area, including Bunker Hill Village, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 4-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Severe Weather /Flooding N/A 2009 N/A Hurricane Ike EM3294 September 2008 N/A Severe Weather/Memorial Day Flood DR4223 May 2015 N/A Severe Weather/Tax Day Flood DR4269 April 2016 N/A Hurricane Harvey DR4332 August 2017 N/A 4.7 HAZARD RISK RANKING Table 4-12 presents a local ranking for Bunker Hill Village of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 4-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 2 Hurricane 32 High 3 Earthquake 14 Low 4 Drought 6 Low 4 Flooding 6 Low 4 Wildfires 6 Low 5 Dam Failure 0 (No Exposure) None 5 Mass Movement 0 (No Exposure) None 5 Coastal Erosion 0 (No Exposure) None 5 Tsunami 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 4-10 4.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 4.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 53 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 3 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 4 4.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issue has been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Local Flooding – Homes and Streets Mitigation actions addressing this issue were prioritized for consideration in the action plan in this annex. 4.9 STATUS OF PREVIOUS PLAN ACTIONS Table 4-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. 4.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 4-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 4-15 identifies the priority for each action. Table 4-16 summarizes the mitigation actions by hazard of concern and mitigation type. 4.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed for this annex. • City of Bunker Hill Village Code of Ordinances — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • City of Bunker Hill Village Building Code and Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • City of Bunker Hill Village Master Drainage Plan The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • Memorial Villages Emergency Manage Plan and Mayors Guide City of Bunker Hill Village 4-11 Table 4-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Expand Early Warning/Alert System – Collaborative Community Communication & Mass Notification for Warning/Information sharing with residential and non-residential areas – Phase 1 and Phase 2 Phase 1 Phase 2 BNK5 Comment: Phase 1 has been completed; Phase 2 to continue – plans for text messaging and social media. Continued effort to reach 100 % of residents Develop Tree Management Program to better manage and keep clear the public right-of-way; to promote stronger, healthier trees and to reduce the impact of debris Yes BNK9 Comment: The City has been budgeting funds for trimming trees along major thoroughfares; however, This needs to be developed into a formal program Approval of Drainage Ordinance for New Development and Re-development to require new development to put in drainage systems to reduce flooding. 2015 Updated 2017 Comment: Implement a regional program to build a tertiary water source to ensure and address public water supply during drought conditions. Yes BNK7 Comment: Develop a Dam/Levee failure flood inundation study to determine risk area within Bunker Hill Village Remove Comment: Implement an Extreme Heat Public Education/Outreach Program to inform residents of extreme heat hazards and actions to take to minimize health impacts and property damage from extreme heat. Remove – part of notification project Comment: Implement a Clean-up Program of heavy wildfire fuel areas (abandoned buildings, abandoned lands, etc.) Yes BNK6 Comment: The City Council has directed staff to develop a vacant house ordinance; This is planned for 2019. This description should be reworded. Develop relationship with local LEPC Yes BNK10 Comment: Implementation of the City of Bunker Hill Village – Drainage Master Plan Update (Approved 2017) Yes BNK8 Comment: This action was added during the planning timeframe and should be carried over. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 4-12 Table 4-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action BNK1 — Where appropriate, support retrofitting or reconstruction of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Severe Weather, Hurricane, Flooding Existing 1, 2, 5 City TBD High HMGP, PDM, FMA Short-term Action BNK2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including the Drainage Ordinance for New Development and Re-development; the City’s Building Codes in accordance with ISO Recommendations; the City of Bunker Hill Village – Drainage Master Plan Update (Approved 2017) Hazards Mitigated: Severe Weather, Drought, Huuricane, Erathquake and Flooding and Wildfire New and Existing 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 City TBD Low Staff Time, General Funds Ongoing Action BNK3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Drought, Huuricane, Erathquake and Flooding, and Wildfire New and Existing 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 City TBD Low Staff Time, General Funds Short-term Action BNK4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Dam failure, flooding, severe weather, New and Existing 1, 3, 5, 7, 8, 10 City TBD Low Staff Time, General Funds Ongoing Action BNK5 — Expand Early Warning/Alert System – Collaborative Community Communication & Notification for Warning/Information sharing with residential and non-residential ( with Memorial Villages Police Department) Hazards Mitigated: Severe Weather, Drought, Huuricane, Erathquake and Flooding and wildfire 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 City TBD Low Staff Time, General Funds for Memorial Villages Police Dept. Ongoing Action BNK6 — Implement the City’s Vacant Property Ordinance to Identify and Monitor Properties for potential hazards such as fire, flooding, nuisance, etc. (abandoned buildings, empty lots, etc.) Hazards Mitigated: Severe Weather, Drought, Wildfires 1, 4, 6 City TBD Low Staff Time Short-term Action BNK7 — Implementation of the City’s Infrastructure Management Plan for replacement of the City’s aging water system including a plan (with other agencies) to ensure and address public water supply during drought conditions. Hazards Mitigated: Severe Weather, Hurricane, Drought, Wildfires 1, 2, 4, 6 City TBD High Staff Time, City’s Capital Improvement Plan Short-term Action BNK8 — Implementation of the City of Bunker Hill Village – Drainage Master Plan Update (Approved 2017) Hazards Mitigated: Severe Weather, Hurricane, Flooding, Tsunami 1, 2, 5, 10 City TBD High Staff Time, City’s Capital Improvement Plan Long- Term Action BNK9 — Develop a Tree Management Program to better manage and keep clear the public rights-of-way; to promote stronger, healthier trees and to reduce the impact of debris Hazards Mitigated: Severe Weather, Hurricane, Earthquake, Drought, Flooding, Wildfires, Coastal Erosion, Tsunami 1, 2, 3, 4, 5, 6, 9, 10 City TBD Low Staff Time, City’s General Fund Short-term City of Bunker Hill Village 4-13 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action BNK10 — Develop relationship with local LEPC Hazards Mitigated: Severe Weather, Drought, Huuricane, Erathquake and Flooding and wildfire New and Existing 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 City LEPC Low Staff Time Ongoing Action BNK11— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Drought, Huuricane, Erathquake and Flooding and wildfire New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Bunker Hill Village HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 4-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya BNK1 3 High High Yes Yes No Medium High BNK2 10 High Low Yes No Yes High Low BNK3 10 High Low Yes No Yes High Low BNK4 6 High Low Yes No Yes High Low BNK5 10 High Low Yes N/A Yes Medium Low BNK6 3 Medium Low Yes N/A Yes High Low BNK7 4 High High Yes Yes In Long Range Plan High High BNK8 4 High High Yes Yes In Long Range Plan High High BNK9 8 Medium Low Yes N/A Yes Medium Low BNK10 10 Medium Low Yes No Yes High Low BNK11 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 4-14 Table 4-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather 1, 2, 3, 4, 5, 6, 7, 8, 9, 11 1, 2, 3, 4, 5, 6, 7, 8, 9 2, 5, 6, 7, 8, 9, 11 6, 9 2, 5, 7, 8, 9, 10, 11 1, 2 11 Hurricane 1, 2, 3, 4, 5, 6, 7, 8, 9, 11 1, 2, 3, 4, 5, 6, 7, 8, 9 2, 5, 6, 7, 8, 9, 11 6, 9 2, 5, 7, 8, 9, 10, 11 1, 2 11 Earthquake 1, 2, 3, 4, 5, 6, 7, 8, 9, 11 1, 2, 3, 4, 5, 6, 7, 8, 9 2, 5, 6, 7, 8, 9, 11 6, 9 2, 5, 7, 8, 9, 10, 11 1, 2 11 Drought 1, 2, 3, 4, 5, 6, 7, 8, 9, 11 1, 2, 3, 4, 5, 6, 7, 8, 9 2, 5, 6, 7, 8, 9, 11 6, 9 2, 5, 7, 8, 9, 10, 11 1, 2 11 Medium-Risk Hazards N/A Low-Risk Hazards Flooding 1, 2, 3, 4, 5, 6, 7, 8, 9, 11 1, 2, 3, 4, 5, 6, 7, 8, 9 2, 5, 6, 7, 8, 9, 11 6, 9 2, 5, 7, 8, 9, 10, 11 1, 2 11 Wildfires 1, 2, 3, 4, 5, 6, 7, 8, 9, 11 1, 2, 3, 4, 5, 6, 7, 8, 9 2, 5, 6, 7, 8, 9, 11 6, 9 2, 5, 7, 8, 9, 10, 11 1, 2 11 a. See the introduction to this volume for explanation of mitigation types. !(!(!(!(!(!(!(!(!(!(HoustonHedwigVillagePiney PointVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.150.30.075Miles±Bunker Hill Village Houston Hedwig Village Piney Point Village FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Bunker Hill Village Houston Hedwig Village Piney Point Village Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Bunker Hill Village Houston Hedwig Village Piney Point Village 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Bunker Hill Village Houston Hedwig Village Piney Point Village 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Bunker Hill Village Houston Hedwig Village Piney Point Village Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Bunker Hill Village Houston Hedwig Village Piney Point Village Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Bunker Hill Village 5-1 5. CITY OF DEER PARK 5.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Robert Hemminger, Director of Emergency Services 2211 East X Street Deer Park, TX 77536 Telephone: 281-478-7284 e-mail Address: rhemminger@deerparktx.org Buddy Rice, Fire Marshal 2211 East X Street Deer Park, TX 77536 Telephone: 281-478-7291 e-mail Address: brice@deerparktx.org 5.2 JURISDICTION PROFILE 5.2.1 Location The city of Deer Park, Texas is located in southeastern Harris County and is in the highly industrialized ship channel area of the county. It is approximately 22 miles east of downtown Houston. The current boundaries generally extend by the city of Pasadena, Texas to the south and west, by the city of La Porte, Texas to the south and east and by the Houston Ship Channel (dredged out Buffalo Bayou) to the north. 5.2.2 History The City was founded by Simeon West in 1892 and was incorporated December 12, 1948 when the population was 700. As of the 2010 U.S. Census, the population of Deer Park, Texas was 32,010. 5.2.3 Climate Deer Park’s climate is classified as humid subtropical and is characterized by hot, humid summers and generally mild to cool winters. 5.2.4 Governing Body Format The City of Deer Park, Texas is a Home Rule City adopted in December 1960 which provides for a Mayor- Council from of government. The Mayor and six (6) members of Council are elected at large and establish goals and priorities that are executed and implemented through the appointed City Manager. The City Council assumes responsibility for the adoption of this plan; the Office of Emergency Management will oversee its implementation. Development of this annex was carried out by the members of the City of Deer Park Local Mitigation Planning Team, whose members are listed in Table 5-1. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 5-2 Table 5-1. Local Mitigation Planning Team Members Name Title Robert Hemminger Emergency Services Director Buddy Rice Fire Marshal Bill Pedersen Public Works Director James Stokes City Manager Gary Jackson Assistant City Manager Kathy Holcomb Operations Coordinator / Floodplain Manager Adam Ballasteros City Engineer Larry Brotherton Chief Building Official 5.3 CURRENT TRENDS 5.3.1 Population According to 2010 U.S. Census, the population of Deer Park, Texas was 32,010. According to the Texas Home Town Locator the population of Deer Park, Texas was 35,139 as of July 1, 2018. Since 2010, the population has grown at an average annual rate of 1.14%. 5.3.2 Development Table 5-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Table 5-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas The city of Deer Park has annexed 32 acres for commercial development How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 59 94 55 51 8 Multi-Family 0 0 0 0 0 Other (commercial, mixed use, etc.) 15 10 19 15 13 Total 74 104 74 56 21 City of Deer Park 5-3 Criterion Response Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 26 commercial properties built within a flood hazard area between 2014 and June 2019 • Landslide: -0- • High Liquefaction Areas: -0- • Tsunami Inundation Area: -0- • Wildfire Risk Areas: -0- Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. As of July 2019, the estimate is the city of Deer Park, Texas is approximately 90% built out. 5.4 CAPABILITY ASSESSMENT The City of Deer Park performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 5-3. • Development and permitting capabilities are presented in Table 5-4. • An assessment of fiscal capabilities is presented in Table 5-5. • An assessment of administrative and technical capabilities is presented in Table 5-6. • An assessment of education and outreach capabilities is presented in Table 5-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 5-8. • Classifications under various community mitigation programs are presented in Table 5-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 5-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 5-4 Table 5-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No Yes Yes Comment: Code of Ordinances, Chapter 18 Buildings and Building Regulations Zoning Code Yes No No Yes Comment: Code of Ordinances, Appendix A Zoning Subdivisions Yes No No Yes Comment: Code of Ordinances, Chapter 98 Subdivisions Stormwater Management Yes Yes Yes Yes Comment: Code of Ordinances, Chapter 106 Utilities Post-Disaster Recovery Yes No No Yes Comment: Code of Ordinances, Chapter 18 Buildings and Building Regulations Division 3 Disaster Recovery Contractors Real Estate Disclosure No No No No Comment: Growth Management Yes No Yes Yes Comment: Code of Ordinances, Chapter 98 Subdivisions and Chapter 102 Taxation Site Plan Review Yes No No Yes Comment: Code of Ordinances, Chapter 106 Utilities, Chapter 98 Subdivisions and Appendix A Zoning Environmental Protection Yes Yes No Yes Comment: Code of Ordinances, Chapter 106 Utilities, Chapter 18 Buildings and Building Requirements and Appendix A Zoning Flood Damage Prevention Yes No Yes Yes Comment: Code of Ordinances, Chapter 46 Floods, Chapter 98 Subdivisions and Chapter 18 Buildings and Building Regulations Emergency Management Yes No Yes Yes Comment: Code of Ordinances, Chapter 26 Civil Emergencies Climate Change No Yes No Yes Comment: Planning Documents General Plan Yes No Yes Yes Comment: Comprehensive Plan Capital Improvement Plan Yes No No Yes How often is the plan updated? Annual during the budget process Comment: Disaster Debris Management Plan Yes Yes No Yes Comment: Contracts are reviewed annually and the contracts are renewed every five (5) years Floodplain or Watershed Plan Yes Yes No Yes Comment: Code of Ordinances, Chapter 46 Floods Stormwater Plan Yes Yes Yes Yes Comment: Code of Ordinances, Chapter 106 Utilities Urban Water Management Plan No No No No Comment: Habitat Conservation Plan No Yes No Yes Comment: The City of Deer Park does not have an HCP but habitat impact is addressed in Code of Ordinances, Chapter 106 Utilities and Chapter 98 Subdivisions Economic Development Plan No No No No Comment: City of Deer Park does have an Economic Development Coordinator Shoreline Management Plan No Yes No No Comment: City of Deer Park is not required to have an SMP City of Deer Park 5-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Community Wildfire Protection Plan No Yes No Yes Comment: City of Deer Park is included in Harris County CWPP Forest Management Plan No Yes No No Comment: Climate Action Plan No Yes No Yes Comment: Comprehensive Emergency Management Plan Yes Yes Yes Yes Comment: Annex P – Hazard Mitigation of the Emergency Operations Plan Threat & Hazard Identification & Risk Assessment (THIRA) No Yes Yes Yes Comment: Post-Disaster Recovery Plan Yes Yes No Yes Comment: Annex J – Disaster Recovery Plan of the Emergency Operations Plan Continuity of Operations Plan Yes No No Yes Comment: Public Health Plan Yes Yes Yes Yes Comment: Annex H – Health and Medical of the Emergency Operations Plan Table 5-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Public Works/Planning and Development Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? No Table 5-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes – Water and Sewer Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 5-6 Table 5-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Planning and Development Engineers or professionals trained in building or infrastructure construction practices Yes Planning and Development Planners or engineers with an understanding of natural hazards Yes Planning and Development Staff with training in benefit/cost analysis Yes Finance and OEM Directors Surveyors Yes Planning & Development Personnel skilled or trained in GIS applications Yes Planning & Development and IT Scientist familiar with natural hazards in local area Yes Local research institutes, colleges and universities Emergency manager Yes OEM Director and EOC Manager Grant writers Yes OEM Director and City Manager’s Office Table 5-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. Public Works disseminates the information Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. Website, Instagram, Facebook and Twitter Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. N/A Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Printed material handouts at all city facilities, social media and utility billing insert Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Code Red, Outdoor Warning Sirens (Whelen), social media outlets, Alertus, Municipal TV Station City of Deer Park 5-7 Table 5-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Public Works Who is your floodplain administrator? (department/position) Public Works Project Coordinator Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? January 2017 Does your floodplain management program meet or exceed minimum requirements? Meets • If exceeds, in what ways? N/A When was the most recent Community Assistance Visit or Community Assistance Contact? Insert appropriate information Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. N/A Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. N/A Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. N/A Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? N/A Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? Yes • If no, is your jurisdiction interested in joining the CRS program? N/A How many flood insurance policies are in force in your jurisdiction?a 4,285 • What is the insurance in force? $1,283,462,500 • What is the premium in force? Unknown How many total loss claims have been filed in your jurisdiction?a 306 • How many claims are still open or were closed without payment? Unknown • What were the total payments for losses? $7,759,475.49 a. According to FEMA statistics as of February 2017 Table 5-9. Community Classifications Participating? Classification Date Classified Community Rating System Yes 7 05/01/2017 Building Code Effectiveness Grading Schedule Yes 4 02/24/2010 Public Protection Yes ISO 2 2016 Storm Ready No N/A N/A Firewise No N/A N/A Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 5-8 Table 5-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Deer Park 5-9 5.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 5.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Basic Plan – The Basic Plan provides a summary on the hazards and threats in the community. • Annex P – Hazard Mitigation is assigned to the Public Works Department and addresses the hazards and threats in the community. The Annex also identifies the various hazard mitigation related programs implemented in the City of Deer Park and which agencies are responsible for administration. 5.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Master Drainage Plan – The City of Deer Park may incorporate a Master Drainage Plan and identify projects to include in the Hazard Mitigation Action Plans. • Flood Mitigation Plan – The City of Deer Park may consider a Flood Mitigation Plan to specifically identify flood mitigation projects for the Mitigation Action Plan. • Capital Improvement Plan – The City of Deer Park updates the CIP on an annual basis and can integrate the goals, objectives, and projects identified in the Hazard Mitigation Action Plan into the CIP process. 5.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 5-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of Deer Park. Other hazard events that broadly affected the entire planning area, including City of Deer Park, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. 5.7 HAZARD RISK RANKING Table 5-12 presents a local ranking for City of Deer Park of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 5-10 Table 5-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey DR-1791 2017 Ongoing Severe Storms, Tornadoes, Straight Line Winds and Flooding DR-4223 2015 $850,000 Hurricane Ike DR-1791 2008 N/A Hurricane Ike EM-3294 2008 N/A Tropical Storm Erin DR-1730 2007 N/A Hurricane Rita DR-1606 2005 N/A Hurricane Rita EM-3261 2005 N/A Hurricane Katrina Evacuation EM-3216 2005 N/A Severe Storms, Tornadoes and Flooding DR-1439 2002 N/A Tropical Storm Allison DR-1379 2001 N/A Extreme Fire Hazards EM-3142 1999 N/A Flooding DR-1257 1998 N/A Tropical Storm Frances DR-1245 1998 N/A Severe Thunderstorms and Flooding DR-1041 1994 N/A Severe Thunderstorms and Flooding DR-970 1992 N/A Severe Thunderstorms and Flooding DR-937 1992 N/A Tropical Storm Allison DR-836 1989 N/A Severe Storms, Tornadoes and Flooding DR-828 1989 N/A Severe Storms and Flooding DR-727 1984 N/A Hurricane Alicia DR-689 1983 N/A Severe Storms, Tornadoes and Flooding DR-580 1979 N/A Severe Storms and Flooding DR-603 1979 N/A Severe Storms and Flooding DR-510 1976 N/A Severe Storms and Flooding DR-398 1973 N/A Table 5-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane and Coastal Storms 48 High 2 Wildfire 13 High 3 Flooding 24 Medium 4 Toxic Chemical Release NA Medium 5 Earthquake 14 Low 6 Drought 6 Low 6 Dam Failure 6 Low 6 Mass Movement 6 Low 6 Energy Pipeline Failures 6 Low 7 Tsunami 0 (No Exposure) None 7 Coastal Erosion 0 (No Exposure) None 7 Tsunami 0 ( No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. City of Deer Park 5-11 5.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 5.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: None • Number of FEMA-identified Severe-Repetitive-Loss Properties: None • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: None 5.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issue has been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Due to the City’s proximity to the chemical plants and refineries along the Ship Channel, Deer Park has a high risk to environmental and hazardous materials incidents due to impacts caused by natural and human caused hazards Mitigation actions addressing this issue were prioritized for consideration in the action plan in this annex. 5.9 STATUS OF PREVIOUS PLAN ACTIONS Table 5-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 5-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2014DERPRK001-Adopt a City Ordinance to require emergency power generation for fueling stations during new construction X Comment: 2014DERPRK002-Retrofit critical infrastructure/public buildings/facilities with generator power systems X Comment: 2014DERPRK003-Install Alertus (mass notification) early warning systems for public buildings X Comment: Partially completed, adding to additional buildings 2014DERPRK004-Install new lightning warning systems at outdoor sporting venues X Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 5-12 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2014DERPRK005-Update drainage ordinance to require detention future development and redevelopment for detention and within the AO (sheet flow) zones X Comment: 2014DERPRK006-Widening and deepening all drainage channels within the city limits X Comment: 2014DERPRK007- Buyout flood prone properties and create detention ponds X Comment: 2014DERPRK008-Retrofit and harden critical infrastructure and/or shelters with impact and wind resistant glass and shutter systems to withstand effects of hurricanes, hail and high-winds X Comment: 2014DERPRK009-Protect VHF Radio System and other emergency communications infrastructure components through hardening and protective structures X Comment: 2014DERPRK010-Retrofit and improve gravel roofing to limit loose debris and high wind damage X Comment: 2014DERPRK011-Center Street Revitalization Project – Utility Relocation X Comment: 2014DERPRK012-Construct protective shelters for critical equipment and vehicles X Comment: 2014DERPRK013-Improve/Retrofit air filtration systems for critical infrastructure/public buildings/school facilities with improved filtration and air purifying capacity to minimize health risks associated with low air quality and to minimize equipment damage due to smoke X Comment: Higher quality system, improved filtration, higher capacity air purification, etc. 2014DERPRK014-Improve code/ordinance to require removal of dead vegetation/dry fuel sources in high risk areas X Comment: 2014DERPRK015-Harden water piping lines and systems to prevent loss of water due to breaks and to mitigate drought X Comment: 2014DERPRK016-Develop a Public Education/Outreach Program to inform the public on water conservation mitigation measures X Comment: 2014DERPRK017- Install emergency power at cooling center X Comment: 2014DERPRK018-Improve existing site to be utilized as a cooling zone (Community Center, Library, sporting fields) with enhanced cooling capabilities, to include misting systems and additional HVAC cooling capacity X Comment: City of Deer Park 5-13 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2014DERPRK019-Install generator to provide adequate heating for use as a warming center X Comment: 2014DERPRK020-Upgrade public facility heating systems to allow utilization of warming centers through improved insulation and energy efficient heating systems, and educate public on actions to mitigate property losses from the hazards of winter storms X Comment: 2014DERPRK021-Install detection systems to monitor and warn of chemical releases X Comment: 2014DERPRK022-Improve code/ordinance for pipeline signage X Comment: 2014DERPRK023-Mapping/identification of inundation risk area for high risk dams/levees X Comment: 2014DERPRK024-Install automated public alert warning system, such as outdoor sirens or automated messaging/telephone notification systems, to provide advance warning for dam failure flood X Comment: 2010DERPRK004-Storm Sewer enlargement and storm sewer additions in different parts of city as part of the Master Drainage Plan that was developed X Comment: These projects will be placed on future Council agendas and follow the process for engineering and bidding of the projects. Design is 90% complete. Enlargement of existing infrastructure would be determined at time of funded project and would be calculated to be the most cost effective size at the time 2010DERPRK005-Widening and deepening of HC Flood Control Channel B112-02-00 X Comment: This would be a joint venture between the City and HC Flood Control District with the exact size and scope of the project still being evaluated and engineered by HCFCD. 2010DERPRK019-Develop/implement tree management program and mitigation measures to reduce high wind damages X Comment: Due to issues of trees in yards being on private property the City must do an awareness program to encourage homeowners to trim their trees around their house 2010DERPRK024-Establish/Expand GIS Mapping/Identification of Pipeline Risk Areas in flood areas X Comment: This project is updated annually with new pipelines or new owners or products 2010DERPRK025-Develop/implement pipeline safety program X Comment: 5.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 5-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 5-15 identifies the priority for each action. Table 5-16 summarizes the mitigation actions by hazard of concern and mitigation type. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 5-14 Table 5-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action DP1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire Existing 3, 4, 10 City Administration TBD High HMGP, PDM, FMA Short-term Action DP2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including the City of Deer Park Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing Action DP3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane and Coastal Storms, Flooding, Earthquake, Wildfire, Drought, Dam Failure, Mass Movement, Energy Pipeline Failures, Toxic Chemical Release New and Existing 1, 5, 8 City Administration TBD Low Staff Time, General Funds Short-term Action DP4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Flooding New and Existing 1, 3, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing Action DP5 — Adopt a City Ordinance to require emergency power generation for fueling stations during new construction Hazards Mitigated: Severe Weather; Flooding; Hurricanes Existing 11, 12, 14 Public Works TBD Low General Fund Short term Action DP6 — Retrofit critical infrastructure/public buildings/facilities with generator power systems Hazards Mitigated: Severe Weather; Flooding; Hurricanes Existing 10, 11 Public Works TBD High Grant Funds Short term Action DP7 — Install Alertus (mass notification) early warning systems for public buildings Hazards Mitigated: Severe Weather-Tornadoes New 1, 4, 11 Information Technology TBD Medium General or Grant Funds Short term Action DP8 — Install new lightning warning systems at outdoor sporting venues Hazards Mitigated: Severe Weather New 1, 10, 11 Parks TBD Low General and Grant Funds Short term Action DP9 — Update drainage ordinance to require detention future development and redevelopment for detention and within the AO (sheet flow) zones Hazards Mitigated: Flooding; Hurricanes, Dam Failure New 8, 9, 11, 12, 14, 15 Public Works TBD Low Staff time Short term Action DP10 — Widening and deepening all drainage channels within the city limits Hazards Mitigated: Flooding; Dam/Levee Failure Existing 7, 8, 10, 11, 12, 15 Public Works TBD High General and Grant Funds Short term Action DP11 — Buyout flood prone properties and create detention ponds Hazards Mitigated: Flooding Existing 6, 7, 8, 9, 10, 11 Public Works TBD High Grant Funds Long term City of Deer Park 5-15 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action DP12 — Retrofit and harden critical infrastructure and/or shelters with impact and wind resistant glass and shutter systems to withstand effects of hurricanes, hail and high-winds Hazards Mitigated: Hurricanes; Tornadoes; Severe Weather Existing 9, 10, 11, 13, 15 Public Works TBD High General and grant funds Long term Action DP13 — Protect VHF Radio System and other emergency communications infrastructure components through hardening and protective structures Hazards Mitigated: Hurricanes; Tornadoes; Severe Weather; Flooding; Wildfires Existing 1, 10, 11, 13 Information Technology TBD Medium General and grant funds Long term Action DP14 — Retrofit and improve gravel roofing to limit loose debris and high wind damage Hazards Mitigated: Hurricanes; Severe Weather Existing 10, 11, 13, 15 Public Works TBD High General and grant funds Short term Action DP15 — Center Street Revitalization Project – Utility Relocation Hazards Mitigated: Hurricanes; Severe Weather Existing 6, 9, 10, 11, 13 Public Works TBD Medium General and grant funds Short term Action DP16 — Construct protective shelters for critical equipment and vehicles Hazards Mitigated: Severe Weather New 9, 10, 11, 13 Public Works TBD Medium General and grant funds Short term Action DP17 — Improve/Retrofit air filtration systems for critical infrastructure/public buildings/school facilities with improved filtration and air purifying capacity to minimize health risks associated with low air quality and to minimize equipment damage due to smoke Hazards Mitigated: Wildfire; Hazmat; Pipeline Failure Existing 4, 9, 10, 11, 13,14 Public Works TBD Medium General and grant funds Short term Action DP18 — Improve code/ordinance to require removal of dead vegetation/dry fuel sources in high risk areas Hazards Mitigated: Wildfire Existing 2, 6, 7, 8, 9, 10, 11, 14 Public Works TBD Low General and grant funds Short term Action DP19 — Harden water piping lines and systems to prevent loss of water due to breaks and to mitigate drought Hazards Mitigated: Drought Existing 9, 10, 11, 13,15 Public Works TBD Medium General and grant funds Short term Action DP20 — Develop a Public Education/Outreach Program to inform the public on water conservation mitigation measures Hazards Mitigated: Drought Existing 7, 8, 10, 11 Public Works TBD Low General funds Short term Action DP21 — Install emergency power at cooling center Hazards Mitigated: Severe weather – extreme heat New 4, 9, 10, 11 Public Works TBD Medium General and grant funds Short term Action DP22 — Improve existing site to be utilized as a cooling zone (Community Center, Library, sporting fields) with enhanced cooling capabilities, to include misting systems and additional HVAC cooling capacity Hazards Mitigated: Severe weather – extreme heat Existing 4, 9, 10, 11 Public Works TBD Medium General and grant funds Short term Action DP23 — Install generator to provide adequate heating for use as a warming center Hazards Mitigated: Severe weather – winter storms New 4, 9, 10, 11 Public Works TBD Medium General and grant funds Short term Action DP24 — Upgrade public facility heating systems to allow utilization of warming centers through improved insulation and energy efficient heating systems, and educate public on actions to mitigate property losses from the hazards of winter storms Hazards Mitigated: Severe weather – winter storms Existing 4, 9, 10, 11 Public Works TBD Medium General and grant funds Short term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 5-16 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action DP25 — Install detection systems to monitor and warn of chemical releases Hazards Mitigated: Hazmat; Pipeline Failure Existing 1, 3, 8, 9, 10, 11 Information Technology TBD Medium General and grant funds Short term Action DP26 — Improve code/ordinance for pipeline signage Hazards Mitigated: Energy Pipeline Failures Existing 1, 3, 6, 9, 10, 11 Emergency Management TBD Low General funds Short term Action DP27 — Mapping/identification of inundation risk area for high risk dams/levees Hazards Mitigated: Dam/Levee Failure; Flooding Existing 3, 10 Information Technology TBD Medium General and grant funds Short term Action DP28 — Install automated public alert warning system, such as outdoor sirens or automated messaging/telephone notification systems, to provide advance warning for dam failure or flood Hazards Mitigated: Dam/Levee Failure; Flooding Existing 1, 3, 6, 9, 10, 11 Information Technology TBD Medium General and grant funds Short term Action DP29 — Storm Sewer enlargement and storm sewer additions in different parts of city as part of the Master Drainage Plan that was developed Hazards Mitigated: Flooding New 7, 9, 10, 11, 13 Public Works TBD High General and grant funds Long term Action DP30 — Widening and deepening of HC Flood Control Channel B112-02-00 Hazards Mitigated: Flooding Existing 7, 9, 10, 11, 13 Engineering TBD High General and grant funds Long term Action DP31 — Develop/implement tree management program and mitigation measures to reduce high wind damages Hazards Mitigated: Hurricane and Severe Weather Existing 2, 6, 7, 8, 9, 10, 11, 14 Public Works TBD Medium General funds Short term Action DP32 — Establish/Expand GIS Mapping/Identification of Pipeline Risk Areas in flood areas Hazards Mitigated: Energy Pipeline Failures; Flooding Existing 3, 7, 8, 9, 10, 11,13 Emergency Management TBD Low General funds Short term Action DP33 — Develop/implement pipeline safety program Hazards Mitigated: Energy Pipeline Failure Existing 3, 7, 8, 9, 10, 11,13 Emergency Management TBD Low General funds Short term Action DP34— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane and Coastal Storms, Flooding, Earthquake, Wildfire, Drought, Dam Failure, Mass Movement, New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Deer Park HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. City of Deer Park 5-17 Table 5-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya DP1 3 High High Yes Yes No Medium High DP2 7 Medium Low Yes No Yes High Low DP3 3 Low Low Yes No Yes High Low DP4 6 Medium Low Yes No Yes High Low DP5 3 High Low Yes No Yes High Low DP6 2 High High Yes Yes No High High DP7 3 Medium Medium Yes Yes No Medium High DP8 3 High Low Yes Yes No Medium Medium DP9 6 Medium Low Yes No Yes High Low DP10 6 High High Yes Yes No Medium High DP11 6 High High Yes Yes No High High DP12 5 High High Yes Yes No Medium Medium DP13 4 Medium Medium Yes Yes No Medium Medium DP14 4 High High Yes Yes No Medium Medium DP15 5 Medium Medium Yes Yes No Medium Medium DP16 4 High Medium Yes Yes No Medium Medium DP17 6 Medium Medium Yes Yes No Medium Medium DP18 8 Medium Low Yes No Yes High Low DP19 5 High High Yes Yes Yes Medium Medium DP20 4 Medium Low Yes No Yes Medium Low DP21 4 High Medium Yes Yes No High High DP22 4 High Medium Yes Yes No High High DP23 4 High Medium Yes Yes No High High DP24 4 High Medium Yes Yes No High High DP25 6 High Medium Yes Yes No High High DP26 6 Medium Low Yes No Yes Medium Low DP27 2 Medium Low Yes No Yes Medium Low DP28 6 High Medium Yes Yes No Medium Medium DP29 5 High High Yes Yes No High High DP30 5 High High Yes Yes No High High DP31 8 Medium Low Yes No Yes Medium Low DP32 7 High Low Yes No Yes Medium Low DP33 7 High Low Yes No Yes Medium Low DP34 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 5-18 Table 5-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather DP1, 12 , 8, 14, 15, 16, 28, 22, 24, 34 DP1, 12, 16 DP7, 8, 34 DP5, 6, 13, 34 DP1, 12, 14, 16 DP21, 24 DP3, 5, 6, 12, 15, 21, 34 Hurricane DP9, 12, 14, 15, 34 DP9, 12 DP34 DP5, 6, 13, 34 DP9, 12, 14 DP9 DP2, 3, 5, 6, 9, 12, 15, 34 Medium-Risk Hazards Flooding DP1, 4, 9, 10, 27, 28, 29, 3031, 32, 34 DP1, 4, 9, 10, 11, 27, 29, 30, 31, 32 DP4, 28, 34 DP10, 27 DP5, 6, 13, 27, 34 DP1, 9, 29, 31 DP9 DP3, 4, 5, 6, 9, 15, 29, 30, 31, 34 Low-Risk Hazards Earthquake DP1, 34 DP1 DP34 DP34 DP1 DP2, 3, 34 Wildfire DP1, 17, 18, 34 DP1 DP34 DP18 DP13, 34 DP1, 17 DP18 DP2, 3, 18, 34 Drought DP19, 21, 22, 23, 34 DP19 DP20, 34 DP34 DP21, 22 DP19, 21, 22, 23 DP2, 3, 22, 23, 34 Dam Failure DP9, 10, 27, 34 DP9, 10 DP34 DP27, 34 DP9, 10 DP2, 3, 9, 27, 34 Mass Movement DP34 DP34 DP34 DP34 Energy Pipeline Failure DP17, 25, 26, 32 DP32 DP25, 26, 33 DP17 DP3, 25 Toxic Chemical Release DP17, 25 DP25 DP17 DP3, 25 a. See the introduction to this volume for explanation of mitigation types. 5.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • City of Deer Park Code of Ordinances — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«225¬«225HoustonHoustonBaytownPasadenaLaPorteLa PorteCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.551.10.275Miles±Deer Park ¬«225 ¬«225 Houston Houston Baytown Pasadena La Porte La Porte FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.55 1.10.275 Miles ± Deer Park ¬«225 ¬«225 Houston Houston Baytown Pasadena La Porte La Porte Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.55 1.10.275 Miles ± Deer Park ¬«225 ¬«225 Houston Houston Baytown Pasadena La Porte La Porte 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.55 1.10.275 Miles ± Deer Park ¬«225 ¬«225 Houston Houston Baytown Pasadena La Porte La Porte 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.55 1.10.275 Miles ± Deer Park ¬«225 ¬«225 Houston Houston Baytown Pasadena La Porte La Porte Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.55 1.10.275 Miles ± Deer Park ¬«225 ¬«225 Houston Houston Baytown Pasadena La Porte La Porte Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.55 1.10.275 Miles ± Deer Park 6-1 6. CITY OF EL LAGO 6.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Thomas Merchant, EMC 315 Oak View Circle El Lago, Texas 77586 Telephone: 281-682-3670 e-mail Address: tmerchant2@comcast.net Art Richard, Assistant EMC 622 Bayview El Lago, Texas 77586 Telephone: 281-326-3348 e-mail Address: zartadd@aol.com 6.2 JURISDICTION PROFILE 6.2.1 Location The City of El Lago, Texas is in the southeast part of Harris County. The current boundaries generally extend from Taylor Lake on the west to the City of Seabrook on the east, and from Clear Lake on the south to Seabrook on the north. According to the United States Census Bureau, the city encompasses an area of 0.7 square miles (0.6 square miles of land and 0.1 square miles of water). City emergency services are provided under contract by the Lakeview Police Department, Seabrook Volunteer Fire Department and the Nassau Bay Emergency Medical Service. Water and sewer services are provided by Water Control and Improvement District #50 (WCID 50). 6.2.2 History The City of El Lago was incorporated in March of 1961 as a Type-A-General Law city operation under a Mayor- City Council form of government. Residential growth was largely due to the aerospace industry, where many astronauts resided. The growth occurred in four sections and now includes an estimated population of 2700, with approximately 1100 single family dwellings, some duplexes and apartment buildings. Within the city limits there are several small businesses mostly retail and food, one boat yard, two elementary schools and one assisted living center. 6.2.3 Climate The climate of the City of El Lago is typical of southeast Texas, hot humid summers with cool and wet winters. Freezing weather can occur. Average annual rain fall is 45”. Prevailing winds are from the southeast. 6.2.4 Governing Body Format The City of El Lago is governed by a Mayor and five-member City Council (all of which are part time volunteers). City employees include a City Secretary, City Clerk, Court Administrator, and Maintenance Director and an additional maintenance employee. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 6-2 The Mayor and City Council assumes responsibility for the adoption of this plan; The Mayor and City Council also will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 6-1. Table 6-1. Local Mitigation Planning Team Members Name Title Darin Clark Member City council Bob Kosar Flood Plain Administrator Jarret LaRochelle Planning Team Member Doris DeVries Planning Team Member 6.3 CURRENT TRENDS 6.3.1 Population According to the U.S. Census Bureau, the population of the city of El Lago as of December of 2016 was 2,751. Since 1970, the population has grown at an average annual rate of 1.7%. Between those years the population in 1980 had grown by 35.6%, in 1990 an additional 4.5% with declines of 5.9% in 2000 and 12.0% 2010. This last decline can be attributed to the demolition of the Landing Condos, which were heavily damaged by Hurricane Ike. 6.3.2 Development There is minimal anticipated residential development due to the City’s residential space being 99+% already built out. A low to moderate increase in commercial development is expected with a few commercial properties available for new construction. Table 6-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. 6.4 CAPABILITY ASSESSMENT The City of El Lago, Texas has performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 6-3. • Development and permitting capabilities are presented in Table 6-4. • An assessment of fiscal capabilities is presented in Table 6-5. • An assessment of administrative and technical capabilities is presented in Table 6-6. • An assessment of education and outreach capabilities is presented in Table 6-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 6-8. • Classifications under various community mitigation programs are presented in Table 6-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 6-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. City of El Lago 6-3 Table 6-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. • If yes, who currently has permitting authority over these areas? Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas The following are in known hazard risk areas: • Condominium development previously called The Landing • Northwest corner of Bayou View/Nasa 1 (currently vacant) • Five-to ten homes to be elevated in the repetitive loss category How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 2 1 1 4 2 Multi-Family Other (commercial, mixed use, etc.) 1 Total 2 1 1 5 2 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. Approximately half of the new construction permits were in a special flood hazard area. Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. Buildout most occurred on residential properties and one occurred on a commercial property. Table 6-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No No No Comment: Building Ordinance of the City of El Lago Ordinance # 146 adopted 8/21/78 with sections modified through 6/5/2013 Zoning Code Yes No No No Comment: City ordinances Appendix A with references to multiple ordinances dealing with residential and commercial zones with multiple adoption dates Subdivisions Yes No No No Comment: Appendix B, Ordinance 131 adopted 11/1/76. The city is also divided into several homeowner associations, each with their individual covenants and bylaws. Stormwater Management Yes Yes No No Comment: WCID 50 controlled. MS4 permit renewed every 5 years. Post-Disaster Recovery Yes Yes Yes No Comment: Post disaster recovery activities are outlined in the City’s Emergency Management Procedures. Currently being reviewed. Real Estate Disclosure No No No No Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 6-4 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Growth Management No No No No Comment: Site Plan Review Yes No No No Comment: Building code and Ordinance #425 Environmental Protection Yes Yes No No Comment: Sanitary and stormwater is under the jurisdiction of WCID 50. Recognized as a renewable energy city. Drought water rationing plans and year-round water conservation plan.. Flood Damage Prevention Yes No No No Comment: Flood Damage Prevention Ordinance # 425 adopted 2/20/15 Emergency Management Yes Yes Yes Yes Comment: Ordinance # 327 adopted 1/8/2001 and Ordinance # 378 adopted 11/21/2009 Climate Change No No No No Comment: Planning Documents General Plan No No No No Comment: Capital Improvement Plan No No No No How often is the plan updated? Comment: Disaster Debris Management Plan Yes No No No Comment: Contracted Floodplain or Watershed Plan No No No No Comment: Stormwater Plan No Yes No No Comment: WCID 50 Stormwater drainage improvement plan Urban Water Management Plan No Yes No No Comment: WCID 50 with TWDB 50 year water plan Habitat Conservation Plan Yes No No No Comment: The city is a bird sanctuary community with several butterfly habitats. Economic Development Plan No No No No Comment: Shoreline Management Plan No Yes Yes No Comment: Texas GLO Community Wildfire Protection Plan No No No No Comment: Forest Management Plan No No No No Comment: Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes Yes Yes No Comment: Ordinance # 327 adopted 1/8/2001 and Ordinance # 378 adopted 11/21/2009 Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes Yes No Comment: Ordinance # 327 adopted 1/8/2001 and Ordinance # 378 adopted 11/21/2009 City of El Lago 6-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Post-Disaster Recovery Plan Yes Yes Yes No Comment: Post disaster recovery activities are outlined in the City’s Emergency Management Procedures, Currently being reviewed. Continuity of Operations Plan Yes Yes No No Comment: Essential records are backed up to the cloud plus Standard Operating Procedures / interlocal agreements, Public Health Plan Yes Yes No No Comment: Health and Sanitation Ordinance # 272 adopted 5/4/92 Table 6-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Building Inspector and Floodplain Administrator Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? No Table 6-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes Other No Table 6-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices No Engineers or professionals trained in building or infrastructure construction practices No Planners or engineers with an understanding of natural hazards No Staff with training in benefit/cost analysis No Surveyors No Personnel skilled or trained in GIS applications No Scientist familiar with natural hazards in local area No Emergency manager Yes Voluntary Emergency Management Coordinator Grant writers Yes City Secretary Other No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 6-6 Table 6-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes, the mayor is the PIO Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. Hazard Mitigation Plan Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. NextDoor and Facebook Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes • If yes, briefly describe. The local Mitigation Planning Team and the city Emergency Management Committee Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Blackboard CTY Connect and LaVentana News Publication Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Blackboard CTY Connect Table 6-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Floodplain Administrator Who is your floodplain administrator? (department/position) Bob Kosar Are any certified floodplain managers on staff in your jurisdiction? No What is the date that your flood damage prevention ordinance was last amended? February 20, 2015 Does your floodplain management program meet or exceed minimum requirements? Meets • If exceeds, in what ways? When was the most recent Community Assistance Visit or Community Assistance Contact? May 24, 2019 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? Yes • If so, state what they are. HCFCD MAAPNext Project Do your flood hazard maps adequately address the flood risk within your jurisdiction? No • If no, state why. Does not include risk due to drainage system capacity Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes • If so, what type of assistance/training is needed? Texas Floodplain Management Association-sponsored training and conferences Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? N/A • If no, is your jurisdiction interested in joining the CRS program? Yes How many flood insurance policies are in force in your jurisdiction?a 884 • What is the insurance in force? $246,562,600.00 • What is the premium in force? $513,571.00 How many total loss claims have been filed in your jurisdiction?a 397 • How many claims are still open or were closed without payment? 0 • What were the total payments for losses? $15,317,515.04 a. According to FEMA statistics as of April 26, 2019 City of El Lago 6-7 Table 6-9. Community Classifications Participating? Classification Date Classified Community Rating System No N/A N/A Building Code Effectiveness Grading Schedule No N/A N/A Public Protection No N/A N/A Storm Ready No N/A N/A Firewise No N/A N/A Table 6-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 6-8 Criterion Jurisdiction Ratinga Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. 6.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 6.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • There is no existing integration. 6.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • The city has not addressed future integration plans. 6.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 6-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of El Lago. Other hazard events that broadly affected the entire planning area, including the City of El Lago, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 6-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Heavy Rain N/A 5/9/2019 4.2” of rain in two hours flooded Loch Lake, Bayview and Whitecap Streets with 18+ inches of water Heavy Rain N/A 12/8/2018 Nearly 5” of rain over 9 hours left 6-10” of water on many streets throughout the city Heavy Rain N/A 1/27/2018 2.5” of rain in two hours flooded Loch Lake and Whitecap Streets with 12-18 inches of water Hurricane Harvey 4332 DR 8/23/2017 – 9/15/2017 $7,755,415 Severe weather, Flooding 4272 DR 5/22/2016 – 6/24/2016 $16,113 Severe weather, Tornadoes, Flooding 4245 DR 10/22/2015 – 10/31/2015 $18,789 City of El Lago 6-9 Type of Event FEMA Disaster # Date Damage Assessment Severe weather, Flooding N/A 4/17/2015 $4,192 Severe weather N/A 4/24/2009 $3,619 Severe weather, Hail N/A 4/15/2009 – 4/18/2009 $151,584 Hurricane Ike 1791 DR 9/7/2008 – 10/2/2008 $5,620,010 Coastal Flooding N/A 10/16/2006 $104,419 Flash Flooding N/A 6/13/2004 – 6/16/2004 $5,103 Hurricane Claudette N/A 7/15/2003 $102,759 Tropical Storm Allison 1379 DR 6/5/2001 – 6/20/2001 $274,404 Hurricane Georges 1245 DR 9/9/1998 – 10/5/1998 $216,597 Severe weather, Flooding 1041 DR 10/14/1994 – 11/8/1994 $3,010 Tropical Storm Allison 836 DR 6/25/1989 – 7/7/1989 $13,608 6.7 HAZARD RISK RANKING Table 6-12 presents a local ranking for the City of El Lago of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 6-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Flooding 54 High 2 Severe Weather 48 High 2 Hurricane 48 High 3 Earthquake 14 Low 4 Drought 6 Low 4 Wildfire 6a Low 4 Mass Movement 6 Low 5 Dam Failure 2b Low 6 Tsunami 0 (No exposure) None 6 Coastal Erosion 0 (No Exposure None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. a. Wildfire incidents in the area have occurred within the past 5 years and the adjacent cities of La Porte and Pasadena. b. Proximity to the surface water storage reservoir that would flow down Armand Bayou and to Clear Lake upon failure. 6.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 6.8.1 Repetitive Loss Properties Repetitive loss records are as follows: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 6-10 • Number of FEMA-identified Repetitive-Loss Properties: 43 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 21 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 13 6.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Sea level rise. • Subsidence. • School access: All ingress/egress to the public and charter schools is cut-off by significant street flooding during any heavy rains. Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. 6.9 STATUS OF PREVIOUS PLAN ACTIONS Table 6-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 6-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Improve code/ordinances to require vegetation management and install drought resistant landscape Yes Comment: ID #2014ELLAGO001 Completed in 2017 Harden water piping lines and systems to prevent loss of water due to breaks in coordination with Water Control and Improvement District #50 (WCID 50) Yes LAG5 Comment: ID #2014ELLAGO002 Improve code/ordinances to require minimum burial depth below 6 feet. Yes Comment: ID #2014ELLAGO003 No longer relevant; the City is 98% built out. Establish code/ordinance to require shutoff valves at entry and exit point of city limits for new construction. Yes Comment: ID #2014ELLAGO004 No longer relevant; no new pipelines will be constructed in the City Install new emergency generator at city hall Yes LAG6 Comment: ID #2014ELLAGO005 Expand mass communication warning system to include notifications and alerts for all-hazards to provide automated landline and cellular calling, email notification as well as automatic posting to the city website. Yes Comment: ID #2014ELLAGO006 Completed over a period of years Acquisition of flood prone properties Yes Yes LAG1 Comment: ID #2014ELLAGO007 Some property has been acquired; Additional acquisitions anticipated Expand city warning system to include flood stage warning Yes LAG7 Comment: ID #2014ELLAGO008 City of El Lago 6-11 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Harden protective structures to minimize damage to critical structures Yes LAG8 Comment: ID #2014ELLAGO009 Improvements for 98 Lakeshore, current courthouse & LPD headquarters Harden existing city building to mitigate damages by installing protective barriers and shatter resistant glass Yes LAG9 Comment: ID #2014ELLAGO010 Improvements to current City Hall Improve detection systems for monitoring alerts Yes Comment: ID #2014ELLAGO011 Completed in 2016 Elevate new public safety building above base flood elevation and harden to withstand high-winds and flooding. Yes LAG10 Comment: ID #2014ELLAGO012 Provide electrical surge protection for electrical systems in critical facilities Yes LAG11 Comment: ID2014ELLAGO013 Establish buffer zones/defensible space around critical infrastructure Yes Comment: 2014ELLAGO014 Completed 2016 Develop ordinance requiring underground utilities on new structures or replacement of existing utilities. Yes LAG12 Comment: ID #2014ELLAGO015 Inflow prevention utilizing a back-flow preventer Yes LAG13 Comment ID #2010ELLAGO001 Also investigating physical barriers Weather Head Reduction Partial Reimbursement Program adopting ordinance requiring all power service lines to residences and businesses be routed underground and cooperative effort to re-route existing power services. Yes LAG12 Comment: ID #2010ELLAGO006 Harden city infrastructure to protect against damages caused by lightning and power surges Yes LAG11 Comment ID #2010ELLAGO009 Implement program to relocate and shelter vulnerable populations during extreme heat events at designated facilities. Yes Comment: ID #2010ELLAGO011 Handled by CERT and other agencies. Develop and establish community wide water smart program Yes Comment ID#2010ELLAGO014 WCID 50 maintains a water conservation system during draughts Ordinances for burning restrictions and storage/disposal of flammable materials. Yes Comment: ID #2010ELLAGO015 Ordinances 184 & 263 Construct shelter for critical city vehicles and equipment Yes Comment ID #2010ELLAGO025 Critical vehicles and equipment can be relocated to a safe location 6.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 6-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 6-15 identifies the priority for each action. Table 6-16 summarizes the actions by hazard and mitigation type. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 6-12 Table 6-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action LAG1 — Where appropriate, support elevating, flood proofing (retrofitting), purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Hurricanes, flooding, severe weather Existing 3, 4, 5, 7, 10, 12 City N/A High HMGP, PDM, FMA Short-term Action LAG2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including emergency air evacuation and response from McNair Park Hazards Mitigated: Hurricanes, flooding, severe weather, earthquake, draught, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 City N/A Medium Staff Time, General Funds Ongoing Action LAG3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Hurricanes, flooding, severe weather, earthquake, drought, wildfire New and Existing 1, 5, 8 City N/A Medium Staff Time, General Funds Short-term Action LAG4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Flooding, severe weather, hurricanes, Dam Failuer New and Existing 3, 4, 7, 9, 10 City HCFCD Medium Staff Time, General Funds Ongoing Action LAG5 — Harden water piping lines and systems to prevent loss of water due to breaks in coordination with Water Control and Improvement District #50 (WCID 50) (formerly ID #2014ELLAGO002) Hazards Mitigated: Drought, Wildfires Existing 3, 4, 8, 9, 11 WCID 50 City High HMGP, WCID 50 Bonds, WCID 50 General Funds Long-term Action LAG6 — Install new emergency generator at city hall (formerly ID #2014ELLAGO005) Hazards Mitigated: Severe weather, hurricanes, flooding, drought, earthquakes, wildfires New 1, 11, 13 City N/A High PDM, HMGP, Staff time, General Funds Short-term Action LAG7 — Expand city warning system to include flood stage warning – signs or water level indicators at three boat launches, Boondoggles restaurant and boat repair yard (formerly ID #2014ELLAGO008) Hazards Mitigated: Flooding, severe weather, hurricanes, dam failure, Mass movement (subsidence), Dam Failure New 1, 3, 4, 9, 10, 11, 15 City N/A Medium PDM, HMGP, Staff time, General Funds Short-term Action LAG8 — Harden courthouse/LVPD headquarters structure to minimize damage to a critical structure – (formerly ID#2014ELLAGO009) Hazards Mitigated: Severe weather, hurricanes Existing 1, 6, 11, 13 City LVPD High PDM, HMGP, Staff time, General Funds Short-term Action LAG9 — Harden existing City Hall building to mitigate damages by installing protective barriers and shatter resistant glass (formerly ID #2014ELLAGO010) Hazards Mitigated: Severe weather, hurricanes Existing 1, 6, 11, 13 City N/A High PDM, HMGP, Staff time, General Funds Short-term Action LAG10 — Replace courthouse/LVPD headquarters structure with a new emergency operations facility designed to withstand multiple hazards and electrical outages. (formerly ID #2014ELLAGO012) Hazards Mitigated: Flooding, hurricanes, severe weather, earthquakes, dam failure, Mass movement (subsidence), Dam Failure New 10, 11, 13, 14 City LVPD High PDM, HMGP, Staff time, General Funds Long-term Action LAG11 — Provide electrical surge protection and lightning rods for electrical systems in critical facilities (formerly ID2014ELLAGO013) including harden city infrastructure to protect against damages caused by lightning and power surges (formerly ID #2010ELLAGO009) Hazards Mitigated: Hurricanes, severe weather Existing 1, 6, 11, 13 City N/A High PDM, HMGP, Staff time, General Funds Short-term City of El Lago 6-13 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action LAG12 — Develop ordinance requiring underground utilities on new structures or replacement of existing utilities. (formerly ID #2014ELLAGO015) and Weather Head Reduction Partial Reimbursement Program adopting ordinance requiring all power service lines to residences and businesses be routed underground and cooperative effort to re-route existing power services. (formerly ID #2010ELLAGO006) Hazards Mitigated: Hurricanes, severe weather, wildfires New and Existing 6, 9, 10, 11 City N/A Medium Staff time, General Funds Short-term Action LAG13 — Inflow prevention utilizing back-flow preventers and/or physical barriers (formerly ID #2010ELLAGO001) Hazards Mitigated: Hurricanes, flooding, severe weather, dam failure, , Mass Movement (subsidence) Existing 6, 7, 8, 9, 10, 11, 15 City WCID 50 High PDM, HMGP, Bonds, General Funds Long-term Action LAG14 — Investigate and install active pumped storm drainage systems. Hazards Mitigated: Hurricanes, flooding, severe weather, school access, Mass movement (subsidence) New 3, 4, 7, 8, 10, 11 City WCID 50 High PDM, FMA, HMGP, Bonds, General Funds Long-term Action LAG15 — Increase fire water system capacity; piping, pumps, hydrants etc. to provide increased water flow in emergencies. Hazards Mitigated: Wildfires, drought Existing 3, 4, 8, 9, 11 WCID 50 City High HMGP, WCID 50 Bonds, WCID 50 General Funds Long-term Action LAG16 — Review and update as needed, city ordinances and building codes to ensure compliance with current Federal, State and local regulatory agencies. Hazards Mitigated: Flooding, severe weather, hurricanes, wildfires, drought Existing 1, 3, 4, 7, 8, 9, 15 City N/A Medium Staff time, General Funds Short-term Action LAG17 — Complete WCID 50 project to improve storm water drainage capabilities involving many south side lines and the main headers on Whitecap and Crestwood. Hazards Mitigated: Hurricanes, flooding, severe weather, school access Existing 3, 4, 7, 8, 10, 11, 12 WCID 50 HCFCD High HCFCD Bonds, WCID 50 Bonds, WCID 50 General Funds Long-term Action LAG18 — Track natural hazard events and the damage caused, including substantially damaged properties. Hazards Mitigated: Hurricanes, flooding, severe weather, wildfires Existing 3, 4, 9, 11 City N/A Medium Staff time, General Funds Short-term Action LAG19 — Remediate home owner’s sanitary sewer lines to prevent storm water from entering the system. Hazards Mitigated: Flooding, hurricanes, severe weather Existing 3, 4, 9, 11 WCID 50 Home owners High HMGP, General Funds Short-term Action LAG20— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane and Coastal Storms, Flooding, Earthquake, Wildfire, Drought, Dam Failure, Mass Movement, New and Existing 1, 3, 4, 5, 9, 10, 11, 15 El Lago HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 6-14 Table 6-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya LAG1 6 High High Yes Yes No Medium High LAG2 7 Medium Medium Yes No No Low Low LAG3 3 Medium Medium Yes No No High Low LAG4 5 Medium Medium Yes No No High Low LAG5 5 Low High Yes Yes No Medium Low LAG6 3 High High Yes Yes No Medium High LAG7 7 High Medium Yes Yes No Medium Medium LAG8 4 High High Yes Yes No Medium High LAG9 4 High High Yes Yes No Medium High LAG10 4 Low High Yes Yes No Low Low LAG11 4 High High Yes Yes No Medium High LAG12 4 Low Medium Yes No No Low Low LAG13 7 High High Yes Yes No Medium High LAG14 6 High High Yes Yes No Medium High LAG15 5 Low High Yes Yes No Low Medium LAG16 7 Medium Medium Yes No No Medium Low LAG17 7 High High Yes No No High High LAG18 4 Low Medium Yes No No Low Low LAG19 4 High High Yes Yes No Medium Low LAG20 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 6-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather LAG2, 4, 12, 16, 18, 20 LAG1, 8, 9, 10, 11 LAG18, 20 LAG19 LAG6, 7, 20 LAG13 LAG14, 17 LAG3, 20 Flooding LAG2, 4, 16, 18, 20 LAG1, 10 LAG18, 20 LAG19 LAG6, 7, 20 LAG13 LAG14, 17 LAG3, 20 Hurricane LAG2, 4, 12, 16, 18, 20 LAG1, 8, 9, 10, 11 LAG18, 20 LAG19 LAG6, 7, 20 LAG13 LAG14, 17 LAG3, 20 Medium-Risk Hazards School Access LAG14, 17 Mass Movement LAG20 LAG10 LAG20 LAG7, 20 LAG13 LAG14 LAG20 City of El Lago 6-15 Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building Low-Risk Hazards Earthquake LAG2, 20 LAG10 LAG20 LAG6, 20 LAG3, 20 Drought LAG2, 16, 20 LAG20 LAG5, 15 LAG6, 15, 20 LAG3, 20 Wildfire LAG2, 12, 16, 18, 20 LAG18, 20 LAG5, 15 LAG6, 15, 20 LAG3, 20 Dam Failure LAG20 LAG10 LAG20 LAG7, 20 LAG13 LAG20 a. See the introduction to this volume for explanation of mitigation types. 6.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX 6.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • The City of El Lago, Texas Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • The City of El Lago, Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. 6.11.2 Staff and Local Stakeholder Involvement in Annex Development This annex was developed over the course of several months with input from the city’s Emergency Management Committee, City Secretary, City Council representative, Floodplain Administrator, CERT Team Coordinator, Special Needs Coordinator and local Mitigation Planning Team members. All persons were asked to contribute to the annex development through reviewing and contributing to the capability assessment, reporting on the status of previously identified actions, and participating in action identification and prioritization. An action development meeting was held on multiple dates from February through August 2019 and was attended by representatives from previously listed groups. Once actions had been identified and compiled in the annex, a draft was internally circulated for comment. !(!(!(!(PasadenaPasadenaSeabrookTaylor LakeVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.10.20.05Miles±El Lago Pasadena Pasadena Seabrook Taylor Lake Village FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.1 0.20.05 Miles ± El Lago Pasadena Pasadena Seabrook Taylor Lake Village Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.1 0.20.05 Miles ± El Lago Pasadena Pasadena Seabrook Taylor Lake Village 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.1 0.20.05 Miles ± El Lago Pasadena Pasadena Seabrook Taylor Lake Village 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.1 0.20.05 Miles ± El Lago Pasadena Pasadena Seabrook Taylor Lake Village Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.1 0.20.05 Miles ± El Lago Pasadena Pasadena Seabrook Taylor Lake Village Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.1 0.20.05 Miles ± El Lago 7-1 7. CITY OF FRIENDSWOOD 7.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Brian Mansfield, Fire Marshal/EMC 910 S. Friendswood Drive Friendswood, TX 77546 Telephone: 281-996-3335 e-mail Address: tybrd@friendswood.com Steven Simmons, Deputy Fire Marshal 910 S. Friendswood Drive Friendswood, TX 77546 Telephone: 281-996-3335 e-mail Address: bmansfield@friendswood.com 7.2 JURISDICTION PROFILE 7.2.1 Location The City of Friendswood in northwest Galveston County and a portion lies in southeast Harris County, divided by Clear Creek. Friendswood lies in an area described on the Physiographic Map of Texas the “Gulf Coastal Plan”. The city is located three miles west of IH-45, halfway between Houston and Galveston. It is bordered on the northwest by the City of Houston, the west by Brazoria County and City of Pearland, southwest by the City of Alvin, on the east by the City of League City. The city’ encompasses 20.9 square miles, of which 20.7 square miles is land area and 0.15 square miles is water. 7.2.2 History Friendswood was founded in 1895 by members of the Religious Society of Friends (Quakers). The colony was originally a farming community of fig and Satsuma orange orchards, and rice fields. Starting Quaker colonies was a common practice of the religious sect called Quakers or Friends, as they were part of the westward movement across the nation in the middle to late 1800s. After the colony survived the Galveston Storm of 1900 with no loss of life, they used their sawmill to convert the swaths of trees felled by the storm into lumber for the construction of a two story building they called the Academy. It served them as church, school, and community meeting place until it was replaced by the present stone church building in 1949. The Academy (high school) operated by the Quakers offered a classical curriculum through 1928, and attracted students, in its earliest years, from surrounding towns that had no high school. From 1895 to 1915, most of the newcomers were Quakers who came to be a part of the Quaker colony. Through 1920, the population was swollen by an influx of farmers, lured by Houston developers who advertised the Gulf Coast as a Garden of Eden where figs, oranges, and rice grew practically wild. By the early 1920s, there were 17,000 to 18,000 acres of figs from Winnie to San Leon, and 17 fig preserving plants. Two of those plants were in Friendswood. Support personnel for the farms brought more people to Friendswood, and the early 1930s brought families dispossessed by the Depression looking for a new chance in life. Late in the decade, the newly developing oil fields east and west of the community provided jobs for more newcomers. The war slowed the growth in the 1940s, but the decade still saw the beginning of a trend of wealthy business and professional people from Houston buying up property along the creeks. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 7-2 The city was officially incorporated in 1960. Major employers in the city are Friendswood ISD, H.E. Butt Grocery Company and Kroger Texas, LP. Today the once small agricultural community is part of the greater Houston Metropolitan area. 7.2.3 Climate The climate of the area is sub-tropical. Mild winters and warm summers best characterize the climate. The average summer temperature ranges from a high of 90 ºF to a low of 74 °F. The average winter temperature ranges from a high of 62 °F to a low of 42 °F. The area receives an average of two hundred seventy-five (275) days per year of sunshine. Average rainfall per year is thirty-eight (38”) inches. Rainfall is abundant and evenly distributed throughout the year. Hurricane season, spanning from June through November, usually produces the heaviest rainfall events. 7.2.4 Governing Body Format The City of Friendswood is governed by a Mayor and six (6) member city council. The Mayor and council members are elected from the city at large to serve three-year terms, with a limit of four terms. The Mayor and council members are volunteers who serve without compensation. The city consists of the following positions and departments: City Manager, Assistant City Manager, City Secretary, Administrative Services, Parks and Recreation, Library, Community Development, Public Works, Police Department, Fire Marshal/Emergency Management. All departmental directors report to either the City Manager or Assistant City Manager depending on the department. The City Manager, City Secretary and City Attorney report to the Mayor and City Council. The city contracts fire and EMS services. The City Council assumes responsibility for the adoption of this plan; the City Manager will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 7-1. Table 7-1. Local Mitigation Planning Team Members Name Title Brian Mansfield Fire Marshal/Emergency Management Coordinator Steven Simmons Deputy Fire Marshal Morad Kabiri City Manager Steve Rhea Assistant City Manager Aubrey Harbin Community Development Director/Planner Brian Rouane Chief Building Official/Floodplain Manager Rene Ibarra Director of Public Works James Toney Director of Parks and Recreation 7.3 CURRENT TRENDS 7.3.1 Population According to the City of Friendswood’s Community Development Department, the estimated October 2018 population is 41,020. U.S. Census for 2000 showed the city’s population at 29,037 and the city’s 2010 population at 35,805 which is a 23.3% increase. The percentage of increase between the 2010 U.S. Census and the October 2018 estimated population is 14.6%. However, the percentage of increase between the 2000 U.S. Census and the October 2018 estimate shows a 41.3% increase, which averages 665.7 annual population increase. City of Friendswood 7-3 7.3.2 Development Table 7-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Table 7-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas Georgetown Subdivision – Southernmost southeast corner of city limits; 352 Acres with 573 single family residential lots; borders with City of Alvin and City of League City; not in known hazard risk area Avalon at Friendswood Lakes – Southeastern portion of the south and West of West Ranch; borders with City of League City; 114 Acres with 203 Residential Lots; will connect League City Parkway with Friendswood Lakes Blvd.; not in known hazard risk area How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 189 141 173 182 122 Multi-Family 0 0 0 20 0 Other (commercial, mixed use, etc.) 4 8 15 13 6* Total 193 149 188 215 128 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. Special Flood Hazard Areas: 4 SF Residential; SHX 8 SF Residential; AE Flood Zone 1 Commercial; Not in SFHA Landslide: N/A High Liquefaction Areas: N/A Tsunami Inundation Area: N/A Wildfire Risk Areas: N/A Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. Total acreage within the City is 11,777 (excludes property owned by school districts, city parks, drainage district and government entities). As of October 2013 8,485 acres were developed, with 3,292 undeveloped acres. Residential structures comprise 6,375 acres with commercial comprising 1,416 acres, and industrial comprising 530 acres. Buildout is expected in 2020 with proposed population totaling 57,400. 7.4 CAPABILITY ASSESSMENT The City of Friendswood performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 7-4 • An assessment of legal and regulatory capabilities is presented in Table 7-3. • Development and permitting capabilities are presented in Table 7-4. • An assessment of fiscal capabilities is presented in Table 7-5. • An assessment of administrative and technical capabilities is presented in Table 7-6. • An assessment of education and outreach capabilities is presented in Table 7-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 7-8. • Classifications under various community mitigation programs are presented in Table 7-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 7-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Table 7-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No Yes Yes Comment: Code of Ordinances, Chapter 14 – Buildings and Building Regulations Zoning Code Yes No No Yes Comment: Code of Ordinances, Appendix C – Zoning Subdivisions Yes No No Yes Comment: Code of Ordinances, Appendix B – Subdivisions Storm Water Management Yes Yes Yes Yes Comment: Code of Ordinances, Chapter 34 – Floods, Article II. – Flood Damage Prevention, Section 34-34 Stormwater Management; Chapter 86 – Utilities, Article V. – Regulation of Stormwater Runoff; Design Criteria Manual, March 2019; Post-Disaster Recovery Yes Yes No Yes Comment: Emergency Operations Plan, Annex J – Recovery Real Estate Disclosure No No No No Comment: Growth Management Yes No Yes Yes Comment: Code of Ordinances, Appendix B – Subdivisions & Appendix C – Zoning Site Plan Review Yes No No Yes Comment: Code of Ordinances, Chapter 30 – Fire Protection & Prevention & Appendix C – Zoning Environmental Protection Yes Yes No Yes Comment: Code of Ordnances, Chapter 26 – Environment Flood Damage Prevention Yes No Yes Yes Comment: Code of Ordinances, Chapter 34 – Floods, Article II. – Flood Damage Prevention Emergency Management Yes No Yes Yes Comment: Code of Ordinances, Chapter 22 – Civil Emergencies, Texas Government Code – Chapters 418 & 433 Climate Change No Yes No Yes Comment: Planning Documents General Plan Yes No Yes Yes Comment: Comprehensive Plan, July 1998; with updates: Future Land Use Map (2008); Major Thoroughfare Plan (2018), Parks Master Plan (2010) Capital Improvement Plan Yes No No Yes How often is the plan updated? Periodically; Historically every 2-4 years. Comment: Capital Improvement Plan, 2017. City of Friendswood 7-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Disaster Debris Management Plan Yes Yes No Yes Comment: Disaster Debris Management Plan, 2014; Contracts are reviewed on an annual basis. Floodplain or Watershed Plan Yes No No Yes Comment: Code of Ordinances, Chapter 34 – Floods, Article II. – Flood Damage Prevention, Division II. Flood Hazard Reduction Storm Water Plan Yes Yes Yes Yes Comment: Storm Water Management Program; Master Drainage Plan – Phase II, 2007 Urban Water Management Plan No No No No Comment: Habitat Conservation Plan No No No No Comment: The City of Friendswood does not have an HCP implemented. However, there is a Gulf-Houston Regional Conservation Plan that implements nature-based infrastructure projects and components of flood mitigation/resiliency. Economic Development Plan No No No Yes Comment: Vision 2020; Downtown Improvement Plan; Policy of Economic Development Shoreline Management Plan No Yes No No Comment: SMPs are required for power generating entities operating under a FERC license and is not applicable to the City of Friendswood. Community Wildfire Protection Plan No Yes No Yes Comment: The City of Friendswood does not have its own CWPP implemented. Harris County has completed a county-wide CWPP; which includes all incorporated jurisdictions within Harris County. Forest Management Plan No Yes No No Comment: Climate Action Plan No Yes No Yes Comment: Comprehensive Emergency Management Plan Yes Yes Yes Yes Comment: Threat & Hazard Identification & Risk Assessment (THIRA) No Yes Yes Yes Comment: A regional THIRA is conducted on an annual basis for UASI and HGAC. The City participates in the development of the THIRA. Post-Disaster Recovery Plan Yes Yes No Yes Comment: Annex J – Recovery is required for local jurisdictions to address local recovery programs, damage assessments, Public Assistance and Individual Assistance programs. Continuity of Operations Plan Yes No No Yes Comment: Public Health Plan Yes Yes Yes Yes Comment: Annex H – Health and Medical is a component of the Emergency Operations Plan and addresses public health, environmental health, and medical response capabilities. The City does not maintain a standalone Public Health Plan. Drought Contingency Plan Yes Yes Yes Yes Comment: Table 7-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? Yes Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 7-6 Table 7-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes Table 7-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Community Development / Projects and Engineering Engineers or professionals trained in building or infrastructure construction practices Yes Community Development / Projects and Engineering Planners or engineers with an understanding of natural hazards Yes Community Development / Projects and Engineering / Office of Emergency Management Staff with training in benefit/cost analysis No NA Surveyors No NA Personnel skilled or trained in GIS applications Yes Community Development Scientist familiar with natural hazards in local area No NA Emergency manager Yes Office of Emergency Management Grant writers Yes Office of Emergency Management Table 7-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. The City’s Hazard Mitigation Plan is posted online Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. Facebook and Twitter are used by the City to communicate with residents. Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes • If yes, briefly describe. Committee examining flooding issues within the City Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. City website, email, and mass notification system Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Mass notification, siren system, social media, website, am radio. City of Friendswood 7-7 Table 7-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Projects and Engineering Who is your floodplain administrator? (department/position) Projects and Engineering / Flood Plain Manager Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? September 10, 2018 Does your floodplain management program meet or exceed minimum requirements? Exceeds • If exceeds, in what ways? City requires 24 inches of Freeboard above Base Flood Elevation When was the most recent Community Assistance Visit or Community Assistance Contact? April 2018 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. NA Are any RiskMAP projects currently underway in your jurisdiction? Yes • If so, state what they are. Galveston County – revised preliminary will become effective August 15, 2019. Do your flood hazard maps adequately address the flood risk within your jurisdiction? No • If no, state why. Current Maps do not, but revised preliminary maps will become effective August 15, 2019 for Galveston County, which includes the Harris County portion of Friendswood. Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes • If so, what type of assistance/training is needed? Assistance with public notification and education of the new maps that will affect insurance rates and possible new insurance requirements from their mortgage companies. Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? Yes • If no, is your jurisdiction interested in joining the CRS program? NA How many flood insurance policies are in force in your jurisdiction?a 8,352 • What is the insurance in force? $ 2,643,916,500 • What is the premium in force? $ 3,439,799 How many total loss claims have been filed in your jurisdiction?a Unknown • How many claims are still open or were closed without payment? • What were the total payments for losses? a. According to FEMA statistics as of September 30, 2018 Table 7-9. Community Classifications Participating? Classification Date Classified Community Rating System Yes 7 May 1, 2015 Building Code Effectiveness Grading Schedule Yes Class 5- Residential Class 4- Commercial February 10, 2017 Public Protection Yes Class- 3/3Y 2012 Storm Ready Yes NA 2018 Firewise No NA NA Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 7-8 Table 7-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Medium Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts High Comment: Local economy current capacity to adapt to climate impacts Medium Comment: Local ecosystems capacity to adapt to climate impacts High Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Friendswood 7-9 7.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 7.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • City of Friendswood Basic Plan. The Basic Plan provides a summary on the hazards and threats in the community. • City of Friendswood Annex P – Hazard Mitigation is assigned to the Community Development department. It addresses the hazards and threats in the community. • City of Friendswood Capital Improvements Plan (CIP), 2017 Update. The CIP is utilized to document the status of current and proposed improvements to city facilities and infrastructure to emphasize protection measures designed to alleviate the effects of future hazards. • City of Friendswood Drought Contingency Plan. This plan details strategies to ensure continued water access and preservation. • City of Friendswood Master Drainage Plan – Phase II, 2007. The Master Drainage Plan details the protection measures to be put into place to alleviate flooding hazards during minor and major weather events. • City of Friendswood Mitigation Plan, 2018 Update. • Galveston County Multi-Jurisdiction Mitigation Plan, 2017. • Galveston County Consolidated Drainage District Hazard Mitigation Plan, September 24, 2013. (Galveston County Consolidated Drainage District is a partnering agency with the city assisting with drainage projects and mitigation efforts. • State of Texas, Hazard Mitigation Plan, 2018 Update. This document was used as a reference to ensure that the city’s mitigation planning process was compliant with the state example. 7.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • City of Friendswood Park & Open Space Master Plan — The parks plan creates a vision for the city’s park system and makes recommendations for improvements and open-space preservation. • Library Long-Range Strategic Plan • Utility Master Plan, 2008 Update — Provides service maps of the City’s water and sewer systems. 7.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 7-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Friendswood. Other hazard events that broadly affected the entire planning area, City of Friendswood, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 7-10 Table 7-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 N/A Severe Storms, Tornadoes, Straight Line Winds and Flooding 4245 DR 2015 N/A Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR 2015 N/A 7.7 HAZARD RISK RANKING Table 7-12 presents a local ranking for City of Friendswood of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 7-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe weather 48 High 1 Hurricane 48 High 2 Flooding 18 Medium 3 Wildfire 17 Medium 4 Earthquake 14 Low 5 Drought 6 Low 6 Mass Movement 0 (No exposure) None 6 Tsunami 0 (No exposure) None 6 Coastal Erosion 0 (No Exposure) None 6 Dam Failure 0 (No exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 7.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 7.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 327 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 93 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 119 7.8.2 Other Noted Vulnerabilities No additional vulnerabilities specific to this jurisdiction have been identified. City of Friendswood 7-11 7.9 STATUS OF PREVIOUS PLAN ACTIONS This is the City of Friendswood’s initial participation for inclusion in the Harris County Mitigation Plan. However, the City previously developed its own hazard mitigation plan, which expires in 2020, and is a participant in the Galveston County Mitigation Plan, which expires in 2022. Table 7-13 summarizes the actions that were recommended in those plans and their implementation status at the time this update was prepared. Table 7-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update Severe Thunderstorms/Hail/Lightning #1: Develop A Public Education Campaign With Information Regarding Property & People Protection X Severe Thunderstorms/Hail/Lightning #2: Develop And Initiate A Public Information Campaign Regarding The Location Of Trees In Relation To Power Lines & Utility Easements X Severe Thunderstorms/Hail/Lightning #3: Thunderstorm & Lightning Sensors For City Parks X FRD5 Flood Events #1: Develop A Comprehensive Flood Mitigation Plan X FRD6 Flood Events #2: Database Development & Maintenance For Rl/SRL Properties; Database Development For Elevation, Relocation And Acquisition X Flood Events #3: Drainage Projects X FRD7 Comment: This Item Is Under Revision To Include Additional Projects, (E.G. Clear Creek, Frenchman’s Creek, And Deepwood) And Remove Completed Projects (e.g., Tributary 2 Drainage/Outfall Improvements). Flood Events #4: Tiger Dam; Protection Of Critical Infrastructure X Hurricane – Wind #1: Public Information Education Program X Hurricane – Wind #2: Protect Power Lines X FRD8 Hurricane – Storm Surge #1: Adopt The 2012 International Building Code (IBC) To Include Asce-24-10 X Hurricane – Storm Surge #2: UPGRADE & RENOVATE CURRENT PUBLIC WORKS BUILDING X FRD9 Comment: This Item Will Be Modified To Remove Reference To Deepwood Location That Was Destroyed During Harvey. Hurricane – Storm Surge #3: Update City Storm Surge Maps To Reflect The National Weather Service Predictions X Tornado #1: Develop Construction Standards And Techniques X Tornado #2: Develop & Conduct Tornado Awareness Activities X Drought #1: Monitor Drought Conditions X Drought #2: Water Conservation X Winter Storms #1: Establish A Warming Center At The Public Library For The General Public X Winter Storms #2: Establish A Warming Station At The Senior Activity Center For Senior Citizens X Subsidence #1: Adopt The 2012 International Building Code (IBC) To Include Asce-24-10 X Subsidence #2: Develop And Conduct Public Education Programs To Inform The Public Of The Effects Of Subsidence X Hazardous Materials #1: Cooperate In Maintaining The Pipeline Integrity Management Resource Reporting In High Consequence Areas X Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 7-12 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update Hazardous Materials #2: Develop A Commodity Flow Study Of All Hazardous Materials Transportation Routes X Additional Mitigation Action Items #: Hurricane Severe Thunderstorms/Hail/Lightning X Additional Mitigation Action Item #6: Develop A Research Program To Study The Effects Of Climate Change X Comment: This Item Will Be Modified To Effect Flood-Proofing Of The Lift Station. Supplemental Action Items #19: Flood/Hurricane/Hurricane Storm Surge/Flood Events X FRD10 Comment: This Item Will Be Modified To Effect Flood-Proofing of the Lift Station. Supplemental Action Items #23: Flood/Hurricane/Hurricane Storm Surge/Flood Events X Supplemental Action Items #24: Flood/Hurricane/Hurricane Storm Surge/Flood Events X Supplemental Action Items #25: Flood/Hurricane/Hurricane Storm Surge/Flood Events X 7.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 7-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 7-15 identifies the priority for each action. Table 7-16 summarizes the mitigation actions by hazard of concern and mitigation type. Table 7-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action FRD1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire Existing 3, 4, 10 City Administration TBD High HMGP, PDM, FMA Short-term Action FRD2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing Action FRD3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe weather, Hurricane and Coastal Storms, Flooding, Wildfire, Earthquake and Drought New and Existing 1, 5, 8 City Administration TBD Low Staff Time, General Funds Short-term City of Friendswood 7-13 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action FRD4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise New and Existing 1, 3, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing Action FRD5 — Severe Thunderstorms/Hail/Lightning #3: Thunderstorm & Lightning Sensors For City Parks Hazards Mitigated: Severe Weather New and Existing 1,3,14 COF High General Fund, Grants Short Term Action FRD6 — Develop A Comprehensive Flood Mitigation Plan Hazards Mitigated: Flood, Hurricane, Severe Weather New and Existing 3,7,8,9,10,11,12 COF High General Fund, Grants Short Term Action FRD7 — Drainage Improvement projects. This Item Is Under Revision To Include Additional Projects, (E.G. Clear Creek, Frenchman’s Creek, And Deepwood) And Remove Completed Projects (e.g., Tributary 2 Drainage/Outfall Improvements). Hazards Mitigated: Severe Weather, Flood New and Existing 11,12,15 COF High CIP, Grant Funding Short Term Action FRD8 — Protect Power Lines from wind sensitive exposures such as trees, bush and overhead obstacles. Hazards Mitigated: Severe Weather, Hurricane Existing 9,11,13,15 COF High General Fund, CIP, Grant Funding Short Term Action FRD9 — UPGRADE & retrofit CURRENT PUBLIC WORKS BUILDING Hazards Mitigated: Hurricane, Coast Storms Existing 9,11,13,15 COF High General Fund, CIP, Grant Funding Short Term Action FRD10 — Flood-Proof vulnerable lift Stations within the City Hazards Mitigated: Flood Severe Weather Existing 11,12,15 COF High General Fund, CIP, Grant Funding Short Term Action FRD11— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane and Coastal Storms, Flooding, Earthquake, Wildfire, Drought, Dam Failure, Mass Movement, New and Existing 1, 3, 4, 5, 9, 10, 11, 15 COF HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 7-14 Table 7-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya FRD1 3 High High Yes Yes No Medium High FRD2 7 Medium Low Yes No Yes High Low FRD3 3 Low Low Yes No Yes High Low FRD4 6 Medium Low Yes No Yes High Low FRD5 3 High High Yes Yes No Medium High FRD6 7 High High Yes Yes No Medium High FRD7 3 High High Yes Yes No Medium High FRD8 4 High High Yes Yes No Medium High FRD9 4 High High Yes Yes No Medium High FRD10 3 High High Yes Yes No Medium High FRD11 8 Medium Low Yes Yes Yes Hiagh High a. See the introduction to this volume for explanation of priorities. Table 7-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather 2,3,6, 11 1,8,10 11 5, 11 7 11 Hurricane 2,3, 11 1,8,9 11 11 11 Medium-Risk Hazards Flood 2,3,4,6, 11 1,4,10 4, 11 4 4, 11 4,7 4 4, 11 Wildfire 2,3, 11 1 11 11 11 Low-Risk Hazards Earthquake 2,3, 11 1 11 11 11 Drought 2,3, 11 11 11 11 a. See the introduction to this volume for explanation of mitigation types. 7.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX 7.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • City of Friendswood Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • City of Friendswood Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. City of Friendswood 7-15 The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. 7.11.2 Staff and Local Stakeholder Involvement in Annex Development This annex was developed over the course of several months with input from many city departments including Administrative Services, Community Development, Fire Marshal’s Office and Office of Emergency Management, Parks and Recreation, and Public Works. All departments were asked to contribute to the annex development through reviewing and contributing to the capability assessment, reporting on the status of previously identified actions, and participating in action identification and prioritization. An action development meeting was held on December 12, 2018 and March 12, 2019 and was attended by representatives from all previously listed department as well as the City Manager’s office. Once actions had been identified and compiled in the annex, a draft was internally circulated for comment. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«35¬«3§¨¦45§¨¦45HoustonHoustonHoustonPasadenaPearlandPearlandLeague CityLeague CityNassau BayWebsterCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.81.60.4Miles±Friendswood ¬«35 ¬«3 §¨¦45 §¨¦45 Houston Houston Houston Pasadena Pearland Pearland League City League City Nassau Bay Webster FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.8 1.60.4 Miles ± Friendswood ¬«35 ¬«3 §¨¦45 §¨¦45 Houston Houston Houston Pasadena Pearland Pearland League City League City Nassau Bay Webster Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.8 1.60.4 Miles ± Friendswood ¬«35 ¬«3 §¨¦45 §¨¦45 Houston Houston Houston Pasadena Pearland Pearland League City League City Nassau Bay Webster 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.8 1.60.4 Miles ± Friendswood ¬«35 ¬«3 §¨¦45 §¨¦45 Houston Houston Houston Pasadena Pearland Pearland League City League City Nassau Bay Webster 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.8 1.60.4 Miles ± Friendswood ¬«35 ¬«3 §¨¦45 §¨¦45 Houston Houston Houston Pasadena Pearland Pearland League City League City Nassau Bay Webster Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.8 1.60.4 Miles ± Friendswood ¬«35 ¬«3 §¨¦45 §¨¦45 Houston Houston Houston Pasadena Pearland Pearland League City League City Nassau Bay Webster Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.8 1.60.4 Miles ± Friendswood 8-1 8. CITY OF GALENA PARK 8.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Jorge Flores, Emergency Management Coordinator 2000 Clinton Drive Galena Park, TX 77547 Telephone: 7136722556 e-mail Address: Jorge.flores@cityofgalenapark-tx.gov Tom Ehlers, Fire Chief 1713 2nd Street Galena Park, TX 77547 Telephone: 832-755-0181 e-mail Address: tehlers@cityofgalenapark-tx.gov 8.2 JURISDICTION PROFILE 8.2.1 Location City of Galena Park is in Harris County, TX. The current boundaries generally extend from just east of Federal Road south to 2,500 feet north of the Houston Ship Channel, west to the city limits of Houston near Fidelity Road, north to the Southern Limit of Jacinto City and east to Federal Road, encompassing an area of 5 square miles. 8.2.2 History City of Galena Park was incorporated in 1935. The City of Galena Park was incorporated on September 21, 1935 and is located in Harris County on the north bank of the Houston Ship Channel (formerly Buffalo Bayou) just east of the Houston City limits. The City is located in the Ezekiel Thomas Survey and has a population of 10,592. The first settler in the area was Ezekiel Thomas of South Carolina, who received a grant on one league of land from the Mexican government in 1824 as one of Stephen F. Austin’s colonists. In 1833, Isaac Batterson and his family settled in the area and named the settlement “Clinton.” Batterson subsequently purchased 1 000 acres from the Ezekiel Thomas estate, a tract located in the center of present day Galena Park. For almost 100 years, the settlement was known as Clinton, and in 1928, when the U.S. Post Office Department refused to grant the town a post office because another post office bearing the name Clinton already existed in Texas, the name of the town was changed to Galena Park, after the Galena-Signal Oil Company, the town’s leading industry at the time. 8.2.3 Climate The climate of City of Galena Park is classified as humid subtropical (Cfa in the Köppen climate classification system), typical of the Southern United States. The city experiences hot, long, and humid summers, and mild winters. While not located in Tornado Alley, like much of northern Texas, spring supercell thunderstorms sometimes bring tornadoes to the area. Prevailing winds are from the south and southeast during most of the year, which bring heat and moisture from the nearby Gulf of Mexico and Galveston Bay. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 8-2 During the summer, temperatures in Galena Park commonly reach over 90 °F. The city reaches or surpasses this temperature on an average of 106.5 days per year, including a majority of days from June to September; additionally, an average of 4.6 days per year reach or exceed 100 °F. Galena Park’s characteristic subtropical humidity often results in a higher apparent temperature, and summer mornings average over 90% relative humidity. Galena Park has mild winters. In January, the normal mean temperature at George Bush Intercontinental Airport is 53.1 °F, with an average of 13 days per year with a low at or below 32 °F, occurring on average between December 3 and February 20, allowing for a growing season of 286 days. Galena Park generally receives ample rainfall, averaging about 49.8 inches annually based on records between 1981 and 2010. Many parts of the city have a high risk of localized flooding due to flat topography, ubiquitous low-permeability clay-silt prairie soils, and inadequate infrastructure. During the mid-2010s, Greater Houston experienced consecutive major flood events in 2015 (“Memorial Day”), 2016 (“Tax Day”), and 2017 (Hurricane Harvey) 8.2.4 Governing Body Format The city operates under a Mayor/Council type government with the city’s Mayor acting as the Chief Executive. The City Council assumes responsibility for the adoption of this plan; The City of Galena Park Office of Emergency Management will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 8-1. Table 8-1. Local Mitigation Planning Team Members Name Title Jorge Flores Emergency Management Coordinator Tom Ehlers Fire Chief Mayra Gonzales City Secretary 8.3 CURRENT TRENDS 8.3.1 Population According to the United States Census Bureau, the population of City of Galena Park as of 2010 was 10,887. Since 2010 the population has remained all most stagnant. 8.3.2 Development The City of Galena Park has not seen major development since the 1960s. The city is nearly built out with only a 36-acre tract remaining undeveloped. Table 8-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. City of Galena Park 8-3 Table 8-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. • If yes, who currently has permitting authority over these areas? Are any areas targeted for development or major redevelopment in the next five years? No • If yes, briefly describe, including whether any of the areas are in known hazard risk areas How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2016 2017 2018 Single Family 2 1 2 Multi-Family 2 3 2 Other (commercial, mixed use, etc.) 0 0 0 Total 4 4 4 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 0 • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. The city is mostly built out with a tract of 36 acres near Hunting Bayou that is not developed. 8.4 CAPABILITY ASSESSMENT City of Galena Park performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 8-3. • Development and permitting capabilities are presented in Table 8-4. • An assessment of fiscal capabilities is presented in Table 8-5. • An assessment of administrative and technical capabilities is presented in Table 8-6. • An assessment of education and outreach capabilities is presented in Table 8-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 8-8. • Classifications under various community mitigation programs are presented in Table 8-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 8-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 8.10 identifies these as community capacity building mitigation actions. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 8-4 Table 8-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code yes no yes yes Comment: Chapter 10 City Code 2012 Zoning Code yes no no no Comment: Chapter 10 2018 City Ordinance Subdivisions yes no no no Comment: Chapter 10 1996 City Ordinance Stormwater Management yes yes yes yes Comment: Clean Water Act Post-Disaster Recovery yes yes yes yes Comment: Chapter 18 City Code 1996 Real Estate Disclosure no no no no Comment: Federal law Growth Management yes no no no Comment: City Plan reviewed every 5 years Site Plan Review yes no no no Comment: Chapter 10 City Code 2012 Environmental Protection yes yes yes yes Comment: Flood Damage Prevention yes yes no yes Comment: Chapter 18 City Code 1996 Emergency Management yes yes yes yes Comment: Chapter 18 City Code 1996 Climate Change no yes yes yes Comment: None Planning Documents General Plan yes yes yes yes Comment: Reviewed yearly Capital Improvement Plan yes no no yes How often is the plan updated? 3 years Comment: Disaster Debris Management Plan yes no no yes Comment: Reviewed every year Floodplain or Watershed Plan yes yes yes yes Comment: Reviewed every 3 years Stormwater Plan yes yes yes yes Comment: Reviewed every 3 years Urban Water Management Plan no no no yes Comment: N/A Habitat Conservation Plan no no no yes Comment: N/A Economic Development Plan yes no no yes Comment: Reviewed yearly Shoreline Management Plan no no no no Comment: City of Galena Park 8-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Community Wildfire Protection Plan no no no no Comment: Forest Management Plan no no no no Comment: Climate Action Plan no no no no Comment: Comprehensive Emergency Management Plan yes yes yes yes Comment: Reviewed Yearly Threat & Hazard Identification & Risk Assessment (THIRA) yes yes yes yes Comment: Reviewed January 2018 Post-Disaster Recovery Plan yes yes yes yes Comment: Reviewed yearly Continuity of Operations Plan yes yes yes yes Comment: Reviewed every 5 years Public Health Plan yes yes yes yes Comment: Reviewed every 3 years Other N/A N/A N/A N/A Comment: Table 8-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Building Department Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? Yes Table 8-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes yes User Fees for Water, Sewer, Gas or Electric Service Yes Water and Sewer Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds yes Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas yes State-Sponsored Grant Programs yes Development Impact Fees for Homebuyers or Developers no Other N/A Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 8-6 Table 8-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices yes Building Engineers or professionals trained in building or infrastructure construction practices yes Building and Fire Department Planners or engineers with an understanding of natural hazards yes Building Staff with training in benefit/cost analysis yes Accounting Surveyors No N/A Personnel skilled or trained in GIS applications No N/A Scientist familiar with natural hazards in local area no N/A Emergency manager Yes OEM Grant writers yes OEM, Fire, Police Other N/A N/A Table 8-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No • If yes, briefly describe. Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. Notifications on Facebook and Twitter Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes • If yes, briefly describe. Dangerous Buildings and Zoning Do you have any other programs already in place that could be used to communicate hazard-related information? No • If yes, briefly describe. Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Swift 911 Notification and Social Media City of Galena Park 8-7 Table 8-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Fire Department Who is your floodplain administrator? (department/position) Tom Ehlers Fire Chief Are any certified floodplain managers on staff in your jurisdiction? No What is the date that your flood damage prevention ordinance was last amended? 5/2019 Does your floodplain management program meet or exceed minimum requirements? Meets • If exceeds, in what ways? When was the most recent Community Assistance Visit or Community Assistance Contact? Insert appropriate information Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Insert appropriate information Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Insert appropriate information Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes • If so, what type of assistance/training is needed? Any training is appreciated Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? N/A • If no, is your jurisdiction interested in joining the CRS program? Yes How many flood insurance policies are in force in your jurisdiction?a 276 • What is the insurance in force? $67,926,100 • What is the premium in force? $149,503 How many total loss claims have been filed in your jurisdiction?a • How many claims are still open or were closed without payment? • What were the total payments for losses? a. According to FEMA statistics as of September 30, 2018 Table 8-9. Community Classifications Participating? Classification Date Classified Community Rating System No N/A N/A Building Code Effectiveness Grading Schedule No N/A N/A Public Protection No N/A N/A Storm Ready No N/A N/A Firewise No N/A N/A Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 8-8 Table 8-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Medium Comment: Jurisdiction-level monitoring of climate change impacts Medium Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Medium Comment: Champions for climate action in local government departments Medium Comment: Political support for implementing climate change adaptation strategies Medium Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Medium Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Medium Comment: Local ecosystems capacity to adapt to climate impacts low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Galena Park 8-9 8.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed at the end of this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 8.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Building Codes • The National Flood Insurance Program • The City’s Emergency Plan • Harris County’s Basic Plan • Storm water management • State and federal regulations. 8.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Real Estate Disclosure • Environmental Protection • Climate Change. 8.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 8-11 lists past occurrences of natural hazards for which specific damage was recorded in Galena Park, TX. Other hazard events that broadly affected the entire planning area, including Harris County, TX, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 8-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey DR4332 8/23/2017 $1,000.000 Hurricane Ike DR1791 9/7/2008 Unknown Hurricane Rita DR1606 10/14/2005 Unknown 8.7 HAZARD RISK RANKING Table 8-12 presents a local ranking for Galena Park, TX of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 8-10 Table 8-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Flooding 18 Medium 3 Earthquake 14 Low 3 Wildfire 14 Low 4 Drought 6 Low 4 Dam Failure 6 Low 4 Mass Movement 6 Low 5 Tsunami 0 (No exposure) None 5 Coastal Erosion 0 (No exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 8.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides risk assessments for each hazard of concern. This section describes key vulnerabilities for the City. Jurisdiction-specific risk maps are provided at the end of this annex. 8.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 12 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 2 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0 8.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Houses near Panther Creek located in flood plain • Age of bridges in city over Panther Creek • Large number of underground pipelines and Chemical Storage tanks • Woodland Acres Police Substation located in flood plain Mitigation actions addressing these issues were prioritized for consideration in the action plan for this annex. 8.9 STATUS OF PREVIOUS PLAN ACTIONS Table 8-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. 8.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 8-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 8-15 identifies the priority for each action. Table 8-16 summarizes the actions by hazard and mitigation type. City of Galena Park 8-11 Table 8-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update Retrofit critical infrastructure facilities with lightning and surge protection measures. No X GP2019-5 Comment: Police Station needs additional lightning protection Retrofit public facilities and radio communication systems with lightning protection rods. No Comment: Police Station Dispatch Center needs updates lightning protection Implement a Flooding Public Education/Outreach Program to inform residents of flooding hazards and actions to take to minimize health impacts and property damage from flooding. No X GP2019-6 Comment: Develop City warning mass notification system to include alerts for flood risk areas. yes Comment: Swift 911 Install/ Improve roofing of public buildings to industry accepted high-wind guidelines. yes Comment: Complete Retrofit critical infrastructure and/ or shelters with shutter systems. Removed Comment: Cost prohibitive Adopt higher-standard/latest edition building codes for critical facilities to withstand high-wind damage from severe thunderstorms, hurricanes, and hail. X GP2019-7 Comment: Building Codes currently under review for update Harden public shelters or public buildings that provide inadequate protection. yes Comment: Construct shelters for critical equipment and vehicles. yes Comment: Install protective structure to minimize damage to critical assets and equipment. yes Comment: Adopt code/ ordinance to require removal of dead vegetation/ dry fuel sources in risk areas. yes Comment: Join Firewise to implement a Public Education/Outreach program for wildfire hazards and actions for residents to minimize fire/smoke damage to property. Removed Comment: Wildfire threat is minimal in city Expand warning system to provide drought warnings and alerts to increase coverage of community population. (mass notification, outdoor warning systems, etc.). yes Comment: Swift 911 system Implement a regional drought contingency program to provide an alternate emergency water source during severe drought to minimize water shortage. X GP2019-8 Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 8-12 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update Implement/ establish grant program to provide cooling systems for Low to Moderate income populations. Not feasible Comment: Installed generators at cooling centers Install public facility emergency power generators to provide adequate cooling for use as a cooling center. yes Comment: Implement/ establish grant program to provide heating systems to LMI populations. Not feasible Comment: Warming Centers available Install public facility emergency power generators to provide adequate heating for use as a heating center. yes Comment: Implement or establish code/ ordinance to require hazards materials transportation corridor. No X GP2019-9 Comment: HM routes needs to be established Identify exposed/ above ground pipelines in flood hazard area. yes Comment: Area near Panther Creek and Hunting Bayou Improve fire protection infrastructure locations. yes Comment: Table 8-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action GP2019-1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, landslide, Severe Weather, , wildfire, Mass Movement, Dam Failure Existing 3, 4, 10 City Administration TBD High HMGP, PDM, FMA Short-term Action GP2019-2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including Flood Plain Management, Zoning, City Ordinances and Building Codes. Hazards Mitigated: Dam failure, drought, earthquake, flooding, tsunami, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing Action GP2019-3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire, Drought, Dam Failure, Mass Movement New and Existing 1, 5, 8 City Administration TBD Low Staff Time, General Funds Short-term Action GP2019-4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise New and Existing 1, 3, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing City of Galena Park 8-13 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action GP2019-5 — Retrofit critical infrastructure facilities with lightning and surge protection measures. Hazards Mitigated: Severe Weather, Hurricane Existing 10,11,13 City Administration TBD Medium General and grant funds, Short term Action GP2019-6 — Implement a Flooding Public Education/Outreach Program to inform residents of flooding hazards and actions to take to minimize health impacts and property damage from flooding. Hazards Mitigated: Flooding Existing 3,10,11 City Administration TBD Low Staff Time Short term Action GP2019-7 — Adopt higher-standard/latest edition building codes for critical facilities to withstand high-wind damage from severe thunderstorms, hurricanes, and hail. Hazards Mitigated: Severe Weather, Hurricane New 9,10,11,14,15 City Administration TBD Low Staff Time Short term Action GP2019-8 — Implement a regional drought contingency program to provide an alternate emergency water source during severe drought to minimize water shortage. Hazards Mitigated: Drought Existing 7,9,10,11 City Administration TBD Low Staff Time Short term Action GP2019-9 — Implement or establish code/ ordinance to require hazardous materials transportation corridor. Hazards Mitigated: Hazardous Materials Incidents Existing 3,6,8,9,10,11,14 City Administration TBD Low Staff Time Short term Action GP2019-10— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire, Drought, Dam Failure, Mass Movement New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Galena Park HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 8-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementatio n Prioritya Grant Pursuit Prioritya GP2019-1 3 High High Yes Yes No High High GP2019-2 7 Medium Low Yes No Yes High Low GP2019-3 3 Low Low Yes No Yes High Low GP2019-4 6 Medium Low Yes No Yes High Low GP2019-5 3 Medium Medium Yes Yes No Medium Medium GP2019-6 3 Medium Low Yes No Yes Medium Low GP2019-7 5 High Low Yes No Yes High Low GP2019-8 4 High Low Yes No Yes Medium Low GP2019-9 7 Medium Low Yes No Yes Medium Low GP2019-10 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 8-14 Table 8-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather GP2019-1, 3, 7, 10 GP2019-1 GP2019-10 GP2019-10 GP2019-1, 5, 7 GP2019-4, 10 Hurricane GP2019-3, 7, 10 GP2019-1 GP2019-10 GP2019-10 GP2019-5, 7 GP2019-10 Flooding GP2019-3, 10 GP2019-1 GP2019-6, 10 GP2019-2 GP2019-10 GP2019-1 GP2019-2, 4, 10 Medium-Risk Hazards Earthquake GP2019-3, 10 GP2019-1 GP2019-10 GP2019-2 GP2019-10 GP2019-1 GP2019-2, 10 Wildfire GP2019-3, 10 GP2019-1 GP2019-10 GP2019-2 GP2019-10 GP2019-1 GP2019-2, 10 Drought GP2019-3, 10 GP2019-10 GP2019-2 GP2019-10 GP2019-8 GP2019-2, 8, 10 Low-Risk Hazards Dam Failure GP2019-3, 10 GP2019-10 GP2019-2 GP2019-10 GP2019-2, 4, 10 Mass Movement GP2019-3, 10 GP2019-1 GP2019-10 GP2019-10 GP2019-1 GP2019-2, 10 Hazardous Materials GP2019-9 GP2019-9 a. See the introduction to this volume for explanation of mitigation types. 8.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • Galena Park Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • Galena Park Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • 2017 Houston UASI THIRA Stakeholder Preparedness Review Regional Stake Holder Report January 2018 – The report was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. City of Galena Park 8-15 8.12 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY A study is needed to better understand the potential for a chemical spill related to flooding rains. The use of above ground tanks for chemical storage in diked areas that hold water during flooding events may cause the tanks to float, potentially leading to a large scale chemical spill as experienced during Hurricane Harvey at a tank farm on American Petroleum Road. It resulted in 100,000 of gallons of gasoline to be released into the ship channel. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(HoustonHoustonHoustonJacinto CityPasadenaCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.250.50.125Miles±Galena Park Houston Houston Houston Jacinto City Pasadena FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.25 0.50.125 Miles ± Galena Park Houston Houston Houston Jacinto City Pasadena Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.25 0.50.125 Miles ± Galena Park Houston Houston Houston Jacinto City Pasadena 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.25 0.50.125 Miles ± Galena Park Houston Houston Houston Jacinto City Pasadena 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.25 0.50.125 Miles ± Galena Park Houston Houston Houston Jacinto City Pasadena Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.25 0.50.125 Miles ± Galena Park Houston Houston Houston Jacinto City Pasadena Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.25 0.50.125 Miles ± Galena Park 9-1 9. CITY OF HEDWIG VILLAGE 9.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Kelly Johnson, City Administrator 955 Piney Point Road Houston, TX 77024 Telephone: 713-465-6009 e-mail Address: KJohnson@hedwigtx.gov Brian T. Muecke 955 Piney Point Road Houston, TX 77024 Telephone: 713-465-6009 e-mail Address: BMuecke@hedwigtx.gov 9.2 JURISDICTION PROFILE 9.2.1 Location The City of Hedwig Village is located in Harris County and is bound on the east by the City of Hunters Creek Village, the south by the City of Piney Point Village and the City of Bunker Hill Village, the north by the City of Houston and the City of Spring Valley Village, and the west by the City of Houston. The City of Hedwig Village is approximately 0.9 square miles or 544 acres. 9.2.2 History The City of Hedwig Village, a Type-A General Law City, was incorporated in 1954. The City of Hedwig Village consists of approximately 572 single family homes, 244 condominium units, two apartment complexes, two public schools, two churches, and many restaurants and retail stores. The City of Hedwig Village provides police protection through their own police department and fire and emergency services through the Village Fire Department. The Village Fire Department, through an interlocal agreement, provides services to the “Memorial Villages” which include the City of Bunker Hill Village, the City of Hedwig Village, the City of Hilshire Village, the City of Hunters Creek Village, the City of Piney Point Village, and the City of Spring Valley Village. 9.2.3 Climate The City of Hedwig Village has a year-round average high temperature around 80 ºF, year-round average low temperature around 60 ºF, and average annual precipitation of about 50 inches. 9.2.4 Governing Body Format The City of Hedwig Village is considered a Type-A General Law City and is governed by a Mayor and five Council Members elected at large. A Type-A General Law City is one that had at the time of its incorporation 600 or more inhabitants. General Law Cities have a population less than 5,000 and are authorized to do only what the State Constitution or Legislature has authorized. The City Council assumes responsibility for the adoption of this plan; the City Administrator will oversee its implementation. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 9-2 Table 9-1 lists members of the jurisdiction’s joint local mitigation planning team. Howard Miller, emergency management coordinator for the Village Fire Department, also participated in planning for the six Memorial Villages. Table 9-1. Local Mitigation Planning Team Members Jurisdiction Name / Title Phone Email City of Bunker Hill Village Karen Glynn, City Admin. 713-467-9762 KGlynn@bunkerhilltx.gov City of Hedwig Village Kelly Johnson, City Admin./Secretary 713-465-6009 KJohnson@hedwigtx.gov City of Hilshire Village Susan Blevins, City Admin/Secretary Efrain Him 713-973-1779 Susan.blevins@hilshirevillagetexas.com Efrain.him@hdrinc.com City of Hunters Creek Village Tom Fullen, City Admin. 713-465-2150 tfullen@cityofhunterscreek.org City of Piney Point Village Roger Nelson, City Admin. 713-230-8703 cityadmin@pineypt.org City of Spring Valley Village Julie Robinson, City Admin. Arthur Faiello, PW Director 713-465-5306 832-910-8576 jrobinson@springvalleytx.com afaiello@springvalleytx.com 9.3 CURRENT TRENDS 9.3.1 Population According to the 2010 Census, the population of the City of Hedwig Village was 2,557. Hedwig Village’s population has remained consistent for many years. 9.3.2 Development The City of Hedwig Village is continuing to experience residential redevelopment of new, larger homes. The City is also seeing the redevelopment of commercial property along the I-10 corridor. The City of Hedwig Village is landlocked by other municipalities; therefore there is no growth opportunity. Table 9-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. 9.4 CAPABILITY ASSESSMENT The City of Hedwig Village performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 9-3. • Development and permitting capabilities are presented in Table 9-4. • An assessment of fiscal capabilities is presented in Table 9-5. • An assessment of administrative and technical capabilities is presented in Table 9-6. • An assessment of education and outreach capabilities is presented in Table 9-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 9-8. • Classifications under various community mitigation programs are presented in Table 9-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 9-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. City of Hedwig Village 9-3 Table 9-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? NO • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A Is your jurisdiction expected to annex any areas during the performance period of this plan? NO • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A Are any areas targeted for development or major redevelopment in the next five years? YES • If yes, briefly describe, including whether any of the areas are in known hazard risk areas The City of Hedwig Village is starting to see the redevelopment of their commercial areas along I-10 and the continued redevelopment of their residential homes with new, larger homes. How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 11 6 7 5 4 Multi-Family N/A N/A N/A N/A N/A Other (commercial, mixed use, etc.) 2 1 0 1 4 Total 13 7 7 6 8 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: # N/A • Landslide: # N/A • High Liquefaction Areas: # N/A • Tsunami Inundation Area: # N/A • Wildfire Risk Areas: # N/A Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. Hedwig Village continues to experience redevelopment of older residential homes being demolished and new homes constructed. Hedwig Village is also slowly seeing redevelopment of their commercial area’s along I-10. Table 9-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes Yes Yes Yes Comment: Chapter 14 of City Code of Ordinances, 1991 Zoning Code Yes Yes Yes Yes Comment: Appendix A of City Code of Ordinances, 1961 Subdivisions Yes Yes Yes Yes Comment: Chapter 74 of City Code of Ordinances, 2001 Stormwater Management Yes Yes Yes Yes Comment: Chapter 14 of City Code of Ordinances, (1991) and TCEQ Post-Disaster Recovery Yes Yes Yes No Comment: TDEM, Harris County Interlocal Mutual Aid Agreement, FEMA Real Estate Disclosure No No No No Comment: Growth Management Yes Yes Yes Yes Comment: Through Harris County Flood Control District (HCFCD) Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 9-4 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Site Plan Review Yes Yes Yes No Comment: Village Fire Department (VFD), City Ordinances, and Harris County Flood Control Environmental Protection No Yes Yes No Comment: Texas Commission on Environmental Quality (TCEQ) & EPA Flood Damage Prevention Yes No Yes Yes Comment: Floodplain Ordinance Emergency Management Yes Yes Yes No Comment: VFD, Harris County Emergency Management Climate Change No No No No Comment: Planning Documents General Plan Yes No Yes Yes Comment: Zoning Ordinance Capital Improvement Plan Yes No No Yes How often is the plan updated? Annually w/Budget Comment: Disaster Debris Management Plan Yes Yes No No Comment: Interlocal with Harris County for Debris removal and Ceres Environmental Services Floodplain or Watershed Plan No Yes No No Comment: HCFCD Stormwater Plan Yes Yes No Yes Comment: TCEQ Urban Water Management Plan No No No No Comment: Habitat Conservation Plan No Yes No No Comment: TCEQ and EPA Economic Development Plan Yes No Yes No Comment: City has the ability Shoreline Management Plan No No No No Comment: Community Wildfire Protection Plan No No No No Comment: Forest Management Plan No No No No Comment: Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes Yes Yes No Comment: Harris County Emergency Management Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes Yes No Comment: Harris County Hazard Mitigation Plan Post-Disaster Recovery Plan Yes Yes Yes No Comment: Harris County Emergency Management Continuity of Operations Plan No No No No Comment: Public Health Plan No Yes No No Comment: Harris County Public Health City of Hedwig Village 9-5 Table 9-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Permit Department Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? No Table 9-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants – low income No Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Other No Table 9-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes BBG Contract Building Official Engineers or professionals trained in building or infrastructure construction practices Yes Contract Building Official, Contract City Engineer, and VFD Marshall Planners or engineers with an understanding of natural hazards Yes Contract Building Official and Contract City Engineer Staff with training in benefit/cost analysis Yes City Treasurer Surveyors Yes Contract Personnel skilled or trained in GIS applications Yes Contract Scientist familiar with natural hazards in local area Yes Contract Emergency manager Yes Mayor and VFD Grant writers Yes Contract Other No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 9-6 Table 9-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No • If yes, briefly describe. Do you use social media for hazard mitigation education and outreach? No • If yes, briefly describe. Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Reverse 911/website/ENotification Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Reverse 911/website/ENotification Table 9-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Permit Dept. Who is your floodplain administrator? (department/position) City Secretary Are any certified floodplain managers on staff in your jurisdiction? No What is the date that your flood damage prevention ordinance was last amended? Dec 2004 Does your floodplain management program meet or exceed minimum requirements? Meets • If exceeds, in what ways? When was the most recent Community Assistance Visit or Community Assistance Contact? May 2019 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? No • Areas have flooded that are not within a flood risk area. Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? • If no, is your jurisdiction interested in joining the CRS program? No How many flood insurance policies are in force in your jurisdiction?a 385 • What is the insurance in force? $130,960,000 • What is the premium in force? $195,280 How many total loss claims have been filed in your jurisdiction?a 121 • How many claims are still open or were closed without payment? 18 • What were the total payments for losses? $3,457,558.39 a. According to FEMA statistics as of March 28, 2019 City of Hedwig Village 9-7 Table 9-9. Community Classifications Participating? Classification Date Classified Community Rating System No Building Code Effectiveness Grading Schedule No Public Protection Yes ISO 2015 Storm Ready No Firewise No Table 9-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 9-8 Criterion Jurisdiction Ratinga Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. 9.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 9.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • MS4 Storm Water Plan — Storm Water Protection Plan as required by TCEQ. • All Hazard Mitigation Plan with Harris County 9.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • MS4 Storm Water Plan — Storm Water Protection Plan as required by TCEQ. • All Hazard Mitigation Plan with Harris County 9.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 9-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Hedwig Village. Other hazard events that broadly affected the entire planning area, including City of Hedwig Village, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. City of Hedwig Village 9-9 Table 9-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 $ 18,945,021 Weather Event (rain) ------ 4/18/2016 Unknown Weather Event (rain) ------ 5/25/2015 Unknown Weather Event (rain) ------ 4/28/2009 Unknown Weather Event (hail) & Flash Flood 32615 & 32616 5/30/2007 $0 Hurricane Alicia 689 DR 1983 $12,130,470 9.7 HAZARD RISK RANKING Table 9-12 presents a local ranking for City of Hedwig Village of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 9-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 2 Hurricane 32 High 3 Earthquake 14 Low 4 Drought 6 Low 4 Fire 6 Low 4 Mass Movement 6 Low 5 Flooding 0 None 5 Dam Failure 0 (no exposure) None 5 Coastal Erosion 0 (No exposure) None 5 Tsunami 0 (No exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 9.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 9.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 22 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 4 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 1 9.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 9-10 • Aging infrastructure (sink holes) • Above ground power lines Mitigation actions addressing these issues were prioritized for consideration in the action plan for this annex. 9.9 STATUS OF PREVIOUS PLAN ACTIONS Table 9-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 9-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Install drought-resistant landscaping around facilities as part of water conservation plan Ongoing Yes HED 8 Comment: Carry Over Improve codes/ordinances allowing xeriscape. Not-Started Yes HED 11 Comment: Carry Over Expand warning system using City-wide Emergency Notification System to enhance coverage of the community’s population. Ongoing Yes HED 5 Comment: The City designed and implemented a new website in 2016 which enables residents to sign up to receive up-to-date emergency notices. This was used during Hurricane Harvey. Completed in Phase I. Establish codes/ordinances for buffer zones Yes Comment: Remove/Delete Harden air handling and air conditioning systems. Yes Comment: Both city hall and the police station have been updates with control systems. Completed in Phase I. Install protective structures for city vehicles Yes Comment: Carport installed at police station. Completed in Phase I. Implement a tree management program to limit debris damage to critical infrastructure, public facilities from falling tree canopy. Ongoing Yes HED 6 Comment: This is an ongoing activity to maintain canopy. The City does have a debris contract for major tree damages. Retrofit Maintenance Building with lightning and surge protection measures. Yes Comment: The City completed the implementation with the police station was complete in 2017. Completed in Phase I. Retrofit backup generator at Police Department with new automatic switching equipment. Yes Comment: Both city hall and the police station generators have an automated transfer switch. Completed in Phase I. Retrofit Police Department facility to withstand high-wind damages from severe thunderstorms, hurricanes and hail. Yes Comment: Completed with the new police station in 2017. Completed in Phase I. Install cover and freeze insulation protection of above ground public irrigation equipment and FDC connections Yes Comment: Completed in Phase I. Insulate exposed fire protection equipment/system components Yes Comment: Completed in Phase I. City of Hedwig Village 9-11 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Develop/implement outreach/public awareness/warning programs and meet with local providers on how they will handle extreme power demands. Not-Started Yes HED 7 Comment: Carry Over Strengthen Building Codes/Ordinances relative to job site (Construction) debris management and removal of dead trees. Yes Comment: Updated the Building Codes the last few years. Completed in Phase I. Install and improve Storm Sewer System by increasing drainage to mitigate flooding. Ongoing Yes HED 9 Comment: The City has spent close to $500K in a master drainage plan with the anticipation to go to voters in late 2019 or sometime in 2020 in a bond election to decide if residents want to pay to improve streets and drainage. Develop community outreach program to educate the public on flooding risk and actions they can take to protect their homes from flooding. Ongoing Yes HED 10 Comment: Some outreach has been done through the City’s website. Hardening of critical infrastructure facilities. Yes Comment: Completed in Phase I. Update and strengthen ordinances on burning restrictions with local Fire Marshal. Yes Comment: No outside burning is allowed in Hedwig Village. Completed in Phase I. 9.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 9-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 9-15 identifies the priority for each action. Table 9-16 summarizes the mitigation actions by hazard of concern and mitigation type. Table 9-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HED1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Severe Weather, Hurricane, Flooding, WildFire, Mass Movement, Earthquake Existing 3, 4, 10 City Administration TBD High Hazard Mitigation Grant Program, Pre-Disaster Mitigation, Flood Mitigation Assistance Short-term Action HED 2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including development and drainage. Hazards Mitigated: drought, earthquake, flooding, landslide, tsunami, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing Action HED 3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, WildFire, Mass Movement, Earthquake, Drought New and Existing 1, 5, 8 City Administration TBD Low Staff Time, General Funds Short-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 9-12 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HED 4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise New and Existing 1, 3, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing Action HED 5 — Expand warning system using City-wide Emergency Notification System to enhance coverage of the community’s population. Hazards Mitigated: New and Existing 1, 3 Public works TBD Low Staff Time, General Funds Ongoing Action HED 6 — Implement a tree management program to limit debris damage to critical infrastructure, public facilities from falling tree canopy. Hazards Mitigated: Severe weather, flooding, wildfire Existing 8, 10, 12 Public Works TBD Low Staff Time, General Funds, Ongoing Action HED 7 — Develop/implement outreach/public awareness/warning programs and meet with local providers on how they will handle extreme power demands Hazards Mitigated: Drought, severe weather New 1, 3 Administration Center-point Energy Low Staff Time, General Funds Ongoing Action HED 8 — Install drought-resistant landscaping around facilities as part of water conservation plan Hazards Mitigated: Drought Existing 11 Public Works TBD Low Staff time, general funds Short-term Action HED 9 — Install and improve Storm Sewer System by increasing drainage to mitigate flooding. Hazards Mitigated: Severe weather, hurricane, flooding Existing and New 7, 11, 12 Public Works TBD High Staff time, bond election, Hazard Mitigation Grant Program, Pre-Disaster Mitigation, Flood Mitigation Assistance Ongoing Action HED 10 — Develop community outreach program to educate the public on flooding risk and actions they can take to protect their homes from flooding. Hazards Mitigated: Severe weather, hurricane, flooding Existing 1, 3 Administration Harris County, State, Federal Low Staff time, general fund Short Action HED 11 — Improve codes/ordinances allowing xeriscape. Hazards Mitigated: Drought Existing 11 Building Department TBD Low Staff time, general fund Short Action HED12— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire, Drought, Mass Movement New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Galena Park HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. City of Hedwig Village 9-13 Table 9-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya HED 1 3 High High Yes Yes No Medium High HED 2 7 Medium Low Yes No Yes High Low HED 3 3 Low Low Yes No Yes High Low HED 4 6 Medium Low Yes No Yes High Low HED 5 2 High Low Yes No Yes High High HED 6 3 High Medium Yes No No High Medium HED 7 2 High Low Yes No Yes High Low HED 8 1 Low High No Yes No Low Low HED 9 3 High High Yes Yes NO High High HED 10 2 Medium Low Yes No Yes Medium Medium HED 11 1 Low Low Yes No Yes Low Low HED12 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 9-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather HED 3, 12 HED 1, 6 HED 5, 7, 10, 12 HED 6 HED 5, 10, 12 HED 1, 9 HED 3, 9, 12 Hurricane HED 3, 12 HED 1, 6 HED 5, 7, 10, 12 HED 6 HED 5, 10, 12 HED 1, 9 HED 3, 9, 12 Medium-Risk Hazards Flooding HED 2, 3, 4, 6, 12 HED 1, 4, 6 HED 5, 7, 10, 12 HED 6 HED 5, 10, 12 HED 1, 9 HIL 4 HED 3, 9, 12 Low-Risk Hazards Drought HED 3, 11, 8, 12 HED 1, 6 HED 11, 12 HED 8, 11 HED 5, 12 HED 8, 11 HED 7, 12 Fire HED 2, 3, 12 HED 1, 6 HED12 HED 6 HED 5, 12 HED 3, 12 Mass Movement HED 2, 3, 12 HED 1, 6 HED12 HED 5, 12 HED 9 HED 3, 12 Earthquake HED 2, 3, 12 HED 1, 6 HED12 HED 5, 12 HED 3, 12 a. See the introduction to this volume for explanation of mitigation types. 9.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 9-14 • The City of Hedwig Village Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • The City of Hedwig Village Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • The City of Hedwig Village MS4 Storm Water Plan-- The MS4 Storm Water Plan was reviewed by TCEQ and is compliance. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. !(!(!(!(!(!(!(!(!(§¨¦10§¨¦10HoustonSpring ValleyHunters CreekVillagePiney PointVillageBunker HillVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.150.30.075Miles±Hedwig Village §¨¦10 §¨¦10 Houston Spring Valley Hunters Creek Village Piney Point Village Bunker Hill Village FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Hedwig Village §¨¦10 §¨¦10 Houston Spring Valley Hunters Creek Village Piney Point Village Bunker Hill Village Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Hedwig Village §¨¦10 §¨¦10 Houston Spring Valley Hunters Creek Village Piney Point Village Bunker Hill Village 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Hedwig Village §¨¦10 §¨¦10 Houston Spring Valley Hunters Creek Village Piney Point Village Bunker Hill Village 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Hedwig Village §¨¦10 §¨¦10 Houston Spring Valley Hunters Creek Village Piney Point Village Bunker Hill Village Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Hedwig Village §¨¦10 §¨¦10 Houston Spring Valley Hunters Creek Village Piney Point Village Bunker Hill Village Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Hedwig Village 10-1 10. CITY OF HILSHIRE VILLAGE 10.