HomeMy WebLinkAboutHarrisCounty-Vol2_Planning_Partner_AnnexesHarris County Multi-Hazard Mitigation Action Plan
Volume 2 — Planning Partner Annexes
April 2020
PREPARED FOR PREPARED BY
Harris County Office of Homeland Security and
Emergency Management Tetra Tech
6922 Katy Road
Houston, Texas 77024
1999 Harrison Street
Suite 500
Oakland, CA 94612
Phone: 510.302.6300
Fax: 510.433.0830
www.tetratech.com
Tetra Tech Project #103S5992
HarrisCounty-Vol2_ FINAL_2020-04.docx
v
CONTENTS
Introduction .......................................................................................................................... xvii
Background ..................................................................................................................................................... xvii
The Planning Partnership ................................................................................................................................ xvii
Annex-Preparation Process .............................................................................................................................. xix
Mitigation Action Plan Development ................................................................................................................xx
Compatibility with Previous Approved Plans ................................................................................................ xxiii
Final Coverage Under the Plan ........................................................................................................................xxv
Acronyms ...................................................................................................................................................... xxvii
1. Harris County .................................................................................................................... 1-1
1.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 1-1
1.2 Jurisdiction Profile ..................................................................................................................................... 1-1
1.3 Current Trends ........................................................................................................................................... 1-3
1.4 Capability Assessment ............................................................................................................................... 1-3
1.5 Integration with Other Planning Initiatives .............................................................................................. 1-10
1.6 Jurisdiction-Specific Natural Hazard Event History ................................................................................ 1-10
1.7 Hazard Risk Ranking ............................................................................................................................... 1-11
1.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 1-11
1.9 Status of Previous Plan Actions ............................................................................................................... 1-11
1.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 1-13
1.11 Review and Incorporation of Information for This Annex .................................................................... 1-16
2. City of Baytown ................................................................................................................ 2-1
2.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 2-1
2.2 Jurisdiction Profile ..................................................................................................................................... 2-1
2.3 Current Trends ........................................................................................................................................... 2-3
2.4 Capability Assessment ............................................................................................................................... 2-6
2.5 Integration with Other Planning Initiatives .............................................................................................. 2-12
2.6 Jurisdiction-Specific Natural Hazard Event History ................................................................................ 2-12
2.7 Hazard Risk Ranking ............................................................................................................................... 2-13
2.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 2-14
2.9 Status of Previous Plan Actions ............................................................................................................... 2-15
2.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 2-19
2.11 Review and Incorporation of Information for This Annex .................................................................... 2-23
2.12 Future Needs to Better Understand Risk/Vulnerability ......................................................................... 2-24
3. City of Bellaire .................................................................................................................. 3-1
3.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 3-1
3.2 Jurisdiction Profile ..................................................................................................................................... 3-1
3.3 Current Trends ........................................................................................................................................... 3-3
3.4 Capability Assessment ............................................................................................................................... 3-4
3.5 Integration with Other Planning Initiatives ................................................................................................ 3-9
3.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 3-9
3.7 Hazard Risk Ranking ................................................................................................................................. 3-9
3.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 3-10
3.9 Status of Previous Plan Actions ............................................................................................................... 3-10
Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes
vi
3.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 3-10
3.11 Review and Incorporation of Information for This Annex .................................................................... 3-14
4. City of Bunker Hill Village ................................................................................................ 4-1
4.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 4-1
4.2 Jurisdiction Profile ..................................................................................................................................... 4-1
4.3 Current Trends ........................................................................................................................................... 4-2
4.4 Capability Assessment ............................................................................................................................... 4-3
4.5 Integration with Other Planning Initiatives ................................................................................................ 4-8
4.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 4-9
4.7 Hazard Risk Ranking ................................................................................................................................. 4-9
4.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 4-10
4.9 Status of Previous Plan Actions ............................................................................................................... 4-10
4.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 4-10
4.11 Review and Incorporation of Information for This Annex .................................................................... 4-10
5. City of Deer Park ............................................................................................................... 5-1
5.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 5-1
5.2 Jurisdiction Profile ..................................................................................................................................... 5-1
5.3 Current Trends ........................................................................................................................................... 5-2
5.4 Capability Assessment ............................................................................................................................... 5-3
5.5 Integration with Other Planning Initiatives ................................................................................................ 5-9
5.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 5-9
5.7 Hazard Risk Ranking ................................................................................................................................. 5-9
5.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 5-11
5.9 Status of Previous Plan Actions ............................................................................................................... 5-11
5.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 5-13
5.11 Review and Incorporation of Information for This Annex .................................................................... 5-18
6. City of El Lago .................................................................................................................. 6-1
6.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 6-1
6.2 Jurisdiction Profile ..................................................................................................................................... 6-1
6.3 Current Trends ........................................................................................................................................... 6-2
6.4 Capability Assessment ............................................................................................................................... 6-2
6.5 Integration with Other Planning Initiatives ................................................................................................ 6-8
6.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 6-8
6.7 Hazard Risk Ranking ................................................................................................................................. 6-9
6.8 Jurisdiction-Specific Vulnerabilities .......................................................................................................... 6-9
6.9 Status of Previous Plan Actions ............................................................................................................... 6-10
6.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 6-11
6.11 Review and Incorporation of Information for This Annex .................................................................... 6-15
7. City of Friendswood ......................................................................................................... 7-1
7.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 7-1
7.2 Jurisdiction Profile ..................................................................................................................................... 7-1
7.3 Current Trends ........................................................................................................................................... 7-2
7.4 Capability Assessment ............................................................................................................................... 7-3
7.5 Integration with Other Planning Initiatives ................................................................................................ 7-9
7.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 7-9
7.7 Hazard Risk Ranking ............................................................................................................................... 7-10
Contents
vii
7.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 7-10
7.9 Status of Previous Plan Actions ............................................................................................................... 7-11
7.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 7-12
7.11 Review and Incorporation of Information for This Annex .................................................................... 7-14
8. City of Galena Park ........................................................................................................... 8-1
8.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 8-1
8.2 Jurisdiction Profile ..................................................................................................................................... 8-1
8.3 Current Trends ........................................................................................................................................... 8-2
8.4 Capability Assessment ............................................................................................................................... 8-3
8.5 Integration with Other Planning Initiatives ................................................................................................ 8-9
8.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 8-9
8.7 Hazard Risk Ranking ................................................................................................................................. 8-9
8.8 Jurisdiction-Specific Vulnerabilities ........................................................................................................ 8-10
8.9 Status of Previous Plan Actions ............................................................................................................... 8-10
8.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 8-10
8.11 Review and Incorporation of Information for This Annex .................................................................... 8-14
8.12 Future Needs to Better Understand Risk/Vulnerability ......................................................................... 8-15
9. City of Hedwig Village ...................................................................................................... 9-1
9.1 Hazard Mitigation Plan Point of Contact ................................................................................................... 9-1
9.2 Jurisdiction Profile ..................................................................................................................................... 9-1
9.3 Current Trends ........................................................................................................................................... 9-2
9.4 Capability Assessment ............................................................................................................................... 9-2
9.5 Integration with Other Planning Initiatives ................................................................................................ 9-8
9.6 Jurisdiction-Specific Natural Hazard Event History .................................................................................. 9-8