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Name, Title: Susan Blevins, City Administrator Street Address: 8301 Westview City, State ZIP: Houston, Texas 77055 Telephone: 713-973-1779 e-mail Address: susan.blevins@hilshirevillagetexas.com Name, Title: Efrain Him, City Engineer Street Address: 4828 Loop Central Drive, Ste. 800 City, State ZIP: Houston, Texas 77081 Telephone: 713-622-9264 e-mail Address: efrain.him@hdrinc.com 10.2 JURISDICTION PROFILE 10.2.1 Location The City of Hilshire Village is located in the southwestern area of Harris County. The current boundaries generally extend from Westview Drive on the north to I-10 on the south, and from Wirt Road on the east to the City of Spring Valley on the west. The City encompasses an area of one-third of a square mile. 10.2.2 History The City of Hilshire Village was incorporated in 1955. The City today consists of 312 single-family dwellings; two private schools, one preschool/after-school facility, four churches, one small Harris County pocket park, and a small commercial area. Through the years, the City has adopted ordinances establishing zoning regulations to preserve the character of the “Memorial Villages.” The six Memorial Villages are independent cities that operate autonomously of Houston. All six are served by the Village Fire Department. Spring Valley Police Department serves the City of Hilshire Village along with the City of Spring Valley. The six villages have executed an inter- local agreement and developed an emergency management guide for emergency needs. 10.2.3 Climate The climate of the City of Hilshire Village is characterized by relatively high temperatures and evenly distributed precipitation throughout the year with high humidity. 10.2.4 Governing Body Format The City of Hilshire Village is considered a Type-A General Law City and is governed by a Mayor and five Council Members elected at large. A Type-A General Law City is one that had at the time of its incorporation 600 or more inhabitants. General Law Cities have a population less than 5,000 and are authorized to do only what the State Constitution or Legislature has authorized. The City Council assumes responsibility for the adoption of this plan; the City Administrator will oversee its implementation. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 10-2 Table 10-1 lists members of the jurisdiction’s joint local mitigation planning team. Howard Miller, emergency management coordinator for the Village Fire Department, also participated in planning for the six Memorial Villages. Table 10-1. Local Mitigation Planning Team Members Jurisdiction Name / Title Phone Email City of Bunker Hill Village Karen Glynn, City Admin. 713-467-9762 KGlynn@bunkerhilltx.gov City of Hedwig Village Kelly Johnson, City Admin./Secretary 713-465-6009 kjohnson@hedwigtx.gov City of Hilshire Village Susan Blevins, City Admin/Secretary. Efrain Him 713-973-1779 Susan.blevins@hilshirevillagetexas.com Efrain.him@hdrinc.com City of Hunters Creek Village Tom Fullen, City Admin. 713-465-2150 tfullen@cityofhunterscreek.org City of Piney Point Village Roger Nelson, City Admin. 713-230-8703 cityadmin@pineypt.org City of Spring Valley Village Julie Robinson, City Admin. Arthur Faiello, PW Director 713-465-5306 832-910-8576 jrobinson@springvalleytx.com afaiello@springvalleytx.com 10.3 CURRENT TRENDS 10.3.1 Population According to the 2010 Census Data, the population of the City of Hilshire Village was 310. Since the 1990 Census, the population has slightly increased. 10.3.2 Development The City of Hilshire Village is continuing to experience residential redevelopment of new, larger homes. The city is landlocked by other municipalities; therefore there is no growth opportunity. Table 10-2 summarizes development trends in the period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. 10.4 CAPABILITY ASSESSMENT The City of Hilshire Village performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 10-3. • Development and permitting capabilities are presented in Table 10-4. • An assessment of fiscal capabilities is presented in Table 10-5. • An assessment of administrative and technical capabilities is presented in Table 10-6. • An assessment of education and outreach capabilities is presented in Table 10-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 10-8. • Classifications under various community mitigation programs are presented in Table 10-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 10-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. City of Hilshire Village 10-3 Table 10-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? NO • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A Is your jurisdiction expected to annex any areas during the performance period of this plan? NO • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A Are any areas targeted for development or major redevelopment in the next five years? yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas The City of Hilshire Village is continuing to experience residential redevelopment of new, larger homes. A developer recently subdivided a track of land into 10 lots. How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 8 4 3 7 3 Multi-Family N/A N/A N/A N/A N/A Other (commercial, mixed use, etc.) N/A N/A 1 2 N/A Total 10 4 4 9 3 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: #N/A • Landslide: # N/A • High Liquefaction Areas: # N/A • Tsunami Inundation Area: # N/A • Wildfire Risk Areas: # N/A Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. City of Hilshire Village continues to experience redevelopment of their residential lots; older homes are demolished and new homes constructed. Table 10-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes Yes Yes Yes Comment: Ord # 719 Zoning Code Yes Yes Yes Yes Comment: Chapter 12 code of ordinances Subdivisions Yes Yes Yes Yes Comment: Chapter 9, Article 9.100, 6/28/2016 Stormwater Management Yes Yes Yes Yes Comment: Ordinance and TCEQ Post-Disaster Recovery Yes Yes Yes No Comment: Mutual Aid Agreement with Harris County , FEMA, TDEM Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 10-4 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Real Estate Disclosure No No No No Comment: Growth Management Yes Yes Yes Yes Comment: Site Plan Review Yes Yes Yes No Comment: Building Official, City Engineer, Village Fire Department and HCFCD Environmental Protection No Yes Yes No Comment: TCEQ, EPA Flood Damage Prevention Yes No Yes/ /No Comment: Emergency Management Yes Yes Yes Yes Comment: Harris County Emergency Management, Village Fire Department Climate Change No No No /No Comment: N/a Planning Documents General Plan Yes /No Yes Yes Comment: Zoning Ordinance Capital Improvement Plan Yes No No Yes How often is the plan updated? Comment: We have a 5 year plan but we review yearly during the budget process Disaster Debris Management Plan Yes Yes Yes No Comment: Interlocal with Harris County Floodplain or Watershed Plan No Yes No No Comment: Harris County Flood Control Agreement Stormwater Plan Yes Yes No Yes Comment: TCEQ Urban Water Management Plan No Yes Yes No Comment: City of Houston Habitat Conservation Plan No Yes/ No No Comment: Wild Life Protection Services Economic Development Plan Yes No Yes No Comment: Do not have a plan Shoreline Management Plan No No No No Comment: Community Wildfire Protection Plan No No No No Comment: Forest Management Plan No No No No Comment: Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes Yes Yes No Comment: Harris County Emergency Management Threat & Hazard Identification & Risk Assessment (THIRA) No No No No Comment: Harris County Hazard Mitigation Plan Post-Disaster Recovery Plan Yes Yes Yes No Comment: Harris County Emergency Management City of Hilshire Village 10-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Continuity of Operations Plan No No No No Comment: Public Health Plan No Yes No No Comment: Interlocal with Harris County Table 10-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? No Table 10-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants No Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Yes Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Other Infrastructure is required before City assumes the ownership No Table 10-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes City Engineer – Under contract Engineers or professionals trained in building or infrastructure construction practices Yes City Engineer and Building Official under contract – Also Fire Marshal Planners or engineers with an understanding of natural hazards Yes City Engineer – Under contract Staff with training in benefit/cost analysis Yes City Engineer – Under contract Surveyors Yes City Engineer – Under contract Personnel skilled or trained in GIS applications Yes City Engineering Firm – Under contract Scientist familiar with natural hazards in local area Yes City Engineering Firm – Under contract Emergency manager Yes Village Fire Department Grant writers Yes City Engineering Firm – Under contract Other Yes/No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 10-6 Table 10-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes the Mayor Do you have personnel skilled or trained in website development? Yes – under contract Do you have hazard mitigation information available on your website? No • If yes, briefly describe. Do you use social media for hazard mitigation education and outreach? No • If yes, briefly describe. Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Website, email and reverse 911 Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Website, email and reverse 911 Table 10-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? City Engineering Under contract Who is your floodplain administrator? (department/position) Mayor who then assigns to City Engineer Are any certified floodplain managers on staff in your jurisdiction? City Engineering Under contract What is the date that your flood damage prevention ordinance was last amended? March 18, 2014 Does your floodplain management program meet or exceed minimum requirements? Meets • If exceeds, in what ways? When was the most recent Community Assistance Visit or Community Assistance Contact? Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? City Engineer is contracted Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? No • If no, is your jurisdiction interested in joining the CRS program? Yes/No How many flood insurance policies are in force in your jurisdiction?a 143 • What is the insurance in force? $48,642,200 • What is the premium in force? $58,006 How many total loss claims have been filed in your jurisdiction? Total closed paid policies 33 Insert appropriate information • How many claims are still open or were closed without payment? Insert appropriate information • What were the total payments for losses? $1,223,649 a. According to FEMA statistics as of MONTH XX, 201X City of Hilshire Village 10-7 Table 10-9. Community Classifications Participating? Classification Date Classified Community Rating System No Date Building Code Effectiveness Grading Schedule Yes Personal Class 5 and Commercial Class 5 8/2015 Public Protection Yes 1 2015 Storm Ready No Firewise No Table 10-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 10-8 Criterion Jurisdiction Ratinga Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. 10.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 10.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • MS4 Stormwater Plan in Progress • All Hazard Mitigation Plan 10.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified no plans or programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future. 10.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 10-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Hilshire Village. Other hazard events that broadly affected the entire planning area, including City of Hilshire Village are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 10-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Alicia 689 DR 1983 $2,299,792 Severe Weather (Wind) 36254 6/5/2011 $15,000 Hurricane Harvey 4332 DR 2017 $36,938,741 10.7 HAZARD RISK RANKING Table 10-12 presents a local ranking for City of Hilshire Village of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. City of Hilshire Village 10-9 Table 10-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 2 Hurricane 32 High 3 Flooding 18 Medium 4 Earthquake 14 Low 5 Wild Fire 6 Low 5 Drought 6 Low 5 Hazardous materials 6 Low 6 Coastal Erosion 0 (No Exposure) None 6 Tsunami 0 (No Exposure) None 6 Mass Movements 0 (No exposure) None 6 Dam Failure 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 10.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 10.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 1 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 1 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0 10.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issue has been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Age and type of the tree canopy. Mitigation actions addressing this issue were prioritized for consideration in the action plan in this annex. 10.9 STATUS OF PREVIOUS PLAN ACTIONS Table 10-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. 10.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 10-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 10-15 identifies the priority for each action. Table 10-16 summarizes the mitigation actions by hazard of concern and mitigation type. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 10-10 Table 10-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update 2014HILVIL001 — Revise drainage ordinance to require detention for future development and redevelopment yes Comment: The City has a new development coming in off Westview. They are installing underground detention and will tie into the City of Houston’s drainage system. City has adopted an ordinance that states the maximum coverage of any lot with any non- constructed surface shall not exceed 55 percent of the lot area located behind the required front building line and shall not exceed 50 percent of the lot area located in front of the required front building line. Also, the City amended its drainage guidelines to not allow rain gutter downspouts to be tied into existing or proposed underground storm sewer lines that drain directly into the City’s ditches on the front and/or side of the owner’s property, nor shall they be extended to tie directly into the City’s ditches. Rain gutter downspouts, however, may be tied into: (a) on-site (below ground) retention features that would allow storm water to percolate into the ground; or (b) on-site (below ground) retention features to re-use storm water runoff for “green” applications such as irrigation. 2014HILVIL002 — Update and adopt higher standards to enhance floodplain management and incorporate into the local FDPO. yes Comment: The City recently approved an ordinance that requires the maximum coverage of any lot with any non-constructed surface shall not exceed 55 percent of the lot area located behind the required front building line and shall not exceed 50 percent of the lot area located in front of the required front building line. Also, the City amended its drainage guidelines to not allow rain gutter downspouts to be tied into existing or proposed underground storm sewer lines that drain directly into the City’s ditches on the front and/or side of the owner’s property, nor shall they be extended to tie directly into the City’s ditches. Rain gutter downspouts, however, may be tied into: (a) on-site (below ground) retention features that would allow storm water to percolate into the ground; or (b) on-site (below ground) retention features to re-use storm water runoff for “green” applications such as irrigation. 2014HILVIL003 — Retrofit critical infrastructure (City Hall – Emergency Command Center) with impact and wind resistant glass no Yes HIL5 Comment: Project started – Did research on building. The roof is rated for 110 mph Class B. Need to have windows and building inspected 2014HILVIL004 — Retrofit and harden roofing of critical infrastructure (City Hall – Emergency Command Center) to industry accepted high-wind building standards. yes Comment: Inspected roof to make sure it was met Hurricane standards and was in good shape – It was. 2014HILVIL005 — Develop/Implement tree management program and mitigation measures Yes Comment: The City is pro-active with notifying residence of dead trees and asking them to remove. CenterPoint comes through the City and trims trees that might cause damage to their infrastructure. The City has signed an Inter-Local Agreement with Harris County for debris mitigation after a disaster 2014HILVIL006 — Expand early warning alarm system (Code Red Mass Notification System) to increase coverage of the Community’s population. Yes Comment: The City utilizes the Nixle Mass Notification System provided by the Police Department. The Nixle system is established and reaches the City’s community. The Police Department also has the capability to use Harris County Reverse 911 for Hilshire Village 2014HILVIL007 — Join FireWise to educate community on wildfire risks and provide actions to take to protect property and equipment from wildfire damages. No Yes HIL8 Comment: Started – Working with the Fire Department on ordering material and scheduling a safety awareness meeting. Fire Department has had several awareness meeting and the City is scheduling to have a City Hall after material arrives 2014HILVIL008 — Install drought-resistant landscaping (xeriscaping) in common and public areas as part of the water conservation program No Yes HIL9 Comment: Started – Working on replacing landscaping in common areas that are drought resistant. The City has also adopted a Draught Contingency Plan City of Hilshire Village 10-11 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update 2014HILVIL009 — Installation of a rainwater collection system for irrigation/sprinkler systems to mitigate drought conditions at City Hall No Yes HIL10 Comment: Have not started 2014HILVIL010 — Install/Improve lighter color roofing of critical infrastructure (City Hall – Emergency Command Center) No Removed, not feasible Comment: Have not started 2014HILVIL011 — Install cover and freeze insulation protection of above ground public irrigation systems/equipment to mitigate damage from freezing temperatures. No Yes HIL12 Comment: started 2014HILVIL012 — Installation of signs prohibiting/banning the commercial transportation of hazardous materials through the City No Yes HIL13 Comment: Started Added no thru truck signs in several locations – ordered signs for additional locations 2014HILVIL013 — Identify exposed/above ground energy pipelines in flood hazard area yes Comment: Completed – The City has no pipelines running through the City 2010HILVIL001 — Expand early Warning Community Notification system (Code Red Mass Notification System) to provide coverage to residents that would be impacted by flooding. yes Comment: The City utilizes the Nixle Mass Notification System provided by the Police Department. The Nixle system is established and reaches the City’s community. The Police Department also has the capability to use Harris County Reverse 911 for Hilshire Village 2010HILVIL003 — Non Structural Mitigation Measure – Buried power lines, and generators Install generators at critical facilities to sustain critical operations from power outages due to damages from hazards. No Yes HIL7 Comment: CenterPoint will not bury power lines because this is cost prohibitive and there is limited access due to the area being wooded. The City Hall has a generator installed, but the City still needs a generator at its Lift Station. 2010HILVIL004 — Develop a Residential debris and tree management program to reduce damages from high-winds No Yes HIL14 Comment: This is an ongoing activity. The City maintains ravines and gullies to minimize flooding. The City will implement this activity every other year and is before City Council in 2016. The City is proactive in managing tree/wooded areas of the community. CenterPoint also maintains tree line to prevent damage to over-head power lines. 2010HILVIL005 — Implement Non Structural Mitigation Measures by burying power lines to reduce damages to electrical lines from high-winds. No Yes Comment: CenterPoint will not bury power lines because this is cost prohibitive and there is limited access due to the area being wooded. 2010HILVIL006 — Develop a Residential debris and tree management program to reduce damages from high-winds No Yes HIL14 Comment: This is an ongoing activity. The City maintains ravines and gullies to minimize flooding. The City will implement this activity every other year and is before City Council in 2016. The City is proactive in managing tree/wooded areas of the community. CenterPoint also maintains tree line to prevent damage to over-head power lines. 2010HILVIL007 — Install/expand community early warning system (Code Red Mass Notification System) to increase coverage to the community’s population yes Comment: The City utilizes the Nixle Mass Notification System provided by the Police Department. The Nixle system is established and reaches the City’s community. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 10-12 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update 2010HILVIL008 — Install lightning and surge protection measures for critical infrastructure yes Comment: Lift Station and City Hall has surge protection. 2010HILVIL012 — Develop/implement groundwater contingency planning/measures for Critical Infrastructure and Fire Protection deleted Comment: Not Started. This action is no longer feasible. TCEQ requires cities to install pressure boosters for fire protection. However, the City does not have a water facility and received a waiver and exemption. The Project Cost was estimated in the millions and was considered an undue hardship. 2010HILVIL0014 — Install/Expand a Community early warning system (Code Red Mass Notification System) to increase coverage to the community’s population yes Comment: The City utilizes the Nixle Mass Notification System provided by the Police Department. The Nixle system is established and reaches the City’s community. 2010HILVIL016 — Clean-up of heavy wildfire fuel areas (abandoned buildings, abandoned lands, etc.). yes Comment: Renovated and cleaned up. The commercial area has been cleaned up 2010HILVIL018 — Develop/implement tree management planning and mitigation measures. Bury Power lines yes Comment: Completed – New ordinance approved and it has become an ongoing policy now to keep trees trimmed in the right of way. CenterPoint will not bury transmission power lines. However, some residents have self-funded their service lines being buried 2010HILVIL020 — Develop relationship with local LEPC. yes Comment: The six Memorial Villages in conjunction with the Village Fire Department have developed a plan to pull resources and have a unified EOC. The plan has been tested and will be an ongoing development. 2010HILVIL022 — Develop relationship with local LEPC yes Comment: Started Added no thru truck signs in several locations – ordered signs for additional locations Table 10-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HIL1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Severe weather, drought, earthquake, flooding, wildfire, flooding, hurricane Existing 3, 4, 10 Public Works TBD High HMGP, PDM, FMA Short-term Action HIL2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including development and drainage. Hazards Mitigated: Severe weather, drought, earthquake, flooding, wildfire, flooding, hurricane New and Existing 1, 3, 4, 5, 7, 8, 10 Building Harris County, Houston- Galveston Council of Governments Low Staff Time, General Funds Ongoing Action HIL3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe weather, hurricane, flooding, wild fire, drought, earthquake New and Existing 1, 5, 8 Public Works Harris County Low Staff Time, General Funds Short-term City of Hilshire Village 10-13 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HIL4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: flooding, severe weather, tsunami, sea level rise New and Existing 1, 3, 5, 7, 8, 10 Public Works Building Department, Harris County, Houston Galveston Council of Governments Low Staff Time, General Funds Ongoing Action HIL5 — Retrofit critical infrastructure (City Hall – Emergency Command Center) with impact and wind resistant glass Hazards Mitigated: Severe weather, Hurricane Existing 10, 11, 13, 15 Public Works TBD Medium Staff time, General Funds, Hazard Mitigation Grant Program, Pre- Disaster Mitigation, Flood Mitigation Assistance, other grant opportunities Short Term Action HIL6 — The City maintains ravines and gullies to minimize flooding. The City will implement this activity every other year. The City is proactive in managing tree/wooded areas of the community. CenterPoint also maintains tree line to prevent damage to over-head power lines. Hazards Mitigated: Severe weather, hurricane, flooding. Existing 2, 8, 11, 13, 15 Public Works TBD Medium Staff time, general fund, Hazard Mitigation Grant Program, Pre- Disaster Mitigation, Flood Mitigation Assistance, other grant opportunities Ongoing Action HIL7 — Install generators at critical facilities to sustain critical operations from power outages due to damages from hazards. Hazards Mitigated: Severe weather, hurricane, flooding Existing 2, 11, 13, 15 Public Works TBD $100,000 Staff time, general fund, Hazard Mitigation Grant Program, Pre- Disaster Mitigation, other grant opportunities Short Term Action HIL8 — Join FireWise to educate community on wildfire risks and provide actions to take to protect property and equipment from wildfire damages. Hazards Mitigated: Wild fire Existing 1, 2 Administrati on Harris County, Houston Galveston Area Council of Governments Low Staff time, general fund Short Term Action HIL9 — Install drought-resistant landscaping (xeriscaping) in common and public areas as part of the water conservation program Hazards Mitigated: Drought Existing 2, 8, 11, 15 Public Works Harris County, Houston Galveston Area Council of Governments Medium Staff time, general fund. Long Term Action HIL10 — Installation of a rainwater collection system for irrigation/sprinkler systems to mitigate drought conditions at City Hall Hazards Mitigated: Drought New 7, 8, 10 Public Works TBD Medium Staff time, general fund, grant opportunities Ongoing Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 10-14 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HIL11 — Maintenance and improvement of the Harris County drainage channel #W 140-04-00, to mitigate severe weather hazards. Hazards Mitigated: Severe weather, flooding, hurricane Existing 2, 8, 11 Public Works Harris County Flood Control, Harris County, Galveston Area Council of Governments Medium general fund, Hazard Mitigation Grant Program, Pre-Disaster Mitigation Long Term Action HIL12 — Install cover and freeze insulation protection of above ground public irrigation systems/equipment to mitigate damage from freezing temperatures. Hazards Mitigated: Severe weather Existing 11, 13 Public Works TBD Medium Staff time, general fund Short Term Action HIL13 — Installation of signs prohibiting/banning the commercial transportation of hazardous materials through the City Hazards Mitigated: Hazardous material Existing 6, 11 Public Works Low Staff time, General Fund Short Term Action HIL14 — Develop a Residential debris and tree management program to reduce damages from high-winds Hazards Mitigated: Severe weather, hurricane Existing 4, 8, 11, 15 Public Works CenterPoint Energy, Building Department Harris County Medium Staff time, general fund, Hazard Mitigation Grant Program. Ongoing Action HIL15— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wild Fire, Drought, Earthquake New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Hilshire Village HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 10-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya HIL1 3 High High Yes Yes No Medium High HIL2 7 Medium Low Yes No Yes High Low HIL3 3 Low Low Yes No Yes High Low HIL4 6 Medium Low Yes No Yes High Low HIL5 4 Medium Medium Yes Yes No Medium High HIL6 5 High Medium Yes Yes Yes High Medium HIL7 4 High Medium Yes Yes No High High HIL8 2 Low Low Yes No Yes Low Low HIL9 4 Low Medium Yes No No Low Low HIL10 3 Low Medium Yes Yes Yes Low Low City of Hilshire Village 10-15 Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya HIL11 3 Medium Medium Yes Yes No Medium Medium HIL12 2 Medium Medium Yes No No Medium Low HIL13 2 High Low Yes No Yes High Low HIL14 4 High Medium Yes Yes No Medium Medium HIL15 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 10-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather HIL 2, 3, 4, 15 HIL 1, 6 HIL 4, 15 HIL 3, 6, 11 HIL 7, 14, 15 HIL 5, 12 HIL 3, 15 Hurricane HIL 2, 3, 4, 15 HIL 1, 6 HIL 4, 15 HIL 3, 6, 11 HIL 7, 14, 15 HIL 5 HIL 3, 15 Medium-Risk Hazards Flooding HIL 2, 3, 4, 15 HIL 4, 15 HIL 3, 6, 11 HIL 7, 14, 15 HIL 5 HIL 4 HIL 3, 15 Low-Risk Hazards Wild Fire HIL 2, 3, 15 HIL 1, 6 HIL 8, 14, 15 HIL 3, 14 HIL 7, 14, 15 HIL 3, 15 Drought HIL 2, 3, 15 HIL 1 HIL15 HIL 3 HIL15 HIL 10 HIL 9, 10 HIL 3, 15 Earthquake HIL 2, 3, 15 HIL 1 HIl15 HIL 3 HIL15 HIL 3, 15 Hazardous Materials HIL 2, 3, 15 HIL 1 HIL 13, 15 HIL 3 HIL15 HIL 3, 15 a. See the introduction to this volume for explanation of mitigation types. 10.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed for this annex. • Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. !(!(!(!(!(§¨¦10§¨¦10HoustonSpring ValleyHuntersCreekVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.070.140.035Miles±Hilshire Village §¨¦10 §¨¦10 Houston Spring Valley Hunters Creek Village FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.07 0.140.035 Miles ± Hilshire Village §¨¦10 §¨¦10 Houston Spring Valley Hunters Creek Village Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.07 0.140.035 Miles ± Hilshire Village §¨¦10 §¨¦10 Houston Spring Valley Hunters Creek Village 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.07 0.140.035 Miles ± Hilshire Village §¨¦10 §¨¦10 Houston Spring Valley Hunters Creek Village 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.07 0.140.035 Miles ± Hilshire Village §¨¦10 §¨¦10 Houston Spring Valley Hunters Creek Village Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.07 0.140.035 Miles ± Hilshire Village §¨¦10 §¨¦10 Houston Spring Valley Hunters Creek Village Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.07 0.140.035 Miles ± Hilshire Village 11-1 11. CITY OF HUMBLE 11.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact James Nykaza, Emergency Management Coordinator 110 W. Main Street Humble, Texas, 77338 Telephone: 281-446-4928 e-mail Address: jnykaza@cityofhumble.net Stephen Forbes 110 W. Main Street Humble, Texas, 77338 Telephone: 281-446-4928 e-mail Address: sforbes@cityofhumble.net 11.2 JURISDICTION PROFILE 11.2.1 Location The City of Humble is in Harris County, Texas. It is located within the Houston metropolitan area. The current boundaries generally extend from San Jacinto River to north of Greens Road, encompassing an area of 10 square miles. 11.2.2 History Humble became an oil boomtown in the early 20th century after oil was discovered there in 1903. By 1905 the Humble oilfield was the largest producing oilfield in Texas. Humble was home of Humble Oil, a predecessor of Exxon. The City of Humble was incorporated in 1933. 11.2.3 Climate The climate of City of Humble is characterized by hot, humid summers and generally mild to cool winters. 11.2.4 Governing Body Format The City government is a council-manager form. It consists of a mayor, five council members and a city manager. The City of Humble assumes responsibility for the adoption of this plan; Harris County will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 11-1. Table 11-1. Local Mitigation Planning Team Members Name Title James Nykaza EMC Stephen Forbes Asst. EMC Mark Smith Deputy Building Official Mark Arnold Asst. Director Public Works Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 11-2 11.3 CURRENT TRENDS 11.3.1 Population According to United States Census Bureau, the population of City of Humble as of April 2010 was 15,133. Since 2010, the population has grown at an average annual rate of 5.8 percent. 11.3.2 Development The anticipated development of the City of Humble is moderate to high. The City of Humble has seen a high growth in commercial development and a low growth in residential development. The City of Humble is adopting a Strategic Plan in January 2019 and will focus on the growth and development of the City of Humble. Table 11-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Table 11-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. • If yes, who currently has permitting authority over these areas? Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas Townsen Blvd area west of US 59. This area is in the 100 -500 year flood plain. How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 16 23 22 25 15 Multi-Family 0 0 1 1 0 Other (commercial, mixed use, etc.) 13 12 15 19 23 Total 29 35 37 44 38 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 0 • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. The buildout of the City of Humble is at 75%. City of Humble 11-3 11.4 CAPABILITY ASSESSMENT City of Humble performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 11-3. • Development and permitting capabilities are presented in Table 11-4. • An assessment of fiscal capabilities is presented in Table 11-5. • An assessment of administrative and technical capabilities is presented in Table 11-6. • An assessment of education and outreach capabilities is presented in Table 11-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 11-8. • Classifications under various community mitigation programs are presented in Table 11-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 11-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Table 11-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No No No Comment: Ord. 19-836, Adopted 2/14/2019, ICC 2018 Zoning Code No No No No Comment: Subdivisions No No No No Comment: Stormwater Management Yes No Yes No Comment: Post-Disaster Recovery Yes No Yes No Comment: Real Estate Disclosure No No No No Comment: Growth Management No No No No Comment: Site Plan Review Yes No No No Comment: Ord. 18-816, Adopted 2/22/2018 Environmental Protection No Yes No Yes Comment: Flood Damage Prevention Yes No No No Comment: Ord. 18-816, Adopted 2/18/2018 Emergency Management Yes No No No Comment: Ord. 19-841, Adopted rev.- 04/11/2019 Climate Change No Yes No Yes Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 11-4 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Planning Documents General Plan Yes No Yes No Comment: Capital Improvement Plan Yes No Yes No How often is the plan updated? Yearly Comment: Water, sewer and roads Disaster Debris Management Plan Yes No Yes Yes Comment: FEMA approved July 2019 Floodplain or Watershed Plan Yes No Yes Yes Comment: Stormwater Plan Yes No Yes No Comment: Urban Water Management Plan Yes No Yes No Comment: Habitat Conservation Plan No Yes No No Comment: Economic Development Plan Yes Yes No No Comment: Shoreline Management Plan No Yes No No Comment: Community Wildfire Protection Plan No Yes No No Comment: Forest Management Plan No Yes No No Comment: Climate Action Plan No Yes No No Comment: Comprehensive Emergency Management Plan Yes No Yes Yes Comment: Partner with Harris County Threat & Hazard Identification & Risk Assessment (THIRA) Yes No Yes Yes Comment: Post-Disaster Recovery Plan Yes No Yes Yes Comment: Continuity of Operations Plan Yes No Yes Yes Comment: Public Health Plan No Yes Yes No Comment: Other No No No No Comment: Table 11-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Building Dept. Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? Yes City of Humble 11-5 Table 11-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes Incur Debt through General Obligation Bonds No Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes Other No Table 11-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Public Works and Building Department Engineers or professionals trained in building or infrastructure construction practices Yes Public Works Planners or engineers with an understanding of natural hazards Yes Public Works Staff with training in benefit/cost analysis Yes Emergency Management Surveyors Yes Can Contract Personnel skilled or trained in GIS applications Yes Public Works Scientist familiar with natural hazards in local area Yes Can Contract Emergency manager Yes Emergency Management Grant writers Yes Can Contract Other No Table 11-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? No Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. Emergency Management website Do you use social media for hazard mitigation education and outreach? No • If yes, briefly describe. Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Swift 911 Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Swift 911 Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 11-6 Table 11-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Humble Building Department Who is your floodplain administrator? (department/position) Building Official Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? January 2019 Does your floodplain management program meet or exceed minimum requirements? Meets • If exceeds, in what ways? When was the most recent Community Assistance Visit or Community Assistance Contact? Unknown Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes • If so, what type of assistance/training is needed? Training Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? • If no, is your jurisdiction interested in joining the CRS program? Yes How many flood insurance policies are in force in your jurisdiction?a 927 • What is the insurance in force? $275183900 • What is the premium in force? $604760 How many total loss claims have been filed in your jurisdiction?a 829 • How many claims are still open or were closed without payment? 92 • What were the total payments for losses? $55176554.06 a. According to FEMA statistics as of September 30, 2018 Table 11-9. Community Classifications Participating? Classification Date Classified Community Rating System No N/A Date Building Code Effectiveness Grading Schedule Yes 7 Jan 23, 2019 Public Protection Yes 2 2014 Storm Ready No N/A Date Firewise No N/A Date City of Humble 11-7 Table 11-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts High Comment: Due to numerous years of flooding Jurisdiction-level monitoring of climate change impacts Medium Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Medium Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Unsure Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 11-8 11.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 11.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Harris County All Hazards Mitigation Plan 11.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified no plans or programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future. 11.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 11-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Humble. Other hazard events that broadly affected the entire planning area, including City of Humble, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 11-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey DR4332 2017 N/A Flooding DR 4269 2016 N/A Flooding DR 4272 2016 N/A Hurricane Ike 1791 DR 2008 N/A Hurricane Rita 1606 DR 2005 N/A Tropical Storm Allison 1379 DR 2001 N/A 11.7 HAZARD RISK RANKING Table 11-12 presents a local ranking for City of Humble of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. City of Humble 11-9 Table 11-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Dam Failure 26 Medium 3 Flood 18 Medium 4 Wildfire 17 Medium 5 Earthquake 14 Low 6 Drought 6 Low 7 Mass Movement 0 (No Exposure) None 7 Tsunami 0 (No Exposure) None 7 Coastal Erosion 0 (No Exposure None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 11.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 11.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 48 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 4 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 1 11.8.2 Other Noted Vulnerabilities No jurisdiction-specific issues were identified through review of the results of the risk assessment, public involvement strategy, and other available resources. 11.9 STATUS OF PREVIOUS PLAN ACTIONS Table 11-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. 11.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 11-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 11-15 identifies the priority for each action. Table 11-16 summarizes the mitigation actions by hazard of concern and mitigation type. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 11-10 Table 11-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Retrofit and harden critical infrastructure facilities to withstand severe thunderstorms, hurricane winds and hail X HUM9 Comment: Not Started Harden and retrofit communications tower to withstand high winds. X Comment: Removed due to changing radio systems Develop a public education/outreach program to educate the public on thunderstorms and wildfire hazards and the appropriate actions to take to protect property and equipment. X HUM10 Comment: Develop a public education/outreach program to inform the public on wildfire/drought/extreme heat hazards and appropriate actions to take to protect personal property and equipment during wildfire/drought/extreme heat conditions. X Comment: Remove no longer needed Adopt latest and higher Development/Modification of building standard building codes for, zoning/ city/storm water ordinances for mitigation of Riverine flood hazards to manage development in flood areas and reduce property damage. X Comment: Not Started Development/Modification of Adopt latest and higher standard building codes / ordinances for to harden and retrofit city buildings to withstand mitigation of hurricane wind hazards. High-wind damages. X Comment: Phase 1 Consisted of working with administration to improve code/ordinance. A proposal was submitted to adopt 2012 building codes. Complete Phase 2: Adopt buildings codes for all city buildings. Research new standard and impact upon building affordability, insurability and compliance with such existing requirements as accessibility under ADA, etc. Increase Expand early warning system- Mass Notification alert capabilities for to increase coverage of community’s public/private schools and colleges X Comment: Develop/expand community early warning system Mass Notification to enhance coverage to the community’s population/general public. X Comment: Purchase the use of a communications software for notification. Swift911 Develop/implement tree management planning and mitigation measures. X Comment: Phase 1 – In May 2012, Public Works utilized contractors to remove all dead or damaged trees and foliage on City maintained property (utilizing existing funds). Phase 2 – Implement and improve tree management program to limit debris damage to critical infrastructure and public facilities from falling tree canopy. City of Humble 11-11 Table 11-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HUM1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, wildfire, Hurricane, Severe Weather New 3, 4, 10 City Administration TBD High HMGP, PDM, FMA Short-term Action HUM2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including all new construction. Hazards Mitigated: Dam failure, drought, earthquake, flooding, wildfire New and Existing 1, 2, 3, 4, 5, 6, 7 City Administration TBD Low Staff Time, General Funds Ongoing Action HUM3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Dam Failure, Flood, Wildfire, Earthquake, Drought New and Existing 3,7,9,10 City Administration TBD Low Staff Time, General Funds Short-term Action HUM4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Dam failure, flooding, severe weather New and Existing 3,7,10 City Administration TBD Low Staff Time, General Funds Ongoing Action HUM5 — Implement Non-Structural Mitigation Measures by burying power lines to reduce damages to electrical lines from high- winds. Hazards Mitigated: Severe Weather, Hurricane New 6,11 City Administration TBD low HMGP, PDM, FMA Short-term Action HUM6 — Install Backup power system generators to enable critical facilities to continue basic services, which can be used by critical facilities to ensure security and protect refrigerated goods. Hazards Mitigated: Severe Weather, Hurricane, Dam Failure, Flood, Wildfire, Earthquake, Drought New and Existing 11 City Administration TBD Low HMGP, PDM Short-term Action HUM7 — Improve drainage channels to increase flow rate and increased retention areas. Hazards Mitigated: Flooding, Severe Weather, Hurricane New and Existing 7,8,9,10,11, City Administration TBD Moderate HMGP, PDM Long-term Action HUM8- Harden 911 Communications Center Hazards Mitigated: Severe Weather, Hurricane, Dam Failure, Flood, Wildfire, Earthquake, Drought New and Existing 10,11 City Administration TBD Low PDM, HMGP Short-term Action HUM9 — Retrofit and harden critical infrastructure facilities to withstand severe thunderstorms, hurricane winds and hail Hazards Mitigated: Severe Weather, Hurricane New and Existing 10,11,13 City Administration TBD High Grant funds Long-term Action HUM10 — Develop a public education/outreach program to educate the public on thunderstorms and wildfire hazards and the appropriate actions to take to protect property and equipment. Hazards Mitigated: Severe Weather, Wildfire Existing 1 City Administration TBD Low Staff time, General funds Short term Action HUM11— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Dam Failure, Flood, Wildfire, Earthquake, Drought New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Humble HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 11-12 Table 11-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya HUM1 3 Low Medium Yes Yes No Medium Low HUM2 7 Medium Low Yes No Yes High Low HUM3 4 Low Low Yes No Yes High Low HUM4 3 Medium Low Yes No Yes High Low HUM5 2 High High Yes Yes No Medium Low HUM6 1 Low Low Yes Yes Yes Low High HUM7 5 High Medium Yes Yes No High High HUM8 2 Medium Low Yes Yes Yes Medium High HUM9 3 High High Yes Yes No High High HUM10 1 Medium Low Yes No Yes Medium Low HUM11 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 11-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather 1,5,9, 11 1,9 10, 11 7 8, 11 1,6,7,8,9 7 3, 11 Hurricane 1, 5, 9, 11 1, 9 11 7 8, 11 1,6,7,8,9 7 3, 11 Medium-Risk Hazards Dam Failure 2,4,9, 11 2,4,9 11 8, 11 2,6,8,8 7 2,3,4, 11 Flooding 1,2,4,5,9, 11 1,2,4,9 11 7 8, 11 1,2,6,7,8,9 7 2,3,4, 11 Wildfires 1,2,5,9, 11 1,2,9 10, 11 8, 11 1,2,6,8,9 2,3, 11 Low-Risk Hazards Earthquake 2,5,9, 11 2,9 11 8, 11 2,6,8,9 2,3, 11 Drought 2,5,9, 11 2,9 11 11 2,9 2,3, 11 a. See the introduction to this volume for explanation of mitigation types. 11.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed for this annex. • City of Humble Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • City of Humble Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(§¨¦69§¨¦69HoustonCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.510.25Miles±Humble §¨¦69 §¨¦69 Houston FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.5 10.25 Miles ± Humble §¨¦69 §¨¦69 Houston Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.5 10.25 Miles ± Humble §¨¦69 §¨¦69 Houston 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.5 10.25 Miles ± Humble §¨¦69 §¨¦69 Houston 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.5 10.25 Miles ± Humble §¨¦69 §¨¦69 Houston Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.5 10.25 Miles ± Humble §¨¦69 §¨¦69 Houston Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.5 10.25 Miles ± Humble 12-1 12. CITY OF HUNTERS CREEK VILLAGE 12.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Tom Fullen, City Administrator 1 Hunters Creek Place Houston, TX 77024 (713) 465-2150 tfullen@cityofhunterscreek.org James Stewart, Building Official / Director of Public Works. 1 Hunters Creek Place Houston, TX 77024 (713) 465-2150 jstewart@cityofhunterscreek.org 12.2 JURISDICTION PROFILE 12.2.1 Location The City of Hunters Creek Village is a municipality in the southwestern area of Harris County. The current boundaries are generally Lindenwood Drive on the east, Buffalo Bayou and Voss Road on the south, I-10 on the north, and Hedwig Road on the west. The City encompasses an area of 1.9 square miles. 12.2.2 History The City of Hunters Creek Village was incorporated in 1954 as a Type-A General Law City. The City of Hunters Creek Village consists of approximately 1,500 single-family dwellings; one privately owned and members only social, recreational, and fitness club, one elementary school, two churches, one gas station, one funeral home, one medical imaging center, and other lots with a variety of independently operated businesses. Through the years the City has adopted ordinances establishing zoning regulations that have very effectively preserved the characteristics that are so well known as “the Memorial Villages.” The six Memorial Villages are independent cities that operate autonomously of Houston. All six of the villages are served by the Village Fire Department. The Memorial Villages Police Department serves provided Hunters Creek Village, Piney Point Village, and Bunker Hill Village. The other Villages are served independently. The six villages have executed an inter-local agreement and developed an emergency management guide for emergency needs. 12.2.3 Climate The climate of the City of Hunters Creek Village is characterized by relatively high temperatures and evenly distributed precipitation throughout the year with legendary humidity. 12.2.4 Governing Body Format The City of Hunters Creek Village is considered a Type-A General Law City and is governed by a Mayor and five Council Members elected at large. A Type-A General Law City is one that had at the time of its incorporation 600 or more inhabitants. General Law Cities have a population less than 5,000 and are authorized to do only what the State Constitution or Legislature has authorized. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 12-2 The City Council assumes responsibility for the adoption of this plan; the City Administrator will oversee its implementation. Table 12-1 lists members of the jurisdiction’s joint local mitigation planning team. Howard Miller, emergency management coordinator for the Village Fire Department, also participated in planning for the six Memorial Villages. Table 12-1. Local Mitigation Planning Team Members Jurisdiction Name / Title Phone Email City of Hunters Creek Village Tom Fullen, City Admin. 713-465-2150 tfullen@cityofhunterscreek.org City of Bunker Hill Village Karen Glynn, City Admin. 713-467-9762 KGlynn@bunkerhilltx.gov City of Hedwig Village Kelly Johnson, City Admin./Secretary 713-465-6009 kjohnson@hedwigtx.gov City of Hilshire Village Susan Blevins, City Admin/Secretary. Efrain Him 713-973-1779 Susan.blevins@hilshirevillagetexas.com Efrain.him@hdrinc.com City of Piney Point Village Roger Nelson, City Admin. 713-230-8703 cityadmin@pineypt.org City of Spring Valley Village Julie Robinson, City Admin. Arthur Faiello, PW Director 713-465-5306 832-910-8576 jrobinson@springvalleytx.com afaiello@springvalleytx.com 12.3 CURRENT TRENDS 12.3.1 Population According to the 2010 Census Data, the population of the City of Hunters Creek Village was 4,367. Since the 1990 Census, the population has been relatively stable. 12.3.2 Development The City of Hunters Creek Village is continuing to experience residential redevelopment of new, larger homes. City of Hunters Creek Village is landlocked by other municipalities; therefore there is no growth opportunity. Table 12-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. 12.4 CAPABILITY ASSESSMENT The City of Hunters Creek Village performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 12-3. • Development and permitting capabilities are presented in Table 12-4. • An assessment of fiscal capabilities is presented in Table 12-5. • An assessment of administrative and technical capabilities is presented in Table 12-6. • An assessment of education and outreach capabilities is presented in Table 12-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 12-8. • Classifications under various community mitigation programs are presented in Table 12-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 12-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. City of Hunters Creek Village 12-3 Table 12-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas The City of Hunters Creek Village is continuing to experience residential redevelopment of new, larger homes. How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 29 24 10 20 26 Multi-Family N/A N/A N/A N/A N/A Other (commercial, mixed use, etc.) N/A N/A N/A N/A N/A Total 29 24 10 20 26 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: #N/A • Landslide: # N/A • High Liquefaction Areas: # N/A • Tsunami Inundation Area: # N/A • Wildfire Risk Areas: # N/A Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. The City Hunters Creek Village continues to experience redevelopment of their residential lots; older homes are demolished and new homes constructed. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 12-4 Table 12-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes Yes Yes No Comment: International Bldg. Codes / Residential Codes are a State mandate Zoning Code Yes Yes Yes No Comment: General Law City Subdivisions Yes Yes Yes No Comment: Zoning Ordinance Stormwater Management Yes Yes Yes No Comment: TCEQ Post-Disaster Recovery Yes Yes Yes No Comment: Real Estate Disclosure No No No No Comment: Growth Management Yes No No No Comment: Zoning Ordinance Site Plan Review Yes Yes NO No Comment: Harris County Flood Control District Environmental Protection Yes Yes Yes Yes Comment: TCEQ and EPA Flood Damage Prevention Yes Yes No No Comment: Harris County Flood Control District Emergency Management Yes Yes No No Comment: Village Fire Department / Harris County Climate Change No No No No Comment: Planning Documents General Plan NA NA NA NA Comment: Capital Improvement Plan Yes No No Yes How often is the plan updated? Annually Comment: Disaster Debris Management Plan Yes Yes No Yes Comment: Harris County Floodplain or Watershed Plan Yes Yes No Yes Comment: Harris County Flood Control District Stormwater Plan Yes Yes Yes Yes Comment: Harris County Flood Control District Urban Water Management Plan Yes No No No Comment: Harris County Flood Control District Habitat Conservation Plan No Yes Yes No Comment: TCEQ and EPA Economic Development Plan No No No No Comment: Shoreline Management Plan No No No No Comment: City of Hunters Creek Village 12-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Community Wildfire Protection Plan Yes No No Yes Comment: Village Fire Department Forest Management Plan Yes No No Yes Comment: City Ordinance Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes Yes No Yes Comment: Village Fire Department Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes No Yes Comment: Village Fire Department Post-Disaster Recovery Plan Yes Yes No Yes Comment: Harris County Continuity of Operations Plan No No No No Comment: Public Health Plan Yes Yes Yes Yes Comment: City Ordinance and Texas Department of Health Table 12-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Building Department Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? Yes Table 12-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants No Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 12-6 Table 12-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes CobbFendley Associates Engineers or professionals trained in building or infrastructure construction practices Yes Building Official Planners or engineers with an understanding of natural hazards Yes CobbFendley Associates Staff with training in benefit/cost analysis Yes City Administrator Surveyors Yes CobbFendley Associates Personnel skilled or trained in GIS applications Yes CobbFendley Associates Scientist familiar with natural hazards in local area No n/a Emergency manager Yes City Administrator Grant writers Yes CobbFendley Associates Table 12-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. Links to County Agencies Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. Email / Text Alerts Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. N/A Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Mayor / Council Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Vlinc Email / Text Alerts City of Hunters Creek Village 12-7 Table 12-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Building Depart / City Engineer Who is your floodplain administrator? (department/position) City Engineer Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? 2001 Does your floodplain management program meet or exceed minimum requirements? Meets • If exceeds, in what ways? N/A When was the most recent Community Assistance Visit or Community Assistance Contact? N/A Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. N/A Are any RiskMAP projects currently underway in your jurisdiction? Yes • If so, state what they are. Outfall Rehabilitation Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. N/A Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes • If so, what type of assistance/training is needed? CFM Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? N/A • If no, is your jurisdiction interested in joining the CRS program? Yes How many flood insurance policies are in force in your jurisdiction?a 788 • What is the insurance in force? $270,932,500 • What is the premium in force? $336,552 How many total loss claims have been filed in your jurisdiction?a Unknown • How many claims are still open or were closed without payment? Unknown • What were the total payments for losses? $17,794,549 a. According to FEMA statistics as of March 28, 2019 Table 12-9. Community Classifications Participating? Classification Date Classified Community Rating System No N/A N/A Building Code Effectiveness Grading Schedule Yes 5 2017 Public Protection No N/A N/A Storm Ready No N/A N/A Firewise Yes 1 2017 Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 12-8 Table 12-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted High Comment: Public Capacity Local residents knowledge of and understanding of climate risk Unknown Comment: Local residents support of adaptation efforts Unknown Comment: Local residents’ capacity to adapt to climate impacts Unknown Comment: Local economy current capacity to adapt to climate impacts Unknown Comment: Local ecosystems capacity to adapt to climate impacts Unknown Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Hunters Creek Village 12-9 12.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 12.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Capital Improvement Plan – Studies existing infrastructure and allows planning of activities and projects to improve that infrastructure to mitigate identified hazards. • Disaster Debris Management Plan – Outlines actions to quickly remove hazards associated with disaster debris. • Floodplain or Watershed Plan – Ensures compliance with Federal Guidelines and Building Codes to eliminate potential hazards associated with flooding. • Storm Water Plan – Identification and repair of potential hazards associated with Storm water Infrastructure 12.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Building and Zoning Codes – Allows the review and mitigation of potential hazards during the planning and construction process. • Site Plan Review – Gives the City the ability to review potential hazards and have them corrected before permitting. • Flood Damage Prevention – Review and update the City’s Flood Damage Prevention Ordinance to include more stringent guidelines to reduce flood losses. 12.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 12-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of Hunters Creek Village. Other hazard events that broadly affected the entire planning area, including the City of Hunters Creek Village, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 12-11. Past Natural Hazard Events Date Damage Assessment Hurricane Harvey DR4332 2017 N/A Flooding DR 4269 2016 N/A Flooding DR 4272 2016 N/A Hurricane Ike 1791 DR 2008 N/A Hurricane Rita 1606 DR 2005 N/A Tropical Storm Allison 1379 DR 2001 N/A Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 12-10 12.7 HAZARD RISK RANKING Table 12-12 presents a local ranking for the City of Hunters Creek Village of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 12-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Hurricane/Coastal Storm 48 High 1 Severe Weather 48 High 2 Flooding 18 Medium 3 Earthquake 14 Low 4 Drought 6 Low 4 Dam/Levee Failure 6 Low 4 Mass Movements 6 Low 5 Wildfire 0 (No Exposure) None 5 Coastal Erosion 0 (No Exposure) None 5 Tsunami 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 12.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 12.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 30 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 1 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 3 12.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Flooding potential from close proximity to Buffalo Bayou • Severe tree damage potential from Hurricanes/Tornadoes Mitigation actions addressing these issues were prioritized for consideration in the action plan for this annex. 12.9 STATUS OF PREVIOUS PLAN ACTIONS Table 12-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. City of Hunters Creek Village 12-11 Table 12-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2014HNTCRK001 Implement a Public Outreach Program on Flooding to Educate residents on actions to reduce residential property damage. No 2014HNTCRK002 Develop new drainage ordinance to require detention for future development and redevelopment for detention. No 2014HNTCRK003 Strengthen Building Codes/Ordinances relative to job site (construction), debris removal management & removal of dead trees. No 2014HNTCRK004 Develop a tree management program to limit debris damage to critical infrastructure, public facilities from falling tree canopy due to high winds. Yes HNT9 2014HNTCRK005 Harden and retrofit critical infrastructure facilities to withstand high wind damages. No 2014HNTCRK006 Improve and enhance regulations with higher- standards/attest building codes for facilities to withstand severe thunderstorms, high winds and hail. No 2014 HNTCRK007 Retrofit City Hall and Public Works Maintenance Building with lightning and surge protection measures. Yes HNT8 2014HNTCRK014 Enhance use if upgraded warning system CodeRED using citywide mass notification system to enhance coverage of the community’s population. No 2014HNTCRK015 Install cover and freeze insulation protection of above ground irrigation and FDC connections in public facilities. Yes 2014HNTCRK020 Develop and adopt higher-standard/latest edition construction codes and ordinances to protect structures from severe wind damage. Yes HNT5 2014HNTCRK009 Implement a Public Education/Outreach Program on Extreme Heat to educate residents on actions to reduce property damage and health impacts within the community. NO 2014HNTCRK010 Improve public facility emergency power (by installing generators) to provide adequate cooling for use as a cooling center. No 12.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 12-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 12-15 identifies the priority for each action. Table 12-16 summarizes the mitigation actions by hazard of concern and mitigation type. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 12-12 Table 12-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HNT1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire Existing 3, 4, 10 Hunters Creek FEMA High HMGP, PDM, FMA Short-term Action HNT2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including Capital Improvements Plan, Zoning Ordinances Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 Hunters Creek Harris County Low Staff Time, General Funds Ongoing Action HNT3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Hurricane/Coastal Storm, Severe Weather, Flooding, Earthquake, Drought, Dam/Levee Failure, Mass Movements New and Existing 1, 5, 8 Harris County Hunters Creek Low Staff Time, General Funds Short-term Action HNT4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise New and Existing 1, 3, 5, 7, 8, 10 Hunters Creek FEMA Low Staff Time, General Funds Ongoing Action HNT5 — Strengthen existing Building Codes and Ordinances by adoption of updated/current Model Codes Hazards Mitigated: Hurricane/Coastal Storm, Earthquake, Flood, Wildfire New and Existing 4, 12, 14, 15 Hunters Creek Low Staff Time/General Funds Short-term Action HNT6 — Video inspection of City’s Storm Sewer System to identify and correct potential hazards. Hazards Mitigated: Flooding, Coastal Erosion, Mass Movements Existing 8, 10, 11 Hunters Creek Medium Staff Time/General Funds Ongoing Action HNT7 — Enhance the dissemination of Public Information with the use of the City’s V Link program. Hazards Mitigated: Hurricane/Coastal Storm, Severe Weather, Flooding, Earthquake, Drought, Dam/Levee Failure, Mass MovementsAll hazards New and Existing 1, 3, 9 Hunters Creek Police Department Low Staff Time/General Funds Ongoing Action HNT8 — Retrofit Public Works Maintenance Building with Back-Up Power Generator Hazards Mitigated: Hurricane/Coastal Storm, Earthquake, Flood New 1, 9, 11, 13 Hunters Creek Medium General Funds Short-term Action HNT9 — Development of a Tree Management Program to limit potential damage to critical infrastructure from falling trees or limbs. Hazards Mitigated: Hurricane/Coastal Storm, Earthquake, Wildfire New 5, 6, 7, 8 Hunters Creek Low Staff Time Short-term Action HNT10— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Hurricane/Coastal Storm, Severe Weather, Flooding, Earthquake, Drought, Dam/Levee Failure, Mass Movements New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Hunters Creek HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. City of Hunters Creek Village 12-13 Table 12-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya HNT1 3 High High Yes Yes No Medium High HNT2 7 Medium Low Yes No Yes High Low HNT3 3 Low Low Yes No Yes High Low HNT4 6 Medium Low Yes No Yes High Low HNT5 4 High Low Yes No Yes High Low HNT6 3 High High Yes Yes Yes High Low HNT7 3 High Low Yes No Yes High Low HNT8 4 Medium Medium Yes No Yes Medium Low HNT9 4 Medium Low Yes No Yes Medium Low HNT10 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 12-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Hurricane/ Coastal Storm HNT1, HNT3, HNT4, HNT5, HNT9, HNT10 HNT1, HNT3, HNT4, HNT5, HNT8, HNT9 HNT3, HNT4, HNT7, HNT10 HNT1, HNT3, HNT4, HNT5, HNT9 HNT3, HNT7, HNT8, HNT10 HNT1, HNT3, HNT5, HNT8 HNT3 HNT3, HNT7, HNT10 Severe Weather HNT1, HNT3, HNT4, HNT5, HNT9, HNT10 HNT1, HNT3, HNT4, HNT5, HNT8, HNT9 HNT3, HNT4, HNT7, HNT10 HNT1, HNT3, HNT4, HNT5, HNT9 HNT3, HNT7, HNT8, HNT10 HNT1, HNT3, HNT5, HNT8 HNT3 HNT3, HNT7, HNT10 Medium Risk Hazards Flooding HNT1, HNT2, HNT3, HNT4, HNT5, HNT6, HNT10 HNT1, HNT2, HNT3, HNT4, HNT5, HNT6, HNT8 HNT3, HNT4, HNT7, HNT10 HNT1, HNT2, HNT3, HNT4, HNT5, HNT6 HNT 3, HNT7, HNT8 HNT10, HNT1, HNT2, HNT3, HNT5, HNT6, HNT8 HNT3 HNT3, HNT7, HNT10 Low-Risk Hazards Mass Movements HNT1, HNT2, HNT3, HNT6, HNT10 HNT1, HNT2, HNT3, HNT6 HNT3, HNT7, HNT10 HNT1, HNT2, HNT3, HNT6 HNT3, HNT7, HNT10 HNT1, HNT2, HNT3, HNT6 HNT3 HNT3, HNT7, HNT10 Earthquake HNT1, HNT2, HNT3, HNT5, HNT9, HNT10 HNT1, HNT2, HNT3, HNT5, HNT8, HNT9 HNT3, HNT7, HNT10 HNT1, HNT2, HNT3, HNT5, HNT9 HNT3, HNT7, HNT8, HNT10 HNT1, HNT2, HNT3, HNT5, HNT8 HNT3 HNT3, HNT7, HNT10 Drought HNT2, HNT3, HNT10 HNT2, HNT3 HNT3, HNT7, HNT10 HNT2, HNT3 HNT3, HNT7, HNT10 HNT2, HNT3 HNT3 HNT3, HNT7, HNT10 Dam/Levee Failure HNT2, HNT3, HNT10 HNT2, HNT3 HNT3, HNT7, HNT10 HNT2, HNT3 HNT3, HNT7, HNT10 HNT2, HNT3 HNT3 HNT3, HNT7, HNT10 a. See the introduction to this volume for explanation of mitigation types. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 12-14 12.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • The City of Hunters Creek Village Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • The City of Hunters Creek Village Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. !(!(!(!(!(§¨¦10§¨¦10HoustonSpring ValleyHilshireVillageHedwigVillagePiney PointVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.20.40.1Miles±Hunters Creek Village §¨¦10 §¨¦10 Houston Spring Valley Hilshire Village Hedwig Village Piney Point Village FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Hunters Creek Village §¨¦10 §¨¦10 Houston Spring Valley Hilshire Village Hedwig Village Piney Point Village Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Hunters Creek Village §¨¦10 §¨¦10 Houston Spring Valley Hilshire Village Hedwig Village Piney Point Village 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Hunters Creek Village §¨¦10 §¨¦10 Houston Spring Valley Hilshire Village Hedwig Village Piney Point Village 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Hunters Creek Village §¨¦10 §¨¦10 Houston Spring Valley Hilshire Village Hedwig Village Piney Point Village Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Hunters Creek Village §¨¦10 §¨¦10 Houston Spring Valley Hilshire Village Hedwig Village Piney Point Village Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Hunters Creek Village 13-1 13. CITY OF JERSEY VILLAGE 13.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Mark Bitz, Fire Chief / EMC 16501 Jersey Drive Jersey Village, Texas 77040 Telephone: 713-466-2130 e-mail Address: mbitz@jerseyvillagetx.com Austin Bleess, City Manager 16501 Jersey Drive Jersey Village, TX 77040 Telephone: 713-466-2109 e-mail Address: Ableess@jerseyvillagetx.com 13.2 JURISDICTION PROFILE 13.2.1 Location Jersey Village is in Northwest Harris County. The current boundaries generally extend from Highway 290 at Sam Houston Tollway West to Eldridge Parkway from FM 529 North up Jones Road to the 8800 block, from the Sam Houston Tollway to Eldridge Parkway, encompassing an area of 3.5 square miles. 13.2.2 History City of Jersey Village was incorporated in April 16, 1956. The 1936 Harris County highway map indicated several residences in the area. Clark W. Henry owned 1,236 acres of land on which he operated F&M Dairy and raised Jersey cattle. Henry discontinued his dairy when his health declined, and he gave the land up so a residential community could be built in 1953. Henry and LeRoy Kennedy, members of the Garden Oaks Baptist Church, began developing the community in February 1954. At first the city had 5 miles of streets and drainage, gas, sewage, and water services. Several houses were established along Jersey Drive. The first family moved to the subdivision in late October 1954. The community developed a school, a park, and an 18-hole golf course. When Jersey Village incorporated on April 16, 1956, all 58 votes were in favor of incorporation and a volunteer police force. Because of the incorporation, Houston did not incorporate Jersey Village’s territory into its city limits. 13.2.3 Climate The climate of Jersey Village is humid subtropical. 13.2.4 Governing Body Format Jersey Village has a home rule charter and a council manager form of government. The city manager acts as the city’s chief executive officer. The council, consisting of the mayor and five elected members, serves as the city’s legislative body and votes on matters related to city government. The mayor and each council member have two year terms. Each member is limited to four terms as mayor, council member, or both. The mayor votes if the city council has a tie vote. The city manager has no voice in the city council; the city manager attends all council Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 13-2 meetings and provides advice. The city manager manages all city affairs assigned to the city manager by the charter, implements city council directives, and ordinances. The city manager also manages and directs the city organization and employees. The City of Jersey Village assumes responsibility for the adoption of this plan; City of Jersey Village will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 13-1. Table 13-1. Local Mitigation Planning Team Members Name Title Mark Bitz Fire Chief / EMC Austin Bleess City Manager Eric Foerster Police Chief / Deputy EMC Jason Alfaro Parks and Recreation Director Isabel Kato Finance Director 13.3 CURRENT TRENDS 13.3.1 Population According to United States Census Bureau the population of The City of Jersey Village as of January 2010 was 7620. Since 2010, the population has grown at an average annual rate of 11 percent. The population was 7,620 at the 2010 Census. The 2018 Population Estimate is 7,962. 1.3.2 Development The City of Jersey Village has become more aggressive in the last few years to diversify the local economy. By utilizing tax incentives the city has attracted two new employers to the community that have diversified and expanded our local tax base. This has helped to shift some of the burden away from property taxes. Over the last few years the residential property tax base has increased at an average rate of 5% since 2016. We have seen a marked decrease in industrial personal property value. Back in 2016 the city lost a major manufacturing operation which removed nearly $200,000,000 in valuation from our community. In 2017 the City created a Tax Increment Reinvestment Zone to help spur new development in an underdeveloped area. This development is just taking root and will be two years before the city sees the benefits from this. Overall the city is on an upward trajectory and is positioning itself well for an increase in economic development in the coming years. Table 13-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. City of Jersey Village 13-3 Table 13-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. • If yes, who currently has permitting authority over these areas? Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas Jones Road area south of 290 How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 4 32 30 29 11 Multi-Family 0 0 0 0 0 Other (commercial, mixed use, etc.) 4 – Co m 2-com 1-com 7-com 1-com Total 8 34 31 36 12 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 43 • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. 93% 13.4 CAPABILITY ASSESSMENT The City of Jersey Village performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 13-3. • Development and permitting capabilities are presented in Table 13-4. • An assessment of fiscal capabilities is presented in Table 13-5. • An assessment of administrative and technical capabilities is presented in Table 13-6. • An assessment of education and outreach capabilities is presented in Table 13-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 13-8. • Classifications under various community mitigation programs are presented in Table 13-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 13-10. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 13-4 Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Table 13-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No Yes Yes Comment: International Building Code, Code of Ordinances Chapter 14 Article VIII Zoning Code Yes No Yes Yes Comment: Code of Ordinances – Chapter 14 Article IV Subdivisions Yes Yes Yes Yes Comment: Chapter 14 Article III and Article IX Stormwater Management Yes Yes Yes Yes Comment: Code of Ordinances Chapter 14 Article XXI Post-Disaster Recovery Yes Yes Yes Yes Comment: Annex J – Harris County Basic Plan – Recovery and post-disaster permitting and code enforcement regulations. Real Estate Disclosure N/A N/A N/A N/A Comment: Growth Management Yes Yes No Yes Comment: Code of Ordinances Chapter 14 Article I Section 14-3 Site Plan Review Yes Yes No Yes Comment: Code of Ordinances Chapter 14 Article 1 Section 14-6 Environmental Protection Yes Yes Yes Yes Comment: Chapter 14 Article IX Flood Damage Prevention Yes Yes Yes Yes Comment: Code of Ordinances Chapter 14 Article IX Emergency Management Yes Yes Yes Yes Comment: Code of Ordinances Chapter 22 Article II Climate Change N/A N/A N/A N/A Comment: Planning Documents General Plan Yes Yes No Yes Comment: Comprehensive Plan adopted February 15, 2016 Capital Improvement Plan Yes Yes No Yes How often is the plan updated? Annual Basis Comment: Disaster Debris Management Plan Yes Yes No Yes Comment: Contracts and memorandums of understanding are reviewed on an annual basis Floodplain or Watershed Plan Yes Yes No Yes Comment: Chapter 14 Article IX Stormwater Plan Yes Yes No Yes Comment: Chapter 14 Article IX and Article XXI Urban Water Management Plan Yes Yes No Yes Comment: Chapter 14 Article XXI Economic Development Plan Yes Yes No Yes Comment: TIRZ – June 2017 City of Jersey Village 13-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Shoreline Management Plan N/A N/A N/A N/A Comment: Community Wildfire Protection Plan No Yes No Yes Comment: The City of Jersey Village does not have its own CWPP implemented. Harris County has completed a county-wide CWPP; which includes all incorporated jurisdictions within Harris County. Forest Management Plan N/A N/A N/A N/A Comment: Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes Yes No Yes Comment: Annex P – Hazard Mitigation and Hazard Summaries in Basic Plan. Threat & Hazard Identification & Risk Assessment (THIRA) No Yes Yes Yes Comment: A regional THIRA is conducted on an annual basis for UASI and HGAC. Post-Disaster Recovery Plan Yes No No Yes Comment: Annex J – Recovery is required for local jurisdictions to address local recovery programs, damage assessments, Public Assistance and Individual Assistance programs. Continuity of Operations Plan Yes No No Yes Comment: Government Code 418 grants political subdivisions the option to adopt plans for continuity of functions but is not mandated. The City of Jersey Village does have department Continuity of Operations Plans. Public Health Plan Yes Yes Yes Yes Comment: Annex H – Health and Medical is a component of the Emergency Operations Plan and addresses public health, environmental health, and medical response capabilities. The City does not maintain a standalone Public Health Plan. Table 13-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Community Development / Public Works Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? Yes Table 13-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants No Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes Water and Sewer Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 13-6 Table 13-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Community Development / Public Works Engineers or professionals trained in building or infrastructure construction practices Yes Permits and Inspections / Community Development / Public Works Planners or engineers with an understanding of natural hazards Yes Community Development / Public Works Staff with training in benefit/cost analysis Yes City Manager’s Office / Public Works / Finance Surveyors No Personnel skilled or trained in GIS applications No Scientist familiar with natural hazards in local area No Emergency manager Yes Emergency Manager’s Office Grant writers Yes Multiple Departments Table 13-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. The website provides links to all of our plans including flood plan and comprehensive plan just to name two. Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. We posted recently the Hazard Mitigation Process for public remarks on Facebook and Twitter Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Website and Social Media Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Social Media and Storm Siren City of Jersey Village 13-7 Table 13-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Permits / Inspections / Public Works / Community Development Who is your floodplain administrator? (department/position) Administration and Public Works City Manager and Public Works Director Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? February 2019 Does your floodplain management program meet or exceed minimum requirements? Exceeds • If exceeds, in what ways? Higher than base flood requirements / 18” higher than base. When was the most recent Community Assistance Visit or Community Assistance Contact? March 2019 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? No • If no, state why. FEMA has not updated the maps in years Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes • If so, what type of assistance/training is needed? Communication to start. No one will return calls for assistance Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? • If no, is your jurisdiction interested in joining the CRS program? Yes How many flood insurance policies are in force in your jurisdiction? 1352 • What is the insurance in force? $414,351,300 • What is the premium in force? $1,094,188 How many total loss claims have been filed in your jurisdiction?a 856 • How many claims are still open or were closed without payment? 82 • What were the total payments for losses? $46,383,754 Table 13-9. Community Classifications Participating? Classification Date Classified Community Rating System No Building Code Effectiveness Grading Schedule Yes 4 October 23, 2018 Public Protection Yes 2 November 2015 Storm Ready No Firewise No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 13-8 Table 13-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Jersey Village 13-9 13.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 13.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • We have started flood mitigation efforts in our city by working to install a BERM around portions of our golf course to prevent water runoff into the storm system. • We are working to improve storm sewer upgrades to one main street in our city as part of the flood mitigation. • We have received Federal Funding to elevate 18 homes in our city. RFP’s have been received from potential contractors and three contractors have been chosen to oversee this project. Residence have been chosen to have their homes elevated. They now have the option of choosing one of the three selected contractors to begin the work. 13.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • We plan to apply for more federal funding on an annual basis to elevate homes and for other related flood mitigation projects. 13.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 13-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Jersey Village. Other hazard events that broadly affected the entire planning area, including City of Jersey Village are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 13-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Alicia DR-689 March 18-20 Declared August 19, 1983 N/A Major Storm DR-937 March 4-30 – Declared March 20, 1992 N/A Major Storm DR – 1041 October 17, 1994 N/A Tropical Storm Frances DR – 1245 September 22, 1998 N/A Tropical Storm Allison DR – 1379 June 5-20 Declared June 9, 2001 N/A Hurricane Ike EM – 3294 / DR – 1791 September 9, 2008 / September 12, 2008 $3,159,150 Tax Day Floods R – 4269 April 17-30 Declared April 25, 2016 N/A Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 13-10 13.7 HAZARD RISK RANKING Table 13-12 presents a local ranking for City of Jersey Village of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 13-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Flooding 42 High 3 Earthquake 14 Low 4 Drought 6 Low 4 Wildfire 6 Low 5 Mass Movement 0 (No Exposure) None 5 Tsunami 0 (No Exposure) None 5 Dam Failure 0 (No Exposure) None 5 Coastal Erosion 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 13.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 13.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 155 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 10 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 4 13.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Homes in flood prone areas are vulnerable to repetitive flooding. We are working to elevate multiple homes • Homes in flood prone areas have also had repetitive flooding. Homes with repetitive flooding are being review now to potentially buy out and then rebuild to our current flood plain management plan to elevate new hones when built. Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. City of Jersey Village 13-11 13.9 STATUS OF PREVIOUS PLAN ACTIONS Table 13-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 13-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Retrofit Critical Infrastructure with Backup Generation X Comment: Two Water Plants require backup generators Electric Surge Protection on Public Infrastructure X Comment: City Facilities and Critical Infrastructure should be protected from severe storms that produce lightning Community Rating System Participation X Comment: We are actively working on this item. Golf Course Water Detention Upgrade X Comment: Add Impact Glazing to the International Electrical Conservation Code X Comment: Implement a Tree Management Program X Comment: This program will help during times of Hurricanes to prevent trees from falling in city streets Add an Ordinance to add Safe Rooms in Homes X Comment: The addition of safe rooms in homes would be an ideal way to protect residents from unexpected occurrence of Tornadic Activity Review Current City Infrastructure for Tornadic Impact X Comment: Review Current city facilities to determine if they can handle impact from a Tornado Identify and Protect vulnerable city assets from Hail X Comment: This mostly would be vehicles an equipment outside and not under protective covers. Vehicles etc. Installation of water supply to area without current water X Comment: The area south of our city in our ETJ and an area we could eventually annex, has 85% of the area without city water. Install Wind Monitoring Equipment X Comment: In an effort to monitor wind conditions conducive to wildfires, we would look to install wind monitoring stations throughout the city. Implement waste water reuse program to water golf course X Comment: We are actively working on this item Improve water lines X Comment: This ongoing project will review current water lines and replace them as we replace other infrastructure like streets and sewer Heat Index on Website X Comment: After updating the city website, we will look at ways to like National Weather Service and other easy links to help the community during storm conditions. We have this on our flood information page: https://www.jerseyvillagetx.com/page/city.flood_control Install Cooling area during times of power loss X Comment: We will look at current city facilities to identify areas where we could implement cooling areas during power loss Develop a Winter Storm Protocol for response during winter storms X Comment: This would be to work with other agencies to develop a common protocol of response during winter emergencies. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 13-12 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Purchase a trailer with road barricades and cones for traffic control X Comment: During Icy conditions, it is very difficult to block roadways. This trailer would help to implement safety zones on freeways and roadways and keep vehicles out of the path of moving traffic during icy conditions. Develop Ordinance for Hazardous Material Storage on Residential Property X Comment: This would provide direction to residents on how they should store Gasoline and other chemicals used around the home to prevent Hazardous or toxic release. Upgrade and move all business pre-plans to computer X Comment: Business Pre-plans are currently in paper form. The goal is to move all these to computer. Develop a Detailed Pipeline Risk Map X Comment: To have a better understanding of all pipelines running through the city and what hazards they are. We have GIS data for all of the pipeline easements through JV. Develop a yearly inspection of pipelines X Comment: To work with pipeline companies to develop an inspection program which will help us to monitor the pipelines running through our city. 13.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 13-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 13-15 identifies the priority for each action. Table 13-16 summarizes the mitigation actions by hazard of concern and mitigation type. Table 13-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action JRV1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Severe Weather, Hurricane, flooding Existing 9, 10,11, 12, 15 City Administration TBD High HMGP, PDM, FMA Short-term Action JRV2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community Hazards Mitigated: Severe Weather, Hurricane, drought, earthquake, flooding, wildfire New and Existing 10 City Administration TBD Low Staff Time, General Funds Ongoing Action JRV3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire New and Existing 1, 5, 8 City Administration TBD Low Staff Time, General Funds Short-term City of Jersey Village 13-13 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action JRV4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Severe Weather, Hurricane, Flooding New and Existing 1, 3, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing Action JRV5 — Elevation of Pre-Existing Homes that are prone to repetitive flooding Pre-Disaster Mitigation, Hazard Mitigation Grant Program, Flood Mitigation Assistance Program National Flood Insurance Program (Increased Cost of Compliance), Housing and Urban Development – Disaster Recovery Initiative Project Schedule/Completion Timeframe: 10 Years Hazards Mitigated: Flooding, Severe Weather, Hurricane New 11, 12 Jersey Village TBD High Grant Funding 10 years Action JRV6 — Demolition of existing homes that are prone to repetitive flooding. Pre-Disaster Mitigation, Hazard Mitigation Grant Program, Flood Mitigation Assistance Program National Flood Insurance Program (Increased Cost of Compliance), Housing and Urban Development – Disaster Recovery Initiative Project Schedule/Completion Timeframe: 10 years Hazards Mitigated: Flooding, Severe Weather, Hurricane New 11, 12 Jersey Village TBD High Grant Funding 10 years Action JRV7 – Retrofit Critical Infrastructure with Backup Generation Hazards Mitigated: Severe Weather, Hurricane, Earthquake Existing 10,11,13 Jersey Village TBD High Grant funding Long term Action JRV8 – Electric Surge Protection on Public Infrastructure Hazards Mitigated: Severe Weather Existing 10,11,13 Jersey Village TBD Medium Grant funding Short term Action JRV9 – Community Rating System Participation Hazards Mitigated: Flooding Existing 9,14 Jersey Village TBD Staff time General funds Short term Action JRV10 – Golf Course Water Detention Upgrade Hazards Mitigated: Drought Existing 7,8,10,11 Jersey Village TBD Medium General and grant funding Short term Action JRV11 – Add Impact Glazing to the International Electrical Conservation Code Hazards Mitigated: Severe Weather, Hurricane New and Existing 3,9,12,13 Jersey Village TBD Low General funds Short term Action JRV12 – Implement a Tree Management Program Hazards Mitigated: Severe Weather, Hurricane, Wildfire New and Existing 2,7 Jersey Village TBD Low General funds Short term Action JRV13 – Add an Ordinance to add Safe Rooms in Homes Hazards Mitigated: Severe Weather, Hurricane, Earthquake New and existing 4, 9, 10, 11,12, 15 Jersey Village TBD Low General funds Short term Action JRV14 – Identify and Protect vulnerable city assets from Hail Hazards Mitigated: Severe Weather Existing 13 Jersey Village TBD Medium General and grant funds Long term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 13-14 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action JRV15 – Installation of water supply to area without current water Hazards Mitigated: Drought Existing 2,7 Jersey Village TBD High General funds Long term Action JRV16 – Install Wind Monitoring Equipment Hazards Mitigated: Severe Weather, Hurricane Existing 9, 11 Jersey Village TBD Medium General Short term Action JRV17 – Implement waste water reuse program to water golf course Hazards Mitigated: Drought Existing 2, 5, 7 Jersey Village TBD Medium General and grant funds Short term Action JRV18 – Heat Index on Website Hazards Mitigated: Severe Weather Existing 1,4, 11 Jersey Village TBD Low Staff time Short term Action JRV19 – Install Cooling area during times of power loss Hazards Mitigated: Severe Weather, Hurricane Existing 4, 10 Jersey Village TBD Medium General and grant funds Short term Action JRV20 – Develop a Winter Storm Protocol for response during winter storms Hazards Mitigated: Severe Weather Existing 3, 4, 9 Jersey Village TBD Low Staff time Short term Action JRV21 – Purchase a trailer with road barricades and cones for traffic control Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire New 6, 9 Jersey Village TBD Medium General or grant funds Short term Action JRV22 – Develop Ordinance for Hazardous Material Storage on Residential Property Hazards Mitigated: Hazardous material incidences, flooding Existing 2, 3, 7,8 Jersey Village TBD Low Staff time Short term Action JRV23 – Upgrade and move all business pre-plans to computer Hazards Mitigated: Severe Weather, Hurricane, Earthquake Existing 10 Jersey Village TBD Low Staff time Short term Action JRV24 – Develop a Detailed Pipeline Risk Map Hazards Mitigated: Pipeline incident Existing 3, 9 10, 11 Jersey Village TBD Low General funds Short term Action JRV25 – Develop a yearly inspection of pipelines Hazards Mitigated: Pipeline incident Existing 3, 9 10, 11 Jersey Village TBD Low General funds Short term Action JRV26— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Jersey Village HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. City of Jersey Village 13-15 Table 13-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya JRV1 5 High High Yes Yes No Medium High JRV2 1 Medium Low Yes No Yes High Low JRV3 3 Low Low Yes No Yes High Low JRV4 3 Medium Low Yes No Yes High Low JRV5 2 High High Yes Yes No High High JRV6 2 High High Yes Yes No High High JRV7 3 High High Yes Yes No High High JRV8 3 High Medium Yes Yes No High High JRV9 2 Medium Low Yes No Yes Medium Low JRV10 4 Medium Medium Yes No Yes Low Low JRV11 4 Medium Low Yes No Yes Medium Low JRV12 2 Medium Low Yes No Yes Medium Low JRV13 6 Medium Low Yes No Yes Low Low JRV14 1 Medium Medium Yes Yes Yes Medium Medium JRV15 2 High High Yes Yes Yes High High JRV16 2 Medium Medium Yes Yes No Medium Medium JRV17 3 Medium Medium Yes No Yes Medium Low JRV18 3 Medium Low Yes No Yes Medium Low JRV19 2 Medium Medium Yes Yes No Medium Medium JRV20 3 Medium Low Yes No Yes Medium Low JRV21 2 Medium Medium Yes Yes No Medium Medium JRV22 4 Medium Low Yes No Yes Medium Low JRV23 1 High Low Yes No Yes High Low JRV24 4 High Low Yes No Yes High Low JRV25 4 High Low Yes No Yes High Low JRV26 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 13-16 Table 13-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather JV5, 6, 7, 8, 12, 14, 16, 18, 19, 20, 22, 26 JV1, 4, 5, 6, 14 JV16, 18, 26 JV14, 16, 20, 21, 26 JV1, 5, 6, 7, 8 JV7, 13, 19 JV2, 3, 14, 20, 23, 26 Hurricane JV5, 6, 7, 8, 16, 19, 26 JV1, 4, 5, 6 JV16, 26 JV21, 26 JV1, 5, 6, 7, 8 JV7, 19 JV2, 3, 23, 26 Flooding JV5, 6, 7, 26 JV1, 4, 5, 6 JV26 JV10, 22 JV21, 26 JV1, 5, 6, 7, 8, 10 JV7, 9, 10 JV2, 3, 9, 26 Low-Risk Hazards Earthquake JV7, 8, 26 JV26 JV21, 26 JV2, 3, 23, 26 Drought JV26 JV26 JV15, 17 JV26 JV15 JV15 JV2, 3, 26 Wildfire JV12, 26 JV26 JV12 JV1, 26 JV1 JV12 JV2, 3, 26 ta. See the introduction to this volume for explanation of mitigation types. 13.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX 13.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • Jersey Village Municipal Code of Ordinances — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • Jersey Village Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • Jersey Village International Building, Electrical, Fire, Mechanical, Residential codes – The city adopted codes were used to identify specific regulatory capabilities. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • The Internet was used for fact gathering n specific city information for this report. Specifically for population, census, area of city etc. Staff and Local Stakeholder Involvement in Annex Development Jersey Village has been in discussion with Harris County and Tetra Tech since mid 2018 in preparation of the updated all Hazard Mitigation Plan. We have attended several planning meetings. We have worked together with Harris County to review our existing 2015 plan and determine what action items listed were completed or still ongoing. We have met all deadlines for Harris County to review the plan and are confident it meets or exceeds the requirements outlined. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(£¤290£¤290HoustonCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.30.60.15Miles±Jersey Village £¤290 £¤290 Houston FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.3 0.60.15 Miles ± Jersey Village £¤290 £¤290 Houston Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.3 0.60.15 Miles ± Jersey Village £¤290 £¤290 Houston 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.3 0.60.15 Miles ± Jersey Village £¤290 £¤290 Houston 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.3 0.60.15 Miles ± Jersey Village £¤290 £¤290 Houston Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.3 0.60.15 Miles ± Jersey Village £¤290 £¤290 Houston Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.3 0.60.15 Miles ± Jersey Village 14-1 14. CITY OF KATY 14.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Greg Goedecker, Emergency Management Coordinator Street Address Katy, TX 77493 Telephone: 281-574-8633 e-mail Address: ggoedecker@cityofkaty.com Jason Rivera Asst. Public Works Director Street Address Katy, TX 77493 Telephone: 281-391-4796 e-mail Address: jrivera@cityofkaty.com 14.2 JURISDICTION PROFILE 14.2.1 Location The City of Katy is the Hub City of Three Counties. Katy lies in the western portion of Harris County, the far southeastern portion of Waller County, and the northern most portion of Fort Bend County. The actual city limits of Katy are north and south of Interstate 10, and roughly between Katy Fort Bend Road on the east and Pederson Road on the west. The historic downtown area is north of Highway 90, near the landmark grain elevators. This is the original Katy from before the 1970s when Houston’s Energy Corridor (and the development that came with it) made its way west on I-10. The city’s total area is 15.1 square miles. 14.2.2 History Katy was incorporated in 1945. In the beginning Katy was only a wide open prairie, the hunting ground of the Karankawa Indian tribes, the winter feeding grounds of great herds of buffalo and large flocks of wild ducks, geese, sandhill and whooping cranes, and numerous other game birds, and home to longhorn cattle, deer, and wolves. Earliest settlement of the community known as Cane Island, for Cane Island Creek that runs through it, was in 1872. The townsite of Katy was laid out and platted by J. O. Thomas, L. C. Luckel, and R. M. Cash in 1895, supposedly named for the M-K-T Railroad that runs through it. Katy has always been a traditional family style community; however, it also played a major role as a rail hub, a rice farming and agricultural center, and one of the largest gas fields in this part of Texas. 14.2.3 Climate The climate of Katy is warm and temperate. The rainfall in Katy is significant, with precipitation even during the driest month. The average annual temperature is 68 °F in Katy. The average annual rainfall is 42.28 inches. July is the warmest month of the year. The temperature in July averages 83.1 °F. At 50.4 °F on average, January is the coldest month of the year. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 14-2 14.2.4 Governing Body Format The City of Katy is a home rule city with a mayor-councilmember-administrator type of government. City Council consists of five City Councilmembers. The City consists of 20 departments: Administration, Municipal Court, City Secretary, Finance, Social Services, Human Resources, Police, Fire, Animal Control, Library, Parks, Streets, Public Works, Sanitation, Permits-Inspections, Building Maintenance, Marketing & Tourism, Water, Sewer and Utility Billing. The City has 12 boards and commissions, which are appointed by City Council. The City Council assumes responsibility for the adoption of this plan; the City Administrator will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 14-1. Table 14-1. Local Mitigation Planning Team Members Name Title Greg Goedecker Emergency Management Coordinator Jason Rivera Asst. Public Works Director Elaine Lutringer Public Works Director Cindy Kuykendall Code Enforcement Officer Anas Garfaoui City Planner David Leyendecker City Engineer 14.3 CURRENT TRENDS 14.3.1 Population According to U.S. Census Bureau, the population of Katy as of July 2017 was 18,282. Since 2010, the population has grown at an average annual rate of 4.2 percent. 14.3.2 Development Since 2015, there has been an increase in single-family residential housing in the City of Katy. The city has also experienced an increase in commercial development, primarily in large scale office/warehouse/distribution projects between US Highway 90 and Interstate 10. Table 14-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. City of Katy 14-3 Table 14-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? Yes/No • If yes, give the estimated area annexed and estimated number of parcels or structures. 953 Acres 14 Parcels Is your jurisdiction expected to annex any areas during the performance period of this plan? Yes • If yes, describe land areas and dominant uses. Commercial/Industrial • If yes, who currently has permitting authority over these areas? County (Waller, Harris, Fort Bend Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas Area between US HWY 90 and I-10 (No known hazard risk areas) How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 186 343 370 418 607 Multi-Family 0 0 0 0 0 Other (commercial, mixed use, etc.) 37 60 57 13 58 Total 223 403 427 431 665 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 11 AE Zones • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. Approximate City of Katy size: 15.1 Sq. Miles or 9,664 acres Approximate City of Katy available land: 2.05 Sq. Miles or 1,312 acres Approximately 86% buildout as of January 2019 14.4 CAPABILITY ASSESSMENT The City of Katy performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 14-3. • Development and permitting capabilities are presented in Table 14-4. • An assessment of fiscal capabilities is presented in Table 14-5. • An assessment of administrative and technical capabilities is presented in Table 14-6. • An assessment of education and outreach capabilities is presented in Table 14-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 14-8. • Classifications under various community mitigation programs are presented in Table 14-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 14-10. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 14-4 Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Table 14-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No No No Comment: 2874 IBC 2015, City Ordinance. 2874; sect. 3.02.053; 10-22-18 Zoning Code Yes No No No Comment: City Ordinance. 621; sect. 14.02.001; 3-24-18 Subdivisions Yes No No No Comment: City Ordinance. 2595 & 2595a; Chapter 10; 10-28-13 Stormwater Management Yes Yes Yes Yes Comment: TCEQ, City Ordinance. 2893; 3.11.003 & 3.11.004; 1-28-19 Post-Disaster Recovery Yes Yes No Yes Comment: City of Katy EOP Annex J – Recovery and post-disaster permitting and code enforcement regulations. 9-28-16 Real Estate Disclosure No No No No Comment: Growth Management No No Yes Yes Comment: Site Plan Review Yes No No Yes Comment: City Ordinance. 2874; sect. 3.08.003 ;10-22-18 Environmental Protection Yes No No Yes Comment: TCEQ, EPA Flood Damage Prevention Yes No Yes Yes Comment: City Ordinance 2417 Sect. 3.04 1-26-09 Emergency Management Yes No No Yes Comment: City Ordinance 0695 1-20-19, Texas Government Code 418 Climate Change No No No Yes Comment: Planning Documents General Plan Yes No Yes Yes Comment: Comprehensive Plan 6-11-2001 Capital Improvement Plan No Bo No Yes How often is the plan updated? N/A Comment: Disaster Debris Management Plan No No No Yes Comment: Floodplain or Watershed Plan Yes Yes No Yes Comment: Harris Co Flood Con Dist. Res 430, City Ordinance 2626; sect. 3.04.041 & 3.04.042 or 3.01.007, 3.04.042; 3-10-14 Stormwater Plan Yes Yes Yes Yes Comment: City Ordinance. 2893; section 3.11.003 & 3.11.004; 1-28-19 Urban Water Management Plan No No No No Comment: Habitat Conservation Plan No No No No Comment: City of Katy 14-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Economic Development Plan No No No No Comment: Shoreline Management Plan No No No No Comment: Community Wildfire Protection Plan No No No No Comment: The City of Katy does not have its own CWPP implemented. Harris County has completed a county-wide CWPP; which includes all incorporated jurisdictions within Harris County. Forest Management Plan No No No Yes Comment: Climate Action Plan No No No Yes Comment: Comprehensive Emergency Management Plan Yes No No Yes Comment: City Ordinance 0695 2-8-16 Threat & Hazard Identification & Risk Assessment (THIRA) No No Yes Yes Comment: Post-Disaster Recovery Plan Yes Yes No Yes Comment: City of Katy EOP Annex J – Recovery is required for local jurisdictions to address local recovery programs, damage assessments, Public Assistance and Individual Assistance programs. The City of Katy is in the process of developing a Pre- Disaster Recovery Plan to assist in the transition from response to recovery for future incidents. 9-28-16 Continuity of Operations Plan Yes No No Yes Comment: Government Code 418 grants political subdivisions the option to adopt plans for continuity of functions but is not mandated. The City of Katy does have department Continuity of Operations Plans. Public Health Plan Yes Yes Yes Yes Comment: City of Katy EOP Annex H – Health and Medical is a component of the Emergency Operations Plan and addresses public health, environmental health, and medical response capabilities. The City does not maintain a standalone Public Health Plan. 10-27-16 Table 14-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Building Department Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? Yes Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 14-6 Table 14-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Other No Table 14-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Public Works Engineers or professionals trained in building or infrastructure construction practices Yes City Engineer Planners or engineers with an understanding of natural hazards Yes Public Works, City Engineer Staff with training in benefit/cost analysis Yes Public Works, City Engineer Surveyors Yes City Engineer Personnel skilled or trained in GIS applications Yes N/A Scientist familiar with natural hazards in local area No N/A Emergency manager Yes Fire Dept. Grant writers No N/A Other No N/A Table 14-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No • If yes, briefly describe. Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. Post educational material on Facebook and Twitter Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? No • If yes, briefly describe. Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Everbridge Mass Notification System – KTALERT City of Katy 14-7 Table 14-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Building Dept Who is your floodplain administrator? (department/position) Floodplain Manager Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? Check Does your floodplain management program meet or exceed minimum requirements? Meet • If exceeds, in what ways? N/A When was the most recent Community Assistance Visit or Community Assistance Contact? June 19, 2007 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. N/A Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. N/A Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. N/A Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? No • If no, is your jurisdiction interested in joining the CRS program? Yes How many flood insurance policies are in force in your jurisdiction?a 2149 • What is the insurance in force? $664,828,300 • What is the premium in force? $1,017,481 How many total loss claims have been filed in your jurisdiction?a 466 • How many claims are still open or were closed without payment? Unknown • What were the total payments for losses? $38,432,381 a. According to FEMA statistics as of July 31, 2019 Table 14-9. Community Classifications Participating? Classification Date Classified Community Rating System No N/A N/A Building Code Effectiveness Grading Schedule Yes 4 Public Protection Yes ISO 1 10/1/2019 Storm Ready Yes Storm Ready Community 8/1/2016 Firewise No N/A N/A Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 14-8 Table 14-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Medium Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Medium Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Unsure Comment: Identified strategies for adaptation to impacts Unsure Comment: Champions for climate action in local government departments Unsure Comment: Political support for implementing climate change adaptation strategies Unsure Comment: Financial resources devoted to climate change adaptation Unsure Comment: Local authority over sectors likely to be negative impacted Unsure Comment: Public Capacity Local residents knowledge of and understanding of climate risk Unsure Comment: Local residents support of adaptation efforts Unsure Comment: Local residents’ capacity to adapt to climate impacts Unsure Comment: Local economy current capacity to adapt to climate impacts Unsure Comment: Local ecosystems capacity to adapt to climate impacts Unsure Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Katy 14-9 14.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 14.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • City of Katy Emergency Operations Basic Plan — The Basic Plan provides a summary on the hazards and threats in the community. • City of Katy Water Conservation and Drought Contingency Plan. This plan details strategies to ensure continued water access and preservation. • City of Katy Flood Damage Prevention Plan. The Flood Damage Prevention Plan details the protection measures to be put into place to alleviate flooding hazards during minor and major weather events. 14.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Post-Disaster Recovery Plan — The City does not have a post disaster recovery plan and intends to develop one as a mitigation planning action during the next five years. The plan will build on the goals and objectives identified in the hazard mitigation plan. • Stormwater Management — The City currently integrates hazard mitigation information into Stormwater Management but, this plan provides opportunities and information to upgrade the plan. The additional mitigation information and measures will be considered for inclusion into the plan. • Emergency Operations Plan — The City currently integrates hazard mitigation information into the Emergency Operations plan but, this plan provides opportunities and information to upgrade the plan. The additional mitigation information and measures will be considered for inclusion into the plan. • Flood Damage Prevention — Flood Damage Prevention project proposals may take into consideration hazard mitigation potential as a means of evaluating project prioritization. • Debris Management Plan — The City does not have a Debris Management plan and intends to develop one as a mitigation planning action during the next five years. The plan will build on the goals and objectives identified in the hazard mitigation plan. • Floodplain Plan — The City currently integrates hazard mitigation information into Floodplain Management but, this plan provides opportunities and information to upgrade the plan. The additional mitigation information and measures will be considered for inclusion into the plan. • Public Health Plan — The City does not have a Public Health plan and intends to develop one as a mitigation planning action during the next five years. The plan will build on the goals and objectives identified in the hazard mitigation plan. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 14-10 14.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 14-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of Katy Other hazard events that broadly affected the entire planning area, including the City of Katy, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 14-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Severe Weather, Tornado January 14, 1991 $ 40,000 Severe Weather, Tornado 970 DR November 21, 1992 $ 350,525,000 Severe Weather, Tornado 1993 $ N/A Severe Weather, Hail 1993 $ N/A Severe Weather, Hail 1995 $ N/A Severe Weather, Hail 1996 $ N/A Severe Weather, Hail 1998 $ N/A Severe Weather, Hail February 2, 2003 $ 5,000 Severe Weather, Hail April 24, 2003 $ 6,000 Severe Weather, Tornado August 16, 2003 $ N/A Severe Weather, Tornado September 1, 2003 $ N/A Severe Weather, Tornado & Hail April 10, 2004 $80,000 Severe Weather, Hail December 21, 2006 $ 4,000 Severe Weather, Hail March 13, 2007 $ 3,000 Severe Weather, Hail May 30, 2007 $ N/A Severe Weather, Tornado August 4, 2007 $ N/A Wildfire January 1, 2008 $ N/A Wildfire January 9, 2008 $ N/A Wildfire July 30, 2008 $ N/A Severe Weather, Wind July 10, 2012 $ 5,000 Severe Weather, Heavy Rain July 7, 2014 $ N/A Severe Weather, Wind August 25, 2015 $ N/A Flooding 4245 DR October 24, 2015 $ N/A 14.7 HAZARD RISK RANKING Table 14-12 presents a local ranking for the City of Katy of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. City of Katy 14-11 Table 14-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Flooding 32 High 3 Wildfire 16 Medium 4 Mass Movement 15 Medium 5 Earthquake 14 Low 6 Drought 6 Low 6 Dam Failure 6 Low 7 Tsunami 0 (No Exposure) None 7 Coastal Erosion 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 14.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 14.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 80 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 0 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0 14.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Land Development- considering the City and adjacent development which directly impact impervious surface/stormwater run-off. In addition, the stormwater conveyance has significant impact to the downstream and associated waterway and drainage structures • New construction standards and storm water design criteria challenge or conflicts with aged infrastructure design and capacity for stormwater and flood protection. Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. 14.9 STATUS OF PREVIOUS PLAN ACTIONS Table 14-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 14-12 Table 14-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Improve and adopt higher-standard/latest edition manufactured homes standards/codes to include tie-downs or anchorage 2015 Comment: Existing Ordinance address manufactured homes standards codes/ and tie-downs or anchorage Electric surge protection and shielding for electronic systems in public facilities or critical infrastructure 2015 Comment: All 5 Water Plants have surge protection installed Elevate generator above freeboard to mitigate flooding risk  Comment: No specific generator was ever targeted for this action. Public Works Officials were never informed of this action item. Develop and adopt a drainage ordinance to require detention for future development and redevelopment for detention 2018 Comment: City Council adopted Harris County Flood Control development plans, which is more restrictive Improve critical infrastructure/public buildings to harden against hurricane related effect 2018 Comment: Water Plant #6 27515 Hwy Blvd., Upgraded Roof to reinforced concrete. Implement a tree management program to limit debris damage to critical infrastructure, public facilities from falling tree canopy due to high-winds, freezing conditions, and burning debris. 2015 Comment: Implemented a “Best Management Practices” for tree management. Improve and enhance requirements for critical facilities to withstand severe thunderstorms, hurricane winds and hail 2018 Comment: Wastewater Plant, 25839 I-10 Freeway – Elevated transfer switch, and soft starts electronic components; and replaced 2 pumps to dry-submersible pumps Construct protective structure/shelter for critical equipment and vehicles to minimize damage from high-winds and freezing conditions. 2016 Comment: Addition to Fleet Maintenance – Added roof extension for storage of equipment and material. Built to withstand 140 mph wind load. Implement a Public Education/Outreach Program on Hail-hazards to inform residents on actions to reduce hail damage to property and equipment.  KTY5 Comment: No program was ever implemented. Improve code/ordinance to require removal of dead vegetation/dry fuel sources in risk areas  Comment: No ordinance was ever developed or brought to City Council to approve. Implement and join FireWise Program to educate residents and businesses on actions to reduce property loss and damages from wildfire.  KTY7 Comment: The City never joined or looked into the program Expand warning system, to a mass notification system, to provide hazard awareness and alerts to mitigate all-hazards and to increase coverage of the community utilizing mobile/cellular devices. 2015 Comment: A mass notification system was implemented, but the City of Katy chose not to renew its contract for it. A new web based mass notification system was purchased in 2018. Install drought resistant landscaping as part of a water conservations program  KTY6 Comment: Continuing on working on this through the City’s Water Conservation Plan City of Katy 14-13 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Improve public facility emergency power by installing generators/alternate power sources to provide adequate cooling for use as cooling center  Comment: Generators will be or only installed on critical infrastructure. There was no plan developed to add alternate power sources to other City owned public facilities. Implement a Public Education/Outreach Program on extreme heat to educate residents and businesses on actions to reduce health impacts and property losses.  KTY5 Comment: No program was ever implemented. Insulate exposed/above ground domestic water components  Comment: This practice was already occurring at the time the plan was written Improve chemical storage and waste disposal facilities  Comment: The City eliminated the Oil Recycle Center off of East Avenue Establish/improve code/ordinance to require secondary containment structures for all above ground storage tanks for new construction  Comment: No ordinance was ever developed or brought to City Council to approve. Identify exposed/above ground pipelines in flood hazard area  Comment: No plans or procedures were ever developed to capture this data. 14.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 14-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 14-15 identifies the priority for each action. Table 14-16 summarizes the mitigation actions by hazard of concern and mitigation type. Table 14-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action KTY1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, mass movement, wildfire Existing 3, 4, 10 Public Works OEM High HMGP, PDM, FMA Short-term Action KTY2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including the City of Katy Hazards Mitigated: Drought, earthquake, flooding, mass movement, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 Planning Public Works, OEM Low Staff Time, General Funds Ongoing Action KTY3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wildfire, Mass Movement, Earthquake, Drought, Dam Failure New and Existing 1, 5, 8 OEM Public Works Low Staff Time, General Funds Short-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 14-14 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action KTY4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Flooding, severe weather New and Existing 1, 3, 5, 7, 8, 10 Public Works OEM Low Staff Time, General Funds Ongoing Action KTY5 — Implement a Public Education/Outreach Program on all-hazards to inform residents on actions to reduce severe weather damage to property and equipment. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wildfire, Mass Movement, Earthquake, Drought, Dam Failure New and Existing 3, 4, 10, 15 OEM National Weather Service, HCFCD Low Staff Time, General Funds Ongoing Action KTY6 — Incorporate drought tolerant or xeriscape practices into landscape ordinances to reduce dependence on irrigation around city facilities Hazards Mitigated: Drought, Mass Movement New and Existing 7, 8, 15 City Administration Public Works Medium General Funds Ongoing Action KTY7 — Implement and join FireWise Program to educate residents and businesses on actions to reduce property loss and damages from wildfire. Hazards Mitigated: Wildfire New and Existing 2, 3 Fire OEM High Short-term Action KTY8 — Install a new emergency generator and elevate it above flood 500 year flood level at Kingsland Water Plant. Kingsland Water Plant is a critical facility Hazards Mitigated: Flooding, severe weather, hurricane Existing 10, 11, 13 OEM Public Works High HMGP, PDM, General Funds Short-term Action KTY9 — Install a new emergency generator and elevate it above flood 500 year flood level at Fire Station 1 Fire Station 1 is a critical facility Hazards Mitigated: Flooding, severe weather, hurricane Existing 10, 11, 13 OEM Fire High HMGP, PDM, General Funds Short-term Action KTY10 — Install a new emergency generator at Fire Station 3. Fire Station 3 is a critical facility Hazards Mitigated: Flooding, severe weather, hurricane Existing 10, 11, 13 OEM Fire High HMGP, PDM, General Funds Short-term Action KTY11 — Add quick emergency generator quick connect capabilities to all city owned critical facilities Hazards Mitigated: Flooding, severe weather, hurricane New and Existing 10, 11, 13 OEM Public Works Medium HMGP, PDM, General Funds Long-term Action KTY12 — Provide incentives to private industry and contractors, for using permeable driveways and surfaces to reduce runoff and promote groundwater recharge. Hazards Mitigated: Drought, Mass Movement New and Existing 7, 8, 15 City Administration Public Works Low General Funds Ongoing City of Katy 14-15 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action KTY13 — Implement a Fuels Management Program to reduce hazardous vegetative fuels on public lands, near critical infrastructure Hazards Mitigated: Wildfire New and Existing 2, 13 OEM Fire Low General Funds Ongoing Action KTY14 — Using GIS to map areas that are at risk to the wind hazard associated with different hurricane and severe weather wind conditions and to identify concentrations of at-risk structures and populations.. Hazards Mitigated: Severe weather, hurricane New and Existing 1, 2, 4, 12 OEM IT, Harris County OHSEM Low General Funds Short- Term Action KTY15 — Create defensible space around all City of Katy critical infrastructure Hazards Mitigated: Wildfire New and Existing 2, 6 Public Works Fire, OEM Low General Funds Ongoing Action KTY16 — Implement a Tree Management Program/Ordinance Hazards Mitigated: Severe weather, hurricane New and Existing 6, 11 Public Works OEM Low General Funds Ongoing Action KTY17 — Install a new emergency generator and elevate it above flood 500 year flood level at the Katy Wastewater Plant. Katy Wastewater Plant is a critical facility Hazards Mitigated: Flooding, severe weather, hurricane Existing 10, 11, 13 Public Works OEM High HMGP, PDM, General Funds Short-term Action KTY18 — Construct a berm around the Katy Wastewater Treatment Plant to prevent flooding Hazards Mitigated: Flooding, severe weather New and Existing 10, 11, 13 Public Works OEM High HMGP, PDM, General Funds Long-term Action KTY19 — • Patna/Fortuna/Rexora public roadway projects- to address flood prone neighborhood- the roadway elevation and stormwater conveyance system will be redesigned to manage stormwater and property protection for the area. Hazards Mitigated: Flooding, severe weather New and Existing 10, 11, 13 City Administration Public Works High City Sourced Funding Short-term Action KTY20 — Pitts Rd detention pond expansion- this is a significant detention pond improvement implement a 14 acres addition to stormwater detention and flood protection for the City. Hazards Mitigated: Flooding, severe weather New and Existing 10, 11, 13 City Administration Public Works High City Sourced Funding Short-term Action KTY21— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wildfire, Mass Movement, Earthquake, Drought, Dam Failure New and Existing 1, 3, 4, 5, 9, 10, 11, 15 City Administration HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 14-16 Table 14-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya KTY1 3 High High Yes Yes No Medium High KTY2 7 Medium Low Yes No Yes High Low KTY3 3 Low Low Yes No Yes High Low KTY4 6 Medium Low Yes No Yes High Low KTY5 4 High Low Yes No Yes High Low KTY6 3 Medium Medium Yes Yes No Medium Low KTY7 2 Low Low Yes No Yes High Low KTY8 2 High High Yes Yes No Medium High KTY9 3 High High Yes Yes No Medium High KTY10 3 High High Yes Yes No Medium High KTY11 3 Medium Medium Yes Yes No Medium Medium KTY12 3 Low Low Yes No Yes High Low KTY13 2 Low Low Yes No Yes High Low KTY14 4 Low Low Yes No Yes High Low KTY15 2 Low Low Yes No Yes High Low KTY16 2 Low Low Yes No Yes High Low KTY17 3 High High Yes Yes No Medium High KTY18 3 High High Yes Yes No Low Low KTY19 3 High Low Yes Yes Yes High Low KTY20 3 High Low Yes Yes Yes High Low KTY21 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. City of Katy 14-17 Table 14-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather KTY-1, 2, 4, 21 KTY-1, 2, 4, 8, 9, 10, 11, 16, 18 KTY-4, 5, 21 KTY-2 KTY-8, 9, 10, 11, 15, 16, 17, 21 KTY-1, 18, 19 KTY-2 KTY-2, 3, 14, 16, 21 Hurricane KTY-16, 21 KTY-8, 9, 10, 11, 16, 17 KTY-5, 16, 21 KTY-8, 9, 10, 11, 15, 16, 17, 21 KTY-3, 14, 16, 21 Flooding KTY-2,4, 21 KTY-4, 8, 9, 10, 11, 17, 18 KTY-4, 5, 21 KTY-8, 9, 10, 11, 17, 21 KTY-18, 19 KTY-3, 21 Medium-Risk Hazards Wildfire KTY-1,2,7, 21 KTY-1, 2, 7, 13 KTY-5, 7, 21 KTY-7, 13, 15, 21 KTY-3, 21 Mass Movement KTY-1,2, 21 KTY-1, 2 KTY-5, 21 KTY-6, 12 KTY21 KTY-6, 12 KTY-3, 21 Low-Risk Hazards Earthquake KTY-1,2, 21 KTY-5, 21 KTY21 KTY-3, 21 Drought KTY-1,2, 21 KTY-5, 21 KTY-6, 12 KTY21 KTY-6, 12 KTY-3, 21 Dam Failure KTY21 KTY21 KTY21 KTY21 a. See the introduction to this volume for explanation of mitigation types. 14.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX 14.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • City of Katy Code of Ordinances — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • City of Katy Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • City of Katy Stormwater Management Ordinance — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. 14.11.2 Staff and Local Stakeholder Involvement in Annex Development This annex was developed over the course of several months with input from many city departments including Public Works, Fire, Police, Finance, and City Secretary office. All departments were asked to contribute to the Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 14-18 annex development through reviewing and contributing to the capability assessment, reporting on the status of previously identified actions, and participating in action identification and prioritization. An action development meeting was held on March 5, 2019 and was attended by representatives from all previously listed department as well as the City Administrator’s office. Once actions had been identified and compiled in the annex, a draft was internally circulated for comment. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(§¨¦10§¨¦10HoustonCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.450.90.225Miles±Katy §¨¦10 §¨¦10 Houston FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.45 0.90.225 Miles ± Katy §¨¦10 §¨¦10 Houston Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.45 0.90.225 Miles ± Katy §¨¦10 §¨¦10 Houston 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.45 0.90.225 Miles ± Katy §¨¦10 §¨¦10 Houston 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.45 0.90.225 Miles ± Katy §¨¦10 §¨¦10 Houston Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.45 0.90.225 Miles ± Katy §¨¦10 §¨¦10 Houston Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.45 0.90.225 Miles ± Katy 15-1 15. CITY OF LA PORTE 15.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Kristin Gauthier, Emergency Management Coordinator 3001 N. 23rd St. La Porte, TX 77571 Telephone: 281-470-0009 e-mail Address: gauthierk@laportetx.gov Johnny Morales, Assistant EMC 3001 N. 23rd St. La Porte, TX 77571 Telephone: 281-470-0011 e-mail Address: moralesj@laportetx.gov 15.2 JURISDICTION PROFILE 15.2.1 Location The City of La Porte is located in southeast Harris County, about 30 minutes southeast of Houston. It is accessible by State Highways 225 and 146. La Porte is located at the entrance to the Houston Ship Channel, and is home to two major Port Houston terminals: Barbours Cut and Bayport. La Porte’s location along the Houston Ship Channel makes it home to numerous petrochemical facilities. The current boundaries generally extend from the city boundaries of Deer Park and Pasadena to the west, Galveston Bay to the east, State Highway 225 to the north, and the Port of Houston Bayport Terminal to the south. The city encompasses an area of approximately 18.6 square miles. 15.2.2 History The City of La Porte was incorporated in 1892. In the early 1900s, La Porte was a popular tourist destination due to its location on Galveston Bay. Originally named Sylvan Grove Park, Sylvan Beach became a nationally recognized tourist destination, and remains one of La Porte’s biggest attractions. Several hurricanes impacted La Porte in the early part of the 20th century, causing tourism in the area to diminish. Following World War II, shipyards and industrial plants began to be developed in the region, resulting in the large petrochemical presence that still exists to this day. 15.2.3 Climate La Porte’s climate is classified as humid subtropical. Prevailing winds from the south and southeast bring heat from the deserts of Mexico and moisture from the Gulf of Mexico. Summer temperatures typically have highs near 90 °F (32 °C), though higher temperatures are not uncommon. The city’s proximity to the bay, and winds that it generates, moderate the area’s temperatures and ease the effects of the humidity, creating a more pleasant climate than inland communities like Houston. Winters in the area are temperate with typical January high of 61 °F (16 °C) and lows are near 42 °F (6 °C). Snowfall is rare. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 15-2 Annual rainfall averages exceed 50 inches, with an annual average of 91 precipitation days. The average elevation of La Porte is approximately 20 feet above sea level. 15.2.4 Governing Body Format The City of La Porte is a Home Rule City, operating under the Council-Manager form of government, with a City Council composed of a Mayor and eight Council members. The Mayor and 2 councilpersons-at-large are elected by a majority vote of the qualified voters of the city at large. The city is divided into 6 districts, Districts 1, 2, 3, 4, 5, and 6; and 1 councilperson is elected from each district by majority vote of the resident voters of such district. The City Council appoints a City Manager to act as the chief administrative and executive officer of the City. The La Porte City Council assumes responsibility for the adoption of this plan; the La Porte Office of Emergency Management will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 15-1. Table 15-1. Local Mitigation Planning Team Members Name Title Kristin Gauthier Emergency Management Coordinator Jason Weeks Assistant City Manager Teresa Evans Director of Planning Lorenzo Wingate City Engineer Alfonso Acosta Deputy Building Official Richard Glass Plans Examiner Ian Clowes City Planner Abrin Brooks GIS Manager 15.3 CURRENT TRENDS 15.3.1 Population According to the U.S. Census, the population of the City of La Porte as of July 2017 was 35,371. Since April 2010, the population has grown by 4.6 percent. 15.3.2 Development Anticipated development levels for La Porte are moderate, consisting primarily of single family and multi-family development with complementary commercial construction. Additional industrial and warehousing construction are also expected. Table 15-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. City of La Porte 15-3 Table 15-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas 1) New construction of 640 single-family homes and 350 multi-family units being built in the Morgan’s Landing Subdivision located along Bay Area Blvd., between Spencer Hwy. and Fairmont Pkwy. A portion of this development is located within the floodplain. 2) New construction of 82 single-family homes and 350 multi-family units being built in the Artesia Village/Hawthorne La Porte development located along the east side of SH 146, between Wharton Weems and Fairmont Pkwy. This development is located within the floodplain. 3) Preliminary proposal for Creekhaven Estates, a development consisting of 45 single – family residential homes located along McCabe Rd., between SH 146 and S. Broadway. This proposed development is located within the floodplain. How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family All Permits 68 87 88 54 76 Special Flood Hazard Area Permits 16 9 13 12 15 Multi-Family All Permits 0 4 1 0 0 Special Flood Hazard Area Permits 1 0 0 0 0 Other (commercial, mixed use, etc.) All Permits 13 24 25 29 22 Special Flood Hazard Area Permits 3 2 3 5 8 Total All Permits 81 115 114 83 98 Special Flood Hazard Area Permits 20 11 16 17 23 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 87 (Total for 2014 – 2018) • Landslide: N/A • High Liquefaction Areas: N/A • Tsunami Inundation Area: N/A • Wildfire Risk Areas: N/A Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. Based on aerial imagery combined with current zoning and knowledge of upcoming projects, it is estimated that approximately 75-80% of buildable land is currently developed. A large portion of our northern city limits is designated as single family large lot. The majority of these lots are developed but the overall density is much less than that of traditional single family subdivisions. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 15-4 15.4 CAPABILITY ASSESSMENT The City of La Porte performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 15-3. • Development and permitting capabilities are presented in Table 15-4. • An assessment of fiscal capabilities is presented in Table 15-5. • An assessment of administrative and technical capabilities is presented in Table 15-6. • An assessment of education and outreach capabilities is presented in Table 15-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 15-8. • Classifications under various community mitigation programs are presented in Table 15-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 15-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Table 15-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes Yes Yes Yes Comment: Code of Ordinances, Subpart B, Chapter 82 – Buildings and Building Regulations; Adoption: 2012 International Residential Code and International Business Code Zoning Code Yes No No Yes Comment: Code of Ordinances, Subpart B, Chapter 106 – Zoning Subdivisions Yes No No No Comment: Code of Ordinances, Subpart B, Chapter 86 – General Plans, Sec. 86-15 – General standards for subdivision & developments Stormwater Management Yes Yes Yes Yes Comment: Code of Ordinances, Subpart A, Chapter 34 – Environment, Article VI – Stormwater Discharges Post-Disaster Recovery Yes Yes No Yes Comment: Annex J – Recovery and post-disaster permitting and code enforcement regulations. Real Estate Disclosure No No Yes No Comment: Growth Management No No No Yes Comment: Site Plan Review Yes Yes No Yes Comment: Code of Ordinances, Chapter 86, Sec. 86-7 Environmental Protection Yes Yes Yes Yes Comment: Code of Ordinances, Subpart A, Chapter 34 – Environment Flood Damage Prevention Yes Yes Yes Yes Comment: Code of Ordinances, Subpart B, Chapter 94 – Floods Emergency Management Yes No Yes Yes Comment: Code of Ordinances, Subpart A, Chapter 26 – Emergency Management; Local Ordinance No. 1498-A Climate Change No Yes No Yes Comment: City of La Porte 15-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Planning Documents General Plan Yes No No Yes Comment: La Porte Comprehensive Plan; Adopted on December 10, 2012; 5-year updated adopted on June 11, 2018 Capital Improvement Plan No No No Yes How often is the plan updated? Comment: Disaster Debris Management Plan Yes No No No Comment: Last updated on June 26, 2014, and Approved by FEMA on August 6, 2014 Floodplain or Watershed Plan No No No Yes Comment: Stormwater Plan Yes No Yes Yes Comment: Last adopted in 2014 Urban Water Management Plan No No No No Comment: Habitat Conservation Plan No Yes Yes No Comment: Economic Development Plan Yes No No No Comment: Chapter 5 of the Comprehensive Plan Shoreline Management Plan No Yes No No Comment: Community Wildfire Protection Plan No Yes No Yes Comment: The City of La Porte does not have its own CWPP implemented. Harris County has completed a county-wide CWPP; which includes all incorporated jurisdictions within Harris County. Forest Management Plan No Yes No No Comment: Climate Action Plan No Yes No Yes Comment: Comprehensive Emergency Management Plan Yes No Yes Yes Comment: Emergency Operations Plan; all annexes last reviewed and approved by the State in June – August 2016 Threat & Hazard Identification & Risk Assessment (THIRA) No Yes Yes Yes Comment: A regional THIRA is conducted on an annual basis for UASI and HGAC. The City participates in the development of the THIRA. Post-Disaster Recovery Plan Yes Yes No Yes Comment: Annex J – Recovery to the City’s Emergency Operations Plan; approved by the State on July 18, 2016 Continuity of Operations Plan Yes No No Yes Comment: Basic Plan and all department plans updated in April – June 2019 Public Health Plan Yes Yes Yes Yes Comment: Annex H – Health and Medical is a component of the City’s Emergency Operations Plan and addresses public health, environmental health, and medical response capabilities. The City does not maintain a standalone Public Health Plan. Pandemic Plan Yes No No Yes Comment: Pandemic Influenza Plan last revised on August 7, 2012 Table 15-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Planning Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 15-6 Table 15-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes – Water and Sewer Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes Table 15-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Planning/Public Works Engineers or professionals trained in building or infrastructure construction practices Yes Public Works Planners or engineers with an understanding of natural hazards Yes Planning/Public Works Staff with training in benefit/cost analysis Yes City Manager’s Office/Finance Surveyors Yes Can contract for service Personnel skilled or trained in GIS applications Yes Planning GIS Division Scientist familiar with natural hazards in local area Yes Can contract for service Emergency manager Yes Emergency Management Grant writers Yes Can contract for service Table 15-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. Floodplain information managed by Public Works/Mapping managed by GIS/Preparedness info managed by Emergency Management Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. La Porte Emergency Management page used to promote preparedness information and events Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes • If yes, briefly describe. Planning & Zoning Commission, Drainage & Flooding Committee Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Phone notification system, sirens, social media, Ready LP app, community events Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Phone notification system, sirens, alerts, Ready LP App City of La Porte 15-7 Table 15-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Public Works Who is your floodplain administrator? (department/position) Public Works/City Engineer Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? April 26, 2010 Does your floodplain management program meet or exceed minimum requirements? Exceeds • If exceeds, in what ways? Various When was the most recent Community Assistance Visit or Community Assistance Contact? May 31, 2018 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? No • If no, state why. Do not address impacts of flash flooding Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes • If so, what type of assistance/training is needed? Floodplain Development Inspections Training Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? Yes • If no, is your jurisdiction interested in joining the CRS program? How many flood insurance policies are in force in your jurisdiction?a 4,961 • What is the insurance in force? $1,371,066,800 • What is the premium in force? $2,946,020 How many total loss claims have been filed in your jurisdiction?a 3,086 • How many claims are still open or were closed without payment? 583 • What were the total payments for losses? $94,819,110.60 a. According to FEMA statistics as of September 30, 2018 Table 15-9. Community Classifications Participating? Classification Date Classified Community Rating System Yes 7 10/1/2017 Building Code Effectiveness Grading Schedule Yes Residential – 5 Commercial – 5 May 26, 2014 Public Protection Yes 2 2018 Storm Ready Yes 12/27/2017 Firewise No N/A N/A Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 15-8 Table 15-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of La Porte 15-9 15.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 15.5.1 Existing Integration This was not a metric in the 2015 Plan. Therefore, integration with other plans and programs was not measured. 15.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Comprehensive Plan – The City’s Comprehensive Plan is the most forward thinking plan the City has in place to identify opportunities for the future. It guides future policy decisions relating to the physical and economic development of the city. Better incorporating mitigation activities into this plan is one of the greatest opportunities for future integration. • Building and Zoning Codes – There is an opportunity for the City to review building and zoning codes, and identify mitigation measures as a priority for existing and future codes. • Capital Improvement Plan – There are opportunities to better structure the City’s Capital Improvement Plan to allow the City to identify and plan for future mitigation projects. • Comprehensive Emergency Management Plan – Annex P to the City’s Emergency Management Plan provides a broad overview of hazard mitigation and structure for conducting mitigation planning activities. During the next review, the City will assess the same 10 hazards that are identified in the Hazard Mitigation Plan. • Citywide Drainage Plan – The Plan looks at the current integrity of the City’s drainage system and provides recommendations for improvement that will be considered in the future. During the next review, the City will review both plans to ensure consistency and inclusion of each identified action item from the Hazard Mitigation Plan. 15.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 15-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of La Porte. Other hazard events that broadly affected the entire planning area, including the City of La Porte are listed in the risk assessments in Volume 1 of this hazard mitigation plan. 15.7 HAZARD RISK RANKING Table 15-12 presents a local ranking for the City of La Porte of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 15-10 Table 15-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Winter Storm 0 1/16/2018 Not Available Flash Flood 0 1/20/2017 Not Available Tornado 0 3/29/2017 Not Available Tropical Storm 4332 DR 8/26/2017 $25,000,000.00 Tornado 4245 DR 10/31/2015 $4,000,000.00 Flash Flood 0 4/17/2015 Not Available Thunderstorm/Wind 0 5/27/2014 Not Available Flash Flood 0 10/22/2009 Not Available Thunderstorm/Wind 0 4/24/2009 Not Available Winter Storm 0 12/10/2008 Not Available Hurricane 1791 DR 9/12/2008 $50,000,000.00 Tropical Storm 1730 DR 8/16/2007 $5,000,000.00 Flash Flood 0 10/16/2006 Not Available Hurricane 1606 DR 9/23/2005 $5,000,000.00 Thunderstorm/Wind 0 7/6/2005 Not Available Tornado 0 10/9/2003 Not Available Tornado 0 3/30/2002 Not Available Tornado 0 10/11/2001 Not Available Tropical Storm 1379 DR 6/11/2001 $21,000,000.00 Tornado 0 9/11/1998 Not Available Tornado 0 4/20/1995 Not Available Table 15-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Flooding 18 High 3 Wildfire 16 Low 4 Earthquake 14 Low 5 Dam Failure 6 Low 5 Drought 6 Low 5 Mass Movement 6 Low 5 Coastal Erosion 6 Low 6 Tsunami 0 (No Exposure) None Notes The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. Based on local knowledge and substantiated data and documentation of previous flooding in La Porte, we believe this category should be ranked as “High”. Based on local knowledge and substantiated data and documentation of previous wildfires in La Porte, we believe this category should be ranked as “Low”. City of La Porte 15-11 15.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 15.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 307 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 70 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 57 15.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issue has been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • The jurisdiction has a high risk of severe weather, flooding, and hurricanes. This includes the threat of strong winds, hail, tornadoes, and storm surge. Based on the jurisdiction’s natural event history, these hazards account for the greatest amount of historical damage in La Porte. Due to the geography of La Porte, the population is most at risk of these three hazard categories. Mitigation actions addressing this issue were prioritized for consideration in the action plan in this annex. 15.9 STATUS OF PREVIOUS PLAN ACTIONS Table 15-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 15-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Installation of a large trunked drainage system within the 3rd Street right-of-way Yes Comment: Project Complete Construct Gladwyne Detention Pond No X LPT5 Comment: Implement a Winter Storm Public Education Program to focus on home heating methods and reduction of fire/structure damage or loss and appropriate insulation techniques. No X Comment: Implement/establish grant program to provide heating systems to LMI populations No X Comment: Improve Air Filtration Systems for CI/public/healthcare/school facilities by increasing capacity or quality to remove more particulates in order to minimize health risks associated with low air quality and to minimize equipment damage due to smoke No X Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 15-12 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Improve or develop a fire buffer zone around critical infrastructure No X Comment: Improve existing site to be utilized as a cooling zone (i.e. – tennis court, shading with mist cooling systems) No X Comment: Install generators/emergency power systems to provide cooling at critical/healthcare facilities No X Comment: Mapping/identification of inundation risk area for high-risk dams/levees No X Comment: Install additional Flood Alert Gauges No X LPT13 Comment: In Progress Acquisition/Buyout program No X LPT14 Comment: In Progress Channel Improvement & Inline Detention Pond (F216-00-00) No X LPT15 Comment: In Progress One Regional Detention Pond for Pinegrove Valley & residents along L St. and P St. (F101-06-00) No X LPT16 Comment: In Progress Backup power for public buildings and utilities currently without generators No X Comment: Install wind load proof window coverings on city buildings Yes Comment: Project Complete Implement Debris Management Program No X LPT18 Comment: Construct safe rooms in vulnerable public areas (ex: parks & various public buildings) No X LPT19 Comment: Install a Weather/Lightning alert system to minimize damage and risk to local athletic facilities and other public events. Yes Comment: A lightning warning system has been added to our weather subscription Install a covered parking area (protective structure) at Public Works and/or the Police Department for City vehicles and equipment in order to decrease the potential for damage as a result of hail. No X LPT20 Comment: Conduct a Risk Management Program to examine the potential hazards, as well as the various sources of these hazards within the city. No X Comment: In Progress – a fixed industrial facility study was completed for La Porte and can serve as a component of this project Enhance and expand the City’s current outdoor warning sirens to provide coverage to areas not in audible range at this time. No X LPT22 Comment: In Progress – all sirens have been upgraded to add solar panels. No additional sirens have been added. Develop a Pipeline Response and Safety Program No X Comment: Development/modification of ordinances for mitigation of drought related hazards by restricting or limiting water use during drought conditions and water shortages. No X LPT24 City of La Porte 15-13 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Comment: Develop/implement water smart program to educate the public on how to conserve water, especially during drought conditions. No X LPT25 Comment: Install a Mass Notification system that can warn the public of impending flooding due to dam failure. No X Comment: There are County notification systems, so this project is no longer needed. 15.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 15-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 15-15 identifies the priority for each action. Table 15-16 summarizes the mitigation actions by hazard of concern and mitigation type. Table 15-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action LPT1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Flooding, Hurricane Existing 3, 4, 10 Public Works Planning High HMGP, PDM, FMA Short-term Action LPT2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including the Comprehensive Plan, Building and Zoning Codes, Capital Improvement Plan, Citywide Drainage Plan, etc. Hazards Mitigated: Dam Failure, Drought, Earthquake, Flooding, Mass Movement, Severe Weather, Hurricane, Wildfire, Coastal Erosion New and Existing 3, 6, 9, 10, 11, 12, 15 OEM Planning/Public Works Low Staff Time, General Funds Ongoing Action LPT3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: All hazards New and Existing 3, 9, 10, 11 OEM Planning Low Staff Time, General Funds Short-term Action LPT4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Flooding, Severe Weather New and Existing 1, 3, 5, 7, 8, 10 Public Works Planning Low Staff Time, General Funds Ongoing Action LPT5 — Construct Gladwyne Detention Pond Hazards Mitigated: Flooding New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP, PDM, FMA Short-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 15-14 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action LPT6 — Purchase generators for critical facilities and infrastructure that lack adequate back-up power. Hazards Mitigated: Severe Weather, Hurricane New and Existing 4, 10, 13 Public Works Parks and Recreation Medium General Funds, HMGP, PDM, FMA Short-term Action LPT7 — Brookglen Flooding Mitigation Analysis Hazards Mitigated: Flooding New and Existing 4, 8, 10, 11, 12 Public Works Planning Medium Staff Time, General Funds, Water Development Grant Short-term Action LPT8 — Bayside Terrace Drainage Improvements Hazards Mitigated: Flooding, Hurricane New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP, PDM, FMA Short-term Action LPT9 — Lomax/F101-06-00 – Drainage Channel Improvements Hazards Mitigated: Flooding New and Existing 4, 8, 10, 11, 12 Public Works Planning Medium General Funds, HMGP, PDM, FMA Short-term Action LPT10 — Little Cedar Bayou/F216 Phase III Improvements Hazards Mitigated: Flooding New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP, PDM, FMA Short-term Action LPT11- 6th Street (Madison to Main) Paving and Drainage Hazards Mitigated: Flooding New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP, PDM, FMA, CDBG Short-term Action LPT12 – 8th St and D St Storm Water and Conveyance Improvements Hazards Mitigated: Flooding New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP, PDM, FMA Short-term Action LPT13 – Install additional Flood Alert Gauges Hazards Mitigated: Flooding New and Existing 1, 4, 8, 10, 11, 12 OEM Public Works Low General Funds, HMGP, PDM, FMA Short-term Action LPT14 – Acquisition/Buyout Program Hazards Mitigated: Flooding, Hurricane Existing 4, 10, 11, 12 Planning Public Works High HMGP, PDM, FMA Ongoing Action LPT15 – Channel Improvement & Inline Detention Pond (F216-00-00) Hazards Mitigated: Flooding New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP, PDM, FMA Short-term Action LPT16 – One Regional Detention Pond for Pinegrove Valley & residents along L St. and P St. (F101-06-00) Hazards Mitigated: Flooding New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP, PDM, FMA Short-term City of La Porte 15-15 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action LPT17 – Construct new Public Works facility Hazards Mitigated: Severe Weather, Hurricane Existing 10, 11, 13, 15 Public Works Parks and Recreation High General Funds, HMGP, PDM, FMA Short-term Action LPT18 – Implement Debris Management Program Hazards Mitigated: Earthquake, Flooding, Severe Weather, Hurricane, Tsunami, Wildfire Existing 7, 9, 10, 13 Public Works OEM Low Staff Time, General Funds Ongoing Action LPT19 – Construct safe rooms in vulnerable public areas (Ex: parks and various public buildings) Hazards Mitigated: Severe Weather New and Existing 3, 10, 11, 13 Parks and Recreation OEM High General Funds, HMGP, PDM Short-term Action LPT20 – Install a covered parking area (protective structure) at Public Works and/or the Police Department for City vehicles and equipment in order to decrease the potential for damage as a result of hail. Hazards Mitigated: Severe Weather, Hurricane Existing 11, 12, 13 Police Department OEM Low General Funds, HMGP, PDM, FMA Short-term Action LPT21 – Bob’s Gully Drainage Improvements Hazards Mitigated: Flooding New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP, PDM, FMA Short-term Action LPT22 – Enhance and expand the City’s current outdoor warning sirens to provide coverage to areas not in audible range at this time. Hazards Mitigated: Severe Weather New 1, 10 OEM Police Department Low General Funds Ongoing Action LPT23 – Battleground Estates Phase II Drainage Improvements Hazards Mitigated: Flooding New and Existing 4, 8, 10, 11, 12 Public Works Planning Medium General Funds, HMGP, PDM, FMA Short-term Action LPT24 – Development/modification of ordinances for mitigation of drought related hazards by restricting or limiting water use during drought conditions and water shortages. Hazards Mitigated: Drought New and Existing 8, 9, 10, 11, 14 Public Works Finance Low Staff Time Short-term Action LPT25 – Develop/implement water smart program to educate the public on how to conserve water, especially during drought conditions. Hazards Mitigated: Drought New and Existing 8, 9, 10, 11, 14 Public Works Finance Low Staff Time, General Funds Ongoing Action LPT26— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Dam Failure, Drought, Earthquake, Flooding, Mass Movement, Severe Weather, Hurricane, Wildfire, Coastal Erosion New and Existing 1, 3, 4, 5, 9, 10, 11, 15 City Administration HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 15-16 Table 15-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya LPT1 3 High High Yes Yes No Medium High LPT2 7 Medium Low Yes No Yes High Low LPT3 4 Low Low Yes No Yes High Low LPT4 6 Medium Low Yes No Yes High Low LPT5 5 Medium High No Yes No High High LPT6 3 High Medium Yes Yes No Medium Medium LPT7 5 High Medium Yes Yes No High High LPT8 5 Medium High No Yes No High Medium LPT9 5 Medium Medium Yes Yes No High Medium LPT10 5 High High Yes Yes No High High LPT11 5 High High Yes Yes Yes High High LPT12 5 High High, Yes Yes No High High LPT13 6 High Low Yes Yes No Low Low LPT14 4 High High Yes Yes No Low Low LPT15 5 High High Yes Yes Yes High High LPT16 5 High High Yes Yes No Medium Medium LPT17 4 High High Yes Yes No Low Low LPT18 4 Low Low Yes No Yes Low Low LPT19 4 Low High No Yes No Low Low LPT20 3 Medium Low Yes Yes No Medium Medium LPT21 5 Medium High No Yes No High Medium LPT22 2 Low Low Yes No No Low Low LPT23 5 Medium Medium Yes Yes No Medium Medium LPT24 5 Low Low Yes No Yes Low Low LPT25 5 Low Low Yes No Yes Low Low LPT26 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. City of La Porte 15-17 Table 15-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather LPT-2, 4, 18, 26 LPT-6, 17, 19, 20 LPT4, 18, 26 LPT-6, 20, 22, 26 LPT-17, 19, 20 LPT-2, 3, 4, 22, 18, 26 Hurricane LPT-1, 2, 14, 18, 26 LPT-1, 6, 14, 17, 20 LPT-18, 26 LPT-6, 20, 26 LPT-8, 17, 20 LPT-2, 3, 18, 26 Flooding LPT-1, 2, 4, 7, 14, 18, 26 LPT-1, 14 LPT-4, 13, 18, 26 LPT-13, 26 LPT-5, 8, 9, 10, 11, 15, 16, 21, 23 LPT-2, 3, 4, 7, 18, 26 Low-Risk Hazards Dam Failure LPT-2, 26 LP{T26 LPT26 LPT-2, 3, 26 Drought LPT-2, 24, 25, 26 LPT-25, 26 LPT26 LPT-2, 3, 24, 25, 26 Earthquake LPT-2, 18, 26 LPT-18, 26 LPT26 LPT-2, 3, 18, 26 Mass Movement LPT-2, 26 LPT26 LPT26 LPT-2, 3, 26 Tsunami LPT-2, 18, 26 LPT-18, 26 LPT26 LPT-2, 3, 18, 26 Wildfire LPT-2, 18, 26 LPT-18, 26 LPT26 LPT-2, 3, 18, 26 a. See the introduction to this volume for explanation of mitigation types. 15.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • La Porte Municipal Code — The municipal code/code of ordinances was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • La Porte Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • La Porte Comprehensive Plan – The comprehensive plan was used to answer various questions related to future growth in the city, building and zoning practices, and existing plans related to mitigation activities. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«225¬«225¬«146¬«146HoustonHoustonBaytownDeer ParkPasadenaMorgan'sPointShoreacresPasadenaPasadenaCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.71.40.35Miles±La Porte ¬«225 ¬«225 ¬«146 ¬«146 Houston Houston Baytown Deer Park Pasadena Morgan's Point Shoreacres Pasadena Pasadena FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.7 1.40.35 Miles ± La Porte ¬«225 ¬«225 ¬«146 ¬«146 Houston Houston Baytown Deer Park Pasadena Morgan's Point Shoreacres Pasadena Pasadena Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.7 1.40.35 Miles ± La Porte ¬«225 ¬«225 ¬«146 ¬«146 Houston Houston Baytown Deer Park Pasadena Morgan's Point Shoreacres Pasadena Pasadena 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.7 1.40.35 Miles ± La Porte ¬«225 ¬«225 ¬«146 ¬«146 Houston Houston Baytown Deer Park Pasadena Morgan's Point Shoreacres Pasadena Pasadena 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.7 1.40.35 Miles ± La Porte ¬«225 ¬«225 ¬«146 ¬«146 Houston Houston Baytown Deer Park Pasadena Morgan's Point Shoreacres Pasadena Pasadena Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.7 1.40.35 Miles ± La Porte ¬«225 ¬«225 ¬«146 ¬«146 Houston Houston Baytown Deer Park Pasadena Morgan's Point Shoreacres Pasadena Pasadena Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.7 1.40.35 Miles ± La Porte 16-1 16. CITY OF MISSOURI CITY 16.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Trameka Jewett, Emergency Management Coordinator 3849 Cartwright Road Missouri City, Texas 77459 Telephone: 281-403-4370 email address:trameka.jewett@missouricitytx.gov Matt Rios, Assistant Chief- Fire Marshal 3849 Cartwright Road Missouri City, Texas 77459 Telephone: 281-403-4309 email address:mrios@missouricitytx.gov 16.2 JURISDICTION PROFILE 16.2.1 Location The City of Missouri City is located on the east side of Fort Bend County, and a small portion of the city is located within the southern portion of Harris County. The total square miles located within the city limits is 30.3. The City of Missouri City’s Fire and Rescue Services also responds to a portion of our Extra-Territorial Jurisdiction, located within Fort Bend County, which is the city’s unincorporated limits. The current boundaries generally extend west of the eastern City of Sugar Land’s city limits along Hwy 6 to the western city limit of Arcola. The City of Missouri City’s northern borders abut the southern edges of the City of Stafford and portions of Harris County. The southern portion of our city limits currently abuts the Fort Bend County limits encompassing an area of approximately 30 square miles. 16.2.2 History The City of Missouri City was incorporated in February of 1956 and had an approximate city population of 75,000 as of 2017. In October of 1894, Missouri City was officially registered in the records of Harris County clerk and September of 1895 in Fort Bend County, thus marking the first beginnings of Missouri City. Since this time, Missouri City has grown, not only in its small 600 citizen population at the time of registration but also in its land use. Long gone are the days of farmers and ranchers that settled the land in the early 1800s, the city now boasts 488 miles of streets and roads, 35 parks and undeveloped areas that cover almost 920 acres, as well as an above the state average for median household income. 16.2.3 Climate The climate in the City of Missouri City typically have summers that are long, hot, and oppressive; the winters are short, cold, and windy; and it is wet and partly cloudy year-round. Over the year, the temperature typically varies from 45°F to 93°F and is rarely below 33°F or above 98°F. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 16-2 16.2.4 Governing Body Format The City of Missouri City is governed as a general law city with a Mayor, Mayor Pro-Tem, and five City Council Members. These elected officials are supported by a City Manager, Assistant City Managers, City Secretary, Fire and Police Chiefs, Human Resources Director, Municipal Court Director, and Public Works Director. The City Council assumes responsibility for the adoption of this plan; City Manager will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 1-1. Table 16-1. Local Mitigation Planning Team Members Name Title Eugene Campbell, Jr. Fire Chief Shashi Kumar Public Works Director Matt Rios Assistant Chief- Fire Marshal 16.3 CURRENT TRENDS 16.3.1 Population According to the U.S. Census, the population of the City of Missouri City as of July 2017 was 74,497. Since April 2010, the population has grown at an average annual rate of 11.7 percent. 1.3.2 Development Table 16-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Table 16-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? NO • If yes, give the estimated area annexed and estimated number of parcels or structures. Is your jurisdiction expected to annex any areas during the performance period of this plan? NO • If yes, describe land areas and dominant uses. • If yes, who currently has permitting authority over these areas? Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas The Texas Parkway corridor is undergoing revitalization efforts and is not in any known hazard risk areas City of Missouri City 16-3 Criterion Response How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 333 303 251 331 501 Multi-Family 312 29 215 0 0 Other (commercial, mixed use, etc.) 307 448 315 385 692 Total 952 753 781 716 1193 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: # 0 • Landslide: # 0 • High Liquefaction Areas: # 0 • Tsunami Inundation Area: # 0 • Wildfire Risk Areas: # 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. Currently, there several areas of land that are being developed for commercial use as well as residential construction. The Hwy 90A and Beltway 8 area are scheduled to build an estimated 1.5 to 3 million square feet of warehouse/ office building in the next two years alone. Hwy 6 south is also developing additional commercial retail areas with the majority of the new construction near the Fort Bend Toll road area. Along the Fort Bend Toll Road area, a large amount of new residential construction is developing along with a new 270,000 sf power center and mixture of commercial small retail shops intermingled within the new subdivisions and commercial space.. 16.4 CAPABILITY ASSESSMENT The City of Missouri City performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 16-3. • Development and permitting capabilities are presented in Table 16-4. • An assessment of fiscal capabilities is presented in Table 16-5. • An assessment of administrative and technical capabilities is presented in Table 16-6. • An assessment of education and outreach capabilities is presented in Table 16-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 16-8. • Classifications under various community mitigation programs are presented in Table 16-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 16-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 16-4 Table 16-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No No No Comment: International Building Code (03-02-2015, Ordinance O-15-08) Zoning Code Yes No Yes No Comment: Zoning Ordinance (01-19-1981, Ordinance O-81-1) Subdivisions Yes No Yes Yes Comment: Subdivision Ordinance (03-18-1974, Ordinance No. 158) Stormwater Management Yes Yes Yes Yes Comment: Updated May 2014 Post-Disaster Recovery No No No No Comment: Real Estate Disclosure No No No No Comment: Growth Management Yes Yes No Yes Comment: Site Plan Review Yes Yes Yes Yes Comment: See Building Code, Zoning Ordinance, Subdivision Ordinance above Environmental Protection No No No No Comment: Flood Damage Prevention Yes Yes Yes Yes Comment: Emergency Management Yes Yes Yes Yes Comment: Climate Change No No No No Comment: Planning Documents General Plan Yes No Yes Yes Comment: 2017 Missouri City Comprehensive Plan (06-19-2017, Ordinance O-17-16) Capital Improvement Plan Yes No No Yes How often is the plan updated? Annually Comment: Disaster Debris Management Plan No No No No Comment: Floodplain or Watershed Plan Yes Yes No Yes Comment: Stormwater Plan Yes Yes Yes Yes Comment: Urban Water Management Plan No No No No Comment: Habitat Conservation Plan No No No No Comment: Economic Development Plan Yes No No No Comment: City plan Shoreline Management Plan No No No No Comment: City of Missouri City 16-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Community Wildfire Protection Plan Yes Yes No No Comment: Forest Management Plan No No No No Comment: Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes Yes No No Comment: Annex in Fort Bend Co. Plan Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes No No Comment: Post-Disaster Recovery Plan Yes Yes No No Comment: Fort Bend Co. Annex Continuity of Operations Plan Yes Yes No No Comment: Public Health Plan Yes Yes No No Comment: Fort Bend Co. Annex Table 16-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Development Services Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? Yes Table 16-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes (water and sewer) Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 16-6 Table 16-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Development Services; Public Works/City of Missouri City/Director, Assistant Director, Manager Engineers or professionals trained in building or infrastructure construction practices Yes Public Works Director and Building Officials office Planners or engineers with an understanding of natural hazards No Staff with training in benefit/cost analysis Yes Finance Director/ Department Surveyors No Contracted out Personnel skilled or trained in GIS applications Yes Public Works/City of Missouri City/GIS Division Scientist familiar with natural hazards in local area No Emergency manager Yes Fire Department/ EMC Grant writers No Table 16-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes The Fort Bend County Hazard mitigation plan that our city has an annex in is available on the city’s website. • If yes, briefly describe. Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. Through messages and information on our, City maintained website Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? Yes We have a “Missouri City Ready” website, specifically for Emergency Management communications. • If yes, briefly describe. Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Alert Center through City website through email and cell phone options. City of Missouri City 16-7 Table 16-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Public Works Who is your floodplain administrator? (department/position) Public Works/ Director Are any certified floodplain managers on staff in your jurisdiction? Public Works/ City Engineer What is the date that your flood damage prevention ordinance was last amended? March 3rd, 2014 Does your floodplain management program meet or exceed minimum requirements? Exceeds • If exceeds, in what ways? the requirement that lowest finished flows be elevated 12 inches above base flood elevation When was the most recent Community Assistance Visit or Community Assistance Contact? Scheduled August 15th, 2019 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes However, backwater impacts are not mapped • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes • If so, what type of assistance/training is needed? Financial Assistance Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? Yes • If no, is your jurisdiction interested in joining the CRS program? How many flood insurance policies are in force in your jurisdiction?a Approximately 4,000 • What is the insurance in force? $Unknown • What is the premium in force? $Unknown How many total loss claims have been filed in your jurisdiction?a 120 • How many claims are still open or were closed without payment? 116 • What were the total payments for losses? $1,992,728 a. According to FEMA statistics as of December 2018 Table 16-9. Community Classifications Participating? Classification Date Classified Community Rating System Yes 7 October 1st, 2017 Building Code Effectiveness Grading Schedule Yes ISO 1 August 1st, 2016 Public Protection No N/A Storm Ready No N/A Firewise No N/A Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 16-8 Table 16-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Rating Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Missouri City 16-9 16.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 16.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Fort Bend County Hazard Mitigation Plan 16.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • City of Missouri City Comprehensive Plan: As the City continues to grow, issues such as an aging infrastructure, the preservation of neighborhoods, encouraging economic development and strategic investments continue to emerge as challenges which the community must address. This Plan is provided to assist all members of the community in responding to these challenges ahead and to build upon the City’s reputation as an inclusive, beautiful, safe, enjoyable and overall great place to live. • City of Missouri City Subdivision Ordinance: All subdivisions in the city and in its extraterritorial jurisdiction shall be platted in conformance with the comprehensive plan of the city. 16.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 16-11 lists past occurrences of natural hazards for which specific damage was recorded in Missouri City. Other hazard events that broadly affected the entire planning area, including Missouri City, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. 16.7 HAZARD RISK RANKING Table 16-12 presents a local ranking for Missouri City of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. 16.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 16-10 Table 16-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Rain event/ flooding N/A 5-7-19 Unknown, street flooding in multiple areas Hurricane Harvey DR-4332 8/23/17 $Unknown Rain/ Flooding event DR-4269 4/18/16 $Unknown Wind/ Thunderstorm DR-4272 5/29/15 $2,000 Wind/ Thunderstorm N/A 5/18/15 $50,000 Rain/ Flooding N/A 4/28/09 Unknown Wildfire N/A 5/26/06 303 Acres burned Hail N/A 4/11/04 $15,000 Hail N/A 4/7/03 $5,000 Hail N/A 3/30/02 $Unknown Rain/ Tropical Storm N/A 6/7/01 $Unknown Hail N/A 4/16/01 $2,000,000 Hail N/A 7/17/98 $5,000 Rain/ Tropical Storm N/A 7/29/95 Unknown Tornado N/A 4/7/93 $50,000 Table 16-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 2 Hurricane 35 High 3 Flood 32 High 4 Dam/Levee Failure 18 Medium 5 Drought 15 Medium 6 Earthquake 14 Low 7 Wildfire 6 Low 7 Mass Movements 6 Low 8 Coastal Erosion 0 (No Exposure) None 8 Tsunami 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 16.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 48 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 5 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 2 16.8.2 Other Noted Vulnerabilities No jurisdiction-specific issues were identified from a review of the results of the risk assessment and other available resources. City of Missouri City 16-11 16.9 STATUS OF PREVIOUS PLAN ACTIONS Table 16-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 16-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 1. Detention Area Outfall and Levee Improvements No x MSS16 Comment: At Kitty Hollow Lake, Vicksburg Diversion Channel, Weir Enlargement, and channel improvements for the Vicksburg Diversion Channel 2. Channel Improvements No x MSS17 Comment: Along Mustang Bayou Diversion Channel from the confluence with the old channel to Kitty Hollow Lake Detention area 3. Replace Culvert No x MSS18 Comment: Replacement of the Watts-Plantation Road Culvert with appropriately sized box culverts 4. Channel Improvements Ongoing x MSS19 Comment: Mustang Bayou Channel from the GCWA Canal thru Thunderbird North Subdivision including the reconstruction of the bridge at Turtle Creek Dr. 5. Channel Improvements Yes x MSS20 Comment: Along Mustang Bayou from the Thunderbird North Subdivision to the confluence with old channel; including pipeline relocations and a sheet pile structure. 6. Extend Canal Flume No x MSS21 Comment: Extend Briscoe Canal Flume over Lower Oyster Creek 7. Channel Improvements No x MSS22 Comment: Along Long Point Creek Overflow Channel upstream of the Brisco Canal Flume 8. Promote Flood Insurance Ongoing x MSS23 Comment: Providing information about the National Flood Insurance Program 9. Improve NFIP CRS Rating Ongoing x MSS24 Comment: Evaluate ways to improve the City’s Community Rating System (CRS) to reduce the Flood Insurance Premium 10. Understanding Dam/Levee Failure Risks No x MSS25 Comment: Engage with County and State Floodplain Managers, Engineers and Emergency Managers to ensure that local officials have a detailed understanding of potential risks to the community from dam and/or levee failures 11. Evacuation Plans Ongoing x MSS26 Comment: Engage with County and State Floodplain Managers, Engineers and Emergency Managers to ensure that local officials have a detailed understanding of potential risks to the community from dam and/or levee failures. This will allow for a more comprehensive evacuation plan, routes, and at-risk areas that will need to be focused on in the event of an evacuation notice. 12. Upgrades to At-Risk Public Structures No x MSS27 Comment: Initiate upgrades to at-risk public facilities that includes structurally fortifying facilities, impact resistant film or glass, surge protection systems, mandate freeboard for new development, etc. Mitigates specific risks to structures, people, and operations. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 16-12 16.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 16-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 16-15 identifies the priority for each action. Table 16-16 summarizes the mitigation actions by hazard of concern and mitigation type. Table 16-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action MSS1 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions within the community of Missouri City. Hazards Mitigated: Levee failure, drought, flooding, wildfire New 9, 10, 11,14 City Administration TBD Low Staff Time, General Funds Ongoing Action MSS2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Flood, Dam/Levee Failure, Drought, Earthquake, Wildfire, Mass Movements New and Existing 9, 10, 11,14 City Administration TBD Low Staff Time, General Funds Short-term Action MSS3 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Levee failure, flooding, severe weather, hurricane New and Existing 3, 10, 11,14 City Administration TBD Low Staff Time, General Funds Ongoing Action MSS4 — Detention Area Outfall and Levee Improvements (At Kitty Hollow Lake, Vicksburg Diversion Channel, Weir Enlargement, and channel improvements for the Vicksburg Diversion Channel) Hazards Mitigated: Flooding, Severe Weather, Hurricane Existing 7,11 City Administration TBD High General and/or Grant funds Long term Action MSS5 — Channel Improvements along Mustang Bayou Diversion Channel from the confluence with the old channel to Kitty Hollow Lake Detention area Hazards Mitigated: Flooding, Severe Weather, Hurricane Existing 7,11 City Administration TBD High General and/or Grant funds Long term Action MSS6 — Replacement of the Watts-Plantation Road Culvert with appropriately sized box culverts Hazards Mitigated: Flooding, Severe Weather, Hurricane New 7,11 City Administration TBD High General and/or Grant funds Long term Action MSS7 — Channel improvements along Mustang Bayou Channel from the GCWA Canal thru Thunderbird North Subdivision including the reconstruction of the bridge at Turtle Creek Dr. Hazards Mitigated: Flooding, Severe Weather, Hurricane New and Existing 7,11 City Administration TBD High General and/or Grant funds Long term Action MSS8 — Channel improvements along Mustang Bayou from the Thunderbird North Subdivision to the confluence with old channel; including pipeline relocations and a sheet pile structure. Hazards Mitigated: Flooding, Severe Weather, Hurricane New and Existing 7,11 City Administration TBD High General and/or Grant funds Long term Action MSS9 — Extend Briscoe Canal Flume over Lower Oyster Creek Hazards Mitigated: Flooding, Severe Weather, Hurricane New and Existing 7,11 City Administration TBD High General and/or Grant funds Long term Action MSS10 — Channel improvements along Long Point Creek Overflow Channel upstream of the Briscoe Canal Flume Hazards Mitigated: Flooding, Severe Weather, Hurricane New and Existing 7,11 City Administration TBD High General and/or Grant funds Long term City of Missouri City 16-13 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action MSS11 — Promote Flood Insurance Hazards Mitigated: Flooding New and Existing 9 City Administration TBD Low Staff Time, General Funds Short term Action MSS12 — Improve NFIP CRS Rating Hazards Mitigated: Flooding New and Existing 9 City Administration TBD Low Staff Time, General Funds Short term Action MSS13 — Engage with County and State Floodplain Managers, Engineers and Emergency Managers to ensure that local officials have a detailed understanding of potential risks to the community from dam and/or levee failures Hazards Mitigated: Dam and Levee Failure Existing 3,7,9,11 City Administration High Low Staff Time, General Funds Short term Action MSS14 — Develop evacuation plans in the event of dam and/or levee failures Hazards Mitigated: Dam and Levee Failure Existing 9,10 City Administration TBD Low Staff Time, General Funds Short term Action MSS15 — Initiate upgrades to at-risk public facilities that includes structurally fortifying facilities, impact resistant film or glass, surge protection systems, mandate freeboard for new development, etc. Mitigates specific risks to structures, people, and operations Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire Existing 11,13 City Administration TBD High General and/or Grant funds Long term Action MSS16 — Detention Area Outfall and Levee Improvements. At Kitty Hollow Lake, Vicksburg Diversion Channel, Weir Enlargement, and channel improvements for the Vicksburg Diversion Channel Hazards Mitigated: Flood, Severe Weather Existing 11,13,15 City Administration TBD High General and/or Grant funds Short Term Action MSS17 — Channel Improvements. Along Mustang Bayou Diversion Channel from the confluence with the old channel to Kitty Hollow Lake Detention area Hazards Mitigated: Flood, Severe Weather Existing 11,13,15 City Administration TBD High General and/or Grant funds Short Term Action MSS18 — Culvert Replacement. Replacement of the Watts-Plantation Road Culvert with appropriately sized box culverts Hazards Mitigated: Flood, Severe Weather Existing 11,13,15 City Administration TBD High General and/or Grant funds Short Term Action MSS19 — Channel Improvements. Mustang Bayou Channel from the GCWA Canal thru Thunderbird North Subdivision including the reconstruction of the bridge at Turtle Creek Dr. Hazards Mitigated: Flood, Severe Weather Existing 11,13,15 City Administration TBD High General and/or Grant funds Short Term Action MSS20 — Channel improvements. Along Mustang Bayou from the Thunderbird North Subdivision to the confluence with old channel; including pipeline relocations and a sheet pile structure. Hazards Mitigated: Flood Severe weather Existing 11,13,15 City Administration TBD High General and/or Grant funds Short Term Action MSS21 — Extend Briscoe Canal Flume over Lower Oyster Creek Hazards Mitigated: Flood, Severe Weather New 11,13,15 City Administration TBD High General and/or Grant funds Short Term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 16-14 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action MSS22 — Channel Improvements. Along Long Point Creek Overflow Channel upstream of the Brisco Canal Flume Hazards Mitigated: Flood, Severe Weather Existing 11,13,15 City Administration TBD High General and/or Grant funds Short Term Action MSS23 — Promote Flood Insurance. Providing information about the National Flood Insurance Program Hazards Mitigated: Flood, Severe Weather New and Existing 3,9,10 Public Works HCFCD Low General Fund Ongoing Action MSS24 — Improve CRS rating. Evaluate ways to improve the City’s Community Rating System (CRS) to reduce the Flood Insurance Premium Hazards Mitigated: Flood, Severe Weather New and Existing 3,9,10 Public Works TBD Low General Fund )n-going Action MSS25 — Engage with County and State Floodplain Managers, Engineers and Emergency Managers to ensure that local officials have a detailed understanding of potential risks to the community from dam and/or levee failures Hazards Mitigated: Dam/Levee failure Flood , Severe Weather Existing 11,13,15 Public Works HCFCD High General and/or Grant funds Short Term Action MSS26 — Engage with County and State Floodplain Managers, Engineers and Emergency Managers to ensure that local officials have a detailed understanding of potential risks to the community from dam and/or levee failures. This will allow for a more comprehensive evacuation plan, routes, and at-risk areas that will need to be focused on in the event of an evacuation notice. Hazards Mitigated: Dam/Levee failure Flood , Severe Weather New and Existing 1,3,7,9,10,15 Emergency Management Public Works High General and/or Grant funds Short Term Action MSS27 — Initiate upgrades to at-risk public facilities that includes structurally fortifying facilities, impact resistant film or glass, surge protection systems, mandate freeboard for new development, etc. Mitigates specific risks to structures, people, and operations Hazards Mitigated: Hurricane, Severe Weather, Flood Existing 13,15 City Administration TBD High General and/or Grant funds Short Term Action MSS28— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flood, Dam/Levee Failure, Drought, Earthquake, Wildfire, Mass Movements New and Existing 1, 3, 4, 5, 9, 10, 11, 15 City Administration HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. City of Missouri City 16-15 Table 16-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya MSS1 4 High Low Yes No Yes High Low MSS2 4 Medium Low Yes No Yes High Low MSS3 4 Low Low Yes No Yes High Low MSS4 2 High High Yes Yes No High High MSS5 2 High High Yes Yes No High High MSS6 2 High High Yes Yes No High High MSS7 2 High High Yes Yes No High High MSS8 2 High High Yes Yes No High High MSS9 2 High High Yes Yes No High High MSS10 2 High High Yes Yes No High High MSS11 1 Medium Low Yes No Yes Medium Low MSS12 1 Medium Low Yes No Yes Medium Low MSS13 4 Medium Low Yes No Yes Medium Low MSS14 2 Medium Low Yes No Yes Medium Low MSS15 2 High High Yes Yes No High High MSS16 3 High High Yes Yes No Medium High MSS17 3 High High Yes Yes No Medium High MSS18 3 High High Yes Yes No Medium High MSS19 3 High High Yes Yes No Medium High MSS20 3 High High Yes Yes No Medium High MSS21 3 High High Yes Yes No Medium High MSS22 3 High High Yes Yes No Medium High MSS23 3 Medium Low Yes No Yes High None MSS24 3 Medium Low Yes No Yes High None MSS25 3 High High Yes Yes No Medium High MSS26 6 High High Yes Yes No Medium High MSS27 2 High High Yes Yes No Medium High MSS28 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 16-16 Table 16-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Hurricanes/ Coastal Storms MSS4,5,6,7 ,8,9,15, 28 MSS3,15,27 MSS28 MSS25, 28 MSS4,5,6,7, 8,9,10,15 MSS2,3,25, 28 Flood MSS1,4,5,6 ,7,8,9,10,15 ,24, 28 MSS3,15,23, 24,27 MSS11,23,24, 28 MSS1,24 MSS24,25, 28 MSS4,5,6,7, 8,9,10,15,16, 17,18,19,20, 21,22,24 MSS11,24 MSS1,2,3,11 ,12,24,25, 28 Severe Weather MSS4,5,6,7 ,8,9,10,15, 28 MSS3,15,27 MSS28 MSS25, 28 MSS4,5,6,7, 8,9,10,15,16, 17,18,19,20, 21,22 MSS2,3,25, 28 Medium-Risk Hazards Dam/ Levee Failure MSS1,13,1 4, 238 MSS3 MSS13, 28 MSS1 MSS28 MSS1,2,3,13 ,14, 28 Drought MSS1, 28 MSS28 MSS1 MSS28 MSS1,2, 289 Low-Risk Hazards Wildfire MSS1,15, 28 MSS15 MSS28 MSS1 MSS28 MSS15 MSS1,2, 28 Mass Movements MSS28 MSS28 MSS28 MSS2, 28 Earthquake MSS15, 28 MSS15 MSS28 MSS15 MSS2, 28 a. See the introduction to this volume for explanation of mitigation types. 16.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • Fort Bend County Hazard Mitigation Plan- Reviewed Missouri City’s Annex for data to complete Phase 2 document The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«6¬«6¬«6§¨¦69£¤90£¤90HoustonMeadowsPlaceStaffordPearlandPearlandCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.951.90.475Miles±Missouri City ¬«6 ¬«6 ¬«6 §¨¦69 £¤90 £¤90 Houston Meadows Place Stafford Pearland Pearland FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.95 1.90.475 Miles ± Missouri City ¬«6 ¬«6 ¬«6 §¨¦69 £¤90 £¤90 Houston Meadows Place Stafford Pearland Pearland Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.95 1.90.475 Miles ± Missouri City ¬«6 ¬«6 ¬«6 §¨¦69 £¤90 £¤90 Houston Meadows Place Stafford Pearland Pearland 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.95 1.90.475 Miles ± Missouri City ¬«6 ¬«6 ¬«6 §¨¦69 £¤90 £¤90 Houston Meadows Place Stafford Pearland Pearland 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.95 1.90.475 Miles ± Missouri City ¬«6 ¬«6 ¬«6 §¨¦69 £¤90 £¤90 Houston Meadows Place Stafford Pearland Pearland Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.95 1.90.475 Miles ± Missouri City ¬«6 ¬«6 ¬«6 §¨¦69 £¤90 £¤90 Houston Meadows Place Stafford Pearland Pearland Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.95 1.90.475 Miles ± Missouri City 17-1 17. CITY OF MORGAN’S POINT 17.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Chief Sherri Ditrich 510 Bayridge Morgan’s Point, TX. 77571 281-471-2171 sditrich@morganspoint-tx.com Brian Schneider 510 Bayridge Morgan’s Point, TX. 77571 281-471-2171 bschneider@morganspoint-tx.com 17.2 JURISDICTION PROFILE 17.2.1 Location City of Morgan’s Point is located 30 miles east of Houston in Harris County adjacent to Galveston Bay at the inlet to the Houston Ship Channel. 17.2.2 History Located at the junction of Buffalo Bayou and San Jacinto Bay, the townsite of New Washington was settled by Col. James Morgan (1786-1866), who bought 1600 acres of land in the area in 1835. A native of Philadelphia, Morgan had come to Texas in 1830 and served at various times and places as merchant, civic leader, and land agent. While away from his home, serving as a colonel during the Texas Revolution, Mexican troops burned the town of New Washington. After the war, Morgan and others rebuilt New Washington, and the townsite began to flourish. Morgan realized, however, that it could never compete with the growth of nearby Houston, and during the 1850s he began to promote plans for a channel along Buffalo Bayou that would increase the region’s trade potential. That dream was completed in 1876 with the dredging of the Houston Ship Channel by steamship tycoon Charles Morgan. As Houston continued to grow, New Washington was recognized only as a major bend for the ship traffic along the bayou. Now known as Morgan’s Point, the townsite was incorporated in 1949 and stands as a reminder of the early commercial history of Harris County. The peninsula on Galveston Bay known as Morgan’s Point was named for early landowner Colonel James Morgan. Later the area became a favorite summer retreat for wealthy Houston residents who sought refuge from the oppressive heat and humidity of the city. The bluff attracted Gulf breezes and boasted spectacular views and recreational potential. In 1893, twelve prominent Houston families formed the Bay Ridge Park Association and acquired 40 acres of land on which they constructed a resort community for summer residency. To allow each family beachfront property the land was platted into long narrow lots chosen by ballots. The first houses built were modest one-and two-story frame dwellings with verandas; most featured Eastlake and Queen Anne style detailing. Homes built in the early 20th century were designed by renowned architects and reflected various styles including Mediterranean revival, colonial revival, and prairie school. Among the many grand houses is one patterned after the White House built for Texas Governor Ross Sterling and his wife Maude. Listed on the National register of Historic Places, the area is one of Texas’ most significant seaside residential developments. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 17-2 17.2.3 Climate The climate of City of Morgan’s Point is warm with mild winters. 17.2.4 Governing Body Format City of Morgan’s Point is a Type-B General Law, Council form of government. The City assumes responsibility for the adoption of this plan; Harris County will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 17-1. Table 17-1. Local Mitigation Planning Team Members Name Title Sherri Ditrich Chief of Police/EMC Brian Schneider City Administrator 17.3 CURRENT TRENDS 17.3.1 Population According to United States Census Bureau, the population of the City of Morgan’s Point, as of 2010, was 339. Since 2010, the population has grown at an average annual rate of 0 percent. 17.3.2 Development The City of Morgan’s Point commercial and industrial zoned land is built out. There is approximately seventy acres available for residential development. On average, one home is built every five years. Table 17-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. 17.4 CAPABILITY ASSESSMENT The City of Morgan’s Point performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 17-3. • Development and permitting capabilities are presented in Table 17-4. • An assessment of fiscal capabilities is presented in Table 17-5. • An assessment of administrative and technical capabilities is presented in Table 17-6. • An assessment of education and outreach capabilities is presented in Table 17-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 17-8. • Classifications under various community mitigation programs are presented in Table 17-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 17-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. City of Morgan’s Point 17-3 Table 17-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. • If yes, who currently has permitting authority over these areas? Are any areas targeted for development or major redevelopment in the next five years? No • If yes, briefly describe, including whether any of the areas are in known hazard risk areas How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 0 0 0 0 1 Multi-Family 0 0 0 0 0 Other (commercial, mixed use, etc.) 0 0 0 0 0 Total 0 0 0 0 1 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 0 • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. 60% Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 17-4 Table 17-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No Yes Yes Comment: Adopted the 218 IBC in 02/2012, Ord# 19-762 Zoning Code Yes No No Yes Comment: Adopted 08/2000, Ord#00-432 Subdivisions Yes No No Yes Comment: Adopted 08/2000, Ord#00-432 Stormwater Management Yes Yes No Yes Comment: Adopted 08/2000, Ord#00-432, Post-Disaster Recovery Yes Yes No No Comment: Ord #13-641, Harris County Annex J Real Estate Disclosure No No No No Comment: Growth Management Yes No No Yes Comment: Adopted 05/2018, Ord# 18-749 Site Plan Review Yes No No No Comment: Adopted 08/2000, Ord#00-432 Environmental Protection Yes No No Yes Comment: Adopted 08/2000, Ord#00-432 Flood Damage Prevention Yes No Yes Yes Comment: Updated 09/2016, Ord#16-722 Emergency Management Yes Yes No Yes Comment: Updated 07/2015, Rod# 15-681, Harris County Annex N Climate Change No No No No Comment: Planning Documents General Plan Yes No No Yes Comment: Comprehensive Plan Capital Improvement Plan Yes No No Yes How often is the plan updated? Comment: As needed Disaster Debris Management Plan Yes No No Yes Comment: Contract approved 12/2017; Monitoring Contract approved 09/2016; Contracts are reviewed on an annual basis and the plans are updated every four & five years Floodplain or Watershed Plan No Yes No Yes Comment: HARRIS COUNTY FLOOD CONTROL Storm water Plan No Yes No Yes Comment: HARRIS COUNTY FLOOD CONTROL Urban Water Management Plan No No No No Comment: Habitat Conservation Plan No No No No Comment: Economic Development Plan Yes No No Yes Comment: Resolution 1059, 03/2010 Shoreline Management Plan No No No No Comment: City of Morgan’s Point 17-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Community Wildfire Protection Plan No Yes No No Comment: The City of Morgan’s Point does not have its own CWPP implemented. Harris County has completed a county-wide CWPP; which includes all incorporated jurisdictions within Harris County. Forest Management Plan No No No No Comment: Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan No Yes No Yes Comment: Harris County Annex P Threat & Hazard Identification & Risk Assessment (THIRA) No No No No Comment: Post-Disaster Recovery Plan Yes Yes No Yes Comment: Ord #13-641 Harris County Annex J Continuity of Operations Plan No No No No Comment: Public Health Plan No Yes Yes Yes Comment: Annex H — Health and Medical is a component of the Emergency Operations Plan and addresses public health, environmental health, and medical response capabilities. The City does not maintain a standalone Public Health Plan. Table 17-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Administrative Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? No Table 17-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes/Through Harris County Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes No User Fees for Water, Sewer, Gas or Electric Service Yes Water & Waste Water Incur Debt through General Obligation Bonds No Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas No State-Sponsored Grant Programs No Development Impact Fees for Homebuyers or Developers No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 17-6 Table 17-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Contracted/Administration Engineers or professionals trained in building or infrastructure construction practices Yes Contracted/Administration Planners or engineers with an understanding of natural hazards Yes Contracted/Administration Staff with training in benefit/cost analysis Yes City Administrator Surveyors No Personnel skilled or trained in GIS applications No Scientist familiar with natural hazards in local area No Emergency manager Yes Chief of Police Grant writers Yes City Administrator Table 17-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? No Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. We use our City website and Facebook Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. We have a CTY/Blackboard Messaging services. We have two (2) digital messaging boards at the entrances to the city displaying messages if needed. Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Whelan Warning System City of Morgan’s Point 17-7 Table 17-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Administration Who is your floodplain administrator? (department/position) KSA Engineering Are any certified floodplain managers on staff in your jurisdiction? No What is the date that your flood damage prevention ordinance was last amended? 9/13/2016 Does your floodplain management program meet or exceed minimum requirements? Meets • If exceeds, in what ways? When was the most recent Community Assistance Visit or Community Assistance Contact? N/A Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any Risk MAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? No • If no, is your jurisdiction interested in joining the CRS program? Yes How many flood insurance policies are in force in your jurisdiction? Unknown • What is the insurance in force? Unknown • What is the premium in force? Unknown How many total loss claims have been filed in your jurisdiction? Unknown • How many claims are still open or were closed without payment? Unknown • What were the total payments for losses? Unknown Table 17-9. Community Classifications Participating? Classification Date Classified Community Rating System No Date Building Code Effectiveness Grading Schedule Yes 2 08/14/2014 Public Protection No Date Storm Ready No Date Fire wise No Date Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 17-8 Table 17-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents’ knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Morgan’s Point 17-9 17.5 INTEGRATION WITH OTHER PLANNING INITIATIVES The information on hazards, risk, vulnerability and mitigation contained in this hazard mitigation plan is based on the best available data. Plan integration is the incorporation of this information into other relevant planning mechanisms, such as general planning and capital facilities planning. It includes the integration of natural hazard information and mitigation policies, principles and actions into local planning mechanisms and vice versa. Additionally, plan integration is achieved though the involvement of key staff and community officials in collaboratively planning for hazard mitigation. 17.5.1 Existing Integration In the performance period since adoption of the previous hazard mitigation plan, made progress on integrating hazard mitigation goals, objectives and actions into other planning initiatives. The following plans and programs currently integrate components of the hazard mitigation strategy: • The City of Morgan’s Point adopted a new section (10.41) amending the Building Code with the desire to adopt regulations for the health, safety, and general welfare of the City. • Basic Plan — The Basic Plan provides a summary on the hazards and threats in the community. • Revised and Updated our Comprehensive Plan in 2018, to include Land Use/Growth Management, Environmental Quality. Resources listed in this annex were used to provide information for this annex on integration of hazard mitigation information into other jurisdiction plans or programs. 17.5.2 Opportunities for Future Integration As this hazard mitigation plan is implemented, City of Morgan’s Point will use information from the plan as the best available science and data on natural hazards. The capability assessment presented in this annex identifies codes, plans and programs that provide opportunities for integration. The progress reporting process described in Volume 1 will outline the progress of area-wide and local hazard mitigation actions related to plan integration. The annual progress report also will identify new opportunities for integration. The capability assessment identified the following plans and programs that do not currently integrate goals or recommendations of the hazard mitigation plan but provide opportunities to do so in the future: • Capital Improvement Plan — The City of Morgan’s Point can develop a five-year CIP and review it on a yearly basis as well as integrate the goals, objectives, and projects identified in the Hazard Mitigation Action Plan into the CIP process. • Building and Zoning Codes – There is an opportunity for the City to review building and zoning codes and identify mitigation measures as a priority for existing and future codes. • Thorough GIS mapping of the City in order to understand the different types of geographical data currently within the City, then incorporate that information into future hazard mitigation opportunities. • Completing a stormwater drainage study for known problem areas. 17.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 17-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of Morgan’s Point. Other hazard events that broadly affected the entire planning area, including City of Morgan’s Point, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 17-10 Table 17-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 $ Not available/flooding, streets closed, residents without electricity and displaced, down trees and power lines Tornado N/A 2017 $ Not available/flooding, streets closed, residents without electricity and displaced, down trees and power lines Hurricane Ike 1791 DR 2008 $ Not available/flooding, streets closed, residents without electricity and displaced, down trees and power lines Tropical Storm Allison 1379 DR 2001 $ Not available/flooding, streets closed, residents without electricity and displaced, down trees and power lines Hurricane Alicia 689 DR 1983 $ Not available/flooding, streets closed, residents without electricity and displaced, down trees and power lines 17.7 HAZARD RISK RANKING Table 17-12 presents a local ranking for the City of Morgan’s Point of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 17-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Flooding 27 Medium 3 Earthquake 14 Low 4 Drought 6 Low 4 Mass Movement 6 Low 4 Dam Failure 6 Low 4 Wild Fire 6 Low 4 Coastal Erosion 6 Low 5 Tsunami 0 (no Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 17.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 17.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 1 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 0 City of Morgan’s Point 17-11 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0 17.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Flooding from heavy rains/severe storms. Performing a comprehensive stormwater drainage study would assist in locating any deficiencies in drainage in the City after a severe rain storm or hurricane. • It is noted that the City has not completed a GIS mapping of the City. This would be beneficial to obtain hazard data and to map risk for various hazards. • The City does not currently have an emergency generator for our community center to serve as a short-term shelter after a natural disaster or heat event. • The City currently has one (1) Whelan siren system in the city which is erected on the very north part of the city. In order to assure the residents on the south/east/west sides of the City can hear the siren in case of an emergency, the City would need to have another one more centrally located towards the south of the City. Mitigation actions addressing these issues were prioritized for consideration in the action plan for this annex. 17.9 STATUS OF PREVIOUS PLAN ACTIONS Table 17-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 17-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update MRG5 — Expand outdoor siren warning system to increase coverage within the community’s population where the existing sirens are currently difficult to hear. X MRG5 2014MORGPT002 — Protective Covering for Three Generators X MRG10 2014MORGPT003 — Implement a tree management program to limit debris damage to critical infrastructure and public facilities from falling tree canopy due to hail, high-winds, freezing/icing, and crown fires. X MRG11 MRG9 — Install a New Generator for Cooling and Heating Center at Community Center X MRG9 2014MORGPT005 — Implement waste water reuse system for non-potable water at City Park X MRG12 2014MORGPT006 — Establish rainwater collection/capture systems for city infrastructure to provide alternative water supplies limiting effects of water shortages caused by drought or other hazards. X MRG13 2014MORGPT007 — Mapping of all hazardous material facilities that may be an increased risk for flood event X MRG14 2014MORGPT008 — Extension of fire protection infrastructure locations X MRG15 2010MORGPT009 — Install wind load proof window coverings on City buildings X MRG16 2010MORGPT014 — Drainage improvements – Increase drainage channel flow rate on South Oak Street YES Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 17-12 17.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 17-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 17-15 identifies the priority for each action. Table 17-16 summarizes the mitigation actions by hazard of concern and mitigation type. Table 17-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action MRG1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, landslide, tsunami, hurricane, Coastal Erosion Existing 3, 4, 10, 13 City Administration TBD High HMGP, PDM, FMA Short-term Action MRG2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including City of Morgan’s Point. Hazards Mitigated: Drought, earthquake, flooding, tsunami, hurricane, Coastal Erosion New and Existing 1, 3, 4, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing Action MRG3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Flooding, severe weather, tsunami, sea level rise, hurricane, Coastal Erosion New and Existing 1, 5, 8 City Administration TBD Low Staff Time, General Funds Short-term Action MRG4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Flooding, severe weather, tsunami, , hurricane, Coastal Erosion New and Existing 1, 3, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing Action MRG5 — Expand outdoor siren warning system to increase coverage within the community’s population where the existing sirens are currently difficult to hear. Hazards Mitigated: Flooding, severe weather, tsunami, , drought, hurricane, Coastal Erosion New and Existing 1, 3, 4, City Administration TBD Staff Time, General Funds Short-term Action MRG6 — Map Community Risk by Developing a coordinated GIS Department. Find out who uses GIS, determine how it is used, and identify other potential uses. • Incorporating a GIS system/management plan for tracking permitting, land use patterns, etc. • Obtaining hazard data and using GIS to map risk for various hazards Hazards Mitigated: Flooding, severe weather, tsunami, , drought, Coastal Erosion Existing 1, 3, 5, 7, 8, 10, 11 City Administration TBD Low Staff Time, General Funds Ongoing Action MRG7 — Conduct Regular Maintenance for Drainage Systems and Flood Control Structures by Performing regular drainage system maintenance, such as sediment and debris clearance, as well as detection and prevention of discharges into stormwater and sewer systems from home footing drains, downspouts, or sewer pumps. • Implementing an inspection, maintenance, and enforcement program to help ensure continued structural integrity of dams and levees. • Routinely cleaning debris from support bracing underneath low-lying bridges. • Routinely cleaning and repairing stormwater drains. • Regularly clearing sediment build-up on riverbanks near aerial lines. • Inspecting bridges and identifying if any repairs or retrofits are needed to prevent scour. Hazards Mitigated: Flooding, severe weather, tsunami, , hurricane, Coastal Erosion Existing 3, 4, 6, 8, 10, 11 City Administration TBD Medium Staff Time, General Funds Ongoing City of Morgan’s Point 17-13 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action MRG8 — Improve Stormwater Management Planning by Completing a stormwater drainage study for known problem areas. • Preparing and adopting a stormwater drainage plan and ordinance. • Preparing and adopting a community-wide stormwater management master plan. • Regulating development in upland areas in order to reduce stormwater run-off through a stormwater ordinance. • Linking flood hazard mitigation objectives with EPA Stormwater Phase II initiatives. • Developing engineering guidelines for drainage from new development. • Requiring a drainage study with new development • Encouraging the use of Low Impact Development techniques Hazards Mitigated: Flooding, severe weather, tsunami, , hurricane Existing 3, 4, 6, 8, 10, 11 City Administration TBD Low Staff Time, General Funds Ongoing Action MRG9 Install a New Generator for Cooling, Heating Center, temporary emergency center after natural disaster at Community Center Hazards Mitigated: Flooding, severe weather, tsunami, , , hurricane, Coastal Erosion Existing 3, 4, 8, 10, 11 City Administration TBD High HMGP, PDM Short Term Action MRG10 — Protective Covering for Three Generators Hazards Mitigated: Severe weather, hurricane New 11 City Administration TBD Medium Grant funds Short term Action MRG11 — Implement a tree management program to limit debris damage to critical infrastructure and public facilities from falling tree canopy due to hail, high-winds, freezing/icing, and crown fires. Hazards Mitigated: Severe weather, hurricane, wildfire Existing 2, 8, 11 City Administration TBD Low Staff Time, General Funds Short term Action MRG12 — Implement waste water reuse system for non-potable water at City Park Hazards Mitigated: Drought Existing 7, 8 City Administration TBD Low Staff Time, General Funds Short term Action MRG13 — Establish rainwater collection/capture systems for city infrastructure to provide alternative water supplies limiting effects of water shortages caused by drought or other hazards. Hazards Mitigated: Drought Existing 7, 8 City Administration TBD Low Staff Time, General Funds Short term Action MRG14 — Mapping of all hazardous material facilities that may be an increased risk for flood event Hazards Mitigated: Flooding Existing 3, 8 City Administration TBD Low Staff Time, General Funds Short term Action MRG15 — Extension of fire protection infrastructure locations Hazards Mitigated: Wildfire Existing 13, 14 City Administration TBD Medium General and/or grant funds Short term Action MRG16 — Install wind load proof window coverings on City buildings Hazards Mitigated: Severe weather, hurricane Existing 11, 13 City Administration TBD High Grant funds Short term Action MRG17— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flood, Dam/Levee Failure, Drought, Earthquake, Wildfire, Mass Movements New and Existing 1, 3, 4, 5, 9, 10, 11, 15 City Administration HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 17-14 Table 17-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya MRG1 4 High High Yes Yes No Medium High MRG 2 7 Medium High Yes No No High Low MRG 3 3 Low High No No No High Low MRG 4 6 Medium High Yes No No High Low MRG 5 3 Medium High Yes No No Low Low MRG 6 7 Medium High Yes No No Low Low MRG 7 6 High High Yes No No Low Low MRG 8 6 Low High No No No Low Low MRG 9 5 Medium High Yes Yes No Medium High MRG10 1 High Medium Yes No No Medium Medium MRG11 3 Medium Low Yes No No Low Low MRG12 2 Medium Low Yes No No Low Low MRG13 2 Medium Low Yes No No Low Low MRG14 2 Medium Low Yes No No Low Low MRG15 2 Medium Medium Yes No No Medium Medium MRG16 2 High High Yes Yes No High High MRG17 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 17-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather MRG 1, 2, 3, 4, 6, 7, 8, 11, 16, 17 MRG 1, 10, 11, 16 MRG 1, 2, 3, 4, 5, 9, 17 MRG 6, 7, 8, 11 MRG 5, 9, 17 MRG 10, 16 MRG 1, 2, 3, 4, 5, 6, 7, 8, 9, 17 Hurricane MRG 1, 4, 7, 8, 11, 16,17 MRG 1, 4, 7, 10, 11, 16 MRG 5. 17 MRG 11 MRG17 MRG 1, 7, 8, 10, 16 MRG 8 MRG 2,3, 17 Medium-Risk Hazards Flooding MRG 1, 2, 3, 4, 6, 7, 8, 14, 17 MRG 1, 14 MRG 1, 2, 3, 4, 5, 9, 17 MRG 6, 7, 8 MRG 5, 9, 14, 17 MRG 1, 2, 3, 4, 5, 6, 7, 8, 9, 14, 17 Low-Ranked Hazards Earthquake MRG 17 MRG17 MRG17 MRG17 Drought MRG 3, 5, 6, 9, 17 MRG 1, 2, 3, 5, 9, 17 MRG 12, 13 MRG 5, 9, 17 MRG 12,13 MRG 12,13 MRG 1, 2, 3, 4, 5, 6, 7, 8, 9, 17 Mass Movement MRG17 MRG17 MRG17 MRG17 Dam Failure MRG17 MRG17 MRG17 MRG17 Coastal Erosion MRG 1, 2, 3, 4, 6, 7, 8, 17 MRG 1, MRG 1, 2, 3, 4, 5, 9, 17 MRG 6, 7, 8 MRG 5, 9, 17 MRG 1, 2, 3, 4, 5, 6, 7, 8, 9, 17 Wildfire MRG 11, 15,17 MRG 11, 15 MRG17 MRG 11 MRG17 MRG 15 MRG17 a. See the introduction to this volume for explanation of mitigation types. City of Morgan’s Point 17-15 17.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX 17.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • City of Morgan’s Point Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • City of Morgan’s Point Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • City of Morgan’s Comprehensive Plan — The Comprehensive Plan was reviewed for the full capability assessment and for identifying opportunities for action plan integration. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • FEMA — Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards to obtain a better understanding of potential unthought-of actions/mitigations that could be used to reduce or eliminate long term risk to people and property from natural disasters in the City of Morgan’s Point. !(!(!(!(!(!(!(!(!(La PorteCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.150.30.075Miles±Morgan's Point La Porte FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Morgan's Point La Porte Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Morgan's Point La Porte 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Morgan's Point La Porte 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Morgan's Point La Porte Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Morgan's Point La Porte Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Morgan's Point 18-1 18. CITY OF NASSAU BAY 18.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Dena Mahan/EMC 1800 Space Park Drive, Ste. 200 Nassau Bay, TX 77058 Telephone: 281-333-7373 e-mail Address: dena.mahan@nassaubay.com Tom George, Fire Chief/Deputy EMC 18295 Upper Bay Road Nassau Bay, TX 77058 Telephone: 281-336-6295 e-mail Address: tom.george@nassaubay.com 18.2 JURISDICTION PROFILE 18.2.1 Location The City of Nassau Bay is in the Clear Lake region of southeast Harris County, along Clear Creek and the western portion of Clear Lake. It is located across the street from Johnson Space Center; a peninsula encompassing 1.7 square miles. The current boundaries generally extend from NASA Johnson Space Center to the north, Clear Lake to the east, the injunction of Clear Creek and Clear Lake to the south, and Cow Bayou to the west. The City of Webster is to the west, League City to the south, Houston to the north, and Clear Lake to the east. 18.2.2 History The City of Nassau Bay was incorporated in 1978. The Nassau Bay community was originally developed to provide housing opportunities for NASA employees. Being across the street from NASA Lyndon B. Johnson Space Center, it continues to maintain a strong relationship with the space industry. Additionally, the City’s economy is directly impacted by Houston Methodist St. John Hospital, which is located inside the City, as well as tourism and recreation activities along the Texas coast. Nassau Bay is a triangular peninsula that juts into Clear Lake and is surrounded by water on its west, south and east boundaries. It is a charming and intimate community with a population of approximately 4,099 residents who enjoy the water front possibilities and lush green spaces the City offers. 18.2.3 Climate The climate of Nassau Bay is typical of the upper Texas Gulf Coast, with hot and humid summers, and mild winters. There are approximately 207 sunny days per year, with the dry season consuming eight months, the wet season four. The annual rainfall in Nassau Bay is above average with 56 inches per year. The summer high is about 91 degrees and the winter low is close to 44. The dominant wind is from the south, with wind speeds varying throughout the year. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 18-2 18.2.4 Governing Body Format The City of Nassau Bay is a Texas Home Rule City which operates in a Council-Manager form of government. The board is led by the mayor and six councilmembers. There are eight departments in the City: Community Development & Planning, Police, Fire, Emergency Management, Public Works, Finance, Tourism, Human Resources and the City Manager’s Office. The City Council assumes responsibility for the adoption of this plan; the City Manager will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 18-1. Table 18-1. Local Mitigation Planning Team Members Name Title Jason E. Reynolds City Manager Tom George Fire Chief/Deputy EMC Dena Mahan EMC Paul Lopez Public Works Director Mark Stelly Floodplain Administrator/Building Official 18.3 CURRENT TRENDS 18.3.1 Population According to US Census the population of Nassau Bay as of July 2017 was 4,052. Since 2010, the population has remained constant. 18.3.2 Development Nassau Bay is experiencing a renaissance of commercial development due to the growth in the Clear Lake region, the success of the space industry, and the insurgence of a medical hub along the I-45/Gulf Freeway. The development is comprised of infill and rehabilitation, with a moderate outlook for future commercial infill. Residential expansion is low in the City, but the demand for additional multi-family housing opportunities continues to grow. The City is updating its comprehensive plan in 2019 and 2020. The plan will refocus the vision of the community with the changing environment while staying true to the needs of the community. In addition, the plan will address land use allocations, zoning, redevelopment, waterways, tourism, and capital improvements. Future growth and development in the City will be managed as identified in the comprehensive plan. Table 18-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. City of Nassau Bay 18-3 Table 18-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas There is a multi-family/business complex scheduled to be built on a waterfront lot that is susceptible to storm surge during high wind events. How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 2 1 1 1 3 Multi-Family 0 0 0 0 0 Other (commercial, mixed use, etc.) 3 0 0 3 2 Total 5 1 1 3 4 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 0 • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. The City is on the verge of a complete buildout; only three lots are available to build on in the commercial corridor. One of those lots are highly susceptible to flooding and surge, which deters from future buildout. There are 20 residential lots available for construction, but are vacant because of repetitive flooding which is a negative consideration for new home builds. 18.4 CAPABILITY ASSESSMENT The City of Nassau Bay performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 18-3. • Development and permitting capabilities are presented in Table 18-4. • An assessment of fiscal capabilities is presented in Table 18-5. • An assessment of administrative and technical capabilities is presented in Table 18-6. • An assessment of education and outreach capabilities is presented in Table 18-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 18-8. • Classifications under various community mitigation programs are presented in Table 18-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 18-10. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 18-4 Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 18.10 identifies these as community capacity building mitigation actions. Table 18-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No No No Comment: Ord. No. O2013-708, §§ 1, 2 2012 International Building Codes adopted 06/10/13 Zoning Code Yes No No No Comment: Ord. No. 94-435, adopted 09-12-94 Amended 8-12-13 Subdivisions Yes No No No Comment: Ord. No. 83-298, Art. I, § 1, adopted 04-11-83 The Land Subdivision Regulations of the City of Nassau Bay, State of Texas Stormwater Management No No No No Comment: Post-Disaster Recovery No No No No Comment: Real Estate Disclosure No No No No Comment: Growth Management No No No No Comment: Site Plan Review Yes No No No Comment: Ord. No. O2013-712, Exhibit B, adopted 8-12-13 Article 5 Administrative Procedures Environmental Protection No No No No Comment: Flood Damage Prevention Yes Yes No Yes Comment: Ord. No. 2000-511, Art. I, § A, adopted 05-08-2000; State of Texas Water Code section 16.318 Emergency Management Yes Yes Yes Yes Comment: Ord. No. 2010-660, § 1, 1-11-10 Civil Defense and Emergency Management; Texas Gov. Code Title 4 Chapter 418 Climate Change No No No No Comment: Energy Conservation Yes Yes No No Comment: International Energy Conservation Code 2015 Planning Documents General Plan Yes No No Yes Comment: Comprehensive Plan is currently being updated. Expected adoption date is early 2020. Current plan is dated 2015. Capital Improvement Plan Yes No No No How often is the plan updated? Annually Comment: Current plan date: September 17, 2018 Disaster Debris Management Plan Yes No No No Comment: Debris Management Plan, June 14, 2018 Floodplain or Watershed Plan No No No No Comment: Stormwater Plan Yes Yes No Yes Comment: Storm Water Management Plan date – February 2008 (revised March 2009) Urban Water Management Plan No No No No Comment: City of Nassau Bay 18-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Habitat Conservation Plan No No No No Comment: Economic Development Plan No No No No Comment: Shoreline Management Plan No No No No Comment: Community Wildfire Protection Plan No No No No Comment: Forest Management Plan No No No No Comment: Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes No No Yes Comment: Emergency Operations Plan, 12/2015 Threat & Hazard Identification & Risk Assessment (THIRA) No Yes Yes Yes Comment: A regional THIRA is conducted on an annual basis for UASI and HGAC. The City participates in the development of the THIRA. Post-Disaster Recovery Plan Yes Yes No Yes Comment: Annex J – Recovery to the City’s Emergency Operations Plan Continuity of Operations Plan No No No No Comment: Public Health Plan No No No No Comment: Table 18-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Building Department Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 18-6 Table 18-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants No Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers N/A Table 18-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Community Development & Planning Engineers or professionals trained in building or infrastructure construction practices Yes Building Official & City Engineer Planners or engineers with an understanding of natural hazards Yes Community Development & Planning Staff with training in benefit/cost analysis Yes OEM Surveyors Yes Can contract for this service Personnel skilled or trained in GIS applications Yes Water, Building Official Scientist familiar with natural hazards in local area Yes Fire Chief & FPA/Building Official Emergency manager Yes OEM EMC/Deputy EMC Grant writers Yes EMC and can contract for this service Table 18-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. Emergency Preparedness Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. The City’s Facebook page is used to promote preparedness information and events Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes • If yes, briefly describe. Nassau Bay Planning Commission Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Nextdoor.com/Facebook/Swift911 Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Swift 911 City of Nassau Bay 18-7 Table 18-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Building Official/FPA Who is your floodplain administrator? (department/position) CD&P/Building Official/FPA Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? 5/8/2000 Does your floodplain management program meet or exceed minimum requirements? Exceeds • If exceeds, in what ways? Various When was the most recent Community Assistance Visit or Community Assistance Contact? 2018 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? No • If no, state why. Do not address impacts of flash flooding Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? Yes • If no, is your jurisdiction interested in joining the CRS program? How many flood insurance policies are in force in your jurisdiction?a 1389 • What is the insurance in force? $412,242,800 • What is the premium in force? $1,148,385 How many total loss claims have been filed in your jurisdiction?a 1544 • How many claims are still open or were closed without payment? 370 • What were the total payments for losses? $57,671,386.09 a. According to FEMA statistics as of September 30, 2018 Table 18-9. Community Classifications Participating? Classification Date Classified Community Rating System Yes 7 05/01/2009 Building Code Effectiveness Grading Schedule Yes 4 Unknown Public Protection Yes 2 Unknown Storm Ready Yes N/A 01/2017 Firewise No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 18-8 Table 18-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: 18.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from City of Nassau Bay 18-9 those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 18.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • City of Nassau Bay Emergency Operations Plan/Emergency Management Ordinance — The Emergency Operations Plan addresses the City’s responsibilities in emergencies associated with natural disaster, human-caused emergencies and technological incidents. It provides a framework for coordination of response and recovery efforts within the City in coordination and with local, State, and federal agencies. The Plan establishes an emergency organization to direct and control operations during a period of emergency by assigning responsibilities to specific personnel. Information from the hazard mitigation plan is incorporated as appropriate. • Capital Improvements Plan — The capital improvement plan includes projects can help mitigate potential hazards. The city will act to ensure consistency between the hazard mitigation plan and the current and future capital improvement plans. The hazard mitigation plan may identify new possible funding sources for capital improvement projects and may result in modifications to proposed projects based on results of the risk assessment. • Nassau Bay Volunteer Fire Department Emergency Operations Plan — The NBVFD Emergency Operations Plan addresses the Fire Department’s responsibilities in emergencies associated with natural disaster, human-caused emergencies and technological incidents. It provides a framework for coordination of response and recovery efforts within the City of Nassau Bay in coordination and with local, State, and federal agencies. • Functional and Access Needs Plans — The city addresses the needs of individuals with disabilities and the elderly during an emergency or disaster situation, and provides safe, sanitary, secure shelter and care for all residents including those residents with functional needs. • Flood Damage Prevention Ordinance – The city’s Flood Damage Prevention ordinance covers the entire community, includes numerous methods of reducing flood losses, defines floodplain administration for the city, and outlines standards for development. Because the ordinance was last updated in 2000, it does need to be updated. With that update, additional integration opportunities may be available. • Threat & Hazard Identification & Risk Assessment – Nassau Bay is a participant in the development of Harris County’s THIRA, and findings of this assessment have been and will continue to be integrated into mitigation and emergency management plans. 18.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Comprehensive Plan – Comprehensive Plans provide a framework for the physical design and development of a city over a long-term planning horizon. They address social, economic, and environmental issues by the manner in which they guide overall growth and development. The vision, goals, and policies of the comprehensive plan are routinely implemented through other local planning instruments such as zoning ordinances, subdivision regulations, and capital improvement programs. Integrating hazard mitigation into the local comprehensive plan thereby establishes resilience as an Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 18-10 overarching value of a community and provides the opportunity to continuously manage development in a way that does not lead to increased hazard vulnerability • Post-Disaster Recovery Plan – The City of Nassau Bay will be developing a standalone Post-Disaster Recovery Plan to expand on what is currently in the Recovery Annex of the Emergency Operations Plan. Incorporating mitigation actions into disaster recovery can be an extremely cost-effective means of mitigation future damage. • Stormwater Management Plan and Ordinance – The City of Nassau Bay will update its stormwater management plan and consider low impact development techniques to manage storm water by incorporating techniques such as bio-retention areas, dry wells, infiltration trenches, filter/buffer strips, vegetated swales, rain barrels, and cisterns. This could reduce the impact of flooding in flood-prone areas within the community. 18.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 18-11 lists past occurrences of natural hazards for which specific damage was recorded in Nassau Bay. Other hazard events that broadly affected the entire planning area, including Nassau Bay, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 18-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 2017 $10,000,000 Severe Storms and Flooding 4272 2016 Unknown Severe Storms and Flooding 4269 2016 Unknown Hurricane Ike 1791 2008 $24,000,000 Hurricane Rita 1606 2005 $375,000 Tropical Storm Allison 1379 2001 Unknown 18.7 HAZARD RISK RANKING Table 18-12 presents a local ranking for Nassau Bay of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 18-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 2 Flooding 36 High 2 Hurricane 36 High 3 Mass Movement N/A Medium 4 Earthquake 14 Low 5 Wildfire 12 Low 6 Drought 6 Low 6 Coastal Erosion 6 Low 7 Dam Failure 0 None 7 Tsunami 0 None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. City of Nassau Bay 18-11 18.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 18.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 160 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 37 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 17 18.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • The majority of city properties are in the 1% annual chance flood hazard area, and the rest are within the 0.2 percent chance flood hazard area • The City of Nassau Bay is in close proximity to NASA’s Johnson Space Center • The City of Nassau Bay is located near the Houston Ship Channel and numerous chemical and oil refining facilities • Houston Methodist Hospital Clear Lake resides in the City of Nassau Bay Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. 18.9 STATUS OF PREVIOUS PLAN ACTIONS Table 18-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 18-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Adopt new and updated coastal flood mapping once available. Ongoing Yes NAS8 Comment: Adopted January 2017; ongoing effort as new maps are produced Implement acquisition, elevation and flood proofing for SRL and/or RL structures by elevating existing structures to 2’ above BFE. No Yes NAS1 Comment: Continue to work on this project as the SRL/RL list contains 10% of the housing stock Adopt latest and higher standard floodplain regulations to minimize damage to residential/critical infrastructure properties located within storm surge areas and LIMWA areas. No Yes NAS6 Comment: Nothing recent but a continued action item for the City Improve and enhance requirements for critical facilities to withstand severe thunderstorms, hurricane winds and hail. No Yes NAS7 Comment: Completed work for the Fire & EMS Station, Emergency Operation Center, and further strengthen the WWWTP facilities. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 18-12 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Construct Protective Structures to minimize damage to critical assets & equipment. No Yes NAS7 Comment: Elevated generator and the grit king at WWWTP. Constructed Fire Station at Cat 5 storm rating. Moved Public Works to new facility in wind rated facility. Continue to plan and implement small. Review & update existing city codes to require installation of materials to harden residential & commercial structures to lessen the effects of hail & tornadoes. No Yes NAS8 Comment: Continue to adopt the latest codes & operate by the spirit of the objective. Planning and operations continue to be geared around this. Improve code/ordinance to require removal of dead vegetation/dry fuel sources in fire risk areas. No Yes NAS9 Comment: . Improve/Retrofit Air Filtration Systems with higher capacity and higher quality filtration/purification system to remove particulates for CI/Public/Healthcare facilities to minimize health risks associated with low air quality and to minimize equipment damage due to smoke. No Yes NAS10 Comment: Work with Hospital as they renovate the facility. Mapping of all hazardous material facilities that may be an increased risk within the city limits. No Yes NAS11 Comment: Continue to work on. Identify & map exposed/aboveground pipelines in the city limits. Yes Yes NAS9 Comment: Establish/improve code/ordinance to require shutoff valves at entry and exit points of city limits for new pipeline construction. No X Comment: This project is no longer feasible Insulate exposed/aboveground domestic water system components, water pipes, irrigation systems and sprinkler systems on municipal facilities. Ongoing Yes NAS12 Comment: Ongoing effort that is completed each year. Develop and implement a Winter Storm Public Education/Outreach Program to educate residents on winter hazards and actions to reduce damage to property from cold/freezing winter weather conditions. No Yes NAS13 Comment: Change to social media/public outreach instead of class. Expand warning system (Mass Notification) to provide hazard awareness and alerts by increasing coverage of the community’s population to mitigate drought and extreme heat. (SMS, iPAWS, and mass notification). Yes No Comment: The city is now using a reverse 911 system, social media, website and other means to provide warnings to residents. Harden nonflexible water supply piping during line replacement projects with drought resistant piping materials. Ongoing Yes NAS14 Comment: City is replacing all water and sewer lines over the next 15 years with polyvinyl chloride pipe. Establish a cooling center at identified site to limit the effects of extreme heat upon vulnerable populations. Yes Yes NAS15 Comment: Flood remediation – Raise concrete walls around present sand filter unit. No Yes NAS10 Comment: Applied for grant through FEMA after Hurricane Harvey to complete. City of Nassau Bay 18-13 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Install new chemical feed disinfection and de-chlorination system at the City’s wastewater treatment plant. No Yes NAS12 Comment: Applied for grant through FEMA after Hurricane Harvey to complete. Replace the Chlorine storage and supply system and bring facility up to current codes. No Yes NAS20 Comment: Applied for grant through FEMA after Hurricane Harvey to complete. Reduce street and residential flooding by installing new storm sewers. [Saxony Ln and Nassau Bay Drive] No Yes NAS16 Comment: Ongoing effort on the planned capital improvement list. 18.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 18-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 18-15 identifies the priority for each action. Table 18-16 summarizes the mitigation actions by hazard of concern and mitigation type. Table 18-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action NAS1 — Where appropriate, support elevation, retrofitting, purchase, or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Flooding Existing 3, 4, 10 Nassau Bay High HMGP, PDM, FMA Short-term Action NAS2 — Integrate the hazard mitigation plan into other plans, ordinances, and programs that dictate land use decisions in the community. Hazards Mitigated: Dam failure, drought, earthquake, flooding, mass movement, tsunami, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 Nassau Bay Low Staff Time, General Funds Ongoing Action NAS3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: All hazards New and Existing 1, 8, 10 Nassau Bay Low Staff Time, General Funds Short-term Action NAS4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Dam failure, flooding, severe weather, tsunami New and Existing 12, 14, 15 Nassau Bay Low Staff Time, General Funds Ongoing Action NAS5 — Develop a post-disaster recovery plan that includes methods of integrating mitigation measures into recovery. Hazards Mitigated: All hazards New and Existing 3, 8, 9, 11 Nassau Bay Medium Staff Time, General Funds Short-term Action NAS6 — Adopt latest and higher standard floodplain regulations to minimize damage to residential/critical infrastructure properties located within storm surge areas and LIMWA areas Hazards Mitigated: Flooding New and Existing 9, 12, 13, 15 Nassau Bay Low Staff Time Ongoing Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 18-14 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action NAS7 — Improve existing city-owned structures and enhance requirements for new critical facilities, assets, and equipment to withstand severe thunderstorms, hurricane winds, and hail. Hazards Mitigated: Severe weather, hurricane New and Existing 11, 12, 13 Nassau Bay High HMGP, PDM, General Funds Long-term Action NAS8 — Adopt new and updated flood maps as they become available. Hazards Mitigated: Flooding New and Existing 3, 9 Nassau Bay Low Staff Time Ongoing Action NAS9 — Identify and map exposed/above ground pipeline infrastructure within the city limits. Hazards Mitigated: Human-caused/technological, Severe Weather, Hurricane Existing 3 Nassau Bay Medium Staff Time, Contractor/GIS Short-term Action NAS10 — Raise concrete walls around the sand filter at the wastewater treatment plant. Hazards Mitigated: Flooding, hurricane, severe weather Existing 11, 13 Nassau Bay High 406 Mitigation Funds, HMGP, FMA, PDM Short-term Action NAS11- Elevate water and wastewater pumps, motors, and electrical controls. Hazards Mitigated: Flooding Existing 13 Nassau Bay Medium 406 Mitigation Funds, HMGP, FMA, PDM, CIP Short-term Action NAS12 – Install new chemical feed disinfection and de-chlorination system at the wastewater treatment plant. Hazards Mitigated: Flooding, Technological Existing 8, 13 Nassau Bay Medium General Funds, CIP Long-term Action NAS13 – Install structured covers for existing generators to protect them from severe weather hazards. Hazards Mitigated: Severe weather, hurricane Existing 6, 13 Nassau Bay High Bonds, Fee Increases, HMGP, PDM Long-term Action NAS14 – Harden nonflexible water supply piping during line replacement projects with drought resistant piping materials. Hazards Mitigated: Drought Existing 13 Nassau Bay Medium General Funds/CIP, HMGP, PDM Ongoing Action NAS15 – Establish a cooling center at identified site to limit the effects of extreme heat upon vulnerable populations. Hazards Mitigated: Drought/Extreme Heat New and Existing 4 Nassau Bay Low Staff Time, General Funds Short-term Action NAS16 – Reduce street and residential flooding by installing new storm sewers. [Saxony Ln and Nassau Bay Drive] Hazards Mitigated: Flooding New and Existing 13 Nassau Bay Medium General Funds/CIP, HMGP, FMA, PDM Short-term Action NAS17 – Conduct geological mapping of the area to determine risk areas for subsidence or sinkholes. Hazards Mitigated: Mass Movement New and Existing 3 Nassau Bay Contract Engineer/ Firm Medium General Funds, CIP Long-term Action NAS18 – Develop a new stormwater management plan (to include a hydrological study of the Nassau Bay area). Hazards Mitigated: Flooding New and Existing 9, 10 Nassau Bay Contract Firm Medium HMGP, FMA, PDM Short-term Action NAS19 – Develop a Continuity of Operations/Government Plan for the City of Nassau Bay. Hazards Mitigated: All hazards New and Existing 9, 10 Nassau Bay Low Staff Time, Grants Short-term City of Nassau Bay 18-15 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action NAS20 – . Elevate and/or replace the chlorine and sulfur dioxide storage and supply system at the wastewater treatment plant, and bring it up to current code. Hazards Mitigated: Flooding, hurricane, severe weather, tsunami Existing 13 Nassau Bay Medium 406 Mitigation funds, HMGP, FMA, PDM Short-term Action NAS21 – Install backup power systems for public buildings, utilities, and critical infrastructure currently without generators or with undersized generators Hazards Mitigated: Flooding, severe weather, hurricane Existing 13 Nassau Bay High HMGP, FMA, PDM Short-term Action NAS22 – Install additional Flood Alert Gauges and a velocity meter in sections of Clear Creek near/within Nassau Bay. Hazards Mitigated: Flooding New and Existing 1, 3 Harris County Flood Control Nassau Bay Medium HMGP, FMA, PDM Short-term Action NAS23 – Bring water treatment plant facility up to homeland security standards for drinking water. Hazards Mitigated: Flooding, terrorism Existing 4, 13 Nassau Bay High UASI Grant, Long-term Action NAS24 – Install wind load proof window coverings on city buildings Hazards Mitigated: Hurricane, severe weather Existing 13 Nassau Bay Medium HMGP, PDM, General Fund/CIP Short-term Action NAS25 – Develop/implement water smart program to educate the public on how to conserve water, especially during drought conditions. Hazards Mitigated: Drought New and Existing 3 Nassau Bay Low Staff Time Short-term Action NAS26 – Develop and implement a program to capture perishable data after significant events/incidents (e.g. high water marks, preliminary damage estimates, damage photos) to support future mitigation efforts including the implementation and maintenance of the hazard mitigation plan. Hazards Mitigated: Flooding, Severe Weather, Hurricane, Mass Movement, Earthquake, Wildfire, Drought, Coastal Erosion New and Existing 3 Nassau Bay Low Staff Time Ongoing Action NAS27 – Install a Weather/Lightning alert system to minimize damage and risk to local athletic facilities and other public events and purchase a loudspeaker to warn public of severe weather. Hazards Mitigated: Severe Weather New and Existing 1 Nassau Bay Med Action NAS28 – Develop a Shoreline Management Plan. Hazards Mitigated: Coastal Erosion, Mass Movement, Flooding, Tsunami New and Existing 10 Nassau Bay Medium HMGP, FMA, PDM, CIP Short-term Action NAS29 – Elevate Upper Bay Road to alleviate significant street flooding and high-velocity flows. Hazards Mitigated: Flooding New and Existing 11, 13 Nassau Bay High HMGP, FMA, PDM Long-term Action NAS30— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Flooding, Severe Weather, Hurricane, Mass Movement, Earthquake, Wildfire, Drought, Coastal Erosion New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Nassau Bay HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 18-16 Table 18-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya NAS1 3 High High Yes Yes No Medium High NAS2 7 Medium Low Yes No Yes High Low NAS 3 3 Low Low Yes No Yes High Low NAS4 3 Medium Low Yes No Yes High Low NAS5 4 Medium Medium Yes Yes Yes High High NAS6 4 Medium Low Yes No Yes High Low NAS7 3 High High Yes Yes No Medium High NAS8 2 Medium Low Yes No Yes High Low NAS9 1 Low Medium No No No Low Low NAS10 2 High High Yes Yes No Medium High NAS11 1 High Medium Yes Yes No Medium High NAS12 2 Medium Medium Yes No No Low Low NAS13 2 High High Yes Yes No Medium High NAS14 1 Medium Medium Yes Yes No Medium Medium NAS15 1 High Low Yes No No Medium Low NAS16 1 High Medium Yes Yes No Medium High NAS17 1 Low Medium No No No Low Low NAS18 2 Medium Medium Yes Yes No Medium High NAS19 2 Low Low Yes Yes Yes High Medium NAS20 1 High Medium Yes Yes No Medium High NAS21 1 High High Yes Yes No Medium High NAS22 2 High Medium Yes Yes No Medium High NAS23 2 High High Yes Yes No Medium High NAS24 1 High Medium Yes Yes No Medium High NAS25 1 Low Low Yes No Yes High Low NAS26 1 Medium Low Yes No Yes High Low NAS27 1 High Medium Yes No No Medium Low NAS28 1 Medium Medium Yes Yes No Medium High NAS29 2 High High Yes Yes No Medium High NAS30 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. City of Nassau Bay 18-17 Table 18-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather NAS4, 30 NAS7, 10, 13, 20, 24 NAS22, 30 NAS10 NAS21, 27, 30 NAS13 NAS3, 5, 9, 19, 22, 26, 30 Flooding NAS2, 4, 6, 8, 30 NAS1, 10, 11, 12, 20, 23 NAS30 NAS10 NAS21, 30 NAS10, 16, 29 NAS3, 5, 18, 19, 26, 28, 30 Hurricane NAS2, 30 NAS7, 10, 13, 20, 24 NAS30 NAS10 NAS21, 30 NAS13 NAS3, 5, 9, 19, 26, 30 Medium-Risk Hazards Mass Movement NAS30 NAS30 NAS30 NAS3, 5, 17, 19, 26, 28, 30 Low-Risk Hazards Earthquake NAS2, 30 NAS30 NAS30 NAS3, 5, 19, 26, 30 Wildfire NAS2, 30 NAS30 NAS30 NAS3, 5, 19, 26, 30 Drought NAS2, 30 NAS14 NAS25 NAS15 NAS3, 5, 19, 26, 30 Coastal Erosion NAS30 NAS30 NAS30 NAS3, 5, 19, 26, 28, 30 a. See the introduction to this volume for explanation of mitigation types. 18.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • Nassau Bay Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • Nassau Bay Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • Texas Water Development Board – Repetitive Loss property report The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. !(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«3HoustonPasadenaLeague CityWebsterCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.20.40.1Miles±Nassau Bay ¬«3 Houston Pasadena League City Webster FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Nassau Bay ¬«3 Houston Pasadena League City Webster Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Nassau Bay ¬«3 Houston Pasadena League City Webster 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Nassau Bay ¬«3 Houston Pasadena League City Webster 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Nassau Bay ¬«3 Houston Pasadena League City Webster Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Nassau Bay ¬«3 Houston Pasadena League City Webster Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Nassau Bay 19-1 19. CITY OF PASADENA 19.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Frank Bengochea, EMC 1201 Davis Street Pasadena, Texas 77506 Telephone: 713-475-5588 e-mail Address: fbengochea@pasadenatx.gov Azell Carter, Deputy EMC 1201 Davis Street Pasadena, Texas 77506 Telephone: 713-475-5588 e-mail Address: acarter@pasadenatx.gov 19.2 JURISDICTION PROFILE 19.2.1 Location The City of Pasadena is located in southeast Harris County and has a population of 153,520, making it the second- largest city in the region. The City encompasses an area of 55 square miles. 19.2.2 History Pasadena was founded in 1893 by John H. Burnett of Galveston, who named the area after Pasadena, California, because of the perceived lush vegetation. The La Porte, Houston and Northern Railroad was built through the town site in 1894 and opened the area for development as a farming community. Transition from a farming economy to an industrial one did not occur until the late 1930s, when the war in Europe spurred a major increase in the ship-channel industries. 19.2.3 Climate The climate of the City of Pasadena is characterized by hot, humid summers and mild to cool winters. 19.2.4 Governing Body Format The City of Pasadena operates under a Strong Mayor-Council form of government with a mayor and eight council members. The City of Pasadena assumes responsibility for the adoption of this plan; the Office of Emergency Management will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 19-1. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 19-2 Table 19-1. Local Mitigation Planning Team Members Name Title Frank Bengochea Emergency Management Coordinator Azell Carter Deputy Emergency Management Coordinator Erik Sweet Emergency Management Planner Sarah Benavidez Sr Assistant City Engineer Deanna Schmidt Director of Planning Michelle Janise Building Official 19.3 CURRENT TRENDS 19.3.1 Population According to US Census July 1, 2017, (V2017), the population of Pasadena as of July 1, 2017 was 153,520. Since April 1, 2010, the population has grown at an average annual rate of 2.8 percent. 19.3.2 Development Pasadena has experienced significant growth along Sam Houston Parkway in the last decade. Growth in new development is expected to slow as Pasadena nears buildout. The remaining large parcels are located in the Industrial Districts. These parcels will likely develop as port-related warehousing. Future economic growth will be driven by redevelopment of older neighborhoods and commercial centers. Table 19-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. 19.4 CAPABILITY ASSESSMENT The City of Pasadena performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 19-3. • Development and permitting capabilities are presented in Table 19-4. • An assessment of fiscal capabilities is presented in Table 19-5. • An assessment of administrative and technical capabilities is presented in Table 19-6. • An assessment of education and outreach capabilities is presented in Table 19-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 19-8. • Classifications under various community mitigation programs are presented in Table 19-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 19-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. City of Pasadena 19-3 Table 19-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? Yes • If yes, give the estimated area annexed and estimated number of parcels or structures. 270 acres Is your jurisdiction expected to annex any areas during the performance period of this plan? Yes • If yes, describe land areas and dominant uses. 107 acres – commercial development • If yes, who currently has permitting authority over these areas? Harris County Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas (1) Areas recently and planned to be annexed are with the 100-year flood plain. These areas will be developed as large industrial warehousing. (2) Approximately, 100-acres targeted for redevelopment in Historic Pasadena near City Hall Is not in a known hazard risk area. (3) Approximately 200 acres are targeted for redevelopment near the Convention Center. Approximately one-half of the area to be developed is in the 500- year flood plain. How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 77 119 99 54 129 Multi-Family 0 0 0 0 0 Other (commercial, mixed use, etc.) 69 75 89 71 57 Total 146 194 188 125 186 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: Single family: 80 (2014-2018), Multi-family: 29 (2014- 2018), Other: 46 (2014-2018) • Landslide: N/A • High Liquefaction Areas: N/A • Tsunami Inundation Area: N/A • Wildfire Risk Areas: N/A Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. The City does not maintain a buildable lands inventory. Parcels available for development are dispersed throughout the City and most are less than 10 acres in size and of outside of the Industrial Districts. Within the Industrial Districts, larger parcels will likely develop as port- or petrochemical related industry. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 19-4 Table 19-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No No No Comment: Pasadena Code of Ordinances – Chapter 9 – Buildings and General Building Zoning Code No No No No Comment: The City of Pasadena does not have zoning but regulates some land uses Subdivisions Yes No Yes No Comment: State of Texas/Subdivision regulations conform to Texas State law Stormwater Management Yes No Yes No Comment: State of Texas and FEMA/All storm water management city ordinances meet or exceed local, state, and federal requirements Post-Disaster Recovery No No No No Comment: Real Estate Disclosure No No No No Comment: Growth Management No No No No Comment: Site Plan Review Yes No No No Comment: The review is limited to being a part of the building permit process Environmental Protection Yes Yes Yes No Comment: Local ordinances, TCEQ, and EPA Flood Damage Prevention Yes Yes Yes No Comment: Local flood damage prevention ordinance, Texas water Development Board, and FEMA Emergency Management Yes Yes Yes No Comment: Texas Local Government Code 418 Climate Change No No No No Comment: Other No No No No Comment: Planning Documents General Plan No No No No Comment: N/A Capital Improvement Plan Yes No No No How often is the plan updated? Annually Comment: This is a 5-year plan Disaster Debris Management Plan Yes No No No Comment: Contracts are reviewed on an annual basis and the plan is updated every five years, last Updated 5/13/2018 Floodplain or Watershed Plan Yes Yes No No Comment: FEMA. The city has a floodplain management which is updated as necessary Stormwater Plan Yes No No No Comment: Pasadena Code of Ordinances – Chapter 37 Urban Water Management Plan No No No No Comment: Habitat Conservation Plan No No No No Comment: Economic Development Plan Yes No No No Comment: The Pasadena Economic Development Corporation coordinates economic development. City of Pasadena 19-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Shoreline Management Plan No No No No Comment: Community Wildfire Protection Plan No No No No Comment: Forest Management Plan No No No No Comment: Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes No Yes No Comment: The State of Texas and The Department of Homeland Security. The city has a THIRA. It is mandated that the city has a THIRA since we accept UASI and Homeland Security grant funds. Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes Yes No Comment: Department of Homeland Security. The city has a THIRA. It is mandated that the city has a THIRA since we accept UASI and Homeland Security grant funds. Post-Disaster Recovery Plan No No No No Comment: Continuity of Operations Plan Yes Yes Yes No Comment: Department of Homeland Security. The city has a THIRA. It is mandated that the city has a THIRA since we accept UASI and Homeland Security grant funds. Public Health Plan Yes Yes Yes No Comment: Harris County Public Health Department. The state of Texas mandates that the city has a public Health Plan. Table 19-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Permit Department Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? No Table 19-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes – (If yes, specify) Water and Sewer: Connection and Usage fees. Gas and Electric: private utility company (N/A) Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 19-6 Table 19-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Public Works /Engineering Engineers or professionals trained in building or infrastructure construction practices Yes Public Works /Engineering Planners or engineers with an understanding of natural hazards Yes Public Works /Engineering Staff with training in benefit/cost analysis Yes Public Works /Engineering Surveyors No N/A Personnel skilled or trained in GIS applications Yes Public Works /Engineering Scientist familiar with natural hazards in local area No N/A Emergency manager Yes Office of Emergency Management Grant writers Yes Multiple City Debarments Other No N/A Table 19-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. https://www.pasadenatx.gov/185/Emergency- Management Do you use social media for hazard mitigation education and outreach? No • If yes, briefly describe. The OEM has a social media account that is used for outreach but is not used for education. Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. N/A Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. The city annually host a Hurricane Workshop for the citizens of Pasadena. Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. The city has 15 sirens that will be activated if a hazard event/incident occurs or is detected. City of Pasadena 19-7 Table 19-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Public Works/Engineering Who is your floodplain administrator? (department/position) Public Works Director Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? 2017 Does your floodplain management program meet or exceed minimum requirements? Exceeds • If exceeds, in what ways? 1ft free board requirement When was the most recent Community Assistance Visit or Community Assistance Contact? 2017 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. N/A Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. N/A Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? Yes • If no, is your jurisdiction interested in joining the CRS program? N/A How many flood insurance policies are in force in your jurisdiction?a 9,819 • What is the insurance in force? $2,836,961,900 • What is the premium in force? Varies How many total loss claims have been filed in your jurisdiction?a 7,122 • How many claims are still open or were closed without payment? 1,597 • What were the total payments for losses? $190,750,863.00 a. According to FEMA statistics as of September 2018 Table 19-9. Community Classifications Participating? Classification Date Classified Community Rating System Yes Class 5 10/1/14 Building Code Effectiveness Grading Schedule Yes 9 2016 Public Protection Yes Class 1 1/1/19 Storm Ready Yes Storm Ready 12/22/05 Firewise No N/A N/A Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 19-8 Table 19-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Pasadena 19-9 19.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 19.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Basic Plan — The Basic Plan provides a summary on the hazards and threats in the community. • Annex P — Hazard Mitigation is assigned to the Engineering Department and addresses the hazards and threats in the community. The Annex also identifies the various hazard mitigation related programs implemented in the City of Pasadena and which agencies are responsible for administration. • Master Drainage Plan — The City of Pasadena developed a drainage plan in 2018 that identifies several drainage projects related to flood mitigation and the identified projects have been integrated into the Hazard Mitigation Action Plan. • Flood Mitigation Plan — The City of Pasadena developed a flood mitigation plan in 2016 that followed the CRS floodplain management planning process and several of the identified projects have been integrated into the Hazard Mitigation Action Plan. 19.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Capital Improvement Plan — The City of Pasadena updates the CIP on an annual basis and can integrate the goals, objectives, and projects identified in the Hazard Mitigation Action Plan into the CIP process. • Comprehensive Plan — The Pasadena Planning Department and the Pasadena Economic Development Corporation will develop a new overall plan to document existing conditions and establish goals for the future. • Master Parks Plan — The parks plan creates a vision for the city’s park system and makes recommendations for improvements and open-space preservation. 19.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 19-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of Pasadena. Other hazard events that broadly affected the entire planning area, including the City of Pasadena, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 19-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Severe Storms & Street Flooding N/A May 7-11. 2019 Not Available Tornado (F1) N/A April 7, 2019 $500,000 Severe Storms & Street Flooding N/A January 3, 2019 Not Available Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 19-10 Type of Event FEMA Disaster # Date Damage Assessment Severe Storms & Street Flooding N/A December 6-7, 2018 Not Available Severe Storms & Street Flooding N/A October 31,2018 Not Available Severe Storms & Street Flooding N/A July 3, 2018 Not Available Severe Storms & Street Flooding N/A March 28, 2018 Not Available Ice and Snow Storm N/A January 16-17-2018 Not Available Hurricane (Harvey) 4332 DR August 22- September 4, 2017 $50,000,000 Heat N/A July 28, 2017 Not Available Tornado (F2) N/A March 29 , 2017 $1,000,000 Severe Storms & Street Flooding N/A February 14, 2017 Not Available Severe Storms & Street Flooding N/A June 2, 2016 Not Available Severe Storms & Street Flooding 4272 DR May 27, 2016 Not Available Severe Storms & Street Flooding 4269 DR April 18, 2016 Not Available Hail N/A March 18, 2016 Not Available Severe Storms & Street Flooding N/A March 8, 2016 Not Available Tornado (F2) 4245 DR October 31, 2015 $5,000,000 Severe Storms & Street Flooding N/A August 11, 2015 Not Available Heat N/A August 7, 2015 Not Available Severe Storms & Street Flooding 4223 DR May 25-26, 2015 Not Available Severe Storms & Street Flooding 4223 DR May 12, 2015 Not Available Severe Storms & Street Flooding N/A April 16-17, 2015 Not Available Severe Storms & Street Flooding N/A September 16, 2014 Not Available Severe Storms & Street Flooding N/A August 01, 2014 $100,000 Severe Storms & Street Flooding N/A May 28, /2014 Not Available Severe Storms & Street Flooding N/A October 31, 2013 Not Available Severe Storms & Street Flooding N/A May 10, 2013 $5,000 Severe Storms & Street Flooding N/A April 27, 2013 Not Available Severe Storms & Street Flooding N/A May 12, 2012 Not Available Severe Storms & Street Flooding N/A January 25, 2012 Not Available Severe Storms & Street Flooding N/A January 09, 2012 Not Available Severe Storms & Street Flooding N/A July 02, 2010 Not Available Severe Storms & Street Flooding N/A October 22, 2009 $4,000 Severe Storms & Street Flooding N/A April 28, 2009 $1,000,000 Severe Storms & Street Flooding N/A April 24, 2009 $1,000,000 Severe Storms & Street Flooding N/A April 18, 2009 $3,500,000 Hurricane (Ike) 1791 DR September 12-14, 2008 $150,000,000 Hurricane (TS Erin) N/A August 16, 2007 $750,000 Severe Storms & Street Flooding N/A June 19, 2006 $3,300,000 Hurricane (Rita) 1606 DR September 24-25, 2005 $5,000,000 Severe Storms & Street Flooding N/A December 14, 2005 $40,000 Severe Storms & Street Flooding N/A July 14, 2005 Not Available Severe Storms & Street Flooding N/A November 17, 2003 $3,000,000 Severe Storms & Street Flooding N/A August 31, 2003 $3,000 Severe Storms & Street Flooding N/A October 28, 2002 $775,000 Severe Storms & Street Flooding N/A October 24, 2002 Not Available City of Pasadena 19-11 Type of Event FEMA Disaster # Date Damage Assessment Severe Storms & Street Flooding N/A September 08, 2002 $15,000 Severe Storms & Street Flooding N/A August 15, 2002 Not Available Severe Storms & Street Flooding N/A April 08, 2002 $70,000 Severe Storms & Street Flooding N/A August 28-31, 2001 Not Available Hurricane (TS Allison) N/A June 06, 2001 $5,000,000 Severe Storms & Street Flooding N/A September 13, 2000 Not Available Severe Storms & Street Flooding N/A October 04, 1998 $5,000 Severe Storms & Street Flooding N/A September 14, 1998 $5,000 Hurricane (TS Frances) N/A September 11, 1998 $5,000,000 Severe Storms & Street Flooding N/A January 04, 1998 $3,000 Severe Storms & Street Flooding N/A December 20, 1997 $20,000 Severe Storms & Street Flooding N/A May 30, 1997 Not Available Severe Storms & Street Flooding N/A May 24, 1997 Not Available Severe Storms & Street Flooding N/A April 04, 1997 Not Available Severe Storms & Street Flooding N/A January 27, 1997 Not Available Severe Storms & Street Flooding N/A September 27, 1996 Not Available Severe Storms & Street Flooding N/A September 18, 1996 $1,500,000 Severe Storms & Street Flooding 1041 DR October 16-18, 1994 $50,000,000 Severe Storms & Street Flooding N/A March 1992 Not Available 19.7 HAZARD RISK RANKING Table 19-12 presents a local ranking for City of Pasadena of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 19-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Flooding 48 High 2 Hurricane 34 High 3 Wildfire 29 Medium 3 Drought 29 Medium 4 Earthquake 14 Low 4 Tsunami 14 Low 5 Dam Failure 2 Low 5 Mass Movement 2 Low 6 Coastal Erosion 0 (No Exposure) None 6 Tsunamio 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 19-12 19.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 19.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 402 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 108 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 94 19.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • One of the City’s wastewater treatment plants is located in an area that is likely to be inundated by a Hurricane Storm Surge and or flooding on Armand Bayou. • Due to the City’s proximity to chemical plants and refineries along the Ship Channel, Pasadena has a high risk to environmental and hazardous materials incidents due to impacts cause by natural and human- caused hazards. Mitigation actions addressing these issues were prioritized for consideration in the action plan for this annex. 19.9 STATUS OF PREVIOUS PLAN ACTIONS Table 19-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 19-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2018PASDNA001 Right of Way Mitigation Projects X PAS8 Comments: Started in 2018 – Some projects are dependent upon future grant opportunities. 2018 PASDNA002 Golden Acres Wastewater Treatment Plant Elimination X PAS8 Comments: Not Started and dependent upon future grant opportunities. 2014PASDNA001 Improve critical infrastructure/public buildings and /or shelters to harden against hurricanes effects, retrofit with impact and wind resistant glass and shutter systems, surge protectors and lightening protection. X PAS5 Comments: Ongoing project – hardening of facilities will be combined into a single action item in the 2020 update. 2014PASDNA002 Improve manufactured homes standards/codes to include tie- downs or anchorage. X PAS5 Comments: Ongoing project – dependent upon future grant opportunities City of Pasadena 19-13 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2014PASDNA003 Develop a Wildfire Public Education/Outreach Program to educate residents on wildfire hazards and actions to minimize fire/smoke damage to property. X PAS9 Comments: Ongoing project – dependent upon future grant opportunities 2014PASDNA004 Expand warning system (sirens, mass notification and reverse 911) to provide hazard awareness and alerts to mitigate all hazards and increase coverage of the community’s population. X PAS6 Comment: Ongoing project – will combine into a single all‐hazards warning and alert project in 2020 update. 2014PASDNA005 Improve safe room shelters to meet wind specifications X PAS5 Comments: Not Started and dependent upon future grant opportunities. 2014PASDNA006 Install retention ponds at selected facilities and geographic locations to collect non-potable water for irrigation and sprinkler system usage. X PAS10 Comments: Not Started and dependent upon future grant opportunities. 2014PASDNA007 Improve public facility emergency power to provide adequate cooling for use as cooling centers. X PAS7 Comments: Ongoing project – will combine heating and cooling centers projects in 2020 update into a single action Item 2014PASDNA008 Establish grant program to provide cooling equipment (fans, window A/C’s, etc.) to low to- moderate income (LMI) population. X PAS7 Comments: Ongoing project – will combine heating and cooling centers projects in 2020 update into a single action Item 2014PASDNA009 Upgrade heating systems and emergency power capacity at public facilities for use as warming centers. X PAS7 Comments: Ongoing project – will combine heating and cooling centers projects in 2020 update into a single action Item 2014PASDNA010 Establish grant program to provide heating equipment to low-to- moderate income (LMI) population. X PAS7 Comments: Ongoing project – will combine heating and cooling centers projects in 2020 update into a single action Item 2014PASDNA011 Expand community warning system to include direct notification to local business community during hazardous materials incidents. X PAS6 Comments: Ongoing project – will combine into a single all‐hazards warning and alert project in 2020 update. 2014PASDNA012 Retrofit critical infrastructure facilities with positive pressure ventilation systems and HVAC emergency shutdown mechanism for shelter-in-place capability. X PAS5 Comments: Ongoing project – dependent upon future grant opportunities 2014PASDNA013 Establish ordinance to require shutoff valves at entry and exit points of city limits. X Comment: Remove Action Item. No longer feasible and regulated by State and Federal agencies. 2014PASDNA014 Improve ordinances requiring fortified spill containment and engineered anchoring systems on aboveground storage tanks (AST). X PAS10 Comments: Ongoing project – dependent upon future grant opportunities 2014PASDNA015 Expand community warning system like mass notification, reverse 911, sirens, etc. to include coverage to warn flood-prone areas during dam/levee failure. X PAS6 Comments: Ongoing project – will combine into a single all‐hazards warning and alert project in 2020 update. 2014PASDNA016 Create mapping/identification of inundation risk areas from dam/levee failure. X PAS9 Comments: Remove Item Pasadena is not in a risk area for a Dam failure. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 19-14 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2010PASDNA002 Improve drainage easements by expanding the slopes, banks and drainage structures. X PAS8 Comments: Ongoing project – dependent upon future grant opportunities. 2010PASDNA004 Develop a Public Education Program on flood risk and Community Rating System (CRS) to educate public on action to minimize damage to human life and personal property from floods. X PAS4 Comments: Ongoing project – dependent upon future grant opportunities 2010PASDNA005 Expand and protect current bayou environment associated with riverine flood to mitigate city’s threat from flooding. X PAS8 Comments: Ongoing project – dependent upon future grant opportunities 2010PASDNA006 Construction of floodwalls, detention and retention basins, spillways and other related Structures X PAS8 Comments: : Ongoing project – dependent upon future grant opportunities. 2010PASDNA008 Burying power lines X Comments: On going, dependent upon future grant opportunities 2010PASDNA009 Construction of safe rooms PAS5 Comments: Not Started and dependent upon future grant opportunities. 2010PASDNA014 Heating and cooling requirements Implement and adopt city code to require housing landlords to ensure minimum and maximum temperatures be sustained for a minimum period of time to limit the effects of extreme heat and extreme cold. X Comments: No Longer Feasible 2010PASDNA015 Establish and harden Heating and cooling centers to reduce exposure and the effects of extreme heat and winter storms. X PAS7 Comments: Comments: Ongoing project – will combine heating and cooling centers projects in 2020 update into a single action Item 2010PASDNA016 Develop Buffer Zones/defensible space by GIS Mapping of areas to reduce impact of wildfires. X PAS9 Comments: Ongoing project – dependent upon future grant opportunities 2010PASDNA019 Establish facilities to serve as winter heating centers for animal/livestock. X PAS7 Comments: Comments: Ongoing project – will combine heating and cooling centers projects in 2020 update into a single action Item 2010PASDNA020 Hazardous material disposal X PAS10 Comments: Ongoing project – dependent upon future grant opportunities 2010PASDNA021 Security provisions and plans for man-made threats to facilities X PAS10 Comments: Ongoing project – dependent upon future grant opportunities 2010PASDNA022 Develop and practice an emergency plan for handling transportation accidents involving radiological materials X PAS10 Comments: Ongoing project – dependent upon future grant opportunities 2010PASDNA023 Procure and utilize responder personal protective equipment and detection instruments X PAS10 Comments: Ongoing project – dependent upon future grant opportunities 2010PASDNA027 Digging Hotlines X Comments: 811 Dig Lines is fully implemented in the City of Pasadena 2010PASDNA028 Protective shelters for Response vehicles X PAS5 Comments: Ongoing project – hardening of city facilities will be combined into a single action item in the 2020 update. City of Pasadena 19-15 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2010PASDNA029 Hardening roofs of vulnerable City buildings X PAS5 Comments: Ongoing project – hardening of facilities will be combined into a single action item in the 2020 update. 2010PASDNA030 Install Backup power system generators to enable critical facilities to continue basic services, which can be used by critical facilities to ensure security and protect refrigerated goods. X PAS5 Comments: Ongoing project – hardening of facilities will be combined into a single action item in the 2020 update. 2010PASDNA031 Fuel Facility Hardening – Harden and protect the City’s fueling center against severe weather events and power outages X PAS5 Comments: Ongoing project – hardening of facilities will be combined into a single action item in the 2020 update. 2010PASDNA032 Install generators for Major Intersections X PAS5 Comments: Ongoing project – dependent upon future grant opportunities 2010PASDNA033 Hydrological routing X PAS8 Comments: On going, dependent upon future grant opportunities 2005PASDN001 Improve and expand the community’s Hurricane public education/outreach program, the annual hurricane workshop, to educate residents on appropriate actions to minimize damage from hurricanes and to reach more of the community over the next five years. X PAS11 Comments: On going 2005PASDNA005 Adopt and enhance higher-standard windstorm building requirements to minimize property damage from high-winds X PAS5 Comments: On going, dependent upon future grant opportunities 2005PASDNA011 Harden critical city facilities to lessen the impacts of natural and human-caused hazards. X PAS5 Comments: Ongoing project – hardening of facilities will be combined into a single action item in the 2020 update. 2005PASDNA012 Implement Capital Improvement Projects to reduce flood-related impacts by installing back-up generators at key water and wastewater facilities. X PAS5 Comments: Ongoing, dependent upon future grant opportunities 19.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 19-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 19-15 identifies the priority for each action. Table 19-16 summarizes the mitigation actions by hazard of concern and mitigation type. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 19-16 Table 19-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action PAS1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire, hurricane, severe weather Existing 3, 4, 10 Public Works Emergency Management High HMGP, PDM, FMA Short-term Action PAS2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including the City of Pasadena Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 Public Works Planning Low Staff Time, General Funds Ongoing Action PAS3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Flooding, Hurricane, Wildfire, Drought, Earthquake, Tsunami, Dam Failure, Mass Movement New and Existing 1, 5, 8 Emergency Management Public Works Low Staff Time, General Funds Short-term Action PAS4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise New and Existing 1, 3, 5, 7, 8, 10 Public Works Emergency Management Low Staff Time, General Funds Ongoing Action PAS5 — The hardening of critical infrastructure, public and private buildings and shelters in order to lessen the impacts of natural and human-caused hazards: • Improve critical infrastructure, public and private buildings and shelters to harden against the effects of natural and human-caused hazards including wind, flood lightning, earthquakes, fire, hazardous materials and environmental hazards. • Install backup power system generators at critical infrastructure sites including traffic intersections, water and wastewater facilities. • Improve manufactured homes standards/codes to include tie-downs or anchorage. • Critical response vehicle storage & fuel facility hardening – Build, harden and or protect the City’s vehicle storage and fueling centers against severe weather events and power outages. • Improve safe room shelters to meet wind specifications. • Retrofit critical infrastructure facilities with positive pressure ventilation systems and HVAC emergency shutdown mechanism for shelter-in-place capability. • Adopt and enhance higher-standard windstorm building requirements to minimize property damage from high-winds Hazards Mitigated: Drought, Earthquake, Flooding, Mass Movement, Severe Weather, Hurricane, Tsunami, Wildfire New and Existing 1, 2, 3, 7, 8, 9, 10, 13 Public Works Emergency Management High HMGP, PDM, FMA Ongoing Action PAS6 — Expand all hazards warning and alerting systems. • Expand warning system (sirens, mass notification and reverse 911) to provide hazard awareness and alerts to mitigate all hazards and increase coverage of the community’s population. • Expand community warning system to include direct notification to local business community during hazardous materials incidents. Hazards Mitigated: Drought, Earthquake, Flooding, Mass Movement, Severe Weather, Hurricane, Tsunami, Wildfire New and Existing 1, 3, 10 Emergency Management SERLEPC Medium HMGP, PDM, FMA, Local Short Term City of Pasadena 19-17 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action PAS7 — Establish heating and cooling centers to reduce exposure and the effects of extreme heat and winter storms. • Improve public facility emergency power to provide adequate cooling for use as cooling centers. • Establish grant program to provide cooling and heating equipment to low- to moderate-income (LMI) population. • Upgrade heating systems and emergency power capacity at public facilities for use as warming centers. • Establish facilities to serve as winter heating centers for animal/livestock. Hazards Mitigated: Drought, Earthquake, Flooding, Mass Movement, Severe Weather, Hurricane, Tsunami, Wildfire New and Existing 3, 10, 15 Public Works Emergency Management High HMGP, PDM Long Term Action PAS8 — Flood control and drainage improvements. • Improve drainage easements by expanding the slopes, banks and drainage structures. • Expand and protect current bayou environment associated with riverine flood to mitigate city’s threat from flooding. • Construction of floodwalls, detention and retention basins, spillways and other related structures. • Hydrological routing • Right of Way Flood Mitigation • Projects Golden Acres Wastewater Treatment Plant Elimination Hazards Mitigated: Flooding, Severe Weather, Hurricane, Tsunami New and Existing 1, 2, 7, 8, 10, 12, 13 Public Works Emergency Management High HMGP, PDM, FMA Ongoing Action PAS9 — Wildfire Prevention & Mitigation Projects by developing buffer zones/defensible space to reduce impact of wildfires. Hazards Mitigated: Drought, Wildfire New and Existing 2, 3, 6, 7, 10, 12 Planning Emergency Management Low HMGP, PDM Short Term Action PAS10 — Man-Made and Technological Disasters Prevention and Mitigation • Security provisions and plans for man-made threats to facilities. • Develop and practice an emergency plan for handling transportation accidents involving radiological materials • Procure and utilize responder personal protective equipment and detection instruments • Improve ordinances requiring fortified spill containment and engineered anchoring systems on aboveground storage tanks (AST). • Install retention ponds at selected facilities and geographic locations to collect non-potable water for irrigation and sprinkler system usage Hazards Mitigated: Drought, Hazardous Materials New and Existing 1, 3 , 6, 10, 12 Police & Fire Emergency Management Medium HMGP, PDM, FMA, Local Short Term Action PAS11 — Public Education and Outreach for natural and human-caused hazards. • Improve and expand the community’s Hurricane public education/outreach program, the annual hurricane workshop, to educate residents on appropriate actions to minimize damage from hurricanes. • Develop a Wildfire Public Education/Outreach Program to educate residents on wildfire hazards and actions to minimize fire/smoke damage to property. • Drought, Earthquake, Flooding, Mass Movement, Severe Weather, Hurricane, Tsunami, Wildfire New and Existing 2, 3, 10, 12 Emergency Management Fire Low HMGP, PDM, FMA, Local Short Term Action PAS12— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Flooding, Hurricane, Wildfire, Drought, Earthquake, Tsunami, Dam Failure, Mass Movement New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Pasadena HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 19-18 Table 19-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya PAS1 3 High High Yes Yes No Medium High PAS2 7 Medium Low Yes No Yes High Low PAS3 3 Low Low Yes No Yes High Low PAS4 6 Medium Low Yes No Yes High Low PAS5 8 High High Yes Yes No High High PAS6 3 Medium Low Yes Yes No High Medium PAS7 3 High High Yes Yes No High High PAS8 7 High High Yes Yes No High High PAS9 6 Medium Medium Yes Yes No Medium Medium PAS10 5 Medium Medium Yes Yes No Medium Medium PAS11 4 Medium Medium Yes Yes No Medium Medium PAS12 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 19-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Sever Weather PAS2, 12 PAS1, PAS5 PAS4, PAS11, 12 PAS8 PAS6, 12 PAS5 PAS7 PAS3, 12 Flooding PAS2, 12 PAS1, PAS5 PAS4, PAS11, 12 PAS8 PAS6, 12 PAS5 PAS7 PAS3, 12 Hurricane PAS2, 12 PAS1, PAS5 PAS4, PAS11, 12 PAS8 PAS6, 12 PAS5 PAS7 PAS3, 12 Medium-Risk Hazards Wildfire PAS2, 12 PAS1, PAS5 PAS4, PAS11, 12 PAS9 PAS6, 12 PAS7 PAS3, 12 Drought PAS2, 12 PAS5 PAS4, PAS11, 12 PAS9 PAS6, PAS10, 12 PAS7 PAS3, 12 Low-Risk HazardsPAS11 Earthquake PAS2, 12 PAS1, PAS5 PAS11, 12 PAS6, 12 PAS5 PAS3, 12 Tsunami PAS2, 12 PAS1, PAS5 PAS4, PAS11, 12 PAS8 PAS6, 12 PAS5 PAS7 PAS3, 12 Dam Failure PAS2, 12 PAS5 PAS4, PAS11, 12 PAS6, 12 PAS5 PAS7 PAS3, 12 Mass Movement PAS2, 12 PAS5 PAS11, 12 PAS6, 12 PAS5 PAS3, 12 a. See the introduction to this volume for explanation of mitigation types. 19.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • City of Pasadena Municipal Ordinance — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. City of Pasadena 19-19 • City of Pasadena Flood Control & Drainage Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«96¬«96¬«35¬«225¬«225¬«3¬«3¬«146¬«146§¨¦10§¨¦45§¨¦45£¤90HoustonBaytownJacinto CityGalena ParkDeer ParkLa PorteMorgan'sPointSouth HoustonShoreacresLa PortePearlandSeabrookTaylor LakeVillageEl LagoFriendswoodPearlandLeague CityLeague CityNassauBayWebsterClear LakeShoresKemahCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County01.530.75Miles±Pasadena ¬«96 ¬«96¬«35 ¬«225 ¬«225 ¬«3 ¬«3 ¬«146 ¬«146 §¨¦10 §¨¦45 §¨¦45 £¤90 Houston Baytown Jacinto City Galena Park Deer Park La Porte Morgan's Point South Houston Shoreacres La Porte Pearland SeabrookTaylor Lake Village El Lago Friendswood Pearland League City League City Nassau Bay Webster Clear Lake Shores Kemah FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 1.5 30.75 Miles ± Pasadena ¬«96 ¬«96¬«35 ¬«225 ¬«225 ¬«3 ¬«3 ¬«146 ¬«146 §¨¦10 §¨¦45 §¨¦45 £¤90 Houston Baytown Jacinto City Galena Park Deer Park La Porte Morgan's Point South Houston Shoreacres La Porte Pearland SeabrookTaylor Lake Village El Lago Friendswood Pearland League City League City Nassau Bay Webster Clear Lake Shores Kemah Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 1.5 30.75 Miles ± Pasadena ¬«96 ¬«96¬«35 ¬«225 ¬«225 ¬«3 ¬«3 ¬«146 ¬«146 §¨¦10 §¨¦45 §¨¦45 £¤90 Houston Baytown Jacinto City Galena Park Deer Park La Porte Morgan's Point South Houston Shoreacres La Porte Pearland SeabrookTaylor Lake Village El Lago Friendswood Pearland League City League City Nassau Bay Webster Clear Lake Shores Kemah 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 1.5 30.75 Miles ± Pasadena ¬«96 ¬«96¬«35 ¬«225 ¬«225 ¬«3 ¬«3 ¬«146 ¬«146 §¨¦10 §¨¦45 §¨¦45 £¤90 Houston Baytown Jacinto City Galena Park Deer Park La Porte Morgan's Point South Houston Shoreacres La Porte Pearland SeabrookTaylor Lake Village El Lago Friendswood Pearland League City League City Nassau Bay Webster Clear Lake Shores Kemah 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 1.5 30.75 Miles ± Pasadena ¬«96 ¬«96¬«35 ¬«225 ¬«225 ¬«3 ¬«3 ¬«146 ¬«146 §¨¦10 §¨¦45 §¨¦45 £¤90 Houston Baytown Jacinto City Galena Park Deer Park La Porte Morgan's Point South Houston Shoreacres La Porte Pearland SeabrookTaylor Lake Village El Lago Friendswood Pearland League City League City Nassau Bay Webster Clear Lake Shores Kemah Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 1.5 30.75 Miles ± Pasadena ¬«96 ¬«96¬«35 ¬«225 ¬«225 ¬«3 ¬«3 ¬«146 ¬«146 §¨¦10 §¨¦45 §¨¦45 £¤90 Houston Baytown Jacinto City Galena Park Deer Park La Porte Morgan's Point South Houston Shoreacres La Porte Pearland SeabrookTaylor Lake Village El Lago Friendswood Pearland League City League City Nassau Bay Webster Clear Lake Shores Kemah Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 1.5 30.75 Miles ± Pasadena 20-1 20. CITY OF PINEY POINT VILLAGE 20.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Roger Nelson, City Administrator 7676 Woodway Drive, Suite 300 Houston, Texas 77063 713-230-8703 e-mail: cityadmin@pineypt.org Annette Arriaga, Building Official 7676 Woodway Drive, Suite 300 Houston, Texas 77063 Telephone: 713-782-3178 e-mail: bldgofficial@pineypt.org 20.2 JURISDICTION PROFILE 20.2.1 Location The City of Piney Point Village is a municipality in southwestern Harris County. Piney Point’s boundary on the north is generally Beinhorn Taylorcrest. To the west, Blalock and Memorial Point. To the south Arrowwood Circle, Windemere Lane and Buffalo Bayou. The eastern boundary is Buffalo Bayou, Memorial Drive and Hedwig Road. The City encompasses an area of 2.1 square miles. 20.2.2 History Piney Point Village was incorporated in 1954. There are 1,064 houses in Piney Point and 3,125 residents. There are three churches and four schools (one public elementary school, two church schools and one private school. 20.2.3 Climate The climate of Piney Point is typically warm with significant annual rainfall. 20.2.4 Governing Body Format The City of Piney Point Village is a Type-A General Law City and is governed by a Mayor and five Aldermen. All Council positions are elected at large for two year terms. The Piney Point Village City Council assumes responsibility for the adoption of this plan; Roger Nelson, City Administrator will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 20-1. Table 20-1. Local Mitigation Planning Team Members Name Title Howard Miller Emergency Management Coordinator – VFD Roger Nelson City Administrator – Piney Point Village Annette Arriaga Building Official – Piney Point Village Karen Farris City Secretary – Piney Point Village Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 20-2 20.3 CURRENT TRENDS 20.3.1 Population According to 2010 Census, the population of Piney Point Village was 3,125. Since 2010, the population has remained the same. 20.3.2 Development Table 20-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Table 20-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. • If yes, who currently has permitting authority over these areas? Are any areas targeted for development or major redevelopment in the next five years? No • If yes, briefly describe, including whether any of the areas are in known hazard risk areas The City of Piney Point Village continues to see redevelopment of existing houses. This development is occurring throughout the Village How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 16 11 8 4 10 Multi-Family 0 0 0 0 0 Other (commercial, mixed use, etc.) 0 0 0 0 0 Total 16 11 8 4 10 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 0 • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. The City of Piney Point Village continues to see redevelopment of existing houses. This development is occurring throughout the Village 20.4 CAPABILITY ASSESSMENT The City of Piney Point Village performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the City of Piney Point Village 20-3 components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 20-3. • Development and permitting capabilities are presented in Table 20-4. • An assessment of fiscal capabilities is presented in Table 20-5. • An assessment of administrative and technical capabilities is presented in Table 20-6. • An assessment of education and outreach capabilities is presented in Table 20-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 20-8. • Classifications under various community mitigation programs are presented in Table 20-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 20-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Table 20-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No No No Comment: PPV Development Services Zoning Code Yes No No No Comment: PPV Development Services Subdivisions Yes No No No Comment: Stormwater Management Yes Yes Yes Yes Comment: HCFCD Post-Disaster Recovery Yes Yes No Yes Comment: Harris County Real Estate Disclosure No No No No Comment: Growth Management No No No No Comment: Site Plan Review Yes No No No Comment: Environmental Protection Yes Yes No Yes Comment: HCFCD Flood Damage Prevention Yes Yes No No Comment: HCFCD Emergency Management Yes Yes No Yes Comment: Hedwig, Spring Valley, Hunters Creek, Hilshire, VFD Climate Change No No No No Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 20-4 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Planning Documents General Plan Yes No No No Comment: Capital Improvement Plan No No No No How often is the plan updated? N/A Comment: Disaster Debris Management Plan Yes Yes No Yes Comment: Harris County Floodplain or Watershed Plan Yes Yes No Yes Comment: HCFCD Stormwater Plan Yes Yes No Yes Comment: HCFCD Urban Water Management Plan No No No No Comment: Habitat Conservation Plan No No No No Comment: Economic Development Plan No No No No Comment: Shoreline Management Plan No No No No Comment: Community Wildfire Protection Plan No No No No Comment: Forest Management Plan No No No No Comment: Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes Yes No Yes Comment: VFD Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes No Yes Comment: VFD Post-Disaster Recovery Plan Yes Yes No Yes/No Comment: Harris County Continuity of Operations Plan Yes No No No Comment: Public Health Plan No No No No Comment: Other Yes/No Yes/No Yes/No Yes/No Comment: Table 20-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Development Services Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? Yes City of Piney Point Village 20-5 Table 20-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes Table 20-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Combination of City employees and the City’s engineering firm – HDR Engineers or professionals trained in building or infrastructure construction practices Yes City’s engineering firm – HDR Planners or engineers with an understanding of natural hazards Yes City’s engineering firm – HDR Staff with training in benefit/cost analysis Yes City Administrator Surveyors Yes City’s engineering firm – HDR Personnel skilled or trained in GIS applications No City’s engineering firm – HDR Scientist familiar with natural hazards in local area No Emergency manager Yes Emergency Management Coordinator – VFD Grant writers No Table 20-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? No Do you have hazard mitigation information available on your website? No • If yes, briefly describe. Do you use social media for hazard mitigation education and outreach? No • If yes, briefly describe. Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. We use the MVPD’s “V-Link” system which is a community wide, internet based system Do you have any established warning systems for hazard events? No • If yes, briefly describe. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 20-6 Table 20-8. National Flood Insurance Program Compliance Criterion What local department is responsible for floodplain management? Harris County Flood Control District Who is your floodplain administrator? (department/position) Annette Arriaga – Development Services Are any certified floodplain managers on staff in your jurisdiction? No What is the date that your flood damage prevention ordinance was last amended? March 26, 2019 Does your floodplain management program meet or exceed minimum requirements? Yes • If exceeds, in what ways? When was the most recent Community Assistance Visit or Community Assistance Contact? 2018 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? • If no, is your jurisdiction interested in joining the CRS program? Yes How many flood insurance policies are in force in your jurisdiction?a 620 • What is the insurance in force? $207,040,600 • What is the premium in force? $347,337 How many total loss claims have been filed in your jurisdiction?a 338 • How many claims are still open or were closed without payment? Unknown • What were the total payments for losses? $20,537,774 a. According to FEMA statistics as of MONTH XX, 201X Table 20-9. Community Classifications Participating? Classification Date Classified Community Rating System No Building Code Effectiveness Grading Schedule No Public Protection No Storm Ready No Firewise No City of Piney Point Village 20-7 Table 20-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 20-8 20.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in Section 20.11 were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 20.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • The Cities of Piney Point, Hedwig, Bunker Hill and Hunters Creek share engineering plans, specifically related to drainage projects so that we all know what the other is doing and how we are potentially impacting each other. • The Cities of Piney Point, Bunker Hill and Hunters Creek share a Police Department • The Cities of Piney Point, Bunker Hill, Hunters Creek, Hedwig, Spring Valley and Hilshire share a Fire Department. The Fire Department serves as the lead hazard mitigation entity. 20.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: unknown 20.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 20-11 lists past occurrences of natural hazards for which specific damage was recorded in Piney Point Village. Other hazard events that broadly affected the entire planning area, including Piney Point Village, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 20-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 $19,325,155 Memorial Day Flood 4269 DR 2016 Not Available Tax Day Flood 4227DR 2016 Not Available Hurricane Ike 1791 DR 2008 Not Available Hurricane Rita 1606 DR 2005 Not Available Hurricane Alicia 1379 DR 1983 Not Available 20.7 HAZARD RISK RANKING Table 20-12 presents a local ranking for Piney Point Village of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. City of Piney Point Village 20-9 Table 20-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Flooding 18 Medium 3 Earthquake 14 (negligible level of risk from this hazard) Low 4 Drought 6 Low 4 Mass Movement 6 Low 4 Wildfire 6 Low 5 Tsunami 0 (No exposure) None 5 Dam Failure 0 (No exposure) None 5 Coastal Erosion 0 (No exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 20.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 20.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 52 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 3 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0 20.8.2 Other Noted Vulnerabilities No additional vulnerabilities specific to this jurisdiction have been identified. 20.9 STATUS OF PREVIOUS PLAN ACTIONS Table 20-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. 20.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 20-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 20-15 identifies the priority for each action. Table 20-16 summarizes the mitigation actions by hazard of concern and mitigation type. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 20-10 Table 20-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update Expand Early Warning/Alert System – Collaborative Community Alert & Notification (Code Red Mass Notification) for information sharing to increase mobile coverage of residential and non-residential areas X PPV5 Comment: Under consideration in FY 2020 budget Develop Tree Management Program to better manage and keep clear the public right-of-way; to promote stronger, healthier trees and to reduce the impact of debris X Comment: Table 20-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action PPV1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Severe weather, hurricane, flooding, earthquake Existing 11, 13 City Administration TBD High HMGP, PDM, FMA Short-term Action PPV2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community Hazards Mitigated: Severe weather, hurricane, flooding, earthquake, drought New and Existing 9, 10, 11 City Administration TBD Low Staff Time, General Funds Ongoing Action PPV3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Mass Movement, Wildfire New and Existing 9, 10, 11 City Administration TBD Low Staff Time, General Funds Short-term Action PPV4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Flooding, severe weather, hurricane New and Existing 1, 3, 5, 7, 8, 10, 14 City Administration TBD Low Staff Time, General Funds Ongoing Action PPV5 — Expand Early Warning/Alert System – Collaborative Community Alert & Notification (Code Red Mass Notification) for information sharing to increase mobile coverage of residential and non-residential areas Hazards Mitigated: Al Hazards New and Existing 1,3,15 City Administration TBD Medium General Fund. Grants Ongoing Action PPV6— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Mass Movement, Wildfire New and Existing 1, 3, 4, 5, 9, 10, 11, 15 City Admistration HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. City of Piney Point Village 20-11 Table 20-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya PPV1 3 High High Yes Yes No Medium High PPV2 7 Medium Low Yes No Yes High Low PPV3 3 Low Low Yes No Yes High Low PPV4 6 Medium Low Yes No Yes High Low PPV5 3 Medium Medium Yes Yes Yes High Medium PPV6 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 20-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather PPV1, 4, 6 PPV1, 4 PPV 4, 6 PPV6 PPV 1, PPV5 PPV 2, 3, 4, 6 Hurricane PPV1, 4, 6 PPV1, 4 PPV 4, 6 PPV6 PPV 1, PPV5 PPV 2, 3, 4, 6 Medium-Risk Hazards Flooding PPV1, 4, 6 PPV1, 4 PPV 4, 6 PPV6 PPV 1, PPV5 PPV 2, 3, 4, 6 Low-Risk Hazards Earthquake PPV 1, 6 PPV 1 PPV6 PPV6 PPV 1, PPV5 PPV 2, 3, 4, 6 Drought PPV6 PPV6 PPV6 PPV 2, 3, 4, 6 Mass Movement PPV6 PPV6 PPV6 PPV 2, 3, 4, 6 Wildfire PPV6 PPV6 PPV6 PPV 2, 3, 4, 6 a. See the introduction to this volume for explanation of mitigation types. 20.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • City of Piney Point Village Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • City of Piney Point Village Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. !(!(!(!(!(!(!(!(!(!(!(!(!(!(HoustonHuntersCreek VillageHedwigVillageBunker HillVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.20.40.1Miles±Piney Point Village Houston Hunters Creek Village Hedwig Village Bunker Hill Village FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Piney Point Village Houston Hunters Creek Village Hedwig Village Bunker Hill Village Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Piney Point Village Houston Hunters Creek Village Hedwig Village Bunker Hill Village 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Piney Point Village Houston Hunters Creek Village Hedwig Village Bunker Hill Village 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Piney Point Village Houston Hunters Creek Village Hedwig Village Bunker Hill Village Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Piney Point Village Houston Hunters Creek Village Hedwig Village Bunker Hill Village Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Piney Point Village 21-1 21. CITY OF SEABROOK 21.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Nick Kondejewski 1100 Red Bluff Seabrook, Texas 77586 Telephone: 281-291-5638 e-mail Address: nickk@seabrooktx.gov Brian Craig 1100 Red Bluff Seabrook, Texas 77586 Telephone: 281-291-5719 Email Address: bcraig@seabrooktx.gov 21.2 JURISDICTION PROFILE 21.2.1 Location The City of Seabrook is located just 30 minutes south of downtown Houston, Seabrook is the southernmost city Harris County along State Highway 146. Located on Galveston Bay, Clear Lake, and Taylor Lake. Seabrook has water on Eastern Side, South western side and the North West side of the City. State Highway 146 divides the City into two halves. To the south of Seabrook is Kemah, Texas which is connected by the Seabrook/Kemah Bridge, which cross the Clear Creek Channel. To the north of Seabrook is Pasadena and Port of Houston Bayport Terminal. To the west of Seabrook is El Lago. Seabrook with El Lago and a portion of Pasadena is actually an Island in the southernmost portion of Harris County. Seabrook currently encompasses an area of approximately 5 square miles of land not including several square miles of Galveston Bay. 21.2.2 History The City of Seabrook was incorporated in October 23, 1961. Historic records date back to 1832, when Ritson Morris, a native Virginian, obtained a league of land from the Mexican government. A portion of the land was purchased by Seabrook W. Sydnor in 1895 and a plat was filed with the Harris County Courthouse the following year. In March 1903, the Seabrook Company of Houston filed a revised layout of the proposed Seabrook town site, which appealed to local farmers, fishermen and merchants. Some years later, in 1961, local leaders had the city incorporated. In 1964, not long after the city became incorporated, a bridge was built between Kemah and Seabrook plus State Highway 146 was established as a four-lane highway. The bridge and highway allowed easy access to Seabrook along Galveston Bay and the small town began to grow considerably. A youth center named for astronaut Edward H. White II, America’s first space walker, opened in 1971. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 21-2 Through the years the City has gone through many growing pains as the widening of Nasa Parkway, State High 146 and again the current widening of State High 146. Other growing pains of Natural Disasters strike home with Hurricane Carla, Hurricane Alicia, Hurricane Ike and Hurricane Harvey. 21.2.3 Climate Seabrook’s climate is classified as humid subtropical. Prevailing winds from the south and southeast bring heat from the deserts of Mexico and moisture from the Gulf of Mexico. Summer temperatures typically have highs near 91 °F though higher temperatures are not uncommon. The city’s proximity to the bay and the winds that it generates moderate the area’s temperatures and ease the effects of the humidity, creating a more pleasant climate than inland communities like Houston. Winters in the area are temperate with typical January 61 °F and lows are near 45 °F. Snowfall is rare. Annual rainfall averages exceed 56 inches, with an annual average of 69 precipitation days. The average elevation of Seabrook is approximately 11 ft. above sea level. 21.2.4 Governing Body Format The City of Seabrook is a Home Rule City operating under the Council-Manager form of government, with a City Council composed of a Mayor (elected at large) and six at large Council members. The City Council appoints a City Manager to act as the chief administrative and executive officer of the City. The City of Seabrook City Council assumes responsibility for the adoption of this plan; The Office of Emergency Management will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 21-1. Table 21-1. Local Mitigation Planning Team Members Name Title Charles J. Galyean OEM Director Nick Kondejewski Building Official, FPM Sean Landis Deputy City Manager Kevin Padgett Public Works Director Brian Craig Assistant Public Works Dir Brad Goudie Director of Emergency Services Amanda Alvarado Communication 21.3 CURRENT TRENDS 21.3.1 Population According to U.S. Census, the population of City of Seabrook, as of July 1, 2017 was 13,693. Since 2010, the population has grown at an average annual rate of 3 percent. Over the last year the population growth has leveled off due to a lack of development and lack of buildable land space. 21.3.2 Development The City of Seabrook is zoned community with large residential base with commercial throughout the major roadways in the city. Major construction by the State of Texas on a Roadway expansion project will and has had a City of Seabrook 21-3 very large impact to the community. There were over 60 business that were affected by this expansion and many did not relocate within the city and some have chosen to not to reopen anywhere after the buyout by TxDOT. With the multi-year long construction project by TxDOT development along this corridor is slow and slow city wide due to the impact of construction. During this time construction is primarily in fill in the residential areas of the city. Table 21-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Table 21-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas The areas for development over the next 5 years are as follows: • S.H. 146 corridor -- This will be commercial development consisting on mainly retail. • Repsdorph and Lakeside (Town Center) -- will consist of commercial development that will mainly contain retail. • Water Front Drive – Will consist of commercial with retail, restaurant, entertainment. • North end of the City East of State Hwy 146 – Commercial, Light industrial and residential How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 19 20 23 27 30 Multi-Family 1 0 1 0 0 Other (commercial, mixed use, etc.) 4 1 4 5 2 Total 24 21 28 32 32 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 110 • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. Currently the City is about at 85% buildout with limited areas for development. Fill in areas with in the residential areas and fill in area through the Commercially Zoned areas. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 21-4 21.4 CAPABILITY ASSESSMENT The City of Seabrook performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 21-3. • Development and permitting capabilities are presented in Table 21-4. • An assessment of fiscal capabilities is presented in Table 21-5. • An assessment of administrative and technical capabilities is presented in Table 21-6. • An assessment of education and outreach capabilities is presented in Table 21-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 21-8. • Classifications under various community mitigation programs are presented in Table 21-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 21-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Table 21-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No No No Comment: Seabrook has adopted the 2015 ICC Code complement and the 20117 NEC Zoning Code Yes No No No Comment: Seabrook, Texas Code of Ordinance, Chapter80 Subdivisions Yes No No No Comment: Seabrook, Texas Code of Ordinance, Chapter80 Stormwater Management Yes Yes Yes No Comment: Seabrook, Texas Charter Article II – Flood Damage Prevention Post-Disaster Recovery No No no NO Comment: Real Estate Disclosure Yes No Yes Yes Comment: Growth Management Yes No No No Comment: Site Plan Review Yes Yes No No Comment: Both the city and county review commercial development plans storm water requirements Environmental Protection Yes Yes Yes Yes Comment: Flood Damage Prevention Yes No Yes Yes Comment: Harris County Emergency Management Yes Yes Yes Yes Comment: Emergency Operations Plan with Basic Plan with 22 Annexes updated every fifth year Climate Change No No No No Comment: Seabrook Currently has no specific regulations related to change but may consider in the future. City of Seabrook 21-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Planning Documents General Plan Yes No Yes Yes Comment: City of Seabrook Comprehensive Master Plan Capital Improvement Plan Yes No No Yes How often is the plan updated? Annually Comment: Disaster Debris Management Plan No No No NO Comment: Floodplain or Watershed Plan No Yes No No Comment: Harris County Flood Control Stormwater Plan Yes No Yes No Comment: MS4 permit and SWQMP Urban Water Management Plan No No No No Comment: Habitat Conservation Plan No Yes No No Comment: Gulf / Houston regional conservation plan. Economic Development Plan No No No No Comment: Shoreline Management Plan No Yes Yes No Comment: Gulf / Houston regional conservation plan. Community Wildfire Protection Plan No Yes No No Comment: Gulf / Houston regional conservation plan. Forest Management Plan No No No No Comment: Climate Action Plan No No No Yes Comment: Emergency Management Plan Yes Yes Yes Yes Comment: Annex P — Hazard Mitigation and Hazard Summaries in Basic Plan Threat & Hazard Identification & Risk Assessment (THIRA) No Yes yes yes Comment: State and Harris County Post-Disaster Recovery Plan Yes No No Yes Comment: Currently in the works Continuity of Operations Plan Yes No No No Comment: Currently in the works Public Health Plan No Yes No NO Comment: Park Plan Yes No No Yes Comment: Park Trails Master Plan Table 21-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? (Building Department) Does your jurisdiction have the ability to track permits by hazard area? Yes (Flood Only) Does your jurisdiction have a buildable lands inventory? No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 21-6 Table 21-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes – Water and Sewer Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes Table 21-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Public Work/Seabrook/City Engineer Engineers or professionals trained in building or infrastructure construction practices Yes Public Work/Seabrook/City Engineer Planners or engineers with an understanding of natural hazards Yes Public Work/Seabrook/City Engineer Staff with training in benefit/cost analysis Yes Emergency Management Surveyors No (Reliance on licensed consultant) Personnel skilled or trained in GIS applications Yes Public Works/Seabrook/GIS Tech Scientist familiar with natural hazards in local area No (Reliance on licensed professional) Emergency manager Yes Emergency Management Grant writers No Everyone No professional Other Yes/No Insert appropriate information Table 21-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. Links to the Harris County Plan Building Department is responsible for floodplain management and public outreach efforts regarding flooding hazards for CRS participation. Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. Link to Harris County Sites Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Community Rating System, Social Media accounts, and Emergency Management websites. City Hall and Library can be a source of printed material on hazard mitigation and flooding. Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Telephone Call down & TEXT, Email, Social Media City of Seabrook 21-7 Table 21-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Building Department Who is your floodplain administrator? (department/position) Building Department/Building Official Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? November 1, 2016 Does your floodplain management program meet or exceed minimum requirements? Exceeds • If exceeds, in what ways? Higher regulatory standards enforced across the entire city (beyond the SFHA) When was the most recent Community Assistance Visit or Community Assistance Contact? Fall 2018 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. N/A Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Harris County – Flood Insurance Study, revised preliminary November 13, 2018. Coastal flood mapping – TXCHART, Preliminary March 29, 2013. Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Map revisions will be made based on the most recent precipitation frequencies in Texas through the NOAA Atlas 14 study. Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes • If so, what type of assistance/training is needed? Any and all training is never enough Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? Yes • If no, is your jurisdiction interested in joining the CRS program? N/A How many flood insurance policies are in force in your jurisdiction? 3383a • What is the insurance in force? $1,004,594,000a • What is the premium in force? $3,163,902a How many total loss claims have been filed in your jurisdiction? 2,505a • How many claims are still open or were closed without payment? 0a • What were the total payments for losses? $119,384,447a a. According to FEMA statistics as of March 3, 2019 Table 21-9. Community Classifications Participating? Classification Date Classified Community Rating System Yes 7 Oct. 1, 2011 Building Code Effectiveness Grading Schedule Yes 4/4 Oct. 2, 2017 Public Protection Yes 3 March 1, 2016 Storm Ready No N/A N/A Firewise No N/A N/A Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 21-8 Table 21-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Seabrook 21-9 21.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 21.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Capital Improvement Plan — Looking to make sure improvements are made with the Mitigation Plan needs • Basic Plan — The Basic Plan provides a summary on the hazards and threats in the community. • Annex P — Hazard Mitigation is assigned to the Engineering Department and addresses the hazards and threats in the community. The Annex also identifies the various hazard mitigation related programs implemented in the City of Seabrook and which agencies are responsible for administration. 21.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: 21.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 21-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Seabrook. Other hazard events that broadly affected the entire planning area, including City of Seabrook, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 21-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 2017 $1,000,000 Serve Storms and Flooding 4269 2016 Not Available Serve Storms and Flooding 4272 2016 Not Available Tropical Storm Bill N/A 2015 Not Available Hurricane IKE 1791 2008 $15,000,000 Thunder Strom N/A 1/31/2008 $5,000 Tropical Storm Erin 1730 2007 Not Available Hail N/A 07/11/2003 $8000 Thunderstorm Wind N/A 07/11/2003 $11000 Hail N/A 04/07/2003 $2000 Tornado N/A 12/30/2002 $5000 Tropical Storm Allison 1379 2001 $10,000 Hurricane Alicia 689 1983 $5,000,000 Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 21-10 21.7 HAZARD RISK RANKING Table 21-12 presents a local ranking for City of Seabrook, of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 21-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Flooding 51 High 2 Severe Weather 48 High 2 Hurricane 48 High 3 Earthquake 14 Low 3 Hazardous Materials 14 Low 3 Tsunami 14 Low 4 Wildfire 11 Low 5 Drought 6 Low 5 Mass Movement 6 Low 6 Dam Failure 0 (No exposure) None 6 Coastal Erosion 0 (No exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 21.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 21.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 209 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 26 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 90 21.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • The City of Seabrook is vulnerable to maritime threats and hazards since it is located along the Port of Houston and the Houston Ship Channel. • The City of Seabrook is vulnerable to hazardous material incidents and chemical accidents from surrounding petrochemical industries, chemical manufacturers, and chemical storage facilities. Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. City of Seabrook 21-11 21.9 STATUS OF PREVIOUS PLAN ACTIONS Table 21-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 21-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Install early warning systems for public buildings X SBK10 Comment: Currently the emergency notification is relied on by a telephone communication system. Providing alerting systems in Critical facilities will help contain hazardous incident when they arise. Buyout/acquisition/demobilization of Severe Repetitive Loss properties and Repetitive Loss properties X SBK1 Comment: Severe Repetitive Loss and Repetitive loss structures throughout the city can be reduced by taking care of these structures when the owners cannot. Install flood barrier systems, i.e. modular flood panels designed to withstand high velocity water loads and high impact forces to enhance flood protection at critical care and/or public infrastructure X SBK11 Comment: Currently the city has no protection in place for this time of the hazard. Facilities did receive water during a flooding event but funds were not in place to mitigate any further. Relocate critical infrastructure out of flood hazard area X SBK1, SBK5, SBK7 Comment: Improving the productivity of the city staff and city services by moving these structures out of the flood plain will be huge. Currently Waste water treatment and Public works facilities are out dated and reside in the flood prone areas. Implement a tree management program to limit debris damage to critical infrastructure, public facilities from falling tree canopy X SBK13 Comment: Currently the City of Seabrook has 20 parks with trails and trees. A clearing process is needed to harvest dead trees and protect the critical infrastructure of the city. Adopt higher standards/latest edition of 2015 IBC – Construction Standards, which provide high-wind requirements for critical facilities to withstand severe thunderstorms, hurricane winds, tornadoes and hail. X Comment: Codes have changed since the structures were built and upgrades need to be made. Buildings are smaller and the staff has grown. Codes Have been updated Install protective structures to minimize damage to critical assets and equipment from hail, snow loads/freezing and high-winds. X Comment: Assists obtained by the city need to be protected to insure a longer life of the assets. Completed with the Building of the New Public Works Facility Improve code/ordinance to require removal of dead vegetation/dry fuel sources in risk areas X SBK9 Comment: 20 parks and trail and tree systems provides for a large area of potential fire fuel. Keeping the area clean and free of dead trees can help prevent accidental fires which can lead to disaster. Harden water piping lines and systems with non-corrosive linings/coatings (drought resistant materials) to prevent loss of water due to breaks caused by dry ground conditions from drought X SBK12 Comment: This has been put into place with a new replacement system Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 21-12 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Establish emergency water supply lines and infrastructure to provide alternate emergency pathways during water breaks/shortages by installing more valves to shut-off or re-route water. X SBK8 Comment: Providing more valves to shut off water and reroute water in the event of a water breakage/shortages caused by drought. Improve or install lighter color roofing materials or cooler paving materials X SBK19 Comment: Enhancing the building and surrounding parking lots to make the buildings cooler and providing a more energy efficient building. Improve and enhance cover and freeze protection of above (insulate pipes above) ground water pipes, public irrigation systems and fire sprinkler systems, FDC connections X Comment: New public awareness campaign kicked off and maintenance has improved on city equipment Implement or establish code/ordinance to require hazardous materials transportation corridor X Comment: Traffic Plan was adopted by the City that reflects this item Establish/improve code/ordinance to require shutoff valves at entry and exit point of city limits for new construction X Comment: Pipeline ordinance adopted and addressed this Identify exposed/above ground pipelines in flood hazard area X SBK20 Comment: This is an ongoing process Implement a GIS System to Create a map of Emergency Routes to be used by emergency vehicles in flooding conditions. X Comment: GIS department has been established Add 2-foot freeboard requirement to Flood Damage Prevention Ordinance. X Comment: The City agreed on 18 inch Replace the three existing water flow culverts with bridges; Second Street, Elmar and Meyer and Pine Gully X SBK21 Comment: The city has completed one of the Three Investigate the impact of the new Flood Hazard Recovery Data and how it effects the City and residents. X Comment: New maps adopted Relocate the current Emergency operations Center (EOC) and Police Department to a higher elevation site within the City of Seabrook X SBK7 Comment: Still needing to be done. Relocating out of the flood hazard area Harden critical city facilities to lessen the impacts of natural and human- caused hazards. X Comment: Ballistic Material added to the Lobby of City Hall Develop reliable fiber-optic communications network to maintain communications during disasters, and facilitate disaster preparedness and recovery for data network. X SBK6 Comment: In process Identify vulnerable populations to extreme heat hazards. X SBK22 Comment: Continued process through outreach City of Seabrook 21-13 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Develop/implement cooling center program to educate the public on the hazards of extreme heat and actions they can take to limit the effects of extreme heat upon health and property. X Comment: Worked with Harris County and use of Library Develop/implement groundwater contingency measures for Critical Infrastructure X Comment: New above ground tank added for more capacity for the City Develop/implement water smart program to educate the public on drought hazards and actions to minimize the impacts of drought upon property X Comment: Ongoing campaign of outreach Construct shelter for critical equipment and vehicles. X Comment Completed with New Construction of Public Works Facility Investigate the impact of the new Flood Hazard Recovery Data and how it effects the City and residents. X Comment: New maps adopted Clean-up of heavy wildfire fuel areas (abandoned buildings, abandoned lands, etc.). X Comment: Ongoing with Code Enforcement Develop/implement a Winter Storm Public Education Program for home heating, to educate the public on winter hazards and personal actions to mitigate winter damages to property and to safely heat homes X SBK23 Comment: In Process; The City continues to distribute FLASH Materials on natural hazards at City Hall. Increase Haz-Mat training/equipment for local responders. X SBK14 Comment: Continue Training Develop/implement Haz-Mat Safety Program. X Comment: Completed with Traffic Plan and out reach Send appropriate local officials to FEMA’s Emergency Management Institute for continuing education and training X SBK24 Comment: Some have gone others need to go Develop/implement pipeline program. X Comment: Information has been presented in open meetings and safety fairs on pipelines and pipeline safety. Also information has been placed in the City of Seabrook Website and local Television Channel. Staff has been to training with the Pipeline Group. Staff attending annual training. Relocate the current Waste Water Treatment facility from the location on Galveston Bay to a high location in the City X SBK5 Comment: In process, Have applied for grants with no luck so far part of CIP Re-level the City Benchmark System to the new FEMA datum to accurately correlate the new flood zone maps X Comment: Part of CRS Annual Inspection Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 21-14 21.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 21-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 21-15 identifies the priority for each action. Table 21-16 summarizes the mitigation actions by hazard of concern and mitigation type. Table 21-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action SBK 1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Flooding, Hurricane, Severe Weather Existing 12, 13, 14, 15 Building Department EM, Com Dev High HMGP, PDM, FMA Long-term Action SBK 2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including Capital Improvement Programs, Master Plans, and Strategic Plans Hazards Mitigated: Flooding, Severe Weather, Hurricane, Earthquake, Hazardous Materials, Wildfire, Drought, Tsunami , Mass Movement, New and Existing 3, 5, 7, 9, 10 EM ENG, PLNG, PW Low Staff Time, General Funds Ongoing Action SBK 3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: All hazards New and Existing 3, 5, 7, 9, 10 EM ENG, PLNG, PW Low Staff Time, General Funds Short-term Action SBK 4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Flooding, Hurricane, Severe Weather New and Existing 2, 8, 9, 11, 14 EM ENG, PLNG, PW Low Staff Time, General Funds Ongoing Action SBK 5 – Relocate the current Waste Water Treatment facility from the location on Galveston Bay to a high location in the City Hazards Mitigated: Flooding, Hurricane 3, 7, 9, 11, 13 PW EM, ENG High HMGP Short-term Action SBK 6 — Develop reliable fiber-optic communications network to maintain communications during disasters, and facilitate disaster preparedness and recovery for data network. Hazards Mitigated: Severe Weather, Hurricanes New and Existing 6, 7, 10, 13 IT EM, PW High Staff Time, General Funds Short-term Action SBK 7 — Relocate the current Emergency operations Center (EOC) and Police Department to a higher elevation site within the City of Seabrook Hazards Mitigated: Serve Weather, Flooding, Hurricanes New and Existing 1, 7, 9, 11, 12, 13, 15 PD EM, ENG, COM DEV High HMGP, FMA Long-term Action SBK 8 — Establish emergency water supply lines and infrastructure to provide alternate emergency pathways during water breaks/shortages by installing more connections and valves to shut-off or re-route water. Hazards Mitigated: Drought New and Existing 3, 4, 7, 9, 11, 13 PW ENG High Staff Time, General Funds Ongoing Action SBK 9 — Improve code/ordinance to require removal of dead vegetation/dry fuel sources in risk areas Hazards Mitigated: Wild Fires New and Existing 2, 2, 4, 6, 8, 15 COM DEV EM, PW Low Staff Time, General Funds Short-term City of Seabrook 21-15 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action SBK 10 — Install early warning systems for public buildings Hazards Mitigated: Flooding, Severe Weather, Hurricane, Earthquake, Hazardous Materials, Wildfire, Drought, Tsunami , Mass Movement, New and Existing 1, 3, 4, 9 EM PW Low Staff Time, General Funds Short-term Action SBK 11 — Install flood barrier systems, i.e. modular flood panels designed to withstand high velocity water loads and high impact forces to enhance flood protection at critical care and/or public infrastructure Hazards Mitigated: Flooding New and Existing 9, 10, 11, 12 EM PW, COM DEV, ENG High HMGP, FMA Long-term Action SBK 12 — Harden water piping lines and systems with non-corrosive linings/coatings (drought resistant materials) to prevent loss of water due to breaks caused by dry ground conditions from drought Hazards Mitigated: Drought New and Existing 3, 4, 7, 9, 11, 13 PW ENG High Staff Time, General Funds Short-term Action SBK 13 — Implement a tree management program to limit debris damage to critical infrastructure, public facilities from falling tree canopy Hazards Mitigated: Wild Fires New and Existing 2, 3, 4, 6, 8, 15 COM DEV EM, PW low Staff Time, General Funds Short-term Action SBK 14 — Increase Haz-Mat training/equipment for local responders Hazards Mitigated: Hazardous Materials Incident New and Existing 3, 6, 9, 14 EM PD, FD, PW low Staff Time, General Funds Short-term Action SBK 15 — Continue on building the relationships with local essential personnel throughout the neighboring communities and communications to the Public Hazards Mitigated: Flooding, Severe Weather, Hurricane, Earthquake, Hazardous Materials, Wildfire, Drought, Tsunami , Mass Movement, New and Existing 1, 3, 4, 9, 11 EM Communications Low Staff Time, General Funds Ongoing Action SBK 16 — Harden waste water piping lines and systems with non-corrosive linings/coatings (drought resistant materials) to prevent loss of water due to breaks caused by dry ground conditions from drought Hazards Mitigated: Drought New and Existing 3, 4, 7, 9, 11, 13 PW ENG High Staff Time, General Funds Long-term Action SBK 17 — Conform to NOAA ATLAS 14 standards in all Repetitive Loss areas impacted by 100-year storm event. Hazards Mitigated: Flooding, Severe Weather New and Existing 3, 4, 10, 11, 12, 13 ENG COM DEV, PW Low Staff Time, General Funds Ongoing Action SBK 18 — Eliminate low lying areas that prohibit emergency access during flooding events. Remove to NOAA ATLAS 14 Guidelines Hazards Mitigated: Flooding, Serve Weather New and Existing 3, 4, 10, 11, 12, 13 ENG PW, COM DEV High HMGP, CDBG, FMA Long-term Action SBK 19 — Improve or install lighter color roofing materials or cooler paving materials Hazards Mitigated: Severe Weather Existing 5, 7, 13 PW ENG Medium Staff Time, General Funds Long-term Action SBK 20 — Identify exposed/above ground pipelines in flood hazard area Hazards Mitigated: Severe weather, flooding, hurricane Existing 3, 4, 7, 9, 11, 13 PW ENG Low Staff Time, General Funds Long-term Action SBK 21 — Replace the three existing water flow culverts with bridges; Second Street, Elmar and Meyer and Pine Gully Hazards Mitigated: Flooding, Severe weather, hurricane 3, 4, 7, 9, 11, 13 PW ENG High General and/or grant funds Long-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 21-16 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action SBK 22 — Identify vulnerable populations to extreme heat hazards. Hazards Mitigated: Severe weather Existing 3, 4, EM COM DEV Low Staff Time, General Funds Short term Action SBK 23 — Develop/implement a Winter Storm Public Education Program for home heating, to educate the public on winter hazards and personal actions to mitigate winter damages to property and to safely heat homes Hazards Mitigated: Severe weather Existing 1, 4, 10, 11 EM COMM Low Staff Time, General Funds Short term Action SBK24— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Flooding, Severe Weather, Hurricane, Earthquake, Hazardous Materials, Wildfire, Drought, Tsunami , Mass Movement New and Existing 1, 3, 4, 5, 9, 10, 11, 15 City Admistration HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 21-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya SBK 1 4 High High Yes Yes No Medium High SBK 2 5 Medium Low Yes No Yes High Low SBK 3 5 Low Low Yes No Yes High Low SBK 4 5 Medium Low Yes No Yes High Low SBK 5 5 High High Yes Yes Yes High High SBK 6 4 Medium Medium Yes No Yes High Low SBK 7 7 High High Yes No No Medium High SBK 8 6 High High Yes Yes Yes High Low SBK 9 6 Medium Low Yes No No Medium Low SBK 10 4 High Low Yes Yes No Medium Low SBK 11 4 High High Yes Yes No High High SBK 12 6 High High Yes Yes Yes High High SBK 13 6 High Low Yes No Yes High Low SBK 14 4 High Low Yes No No High Low SBK 15 5 High Low Yes No Yes High Low SBK 16 6 High High Yes Yes Yes High High SBK 17 6 High Low Yes Yes Yes Low Low SBK 18 6 High High Yes Yes No High High SBK 19 3 Medium Medium Yes No Yes Medium Low SBK 20 6 Medium Low Yes No Yes Medium Low SBK 21 6 High High Yes Yes No High High City of Seabrook 21-17 Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya SBK 22 2 High Low Yes No Yes High Low SBK 23 4 High Low Yes No Yes High Low SBK24 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 21-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Flooding SBK 2, 3, 4, 5, 10, 11, 15, 17, 18, 20, 21,24 SBK 1, 4, 5, 7, 11, 17, 18, 20, 21 SBK 4, 10, 15, 24 SBK 1 SBK 5, 7, 11, 15, 20, 24 SBK 5, 7, 11, 17, 18, 20, 21 SBK 2, 24 Severe Weather SBK 2, 3, 6, 10, 15, 17, 18, 20, 21, 24 SBK 1, 5, 7, 17, 18, 20, 21 SBK 4, 10, 15, 23, 24 SBK 1 SBK 6, 7, 15, 20, 24 SBK 7, 17, 18, 19, 20, 21 SBK 22 SBK 2, 22, 24 Hurricane SBK 2, 3, 5, 6, 10, 15, 20, 21, 24 SBK 1, 5, 7, 20, 21 SBK 4, 10, 15, 24 SBK 1 SBK 5, 6, 7, 15, 24 SBK 5, 7, 20, 21 SBK 2, 24 Low-Risk Hazards Earthquake SBK24 N/A SBK24 N/A SBK24 N/A N/A SBK24 Hazardous Material SBK 2, 3, 10, 15, 24 SBK 1 SBK 4, 10, 15, 24 SBK 1 SBK 14, 15, 24 SBK 2, 24 Wildfire SBK 2, 3, 9, 10, 13, 15, 24 SBK 9, 13 SBK 9, 10, 13, 15, 24 SBK 1, 9, 13 SBK 15, 24 SBK 9, 13 SBK 2, 24 Drought SBK 2, 3, 8, 10, 12, 15, 16, 24 SBK 8, 10, 12, 16 SBK 15, 24 SBK 8, 10, 12, 16 SBK 15, 24 SBK 8, 10 SBK 8, 10, 12, 16 SBK 2, 24 Tsunami SBK24 SBK24 SBK24 SBK24 Mass Movement SBK24 SBK24 SBK24 SBK24 a. See the introduction to this volume for explanation of mitigation types. 21.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • City of Seabrook Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • City of Seabrook Flood Damage Prevention Ordinance Chapter 38 Article II Flood Damage Prevention — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 21-18 The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • Capital Improvement Plan – The CIP was used to in the development in Hazard Mitigation Action Items. 21.12 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY The City of Seabrook needs the following to better understand future risks and vulnerabilities from natural hazards and to better plan for the future: • Updated and revised flood maps and flood hazard areas. • Develop an updated Drainage Plan and Study to better understand local drainage issues, run-off, sheet- flow, and ponding. • Develop an enhanced outreach program on flood insurance and wind insurance. • Build capacity and strategies for resilience to cope with future impacts from natural hazards. • Develop local community planning, development, and building design standards that address impacts from natural hazards to build a safer and stronger city. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«146¬«146PasadenaPasadenaTaylorLakeVillageEl LagoLeague CityClear LakeShoresKemahCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.350.70.175Miles±Seabrook ¬«146 ¬«146 Pasadena Pasadena Taylor Lake Village El Lago League City Clear Lake Shores Kemah FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.35 0.70.175 Miles ± Seabrook ¬«146 ¬«146 Pasadena Pasadena Taylor Lake Village El Lago League City Clear Lake Shores Kemah Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.35 0.70.175 Miles ± Seabrook ¬«146 ¬«146 Pasadena Pasadena Taylor Lake Village El Lago League City Clear Lake Shores Kemah 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.35 0.70.175 Miles ± Seabrook ¬«146 ¬«146 Pasadena Pasadena Taylor Lake Village El Lago League City Clear Lake Shores Kemah 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.35 0.70.175 Miles ± Seabrook ¬«146 ¬«146 Pasadena Pasadena Taylor Lake Village El Lago League City Clear Lake Shores Kemah Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.35 0.70.175 Miles ± Seabrook ¬«146 ¬«146 Pasadena Pasadena Taylor Lake Village El Lago League City Clear Lake Shores Kemah Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.35 0.70.175 Miles ± Seabrook 22-1 22. CITY OF SHOREACRES 22.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Troy D. Harrison/City Manager-Police Chief 601 Shore Acres Blvd. Shoreacres, Texas 77571 Telephone: 281-307-1959 e-mail Address: THarrison@cityofshoreacres.us Ray Dodd/Public Works Director 601 Shore Acres Blvd. City, State ZIP Telephone:281-471-2244 e-mail Address: ldodd@cityofshoreacres.us 22.2 JURISDICTION PROFILE 22.2.1 Location Shoreacres is located in Harris County, Texas alongside State Highway 146 and extends to Galveston Bay. The City encompasses less than 2 square miles. 22.2.2 History The City of Shoreacres was incorporated in 1949. 22.2.3 Climate The climate of Shoreacres is considered sub-tropical. 22.2.4 Governing Body Format Shoreacres is governed by a five-member City Council under the city manager form of government as adopted under Ordinance No. 2017-266 that was approved by city council June 12, 2017. The current City Manager is Troy D. Harrison, Sr. The current Mayor is David Jennings (term ends 2020). Council consists of five at-large Alderpersons including Mayor Pro-Tempore Ricky Bowles (term ends 2020), Karen Harris (term ends 2019), Jerome McKown (term ends 2019), Neil Moyer (term ends 2020) and Felicia Ramos (term ends 2019). Council members serve staggered two-year terms. The city provides police, recycling, parks, planning, zoning, floodplain management, and building code inspections among its services. The city provides fire, sanitation, and emergency medical services by contract. The City of Shoreacres assumes responsibility for the adoption of this plan; the City of Shoreacres will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 22-1. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 22-2 Table 22-1. Local Mitigation Planning Team Members Name Title Troy D. Harrison City Manager-Chief of Police Ray Dodd Public Works Director 22.3 CURRENT TRENDS 22.3.1 Population According to U.S. Census, the population of Shoreacres as of March 2010 was 1,493. 22.3.2 Development Table 22-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Table 22-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A Are any areas targeted for development or major redevelopment in the next five years? No • If yes, briefly describe, including whether any of the areas are in known hazard risk areas How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 6 5 4 3 2 Multi-Family 0 0 0 0 0 Other (commercial, mixed use, etc.) 0 0 0 0 0 Total 6 5 4 3 2 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 20 • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. Very few empty lots remain City of Shoreacres 22-3 22.4 CAPABILITY ASSESSMENT The City of Shoreacres performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 22-3. • Development and permitting capabilities are presented in Table 22-4. • An assessment of fiscal capabilities is presented in Table 22-5. • An assessment of administrative and technical capabilities is presented in Table 22-6. • An assessment of education and outreach capabilities is presented in Table 22-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 22-8. • Classifications under various community mitigation programs are presented in Table 22-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 22-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Table 22-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No No No Comment: Chapter 10, Article III, adopts The International Building Code, 2015 Edition and amendments, 7/14/2014 Zoning Code Yes No No No Comment: Chapter 50, Article II, 10/13/2003 Subdivisions Yes No No No Comment: Chapter 74, Appendix A, Stormwater Management Yes No No No Comment: Chapter 66, Article II, Post-Disaster Recovery No No No No Comment: Real Estate Disclosure No No No No Comment: Growth Management Yes No No No Comment: Site Plan Review Yes No No No Comment: Environmental Protection Yes No No No Comment: Flood Damage Prevention Yes No No No Comment: Chapter 30, 10/10/2016 Emergency Management Yes No No No Comment: Chapter 14, Article II, 11/9/2009 Climate Change No No No No Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 22-4 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Planning Documents General Plan No No No No Comment: N/A Capital Improvement Plan No No No No How often is the plan updated? N/A Comment: Disaster Debris Management Plan Yes No No No Comment: Floodplain or Watershed Plan No Yes No No Comment: HCFCD Stormwater Plan Yes Yes No No Comment: HCFCD Urban Water Management Plan No No No No Comment: Habitat Conservation Plan No No No No Comment: Economic Development Plan No No No No Comment: Shoreline Management Plan No No No No Comment: Community Wildfire Protection Plan No No No No Comment: Forest Management Plan No No No No Comment: Climate Action Plan No No No No Comment: Comprehensive EM Plan No Yes No No Comment: Harris County Threat & Hazard Identification & Risk Assessment (THIRA) No Yes No No Comment: Post-Disaster Recovery Plan No No No No Comment: Continuity of Operations Plan No No No No Comment: Public Health Plan No No No No Comment: Table 22-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Administrative Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? No City of Shoreacres 22-5 Table 22-5. Fiscal Capability Financial Resource Community Development Block Grants No Capital Improvements Project Funding No Authority to Levy Taxes for Specific Purposes Yes Water and Sewer User Fees for Water, Sewer, Gas or Electric Service Yes Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas No State-Sponsored Grant Programs No Development Impact Fees for Homebuyers or Developers No Table 22-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Contracted Engineers or professionals trained in building or infrastructure construction practices Yes Contracted Planners or engineers with an understanding of natural hazards Yes Contracted Staff with training in benefit/cost analysis Yes Contracted Surveyors Yes Contracted Personnel skilled or trained in GIS applications Yes Contracted Scientist familiar with natural hazards in local area No Emergency manager Yes City EMC Grant writers No Table 22-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. Several links to information provided Do you use social media for hazard mitigation education and outreach? No • If yes, briefly describe. Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? No • If yes, briefly describe. Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Constant Contact/Alarms Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 22-6 Table 22-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Contracted Who is your floodplain administrator? (department/position) Contracted (Jerry Grainer) Are any certified floodplain managers on staff in your jurisdiction? No What is the date that your flood damage prevention ordinance was last amended? October 10, 2016 Does your floodplain management program meet or exceed minimum requirements? Exceeds • If exceeds, in what ways? Stronger building codes When was the most recent Community Assistance Visit or Community Assistance Contact? November 2018 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? Yes • If no, is your jurisdiction interested in joining the CRS program? n/a How many flood insurance policies are in force in your jurisdiction?a 526 • What is the insurance in force? $139,390,900 • What is the premium in force? $711,869 How many total loss claims have been filed in your jurisdiction?a 1020 • How many claims are still open or were closed without payment? Unknown • What were the total payments for losses? $57,079,468 Table 22-9. Community Classifications Participating? Classification Date Classified Community Rating System Yes 8 Ongoing Building Code Effectiveness Grading Schedule Yes 2016 Public Protection No Date Storm Ready No Date Firewise No Date City of Shoreacres 22-7 Table 22-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 22-8 22.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 22.5.1 Existing Integration No integration has yet been established between local hazard mitigation planning and other local plans and programs. 22.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified no plans or programs that provide opportunities to integrate hazard mitigation information in the future. 22.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 22-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of Shoreacres. Other hazard events that broadly affected the entire planning area, including the City of Shoreacres, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 22-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 Monies not available, most damage was from down trees and other vegetation, failure of power lines and street and home flooding Hurricane Ike 1791 DR 2008 Monies not available, street flooding, homes flooded, residents displaced, no electricity, downed trees and power lines Tropical Storm Allison 1379 DR 2001 Monies not available, flooding in streets and homes, no electricity, down trees and power lines Hurricane Alicia 689 DR 1983 Monies not available, street flooding, homes flooded, residents displaced, no electricity, downed trees and power lines, streets closed for extended period 22.7 HAZARD RISK RANKING Table 22-12 presents a local ranking for the City of Shoreacres of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. City of Shoreacres 22-9 Table 22-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Flooding 54 High 2 Severe Weather 48 High 2 Hurricane 48 High 3 Wildfire 16 Medium 4 Earthquake 14 Low 4 Tsunami 14 Low 5 Drought 6 Low 5 Mass Movement 6 Low 6 Dam Failure 0 (No Exposure) None 6 Coastal Erosion 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 22.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 22.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 117 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 21 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 47 22.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Flooding from heavy rains/severe storms. Performing a comprehensive storm-water drainage study would assist in locating any deficiencies in drainage in the City after a severe rain storm or hurricane. • It is noted that the City has not completed a GIS mapping of the City, This would beneficial to obtain hazard data and to map risk for various hazards. • The City does not currently have a building to serve as a short term shelter after a natural disaster or heat event. Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. 22.9 Status of Previous Plan Actions Table 22-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 22-10 Table 22-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2014SHORAC001 Install new stand-by power (generator) for critical facilities: Police Station and Public Works Building X Comment: 2014SHORAC002 New public safe room / structure / shelter located at Circle Park. X Comment: 2014SHORAC003 Join FireWise Program. X Comment: 2014SHORAC004 New tower mounted FLIR PTZ video camera for detection and early warning of chemical releases from Bayport Ship Channel chemical industrial facilities, rail tank cars, ships and pipelines (to be installed on existing 40-foot tower located at EOC). X Comment: 2014SHORAC005 New tower mounted PTZ video camera for detection and early warning of chemical releases from Bayport Industrial district facilities, rail tank cars, pipelines and tank trucks (to be installed on new 40-foot tower located at city wastewater lift station #1 adjacent to railroad and State Highway 146). X Comment: 2014SHORAC006 Establish weather sensors (wind speed, wind direction, air temperature, and humidity) for enhanced warning of chemical release threat (plume determination) • In central residential district adjacent to Bayport Ship Channel to be installed on existing 40-foot tower located at EOC). • In Bayport Industrial district (to be installed on new 40-foot tower located at city wastewater lift station #1). X Comment: 2014SHORAC007 Establish a Cooling Center and install misting systems to limit the effects of extreme heat upon vulnerable populations. Locations: • City Hall Meeting Center • Public Works Building X Comment: 2010SHORAC001 Adoption of flood surge zone regulations to harden and increase stability of new structures. X Comment: 2010SHORAC002 Expand current flood warning system(s) by including an additional outdoor siren, digital signage, automated calling system, flood gauges, and loudspeaker warning announcement system to increase coverage within the community’s population and improve automation. X SA19 Comment: 2010SHORAC003 Conduct study for updating local inundation risk areas and mapping. X SA20 Comment: 2010SHORAC004 Harden manhole access points to prevent entrance of flood water or hazardous fluids into sanitary sewer system. Comment: X City of Shoreacres 22-11 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2010SHORAC005 Elevate utility equipment storage building. Comment: X SA21 2010SHORAC010 Construct revetment at shoreline of Galveston Bay Comment: X 2010SHORAC012 Development Adoption of latest edition/higher standard of building codes / ordinances for mitigation of hurricane wind hazards. Comment: X SA22 2010SHORAC014 Harden and retrofit records storage to withstand high-wind damage. Comment: X SA23 2010SHORAC018 Install lightning and surge protection systems to harden facility and equipment of public service buildings. Comment: X SA24 2010SHORAC022 Develop/implement water smart public education program to inform the public on actions that can be taken to conserve water and reduce the impact of drought. Comment: X SA25 2010SHORAC024 Proposed Mitigation Action (describe): Construct shelter for critical equipment and vehicles. Comment: X 2010SHORAC025 Develop/implement hail safety public education program to educate the public on hail hazards and actions to minimize hail damage to property and equipment. Comment: X SA26 2010SHORAC027 Clean-up of heavy wildfire fuel areas (abandoned buildings, abandoned lands, etc.). Comment: X SA27 2010SHORAC028 Develop/implement home heating public education program to address winter storm hazards and provide personal actions to minimize winter damages to property and equipment. Comment: X SA28 2010SHORAC029 Develop/implement tree management planning and mitigation measures. Comment: X SA29 2010SHORAC032 Develop/implement Haz-Mat Safety Program. Comment: X SA30 2010SHORAC033 Conduct HVAC assessment/study/mitigations to ventilation systems for Critical Infrastructure. Comment: X SA31 2010SHORAC035 Develop/update Risk Management Plan/mitigation measures for Haz-Mat transportation (road/water) within the Special Flood Hazard Area. Comment: X SA32 2010SHORAC037 Develop/implement pipeline safety program. Comment: X Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 22-12 22.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 22-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 22-15 identifies the priority for each action. Table 22-16 summarizes the mitigation actions by hazard of concern and mitigation type. Table 22-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action SA1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Flooding, severe weather, hurricane, wildfire, Earthquake, flooding, Existing 3, 4, 10 City Administration TBD High HMGP, PDM, FMA Short-term Action SA2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including the City of Shoreacres Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing Action SA3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Flooding, Severe Weather, Hurricane, Wildfire, Earthquake, Drought, Tsunami, Mass Movement New and Existing 1, 5, 8 City Administration TBD Low Staff Time, General Funds Short-term Action SA4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, New and Existing 1, 3, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing Action SA5 — Expand current flood warning system(s) by including an additional outdoor siren, digital signage, automated calling system, flood gauges, and loudspeaker warning announcement system to increase coverage within the community’s population and improve automation Hazards Mitigated: Flooding, severe weather, hurricane New 1, 4, 10, 11 City Administration TBD Medium General and/or grant fund Short term Action SA6 — Conduct study for updating local inundation risk areas and mapping. Hazards Mitigated: Flooding, severe weather, hurricane Existing 3, 7, 9, 11 City Administration TBD Low General and/or grant fund Short term Action SA7 — Elevate utility equipment storage building Hazards Mitigated: Flooding, severe weather, hurricane Existing 11, 13 City Administration TBD Medium General and/or grant fund Short term Action SA8 — Development Adoption of latest edition/higher standard of building codes / ordinances for mitigation of hurricane wind hazards Hazards Mitigated: Hurricane Existing 9, 14 City Administration TBD Low General and/or grant fund Short term City of Shoreacres 22-13 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action SA9 — Harden and retrofit records storage to withstand high-wind damage Hazards Mitigated: Severe weather, hurricane Existing 13 City Administration TBD Medium General and/or grant fund Short term Action SA10 — Install lightning and surge protection systems to harden facility and equipment of public service buildings Hazards Mitigated: Severe weather, hurricanes Existing 13 City Administration TBD Medium General and/or grant fund Short term Action SA11 — Develop/implement water smart public education program to inform the public on actions that can be taken to conserve water and reduce the impact of drought. Hazards Mitigated: Drought Existing 7, 8, 10 City Administration TBD Low Staff Time, General Funds Short-term Action SA12 — Develop/implement hail safety public education program to educate the public on hail hazards and actions to minimize hail damage to property and equipment Hazards Mitigated: Severe weather Existing 1,3 City Administration TBD Low Staff Time, General Funds Short-term Action SA13 — Clean-up of heavy wildfire fuel areas (abandoned buildings, abandoned lands, etc.). Hazards Mitigated: Wildfire Existing 2, 6, 8 City Administration TBD Low Staff Time, General Funds Short-term Action SA14 — Develop/implement home heating public education program to address winter storm hazards and provide personal actions to minimize winter damages to property and equipment Hazards Mitigated: Severe weather Existing 1, 4, 10 City Administration TBD Low Staff Time, General Funds Ongoing Action SA15 — Develop/implement tree management planning and mitigation measures. Hazards Mitigated: Severe weather, hurricane, wildfire Existing 2, 6, 8 City Administration TBD Low Staff Time, General Funds Short-term Action SA16 — Develop/implement Haz-Mat Safety Program Hazards Mitigated: Hazardous materials incidents Existing 3, 11 City Administration TBD Low Staff Time, General Funds Short-term Action SA17 — Conduct HVAC assessment/study/mitigations to ventilation systems for Critical Infrastructure Hazards Mitigated: Wildfire, hazardous materials incidents Existing 3, 8, 11, 13 City Administration TBD Medium General and/or grant fund Short term Action SA18 — Develop/update Risk Management Plan/mitigation measures for Haz-Mat transportation (road/water) within the Special Flood Hazard Area Hazards Mitigated: hazardous materials incidents Existing 3, 11 City Administration TBD Low Staff Time, General Funds Short-term Action SA19 — Expand current flood warning system(s) by including an additional outdoor siren, digital signage, automated calling system, flood gauges, and loudspeaker warning announcement system to increase coverage within the community’s population and improve automation. Hazards Mitigated: Flood, Severe Weather, Hurricane New and Existing 1,3,10,15 City Administration TBD High General Fund, Grants Short-term Action SA20 — Conduct study for updating local inundation risk areas and mapping. Hazards Mitigated: Flood, Severe Weather New and Existing 3,10,15 City Administration TBD High General Fund, RiskMAP Short-term Action SA21 — Elevate utility equipment storage building. Hazards Mitigated: Flood, severe weather Existing 13,15 City Administration TBD High General Fund, Grants Short-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 22-14 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action SA22 — Development Adoption of latest edition/higher standard of building codes / ordinances for mitigation of hurricane wind hazards. Hazards Mitigated: Flood, Severe weather, Hurricane New and Existing 3,9,12,15 Planning City Council Low General Fund Short-term Action SA23 — Harden and retrofit records storage to withstand high-wind damage. Hazards Mitigated: Hurricane, Severe weather Existing 13,15 City Administration TBD High General Fund, Grants Short-term Action SA24 — Install lightning and surge protection systems to harden facility and equipment of public service buildings. Hazards Mitigated: Severe Weather New and Existing 1,3,15 City Administration RBD High General Fund, Grants Short-term Action SA25 — Develop/implement water smart public education program to inform the public on actions that can be taken to conserve water and reduce the impact of drought. Hazards Mitigated: Drought New and Existing 3,7,15 City Administration TBD High General, Fund Short-term Action SA26 — Develop/implement hail safety public education program to educate the public on hail hazards and actions to minimize hail damage to property and equipment. Hazards Mitigated: Severe Weather New and Existing 3,9,10,15 City Administration TBD Low General Fund Short-term Action SA27 — Clean-up of heavy wildfire fuel areas (abandoned buildings, abandoned lands, etc.). Hazards Mitigated: Wildfire New and Existing 13,15 City Administration TBD Low General Fund Ongoing Action SA28 — Develop/implement home heating public education program to address winter storm hazards and provide personal actions to minimize winter damages to property and equipment. Hazards Mitigated: Severe weather New and Existing 3,7,15 City Administration TBD Low General Fund Short-term Action SA29 — Develop/implement tree management planning and mitigation measures. Hazards Mitigated: Severe Weather New and Existing 13,15 City Administration TBD Low General Fund Short-term Action SA30 — Develop/implement Haz-Mat Safety Program. Hazards Mitigated: Hazardous Materials New and Existing 3,7,15 City Administration TBD Medium General Fund Short-term Action SA31 — Conduct HVAC assessment/study/mitigations to ventilation systems for Critical Infrastructure. Hazards Mitigated: All Hazards Existing 13,15 City Administration TBD High General Fund, Grants Short-term Action SA32 — Develop/update Risk Management Plan/mitigation measures for Haz-Mat transportation (road/water) within the Special Flood Hazard Area. Hazards Mitigated: Hazardous Materials, Flood New and Existing 3,7,15 City Administration TBD High General Fund Short-term Action SA33— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Flooding, Severe Weather, Hurricane, Wildfire, Earthquake, Drought, Tsunami, Mass Movement New and Existing 1, 3, 4, 5, 9, 10, 11, 15 City Admistration HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. City of Shoreacres 22-15 Table 22-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya 1 3 High High Yes Yes No Medium High 2 7 Medium Low Yes No Yes High Low 3 3 Low Low Yes No Yes High Low 4 6 Medium Low Yes No Yes High Low 5 5 High Medium Yes Yes No High High 6 4 Medium Low Yes No Yes Medium Medium 7 2 High Medium Yes Yes No High High 8 2 Medium Low Yes No Yes Medium Low 9 1 High Medium Yes Yes No High High 10 1 High Medium Yes Yes No High High 11 3 Medium Low Yes No Yes Medium Low 12 2 Medium Low Yes No Yes Medium Low 13 3 Medium Low Yes No Yes Medium Low 14 3 Medium Low Yes No Yes Medium Low 15 3 Medium Low Yes No Yes Medium Low 16 2 Medium Low Yes No Yes Medium Low 17 4 Medium Medium Yes Yes Yes Medium Medium 18 2 Medium Low Yes No Yes Medium Low 19 2 High High Yes Yes No Medium High 20 4 High High Yes Yes No Medium High 21 3 High High Yes Yes No Medium High 22 4 Medium Low Yes No Yes High Low 23 2 High High Yes Yes No Medium High 24 3 High High Yes Yes No Medium High 25 3 High High Yes Yes No Medium High 26 4 Medium Low Yes No Yes High Low 27 2 Medium Low Yes No Yes High Low 28 3 Medium Low Yes No Yes High Low 29 2 Medium Low Yes No Yes High Low 30 3 High Medium Yes Yes No Medium High 31 2 High High Yes Yes No Medium High 32 3 High High Yes Yes No Medium high 33 8 Medium Low Yes Yess Yes High High a. See the introduction to this volume for explanation of priorities. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 22-16 Table 22-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Flooding 1, 2, 3, 4, 5, 6, 7, 8, 20, 22, 33 1, 7, 21, 31 1, 2, 3, 4, 5, 9 6, 7, 8 5, 9, 19, 32 7 7 1, 2, 3, 4, 5, 6, 7, 8, 9 Severe Weather 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 12, 15, 20, 22, 29, 33 1, 7 9, 10, 21, 23, 24, 31 1, 2, 3, 4, 5, 9, 12, 15, 26, 28 6.7.8 5, 9, 19 7, 9, 10 1, 2, 3, 4, 5, 6, 7, 8, 9 Hurricane 5, 6, 7, 8, 9, 22, 33 7, 8, 9, 23, 31 5 19 7, 9 Medium-Risk Hazards Wildfire 13, 27, 33 13, 17, 31 13 17 Low-Risk Hazards Earthquake 33 31 Drought 3.5.6.9, 33 31 1, 2, 3, 5, 9, 11, 25 5.9 11 1, 2, 3, 4, 5, 6, 7, 8, 9 Tsunami 33 Mass Movement 33 Hazardous Materials 31 30 32 a. See the introduction to this volume for explanation of mitigation types. 22.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • The City of Shoreacres Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • The City of Shoreacres Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • FEMA- Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards to obtain a better understanding of potential of actions/mitigations that have not been prepared for that could be used to reduce or eliminate long term risk to people and property from natural disasters in the City of Shoreacres. !(!(!(!(!(!(!(¬«146¬«146PasadenaLa PorteLa PortePasadenaPasadenaCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.20.40.1Miles±Shoreacres ¬«146 ¬«146 Pasadena La Porte La Porte Pasadena Pasadena FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Shoreacres ¬«146 ¬«146 Pasadena La Porte La Porte Pasadena Pasadena Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Shoreacres ¬«146 ¬«146 Pasadena La Porte La Porte Pasadena Pasadena 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Shoreacres ¬«146 ¬«146 Pasadena La Porte La Porte Pasadena Pasadena 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Shoreacres ¬«146 ¬«146 Pasadena La Porte La Porte Pasadena Pasadena Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Shoreacres ¬«146 ¬«146 Pasadena La Porte La Porte Pasadena Pasadena Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Shoreacres 23-1 23. CITY OF SPRING VALLEY VILLAGE 23.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Julie M. Robinson, City Administrator 1025 Campbell Road Houston, TX 77055 Telephone: 713-465-5306 e-mail Address: jrobinson@springvalleytx.com Pat Riley, Public Works Director 1025 Campbell Road Houston, TX 77055 Telephone: 713-465-5306 e-mail Address: priley@springvalleytx.com 23.2 JURISDICTION PROFILE 23.2.1 Location The City of Spring Valley Village is a municipality in southwestern Harris County. The current boundaries generally extend from Spring Branch Creek on the east, Katy Freeway on the south, Spring Branch Creek on the north, and on the west by Adkins and Campbell Roads. The City encompasses a total area of approximately 1.3 square miles. 23.2.2 History In 1936 state highway maps indicated a cemetery and a church. Initially the settlement consisted of one and one- half square miles. In the mid-1950s, effort to form a Spring Branch municipality (proposed to be called the city of Spring Branch in roughly the area known today as the Memorial Villages) failed. The city incorporated in 1955 as Spring Valley. There had been two elections for incorporation. The first result was against incorporation, and state law mandated that the next election for incorporation of the same boundary would have to be held at least one year later. Some advocates of incorporation convinced Robert R. Casey, then Harris county judge, to modify the boundary of the proposed area by removing the Campbell Place area and therefore many voters who opposed incorporating. The following election, held on April 9, 1955, was in favor of incorporation. Because of the 1955 incorporation, Houston did not incorporate Spring Valley’s territory into its city limits, while Houston annexed surrounding areas that were unincorporated. In 2007, the name of the city was officially changed from Spring Valley to Spring Valley Village. 23.2.3 Climate The City of Spring Valley Village’s weather is typical of the Texas Gulf Coast – mainly humid subtropical climate, with tropical influences. August is normally the warmest month with a daily average temperature of 84.6 °F. January is typically the coldest month with a daily average temperature of 53.1 °F. The normal annual precipitation measures 49.77 inches. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 23-2 23.2.4 Governing Body Format The City of Spring Valley Village is a Type-A General Law City governed by a Mayor and five Council Members all of whom are elected at large. The City consists of 7 departments: Police, Public Works/Utilities, Building and Development, Municipal Court, Finance, the City Secretary’s Office, and the City Administrator’s Office. Fire and EMS Services are provided by the Village Fire Department, a separate entity created and funded by the six Memorial Villages. The City Council assumes responsibility for the adoption of this plan, and the City Administrator will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 1-1. Table 23-1. Local Mitigation Planning Team Members Jurisdiction Name / Title Phone Email City of Spring Valley Village Julie Robinson, City Admin. Matthew Hitt, Assistant to City Admin. 713-465-5306 832-910-8586 jrobinson@springvalleytx.com mhitt@springvalleytx.com City of Bunker Hill Village Karen Glynn, City Admin. 713-467-9762 KGlynn@bunkerhilltx.gov City of Hedwig Village Kelly Johnson, City Admin./Secretary 713-465-6009 kjohnson@hedwigtx.gov City of Hilshire Village Susan Blevins, City Admin/Secretary. Efrain Him 713-973-1779 Susan.blevins@hilshirevillagetexas.com Efrain.him@hdrinc.com City of Hunters Creek Village Tom Fullen, City Admin. 713-465-2150 tfullen@cityofhunterscreek.org City of Piney Point Village Roger Nelson, City Admin. 713-230-8703 cityadmin@pineypt.org 23.3 CURRENT TRENDS 23.3.1 Population According to the 2010 Census Data, the population of the City of Spring Valley Village was 3,715. The Census Bureau 2016 population estimate was 4,224. Since the 1990 Census, the population has increased by approximately 24.5%. 23.3.2 Development While availability of undeveloped residential lots is limited, the City of Spring Valley Village continues to experience residential redevelopment of existing homes whereby smaller homes are demolished and new, larger homes are built. The City of Spring Valley Village is landlocked by other municipalities; however, there are several large undeveloped tracts of land that border I-10 and are available for commercial and/or mixed use development. Table 23-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. City of Spring Valley Village 23-3 Table 23-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? NO • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A Is your jurisdiction expected to annex any areas during the performance period of this plan? NO • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A Are any areas targeted for development or major redevelopment in the next five years? YES • If yes, briefly describe, including whether any of the areas are in known hazard risk areas There are several large undeveloped tracts of land that border I-10 and are available for commercial and/or mixed use development. How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 23 21 27 27 24 Multi-Family 0 0 0 0 0 Other (commercial, mixed use, etc.) 2 3 3 2 1 Total 25 24 30 29 25 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 0 • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. With the exception of a few large tracts along I-10 that may be developed for commercial and/or mixed use development, City of Spring Valley Village is essentially built out. 23.4 CAPABILITY ASSESSMENT The City of Spring Valley Village performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 23-3. • Development and permitting capabilities are presented in Table 23-4. • An assessment of fiscal capabilities is presented in Table 23-5. • An assessment of administrative and technical capabilities is presented in Table 23-6. • An assessment of education and outreach capabilities is presented in Table 23-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 23-8. • Classifications under various community mitigation programs are presented in Table 23-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 23-10. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 23-4 Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Table 23-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No Yes Yes Comment: City adopted the International Building Code (IBC) 2015 Edition on February 24, 2015 by Ordinance No. 2015-03. This Ordinance has been codified in Chapter 3 of the City’s Code of Ordinances. Zoning Code Yes No Yes Yes Comment: The City adopted its original zoning regulations on December 15, 1981 by Ordinance No. 115, Book I, and it has been amended throughout the years. The current zoning regulations may be found in Chapter 12 of the City’s Code of Ordinances. Subdivisions Yes No Yes No Comment: The City adopted its original subdivision regulations on October 10, 1955, by Ordinance No. 5, Book 1, and it has been amended throughout the years. On November 25, 2008 by Ordinance No. 2008-23, the City repealed and reenacted the subdivision regulations in their entirety. The current subdivision regulations may be found in Chapter 9 of the City’s Code of Ordinances. Stormwater Management Yes Yes Yes Yes Comment: Texas Commission on Environmental Quality, SVV Storm Water Management Plan Post-Disaster Recovery Yes Yes Yes No Comment: Harris County, Texas Department of Emergency Management, FEMA Real Estate Disclosure No No No No Comment: Growth Management Yes Yes Yes Yes Comment: Harris County Flood Control District Site Plan Review Yes Yes Yes No Comment: Harris County Flood Control District, Village Fire Department, SVV Code of Ordinances Chapter 3 Environmental Protection No Yes No No Comment: Texas Commission on Environmental Quality, EPA, Harris County Public Health Flood Damage Prevention Yes No Yes Yes Comment: The City adopted its current flood prevention regulations on May 22, 2007 by Ordinance No. 2007-12. The current flood damage prevention regulations may be found in Article 3.1600 of Chapter 3 of the City’s Code of Ordinances. Emergency Management Yes Yes Yes No Comment: Harris County, Village Fire Department Climate Change No No No No Comment: City of Spring Valley Village 23-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Planning Documents General Plan (Comprehensive Plan) Yes No Yes Yes Comment: The City’s zoning regulations constitute its Comprehensive Plan Capital Improvement Plan Yes No No Yes How often is the plan updated? Reviewed annually and updated as needed Comment: The City maintains a 5-year rolling CIP Disaster Debris Management Plan Yes Yes No No Comment: The City participates in the Harris County Emergency Management Plan Floodplain or Watershed Plan No Yes No No Comment: Harris County Flood Control District Stormwater Plan Yes Yes Yes Yes Comment: The City was granted an MS4 permit from Texas Commission on Environmental Quality and files its annual reports with TCEQ as required by the permit. Urban Water Management Plan Yes Yes Yes No Comment: Houston-Galveston Subsidence District Groundwater Reduction Plan, Drought Contingency Plan Habitat Conservation Plan No Yes No No Comment: Texas Parks and Wildlife, Texas Commission on Environmental Quality, EPA Economic Development Plan Yes No Yes No Comment: While the City has legal authority to develop an economic development plan, it currently does not have one Shoreline Management Plan No No No No Comment: Community Wildfire Protection Plan No No No No Comment: Forest Management Plan No No No No Comment: Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes Yes Yes No Comment: The City participates in the Harris County Emergency Management Plan Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes Yes No Comment: The City participates in the Harris County Hazard Mitigation Plan Post-Disaster Recovery Plan Yes Yes Yes No Comment: The City participates in the Harris County Emergency Management Plan Continuity of Operations Plan No No No No Comment: Public Health Plan No Yes No No Comment: Harris County Public Health Authority Table 23-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 23-6 Table 23-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants No Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Table 23-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes City Administrator, City of Spring Valley Village Building Official, City of Spring Valley Village Director of Public Works, City of Spring Valley Village Contract Engineering Firm Contract Planning Firm Engineers or professionals trained in building or infrastructure construction practices Yes Building Official, City of Spring Valley Village Fire Marshal, Village Fire Department Director of Public Works, City of Spring Valley Village Contract Engineering Firm Planners or engineers with an understanding of natural hazards Yes City Administrator, City of Spring Valley Village Building Official, City of Spring Valley Village Director of Public Works, City of Spring Valley Village Contract Engineering Firm Staff with training in benefit/cost analysis Yes Contract Engineering Firm Surveyors Yes Contract Surveying Firm Personnel skilled or trained in GIS applications No Scientist familiar with natural hazards in local area No Emergency manager Yes Emergency Management Coordinator, Village Fire Department City Administrator, City of Spring Valley Village Grant writers Yes Contract Grant Writer Other City of Spring Valley Village 23-7 Table 23-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? No Do you have personnel skilled or trained in website development? No Do you have hazard mitigation information available on your website? No • If yes, briefly describe. Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. City Website and Social Media Alerts are posted Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Constant Contact, City website, City social media platforms Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Constant Contact, City website, City social media platforms Table 23-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Building Official – City Management Who is your floodplain administrator? (department/position) Building Official Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? May 22, 2007 Does your floodplain management program meet or exceed minimum requirements? Meets • If exceeds, in what ways? When was the most recent Community Assistance Visit or Community Assistance Contact? Unknown Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? Unknown • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? • If no, is your jurisdiction interested in joining the CRS program? No How many flood insurance policies are in force in your jurisdiction?a 797 • What is the insurance in force? $ 272,270,900.00 • What is the premium in force? $313,168 How many total loss claims have been filed in your jurisdiction?a Unknown • How many claims are still open or were closed without payment? Total of closed paid losses: 82 • What were the total payments for losses? $2,103,028 a. According to FEMA statistics as of March 26, 2019 Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 23-8 Table 23-9. Community Classifications Participating? Classification Date Classified Community Rating System No Building Code Effectiveness Grading Schedule Yes 4 for 1 and 2 family dwellings 3 for all other construction 01/27/2010 Public Protection Yes (ISO) 1 2015 Storm Ready No Firewise No Table 23-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: City of Spring Valley Village 23-9 Criterion Jurisdiction Ratinga Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. 23.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 23.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • City of Spring Valley Village’s MS4 Permit • City of Spring Valley Village’s Flood Damage Prevention regulations • City of Spring Valley Village’s Adopted 5-Year Rolling Capital Improvement Program 23.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Future updates to the adopted Building Codes • Future revisions to the City’s zoning regulations • Future revisions to the City’s flood damage prevention regulations 23.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 23-11 lists past occurrences of natural hazards for which specific damage was recorded in Spring Valley Village. Other hazard events that broadly affected the entire planning area, including Spring Valley Village, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 23-10 Table 23-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 NA Severe Storms and Flooding 4269 DR 2016 NA Severe Storms and Flooding 4272 DR 2016 NA Severe Storms, Tornadoes, Straight Line Winds and Flooding 4245 DR 2015 NA Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR 2015 NA Forest Brook Fire 2924 FM 2011 NA Hurricane Ike 1791 DR 2008 NA Hurricane Ike 3294 EM 2008 NA Hurricane Gustav 3290 EM 2008 NA Hurricane Dean 3277 EM 2007 NA Tropical Storm Erin 1730 DR 2007 NA Extreme Wildfire Threat 1624 DR 2006 NA Hurricane Rita 1606 DR 2005 NA Hurricane Rita 3261 EM 2005 NA Hurricane Katrina Evacuation 3216 EM 2005 NA Severe Storms, Tornadoes and Flooding 1439 DR 2002 NA Tropical Storm Allison 1379 DR 2001 NA Extreme Fire Hazards 3142 EM 1999 NA Flooding 1257 DR 1998 NA Tropical Storm Charley 1239 DR 1998 NA Hurricane Georges 1245 DR 1998 NA Severe Thunderstorms and Flooding 1041 DR 1994 NA Severe Thunderstorms and Tornadoes 970 DR 1992 NA Severe Storms and Flooding 937 DR 1992 NA Tropical Storm Allison 836 DR 1989 NA Severe Storms, Tornadoes and Flooding 828 DR 1989 NA 23.7 HAZARD RISK RANKING Table 23-12 presents a local ranking for Spring Valley Village of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. City of Spring Valley Village 23-11 Table 23-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 2 Hurricane 32 High 3 Earthquake 14 Low 4 Flooding 12 Low 5 Drought 6 Low 5 Mass Movement 6 Low 5 Wildfire 6 Low 6 Dam Failure 0 (No Exposure) None 6 Tsunami 0 (No Exposure) None 6 Coastal Erosion 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 23.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 23.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 7 • Number of FEMA-identified Severe-Repetitive-Loss Properties: None • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 1 23.8.2 Other Noted Vulnerabilities No jurisdiction-specific issues were identified from review of the results of the risk assessment and other available resources. 23.9 STATUS OF PREVIOUS PLAN ACTIONS Table 23-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 23-12 Table 23-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update Conduct HVAC Assessment/Mitigation to Ventilation Systems for Critical Infrastructure X SVV5 Comment: In progress. The City constructed a new City Hall and Police Building with a new ventilation system, and the new facility opened in May of 2017. The City has committed to renovating the Public Works Facility (also Critical Infrastructure) including its current ventilation system as part of its 5-Year Capital Improvement Program with the project to be undertaken in FY 2021 Expand community early warning system, reverse 911 to enhance coverage within the community’s population X Comment: In 2012, the City implemented a reverse 911 system that notifies all telephone numbers in the City. During Hurricane Harvey, the City found that the reverse 911 system that was implemented went down. Consequently, the City is evaluating other reverse 911 options to implement. The City currently utilizes Constant Contact, its website, and different social media platforms to quickly notify residents and businesses about hazards that may affect the City. During Hurricane Harvey, it was clear that these forms of communication were more effective and efficient, and the City will continue to utilize and improve upon these forms of communication. Expand early warning system, reverse 911 alert capabilities to increase coverage to public/private schools. x Comment: In 2012, the City implemented a reverse 911 system that notifies all telephone numbers, including public and private schools, in the City. During Hurricane Harvey, the City found that the reverse 911 system that was implemented went down. Consequently, the City is evaluating other reverse 911 options to implement. The City currently utilizes Constant Contact, its website, and different social media platforms to quickly notify residents and businesses about hazards that may affect the City. During Hurricane Harvey, it was clear that these forms of communication were more effective and efficient, and the City will continue to utilize and improve upon these forms of communication. Adoption of higher standard/latest edition of building codes for jobsite debris management to minimize damages from debris during high winds X Comment: The City adopted the International Building Code (IBC) 2015 Edition on February 24, 2015. Briar Branch Bypass project and contrast a detention pond to mitigate flood-related impacts. X Comment: Several years ago, the City met with Harris County Flood Control District (HCFCD) to discuss the installation of a real-time monitoring gauge on Briar Branch at Campbell Road to provide notification to the residents about potential flooding. The real- time flood gauge was installed by HCFCD on March 31, 2017. Due to the size of the rest of the original project and the number of governmental and non-governmental entities that would be involved, action is no longer considered feasible. The City has completed the only part it could complete. Develop/implement water smart program to educate the public on drought hazards and potential individual actions to minimize damages to property and equipment X X SVV6 Comment: The City has water conservation and drought contingency regulations in place that include a goal of reducing water consumption by 10% through conservation measures and a graduated drought contingency plan. Additionally, the City’s regulations include savings on water rates for customers who implement conservation measures such as retrofitting high-use fixtures with low-flow fixtures, low-flow design irrigation systems, and xeriscaping features. Information on water conservation measures is provided in the City’s new resident welcome packet as well as on the City’s website. The City would like to carry this measure forward and change the wording of the Action Item to: Develop and implement public outreach program to educate the public on drought hazards and water conservation measures that may be implemented by individuals to reduce water usage and minimize damages to property and equipment. City of Spring Valley Village 23-13 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update Implement a Debris Removal Program to minimize flooding due to obstructions along channel to increase flow along Briar Branch and minimize damages to residential properties. X X SVV7 Comment: Since Briar Branch is under the jurisdiction of Harris County Flood Control District (HCFCD), the extent of the Debris Removal Program has been to monitor Briar Branch continuously and notify HCFCD of the need for debris removal and/or de-snagging as needed. Throughout the City limits, the City monitors and removes possible obstructions such as trees, trash cans, debris washed into ditches and storm sewers prior to and during all storm incidents, and residents and businesses are notified via Constant Contact and all City social media platforms to continuously monitor and remove any possible obstructions. The City would like to carry this measure forward and change the wording of the Action Item to: Develop and implement a public outreach program designed to educate the public about debris removal and other ways to minimize damages to residential properties. Develop/implement tree management program to minimize damage from debris due to high winds and icing/freezing temperatures X Comment: The City adopted tree preservation and management regulations in 2017 that include provisions for addressing diseased and/or dead trees, and the City enforces such regulations throughout the year. Additionally, in accordance with the tree preservation regulations, the City requires a permit for removal of trees. City staff also monitors trees on City property and in public rights-of-way and addresses trees that could cause damage. Develop/implement a home heating safety public education program to educate the public on winter storm hazards and action to minimize damage to residential property and equipment caused by winter hazards and home heating. X X SVV12 Comment: This is an ongoing program. On behalf of the City, the Village Fire Department conducts a fire safety and prevention program throughout the year to different public and private schools, reaching approximately 1,500 students each year. Through public education, the City and VFD hope to reduce fire hazards caused by individuals. The City would like to carry this measure forward and change the wording of the Action Item to: Conduct a fire safety and prevention program in conjunction with the Village Fire Department. Bank re-stabilization with slope stabilization along portions of Briar Branch to increase flow to minimize flood damages. X Comment: The portions of the bank of Briar Branch that would be good candidates for a re-stabilization project are privately owned property and areas that are not maintained by Harris County Flood Control District. Action is no longer feasible since the City has no control over these areas. Clean-up of heavy wildfire fuel areas (abandoned buildings, abandoned lands, etc.) X X SVV9 Comment: The City monitors heavy wildfire fuel areas throughout the year and addresses any area of concern with the appropriate individual, entity or agency. The City removes dead trees and/or other vegetation and maintains underbrush on City property and public rights-of-way throughout the year. In September of 2017, the City adopted the 2015 International Property Maintenance Code which provides additional tools for the City to use in addressing residential properties that may become substandard and prevent such properties from developing into heavy wildfire fuel areas. The City would like to carry this measure forward and change the wording of the Action Item to: Continuously monitor and mitigate heavy wildfire fuel areas such as abandoned buildings, abandoned lands, etc. Establish local supplemental benchmark program X Comment: The exact purpose of this particular Action Item is unknown and it does not appear to do anything to mitigate flood damage to structures. The City adopted flood damage prevention regulations in 2007 including a provision that new residential and non- residential construction must meet base flood elevation + 1 foot. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 23-14 23.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 23-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 23-15 identifies the priority for each action. Table 23-16 summarizes the mitigation actions by hazard of concern and mitigation type. Table 23-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action SVV1 — Where appropriate, support retrofitting of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire Existing 3, 4, 10 Spring Valley Village Spring Valley Village – Public Works High HMGP, PDM, FMA Long-term Action SVV2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including Spring Valley Village Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 Spring Valley Village Spring Valley Village – Public Works Low Staff Time, General Funds Ongoing Action SVV3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Earthquake, Flooding, Drought, Mass Mopvement, Wildfire New and Existing 1, 5, 8 Spring Valley Village The Memorial Villages Low Staff Time, General Funds Short-term Action SVV4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise New and Existing 1, 3, 5, 7, 8, 10 Spring Valley Village – Public Works and Building Official TBD Low Staff Time, General Funds Ongoing Action SVV5 — Conduct HVAC Assessment/Mitigation to Ventilation Systems for Critical Infrastructure Hazards Mitigated: Toxic/Haz-Mat, Energy Pipeline Failures Existing 3, 7, 13 Spring Valley Village TBD Medium CIP Short-term Action SVV6 — Develop and implement public outreach program to educate the public on drought hazards and water conservation measures that may be implemented by individuals to reduce water usage and minimize damages to property and equipment. Hazards Mitigated: Drought New and Existing 4, 6, 7, 8, 11 Spring Valley Village – Public Works TCEQ, HGSD Low CIP, Utilities Fund, Fed Water SMART grant Ongoing ActionSVV7 — Develop and implement a public outreach program designed to educate the public about debris removal and other ways to minimize damage to residential properties.. Hazards Mitigated: Flooding Existing 4, 7, 8 Spring Valley Village Harris County Flood Control Medium General Fund Ongoing City of Spring Valley Village 23-15 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea ActionSVV8 — Conduct a fire safety and prevention program in conjunction with the Village Fire Department. Hazards Mitigated: Wildfire Existing 2, 3, 4 Spring Valley Village Villages Fire Department Low General Fund Ongoing ActionSVV9 — Continuously monitor and mitigate heavy wildfire fuel areas such as abandoned buildings, abandoned lands, etc. Hazards Mitigated: Wild Fire Existing 2, 3, 4 Spring Valley Village Villages Fire Department Low General Fund Ongoing Action SVV10 — Improve storm drainage on street projects in accordance with 5 year CIP - Hazards Mitigated: Flooding New 4, 7, 9 Spring Valley Village TBD Medium Bonds, CIP Ongoing Action SVV11 — Provide Public Education and outreach program to businesses, citizens, employees and the general public about hazards associated with illegal discharge and improper disposal of waste and the impacts storm water can have on the quality of water as described in the City’s Storm Water Management Plan. Hazards Mitigated: Flooding New and Existing 3, 4, 6, 8, 11 Spring Valley Village TBD Low General Fund Ongoing Action SVV12 — Briar Branch Bypass project and contrast a detention pond to mitigate flood-related impacts. Hazards Mitigated: Flooding New 4, 7, 9 Spring Valley Village Harris County Flood Control, Other Memorial Villages High General Fund, Bonds, CIP, Grants Long-Term Action SVV13 — Bank re-stabilization with slope stabilization along portions of Briar Branch and Spring Branch to improve/increase flow and minimize flood damage. Hazards Mitigated: Flooding New 4, 7, 9 Spring Valley Village Harris County Flood Control High General Fund, Bonds, CIP, Grants Long-Term ActionSVV14 — Replace bridges in Spring Valley Village with improved hardened bridges to withstand flooding and debris. Hazards Mitigated: Hurricane, Flooding New 4, 7, 9, 10 Spring Valley Village Harris County Flood Control High General Fund, Bonds, CIP, Grants Long-Term ActionSVV15 — Develop and implement master drainage plan and drainage model, including analysis of existing drainage system. Hazards Mitigated: Flooding New 2, 3, 7, 9, 10 Spring Valley Village Harris County Flood Control Medium General Fund Short-Term Action SVV16 — Develop Critical Infrastructure and Key Resources database Hazards Mitigated: Hurricane, Severe Weather, Flooding, Tornado, Drought, Earthquake, Wildfire, Tsunami, and Mass Movement New 2, 3, 7, 9, 10, 13 Spring Valley Village TBD Medium General Fund, Grants Short-Term Action SVV17 — Implement updates for drought contingency plan Hazards Mitigated: Drought New and Existing 5, 7, 8, 9, 10 Spring Valley Village TBD Low General Fund Short-Term Action SVV18 — Develop Partnership Projects with Harris County Flood Control District for the purpose of optimizing drainage systems in Spring Valley Village Hazards Mitigated: Flooding, Dam Failure New 7, 9 Spring Valley Village Harris County Flood Control, Other Memorial Villages High Bonds, CIP, Grants Long-Term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 23-16 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action SVV19 — Generators for water and wastewater infrastructure. Hazards Mitigated: Flooding, Sever Weather, Hurricane, Earthquake, Mass Movement, Wildfire, New 4, 7, 9 Spring Valley Village TBD Medium CIP, Grants, General Fund Short-Term Action SVV20— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Earthquake, Flooding, Drought, Mass Mopvement, Wildfire New and Existing 1, 3, 4, 5, 9, 10, 11, 15 City Admistration HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 23-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya SVV1 3 Low High No Yes No Low Low SVV2 7 Medium Low Yes No Yes High Low SVV3 3 Low Low Yes No Yes High Low SVV4 6 Medium Low Yes No Yes High Low SVV5 3 Low Medium No No No Low Low SVV6 5 High Low Yes No Yes High Low SVV7 3 Medium Low Yes Yes No Medium Medium SVV8 3 Medium Low Yes Yes No Medium Low SVV9 3 Medium Low Yes Yes No Medium Low SVV10 3 High High Yes Yes No High High SVV11 5 Low Low Yes No Yes Medium Low SVV12 3 High High Yes Yes No Medium High SVV13 3 High High Yes Yes No Medium High SVV14 4 Medium High No Yes No Medium Medium SVV15 5 High Medium Yes Yes No Medium Medium SVV16 6 High Medium Yes Yes No Medium Medium SVV17 5 Medium Low Yes Yes Yes High Medium SVV18 2 High Medium Yes Yes No Medium High SVV19 3 Medium Medium Yes Yes No Medium Medium SVV20 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. City of Spring Valley Village 23-17 Table 23-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Pro-tection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather SVV-3, SVV-4, 20 SVV-4 SVV-4, SW-20 SVV-20 Hurricane SVV-1, SVV-3, SVV-4, SVV-20 SVV-1, SVV-4 SVV-4, SW-20 SVV-14, SVV-16 SVV-19, SVV-20 SVV-1, SVV-14 SVV-20 Low-Risk Hazards Earthquake SVV-1, SVV-3, SVV-20 SVV-1 SVV-20 SVV-16, SVV-19, SVV-20 SVV-1 SVV-2, SVV-20 Flooding SVV-1, SVV-3, SVV-4, SVV-7, SVV-10, SVV-12, SVV-13, SVV-15, SVV-20 SVV-1, SVV-4, SVV-7, SVV-10, SVV-12, SVV-13 SVV-18 SVV-4, SVV-11, SWW-20 SVV-11 SVV-14, SVV-16, SVV-19, SVV-20 SVV-1, SVV-12, SVV-13, SVV-14 SVV-18 SVV-20 Drought SVV-3, 20 SVV-6, SVV-17, SVV-20 SVV-6 SVV20 SVV-6, SVV-17 SVV-2, SVV-17, SVV20 Wildfire SVV-1, SVV-3, SVV-9, SWW-20 SVV-1 SVV-8, SWW-20 SVV-16, SVV-19, SVV-20 SVV-1 SVV-2, SVV-20 Mass Movement SVV-1, SVV-3, SVV-20 SVV-1 SVV-20 SVV-16, SVV-19, SVV-20 SVV-1 SVV-2, SVV-20 a. See the introduction to this volume for explanation of mitigation types. 23.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX 23.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • City of Spring Valley Village Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • City of Spring Valley Village Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • City of Spring Valley Village MS4 Permit – The MS4 Permit was review for determining existing integration of current action plan items and for identifying opportunities for future action plan integration. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • Texas Water Development Board Flood Outreach – Community Assistance Program – Flood insurance and total loss claims information was obtained through this Program. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 23-18 23.11.2 Staff and Local Stakeholder Involvement in Annex Development This annex was developed over the course of one month with input from various City departments including Public Works, Community Development, Finance, and City Administration, as well as a representative from the Village Fire Department. !(!(!(!(!(!(!(!(!(!(!(!(§¨¦10§¨¦10HoustonHilshireVillageHuntersCreekVillageHedwigVillagePiney PointVillageBunkerHillVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.20.40.1Miles±Spring Valley §¨¦10 §¨¦10 Houston Hilshire Village Hunters Creek Village Hedwig Village Piney Point VillageBunker Hill Village FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Spring Valley §¨¦10 §¨¦10 Houston Hilshire Village Hunters Creek Village Hedwig Village Piney Point VillageBunker Hill Village Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Spring Valley §¨¦10 §¨¦10 Houston Hilshire Village Hunters Creek Village Hedwig Village Piney Point VillageBunker Hill Village 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Spring Valley §¨¦10 §¨¦10 Houston Hilshire Village Hunters Creek Village Hedwig Village Piney Point VillageBunker Hill Village 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Spring Valley §¨¦10 §¨¦10 Houston Hilshire Village Hunters Creek Village Hedwig Village Piney Point VillageBunker Hill Village Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Spring Valley §¨¦10 §¨¦10 Houston Hilshire Village Hunters Creek Village Hedwig Village Piney Point VillageBunker Hill Village Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.2 0.40.1 Miles ± Spring Valley 24-1 24. CITY OF STAFFORD 24.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Ashley Merchant, Grant Manager 2610 South Main St. Stafford, TX 77477 Telephone: 281-261-3993 e-mail Address: AMerchant@staffordtx.gov Peter E. Alvarado, Emergency Management Coordinator 2610 South Main St. Stafford, TX 77477 Telephone: 281-261-3947 e-mail Address: PAlvarado@staffordtx.gov 24.2 JURISDICTION PROFILE 24.2.1 Location The City of Stafford is in the southwest portion of Harris County and the northeast portion of Fort Bend County. The City of Houston is to the north, the city of Meadows place to the northwest, the City of Sugar Land to the west, and Missouri City to the south and east. Stafford is located approximately 50 miles from the Gulf of Mexico in southeast Texas. The current boundaries generally extend from West Airport Blvd. to Highway 90 north-south and Texas Parkway to Dairy Ashford Rd. east-west, encompassing an area of approximately 7 square miles. Stafford is home to Houston Community College-Stafford Campus, a UPS distribution center and the state’s only municipal school district. 24.2.2 History The City of Stafford was incorporated in 1956. In 1824, William J. Stafford was granted a league-and-a-half of land, which became known as Stafford’s Point, and aided by a horse-powered cotton gin, began farming on his plantation and operating the gin to bale his and other farmers’ crops in the area. It marked the business friendly climate that remains a trademark of Stafford today. In 1836, during the Texas Revolution, General Santa Ana and his troops stopped in Stafford’s Point for the night on their way to San Jacinto. Before departing, they pillaged and burned the community. By 1840, settlers had returned to begin rebuilding, and their preferred economic product shifted from cotton to sugar cane as the primary source of income for revitalizing the community’s economy. Attracted by this expanding community, Stafford’s Point became the terminal point of the first railroad tracks built in Texas which became a robust system over the next century. Since Stafford’s incorporation, it has stood out by promoting commerce instead of concentrating solely on residential development. 24.2.3 Climate The climate of the City of Stafford is typical of the upper Texas coast, humid subtropical, with hot and humid summers and mild winters. The average annual temperature is around 69°F and average annual rainfall is approximately 50 inches. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 24-2 24.2.4 Governing Body Format As a home rule city, Stafford established a “mayor-council” form of municipal government. The city is governed by the mayor and six council members. The city consists of 10 departments: Fire, Police, Finance, Human Resources, Public Works, Municipal Court, Information Technology, Municipal Educational Television, Recreation and City Administration. The Stafford Economic Development Corporation is a nonprofit which pursues the economic development expansion of the city and reports to City Council. The City Council assumes responsibility for the adoption of this plan; the Mayor will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 24-1. Table 24-1. Local Mitigation Planning Team Members Name Title Peter Alvarado Emergency Management Coordinator Efrem Burns Fire Marshal Cassandra Fair Administrative Assistant Jeff Johnson City Planner Ashley Merchant Grant Manager Chris Riggs Director of Public Works 24.3 CURRENT TRENDS 24.3.1 Population According to the United States Census Bureau, the population of the City of Stafford as of April 2010 was 17,693. Since 2010, the population has grown at an average annual rate of 0.61 percent, though in 2017 it is estimated that the population decreased by 0.66 percent from 2016. 24.3.2 Development Anticipated redevelopment/development levels are low to moderate, consisting primarily of commercial redevelopment. Approximately 93 percent of the City is built-out, with the most recent development being infill. Residentially, there has been a focus on increased density and compact urban uses through planned developments. The City of Stafford updated its Comprehensive Plan in 2015. The plan focuses on issues of the greatest concern to the community. City actions, such as those relating to land use allocations, annexations, zoning, subdivision and design review, redevelopment and capital improvements, must be consistent with the plan. Future growth and development in the City will be managed as identified in the general plan. Table 24-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Table 24-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. N/A City of Stafford 24-3 Criterion Response Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. N/A • If yes, who currently has permitting authority over these areas? N/A Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas There is a Master Planned 200 acre mixed use (residential/commercial) project called the “Grid” at the northwest corner of the intersection of I-59 and Kirkwood Road that is under construction. There are no known hazard risks in this area. How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 33 12 39 4 6 Multi-Family 0 0 0 0 7 Other (commercial, mixed use, etc.) 11 17 15 13 11 Total 44 29 54 17 24 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 0 • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. • The City of Stafford has a current population of approximately 19,000. It is anticipated at the time of build out in 2030 that a minimum of 3,000 residential dwelling units will be added to the existing approximately 180 acres of vacant residential property. • Population of the City will be approximately 27,500 in 2030. With an increased demand in compact urban dwelling units, the population will continue to rise in the future. • There is approximately 150 acres of vacant commercial/industrial property. Buildout is anticipated by 2030. There will be an increased demand to mixed use developments (residential/commercial/industrial) in the future to make these developments viable. 24.4 CAPABILITY ASSESSMENT The City of Stafford performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 24-3. • Development and permitting capabilities are presented in Table 24-4. • An assessment of fiscal capabilities is presented in Table 24-5. • An assessment of administrative and technical capabilities is presented in Table 24-6. • An assessment of education and outreach capabilities is presented in Table 24-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 24-8. • Classifications under various community mitigation programs are presented in Table 24-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 24-10. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 24-4 Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Table 24-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No No Yes Comment: International Building Code 2015 Zoning Code Yes No No Yes Comment: Comprehensive Zoning Ordinance 102 Subdivisions Yes No No Yes Comment: Subdivision Ordinance 82 Stormwater Management Yes No Yes Yes Comment: Stormwater Pollution Protection Ordinance: Subdivision Ordinance Chapter 35 Section 205-208; TCEQ Post-Disaster Recovery Yes Yes Yes Yes Comment: Fort Bend County Plan Real Estate Disclosure No Yes No No Comment: Fort Bend County Growth Management Yes No No Yes Comment: Code of Ordinance Article III Section 62 Site Plan Review Yes No No Yes Comment: Comprehensive Zoning Ordinance 102 Environmental Protection No Yes Yes No Comment: TCEQ and EPA Flood Damage Prevention Yes No No Yes Comment: Code of Ordinance Article IV Section 26 Emergency Management Yes No Yes Yes Comment: Code of Ordinance Article II Section 22 Climate Change No No No No Comment: Planning Documents General Plan Yes Yes Yes Yes Comment: Fort Bend County Capital Improvement Plan Yes No No Yes How often is the plan updated? 1 year Comment: City of Stafford Capital Improvement Plan Revised 2018 Disaster Debris Management Plan No Yes Yes No Comment: Fort Bend County Debris Management Plan Floodplain or Watershed Plan Yes Yes No Yes Comment: Code of Ordinance Article IV Section 26 Stormwater Plan Yes Yes Yes Yes Comment: Stormwater Pollution Protection Ordinance: Subdivision Ordinance Chapter 35 Section 205-208; State Mandate via Texas Commission on Environmental Quality Urban Water Management Plan No Yes No No Comment: Water Control Improvement District #2 (Fort Bend County) Habitat Conservation Plan No No No No Comment: City of Stafford 24-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Economic Development Plan Yes No No No Comment: City of Stafford Comprehensive Plan 2015 Shoreline Management Plan No No No No Comment: Community Wildfire Protection Plan No No No No Comment: Forest Management Plan No No No No Comment: Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes Yes Yes Yes Comment: Fort Bend County Emergency Management Plan Threat & Hazard Identification & Risk Assessment (THIRA) No Yes Yes Yes Comment: 2017 Houston Regional Threat and Hazard Identification and Risk Assessment Post-Disaster Recovery Plan Yes Yes Yes Yes Comment: Fort Bend County Plan Continuity of Operations Plan Yes No No Yes Comment: City of Stafford Continuity of Operations Plan Public Health Plan Yes Yes No Yes Comment: Code Enforcement Health Inspection Table 24-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Public Works- Development Services Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? No Table 24-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 24-6 Table 24-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Public Works- City Planner Engineers or professionals trained in building or infrastructure construction practices Yes Contract Support Planners or engineers with an understanding of natural hazards Yes Contract Support Staff with training in benefit/cost analysis No N/A Surveyors No N/A Personnel skilled or trained in GIS applications Yes Public Works- GIS Applications Specialist Scientist familiar with natural hazards in local area No N/A Emergency manager Yes Fire Department- Emergency Management Coordinator Grant writers Yes Grant Manager Table 24-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. There is a link in the Emergency Management section and occasionally information will be posted on the flash screen of the home page. Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. Information is posted through Facebook, Twitter and NextDoor. Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. N/A Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Stafford Municipal Educational Television Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Warnings are posted on electronic billboards in the city and broadcast over an AM radio station. City of Stafford 24-7 Table 24-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Public Works Who is your floodplain administrator? (department/position) Contract Support Are any certified floodplain managers on staff in your jurisdiction? No What is the date that your flood damage prevention ordinance was last amended? 2/13/2008 Does your floodplain management program meet or exceed minimum requirements? Meets • If exceeds, in what ways? N/A When was the most recent Community Assistance Visit or Community Assistance Contact? Insert appropriate information Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. N/A Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. N/A Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. N/A Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes • If so, what type of assistance/training is needed? Basic training. Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? N/A • If no, is your jurisdiction interested in joining the CRS program? Yes How many flood insurance policies are in force in your jurisdiction?a 635 • What is the insurance in force? $201,754,900 • What is the premium in force? $301,180 How many total loss claims have been filed in your jurisdiction?a 106 • How many claims are still open or were closed without payment? 31 • What were the total payments for losses? $1,754,301 a. According to FEMA statistics as of OCTOBER 31, 2018 Table 24-9. Community Classifications Participating? Classification Date Classified Community Rating System No N/A N/A Building Code Effectiveness Grading Schedule No N/A N/A Public Protection No N/A N/A Storm Ready No N/A N/A Firewise No N/A N/A Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 24-8 Table 24-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Medium Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Medium Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Medium Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Stafford 24-9 24.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 24.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Municipal Codes and Ordinances — The City’s Municipal Codes were reviewed for the full capacity assessment and for identifying opportunities for action plan integration, including Section 26 – Drainage and Flood Control. • Capital Improvement Plan — The Capital Improvement Plan includes projects that can help mitigate potential hazards. The City will act to ensure consistency between the hazard mitigation plan and the current and future capital improvement plans. The hazard mitigation plan may identify new possible funding sources for capital improvement projects may result in modifications to proposed projects based on results of the risk assessment • Building Code and Fire Code — The City’s adoption of the 2015 International Building and Fire Code incorporate local modifications to account for climatic, topographic and geographic conditions that exists in the City • Comprehensive Plan — The City’s 2015 Comprehensive Plan includes an “Infrastructure Assessment” element to protect the community from unreasonable risk by establishing policies and actions to avoid or minimize infrastructure hazards pertaining to flooding. 24.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Zoning Ordinance — In the future, the City will be conducting a comprehensive update to the zoning ordinance. The opportunity to incorporate additional mitigation and abatement measures will be considered for inclusion into the ordinance • Capital Improvement Projects — The City will continue to place a higher rank or score when evaluating capital projects that take into consideration hazard mitigation potential. • Economic Development Corporation — The City will continue to work with the Economic Development Corporation to incorporate hazard mitigation planning in future development within the City. 24.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 24-11 lists past occurrences of natural hazards for which specific damage was recorded in [City of Stafford]. Other hazard events that broadly affected the entire planning area, including [City of Stafford], are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 24-10 Table 24-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane DR-4332 8/23/2017-9/15/2017 $795,610.33 Flash Flood 8/26/2017 $0 Tornado 2/14/2017 $200,000 Severe Storms and Flooding DR-4272 5/22/2016-6/24/2016 Severe Storms and Flooding DR-4269 4/17/2016-4/30/2016 Severe Weather, Tornadoes, Straight Line Winds and Flooding DR-4223 5/4/2015-6/22/2015 Thunderstorm Winds 4/17/2015 $0 Flooding 2014 Portions of FM 1092 flooded. Thunderstorm Winds 8/13/2009 $15,000 Hurricane Ike DR-1791 9/7/2008-10/2/2008 $269,276.27 Hurricane Gustav EM-3290 8/27/2008-9/7/2008 Hurricane Dean EM-3277 8/17/2008-9/5/2008 Lightning 6/18/2008 $10,000 Extreme Wildfire Threat DR-1624 11/27/2006-5/14/2006 Lightning 7/18/2006 $4,000 Lightning 7/4/2006 $25,000 Hurricane Rita DR-1606 9/23/2005-10/14/2005 Hurricane Rita EM-3261 9/20/2005-10/14/2005 Hurricane Katrina Evacuation EM-3216 8/29/2005-10/1/2005 Hail 2/24/2005 $4,000 Tornado 11/17/2003 $300,000 Hail 10/28/2002 $5,000 Severe Storms, Tornadoes and Flooding DR-1439 10/24/2002-11/15/2002 Hail 5/30/2002 $2,000 Tropical Storm Allison DR-1379 6/5/2001-6/20/2001 Thunderstorm Winds 4/16/2001 $150,000 Extreme Fire Hazards EM-3142 8/1/1999-12/10/1999 Texas Tropical Storm Frances DR-1245 9/9/1998-10/5/1998 Lightning 6/3/1996 One fatality Severe Thunderstorms and Flooding DR-1041 10/14/1994-11/8/1994 Texas Severe Storm, Thunderstorms DR-930 12/20/1991-1/14/1992 Tropical Storm Allison DR-836 6/25/1989-7/7/1989 Hurricane Alicia DR-689 8/18/1983-8/20/1983 24.7 HAZARD RISK RANKING Table 24-12 presents a local ranking for [City of Stafford] of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. City of Stafford 24-11 Table 24-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Earthquake 14 Low 3 Drought 6 Low 3 Wildfire 6 Low 3 Flooding 6 Low 4 Dam Failure 0 (No exposure) None 4 Mass Movement 0 (No Exposure) None 4 Tsunami 0 (No exposure) None 4 Coastal Erosion 0 (No exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 24.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 24.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 11 • Number of FEMA-identified Severe-Repetitive-Loss Properties: None • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: None 24.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • There are areas in the City with urban drainage issues that result in localized flooding during heavy rain. • Fire Station 1, a critical facility which also houses Emergency Medical Service (EMS), has a generator in poor condition and in need of replacement. Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. 24.9 STATUS OF PREVIOUS PLAN ACTIONS Table 24-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 24-12 Table 24-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Install generators/emergency power at the Stafford Centre and Civic Center. X STF5 Comment: Not started. Expand city’s emergency warning system to increase coverage within the community’s population. X STF6 Comment: Ongoing Install protective structures to minimize damage to critical assets and equipment. X Comment: Shed covers were installed to cover equipment in 2015. Improve drainage channels to increase flow rate and increased retention areas. X STF7 Comment: In progress. Work began in 2017. One of three projects has been completed and the remaining two are underway. Improve storm sewer to lower hydraulic grade line in Sugar Creek subdivision. X Comment: This project was completed on September 12, 2018. Implement drainage improvements in Missouri City Estates- replace open ditches by- installing storm sewers and level ground to reduce overland and sheet flow flooding within neighborhoods. X STF8 Comment: In progress. Drainage improvement is currently underway in Missouri City Estates, the project started on September 1, 2018. A new detention pond will be installed and there will be partial curb and gutter installed in the subdivision. Electric Surge protection and shielding for electronic systems in public facilities or critical infrastructure. X Comment: Back-up systems approved in October of 2017. Harden air filtration system and critical infrastructure/public buildings to support high efficiency particulate air resistance filters in order to minimize health risks and property damage due to air particulate hazards and minimize equipment damage due to smoke. X STF9 Comment: Not started. Hardening of critical infrastructure facilities for hurricane wind hazards. X STF10 Comment: Not started. Development/Modification of building codes/ordinances for mitigation of hurricane wind hazards. X Comment: 2015 International Building Codes adopted by Council on May 2, 2018. 24.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 24-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 24-15 identifies the priority for each action. Table 24-16 summarizes the mitigation actions by hazard of concern and mitigation type. City of Stafford 24-13 Table 24-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action STF1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, landslide, wildfire Existing 3, 4, 10 Public Works Emergency Management High HMGP, PDM, FMA Short-term Action STF2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including Zoning Ordinance, Capital Improvement projects and Economic Development Corporation planning Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 Planning and Zoning Stafford Economic Development Corporation Low Staff Time, General Funds Ongoing Action STF3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Earthquake, Drought, Wildfire, Flooding New and Existing 1, 5, 8 Emergency Management Public Works Low Staff Time, General Funds Short-term Action STF4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Dam failure, flooding, severe weather, New and Existing 1, 3, 5, 7, 8, 10 Public Works Emergency Management Low Staff Time, General Funds Ongoing Action STF5 — Install generators/emergency power at the Stafford Centre for use as an emergency shelter. Hazards Mitigated: Hurricane, severe weather, wind, flooding Existing 3, 4, 6, 10, 11 Economic Development Corporation Emergency Management Low HMGP, PDM; EDC Funds Short- Term Action STF6 — Expand city’s emergency warning system to increase coverage within the community’s population. Hazards Mitigated: Hurricane, flooding, severe weather, wildfire, drought, New 1, 3, 11 Emergency Management Police/Fire Medium Grant funding; General Funds Ongoing Action STF7 — Improve drainage channels to increase flow rate and increased retention areas. Hazards Mitigated: Hurricane, flooding, severe weather Existing 6, 8, 9, 11, 14, 15 Stafford Public Works Fort Bend County Drainage/Stafford Economic Development Corporation Medium Staff Time, General Funds Ongoing Action STF8 — Implement drainage improvements in Missouri City Estates- replace open ditches by installing storm sewers and level ground to reduce overland and sheet flow flooding within neighborhoods. Hazards Mitigated: Hurricane, flooding, severe weather New and Existing 6, 8, 9, 11, 14, 15 Public Works Low Staff Time, General Funds Short- Term Action STF9 — Harden air infiltration system and critical infrastructure/public buildings to support high efficiency particulate air resistance filters in order to minimize health risks and property damage due to air particulate hazards and minimize equipment damage due to smoke. Hazards Mitigated: Severe weather, wind, hurricane, tornado, wildfire, non-natural Existing 11, 13 Public Works Medium HMGP, PDM, FMA; Staff Time, General Funds Short- Term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 24-14 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action STF10 — Hardening of critical infrastructure facilities for hurricane wind hazards. Hazards Mitigated: Hurricane, wind, severe weather, tornado Existing 11, 13 Public Works Emergency Management Medium HMGP, PDM, FMA; General Funds Short- Term Action STF11 — Purchase generator for Fire/EMS Station 1. Hazards Mitigated: Hurricane, severe weather, wind, flooding New 3, 4, 6, 10, 11 Public Works Emergency Management Low Staff Time, General Funds Short- Term Action STF12 — Purchase/install generators at critical facilities and infrastructure that lack adequate back-up power or are in need of replacement. Hazards Mitigated: Hurricane, severe weather, wind, flooding New 3, 4, 6, 10, 11 Public Works Emergency Management Medium HMGP, PDM; General Funds Ongoing Action STF13— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Earthquake, Drought, Wildfire, Flooding New and Existing 1, 3, 4, 5, 9, 10, 11, 15 City Admistration HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 24-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya 1 3 High High Yes Yes No Medium High 2 7 Medium Low Yes No Yes High Low 3 3 Low Low Yes No Yes High Low 4 6 Medium Low Yes No Yes High Low 5 5 Medium Low Yes Yes No Low High 6 3 High Medium Yes Maybe No Low High 7 6 Medium Medium Yes Yes Yes Medium Low 8 6 Medium Low Yes Yes Yes High Low 9 2 Low Medium No Yes No Low Low 10 2 Low Medium No Yes No Low Low 11 5 High Low Yes Yes Yes High Low 12 5 High Medium Yes Yes No Medium Medium 13 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. City of Stafford 24-15 Table 24-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather STF-4, 13 STF-9, 10 STF-6, 13 STF-5, 6, 11, 12, 13 STF-7, 8 STF-3, 4, 13 Hurricane STF13 STF-9, 10 STF-6, 13 STF-5, 6, 11, 12, 13 STF-7, 8 STF-3, 13 Low-Risk Hazards Earthquake STF-2, 13 STF13 STF13 STF-1 STF-3, 13 Drought STF-2, 13 STF-6, 13 STF-5, 6, 11, 12, 13 STF-3, 13 Wildfire STF-2, 13 STF-9 STF-6, 13 STF-5, 6, 11, 12, 13 STF-1 STF-3, 13 Flooding STF-2, 4, 13 STF-6, 13 STF-5, 6, 11, 12, 13 STF-1, 7, 8 STF-3, 4, 13 a. See the introduction to this volume for explanation of mitigation types. 24.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX 24.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • City of Stafford Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • City of Stafford Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • City of Stafford Comprehensive Plan — The City of Stafford Comprehensive Plan was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • City of Stafford Capital Improvement Plan — The City of Stafford’s Capital Improvement Plan was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • Fort Bend County Debris Management Plan — The Fort Bend County Debris Management Plan was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • City of Stafford Continuity of Operations Plan — The City of Stafford’s Continuity of Operations Plan was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • 2017 Houston Regional Threat and Hazard Identification Risk and Assessment — The 2017 Houston Regional Threat and Hazard Identification Risk and Assessment was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • Fort Bend County Emergency Management Plan — The Fort Bend County Emergency Management Plan was reviewed for the full capability assessment and for identifying opportunities for action plan integration. The following outside resources and references were reviewed: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 24-16 • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. 24.11.2 Staff and Local Stakeholder Involvement in Annex Development This annex was developed over the course of several months with input from many city departments including public works, planning, finance and emergency management. All departments were asked to contribute to the annex development through reviewing and contributing to the capability assessment, reporting on the status of previously identified actions, and participating in action identification and prioritization. An action development meeting was held on March 25, 2019 and was attended by representatives from the previously listed departments as well as the City Administrative office. Once action had been identified and compiled in Phase II of the annex, a draft was internally circulated for comment. Representatives from the Fire Marshal’s Office, planning and emergency management department attended a mandatory workshop on July 17, 2019 covering Phase III of the annex development process. On July 31, 2019, an interdepartmental meeting covering Phase III of the City’s annex was conducted with department representatives from emergency management, the Fire Marshal’s Office, planning, and public works. A draft of the annex was internally circulated for comment and reviewed by the Mayor before a final draft was submitted to the Core Planning Team representing Harris County. !(!(!(!(!(!(§¨¦69£¤90£¤90HoustonHoustonHoustonMeadows PlaceMissouri CityCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.40.80.2Miles±Stafford §¨¦69 £¤90 £¤90 Houston Houston Houston Meadows Place Missouri City FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.4 0.80.2 Miles ± Stafford §¨¦69 £¤90 £¤90 Houston Houston Houston Meadows Place Missouri City Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.4 0.80.2 Miles ± Stafford §¨¦69 £¤90 £¤90 Houston Houston Houston Meadows Place Missouri City 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.4 0.80.2 Miles ± Stafford §¨¦69 £¤90 £¤90 Houston Houston Houston Meadows Place Missouri City 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.4 0.80.2 Miles ± Stafford §¨¦69 £¤90 £¤90 Houston Houston Houston Meadows Place Missouri City Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.4 0.80.2 Miles ± Stafford §¨¦69 £¤90 £¤90 Houston Houston Houston Meadows Place Missouri City Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.4 0.80.2 Miles ± Stafford 25-1 25. CITY OF TAYLOR LAKE VILLAGE 25.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Jon Keeney, Mayor 500 Kirby Taylor Lake Village, TX 77586 Telephone: 2813262843 email Address: mayor@tlv-tx.us Jon Powell, Councilman 500 Kirby Taylor Lake Village, TX 77586 Telephone: 2813262843 email Address: jpowell@tlv-tx.us 25.2 JURISDICTION PROFILE 25.2.1 Location City of Taylor Lake Village is in southeast Harris County just north of Clear Lake and between Lake Pasadena and Taylor Lake. The current boundaries generally extend from Pasadena to El Lago, encompassing an area of 1.3 square miles, of which 1.1 square miles is land and 0.19 square miles is water. 25.2.2 History The City of Taylor Lake Village was incorporated in 1962. The City was home to four of the original seven NASA Mercury program astronauts. Many residents work for NASA, and a number of current and former astronauts still live here. 25.2.3 Climate The climate of Taylor Lake Village is Texas Gulf Coastal. 25.2.4 Governing Body Format Taylor Lake Village is a General Law Type-A city. It has a mayor and city council with each of the council members being elected at-large. The Taylor Lake Village City Council assumes responsibility for the adoption of this plan; the City Council will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 25-1. Table 25-1. Local Mitigation Planning Team Members Name Title Jon Keeney Mayor Jon Powell Coty Council Pos. 2 Jack Fryday City Building Official Jesse Ryholt Emergency Management Coordinator Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 25-2 25.3 CURRENT TRENDS 25.3.1 Population According to the United States Census Bureau, the population of Taylor Lake Village as of the 2010 census was 3,544. Since 1980, the population has remained fairly constant. 25.3.2 Development Table 25-2 summarizes development trends in the period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Table 25-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. • If yes, who currently has permitting authority over these areas? Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas Located in flood hazard risk area How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 4 3 1 1 3 Multi-Family 0 0 0 0 0 Other (commercial, mixed use, etc.) 0 0 0 0 0 Total 4 3 1 1 3 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. Special Flood Hazard Areas: Most of Taylor Lake Village is a flood hazard area • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. Kingston Harbor area of Taylor Lake Village was recently purchased by an entity that indicates that it plans to build single family homes. As this area is currently in the flood plain of Taylor Lake, the homes will have to be built with the lowest floor at the current elevation above Mean Flood Elevation level. 25.4 CAPABILITY ASSESSMENT The City of Taylor Lake Village is currently undertaking an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following interim findings of the assessment to date: • An assessment of legal and regulatory capabilities is presented in Table 25-3. City of Taylor Lake Village 25-3 • Development and permitting capabilities are presented in Table 25-4. • An assessment of fiscal capabilities is presented in Table 25-5. • An assessment of administrative and technical capabilities is presented in Table 25-6. • An assessment of education and outreach capabilities is presented in Table 25-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 25-8. • Classifications under various community mitigation programs are presented in Table 25-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 25-10. Findings of the capability assessment will be reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities are identified and determined to be feasible, they will be included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Table 25-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No Yes Yes Comment: Chapter 10, Article II, section 10-31 of the TLVMC adopts the 2018 Edition of International Code Council Codes and the 2017 National Electrical Code, (Ord. No. 18-689, § 2, 5-30-18) Zoning Code Yes No No Yes Comment: Appendix A of the TLVMC is known as and may be cited as “The City of Taylor Lake Village Zoning Ordinance (Ord. No. 10- 600, § 1, 8-4-2010). Subdivisions Yes Yes No Yes Comment: The City works closely with individual subdivision and the homeowner associations to ensure compliance. Chapter 66 of the TLVMC, (Ord. No. 84-226, § 1.04, 10-17-84) Stormwater Management Yes Yes Yes Yes Comment: Chapter 66, Article III, section Sec. 66-115. – Drainage. (Ord. No. 84-226, § 3.21, 10-17-84) Post-Disaster Recovery Yes Yes No Yes Comment: Historically worked with Harris County. Changes to county policy now prohibits. Would like to coordinate with county Real Estate Disclosure No No No No Comment: Growth Management Yes No No Yes Comment: Few opportunities for growth of land use, but will coordinate with county and other entities Site Plan Review Yes No No Yes Comment: Environmental Protection No Yes Yes Yes Comment: Rely on State and local regulatory authority Flood Damage Prevention Yes Yes Yes Yes Comment: Chapter 34, Article II, TLVMC. (Ord. No. 17-683, § 1, 12-6-17) Emergency Management No Yes Yes Yes Comment: Policing and emergency response is addressed by contract with nearby municipalities. Chapter 22, TLVMC (Ord. No. 09-579, § 10, 10-21-09) Climate Change No Yes No Yes Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 25-4 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Planning Documents General Plan Yes No Yes Yes Comment: Currently under review Capital Improvement Plan No No No Yes Comment: Disaster Debris Management Plan No No No Yes Comment: Historically worked with Harris County. Changes to county policy now prohibits. Would like to coordinate with county again Floodplain or Watershed Plan Yes Yes Yes Yes Comment: https://www.taylorlakevillage.us/index.asp?SEC=EDE25814-2435-4435-8090-73EEF66EA51B&Type=B_BASIC Stormwater Plan Yes Yes Yes Yes Comment: Currently under review for update Urban Water Management Plan No No No Yes Comment: Habitat Conservation Plan No No No Yes Comment: Economic Development Plan No No No Yes Comment: Shoreline Management Plan Yes Yes Yes Yes Comment: Complying with existing city, and state codes. Community Wildfire Protection Plan No No No Yes Comment: Forest Management Plan No No No Yes Comment: Climate Action Plan No No No Yes Comment: Comprehensive Emergency Management Plan Yes Yes No Yes Comment: Currently in development Threat & Hazard Identification & Risk Assessment (THIRA) No No No Yes Comment: Post-Disaster Recovery Plan No No No Yes Comment: Continuity of Operations Plan No No No Yes Comment: Public Health Plan No No No No Comment: Table 25-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes If no, who does? If yes, which department? City Building Department Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? Yes City of Taylor Lake Village 25-5 Table 25-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants No Capital Improvements Project Funding Yes but limited Authority to Levy Taxes for Specific Purposes Yes, but subject to state and local requirements User Fees for Water, Sewer, Gas or Electric Service No, City does not supply utilities Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs No Development Impact Fees for Homebuyers or Developers No Table 25-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices No Can Contract for this service Engineers or professionals trained in building or infrastructure construction practices Yes Not on staff. Obtain as necessary Planners or engineers with an understanding of natural hazards Yes Not on staff. Obtain as necessary Staff with training in benefit/cost analysis Yes Elected officials, not staff Surveyors No Can Contract for this service Personnel skilled or trained in GIS applications No Can contract for this service Scientist familiar with natural hazards in local area Yes Not on staff. Obtain as necessary Emergency manager Yes Emergency Management Coordinator Grant writers Yes Not on staff. Obtain as necessary Other Yes City has had success relying on resident volunteers with specific knowledge Table 25-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Elected officials and City Administrator function Do you have personnel skilled or trained in website development? Limited Do you have hazard mitigation information available on your website? Yes • If yes, briefly describe. Limited, but with links to information providers Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. Information is posted on the TLV website, the TLV Facebook page, and other social media such as NextDoor. Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? No • If yes, briefly describe. Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Blackboard Connect, mass email, text system, and utilization of the TLV website and social media sites as best as possible. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 25-6 Table 25-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Building Department Who is your floodplain administrator? (department/position) Mayor Are any certified floodplain managers on staff in your jurisdiction? No What is the date that your flood damage prevention ordinance was last amended? 1996 Does your floodplain management program meet or exceed minimum requirements? Meets • If exceeds, in what ways? When was the most recent Community Assistance Visit or Community Assistance Contact? Unknown Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Rely on State and County maps Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes • If so, what type of assistance/training is needed? Coordination with other local entities Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? Yes • If no, is your jurisdiction interested in joining the CRS program? N/A How many flood insurance policies are in force in your jurisdiction?a 1,091 What is the insurance in force? $361,039,200 What is the premium in force? $604,650 How many total loss claims have been filed in your jurisdiction?a 692 How many claims are still open or were closed without payment? 1 What were the total payments for losses? $16,840,710 a. According to FEMA statistics as of September 30, 2018 Table 25-9. Community Classifications Participating? Classification Date Classified Community Rating System Yes 8 05/01/2014 Building Code Effectiveness Grading Schedule Unknown Public Protection Unknown Storm Ready No N/A N/A Firewise No N/A N/A City of Taylor Lake Village 25-7 Table 25-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Medium Comment: Not addressed formally Jurisdiction-level monitoring of climate change impacts Low Comment: Individual residents are available to provide input Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: City is small, primarily residential and relies on estimates from County and State Capital planning and land use decisions informed by potential climate impacts Low Comment: Has not come up Participation in regional groups addressing climate risks Low Comment: Individual residents and elected officials participate as individuals and periodically report to the City Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Unknown Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Unknown Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Medium Comment: Public Capacity Local residents knowledge of and understanding of climate risk Unknown Comment: Local residents support of adaptation efforts Unknown Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Unknown Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 25-8 25.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in Section 1.11 were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 25.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Participation in County and Precinct efforts 25.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Participation in County and Precinct efforts 25.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 25-11 lists past occurrences of natural hazards for which specific damage was recorded in Taylor Lake Village. Other hazard events that broadly affected the entire planning area, including Taylor Lake Village, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 25-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 $50,404.71 Severe Storms and Flooding 4269 DR 2016 $0.00 Severe Storms and Flooding 4272 DR 2016 $0.00 Severe Storms, Tornadoes, Straight Line Winds and Flooding 4245 DR 2015 $0.00 Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR 2015 $0.00 Hurricane Ike 1791 DR 2008 $750,254.91 Hurricane Ike 3294 EM 2008 $11,790.02 Hurricane Gustav 3290 EM 2008 $0.00 Hurricane Dean 3277 EM 2007 $0.00 Tropical Storm Erin 1730 DR 2007 $0.00 Hurricane Rita 1606 DR 2005 $66,348.69 Severe Storms, Tornadoes and Flooding 1439 DR 2002 $0.00 Tropical Storm Allison 1379 DR 2001 No data available Flooding 1257 DR 1998 No data available Hurricane Georges 1245 DR 1998 No data available City of Taylor Lake Village 25-9 25.7 HAZARD RISK RANKING Table 25-12 presents a local ranking for Taylor Lake Village of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 25-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Flooding 51 High 2 Severe Weather 48 High 2 Hurricane 48 High 3 Wildfire 16 Medium 4 Earthquake 14 Low 5 Drought 6 Low 5 Mas Movement 6 Low 6 Dam Failure 0 (No Exposure) None 6 Tsunami 0 (No exposure) None 6 Coastal Erosion 0 (No Exposure None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 25.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 25.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 55 • Number of FEMA-identified Severe-Repetitive-Loss Properties: None • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 26 25.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issue has been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • The city is vulnerable on almost all sides as barges that carry chemicals traverse the bay, and countless numbers of tankers travers the local roads transporting all kinds of materials. We are an almost all volunteer city with limited resources and limited capability for receiving and passing timely information. The volume of traffic the transports chemicals around our immediate area makes us very vulnerable. Mitigation actions addressing this issue were prioritized for consideration in the action plan in this annex. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 25-10 25.9 STATUS OF PREVIOUS PLAN ACTIONS Table 25-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 25-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Developed emergency action education program and plan x Comment: Plan requires updating. Need to continue public information program Joined Community Rating System x Comment: City continues to have building requirements to be +3 feet above base flood elevation Continue flood and storm hazard mitigation program Ongoing x TLV6 Comment: Develop awareness and communication with industry for emergency prep Ongoing x TLV7 Comment: Participate in community advisory panels and report to residents Establish city warning signage program to notify community residents of Clear Lake Water Authority drought water restrictions – warnings to be posted on primary city egress routes. Yes Comment: City continues to be able to accomplish this action item with relative ease. Install generators with fuel capacity at city hall Yes Comment: Expand siren warning system to increase coverage within the community’s population where the siren(s) are currently difficult to hear. Yes Comment: System was upgraded and is maintained to be able to meet peek performance if/when need be. Install lightening and surge protective measures on City Hall. Yes Comment: Harden and retrofit City Hall facilities to withstand high winds, thunderstorms, tornadoes, hurricanes and hail. No x Comment: 25.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 25-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 25-15 identifies the priority for each action. Table 25-16 summarizes the mitigation actions by hazard of concern and mitigation type. City of Taylor Lake Village 25-11 Table 25-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action TLV1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Flooding, hurricane, severe weather Existing 3, 4, 10 City of TLV Harris County, Available Resources High HMGP, PDM, FMA Short-term Action TLV2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including any opportunity to include in city ordinances as authorize/applicable. Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 City of TLV Harris County, Available Resources Low Staff Time, General Funds Ongoing Action TLV3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Flooding, Severe Weather, Hurricane, Wildfire, Earthquake, Drought, Mas Movement New and Existing 1, 5, 8 City of TLV Harris County, Available Resources Low Staff Time, General Funds Short-term Action TLV4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Flooding, severe weather, hurricane, sea level rise New and Existing 1, 3, 5, 7, 8, 10 City of TLV Harris County, Available Resources Low Staff Time, General Funds Ongoing Action TLV5 — Continue to advocate and coordinate for local outreach programs to include town hall meetings and other social gatherings with the city and local and surrounding city’s residents. The objective of this outreach program will be to: • Bring together subject matter experts in weather, law enforcement, emergency management, and city leadership to speak on their respective subjects to local residents • Provide an interactive environment where local residents can initiate dialogue and ask questions to the subject matter experts • Ensure these events address concerns whether on a seasonal basis (i.e. hurricane season), or based on a need that is understood by the city • Posting visual aids and sending mass notifications for information on events, resources, and immediate inputs Hazards Mitigated: Flooding, severe weather, hurricane, sea level rise New and Existing 3, 4, 10 City of TLV Harris County, Available Resources Low Staff Time, General Funds Ongoing Action TLV6 — Flood and storm hazard mitigation program Hazards Mitigated: Flood. Severe weather Existing 3,7,8,9,15 City of TLV Harris County, Available Resources Low Staff Time, General Funds Ongoing Action TLV7 — Develop awareness and communication with industry for emergency preparation. Participate in community advisory panels and report to residents Hazards Mitigated: Flooding, Severe Weather, Hurricane, Wildfire, Earthquake, Drought, Mas Movement New and Existing 3,10,15 City of TLV Harris County, Available Resources Low Staff Time, General Funds Ongoing Action TLV8— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Earthquake, Drought, Wildfire, Flooding New and Existing 1, 3, 4, 5, 9, 10, 11, 15 City of TLV HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 25-12 Table 25-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya TLV1 3 High High Yes Yes No Medium High TLV2 7 Medium Low Yes No Yes High Low TLV3 3 Low Low Yes No Yes High Low TLV4 6 Medium Low Yes No Yes High Low TLV5 3 High Low Yes No No High Low TLV6 5 Medium Low Yes No Yes High Low TLV7 3 Medium Low Yes No Yes High Low TLV8 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 25-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather TLV5, TLV6, TLV8 TLV2, TLV6 TLV5, TLLV6, TLV7, TLV8 TLV2 TLV5, TLV6, TLV8 TLV1, TLV6 TLV1, TLV6, TLV8 Hurricane TLV5, TLV8 TLV2 TLV5, TLV7,TLV8 TLV2 TLV5, TLV8 TLV1 TLV1, TLV8 Flooding TLV5, TLV6, TLV8 TLV2, TLV6 TLV5, TLV6, TLV7, TLV8 TLV2 TLV5, TLV, TLV86 TLV1, TLV6 TLV1, TLV6, TLV8 Medium-Risk Hazards Wildfire TLV8 TLV5, TLV7, TLV8 TLV8 TLV8 Low-Risk Hazards Earthquake TLV8 TLV7, TLV8 TLV8 TLV8 Drought TLV8 TLV5, TLV7, TLV8 TLV8 TLV8 a. See the introduction to this volume for explanation of mitigation types. 25.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • City of Taylor Lake Village Municipal Code — The municipal code is undergoing review for the full capability assessment and for identifying opportunities for action plan integration. City of Taylor Lake Village 25-13 • City of Taylor Lake Village Flood Damage Prevention Ordinance — The flood damage prevention ordinance is undergoing review for compliance with changes to the National Flood Insurance Program implemented since the ordinance was adopted. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit is being used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the updates to a mitigation action plan. !(!(!(!(PasadenaPasadenaSeabrookSeabrookEl LagoCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.150.30.075Miles±Taylor Lake Village Pasadena Pasadena Seabrook Seabrook El Lago FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Taylor Lake Village Pasadena Pasadena Seabrook Seabrook El Lago Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Taylor Lake Village Pasadena Pasadena Seabrook Seabrook El Lago 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Taylor Lake Village Pasadena Pasadena Seabrook Seabrook El Lago 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Taylor Lake Village Pasadena Pasadena Seabrook Seabrook El Lago Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Taylor Lake Village Pasadena Pasadena Seabrook Seabrook El Lago Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± Taylor Lake Village 26-1 26. CITY OF TOMBALL 26.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact David Esquivel, PE Assistant City Manager City of Tomball 501 James St. Tomball, Texas 77375 Telephone: 281-290-1415 e-mail Address: desquivel@tomballtx.gov Joe Sykora, FSCEO FEMT Fire Marshal / Deputy EMC City of Tomball 1200 Rudel Rd Tomball, Texas 77375 Telephone: 281-290-1440 e-mail Address: jsykora@tomballtx.gov 26.2 JURISDICTION PROFILE 26.2.1 Location and Description The City of Tomball is located in northwest Harris County, Texas, approximately 28 miles from downtown Houston. The city is approximately 12 square miles with an additional 5 square miles of extraterritorial jurisdiction. Tomball is one of 24 municipalities within Harris County and the only municipality located in northwestern Harris County. Located just south of the Montgomery County Line, the City has a dynamic and expanding economy and functions as a commercial center for the area. Tomball boasts a wide variety commercial developments including, Baker Hughes, Wal-Mart, Packers Plus, Suez and more. The City has seen a number of new residential subdivisions developed since 2014 with a wide-range of prices. With a population of over 11,500 residents, & daily visitor traffic of 30,000, Tomball does not consider itself “merely a suburb”, rather a destination. 26.2.2 Brief History Tomball is a historic city that honors the past & embraces its future. First known as Peck, an agricultural community, the city was renamed after Thomas Henry Ball, a member of the U.S. House of Representatives. Ball’s leadership in 1907 established Tomball as a major railroad center for the transport of agricultural products. The City of Tomball assumed its name on December 2, 1907, however it was not until 1933 that the city was officially incorporated. In the 1930s, the City became known as “Oil Town USA” as Humble Oil discovered a major oil and gas field beneath the city. 26.2.3 Climate The City of Tomball is located 92.7 miles inland from the Gulf Coast in Southeastern Texas. The principal characteristics of the local climate are hot and humid summers with cool and relatively rainy winters. The average annual temperature is 78.6ºF and the annual average rainfall is 48 inches. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 26-2 26.2.4 Governing Body Format The City of Tomball is a “Home Rule” municipality, as established by the City of Tomball’s Charter and operates a “Council-Manager” form of government. All powers of the City and the determination of all matters of policy are vested in the Council, subject to the provisions of the Charter and Constitution of the State of Texas. As regards to the Tomball Annex to the Harris County Local Hazard Mitigation Plan dated 2018, City Council assumes responsibility for adoption of the Plan, and the City Manager will oversee its implementation. The members of the local mitigation planning team, whose members are listed in Table 26-1, developed this annex. Table 26-1. Local Mitigation Planning Team Members Name Title David Esquivel Assistant City Manager Beth Jones Director of Public Works Randall Parr Fire Chief/EMC Joe Sykora Fire Marshal/Deputy EMC Craig Meyers Director of Community Development 26.3 CURRENT TRENDS 26.3.1 Population As of the 2010, United States Census Tomball’s population was 10,753. The overall population has increased 8.8 percent between January 1, 2010 (10,753) and January 1, 2017 (11,707). 26.3.2 Development Development in Tomball has steadily increased in the 2000’s. Between October 2008 and September 2017, Tomball issued building permits for construction of 356 new housing units and 163 new commercial buildings. The Tomball Comprehensive Plan, Vision 2030, (the “Plan”) estimates that City of Tomball’s population will grow to nearly 20,000 by the year 2030. The Plan also outlines 13 land use and development goals, including the need to preserve the Downtown area as a “sense of place” and promote high quality, safe, cohesive and attractive developments that meet the needs of present and future residents of Tomball. Table 26-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. City of Tomball 26-3 Table 26-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the development of the previous hazard mitigation plan? If yes, give the estimated area annexed and estimated number of parcels or structures. Yes Approximately 70 acres, including right-of-way Retail development tract at SH 249/SH 99 Caterpillar facility on Holderrieth Road and a multiple building complex on Brown Road Is your jurisdiction expected to annex any areas during the performance period of this plan? • If yes, please describe land areas and dominant uses. • If yes, who currently has permitting authority over these areas? Yes The City of Tomball will consider annexation of properties in the unincorporated areas adjacent to the City. The City of Tomball does not annex properties without the request of the property owner. This will limit the number of properties and land area annexed over the timeframe of the hazard mitigation plan. Harris County Are any areas targeted for development or major redevelopment in the next five years? • If yes, please briefly describe, including whether any of the areas are in known hazard risk areas Yes Development and redevelopment projects could be located in areas prone to flooding. However, all City Codes will need to be met in regards to elevating new and substantially improved structures above determined flood inundation elevations. How many building permits were issued in your jurisdiction since the development of the previous hazard mitigation plan? 2013 2014 2015 2016 2017 Single Family 73 99 59 25 45 Commercial (other) 19 11 36 14 10 Please provide the number of permits for each hazard area or provide a qualitative description of where development has occurred. Permits for construction in flood hazard areas are required to be elevated above determined flood inundation elevations. Please describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. A buildable lands inventory does not exist, however much of the City remains undeveloped. 26.4 CAPABILITY ASSESSMENT The City of Tomball performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 26-3. • Development and permitting capabilities are presented in Table 26-4. • An assessment of fiscal capabilities is presented in Table 26-5. • An assessment of administrative and technical capabilities is presented in Table 26-6. • An assessment of education and outreach capabilities is presented in Table 26-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 26-8. • Classifications under various community mitigation programs are presented in Table 26-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 26-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included in the action plan for this annex identifies these as community capacity building mitigation actions. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 26-4 Table 26-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No Yes No Comment: 2012 International Residential Code, 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2011 National Electrical Code, 2015 International Energy Conservation Code, 2012 International Fire Code Zoning Code Yes No No No Comment: Municipal Code, Chapter 50 Subdivisions Yes No No No Comment: Municipal Code, Chapter 40 Storm water Management Yes No Yes Yes Comment: Municipal Code, Chapter 18 Post-Disaster Recovery No No No Yes Comment: Real Estate Disclosure No No No No Comment: Growth Management No No No No Comment: Site Plan Review Yes No No No Comment: Municipal Code, Chapter 10, 18, 40 and 50 Environmental Protection Yes No Yes No Comment: Municipal Code, Chapter 18 Flood Damage Prevention Yes Yes No No Comment: Municipal Code, Chapter 10 Emergency Management Yes No No Yes Comment: Municipal Code, Chapter 14 Climate Change No No No No Comment: Planning Documents General Plan Yes No No No Comment: Comprehensive Plan, Vision 2030, Strategic Plan Capital Improvement Plan Yes No No Yes How often is the plan updated? Annually Comment: Disaster Debris Management Plan Yes No No Yes Comment: Floodplain or Watershed Plan Yes No No Yes Comment: Storm water Plan Yes No No Yes Comment: Master Drainage Plan 2012-2020 Water Master Plan Yes No No Yes Comment: Tomball Water Master Plan – 2018 Habitat Conservation Plan Yes No No No Comment: Economic Development Plan No No No Yes Comment: Tomball Economic Development Corporation Strategic Plan City of Tomball 26-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Shoreline Management Plan No No No No Comment: Community Wildfire Protection Plan Yes No No Yes Comment: In process Forest Management Plan No No No No Comment: Climate Action Plan No No No Yes Comment: Comprehensive Emergency Management Plan Yes Yes No Yes Comment: Tomball is a signatory to the Harris County Plan Threat & Hazard Identification & Risk Assessment (THIRA) No No No Yes Comment: None located Post-Disaster Recovery Plan No No No Yes Comment: None located Continuity of Operations Plan Yes No No No Comment: In process Public Health Plan No Yes No Yes Comment: The City utilizes the services of Harris County PHES Table 26-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Community Development Department Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? No Table 26-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes (water and sanitary sewer) Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes Other Yes Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 26-6 Table 26-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Community Development Department Engineers or professionals trained in building or infrastructure construction practices Yes Community Development Department Planners or engineers with an understanding of natural hazards Yes Community Development Department Staff with training in benefit/cost analysis Yes Multiple City departments Surveyors Yes Available through on-call Personnel skilled or trained in GIS applications Yes Community Development Department, IT Department, Public Works Department, Fire Department Scientist familiar with natural hazards in local area Yes Multiple City departments Emergency manager Yes The Mayor is the Director of Emergency Management but appoints the Emergency Management Coordinator Grant writers Yes Multiple City departments Table 26-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No • If yes, briefly describe. Do you use social media for hazard mitigation education and outreach? Yes • If yes, briefly describe. The City uses its “Constant Contact” program to provide relevant information to the community. Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes • If yes, briefly describe. Tomball Area Local Emergency Planning Committee Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Tomball Fire Department operates a low power FM radio station that has been used to broadcast local conditions related to wide-spread. Additionally information is provided via CivicReady (Text/Email) and Social Media Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. KTTF-FM (low power FM radio) and Civic Ready community contact system City of Tomball 26-7 Table 26-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Community Development Who is your floodplain administrator? (department/position) Craig T. Meyers, PE, CFM, Community Development Director Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? 11/19/2007 Does your floodplain management program meet or exceed minimum requirements? Exceeds NFIP minimum standards • If exceeds, in what ways? When was the most recent Community Assistance Visit or Community Assistance Contact? Post Hurricane Harvey Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? • If so, state what they are. No Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? • If no, is your jurisdiction interested in joining the CRS program? No How many flood insurance policies are in force in your jurisdiction?a Unknown • What is the insurance in force? • What is the premium in force? How many total loss claims have been filed in your jurisdiction?a Unknown • How many claims are still open or were closed without payment? • What were the total payments for losses? Table 26-9. Community Classifications Participating? Classification Date Classified Community Rating System No Building Code Effectiveness Grading Schedule Yes 4 5/29/2014 Public Protection Yes 1 7/1/2003 Storm Ready No Fire Wise No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 26-8 Table 26-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Medium Comment: Jurisdiction-level monitoring of climate change impacts Medium Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Medium Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Medium Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Medium Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Tomball 26-9 26.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 26.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Tomball Comprehensive Plan – Vision 2030 – Land use and development goals • Major Thoroughfare Plan – Mobility Planning • Municipal Code – includes flood damage prevention requirements • Tomball Economic Development Corporation Strategic Plan – Job creating economic development guidelines for new business development • City of Tomball Building and Fire Codes • City Facilities Needs Assessment – current and future facilities recommendations • City of Tomball Infrastructure, Water, Wastewater and Drainage Master Plans – citywide infrastructure development plans • City of Tomball Strategic Plan – goals and objectives related to growth and providing services to meet the growth of the city 26.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Community Rating System • Storm Ready • Fire Wise 26.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 26-11 lists past occurrences of natural hazards for which specific damage was recorded in The City of Tomball. Other hazard events that broadly affected the entire planning area, including The City of Tomball, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 26-10 Table 26-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332DR 2017 N/A Severe storms and flooding (tax day) 4269 DR 2016 N/A Severe storms and flooding (Memorial Day) 4272 DR 2016 N/A Wildfire (Riley Road) FMAG 2964-FM 2011 N/A Hurricane Ike 1791 DR 2008 N/A Hurricane Rita 1606 DR 2005 N/A Hurricane Katrina Evacuation 3216 EM 2005 N/A Wildfire (Local impacts) N/A 2011 N/A 26.7 HAZARD RISK RANKING Table 26-12 presents a local ranking for The City of Tomball of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 26-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Flooding 18 Medium 3 Wildfire 17 Medium 4 Earthquake 14 Low 5 Drought 6 Low 6 Dam Failure 0 (No Exposure) None 6 Mass Movement 0 (No exposure) None 6 Tsunami 0 (No exposure) None 6 Coastal Erosion 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 26.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 26.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 14 • Number of FEMA-identified Severe-Repetitive-Loss Properties: None • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 2 City of Tomball 26-11 26.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Several areas of the city suffer from an urban drainage issue that results in localized flooding from minimal rain incidents. • The City Hall and Police Station share a generator that is not properly sized to support all operations of both facilities. • Several Neighborhoods may potentially experience little to no ingress/egress as a result of severe weather accompanied by a significant rain incident Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex: • Continue to seek grant opportunities to design, acquire right-of-way and construct expanded drainage facilities • Develop specifications and seek funding for a replacement generator • Continue to seek grant opportunities to design, acquire right-of-way and construct expanded drainage facilities. Continue to partner with Harris County on flood control projects 26.9 STATUS OF PREVIOUS PLAN ACTIONS Table 26-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. 26.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 26-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 26-15 identifies the priority for each action. Table 26-16 summarizes the mitigation actions by hazard of concern and mitigation type. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 26-12 Table 26-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update Implement a Community Fire Wise Program to educate people about the threat of wildfire; develop defensible space/buffer zones; remove fuel sources. X TOM1 Comment: Expand City Warning System, (Civic Ready Emergency Notification System), to include Alerts for the community’s population located within Flood Risk Areas; citizens will be able to sign into the system and include cell phone numbers and other methods of contact X Comment: Install flood-proofing to mitigate flood risk to critical infrastructure and public facilities. X Comment: Establish a site to be utilized as a Cooling Zone (Center). X Comment: City of Tomball Community Center Retrofit/Improve critical infrastructure facilities with positive ventilation systems X Comment: Protection of City Facilities windows and doors X Comment: Pre-cut plywood Expand early warning system, (Civic Plus Emergency Notification System), to increase alert capabilities and coverage for the public; the residents may enter their alternate contact information into the system to be alerted when away from home/businesses. X Comment: Develop/implement tree management program to minimize damages from potential debris X TOM5 Comment: Establish/Expand GIS Mapping/Identification of Pipeline Risk Areas in flood area. X TOM6 Comment: City of Tomball 26-13 Table 26-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action TOM1 — Implement a Community Fire Wise Program to educate people about the threat of wildfire in the Tomball area, develop defensible space/buffer zones; remove fuel sources. Hazards Mitigated: Wildfire Existing 9 Fire Department Public Works Low Staff Time, General Funds Short-term Action TOM2 — Complete the City’s Storm Water Drainage Plan to minimize the impact of future events by identifying efficient pathways to transport storm water away from the areas prone to flooding. Hazards Mitigated: Severe weather, Hurricane, Flood, Dam failure New and Existing 1, 4, 6, 7 Community Development Public Works High HMGP, CDBG, Staff Time, General Funds Ongoing Action TOM3 — Acquire rights-of-way necessary to construct the drainage channels identified in Action TOM2. Hazards Mitigated: Severe weather, Hurricane, Flood, Dam failure New and Existing 1, 4, 6, 7 Public Works Community Development High HMGP, CDBG, Staff Time, General Funds Ongoing Action TOM4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Severe weather, Hurricane, Flood, Dam failure New and Existing 1, 4, 6, 7 Community Development Public Works Low Staff Time, General Funds, HMGP Ongoing Action TOM5 — Develop/implement tree management program to minimize damages from potential debris. Tree trimming in public right- of-way to keep streets clear; coordinate with utility companies to remove tree limbs/trees from potential contact with power lines. Hazards Mitigated: Severe weather, Hurricane, Wildfire New and existing 6, 7, 9 Public Works Community Development Moderate Staff time, General Funds, HMGP Ongoing Action TOM6 — Expand the city’s GIS capabilities and mapping capacity to provide information from which to make better, more informed decisions. This would apply to flood hazard mapping and wildland urban interface projects. Hazards Mitigated: Severe weather, wildfire, hurricane, flooding New and Existing 4, 6, 7, 9 IT Public Works Low Staff time, general funds, HMGP Ongoing Action TOM7— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wildfire, Earthquake, Drought New and Existing 1, 3, 4, 5, 9, 10, 11, 15 City of Tomball HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 26-14 Table 26-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya TOM1 1 High Low Yes Yes Yes Low Medium TOM2 4 Medium High Yes Yes No Medium High TOM3 4 Medium High Yes Yes No High High TOM4 4 High Low Yes Yes Yes High Low TOM5 3 High Medium Yes Yes No Medium Medium TOM6 4 High Medium Yes Yes Yes High High TOM7 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 26-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather TOM1, 2, 3, 4, 5, 6, 7 TOM1, TOM1, 2, 3, 4, 5, 6, 7 TOM1, 2, 3, 4, 5, 6 TOM1, 2, 3, 4, 5, 6, 7 TOM1, 2, 3, 4 TOM1, 2, 3, 4, 5, 6, 7 Hurricane TOM1, 2, 3, 4, 5, 6, 7 TOM1, TOM1, 2, 3, 4, 5, 6, 7 TOM1, 2, 3, 4, 5, 6 TOM1, 2, 3, 4, 5, 6, 7 TOM1, 2, 3, 4 TOM1, 2, 3, 4, 5, 6, 7 Medium-Risk Hazards Flooding TOM1, 2, 3, 4, 5, 6, 7 TOM1, TOM1, 2, 3, 4, 5, 6, 7 TOM1, 2, 3, 4, 5, 6 TOM1, 2, 3, 4, 5, 6, 7 TOM1, 2, 3, 4 TOM1, 2, 3, 4, 5, 6, 7 Wildfire TOM1, 6, 7 TOM1 TOM1, 6, 7 TOM1, 6 TOM1, 6, 7 TOM1, 6, 7 Low-Risk Hazards Drought TOM7 TOM1 TOM1, 7 TOM1 TOM1, 7 TOM1, 7 Earthquake TOM7 TOM1, 7 TOM1, 7 TOM1, 7 a. See the introduction to this volume for explanation of mitigation types. 26.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for inclusion into the 2017 Multi-Jurisdiction Hazard Mitigation Plan. All of the below items were additionally reviewed as part of the full capability assessment for the City of Tomball. • Comprehensive Plan, Vision 2030 • Major Thoroughfare Plan • Municipal Code-includes flood damage prevention requirements • Capital Improvements Plan • Infrastructure Master Plan 2012-2022 • Water Master Plan City of Tomball 26-15 • Wastewater Master Plan • Master Drainage Plan 2012-2030 • FEMA FIRM • City of Tomball Strategic Plan 26.12 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY An active fault line crosses through the city on an east/west pathway north of Main Street (FM 2920). This geological anomaly has previously resulted in roadway and building damage. While not a priority, the potential of this phenomenon should be further explored to better understand the City and its resident’s exposure. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«249¬«249HoustonCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.450.90.225Miles±Tomball ¬«249 ¬«249 Houston FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.45 0.90.225 Miles ± Tomball ¬«249 ¬«249 Houston Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.45 0.90.225 Miles ± Tomball ¬«249 ¬«249 Houston 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.45 0.90.225 Miles ± Tomball ¬«249 ¬«249 Houston 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.45 0.90.225 Miles ± Tomball ¬«249 ¬«249 Houston Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.45 0.90.225 Miles ± Tomball ¬«249 ¬«249 Houston Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.45 0.90.225 Miles ± Tomball 27-1 27. CITY OF WEBSTER 27.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Dean Spencer, Acting Fire Chief/EMC 18300 Highway 3 Webster, Texas 77598 Telephone: 281-316-3744 E-mail Address: dspencer@websterfd.com Jason Myers, Shift Commander/ Deputy EMC 18300 Highway 3 Webster, Texas 77598 Telephone: 281-316-3751 e-mail Address: jmyers@websterfd.com 27.2 JURISDICTION PROFILE 27.2.1 Location Webster, a small city in terms of its square miles – just 6.7, but mighty in terms of commercial vibrancy – home to more than 2,200 businesses. Webster is positioned midway between downtown Houston and Galveston, and the last city in Harris County on the south end. 27.2.2 History In the early 1900s, a small farming community comprised of Japanese immigrants established rice farming as a key crop for the region. In addition to rice and fruit, dairies and livestock ranches abounded. In the 1930s, petroleum was discovered at the Webster-Friendswood Oilfield. Webster was incorporated in 1958, shortly before NASA (National Aeronautics and Space Administration) announced that it would build the Johnson Space Center (formerly called the Manned Space Center) in 1961. Naturally, NASA served as a catalyst to grow the City of Webster and the region. Webster has been home to many aerospace companies, including Ad Astra Rocket Company and Lockheed Martin’s Exploration Development Laboratory. Two of Webster’s growth industries have always been aerospace and medical. Webster became the “medical center of the south” with Houston as the “medical center of the north” beginning in 1972 with Clear Lake Regional Medical Center. Webster’s medical center accommodates a service area population exceeding more than 1,800,000 patients annually. With the opening of Bay Area Regional Medical Center in 2014, that number is anticipated to continually escalate. 27.2.3 Climate The climate of The City of Webster is classified as humid subtropical. Prevailing winds from the south and southeast bring heat from the deserts of Mexico and moisture from the Gulf of Mexico. Summer temperatures typically have highs near 90 °F (32 °C) though higher temperatures are not uncommon. The city’s proximity to the bay and the winds that it generates moderate the area’s temperatures and ease the effects of the humidity, creating a more pleasant climate than inland communities like Houston. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 27-2 Winters in the area are temperate with typical January high of 61 °F (16 °C) and lows near 42 °F (6 °C). Snowfall is rare. Annual rainfall averages exceed 49 inches (124 cm), with an annual average of 82 precipitation days. 27.2.4 Governing Body Format The City of Webster is governed by a seven-member city council. The City consists of 4 departments: Administration, Public Safety, Public Works, and Community Development. The City Council assumes responsibility for the adoption of this plan; the City Manager will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 27-1. Table 27-1. Local Mitigation Planning Team Members Name Title Dean Spencer Acting Fire Chief – EMC Jason Myers Shift Commander – Deputy EMC Donna Rogers Mayor Danny Presley City Manager Shannon Hicks Public Works Director Derhyl Hebert Community Development Director 27.3 CURRENT TRENDS 27.3.1 Population According to the U.S. Census, the population of Webster as of 2017 was 11,123. Since 2010, the population has grown at an average annual rate of 1.2 percent, though that rate is declining, with an annual average of only 0.8 percent since 2015. 27.3.2 Development Significant new development within Webster’s 6.7 square miles is transpiring within Project Genesis, the City’s northwest quadrant (Costco, Odyssey Park, Baybrook Commons), Project Destination Development, the City’s southeast quadrant (Academy, Top Golf, American Furniture Warehouse), and Edgewater (new commercial development that will begin in late 2019 amid 30 acres). Significant road projects include new arteries in Destination Development, along with Myrtle, Old Galveston Road, and the NASA One Bypass Extension. Webster features over 150 restaurants and entertainment venues — new entertainment and recreation venues that will open shortly include Urban Air Adventure Park, D-Bat, The Game Preserve — and underway in late 2019, AVA and Point Blank. Webster’s medical center and aerospace sectors are flourishing, as is the hospitality sector with the City’s 20th hotel poised to open in late 2109. Table 27-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. City of Webster 27-3 Table 27-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. • If yes, who currently has permitting authority over these areas? Are any areas targeted for development or major redevelopment in the next five years? Yes • If yes, briefly describe, including whether any of the areas are in known hazard risk areas Destination development How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 21 19 38 53 70 Multi-Family 0 1 0 1 1 Other (commercial, mixed use, etc.) 22 30 39 36 49 Total 43 50 77 90 120 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: # 0 • Landslide: # 0 • High Liquefaction Areas: # 0 • Tsunami Inundation Area: # 0 • Wildfire Risk Areas: # 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. Commercial 27.4 CAPABILITY ASSESSMENT The City of Webster performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 27-3. • Development and permitting capabilities are presented in Table 27-4. • An assessment of fiscal capabilities is presented in Table 27-5. • An assessment of administrative and technical capabilities is presented in Table 27-6. • An assessment of education and outreach capabilities is presented in Table 27-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 27-8. • Classifications under various community mitigation programs are presented in Table 27-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 27-10. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 27-4 Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 27.10 identifies these as community capacity building mitigation actions. Table 27-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No Yes Yes Comment: Code of Ordinances, Ch. 18 Buildings and Building regulations. Zoning Code Yes No No Yes Comment: Code of Ordinances, Ch. 98 Zoning Subdivisions Yes No No Yes Comment: Code of Ordinances, Ch. 78 Subdivisions Stormwater Management Yes Yes Yes Yes Comment: Code of Ordinances, Ch. 18 Div. 4 Storm water Post-Disaster Recovery Yes Yes No Yes Comment: Annex J – Recovery and post disaster permitting and code enforcement regulations. Real Estate Disclosure No No No No Comment: Growth Management Yes No Yes Yes Comment: Site Plan Review Yes No No Yes Comment: Code of Ordinances, Ch. Sec. 98-123. – Site plans requirements Environmental Protection Yes Yes No Yes Comment: Code of Ordinances, Ch.34 Environment Flood Damage Prevention Yes No Yes Yes Comment: Code of Ordinances, Ch. 42 – Floods article II Emergency Management Yes No Yes Yes Comment: Code of Ordinances, Ch. 2 Div. 10 – Civil Emergencies, Texas Government Code 418 Climate Change No Yes No Yes Comment: Planning Documents General Plan Yes No Yes Yes Comment: Comprehensive Plan 2015 Capital Improvement Plan Yes No No Yes How often is the plan updated? Comment: Annual Disaster Debris Management Plan Yes Yes No Yes Comment: Contract are review on an annual basis and the plan is reviewed every 5 years. Floodplain or Watershed Plan Yes Yes No Yes Comment: Code of Ordinances, Ch. 42 Div. 2 Stormwater Plan Yes Yes Yes Yes Comment: Habitat Conservation Plan No Yes No Yes Comment: Economic Development Plan Yes No No No Comment: Webster Economic Development Committee City of Webster 27-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Shoreline Management Plan No Yes No No Comment: Community Wildfire Protection Plan No Yes No No Comment: Forest Management Plan No Yes No Yes Comment: Climate Action Plan No No Yes No Comment: Comprehensive Emergency Management Plan Yes Yes No Yes Comment: Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes Yes Yes Comment: Annex P Post-Disaster Recovery Plan No Yes Yes Yes Comment: Continuity of Operations Plan No No Yes Yes Comment: Public Health Plan Yes No No Yes Comment: Table 27-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Building Department Does your jurisdiction have the ability to track permits by hazard area? Yes Does your jurisdiction have a buildable lands inventory? No Table 27-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants No Capital Improvements Project Funding No Authority to Levy Taxes for Specific Purposes No User Fees for Water, Sewer, Gas or Electric Service Yes Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas No State-Sponsored Grant Programs No Development Impact Fees for Homebuyers or Developers Yes Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 27-6 Table 27-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Community Development/City Planner Engineers or professionals trained in building or infrastructure construction practices Yes Public Works Planners or engineers with an understanding of natural hazards Yes Public Works Staff with training in benefit/cost analysis Yes Finance Department Surveyors No City contracts this out Personnel skilled or trained in GIS applications Yes Community Development/GIS Scientist familiar with natural hazards in local area No Emergency manager Yes Fire Dept./ OEM Grant writers No Table 27-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Not at this time • If yes, briefly describe. Do you use social media for hazard mitigation education and outreach? Yes, • If yes, briefly describe. We have an active Social media account managed by the PIO Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Social media, Swift 911 Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Swift 911 City of Webster 27-7 Table 27-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Building Department Who is your floodplain administrator? (department/position) Erich Penn/Building Official Are any certified floodplain managers on staff in your jurisdiction? Yes 2 What is the date that your flood damage prevention ordinance was last amended? 2007 Does your floodplain management program meet or exceed minimum requirements? Exceeds • If exceeds, in what ways? 1’ Freeboard Residential & Commercial 1’ above BFE When was the most recent Community Assistance Visit or Community Assistance Contact? 2017 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? No • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes/No • If so, what type of assistance/training is needed? Insert appropriate information Does your jurisdiction participate in the Community Rating System (CRS)? No • If yes, is your jurisdiction interested in improving its CRS Classification? No • If no, is your jurisdiction interested in joining the CRS program? Yes How many flood insurance policies are in force in your jurisdiction?a 1227 • What is the insurance in force? $605,836 • What is the premium in force? $494 (average) How many total loss claims have been filed in your jurisdiction?a • How many claims are still open or were closed without payment? • What were the total payments for losses? $0 a. According to FEMA statistics as of September 25, 2018 Table 27-9. Community Classifications Participating? Classification Date Classified Community Rating System No Building Code Effectiveness Grading Schedule Yes 4 1/19 Public Protection Yes ISO1 2017 Storm Ready Yes 2017 Firewise No Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 27-8 Table 27-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. City of Webster 27-9 27.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 27.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Basic Plan – The Basic Plan provides a summary on the hazards and threats in the community. • Annex P – Hazard Mitigation is assigned to the Community Development Department and addresses the hazards and threats in the community. The Annex also identifies the various hazard mitigation related programs implemented in the City of Webster and which agencies are responsible for administration. 27.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Capital Improvement Plan – The City of Webster updates the CIP on an annual basis and can integrate the goals, objectives, and projects identified in the Hazard Mitigation Action Plan into the CIP process. • Comprehensive Plan — The Planning and Development Department will develop a new overall plan to document existing conditions and establish goals to replace the existing plan. • Downtown Revitalization Plan – The NASA Parkway Revitalization Plan provides a vision and a series of recommendations that are consistent with the principles of the updated Comprehensive Plan. The recommendations focus on amendments to the City’s development ordinances, but also include potential incentives that can be built into a revised code, and a list of City-initiated action items. Together, these tools provide a well-rounded approach to facilitate continued economic growth, aesthetic enhancement, and civic pride in the NASA Parkway corridor. 27.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 27-11 lists past occurrences of natural hazards for which specific damage was recorded in The City of Webster. Other hazard events that broadly affected the entire planning area, including The City of Webster, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 27-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 $2,326,000.00 Hurricane Ike 1791 DR 2008 $12,000,000.00 27.7 HAZARD RISK RANKING Table 27-12 presents a local ranking for The City of Webster of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 27-10 jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 27-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Flooding 36 High 3 Wildfire 14 Low 3 Earthquake 14 Low 4 Drought 6 Low 4 Mass Movement 6 Low 5 Dam Failure 0 (No exposure) None 5 Tsunami 0 (No exposure) None 5 Coastal Erosion 0 (No exposurte) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 27.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 27.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 25 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 1 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated:1 27.9 STATUS OF PREVIOUS PLAN ACTIONS Table 27-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. 27.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 27-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 27-15 identifies the priority for each action. Table 27-16 summarizes the mitigation actions by hazard of concern and mitigation type. City of Webster 27-11 Table 27-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2010WEBSTR001. Adoption of higher standards/latest edition of building codes, zoning/city/storm water ordinances to limit development in flood area for mitigation of flood hazards. X WB005 Comment: In Process 2010WEBSTR002. Expand current flood warning system(s), Blackboard Connect CTY Mass Notification, to provide coverage to the community’s population located in flood areas. X WB06 Comment: Phase I Complete Phase II in progress 2010WEBSTR004. Adoption of higher standards/latest edition of building codes, zoning/city/storm water ordinances for mitigation of Coastal flood hazards. X Comment: Complete 2010WEBSTR005. Harden critical infrastructure facilities to withstand high wind and hail damage. X WB07 Comment: Phase I complete, moved EOC to new fire station, Phase II in progress 2010WEBSTR006. Implement tree management program to limit debris damage to critical infrastructure, public facilities from falling tree canopy. X Comment: Complete 2010WEBSTR007. Installation of generators / power back-up systems at critical facilities. X Comment: Complete 2010WEBSTR008. Adoption of higher standard/latest edition building codes to require tie-downs for manufactured homes to reduce damages to mobile homes X Comment: 2010WEBSTR009. Expand early warning system alert capabilities, Blackboard Connect CTY Mass Notification System, to include IPAWS and expand coverage to public/private schools and colleges. X Comment: Adopted new mass communication system, Swift911. No longer use Blackboard Connect CTY. IPAWS is included in Swift911. 2010WEBSTR010. Expand community early warning system, Connect CTY Mass Notification System, to integrate IPAWS and increase coverage to the general public. X Comment: Adopted new mass communication system, Swift911. No longer use Blackboard Connect CTY. Swift911 includes IPAWS. 2010WEBSTR011. Install lightning and surge protection systems for critical infrastructure. X Comment: Complete 2010WEBSTR012 X Comment: In Process 2010WEBSTR013 X Comment: Complete – The city civic center will serve as cooling center with backup power Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 27-12 Table 27-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action WB01 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: flooding, severe weather, hurricane Existing 3, 4, 10 EM Planning High HMGP, PDM, FMA Short-term Action WB02 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including the surrounding areas Hazards Mitigated: flooding, hurricane, severe weather New and Existing 1, 3, 4, 5, 7, 8, 10 Planning EM Low Staff Time, General Funds Ongoing Action WB03 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wildfire, Earthquake, Drought, Mass Movement New and Existing 1, 5, 8 EM Head of Departments Low Staff Time, General Funds Short-term Action WB04 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: flooding, severe weather, hurricane New and Existing 1, 3, 5, 7, 8, 10 EM Planning Low Staff Time, General Funds Ongoing Action WB05 — Adoption of higher standards/latest edition of building codes, zoning/city/storm water ordinances to limit development in flood area for mitigation of flood hazards. Hazards Mitigated: Flooding Existing 12,14 Planning EM Low Staff Time, General Funds Short term Action WB06 — Expand current flood warning system(s), Blackboard Connect CTY Mass Notification, to provide coverage to the community’s population located in flood areas. Hazards Mitigated: Flooding, Hurricane, Severe weather Existing 1 EM TBD Low Staff Time, General Funds Short term Action WB07 — Harden critical infrastructure facilities to withstand high wind and hail damage. Hazards Mitigated: Severe weather, hurricane Existing 6, 11, 13 PW EM High General and Grant Funds Long term Action WB08— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wildfire, Earthquake, Drought, Mass Movement New and Existing 1, 3, 4, 5, 9, 10, 11, 15 City of Tomball HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. City of Webster 27-13 Table 27-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya WB01 3 High High Yes Yes No Medium High WB02 7 Medium Low Yes No Yes High Low WB03 3 Low Low Yes No Yes High Low WB04 6 Medium Low Yes No Yes High Low WB05 2 Medium Low Yes No Yes Medium Low WB06 1 High Low Yes No Yes High Low WB07 3 High High Yes Yes No High High WB08 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 27-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe weather WB1, 8 WB1 WB4, 6, 8 WB08 WB1,7 WB2, 3, 4, 8 Hurricane WB1, 8 WB1 WB4, 6, 8 WB08 WB1,7 WB2, 3, 4, 8 Flooding WB1,5, 8 WB1,5 WB4, 6, 8 WB08 WB1,5 WB2, 3, 4, 5, 8 Low-Risk Hazards Wildfire WB08 WB08 WB08 WB 3, 8 Earthquake WB08 WB08 WB08 WB 3, 8 Drought WB08 WB08 WB08 WB 3, 8 Mass Movement WB08 WB08 WB08 WB 3, 8 a. See the introduction to this volume for explanation of mitigation types. 27.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX 27.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • The City of Webster Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • The City of Webster Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • City of Webster Code of Ordinances Chapter 42 The following outside resources and references were reviewed: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 27-14 • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. 27.11.2 Staff and Local Stakeholder Involvement in Annex Development This annex was developed over the course of several months with input from many city departments including Public Works, Community Development, Emergency Management, Fire, and Finance. All departments were asked to contribute to the annex development through reviewing and contributing to the capability assessment, reporting on the status of previously identified actions, and participating in action identification and prioritization. Additional Comments !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«3¬«3¬«3§¨¦45§¨¦45HoustonHoustonFriendswoodFriendswoodLeague CityNassau BayCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.30.60.15Miles±Webster ¬«3 ¬«3 ¬«3 §¨¦45 §¨¦45 Houston Houston Friendswood Friendswood League City Nassau Bay FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.3 0.60.15 Miles ± Webster ¬«3 ¬«3 ¬«3 §¨¦45 §¨¦45 Houston Houston Friendswood Friendswood League City Nassau Bay Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.3 0.60.15 Miles ± Webster ¬«3 ¬«3 ¬«3 §¨¦45 §¨¦45 Houston Houston Friendswood Friendswood League City Nassau Bay 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.3 0.60.15 Miles ± Webster ¬«3 ¬«3 ¬«3 §¨¦45 §¨¦45 Houston Houston Friendswood Friendswood League City Nassau Bay 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.3 0.60.15 Miles ± Webster ¬«3 ¬«3 ¬«3 §¨¦45 §¨¦45 Houston Houston Friendswood Friendswood League City Nassau Bay Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.3 0.60.15 Miles ± Webster ¬«3 ¬«3 ¬«3 §¨¦45 §¨¦45 Houston Houston Friendswood Friendswood League City Nassau Bay Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.3 0.60.15 Miles ± Webster 28-1 28. CITY OF WEST UNIVERSITY PLACE 28.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Aaron Taylor, Fire Chief/ EMC 3800 University Blvd. West University Pl., TX 77005 Telephone: 713-662-5836 e-mail Address: ataylor@westutx.gov James Novak, Fire Marshal 3800 University Blvd. West University Pl., TX 77005 Telephone: 713-662-5837 e-mail Address: jnovak@westutx.gov 28.2 JURISDICTION PROFILE 28.2.1 Location West University Place is located in Harris County, Texas within the Houston metropolitan area. The City of West University Borders the City of Houston, The City of Bellaire and The City of Southside Place. The City boundaries generally extend from Bellaire Blvd./ W. Holcombe north to Bissonnet and from Kirby Drive west to Community Dr. encompassing an area of 2.2 Sq. Miles. 28.2.2 History City of West University Place was incorporated in 1924. Origins The idea for a community of country homes in the area that is now West University Place was conceived in 1910 by Ben W. Hooper, then Governor of Tennessee. That year, Governor Hooper bought a tract of land southwest of Houston out of an old Spanish land grant, which had been surveyed by A.C. Reynolds. Lots for Sale The Houston West End Realty Company, A.D. Foreman, President, developed today’s West University Place 1st addition and put the 1st lots up for sale on April 1, 1917. Naming the Area The area’s proximity to Rice University led to the name West University Place. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 28-2 Early Problems Utilities When the City of Houston decided not to invest in utility lines to service the tiny community with an uncertain future, Foreman spent $100,000 of his own earnings to bring electrical, water and telephone service to West University Place. Still, in 1923 there were only 40 families living in the muddy, poorly drained swamp. Housing Costs In those early days, a 100 foot by 200 foot lot cost $1,000 and houses were required to cost a minimum of $2,500. Homes facing Buffalo Speedway and Bellaire Boulevard were required to cost $4,000 and $5,000 respectively. Infrastructure Improvements Residents dissatisfied with muddy streets, poor drainage, and the absence of schools and fire protection joined in a series of town meetings, resulting in the incorporation of the City in 1924. For 6 years, city fathers put the creation of an infrastructure above all other conveniences by building streets and providing various services such as: • Garbage collection • Natural gas supply • Police and fire protection • Postal delivery • Sewage disposal • Water supply Wier Park The pragmatism of the city’s early residents resulted in the development of our 1st park, Wier Park, at Belmont and Sunset, in 1930. With most of our park land donated to the city by early residents and developers, West U continues to take pride in the greenery and open recreational space offered at 6 developed parks in existence today. Expansion of our largest park, Colonial Park, continues with the acquisition of surrounding lots. City Charter In 1939, the City exhibited confidence in its own political maturity and the character of its citizens by refusing to consolidate with its larger, powerful neighbor, the City of Houston. The confidence was solidified in adoption of the 1st City Charter in 1940. Progress Over the years, the City has progressed steadily toward its present position as one of the area’s most desirable neighborhoods. Civic-minded citizens and small-town government, combined with a proximity to major business, educational, cultural, and scientific centers, have contributed to a steady increase in property values. 28.2.3 Climate West University Place, Texas gets 52 inches of rain, on average, per year. The US average is 39 inches of rain per year. West University Place averages 0 inches of snow per year. The US average is 26 inches of snow per year. On average, there are 205 sunny days per year in West University Place. The US average is 205 sunny days. • Summer High: the July high is around 92 degrees • Winter Low: the January low is 45 City of West University Place 28-3 Sperling’s Comfort Index for West University Place is a 76 out of 100. A higher score indicates a more comfortable year-round climate. The US average for the comfort index is 54. Our index is based on the total number of days annually within the comfort range of 70-80 degrees, and we also applied a penalty for days of excessive humidity. West University Place gets some kind of precipitation, on average, 66 days per year. 28.2.4 Governing Body Format The City of West University Place is a home rule City with a Council-Manager form of government. The City Council consist of a Mayor and four council members. The City Council appoints a City Manager to oversee the daily operations of the City. The City consist of 6 departments: Administration, Finance, Fire, Police, Public Works, Parks and Recreation. The City Council assumes responsibility for the adoption of this plan; the City Manager will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 28-1. Appropriate staff members were instructed to fill out the sections that applied to them. Table 28-1. Local Mitigation Planning Team Members Name Title Aaron Taylor Fire Chief/ EMC James Novak Fire Marshal/ Asst. Chief Dave Beach Public Works Director/ ACM Clay Chew Chief Building Official 28.3 CURRENT TRENDS 28.3.1 Population According to The U.S. Census Bureau, the population of West University Place, Texas as of July 1, 2017 was 15,608. Since 2010, the population has grown at an average annual rate of 7.2% percent. 28.3.2 Development Anticipated development levels for West University Place are low to moderate, consisting of primarily residential development. The vast majority of recent development has been infill. Residentially, there has been a focus on upscale housing units with large increases in square footage. The number of residential new construction permits are: • November 2018 YTD: 59 • 2017 Totals: 47 • 2016 Totals: 38 • 2015 Totals: 58 • 2014 Totals: 67 • 2013 Totals: 63 Table 28-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 28-4 Table 28-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No • If yes, give the estimated area annexed and estimated number of parcels or structures. Is your jurisdiction expected to annex any areas during the performance period of this plan? No • If yes, describe land areas and dominant uses. • If yes, who currently has permitting authority over these areas? Are any areas targeted for development or major redevelopment in the next five years? No • If yes, briefly describe, including whether any of the areas are in known hazard risk areas How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family 67 58 38 47 59 Multi-Family 0 0 0 0 0 Other (commercial, mixed use, etc.) 1 1 0 0 0 Total 68 59 38 47 59 Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: 33 • Landslide: 0 • High Liquefaction Areas: 0 • Tsunami Inundation Area: 0 • Wildfire Risk Areas: 0 Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. West University Place is fully developed 28.4 CAPABILITY ASSESSMENT The City of West University Place performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 28-3. • Development and permitting capabilities are presented in Table 28-4. • An assessment of fiscal capabilities is presented in Table 28-5. • An assessment of administrative and technical capabilities is presented in Table 28-6. • An assessment of education and outreach capabilities is presented in Table 28-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 28-8. • Classifications under various community mitigation programs are presented in Table 28-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 28-10. City of West University Place 28-5 Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 28.10 identifies these as community capacity building mitigation actions. Table 28-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes No Yes Yes Comment: Appendix C of the Code of Ordinances Zoning Code Yes No No Yes Comment: Appendix A of the Code of Ordinances Subdivisions Yes No No Yes Comment: Chapter 74 of the Code of Ordinances Stormwater Management Yes Yes Yes Yes Comment: Stormwater Management Plan is completed every 5 year and submitted to the TCEQ. Post-Disaster Recovery Yes No Yes No Comment: Debris Hauling and Debris Monitoring contracts are in place. Real Estate Disclosure No No Yes No Comment: Don’t have a local requirement for it but the state does and that affects the realtors here. Growth Management No No No No Comment: No Growth in West U Site Plan Review Yes No No No Comment: Chapter 18 of the Code of Ordinances Environmental Protection No Yes Yes No Comment: Harris County Public Health Flood Damage Prevention Yes Yes Yes Yes Comment: Integration opportunity with HCFCD Emergency Management Yes No Yes Yes Comment: (Ord. No. 1850, § 6, 8-13-07) Signatory city under the Harris County EM Plan Climate Change No No No No Comment: Planning Documents General Plan No No No No Comment: Capital Improvement Plan Yes No No Yes How often is the plan updated? Comment: Annually Disaster Debris Management Plan Yes No No No Comment: Contract is in place to handle debris Floodplain or Watershed Plan No Yes Yes Yes Comment: Braes Bayou Watershed managed by HCFCD Stormwater Plan Yes Yes Yes Yes Comment: Stormwater Management Plan and SWPPP Urban Water Management Plan No No Yes No Comment: Habitat Conservation Plan No No No No Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 28-6 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Economic Development Plan No No No No Comment: City is built out Shoreline Management Plan No No No No Comment: No shoreline here Community Wildfire Protection Plan No No No No Comment: No forests Forest Management Plan No No No No Comment: Climate Action Plan No No No No Comment: Comprehensive Emergency Management Plan Yes Yes Yes Yes Comment: (Ord. No. 1850, § 6, 8-13-07) Signatory city under the Harris County EM Plan Threat & Hazard Identification & Risk Assessment (THIRA) No No No No Comment: Post-Disaster Recovery Plan Yes No Yes Yes Comment: Contracts in place for debris hauling and debris monitoring. Plan reviewed annually Continuity of Operations Plan Yes No No No Comment: Updated March 2019 Public Health Plan No No No No Comment: Table 28-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes • If no, who does? If yes, which department? Public Works – Development Services Division Does your jurisdiction have the ability to track permits by hazard area? No Does your jurisdiction have a buildable lands inventory? No Table 28-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes (Water, Sewer, Solid Waste Collection, Permits) Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes City of West University Place 28-7 Table 28-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes City Planner/Building Official Engineers or professionals trained in building or infrastructure construction practices Yes PW Director, Asst. PW Director, Operations Superintendent, Chief Building Official, Planner Planners or engineers with an understanding of natural hazards Yes (outsourced) Staff with training in benefit/cost analysis Yes Assistant Public Works Director Surveyors Yes (outsourced) Personnel skilled or trained in GIS applications Yes City Information Technology Department Scientist familiar with natural hazards in local area No Emergency manager Yes Fire Chief Grant writers Yes Contracted with DCMC Partners for mitigation grant writing and management Table 28-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No • If yes, briefly describe. Do you use social media for hazard mitigation education and outreach? Yes – Issue dependent • If yes, briefly describe. Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, briefly describe. Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, briefly describe. Swift911 Mass Notification System Do you have any established warning systems for hazard events? Yes • If yes, briefly describe. Swift911 Mass Notification System Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 28-8 Table 28-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Public Works – Development Services Who is your floodplain administrator? (department/position) Clay Chew – Chief Building Official Are any certified floodplain managers on staff in your jurisdiction? Yes What is the date that your flood damage prevention ordinance was last amended? 2018 Does your floodplain management program meet or exceed minimum requirements? Exceeds • If exceeds, in what ways? 24 inch Freeboard Requirement Article IX Flood Damage Prevention When was the most recent Community Assistance Visit or Community Assistance Contact? CAV November 13, 2018 Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No • If so, state what they are. Are any RiskMAP projects currently underway in your jurisdiction? No • If so, state what they are. Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes • If no, state why. Does your floodplain management staff need any assistance or training to support its floodplain management program? No • If so, what type of assistance/training is needed? Does your jurisdiction participate in the Community Rating System (CRS)? Yes • If yes, is your jurisdiction interested in improving its CRS Classification? Yes • If no, is your jurisdiction interested in joining the CRS program? How many flood insurance policies are in force in your jurisdiction?a 3358 • What is the insurance in force? $1,644,530 • What is the premium in force? $490.00 How many total loss claims have been filed in your jurisdiction?a Zero • How many claims are still open or were closed without payment? Zero • What were the total payments for losses? $3,441,439 a. According to FEMA statistics as of June 30, 2018 Table 28-9. Community Classifications Participating? Classification Date Classified Community Rating System Yes 7 2019 Building Code Effectiveness Grading Schedule Yes 4/4 2014 Public Protection Yes Class 1 02/01/2015 Storm Ready No Firewise No City of West University Place 28-9 Table 28-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Medium Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 28-10 28.5 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 28.5.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Harris County Flood Control District — Floodplain/Watershed Management • Harris County Office of Emergency Management and Homeland Security – Emergency Management Program • City of West University – Community Improvement Plan(Capital Improvement Plan) 28.5.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Zoning Code – To integrate mitigation measures identified in the plan into future zoning considerations. 28.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 28-11 lists past occurrences of natural hazards for which specific damage was recorded in The City of West University Place. Other hazard events that broadly affected the entire planning area, including West University Place, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. 28.7 HAZARD RISK RANKING Table 28-12 presents a local ranking for The City of West University Place of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. 28.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. City of West University Place 28-11 Table 28-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Severe Storms N/A April 7 2019 Severe Storms and high winds damaged several residential properties and required activation of debris hauler to clear vegetation from public right of way. Damage estimated at $100,000 Hurricane Harvey DR 4332 2017 Estimated $500,000 in Public Assistance, Damage assessment cost to private property unknown. Severe Storms/Flooding DR 4269 2016 N/A Severe Storms/Flooding DR 4223 2015 N/A Hurricane Ike EM 3294 2008 N/A Hurricane Gustav EM 3290 2008 N/A Tropical Storm Erin DR 1730 2007 N/A Hurricane Dean EM 3277 2007 N/A Hurricane Rita EM 3261 2005 N/A Hurricane Katrina EM 3216 2005 N/A Tropical Storm Allison DR 1379 2001 N/A Severe Storms/Flooding SBA 3259 2000 N/A Severe Storms/ Flooding DR 1257 1998 N/A Tropical Storm Frances DR 1245 1998 N/A Severe Storms/Flooding DR 1041 1994 N/A Severe Storms/Tornado SBA 8253 1994 N/A Severe Storms/Tornado DR 970 1992 N/A Table 28-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 2 Hurricane 32 High 3 Flooding 22 Medium 4 Earthquake 14 Low 5 Drought 6 Low 5 Mass Movement 6 Low 6 Dam Failure 0 (No Exposure) None 6 Wildfire 0 (No Exposure None 6 Tsunami 0 (No Exposure) None 6 Coastal Erosion 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 28.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: 35 • Number of FEMA-identified Severe-Repetitive-Loss Properties: 3 • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 1 Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 28-12 28.9 STATUS OF PREVIOUS PLAN ACTIONS Table 28-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 28-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Improvements to storm water drainage system in the 3800 block from University Blvd. south to Bellaire Blvd. The Auden Street Drainage Improvements limits are on Auden Street from University Blvd. to Bellaire Blvd. The improvements consist of storm sewer improvements ranging from 42” RCP to 72” RCP and the replacement of 1/2 curb and gutter concrete street. No X WUP-11 Comment: Raising concrete walls around head works at the wastewater treatment plant to mitigate future flood water inundation. Currently the headworks is below base flood elevation allowing flood water to overtop the walls and inundate the headworks, raising the walls would reduce the likelihood of shut down due to flood waters. No X Comment: This action item has been revised to allow additional mitigation options for the facility. The new action item is WUP-6. Ruffino Hills Flood Detention – The City owns approximately 75 acres of land near the I-69 South/BW 8 interchange (adjacent to approximately another 75 acre tract owned by the City of Bellaire) that could be used for flood control detention space. The site operated as a landfill from 1959 to Jan 1992. This site is adjacent to Keegans Bayou which is one of the largest contributors of water to the Brays Bayou. Both cities are proposing to use their 75 acres toward flood mitigation for a total of 150 acres. The proposed regional detention facility will provide up to 1,770 acre-feet of storage, allowing storm water to be diverted out of Keegans Bayou and reducing storm flow rates in the lower reaches of that stream and along Brays Bayou downstream of the Keegans Bayou confluence. Preliminary modeling results indicate that 100-year (1% chance) flow rates along Keegans may be reduced by as much as 1,800 cubic feet per second, while Brays Bayou flow rates may be reduced by as much as 1,500 cubic feet per second. This project represents a regional drainage solution that will benefit the City of West University Place, the City of Bellaire, the City of Houston, and unincorporated areas within Harris County. Potential stakeholders and project participants include those entities as well as the Harris County Flood Control District. No X Comment: This action item is being removed and replaced with a broader action item to allow pursuit of detention space in more than one location. The new related action item is WUP-7. Reduce the potential for wildfires along the Union Pacific rail line through improved control of vegetation adjacent to the railroad tracks. No X Comment: Existing action item removed due to a change in community priorities. Expand mass notification warning systems to notify residents of impending dangers and increase coverage of the community’s population. Yes X Comment: Completed in 2015 Installation of emergency generator at the West University/Harris County Public Library to ensure continuity of operation for warming/cooling center. No X Comment: Existing action item removed due to a change in community priorities. City of West University Place 28-13 Removed; Carried Over to Plan Update Action Item Completed No longer Feasible Check if Yes Action # in Update Home Elevations – 10 homes or less; raise elevation of repetitive loss structures above base flood elevation. The City is interested in assisting interested residents in mitigating flood risk of existing structures by raising the foundation above base flood elevation. Specific mitigation sites have not yet been identified. No X Comment: Existing action item removed due to Action Item WUP-1 addressing retrofitting to include home elevations. Improvements to storm water drainage along the Buffalo Speedway Corridor from Bellefontaine Street in Houston north through West University Place and continuing up to the south ROW for the Interstate 69 corridor at Buffalo Speedway and including areas east and west of this described corridor to extend the drainage area by adding a 2nd 66 inch monolithic concrete pipe in addition to replacing the existing 66 in monolithic concrete pipe. No X WUP-10 Comment: Carried over to plan update. The City has applied for HMGP and CDBG-DR grant funding for the project. Engineering contract has been awarded. Improve Ruskin Street storm water drainage infrastructure by installing new roadway with improved curb and gutters. Install underground piping to increase underground detention capacity. Will include installation of additional inlets and catch basins. Yes X Comment: Completed in 2015 Adopt latest edition and higher standard Building Codes, Zoning / City / Storm Water Ordinances for Mitigation of Riverine Flood Hazards. Yes X Comment: Completed in 2018. Ongoing. This action item has been modified and titled WUP-9 in the plan update. Develop/implement and harden an alternative ground-water source to limit the damages of water shortages caused by drought Yes X Comment: Completed in 2016; Develop/implement tree management program to reduce potential debris damages from high-wind and canopy crown-fires. Yes X Comment: Completed in 2018. Tree Management and Debris reduction are also addressed in WUP-2 in the plan update. Develop/implement hail public education program to educate the public on hail hazards and appropriate actions to take to reduce hail damages to property. No X Comment: Not currently a priority for the City. Establish / Expand GIS Mapping / Identification of Pipeline Risk Areas. No X Comment: Existing action item removed due to a change in community priorities. Conduct Pipeline Awareness Training & Pre-Planning for Local Responders. Yes X Comment: Completed 28.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 28-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 28-15 identifies the priority for each action. Table 28-16 summarizes the mitigation actions by hazard of concern and mitigation type. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 28-14 Table 28-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action WUP1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Severe Weather, Hurricane, Flooding Existing 3, 4, 10, 11, 12 West University Place – EMC West University Place – Public Works High HMGP, PDM, FMA Short- term Action WUP2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including Zoning Ordinances. Hazards Mitigated: Severe Weather, Hurricane, Flooding New and Existing 1, 3, 4, 5, 7, 8, 9, 10 West University Place – Public Works West University Place – EMC Low Staff Time, General Funds Ongoing Action WUP3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Mass Movement New and Existing 1, 5, 8 West University Place – EMC West University Place – Hazard Mitigation Planning Team Low Staff Time, General Funds Short- term Action WUP4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Severe Weather, Hurricane, Flooding New and Existing 1, 3, 5, 7, 10, 15 West University Place – Public Works Chief Building Official Low Staff Time, General Funds Ongoing Action WUP5 — Improvements to storm water drainage system in planning areas 1-12 as outlined in the 2019 Citywide Drainage Study to increase capacity and reduce flood hazard. Hazards Mitigated: Severe Weather, Hurricane, Flooding New and Existing 3, 4, 7, 11, 12 West University Place – Public Works High HMGP, PDM, FMA Long Term Action WUP6 — Enhance flood water protection for the City’s Wastewater Treatment Plant to reduce the likelihood of shut down due to flood waters. Hazards Mitigated: Severe Weather, Hurricane, Flooding New and Existing 3, 4, 7, 9, 10, 11, 13, 15 West University Place – Public Works Medium HMGP, PDM, FMA Short Term Action WUP7 — Coordinate with Harris Flood Control District to obtain flood water detention space within the Brays Watershed to reduce the likelihood of flooding. Hazards Mitigated: Severe Weather, Hurricane, Flooding New 3, 4, 11, 12, 14, 15 West University Place – Public Works High HMGP, PDM, FMA Short Term Action WUP8 — Seek opportunities to relocate above ground utilities to harden infrastructure and reduce impacts of severe weather events and/or disruption of City services. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake New and Existing 4, 11, 13 West University Place – Public Works High HMGP, PDM, FMA Long Term City of West University Place 28-15 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action WUP9 — Adopt latest edition and higher standard Building Codes, Zoning / City / Storm Water Ordinances for Mitigation of Flood Hazards. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake New and Existing 3, 4, 7, 9, 10, 11, 12, 14, 15 West University Place- Public Works Low Staff Time, General Funds Ongoing Action WUP10 — Improvements to storm water drainage along the Buffalo Speedway Corridor from Bellefontaine Street in Houston north through West University Place and continuing up to the south ROW for the Interstate 69 corridor at Buffalo Speedway and including areas east and west of this described corridor to extend the drainage area by adding a 2nd 66 inch monolithic concrete pipe in addition to replacing the existing 66 in monolithic concrete pipe Hazards Mitigated: Severe Weather, Hurricane, Flooding New and Existing 3, 4, 9, 10, 11, 13 West University Place – Public Works High HMGP, PDM, FMA, CDBG-DR, Municipal Bonds Short Term Action WUP11 — Improvements to storm water drainage system in the 3800 block from University Blvd. south to Bellaire Blvd. The Auden Street Drainage Improvements limits are on Auden Street from University Blvd. to Bellaire Blvd. The improvements consist of storm sewer improvements ranging from 42” RCP to 72” RCP and the replacement of 1/2 curb and gutter concrete street. Hazards Mitigated: Severe Weather, Hurricane, Flooding New and Existing 3, 4, 9, 10, 11, 13 West University Place – Public Works High HMGP, PDM, FMA, CDBG-DR, Municipal Bonds Short Term Action WUP12 — Academy Street Drainage – Improvements to storm water drainage system in the 4100 block from Bissonnet St. south to the discharge for Academy trunk line to reduce the likelihood of flooding. Hazards Mitigated: Severe Weather, Hurricane, Flooding New and Existing 3, 4, 9, 10, 11, 13 West University Place – Public Works High HMGP, PDM, FMA, CDBG-DR, Municipal Bonds Long Term Action WUP13 – Coordinate with Harris County Flood Control District and the City of Southside Place to improve storm water drainage and increase capacity along the drainage easement containing Poor Farm Ditch to reduce the likelihood of flooding. Hazards Mitigated: Severe Weather, Hurricane, Flooding New and Existing 3, 4, 7, 10, 11, 15 Harris County Flood Control District West University Place, Southside Place High HMGP, PDM, FMA, CDBG-DR, Municipal Bonds Short Term Action WUP14— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Mass Movement New and Existing 1, 3, 4, 5, 9, 10, 11, 15 City Administration HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 28-16 Table 28-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya WUP1 5 High High Yes Yes No Medium High WUP2 8 Medium Low Yes No Yes High Low WUP3 3 Low Low Yes No Yes High Low WUP4 6 Medium Low Yes No Yes High Low WUP5 5 High High Yes Yes No Medium High WUP6 8 High Medium Yes Yes No Medium High WUP7 6 High High Yes Yes No Medium High WUP8 3 High High Yes Yes No Low Medium WUP9 9 Medium Low Yes No Yes High Low WUP10 6 High High Yes Yes No Medium High WUP11 6 High High Yes Yes No Medium High WUP12 6 High High Yes Yes No Medium High WUP13 6 High High Yes Yes No Medium High WUP14 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 28-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather WUP-1, 3, 4, 9, 14 WUP-1, 5, 6, 7, 8, 10, 11, 12, 13 WUP-2, 3, 4, 5, 14 WUP-6 WUP-5, 6, 7, 8, 10, 11, 12, 13, 14 WUP-5, 6, 7, 10, 11, 12, 13 WUP-9 WUP-2, 3, 9, 14 Hurricane WUP-1, 3, 4, 9, 14 WUP-1, 5, 6, 7, 8, 10, 11, 12, 13 WUP-2, 3, 4, 5, 14 WUP-6 WUP-5, 6, 7, 8, 10, 11, 12, 13, 14 WUP-5, 6, 7, 10, 11, 12, 13 WUP-9 WUP-2, 3, 9, 14 Medium-Risk Hazards Flood WUP-1, 3, 4, 9, 14 WUP-1, 5, 6, 7, 8, 10, 11, 12, 13 WUP-2, 3, 4, 5, 14 WUP-6 WUP-5, 6, 7, 8, 10, 11, 12, 13, 14 WUP-5, 6, 7, 10, 11, 12, 13 WUP-9 WUP-2, 3, 9, 14 Low-Risk Hazards Mass Movement WUP-1, 3, 4, 9, 14 WUP-1, 5, 6, 7, 8, 10, 11, 12, 13 WUP-2, 3, 4, 5, 14 WUP-6 WUP-5, 6, 7, 8, 10, 11, 12, 13, 14 WUP-5, 6, 7, 10, 11, 12, 13 WUP-9 WUP-2, 3, 9, 14 Earthquake WUP14 WUP14 WUP14 WUP14 Drought WUP14 WUP14 WUP14 WUP14 a. See the introduction to this volume for explanation of mitigation types. City of West University Place 28-17 28.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • City of West University Place Municipal Code — The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • City of West University Place Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • City of West University Place – Citywide Drainage Study • City of West University Place – Community Improvement Plan The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • FEMA Disaster History Data, CRS & NFIP requirements. !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(§¨¦69§¨¦69HoustonBellaireSouthsidePlaceCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.150.30.075Miles±West University Place §¨¦69 §¨¦69 Houston Bellaire Southside Place FEMA Flood Hazard 1% Annual Chance Flood (100-yr) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± West University Place §¨¦69 §¨¦69 Houston Bellaire Southside Place Hurricane Alicia (1983) Peak WInd Gust (mph) 87 - 94 95 - 98 99 - 101 102 - 104 105 - 110 Storm Track Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± West University Place §¨¦69 §¨¦69 Houston Bellaire Southside Place 20-year ProbabilisticHurricane Peak Wind Gust (mph) 63 - 71 72 - 76 77 - 80 81 - 84 85 - 92 Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± West University Place §¨¦69 §¨¦69 Houston Bellaire Southside Place 100-year ProbabilisticHurricane Peak Wind Gust (mph) 89 - 101 102 - 106 107 - 111 112 - 117 118 - 128 Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± West University Place §¨¦69 §¨¦69 Houston Bellaire Southside Place Wildfire Ignition Density 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± West University Place §¨¦69 §¨¦69 Houston Bellaire Southside Place Wildfire Threat 1 (Low) 2 3 (Moderate) 4 5 (High) 6 7 (Very High) Incorporated Cities Harris County 0 0.15 0.30.075 Miles ± West University Place 29-1 29. HOUSTON INDEPENDENT SCHOOL DISTRICT 29.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Wm. Earl Finley 6351 Pinemont Street Houston, Texas 77092 Telephone: 713-556-9225 email Address: wfinley@houstonisd.org or email Address: RiskManagement@houstonisd.org Robert Cage 6351 Pinemont Street Houston, Texas 77092 Telephone: 713-556-9225 email Address: RCageJr@houstonisd.org or email Address: RiskManagement@houstonisd.org 29.2 JURISDICTION PROFILE 29.2.1 Overview The Houston Independent School District (HISD) is the largest school district in Texas and the seventh largest school district in America. HISD was established in 1923 by the Texas Legislature. HISD encompasses 333 square miles within greater Houston. Over 209,000 students attend HISD’s 280 schools, and over 27,000 employees work for the district. HISD has the lowest property taxes of all the school districts in Harris County. The sources of district funding are the state of Texas, local property taxes, bonds, and grants. The district has 53 dual-language schools and 44 schools listed on U.S. News and World Reports Best High Schools in America; 92 percent of HISD’s schools received a met standard rating on the state’s accountability system, and 90.7 percent of HISD’s highly effective teachers have been retained. HISD has the highest credit rating — AAA — from Moody’s rating service, and is rated AA+ by Standard and Poor’s. The Houston Independent School District assumes responsibility for the adoption of this plan; the HISD Board or its designee will oversee the plan’s implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 29-1. Table 29-1. Local Mitigation Planning Team Members Name Title Wm Earl Finley HISD Senior Manager of Risk Management Robert Cage HISD Field Safety Team Leader 1.2.2 Service Area and Trends HISD’s service area covers 333 square miles within greater Houston, serving a population of 209,000 students with over 27,000 employees. The districts customers are our students, our parents, and our community where all our schools reside. After Hurricane Harvey the number of students attending HISD declined. The number of students attending will likely remain level or the same due to there are many families that are still displaced from their homes working with FEMA and other sources of funding to have their homes rebuilt. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 29-2 29.2.2 Assets Table 29-2 summarizes the critical assets of the district and their value. Table 29-2. Special Purpose District Assets Asset Value Property All – School, Non-School Buildings, and Property $5,154,473,535 Equipment 1200 Buses $96,448,308 SUVS $2,135,291 Trucks, Various Types – Bobtail (Dry & Ref), Box, Flatbed, Stahl Body, Pick-up, Stake Bed, Welding, Wrecker, etc. $14,057,484 Vans – Various – Cargo, Crew, Cutaway, Passenger, Stahl Body $9,425,594 Other – 53 Generators (+3 very large mounted generators) $1,436,552* Other – 25 Trailers, Flatbed and 44 Trailers, Enclosed $1,258,629* Other – 8 Backhoes $358,912* Other – 15 Tractors $544,830* Other – 29 Forklifts $681,529* Other – 2 Bulldozers — Total: $5,263,899,258 Critical Facilities and Infrastructure for Response Transportation Department Included Above Nutrition Services Department Included Above Facility Services Department Included Above Hattie Mae White Administration Bldg. Included Above Senior Staff Included Above Communications Department Included Above IT Department Included Above Police Department Included Above * Averaged Value for Total $ Entered 29.3 CAPABILITY ASSESSMENT An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or integrate capabilities in order to facilitate hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 29.9 identifies these as community capacity building mitigation actions. 29.3.1 Planning and Regulatory Capabilities Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents. When effectively prepared and administered, these plans, programs and regulations can support the implementation of mitigation actions. Table 29-3 summarizes existing codes, ordinances, policies, programs or plans that are applicable to this hazard mitigation plan. Houston Independent School District 29-3 Table 29-3. Planning and Regulatory Capability Plan, Study or Program Date of Most Recent Update Comment Emergency Operations Plan (EOP) July 2018 Each School or Non-School location must also have their own Emergency Operations Plan. National Incident Management System (NIMS) Hurricane Preparedness Guide Protocols and Procedures – Districtwide May 2019 Pre-storm, During Storm, After Storm Recovery National Incident Management System (NIMS) District Design Standards Nov 2018 District Facility Assessment 2016 District Capital Improvement Plan 2012 Refuge of Last Resort 2019-2020 Agreement with City of Houston to Make Available Seven Schools to use as a refuge of last resort in an emergency. NFIP Policies in Place for flood zone properties April 2019 Elevation Certificates on File for All Properties in the Flood Zone Covered by NFIP Applicable City/County/State/Federal Codes or Standards: Various Must include any and all Americans with Disabilities Act (ADA) related codes and regulations. >Detention Ponds As or When Applicable City/County Codes >Elevating Property at Four Elementary Schools, Located in the Flood Zone Substantially Damaged as a Result of Hurricane Harvey. In Progress Braeburn Elem.., Kolter Elem., Mitchell, Elem., and Scarborough Elem. are the four schools being rebuilt and elevated per city code. Addition of and/or Replacement of Generators at Key Support Facilities Within the District Requiring Emergency Power. 2016 Planned addition/replacement or when unforeseen damage or breakdown occurs supporting replacement rather than repair. Applicable Houston ISD Board Policies Related to Safety, Health, and Environmental Various 29.3.2 Fiscal, Administrative and Technical Capabilities Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard mitigation projects. An assessment of fiscal capabilities is presented in Table 29-4. Administrative and technical capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of administrative and technical capabilities is presented in Table 29-5. Table 29-4. Fiscal Capability Financial Resource Accessible or Eligible to Use? Capital Improvements Project Funding No Authority to Levy Taxes for Specific Purposes No User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Federal Grant Programs Yes Other – 1. Limited Tax Bonds; 2. Tax Anticipation Notes and Revenue Anticipation Notes; 3. Delinquent Tax Notes; 4. Time Warrants; 5. Maintenance Tax Notes and Contractual Obligations; 6. Lease Purchase Agreements; and 7. Revenue Bonds Yes Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 29-4 Table 29-5. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Bond/Construction Department Engineers or professionals trained in building or infrastructure construction practices Yes Bond/Construction Department Planners or engineers with an understanding of natural hazards Yes Bond/Construction Department Staff with training in benefit/cost analysis Yes Finance & Budget Department Surveyors Yes Under Contract Personnel skilled or trained in GIS applications Yes Bond/Construction Department Scientist familiar with natural hazards in local area Yes Not Under Contract Safety and Emergency Manager Yes Risk Management Department Grant Writers Yes Grant Development Department 29.3.3 Education and Outreach Capabilities Outreach and education capability identifies the connection between government and community members, which opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is presented in Table 29-6. Table 29-6. Education and Outreach Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, please briefly describe Facility Maintenance Department – Submitting a Repair Request Risk Management Department – Submitting an Insurable Claim Do you use social media for hazard mitigation education and outreach? Yes • If yes, please briefly describe Emergency Operation Procedure Phone App What to Do in Bad Weather – Posted on Internet Main Page Use of Robo Phone Call System; Twitter, HISD News Blog Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, please briefly specify Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, please briefly describe Use of Robo Phone Call System; Twitter, HISD News Blog, Post Message on Internet Main Page; Local Media – Radio & TV Do you have any established warning systems for hazard events? Yes • If yes, please briefly describe Manager of Safety and Emergency Management receives and monitors alerts communicates via chain of command of an emergency, and provides information and recommendations to be relayed up the chain of command to Senior Staff. 29.3.4 Adaptive Capacity for Climate Change Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 29-7 summarizes the jurisdiction’s adaptive capacity for climate change. Houston Independent School District 29-5 Table 29-7. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Medium Comment: Jurisdiction-level monitoring of climate change impacts Medium Comment: Technical resources to assess proposed strategies for feasibility and externalities Medium Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Medium to High Comment: Flood Zones are Changing Due to Harvey. Rebuilding may Require Elevation of Structure Participation in regional groups addressing climate risks Medium Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Medium to High Comment: New LEED Schools, Energy Efficient; Flood Mitigation Planning; Energy Management Identified strategies for greenhouse gas mitigation efforts Medium to High Comment: New LEED Schools – Bond Program; Energy Management Identified strategies for adaptation to impacts Medium to High Comment: New Construction – Bond Program Champions for climate action in local government departments Unsure Comment: Political support for implementing climate change adaptation strategies High Comment: New LEED Buildings; Flood Mitigation Planning; Energy Management Financial resources devoted to climate change adaptation Medium – High Comment: New Construction – Bond Program Local authority over sectors likely to be negative impacted Unsure Comment: Public Capacity Local residents knowledge of and understanding of climate risk Unsure Comment: Local residents support of adaptation efforts Medium to High Comment: Local residents’ capacity to adapt to climate impacts Unsure Comment: Local economy current capacity to adapt to climate impacts Unsure Comment: Local ecosystems capacity to adapt to climate impacts Unsure Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 29-6 29.4 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 29.4.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Houston ISD Facilities Assessment • Houston ISD has a Long Term Capital Improvement Plan • Houston ISD Hurricane Preparedness Guide – Protocols and Procedures – Districtwide. The plan has defined 1) pre-storm, 2) during Storm, and 3) after storm recovery – checklists that can and may mitigate potential for damage. • Houston ISD has a Refuge of Last Resort Agreement in place with the City of Houston for seven Houston ISD schools to be used as places of refuge in an emergency. • Obtained elevation certificates and purchased NFIP insurance for schools in the flood zone. 29.4.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • The New FEMA Flood Zone Map(s) for Houston Area are due out in 2023. This may require adjustments to HISD’s long term capital improvement plan. • Future Bond/Construction Programs • Adopt or Develop a Climate Action Plan 29.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 29-8 lists past occurrences of natural hazards for which specific damage was recorded in the Houston Independent School District. Other hazard events that broadly affected the entire planning area, including the Houston Independent School District, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 29-8. Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey DR 4332 2017 Active, Ongoing Claim Severe Storms & Flooding DR 4269 2016 $1,433,755.45 Severe Storms & Flooding DR 4223 2015 $1,045,522.42 Hurricane IKE DR 1791 2008 $21,023,715.29 Hurricane Rita DR 1606 2005 Minimal Damage Houston Independent School District 29-7 29.6 HAZARD RISK RANKING Table 29-9 presents a local ranking for the Houston Independent School District of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 29-9. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Flooding 27 Medium 3 Earthquake 14 Low 3 Tsunamia 14 Low 4 Dam Failure 12 Low 5 Wildfire 9 Low 6 Drought 6 Low 6 Mass Movementb 6 Low 7 Coastal Erosion 0 (No exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. a. No Data Available – Utilized earthquake statistics, because earthquakes can cause tsunamis. b. No Data Available – Utilized drought statistics, because drought leads to mass movement (subsidence, sinkholes, landslide) 29.7 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. The following jurisdiction-specific issues have been identified based on a review of the results from the Houston/Harris County’s risk assessment (Loss/Matrix Report), public involvement strategy, and other available resources: • The natural hazards below historically for Houston ISD are the highest risk and occurred more frequently.  Severe Weather — Extreme Heat, Hail, Tornadoes, Severe Thunderstorms, Winter Storms and Freezes  Hurricane — Coastal Storms/Tropical Systems, Named Storms, Named Hurricanes, and Tornadoes.  Flooding — Resulting from either Severe Weather or Hurricane above • The next six natural hazards below are of lower risk for Houston ISD. Drought and Mass Movement have historically caused damage to Houston ISD property.  Wildfire  Earthquake  Tsunami  Dam Failure  Drought (Damage to sewer and water lines, gas lines, foundations, walls, sidewalks, parking lots, driveways, etc.)  Mass Movement – (subsidence, sinkholes, landslide) • Non-Natural Hazards of risk to Houston ISD include: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 29-8  Toxic Release/Hazardous Materials  Energy Pipeline Failures Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. 29.8 STATUS OF PREVIOUS PLAN ACTIONS Houston Independent School District has not participated before with the Harris County All Hazard Mitigation Plan. There are no previous plan actions to review. 29.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 29-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 29-11 identifies the priority for each action. Table 29-12 summarizes the mitigation actions by hazard of concern and mitigation type. Table 29-10. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HOUISD1 — Where appropriate, support retrofitting, relocation, or rebuilding of structures that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: For Medium to High Risk Hazards – Severe Weather*, Hurricane*, Flooding* Existing 1-15 Business Operations Support N/A High Staff Time, General Funds Short-term Action HOUISD2 — Where appropriate, support retrofitting, relocation, or rebuilding of structures that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.. Hazards Mitigated: For Low to Medium Risk Hazards – Wildfire, Earthquake, Tsunami, Dam Failure, Drought, Mass Movement Existing 1-15 Business Operations Support N/A Low to Medium Staff Time, General Funds Short-term Action HOUISD3 — Partner with Harris County and the City of Houston for mutual disaster preparedness, training, response and support Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Tsunami, Wildfire, Dam Failure, Drought, Mass Movement Existing 1, 3 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 Risk Management and Business Operations Support County & City Low Staff Time, General Funds Ongoing Action HOUISD4 — Trimming or Removal of Trees Close to Buildings or Playgrounds; and, Planting of More Drought Resistant Type Plants and Shrubs Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Tsunami, Wildfire, Dam Failure, Drought, Mass Movement Existing 2, 7, 11 Business Operations Support N/A Low Staff Time, General Funds Ongoing Action HOUISD5 — Flood Mitigation – Code Required by City/County Hazards Mitigated: Detention Ponds / Irrigation-Drainage Modifications / Flood Mitigation Existing 3, 7, 9, 10, 11, 15 Bond / Construction N/A Medium to High Staff Time, General Funds Bond Funds Long-term and When Required Action HOUISD6 — Flood Mitigation Hazards Mitigated: Property Elevation (code required) – For the Rebuilding of a School/Non-School Building in Flood Zone Existing 3, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 Bond / Construction N/A High General Funds or Bond Funds Long-term Houston Independent School District 29-9 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HOUISD7 — Hazard Response Preparedness Hazards Mitigated: Acquire / Replace / Have Ready – Response equipment including portable fencing, sand bags, portable generators, portable pumps, other tools & equipment needed for and used for response. Existing 3, 4, 6, 7, 8, 9, 10, 11, 12, 13, 14 Business Operations Support N/A Medium Staff Time, General Funds Ongoing Action HOUISD8 — CERT Training – Ensure appropriate, key staff is trained to support District functions when the (EOC) Emergency Operation Center is activated. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Tsunami, Wildfire, Dam Failure, Drought, Mass Movement New 1, 3, 4, 6, 7, 8, 9, 10, 13, 14 Risk Management and Business Operations Support N/A Low Staff Time, General Funds Ongoing Action HOUISD9 — Plan, instruct, and equip campuses with procedures/protocols for a toxic hazardous materials event or a hazardous energy pipeline event. Hazards Mitigated: Non-Natural Hazards – Toxic Release/Hazardous Materials and Energy Pipeline Failures New 1, 3, 4, 6, 7, 8, 9, 10, 13, 14 Risk Management and Business Operations Support N/A Low Staff Time, General Funds Ongoing Action HOUISD10 — Performing preventative maintenance and repair protocols, which mitigate natural hazards. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Tsunami, Wildfire, Dam Failure, Drought, Mass Movement Existing 1-15 Risk Management and Business Operations Support N/A High Staff Time, General Funds Ongoing Action HOUISD11— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Tsunami, Wildfire, Dam Failure, Drought, Mass Movement New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Risk Management and Business Operations Support HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 29-11. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya HOUISD1 15 High High Yes Yes Yes High High HOUISD2 15 Medium Low to Medium Yes Yes Yes Low to Medium Low to Medium HOUISD3 12 High Low Yes Yes Yes High Low HOUISD4 3 High Low Yes Yes Yes High Low HOUISD5 6 High Medium to High Yes Yes Yes High Medium to High HOUISD6 11 High High Yes Yes Yes High High HOUISD7 11 Medium Medium Yes Yes Yes Medium Medium HOUISD8 9 Medium Low Yes Yes Yes medium Low HOUISD9 10 High Low Yes Yes Yes High Low HOUISD10 15 High High Yes Yes Yes High High HOUISD11 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 29-10 Table 29-12. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather HOUISD 1-7, 9, 10,11 HOUISD 1, 2, 4, 5, 6, 7, 10 HOUISD 3, 11 HOUISD 3, 7, 8, 11 HOUISD 1, 2, 6, 10 HOUISD 1, 2, 5, 6, 10 HOUISD 3, 8, 11 Hurricane HOUISD 1-7, 9, 10,11 HOUISD 1, 2, 4, 5, 6, 7, 10 HOUISD 3, 11 HOUISD 3, 7, 8, 11 HOUISD 1, 2, 6, 10 HOUISD 1, 2, 5, 6, 10 HOUISD 3, 8, 11 Medium-Risk Hazards Flooding HOUISD 1-7, 9, 10,11 HOUISD 1, 2, 4, 5, 6, 7, 10 HOUISD 3, 11 HOUISD 3, 7, 8, 11 HOUISD 1, 2, 6, 10 HOUISD 1, 2, 5, 6, 10 HOUISD 3, 8, 11 Low-Risk Hazards Drought HOUISD 1-7, 9, 10,11 HOUISD 1, 2, 4, 5, 6, 7, 10 HOUISD 3, 11 HOUISD11 HOUISD 1, 2, 6, 10 HOUISD11 Mass Movement HOUISD 1-7, 9, 10,11 HOUISD 1, 2, 4, 5, 6, 7, 10 HOUISD 3, 11 HOUISD11 HOUISD 1, 2, 6, 10 HOUISD11 Wildfire HOUISD 1-7, 9, 10, 11 HOUISD 1, 2, 4, 5, 6, 7, 10 HOUISD 3, 11 HOUISD 3, 7, 8 HOU1, 2, 6, 10 HOUISD 1, 2, 5, 6, 10 HOUISD 3, 8 Earthquake HOUISD11 HOUISD11 HOUISD11 HOUISD11 Tsunami HOUISD11 HOUISD11 HOUISD11 HOUISD11 Dam Failure HOUISD11 HOUISD11 HOUISD11 HOUISD11 a. See the introduction to this volume for explanation of mitigation types. 29.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX 29.10.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • General information available on HISD’s website • HISD Risk Management Department – Asset Information • HISD Finance Department – Financial Question/Answers • HISD Facilities Department information available on HISD’s website • HISD Bond/Construction 2012 Bond Program information available on HISD’s Website • District Design Standards • District Facilities Assessment • District Capital Improvement Plan • Applicable District Policies The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. Houston Independent School District 29-11 29.10.2 Staff and Local Stakeholder Involvement in Annex Development Utilized information available on HISD’s website, information on file with HISD Risk Management, HISD Finance Department for financial questions, and HISD Facilities Department and HISD Bond/Construction Department information on HISD’s website at www.houstonisd.org. 29.11 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY • A new district capital improvement plan (CIP) will replace the current capital improvement plan. • A new district facility assessment plan (FAP) will replace the current facility assessment plan. • The new flood zone maps, when issued by FEMA for Houston, may require adjustments to CIP and FAP above and adjustments to insurance coverage as well. • The new flood zone maps, when issued by FEMA, may require adjustments to current insurance coverage like NFIP insurance. 29.12 ADDITIONAL COMMENTS The new flood zone maps, when issued by FEMA, are going to be critical to future plans and types of insurance coverage. 30-1 30. HUFFMAN INDEPENDENT SCHOOL DISTRICT 30.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Tim Brittain, Chief Financial Officer 24302 FM 2100 Huffman, TX 77336 Telephone: 281-324-7623 e-mail Address: tbrittain@huffmanisd.net David Carpenter, Emergency Management Coordinator 24302 FM 2100 Huffman, TX 77336 Telephone: 281-324-7659 e-mail Address: dcarpenter@huffmanisd.net 30.2 JURISDICTION PROFILE 30.2.1 Overview Huffman ISD is a public school district in Texas that serves approximately 3,600 students and has 445 staff members. Through the efforts of our staff, our students flourish in academics, the fine arts, and athletics. Our Falcons excel from our pre-K program to the time they graduate. Through our programs we provide character education and promote pride in being a part of our school community. Importantly, our district succeeds because of the high standards for achievement in our community. There is no place that supports their public schools like Huffman. It is a great place to raise a family. Our district enrollment is approximately 3,400 students. We have four campuses: Huffman Elementary School, Falcon Ridge Elementary School, Huffman Middle School, and Hargrave High School. Huffman ISD receives funding from three sources: the state (54%), property taxes and other local sources (44%), and the federal government (2%). The proportion of funding from each source varies across Texas school districts. The Huffman Independent School District assumes responsibility for the adoption of this plan; Harris County will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 30-1. 30.2.2 Service Area and Trends Huffman ISD is an unincorporated community thirty miles northeast of Houston in Harris County. The district service area covers 52 square miles, serving a population of 8,678. Huffman is a unique community comprised largely of residential subdivisions, scattered farms, apartments, and small businesses. The area is showing steady medium growth. The main subdivisions include; The Commons of Lake Houston, Fairway Crossing, Lochshire, Lakewood Heights, Spanish Cove, Saddle Creek Farms, and Indian Shores. Most residents commute to Houston, Humble, Baytown, and surrounding communities for employment. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 30-2 Table 30-1. Local Mitigation Planning Team Members Name Title Tim Brittain Huffman ISD, Chief Financial Officer David Carpenter Huffman ISD, Director of Safety & Security Tom Trial Bond Program Management Services, Program Manager Jason McCright Rostan Solutions, Senior Consultant Dinh Ho Adico, LLC, Engineer Martin Brennan Joiner Architects, Architect Jim Moore Rostan Solutions, Consultant Jonathan Dotch Rostan Solutions, Consultant 30.2.3 Assets Table 30-2 summarizes the critical assets of the district and their value. Table 30-2. Special Purpose District Assets Asset Value Property 125 acres of land $5,125,000 Equipment Buses – 38 $3,914,000 Maintenance Vehicles $325,000 Total: $4,239,000 Critical Facilities and Infrastructure Administration – 24302 FM 2100, Huffman, TX 77336 $4,104,500 Huffman Elementary School – 24403 East Lake Houston Pkwy, Huffman, TX 77336 $44,865,000 Falcon Ridge Elementary – 26503 FM 2100, Huffman, TX 77336 $23,500,000 Huffman Middle School – 3407 Huffman Eastgate Rd., Huffman, TX 77336 $30,291,100 Hargrave High School – 25400 Willy Lane, Huffman, TX 77336 $45,736,725 Athletic Complex – 25400 Willy Lane, Huffman, TX 77336 $6,758,000 Maintenance and Warehouse – 421 Swift Current, Huffman, TX 77336 $712,000 Water Plant – 3407 Huffman Eastgate, Rd., Huffman, TX 77336 $650,000 Sewer Plant – 3407 Huffman Eastgate, Rd., Huffman, TX 77336 $1,205,000 Total: $157,822,825 30.3 CAPABILITY ASSESSMENT An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 29.9 identifies these as community capacity building mitigation actions. 30.3.1 Planning and Regulatory Capabilities Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents. When effectively prepared and administered, these plans, programs and regulations can support the implementation of mitigation actions. Table 30-3 summarizes existing codes, ordinances, policies, programs or plans that are applicable to this hazard mitigation plan. Huffman Independent School District 30-3 Table 30-3. Planning and Regulatory Capability Plan, Study or Program Date of Most Recent Update Comment District Design Standards 2017 Capital Improvement Plan Annually 5 year plan Emergency Operations Plan 2018 District Facility Assessment 2014 Harris County Building Codes City of Houston Building Codes 30.3.2 Fiscal, Administrative and Technical Capabilities Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard mitigation projects. An assessment of fiscal capabilities is presented in Table 30-4. Administrative and technical capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of administrative and technical capabilities is presented in Table 30-5. Table 30-4. Fiscal Capability Financial Resource Accessible or Eligible to Use? Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Federal Grant Programs Yes Other Table 30-5. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Contract Support Engineers or professionals trained in building or infrastructure construction practices Yes Contract Support Planners or engineers with an understanding of natural hazards Yes Contract Support Staff with training in benefit/cost analysis Yes Chief Financial Officer Surveyors Yes Contract Support Personnel skilled or trained in GIS applications Yes Technology Director Scientist familiar with natural hazards in local area No Emergency manager Yes Emergency Management Coordinator Grant writers No Other Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 30-4 30.3.3 Education and Outreach Capabilities Outreach and education capability identify the connection between government and community members, which opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is presented in Table 30-6. Table 30-6. Education and Outreach Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No • If yes, please briefly describe Do you use social media for hazard mitigation education and outreach? Yes • If yes, please briefly describe Share Partner Content Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes • If yes, please briefly specify School Safety and Security Committee Do you have any other programs already in place that could be used to communicate hazard-related information? No • If yes, please briefly describe Do you have any established warning systems for hazard events? No • If yes, please briefly describe 30.3.4 Adaptive Capacity for Climate Change Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 30-7 summarizes the jurisdiction’s adaptive capacity for climate change. Huffman Independent School District 30-5 Table 30-7. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Medium Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Medium Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 30-6 30.4 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 30.4.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Capital Improvement Plan — The hazard mitigation plan may identify new possible funding sources for capital improvement projects and may result in modifications to proposed projects based on results of the risk assessment. • Emergency Operations Plan — The results of the risk assessment may identify modifications to the emergency operations plan. 30.4.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Capital Improvement Projects — Capital improvement project proposals may take into consideration hazard mitigation potential as a means of evaluating project prioritization. • Post-Disaster Recovery Plan — The District does not have a recovery plan and intends to develop one as a mitigation planning action during the next five years. The plan will build on the mitigation goals and objectives identified in the mitigation plan. 30.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 30-8 lists past occurrences of natural hazards for which specific damage was recorded in Huffman ISD. Other hazard events that broadly affected the entire planning area, including Huffman ISD, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 30-8. Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey DR-4332 8/25/17 $17,000,000 Tornado 4/18/16 Information Not Available Tornado 11/8/11 Information Not Available Hurricane Ike DR-1791 9/7/08 $61,476 Tornado 12/14/05 Information Not Available Hail 2/14/03 Information Not Available Flood 5/27/16 Information Not Available Huffman Independent School District 30-7 30.6 HAZARD RISK RANKING Table 30-9 presents a local ranking for Huffman ISD of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 30-9. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Hurricanes and Costal Storms 27 High 1 Flooding 27 High 2 Severe Thunderstorms 21 Medium 3 Tornados 16 Medium 4 Hail 10 Low 5 Extreme Heat 6 Low 5 Drought 6 Low 6 Coastal Erosion 0 (No Exposure) None 6 Dam Failure 0 (No Exposure) None 6 Mass Movements 0 (No Exposure) None 6 Tsunami 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 30.7 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • The eastern part of the district is in the floodway. The transportation facility was located in this part of the district and we are determining mitigation currently. The sewer plant that serves Huffman Middle School and Hargrave High School is located in the floodway. • Parts of Huffman Middle and Hargrave High School campuses are located in a high hazard flood zone. • The water and sewer plants that serves Huffman Middle School and Hargrave High School are in a high hazard flood zone. • District elementary schools are located in an area of terrain transition and may be at increased risk for tornados Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. 30.8 STATUS OF PREVIOUS PLAN ACTIONS The Huffman Independent School District has not previously completed any hazard mitigation planning effort. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 30-8 30.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 30-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 30-11 identifies the priority for each action. Table 30-12 summarizes the mitigation actions by hazard of concern and mitigation type. Table 30-10. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HUF1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Flooding, Hurricanes, Tornados, Severe Thunderstorms, Hail Existing 3, 4, 10 District Administration TBD High HMGP, PDM, FMA Short-term Action HUF2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Hurricanes and Costal Storms, Flooding, Severe Thunderstorms, Tornados, Hail, Extreme Heat, Drought New and Existing 1, 5, 8 District Administration TBD Low Staff Time, General Funds Short-term Action HUF3 — Integrate the hazard mitigation plan into other plans, ordinances and programs within the community Hazards Mitigated: Dam failure, earthquake, flooding, landslide, severe weather, tsunami, wildfire Existing 2, 6, 9 District Administration TBD Action HUF4 — Expand generator capability for critical facilities lacking sufficient backup power Hazards Mitigated: Hurricanes, Tornados, Severe Thunderstorms Existing 3, 4, 10 District Administration TBD High HMGP, PDM, FMA Short-term Action HUF5— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Hurricanes and Costal Storms, Flooding, Severe Thunderstorms, Tornados, Hail, Extreme Heat, Drought New and Existing 1, 3, 4, 5, 9, 10, 11, 15 District Administration HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 30-11. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya HUF1 3 High High Yes Yes No Medium High HUF2 3 Low Low Yes No Yes High Low HUF3 3 High Medium Yes Yes No Medium High HUF4 3 High Medium Yes Yes No Medium High HUF5 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Huffman Independent School District 30-9 Table 30-12. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Flooding HUF2, 3, 5 HUF1 HUF5 HUF1, 5 HUF1 HUF2, 3, 5 Hurricanes and Costal Storms HUF2, 3, 5 HUF1, 4 HUF5 HUF1, 4, 5 HUF1 HUF2, 3, 5 Medium-Risk Hazards Severe Thunderstorms HUF2, 3, 5 HUF1, 4 HUF5 HUF1, 4, 5 HUF2, 3, 5 Tornados HUF2, 3, 5 HUF1, 4 HUF5 HUF1, 4, 5 HUF2, 3, 5 Low-Risk Hazards Drought HUF2, 3, 5 HUF5 HUF5 HUF2, 3, 5 Extreme Heat HUF2, 3, 5 HUF5 HUF5 HUF2, 3, 5 Hail HUF2, 3, 5 HUF1 HUF5 HUF5 HUF2, 3, 5 a. See the introduction to this volume for explanation of mitigation types. 30.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • Huffman ISD emergency Operations Plan The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. 31-1 31. PASADENA INDEPENDENT SCHOOL DISTRICT 31.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Kevin Fornof, Associate Superintendent Facilities & Construction 1814 E. Sam Houston Parkway South Pasadena, TX 77503 Telephone: 713-740-5350 e-mail Address: kfornof@pasadenaisd.org Carla Merka, CFO 1515 Cherrybrook Lane Pasadena, TX 77502 Telephone: 713-740-0023 e-mail Address: cmerka@pasadenaisd.org 31.2 JURISDICTION PROFILE 31.2.1 Overview The Pasadena Independent School District was created in 1893. The district serves 54,000 students. It currently has 8,800 employees. A seven-member elected Board of Trustee governs the District. The district is funded with local tax dollars, state revenue and federal grants. The Board of Trustees assumes responsibility for the adoption of this plan; the superintendent, associate superintendent and CFO will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 31-1. Table 31-1. Local Mitigation Planning Team Members Name Title Dr. DeeAnn Powell Superintendent Kevin Fornof Associate Superintendent Facilities & Construction Carla Merka Chief Financial Officer 31.2.2 Service Area and Trends The District is a fiscally independent, political subdivision of the State of Texas located in Harris County and serving a population of 54,000 students. The District service area covers 85.5 square miles. 31.2.3 Assets Table 31-2 summarizes the critical assets of the district and their value. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 31-2 Table 31-2. Special Purpose District Assets Asset Value Property 80 building sites spread over the district Equipment FF&E spread over the district $138,057,020 Vehicles $37,655,595 Library Book & Media $13,623,515 Critical Facilities and Infrastructure 80 building spread over the district $1,168,329,961 Total: $1,168,329,961 31.3 CAPABILITY ASSESSMENT An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table identifies these as community capacity building mitigation actions. 31.3.1 Planning and Regulatory Capabilities Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents. When effectively prepared and administered, these plans, programs and regulations can support the implementation of mitigation actions. PISD follows the currently adopted codes and ordinances of the U.S. federal governmental agencies, the state of Texas, the city of Houston, the city of south Houston, the city of Pasadena, and the city of Pearland. Current PISD planned projects include the following: • Add detention to various facilities to benefit the school and the community • Add emergency generator to various facilities to ensure that electrical, and data and phone communications are available and food coolers and freezers maintain proper temperatures during power outages. • Demolish and rebuild Thompson Intermediate to elevations that raise the facility out of the flood zone. 31.3.2 Fiscal, Administrative and Technical Capabilities Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard mitigation projects. An assessment of fiscal capabilities is presented in Table 31-3. Administrative and technical capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of administrative and technical capabilities is presented in Table 31-4. 31.3.3 Education and Outreach Capabilities Outreach and education capability identifies the connection between government and community members, which opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is presented in Table 31-5. Pasadena Independent School District 31-3 Table 31-3. Fiscal Capability Financial Resource Accessible or Eligible to Use? Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes No User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Federal Grant Programs Yes Table 31-4. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Civil consultants Engineers or professionals trained in building or infrastructure construction practices Yes Civil and MEP consultants Planners or engineers with an understanding of natural hazards Yes Civil and MEP consultants Staff with training in benefit/cost analysis Yes PISD facilities and construction Surveyors Yes PISD has a unit price agreement with West Belt Surveying Personnel skilled or trained in GIS applications No Scientist familiar with natural hazards in local area Yes Civil engineering, surveyor, geotechnical engineers, and landscape consultants Emergency manager Yes Varies by event Grant writers Yes PISD Grants Dept. Table 31-5. Education and Outreach Criterion Response Do you have a public information officer or communications office? YES Do you have personnel skilled or trained in website development? YES Do you have hazard mitigation information available on your website? No • If yes, please briefly describe Do you use social media for hazard mitigation education and outreach? No • If yes, please briefly describe Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, please briefly specify Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, please briefly describe Automated Phone Messaging / Email / Text / Social Media/ Local News Channels Do you have any established warning systems for hazard events? Yes • If yes, please briefly describe Automated Phone Messaging / Email / Text / Social Media/ Local News Channels Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 31-4 31.3.4 Adaptive Capacity for Climate Change Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 31-6 summarizes the jurisdiction’s adaptive capacity for climate change. Table 31-6. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts High Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts High Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts High Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Medium Comment: Local authority over sectors likely to be negative impacted Medium Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Medium Comment: Local residents’ capacity to adapt to climate impacts High Comment: Local economy current capacity to adapt to climate impacts High Comment: Local ecosystems capacity to adapt to climate impacts High Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. Pasadena Independent School District 31-5 31.4 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 31.4.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Use of energy management practices, meet or exceed IECC code, and material and equipment selections 31.4.2 Opportunities for Future Integration The capability assessment presented in this annex identified no plans or programs that provide opportunities to integrate hazard mitigation information in the future. 31.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 31-8 lists past occurrences of natural hazards for which specific damage was recorded in Pasadena ISD. Other hazard events that broadly affected the entire planning area, including Pasadena ISD, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 31-8. Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment TORNADO N/A April 8, 2019 $190,000 HURRICANE HARVEY 4332 DR August 17, 2017 $15,379,690 HURRICANE IKE 1791 DR / 3294 EM September 13, 2008 $16,764,211.76 31.6 HAZARD RISK RANKING Table 31-9 presents a local ranking for Pasadena ISD of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. 31.7 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. No additional vulnerabilities specific to this jurisdiction have been identified. 31.8 STATUS OF PREVIOUS PLAN ACTIONS The Pasadena Independent School District has not previously completed any hazard mitigation planning effort. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 31-6 Table 31-9. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Flooding 24 Medium 3 Earthquake 14 Low 4 Wildfire 6 Low 4 Drought 6 Low 5 Dam Failure 0 (No Exposure) None 5 Mass Movement 0 (No Exposure) None 5 Tsunami 0 (No Exposure) None 5 Coastal Erosion 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 31.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 31-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 31-11 identifies the priority for each action. Table 31-12 summarizes the mitigation actions by hazard of concern and mitigation type. Table 31-10. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action PSD1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Severe weather, hurricane, Earthquake, flooding, wildfire Existing 11, 13 District Administration TBD High HMGP, PDM, FMA Short-term Action PSD2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire, Drought New and Existing 9, 10 District Administration TBD Low Staff Time, General Funds Short-term Action PSD3 — Integrate the hazard mitigation plan into other plans, ordinances and programs within the community Hazards Mitigated: Hurricane, earthquake, flooding, severe weather wildfire Existing 2, 6, 9 District Administration TBD Low Staff Time, General Funds Short-term Action PSD4— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire, Drought New and Existing 1, 3, 4, 5, 9, 10, 11, 15 District Administration HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Pasadena Independent School District 31-7 Table 31-11. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya PSD1 3 High High Yes Yes No High High PSD2 3 Medium Low Yes No Yes Medium Low PSD3 3 Medium Low Yes No Yes Medium Low PSD4 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 31-12. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather PSD1, 4 PSD1 PSD4 PSD4 PSD1 PSD2, 3, 4 Hurricane PSD1, 4 PSD1 PSD4 PSD4 PSD1 PSD2, 3, 4 Medium-Risk Hazards Flooding PSD1, 4 PSD1 PSD4 PSD4 PSD1 PSD2, 3, 4 Low-Risk Hazards Earthquake PSD1, 4 PSD1 PSD4 PSD4 PSD1 PSD2, 3, 4 Wildfire PSD1, 4 PSD1 PSD4 PSD4 PSD1 PSD2, 3, 4 Drought PSD4 PSD4 PSD4 PSD2, 3, 4 a. See the introduction to this volume for explanation of mitigation types. 31.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • Discussions with staff and administrations The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. Building requests were developed from need assessments to better respond to catastrophes through better communications and by better protecting district resources 31.11 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY Our detention ponds will give relieve to our neighborhoods from flooding. We also have two schools in a flood zone that backs up to the flood district. If we could move those schools that area could be turned into a larger detention pond for the flood district. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 31-8 32-1 32. HOUSTON COMMUNITY COLLEGE 32.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Robert McCracken, Executive Director, Risk Management 3200 Main St Houston, TX 77459 Telephone: 713-718-7520 e-mail Address: Robert.McCracken@hccs.edu Brian Owoseni, Manager, Emergency Management. 3200 Main St Houston, TX 77459 Telephone: 713-718-2591 e-mail Address: Oludoyin.Owoseni@hccs.edu 32.2 JURISDICTION PROFILE 32.2.1 Overview Since its opening in 1971, millions of students have improved their lives through education and training obtained from Houston Community College (HCC). An open admission public institution, HCC awards associate degrees and certificates in academic studies and career and technology programs. HCC is committed to meeting the needs of its diverse communities, providing academic courses for transfer to four-year institutions; associates degrees and certificates in more than 70 fields of work; as well as continuing education, corporate training, literacy, adult education, and lifelong learning and enrichment programs. HCC provides comprehensive educational services to the greater Houston region. The Houston Community College District was created under the governance of the Houston Independent School District (HISD) as the result of a public referendum on May 18, 1971. HCC separated from HISD in 1989, establishing its own Board of Trustees and taxing authority. HCC restructured in 1991, creating five regional colleges, as well as the College Without Walls and selected six college presidents. The president of HCC then became the HCC System Chancellor. The Coleman College for Health Sciences was established in 2004. Through the process of transformation initiated in 2014, instructional programs were organized into Centers of Excellence and Instructional Divisions, providing increased focus for credit programs. In spring 2018, HCC established the Online College to meet the 21st century educational needs of our students, especially those with full-time jobs. HCC employs 2,600 full-time faculty and staff and 3,800 adjunct faculty and part-time staff. Operations are funded primarily through local property tax, state appropriations, and tuition and fees. The Board of Trustees is composed of nine members elected from single-member districts. The Board of Trustees is the official governing body of HCC and is responsible for the adoption of this plan. The Office of Emergency Management will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 32-1. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 32-2 Table 32-1. Local Mitigation Planning Team Members Name Title Robert McCracken Executive Director, Risk Management Brian Owoseni Manager, Emergency Management Marshall Heins Chief Facilities Officer Carin Hutchins Associate Vice Chancellor, Finance & Accounting Greg Cunningham Chief of Police Darin Baskin Faculty Senate President Dr. Monique Umphrey President, Northeast College 32.2.2 Service Area and Trends The HCC Service District Area (SDA) includes Houston, Katy, Spring Branch, and Alief Independent School Districts (ISDs); Stafford Municipal District; and the portions of Fort Bend ISD located in Missouri City, the City of Pearland, and the City of Houston (see Figure 32-1). The SDA encompasses 631.3 square miles and serves a population of over 2.4 million people. HCC has an unduplicated enrollment of over 114,000 students annually. Figure 32-1. Houston Community College 2018 Service Area The HCC SDA is economically, educationally and ethnically diverse. While the average household income is $96,707, more that 22.3% of the households in the SDA have an income less than $25,000. While 41.0% of the population has a college degree, 19.5% of the population has no high school degree. The population’s ethnicity is 40.9% Hispanic, 26.1% white, 22.7% African American and 10.3% Asian/Other. There is a relatively large young Houston Community College 32-3 population — 24.5% under the age of 18 years old. These factors give HCC the potential of providing a large workforce pool for the service delivery area, the state and the nation’s economic growth, particularly in the energy and healthcare sectors. In fall 2018 the semester credit hour student population’s ethnicity was 38% Hispanic, 29% African American, 15% Asian, 13% white, and 5% Other. 32.2.3 Assets Table 32-2 summarizes the critical assets of the district and their value. Table 32-2. Special Purpose District Assets Asset Value Property 436 acres of land undetermined Equipment 25 Permanently Installed Emergency Generators undetermined 5 Mobile Generators $50,000 Total: undetermined Critical Facilities and Infrastructure Administrative Buildings (multiple buildings) – 3100 Main St. $181,000,000 NE College (multiple campuses) – 555 Community College Dr. $178,000,000 Central College (multiple campuses) – 1300 Holman St. $229,000,000 SE College (multiple campuses) – 6815 Rustic St. $144,000,000 Coleman College (multiple buildings) – 1900 Pressler St. $122,000,000 SW College (multiple campuses) – 10041 Cash Rd. $231,000,000 NW College (multiple campuses) – 2811 Hayes Rd. $203,000,000 Total: $1,288,000,000 32.3 CAPABILITY ASSESSMENT An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 29.9 identifies these as community capacity building mitigation actions. 32.3.1 Planning and Regulatory Capabilities Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents. When effectively prepared and administered, these plans, programs and regulations can support the implementation of mitigation actions. Table 32-3 summarizes existing codes, ordinances, policies, programs or plans that are applicable to this hazard mitigation plan. 32.3.2 Fiscal, Administrative and Technical Capabilities Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard mitigation projects. An assessment of fiscal capabilities is presented in Table 32-4. Administrative and technical capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of administrative and technical capabilities is presented in Table 32-5. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 32-4 Table 32-3. Planning and Regulatory Capability Plan, Study or Program Date of Most Recent Update Comment HCC Institutional Emergency Operations Plan 2018 HCC Strategic Plan 2019 HCC Capital Improvements Program 2013 HCC Facilities Condition Assessment 2019 International Building Code 2018 NFPA 1, Fire Code 2015 Edition 2015 NFPA 101, Life Safety Code 2015 Edition 2015 Various Federal/State regulations relating to Environmental, Health & Safety Various Table 32-4. Fiscal Capability Financial Resource Accessible or Eligible to Use? Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Federal Grant Programs Yes Other Yes- miscellaneous revenues Table 32-5. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Facilities Department / Contracted Services Engineers or professionals trained in building or infrastructure construction practices Yes Facilities Department / Contracted Services Planners or engineers with an understanding of natural hazards Yes Environmental Health & Safety, HCC Emergency Management Staff with training in benefit/cost analysis Yes Finance & Accounting Surveyors Yes Contracted Services Personnel skilled or trained in GIS applications No Scientist familiar with natural hazards in local area No Emergency manager Yes Emergency Management Grant writers Yes Grants Department 32.3.3 Education and Outreach Capabilities Outreach and education capability identifies the connection between government and community members, which opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is presented in Table 32-6. Houston Community College 32-5 Table 32-6. Education and Outreach Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No • If yes, please briefly describe Do you use social media for hazard mitigation education and outreach? No • If yes, please briefly describe Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, please briefly specify Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, please briefly describe In addition to a comprehensive website, social media, marketing, and communications capacity HCC operates HCC TV which includes studios, television and video production capacity. Do you have any established warning systems for hazard events? Yes • If yes, please briefly describe Emergency Notification System mass notification tool for HCC students, staff, and faculty. Additional warning systems/channels include website, social media, local television and radio stations, Harris County Joint Information Center, and local systems for HCC campuses. Additionally, HCC police utilize radios and a dispatch center. 32.3.4 Adaptive Capacity for Climate Change Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 32-7 summarizes the jurisdiction’s adaptive capacity for climate change. Table 32-7. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Medium Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Medium Comment: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 32-6 Criterion Jurisdiction Ratinga Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Medium Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents’ knowledge of and understanding of climate risk Low Comment: Local residents’ support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. 32.4 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 32.4.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Emergency Operations Plan — The results of the risk assessment were used in the development of the emergency operations plan. Houston Community College 32-7 • Facilities Plan — The results of the risk assessment and mapped hazard areas are used in facility planning for the district. Potential sites are reviewed for hazard risks and appropriate mitigation measures are considered in building and site design. • Junior College Audit Report – The required review of campus safety and security includes extensive review of emergency preparedness, response, recovery, prevention and mitigation. Results of the review are utilized to guide hazard mitigation activities and projects. • Facility Condition Assessment – The assessment details the current condition of major building systems and identifies needed capital improvements and established a long-term projection for necessary capital spending to maintain the facilities. Many of the identified needs relate to major system upgrades and renovations that can increase facility resiliency and mitigate damages incurred as the result of a hazard. • Facilities Maintenance Plan – The facilities maintenance plan focuses resources on maintaining the facility grounds, parking lots, landscaping, and structures in a manner that minimizes damages from natural hazards to reduce the impact of high winds, flooding, and power disruptions. • Information Systems Business Continuity Plan – The District Information Systems are designed with redundancies to minimize the risk of loss of data due to damaged District buildings or regional infrastructure. 32.4.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Facility Master Plan- Integration of hazard data into planning process can provide insight into the costs and benefits of renovations to existing facilities, consideration of new facilities/sites, and potential changes to workforce training needs. • Capital Improvement Plan- Capital improvement project proposals may take into consideration hazard mitigation potential as a means of evaluating project prioritization. 32.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 32-8 lists past occurrences of natural hazards for which specific damage was recorded on HCC campuses or facilities in the past 10 years. Other hazard events that broadly affected the entire planning area, including HCC, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 32-8. Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Severe Weather / Flooding 2019 Significant Operational Impact Winter Freeze 2018 Significant Operational Impact Hurricane Harvey 4332DR 2017 Significant Operational Impact $1,700,000 Severe Weather / Flooding 2017 Significant Operational Impact Severe Weather / Tornado 2017 $15,000 Tax Day Flood 4272DR 2016 Significant Operational Impact Memorial Day Flood 4223DR 2015 Significant Operational Impact Hurricane Ike 1791DR 2008 Significant Operational Impact $4,700,000 32.6 HAZARD RISK RANKING Table 32-9 presents a local ranking for HCC of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 32-8 in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 32-9. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Hurricane 54 (3 x (9+6+3)) High 2 Flood 45 (3 x (6+6+3)) High 3 Severe Weather 36 (3 x (9+2+1)) High 4 Dam Failure 20 (2 x (3+4+3)) Medium 5 Earthquake 14 (1 x (9+4+1)) Low 6 Wildfire 6 (1 x (3+2+1)) Low 6 Drought 6 (3 x (0+1+1)) Low 6 Landslide 6 (1 x (3+2+1)) Low 7 Tsunami 3 (1 x (3+0+0)) Low 7 Coastal Erosion 3 (1x (3+0+0)) Low NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 32.7 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. The following jurisdiction-specific issue has been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • HCC Police Department building is not equipped with a generator but houses police personnel during ride-out situations. Mitigation actions addressing this issue were prioritized for consideration in the action plan in this annex. 32.8 STATUS OF PREVIOUS PLAN ACTIONS Houston Community College has not previously completed a formally adopted hazard mitigation plan. 32.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 32-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 32-11 identifies the priority for each action. Table 32-12 summarizes the mitigation actions by hazard of concern and mitigation type. Houston Community College 32-9 Table 32-10. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HCC 1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are in high- or medium-risk hazard areas. Hazards Mitigated: Hurricane, flooding, severe weather, dam failure, earthquake, landslide, wildfire Existing 3, 4, 5, 6, 8, 9, 10, 11, 12, 13, Facilities Finance High HMGP, PDM, FMA, General Funds, CIP, Bonds Long Term Action HCC 2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Hurricane, Flood, Severe Weather, Dam Failure, Earthquake, Wildfire, Drought, Landslide, Tsunami, Coastal Erosion New and Existing 1, 3, 5, 9, 10 Risk Management Facilities Low Staff Time, General Funds Ongoing Action HCC 3 — • Develop and/or update plans that support or enhance continuity of operations following disasters. Hazards Mitigated: All Hazards New and Existing 1, 3, 4, 10, 13 Risk Management IT, Facilities Medium HMGP, PDM, Staff Time, General Funds, Technology Fee, CIP Ongoing Action HCC 4 — Integrate the hazard mitigation plan into other plans and programs within the College. Hazards Mitigated: All Hazards New and Existing 3, 4, 6, 7, 8, 9, 10, 11, 12, 13, 15 Risk Management Facilities, Finance & Administration Low Staff Time, General Funds, Technology Fee, CIP Ongoing Action HCC 5 — • Develop a post-disaster recovery plan and a debris management plan. Hazards Mitigated: All Hazards Existing 6, 8, 9, 10, 13, 14 Facilities Procurement Low HMGP, PDM, FMA, General Funds, Insurance Short Term Action HCC 6 – Purchase generators for critical facilities and infrastructure that lack adequate back-up power and install quick connect emergency generator hook ups for non-permanently installed generators. Hazards Mitigated: Flooding, Hurricane, Severe Weather, Earthquake, Dam Failure, Wildfire, Landslide, Tsunami Existing 1, 4, 9, 10, 11 HCC Facilities Procurement High HMGP, PDM, General Funds, CIP, Bonds Long Term Action HCC 7 — Build and operationalize the Regional Emergency Response Training Center to increase regional capabilities during flood events. Hazards Mitigated: Hurricane, Flooding, Severe Weather, Dam Failure, Tsunami New and Existing 3, 4, 5, 10, 13 HCC Facilities President’s Office, Finance, Procurement High HMGP, PDM, FMA, General Funds, CIP, Bonds, State Appropriation, Partnership Agreements, HCC Foundation Short Term Action HCC 8 — Dry-proof the Stafford Campus Fine Arts Center to increase resistance to water intrusion. Hazards Mitigated: Hurricane, Flooding, Dam Failure Existing 4, 11, 12, 13, 15 HCC Facilities Risk Management, Procurement $150k HMGP, General Funds, PA Grant, Insurance Short Term Action HCC 9 — Retrofit smoke exhaust louvers to prevent water intrusion by wind driven rain at Alief Hayes Campus. Hazards Mitigated: Severe Weather, Hurricane Existing 4, 11, 12, 13, 15 HCC Facilities Risk Management, Procurement $30k HMGP, General Funds, PA Grant Short Term Action HCC 10 — Increase resiliency to electrical system failures with appropriate upgrades / retrofits of lightning protection, uninterruptable power supplies, switch gear, transfer switches, transformers, and emergency generator replacement. Hazards Mitigated: Hurricane, Flooding, Severe Weather, Dam Failure, Earthquake, Wildfire, Landslide, Tsunami New and Existing 1, 4, 9, 10, 11, 13 HCC Facilities Finance, Procurement $2.5 M HMGP, PDM, FMA, General Funds, CIP, Bond Long Term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 32-10 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HCC 11 — Complete appropriate structural retrofits of existing building to improve the integrity of the building envelope and roof systems. Hazards Mitigated: Hurricane, Flooding, Severe Weather, Dam Failure New and Existing 4, 9. 10, 11, 13 HCC Facilities Finance, Procurement $10.0 M HMGP, PDM, FMA, General Funds, CIP, Bond Long Term Action HCC 12 — Where appropriate Improve site drainage to minimize risk of urban flash flooding. Hazards Mitigated: Hurricane, Flooding, Dam Failure Existing 1, 4, 9, 10, 11, 12 HCC Facilities $1.0 M HMGP, PDM, FMA, General Funds, CIP, Bond Short Term Action HCC 13— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Hurricane, Flood, Severe Weather, Dam Failure, Earthquake, Wildfire, Drought, Landslide, Tsunami, Coastal Erosion New and Existing 1, 3, 4, 5, 9, 10, 11, 15 HCC Facilities HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 32-11. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya HCC1 10 High High Yes Yes No Low Medium HCC2 5 Low Low Yes No Yes High Low HCC3 5 High Medium Yes Yes No High High HCC4 11 Low Low Yes No Yes High Low HCC5 6 High Low Yes Yes Yes High High HCC6 5 High High Yes Yes No Low Medium HCC7 5 High High Yes Yes No Medium High HCC8 5 High Low Yes Yes Yes High High HCC9 5 High Low Yes Yes Yes High High HCC10 6 High High Yes Yes No Low Medium HCC11 4 High High Yes Yes No Low Medium HCC12 5 High Medium Yes Yes No Medium High HCC13 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Houston Community College 32-11 Table 32-12. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Hurricane HCC1, 12, 13 HCC1, 6, 8, 9, 10, 11 HCC2, 4, 7, 13 HCC12 HCC3, 4, 5, 6, 7, 9, 10, 13 HCC8, 12 HCC3, 12 HCC2, 3, 4, 5, 13 Flood HCC1, 12, 13 HCC1, 6, 8, 10, 11 HCC2, 4, 7, 13 HCC12 HCC3, 4, 5, 6, 7, 10, 13 HCC8, 12 HCC3, 12 HCC2, 3, 4, 5, 13 Severe Weather HCC1, 12, 13 HCC1, 6, 9, 10, 11 HCC2, 4, 7, 13 HCC3, 4, 5, 6, 7, 9, 10, 13 HCC3, 12 HCC2, 3, 4, 5, 13 Medium-Risk Hazards Dam Failure HCC1, 12 , 13 HCC1, 6, 8, 10, 11 HCC2, 4, 7, 13 HCC12 HCC3, 4, 5, 6, 7, 10, 13 HCC8, 12 HCC3 HCC2, 3, 4, 5, 13 Low-Risk Hazards Earthquake HCC1, 13 HCC1, 6, 10 HCC2, 4, 13 HCC3, 4, 5, 6, 10, 13 HCC2, 3, 4, 5, 13 Wildfire HCC1, 13 HCC1, 6, 10 HCC2, 4, 13 HCC3, 4, 5, 6, 10, 13 HCC3 HCC2, 3, 4, 5, 13 Drought HCC13 HCC11 HCC2, 4, 13 HCC3, 4, 5, 13 HCC3 HCC2, 3, 4, 5, 13 Landslide HCC1, 13 HCC1, 6, 10 HCC2, 4, 13 HCC3, 4, 5, 6, 10, 13 HCC2, 3, 4, 5, 13 Tsunami HCC13 HCC10 HCC2, 4, 7, 13 HCC3, 4, 5, 6, 7, 10, 13 HCC2, 3, 4, 5, 13 Coastal Erosion HCC13 HCC2, 4, 13 HCC3, 4, 5, 13 HCC3 HCC2, 3, 4, 5, 13 a. See the introduction to this volume for explanation of mitigation types. 32.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX 32.10.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • HCC Hazard Vulnerability Assessment — This tool scores and ranks potential hazards or threats to HCC staff, operations, or property, and is used in EOP development. • HCC Property Insurance Loss Runs – The historical data regarding losses during past disasters was utilized in the analysis of hazards and the development of the hazard mitigation action plan. • HCC Institutional Emergency Operations Plan and HCC Business Continuity Plan were reviewed during the capability assessment and determining the level of integration with existing plans. • HCC Strategic Plan was reviewed during the capability assessment and in determining the level of integration with existing plans. • HCC Facilities Condition Assessment provides a detailed assessment of the condition of HCC facilities and identifies specific actions that can be taken to increase the resilience of the facilities to natural hazards. The assessment also includes projected capital expenditure required to maintain existing Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 32-12 buildings over time. The assessment was utilized as a primary driver for the selection of facilities related mitigation actions. • HCC Property Insurance Statement of Values was utilized to establish the critical facilities and assets and the associated values. • HCC Comprehensive Annual Financial Report was utilized during the capability assessment and the completion of the mitigation action plan matrix and the establishment of mitigation priorities. • HCC Capital Improvements Program was utilized during the capability assessment. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • FEMA Flood Maps were utilized in the hazard ranking and the selection of hazard mitigation action plan items. • NFPA 101, Life Safety Code 2015 Edition was utilized during the capability assessment. • Robert T. Stafford Disaster Relief and Emergency Assistance Act, (as amended), 42 U.S.C. 5121 was utilized to in the completion of the hazard mitigation action plan. • FEMA, Continuity Guidance Circular 1, July 2013 and FEMA, Continuity Guidance Circular 2, October2013 were utilized in the completion of the capability assessment. • FEMA, Guide for Developing High‐Quality Emergency Operations Plans for Institutions of Higher Education was utilized in the completion of the capability assessment. • Junior College Audit Reporting Tool is provided by the Texas School Safety Center and provides a comprehensive checklist utilized to facilitate the capability assessment. 32.10.2 Staff and Local Stakeholder Involvement in Annex Development The annex was developed by a committee involving HCC Office of Emergency Management, Risk Management, Facilities, HCC Police, Northeast College Office of the President, and Finance. Committee meetings were held as each phase was released, and relevant departments were consulted for related sections of the annex. Updates were internally circulated and vetted for accuracy. 33-1 33. LONE STAR COLLEGE 33.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Derrick Harris, Senior Business Analyst 20515 SH 249 Houston, TX 77070 Telephone: 281-290-3667 e-mail Address: Derrick.D.Harris@lonestar.edu Cheryl Cepeda, Manager 20515 SH 249 Houston, TX 77070 Telephone: 281-290-2891 e-mail Address: Cheryl.Cepeda@lonestar.edu 33.2 JURISDICTION PROFILE 33.2.1 Overview The Lone Star College (LSC) was established in 1972 as a public junior college district providing post-secondary educational opportunities. LSC is governed by a nine-member Board of Trustees. The Chancellor serves as the Chief Executive Officer and oversees the daily operations of LSC. The Chancellor assumes responsibility for the adoption of this plan; the Department of Emergency Preparedness will oversee its implementation. LSC currently has approximately 7,800 full-time and part-time employees. Funding comes primarily through ad valorem taxes, tuition and fees, and state appropriations. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 33-1. Table 33-1. Local Mitigation Planning Team Members Name Title Derrick Harris Senior Business Analyst, Department of Emergency Preparedness Cheryl Cepeda Manager, Department of Emergency Preparedness Paul Willingham Senior Associate Vice-Chancellor/Police Chief Mark Pemberton Captain, Police Department Sandra Joachim Chief of Staff, Police Department 33.2.2 Service Area and Trends The Lone Star College (LSC) currently has a student enrollment of 95,000 with a service area covering more than 1,400 square miles in Harris, Montgomery, San Jacinto, and Walker counties, including multiple school districts: Aldine, Cleveland, Conroe, Cypress-Fairbanks, Humble, Huntsville, Klein, Magnolia, Montgomery, New Caney, New Waverly, Splendora, Spring, Tarkington, Tomball, Waller, and Willis. Lone Star College is the largest institution of higher education in the Houston area and is one of the top three largest colleges in the nation. LSC is composed of seven colleges, two university centers, and ten centers. LSC continues to grow with plans to build additional centers and complete building expansion at various locations to accommodate the growth demand in the LSC service area. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 33-2 33.2.3 Assets Table 33-2 summarizes the critical assets of the district and their value. Table 33-2. Special Purpose District Assets Asset Value Property Land -Property addresses listed below under critical facilities and infrastructure $86,978,392 Construction-in-Progress $47,692,568 Equipment Furniture, Machinery, Vehicles $100,186,178 Total: Critical Facilities and Infrastructure $906,495,848 LSC-Cyfair – 9191 Barker Cypress Road, Cypress, TX 77433 LSC-Cypress Center – 19710 Clay Road, Katy, Texas 77449 LSC-Westway Park Technology Center – 5060 Westway Park Boulevard, Houston, Texas 77041 LSC-Kingwood – 20000 Kingwood Drive, Kingwood, TX 77339-3801 LSC-Atascocita Center – 15903 West Lake Houston, Houston, TX 77044 LSC-EMCID Center, 21575 Highway 59 N, New Caney, TX 77357 LSC-Process Technology Center, 14001 Lockwood Rd, Houston, Texas 77044 LSC-Houston North Fairbanks – 14955 Northwest Freeway, Houston, Texas 77040 LSC-Houston North Greenspoint – 250 N. Sam Houston Pkwy E., Houston, Texas 77060 LSC-Houston North Victory – 4141 Victory Drive, Houston, Texas 77088 LSC-Montgomery – 3200 College Park Drive, Conroe, TX 77384 LSC-Conroe Center – 777 Conroe Park North Drive, Conroe, TX 77303 LSC-North Harris – 2700 W.W. Thorne Drive, Houston, TX 77073 CHI LSC-North Harris – 910 E Richey Rd., Houston, TX 77073 LSC-Health Professions Building – 17200/17202 Red Oak Dr., Houston, TX 77090 LSC-Transportation Institute – 24037 W Hardy Rd., Spring, TX 77373 LSC-East Aldine Center (Opening Fall 2019) – 2500 Aldine Mail Route Road, Houston, Texas 77039 LSC-Tomball – 30555 Tomball Parkway, Tomball, TX 77375 LSC-Tomball Health Science Building – 700 Graham Dr., Tomball, Texas 77375 LSC-Creekside Center – 8747 West New Harmony Trail., The Woodlands 77375 LSC-University Park – 20515 SH 249, Houston, 77070 LSC-Energy & Manufacturing Institute – 11521 Compaq Center West Drive, Houston, TX 77070 LSC-Center for Science & Innovation – 919 University Park Campus Drive, Houston, TX 77070 LSC-Central Plant – 20555 SH 249, Houston, TX 77070 Visitors Center/YMCA Child Care – 11144 Compaq Center W Dr., Houston, TX 77070 Total: $1,141,352,986 33.3 CAPABILITY ASSESSMENT An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 29.9 identifies these as community capacity building mitigation actions. Lone Star College 33-3 33.3.1 Planning and Regulatory Capabilities Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents. When effectively prepared and administered, these plans, programs and regulations can support the implementation of mitigation actions. Table 33-3 summarizes existing codes, ordinances, policies, programs or plans that are applicable to this hazard mitigation plan. Table 33-3. Planning and Regulatory Capability Plan, Study or Program Date of Most Recent Update Comment Emergency Operations Plan/Emergency Management Plan 2015 Currently being updated Continuity of Operations Plan 2015 Currently being updated Evacuation Plan 2018 Some locations undergoing revisions 33.3.2 Fiscal, Administrative and Technical Capabilities Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard mitigation projects. An assessment of fiscal capabilities is presented in Table 33-4. Administrative and technical capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of administrative and technical capabilities is presented in Table 33-5. Table 33-4. Fiscal Capability Financial Resource Accessible or Eligible to Use? Capital Improvements Project Funding No Authority to Levy Taxes for Specific Purposes No User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds No Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds No State-Sponsored Grant Programs Yes, Hazard Mitigation Grant Program Development Impact Fees for Homebuyers or Developers No Federal Grant Programs Yes, Hazard Mitigation Grant Program Table 33-5. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices No Engineers or professionals trained in building or infrastructure construction practices Yes Facilities & Construction Planners or engineers with an understanding of natural hazards Yes Department of Emergency Preparedness Staff with training in benefit/cost analysis Yes Department of Emergency Preparedness Surveyors Yes Contractor Personnel skilled or trained in GIS applications No Scientist familiar with natural hazards in local area No Emergency manager Yes Department of Emergency Preparedness Grant writers Yes Resource Development & Administration/ Department of Emergency Preparedness Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 33-4 33.3.3 Education and Outreach Capabilities Outreach and education capability identifies the connection between government and community members, which opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is presented in Table 33-6. Table 33-6. Education and Outreach Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No • If yes, please briefly describe Do you use social media for hazard mitigation education and outreach? No • If yes, please briefly describe Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, please briefly specify Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, please briefly describe Emergency Preparedness website is currently being developed and will include hazard-related information. Do you have any established warning systems for hazard events? Yes • If yes, please briefly describe LoneStarCollegeAlert/RAVE is the emergency notification system used to inform the LSC community of hazard events. 33.3.4 Adaptive Capacity for Climate Change Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 33-7 summarizes the jurisdiction’s adaptive capacity for climate change. 33.4 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 33.4.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Emergency Operations Plan/Emergency Management Plan: The results of the risk assessment were used in the development of the LSC Emergency Management Plan. Lone Star College 33-5 Table 33-7. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Medium Comment: Jurisdiction-level monitoring of climate change impacts Medium Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks High Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Medium Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Medium Comment: Champions for climate action in local government departments Medium Comment: Political support for implementing climate change adaptation strategies Medium Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 33-6 33.4.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • LSC Emergency Management Plan Annexes – The LSC-Department of Emergency Preparedness will be integrating hazard mitigation information on its annexes, such as, communications, public information, recovery, hazardous materials & chemical spills, and campus/department emergency operations plans. 33.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 33-8 lists past occurrences of natural hazards for which specific damage was recorded in Lone Star College. Other hazard events that broadly affected the entire planning area, including Lone Star College are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 33-8. Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 LSC-Kingwood suffered major damages due to flooding Severe Storms and Flooding 4269 DR 2016 Not Available Severe Storms and Flooding 4272 DR 2016 Not Available Severe Storms, Tornadoes, Straight Line Winds and Flooding 4245 DR 2015 Not Available Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR 2015 Not Available Hurricane Ike 1791 DR 2008 LSC-North Harris had power outage for 2 weeks Hurricane Ike 3294 EM 2008 LSC-North Harris had power outage for 2 weeks Hurricane Rita 1606 DR 2005 LSC-North Harris closed for a week due to electrical issues and high water Hurricane Rita 3261 EM 2005 LSC-North Harris closed for a week due to electrical issues and high water Hurricane Katrina Evacuation 3216 EM 2005 Not Available Tropical Storm Allison 1379 DR 2001 Not Available 33.6 HAZARD RISK RANKING Table 33-9 presents a local ranking for Lone Star College of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Lone Star College 33-7 Table 33-9. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Flooding 27 Medium 3 Earthquake 14 Low 4 Dam Failure 12 Low 5 Wildfire 9 Low 6 Drought 6 Low 7 Coastal Erosion 0 (No exposure) None 7 Mass Movement 0 (No exposure) None 7 Tsunami 0 (No exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 33.7 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • LSC-Kingwood suffered tremendous flood damage caused by Hurricane Harvey, damaging 6 of 9 buildings. • LSC-University Park’s Center for Science Innovation also sustained some flood damage, pushing back the original opening date. • A critical facility used by ride-out teams not equipped with a generator. Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. 33.8 STATUS OF PREVIOUS PLAN ACTIONS Table 33-10 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 33-10. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2014LONSTR001: Reduce the buildup of fuel areas to mitigate the risk of wildfire and provide public awareness to LSC community to further aid in the reduction of fuel areas. X LSC4 Comment: Ongoing – Action item carried over to plan update due t to departmental reorganization. 2014LONSTR002: Increase the effectiveness of exterior warning systems by increasing the number of systems/devices provided through a network connected system-wide exterior speaker array system) installed at LSC facilities that will result in improved public information and warnings on wildfire hazards and threats. X LSC5 Comment: In Progress – Initial planning started Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 33-8 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2014LONSTR003: Create a sustainable balance that will allow the LSC community to operate safely while maintaining environmental harmony in a wildland/urban interface setting through implementation of the Firewise Program. Phase I: (a) enlist a specialist to complete a community assessment and create a plan that identifies agreed-upon achievable solutions to be implemented by the LSC community and (b) sponsor a local Firewise Task Force Committee which maintains the Firewise Community/USA program, then in Phase II submit an annual report to Firewise Communities/USA that documents continuing compliance with the program. X Comment: Removed – Intent of previously identified action is unclear; adequate personnel not available due to department reorganization. 2014LONSTR004: Increase the effectiveness of warning systems by increasing the number of LSC workspaces with NOAA weather alert radios. X LSC6 Comment: On Going – NOAA weather alert radios distributed within LSC-Police Department. Plans to distribute more to other departments if funding becomes available. 2014LONSTR005: Assist LSC with funding to provide the proper design criteria for “tornado safe rooms” or shelters for areas without a safe area for shelter, such as libraries with two or more walls that are 80% or more glass. X Comment: Removed – change in priorities; most facilities have safe areas in interior rooms with no windows/glass. 2014LONSTR006: Expand LSC warning systems to include audio and visual warnings and supporting literature as a means of providing timely public warning and information that includes individuals with functional and access needs while at an LSC campus in the event of a tornado or threat. X Comment: Removed – intent of previously identified action is unclear; action item similar to 2014LONSTR011 and 2014LONSTR012. 2014LONSTR007: Create a chemical safety/hazmat emergency management program to include associated materials specifically for use by educational facilities in partnership with Harris County first responder agencies. This program would include a consolidated database of MSDS/SDS sheet for the top 700+ chemicals tracked by the Environmental Protection Agency and the program would be used to increase the number of Tier II report submissions to the Department of State Health Services, local fire departments and Local Emergency Planning Committees (LEPCs) by members of the LSC community. X Comment: In Progress – The Environmental Health & Life Safety department established and chemical inventories along with SDS are stored in V Drive. Chemical inventories are also included in the intranet site and Digital Sandbox. 2014LONSTR008: Provide proper labeling, secure storage, and appropriate disposal of hazardous materials to avoid spillage and breakage during a hazard event. This program will mitigate risk of hazardous materials accidents within the Lone Star community and aid in increasing the number of entities submitting the appropriate TIER II reports to the Department of State Health Services, local fire departments and Local Emergency Planning Committees (LEPCs). X Comment: In Progress – Awareness program implemented; information available online under www.lonestar.edu/oem, Environmental Health & Safety, Waste Management Guidelines. Lone Star College 33-9 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2014LONSTR009: Install flood protection measures to reduce the adverse effects of flood events by reducing the number of low water crossings at LSC facilities. Public crossings will be elevated by using an articulated concrete block mattress solution (interlocking mats) to form a mattress in the low water. The interlocking mats will elevate grounds allowing for improved stability at crossings for pedestrians while not impeding the passage of vehicles and animals. X Comment: Removed – The LSC department tasked with such activity was not properly consulted; intent of action item was unclear. 2014LONSTR010: Implement an effective flood mitigation program that includes (a) the use of flood controls during construction, (b) the development of a riverine- erosion protection program for riverine-erosion prone areas caused by flooding, and (c) the implementation of a flood awareness program by providing FEMA/NFIP materials to patrons of LSC campus public libraries including those managed by the Harris County Libraries. X LSC7 Comment: Ongoing – All new construction now includes flood controls during the design phase. Flood awareness materials and information will be included in LSC Department of Emergency Preparedness website. 2014LONSTR011: Reduce the loss of property damage resulting from severe weather events by improving external warning systems used to alert/warn the LSC community about severe weather including severe thunderstorms and enhance warning concerning severe weather preparedness. X Comment: Removed – intent of previously identified action is unclear; action item similar to 2014LONSTR006 and 2014LONSTR012. 2014LONSTR012: Expand warning systems by adding sirens and exterior mass notification at all LSC facilities by installing hardware such as speaker arrays, sirens, strobes, and horns to reach LSC occupants in a timely manner that are on or near campus in parking lots and remote areas of campus who may require functional needs support services and/or limited English proficiency. X LSC8 Comment: Ongoing – Exterior mass notification plans have been developed as part of the Safety and Security Bond. 2014LONSTR013: Develop an LSC system wide Drought Contingency Program to include a plan and mitigation actions to identify additional potential impacts of drought on the community to include utilities such as power, drinking water, health and safety (including special needs), and emergency response such as fire and medical services. This action will aid in reducing loss of life and property damage resulting from severe weather events in the LSC community. X LSC9 Comment: Project not started – department undergoing reorganization and will carry over this action item to plan update. 2014LONSTR015: Expand LSC emergency management public education campaigns as a means of extending the reach to those with limited English proficiency and others requiring functional needs support services so that more receive timely warning and information. X LSC10 Comment: In Progress – Pre-scripted messages are available in English and Spanish. Updates to literature materials are currently being reviewed. 2014LONSTR016: Develop and enhance alternate sources for additional feed and adequate shelter for livestock and other animals to mitigate the adverse impact of an energy pipeline failure and to update the LSC-Tomball evacuation plan. X LSC11 Comment: Project not started – department undergoing reorganization and will carry over this action item to plan update. 2014LONSTR017: Harden the LSC Emergency Operations Center by improving its’ technological capabilities for monitoring, warning, and mitigating natural disasters and energy pipeline accidents X Comment: Removed – LSC will be utilizing web EOC and will rely on Harris County EOC for support if needed during natural disasters. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 33-10 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2014LONSTR018: Develop a tree trimming program to prevent limb breakage and safeguard nearby utility lines by working with utilities to identify critical areas of concern involving communication and transmission lines. X Comment: Removed – Tree trimming has occurred however coordination with location utilities unknown at this time. 2014LONSTR020: Enhance the warning of populations at risk from extreme heat when on campus and when participating in outdoor activities and using the information to provide viable options to minimize their risk of extended exposure. X Comment: Removed – Action item similar to 2014LONSTR002. 2014LONSTR021: Increase public awareness through the creation and distribution of materials and provide warning and alerts on the dangers of excessive heat to include persons with functional and access needs while at an LSC facility. X LSC12 Comment: Project not started – department undergoing reorganization and will carry over this action item to plan update. 2014LONSTR022: Install hail resistant roofing and window coverings, determined by a feasibility study, by hardening LSC buildings and critical infrastructure such as Police Offices, server rooms, and shelters for remote areas such as soccer fields, tennis courts that are not adjacent to any structures. X Comment: Removed – intent of previously identified action is unclear. 2014LONSTR024: Evaluate LSC buildings to determine how to mitigate storm damage through hardening measures then educate the LSC community on lessons learned. X Comment: Project not started – department undergoing reorganization and will carry over this action item to plan update. 2014LONSTR025: Harden critical facilities on campuses that would be used by ride-out teams and first responders such as police offices that include rehabilitation facilities, refrigerator, cooling, microwave/stove, water, food, generator, and other essential services. X LSC13 Comment: In Progress – LSC Department of Emergency Preparedness will continue working with the Police Department and Facilities to harden critical facilities used by ride-out teams. 33.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 33-11 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 33-12 identifies the priority for each action. Table 33-13 summarizes the mitigation actions by hazard of concern and mitigation type. Lone Star College 33-11 Table 33-11. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea LSC1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire Existing 3, 4, 10, 12 College Administration TBD High HMGP, PDM, FMA Short-term LSC2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Dam Failure, Wildfire, Drought New and Existing 1, 5, 8 College Administration TBD Low Staff Time, General Funds Short-term LSC3 — Integrate the hazard mitigation plan into other plans, ordinances and programs within the community. Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire Existing 2, 6, 9 College Administration TBD Low Staff Time Short-term LSC4 — Reduce the buildup of fuel areas to mitigate the risk of wildfire and provide public awareness to LSC community to further aid in the reduction of fuel areas. Hazards Mitigated: Wildfire Existing 2, 3, 8 DEP EHLS, Facilities Low HMGP Ongoing LSC5 — Increase the effectiveness of exterior warning systems by increasing the number of systems/devices provided through a network connected system-wide exterior speaker array system) installed at LSC facilities that will result in improved public information and warnings on wildfire hazards and threats. Hazards Mitigated: Dam failure, earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire New and Existing 1, 6, 15 TBD TBD High HMGP, Bond Ongoing LSC6 — Increase the effectiveness of warning systems by increasing the number of LSC workspaces with NOAA weather alert radios. Hazards Mitigated: Earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire Existing 1, 3, 11 DEP PD Medium HMGP, PDM, FMA Short-term LSC7 — Implement an effective flood mitigation program that includes (a) the use of flood controls during construction, (b) the development of a riverine-erosion protection program for riverine-erosion prone areas caused by flooding, and (c) the implementation of a flood awareness program by providing FEMA/NFIP materials to patrons of LSC campus public libraries including those managed by the Harris County Libraries. Hazards Mitigated: Flooding, severe weather, hurricane New and Existing 3, 4, 10 College Administration TBD High HMGP, PDM, FMA Ongoing LSC8 — Expand warning systems by adding sirens and exterior mass notification at all LSC facilities by installing hardware such as speaker arrays, sirens, strobes, and horns to reach LSC occupants in a timely manner that are on or near campus in parking lots and remote areas of campus who may require functional needs support services and/or limited English proficiency. Hazards Mitigated: Dam failure, earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire New and Existing 1, 4, 11 College Administration TBD High HMGP, Bond LSC9 — Develop an LSC system wide Drought Contingency Program to include a plan and mitigation actions to identify additional potential impacts of drought on the community to include utilities such as power, drinking water, health and safety (including special needs), and emergency response such as fire and medical services. This action will aid in reducing loss of life and property damage resulting from severe weather events in the LSC community. Hazards Mitigated: Drought, severe weather Existing 3, 4, 14 DEP TBD Low HMGP, Staff Time Ongoing Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 33-12 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea LSC10 — Expand LSC emergency management public education campaigns as a means of extending the reach to those with limited English proficiency and others requiring functional needs support services so that more receive timely warning and information. Hazards Mitigated: Dam failure, drought, earthquake, flooding, land slide, severe weather, hurricane, tsunami, wildfire New and Existing 1, 4, 15 DEP TBD Low HMGP, PDM, FMA Ongoing LSC11 — Develop and enhance alternate sources for additional feed and adequate shelter for livestock and other animals to mitigate the adverse impact of an energy pipeline failure and to update the LSC-Tomball evacuation plan. Hazards Mitigated: Earthquake, flooding, severe weather, hurricane, tsunami, wildfire Existing 8, 11, 15 College Administration TBD Medium HMGP Ongoing LSC12 — Increase public awareness through the creation and distribution of materials and provide warning and alerts on the dangers of excessive heat to include persons with functional and access needs while at an LSC facility. Hazards Mitigated: Drought, severe weather, wildfire New and Existing 1, 2, 4 DEP TBD Low HMGP, Staff Time Ongoing LSC13 — Harden critical facilities on campuses that would be used by ride-out teams and first responders such as police offices that include rehabilitation facilities, refrigerator, cooling, microwave/stove, water, food, generator, and other essential services. Hazards Mitigated: Drought, earthquake, flooding, severe weather, hurricane New and Existing 1, 3, 7, 13 College Administration TBD High HMGP, PDM, FMA Long-term LSC14 — Develop and/or update plans that support or enhance continuity of operations following disasters. Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire Existing 3, 8, 10, 13, 14 DEP TBD Low Staff Time, HMGP Short-term LSC15 — Purchase generators for critical facilities and infrastructure that lack adequate back-up power. Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire New and Existing 1, 13 College Administration TBD High HMGP, PDM Long-term Action LSC16— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Dam Failure, Wildfire, Drought New and Existing 1, 3, 4, 5, 9, 10, 11, 15 College Administration HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Lone Star College 33-13 Table 33-12. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya LSC1 4 High High Yes Yes No Medium High LSC2 3 Low Low Yes No Yes High Low LSC3 3 High Medium Yes Yes No Medium High LSC4 3 Medium Medium Yes Yes No Medium Medium LSC5 3 High High Yes Yes Yes Low Low LSC6 3 High Medium Yes Yes Yes Medium Medium LSC7 3 High High Yes Yes No Medium High LSC8 3 High High Yes Yes Yes Low Low LSC9 3 Medium Medium Yes Yes No Medium Medium LSC10 3 Medium Medium Yes Yes Yes Low Low LSC11 3 Medium Medium Yes Yes No Medium Low LSC12 3 Medium Medium Yes Yes Yes Low Low LSC13 4 High High Yes Yes No Medium High LSC14 5 High Medium Yes Yes Yes Medium High LSC15 2 High High Yes Yes No Medium High LSC16 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 33-13. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather LSC-1, 7, 16 LSC-1, 7 LSC-7, 10, 12, 16 LSC-7 LSC-5, 6, 8, 11, 13, 15, 16 LSC-1 LSC-2, 3, 9, 14, 16 Hurricane LSC-1, 16 LSC-7 LSC-7, 10, 16 LSC-7 LSC-5, 6, 8, 11, 13, 15, 16 LSC-7 LSC-2, 3, 14, 16 Medium-Risk Hazards Flooding LSC-1, 16 LSC-1, 7, LSC-7, 10, 16 LSC-5, 6, 8, 11, 13, 15, 16 LSC-1 LSC-2, 3, 14, 16 Low-Risk Hazards Earthquake LSC-1, 16 LSC-10, 16 LSC-5, 6, 8, 11, 13, 15, 16 LSC-2, 3, 14, 16 Dam Failure LSC16 LSC-10, 16 LSC-5, 6, 8, 15, 16 LSC-2, 3, 14, 16 Wildfire LSC-1, 4, 16 LSC-1, LSC-4, 10, 12, 16 LSC-5, 6, 8, 11, 15, 16 LSC-1 LSC-2, 3, 14, 16 Drought LSC16 LSC-10, 12, 16 LSC-13, 15, 16 LSC-2, 3, 9, 16 a. See the introduction to this volume for explanation of mitigation types. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 33-14 33.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX 33.10.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • LSC Hazard Mitigation Plan 2018 Annual Evaluation and Monitoring Report – Reviewed last report submitted and used information to update existing action items. • LSC Approved Budget Report Fiscal Year 2019 • LSC Comprehensive Annual Report, August 31, 2018 The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. 33.10.2 Staff and Local Stakeholder Involvement in Annex Development This annex was developed with input from the LSC Police Department and Department of Emergency Preparedness (DEP). All departments were asked to contribute to the annex development through reviewing and contributing to the capability assessment, reporting on the status of previously identified actions, and participating in action identification and prioritization. The LSC DEP, formerly known as LSC Office of Emergency Management, has gone through a reorganization earlier this year and will further reevaluate the departments that will be represented on the Hazard Mitigation Team to ensure all key stakeholders are included. 34-1 34. UNIVERSITY OF HOUSTON 34.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Kelly Boysen, Director of Emergency Management 4343 Elgin St. Houston, TX 77204-0008 Telephone: 713-743-2841 e-mail Address: krboysen@uh.edu Brian Hall, Emergency Management Specialist 4343 Elgin St. Houston, TX 77204-0008 Telephone: 713-743-6082 e-mail Address: bhall@central.uh.edu 34.2 JURISDICTION PROFILE 34.2.1 Overview Established in 1927, the University of Houston is an institution of higher education whose mission is to offer nationally competitive and internationally recognized opportunities for learning, discovery and engagement to a diverse population of students in a real-world setting. The University has 166 buildings and currently employs approximately 10,000 staff and faculty. Funding for the University comes primarily through Tuition/Fees, Contracts & Grants, State Appropriations, Other Operating, and Endowment Income. Table 34-1. Local Mitigation Planning Team Members Name Title Kelly Boysen Director, Emergency Management Jeff Benjamin Executive Director, Facilities Services Wayne Brown Director, Risk Management Bret Collier/Andrea Black Captain, Police Department Chris McDonald Director, Fire and Life Safety Christa Rieck Executive Director, Facilities, Planning & Construction Mike Rosen Executive Director, Media Relations 34.2.2 Service Area and Trends The University of Houston campus covers 574 acres, serving a population of more than 55,000 students, faculty and staff with approximately 8,000 student residents living on campus. The majority of students are from Harris and adjacent counties, however 1,200 are from out of state and over 3,600 are international students, making the University one of the most diverse student populations in the nation. Student enrollment has increased 13.2% in the last five years. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 34-2 34.2.3 Assets Table 34-2 summarizes the critical assets of the district and their value. Table 34-2. Special Purpose District Assets Asset Value Property 574 acres of land $939,915,900.00 Equipment 69 Generators $20,265,648.00 Pipelines $10,000,000.00 Fleet (153 vehicles) $4,881,465.00 Radio Equipment (150 Police radios/264 Facilities Radios) $360,000.00 Chillers and Boilers $31,831,500.00 Facilities Equipment $1,717,640.00 Total: $69,056,253.00 Critical Facilities and Infrastructure UH Police Department – 4051 Wheeler St, Houston, TX, 77204 $5,396,471.37 Central Plant – 4738 Calhoun Rd, Houston, TX, 77204 $4,458,428.01 Center for Public Broadcasting building (includes Emergency Operations Center & EAS LP 2 at KUHF) – 4343 Elgin St, Houston, TX, 77204 $49,508,554.75 General Services Building – 4267 Elgin St, Houston, TX, 77204 $15,734,759.16 Bulk Fueling Diesel Tank Farm – 4267 Elgin St, Houston, TX, 77204 $2,500,000.00 Computing Center – 4221 Elgin St, Houston, TX, 77204 $20,054,948.53 Ezekiel Cullen Building – 4302 University Dr, Houston, TX, 77204 $42,395,830.27 Cougar Sub-Station – 2200 Schlumberger, Houston, TX, 77023 $14,183,424.00 Health 1 – 4849 Calhoun Rd, Houston, TX, 77204 $65,991,467.94 Science and Research 2 – 3455 Cullen Blvd, Houston, TX, 77204 $44,215,511.04 J. Davis Armistead – 4901 Calhoun Rd, Houston, TX, 77204 $32,245,751.81 Sci. & Eng. Research Center – 3517 Cullen Blvd, Houston, TX, 77204 $66,251,298.82 College of Pharmacy (Texas Medical Center) – 1441 Moursund St, Houston, TX, 77204 $17,771,304.96 Child Care Center – 4139 Wheeler St, Houston, TX, 77204 $365,728.13 Isabel C. Cameron – 4235 Cullen Blvd, Houston, TX, 77204 $4,609,979.80 Moody Towers Residence Hall – 4401 Cougar Village Dr, Houston, TX, 77204 $50,773,506.05 Cougar Village I – 4385 Cougar Village Dr, Houston, TX, 77204 $58,414,694.40 Cougar Village II – 4373 Cougar Village Dr, Houston, TX, 77204 $53,865,000.00 Cougar Place – 4016 Cullen Blvd, Houston, TX, 77204 $42,200,625.56 Conrad Hilton College of Hotel & Restaurant Management – 4450 University Dr, Houston, TX, 77204 $76,875,208.70 University Lofts Apartments – 4700 Calhoun Rd, Houston, TX, 77204 $104,403,658.75 Bayou Oaks Apartments – 5063 Calhoun Rd, Houston, TX, 77204 $25,792,819.20 Cullen Oaks Apartments – 4600 Cullen Blvd, Houston, TX, 77204 $102,952.18 Science and Research 1 – 3507 Cullen Blvd, Houston, TX, 77204 $63,574,308.86 Science Teaching Lab – 3589 Cullen Blvd, Houston, TX, 77204 $35,522,664.87 Cullen College of Engineering 1 – 4726 Calhoun Rd, Houston, TX, 77204 $66,589,599.74 Cullen College of Engineering 2 – 4722 Calhoun Rd, Houston, TX, 77204 $31,421,011.97 Lamar Fleming, Jr – 3585 Cullen Blvd, Houston, TX, 77204 $36,556,462.08 Science Building – 3581 Cullen Blvd, Houston, TX, 77204 $15,562,022.63 Univ of Houston Science Center -3369 Cullen Blvd, Houston, TX, 77204 $44,630,507.52 Campus Recreation & Wellness Center – 4500 University Dr, Houston, TX, 77204 $62,088,726.53 University of Houston 34-3 Asset Value Fertitta Center – 3422 Cullen Blvd, Houston, TX, 77204 $62,745,230.00 Football Indoor Practice Facility – 3820 Holman St., Houston, TX, 77204 $20,000,000.00 Health 2 – 4733 Wheeler St., Houston, TX, 77204 $136,000,000.00 Charles F. McElhinney Hall – 3623 Cullen Blvd, Houston, TX, 77204 $11,940,393.03 Guy V. Lewis Basketball Development Facility – 3480 Cullen Blvd, Houston, TX, 77204 $23,000,000.00 Engineering Research Building – 4718 Calhoun Rd., Houston, TX, 77204 $61,000,000.00 Wortham House – 1505 South Blvd. Houston, TX, 77006 $3,194,912.85 University Center – 4455 University Dr, Houston, TX, 77204 $66,562,000.00 University Center Satellite – 3457 Cullen Blvd, Houston, TX, 77204 $6,210,840.38 Cougar Woods Dining – 4277 Cougar Village Dr, Houston, TX, 77204 $9,560,678.40 UH Health Center – 4367 Cougar Village Dr, Houston, TX, 77204 $2,097,845.66 Philip Guthrie Hoffman Hall – 3551 Cullen Blvd, Houston, TX, 77204 $31,874,030.93 Bates Law – 4604 Calhoun Rd, Houston, TX, 77204 $20,686,786.56 Leroy and Lucile Melcher Hall – 4750 Calhoun Rd, Houston, TX, 77204 $40,136,988.67 M.D. Anderson Library – 4333 University Dr, Houston, TX, 77204 $198,948,261.89 Reb.& John Moores Schools of Music – 3333 Cullen Blvd, Houston, TX, 77204 $46,693,933.06 John M. O’Quinn Law Library – 4604 Calhoun Rd, Houston, TX, 77204 $47,258,779.26 Justin Dart Jr. Center for Students w/ DisAbilties – 4369 Cougar Village Dr, Houston, TX, 77204 $800,092.20 Melcher Gym/Charter School – 3871 Holman St, Houston, TX, 77204 $5,131,607.52 Susanna Garrison Gymnasium – 3875 Holman St, Houston, TX, 77204 $6,446,637.72 Cullen Performance Hall – 4300 University Dr, Houston, TX, 77204 $11,841,688.39 UH ERP 1 – 5000 Gulf Fwy, Houston, TX, 77204 $14,424,016.90 UH ERP 2 – 5000 Gulf Fwy, Houston, TX, 77204 $7,143,590.76 UH ERP 3 – 5000 Gulf Fwy, Houston, TX, 77204 $11,664,027.65 UH ERP 4 – 5000 Gulf Fwy, Houston, TX, 77204 $9,438,895.28 UH ERP 5 – 5000 Gulf Fwy, Houston, TX, 77204 $8,313,957.53 UH ERP 6 – 5000 Gulf Fwy, Houston, TX, 77204 $3,546,077.68 UH ERP 7 – 5000 Gulf Fwy, Houston, TX, 77204 $14,523,927.04 UH ERP 8 – 5000 Gulf Fwy, Houston, TX, 77204 $11,075,678.21 UH ERP 9 – 5000 Gulf Fwy, Houston, TX, 77204 $11,863,481.26 UH ERP 10 – 5000 Gulf Fwy, Houston, TX, 77204 $1,528,973.11 UH ERP 11 – 5000 Gulf Fwy, Houston, TX, 77204 $7,422,911.76 UH ERP 13 – 5000 Gulf Fwy, Houston, TX, 77204 $5,250,832.79 UH ERP 14 – 5000 Gulf Fwy, Houston, TX, 77204 $17,072,934.14 UH ERP 15 – 5000 Gulf Fwy, Houston, TX, 77204 $4,136,768.96 UH ERP 19 – 5000 Gulf Fwy, Houston, TX, 77204 $7,879,680.00 UH ERP 20 – 5000 Gulf Fwy, Houston, TX, 77204 $26,265.60 C.W. Mitchell Center for the Arts – 3351 Cullen Blvd, Houston, TX, 77204 $13,400,433.65 College of Technology Building – 4730 Calhoun Rd, Houston, TX, 77204 $12,896,409.60 Technology Annex – 4902 Gulf Fwy, Houston, TX, 77204 $4,195,053.29 Fine Arts Building – 4188 Elgin St, Houston, TX, 77204 $33,559,031.81 G.D. Hines Coll of Architecture – 4200 Elgin St, Houston, TX, 77204 $36,971,458.56 Teaching Unit 2 Building – 4604 Calhoun Rd, Houston, TX, 77204 $8,209,276.21 Fred J. Heyne – 3695 Cullen Blvd, Houston, TX, 77204 $13,737,538.64 Max Krost Hall – 4604 Calhoun Rd, Houston, TX, 77204 $15,937,497.32 Agnes Arnold Hall – 3553 Cullen Blvd, Houston, TX, 77204 $31,820,249.09 Stephen Power Farish Hall – 3657 Cullen Blvd, Houston, TX, 77204 $25,917,843.46 Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 34-4 Asset Value Graduate School of Social Work – 3511 Cullen Blvd, Houston, TX, 77204 $9,039,947.13 Jack J. Valenti School of Comm. – 3347 Cullen Blvd, Houston, TX, 77204 $7,329,529.01 Science & Engineering Classroom Building – 3487 Cullen Blvd, Houston, TX, 77204 $9,613,209.60 Roy G. Cullen – 3687 Cullen Blvd, Houston, TX, 77204 $10,160,247.55 Classroom and Business Building – 4742 Calhoun Rd, Houston, TX, 77204 $33,261,705.22 Michael J. Cemo Hall – 4746 Calhoun Rd, Houston, TX, 77204 $8,510,054.40 Science & Engineering Annex – 4712 Calhoun Rd, Houston, TX, 77204 $2,123,342.26 Engineering Lecture Hall – 4726 Calhoun Rd, Houston, TX, 77204 $553,005.40 B. Keeland Jr. Design.& Expl Ctr – 4222 Elgin St, Houston, TX, 77204 $660,648.13 Athletic Center – 3204 Cullen Blvd, Houston, TX, 77204 $40,340,447.26 A.D. Bruce Religion Center – 3841 Cullen Blvd, Houston, TX, 77204 $3,377,678.50 TDECU Stadium – 3700 Cullen Blvd, Houston, TX, 77204 $115,014,600.00 Alumni Center – 3204 Cullen Blvd, Houston, TX, 77204 $2,265,060.39 UH-DPS Parking Enforcement – 4055 Wheeler St, Houston, TX, 77204 $1,050,624.00 Student Service Center 1 – 4365 Cougar Village Dr, Houston, TX, 77204 $8,601,868.86 Student Service Center 2 – 4367 Cougar Village Dr, Houston, TX, 77204 $608,737.66 Fire & Life Safety Storage – 4739 Cullen Blvd, Houston, TX, 77204 $1,050,624.00 Visitor Information Booth 1 – 4422 University Dr, Houston, TX, 77204 $105,952.18 KUHT Fiber Optics Building – 4515 Cullen Blvd, Houston, TX, 77204 $364,087.39 KUHT Telephone Equipment – 4515 Cullen Blvd, Houston, TX, 77204 $821,170.41 Tex. Learn & Comp. Ctr. Annex – 4513 Cullen Blvd, Houston, TX, 77204 $718,921.52 Cullen Annex Laboratory – 4519 Cullen Blvd, Houston, TX, 77204 $595,477.68 Dynamometer Test Laboratory – 4505 Cullen Blvd, Houston, TX, 77204 $1,710,650.90 Safety, Human Factors & Ergo. Lab – 4517 Cullen Blvd, Houston, TX, 77204 $213,035.95 South Park Annex – 5011 Calhoun Rd, Houston, TX, 77204 $6,430,346.09 Health and Biomedical – 4733 Wheeler Ave, Houston, TX 77004 $65,991,467.94 Clinical Research Services Ctr – 4455 Cullen Blvd, Houston, TX, 77204 $2,828,080.92 Total: $2,631,485,264.80 34.3 CAPABILITY ASSESSMENT An assessment of the University’s current capabilities was conducted to identify opportunities to expand, initiate or integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table identifies these as community capacity building mitigation actions. 34.3.1 Planning and Regulatory Capabilities The University develops plans and programs and implements rules and regulations to protect and serve the campus community. When effectively prepared and administered, these plans, programs and regulations can support the implementation of mitigation actions. Table 34-3 summarizes existing codes, ordinances, policies, programs or plans that are applicable to this hazard mitigation plan. University of Houston 34-5 Table 34-3. Planning and Regulatory Capability Plan, Study or Program Date of Most Recent Update Texas Facilities Commission Uniform General Conditions (and Supplementary General Conditions) 2015 (Supplementary: 2018) Campus Design Guidelines and Standards 2018 International Building Code 2018 NFPA 1, Fire Code 2015 Edition 2015 NFPA 101, Life Safety Code 2015 Edition 2015 Various Federal/State regulations relating to Environmental, Health & Safety Various Texas Food Establishment Rules 2015 University of Houston (UH) Manual of Administrative Policies and Procedures (MAPP) Emergency Management Policy (06.01.01) 2017 UH MAPP Continuity of Operations Planning (06.01.02) 2019 UH MAPP Laboratory Safety Program and Corresponding Safety Manuals (06.02.03) 2018 UH MAPP Fire and Life Safety Code (06.03.01) 2015 University of Houston System Administrative Memorandum (SAM) 01.C.01- Risk Management Policy 2017 University of Houston Emergency Management Plan 2018 University of Houston Continuity of Operations Plan 2018 Various UH policies, procedures relating to Environmental, Health & Safety Various 34.3.2 Fiscal, Administrative and Technical Capabilities Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard mitigation projects. An assessment of fiscal capabilities is presented in Table 34-4. Administrative and technical capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of administrative and technical capabilities is presented in Table 34-5. 34.3.3 Education and Outreach Capabilities Outreach and education capability identifies the connection between the University and community members, which opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is presented in Table 34-6. Table 34-4. Fiscal Capability Financial Resource Accessible or Eligible to Use? Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes No User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds Yes State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Federal Grant Programs Yes Other Yes (Private Donors; Funding from State Legislature) Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 34-6 Table 34-5. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Contract for service Engineers or professionals trained in building or infrastructure construction practices Yes Contract for service Planners or engineers with an understanding of natural hazards Yes Contract for service Staff with training in benefit/cost analysis Yes Facilities Planning, Space Management and Campus Architect Surveyors Yes Contract for service Personnel skilled or trained in GIS applications Yes Contract for service Scientist familiar with natural hazards in local area Yes Various University Instructors Emergency manager Yes UH Office of Emergency Management Grant writers Yes University Division of Research / Office of Contracts and Grants Other No Table 34-6. Education and Outreach Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, please briefly describe UH Office of Emergency Management Website Do you use social media for hazard mitigation education and outreach? Yes • If yes, please briefly describe Facebook and Twitter Accounts Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes • If yes, please briefly specify University Emergency Planning Committee Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, please briefly describe UH Emergency Management Plan, Various Community Outreach and Training Programs Do you have any established warning systems for hazard events? Yes • If yes, please briefly describe University’s Emergency Notification System, UH ALERT 34.4 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in Section 1.9 were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 34.4.1 Existing Integration The University of Houston is a new Planning Partner and will report on this at the five-year review period. University of Houston 34-7 34.4.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Capital Improvement Plan — The University will work to integrate projects outlined in the hazard mitigation plan with the Capital Improvement Plan in order to help mitigate potential hazards. • UH Recovery Plan — The University does not have a formal, written recovery plan and intends to develop one as a mitigation planning action during the next five years. 34.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 34-8 lists past occurrences of natural hazards for which specific damage was recorded for the University of Houston. Other hazard events that broadly affected the entire planning area, including University of Houston, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 34-8. Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR Aug/Sept 2017 $28,000,000 Severe Storms and Flooding 4269 DR April 2016 N/A (1 day University closure occurred) Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR May 2015 $25,000 Hurricane Ike 1791 DR Sept 2008 $23,000,000 Tropical Storm Allison 1379 DR June 2001 $76,000,000 34.6 HAZARD RISK RANKING Table 34-9 presents a local ranking for University of Houston of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 34-9. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather (3X16) = 48 High 2 Hurricane (3X15)= 45 High 3 Flooding (3X13)= 39 High 4 Drought (3X4) = 12 Low 5 Earthquake (1X11) = 11 Low 6 Wildfire (1X6) = 6 Low 7 Mass Movement (1X4) = 4 Low 8 Dam Failure (2X0) = 0 None 8 Tsunami (1X0) = 0 None 8 Coastal Erosion (0X0) = 0 None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 34-8 34.7 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • A number of University buildings possess a flood risk and have experienced repetitive loss. • Majority of University buildings have hurricane and severe weather risk where power loss may be caused due to high winds. This includes some residence halls, research, and other critical facilities which do not have generators or full-emergency back-up power. In addition, University’s electrical grid is vulnerable due to limited redundancies. • Campus roadways experience frequent flooding and become impassable often due to brief, intense rainfall events. Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. 34.8 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 34-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 34-11 identifies the priority for each action. Table 34-12 summarizes the mitigation actions by hazard of concern and mitigation type. Table 34-10. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action UOH1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Severe weather, hurricane, flooding, drought Existing 7, 10, 11, 12, 13, 15 Facilities Services Facilities Planning & Construction High HMGP, PDM, FMA, General Funds Long-term Action UOH2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami New and Existing 3, 9, 10 UH Office of Emergency Management (OEM) UH Campus Safety Low Staff Time, General Funds Short-term Action UOH3 — Integrate the hazard mitigation plan into other plans, guidelines, standards, university policies and programs (including the University Capital Improvement Plan) within the campus community. Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami New and Existing 9, 10, 12, 13, 15 Facilities Planning & Construction Facilities Services Low Staff Time, General Funds Short-term Action UOH4 — Develop a disaster recovery plan. Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami New and Existing 3, 6, 7, 9, 10, 11, 13 UH OEM UH Campus Safety Low Staff Time, General Funds Short-term Action UOH5 — Develop and/or update plans that support or enhance continuity of operations during/following disasters. Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami New and Existing 3, 11, 13 UH OEM UH Campus Safety Low Staff Time, General Funds Ongoing University of Houston 34-9 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action UOH6 — Conduct an assessment and purchase generators for critical facilities and infrastructure that lack adequate back-up power. Hazards Mitigated: Severe weather, hurricane, flooding, earthquake Existing 4, 6, 7, 10, 11, 13 Facilities Services Facilities Planning & Construction Medium HMGP, PDM, General Funds Long-term Action UOH7 — Expand the University’s emergency alert system by adding additional mass notification channels, capabilities and/or coverage. Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami New and Existing 1, 4 UH OEM IT, University Communications, UHPD, Campus Safety Systems Medium HMGP, General funds Short-term Action UOH8 — Enhance the University’s weather preparedness programs in order to meet the requirements and receive the National Weather Service’s StormReady designation. Hazards Mitigated: Severe weather, hurricane, flooding New and Existing 1, 3 UH OEM UH Police Department Low Staff Time, General Funds Short-term Action UOH9 — Assess and develop a stand-alone UH Hazard Mitigation Plan or pursue better integration into the State Hazard Mitigation Plan. Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami New and Existing 3, 4, 5, 6, 7, 8, 9, 10, 11, 13, 15 UH OEM TDEM Medium Staff Time, HMGP, PDM, FMA, General Funds Short-term Action UOH10 — Assess additional insurance coverages. Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami Existing 3, 10, 13 UH Risk Management UH Finance Medium Staff Time, General Funds Ongoing Action UOH11 — Retrofit/Replace roofs based on recent assessment. Hazards Mitigated: Severe weather, hurricane, flooding, earthquake Existing 10, 11, 13 Facilities Services Facilities Planning & Construction High HMGP, PDM, FMA, General Funds Ongoing Action UOH12 — Investigate and implement redundancies for the campus electrical grid to improve resiliency of University power supply. Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami Existing 7, 10, 11, 13 Facilities Services Facilities Planning & Construction High HMGP, PDM, FMA, General Funds Long-term Action UOH13 — Conduct drainage study of campus and based on the study, implement recommended actions to improve drainage on campus. Hazards Mitigated: Severe Weather, Hurricane, Flooding Existing 3, 6, 7, 9, 10, 11, 15 Facilities Planning & Construction Facilities Services Medium HMGP, PDM, FMA, General Funds Short-term Action UOH14— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Drought, Earthquake, Wildfire, Mass Movement New and Existing 1, 3, 4, 5, 9, 10, 11, 15 UH Risk Management HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 34-10 Table 34-11. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya UOH1 6 High High Yes Yes No High High UOH2 3 Low Low Yes No Yes High Low UOH3 5 Medium Low Yes No Yes High Low UOH4 7 Low Low Yes Yes Yes High Low UOH5 3 Low Low Yes No Yes High Low UOH6 6 High Medium Yes Yes No High High UOH7 2 High Medium Yes Yes No Medium Medium UOH8 2 Low Low Yes No Yes High Low UOH9 11 Medium Medium Yes Yes No Medium Medium UOH10 3 Low Medium No No No Low Low UOH11 3 High High Yes Yes No Medium High UOH12 4 High High Yes Yes No High High UOH13 7 Low Medium No Yes Yes Medium Medium UOH14 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 34-12. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather UOH3, 13, 14 UOH1, 11 UOH8, 14 UOH6, 7, 12, 14 UOH1, 11, 13 UOH3, 13 UOH2, 4, 5, 9, 10, 13, 14 Hurricane UOH3, 13, 14 UOH1, 11 UOH8, 14 UOH6, 7, 12, 14 UOH1, 11, 13 UOH3, 13 UOH2, 4, 5, 9, 10, 13, 14 Flooding UOH3, 13, 14 UOH1, 11 UOH8, 14 UOH6, 7, 12, 14 UOH1, 11, 13 UOH3, 13 UOH2, 4, 5, 9, 10, 13, 14 Low-Risk Hazards Drought UOH3, 14 UOH1 UOH14 UOH7, 12, 14 UOH1 UOH3 UOH2, 4, 5, 9, 10, 14 Earthquake UOH3, 14 UOH1, 11 UOH14 UOH6, 7, 12, 14 UOH11 UOH3 UOH2, 4, 5, 9, 10, 14 Wildfire UOH3, 14 UOH14 UOH7, 12, 14 UOH3 UOH2, 4, 5, 9, 10, 14 Mass Movement UOH3, 14 UOH14 UOH7, 12, 14 UOH3 UOH2, 4, 5, 9, 10, 14 a. See the introduction to this volume for explanation of mitigation types. University of Houston 34-11 34.9 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • Campus Design Guidelines and Standards – This was used during the Capability Assessment. • University of Houston (UH) Manual of Administrative Policies and Procedures (MAPP) 06.01.01 – Emergency Management Policy – This was used during the Capability Assessment. • UH MAPP 06.01.02 – Continuity of Operations Planning – This was used during the Capability Assessment • UH MAPP 06.02.03 Laboratory Safety Program and Corresponding Safety Manuals – This was used during the Capability Assessment. • UH MAPP 06.03.01 Fire and Life Safety Code – This was used during the Capability Assessment. • University of Houston System Administrative Memorandum (SAM) 01.C.01- Risk Management Policy – This was used during the Capability Assessment. • University of Houston Emergency Management Plan – This was used during the Capability Assessment, and reviewed to determine potential for integration with mitigation planning. • University of Houston Continuity of Operations Plan – This was used during the Capability Assessment. • UH Department Continuity of Operations Plan Template – This was used during the Capability Assessment, and reviewed to determine potential for integration with mitigation planning. • Physical Recovery Emergency Plan – This was used during the Capability Assessment, and reviewed to determine potential for integration with mitigation planning. • Ride Out Team Program – This was used during the Capability Assessment, and reviewing to determine potential for integration with mitigation planning. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • Texas Facilities Commission Uniform General Conditions – This was used during the Capability Assessment. • International Building Code – This was used during the Capability Assessment. • NFPA 1, Fire Code (2015 Edition) – This was used during the Capability Assessment because this Code is adopted by the State of Texas for State owned/leased buildings. • NFPA 101, Life Safety Code (2015 Edition) – This was used during the Capability Assessment because this Code is adopted by the State of Texas for State owned/leased buildings. • Texas Food Establishment Rules – This was used during the Capability Assessment because these Rules must be followed by every food establishment that serves the public in the State of Texas 35-1 35. HARRIS COUNTY FLOOD CONTROL DISTRICT 35.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Todd Ward, Risk Mitigation Department Manager 9900 Northwest Freeway Houston, TX 77092 Telephone: 346-286-4858 e-mail Address: Todd.Ward@HCFCD.hctx.net James Wade, Property Acquisition Services Department Manager 9900 Northwest Freeway Houston, TX 77092 Telephone: 346-286-4036 e-mail Address: James.Wade@HCFCD.hctx.net 35.2 JURISDICTION PROFILE 35.2.1 Overview The Harris County Flood Control District (the District) is a special purpose district created by the Texas Legislature in 1937 in response to devastating floods that struck the region in 1929 and 1935. The mission of the Harris County Flood Control District is to provide flood damage reduction projects that work , with appropriate regard for community and natural values. Funding comes primarily through property taxes and revenue bonds, much of which is leveraged to secure additional grant funds. The Harris County Commissioners Court assumes responsibility for the adoption of this plan; the County Judge will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 35-1. Table 35-1. Local Mitigation Planning Team Members Name Title Todd Ward Risk Mitigation Department Manager James Wade Property Acquisition Department Manager 35.2.1 Service Area and Trends The District’s jurisdictional boundaries are set to coincide with Harris County, a community that includes the City of Houston. The district service area covers 1,756 square miles serving a population of approximately 4.7 million people. The District’s drainage and flood control infrastructure is extensive, including more than 1,500 channels totaling about 2,500 miles in length. 35.2.2 Assets Table 35-2 summarizes the critical assets of the district and their value. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-2 Table 35-2. Special Purpose District Assets Asset Value Property 39,949 acres (44% easements, 56% fee simple ownership) $1,649,735,796 Equipment Primarily back-up generators, District Fleet (vehicles, tractors & heavy duty), & misc. equipment $12,132,213.00 Total: $12,132,213.00 Critical Facilities and Infrastructure Administration/Buyout Office $6,221,741.19 Service Center #1 Canopy $167,500.00 Service Center #2 Wash Facility $63,525.33 Service Center #2 Maintenance $568,200.00 Service Center #3 Office $301,200.00 Mike Talbott Service Center Pavilion $648,600.00 Mike Talbott Service Center Canopy $237,500.00 Mike Talbott Service Center Maintenance Bldg. $838,600.00 Mike Talbott Service Center Fuel Facility $78,100.00 Mike Talbott Service Center Garage $278,000.00 Mike Talbott Service Center Administration Bldg. $1,816,200.00 Mike Talbott Service Center Storage Bldg. $154,705.64 Mike Talbott Service Center Wash Facility $67,089.23 Mike Talbott Service Center Canopy #2 $152,361.61 Mike Talbott Service Center Distribution Center $564,900.00 Total: $12,158,223.00 35.3 CAPABILITY ASSESSMENT An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 29.9 identifies these as community capacity building mitigation actions. 35.3.1 Planning and Regulatory Capabilities Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents. When effectively prepared and administered, these plans, programs and regulations can support the implementation of mitigation actions. Table 35-3 summarizes existing codes, ordinances, policies, programs or plans that are applicable to this hazard mitigation plan. Harris County Flood Control District 35-3 Table 35-3. Planning and Regulatory Capability Plan, Study or Program Date of Most Recent Update Comment Capital Improvement Program Updated and approved annually Covers 5 year timeframe. This CIP encompasses all of the estimated capital improvement activities the District will initiate throughout Harris County this fiscal year. Bond Program 2018 2018 On August 14, 2018, Harris County Commissioners Court approved a list of flood risk reduction projects that would meet the goal of the 2018 bond election, which is to both assist with recovery after previous flooding events (including Harvey) and to make our county more resilient for the future. Flood Operations & Hurricane Response Plan 2018 For use by HCFCD employees as a guide for conducting Flood Operations and to address the actions to be taken for the successful function of HCFCD operations during each phase of a hurricane threat, landfall, and recovery. Property Acquisition Program Continuous Responsible for voluntary buyout and project Right-of-Way acquisition for HCFCD. Property Management Program Continuous Primary responsibilities are to identify deficiencies of the District’s channel and detention basin infrastructure, to define the scope of operations to be performed, and to prioritize repairs and cyclical maintenance within the available budget. Vegetation Management Program Continuous Responsible for debris removal & de-snag operations, herbicide applications, selective clearing, and vegetation establishment including turf and native grass, wildflowers, and trees. System Repair Plan Continuous Covers 5 year timeframe. Constantly monitors and assesses the potential repair sites to ensure HCFCD facilities retain their functions. Stormwater Quality Program 2019 Supports the Flood Control District’s mission by ensuring compliance with all storm water permits and supporting other divisions through design of environmental enhancements and site stabilization and revegetation. Updated annually during Annual Report to TCEQ. Watershed Environmental Baseline Program 2019 Documents the baseline environmental conditions, including natural, cultural, and physical resources deemed necessary to evaluate potential project alternatives in Harris County’s watersheds and proposed project areas Updated annually with new environmental database records LOMR Review Program 2019 This partnership program between FEMA and HCFCD allows for HCFCD to perform LOMR and CLOMR reviews for those requests submitted in Harris County. Mapping Activity Statements are developed annually. Model and Map Management System Continuous This system helps maintain current and reliable effective hydrology and hydraulic models, FIRMs, and FIS data. Greens Bayou Wetland Mitigation Bank Provides opportunities for federally permitted government and private developments to mitigate for the unavoidable loss of wetlands elsewhere in Harris County by preserving, restoring and creating wetlands. HCFCD Frontier Program 2019 The purpose of this program is to plan for and implement orderly drainage infrastructure in advance of future land development in specific areas to more effectively mitigate increased stormwater runoff while offering opportunities to provide community amenities and enhance & preserve the area’s natural resources through development of recreation and open space areas. Upper Langham Creek Frontier Program 2012 Exists to implement certain common elements of a regional detention plan that embraces concepts from the HCFCD Frontier Program and uses funding from existing impact fees. Little Cypress Creek Frontier Program 2018 HCFCD initiated the Little Cypress Creek Frontier Program as part of a strategic effort to efficiently and methodically plan for and implement effective flood risk reduction projects, both for existing flooding issues and in anticipation of future development within the watershed Little Cypress Creek Master Drainage Plan 2019 A plan for effective flood risk reduction projects, both for existing flooding issues and in anticipation of future development within the watershed. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-4 Plan, Study or Program Date of Most Recent Update Comment Cypress Creek Overflow Management Plan 2016 Established a set of policies, technical criteria and guidelines that will allow the Flood Control District and Harris County to plan for and implement programs that reduce flood risks that are reflective of the unique hydrologic conditions in upper Cypress Creek and the drainage areas upstream of Addicks and Barker reservoirs. Policy, Criteria, and Procedures Manual 2019 Provides written policies and criteria for the engineering community and HCFCD staff to use for land development and infrastructure projects that are effective, consistent, and practical. Provides a written review and acceptance procedure to efficiently coordinate land development and infrastructure projects with the HCFCD. Harris County Low Impact Development & Green Infrastructure Design Criteria for Storm Water Management 2011 This document is intended to provide a set of interim guidelines for the use of Low Impact Development (LID) and Green Infrastructure (GI) techniques. Little Cypress Creek Interim Guidelines 2014 These guidelines are intended to promote the implementation of the Interim Drainage Plan until such time that the HCFCD adopts a final Regional Drainage Plan for Little Cypress Creek watershed. Supplemental Guidelines And Criteria For Developing In The Addicks Reservoir Watershed, Barker Reservoir Watershed And The Cypress Creek Watershed Upstream Of US 290 2016 Provides direction for the engineering community and HCFCD staff to comply with the HCFCD no adverse impact policy associated with management of stormwater runoff from land development and infrastructure projects in the Cypress Creek watershed upstream of US 290 (upper Cypress Creek), Addicks Reservoir and Barker Reservoir watersheds within Harris County. Upper Langham Creek Development Guidelines 2012 Provides a clear understanding of the roles and responsibilities for constructing new development in the Upper Langham Creek Service Area Hydrology and Hydraulics Guidance Manual 2019 HCFCD prepared this Hydrology and Hydraulics Guidance Manual to document hydrologic and hydraulic methodologies for the analysis of watersheds and open channel projects in Harris County. Updated in 2019 to include additional guidance on 1D Unsteady and 2D flow modeling. Ordinary High Water Mark Delineation Manual 2005 For use as a guide in executing future OHWM delineations for HCFCD. Land Surveying Guidelines 2019 Intended to identify and create land surveying standards applicable to all HCFCD related work. Helps ensure clarity and consistency of survey data. Design Manual for Articulating Concrete Block Systems 2001 This Design Manual provides guidelines and procedures for the design and installation of articulating concrete block revetment systems. Design Guidelines for HCFCD Wet Bottom Detention Basins with Water Quality Features 2014 These Design Guidelines identify criteria, considerations, and procedures for wet bottom detention basins with water quality features that are planned, designed, constructed, operated, and maintained by HCFCD. Detention Basin Pump Operation & Maintenance Manual 2012 The focus of this document is to identify specific content requirements associated with the O&M Manual identified in Section 6.15 of the HCFCD’s Policy Criteria and Procedures Manual 35.3.2 Fiscal, Administrative and Technical Capabilities Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard mitigation projects. An assessment of fiscal capabilities is presented in Table 35-4. Administrative and technical capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of administrative and technical capabilities is presented in Table 35-5. Harris County Flood Control District 35-5 Table 35-4. Fiscal Capability Financial Resource Accessible or Eligible to Use? Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes No User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Yes Federal Grant Programs Yes Other: Rent on owned property (less than 1% of District revenue) Yes Table 35-5. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Planning Division; Watershed Management Department Engineers or professionals trained in building or infrastructure construction practices Yes Construction Division Planners or engineers with an understanding of natural hazards Yes Planning Division; Engineering Division Staff with training in benefit/cost analysis Yes Planning Division; Engineering Division Surveyors Yes Surveying Department Personnel skilled or trained in GIS applications Yes GIS Services Scientist familiar with natural hazards in local area Yes Hydrologic Operations Division Emergency manager Yes Hydrologic Operations Division Grant writers Yes Many HCFCD divisions prepare grant applications with in-house staff. Consultant support for grant writing also utilized. 35.3.3 Education and Outreach Capabilities Outreach and education capability identifies the connection between government and community members, which opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is presented in Table 35-6. 35.3.4 Adaptive Capacity for Climate Change Given the uncertainties associated with how risk may change with a changing climate, a jurisdiction’s ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 35-7 summarizes the jurisdiction’s adaptive capacity for climate change. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-6 Table 35-6. Education and Outreach Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, please briefly describe The information on the website is project specific Do you use social media for hazard mitigation education and outreach? Yes • If yes, please briefly describe Twitter, Facebook, and NextDoor are used for hazard alerts, general education, and safety tips Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes • If yes, please briefly specify The Harris County Flood Control Task Force was created by the Commissioners Court in 1972 to advise and make recommendations to Harris County government Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, please briefly describe Annual outreach/educational events throughout the county Do you have any established warning systems for hazard events? Yes • If yes, please briefly describe An interactive flood warning system utilizes an extensive gage network to provide near real-time rainfall, stream level, and inundation extent information Table 35-7. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts High Comment: HCFCD has done a review of 2014 IPCC data regarding the observed and projected impacts to the frequency and severity of precipitation, floods, hurricanes, to sea level rise, and to water quality. HCFCD has a contract with the Texas State Climatologist to study climate change patterns. Jurisdiction-level monitoring of climate change impacts High Comment: HCFCD has an extensive rain and flood stage gage network across the county and the areas that drain into the county, and also has many water quality monitoring sites. Technical resources to assess proposed strategies for feasibility and externalities High Comment: The District has many technical resources, both in house and with consulting support, to evaluate the effectiveness of mitigation strategies Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: This is not an inventory that the District currently keeps, although we would have record of kilowatt hours purchased for our buildings, fuel purchased for our vehicles and tools, and could potentially seek to determine fuel costs for our construction and maintenance contractors vehicles and tools. Capital planning and land use decisions informed by potential climate impacts High Comment: This capacity exists and is in use, and the District is considering improvements. The District currently implements several strategies, and is considering additional strategies, to increase ecosystem resilience and protect critical ecosystem services, thereby minimizing vulnerability of human and natural systems to climate change. Additionally, the District is considering the newly released NOAA Atlas 14 rainfall study results in the planning of future flood reduction projects. Participation in regional groups addressing climate risks Medium Comment: The District participates with HGAC Harris County Flood Control District 35-7 Criterion Jurisdiction Ratinga Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes High Comment: The District is reviewing a plan aimed at reducing emissions and preparing for climate change. Identified strategies for greenhouse gas mitigation efforts High Comment: Since 2001, the District has planted a total of 264,422 trees. These trees remove carbon dioxide from the air, and slow the growth of grasses, reducing the need for and emissions from mowing. Identified strategies for adaptation to impacts High Comment: The District has identified a number of strategies, both ongoing and proposed, to reduce or mitigate climate change impacts. A plan aimed at reducing emissions and preparing for climate change is under review. Champions for climate action in local government departments Medium Comment: Harris County Commissioners Court Political support for implementing climate change adaptation strategies High Comment: Judge Lina Hidalgo is strongly in support of climate change adaptation being a part of The District’s efforts. Financial resources devoted to climate change adaptation High Comment: Related to the capital planning and land use decisions. Local authority over sectors likely to be negative impacted High Comment: The District has local authority to execute structural and non-structural projects which can reduce flood risks for Harris County property owners, as well as projects to improve water quality. Public Capacity Local residents knowledge of and understanding of climate risk Medium Comment: The District is publishing information regarding newly increased rainfall estimates Local residents support of adaptation efforts Unsure Comment: Residents supported the bond program, and have largely voiced support for updating Flood Insurance Rate Maps to reflect the increased rainfall risk estimates, which are influenced by climate change. Local residents’ capacity to adapt to climate impacts Unsure Comment: Local economy current capacity to adapt to climate impacts Unsure Comment: Local ecosystems capacity to adapt to climate impacts Unsure Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. 35.4 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 35.4.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-8 • Capital Improvement Program — The capital improvement program includes projects that can help mitigate potential hazards and studies that can identify recommended projects or inform watershed management criteria. The District will act to ensure consistency between the hazard mitigation plan and the current and future capital improvement plans. The hazard mitigation plan may identify new possible funding sources for capital improvement projects and may result in modifications to proposed projects based on results of the risk assessment. • Bond Program — The bond improvement program includes projects that can help mitigate potential hazards. The District will act to ensure consistency between the hazard mitigation plan and the projects in the bond program. The hazard mitigation plan may identify new possible funding sources for bond projects and may result in modifications to proposed projects based on results of the risk assessment. • Flood Operations & Hurricane Response Plan — The Hurricane Response Plan addresses the actions to be taken for the successful function of the District operations during each phase of a hurricane threat, landfall, and recovery. The primary purpose of the Harris County Flood Control District (HCFCD) Flood Operations is to better serve the citizens of Harris County and our core partners before, during, and after floods and near-floods. The hazard mitigation plan may provide information to help The District identify, and thus respond to, imminent risks during severe weather events. The hazard mitigation plan may identify new possible funding sources for equipment to help the District monitor and respond to severe weather. • LOMR Review Program & Model and Map Maintenance System — The LOMR Review program and Model and Map Maintenance System help maintain up-to date and reliable FEMA effective hydrology and hydraulic models, Flood Insurance Rate Maps, and Flood Insurance Study documentation. Keeping this data up to date and reliable helps with identification of hazards considered in risk assessment, and thus informs efforts to mitigate flood risk. • Property Acquisition Program — The Property Acquisition program is responsible for voluntary property acquisitions which remove structures at high risk of flooding so that they never flood again, Right-of-Way property acquisitions which can be used to acquire land necessary for construction of flood risk reduction projects. The hazard mitigation plan risk assessment may help inform the prioritization of property acquisition efforts, and may identify new possible sources of funding for voluntary acquisition and project right-of-way acquisition based on the results of the risk assessment. • Little Cypress Creek Frontier Program — The Little Cypress Creek Frontier Program is part of a strategic effort to economically incentivize, plan for, and implement effective and holistic flood risk management solutions in advance of anticipated future development. • Upper Langham Creek Frontier Program — The Upper Langham Creek Frontier Program identifies strategies to more effectively mitigate increased stormwater runoff and replace natural resource functions for new development in the upper Langham Creek area. 35.4.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Adapting Infrastructure for Climate Change — This plan is under development but not yet approved. The plan will recommend actions to reduce net carbon emissions and mitigate hazards associated with climate change. The plan will build on mitigation goals and objectives identified in the mitigation plan. • Vegetation Management Program — The goals and objectives identified in the hazard mitigation plan may be utilized to refine the practices in the Vegetation Management Program. The hazard mitigation plan may identify new possible sources of funding for vegetation management efforts. • Stormwater Quality Program — The goals and objectives identified in the hazard mitigation plan may be utilized to refine the practices in the Stormwater Quality Program. The hazard mitigation plan may Harris County Flood Control District 35-9 identify new possible sources of funding for activities such as natural channel design and other environmental enhancements. • Watershed Environmental Baseline Program — The goals and objectives identified in the hazard mitigation plan may be utilized to identify new datasets it would be desirable to include or develop for inclusion on the Watershed Environmental Baseline Program. 35.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 35-8 lists past occurrences of natural hazards for which specific damage was recorded in the Harris County Flood Control District. Other hazard events that broadly affected the entire planning area, including the Harris County Flood Control District, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 35-8. Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 Over 300,000 flooded vehicles & 154,170 flooded homes Severe Storms and Flooding 4269 DR 2016 9,840 flooded homes Severe Storms and Flooding 4272 DR 2016 425 homes and 22 businesses flooded Severe Storms, Tornadoes, Straight Line Winds and Flooding 4245 DR 2015 394 flooded homes Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR 2015 6,335 flooded homes Severe Storms and Flooding 2014 109 flooded homes Severe Storms and Flooding 2012 71 flooded homes Severe Storms and Flooding 2010 40-45 flooded homes Severe Storms and Flooding April 28, 2009 3,370 flooded homes Severe Storms and Flooding April 18, 2009 170-180 flooded homes Hurricane Ike 1791 DR 2008 3,700-3,900 flooded homes Tropical Storm Erin 1730 DR 2007 508 homes, 601 apartment units, and 55 businesses flooded Severe Storms and Flooding June 2006 3,370 homes, 561 apartments, and 1 nursing home flooded Severe Storms and Flooding October 16, 2006 115-125 flooded homes Severe Storms and Flooding October 26, 2006 26-36 flooded homes Severe Storms and Flooding 2003 300 flooded homes Severe Storms and Flooding 2002 1,225 flooded homes Tropical Storm Allison 1379 DR 2001 73,000 Affected houses 35.6 HAZARD RISK RANKING Table 35-9 presents a local ranking for the Harris County Flood Control District of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-10 Table 35-9. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Hurricane 48 High 1 Severe Weather 48 High 2 Flooding 30 High 3 Earthquake 14 Low 4 Dam Failure 12 Low 5 Wildfire 11 Low 6 Mass Movement 6 Low 6 Drought 6 Low 6 Tsunami 6 Low 7 Coastal Erosion 0 (No exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 35.7 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • The District’s Brookhollow office may become inoperable in the event of a Category 3 or higher hurricane. • The District’s infrastructure is subject to erosion during flood events, which can reduce the flood carrying capacity of the infrastructure for events to follow. Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. 35.8 STATUS OF PREVIOUS PLAN ACTIONS Table 35-10 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 35-10. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 1 Aldine Estates residential acquisition/demolition (23 homes) X FCD180 Comment: Gatewood, Aldine Estates & Greenbranch buyouts are to include 482 parcels. 254 parcels remain to be purchased. 2 Arbor Oaks residential acquisition/demolition (37 homes) X FCD180 Comment: Arbor Oaks buyouts are to include 231 parcels. 23 parcels remain to be purchased. 3 Blue Bell residential acquisition/demolition (28 homes) X FCD180 Comment: Blue Bell buyouts are to include 152 parcels. 33 parcels remain to be purchased. 4 Brookglen residential acquisition/demolition (27 homes) X FCD180 Comment: Brookglen buyouts are to include 56 parcels. 13 parcels remain to be purchased. 5 Castlewood residential acquisition/demolition (36 homes) X Comment: This voluntary buyout project was replaced with a flood reduction capital project. Harris County Flood Control District 35-11 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 6 Creekside-Ted Burger residential acquisition/demolition (10 homes) X FCD180 Comment: Creekside-Ted Burger buyouts are to include 134 parcels. 18 parcels remain to be purchased. 7 Gatewood residential acquisition/demolition (188 homes) X FCD180 Comment: Gatewood, Aldine Estates & Greenbranch buyouts are to include 482 parcels. 254 parcels remain to be purchased. 8 Gatewood residential acquisition/demolition (12 homes) X FCD180 Comment: Gatewood, Aldine Estates & Greenbranch buyouts are to include 482 parcels. 254 parcels remain to be purchased. 9 Greenbranch residential acquisition/demolition (20 homes) X FCD180 Comment: Gatewood, Aldine Estates & Greenbranch buyouts are to include 482 parcels. 254 parcels remain to be purchased. 10 Homeowned Estates residential acquisition/demolition (58 homes) X FCD180 Comment: Homeowned estates buyouts are to include 111 parcels. 67 parcels remain to be purchased. 11 Lake Forest residential acquisition/demolition (48 homes) X Comment: Depth of structures did not meet the criteria for buyouts 12 Lakewood residential acquisition/demolition (53 homes) X FCD180 Comment: Lakewood buyouts are to include 141 parcels. 125 parcels remain to be purchased. 13 Langley Road Place residential acquisition/demolition (12 homes) X FCD180 Comment: Langley Road Place (Farrington) buyouts are to include 103 parcels. 84 parcels remain to be purchased. 14 Langwood residential acquisition/demolition (23 homes) X FCD180 Comment: Langwood buyouts are to include 143 parcels. 99 parcels remain to be purchased. 15 Ramona residential acquisition/demolition (10 homes) X FCD180 Comment: Ramona buyouts are to include 17 parcels. 15 parcels remain to be purchased. 16 Woodland Trail and Woodland Oaks residential acquisition/demolition (196 homes) X FCD180 Comment: Woodland Trail and Woodland Oaks buyouts are to include 547 parcels. 71 parcels remain to be purchased. 17 Woodshadows residential acquisition/demolition (90 homes) X FCD180 Comment: Woodshadows buyouts are to include 158 parcels. 92 parcels remain to be purchased. 18 The Brays Bayou Flood Damage Reduction Project X FCD29 Comment: Eldridge Road Basin, Old Westheimer Basin, Arthur Storey Park Basin, and Willow Waterhole Basins are complete. 10 of 12 channel modifications reaches are complete, as well as 16 of 32 bridge modifications. 19 The Clear Creek Flood Damage Reduction Project X FCD58 Comment: In 2013, the Corps completed a General Reevaluation Report (GRR), which presents an alternative to the Clear Creek Federal Project that was being implemented by the Corps, Flood Control District and Galveston County based on a 1986 agreement. 20 Cypress Creek Watershed damage reduction projects X FCD71 Comment: A feasibility study is underway to develop a drainage plan to reduce for major tributaries in Cypress Creek, and to investigate detention options along the main stem of the channel. Additionally, the District is buying land for floodplain preservation. 21 The Greens Bayou Federal Flood Damage Reduction Project X FCD84 Comment: Phase II construction of the project began in late 2016 and is expected to take approximately three years to complete. Phase II work includes completion of the north cell of the basin, located north of West Greens Road; excavation of the south cell, which is located south of West Greens Road; and construction of the channel conveyance improvements from Cutten Road to Veterans Memorial Drive. Phase I of the project, which included excavation of the north cell and construction of an outfall structure to Greens Bayou, was completed in 2016. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-12 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 22 Hunting Bayou Flood Damage Reduction Project X FCD102 Comment: Construction began in August 2017 on the final phase of excavation for H500-01-00. 784,000 cy of soil will be removed during this phase. The first two phases removed 265,000 cy and 648,000 of soil, respectively. Also in August 2017, construction began on channel improvements between H500-01-00 and Liberty Road. Channel improvements have been completed between North Loop 610 near North Gorge Street to Dabney Street. The project will include replacing a pedestrian bridge, and lengthening UPRR and Loop 610 bridges over Hunting Bayou. 23 Poor Farm Ditch Conveyance Improvements Project X FCD32 Comment: The plans are at 90%. The District is working on interlocal agreements with West University and the City of Southside Place. Lack of funding has slowed progress. 24 The Sims Bayou Federal Flood Reduction Project X Comment: 10/10/2015 25 White Oak Bayou Flood Reduction Project X FCD148 Comment: Channel work from E122-00-00 to Beltway 8 is complete, as are basins E500-01-00, E500-02-00, E500-03-00, E500-10-00, E500-11-00, E500-12-00 and bypass channel E200-00-00. Delay in reimbursements from USACE stalled progress on additional construction. 26 Buffalo Bayou & Lower White Oak Bayou Federal Flood Damage Reduction and Ecosystem Restoration Study X Comment: 4/17/2017 27 Halls Bayou Federal Feasibility Study X Comment: 9/12/2013 28 Increase flood predictive capability for streams and creeks that affect the District (stream gages). X FCD165 Comment: The district currently has 176 stream gages, and intends to add more. 29 Develop and adopt master drainage plans in order for HCFCD to exercise the authority granted to districts under Chapter 49.211 of the Texas Water Code. Changes to Chapter 49.211, made via House Bill 919, require HCFCD review and approval of subdivision drainage plans X FCD186 Comment: Ongoing. The District has developed and adopted a master plan and does update and modify it. 30 Periodic informational mailings to SFHA property owners (flood insurance, importance of maintaining drainage, flood safety easy mitigation measures, permit requirements). X Comment: 12/31/2012 31 Obtain generators for District facilities due to be able to work during and after an event X FCD187 Comment: The District owns 5 backup generators to serve its various facilities, but may rent additional generators during an event if warranted. 32 Harden the District’s Office with Hurricane Shutters X Comment: It is planned that the District’s Office will relocate in a few years. 33 Educating the employees on hazards including HCFCD evacuation plan and emergency plan and precautions that need to be taken for facilities. X FCD188 Comment: Evacuation plan is posted around Brookhollow and intranet. An updated evacuation plan is needed for the Mike Talbott Service Center. The District last updated its hurricane response plan in 2018, but that plan requires occasional updates. Harris County Flood Control District 35-13 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 34 Due to the data deficiency identified in Section 6 [of the HCFCD HMP adopted in 2014] relative to the current RL non-residential data (RL list does not differentiate non-residential buildings as commercial or industrial) HCFCD will attempt to further identify Non-residential properties between the approval of this plan and the next update. X Comment: Differentiating between types of non-residential repetitive loss buildings does not seem to serve any purpose that supports The District’s mission. 35 Utilize public information capabilities, including social media and printed media, to inform public of the importance of water conservation and water rationing during drought conditions by installing flow restrictors, low-flow toilets, replacing showerheads and xeriscaping X Comment: These activities would not fall under the Harris County Flood Control District’s responsibilities. 36 Replace landscaping with drought resistant plants and trees around HCFCD facilities X FCD189 Comment: Ongoing. The District plants drought resistant species where appropriate as a part of our ongoing tree planting and maintenance program 37 Clear out dead brush and tree limbs around HCFCD facilities that could be a burn agent to wildfires X FCD190 Comment: Ongoing. It is part of our regular infrastructure maintenance that we clear brush and tree limbs from around HCFCD facilities. 38 Obtain the data necessary to complete and improve future vulnerability analysis on HCFCD’s facilities for certain hazards X FCD173 Comment: Ongoing U100-00-00-E007 Upper Langham Creek Frontier Program X FCD195 Comment: 10/23/2013 U100-00-00-P003 Addicks Reservoir Watershed Master Plan X Comment: 9/29/2010 U100-00-00-P004 Upper Langham Creek Frontier Study X Comment: 4/13/2010 U101-00-00-P001 S Mayde Creek Sub-Reg Frontier X Comment: 3/24/2016 U502-02-00-E001 John Paul’s Landing Park Basin X Comment: 10/26/2017 U502-02-00-E002 E & R Agreement-Sprint (JPL) X Comment: 3/10/2014 U506-05-00-E001 E & R Contract-Sprint X Comment: 4/5/2012 U506-05-00-E002 E & R Contract-Sprint X Comment: 5/23/2011 B100-00-00-H002 City of Pasadena Interlocal X Comment: 7/21/2010 B109-00-00-C001 Conveyance Improvements X Comment: 3/10/2017 B500-02-00-W001 Fairmont Basin Environmental Enhancement X Comment: 5/3/2017 Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-14 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update B500-04-00-E002 E&R Agreement X Comment: 4/12/2016 B509-03-00-E001 E&R Agreement X FCD25 Comment: This project has just kicked off T100-00-00-P001 Barker Reservoir Watershed Master Plan X Comment: 1/11/2011 T501-01-00-E001 Basin Master Plan X Comment: 3/14/2017 D100-00-00-B006 South 75th Street Bridge X FCD29 Comment: Scheduled for construction to begin 3rd Quarter 2019 and finish 2nd Quarter 2021. D100-00-00-B007 Forest Hill Street Bridge X FCD29 Comment: Began construction July 23, 2018. Scheduled to finish 3rd Quarter 2019. D100-00-00-B008 Lawndale Street Bridge X FCD29 Comment: Scheduled for construction to begin 3rd Quarter 2019 and finish 2nd Quarter 2021. D100-00-00-B009 Telephone Road Bridge X FCD29 Comment: Scheduled for construction to begin 3rd Quarter 2019 and finish 2nd Quarter 2021. D100-00-00-B010 Old Spanish Trail Bridge X Comment: 3/8/2016 D100-00-00-B011 Calhoun Street Bridge X FCD29 Comment: Scheduled for construction to begin 2nd Quarter 2019 and finish 2nd Quarter 2020. D100-00-00-B015 Almeda Road Bridge X FCD29 Comment: Scheduled for construction to begin 3rd Quarter 2019 and finish 2nd Quarter 2021. D100-00-00-B038 Galveston Sub Railroad Bridge X FCD29 Comment: Scheduled for construction to begin 1st Quarter 2019 and finish 3rd Quarter 2019. D100-00-00-B040 Wheeler Street Bridge X Comment: 3/1/2017 D100-00-00-E002 Conveyance Improvements, DS 101 X Comment: 3/30/2016 D100-00-00-E003 Conveyance Improvements, DS 102 X Comment: 4/11/2014 D100-00-00-E004 Conveyance Improvements, DS 103 X Comment: 3/30/2017 D100-00-00-E006 Conveyance Improvements, DS 105 X Comment: 3/8/2016 D100-00-00-E007 Conveyance Improvements, DS 106 X Comment: 3/14/2016 D100-00-00-E008 DS107 – Braeswood to S Main X Comment: 3/8/2016 D100-00-00-E009 DS108 – S Main to Buffalo Speedway X Comment: 11/01/2017 D100-00-00-G002 BBFFDRP – Development X FCD29 Comment: On-call engineering in support of Project Brays, to be held open through the completion of Project Brays Harris County Flood Control District 35-15 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update D100-00-00-G003 BBFFDRP – Bridge Survey X Comment: 11/4/2013 D100-00-00-G005 BBFFDRP – H & H Support X FCD29 Comment: Hydrology and Hydraulics modeling support for no-rise letters for elements of Project Brays to be held open through the completion of Project Brays D100-00-00-G006 BBFFDRP – DDR Engineering X Comment: 11/4/2013 D100-00-00-G007 BBFFDRP – Control Survey X FCD29 Comment: Surveying services to establish horizontal and vertical control for design survey in support of Project Brays, to be held open through the completion of Project Brays D100-00-00-G009 BBFFDRP – Architectural & Tree Survey X FCD29 Comment: Development of architectural guidelines as well as tree location survey and preservation plan in support of Project Brays, to be held open through the completion of Project Brays D100-00-00-G011 BBFFDRP – UPRR Engineering X Comment: 7/18/2016 D100-00-00-G0013 BBFFDRP – Evaluation of TxDot Bridges X Comment: 3/14/2016 D100-00-00-G0015 BBFFDRP – Public Awareness X Comment: 11/4/2013 D100-00-00-G0017 BBFFDRP – Recreation Feasibility Study X FCD29 Comment: HCFCD sponsored feasibility study to identify recreational elements that may qualify for federal funding. To be held open through the completion of Project Brays D100-00-00-Y005 Brays Bayou Federal Feasibility Study X Comment: 4/09/2009 D111-00-00-Y003 Project Dev. Report for Poor Farm Ditch X Comment: 12/16/2015 D500-04-00-E016 Basin Improvements, DS16 X Comment: 5/25/2012 D500-04-00-E023 Eldridge Detention Basin Comp 1, DS 23 X Comment: 4/7/2016 D500-04-00-E025 Eldridge Detention Basin DS25 X Comment: 4/7/2016 D500-06-00-E002 Basin Improvements, DS12 X Comment: 12/27/2018 D500-06-00-E022 Basin Improvements, DS22 X Comment: 7/25/2013 D500-06-00-V071 Brays Bayou Federal Flood Control Project X Comment: 3/14/2016 D512-01-00-E201 Basin Improvements, DS201 X Comment: 11/7/2016 D512-01-00-E202 Basin Improvements, DS202 X Comment: 12/14/2018 Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-16 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update D512-01-00-E209 Basin Improvements, DS209 X Comment: 5/25/2016 D512-01-00-R001 ROW Acquisition – Basin X FCD29 Comment: Additional sites may be investigated and acquired for expansion of the D512-01-00 detention basin. W100-00-00-P006 Buffalo Bayou Federal Feasibility Study X Comment: 4/17/2017 W100-00-00-R002 Buffalo Bayou Acquisition Downtown X Comment: 4/13/2017 W129-00-00-C001 Conveyance Improvements, Phase 1 X Comment: 10/21/2008 W129-00-00-C002 Conveyance Improvements, Phase 2 X Comment: 3/14/2016 W140-04-00-Y001 Interlocal Agreement with City of Hilshire Village X Comment: 1/12/2010 W151-00-00-P001 Drainage & Flood Control Study X Comment: 11/27/2012 K100-00-00-H013 FMA-1 X Comment: 6/11/2010 K100-00-00-P003 Upper Cypress Creek Watershed Master Plan X Comment: 3/10/2011 K100-00-00-R001 ROW Acquisition – Floodplain X Comment: 4/19/2013 K100-00-00-R002 ROW Acquisition – Maintenance X Comment: 2/7/2005 K161-00-00-R001 ROW Acquisition – Channel X Comment: 6/18/2009 K500-01-00-E001 E & R Contract – Sprint X Comment: 4/5/2012 K500-01-00-FP001 Basin Improvements X Comment: 12/31/2014 L100-00-00-P002 Little Cypress Frontier Program X FCD108 Comment: The Master Plan has been adopted by Commissioners Court. Implementation of the L500-01-00-R001 ROW Acquisition – Basin X Comment: 7/13/2010 L500-02-00-E001 Conveyance Improvements, DS 102 X Comment: 12/29/2017 L514-01-00-E001 Conveyance Improvements, DS 103 X Comment: 8/10/2009 L514-01-00-E002 Conveyance Improvements, DS 103 X Comment: 3/18/2019 F101-06-00-C001 Channel Conveyance Exxon Mobil X Comment: 4/13/2018 Harris County Flood Control District 35-17 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update F101-06-00-E001 Replacement of Transition Control Structure X Comment: 8/16/2012 P118-00-00-P003 Halls Bayou Federal Feasibility Study X Comment: 9/12/2013 P118-00-00-P004 Halls Bayou Federal Feasibility Study X Comment: 2/8/2018 P118-00-00-R002 Halls Bayou ROW Acquisition X Comment: ROW for Halls Bayou is being acquired under project IDs. P118-14-00-FP000 HMGP 1791 P118-14-00 Halls Bayou X FCD99 Comment: This effort includes excavation of 2 basins and channel conveyance improvements which are currently under design. P518-02-00-B001 Pedestrian Bridges Keith-Weiss Park X Comment: 6/10/2010 P518-02-00-Y001 Detention Basin Improvements at Keith-Weiss Park X Comment: 8/3/2010 P518-03-00-E001 Street Closure X Comment: 4/4/2012 P518-03-00-FP000 Hall Park Detention Basin X Comment: 2/15/2019 P518-04-00-E001 Utility Adjustment/Street Closure X Comment: 4/6/2009 P518-04-00-E002 Bretshire Basin – Recreational Amenities X Comment: 3/15/2010 P518-04-00-E003 Bretshire Stormwater Detention Basin Final X Comment: 2/10/2014 P518-04-00-W001 Bretshire Stormwater Basin Env. Enhance X Comment: 3/8/2016 P100-00-00-FP005 U.S. Army Corps of Engineers Veterans MEM to BAMMEL X FCD184 Comment: P100-00-00-FP005, P100-00-00-FP006, and P500-05-00-FP000 are under construction. Construction is 45% complete (channel and basin combined); 86% complete at the basin. P100-00-00-FP006 U.S. Army Corps of Engineers BAMMEL N HOU. To CUTTEN X FCD184 Comment: P100-00-00-FP005, P100-00-00-FP006, and P500-05-00-FP000 are under construction. Construction is 45% complete (channel and basin combined); 86% complete at the basin. P100-00-00-P004 Greens Bayou Watershed Master Plan X Comment: 1/11/2011 P100-00-00-R001 ROW Acquisition – Floodplain X FCD180 Comment: Project to be held open for when floodplain ROW becomes necessary or available. P100-00-00-Y018 Greens Bayou Bid Reach FDRP X Comment: 8/11/2009 P500-02-00-E008 E & R Contract – Sprint X Comment: 1/8/2010 P500-02-00-E009 Harris County Interlocal Agreement/ Hollister X Comment: 11/23/2011 Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-18 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update P500-03-00-E001 Basin Improvements, Phase 1 X Comment: 2/4/2010 P500-03-00-E002 Basin Improvements, Phase 2 X FCD191 Comment: Basin excavation is underway. 15% excavated as of now. P500-04-00-R001 ROW Acquisition – Basin X Comment: 4/6/2009 P500-05-00-FP000 U.S. Army Corps of Engineers Antoine Basin X FCD184 Comment: P100-00-00-FP005, P100-00-00-FP006, and P500-05-00-FP000 are under construction. Construction is 45% complete (channel and basin combined); 86% complete at the basin. P500-06-00-R002 Castlewood Buyout X Comment: 3/8/2016 P500-08-00-E001 Basin Improvements, Phase 1 X FCD192 Comment: Excavation and removal approximately 87% complete; Installed access ramps to each cell; Began repairs to adjacent trail system; Began concrete work for weir on basin A P500-08-00-FP000 HMGP 1791 Greens Bayou Mid Reach X Comment: This was rolled into P500-08-00-E001 P500-08-00-R001 ROW Acquisition – Basin X Comment: 2/1/2011 P545-01-00-E005 Kuykendahl Stormwater Detention Basin X FCD193 Comment: Excavation and removal approximately 97% complete; Installed 2-54” outfalls, 48” CMP, and 10x6 and 12x6 RCBs; Installed the P145-03-00 and P145-00-00 weirs; Began concrete/grading along P145 channel; Completed the channel slope repairs P545-01-00-Y008 E & R Contract – Weatherford X Comment: 1/15/2010 P700-01-00-Y001 GB Wetlands Mitigation Project X Comment: Construction is completed, but the management of the mitigation bank is ongoing. H100-00-00-P003 Project Hunting – Hydrology and Hydraulics Support X Comment: 9/11/2017 H100-00-00-R001 ROW Acquisition – Channel X FCD102 Comment: All but 2 tracts necessary for the Hunting Bayou Project have been obtained. H100-00-00-Y001 Hunting Bayou Federal Feasibility Study X Comment: 11/7/2016 H100-00-00-Y005 Project Dev. Report for Project Hunting X Comment: 10/27/2017 H500-01-00-E001 Basin Improvements, Phase 1 X Comment: 4/4/2012 H500-01-00-E002 Homestead Stormwater Detention Basin X Comment: 8/10/2017 G103-00-00-H002 Home Buyout X Comment: 11/16/2009 G103-05-02-R001 ROW Acquisition – Maintenance X Comment: 4/6/2009 G103-27-00-E001 Lake Houston to Cuba Libra Drive X Comment: 9/4/2015 Harris County Flood Control District 35-19 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update G504-01-00-R001 Deer Park Interlocal for G504-01-00 X Comment: 11/26/2018 C100-00-00-B016 MLK Boulevard Bridge X Comment: 10/4/2010 C100-00-00-B022 Almeda Road Bridge X Comment: 1/11/2011 C100-00-00-B023 Buffalo Speedway Bridge X Comment: 9/1/2011 C100-00-00-B024 Whiteheather Road Bridge X Comment: 12/3/2012 C100-00-00-B025 Hiram Clark Street Bridge X Comment: 5/17/2017 C100-00-00-B026 South Post Oak Street Bridge X Comment: 9/19/2017 C100-00-00-B027 Heatherbrook Street Bridge X Comment: 2/22/2016 C100-00-00-B039 Law Park Pedestrian Bridge X Comment: 12/19/2013 C100-00-00-B040 Buxley Pedestrian Bridge X Comment: 7/3/2013 C100-00-00-E012 SBFFDRP – LERRD X Comment: 7/1/2013 C100-00-00-E013 SBFFDRP – LERRD X Comment: 11/7/2016 C100-00-00-E014 SBFFDRP – LERRD X Comment: 11/7/2016 C100-00-00-G001 SBFFDRP – Overall Support X Comment: 10/10/2015 C100-00-00-G003 SBFFDRP – Bridge Management X Comment: 4/9/2013 C106-00-00-P003 Channel Improvements Impact Analysis X Comment: 6/11/2013 C106-03-00-C002 Channel Improvements Phase 2 X Comment: 1/13/2019 C106-03-00-C003 Channel Improvements Phase 3 X Comment: 4/20/2010 C106-03-00-FP01 Mitigation Project – Basin X Comment: 11/21/2016 C106-08-00-C003 Conveyance Improvements Phase 2 X Comment: 8/30/2012 C200-00-00-Y001 Sims Bayou Conditions Assessment X Comment: 8/14/2015 Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-20 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update C500-03-00-Y001 The Hill at Sims Greenway X Comment: 8/3/2010 C500-03-00-Y003 The Hill Site Stabilization Project X Comment: 2/26/2014 C500-03-00-Y004 The Hill Site Stabilization Project Phase 2 X Comment: 2/26/2014 C508-02-00-E003 E&R Agreement X Comment: 9/9/2013 J100-00-00-R001 ROW Acquisition – Floodplain X FCD144 Comment: Some ROW acquired. Project to be held open for when floodplain ROW becomes necessary or available. O100-00-00-E001 Goose Creek Flood Damage Reduction Project X Comment: 12/16/2014 O100-00-00-E002 Channel Improvements X Comment: 3/29/2004 E100-00-00-R002 Arbor Oaks Buyout X FCD179 Comment: 20 remaining structures to be purchased E100-00-00-Y001 White Oak Bayou Federal Study Support X Comment: 12/19/2016 E100-00-00-Y003 White Oak Bayou Federal Study X Comment: 3/15/2016 E100-00-00-Y009 White Oak Bayou Lawsuit X Comment: 2/8/2018 E121-00-00-E001 Vogel Creek Conveyance Improvement Project X Comment: 3/8/2011 E121-00-00-E003 Vogel Creek Project, Phase 3 X Comment: 8/16/2010 E200-00-00-E003 Jersey Village Channel Project, Phase 3 X Comment: 4/5/2012 E500-00-00-FP001 Inwood Golf Course Acquisition X Comment: The City of Houston purchased this land instead of the District E500-03-00-E001 Basin Improvements, Phase 3 X Comment: 11/4/2013 E500-03-00-W001 Environmental Enhancements X FCD148 Comment: Recent nutria rat colonization of the site has slowed progress E500-11-00-E001 Ranchstone Stormwater Detention Basin X Comment: 8/3/2010 E500-11-00-W001 Environmental Enhancements X Comment: 10/16/2017 E500-12-00-E001 Fallbrook Stormwater Detention Basin X Comment: 5/7/2009 E515-01-00-E001 Brickhouse Gully Stormwater Detention Basin X Comment: 3/15/2010 Harris County Flood Control District 35-21 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update E515-01-00-W001 Environmental Enhancements X Comment: 4/28/2017 E535-01-00-E004 PER for Stormwater Detention Basin X Comment: 10/27/2017 E535-01-00-FP001 HMGP1791 Jersey Village Basin X Comment: 10/27/2017 M125-00-00-E001 Conveyance Improvements X Comment: 1/18/2019 M500-01-00-E001 E & R Contract – Morris Tractor X Comment: 9/22/2017 35.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 35-11 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 35-12 identifies the priority for each action. Table 35-13 summarizes the mitigation actions by hazard of concern and mitigation type. Table 35-11. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire Existing 3, 4, 10 HCFCD TBD High HMGP, PDM, FMA Short-term Action FCD2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: All hazards New and Existing 1, 5, 8 HCFCD TBD Low Staff Time, General Funds Short-term Action FCD3 — Integrate the hazard mitigation plan into other plans, ordinances and programs within the community Hazards Mitigated: Dam failure, earthquake, flooding, landslide, severe weather, tsunami, wildfire Existing 2, 6, 9 HCFCD TBD High TBD Ongoing Action FCD4 — C-40, AB Res SECTION-216, Corps of Engineers Section 216 Study – Addicks and Barker Reservoirs Hazards Mitigated: Dam failure, flooding New and Existing 8, 10, 11 USACE HCFCD Low Congressional Appropriation Short-term Action FCD5 — F-53, U100-00-00-CONV, Rehabilitation of Channels Upstream of Addicks Reservoir to Restore Channel Conveyance Capacity Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-22 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD6 — F-54, U100-00-00-E008, Right-Of-Way Acquisition, Design and Construction of Control Structures and Stormwater Quality Features for the Upper Langham Creek Program Hazards Mitigated: Flooding New 2, 10, 11, 12, 15 HCFCD N/A Low 2018 HCFCD BOND, Private Participants Short-term Action FCD7 — C-36, U101-00-00-FP001, Right-Of-Way Acquisition, Design and Construction of Channel Conveyance Improvements and Bypass Channel for South Mayde Creek Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term Action FCD8 — C-46, U101-00-00-FP002, Right-Of-Way Acquisition, Design and Construction of a Stormwater Detention Basin on South Mayde Creek Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term Action FCD9 — C-47, U101-00-00-FP003, Design and Construction of a Bridge Replacement for Greenhouse Road at South Mayde Creek Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD HCED High 2018 HCFCD BOND Short-term Action FCD10 — C-48, U101-00-00-FP004, Right-Of-Way Acquisition, Design and Construction of a Stormwater Detention Basin on South Mayde Creek near the Grand Parkway Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term Action FCD11 — F-55, U102-00-00-FP001, Planning, Right-Of-Way Acquisition, Design, and Construction for Ultimate Conveyance on Bear Creek Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD12 — F-84, U102-12-00-FP, Design and Construction of Secondary Outfall for John Pauls Landing for the Upper Langham Creek Program Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD13 — F-56, U500-00-00-FP002, Right-Of-Way Acquisition, Design, and Construction of a Retention Area Hazards Mitigated: Dam failure, flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD14 — C-37, U500-01-CON, Design and Construction of Little York Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Short-term Harris County Flood Control District 35-23 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD15 — F-83, U500-North-JPL, Right-Of-Way Acquisition, Design and Construction of a Stormwater Detention Basin North of John Pauls Landing for the Upper Langham Creek Program Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD16 — C-38, U520-01-CON, Design and Construction of Dinner Creek Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Short-term Action FCD17 — F-112, U700-00-00-FP001, Right-Of-Way Acquisition, Design, and Construction of Wetland Mitigation Bank Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD18 — C-52, U-USACE-CONV, Rehabilitation of Channels Inside of Addicks Reservoir to Restore Channel Conveyance Capacity Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND Short-term Action FCD19 — F-99, B100-CON, Right-Of-Way, Design and Construction of Conveyance Improvements along Armand Bayou Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD20 — F-96, B100-GEN, Investigations of General Drainage Improvements in Armand Bayou Watershed Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD21 — C-44, B100-RESTORE, Armand Bayou Right-of-Way Acquisition and Floodplain Preservation Hazards Mitigated: Flooding New and Existing 8, 10, 11, 15 HCFCD TBD Medium 2018 HCFCD BOND Ongoing Action FCD22 — CI-023, B104-00-00-FP, Right-Of-Way, Design and Construction of Conveyance Improvements along Horsepen Bayou Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD23 — C-06, B112-00-00-404, Right-Of-Way Acquisition, Design and Construction of B112-00-00 and Tributaries Conveyance Improvements Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term Action FCD24 — CI-021, B112-BGLEN, Brookglen Flooding Mitigation Analysis Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD TBD Low 2018 HCFCD BOND Short-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-24 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD25 — C-07, B509-0304-CON, Design and Construction of the B509-03-00 and B509-04-00 Stormwater Detention Basins Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Short-term Action FCD26 — F-72, B513-02-00-FP, Design and Construction of the Baywood Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD27 — F-52, T100-00-00-CONV, Rehabilitation of Approximately 20 Miles of Channels Upstream of Barker Reservoir to Restore Channel Conveyance Capacity Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD28 — C-53, T-USACE-CONV, Rehabilitation of Channels Inside of Barker Reservoir to Restore Channel Conveyance Capacity Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND Short-term Action FCD29 — C-11, D100-00-00-USACE, Design and Construction of Project Brays Corps of Engineers (Section 211(f) Project) Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND Short-term Action FCD30 — CI-025, D100-AddDet, Investigation of Additional Stormwater Detention Basins in the Brays Bayou Watershed Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD31 — CI-034, D100-USFondren, Investigation of Channel Improvements Upstream of Fondren Road on Brays Bayou Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD32 — C-12, D111-00-00-404, Right-Of-Way, Design and Construction of Conveyance Improvements along Poor Farm Ditch Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Southside Place and City of West University Place High 2018 HCFCD BOND Long-term Action FCD33 — CI-038, D115-00-00-FP, Restore Channel Conveyance Capacity Along D115-00-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston Medium 2018 HCFCD BOND Short-term Action FCD34 — F-07, D118-00-00-FP001, Planning, Right-Of-Way Acquisition, Design, and Construction of Channel Conveyance Improvements on Keegans Bayou Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Harris County Flood Control District 35-25 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD35 — C-13, D133-00-00-404, Planning, Right-Of-Way, Design and Construction of Conveyance Improvements along Bintliff Ditch Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Long-term Action FCD36 — F-08, D140-00-00-FP001, Planning, Right-Of-Way Acquisition, Design, and Construction of Channel Conveyance Improvements on Fondren Diversion Channel Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD37 — F-58, W100-00-00-LIN, Construction of Linear Detention on Buffalo Bayou Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD38 — CI-017, W100-BCON, Design & Construction of Replacement Bridges Along Buffalo Bayou Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD39 — CI-016, W100-Bstudy, Investigations of Bridges and Potential Channel Bypasses over Buffalo Bayou Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD40 — F-82, W100-COMMERCE, Demolition of 1119 Commerce Street and Slope Stabilization Along Buffalo Bayou Hazards Mitigated: Flooding 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD41 — CI-018, W140-00-00-GEN, Rehabilitation of W140-00-00 to Restore Channel Conveyance Capacity Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD42 — F-59, W140-CON, Spring Branch Creek Stabilization Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD43 — F-80, W141-00-00-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along Soldiers Creek Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD44 — F-81, W151-153-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along W151-00-00 and W153-00-00 Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD45 — F-79, W157-00-00-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along W157-00-00 Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-26 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD46 — CI-009, W190-JOINT, Partnership Project with Fort Bend County on Right-of-Way Acquisition, Design, and Construction of General Drainage Improvements along Clodine Ditch Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD Fort Bend County Medium 2018 HCFCD BOND Long-term Action FCD47 — CI-024, W500-Micro, Investigation of Effectiveness of Micro-Detention in the Buffalo Bayou Watershed Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD48 — F-70, Q100-00-00-FP, Upstream Cedar Bayou Project – Right-Of-Way Acquisition, Design and Construction of Channel Conveyance Improvements and Stormwater Detention Basin Upstream of FM 1960 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD49 — F-42, Q114-00-00-FP, Right-of-Way Acquisition, Design and Construction of Channel Conveyance Improvements along Magee Gully Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD50 — F-41, Q122-00-00-FP, Right-of-Way Acquisition, Design and Construction of Channel Conveyance Improvements along Clawson Ditch and Q124-00-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD51 — F-43, Q128-00-00-FP, Right-of-Way Acquisition, Design and Construction of Channel Conveyance Improvements along Adlong Ditch Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD52 — F-44, Q130-00-00-FP, Right-of-Way Acquisition, Design and Construction of Channel Conveyance Improvements along Q130-00-00 Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD53 — F-45, Q134-00-00-FP, Planning, Right-Of-Way Acquisition, Design and Construction of Channel Conveyance Improvements on Q134-00-00 and Q134-00-01 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD54 — F-69, Q136-00-00-FP, Right-Of-Way Acquisition, Design and Construction of channel conveyance improvements on Q136-00-00 – Part of the Upstream Cedar Bayou Project Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Harris County Flood Control District 35-27 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD55 — F-46, Q500-01-00-FP, Right-Of-Way Acquisition, Design and Construction of the Q500-01 Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD56 — F-47, Q500-CWA, Right-Of-Way Acquisition, Design and Construction of Stormwater Detention Basins near Coastal Water Authority canals and IH 10 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD57 — F-48, Q700-01-CON, Design and Construction of Crosby Eastgate Environmental Mitigation Bank Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD58 — C-03, A100-00-00-USACE, Design and Construction of Corps of Engineers Clear Creek Federal Flood Risk Management Project Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND, Congressional Appropriation Long-term Action FCD59 — CI-001, A100-CONV, Rehabilitation of the Clear Creek channel to Restore Channel Conveyance Capacity Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD60 — CI-039, A100-Nassau, Partnership Project with Nassau Bay to Reduce the Risk of Flooding Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD City of Nassau Bay Low 2018 HCFCD BOND, Nassau Bay Short-term Action FCD61 — CI-013, A104-CONV, Restore Channel Conveyance Capacity on A104-00-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD62 — F-01, A135-00-00-FP001, Right-Of-Way Acquisition, Design, and Construction of Channel Conveyance Improvements on A135-00-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD63 — CI-003, A214-CONV, Rehabilitation of the A214-00-00 channel to Restore Channel Conveyance Capacity Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD Medium 2018 HCFCD BOND Short-term Action FCD64 — F-02, A500-04-CON, Right-Of-Way Acquisition, Design and Construction of Hughes Stormwater Detention Basin on Clear Creek Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-28 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD65 — F-03, A500-08-CON, Design and Construction of Dagg Road Stormwater Detention Basin on Clear Creek Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD66 — CI-62, A500-528-Dixie, Construction of Stormwater Detention Basins Near FM 528 and Dixie Farm Road in Friendswood Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD USACE High 2018 HCFCD BOND Short-term Action FCD67 — C-05, A520-03-00-FP, Construction of South Belt Stormwater Detention Basin and Channel Conveyance Improvements Along Beamer Road Ditch (A120-00-00) Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND Short-term Action FCD68 — F-76, A700-01-WMB, Identification, Design and Construction of the A700-01 Environmental Mitigation Bank Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD69 — CI-012, K100-CONV, Major Maintenance of Cypress Creek and Tributaries Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD70 — F-20, K100-ROW, Cypress Creek Right-of-Way Acquisition and Floodplain Preservation Hazards Mitigated: Flooding New and Existing 8, 10, 11, 15 HCFCD N/A Low 2018 HCFCD BOND Ongoing Action FCD71 — CI-035, K100-TRIBS-DET, Update to 2003 Texas Water Development Board Cypress Creek Tributary Study and Investigate Expanding Stormwater Detention Basins in Cypress Creek Watershed Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD72 — F-21, K129-00-00-X007, Restore Channel Conveyance Capacity on K129-00-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD73 — F-22, K140-MAINT, Restore Channel Conveyance Capacity Along Pillot Gully Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD74 — F-23, K163-CON, Construction of Channel Conveyance Improvements Along K163-00-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Harris County Flood Control District 35-29 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD75 — F-24, K700-01-WMB, Identification, Design and Construction of the K700-01 Environmental Mitigation Bank Hazards Mitigated: Flooding New and Existing 2, 6, 7, 8 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD76 — F-98, F100-00-00-CON, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements in Galveston Bay Watershed Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD77 — F-101, F100-00-00-GEN, Investigations of General Drainage Improvements in Galveston Bay Watershed Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD78 — C-58, F101-06-00-E002, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements Along F101-06-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of La Porte Low 2018 HCFCD BOND Long-term Action FCD79 — C-57, F216-00-CONV, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements Along F216-00-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD Low 2018 HCFCD BOND Long-term Action FCD80 — F-120, O100-00-00-CON, Right-Of-Way Acquisition, Design, and Construction of General Drainage Improvements in Goose Creek watershed Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD81 — F-121, O100-00-00-GEN, Investigations of General Drainage Improvements in Goose Creek watershed Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD82 — F-109, O200-00-00-CON, Right-Of-Way Acquisition, Design, and Construction of General Drainage Improvements on Spring Gully Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD83 — F-39, O200-00-00-GEN, Investigations of General Drainage Improvements on Spring Gully Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD84 — C-20, P100-00-00-FP, Mid-Reach Greens Bayou Project – Design and Construction of Channel Conveyance Improvements along Greens Bayou Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD USACE High 2018 HCFCD BOND Short-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-30 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD85 — CI-006, P118-BROCK, Design and Construction of a Stormwater Detention Basin in Brock Park Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term Action FCD86 — CI-022, P130-05-01-DET, ROW, Design, and Construction of Stormwater Detention Basin Near P130-05 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD87 — C-31, P133-CON, Design and Construction of the Smith Road Channel Diversion Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Short-term Action FCD88 — C-43, P138-01-01-FP, Planning, Right-of-Way Acquisition, Design and Construction of Channel Conveyance Improvements along P138-01-01 Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD HUD High 2018 HCFCD BOND, CDBG Long-term Action FCD89 — F-40, P500-01-CON, Repairs and Enhancements to the Lower Greens Bayou Regional Detention Embankment and Control Structure Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD90 — C-32, P500-02-00-FP001, Design and Construction of the Cutten Road Stormwater Detention Basin Improvements Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Short-term Action FCD91 — C-33, P500-04-00-FP, Design and Construction of Aldine-Westfield Stormwater Detention Basin Improvements Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Short-term Action FCD92 — C-34, P500-06-00-E003/4, Design and Construction of Lauder Stormwater Detention Basin Improvements Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD HUD High 2018 HCFCD BOND, CDBG Short-term Action FCD93 — C-23, P118-08-00-FP, Right-Of-Way, Design, and Construction of Channel Conveyance Improvements on P118- 08-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term Action FCD94 — C-24, P118-09-00-FP, Right-Of-Way, Design, and Construction of Channel Conveyance Improvements on P118- 09-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term Harris County Flood Control District 35-31 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD95 — C-25, P118-21-00-FP, Right-Of-Way, Design, and Construction of Channel Conveyance Improvements on P118- 21-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD HUD High 2018 HCFCD BOND, CDBG Long-term Action FCD96 — C-26, P118-23-00-FP, Right-Of-Way, Design, and Construction of Channel Conveyance Improvements on P118- 23-00 and P118-23-02 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston; Harris County High 2018 HCFCD BOND, City of Houston, Harris County Long-term Action FCD97 — C-28, P118-25-00-FP, Right-Of-Way, Design, and Construction of Channel Conveyance Improvements on P118- 25-00 & P118-25-01 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston; Harris County High 2018 HCFCD BOND, City of Houston, Harris County Long-term Action FCD98 — C-30, P118-27-00-FP, Right-Of-Way, Design, and Construction of Channel Conveyance Improvements on P118- 27-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term Action FCD99 — C-35, P518-10-00-FP001, Design and Construction of Stormwater Detention Basin and Associated Channel Improvements Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD HUD High 2018 HCFCD BOND, CDBG Short-term Action FCD100 — C-01, P518-26-00-FP, Construction of P518-26 Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD HUD High 2018 HCFCD BOND, CDBG Short-term Action FCD101 — C-02, P518-ALDINE-CDBG, Aldine Westfield Stormwater Detention Basin and Channel Improvements Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Long-term Action FCD102 — C-18, H100-00-00-USACE, Design and Construction of Corps of Engineers Hunting Bayou, Section 211(f) Project Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND Short-term Action FCD103 — CI-59, H102-DIV, Planning, Right-Of-Way, Design and Construction of a Diversion Channel from H102-00-00 to H100-00-00 through Galena Park Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD104 — CI-031, H103-00-00-FP001, HCFCD Cost Share of Study with the City of Houston on Wallisville Outfall Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD City of Houston Low 2018 HCFCD BOND Short-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-32 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD105 — F-17, H103-00-00-FP002, Right-Of-Way Acquisition, Design and Construction of Wallisville Outfall Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD106 — F-107, R100-00-00-CON, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements in Jackson Bayou Watershed Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD107 — F-73, R100-00-00-GEN, Investigations of General Drainage Improvements in Jackson Bayou Watershed Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD108 — F-26, L100-00-00-MNG, Management, Right-of-Way Acquisition, Design and Construction of the Little Cypress Creek Frontier Program Hazards Mitigated: Flooding New 2, 10, 11, 12, 15 HCFCD N/A Medium 2018 HCFCD BOND Long-term Action FCD109 — F-27, L500-01-CON, Design and Construction of Zube Park Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD110 — F-28, L500-02-CON, Right-Of-Way Acquisition, Design, and Construction of Kluge Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD111 — F-29, L500-06-CON, Right-Of-Way Acquisition, Design, and Construction of Mueschke East Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD112 — F-30, L500-09-CON, Right-Of-Way Acquisition, Design, and Construction of Schiel Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD113 — F-31, L500-10-CON, Construction of Mueschke West Stormwater Detention Basin Improvements Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD114 — F-32, L500-11-CON, Construction of Hegar Stormwater Detention Basin Improvements Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Harris County Flood Control District 35-33 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD115 — F-89, L500-INC, Design and Construction of Additional Volume in Little Cypress Creek Stormwater Detention Basins Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD116 — F-33, L512-01-CON, Construction of Kleb Woods Stormwater Detention Basin Improvements Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD117 — F-34, L512-03-CON, ROW, Design, and Construction of Mason Stormwater Detention Basin in Little Cypress Creek watershed Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD118 — F-35, L514-01-CON, Construction of Bauer-Hockley Stormwater Detention Basin Improvements Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD119 — F-108, S100-00-00-CON, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements in Luce Bayou Watershed Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD120 — F-85, S100-00-00-GEN, Investigations of General Drainage Improvements along Luce Bayou Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD121 — F-51, S100-00-00-ROW, Luce Bayou Right-of-Way Acquisition and Floodplain Preservation Hazards Mitigated: Flooding New and Existing 8, 10, 11, 15 HCFCD N/A Low 2018 HCFCD BOND Ongoing Action FCD122 — C-50, G103-00-00-JOINT, Funding for Future Partnership Projects Based on Results of Study – for Right-of-Way Acquisition, Design, and Construction of General Drainage Improvements in San Jacinto River Watershed Study Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term Action FCD123 — C-17, G103-00-00-STUDY, San Jacinto River Watershed Study Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD SJRA, City of Houston, Montgomery County, FEMA Low 2018 HCFCD BOND, HMGP Short-term Action FCD124 — F-15, G103-Atascocita, Planning , Right-Of-Way Acquisition, design and Construction of General Drainage Improvements Near Atascocita Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-34 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD125 — CI-61, G103-Dredge, East Fork, West Fork and Lake Houston Dredging Hazards Mitigated: Flooding New and Existing 8, 10, 11 USACE HCFCD, City of Houston High HMGP Short-term Action FCD126 — F-110, G103-ELH, Planning , Right-Of-Way Acquisition, design and Construction of General Drainage Improvements East of Lake Houston Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD127 — CI-028, G103-GATES, Design and Construction of Additional Gates on Lake Houston in Partnership with the City of Houston Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term Action FCD128 — CI-019, G103-GlenDaleDet, Investigations of Potential Detention Sites Around Glendale Dredge Site in Partnership with the City of Houston Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term Action FCD129 — F-110, G103-Huffman, Planning , Right-Of-Way Acquisition, design and Construction of General Drainage Improvements Near Huffman Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD130 — F-14, G103-Kingwood, Planning , Right-Of-Way Acquisition, design and Construction of General Drainage Improvements Near Kingwood Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD131 — CI-60, G112-CON, Planning, Right-Of-Way, Design and Construction of Conveyance Improvements along Panther Creek Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD TBD Low 2018 HCFCD BOND Long-term Action FCD132 — CI-029, C102-00-00-FP, Restore Channel Conveyance Capacity Along C102-00-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term Action FCD133 — CI-027, C106-00-00-FP, Planning, Right-Of-Way Acquisition, Design, and Construction of Improvements for the Tributaries of C106-00-00 Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD City of Houston; City of South Houston Low 2018 HCFCD BOND Long-term Action FCD134 — F-92, C116-00-00-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along C116-00-00 Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Harris County Flood Control District 35-35 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD135 — C-08, C118-00-00-FP001, Right-Of-Way Acquisition, Design, and Construction of Stormwater Detention Basin and Channel Conveyance Improvements along Salt Water Ditch Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Long-term Action FCD136 — F-93, C124-00-00-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along C124-00-00 Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD137 — F-94, C143-00-00-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along C143-00-00 Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD138 — F-95, C144-00-00-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along C144-00-00 Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD139 — CI-037, C146-00-00-FP, Restore Channel Conveyance Capacity Along C146-00-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston Medium 2018 HCFCD BOND Short-term Action FCD140 — C-09, C147-00-00-FP001, Right-Of-Way Acquisition, Design, and Construction of South Post Oak Stormwater Detention Basin and Channel Conveyance Improvements along C147-00-00 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD FEMA High 2018 HCFCD BOND, HMGP Long-term Action FCD141 — C-10, C506-01-CON, Design and Construction of South Shaver Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term Action FCD142 — F-119, J100-00-00-CON, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements along Spring Creek Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD143 — F-75, J100-00-00-GEN, Investigations of General Drainage Improvements along Spring Creek Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD144 — F-19, J100-00-00-ROW, Spring Creek Right-of-Way Acquisition and Floodplain Preservation Hazards Mitigated: Flooding New and Existing 8, 10, 11, 15 HCFCD N/A Low 2018 HCFCD BOND Ongoing Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-36 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD145 — C-118, J100-RES, Planning, Right-of-Way Acquisition, Design and Construction of a Reservoir along Spring Creek Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD TBD Medium 2018 HCFCD BOND Long-term Action FCD146 — F-104, I100-00-00-CON, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements in Vince Bayou Watershed Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD147 — F-78, I100-00-00-GEN, Investigations of General Drainage Improvements in Vince Bayou Watershed Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD148 — C-14, E100-00-00-USACE, Design and Construction of Corps of Engineers White Oak Bayou Section 211(f) Project Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND Short-term Action FCD149 — CI-011, E100-HIDDEN, Partnership Project with the City of Houston for Feasibility Study of General Drainage Improvements around Hidden Lake Townhomes Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD City of Houston Medium 2018 HCFCD BOND Short-term Action FCD150 — F-09, E101-00-00-FP001, Planning, Right-Of-Way Acquisition, Design and Construction of Little White Oak Bayou Channel Conveyance Improvements Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD151 — CI-033, E105-JOINT, Partnership Project with City of Houston on Planning, Right-of-Way Acquisition, Design, and Construction of General Drainage Improvements along E105-00-00 Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD City of Houston Medium 2018 HCFCD BOND Long-term Action FCD152 — CI-030, E106-00-00-GEN, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements along Turkey Gully Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Long-term Action FCD153 — F-10, E115-00-00-FP001, Right-Of-Way Acquisition, Design, and Construction of Channel Conveyance Improvements on Brickhouse Gully Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD154 — CI-010, E127-JOINT, Partnership Project with Jersey Village on Right-of-Way Acquisition, Design, and Construction of General Drainage Improvements along E127-00-00 Hazards Mitigated: Flooding Harris County Flood Control District 35-37 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline New and Existing 8, 10, 11 HCFCD City of Jersey Village Medium 2018 HCFCD BOND Long-term Action FCD155 — C-39, E200-02-00-NC, Right-of-Way Acquisition, Design and Construction of the North Canal Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TXDoT High 2018 HCFCD BOND Long-term Action FCD156 — C-59, E500-21-CON, Construction of Inwood Forest West Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term Action FCD157 — CI-032, E500-AddDet, Investigation of Additional Stormwater Detention Basins in the White Oak Bayou Watershed Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD City of Houston Medium 2018 HCFCD BOND Short-term Action FCD158 — C-15, E500-ARBOROAKS-404, Design and Construction of Arbor Oaks Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term Action FCD159 — C-16, E500-WDLNDTRL-404, Design and Construction of Woodland Trails Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD USACE High 2018 HCFCD BOND Short-term Action FCD160 — F-106, M100-00-00-CON, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements in Willow Creek Watershed Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term Action FCD161 — F-71, M100-00-00-GEN, Investigations of General Drainage Improvements in Willow Creek Watershed Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD162 — F-36, M100-00-00-ROW, Willow Creek Right-of-Way Acquisition and Floodplain Preservation Hazards Mitigated: Flooding New and Existing 8, 10, 11, 15 HCFCD N/A Low 2018 HCFCD BOND Ongoing Action FCD163 — F-37, M124-00-00-FP001, Design and Construction of Channel Conveyance Improvements on M124-00-00 Downstream of SH 249 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-38 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD164 — F-38, M528-01-CON, Design and Construction of Cypress Rosehill Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD165 — Z-09, Z.FWS, Upgrades and Expansion of the Harris County Flood Warning System Hazards Mitigated: Flooding Existing 1, 3 HCFCD N/A Low 2018 HCFCD BOND Ongoing Action FCD166 — Z-10, Z.REMAP, Harris County Floodplain Mapping Updates Hazards Mitigated: Flooding New and Existing 3, 12, 14, 15 HCFCD FEMA Low 2018 HCFCD BOND, FEMA CTP Grant Short-term Action FCD167 — Z-02, D100-00-00-P011, City of Bellaire Master Drainage Concept Plan Hazards Mitigated: Flooding New and Existing 2, 10, 11, 12, 15 HCFCD City of Bellaire Low 2018 HCFCD BOND Short-term Action FCD168 — Z-02, D112-00-00-E001, Flood Risk Reduction Project Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston Low 2018 HCFCD BOND Long-term Action FCD169 — Z-02, D100-00-00-E016, Detention on City of Houston ROW at S Braewood and W 610 Loop Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD City of Houston Low 2018 HCFCD BOND Short-term Action FCD170 — Z-02, U106-00-00-E004, Partnership Project with Spencer Road PUD Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD Spencer Road PUD Low 2018 HCFCD BOND Short-term Action FCD171 — Z-02, P152-00-00-E002, Partnership with WCID 109 for Local Flood Damage Reduction Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD WCID 109 Low 2018 HCFCD BOND Short-term Action FCD172 — Z-02, W100-00-00-P011, St. George Place and Surrounding Area Feasibility Study Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD St. George Redevelopment Authority/TIRZ 1 Low 2018 HCFCD BOND Short-term Action FCD173 — Z-03, Z100-00-00-PLAN, Countywide Ongoing Planning Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Ongoing Action FCD174 — Z-05, Z100-00-00-P029, Drainage Reuse Initiative Feasibility Study Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD HCED Low 2018 HCFCD BOND Short-term Harris County Flood Control District 35-39 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD175 — Z-05, Z100-00-00-Y106, Ecosystem Services Study Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD KPC, Rice SSPEED Center, Texas A&M Agrilife, Prairie View A&M, Simfero, Cibor, Walter P. Moore Low 2018 HCFCD BOND Short-term Action FCD176 — Z-05, W100-00-00-Y002, Fluvial Geomorphic Assessment to Improve the Stability and Resiliency of Buffalo Bayou Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD Buffalo Bayou Partnership Low 2018 HCFCD BOND Short-term Action FCD177 — CI-026, Z100-COH, Investigation of City of Houston Properties for Conversion to Stormwater Detention Basins Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD City of Houston Low 2018 HCFCD BOND Short-term Action FCD178 — Z-04, U502-02-00-E007, John Paul Landing Central Cell Excavation Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD HCED Low 2018 HCFCD BOND Short-term Action FCD179 — Z-Buyout, Z100-HMGP, Countywide Federal Grant Funded Volunteer Home Buyouts Hazards Mitigated: Flooding Existing 8, 10, 11, 15 HCFCD TBD Low 2018 HCFCD BOND, HMGP, PDM, FMA Ongoing Action FCD180 — Z-01, Z100-ROW, Countywide Floodplain Preservation and Right of Way Acquisition Hazards Mitigated: Flooding New and Existing 8, 10, 11, 15 HCFCD TBD Low 2018 HCFCD BOND, HMGP, PDM, FMA Ongoing Action FCD181 — Z-08, Z100-TUNNEL, Preliminary Engineering for Large Diameter Tunnels for Stormwater Conveyance Hazards Mitigated: Flooding New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term Action FCD182 — F-88, Z500-CONV, ROW Acquisition, Design and Construction of Stormwater Detention Basins in Large Buyout Areas Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Ongoing Action FCD183 — Z-StormRep, Z-StormRep, Countywide Storm Repairs in Harris County Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD TBD Low 2018 HCFCD BOND Ongoing Action FCD184 — The Greens Bayou Federal Flood Damage Reduction Project Hazards Mitigated: Flooding New and Existing 8, 10, 11 USACE HCFCD Low Congressional Appropriation Short-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-40 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD185 — Implement the recommendations of the “HCFCD Adapting Infrastructure for Climate Change” presentation. Hazards Mitigated: Dam Failure, Drought, Flooding, Hurricane, Wildfire New and Existing 1, 3, 5, 8, 11 HCFCD N/A Low Operations & Maintenance Budget Ongoing Action FCD186 — Develop and adopt master drainage plans in order for HCFCD to exercise the authority granted to districts under Chapter 49.211 of the Texas Water Code. Changes to Chapter 49.211, made via House Bill 919, require HCFCD review and approval of subdivision drainage plans Hazards Mitigated: Flooding New and Existing 2, 10, 11, 12, 15 HCFCD N/A Low Operations & Maintenance Budget Ongoing Action FCD187 — Obtain generators for District facilities due to be able to work during and after an event Hazards Mitigated: Earthquake, Flooding, Landslide, Severe Weather, Hurricane, Tsunami, Wildfire Existing 11, 13 HCFCD N/A Low Operations & Maintenance Budget Short-term Action FCD188 — Educating the employees on hazards including HCFCD evacuation plan and emergency plan and precautions that need to be taken for facilities. Hazards Mitigated: Earthquake, Flooding, Landslide, Severe Weather, Hurricane, Tsunami, Wildfire Existing 3, 10 HCFCD N/A Low Operations & Maintenance Budget Ongoing Action FCD189 — Replace landscaping with drought resistant plants and trees around HCFCD facilities Hazards Mitigated: Drought Existing 7, 8, 11 HCFCD N/A Low Operations & Maintenance Budget Ongoing Action FCD190 — Clear out dead brush and tree limbs around HCFCD facilities that could be a burn agent to wildfires Hazards Mitigated: Wildfire Existing 2, 7, 8, 10, 11 HCFCD N/A Low Operations & Maintenance Budget Ongoing Action FCD191 — P500-03-00-E002 Basin Improvements, Phase 2 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low CIP Budget Short-term Action FCD192 — P500-08-00-E001 Basin Improvements, Phase 1 Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low CIP Budget Short-term Action FCD193 — P545-01-00-E005 Kuykendahl Stormwater Detention Basin Hazards Mitigated: Flooding New and Existing 8, 10, 11 HCFCD N/A Low CIP Budget Short-term Action FCD194 — Prepare a backup facility from which to conduct Flood Watch activities in the event of a Category 3 or higher hurricane, and train staff to access and utilize that facility Hazards Mitigated: Hurricane Existing 1, 13 HCFCD N/A Low Operations & Maintenance Budget Ongoing Harris County Flood Control District 35-41 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline Action FCD195 — F-54, U100-00-00-E008 Upper Langham Frontier Program Hazards Mitigated: Flooding New 2, 10, 11, 12, 15 HCFCD N/A Low 2018 HCFCD Bond Long-term Action FCD196— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Hurricane, Severe Weather, Flooding, Earthquake, Dam Failure, Wildfire, Mass Movement, Drought, Tsunami New and Existing 1, 3, 4, 5, 9, 10, 11, 15 HCFCD HCOHSEM Low General Funds Ongoing Action FCD197—Pursue the use of green stormwater infrastructure on buyout properties with the best management practices determined at the time of design. Hazards Mitigated: Flooding New and Existing 2, 5, 6, 7, 8, 10, 11 HCFCD N/A Low Operations & Maintenance Budget Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 35-12. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya FCD1 3 High High Yes Yes No Medium High FCD2 3 Low Low Yes No Yes High Low FCD3 3 High Medium Yes Yes No Medium High FCD4 3 Medium Low Yes No Yes High Low FCD5 3 High Low Yes Yes Yes High High FCD6 5 High Low Yes Yes Yes High High FCD7 3 High High Yes Yes Yes Medium High FCD8 3 High High Yes Yes Yes Medium High FCD9 3 High High Yes Yes Yes High High FCD10 3 High High Yes Yes Yes Medium High FCD11 4 High Low Yes Yes Yes Medium High FCD12 3 High Low Yes Yes Yes High High FCD13 3 High Low Yes Yes Yes Medium High FCD14 3 High High Yes Yes Yes High High FCD15 3 High Low Yes Yes Yes Medium High FCD16 3 High High Yes Yes Yes High High FCD17 3 High Low Yes Yes Yes Medium High FCD18 3 High Low Yes No Yes High Low FCD19 3 High Low Yes Yes Yes Medium High FCD20 4 High Low Yes Yes Yes High High FCD21 4 High Medium Yes Yes Yes High High FCD22 3 High Low Yes Yes Yes High High Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-42 Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya FCD23 3 High High Yes Yes Yes Medium High FCD24 4 Medium Low Yes Yes Yes High High FCD25 3 High High Yes Yes Yes High High FCD26 3 High Low Yes Yes Yes High High FCD27 3 High Low Yes Yes Yes High High FCD28 3 High Low Yes No Yes High Low FCD29 3 High Low Yes No Yes High Low FCD30 3 Medium Low Yes Yes Yes High High FCD31 3 High Low Yes Yes Yes High High FCD32 3 High High Yes Yes Yes Medium High FCD33 3 High Medium Yes Yes Yes High High FCD34 3 High Low Yes Yes Yes Medium High FCD35 4 High High Yes Yes Yes Medium High FCD36 4 High Low Yes Yes Yes Medium High FCD37 3 High Low Yes Yes Yes High High FCD38 3 High Low Yes Yes Yes High High FCD39 4 Medium Low Yes Yes Yes Medium Medium FCD40 3 High Low Yes Yes Yes High High FCD41 3 High Low Yes Yes Yes High High FCD42 3 High Low Yes Yes Yes High High FCD43 3 High Low Yes Yes Yes Medium High FCD44 4 High Low Yes Yes Yes Medium High FCD45 4 High Low Yes Yes Yes Medium High FCD46 3 High Medium Yes Yes Yes Medium High FCD47 4 Medium Low Yes Yes Yes High High FCD48 3 High Low Yes Yes Yes Medium High FCD49 3 High Low Yes Yes Yes Medium High FCD50 3 High Low Yes Yes Yes Medium High FCD51 3 High Low Yes Yes Yes Medium High FCD52 4 High Low Yes Yes Yes Medium High FCD53 3 High Low Yes Yes Yes Medium High FCD54 3 High Low Yes Yes Yes Medium High FCD55 3 High Low Yes Yes Yes Medium High FCD56 3 High Low Yes Yes Yes Medium High FCD57 3 High Low Yes Yes Yes High High FCD58 3 High Low Yes No Yes Medium Low FCD59 3 High Low Yes Yes Yes High High FCD60 4 High Low Yes Yes Yes High High FCD61 3 High Low Yes Yes Yes High High FCD62 3 High Low Yes Yes Yes Medium High FCD63 3 High Medium Yes Yes Yes High High FCD64 3 High Low Yes Yes Yes Medium High FCD65 3 High Low Yes Yes Yes High High Harris County Flood Control District 35-43 Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya FCD66 3 High High Yes No Yes High Low FCD67 3 High Low Yes No Yes High Low FCD68 4 Medium Low Yes Yes Yes Medium Medium FCD69 3 High Low Yes Yes Yes High High FCD70 4 High Low Yes Yes Yes High High FCD71 4 Medium Low Yes Yes Yes High High FCD72 3 High Low Yes Yes Yes High High FCD73 3 High Low Yes Yes Yes High High FCD74 3 High Low Yes Yes Yes High High FCD75 4 Medium Low Yes Yes Yes Medium Medium FCD76 3 High Low Yes Yes Yes Medium High FCD77 4 Medium Low Yes Yes Yes High High FCD78 3 High Low Yes Yes Yes Medium High FCD79 3 High Low Yes Yes Yes Medium High FCD80 3 High Low Yes Yes Yes Medium High FCD81 4 Medium Low Yes Yes Yes High High FCD82 3 High Low Yes Yes Yes Medium High FCD83 4 High Low Yes Yes Yes High High FCD84 3 High High Yes No Yes High Low FCD85 3 High Medium Yes Yes Yes High High FCD86 3 High Low Yes Yes Yes Medium High FCD87 3 High High Yes Yes Yes High High FCD88 4 High High Yes Yes Yes Medium High FCD89 3 High Low Yes Yes Yes High High FCD90 3 High High Yes Yes Yes High High FCD91 3 High High Yes Yes Yes High High FCD92 3 High High Yes Yes Yes High High FCD93 3 High High Yes Yes Yes Medium High FCD94 3 High High Yes Yes Yes Medium High FCD95 3 High High Yes Yes Yes Medium High FCD96 3 High High Yes Yes Yes Medium High FCD97 3 High High Yes Yes Yes Medium High FCD98 3 High High Yes Yes Yes Medium High FCD99 3 High High Yes Yes Yes High High FCD100 3 High High Yes Yes Yes High High FCD101 3 High Medium Yes Yes Yes Medium High FCD102 3 High Low Yes No Yes High Low FCD103 4 High Low Yes Yes Yes Medium High FCD104 4 Medium Low Yes Yes Yes High High FCD105 3 High Low Yes Yes Yes High High FCD106 3 High Low Yes Yes Yes Medium High FCD107 4 Medium Low Yes Yes Yes High High FCD108 5 High Medium Yes Yes Yes Medium High Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-44 Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya FCD109 3 High Low Yes Yes Yes High High FCD110 3 High Low Yes Yes Yes Medium High FCD111 3 High Low Yes Yes Yes Medium High FCD112 3 High Low Yes Yes Yes Medium High FCD113 3 High Low Yes Yes Yes High High FCD114 3 High Low Yes Yes Yes High High FCD115 3 High Low Yes Yes Yes High High FCD116 3 High Low Yes Yes Yes High High FCD117 3 High Low Yes Yes Yes Medium High FCD118 3 High Low Yes Yes Yes Medium High FCD119 3 High Low Yes Yes Yes Medium High FCD120 4 Medium Low Yes Yes Yes High High FCD121 4 High Low Yes Yes Yes High High FCD122 4 Medium High No Yes Yes Medium Medium FCD123 4 Medium Low Yes Yes Yes High High FCD124 4 High Low Yes Yes Yes Medium High FCD125 3 High High Yes Yes Yes High High FCD126 4 High Low Yes No Yes Medium Low FCD127 3 High High Yes Yes Yes High High FCD128 4 Medium Medium Yes Yes Yes High High FCD129 4 High Low Yes Yes Yes Medium High FCD130 4 High Low Yes Yes Yes Medium High FCD131 4 High Low Yes Yes Yes Medium High FCD132 3 High Medium Yes Yes Yes High High FCD133 4 High Low Yes Yes Yes Medium High FCD134 4 High Low Yes Yes Yes Medium High FCD135 3 High High Yes Yes Yes Medium High FCD136 4 High Low Yes Yes Yes Medium High FCD137 4 High Low Yes Yes Yes Medium High FCD138 4 High Low Yes Yes Yes Medium High FCD139 3 High Medium Yes Yes Yes High High FCD140 3 High High Yes Yes Yes Medium High FCD141 3 High High Yes Yes Yes High High FCD142 3 High Low Yes Yes Yes Medium High FCD143 4 Medium Low Yes Yes Yes High High FCD144 4 High Low Yes Yes Yes High High FCD145 4 High Medium Yes Yes Yes Medium High FCD146 3 High Low Yes Yes Yes Medium High FCD147 4 High Low Yes Yes Yes High High FCD148 3 High Low Yes No Yes High Low FCD149 4 High Medium Yes Yes Yes High High FCD150 4 High Low Yes Yes Yes High High FCD151 4 High Medium Yes Yes Yes Medium High Harris County Flood Control District 35-45 Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya FCD152 3 High High Yes Yes Yes Medium High FCD153 3 High Low Yes Yes Yes Medium High FCD154 3 High Medium Yes Yes Yes Medium High FCD155 3 High High Yes Yes Yes Medium High FCD156 3 High High Yes Yes Yes High High FCD157 4 High Medium Yes Yes Yes High High FCD158 3 High High Yes Yes Yes High High FCD159 3 High High Yes No Yes High Low FCD160 3 High Low Yes Yes Yes Medium High FCD161 4 High Low Yes Yes Yes High High FCD162 4 High Low Yes Yes Yes High High FCD163 3 High Low Yes Yes Yes High High FCD164 3 High Low Yes Yes Yes High High FCD165 2 High Low Yes Yes Yes High High FCD166 4 Medium Low Yes Yes Yes High High FCD167 5 Medium Low Yes Yes Yes High High FCD168 3 High Low Yes Yes Yes Medium High FCD169 3 High Low Yes Yes Yes High High FCD170 3 High Low Yes Yes Yes High High FCD171 3 High Low Yes Yes Yes High High FCD172 3 Medium Low Yes Yes Yes High High FCD173 4 Medium Low Yes Yes Yes High High FCD174 3 Low Low Yes Yes Yes High High FCD175 3 Low Low Yes Yes Yes High High FCD176 3 Medium Low Yes Yes Yes High High FCD177 4 Medium Low Yes Yes Yes High High FCD178 3 High Low Yes Yes Yes High High FCD179 4 High Low Yes Yes Yes High High FCD180 4 High Low Yes Yes Yes High High FCD181 4 Medium Low Yes Yes Yes High High FCD182 3 High Low Yes Yes Yes High High FCD183 3 High Low Yes Yes Yes High High FCD184 3 High Low Yes No Yes High Low FCD185 5 Medium Low Yes Yes Yes High High FCD186 5 Medium Low Yes Yes Yes High High FCD187 2 Medium Low Yes Yes Yes High High FCD188 2 High Low Yes No Yes High Low FCD189 3 Medium Low Yes No Yes High Low FCD190 5 High Low Yes Yes Yes High High FCD191 3 High Low Yes Yes Yes High High FCD192 3 High Low Yes Yes Yes High High FCD193 3 High Low Yes Yes Yes High High FCD194 2 High Low Yes No Yes High Low Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-46 Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya FCD195 5 High Low Yes Yes Yes Medium High FCD196 8 Medium Low Yes Yes Yes High High FCD197 7 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 35-13. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Hurricane FCD196 FCD194 FCD196 FCD187, FCD194, 196 FCD185 FCD2, 3, 188, FCD194, 196 Severe Weather FCD196 FCD196 FCD187, 196 FCD2, 3, 188, 196 Flooding FCD21, 70, 108, 121, 144, 162, 166, 167, 180, 195, 196 FCD1, 21, 70, 121, 144, 162, 180 FCD166, 196 FCD5, 6, 17, 18, 21, 27, 28, 33, 40, 41, 42, 57, 59, 61, 63, 68, 69, 70, 72, 73, 75, 89, 121, 132, 139, 144, 162, 175, 176, 180, 183, 195 FCD165, 187, 196 FCD6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 19, 22, 23, 25, 26, 29, 32, 34, 35, 36, 37, 38, 40, 43, 44, 45, 46, 48, 49, 50, 51, 52, 53, 54, 55, 56, 58, 62, 64, 65, 66, 67, 74, 76, 78, 79, 80, 82, 84, 85, 86, 87, 88, 90, 91, 92, 93, 94, 95, 96, 94, 98, 99, 100, 101, 102, 103, 105, 106, 108, 109, 110, 111, 112, 113, 114, 115, 116, 117, 118, 119, 122, 124, 125, 126, 127, 129, 130, 131, 133, 134, 135, 136, 137, 138, 140, 141, 142, 145, 146, 148, 150, 151, 152, 153, 154, 155, 156, 158, 159, 160, 163, 164, 168, 169, 170, 171, 178, 182, 184, 191, 192, 193, 195 FCD174, 185 FCD2, 3, 4, 11, 20, 24, 30, 31, 34, 35, 36, 39, 43, 44, 45, 47, 53, 60, 71, 77, 81, 83, 88, 103, 104, 107, 120, 123, 124, 126, 128, 129, 130, 131, 133, 134, 136, 137, 138, 143, 145, 147, 149, 150, 151, 157, 161, 172, 173, 174, 175, 176, 177, 181, 186, 188, 196 Low-Risk Hazards Earthquake FCD196 FCD196 FCD187, 196 FCD2, 3, 188, 196 Dam Failure FCD196 FCD196 FCD196 FCD185 FCD2, 3, 196 Wildfire FCD196 FCD196 FCD190 FCD187, 196 FCD185 FCD2, 3, 188, 196 Mass Movement FCD196 FCD196 FCD187, 196 FCD2, 3, 188, 196 Drought FCD196 FCD196 FCD189 FCD196 FCD185 FCD2, 3, 196 Tsunami FCD196 FCD196 FCD187, 196 FCD2, 3, 188, 196 a. See the introduction to this volume for explanation of mitigation types. 35.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX 35.10.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. Harris County Flood Control District 35-47 • Harris County Flood Control District Hazard Mitigation Plan (2014) — This plan was reviewed to identify action items from the plan, and to help identify areas of existing integration with relevant planning mechanisms. • Flood Operations & Hurricane Response Plan — This plan was reviewed to provide information for the Planning and Regulatory Capabilities section of this annex and to help identify areas of existing integration with relevant planning mechanisms. • Harris County Flood Control District Policy, Criteria & Procedure Manual — This manual was reviewed to provide information for the Planning and Regulatory Capabilities section of this annex. • Harris County Flood Control District Hydrology and Hydraulics Guidance Manual — This manual was reviewed to provide information for the Planning and Regulatory Capabilities section of this annex. • Harris County Flood Control District Land Surveying Guidelines — These guidelines were reviewed to provide information for the Planning and Regulatory Capabilities section of this annex. • Design Guidelines for HCFCD Wet Bottom Detention Basins with Water Quality Features — These guidelines were reviewed to provide information for the Planning and Regulatory Capabilities section of this annex. • Design Manual for Articulating Concrete Block Systems — This manual was reviewed to provide information for the Planning and Regulatory Capabilities section of this annex. • Harris County Low Impact Development & Green Infrastructure Design Criteria for Storm Water Management Manual — This manual was reviewed to provide information for the Planning and Regulatory Capabilities section of this annex. • Ordinary High Water Mark Delineation Manual — This manual was reviewed to provide information for the Planning and Regulatory Capabilities section of this annex. • Detention Basin Pump Operation & Maintenance Manual — This manual was reviewed to provide information for the Planning and Regulatory Capabilities section of this annex. • Little Cypress Creek Interim Guidelines — These guidelines were reviewed to provide information for the Planning and Regulatory Capabilities section of this annex. • Little Cypress Creek Master Drainage Plan — This plan was reviewed to identify action items from the plan, and to help identify areas of existing integration with relevant planning mechanisms. • Cypress Creek Overflow Management Plan — This plan was reviewed to provide information for the Planning and Regulatory Capabilities section of this annex and to help identify areas of existing integration with relevant planning mechanisms. • Supplemental Guidelines and Criteria for Developing in the Addicks Reservoir Watershed, Barker Reservoir Watershed, and the Cypress Creek Watershed Upstream of US 290 — These guidelines were reviewed to provide information for the Planning and Regulatory Capabilities section of this annex and to help identify areas of existing integration with relevant planning mechanisms. • Upper Langham Creek Development Guidelines — These guidelines were reviewed to provide information for the Planning and Regulatory Capabilities section of this annex and to help identify areas of existing integration with relevant planning mechanisms. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • Integrated Management Application — This is an application used by the District to track project information, including status updates and financial information. This was used to help report on the status of previously identified actions. • HCFCD.org — The District’s main website has many pages describing District projects, plans, studies, and programs. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 35-48 • Immediate Flood Reports — The District’s reports summarizing impacts after flooding events were used to inform the Jurisdiction-Specific Natural Hazard Event History. 35.10.2 Staff and Local Stakeholder Involvement in Annex Development This annex was developed over the course of several months with input from many district divisions and departments including Financial Services, the Communications Department, the Engineering Division, and the Planning Division. These divisions and departments were asked to contribute to the annex development through reviewing and contributing to the capability assessment, reporting on the status of previously identified actions, and participating in action identification and prioritization. 36-1 36. HARRIS COUNTY EMERGENCY SERVICE DISTRICT NO. 12 36.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact James Novick, Battalion Chief 911 Hollywood Street Houston, Texas 77015 Telephone:713-453-1811 e-mail Address: jnovick@cloverleaf-fire.org Edward M. Russell, Fire Chief/Business Administrator 911 Hollywood Street Houston, Texas 77015 Telephone: 713-453-1811 e-mail Address: emrussell@cloverleaf-fire.org 36.2 JURISDICTION PROFILE 36.2.1 Overview The Harris County Emergency Service District No. 12 Fire Department (HCESD12) provides fire prevention, suppression, and emergency medical response for basic life support services to an unincorporated area located on the east side of Harris County. HCESD12 was formed on December 12, 2001 as a rural fire protection district; however, on March 3, 2014 the organization transitioned to an Emergency Service District based on the consolidation of laws and regulations governing special districts. The laws that govern the political subdivision of HCESD12 is the Texas Health and Safety Code, Chapter 775, 2011. The department has a career staff that maintains a minimum staffing level of 9 fire firefighters on duty 24 hours-a-day; a total staff of 38 personnel. A five-member elected Board of Commissioners governs the district. Funding for HCESD12 is accomplished by the collection of property tax and sales tax generated within its boundaries. The Emergency Service District Board of Commissioners assumes responsibility for the adoption of this plan; the Fire Chief will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 36-1. Table 36-1. Local Mitigation Planning Team Members Name Title Edward M. Russell Fire Chief/Business Administrator James Novick Battalion Chief The District participates in the Public Protection Class Rating System and currently has a rating of 4. 36.2.2 Service Area and Trends The district service area covers 9.9 square miles, serving a population of 55,000 residents. The Harris County Emergency Service District No. 12 Fire Department was formed to provide fire protection to the residents of the unincorporated area of east Harris County known as Cloverleaf. The response district consists Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 36-2 of commercial, educational, industrial, marine, multi-family dwellings, residential dwellings, office buildings warehousing occupancies, and chemical plants. In addition, the district contains sections of Interstate 10, the Sam Houston Toll Road-Beltway 8, and several railroads. The district extends south to the Houston Ship Channel, north to Crosby Freeway-Highway 90, east to Beltway 8, and west to Greens Bayou; included in the district are the Northshore, Pine Trails, Newforest, Woodforest and Cloverleaf additions. The Cloverleaf and Woodforest additions are densely populated. The economic growth of the area still trends upwards yearly even though the unemployment rate in the district is 8 percent. In 2018, HCESD12 became a first responder organization licensed by the Texas Department of State Health Services; working in cooperation with the licensed medical provider North Channel Emergency Medical Service. As the transition continues, HCESD12 is expected to experience an increase of medical responses to assist the public; our rescue/medical responses has increase 52 percent since the emergency medical service operations started. As of 2019, the department has had a 48 percent increase of call volume since 2013 and the projected annual percentage increase is around 10.5 percent yearly. 36.2.3 Assets Table 36-2 summarizes the critical assets of the district and their value. Table 36-2. Special Purpose District Assets Asset Value Property 3 acres of land $216,775 Equipment Fire Apparatus $4,920,290 Response Equipment $953,576 Total: $5,873,866 Critical Facilities and Infrastructure Station 1 — 911 Hollywood Street, Houston, TX 77015 $2,301,163 Station 2 — 14222 Wallisville Road, Houston, TX 77049 $1,986,757 Communication Center $1,200,000 Total: $5,487,920 36.3 CAPABILITY ASSESSMENT An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 29.9 identifies these as community capacity building mitigation actions. 36.3.1 Planning and Regulatory Capabilities Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents. When effectively prepared and administered, these plans, programs and regulations can support the implementation of mitigation actions. Table 36-3 summarizes existing codes, ordinances, policies, programs or plans that are applicable to this hazard mitigation plan. Harris County Emergency Service District No. 12 36-3 Table 36-3. Planning and Regulatory Capability Plan, Study or Program Date of Most Recent Update Comment Harris County Fire Code 2012 Adopted in December 2014 to be effective on March 1, 2015. Texas Commission of Fire Protection 2009 Texas Government Code Chapter 419 HCESD No. 12 Employee Handbook 2018 Harris County Emergency Response Plan 2015 36.3.2 Fiscal, Administrative and Technical Capabilities Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard mitigation projects. An assessment of fiscal capabilities is presented in Table 36-4. Administrative and technical capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of administrative and technical capabilities is presented in Table 36-5. Table 36-4. Fiscal Capability Financial Resource Accessible or Eligible to Use? Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Federal Grant Programs Yes Table 36-5. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/ Position Planners or engineers with knowledge of land development and land management practices Yes Harris County Engineers or professionals trained in building or infrastructure construction practices Yes Harris County Planners or engineers with an understanding of natural hazards Yes Harris County Staff with training in benefit/cost analysis Yes Fire Administration Surveyors No Personnel skilled or trained in GIS applications Yes IT Scientist familiar with natural hazards in local area No Emergency manager Yes Fire Administration Grant writers Yes Fire Administration 36.3.3 Education and Outreach Capabilities Outreach and education capability identifies the connection between government and community members, which opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is presented in Table 36-6. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 36-4 Table 36-6. Education and Outreach Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No • If yes, please briefly describe Do you use social media for hazard mitigation education and outreach? No • If yes, please briefly describe Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, please briefly specify Do you have any other programs already in place that could be used to communicate hazard-related information? No • If yes, please briefly describe Do you have any established warning systems for hazard events? No • If yes, please briefly describe Industrial Emergency Notification, Harris Co. Emergency Alerting 36.3.4 Adaptive Capacity for Climate Change Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 36-7 summarizes the jurisdiction’s adaptive capacity for climate change. Table 36-7. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts High Comment: Related to hurricanes and the result of flooding hazards Jurisdiction-level monitoring of climate change impacts Medium Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: No regulatory ability to affect carbon emissions. Capital planning and land use decisions informed by potential climate impacts Low Comment: Handled by the county and not the district. Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: No authority Identified strategies for greenhouse gas mitigation efforts Low Comment: No authority Identified strategies for adaptation to impacts Medium Comment: Changes in response due to hazard impacts. Champions for climate action in local government departments Low Comment: Non-existent for response agency Harris County Emergency Service District No. 12 36-5 Criterion Jurisdiction Ratinga Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Impacts pertain to response Local authority over sectors likely to be negative impacted Low Comment: No authority Public Capacity Local residents knowledge of and understanding of climate risk Low Comment: Local residents support of adaptation efforts Low Comment: Local residents’ capacity to adapt to climate impacts Low Comment: Local economy current capacity to adapt to climate impacts Low Comment: Local ecosystems capacity to adapt to climate impacts Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. 36.4 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 36.4.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Capital Improvement Plan — Provides the plan for capital improvements. Within the plan, projects can be identified to assist in hazard mitigation. The hazard mitigation plan can provide funding support for proposed projects based on a risk assessment. 36.4.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Capital Improvement Projects — Capital improvement project proposals may take into consideration hazard mitigation potential as a means of evaluation project prioritization. • Emergency Operations Plan — The District does not have an Emergency Operations Plan and intends to develop one as a mitigation planning action during the next five years. • Continuity of Operations Plan — The District does not have a Continuity of Operations Plan and intends to develop one as a mitigation planning action during the next five years. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 36-6 36.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 36-8 lists past occurrences of natural hazards for which specific damage was recorded in HCESD12. Other hazard events that broadly affected the entire planning area, including HCESD12, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 36-8. Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 240,000 Hurricane Ike 1791 DR 2008 NA Hurricane Rita 1606 DR 2005 NA Hurricane Katrina Evac. 3216 EM 2005 NA Hail NA 2005 NA Tropical Storm Allison 1379 DR 2001 NA Flood/River Fire NA 1994 NA Severe Weather 970 DR 1992 NA Hurricane Alicia 689 DR 1983 NA 36.6 HAZARD RISK RANKING Table 36-9 presents a local ranking for HCESD12 of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 36-9. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 2 Hurricane 32 High 3 Flooding 28 Medium 4 Earthquake 14 Low 5 Drought 6 Low 5 Wildfire 6 Low 6 Dam Failure 0 (No exposure) None 6 Mass Movement 0 (No Exposure) None 6 Tsunami 0 (No Exposure) None 6 Coastal Erosion 0 (No Exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 36.7 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Station fourteen’s district frequently loses power due to a lack of tree maintenance; this excludes the fire station due to the department owned stand-by generator. Harris County Emergency Service District No. 12 36-7 • One of the District’s two fire stations is located in a very high flood risk area. • Several neighborhoods in Station twenty-four’s district has the potential to have ingress and egress cut off as the result flooding. Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this annex. 36.8 STATUS OF PREVIOUS PLAN ACTIONS The Harris County Emergency Service District No. 12 Fire Department has not previously completed any hazard mitigation planning effort. 36.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 36-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 36-11 identifies the priority for each action. Table 36-12 summarizes the mitigation actions by hazard of concern and mitigation type. Table 36-10. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action ESD1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Flooding Existing 3, 4, 8, 10, 11, 13, 15 HCESD12 TBD High HMGP, PDM, FMA Long-term Action ESD2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire New and Existing 1, 5, 8 HCESD12 TBD Low Staff Time, General Funds Short-term Action ESD3 — Integrate the hazard mitigation plan into other plans, ordinances and programs within the community. Hazards Mitigated: Earthquake, flooding, hurricane, severe weather, wildfire Existing 1, 3, 6, 9 HCESD12 NA Low Staff Time, General Funds Ongoing Action ESD4 — Participate in annual multi-agency training. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire, New and Existing 3, 4 HCESD12 HCESD50, HCESD60 Low Staff Time, General Funds Short-term Action ESD5 — Control low hanging, un-kept tree debris from making contact with electrical power sources. Hazards Mitigated: Severe Weather New and Existing 8, 10, 11 HCESD12 Harris County Precinct 2 & 3 Low General Funds Short-term Action ESD6 — Utilize multiple avenues, including organization website, social media, and public education campaigns to disseminate natural hazard information and methods to prepare for and mitigate those risks. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire, New and Existing 3, 4, 10 HCESD12 TBD Low Staff Time, General Funds Ongoing Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 36-8 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action ESD7 — Participate in the development of further interoperability between multiple organizations to improve emergency communications; upgrade mobile and portable radio units to new and current capabilities. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire, All Hazards New and Existing 1, 3, 4, 9, 11, 15 ECOM HCESD12, HCESD50, HCESD60, HCESD6, HCESD4, HCESD5, HCESD14 High Assistance to Firefighters Grant Program Short-term Action ESD8 — Evaluate, analyze, and improve drainage of Big Gulch, a Greens Bayou tributary, to assist in minimizing flooding in station 24’s district. Hazards Mitigated: Hurricane, Flooding, Severe Weather New and Existing 3, 4, 6, 8, 11 Harris County Flood Control District HCESD12 High HMGP, PDM, FMA Long-term Action ESD9 — Improve, expand, and develop new equipment, techniques, and abilities to respond to high water emergencies. Hazards Mitigated: Hurricane, Flooding, Severe Weather New and Existing 4, 11 HCESD12 NA Medium Staff Time, General Funds Short-term Action ESD10 — Develop, implement, and evaluate an Emergency Operations and Continuity of Operations plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire, All Hazards New and Existing 9, 11, 13 HCESD12 TBD Low Staff Time, General Funds; HMGP, PDM, FMA Short-term Action ESD11— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire New and Existing 1, 3, 4, 5, 9, 10, 11, 15 HCESD12 HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 36-11. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya ESD1 7 High High Yes Yes No Medium High ESD2 3 Low Low Yes No Yes High Low ESD3 4 High Medium Yes Yes No Medium High ESD4 2 High Medium Yes Yes Yes Medium Low ESD5 3 High Low Yes No Yes Medium Low ESD6 3 Low Low Yes No Yes Low Low ESD7 6 High High Yes Yes No High High ESD8 5 High High Yes Yes No High High ESD9 2 High Medium Yes Yes Yes High Low ESD10 3 Medium Low Yes Yes Yes Medium Medium ESD11 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Harris County Emergency Service District No. 12 36-9 Table 36-12. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather ESD5, 11 ESD5, 8 ESD6, 11 ESD 4, 7, 9, 10, 11 ESD1, 3 ESD1, 7, 11 Hurricane ESD5, 11 ESD5, 8 ESD6, 11 ESD4, 7, 9, 10, 11 ESD1, 3 ESD1, 7, 8, 11 Medium-Risk Hazards Flooding ESD8, 11 ESD8 ESD6, 11 ESD8 ESD4, 7, 9, 10, 11 ESD1, 3 ESD1, 7, 8, 11 Low-Risk Hazards Earthquake ESD11 ESD6, 11 ESD7, 10, 11 ESD11 Drought ESD11 ESD6, 11 ESD7, 10, 11 ESD11 Wildfire ESD11 ESD5 ESD6, 11 ESD7, 10, 11 ESD11 a. See the introduction to this volume for explanation of mitigation types. 36.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX 36.10.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • Fire Inventory (PSTrax) — Utilized to determine capabilities of response. • Fire Data (Firehouse) — Used in the determination of previous incidents. The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • Safe-D ESD Handbook — Gathered information pertaining to the administration and operations of an emergency service district. 36.10.2 Staff and Local Stakeholder Involvement in Annex Development This annex was developed over the course of several months with a review of material from different areas of tasks including operations, budgeting, and the planning sectors. Information was gathered to contribute to the development of the annex, material was reviewed, and collaborated to use the most vital details for the annex. Discussions were held to identify the capability assessment, planning initiatives, hazard assessment and ranking, and future action plans. Once actions had been identified and complied in the annex, the draft was circulated for review, comments, and adjustments. 37-1 37. HARRIS HEALTH SYSTEM 37.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Ray W. Higgins, Director of Emergency Management 9240 Kirby Houston, TX 77054 Telephone: (713) 634-1470 e-mail Address: Ray.Higgins@harrishealth.org David Attard, Associate Administrator, Healthcare Systems Engineering 9240 Kirby Houston, TX 77054 Telephone: (713) 634-1451 e-mail Address: David.Attard@harrishealth.org 37.2 JURISDICTION PROFILE 37.2.1 Overview The Harris Health System, previously the Harris County Hospital District, is a governmental entity with taxing authority that owns and operates three hospitals, 18 community health centers, three large multi-specialty clinics, five same-day clinics, five school-based clinics, one free-standing dental center, one dialysis center, one geriatric center, and 10 homeless shelter clinics — including five homeless eligibility service locations, mobile immunization and a medical outreach program throughout Harris County, Texas. The system administrative offices are located in Houston. The Harris County Hospital District was created by voter referendum in November 1965 and was formally designated as a political subdivision with taxing authority on January 1, 1966. A hospital district is a governmental entity in Texas, established pursuant to the Texas Constitution or the general statutes of Texas, and its purpose is to provide medical care to the needy residents of a particular county. The system’s two main hospitals serve approximately one million under-insured and uninsured people, nearly a quarter of the entire population of Harris County, the third most-populous county in the United States. Harris County includes Houston, the fourth largest city in the United States. • Ben Taub Hospital is a Level 1 trauma center with 444 licensed beds. It is located in the Texas Medical Center, the largest medical complex in the world, and is staffed by Harris Health employees, faculty, residents, and students of Baylor College of Medicine. • Lyndon B. Johnson Hospital is a 207-bed general hospital with a Level 3 trauma center located northeast of downtown Houston. It is staffed by Harris Health employees, faculty, residents, and students of the University of Texas Health Science Center at Houston and the University of Texas M. D. Anderson Cancer Center. • Quentin Mease Hospital ceased inpatient activities on February 28, 2019 and will be reconfigured to be an outpatient facility. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 37-2 In January 2012, board members of Harris County Hospital District approved name rebranding to “Harris Health System.” The rebranding became effective on September 6, 2012. The Harris Health System Board of Trusties assumes responsibility for the adoption of this plan; the Chief Executive Officer (CEO) will oversee its implementation. Development of this annex was carried out by the members of the Harris Health System Mitigation Planning Team, whose members are listed in Table 37-1. Table 37-1. Local Mitigation Planning Team Members Name Title Ray W. Higgins Director of Emergency Management David Attard Associate Administrator, Healthcare Systems Engineering Aaron Velasquez Emergency Management Specialist (LBJ) Jason Kunnacherry VP, Operations (Ben Taub) Christopher Okezie VP, Operations (System) Benny Stansbury Director Facilities Management (Ben Taub) Jake Goldstein Administrative Director, Ancillary Services (ACS) Jose A. Lara Operations Manager Engineering (ACS) Justin Adams Emergency Management Specialist (Ben Taub) 37.2.2 Service Area and Trends Harris Health System serves Harris County residents. Harris County area covers 1,777 square miles. According to the Census Bureau, the 2018 Harris County population was 4.7 million. • Ben Taub Hospital — Ben Taub Hospital is planning on expanding surgical capacity by 18% in the upcoming calendar year through the opening of 7 additional operating rooms in the hospital. This will allow the facility to become more in-line with community standard wait times for urgent and elective cases. In early 2019, Harris Health will complete the transition from four-bed rooms to semi-private rooms. While this reduces the overall bed count in the facility, it provides for an improved care environment not only for patients, but also for providers. At the same time, performance improvement initiatives are being put in place to reduce length of stay, time from admission decision to arrival in the nursing unit, and turnaround times from patient discharge to the room being ready for the next patient. From a specialty clinic perspective, Harris Health is working on provider efficiencies by considering potential mid-level providers to assist physicians in throughput and appointment availability. Lastly, as the psychiatric needs in Harris County continue to rise, Harris Health is working with other entities to improve access and venues for patients to seek treatment. • Quentin Mease — Quentin Mease Hospital ceased inpatient activities on February 28, 2019 and will be reconfigured to be an outpatient facility. While the need for rehab and skilled nursing facilities continues and will be managed through outsourcing, the existing facility is no longer able to support based on aging infrastructure and changes in code requirements. A master plan is in the works to consolidate to other Harris Health outpatient facilities (Thomas Street Health Center and Riverside Dialysis) into a renovated footprint at Quentin Mease. • Lyndon B. Johnson Hospital — Lyndon B. Johnson Hospital is planning on expanding its ICU bed capacity by adding a new surgical intensive care unit with 8 beds. Current ICU bed capacity at LBJ Hospital is 16 beds, and this will increase the number of ICU beds by 50%. LBJ is also currently analyzing the population’s needs and growth. Future trends show growth for the need of services in the service area related to an Oncology Radiation Center, Higher Trauma level designation, and inpatient services. LBJ is currently planning on expanding Oncology by planning to build a new facility on campus specifically for oncology radiation treatment. Trends show a population growth in the area around LBJ. Harris Health System 37-3 LBJ is in a medically underserved area. There will be a need for an additional 150-bed tower on campus to serve the growing population. Also, there will be a push to have a Level 2 trauma center with helipad to accommodate the growth of the city and its need. • Ambulatory Community Services — Harris Health will continue to operate a range of clinics throughout Harris County. Potential future expansions include managing more care for inmates and collaborating with Harris County on the Riverside Mental Health Center proposed expansion. Service trends will likely include more partnerships with community facilities, like food banks, exercise programs and parks, and community clinics, as well as an increased use of new technology such as telemedicine remote consults and at home patient monitoring and diagnostic tools. 37.2.3 Assets Table 37-2 summarizes the critical assets of the district and their estimated values. Table 37-2. Special Purpose District Assets Asset Value PROPERTY 141.757 acres of land $49,614,950 Equipment Ben Taub Hospital $122,111,233 Quentin Mease $2,075,463 Lyndon B. Johnson Hospital $ 93,999,366 Ambulatory Community Services Equipment (45 locations) $234,637,672 Total: $452,823,734 Critical Facilities and Infrastructure HOSPITALS • Ben Taub Hospital, NPC, Tower, & Garage – 1504 Taub Loop $479,773,550 • Lyndon B. Johnson Hospital, OC, & Garage – 5656 Kelly Street $239,100,742 PRIMARY CARE & SPECIALTY CARE CLINICS (Does not include rental properties) • Acres Home Health Center – 818 Ringold Street, Houston 77088 $9,412,000 • Aldine Health Center – 4755 Aldine Mail Route, Houston 77039 $6,233,900 • Baytown Health Center -1602 Garth Road, Baytown 77520 $6,580,650 • Casa de Amigos Health Center – 1615 North Main Street, Houston 77009 $5,451,300 • Danny Jackson Clinic – 5503 N. Fry Rd, Katy 77449 $5,662,700 • El Franco Lee Health Center – 8901 Boone Road, Houston 77099 $20,749,700 • Gulfgate Health Center – 7550 Office City Drive, Houston 77012 $8,587,000 • Martin Luther King Jr. Health Center – 3550 Swingle Road 77047 $23,471,100 • Northwest Health Center – 1100 West 34th Street, Houston 77018 $6,492,000 • Quentin Mease – 3601 North McGregor Way $31,618,529 • Smith Clinic – 2525-A Holly Hall, Houston 77054 $91,619,800 • Vallbona Health Center – 6630 De Moss Drive, Houston 77074 $5,717,900 ELIGIBILITY CENTERS, ADMINISTRATIVE FACILITY • Lois J. Moore Eligibility Center – 8901-B Boone Rd, Houston 77099 $1,156,106 • Southeast Eligibility Center – 3550-A Swingle Rd, Houston 77047 $1,119,370 • Administration Building & Garage – 2525 Holly Hall, Houston 77054 $204,245,165 Total: $1,152,274,012 Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 37-4 37.3 CAPABILITY ASSESSMENT An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 37.9 identifies these as community capacity building mitigation actions. 37.3.1 Planning and Regulatory Capabilities Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents. When effectively prepared and administered, these plans, programs and regulations can support the implementation of mitigation actions. Table 37-3 summarizes existing codes, ordinances, policies, programs or plans that are applicable to this hazard mitigation plan. Table 37-3. Planning and Regulatory Capability Plan, Study or Program Date of Most Recent Update Comment Texas Department of State Health Services Licensing & Regulation 2017 General and special hospitals to be licensed by the Department of State Health Services. City of Houston – Applicable Building, Fire, Health, Food, & Enforcement Codes 2012 & 2017 Building approval & enforcement of COH codes. Harris County Regulations – Applicable Building, Fire, and Enforcement Codes 2012 Building approval & enforcement of Harris County codes. Centers for Medicare & Medicaid Services (CMS) 42 CFR § 482 2017 Hospitals must meet standards established by the federal government in order to receive reimbursement from the federally funded programs (e.g., Medicare and/or Medicaid). National Integrated Accreditation for Healthcare Organizations (NIAHO) 2018 Hospitals participating in the Medicare and Medicaid program are required to comply with current Conditions of Participation. Complying with NIAHO standards ensure healthcare programs are meeting or exceeding CMS standards of clinical readiness and patient safety. 37.3.2 Fiscal, Administrative and Technical Capabilities Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard mitigation projects. An assessment of fiscal capabilities is presented in Table 37-4. Administrative and technical capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of administrative and technical capabilities is presented in Table 37-5. Table 37-4. Fiscal Capability Financial Resource Accessible or Eligible to Use? Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes No User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Federal Grant Programs Yes Harris Health System 37-5 Table 37-5. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Healthcare Systems Engineering Administration Engineers or professionals trained in building or infrastructure construction practices Yes Healthcare Systems Engineering Administration Department & Hospital Facilities Management Directors Planners or engineers with an understanding of natural hazards Yes Healthcare Systems Engineering Administration Staff with training in benefit/cost analysis Yes Healthcare Systems Engineering Administration Surveyors No Personnel skilled or trained in GIS applications No Scientist familiar with natural hazards in local area No Emergency manager Yes Emergency Management Department Grant writers Yes Harris County Hospital District Foundation Grant Writer & Researcher Other No 37.3.3 Education and Outreach Capabilities Outreach and education capability identifies the connection between government and community members, which opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is presented in Table 37-6. Table 37-6. Education and Outreach Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? No • If yes, please briefly describe Do you use social media for hazard mitigation education and outreach? No • If yes, please briefly describe Do you have any citizen boards or commissions that address issues related to hazard mitigation? No • If yes, please briefly specify Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, please briefly describe Mass Communication System (Internal); Twitter, Facebook Do you have any established warning systems for hazard events? Yes • If yes, please briefly describe Site based emergency communication / notification via text, e-mail, phone and overhead paging. 37.3.4 Adaptive Capacity for Climate Change Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 37-7 summarizes the jurisdiction’s adaptive capacity for climate change. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 37-6 Table 37-7. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Low Comment: Jurisdiction-level monitoring of climate change impacts Low Comment: Technical resources to assess proposed strategies for feasibility and externalities Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment: Capital planning and land use decisions informed by potential climate impacts Low Comment: Participation in regional groups addressing climate risks Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment: Identified strategies for greenhouse gas mitigation efforts Low Comment: Identified strategies for adaptation to impacts Low Comment: Champions for climate action in local government departments Low Comment: Political support for implementing climate change adaptation strategies Low Comment: Financial resources devoted to climate change adaptation Low Comment: Local authority over sectors likely to be negative impacted Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk Medium Comment: Local residents support of adaptation efforts Medium Comment: Local residents’ capacity to adapt to climate impacts Medium Comment: Local economy current capacity to adapt to climate impacts Medium Comment: Local ecosystems capacity to adapt to climate impacts Medium Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. Harris Health System 37-7 37.4 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in this annex were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 37.4.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • City of Houston Flood Mitigation required for new building projects and building plans for existing facilities. Critical Access facilities (Hospitals) have to meet even stricter mitigation requirements. 37.4.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Capital Improvement Program — Capital improvement project proposals may take into consideration hazard mitigation potential as a means of evaluating project prioritization. 37.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 37-8 lists past occurrences of natural hazards for which specific damage was recorded in Harris Health System. Other hazard events that broadly affected the entire planning area, including Harris County, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 37-8. Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Texas Severe Storm & Flooding / Allison DR-1379 6/09/2001 No damage records found Hurricane Ike DR-1791 9/12/2008 $950,270 Hurricane Harvey DR-4332 08/24/17 $15,742,260 37.6 HAZARD RISK RANKING Table 37-9 presents a local ranking for Harris Health System of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 37-8 Table 37-9. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Severe Weather 48 High 1 Hurricane 48 High 2 Flooding 27 Medium 3 Earthquake 14 Low 4 Dam Failure 12 Low 5 Wildfire 9 Low 6 Drought 6 Low 7 Tsunami 0 (No exposure) None 7 Mass Movement 0 (No exposure) None 7 Coastal Erosion 0 (No exposure) None NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 37.7 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Flooding • Hurricane • Severe Weather Mitigation actions addressing these issues were prioritized for consideration in the action plan in this annex. 37.8 STATUS OF PREVIOUS PLAN ACTIONS Table 37-10 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 37-10. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2014HCOHHS001 — Install flood barrier systems, such as flood panels, gates and passive systems, to increase flood protection and minimize damage for critical care facilities X HH-019 Comment: Ben Taub Central Plant is undergoing dry flood proofing to ensure compliance with floodplain regulations and is replacing existing generators located on ground level. Relocated inside Central Plant and behind flood proofing barrier to keep generators from flooding. 2014HCOHHS002 — Expand flood warning system(s), i.e. a mass notification system, to increase coverage to all the Hospital District’s hospitals, clinics and support facilities. X Comment: Mass Notification System is implemented. Medical Center Flood Warning System and RICE Flood Alert System. 2014HCOHHS003 — Develop and install retention ponds to reduce flood damages at the Hospital’s or District’s critical care facilities. X HH-020 Comment: No update at this time. Harris Health System 37-9 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2014HCOHHS004 — Implement flood control measures (riverine erosion controls) to minimize damage to critical care facilities within the flood hazard area. X HH-005 Comment: No update at this time 2014HCOHHS005 — Implement project(s) to elevate emergency generators above base flood elevation(s) at critical care facilities. X Comment: Ben Taub is replacing existing generators located on ground level. Relocated inside Central Plant and behind flood proofing barrier to keep generators from flooding. 2014HCOHHS006 — Retrofit roofing of critical care facilities to meet industry- accepted hurricane high-wind guidelines and retrofit gravel roofing to non-gravel roofing at all locations near critical care facilities to limit damage from high winds and loose debris. X Comment: Ben Taub is in-process. LBJ is complete with only a partial upgrade over annex needing to be retrofitted. LBJ and Ben Taub are retrofitting existing built up roofs (asphalt) with a single ply membrane that meets high-wind guidelines. 2014HCOHHS007 — Bury primary service power lines. X Comment: LBJ increased redundancy by replacing CenterPoint’s transformers and updated capacity and new automatic transfer situations. Increased level of redundancy and additional capacity. Upgrading the main incoming distribution system. 2014HCOHHS008 — Installation of generators / power back-up systems. X Comment: Smith Clinic installation of generator(s) is in progress. 2014HCOHHS009 — Install Roof Modifications necessary for critical care facilities to better survive high wind damage. X Comment: Project is no longer feasible. Roofs will not be modified, but entirely replaced. 2014HCOHHS010 — Install early warning system, i.e. a mass notification system to increase alert capabilities for the Hospital District and provide coverage to the District’s hospitals, clinics and support facilities. X Comment: Mass Notification and warning systems implemented. 2014HCOHHS011 — Provide community early warning system i.e. a mass notification system, to increase alert capabilities for the Hospital District to provide coverage to all the District’s hospitals, clinics, support facilities and general public X Comment: Completed 2014HCOHHS012 — Install lightning and surge protection measures for critical infrastructure. X HH-006 Comment: Not started 2014HCOHHS013 — Develop and harden safe room areas in critical care facilities. X HH-007 Comment: Not started 2014HCOHHS014 — Develop/implement cooling center with emergency power to provide critical life safety cooling during extreme heat events. X HH-008 Comment: Not started 2014HCOHHS015 — Install back-up generators to increase capacity and coverage of HVAC systems to all in-patient care areas. X HH-009 Comment: Not started 2014HCOHHS016 — Install drought-tolerant landscaping to reduce potable water use as part of a water conservation program. X HH-010 Comment: Not started 2014HCOHHS017 — Install ground water well(s) as secondary potable water and cooling water source to mitigate drought at critical care facilities. X HH-011 Comment: Not started Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 37-10 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update 2014HCOHHS018 — Harden water supply piping with materials that can accommodate dry ground conditions due to drought. X HH-012 Comment: Not started 2014HCOHHS019 — Adopt groundwater drought contingency planning measures. X HH-013 Comment: Not started 2014HCOHHS020 — Retrofit existing roofs on critical care facilities to resist the damaging effects of hail. X HH-014 Comment: Not started 2014HCOHHS021 — Install protective structures to minimize damage to critical assets and equipment. X Comment: Near completion. Ben Taub generators being relocated inside Central Plant. 2014HCOHHS022 — Install and improve intake air filtration with higher capacity and higher quality filtration/purification system at critical care facilities to minimize health risks and equipment damage associated with smoke and reduced air quality. X HH-015 Comment: Not started 2014HCOHHS023 — Establish buffer zones cleared of vegetative fuel loads around all critical care facilities. Implement a vegetative fuel load reduction program. X Comment: Not necessary 2014HCOHHS024 — Provide adequate freeze-protection insulation for domestic water supply piping and fire water supply piping where these systems are exposed to the weather. X HH-016 Comment: Not started 2014HCOHHS025 — Implement tree management program, especially where trees abut electric power transmission lines. X HH-017 Comment: Not started 2014HCOHHS026 — Upgrade and improve community warning system to provide reliable HazMat situational awareness and response instruction (evacuation, stay- at-home, seal doors and windows, etc.) Develop/implement HazMat Awareness Safety Program. X Comment: Not started 2014HCOHHS027 — Improve intake air filtration at critical care facilities to minimize health risks and equipment damage associated with reduced air quality resulting from toxic material releases. X Comment: LBJ – replacement of outside air handling units with upgraded air filtration system. 2014HCOHHS028 — Identify all energy pipelines within ¼ mile of critical care facilities. Develop and implement a pipeline awareness safety program for critical care personnel, identifying all energy pipelines within ¼ mile of critical care facilities and coordinating with community early-warning systems for rapid and reliable information dissemination for critical care personnel and their patients. X HH-018 Comment: Not started 2014HCOHHS029 — Improve intake air filtration at critical care facilities to minimize health risks and equipment damage associated with possible smoke and reduced air quality resulting from energy pipeline failure. X Comment: LBJ – replacement of outside air handling units with upgraded air filtration system. Harris Health System 37-11 37.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 37-11 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 37-12 identifies the priority for each action. Table 37-13 summarizes the mitigation actions by hazard of concern and mitigation type. Table 37-11. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HH-001 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Hurricane, Flooding, Severe Weather Existing 3, 4, 10 Harris Health Harris County High HMGP, PDM, FMA Short-term Action HH-002 — Actively participates in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: All hazards New and Existing 1, 5, 8 Harris Health Harris County Low Staff Time, General Funds Short-term Action HH-003 — Integrate the hazard mitigation plan into other plans, ordinances and programs within the community, Hazards Mitigated: Hurricane, Flooding, Severe Weather Existing 2, 6, 9 Harris Health Harris County Low Staff Time, General Funds Short-term Action HH-004 — Install back-up generators to increase capacity for the coverage of patient care/treatment and critical support facilities. Hazards Mitigated: Hurricane, Flooding, Severe Weather New 3, 4, 10 Harris Health Harris County High HMGP, PDM, FMA Short-term Action HH-005 — Implement flood control measures (riverine erosion controls) to minimize damage to critical care facilities within the flood hazard area. Hazards Mitigated: Flood, Severe Weather, Hurricane New and Existing 6, 9, 11, 13 Harris Health Harris County High Grant funding Short term Action HH-006 — Install lightning and surge protection measures for critical infrastructure. Hazards Mitigated: Severe Weather, Hurricane, Earthquake Existing 9, 11, 13 Harris Health Harris County Medium General and/or Grant funds Short term Action HH-007 — Develop and harden safe room areas in critical care facilities. Hazards Mitigated: Severe Weather, Hurricane, Earthquake New and Existing 4, 11, 13 Harris Health Harris County High Grant funding Short term Action HH-008 — Develop/implement cooling center with emergency power to provide critical life safety cooling during extreme heat events. Hazards Mitigated: Severe Weather, Hurricane, Earthquake New 4, 11, 13 Harris Health Harris County High Grant funding Short term Action HH-009 — Install back-up generators to increase capacity and coverage of HVAC systems to all in-patient care areas. Hazards Mitigated: Severe Weather, Hurricane, Earthquake New 4, 11, 13 Harris Health Harris County High Grant funding Short term Action HH-010 — Install drought-tolerant landscaping to reduce potable water use as part of a water conservation program. Hazards Mitigated: Drought New and Existing 5, 7, 8, 10, 15 Harris Health Harris County Low Staff Time, General Funds Short-term Action HH-011 — Install ground water well(s) as secondary potable water and cooling water source to mitigate drought at critical care facilities. Hazards Mitigated: Drought Existing 5, 7, 8, 10, 15 Harris Health Harris County Medium Staff Time, General Funds Short-term Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 37-12 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action HH-012 — Harden water supply piping with materials that can accommodate dry ground conditions due to drought. Hazards Mitigated: Drought Existing 5, 7, 11, 13 Harris Health Harris County Medium General and/or grant funds Short term Action HH-013 — Adopt groundwater drought contingency planning measures. Hazards Mitigated: Drought Existing 5, 7, 8, 10, 15 Harris Health Harris County Low Staff Time, General Funds Short-term Action HH-014 — Retrofit existing roofs on critical care facilities to resist the damaging effects of hail. Hazards Mitigated: Severe Weather Existing 11, 13 Harris Health Harris County High Grant funds Long term Action HH-015 — Install and improve intake air filtration with higher capacity and higher quality filtration/purification system at critical care facilities to minimize health risks and equipment damage associated with smoke and reduced air quality. Hazards Mitigated: Wildfire Existing 11, 13 Harris Health Harris County Medium Staff Time, General Funds Short term Action HH-016 — Provide adequate freeze-protection insulation for domestic water supply piping and fire water supply piping where these systems are exposed to the weather. Hazards Mitigated: Severe Weather Existing 11, 13 Harris Health Harris County Medium General and/or grant funds Short term Action HH-017 — Implement tree management program, especially where trees abut electric power transmission lines. Hazards Mitigated: Severe Weather, Hurricanes, Wildfire Existing 6, 8, 11, 13 Harris Health Harris County Low Staff Time, General Funds Short term Action HH-018 — Identify all energy pipelines within ¼ mile of critical care facilities. Develop and implement a pipeline awareness safety program for critical care personnel, identifying all energy pipelines within ¼ mile of critical care facilities and coordinating with community early-warning systems for rapid and reliable information dissemination for critical care personnel and their patients. Hazards Mitigated: Earthquake Existing 1, 3, 9, 11 Harris Health Harris County Low Staff Time, General Funds Short term Action HH-019 — Install flood barrier systems, such as flood panels, gates and passive systems, to increase flood protection and minimize damage for critical care facilities Hazards Mitigated: Flood Existing 11, 13 Harris Health Harris County High Grant funds Long term Action HH-020 — Develop and install retention ponds to reduce flood damages at the Hospital’s or District’s critical care facilities. Hazards Mitigated: Flood Existing 6, 7, 8, 11, 13 Harris Health Harris County High Grant funds Long term Action HH-021— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Dam Failure, Wildfire, Drought New and Existing 1, 3, 4, 5, 9, 10, 11, 15 HCESD12 HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Harris Health System 37-13 Table 37-12. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya HH-001 3 High High Yes Yes No High High HH-002 3 Low Low Yes Yes Yes Medium Low HH-003 3 Low Low Yes Yes Yes Medium Low HH-004 3 High High Yes Yes No High High HH-005 5 High High Yes Yes No High High HH-006 3 High Medium Yes Yes No High High HH-007 3 High High Yes Yes No High High HH-008 3 High High Yes Yes No High High HH-009 3 High High Yes Yes No High High HH-010 5 Medium Low Yes No Yes Medium Low HH-011 5 Medium Medium Yes No Yes Medium Low HH-012 5 Medium Medium Yes No Yes Medium Low HH-013 5 Medium Low Yes No Yes Medium Low HH-014 2 High High Yes Yes No High High HH-015 2 Medium Medium Yes No Yes Medium Low HH-016 2 High Medium Yes No Yes Medium Low HH-017 4 Medium Low Yes No Yes Medium Low HH-018 5 Medium Low Yes No Yes Medium Low HH-019 2 High High Yes Yes No High High HH-020 5 High High Yes Yes No High High HH-021 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 37-14 Table 37-13. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Severe Weather HH-001, 004, 005,006, 007, 008, 009, 014, 016, 017, 21 HH-001, 004, 005, 006, 007, 008, 009, 014, 016 HH-003, 21 HH-017 HH-21 HH-004, 005, 006, 008, 009, 014, 016 HH-21 Hurricane HH-001, 004, 005, 006, 007, 008, 009, 017, 21 HH-001, 004, 005, 006, 007, 008, 009 HH-003, 21 HH-017 HH-21 HH_004, 005, 006, 008, 009, HH-21 Medium-Risk Hazards Flooding HH-001, 004, 005, 019, 020, 21 HH-001, 004, 005, 019 HH-003, 21 HH-21 HH-004, 005, 019, 020 HH-21 Low-Risk Hazards Earthquake HH-006, 007, 008, 009, 018, 21 HH-006, 007, 008, 009 HH-018, 21 HH-21 HH-006, 008, 009 HH-21 Dam Failure HH-21 HH-21 HH-21 HH-21 Wildfire HH-015, 017, 21 HH-21 HH-017 HH-015 HH-015 HH-21 Drought HH-011, 012, 013, 21 HH 001, 011, 012, 013 HH-21 HH-010, 011, 013 HH-21 HH-011, 012, 013 HH-010, 011, 012, 013 HH-21 a. See the introduction to this volume for explanation of mitigation types. 37.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • Harris Health System Hazard Vulnerability Analysis -Risk Analysis of all Harris Health System Facilities • Capital Improvement Plan – Capital improvement plan is updated annually and covers a 5 year span • Emergency Operations Plan – Updated in 2019 The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • South East Texas Regional Advisory Council Regional Hazard Vulnerability Assessment 2018 (Bi-annual Report) 38-1 38. TEXAS MEDICAL CENTER 38.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Warren Porter 2450 Holcombe Blvd., Suite 1 Houston, TX 77021 Telephone: 713-791-8843 e-mail Address: wporter@tmc.edu Ashley McPhail 2450 Holcombe Blvd., Suite 1 Houston, TX 77021 Telephone: 713-791-8825 e-mail Address: amcphail@tmc.edu 38.2 JURISDICTION PROFILE 38.2.1 Overview Texas Medical Center (TMC) — the largest medical complex in the world — is at the forefront of advancing life sciences. TMC is a 2.1-square-mile medical district and neighborhood in south-central Houston, Texas, immediately south of the Museum District and west of Texas State Highway 288. Over sixty medical institutions, largely concentrated in a triangular area between Brays Bayou, Rice University, and Hermann Park, are members of the Texas Medical Center Corporation — a non-profit umbrella organization — which constitutes the largest medical complex in the world. The TMC has an extremely high density of clinical facilities for patient care, basic science, and translational research. The Texas Medical Center contains over 60 medicine-related institutions, with 21 hospitals and eight specialty institutions, eight academic and research institutions, four medical schools, seven nursing schools, three public health organizations, two pharmacy schools and a dental school. All institutions are not-for-profit. Among the affiliated medical schools are the University of Texas Health Science Center at Houston, Baylor College of Medicine, University of Texas Medical Branch at Galveston and Texas A&M College of Medicine. Some member institutions are located outside the city of Houston. The Texas Medical Center employs over 106,000 people, hosts 10 million patient encounters annually, and has a gross domestic product of US$25 billion. TMC foot print has expanded south of Brays Bayou towards NRG Park, and the organization has developed ambitious plans for a new “innovation campus” south of the river. The 4.93- square-mile Medical Center / Astrodome area, highly populated with medical workers, is home to over 20,000 people. The TMC is serviced by the Metro Rail Red Line, a north-south light rail route which connects the district to Downtown Houston and NRG Park. The Texas Medical Center assumes responsibility for the adoption of this plan; Texas Medical Center will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 38-1. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 38-2 Table 38-1. Local Mitigation Planning Team Members Name Title Warren J. Porter Safety and Emergency Preparedness Manager Ashley McPhail Vice President for Strategy Abbey Roberson Vice President for Planning David Pollard TMC PD Director The District does not participate in the Public Protection Class Rating System. 38.2.2 Service Area and Trends The district service area covers 2.1 Square Miles serving a population of 10 Million patient visits per year. With a 1,345-acre campus in downtown Houston, TMC serves as tertiary care centers for over 35 counties in Southeast Texas. TMC is the world’s largest medical center campus, with 750,000 annual ER visits, 180,000 surgeries annually, contains the world’s largest Children’s and Cancer hospitals, and has over $3 billion in current construction. Additionally, more than 160,000 people visiting TMC every day, totaling over 8 million patient visits annually. TMC is developing a biomedical research hub that will cluster researchers and industry experts together on a collaborative 30-acre campus. The TMC campus integrates leading researchers with a host of top-tier expertise from the private sector. The TMC3 founding institutions are Texas Medical Center, Baylor College of Medicine, Texas A&M University Health Science Center, The University of Texas Health Science Center (UTHealth) and The University of Texas MD Anderson Cancer Center. TMC3 is set to break ground in early 2020. The groundbreaking project will generate a $5.2 billion stimulus to Texas and create nearly 26,000 new jobs, according to a third-party economic impact study by Silverlode Consulting conducted in November 2017. As a center of innovation advancing life sciences through collaboration, education and research, TMC will expand its 50 million square feet of medical, research and office space with an additional 3 million square feet currently in planning stages. TMC’s infrastructure must meet the changing demands for a more robust transportation system by expanding mobility options to support existing development and future growth. 38.2.3 Assets Table 38-2 summarizes the critical assets of the district and their value. Table 38-2. Special Purpose District Assets Asset Value Property Buildings and Improved property $405,170,000 Equipment Police and security vehicles (Patrol vehicles) $288,000 Police specialty vehicles $215,000 Police Support vehicles $135,000 Security Vehicles $256,000 Other vehicles $135,00 Total: $8,029,000 Texas Medical Center 38-3 Asset Value Critical Facilities and Infrastructure TMC Police Department Generator Garage 1 6519 Fannin Houston, TX 77030 Garage 2 1511 E. Holcombe Blvd. Houston, TX 77030 Garage 4 1406 Cambridge Houston, TX 77030 Garage 5 1001 Holcombe Blvd., Houston, TX 77030 Garage 7 1120 Freeman Blvd., Houston, TX 77030 Garage 8 2151 W. Holcombe Blvd., Houston, TX 77030 Garage 9 1100 Bates Houston, TX 77030 Garage 10 6700 M.D. Anderson Blvd., Houston, TX 77030 Executive Offices and Garage 15 6550 Bertner, Houston, TX 77030 Garage 17 1653 Braeswood Blvd., Houston, TX 77030 Garage 18 2450 Holcombe Blvd., Houston, TX 77021 J.P. McGovern Bldg. 2450 Holcombe Blvd., Houston, TX 77021 Garage 19 2010 S. Braeswood, Houston, TX 77030 Baylor College of Medicine 1 Baylor Plaza, Houston, TX 77030 M.D. Anderson Cancer Center 1300 Moursund St., Houston, TX 77030 Texas Children’s Hospital 1102 Bates, Houston, TX 77030 City of Houston Health and Human Services 1115 S. Braeswood Blvd., Houston, TX 77030 The Methodist Hospital 1130 Earle St., Houston, TX 77030 $75,000 $25,080,000 $39,642,000 $ 27,971,000 $9,955,000 $16, 452,000 $22,712,000 $5,664,000 $27,735,000 $34,257,000 $30,950,000 $8,339,000 $90,587,000 $32,844,000 $500,000,000 $900,000,000 $500,000,000 $250,000,000 $700,000,000 Univ. of Texas Health Science Ctr., 1200 Pressler, Houston, TX 77030 Memorial Hermann Hospital 1333 Moursund, Houston, TX 77030 Memorial Hermann TIRR Rehab Hospital 13333 Moursund, Houston, TX 77030 Harris County Hospital (Ben Taub) 1504 Taub Loop, Houston, TX 77030 Thermal Energy Corporation 1615 Braeswood, Houston, TX 77030 Harris County Forensic Institute 1885 Old Spanish Trail, Houston, TX 77030 Houston Hospice 1905 Holcombe Blvd., Houston, TX 77030 Ronald McDonald House 1907 Holcombe Blvd., Houston, TX 77030 Michael E. DeBakey Vet. Affairs Medical Center 2002 Holcombe Blvd., Houston, TX 77030 St. Luke’s Episcopal Hospital 6720 Bertner, Houston, TX 77030 Texas Women’s Hospital 7600 Fannin St., Houston, TX 77030 Texas Medical Center Police Station 1511 E. Holcombe Blvd. Houston, TX 77030 Shriner’s Hospital- Houston 6977 Main St., Houston, TX 77030 The Center for Hearing and Speech 3100 Shenandoah, Houston, TX 77021 $1,000,000,000 $1,000,000,000 $650,000,000 $1,000,000,000 $750,000,000 $500,000,000 $25,000,000 $30,000,000 $1,000,000,000 $800,000,000 $700,000,000 $5,000,000 $800,000,000 $250,000,000 38.3 CAPABILITY ASSESSMENT An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 29.9 identifies these as community capacity building mitigation actions. 38.3.1 Planning and Regulatory Capabilities Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents. When effectively prepared and administered, these plans, programs and regulations can support the implementation of mitigation actions. Table 38-3 summarizes existing codes, ordinances, policies, programs or plans that are applicable to this hazard mitigation plan. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 38-4 Table 38-3. Planning and Regulatory Capability Plan, Study or Program Date of Most Recent Update Comment Business Continuity of Operations Plan 2018 Texas Medical Center Emergency Response Plan (Previous name: TMC Pandemic Influenza Plan) 2012 Currently under revision Texas Medical Center Flood and High Water Response Plan Catastrophic Medical Operations Center Regional Plan 2016 2019 Currently Under revision 38.3.2 Fiscal, Administrative and Technical Capabilities Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard mitigation projects. An assessment of fiscal capabilities is presented in Table 38-4. Administrative and technical capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of administrative and technical capabilities is presented in Table 38-5. Table 38-4. Fiscal Capability Financial Resource Accessible or Eligible to Use? Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes No User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds No Incur Debt through Special Tax Bonds No Incur Debt through Private Activity Bonds No State-Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Federal Grant Programs Yes Table 38-5. Administrative and Technical Capability Staff/Personnel Resource Available? Department/ Agency/ Position Planners or engineers with knowledge of land development and land management practices Yes Through Long Term Contracting Services Engineers or professionals trained in building or infrastructure construction practices Yes Through Long Term Contracted Services Planners or engineers with an understanding of natural hazards Yes Emergency Preparedness Manager and Through Long Term Contracted Services Staff with training in benefit/cost analysis Yes Emergency Preparedness Manager and Through Long Term Contracted Services Surveyors Yes Through Long Term Contracted Services Personnel skilled or trained in GIS applications Yes Through Long Term Contracted Services Scientist familiar with natural hazards in local area Yes Through Long Term Contracted Services Emergency manager Yes Safety and Emergency Preparedness Grant writers Yes Emergency Preparedness Manager or Corporate support Texas Medical Center 38-5 38.3.3 Education and Outreach Capabilities Outreach and education capability identifies the connection between government and community members, which opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is presented in Table 38-6. Table 38-6. Education and Outreach Criterion Response Do you have a public information officer or communications office? Yes Do you have personnel skilled or trained in website development? Yes Do you have hazard mitigation information available on your website? Yes • If yes, please briefly describe TMC has an Emergency Preparedness website Do you use social media for hazard mitigation education and outreach? Yes • If yes, please briefly describe TMC utilizes two primary mechanisms for this. We utilize Social Media platforms, as well as Everbridge notification platform to outreach ad notification Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes • If yes, please briefly specify We primarily have two councils to address hazard mitigation: Emergency Preparedness; and Police/Security Councils- both are comprised of representatives from each member institution. Do you have any other programs already in place that could be used to communicate hazard-related information? Yes • If yes, please briefly describe We utilize Everbridge notification system Do you have any established warning systems for hazard events? Yes • If yes, please briefly describe Everbridge notification system allows for notification of via telephone, text and emails 38.3.4 Adaptive Capacity for Climate Change Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 38-7 summarizes the jurisdiction’s adaptive capacity for climate change. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 38-6 Table 38-7. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts Medium Comment Jurisdiction-level monitoring of climate change impacts Low Comment Technical resources to assess proposed strategies for feasibility and externalities Medium Comment Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low Comment Capital planning and land use decisions informed by potential climate impacts Low Comment Participation in regional groups addressing climate risks Medium Comment: TMC works along with the City of Houston and Harris County and private partners to address climate change issues which are expected to impact TMC campus Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes Low Comment Identified strategies for greenhouse gas mitigation efforts Low Comment Identified strategies for adaptation to impacts Low Comment Champions for climate action in local government departments Low Comment Political support for implementing climate change adaptation strategies Low Comment Financial resources devoted to climate change adaptation Low Comment Local authority over sectors likely to be negative impacted Low Comment Public Capacity Local residents knowledge of and understanding of climate risk N/A Comment Local residents support of adaptation efforts N/A Comment Local residents’ capacity to adapt to climate impacts N/A Comment Local economy current capacity to adapt to climate impacts N/A Comment Local ecosystems capacity to adapt to climate impacts N/A Comment a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. Texas Medical Center 38-7 38.4 INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used in hazard mitigation. This section identifies where such integration is already in place, and where there are opportunities for further integration in the future. Resources listed in Section 1.4.1 were used to provide information on integration. The progress reporting process described in Volume 1 will document the progress of hazard mitigation actions related to integration and identify new opportunities for integration. 38.4.1 Existing Integration Some level of integration has already been established between local hazard mitigation planning and the following other local plans and programs: • Texas Medical Center Pandemic Influenza Plan — This document was used to review current plans, support identification of hazards, processes, and development of the mitigation plan. • Texas Medical Center Flood and High Water Response Plan — The plan was used to review current plans and processes, support the identification of past hazard events and noted vulnerabilities, assist in establishing priorities and risk ranking, and the development of the mitigation action plan. • Southeast Texas Regional Advisory Council (SETRAC) Catastrophic Medical Operations Center Regional Plan — The plan was used to review current plans and processes, support the identification of past hazard events and noted vulnerabilities, assist in establishing priorities and risk ranking, and the development of the mitigation action plan. 38.4.2 Opportunities for Future Integration The capability assessment presented in this annex identified the following plans and programs that do not currently integrate hazard mitigation information but provide opportunities to do so in the future: • Texas Medical Center Emergency Access Study — TMC is currently in the initial stages of initiating a study to evaluate emergency access into and throughout the TMC campus during severe weather incidents. This will incorporate water table data, flood data, improvements in Brays Bayou and adjacent water drainage activities, traffic flow and other factors. The resulting plan will coordinate emergency access to several regional tertiary medical centers located on campus. TMC is Regional asset, with several tertiary care medical facilities serving a 35-county area in SE Texas. • Texas Medical Center Emergency Evacuation Plan — TMC (this district) does not have a coordinated evacuation plan which incorporates all of the tertiary medical facilities, rehabilitation facilities, medical support facilities and transportation needs into one coordinated plan. This was borne out during a FEMA mandated evacuation drill where the major hospitals, rehabilitation centers, nursing homes, and support facilities had 90 minutes to evacuate 10 % of the staffed beds. This drill identified several areas for improvement. This plan will build a coordinated evacuation plan which addresses access, vehicular movement within the campus, and identifies resources needed to support evacuation of medical facilities. TMC intends to develop one as a mitigation planning action during the next five years. • Texas Medical Center Emergency Response Plan — TMC (this district) does not have currently have a coordinated emergency response plan and intends to develop one as a mitigation planning action during the next five years. TMC intends on to develop such a plan in the next five years and the plan will build on the mitigation goals and objectives identified in the mitigation plan. Since TMC is Regional asset, we will also coordinate this plan with Harris County, City of Houston, as well as SETRAC which represents hospitals in a 35-county area in SE Texas. • Texas Medical Center Mitigation Plan — This plan address TMC Strategic priorities and identifies areas which need specific mitigation efforts. TMC (this district) currently does not have a coordinated Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 38-8 mitigation plan. There are several individual hospital or healthcare facilities with individual plans on campus, however those plans have been developed in isolation and do not contribute to an organized and coordinated mitigation plan. • Upgrade Brays Bayou flood prediction (remodeling) – The Brays Bayou, which flows though the TMC Campus, is the primary waterborne threat to the TMC campus. This project will update the modeling capability to predict and mitigate flood impact within the TMC campus and the several tertiary care medical facilities on campus. • Post-Disaster Recovery Plan — Texas Medical Center (this district) does not have a coordinated post- disaster recovery plan and intends to develop one as a mitigation planning action during the next five years. 38.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 38-8 lists past occurrences of natural hazards for which specific damage was recorded in Texas Medical Center. Other hazard events that broadly affected the entire planning area, including Texas Medical Center, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 38-8. Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Hurricane Harvey 4332 DR 2017 $1,400,000 Severe Storms and Flooding 4269 DR 2016 Not Available Severe Storms and Flooding 4272 2016 Not Available Severe Storms and Flooding 4245 DR 2015 Not Available Severe Storms and Flooding 4223 DR 2015 Not Available Hurricane Ike 1791 DR 2008 Not Available Hurricane Ike 3294 EM 2008 Not Available Hurricane Gustav 3290 EM 2008 Not Available Hurricane Dean 3277 EM 2007 Not Available Tropical Storm Erin 1730 DR 2007 Not Available Hurricane Rita 1606 DR 2005 Not Available Hurricane Rita 3261 EM 2005 Not Available Severe Storms and Flooding 1439 DR 2002 Not Available Tropical Storm Allison 1379 DR 2001 Not Available 38.6 HAZARD RISK RANKING Table 38-9 presents a local ranking for the Texas Medical Center of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Texas Medical Center 38-9 Table 38-9. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 Flood 9 x 3 = 27 High 1 Hurricane/Coastal Storms 9 x 3= 27 High 1 Severe Weather 9 x 3= 27 High 2 Dam/Levee Failure 7 x 3= 21 Medium 3 Tsunami 8 x 2=16 Medium 4 Non-Natural 7 x 1= 7 Low 5 Earthquake 5 x 1= 5 Low 6 Mass Movement 4 x 1= 4 Low 7 Wildfire 3x1=3 Low 8 Coastal Erosion 2x1=2 Low 9 Drought 1x1=1 Low NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 38.7 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Access into and throughout the campus is significantly affected due to flooding with approximately 50% of roads into medical campus impassable during severe flooding events. This impacts 35 counties as the campus serves as the majority of the tertiary care centers for the region. Specific areas effected: limiting to emergency access and evacuation for patients, trans-campus movement limited, limits patient access and logistical support. • Ten intersections within campus are prone to intermittent flooding during severe storms; as an example, the TMC Police station is located adjacent to flood prone intersection • The majority of internet and telephone communications come through one location which is not storm resilient. Any interruption would impact ~75-80% communication for most of the facilities. • There is a tunnel system which links several major medical facilities, should this be impacted, such as in TS Allison, this would be a significant loss to those facilities. • There is a dearth of institutional knowledge regarding severe weather impact with the various recent and current construction projects within the campus. This lack of understanding is a barrier to ensuring resiliency. Mitigation actions addressing these issues were prioritized for consideration in the action plan for this annex: • Conduct a detailed assessment of transportation access into and throughout the medical center campus. Determine adaptive actions which can be implemented in the near, and long term. • Conduct an assessment of the flood prone intersections and their impact on adjacent structures. Develop resilient solutions to address this issue over the long term. • Conduct as detailed assessment on critical communication infrastructure and develop a specific action plan to ensure resiliency and redundancy to maintain critical communications. • Conduct a detailed assessment of the tunnel network under the major medical facilities and develop specific measures to ensure the uninterrupted utilization of the tunnels. • Develop a tracking system which addresses resiliency of structures and updates the system when changes are made. This would help move to a more resilient medical center campus. Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 38-10 38.8 STATUS OF PREVIOUS PLAN ACTIONS TMC has not previously completed a formally adopted hazard mitigation plan. 38.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 38-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 38-11 identifies the priority for each action. Table 38-12 summarizes the mitigation actions by hazard of concern and mitigation type. Table 38-10. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action TMC1 — Study to evaluate and develop improved and resilient access into and throughout TMC Campus to include critical transportation infrastructure, during severe weather events Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms Existing assets 3, 4, 6, 10, 11, 13, 15 TMC Harris County, City of Houston High HMGP Long-term Action TMC2 — Study to evaluate and develop improved patient access and resilient evacuation capabilities during severe weather events Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms Existing assets 1, 4, 6, 13 TMC Harris County, City of Houston, DSHS, TDEM High HMGP Long-Term Action TMC3 — Study to evaluate and develop the resiliency of aircraft landing points, as well as the establishment of a coordinated Air Corridor around major medical campus, to support during severe weather events Hazards Mitigated: Flood, Severe Weather, Hurricane/Coastal Storms New Assets 4, 6, 9, 10, 13 TMC Harris County, City of Houston, TDEM High HMGP, TBD Long-Term Action TMC4 — Study to evaluate and develop resilient of pedestrian and handicapped access within TMC Campus Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms Existing assets 3, 4, 9, 13, 15 TMC TBD ~$250,000 HMGP Short-term Action TMC5 — Study to evaluate and develop an integrated and resilient logistical infrastructure, to support a major medical campus, during prolonged severe weather events Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms Exiting Assets 3,4,6,10,13 TMC TBD ~$250,000 HMGP Short-term Action TMC6 — Improve the resiliency of early warning notification and communication networks within TMC Campus during severe weather events Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms Existing assets 1, 3, 4, 6, 9,10,13 TMC TMC Campus Partners ~$500,000 HMGP Short-Term Action TMC7 — Development of an integrated severe weather education program for patients, facility visitors and staff Hazards Mitigated: Flood, Severe weather, Hurricane/Coastal Storms Existing assets 1, 3, 4 TMC TMC Campus Partners ~$250,000 HMGP Short-term Action TMC8 — Study and improve the resiliency of power supply, to include steam and chill water mechanisms, for critical infrastructure during severe weather events Hazards Mitigated: Flood, Severe weather, Hurricane/Coastal Storm Existing 3, 6, 11, 13 TMC TECO, TMC Campus Partners High HMGP Long-Term Action TMC9 — Study and development of resilient storm safe buildings for critical infrastructure medical facilities Hazards Mitigated: Flood, Severe weather, Hurricane/Coastal Storms Existing 3, 4, 6, 11, 13, 15 TMC TBD High HMGP Long-Term Action TMC10 — Study and development of resilient water supply for critical infrastructure major medical campus, during severe weather events Hazards Mitigated: Severe weather, Hurricane/Coastal Storms Existing 3, 11, 13, 15 TMC TBD High HMGP Long-Term Texas Medical Center 38-11 Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action TMC11 — Study and development of an integrated severe weather response plan, within major medical campus (critical infrastructure) during severe weather events Hazards Mitigated: Flood, Severe weather, Hurricane/Coastal Storms Existing 3, 4, 6, 10, 13 TMC TMC Campus Partners High HMGP Short-Term Action TMC12 — Study and development of an integrated family reunification plan and processes during a severe weather event Hazards Mitigated: , Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms Existing 3, 4, 9, 10, 13 TMC TMC Campus Partners ~$150,000 HMGP Short-Term Action TMC13 — Development of an integrated Continuity of Operations Plan for major medical campus, with several tertiary care centers, covering several counties, during a severe weather event Hazards Mitigated: Flood, Severe weather, Hurricane/Coastal Storms Existing 3, 4, 9, 10, 13 TMC TMC Campus Partners ~$250,000 HMGP Short-Term Action TMC14 — Development of a coordinated structural resiliency and damage tracking system for the TMC campus Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms Existing 3, 10, 11, 12, 13, 15 TMC TMC Campus Partners ~$125,000 HMGP Short-Term Action TMC15 — Development of a coordinated post-disaster resiliency plan for the TMC campus Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms Existing 3, 4, 6, 7, 9, 10, 13, 15 TMC TMC Campus Partners ~$150,000 HMGP Short-Term Action TMC16 — Develop and implement a personnel benefit-cost process and software training program for mitigation planning Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms Existing 3, 4, 13, 15 TMC TMC Campus Partners ~$50,000 HMGP Short-Term Action TMC17— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan. Hazards Mitigated: Flood, Hurricane/Coastal Storms, Severe Weather, Dam/Levee Failure, Tsunami, Non-Natural, Earthquake, Mass Movement, Wildfire, Coastal Erosion, Drought New and Existing 1, 3, 4, 5, 9, 10, 11, 15 TMC HCOHSEM Low General Funds Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 38-11. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya TMC1 7 High High Yes Yes No Medium High TMC6 7 High Medium Yes Yes No Medium High TMC11 5 High Medium Yes Yes No Medium High TMC13 6 Medium Medium Yes Yes No Medium Medium TMC16 8 High Medium Yes Yes No Medium Medium TMC3 5 High High Yes Yes No Medium High TMC5 5 High Medium Yes Yes No Medium High TMC8 4 High High Yes Yes No Medium High TMC9 6 High High Yes Yes No Medium High TMC10 4 High High Yes Yes No Medium High TMC14 5 Medium Medium Yes Yes No Medium Medium TMC12 5 Medium Medium Yes Yes No Medium Medium TMC8 3 Medium Medium Yes Yes No Medium Medium Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes 38-12 Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant-Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya TMC2 4 Medium Medium Yes Yes No Medium Medium TMC4 5 Medium Medium Yes Yes No Medium Medium TMC16 4 Medium Medium Yes Yes No Medium Medium TMC17 8 Medium Low Yes Yes Yes High High a. See the introduction to this volume for explanation of priorities. Table 38-12. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education & Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards Flood TMC: 6, 7, 11, 13, 17 TMC: 1, 4, 5, 6, 8, 9, 10, 11, 13, 14, 15, 16 TMC: 6, 7, 12, 17 TMC: 1, 2, 3, 6, 11, 13, 15 TMC: 1, 4, 8, 9, 10, 127 TMC: 8, 10 TMC: 5, 6, 11, 17 Hurricane/Coastal Storms TMC: 6, 7, 11, 13, 17 TMC: 1, 4, 5, 6, 8, 9, 10, 11, 13, 14, 15, 16 TMC: 6, 7, 12, 17 TMC: 1, 2, 3, 6, 11, 13, 15 TMC: 1, 4, 8, 9, 10, 17 TMC: 8, 10 TMC: 5, 6, 11, 17 Severe Weather TMC: 6, 7, 11, 13, 17 TMC: 1, 4, 5, 6, 8, 9, 10, 11, 13, 14, 15, 16 TMC: 6, 7, 12, 17 TMC: 1, 2, 3, 6, 11, 13, 15 TMC: 1, 4, 8, 9, 10, 17 TMC: 8, 10 TMC: 5, 6, 11, 17 Medium-Risk Hazards Dam/Levee Failure TMC127 TMC17 TMC17 TMC17 Tsunami TMC17 TMC17 TMC17 TMC17 Low-Risk Hazards Non-Natural TMC: 6, 17 TMC: 1, 5, 14, 15, 16 TMC: 6, 12, 17 TMC: 1, 2, 6, 15 TMC: 1, 4, 17 TMC: 5, 6, 17 Earthquake TMC: 6, 17 TMC: 1, 5, 14, 15, 16 TMC: 6, 12, 17 TMC: 1, 2, 6, 15 TMC17 TMC17 Mass Movement TMC17 TMC17 TMC17 TMC17 Wildfire TMC17 TMC17 TMC17 TMC17 Coastal Erosion TMC17 TMC17 TMC17 TMC17 Drought TMC17 TMC17 TMC17 TMC17 a. See the introduction to this volume for explanation of mitigation types. 38.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX 38.10.1 Existing Reports, Plans, Regulatory Tools and Other Resources The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. Texas Medical Center 38-13 • Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to review current plans, support the identification of past hazard events and noted vulnerabilities, assist in establishing priorities and risk ranking, and the development of the mitigation action plan. • Texas Medical Center Continuity of Operations Plan — This document was used to review current plans, support identification of hazards, processes, and development of the mitigation plan. • Texas Medical Center Pandemic Influenza Plan — This document was used to review current plans, support identification of hazards, processes, and development of the mitigation plan. • Texas Medical Center Flood and High Water Response Plan — The plan was used to review current plans and processes, support the identification of past hazard events and noted vulnerabilities, assist in establishing priorities and risk ranking, and the development of the mitigation action plan. • Southeast Texas Regional Advisory Council (SETRAC) Catastrophic Medical Operations Center Regional Plan — The plan was used to review current plans and processes, support the identification of past hazard events and noted vulnerabilities, assist in establishing priorities and risk ranking, and the development of the mitigation action plan. 38.10.2 Staff and Local Stakeholder Involvement in Annex Development This annex was developed over the course of several months with input from several departments within TMC including planning, finance, Police/Security, and Strategic planning as well as several (TMC Campus) member institutions in open meeting. All stated departments and (TMC Campus) member institutions were asked to contribute/comment en toto or in relevant parts to the development of this annex. We have met in different venues covering various aspects of the plan. This is an ongoing process and we will continue to work as a team to ensure this plan is completed. 38.11 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY We (TMC) estimate that we will need additional studies on flooding in and around Houston (river delta), structural stability in a flood zone, hydrology and actions of water in current and future water movement structures (e.g. viaducts, water channels), climate change relative to long-term impacts on structures and ground water/soil deterioration, identification of appropriate technologies to assist us in understanding and/or gathering appropriate data. 38.12 ADDITIONAL COMMENTS One area of note for the TMC Campus which will significantly impact mitigation efforts in the short term is the addition of a large medical research facility set to begin breaking ground in early 2020. This new research facility will include over an additional 1.5 million ft2 of space, 250,000 ft2 of collaborative space and 112,000 ft2 of shared research space. This will increase the world’s largest medical center even more when it opens approximately in 2022. Harris County Multi-Hazard Mitigation Action Plan Appendix A. Planning Partner Expectations A-1 A. PLANNING PARTNER EXPECTATIONS GROUPS INVOLVED IN THE PLANNING PROCESS One of the goals of the multi-jurisdictional approach to hazard mitigation planning is to achieve compliance with the Disaster Mitigation Act (DMA) for all participating members in the planning effort. There are several distinct groups who will be involved in this process at various levels. To provide clarity, the following is a general breakdown of those groups: • The Core Planning Team (CPT) — The Core Planning Team (CPT) includes the Hazard Mitigation Planning Coordinator (HMPC) and appropriate personnel from HCOHSEM along with the Project Manager and discipline leads from Harris County’s contract consultant, Tetra tech, Inc. The CPT will ensure project management and the 5-year update process by scheduling meetings, distributing agendas, preparing information/presentations, documenting meeting summaries, and generally seek to facilitate the planning activities. In addition, the CPT will develop and organize the content of the Harris County Multi-Hazard Mitigation Action Plan (MH-MAP). This content will be reviewed by each Local Mitigation Planning Team (LMPT) and approved by the Multi-Jurisdictional Steering Committee (SC) before being posted to the public website or recommended for adoption. • The Multi-Jurisdictional Steering Committee (SC) — The SC serves as a “coordinating entity” to assist with the development of the entire planning area of the MH-MAP. The origination of the SC is such that interests of all planning partners is represented as well as those of identified stakeholders within the planning area that are not participating as full planning partners. The organization of the SC will strive to follow the guidance of FEMA’s Community Rating System (CRS) activity 510, step 2 protocol, but will not be the total basis for the organization of the SC. The organization will strive for a balance between planning partners that can commit time to the SC and non-governmental stakeholders that have a clearly defined stake in the outcomes of this planning process. The size of the SC will be managed such that quorums can be established that are achievable over a defined time frame for this planning process. At a minimum, the makeup of the SC will strive to include the following representation:  At least 2 representatives from Harris County  Harris County Flood Control District  Each jurisdiction that is participating in the CRS program, or considering participation in the CRS program will have a seat on the SC.  Representation of the interests for each non-municipal planning partner, (i.e. if there are 4 school districts with the planning partnership, at least one representative from a school district)  Non-governmental stakeholder’s such as; academia, business interests, advocacy groups, private non- profits, and residents. The SC is responsible for building consensus and developing and approving key planning process milestones that address that address the entire planning area. The SC is chaired by the Hazard Mitigation Planning Coordinator (HMPC) and operate under a Charter approved at their 1st organizational meeting. All SC meetings will be open to the public and advertised as such during the plan update process. The SC Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes A-2 will meet according to a defined schedule that will be posted on the www.readyharris.org website as part of the public engagement strategy for this plan update process. • The planning partners — those jurisdictions or special purpose districts that are developing an annex to the county plan. • The planning stakeholders — the individuals, groups, businesses, academia, private non-profits, etc., from which the planning team gains information to support the various elements of the plan. For this plan update process, 2 types of stakeholders have been defined:  Participatory Stakeholders- These are identified stakeholders that are willing to participate in this planning process as a member of the SC or LMPT.  Coordinating Stakeholders- These are stakeholders that will not actually participate in the process but have requested to be kept apprised of plan development milestones and are provided the opportunity to comment on key planning milestones. DEFINITION OF PARTICIPATION DMA compliance requires that participation be defined in order to maintain eligibility with respect to meeting the requirements that allow a jurisdiction or special purpose district to develop an annex to the base plan. To achieve compliance for all planning partners, the plan must clearly document how each planning partner that is seeking linkage to the plan participated in the plan’s development. The best way to do this is to clearly define “participation.” For this planning process, “participation” is defined by the following criteria: Estimated Level of Effort It is estimated that the total time commitment to meet these “participation” requirements for a planning partner not participating on the steering committee would be approximately 36 to 46 hours over the 14-month period. Most of this time will be devoted to completing the jurisdictional annex template described below. This time may be reduced somewhat for special purpose districts. Duration of the Planning Process This process is expected to take 14 months to complete. It will be easy to become disconnected with the process objectives if you do not participate in some of these meetings to some degree. Participate in the Process As indicated, it must be documented in the plan that each planning partner “participated” in the process to the best of its capabilities. There is flexibility in defining “participation,” which can vary based on the type of planning partner involved (i.e.: city or county vs. a special purpose district). However, the level of participation must be defined at the on-set of the planning process, and we must demonstrate the extent to which this level of participation has been met for each partner. • Complete administrative tasks. Participation in this plan includes the following administrative tasks:  Complete a letter of intent. Provide a “Letter of Intent to participate” or a Resolution to participate to the Core Planning Team (CPT). (See exhibit A).  Identification of a Local Mitigation Planning Team. Each participating jurisdiction will establish a jurisdiction-specific Local Mitigation Planning Team (LMPT). The LMPT is responsible for the development of a jurisdictional annex to the Mitigation Action Plan. LMPT membership should consist of agencies with authority to regulate development and enforce local ordinances or regulatory standards. This may include any of the following agencies involved in hazard mitigation activities, Appendix A, Planning Partner Expectations A-3 such as building/fire code enforcement, emergency management, emergency services, floodplain management, parks and recreation, planning/community development, public information, public works/engineering, stormwater management, transportation, or infrastructure. LMPTs will ensure tasks and responsibilities are completed as required for each participating jurisdiction.  Designate points of contact. Designate a primary and secondary point of contact for this effort. These designees will be listed as the hazard mitigation points of contact for your jurisdiction in the plan.  Approve the Steering Committee. The Steering Committee will be approved via an email vote. • Participate, as able, in additional opportunities. Attendance or participation in the following opportunities will also be recorded. These records will be used to document participation for each planning partner. No thresholds will be established as minimum levels of participation for these events. However, each planning partner should attempt to attend all possible meetings and events:  Attend steering committee meetings.  Attend or host public meetings or open houses.  Participate in and advertise the public review and comment period prior to adoption. • Support the steering committee. This planning process will utilize a Steering Committee that will assume responsibility for many of the planning milestones prescribed for this process to help reduce the burden of time required by each planning partner. This committee will be representative of the whole body. This committee will meet periodically (frequency to be determined by the committee, but likely to be monthly) throughout the process and provide direction and guidance to the planning team. Steering Committee meetings are not mandatory meetings for all planning partners. If you are not on the Steering Committee, your attendance is not required; however, it is our hope that all planning partners will remain engaged with this process and attend meetings from time to time. • Support the public involvement strategy. The Core Planning Team will also request support from the partnership during the implementation of the public involvement strategy developed by the Steering Committee. Support could be in the form of providing venues for public meetings, attending these meetings as meeting participants, providing technical support, providing access to mailing lists, providing existing public information materials, etc. • Participate in the critical facility update. The primary source of building inventory is from the Harris County Appraisal District’s (HCAD) Parcel Data and certified tax roll. Each planning partner will be asked to update their facilities list for use during the risk assessment. If the list is not updated, HAZUS default data will be utilized. Updating this list provides a much more detailed analysis. • Complete the jurisdictional annex template. * Each planning partner must complete a jurisdictional annex template. This template will be distributed to the planning partnership in a phased approach (3 Phases) to extend the level of effort over a series of months. Key components of the annex include the following:  Attend three mandatory workshops. There will be three mandatory workshops that all planning partners will be required to attend. These workshops will cover the proper completion of the jurisdictional annex template, which is the basis for each partner’s jurisdictional chapter in the plan. The three phase workshops are defined as follows: o Phase 1 — Jurisdictional profile and the review of the status of prior action o Phase 2 — Capability Assessment o Phase 3 — Hazard Risk Ranking and action Plan development/Confirmation  Failure to have a representative at each of these workshops will result in one-on one outreach from members of the CPT to assist the jurisdiction in the completion of that phase. The schedule for these Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes A-4 workshops will be such that all committed planning partners will be able to attend. After participation in each of these mandatory workshops, each partner will be required to complete their template and provide it to the CPT in the time frame established. Failure to complete the template in the required time frame may lead to disqualification from the partnership.  Perform a capability assessment. All planning partners will conduct a capability assessment. This assessment will require a review of existing documents (plans, studies and ordinances) as well as technical and financial capabilities pertinent to each jurisdiction that can support hazard mitigation. It should be noted that it is a viable mitigation action to increase a jurisdiction’s capability.  Review the risk assessment. Each partner will be asked to review the risk assessment and identify hazards and vulnerabilities specific to its jurisdiction. The planning team will provide the jurisdiction specific mapping and technical consultation to aid in this task, but the determination of risk and vulnerability will be up to each partner (through a facilitated process during the mandatory workshop).  Review county-wide mitigation recommendations. Each partner will be asked to review and determine if the mitigation recommendations chosen in the base plan will meet the needs of its jurisdiction.  Develop a mitigation action plan. All planning partners will develop an action plan that identifies each project, who will oversee the task, how it will be financed and when it is estimated to occur. Projects within each jurisdiction consistent with the base plan recommendations will need to be identified and prioritized and reviewed to determine their benefits vs. costs. • Adopt the plan. ** The hazard mitigation plan must be formally adopted by each jurisdiction. *Note: Templates and instructions to aid in the compilation and development of this information will be provided to all committed planning partners. Each partner will be asked to complete their templates in a timely manner and according to the timeline specified by the steering committee and the planning team. ** Note: Once this plan is completed, and FEMA approval has been received for each partner, maintaining that eligibility will be dependent upon each partner implementing the plan implementation-maintenance protocol identified in the plan. Appendix A, Planning Partner Expectations A-5 EXHIBIT A — EXAMPLE LETTER OF INTENT TO PARTICIPATE Harris County Hazard Mitigation Planning Partnership Mr. David J. Alamia, Jr., MPA, CEM® Mitigation Planner Harris County Office of Homeland Security and Emergency Management 6922 Katy Road Houston, TX 77024 Harris County Hazard Mitigation Planning Partnership, Please be advised that the ______ (insert City or district name) is committed to participating in the update of the Harris County Multi-Hazard Mitigation Action Plan. As the ______ (title, e.g., Chief Administrative Official) for this jurisdiction, I certify that I will commit all necessary resources in order to meet Partnership expectations as outlined in the “Planning Partners expectations” document provided by the Core Planning Team (CPT), in order to obtain Disaster Mitigation Act (DMA) compliance for our jurisdiction. The following individuals will be our jurisdiction’s primary and alternate point of contact for the mitigation planning process: Name Title Phone Email The following individuals will serve on the jurisdiction’s Local Mitigation Planning Team (LMPT): Name Title Phone Email Sincerely, ______ Harris County Multi-Hazard Mitigation Action Plan Appendix B. Procedures for Linking to Hazard Mitigation Plan B-1 B. PROCEDURES FOR LINKING TO HAZARD MITIGATION PLAN Not all eligible local governments are included in the Harris County Multi-Hazard Mitigation Action Plan. Some or all of these non-participating local governments may choose to “link” to the Plan at some point to gain eligibility for programs under the federal Disaster Mitigation Act (DMA). The following “linkage” procedures define the requirements established by the planning team for dealing with an increase in the number of planning partners linked to this plan. No currently non-participating jurisdiction within the defined planning area is obligated to link to this plan. These jurisdictions can choose to do their own “complete” plan that addresses all required elements of Section 201.6 of Chapter 44 of the Code of Federal Regulations (44 CFR). INCREASING THE PARTNERSHIP THROUGH LINKAGE Eligibility Eligible jurisdictions located in the planning area may link to this plan at any point during the plan’s performance period (5 years after final approval). Eligibility will be determined by the following factors: • The linking jurisdiction is a local or tribal government as defined by the Disaster Mitigation Act. • The boundaries or service area of the linking jurisdiction is completely contained within the boundaries of the planning area established for this hazard mitigation plan. • The linking jurisdiction’s critical facilities were included in the critical facility and infrastructure risk assessment completed for this hazard mitigation plan. Requirements It is expected that linking jurisdictions will complete the requirements outlined below and submit their completed template to the Harris County Office of Homeland Security and Emergency Management for review within six months of beginning the linkage process: • The eligible jurisdiction requests a “Linkage Package” by contacting the Point of Contact (POC) for the plan: Benzon K John Resilience Planner Harris County Office of Homeland Security & Emergency Management 6922 Katy Rd. Houston, TX 77024 Office: (713) 881-3100 | Desk: (713) 426-9554 | Fax: (713) 437-8435 Planning Section Email: plans@hcoem.net • The POC will provide a linkage procedure package that includes linkage information and a linkage tool- kit: Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes B-2  Linkage Information o Procedures for linking to the multi-jurisdictional hazard mitigation plan o Planning partner’s expectations for linking jurisdictions o A sample “letter of intent” to link to the multi-jurisdictional hazard mitigation plan o A copy of Section 201.6 of 44 CFR, which defines the federal requirements for a local hazard mitigation plan.  Linkage Tool-Kit o Copy of Volume 1 and 2 of the plan o A municipal or special purpose district template and instructions o A catalog of hazard mitigation alternatives o A sample resolution for plan adoption • The new jurisdiction will be required to review both volumes of the Harris County Multi-Hazard Mitigation Action Plan, which include the following key components for the planning area:  Goals and objectives  The planning area risk assessment  Comprehensive review of alternatives  Plan implementation and maintenance procedures. Once this review is complete, the jurisdiction will complete its specific annex using the template and instructions provided by the POC. • The development of the new jurisdiction’s annex must not be completed by one individual in isolation. The jurisdiction must develop, implement and describe a public involvement strategy and a methodology to identify and vet jurisdiction-specific actions. The original partnership was covered under a uniform public involvement strategy and a process to identify actions that covered the planning area described in Volume 1 and Volume 2 of this plan. Since new partners were not addressed by these strategies, they will have to initiate new strategies and describe them in their annex. For consistency, new partners are encouraged to develop and implement strategies similar to those described in this plan. • The public involvement strategy must ensure the public’s ability to participate in the plan development process. At a minimum, the new jurisdiction must solicit public opinion on hazard mitigation at the onset of the linkage process and hold one or more public meetings to present the draft jurisdiction-specific annex for comment at least two weeks prior to adoption by the governing body. The POC will have resources available to aid in the public involvement strategy, including:  The questionnaire utilized in the plan development  Presentations from public meeting workshops and the public comment period  Press releases used throughout the planning process  The plan website. • The methodology to identify actions should include a comprehensive range of specific mitigation actions and projects being considered to reduce the effects of each hazard and a description of the process by which chosen actions were identified. As part of this process, linking jurisdictions should coordinate the selection of actions among the jurisdiction’s various departments. • Once their public involvement strategy and template are completed, the new jurisdiction will submit the completed package to the POC for a pre-adoption review to ensure conformance with the multi- jurisdictional plan format and linkage procedure requirements. Appendix B, Procedures for Linking to Hazard Mitigation Plan B-3 • The POC will review for the following:  Documentation of public involvement and action plan development strategies  Conformance of template entries with guidelines outlined in instructions  Chosen actions are consistent with goals, objectives and mitigation catalog of the Harris County Multi-Hazard Mitigation Action Plan  A designated point of contact  A completed FEMA plan review crosswalk. • Plans will be reviewed by the POC and submitted to Texas Division of Emergency Management (TDEM) for review and approval. • TDEM will review plans for state compliance. Non-compliant plans are returned to the lead agency for correction. Compliant plans are forwarded to FEMA for review with annotation as to the adoption status. • FEMA reviews the linking jurisdiction’s plan in association with the approved plan to ensure DMA compliance. FEMA notifies the new jurisdiction of the results of review with copies to TDEM and the approved plan lead agency. • Linking jurisdiction corrects plan shortfalls (if necessary) and resubmits to TDEM through the approved plan lead agency. • For plans with no shortfalls from the FEMA review that have not been adopted, the new jurisdiction governing authority adopts the plan and forwards adoption resolution to FEMA with copies to lead agency and TDEM. • FEMA regional director notifies the new jurisdiction’s governing authority of the plan’s approval. The new jurisdiction plan is then included with the multi-jurisdiction hazard mitigation plan and the linking jurisdiction is committed to participate in the ongoing plan maintenance strategy identified in Chapter 22, Volume 1 of the hazard mitigation plan. DECREASING THE PARTNERSHIP The eligibility afforded under this process to the planning partnership can be rescinded in two ways. First, a participating planning partner can ask to be removed from the partnership. This may be done because the partner has decided to develop its own plan or has identified a different planning process for which it can gain eligibility. A partner that wishes to voluntarily leave the partnership shall inform the POC of this desire in writing. This notification can occur any time during the calendar year. A jurisdiction wishing to pursue this avenue is advised to make sure that it is eligible under the new planning effort, to avoid any period of being out of compliance with the Disaster Mitigation Act. After receiving this notification, the POC shall immediately notify both TDEM and FEMA in writing that the partner in question is no longer covered by the Harris County Multi-Hazard Mitigation Action Plan, and that the eligibility afforded that partner under this plan should be rescinded based on this notification. The second way a partner can be removed from the partnership is by failure to meet the participation requirements specified in the “Planning Partner Expectations” package provided to each partner at the beginning of the process, or the plan maintenance and implementation procedures specified in Volume 1 of the plan. Each partner agreed to these terms by adopting the plan. Eligibility status of the planning partnership will be monitored by the POC. The determination of whether a partner is meeting its participation requirements will be based on the following parameters: • Are partners notifying the POC of changes in designated points of contact? Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes B-4 • Are the partners supporting the Steering Committee by attending designated meetings or responding to needs identified by the body? • Are the partners continuing to be supportive as specified in the planning partners expectations package provided to them at the beginning of the process? Participation in the plan does not end with plan approval. This partnership was formed on the premise that a group of planning partners would pool resources and work together to strive to reduce risk within the planning area. Failure to support this premise lessens the effectiveness of this effort. The following procedures will be followed to remove a partner due to the lack of participation: • The POC will advise the Steering Committee of this pending action and provide evidence or justification for the action. Justification may include: failure to attend meetings determined to be mandatory by the Steering Committee, failure to act on the partner’s action plan, or inability to reach designated point of contact after a minimum of five attempts. • The Steering Committee will review information provided by POC, and determine action by a vote. The Steering Committee will invoke the voting process established in the ground rules established during the formation of this body. • Once the Steering Committee has approved an action, the POC will notify the planning partner of the pending action in writing via certified mail. This notification will outline the grounds for the action, and ask the partner if it is their desire to remain as a partner. This notification shall also clearly identify the ramifications of removal from the partnership. The partner will be given 30 days to respond to the notification. • Confirmation by the partner that they no longer wish to participate or failure to respond to the notification shall trigger the procedures for voluntary removal discussed above. • Should the partner respond that they would like to continue participation in the partnership, they must clearly articulate an action plan to address the deficiencies identified by the POC. This action plan shall be reviewed by the Steering Committee to determine whether the actions are appropriate to rescind the action. Those partners that satisfy the Steering Committee’s review will remain in the partnership, and no further action is required. • Automatic removal from the partnership will be implemented for partners where these actions have to be initiated more than once in a 5-year planning cycle. Harris County Multi-Hazard Mitigation Action Plan Appendix C. Annex Instructions and Templates 1 INSTRUCTIONS FOR COMPLETING CITY/COUNTY ANNEX TEMPLATE The jurisdictional annex templates for the 2018 Harris County Hazard Mitigation Plan update will be completed in three phases. This document provides instructions for completing each phase of the template for municipalities. The target timeline for phase completion is as follows: • Phase 1—Profile, Trends and Previous Plan Status  Deployed: November 26, 2018  Due: December 31, 2018 • Phase 2—Capability Assessment and Information Sources  Deployed: February 19, 2019  Due: March 29, 2019 • Phase 3—Risk Ranking, Action Plan, and Information Sources  Deployed: Mandatory Phase 3 Workshops in mid-July 2019  Due: August 2019 Please direct any questions and return your completed Phase 3 template by August 9, 2019 to: Brian Rutherford Tetra Tech Phone: (281) 414-6741 E-mail: Brian.Rutherford@tetratech.com A Note About Formatting: The template for the annex is a Microsoft Word document in a format that will be used in the final plan. Partners are asked to use this template so that a uniform product will be completed for each partner. Content should be entered within the yellow, highlighted text that is currently in the template, rather than creating text in another document and pasting it into the template. Text from another source will alter the style and formatting of the document. The numbering in the document will be updated when completed annexes are combined into the final document. Please do not adjust any of this numbering. Harris County HMP Instructions for Completing City/County Annex Template 2 IMPORTANT! READ THIS Phase 1 and Phase 2 templates were previously provided to your jurisdiction for completion. If your jurisdiction returned completed Phase 1 and Phase 2 templates: • The Phase 1 and Phase 2 content you provided is already incorporated into your Phase 3 template. • Please review the template to see if we have inserted any comments requesting further work to be done on Phase 1 and Phase 2 o If any comments are included, please address them. Then, begin your work on Phase 3 following the Phase 3 instructions beginning on page 10. o If no comments are included, then you DO NOT need to do any further work on the Phase 1 and Phase 2 content. Go directly to the instructions for Phase 3, beginning on page 10. If your jurisdiction has NOT yet done any work on the Phase 1 and Phase 2 templates, then follow the instructions below for providing the Phase 1 and Phase 2 information. If your jurisdiction started work on the Phase 1 or Phase 2 template but never completed and submitted it, please copy the work you had completed so far into the new template you received for Phase 3. Then complete Phases 1 and 2 following the instructions provided here. PHASE 1 AND PHASE 2 INSTRUCTIONS CHAPTER TITLE You jurisdiction’s name has already been entered as the title of the chapter. Please review and correct if needed. HAZARD MITIGATION PLAN POINT OF CONTACT Provide the name, title, mailing address, telephone number, and e-mail address for the primary point of contact for your jurisdiction. This should be the person responsible for monitoring, evaluating and updating the annex for your jurisdiction. This person should also be the principle liaison between your jurisdiction and the Steering Committee overseeing development of this plan. In addition, designate an alternate point of contact. This would be a person to contact should the primary point of contact be unavailable or no longer employed by the jurisdiction. Note: Both of these contacts should match the contacts that were designated in your jurisdiction’s letter of intent to participate in this planning process. If you have changed the primary or secondary contact, please let the planning team know by inserting a comment into the document. JURISDICTION PROFILE Provide information specific to your jurisdiction as indicated, in a style similar to the examples provided below. This should be information that will not be provided in the overall mitigation plan document. Harris County HMP Instructions for Completing City/County Annex Template 3 Location Describe the community’s location, size and prominent features, similarly to the example below The City of Jones is in the northwest portion of Smith County, along the Pacific Coast in northern California. It is almost 300 miles of San Francisco. The city’s total area is 4.2 square miles, with boundaries generally extending north-south from State Highway 111 to the Johnson River and east-west from Coast Road to East Frank Avenue. The City of Allen is to the north, unincorporated county is to the west, the City of Bethany is to the south, and the Pacific Ocean is to the west. Jones is home to the University of Arbor, Bickerson Manufacturing, and the western portion of Soosoo National Park. History Describe the community’s history, focusing on economy and development, and note its year of incorporation, similarly to the example below The City of Jones was incorporated in 1858. The area was settled during the gold rush in the 1850s as a supply center for miners. As the gold rush died down, timber and fishing became the area's major economic resources. By 1913, the Jones Teachers College, a predecessor to today's University of Arbor, was founded. Recently, the presence of the college has come to shape Jones’ population into a young and educated demographic. In 1981 the City developed the Jones Marsh and Wildlife sanctuary, an environmentally friendly sewage treatment enhancement system. With numerous annexations since its original incorporation, the city’s area has almost doubled. Today it features a commercial core in the center of the city, with mostly residential areas to the north and south, the university to the west and the national park on the east. Climate Describe the community’s key climate characteristics, similarly to the example below Jones’ weather is typical of the Northern California coast, with mild summers and cool, wet winters. It rarely freezes in the winter and it is rarely hot in the summer. Annual average rainfall is over 40 inches, with 80 percent of that falling from November through April. The average year-round temperature is 59ºF. Humidity averages 72 to 87 percent. Prevailing winds are from the north, and average 5 mph. Governing Body Format Describe the community’s key governance elements, similarly to the example below The City of Jones is governed by a five-member city council. The City consists of six departments: Finance, Environmental Services, Community Development, Public Works, Police and the City Manager's Office. The City has 13 commissions and task forces, which report to the City Council. The City Council assumes responsibility for the adoption of this plan; the City Manager will oversee its implementation. Complete the table providing the names and titles of members of the local mitigation planning team responsible for completion of this annex. Team membership should consist of agencies with authority to regulate development and enforce local ordinances or regulatory standards, such as building/fire code enforcement, emergency management, emergency services, floodplain management, parks and recreation, planning/community Harris County HMP Instructions for Completing City/County Annex Template 4 development, public information, public works/engineering, stormwater management, transportation, or infrastructure. CURRENT TRENDS Population For population data, use the most current population figure for your jurisdiction based on an official means of tracking (e.g., the U.S. Census or state office of financial management). According to California Department of Finance, the population of Jones as of July 2018 was 17,280. Since 2010, the population has grown at an average annual rate of 1.2 percent, though that rate is declining, with an annual average of only 0.8 percent since 2015. Development In the yellow-highlighted text that says “Describe trends in general,” provide a brief description of your jurisdiction’s recent development trends similar to the following example: Anticipated development levels for Jones are low to moderate, consisting primarily of residential development. The majority of recent development has been infill. Residentially, there has been a focus on affordable housing and a push for more secondary mother-in-law units on properties. The City of Jones adopted its general plan in July 2000. The plan focuses on issues of the greatest concern to the community. City actions, such as those relating to land use allocations, annexations, zoning, subdivision and design review, redevelopment, and capital improvements, must be consistent with the plan. Future growth and development in the city will be managed as identified in the general plan. Complete the table titled “Recent and Expected Future Development Trends.” Please note: • The portion of the table requesting the number of permits by year is specifically looking for development permits for new construction. If your jurisdiction does not have the ability to differentiate between permit types, please list the total number of permits and indicate “N/A” (not applicable) for the permit sub-types. • If your jurisdiction does not have the ability to track the number of permits for each hazard area, please delete the bullet list of hazard areas and insert a qualitative description of where development has occurred. • Examples of qualitative descriptions of buildout in the jurisdiction are as follows:  The Town is close to being built out. Most new projects involve the demolition of an existing residence and construction of a new replacement residence. A few subdivisions are processed each year.  There are five parcels of underdeveloped land within the city limits. According to the General Plan, the total potential units for these parcels is 33 units. CAPABILITY ASSESSMENT Please note that it is unlikely that you will be able to complete all sections of the capability assessment on your own. You will likely need to reach out to other departments within your local government, such as planning, finance, public works, etc. It may be beneficial to provide these individuals with background information about this planning process, as you will want input from them again during Phase 3 of your annex development. Harris County HMP Instructions for Completing City/County Annex Template 5 Fill in your jurisdiction’s name where indicated on the first line of the first paragraph under the heading “1.4 Capability Assessment.” Legal and Regulatory Capability In the table titled “Legal and Regulatory Capability,” indicate “Yes” or “No” for each listed code, ordinance, requirement or planning document in each of the following columns: • Local Authority—Enter “Yes” if your jurisdiction has prepared or adopted the identified item; otherwise, enter “No.” If yes, then enter the code, ordinance number, or plan name and its date of adoption in the comments column. Note: If you are entering yes, please be sure that you are providing a comment with the appropriate code, ordinance or plan. • Other Jurisdiction Authority—Enter “Yes” if there are any regulations that may impact your jurisdiction that are enforced or administered by another agency (e.g., a state agency or special purpose district) or if you know that there are any state or federal regulations or laws that would prohibit local implementation of the identified item; otherwise, enter “No.” Note: If you answer yes, please indicate the other agency in the comments. • State Mandated—Enter “Yes” if state laws or other requirements enable or require the listed item to be implemented at the local level; otherwise, enter “No.” Note: If you are entering yes, please be sure that you are providing a comment. • Integration Opportunity—Enter “Yes” if your jurisdiction has opportunities for integration of the code, ordinance or plan with the hazard mitigation plan. Consider entering “Yes” in the Integration Opportunity column if you answer “yes” to any of the following:  If you answered “Yes” in the Local Authority column for this code, ordinance or plan:  Does the code, ordinance or plan already address hazards and their potential impacts? o If so, should it be updated or revised to reflect new information about risk? o If not, will (or should) the code, ordinance or plan be updated over the performance period of the hazard mitigation plan (5 years)?  Does the code, ordinance or plan include specific projects that should be reviewed to incorporate hazard mitigation goals?  Does the code, ordinance or plan include specific projects that should be included as action items in the hazard mitigation action plan?  If you answered “No” in the Local Authority column for this code, ordinance or plan:  Will your jurisdiction develop the code, ordinance or plan during the performance period of the hazard mitigation plan? Note: Each capability with a “Yes” answer to Integration Opportunity will be discussed in more detail later in the annex. You may wish to keep notes when assessing the Integration Opportunity or review the “Integration with Other Planning Initiatives” section below. • Comments—Enter the code number and adoption date for any local code indicated as being in place; provide other comments as appropriate to describe capabilities for each entry. PLEASE DO NOT OVERLOOK THIS STEP For the category “Capital Improvement Plan,” answer the specific question regarding plan update frequency, in addition to completing the four columns indicating level of capability. Harris County HMP Instructions for Completing City/County Annex Template 6 Development and Permit Capabilities Complete the table titled “Development and Permitting Capabilities.” Fiscal Capability Complete the table titled “Fiscal Capability” by indicating whether each of the listed financial resources is accessible to your jurisdiction. Enter “Yes” if the resource is fully accessible to your jurisdiction. Enter “No” if there are limitations or prerequisites that may hinder your eligibility for this resource. Administrative and Technical Capability Complete the table titled “Administrative and Technical Capability” by indicating whether your jurisdiction has access to each of the listed personnel resources. Enter “Yes” or “No” in the column labeled “Available?”. If yes, then enter the department and position title in the right-hand column. If you have contract support staff with these capabilities, you can still answer “Yes.” Indicate in the department column that this resource is provided through contract support. Education and Outreach Capabilities Complete the table titled “Education and Outreach” to indicate your jurisdiction’s capabilities and existing efforts regarding natural hazard mitigation education and outreach. National Flood Insurance Program Compliance Complete the table titled “National Flood Insurance Program Compliance” by indicating your jurisdiction’s capabilities related to each question in the table. Classification in Hazard Mitigation Programs Complete the table titled “Community Classifications” to indicate your jurisdiction’s participation in various national programs related to natural hazard mitigation. For each program enter “Yes” or “No” in the second column to indicate whether your jurisdiction participates. If yes, then enter the classification that your jurisdiction has earned under the program in the third column and the date on which that classification was issued in the fourth column; enter “N/A” in the third and fourth columns if your jurisdiction is not participating. If you do not know your current classification, information is available at the following websites: • Community Rating System— https://www.fema.gov/media-library-data/1503240360683- 30b35cc754f462fe2c15d857519a71ec/20_crs_508_oct2017.pdf • Storm Ready— https://www.weather.gov/stormready/communities • Firewise— http://www.firewise.org/usa-recognition-program/map-of-active-participants.aspx • Building Code Effectiveness Grading Schedule (BCEGS)— https://www.isomitigation.com/bcegs/iso- s-building-code-effectiveness-grading-schedule-bcegs.html • Public Protection Classification— https://firechief.iso.com/FCWWeb/mitigation/ppc0001.jsp Adaptive Capacity for Climate Change Consider the climate change impact concerns identified for the planning area: • Reduced snowpack • Increased wildfires Harris County HMP Instructions for Completing City/County Annex Template 7 • Sea level rise and inland flooding • Threats to sensitive species (e.g. coho salmon) • Loss in agricultural productivity (e.g. forestry, wine grapes, nursery products, dairy) • Public health and safety. With those impacts in mind, complete the table titled “Adaptive Capacity for Climate Change” by indicating that your jurisdiction’s capacity for each listed criterion as follows: • High—The capacity exists and is in use. • Medium—The capacity may exist, but is not used or could use some improvement. • Low —The capacity does not exist or could use substantial improvement. • Unsure—Not enough information is known to assign a rating. This is a subjective assessment, but providing a few words of explanation is useful. It is highly recommended that you complete this table with an internal planning team and that you review the results of the other capability assessment tables before completing. INTEGRATION WITH OTHER PLANNING INITIATIVES For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant planning mechanisms, such as general planning and capital facilities planning, and that relevant information from those sources is used in hazard mitigation. The goal of plan integration is to ensure that the potential impact of hazards is considered in planning for future development. FEMA recommends integration as follows: • Integrate hazard mitigation plan goals with community objectives (e.g. incorporate the goals for risk reduction and safety into the policies of other plans). • Use the risk assessment to inform plans and policies (e.g. incorporate risk assessment findings into land use plans, site plan review, emergency operations plans). • Implement mitigation actions through existing mechanisms (e.g. include mitigation projects in the capital improvement plan). • Think about mitigation before and after a disaster (e.g. build recovery planning on existing mitigation plans and goals). After reviewing the plans, programs and ordinances identified in the capability assessment tables, identify all plans and programs that have already been integrated with the hazard mitigation plan, and those that offer opportunities for future integration. The simplest way to do this is to review the Legal and Regulatory Capabilities table to see which items were marked as “Yes” under the Integration Opportunity column. Existing Integration In the highlighted bullet list, list items for which you entered “Yes” under the Integration Opportunity column of the “Legal and Regulatory Capability” table because the plan or ordinance already addresses potential impacts or includes specific projects that should be included as action items in the mitigation action plan. Consider listing items marked as Completed in the “Status of Previous Plan Actions” table if they were indicated as being ongoing actions. Provide a brief description of how the plan or ordinance is integrated. Examples are as follows: • Capital Improvement Plan—The capital improvement plan includes projects can help mitigate potential hazards. The City will act to ensure consistency between the hazard mitigation plan and the current and future capital improvement plans. The hazard mitigation plan may identify new possible funding sources for capital improvement projects and may result in modifications to proposed projects based on results of the risk assessment. Harris County HMP Instructions for Completing City/County Annex Template 8 • Building Code and Fire Code—The City’s adoption of the 2016 California building and fire codes incorporated local modifications to account for the climatic, topographic and geographic conditions that exist in the City. • General Plan—The general plan includes a “Safety, Services, and Infrastructure” element to protect the community from unreasonable risk by establishing policies and actions to avoid or minimize the following hazards:  Geologic and seismic hazards  Fire hazards  Hazardous materials  Flood control  Impacts from climate change. • Climate Action Plan—The City’s Climate Action Plan includes projects for reducing greenhouse gas emissions and adapting to likely impacts of climate change. These projects were reviewed to identify cross-planning initiates that serve both adaptation and mitigation objectives. Note: Any plans that fall into this category should be reviewed during the development of the mitigation strategy in Phase 3 and included as appropriate. Opportunities for Future Integration List any remaining items that say “Yes” in the Integration Opportunity column in the Legal and Regulatory Capabilities and explain the process by which integration will occur. Examples follow: • Zoning Code—The City of Smithburg is conducting a comprehensive update to its zoning code. The opportunity to incorporate additional mitigation and abatement measures will be contemplated for inclusion into the Code. • Capital Improvement Projects—Capital improvement project proposals may take into consideration hazard mitigation potential as a means of evaluating project prioritization. • Post-Disaster Recovery Plan—Smithburg does not have a recovery plan and intends to develop one as a mitigation planning action during the next five years. The plan will build on the mitigation goals and objectives identified in the mitigation plan. After you have accounted for all items marked as “Yes” under the Integration Opportunity column, consider other programs you may have in place in your jurisdiction that include routine consideration and management of hazard risk. Examples of such programs may include: tree pruning programs, right-of-way mowing programs, erosion control or stream maintenance programs, etc. Please add any such programs to the integration discussion and provide a brief description of how these program manage (or could be adapted to manage) risk from hazards. STATUS OF PREVIOUS PLAN ACTIONS Please note that this section only applies to jurisdictions that are conducting updates to previously approved hazard mitigation plans. If your jurisdiction has not previously participated in an approved plan, please enter a note stating this, and we will remove this section in your final annex. All action items identified in prior mitigation planning efforts must be reconciled in this plan update. Action items must all be marked as ONE of the following; check the appropriate box (place an X) and provide the following information: Harris County HMP Instructions for Completing City/County Annex Template 9 • Completed—If an action has been completed since the prior plan was prepared, please check the appropriate box and provide a date of completion in the comment section. If an action has been initiated and is an ongoing program (e.g. annual outreach event), you may mark it as completed and note that it is ongoing in the comments. If an action addresses an ongoing program you would like to continue to include in your action plan, please see the Carried Over to Plan Update bullet below. • Removed—If action items are to be removed because they are no longer feasible, a reason must be given. Lack of funding does not mean that it is no longer feasible, unless the sole source of funding for an action is no longer available. Place a comment in the comment section explaining why the action is no longer feasible or barriers that prevented the action from being implemented (e.g., “Action no longer considered feasible due to lack of political support.”). If the wording and/or intent of a previously identified action is unclear, this can be a reason for removal. A change in community priorities may also be a reason for removal and should be discussed in the comments. • Carried Over to Plan Update—If an action is in progress, is ongoing, or has not been initiated and you would like to carry it over to the plan update, please check the “Check if Yes” column under “Carried Over to Plan Update.” Selecting this option indicates that the action will be included in the mitigation action plan for this update. If you are carrying over an action to the update, please include a comment describing any action that has been taken or why the action was not taken (specifically, any barriers or obstacles that prevented the action from moving forward or slowed progress). Leave the last column, “Action # in Update,” blank at this point. This will be filled in after completing the updated action plan in Phase 3. Please ensure that you have provided a status and a comment for each action. REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX Please note that this section will ultimately describe all information sources used to develop this annex, but that only the sources used for Phases 1 and 2 will be listed at this point. Additional sources will be added with the preparation of the Phase 3 annex template. This section should describe what resources you used to complete the annex and how you used them. Several items are started for you, but please be sure to update and enhance any descriptions. This may seem trivial or unimportant, but it is a requirement to pass the state and FEMA review process. THIS COMPLETES PHASES 1 AND 2 Harris County HMP Instructions for Completing City/County Annex Template 10 PHASE 3 INSTRUCTIONS JURISDICTION-SPECIFIC NATURAL EVENT HISTORY In the table titled “Past Natural Hazard Events,” list in chronological order (most recent first) any natural hazard event that has caused damage to your jurisdiction. Include the date of the event and the estimated dollar amount of damage it caused. You are welcome to include any events, but special attention should be made to include major storms and federally declared disasters. Please refer to the table listing all Presidential Disaster Declarations for the County that is included in the toolkit you received at the workshop. We recommend including most large- scale disasters, unless you know that there were no impacts to your jurisdiction. Specifically, we recommend that you include these events if you have damage estimate information or can provide a brief description of impacts that occurred within your community. In addition to these events, please refer to the NOAA storm events database included in the tool kit. We recommend conducting a search for the name of your jurisdiction in order to identify events with known impacts. Other potential sources of damage information include: • Preliminary damage estimates your jurisdiction filed with the county or state • Insurance claims data • Newspaper archives • Other plans/documents that deal with emergency management (safety element of a comprehensive plan, emergency response plan, etc.) • Resident input. If you do not have estimates for dollars of damage caused, please list “Not Available” in the appropriate column or simply list a brief description of the damages (e.g. Main Street closed as a result of flooding, downed trees and residential damages). Please note that tracking such damages is a valid and useful mitigation action if your jurisdiction does not currently track such information. HAZARD RISK RANKING The risk ranking performed for the overall planning area is presented in the risk assessment section of the overall hazard mitigation plan. However, each jurisdiction has differing degrees of risk exposure and vulnerability and, therefore, needs to rank risk for its own area, using the same methodology as used for the overall planning area. The risk-ranking exercise assesses two variables for each hazard: its probability of occurrence; and its potential impact on people, property and the economy. Enter Risk Rank Based on Loss Matrix Spreadsheet and Local Knowledge Tetra Tech has developed a draft risk ranking for your jurisdiction. It is included in the “Loss Matrix” spreadsheet provided in the toolkit distributed at the workshop. The hazard with the highest risk rating (probability x impact) was given a rank of 1; the hazard with the second highest rating is listed with a rank of 2; and so on. Two hazards with equal risk ratings were given the same rank. “High,” Medium,” and “Low” assignments were given for each hazard of concern based on a total score. To complete this section of the annex template, you need to review the risk ranking provided in the spreadsheet, and then do one of the following: • If you agree with the results, copy them from the spreadsheet into the risk ranking table in your annex. • If the results differ from what you know based on substantiated data and documentation, you may alter the ranking based on this knowledge, and enter the revised ranking into the risk ranking table in your annex. Harris County HMP Instructions for Completing City/County Annex Template 11 If you modify the spreadsheet-generated risk ranking based on local knowledge, please note this fact in your template and include what you believe the rank should be and why. For example, the spreadsheet may have assigned a low risk rank to drought, but you know that the local economy is heavily reliant on water-using industries, such as agriculture or manufacturing, so you believe it should be ranked as medium. Remember that this exercise is about categorizing hazards into broad levels of risk (high, medium, low), not precise calculations. In modifying any risk ratings, keep in mind that one of the purposes of this exercise is to support the selection and prioritization of actions in your plan. You will need to have at least one true mitigation action for each hazard rated as “high” or “medium.” This is discussed in more detail in the Hazard Mitigation Action Plan section of these instructions. Review Risk Ranking Process Used in the Loss Matrix The sections below describe the methodology that was used to derive the risk ranking. They are provided for your information in reviewing the risk ranking prepared for your jurisdiction. Probability of Occurrence for Each Hazard A probability factor is assigned based on how often a hazard is likely to occur. The probability of occurrence of a hazard event is generally based on past hazard events in an area, although weight can be given to expected future probability of occurrence based on established return intervals and changing climate conditions. For example, if your jurisdiction has experienced two damaging floods in the last 25 years, the probability of occurrence is high for flooding and scores a 3 under this category. If your jurisdiction has experienced no damage from landslides in the last 100 years, your probability of occurrence for landslide is low, and scores a 1 under this category. Each hazard was assigned a probability factor as follows: • High—Hazard event is likely to occur within 25 years (Probability Factor = 3) • Medium—Hazard event is likely to occur within 100 years (Probability Factor = 2) • Low—Hazard event is not likely to occur within 100 years (Probability Factor = 1) • None—If there is no exposure to a hazard, there is no probability of occurrence (Probability Factor = 0) Potential Impacts of Each Hazard The impact of each hazard is divided into three categories: impacts on people, impacts on property, and impacts on the economy. These categories are also assigned weighted values. Impact on people was assigned a weighting factor of 3, impact on property was assigned a weighting factor of 2 and impact on the economy was assigned a weighting factor of 1. Impact factors for each category (people, property, economy) are described below. Impacts on People Values are assigned based on the percentage of the total population exposed to the hazard event. The degree of impact on individuals will vary and is not measurable, so the calculation assumes for simplicity and consistency that all people exposed to a hazard because they live in a hazard zone will be equally impacted when a hazard event occurs. Impact factors were assigned as follows: • High—25 percent or more of the population is exposed to a hazard (Impact Factor = 3) • Medium—10 percent to 24 percent of the population is exposed to a hazard (Impact Factor = 2) • Low—9 percent or less of the population is exposed to the hazard (Impact Factor = 1) • No impact—None of the population is exposed to a hazard (Impact Factor = 0) The percent of the total population exposed to each hazard of concern with a defined extent (e.g. floodplain) can be found in the loss estimate matrix in the green highlighted column. For hazards that do not have a defined Harris County HMP Instructions for Completing City/County Annex Template 12 extent, the entire population or a portion of the population is considered to be exposed, depending on the hazard. For the drought hazard, it is common for jurisdictions to list “low” or “none,” because all people in the planning area would be exposed to drought, but impacts to the health and safety of individuals are expected to be minimal. Impacts on Property Values are assigned based on the percentage of the total property value exposed to the hazard event: • High—25 percent or more of the total replacement value is exposed to a hazard (Impact Factor = 3) • Medium—10 percent to 24 percent of the total replacement value is exposed to a hazard (Impact Factor = 2) • Low—9 percent or less of the total replacement value is exposed to the hazard (Impact Factor = 1) • No impact—None of the total replacement value is exposed to a hazard (Impact Factor = 0) The percent of the total value exposed to each hazard of concern with a defined extent and location (e.g. floodplain) can be found in the loss estimate matrix in the blue highlighted column. For those hazards that do not have a defined extent and location (e.g. severe weather) the entire building stock is generally considered to be exposed. For the drought hazard, it is common for jurisdictions to list “low” or “none,” because all structures in the planning area would be exposed to drought, but impacts to structures are expected to be minimal. Impacts on the Economy Values were assigned based on the percentage of the total property value vulnerable to the hazard event. Values represent estimates of the loss from a major event of each hazard in comparison to the total replacement value of the property exposed to the hazard. For some hazards, such as wildland fire and landslide, vulnerability may be considered to be the same or a portion of exposure due to the lack of loss estimation tools specific to those hazards. • High—Estimated loss from the hazard is 10 percent or more of the total replacement value (Impact Factor = 3) • Medium—Estimated loss from the hazard is 5 percent to 9 percent of the total replacement value (Impact Factor = 2) • Low—Estimated loss from the hazard is 4 percent or less of the total replacement value (Impact Factor = 1) • No impact—No loss is estimated from the hazard (Impact Factor = 0). The loss estimates for each hazard of concern that was modeled (i.e. dam failure, flood, earthquake) can be found in the loss estimate matrix in the purple highlighted column. For those hazards that have a defined extent and location, but do not have modelled loss results, loss estimates can be the same as exposure or a portion thereof. For example, a large percentage of the building stock may be exposed to landslide or wildland fire risk, but it would not be expected that one event that resulted in loss to all exposed structures would occur. For those hazards that do not have a defined extent and location, exposure is based on the hazard type. Risk Rating for Each Hazard A risk rating for each hazard was determined by multiplying the assigned probability factor by the sum of the weighted impact factors for people, property and the economy: Risk Rating = Probability Factor x Weighted Impact Factor {people + property + economy} This is the number shown in the risk ranking table in your template. Generally, scores of 30 or greater are rated “high”, scores between 15 and 30 are rated “medium”, and scores of less than 15 are rated “low”. Harris County HMP Instructions for Completing City/County Annex Template 13 JURISDICTION-SPECIFIC VULNERABILITIES Repetitive Loss Properties A repetitive loss property is any property for which FEMA has paid two or more flood insurance claims in excess of $1,000 in any rolling 10-year period since 1978. In the space provided, Tetra Tech has inserted the following information based on data provided by FEMA: • The number of any FEMA-identified repetitive-loss properties in your jurisdiction. • The number of any FEMA-identified severe-repetitive-loss properties in your jurisdiction. • The number (if any) of repetitive-loss or severe-repetitive-loss properties in your jurisdiction that have been mitigated. Mitigated for this exercise means that flood protection has been provided to the structure. Please note that if your jurisdiction has any repetitive loss properties, we would strongly encourage you to include a mitigation action that addresses mitigating these properties. Other Vulnerabilities Review the results of the risk assessment included in the toolkit, your jurisdiction’s natural-events history, and any relevant public comments/input, and based on that review, develop a few sentences that discuss specific risks. You do not need to develop a sentence for every parameter, but review the results and identify a few issues you would like to highlight. For example: • Only about 2 percent of the jurisdiction’s population is estimated to reside in the 1 percent annual chance flood hazard area; however, 45 percent of the population is estimated to reside in the 0.2 percent annual chance flood hazard area where flood insurance is generally not required. • A magnitude 7.5 earthquake on the Smithburg Fault may produce nearly 1 million tons of structure debris. • Over the past 10 years, the jurisdiction has experienced more than $6 million in estimated damages from severe storm events. • More than 50 buildings are located in areas that will be permanently inundated with 12 inches of sea level rise. • The results of the public survey indicated that 40 percent of Smithburg residents would not be able to be self-sufficient for 5 days following a major event. In addition, list any noted vulnerabilities in your jurisdiction related to hazard mitigation that may not be apparent from the risk assessment and other information provided. This may include things such as the following: • An urban drainage issue that results in localized flooding every time it rains. • An area of the community that frequently loses power due to a lack of tree maintenance. • A critical facility, such as a police station, that is not equipped with a generator. • A neighborhood that has the potential to have ingress and egress cut off as the result of a hazard event, such as a flood or earthquake (e.g. bridge only access). • Substantial number of buildings in one area of the community are unreinforced masonry or soft-story construction. • An area along the river is eroding and threatening public and/or private property. • A large visitor population that may not be aware of tsunami risk. Spending some time thinking about the results of the risk assessment and other noted vulnerabilities will be a big help in the development of your mitigation strategy. Tetra Tech has inserted a few items in this section to get you started. In addition, two examples are shown in the table below. Harris County HMP Instructions for Completing City/County Annex Template 14 Noted Vulnerability Example Mitigation Action Only about 2 percent of the jurisdiction’s population is estimated to reside in the 1 percent annual chance flood hazard area; however, 45 percent of the population is estimated to reside in the 0.2 percent annual chance flood hazard area where flood insurance is generally not required. Develop and implement an annual public information initiative that targets residents in the 0.2 percent annual chance flood hazard area. Provide information on the availability of relatively low cost flood insurance policies. An urban drainage issue results in localized flooding every time it rains. Replace undersized culverts that are contributing to localized flooding. Priority areas include: • The corner of Main Street and 1st Street • Old Oak subdivision. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS This section is the heart of your jurisdictional annex. This is where you will identify the actions your jurisdiction would like to pursue with this plan. All of the work that you have done thus far should provide you with a plethora of ideas for actions. With this in mind, we recommend that you review the following and develop a list of potential actions: • Capability Assessment Section of Annex—Review the Legal and Regulatory Capability table, the Fiscal Capability table, the Administrative and Technical Capability table, the Education and Outreach table, and the Community Classification table.  For any capability that you indicated that you did not have, ask yourself – should we have this capability? If yes, consider including an action to develop/acquire the capability.  Example: Ensure a staff person from public works and planning are trained in the use of FEMA’s benefit-cost analysis software.  Review the Legal and Regulatory capabilities. If any have not been reviewed and updated in more than 10 years, consider an action to review and update the capability and, as appropriate, incorporate hazard mitigation principles or information obtained in the risk assessment (Note: actions such as this should also be identified in the opportunities for future integration section). Also, consider including projects or actions that have been identified in other plans and programs such as Capital Improvement Plans, Strategic Plans, etc. as actions in this plan.  For any capability that you indicated you do have, consider how this capability can be leveraged to increase or improve hazard mitigation in the jurisdiction. • National Flood Insurance Program Compliance Table of this Annex—Review the table and consider the following:  If you have no certified floodplain managers and you have flood risk, consider adding an action to provide key staff members with training appropriate to obtain certification.  If your flood damage prevention was last updated in or before 2004, you should identify an action to update your ordinance to ensure it is compliant with NFIP requirements. Wording Your Action Descriptions: Descriptions of your actions need not provide great detail. That will come when you apply for a project grant. Provide enough information to identify the project’s scope and impact. The following are typical descriptions for an action plan action: •Action 1—Address repetitive-loss properties. Through targeted mitigation, acquire, relocate or retrofit the five repetitive loss structures in the County as funding opportunities become available. •Action 2—Perform a non-structural, seismic retrofit of City Hall. •Action 3—Acquire floodplain property in the Smith subdivision. •Action 4—Enhance the County flood warning capability by joining the NOAA "Storm Ready" program. Harris County HMP Instructions for Completing City/County Annex Template 15  If you have any outstanding NFIP compliance issues, be sure to add an action to address them.  If flood hazard maps do not adequately address the flood risk within your jurisdiction, consider actions to request new mapping or conduct studies.  If you don’t participate in CRS or you would like to improve your classification, consider this as an action.  If the number of flood insurance polices in your jurisdiction is low relative to the number of structures in the floodplain, consider an action that will promote flood insurance in your jurisdiction. • Adaptive Capacity for Climate Change Section of this Annex—Consider your responses to this section. For those criteria that you listed as medium or low, think of ways you could improve this rating (see adaptive capacity portion of the mitigation best practices catalog). For those criteria you listed as high, think about how you can leverage this capacity to improve or enhance mitigation or continue to improve this capacity. For those criteria that you were unable to provide responses for, consider ways you could improve your understanding of this capacity (see mitigation best practices and adaptive capacity catalog). • Opportunities for Future Integration Section in this Annex—Review the items you identified in this section. For items that address land use, include them in the prepopulated action in your template that reads as follows: Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including ______________. For other items listed in this section, consider an action that specifically says what the plan, code, ordinance etc. is and how it will be integrated. • Jurisdiction-Specific Vulnerabilities Section in this Annex—Review the items that you have identified in this section and consider actions that will help reduce these vulnerabilities (see mitigation best practices catalog). • Mitigation Best Practices Catalog—A catalog that includes FEMA and other agency identified best practices, steering committee and other stakeholder recommendations was developed as part of the plan development process and included in your tool kit. Review the catalog and identify those actions that your jurisdiction should consider including in its action plan. • Public Input—Review input received during the process, specifically the public survey results included in your toolkit. • Prior Mitigation Planning Efforts—If your jurisdiction participated in a previous hazard mitigation plan, please be sure to remember to include any actions that were identified as “carry over” actions. Once you have carried them over, return to the Status of Previous Actions table and record the new action number (see discussion below). Be sure to consider the following factors in your selection of actions: • Select actions that are consistent with the overall purpose, goals, and objectives of the hazard mitigation plan. • Identify actions where benefits exceed costs. • Include any action that your jurisdiction has committed to pursuing regardless of grant eligibility. • Know what is and is not grant-eligible under the Hazard Mitigation Grant Program (HMGP), Pre-Disaster Mitigation (PDM) and Flood Mitigation Assistance (FMA) grants (see fact sheet provided in toolkit). If you have actions that are not HMGP, PDM or FMA grant eligible, but do mitigate part or all of the hazard and may be eligible for other grant programs sponsored by other agencies, include them in this section. • You must identify at least one true mitigation action (i.e. not a preparedness or response action) that is clearly defined and actionable for hazards ranked as “high” or “medium.” Harris County HMP Instructions for Completing City/County Annex Template 16 Review Actions Recommended for All Partners Four actions have been prepopulated in your annex template. These actions should be included in every annex and should not be removed, although the specifics should be adjusted as needed for the particulars of each community. • Where appropriate, support retrofitting, purchase or relocation of structures located in high hazard areas, prioritizing those structures that have experienced repetitive losses and/or are located in high or medium ranked hazard areas. • Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions within the community. • Actively participate in the plan maintenance protocols outlined in Volume 1 of the hazard mitigation plan. • Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements:  Enforce the flood damage prevention ordinance.  Participate in floodplain identification and mapping updates.  Provide public assistance/information on floodplain requirements and impacts. We also recommend that every planning partner strongly consider the following additional actions, adjusted as needed for the particulars of each community: • Develop and implement a program to capture perishable data after significant events (e.g. high water marks, preliminary damage estimates, damage photos) to support future mitigation efforts including the implementation and maintenance of the hazard mitigation plan. • Develop a post-disaster recovery plan and a debris management plan. • Develop and/or update plans that support or enhance continuity of operations following disasters. • Purchase generators for critical facilities and infrastructure that lack adequate back-up power. Complete the Table Complete the table titled “Hazard Mitigation Action Plan Matrix” for all the actions you have identified and would like to include in the plan: • Enter the action number and description. Replace the “xxx” included in the template with the letter code for your jurisdiction as follows:  Harris County—HAR1, HAR2, HAR3…  City of Baytown—BAY1, BAY2, BAY3…  City of Bellaire—BEL1, BEL2, BEL3…  City of Bunker Hill Village—BNK1, BNK2, BNK3…  City of Deer Park—DPK1, DPK2, DPK3…  City of El Lago—LAG1, LAG2, LAG3…  City of Friendswood—FRD1, FRD2, FRD3…  City of Galena Park—GAL1, GAL2, GAL3…  City of Hedwig Village—HED1, HED2, HED3…  City of Hilshire Village—HIL1, HIL2, HIL3…  City of Humble—HUM1, HUM2, HUM3…  City of Hunters Creek Village—HNT1, HNT2, HNT3…  City of Jacinto City—JAC1, JAC2, JAC3…  City of Jersey Village—JRV1, JRV2, JRV3…  City of Katy—KTY1, KTY2, KTY3…  City of LaPorte—LPT1, LPT2, LPT3…  City of Missouri City —MSS1, MSS2, MSS3…  City of Morgan’s Point—MRG1, MRG2, MRG3…  City of Nassau Bay—NAS1, NAS2, NAS3…  City of Pasadena—PAS1, PAS2, PAS3…  City of Piney Point Village—PPV1, PPV2, PPV3…  City of Seabrook—SBR1, SBR2, SBR3…  City of Shore Acres—SHR1, SHR2, SHR3…  City of Southside Place—SSP1, SSP2, SSP3…  City of Spring Valley—SPV1, SPV2, SPV3…  City of Stafford—STF1, STF2, STF3  City of Taylor Lake Village—TLV1, TLV2, TLV3  City of Tomball—TOM1, TOM2, TOM3…  City of Webster—WEB1, WEB2, WEB3…  City of West University Place—WUP1, WUP2, WUP3… • If the action is carried over from your previous hazard mitigation plan, return to the “Status of Previous Plan Actions” table you completed in Phase 1 and enter the new action number in the column labeled Action # in Update. Harris County HMP Instructions for Completing City/County Annex Template 17 • Indicate whether the action mitigates hazards for new and/or existing assets. • Identify the specific hazards the action will mitigate (note: you must list the hazards, simply indicating all hazards is not deemed acceptable). • Identify by number the mitigation plan objectives that the action addresses (see toolkit). • Indicate who will be the lead in administering the action. This will most likely be a department within your jurisdiction (e.g. planning or public works). If you wish to indicate more than one department, please ensure that it is clear who the lead agency will be and list supporting agencies in the appropriate column. • Enter an estimated cost in dollars if known; otherwise, enter “High,” “Medium” or “Low” as determined for the prioritization process described in the following section. • Identify funding sources for the action. If it is a grant, include the funding sources for the cost share. Refer to your fiscal capability assessment to identify possible sources of funding and refer to the table below for project eligibility for FEMA’s hazard mitigation assistance grant programs. • Indicate the time line as “short-term” (1 to 5 years) or “long-term” (5 years or greater) or “ongoing” (a continual program) Eligible Activities Hazard Mitigation Grant Program Pre-Disaster Mitigation Flood Mitigation Assistance Property Acquisition and Structure Demolition √ √ √ Property Acquisition and Structure Relocation √ √ √ Structure Elevation √ √ √ Mitigation Reconstruction √ √ √ Dry Floodproofing of Historic Residential Structures √ √ √ Dry Floodproofing of Non-residential Structures √ √ √ Generators √ √ Localized Flood Risk Reduction Projects √ √ √ Non-Localized Flood Risk Reduction Projects √ √ Structural Retrofitting of Existing Buildings √ √ √ Non-Structural Retrofitting of Existing Buildings and Facilities √ √ √ Safe Room Construction √ √ Wind Retrofit for One- and Two-Family Residences √ √ Infrastructure Retrofit √ √ √ Soil Stabilization √ √ √ Wildland fire Mitigation √ √ Post-Disaster Code Enforcement √ Advance Assistance √ 5 Percent Initiative Projects* √ Aquifer and Storage Recovery** √ √ √ Flood Diversion and Storage** √ √ √ Floodplain and Stream Restoration** √ √ √ Green Infrastructure** √ √ √ Miscellaneous/Other** √ √ √ Hazard Mitigation Planning √ √ √ Technical Assistance √ Management Costs √ √ √ * FEMA allows increasing the 5% Initiative amount up to 10% for a Presidential major disaster declaration under HMGP. The additional 5% can be used for activities that promote disaster-resistant codes for all hazards. As a condition of the award, a disaster-resistant building code must be adopted or an improved Building Code Effectiveness Grading Schedule is required. ** Proposed actions will be evaluated against program requirements. Eligible projects will be approved if funding is available. Harris County HMP Instructions for Completing City/County Annex Template 18 Prioritization of Mitigation Actions Complete the information in the table titled “Mitigation Strategy Priority Schedule” as follows: • Action #—Indicate the action number from the previous annex table (Hazard Mitigation Action Plan Matrix). • # of Objectives Met—Enter the number of objectives the action will meet. • Benefits—Enter “High,” “Medium” or “Low” as follows:  High: Action will have an immediate impact on the reduction of risk exposure to life and property.  Medium: Action will have a long-term impact on the reduction of risk exposure to life and property, or action will provide an immediate reduction in the risk exposure to property.  Low: Long-term benefits of the action are difficult to quantify in the short term. • Costs—Enter “High,” “Medium” or “Low” as follows:  High: Would require an increase in revenue via an alternative source (i.e., bonds, grants, fee increases) to implement. Existing funding levels are not adequate to cover the costs of the proposed action.  Medium: Could budget for under existing work-plan, but would require a reapportionment of the budget or a budget amendment, or the cost of the action would have to be spread over multiple years.  Low: Possible to fund under existing budget. Action is or can be part of an existing ongoing program.  If you know the estimated cost of an action because it is part of an existing, ongoing program, indicate the amount. • Do Benefits Exceed the Cost?—Enter “Yes” or “No.” This is a qualitative assessment. Enter “Yes” if the benefit rating (high, medium or low) is the same as or higher than the cost rating (high benefit/high cost; high benefit/medium cost; medium benefit/low cost; etc.). Enter “No” if the benefit rating is lower than the cost rating (medium benefit/high cost, low benefit/medium cost; etc.) • Is the Action Grant-Eligible?—Enter “Yes” or “No.” Refer to the fact sheet on HMGP, PDM and FMA and the table above. • Can Action Be Funded Under Existing Program Budgets?—Enter “Yes” or “No.” In other words, is this action currently budgeted for, or would it require a new budget authorization or funding from another source such as grants? • Implementation Priority— Enter “High,” “Medium” or “Low” as follows:  High Priority—An action that meets multiple objectives, has benefits that exceed costs, and has a secured source of funding. Action can be completed in the short term (1 to 5 years).  Medium Priority—An action that meets multiple objectives, has benefits that exceed costs, and is eligible for funding though no funding has yet been secured for it. Action can be completed in the short term (1 to 5 years), once funding is secured. Medium-priority actions become high-priority actions once funding is secured.  Low Priority—An action that will mitigate the risk of a hazard, has benefits that do not exceed the costs or are difficult to quantify, has no secured source of funding, and is not eligible for any known grant funding. Action can be completed in the long term (1 to 10 years). Low-priority actions are generally “wish-list” actions. They may be eligible for grant funding from programs that have not yet been identified. • Grant Pursuit Priority— Enter “High,” “Medium” or “Low” as follows: Harris County HMP Instructions for Completing City/County Annex Template 19  High Priority—An action that meets identified grant eligibility requirements, has high benefits, and is listed as high or medium implementation priority; local funding options are unavailable or available local funds could be used instead for actions that are not eligible for grant funding.  Medium Priority—An action that meets identified grant eligibility requirements, has medium or low benefits, and is listed as medium or low implementation priority; local funding options are unavailable.  Low Priority—An action that has not been identified as meeting any grant eligibility requirements. This prioritization is a simple way to determine that your identified actions meet one of the primary objectives of the Disaster Mitigation Act. It is not the detailed benefit/cost analysis required for HMGP/PDM /FMA action grants. The prioritization will identify any actions whose probable benefits will not exceed the probable costs. Those actions identified as high-priority grant funding actions should be closely reviewed for consideration when grant funding opportunities arise. Note: If a jurisdiction wishes to identify an action as high priority that is outside of the prioritization scheme for high priorities, a note indicating so should be inserted and a rationale should be provided. An example completed table is provided below. Table 1-9. Mitigation Strategy Priority Schedule Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Action Grant- Eligible? Can Action Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya EX-1 3 High High Yes Yes No Medium High EX-2 7 Medium Low Yes No Yes High Low EX-3 2 Low Medium No No Maybe Low Low EX-4 10 Low Low Yes No Yes High Low EX-5 3 Low Low Yes No Yes High Low EX-6 6 Medium Low Yes No Yes High Low EX-7 3 Medium Low Yes No Yes High Low EX-8 1 Medium Medium Yes Yes No Medium High EX-9 2 Medium Low Yes No Yes High Low EX-10 7 Medium Low Yes No Yes High Medium EX-11 3 High Medium Yes Yes No Medium High Analysis of Mitigation Actions Complete the table titled “Analysis of Mitigation Actions” summarizing the mitigation actions by hazard of concern and the following eight mitigation types. Please note that an action can be more than one mitigation type: • Prevention—Government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. • Property Protection—Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter-resistant glass. Harris County HMP Instructions for Completing City/County Annex Template 20 • Public Education and Awareness—Actions to inform residents and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school-age and adult education. • Natural Resource Protection—Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, wetland restoration and preservation, and green infrastructure. • Emergency Services—Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. • Structural Projects—Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms. • Climate Resilient—Actions that incorporate methods to mitigate and/or adapt to the impacts of climate change. Includes aquifer storage and recovery activities, incorporating future conditions projections in project design or planning, or actions that specifically address jurisdiction-specific climate change risks, such as sea level rise or urban heat island effect. • Community Capacity Building—Actions that increase or enhance local capabilities to adjust to potential damage, to take advantage of opportunities, or to respond to consequences. Includes staff training, memorandums of understanding, development of plans and studies, and monitoring programs. This exercise demonstrates that the jurisdiction has selected a comprehensive range of actions. Planning partners should aim to identify at least one action in each category (although this is not required) and should make sure there is at least one action to address “high” and “medium” ranked hazards: An example completed table is provided below. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Type Hazard Type Prevention Property Protection Public Education and Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building Dam Failure EX-2, 3, 4, 5 EX-1, 6 EX-4, 6 EX-8, 11 EX-3, 9, 10 Drought EX-2 EX-1 EX-4 EX-8, 9, 10 Earthquake EX-2, 3, 4, 5 EX-1, 7 EX-4 EX-8, 11 EX-3, 4, 8, 9 Flooding EX-2, 3, 4, 5 EX-1, 6, 7 EX-4, 6 EX-9 EX-8, 11 EX-4 EX-1, 7 EX-3, 4, 8, 9 Landslide EX-2, 3, 4, 5 EX-1, 7 EX-4 EX-8, 11 EX-4 EX-3, 4, 10 Severe Weather EX-2, 3, 4, 5 EX-1, 7, 9 EX-4 EX-8, 9, 11 EX-8, 9, 10 Wildland fire EX-2, 3, 4, 5 EX-1, 7, 9 EX-4, 9 EX-9 EX-8, 11 EX-1, 7, 9 EX-3, 9, 10 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX Please note that this section will ultimately describe all information sources used to develop this annex. You should have previously listed the sources used for Phases 1 and 2. You should now add any further sources used for the preparation of Phase 3. This section should describe what resources you used to complete the annex and how you used them. Several items are started for you, but please be sure to update and enhance any descriptions. This may seem trivial or unimportant, but it is a requirement to pass the state and FEMA review process. Harris County HMP Instructions for Completing City/County Annex Template 21 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY In this section, identify any future studies, analyses, reports, or surveys your jurisdiction needs to better understand its vulnerability to identified or currently unidentified risks. These could be needs based on federal or state agency mandates. Please note that this section is optional. ADDITIONAL COMMENTS Use this section to add any additional information pertinent to hazard mitigation and your jurisdiction not covered in this template. Please note that this section is optional. Harris County HMP Instructions for Completing City/County Annex Template 22 NEXT STEPS After all jurisdictions have submitted their annexes, the draft plan will be submitted for public comment. Following the public comment period and any revisions responsive to public comment, the plan will be submitted to state and federal review agencies. At that point planning partners will be asked to begin making preparations to formally adopt the plan. Once FEMA has reviewed the plan and issued an approved-pending-adoption (APA) notice, planning partners will be asked to adopt the plan. Each planning partner must have its governing board adopt this plan via resolution or ordinance. Once adopted, planning partners will submit adoption information to Tetra Tech, who will submit the proof of adoption to FEMA. Once such adoption has been received, FEMA will issue final approval via a letter for those planning partners who have adopted the plan. It is important to understand that approval is not final until proof of adoption has been received by FEMA and they have issued a letter specifically naming your jurisdiction. More information on the review and approval process, along with adoption support materials, will be provided at a later date. 1-1 1. JURISDICTION NAME 1.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Name, Title Street Address City, State ZIP Telephone: xxx-xxx-xxxx e-mail Address: xxx@xxx.xxx Name, Title Street Address City, State ZIP Telephone: xxx-xxx-xxxx e-mail Address: xxx@xxx.xxx 1.2 JURISDICTION PROFILE 1.2.1 Location ___[jurisdiction name]___ is in ___[general location description]___ The current boundaries generally extend from ___[describe]___, encompassing an area of ___[area in square miles]___. 1.2.2 History ___[jurisdiction name]___ was incorporated in ___[date]___. ___[brief historical summary]___ 1.2.3 Climate The climate of ___[jurisdiction name]___ is ___[general description]___. 1.2.4 Governing Body Format ___[general description]___. The __[name of adopting body]___ assumes responsibility for the adoption of this plan; __[name of oversight agency]__ will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 1-1. Table 1-1. Local Mitigation Planning Team Members Name Title Report Title Jurisdiction Name 1-2 1.3 CURRENT TRENDS 1.3.1 Population According to ___[identify data source]___, the population of ___[jurisdiction name]___ as of ___[month year]___ was ___[population]___ Since ___[year]___, the population has grown at an average annual rate of ___[number]___ percent. 1.3.2 Development _DESCRIBE TRENDS IN GENERAL__. Table 1-2 summarizes development trends in the performance period since the preparation of the previous hazard mitigation plan, as well as expected future development trends. Table 1-2. Recent and Expected Future Development Trends Criterion Response Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? Yes/No • If yes, give the estimated area annexed and estimated number of parcels or structures. ____________ Is your jurisdiction expected to annex any areas during the performance period of this plan? Yes/No • If yes, describe land areas and dominant uses. ____________ • If yes, who currently has permitting authority over these areas? ____________ Are any areas targeted for development or major redevelopment in the next five years? Yes/No • If yes, briefly describe, including whether any of the areas are in known hazard risk areas ____________ How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan? 2014 2015 2016 2017 2018 Single Family __ __ __ __ __ Multi-Family __ __ __ __ __ Other (commercial, mixed use, etc.) __ __ __ __ __ Total __ __ __ __ __ Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred. • Special Flood Hazard Areas: # • Landslide: # • High Liquefaction Areas: # • Tsunami Inundation Area: # • Wildfire Risk Areas: # Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description. ____________ Report Title Jurisdiction Name 1-3 1.4 CAPABILITY ASSESSMENT __[jurisdiction name]__ performed an assessment of its existing capabilities for implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components included in the capability assessment and their significance for hazard mitigation planning. This section summarizes the following findings of the assessment: • An assessment of legal and regulatory capabilities is presented in Table 1-3. • Development and permitting capabilities are presented in Table 1-4. • An assessment of fiscal capabilities is presented in Table 1-5. • An assessment of administrative and technical capabilities is presented in Table 1-6. • An assessment of education and outreach capabilities is presented in Table 1-7. • Information on National Flood Insurance Program (NFIP) compliance is presented in Table 1-8. • Classifications under various community mitigation programs are presented in Table 1-9. • The community’s adaptive capacity for the impacts of climate change is presented in Table 1-10. Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 1.10 identifies these as community capacity building mitigation actions. Report Title Jurisdiction Name 1-4 Table 1-3. Legal and Regulatory Capability Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Codes, Ordinances, & Requirements Building Code Yes/No Yes/No Yes/No Yes/No Comment: Zoning Code Yes/No Yes/No Yes/No Yes/No Comment: Subdivisions Yes/No Yes/No Yes/No Yes/No Comment: Stormwater Management Yes/No Yes/No Yes/No Yes/No Comment: Post-Disaster Recovery Yes/No Yes/No Yes/No Yes/No Comment: Real Estate Disclosure Yes/No Yes/No Yes/No Yes/No Comment: Growth Management Yes/No Yes/No Yes/No Yes/No Comment: Site Plan Review Yes/No Yes/No Yes/No Yes/No Comment: Environmental Protection Yes/No Yes/No Yes/No Yes/No Comment: Flood Damage Prevention Yes/No Yes/No Yes/No Yes/No Comment: Emergency Management Yes/No Yes/No Yes/No Yes/No Comment: Climate Change Yes/No Yes/No Yes/No Yes/No Comment: Other Yes/No Yes/No Yes/No Yes/No Comment: Planning Documents General Plan Yes/No Yes/No Yes/No Yes/No Is the plan compliant with Assembly Bill 2140? Yes/No Comment: Capital Improvement Plan Yes/No Yes/No Yes/No Yes/No How often is the plan updated? ____________ Comment: Disaster Debris Management Plan Yes/No Yes/No Yes/No Yes/No Comment: Floodplain or Watershed Plan Yes/No Yes/No Yes/No Yes/No Comment: Stormwater Plan Yes/No Yes/No Yes/No Yes/No Comment: Urban Water Management Plan Yes/No Yes/No Yes/No Yes/No Comment: Habitat Conservation Plan Yes/No Yes/No Yes/No Yes/No Comment: Economic Development Plan Yes/No Yes/No Yes/No Yes/No Comment: Report Title Jurisdiction Name 1-5 Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity? Shoreline Management Plan Yes/No Yes/No Yes/No Yes/No Comment: Community Wildfire Protection Plan Yes/No Yes/No Yes/No Yes/No Comment: Forest Management Plan Yes/No Yes/No Yes/No Yes/No Comment: Climate Action Plan Yes/No Yes/No Yes/No Yes/No Comment: Comprehensive Emergency Management Plan Yes/No Yes/No Yes/No Yes/No Comment: Threat & Hazard Identification & Risk Assessment (THIRA) Yes/No Yes/No Yes/No Yes/No Comment: Post-Disaster Recovery Plan Yes/No Yes/No Yes/No Yes/No Comment: Continuity of Operations Plan Yes/No Yes/No Yes/No Yes/No Comment: Public Health Plan Yes/No Yes/No Yes/No Yes/No Comment: Other Yes/No Yes/No Yes/No Yes/No Comment: Table 1-4. Development and Permitting Capability Criterion Response Does your jurisdiction issue development permits? Yes/No • If no, who does? If yes, which department? ____________ Does your jurisdiction have the ability to track permits by hazard area? Yes/No Does your jurisdiction have a buildable lands inventory? Yes/No Table 1-5. Fiscal Capability Financial Resource Accessible or Eligible to Use? Community Development Block Grants Yes/No Capital Improvements Project Funding Yes/No Authority to Levy Taxes for Specific Purposes Yes/No User Fees for Water, Sewer, Gas or Electric Service Yes/No (If yes, specify) Incur Debt through General Obligation Bonds Yes/No Incur Debt through Special Tax Bonds Yes/No Incur Debt through Private Activity Bonds Yes/No Withhold Public Expenditures in Hazard-Prone Areas Yes/No State-Sponsored Grant Programs Yes/No Development Impact Fees for Homebuyers or Developers Yes/No Other Yes/No (if yes, specify) Report Title Jurisdiction Name 1-6 Table 1-6. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes/No Insert appropriate information Engineers or professionals trained in building or infrastructure construction practices Yes/No Insert appropriate information Planners or engineers with an understanding of natural hazards Yes/No Insert appropriate information Staff with training in benefit/cost analysis Yes/No Insert appropriate information Surveyors Yes/No Insert appropriate information Personnel skilled or trained in GIS applications Yes/No Insert appropriate information Scientist familiar with natural hazards in local area Yes/No Insert appropriate information Emergency manager Yes/No Insert appropriate information Grant writers Yes/No Insert appropriate information Other Yes/No Insert appropriate information Table 1-7. Education and Outreach Capability Criterion Response Do you have a public information officer or communications office? Yes/No Do you have personnel skilled or trained in website development? Yes/No Do you have hazard mitigation information available on your website? Yes/No • If yes, briefly describe. Insert appropriate information Do you use social media for hazard mitigation education and outreach? Yes/No • If yes, briefly describe. Insert appropriate information Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes/No • If yes, briefly describe. Insert appropriate information Do you have any other programs already in place that could be used to communicate hazard-related information? Yes/No • If yes, briefly describe. Insert appropriate information Do you have any established warning systems for hazard events? Yes/No • If yes, briefly describe. Insert appropriate information Table 1-8. National Flood Insurance Program Compliance Criterion Response What local department is responsible for floodplain management? Insert appropriate information Who is your floodplain administrator? (department/position) Insert appropriate information Are any certified floodplain managers on staff in your jurisdiction? Yes/No What is the date that your flood damage prevention ordinance was last amended? Insert appropriate information Does your floodplain management program meet or exceed minimum requirements? Meets/Exceeds • If exceeds, in what ways? Insert appropriate information When was the most recent Community Assistance Visit or Community Assistance Contact? Insert appropriate information Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? Yes/No • If so, state what they are. Insert appropriate information Are any RiskMAP projects currently underway in your jurisdiction? Yes/No • If so, state what they are. Insert appropriate information Report Title Jurisdiction Name 1-7 Criterion Response Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes/No • If no, state why. Insert appropriate information Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes/No • If so, what type of assistance/training is needed? Insert appropriate information Does your jurisdiction participate in the Community Rating System (CRS)? Yes/No • If yes, is your jurisdiction interested in improving its CRS Classification? Yes/No • If no, is your jurisdiction interested in joining the CRS program? Yes/No How many flood insurance policies are in force in your jurisdiction?a Insert appropriate information • What is the insurance in force? $_______ • What is the premium in force? $_______ How many total loss claims have been filed in your jurisdiction?a Insert appropriate information • How many claims are still open or were closed without payment? Insert appropriate information • What were the total payments for losses? $_______ a. According to FEMA statistics as of MONTH XX, 201X Table 1-9. Community Classifications Participating? Classification Date Classified Community Rating System Yes/No _______ Date Building Code Effectiveness Grading Schedule Yes/No _______ Date Public Protection Yes/No _______ Date Storm Ready Yes/No _______ Date Firewise Yes/No _______ Date Table 1-10. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts High/Medium/Low Comment: Jurisdiction-level monitoring of climate change impacts High/Medium/Low Comment: Technical resources to assess proposed strategies for feasibility and externalities High/Medium/Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory High/Medium/Low Comment: Capital planning and land use decisions informed by potential climate impacts High/Medium/Low Comment: Participation in regional groups addressing climate risks High/Medium/Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes High/Medium/Low Comment: Identified strategies for greenhouse gas mitigation efforts High/Medium/Low Comment: Report Title Jurisdiction Name 1-8 Criterion Jurisdiction Ratinga Identified strategies for adaptation to impacts High/Medium/Low Comment: Champions for climate action in local government departments High/Medium/Low Comment: Political support for implementing climate change adaptation strategies High/Medium/Low Comment: Financial resources devoted to climate change adaptation High/Medium/Low Comment: Local authority over sectors likely to be negative impacted High/Medium/Low Comment: Public Capacity Local residents knowledge of and understanding of climate risk High/Medium/Low Comment: Local residents support of adaptation efforts High/Medium/Low Comment: Local residents’ capacity to adapt to climate impacts High/Medium/Low Comment: Local economy current capacity to adapt to climate impacts High/Medium/Low Comment: Local ecosystems capacity to adapt to climate impacts High/Medium/Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. 1.5 INTEGRATION WITH OTHER PLANNING INITIATIVES The information on hazards, risk, vulnerability and mitigation contained in this hazard mitigation plan is based on the best available data. Plan integration is the incorporation of this information into other relevant planning mechanisms, such as general planning and capital facilities planning. It includes the integration of natural hazard information and mitigation policies, principles and actions into local planning mechanisms and vice versa. Additionally, plan integration is achieved though the involvement of key staff and community officials in collaboratively planning for hazard mitigation. 1.5.1 Existing Integration In the performance period since adoption of the previous hazard mitigation plan, ___[jurisdiction name]___ made progress on integrating hazard mitigation goals, objectives and actions into other planning initiatives. The following plans and programs currently integrate components of the hazard mitigation strategy: • Plan or Program Name—Description • Plan or Program Name—Description • Plan or Program Name—Description • Plan or Program Name—Description • Plan or Program Name—Description Resources listed in Section 1.11 were used to provide information for this annex on integration of hazard mitigation information into other jurisdiction plans or programs. Report Title Jurisdiction Name 1-9 1.5.2 Opportunities for Future Integration As this hazard mitigation plan is implemented, ___[jurisdiction name]___ will use information from the plan as the best available science and data on natural hazards. The capability assessment presented in this annex identifies codes, plans and programs that provide opportunities for integration. The progress reporting process described in Volume 1 will outline the progress of area-wide and local hazard mitigation actions related to plan integration. The annual progress report also will identify new opportunities for integration. The capability assessment identified the following plans and programs that do not currently integrate goals or recommendations of the hazard mitigation plan but provide opportunities to do so in the future: • Plan or Program Name—Description • Plan or Program Name—Description • Plan or Program Name—Description • Plan or Program Name—Description • Plan or Program Name—Description 1.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 1-11 lists past occurrences of natural hazards for which specific damage was recorded in ___[jurisdiction name]___. Other hazard events that broadly affected the entire planning area, including ___[jurisdiction name]___, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 1-11. Past Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ 1.7 HAZARD RISK RANKING Table 1-12 presents a local ranking for ___[jurisdiction name]___ of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Report Title Jurisdiction Name 1-10 Table 1-12. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 _______ _______ High/Medium/Low 2 _______ _______ High/Medium/Low 3 _______ _______ High/Medium/Low 4 _______ _______ High/Medium/Low 5 _______ _______ High/Medium/Low 6 _______ _______ High/Medium/Low 7 _______ _______ High/Medium/Low 8 _______ _______ High/Medium/Low 9 _______ _______ High/Medium/Low NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 1.8 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific risk maps of the hazards are provided at the end of this annex. 1.8.1 Repetitive Loss Properties Repetitive loss records are as follows: • Number of FEMA-identified Repetitive-Loss Properties: XX • Number of FEMA-identified Severe-Repetitive-Loss Properties: XX • Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: XX 1.8.2 Other Noted Vulnerabilities The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Insert as appropriate. • Insert as appropriate. • Insert as appropriate. Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in Section 1.10. 1.9 STATUS OF PREVIOUS PLAN ACTIONS Table 1-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Report Title Jurisdiction Name 1-11 Table 1-13. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: 1.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 1-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 1-15 identifies the priority for each action. Table 1-16 summarizes the mitigation actions by hazard of concern and mitigation type. Report Title Jurisdiction Name 1-12 Table 1-14. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action xxx1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire Existing 3, 4, 10 TBD TBD High HMGP, PDM, FMA Short-term Action xxx2— Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the community, including ______________ Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire New and Existing 1, 3, 4, 5, 7, 8, 10 TBD TBD Low Staff Time, General Funds Ongoing Action xxx3—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: All hazards New and Existing 1, 5, 8 TBD TBD Low Staff Time, General Funds Short-term Action xxx4—Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements: • Enforce the flood damage prevention ordinance. • Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts. Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise New and Existing 1, 3, 5, 7, 8, 10 TBD TBD Low Staff Time, General Funds Ongoing Action xxx5—Description Hazards Mitigated: TBD Action xxx6—Description Hazards Mitigated: Action xxx7—Description Hazards Mitigated: TBD Action xxx8—Description Hazards Mitigated: TBD Action xxx9—Description Hazards Mitigated: TBD a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Report Title Jurisdiction Name 1-13 Table 1-15. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya xxx1 3 High High Yes Yes No Medium High xxx2 7 Medium Low Yes No Yes High Low xxx3 3 Low Low Yes No Yes High Low xxx4 6 Medium Low Yes No Yes High Low xxx5 xxx6 a. See the introduction to this volume for explanation of priorities. Table 1-16. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education and Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards ____________ ____________ ____________ Medium-Risk Hazards ____________ ____________ ____________ Low-Risk Hazards ____________ ____________ ____________ a. See the introduction to this volume for explanation of mitigation types. Report Title Jurisdiction Name 1-14 1.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • ___[jurisdiction name]___ Municipal Code—The municipal code was reviewed for the full capability assessment and for identifying opportunities for action plan integration. • ___[jurisdiction name]___ Flood Damage Prevention Ordinance—The flood damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program. • <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED> • <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED> • <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED> • <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED> The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • <INSERT DOCUMENT AND DESCRIPTION OF HOW IT WAS USED> 1.12 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY Insert text, if any; otherwise, delete section 1.13 ADDITIONAL COMMENTS Insert text, if any; otherwise, delete section 1 INSTRUCTIONS FOR COMPLETING SPECIAL PURPOSE DISTRICT ANNEX TEMPLATE The jurisdictional annex templates for the 2018 Harris County Hazard Mitigation Plan update will be completed in three phases. This document provides instructions for completing each phase of the template for special purpose districts. The target timeline for phase completion is as follows: • Phase 1—Profile, Trends and Previous Plan Status  Deployed: November 26, 2018  Due: December 31, 2018 • Phase 2—Capability Assessment and Information Sources  Deployed: February 19, 2019  Due: March 29, 2019 • Phase 3—Risk Ranking, Action Plan, and Information Sources  Deployed: Mandatory Phase 3 Workshops in mid-July 2019  Due: August 2019 Please direct any questions and return your completed Phase 3 template by August 9, 2019 to: Brian Rutherford Tetra Tech Phone: (281) 414-6741 E-mail: Brian.Rutherford@tetratech.com A Note About Formatting: The template for the annex is a Microsoft Word document in a format that will be used in the final plan. Partners are asked to use this template so that a uniform product will be completed for each partner. Content should be entered within the yellow, highlighted text that is currently in the template, rather than creating text in another document and pasting it into the template. Text from another source will alter the style and formatting of the document. The numbering in the document will be updated when completed annexes are combined into the final document. Please do not adjust any of this numbering. Harris County HMP Instructions for Completing Special Purpose District Annex Template 2 IMPORTANT! READ THIS Phase 1 and Phase 2 templates were previously provided to your jurisdiction for completion. If your jurisdiction returned completed Phase 1 and Phase 2 templates: • The Phase 1 and Phase 2 content you provided is already incorporated into your Phase 3 template. • Please review the template to see if we have inserted any comments requesting further work to be done on Phase 1 and Phase 2 o If any comments are included, please address them. Then, begin your work on Phase 3 following the Phase 3 instructions beginning on page 10. o If no comments are included, then you DO NOT need to do any further work on the Phase 1 and Phase 2 content. Go directly to the instructions for Phase 3, beginning on page 10. If your jurisdiction has NOT yet done any work on the Phase 1 and Phase 2 templates, then follow the instructions below for providing the Phase 1 and Phase 2 information. If your jurisdiction started work on the Phase 1 or Phase 2 template but never completed and submitted it, please copy the work you had completed so far into the new template you received for Phase 3. Then complete Phases 1 and 2 following the instructions provided here. PHASE 1 AND PHASE 2 INSTRUCTIONS CHAPTER TITLE You jurisdiction’s name has already been entered as the title of the chapter. Please review and correct if needed. HAZARD MITIGATION PLAN POINT OF CONTACT Please provide the name, title, mailing address, telephone number, and e-mail address for the primary point of contact for your jurisdiction. This should be the person responsible for monitoring, evaluating and updating the annex for your jurisdiction. This person should also be the principle liaison between your jurisdiction and the Steering Committee overseeing development of this plan. In addition, designate an alternate point of contact. This would be a person to contact should the primary point of contact be unavailable or no longer employed by the jurisdiction. Note: Both of these contacts should match the contacts that were designated in your jurisdiction’s letter of intent to participate in this planning process. If you have changed the primary or secondary contact, please let the planning team know by inserting a comment into the document. JURISDICTION PROFILE Overview Please provide a brief summary description of the following: • The purpose of the jurisdiction Harris County HMP Instructions for Completing Special Purpose District Annex Template 3 • The date of inception • The type of organization • The number of employees • The mode of operation (i.e., how operations are funded) • The type of governing body, and who has adoptive authority. This should be information that is specific to your jurisdiction and will not be provided in the overall, planning area-wide mitigation plan document. Provide information similar to the following example: The Johnsonville Community Services District is a special district created in 1952 to provide water and sewer service. A five-member elected Board of Directors governs the District. The Board assumes responsibility for the adoption of this plan; the General Manager will oversee its implementation. The District currently employs a staff of 21. Funding comes primarily through rates and revenue bonds. Complete the table providing the names and titles of members of the local mitigation planning team responsible for completion of this annex. Team membership should consist of agencies with authority to regulate development and enforce local ordinances or regulatory standards, such as building/fire code enforcement, emergency management, emergency services, floodplain management, parks and recreation, planning/community development, public information, public works/engineering, stormwater management, transportation, or infrastructure. Service Area and Trends Please provide a brief summary description of the following: • A description of who the district’s customers are • An approximation of area served in square miles • A geographical decription of the service area • An overview of current service area trends, including an approximation of current users/subscribers, • A summary description of previous growth trends in the service area and anticipated future increase/decrease in services (if applicable) This should be information that is specific to your jurisdiction and will not be provided in the overall, planning area-wide mitigation plan document. Provide information similar to the following example: The Johnsonville Community Services District originally was formed to serve the unincorporated area east of the City of Smithburg known as Johnsonville. The District’s designated service area expanded throughout the years to include other unincorporated areas of Jones County: Creeks Corner, Jones Hill, Fields Landing, King Salmon, and Freshwater. As of April 30, 2016, the District serves 7,305 water connections and 6,108 sewer connections, with a total service area of 3.3 square miles. Assets Please provide an approximate value for the noted areas within the table. Include the sum total value for identified assets for each section in the “Total” line for the section. Property Provide an approximate value for the land owned by the District. Harris County HMP Instructions for Completing Special Purpose District Annex Template 4 Equipment List categories of equipment owned by the District that are used in times of emergency or that, if incapacitated, have the potential to severely impact the service area. Provide an approximate aggregate replacement value for each. For water and sewer, include mileage of pipeline under this category. Critical Facilities and Infrastructure List District facilities and infrastructgure vital to maintain services to the designated service area. Include the address of each facility. Provide an approximate aggregate replacement value for each line. The Steering Committee has decided upon the following definition of critical facilities for this planning process: • A local (not state or federal) facility in either the public or private sector that is critical to the health and welfare of the population and that is especially important following hazard events, including but not limited to the following:  Structures or facilities that produce, use, or store highly volatile, flammable, explosive, toxic and/or water-reactive materials  Hospitals, nursing homes, and housing facilities likely to contain occupants who may not be sufficiently mobile to avoid death or injury during a natural hazard event  Mass gathering facilities that may be utilized as evacuation shelters  Infrastructure such as roads, bridges and airports that provide sources for evacuation before, during and after natural hazard events  Police stations, fire stations, government facilities, vehicle equipment and storage facilities, hardware stores and emergency operation centers that are needed for response activities before, during and after a natural hazard event  Public and private utility facilities that are vital to maintaining and restoring normal services to damaged areas before, during and after natural hazard events. Please use this definition as a guideline when selecting critical facilities the District owns. NOTE: Placeholders in the table of assets request ADDRESSES for critical facilities. These addresses will not be included in the final published annex, but are needed in order to perform risk mapping and risk analysis for the hazard mitigation plan. Include the addresses in the table if convenient. If not, then provide a separate document listing all critical facilities and addresses for use in development of the hazard mitigation plan. Sample Completed Table – Special District Assets Asset Value Property 11.5 Acres $5,750,000 Equipment Total length of pipe 40 miles ( $1.32 million per mile X 40 miles) $52,800,000 4 Emergency Generators $250,000 Total: $53,050,000 Critical Facilities and Infrastructure Administrative Buildings – 357 S. Jones Street $2,750,000 Philips Pump Station – 111 Fifth Avenue N. $377,000 Total: $3,127,000 Harris County HMP Instructions for Completing Special Purpose District Annex Template 5 CAPABILITY ASSESSMENT Planning and Regulatory Capability List any federal, state, local or district laws, ordinances, codes and policies that govern your jurisdiction that include elements related to hazard mitigation. List any other plans, studies or other documents that address hazard mitigation issues for your jurisdiction. Please provide the date of last update and any comments as appropriate. A few examples follow: Plan, Study or Program Date of Most Recent Update Comment District Design Standards 2010 Capital Improvement Program Updated and approved annually covers 5 year timeframe Emergency Operations Plan 2000 Facility Maintenance Manual 1990 State Building Code 2016 Division of State Architects Review and approval of all building and site design features is required prior to construction Habitat Conservation Plan All development impacting critical habitat must meet federal and state requirements pertaining to the protection of endangered species Fiscal, Administrative and Technical Capabilities Fiscal Capability Complete the table titled “Fiscal Capability” by indicating whether each of the listed financial resources is accessible to your jurisdiction. Enter “Yes” if the resource is fully accessible to your jurisdiction. Enter “No” if there are limitations or prerequisites that may hinder your eligibility for this resource. Administrative and Technical Capability Complete the table titled “Administrative and Technical Capability” by indicating whether your jurisdiction has access to each of the listed personnel resources. Enter “Yes” or “No” in the column labeled “Available?”. If yes, then enter the department and position title in the right-hand column. If you have contract support staff with these capabilities, you can still answer “Yes.” Indicate in the department column that this resource is provided through contract support. Education and Outreach Capabilities Complete the table titled “Education and Outreach” to indicate your jurisdiction’s capabilities and existing efforts regarding natural hazard mitigation education and outreach. Adaptive Capacity for Climate Change Consider the climate change impact concerns identified for the planning area: • Reduced snowpack • Increased wildfires • Sea level rise and inland flooding • Threats to sensitive species (e.g. coho salmon) • Loss in agricultural productivity (e.g. forestry, wine grapes, nursery products, dairy) Harris County HMP Instructions for Completing Special Purpose District Annex Template 6 • Public health and safety. With those impacts in mind, complete the table titled “Adaptive Capacity for Climate Change” by indicating that your jurisdiction’s capacity for each listed criterion as follows: • High—The capacity exists and is in use. • Medium—The capacity may exist, but is not used or could use some improvement. • Low —The capacity does not exist or could use substantial improvement. • Unsure—Not enough information is known to assign a rating. This is a subjective assessment, but providing a few words of explanation is useful. It is highly recommended that you complete this table with an internal planning team and that you review the results of the other capability assessment tables before completing. INTEGRATION WITH OTHER PLANNING INITIATIVES The goal of plan integration is to ensure that the potential impact of hazards is considered in planning for future development. FEMA recommends integration as follows: • Integrate hazard mitigation plan goals with community objectives (e.g. incorporate the goals for risk reduction and safety into the policies of other plans). • Use the risk assessment to inform plans and policies (e.g. incorporate risk assessment findings into land use plans, site plan review, emergency operations plans). • Implement mitigation actions through existing mechanisms (e.g. include mitigation projects in the capital improvement plan). • Think about mitigation before and after a disaster (e.g. build recovery planning on existing mitigation plans and goals). After reviewing the plans, programs and ordinances identified in the capability assessment, identify all plans and programs that have already been integrated with the goals and recommendations of the hazard mitigation plan, and those that offer opportunities for future integration. Existing Integration Provide a brief description of integrated plans or ordinances and how each is integrated. Consider listing items marked as Completed in the “Status of Previous Plan Actions” table if they were indicated as being ongoing actions. Examples are as follows: • Capital Improvement Plan—The capital improvement plan includes projects can help mitigate potential hazards. The District will act to ensure consistency between the hazard mitigation plan and the current and future capital improvement plans. The hazard mitigation plan may identify new possible funding sources for capital improvement projects and may result in modifications to proposed projects based on results of the risk assessment. • Emergency Operations Plan—The results of the risk assessment were used in the development of the emergency operations plan. • Facilities Plan—The results of the risk assessment and mapped hazard areas are used in facility planning for the district. Potential sites are reviewed for hazard risks and appropriate mitigation measures are considered in building and site design. Harris County HMP Instructions for Completing Special Purpose District Annex Template 7 Opportunities for Future Integration List any plans or program that offer the potential for future integration and describe the process by which integration will occur. Examples follow: • Capital Improvement Projects—Capital improvement project proposals may take into consideration hazard mitigation potential as a means of evaluating project prioritization. • Post-Disaster Recovery Plan—The District does not have a recovery plan and intends to develop one as a mitigation planning action during the next five years. The plan will build on the mitigation goals and objectives identified in the mitigation plan. Consider other programs you may have in place in your jurisdiction that include routine consideration and management of hazard risk. Examples of such programs may include: tree pruning programs, right-of-way mowing programs, erosion control or stream maintenance programs, etc. Please add any such programs to the integration discussion and provide a brief description of how these program manage (or could be adapted to manage) risk from hazards. STATUS OF PREVIOUS PLAN ACTIONS Please note that this section only applies to jurisdictions that are conducting updates to previously approved hazard mitigation plans. If your jurisdiction has not previously participated in an approved plan, please enter a note stating this, and we will remove this section in your final annex. All action items identified in prior mitigation planning efforts must be reconciled in this plan update. Action items must all be marked as ONE of the following; check the appropriate box (place an X) and provide the following information: • Completed—If an action has been completed since the prior plan was prepared, please check the appropriate box and provide a date of completion in the comment section. If an action has been initiated and is an ongoing program (e.g. annual outreach event), you may mark it as completed and note that it is ongoing in the comments. If an action addresses an ongoing program you would like to continue to include in your action plan, please see the Carried Over to Plan Update bullet below. • Removed—If action items are to be removed because they are no longer feasible, a reason must be given. Lack of funding does not mean that it is no longer feasible, unless the sole source of funding for an action is no longer available. Place a comment in the comment section explaining why the action is no longer feasible or barriers that prevented the action from being implemented (e.g., “Action no longer considered feasible due to lack of political support.”). If the wording and/or intent of a previously identified action is unclear, this can be a reason for removal. A change in community priorities may also be a reason for removal and should be discussed in the comments. • Carried Over to Plan Update—If an action is in progress, is ongoing, or has not been initiated and you would like to carry it over to the plan update, please check the “Check if Yes” column under “Carried Over to Plan Update.” Selecting this option indicates that the action will be included in the mitigation action plan for this update. If you are carrying over an action to the update, please include a comment describing any action that has been taken or why the action was not taken (specifically, any barriers or obstacles that prevented the action from moving forward or slowed progress). Leave the last column, “Action # in Update,” blank at this point. This will be filled in after completing the updated action plan in Phase 3. Please ensure that you have provided a status and a comment for each action. Harris County HMP Instructions for Completing Special Purpose District Annex Template 8 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX Please note that this section will ultimately describe all information sources used to develop this annex, but that only the sources used for Phases 1 and 2 will be listed at this point. Additional sources will be added with the preparation of the Phase 3 annex template. This section should describe what resources you used to complete the annex and how you used them. Several items are started for you, but please be sure to update and enhance any descriptions. This may seem trivial or unimportant, but it is a requirement to pass the state and FEMA review process. Harris County HMP Instructions for Completing Special Purpose District Annex Template 9 PHASE 3 INSTRUCTIONS JURISDICTION-SPECIFIC NATURAL EVENT HISTORY In the table titled “Past Natural Hazard Events,” list in chronological order (most recent first) any natural hazard event that has caused damage to your jurisdiction. Include the date of the event and the estimated dollar amount of damage it caused. You are welcome to include any events, but special attention should be made to include major storms and federally declared disasters. Please refer to the table listing all Presidential Disaster Declarations for the County that is included in the toolkit you received at the workshop. We recommend including most large- scale disasters, unless you know that there were no impacts to your jurisdiction. Specifically, we recommend that you include these events if you have damage estimate information or can provide a brief description of impacts that occurred within your community. In addition to these events, please refer to the NOAA storm events database included in the tool kit. We recommend conducting a search for the name of your jurisdiction in order to identify events with known impacts. Other potential sources of damage information include: • Preliminary damage estimates your jurisdiction filed with the county or state • Insurance claims data • Newspaper archives • Other plans/documents that deal with emergency management (safety element of a comprehensive plan, emergency response plan, etc.) • Resident input. If you do not have estimates for dollars of damage caused, please list “Not Available” in the appropriate column or simply list a brief description of the damages (e.g. Power out to 35,000 customers for 24 hours). Please note that tracking such damages, is a valid and useful mitigation action if your jurisdiction does not currently track such information. HAZARD RISK RANKING The risk ranking performed for the overall planning area is presented in the risk assessment section of the overall hazard mitigation plan. However, each jurisdiction has differing degrees of risk exposure and vulnerability and, therefore, needs to rank risk for its own area, using the same methodology as used for the overall planning area. The risk-ranking exercise assesses two variables for each hazard: its probability of occurrence; and its potential impact on people, property and the economy. Enter Risk Rank Based on Loss Matrix Spreadsheet and Local Knowledge Tetra Tech has developed a draft risk ranking for your jurisdiction. It is included in the “Loss Matrix” spreadsheet provided in the toolkit distributed at the workshop. The hazard with the highest risk rating (probability x impact) was given a rank of 1; the hazard with the second highest rating is listed with a rank of 2; and so on. Two hazards with equal risk ratings were given the same rank. “High,” Medium,” and “Low” assignments were given for each hazard of concern based on a total score. To complete this section of the annex template, you need to review the risk ranking provided in the spreadsheet, and then do one of the following: • If you agree with the results, copy them from the spreadsheet into the risk ranking table in your annex. • If the results differ from what you know based on substantiated data and documentation, you may alter the ranking based on this knowledge, and enter the revised ranking into the risk ranking table in your annex. Harris County HMP Instructions for Completing Special Purpose District Annex Template 10 If you modify the spreadsheet-generated risk ranking based on local knowledge, please note this fact in your template and include what you believe the rank should be and why. For example, the spreadsheet may have assigned a low risk rank to drought, but you know that the local economy is heavily reliant on water-using industries, such as agriculture or manufacturing, so you believe it should be ranked as medium. Remember that this exercise is about categorizing hazards into broad levels of risk (high, medium, low), not precise calculations. In modifying any risk ratings, keep in mind that one of the purposes of this exercise is to support the selection and prioritization of actions in your plan. You will need to have at least one true mitigation action for each hazard rated as “high” or “medium.” This is discussed in more detail in the Hazard Mitigation Action Plan section of these instructions. Review Risk Ranking Process Used in the Loss Matrix The sections below describe the methodology that was used to derive the risk ranking. They are provided for your information in reviewing the risk ranking prepared for your jurisdiction. Probability of Occurrence for Each Hazard A probability factor is assigned based on how often a hazard is likely to occur. The probability of occurrence of a hazard event is generally based on past hazard events in an area, although weight can be given to expected future probability of occurrence based on established return intervals and changing climate conditions. For example, if your jurisdiction has experienced two damaging floods in the last 25 years, the probability of occurrence is high for flooding and scores a 3 under this category. If your jurisdiction has experienced no damage from landslides in the last 100 years, your probability of occurrence for landslide is low, and scores a 1 under this category. Each hazard was assigned a probability factor as follows: • High—Hazard event is likely to occur within 25 years (Probability Factor = 3) • Medium—Hazard event is likely to occur within 100 years (Probability Factor = 2) • Low—Hazard event is not likely to occur within 100 years (Probability Factor = 1) • None—If there is no exposure to a hazard, there is no probability of occurrence (Probability Factor = 0) Potential Impacts of Each Hazard The impact of each hazard is divided into three categories: impacts on people, impacts on property, and impacts on the economy. These categories are also assigned weighted values. Impact on people was assigned a weighting factor of 3, impact on property was assigned a weighting factor of 2 and impact on the economy was assigned a weighting factor of 1. Impact factors for each category (people, property, economy) are described below: • People—Values are assigned based on the percentage of the total population exposed in your service area to the hazard event. The degree of impact on individuals will vary and is not measurable, so the calculation assumes for simplicity and consistency that all people exposed to a hazard because they live in a hazard zone will be equally impacted when a hazard event occurs. Impact factors were assigned as follows:  High—25 percent or more of the population is exposed to a hazard (Impact Factor = 3)  Medium—10 percent to 24 percent of the population is exposed to a hazard (Impact Factor = 2)  Low—9 percent or less of the population is exposed to the hazard (Impact Factor = 1)  No impact—None of the population is exposed to a hazard (Impact Factor = 0) • Property—Values are assigned based on the percentage of the total district assets exposed to the hazard event: Harris County HMP Instructions for Completing Special Purpose District Annex Template 11  High—25 percent or more of the total replacement value of assets is exposed to a hazard (Impact Factor = 3)  Medium—10 percent to 24 percent of the total replacement value of assets is exposed to a hazard (Impact Factor = 2)  Low—9 percent or less of the total replacement value of assets is exposed to the hazard (Impact Factor = 1)  No impact—None of the total replacement value is exposed to a hazard (Impact Factor = 0) • Operations—Impact on operations is assessed based on estimates of how long it will take your jurisdiction to become 100-percent operable after a hazard event. The estimated functional downtime for critical facilities has been subjectively assigned an impact as follows:  High—Functional downtime of 365 days or more (Impact Factor = 3)  Medium—Functional downtime of 180 to 364 days (Impact Factor = 2)  Low—Functional downtime of 180 days or less (Impact Factor = 1)  No impact—No functional downtime is estimated from the hazard (Impact Factor = 0). Risk Rating for Each Hazard A risk rating for each hazard was determined by multiplying the assigned probability factor by the sum of the weighted impact factors for people, property and the economy: Risk Rating = Probability Factor x Weighted Impact Factor {people + property + operations} This is the number that is shown in the risk ranking table in your template. Generally, scores of 30 or greater are rated “high”, scores between 15 and 30 are rated “medium”, and scores of less than 15 are rated “low”. JURISDICTION-SPECIFIC VULNERABILITIES Review the results of the risk assessment included in the toolkit, your jurisdiction’s natural-events history, and any relevant public comments/input, and based on that review, develop a few sentences that discuss specific risks. You do not need to develop a sentence for every parameter, but review the results and identify a few issues you would like to highlight. For example: • One of the District’s wastewater treatment plants is located in an area likely to be permanently inundated by sea level rise by 2030. • Three of the District’s five fire stations are located in very high landslide risk areas. • The vast majority of the service area for the district is located on high liquefaction potential soils, which has the potential to severely disrupt service for an extended period following even a moderate earthquake event. • The District headquarters is more likely than not to be extensively damaged during a Smithburg fault M7.0 event. In addition, list any noted vulnerabilities in your jurisdiction related to hazard mitigation that may not be apparent from the risk assessment and other information provided. This may include things such as the following: • An area of the community that frequently loses power due to a lack of tree maintenance. • A critical facility, such as a police station, that is not equipped with a generator. • A neighborhood that has the potential to have ingress and egress cut off as the result of a hazard event, such as a flood or earthquake (e.g. bridge only access). Harris County HMP Instructions for Completing Special Purpose District Annex Template 12 Spending some time thinking about the results of the risk assessment and other noted vulnerabilities will be a big help in the development of your mitigation strategy. Tetra Tech has inserted a few items in this section to get you started. In addition, two examples are shown in the table below. Noted Vulnerability Example Mitigation Action One of the District’s wastewater treatment plants is located in an area likely to be permanently inundated by sea level rise by 2030. Conduct a detailed assessment of the wastewater treatment plant vulnerability to sea level rise. Determine adaptation actions that can be implemented in the near- and long-term. A critical facility, such as a police station, that is not equipped with a generator. Unsure all critical facilities within the District have backup power generation capabilities. Priority facilities include: • Main street pump station • Old Oak subdivision pump station. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS This section is the heart of your jurisdictional annex. This is where you will identify the actions your jurisdiction would like to pursue with this plan. All of the work that you have done thus far should provide you with a plethora of ideas for actions. With this in mind, we recommend that you review the following and develop a list of potential actions: • Capability Assessment Section of Annex—Review the Planning and Regulatory Capability table, the Fiscal Capability table, the Administrative and Technical Capability table, and the Education and Outreach table.  For any capability that you indicated that you did not have, ask yourself – should we have this capability? If yes, consider including an action to develop/acquire the capability.  Example: Ensure a staff person is trained in the use of FEMA’s benefit-cost analysis software.  Review the Legal and Regulatory capabilities. If you have not reviewed and updated a capability in more than 10 years, consider an action to review and update the capability and, as appropriate, incorporate hazard mitigation principles or information obtained in the risk assessment (Note: actions such as this should also be identified in the opportunities for future integration section). Also, consider including projects or actions that have been identified in other plans and programs such as Capital Improvement Plans, Strategic Plans, etc. as actions in this plan.  For any capability that you indicated you do have, consider how this capability can be leveraged to increase or improve hazard mitigation in the jurisdiction. • Adaptive Capacity for Climate Change Section of this Annex—Consider your responses to this section. For those criterion that you listed as medium or low, think of ways you could improve this rating (see adaptive capacity portion of the mitigation best practices catalog). For those criterion you listed as high, think about how you can leverage this capacity to improve or enhance mitigation or continue to improve this capacity. For those criterion that you were unable to provide responses for, consider ways you could improve your understanding of this capacity (see mitigation best practices). Wording Your Action Descriptions: Descriptions of your actions need not provide great detail. That will come when you apply for a project grant. Provide enough information to identify the action’s scope and impact. The following are typical descriptions for an action plan action: •Action 1—Address repetitive-loss issues. Through targeted mitigation, acquire, relocate or retrofit the nine pump stations that have been repetitively damaged. •Action 2—Perform a non-structural, seismic retrofit of the administrative building. •Action 3—Develop a schedule to underground overhead powerlines. Harris County HMP Instructions for Completing Special Purpose District Annex Template 13 • Opportunities for Future Integration Section in this Annex—Review the items you identified in this section. Consider an action that specifically says what the plan, code, ordinance etc. is and how it will be integrated. • Jurisdiction-Specific Vulnerabilities Section in this Annex—Review the items that you have identified in this section and consider actions that will help reduce these vulnerabilities (see mitigation best practices catalog). • Mitigation Best Practices Catalog—A catalog that includes FEMA and other agency identified best practices, steering committee and other stakeholder recommendations was developed as part of the plan development process and included in your tool kit. Review the catalog and identify those actions that your jurisdiction should consider including in its action plan. • Public Input—Review input received during the process, specifically the public survey results included in your toolkit. • Prior Mitigation Planning Efforts—If your jurisdiction participated in a previous hazard mitigation plan, please be sure to remember to include any actions that were identified as “carry over” actions. Once you have carried them over, return to the Status of Previous Actions table and record the new action number (see discussion below). Be sure to consider the following factors in your selection of actions: • Select actions that are consistent with the overall purpose, goals, and objectives of the hazard mitigation plan. • Identify actions where benefits exceed costs. • Include any action that your jurisdiction has committed to pursuing regardless of grant eligibility. • Know what is and is not grant-eligible under the Hazard Mitigation Grant Program (HMGP), Pre-Disaster Mitigation (PDM) and Flood Mitigation Assistance (FMA) grants (see fact sheet provided in toolkit). If you have actions that are not HMGP, PDM or FMA grant eligible, but do mitigate part or all of the hazard and may be eligible for other grant programs sponsored by other agencies, include them in this section. • You must identify at least one true mitigation action (i.e. not a preparedness or response action) that is clearly defined and actionable for hazards ranked as “high” or medium.” Review Actions Recommended for All Partners Three actions have been prepopulated in your annex template. These actions should be included in every annex and should not be removed, although the specifics should be adjusted as needed for the particulars of each community. • Where appropriate, support retro-fitting, purchase or relocation of structures located in high hazard areas, prioritizing those structures that have experienced repetitive losses and/or are located in high or medium ranked hazard areas. • Actively participate in the plan maintenance protocols outlined in Volume I of the hazard mitigation plan. • Integrate the hazard mitigation plan into other plans, ordinances and programs within the community. We also recommend that every planning partner strongly consider the following additional actions, adjusted as needed for the particulars of each community: • Develop and implement a program to capture perishable data after significant events (e.g. high water marks, preliminary damage estimates, damage photos) to support future mitigation efforts including the implementation and maintenance of the hazard mitigation plan. • Develop a post-disaster recovery plan and a debris management plan. • Develop and/or update plans that support or enhance continuity of operations following disasters. • Purchase generators for critical facilities and infrastructure that lack adequate back-up power. Harris County HMP Instructions for Completing Special Purpose District Annex Template 14 Complete the Table Complete the table titled “Hazard Mitigation Action Plan Matrix” for all the actions you have identified and would like to include in the plan: • Enter the action number and description. Replace the “xxx” included in the template with the letter code for your jurisdiction as follows:  Cypress Fairbanks Independent School District—CYF1, CYF2, CYF3…  Harris County Emergency Service District No. 12—ESD1, ESD2, ESD3…  Harris County Flood Control District—FCD1, FCD2, FCD2…  Harris Health System—HHS1, HHS2, HHS3…  Houston Community College—HCC1, HCC2, HCC3…  Houston Independent School District—HOU1, HOU2, HOU3…  Huffman Independent School District—HUF1, HUF2, HUF2…  Lone Star College—LSC1, LSC2, LSC3…  Pasadena Independent School District—PSD1, PSD2, PSD3…  Texas Medical Center—TMC1, TMC2, TMC3…  Texas Southern University—TSU1, TSU2, TSU3…  University of Houston—UOH1, UOH2, UOH3… • If the action is carried over from your previous hazard mitigation plan, return to the “Status of Previous Plan Actions” table you completed in Phase 1 and enter the new action number in the column labeled Action # in Update. • Indicate whether the action mitigates hazards for new and/or existing assets. • Identify the specific hazards the action will mitigate. • Identify by number the mitigation plan objectives that the action addresses (see toolkit). • Indicate who will be the lead in administering the action. This will most likely be a department within your jurisdiction (e.g. planning or public works). If you wish to indicate more than one department, please ensure that it is clear who the lead agency will be and list supporting agencies in the appropriate column. • Enter an estimated cost in dollars if known; otherwise, enter “High,” “Medium” or “Low” as determined for the prioritization process described in the following section. • Identify funding sources for the action. If it is a grant, include the funding sources for the cost share. Refer to your fiscal capability assessment to identify possible sources of funding and refer to the table below for project eligibility for FEMA’s hazard mitigation assistance grant program. • Indicate the time line as “short-term” (1 to 5 years) or “long-term” (5 years or greater) or ongoing (a continual program) Eligible Activities Hazard Mitigation Grant Program Pre-Disaster Mitigation Flood Mitigation Assistance Property Acquisition and Structure Demolition √ √ √ Property Acquisition and Structure Relocation √ √ √ Structure Elevation √ √ √ Mitigation Reconstruction √ √ √ Dry Floodproofing of Historic Residential Structures √ √ √ Dry Floodproofing of Non-residential Structures √ √ √ Generators √ √ Localized Flood Risk Reduction Projects √ √ √ Non-Localized Flood Risk Reduction Projects √ √ Structural Retrofitting of Existing Buildings √ √ √ Non-Structural Retrofitting of Existing Buildings and Facilities √ √ √ Safe Room Construction √ √ Wind Retrofit for One- and Two-Family Residences √ √ Infrastructure Retrofit √ √ √ Harris County HMP Instructions for Completing Special Purpose District Annex Template 15 Eligible Activities Hazard Mitigation Grant Program Pre-Disaster Mitigation Flood Mitigation Assistance Soil Stabilization √ √ √ Wildland fire Mitigation √ √ Post-Disaster Code Enforcement √ Advance Assistance √ 5 Percent Initiative Projects* √ Aquifer and Storage Recovery** √ √ √ Flood Diversion and Storage** √ √ √ Floodplain and Stream Restoration** √ √ √ Green Infrastructure** √ √ √ Miscellaneous/Other** √ √ √ Hazard Mitigation Planning √ √ √ Technical Assistance √ Management Costs √ √ √ * FEMA allows increasing the 5% Initiative amount up to 10% for a Presidential major disaster declaration under HMGP. The additional 5% can be used for activities that promote disaster-resistant codes for all hazards. As a condition of the award, a disaster-resistant building code must be adopted or an improved Building Code Effectiveness Grading Schedule is required. ** Proposed actions will be evaluated against program requirements. Eligible projects will be approved if funding is available. Prioritization of Mitigation Actions Complete the information in the table titled “Mitigation Strategy Priority Schedule” as follows: • Action #—Indicate the action number from the previous annex table (Hazard Mitigation Action Plan Matrix). • # of Objectives Met—Enter the number of objectives the action will meet. • Benefits—Enter “High,” “Medium” or “Low” as follows:  High: Action will have an immediate impact on the reduction of risk exposure to life and property.  Medium: Action will have a long-term impact on the reduction of risk exposure to life and property, or action will provide an immediate reduction in the risk exposure to property.  Low: Long-term benefits of the action are difficult to quantify in the short term. • Costs—Enter “High,” “Medium” or “Low” as follows:  High: Would require an increase in revenue via an alternative source (i.e., bonds, grants, fee increases) to implement. Existing funding levels are not adequate to cover the costs of the proposed action.  Medium: Could budget for under existing work-plan, but would require a reapportionment of the budget or a budget amendment, or the cost of the action would have to be spread over multiple years.  Low: Possible to fund under existing budget. Action is or can be part of an existing ongoing program. If you know the estimated cost of a action because it is part of an existing, ongoing program, indicate the amount. • Do Benefits Exceed the Cost?—Enter “Yes” or “No.” This is a qualitative assessment. Enter “Yes” if the benefit rating (high, medium or low) is the same as or higher than the cost rating (high benefit/high cost; high benefit/medium cost; medium benefit/low cost; etc.). Enter “No” if the benefit rating is lower than the cost rating (medium benefit/high cost, low benefit/medium cost; etc.) Harris County HMP Instructions for Completing Special Purpose District Annex Template 16 • Is the Action Grant-Eligible?—Enter “Yes” or “No.” Refer to the fact sheet on HMGP, PDM and FMA. • Can Action Be Funded Under Existing Program Budgets?—Enter “Yes” or “No.” In other words, is this action currently budgeted for, or would it require a new budget authorization or funding from another source such as grants? • Implementation Priority— Enter “High,” “Medium” or “Low” as follows:  High Priority—An action that meets multiple objectives, has benefits that exceed costs, and has a secured source of funding. Action can be completed in the short term (1 to 5 years).  Medium Priority—An action that meets multiple objectives, has benefits that exceed costs, and is eligible for funding though no funding has yet been secured for it. Action can be completed in the short term (1 to 5 years), once funding is secured. Medium-priority actions become high-priority actions once funding is secured.  Low Priority—An action that will mitigate the risk of a hazard, has benefits that do not exceed the costs or are difficult to quantify, has no secured source of funding, and is not eligible for any known grant funding. Action can be completed in the long term (1 to 10 years). Low-priority actions are generally “wish-list” actions. They may be eligible for grant funding from programs that have not yet been identified. • Grant Pursuit Priority— Enter “High,” “Medium” or “Low” as follows:  High Priority—An action that meets identified grant eligibility requirements, has high benefits, and is listed as high or medium implementation priority; local funding options are unavailable or available local funds could be used instead for actions that are not eligible for grant funding.  Medium Priority—An action that meets identified grant eligibility requirements, has medium or low benefits, and is listed as medium or low implementation priority; local funding options are unavailable.  Low Priority—An action that has not been identified as meeting any grant eligibility requirements. This prioritization is a simple way to determine that your identified actions meet one of the primary objectives of the Disaster Mitigation Act. It is not the detailed benefit/cost analysis required for HMGP/PDM /FMA action grants. The prioritization will identify any actions whose probable benefits will not exceed the probable costs. Those actions identified as high-priority grant funding actions should be closely reviewed for consideration when grant funding opportunities arise. Note: If a jurisdiction wishes to identify an action as high priority that is outside of the prioritization scheme for high priorities. A note indicting so should be inserted and a rationale should be provided. An example completed table is provided below. Table 1-9. Mitigation Strategy Priority Schedule Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Action Grant- Eligible? Can Action Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya EX-1 3 High High Yes Yes No Medium High EX-2 7 Medium Low Yes No Yes High Low EX-3 2 Low Medium No No Maybe Low Low EX-4 10 Low Low Yes No Yes High Low EX-5 6 Medium Low Yes No Yes High Low Harris County HMP Instructions for Completing Special Purpose District Annex Template 17 Analysis of Mitigation Actions Complete the table titled “Analysis of Mitigation Actions” summarizing the mitigation actions by hazard of concern and the following eight mitigation types. Please note that an action can be more than one mitigation type: • Prevention—Government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. • Property Protection—Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter-resistant glass. • Public Education and Awareness—Actions to inform residents and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school-age and adult education. • Natural Resource Protection—Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, wetland restoration and preservation, and green infrastructure. • Emergency Services—Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. • Structural Projects—Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms. • Climate Resilient—Actions that incorporate methods to mitigate and/or adapt to the impacts of climate change. Includes aquifer storage and recovery activities, incorporating future conditions projections in project design or planning, or actions that specifically address jurisdiction-specific climate change risks, such as sea level rise or urban heat island effect. • Community Capacity Building—Actions that increase or enhance local capabilities to adjust to potential damage, to take advantage of opportunities, or to respond to consequences. Includes staff training, memorandums of understanding, development of plans and studies, and monitoring programs. This exercise demonstrates that the jurisdiction has selected a comprehensive range of actions. Planning partners should aim to identify at least one action in each category (although this is not required) and should make sure there is at least one action to address “high” and “medium” ranked hazards. Please see the example below based off the recommended actions, but please note that these recommendations are heavy on generalized actions on the prevention spectrum and light in other areas and specificity. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Type Hazard Type Prevention Property Protection Public Education and Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building Dam Failure EX-2, 3, 4, 5 EX-1, 6 EX-4, 6 EX-8, 11 EX-3, 9, 10 Drought EX-2 EX-1 EX-4 EX-8, 9, 10 Earthquake EX-2, 3, 4, 5 EX-1, 7 EX-4 EX-8, 11 EX-3, 4, 8, 9 Flooding EX-2, 3, 4, 5 EX-1, 6, 7 EX-4, 6 EX-9 EX-8, 11 EX-4 EX-1, 7 EX-3, 4, 8, 9 Landslide EX-2, 3, 4, 5 EX-1, 7 EX-4 EX-8, 11 EX-4 EX-3, 4, 10 Severe Weather EX-2, 3, 4, 5 EX-1, 7, 9 EX-4 EX-8, 9, 11 EX-8, 9, 10 Wildland fire EX-2, 3, 4, 5 EX-1, 7, 9 EX-4, 9 EX-9 EX-8, 11 EX-1, 7, 9 EX-3, 9, 10 Harris County HMP Instructions for Completing Special Purpose District Annex Template 18 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX Please note that this section will ultimately describe all information sources used to develop this annex. You should have previously listed the sources used for Phases 1 and 2. You should now add any further sources used for the preparation of Phase 3. This section should describe what resources you used to complete the annex and how you used them. Several items are started for you, but please be sure to update and enhance any descriptions. This may seem trivial or unimportant, but it is a requirement to pass the state and FEMA review process. FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY In this section, identify any future studies, analyses, reports, or surveys your jurisdiction needs to better understand its vulnerability to identified or currently unidentified risks. These could be needs based on federal or state agency mandates. Please note that this section is optional. ADDITIONAL COMMENTS Use this section to add any additional information pertinent to hazard mitigation and your jurisdiction not covered in this template. Please note that this section is optional. Harris County HMP Instructions for Completing Special Purpose District Annex Template 19 NEXT STEPS After all jurisdictions have submitted their annexes, the draft plan will be submitted for public comment. Following the public comment period and any revisions responsive to public comment, the plan will be submitted to the California Governor’s Office of Emergency Services (Cal OES) for review. After their review and approval, Cal OES will submit the plan to FEMA Region IX for plan review and approval. At that point planning partners will be asked to begin making preparations to formally adopt the plan. Each participating planning partner must have the governing board of their jurisdiction adopt via resolution or ordinance. Once FEMA has reviewed the plan and issued an approved pending adoption (APA) notice, planning partners will be asked to go forth and adopt the plan. Once adopted, planning partners will submit adoption information to Tetra Tech, who will submit the proof of adoption to FEMA. Once such adoption has been received, FEMA will issue final approval via a letter for those planning partners who have adopted the plan. It is very important to understand that approval is not final until proof of adoption has been received by FEMA and they have issued a letter specifically naming your jurisdiction. More information on the review and approval process, along with adoption support materials, will be provided at a later date. 1-1 1. DISTRICT NAME 1.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Name, Title Street Address City, State ZIP Telephone: xxx-xxx-xxxx e-mail Address: xxx@xxx.xxx Name, Title Street Address City, State ZIP Telephone: xxx-xxx-xxxx e-mail Address: xxx@xxx.xxx 1.2 JURISDICTION PROFILE 1.2.1 Overview Insert Narrative Profile Information, per Instructions. The __[name of adopting body]___ assumes responsibility for the adoption of this plan; __[name of oversight agency]__ will oversee its implementation. Development of this annex was carried out by the members of the local mitigation planning team, whose members are listed in Table 1-1. Table 1-1. Local Mitigation Planning Team Members Name Title All fire districts should include the following sentence (non-fire special purpose districts may delete the sentence): The District participates/does not participate in the Public Protection Class Rating System and currently has a rating of #. 1.2.2 Service Area and Trends The district service area covers ___[area in square miles]___, serving a population of _ population_. Insert summary description of service trends. 1.2.3 Assets Table 1-2 summarizes the critical assets of the district and their value. Report Title District Name 1-2 Table 1-2. Special Purpose District Assets Asset Value Property _number_ acres of land $_value_ Equipment _description_ $_value_ _description_ $_value_ _description_ $_value_ _description_ $_value_ _description_ $_value_ Total: $_value_ Critical Facilities and Infrastructure _description – Include Address_ $_value_ _description – Include Address_ $_value_ _description – Include Address_ $_value_ _description – Include Address_ $_value_ _description – Include Address_ $_value_ _description – Include Address_ $_value_ Total: $_value_ 1.3 CAPABILITY ASSESSMENT An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in Section 1.9 identifies these as community capacity building mitigation actions. 1.3.1 Planning and Regulatory Capabilities Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents. When effectively prepared and administered, these plans, programs and regulations can support the implementation of mitigation actions. Table 1-3 summarizes existing codes, ordinances, policies, programs or plans that are applicable to this hazard mitigation plan. Table 1-3. Planning and Regulatory Capability Date of Most Recent Update Comment Name of code, ordinance, policy, program or plan _____ _____ Name of code, ordinance, policy, program or plan _____ _____ Name of code, ordinance, policy, program or plan _____ _____ Name of code, ordinance, policy, program or plan _____ _____ Name of code, ordinance, policy, program or plan _____ _____ 1.3.2 Fiscal, Administrative and Technical Capabilities Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard mitigation projects. An assessment of fiscal capabilities is presented in Table 1-4. Administrative and technical Report Title District Name 1-3 capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of administrative and technical capabilities is presented in Table 1-5. Table 1-4. Fiscal Capability Financial Resource Accessible or Eligible to Use? Capital Improvements Project Funding Yes/No Authority to Levy Taxes for Specific Purposes Yes/No User Fees for Water, Sewer, Gas or Electric Service Yes/No Incur Debt through General Obligation Bonds Yes/No Incur Debt through Special Tax Bonds Yes/No Incur Debt through Private Activity Bonds Yes/No State-Sponsored Grant Programs Yes/No Development Impact Fees for Homebuyers or Developers Yes/No Federal Grant Programs Yes/No Other Yes/No (if yes, please specify) Table 1-5. Administrative and Technical Capability Staff/Personnel Resource Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes/No Insert appropriate information Engineers or professionals trained in building or infrastructure construction practices Yes/No Insert appropriate information Planners or engineers with an understanding of natural hazards Yes/No Insert appropriate information Staff with training in benefit/cost analysis Yes/No Insert appropriate information Surveyors Yes/No Insert appropriate information Personnel skilled or trained in GIS applications Yes/No Insert appropriate information Scientist familiar with natural hazards in local area Yes/No Insert appropriate information Emergency manager Yes/No Insert appropriate information Grant writers Yes/No Insert appropriate information Other Yes/No Insert appropriate information 1.3.3 Education and Outreach Capabilities Outreach and education capability identifies the connection between government and community members, which opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is presented in Table 1-6. Table 1-6. Education and Outreach Criterion Response Do you have a public information officer or communications office? Yes/No Do you have personnel skilled or trained in website development? Yes/No Do you have hazard mitigation information available on your website? Yes/No • If yes, please briefly describe Insert appropriate information Do you use social media for hazard mitigation education and outreach? Yes/No • If yes, please briefly describe Insert appropriate information Report Title District Name 1-4 Criterion Response Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes/No • If yes, please briefly specify Insert appropriate information Do you have any other programs already in place that could be used to communicate hazard-related information? Yes/No • If yes, please briefly describe Insert appropriate information Do you have any established warning systems for hazard events? Yes/No • If yes, please briefly describe Insert appropriate information 1.3.4 Adaptive Capacity for Climate Change Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 1-7 summarizes the jurisdiction’s adaptive capacity for climate change. Table 1-7. Adaptive Capacity for Climate Change Criterion Jurisdiction Ratinga Technical Capacity Jurisdiction-level understanding of potential climate change impacts High/Medium/Low Comment: Jurisdiction-level monitoring of climate change impacts High/Medium/Low Comment: Technical resources to assess proposed strategies for feasibility and externalities High/Medium/Low Comment: Jurisdiction-level capacity for development of greenhouse gas emissions inventory High/Medium/Low Comment: Capital planning and land use decisions informed by potential climate impacts High/Medium/Low Comment: Participation in regional groups addressing climate risks High/Medium/Low Comment: Implementation Capacity Clear authority/mandate to consider climate change impacts during public decision-making processes High/Medium/Low Comment: Identified strategies for greenhouse gas mitigation efforts High/Medium/Low Comment: Identified strategies for adaptation to impacts High/Medium/Low Comment: Champions for climate action in local government departments High/Medium/Low Comment: Political support for implementing climate change adaptation strategies High/Medium/Low Comment: Financial resources devoted to climate change adaptation High/Medium/Low Comment: Local authority over sectors likely to be negative impacted High/Medium/Low Comment: Report Title District Name 1-5 Criterion Jurisdiction Ratinga Public Capacity Local residents knowledge of and understanding of climate risk High/Medium/Low Comment: Local residents support of adaptation efforts High/Medium/Low Comment: Local residents’ capacity to adapt to climate impacts High/Medium/Low Comment: Local economy current capacity to adapt to climate impacts High/Medium/Low Comment: Local ecosystems capacity to adapt to climate impacts High/Medium/Low Comment: a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement; Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating. 1.4 INTEGRATION WITH OTHER PLANNING INITIATIVES The information on hazards, risk, vulnerability and mitigation contained in this hazard mitigation plan is based on the best available data. Plan integration is the incorporation of this information into other relevant planning mechanisms, such as general planning and capital facilities planning. It includes the integration of natural hazard information and mitigation policies, principles and actions into local planning mechanisms and vice versa. Additionally, plan integration is achieved though the involvement of key staff and community officials in collaboratively planning for hazard mitigation. 1.4.1 Existing Integration In the performance period since adoption of the previous hazard mitigation plan, ___[district name]___ made progress on integrating hazard mitigation goals, objectives and actions into other planning initiatives. The following plans and programs currently integrate components of the hazard mitigation strategy: • Plan or Program Name—Description • Plan or Program Name—Description • Plan or Program Name—Description • Plan or Program Name—Description • Plan or Program Name—Description Resources listed in Section 1.10 were used to provide information on integration of hazard mitigation information into other jurisdiction plans or programs. 1.4.2 Opportunities for Future Integration As this hazard mitigation plan is implemented, ___[district name]___ will use information from the plan as the best available science and data on natural hazards. The capability assessment presented in this annex identifies codes, plans and programs that provide opportunities for integration. The progress reporting process described in Volume 1 will outline the progress of area-wide and local hazard mitigation actions related to plan integration. The annual progress report also will identify new opportunities for integration. The capability assessment identified the following plans and programs that do not currently integrate goals or recommendations of the hazard mitigation plan but provide opportunities to do so in the future: Report Title District Name 1-6 • Plan or Program Name—Description • Plan or Program Name—Description • Plan or Program Name—Description • Plan or Program Name—Description • Plan or Program Name—Description 1.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 1-8 lists past occurrences of natural hazards for which specific damage was recorded in ___[district name]___. Other hazard events that broadly affected the entire planning area, including ___[district name]___, are listed in the risk assessments in Volume 1 of this hazard mitigation plan. Table 1-8. Natural Hazard Events Type of Event FEMA Disaster # Date Damage Assessment Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ Insert event type _______ Date $______ 1.6 HAZARD RISK RANKING Table 1-9 presents a local ranking for ___[district name]___ of all hazards of concern for which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high and medium rankings. Table 1-9. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) Category 1 _______ _______ High/Medium/Low 2 _______ _______ High/Medium/Low 3 _______ _______ High/Medium/Low 4 _______ _______ High/Medium/Low 5 _______ _______ High/Medium/Low 6 _______ _______ High/Medium/Low 7 _______ _______ High/Medium/Low Report Title District Name 1-7 Rank Hazard Type Risk Rating Score (Probability x Impact) Category 8 _______ _______ High/Medium/Low 9 _______ _______ High/Medium/Low NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan. 1.7 JURISDICTION-SPECIFIC VULNERABILITIES Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern. The following jurisdiction-specific issues have been identified based on a review of the results of the risk assessment, public involvement strategy, and other available resources: • Insert as appropriate. • Insert as appropriate. • Insert as appropriate. Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in Section 1.9. 1.8 STATUS OF PREVIOUS PLAN ACTIONS Table 1-10 summarizes the actions that were recommended in the previous version of the hazard mitigation plan and their implementation status at the time this update was prepared. Table 1-10. Status of Previous Plan Actions Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Insert Action Number & Text Comment: Report Title District Name 1-8 Removed; Carried Over to Plan Update Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update Insert Action Number & Text Comment: Insert Action Number & Text Comment: 1.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED ACTIONS Table 1-11 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 1-12 identifies the priority for each action. Table 1-13 summarizes the mitigation actions by hazard of concern and mitigation type. Table 1-11. Hazard Mitigation Action Plan Matrix Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea Action xxx1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas. Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire Existing 3, 4, 10 TBD TBD High HMGP, PDM, FMA Short-term Action xxx2—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan. Hazards Mitigated: All hazards New and Existing 1, 5, 8 TBD TBD Low Staff Time, General Funds Short-term Action xxx3— Integrate the hazard mitigation plan into other plans, ordinances and programs within the community, Hazards Mitigated: Dam failure, earthquake, flooding, landslide, severe weather, tsunami, wildfire Existing 2, 6, 9 TBD TBD Action xxx4—Description Hazards Mitigated: TBD Action xxx5—Description Hazards Mitigated: TBD Action xxx6—Description Hazards Mitigated: TBD Action xxx7—Description Hazards Mitigated: TBD Action xxx8—Description Hazards Mitigated: TBD Action xxx9—Description Hazards Mitigated: TBD Report Title District Name 1-9 a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date See the introduction to this volume for list of acronyms used here. Table 1-12. Mitigation Action Priority Action # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Implementation Prioritya Grant Pursuit Prioritya xxx1 3 High High Yes Yes No Medium High xxx2 3 Low Low Yes No Yes High Low xxx3 3 High Medium Yes Yes No Medium High a. See the introduction to this volume for explanation of priorities. Table 1-13. Analysis of Mitigation Actions Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education and Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building High-Risk Hazards ____________ ____________ ____________ Medium-Risk Hazards ____________ ____________ ____________ Low-Risk Hazards ____________ Report Title District Name 1-10 Action Addressing Hazard, by Mitigation Typea Hazard Type Prevention Property Protection Public Education and Awareness Natural Resource Protection Emergency Services Structural Projects Climate Resilient Community Capacity Building ____________ ____________ a. See the introduction to this volume for explanation of mitigation types. 1.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this annex. • <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED> • <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED> • <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED> The following outside resources and references were reviewed: • Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the mitigation action plan. • <INSERT DOCUMENT AND DESCRIPTION OF HOW IT WAS USED> 1.11 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY Insert text, if any; otherwise, delete section 1.12 ADDITIONAL COMMENTS Insert text, if any; otherwise, delete section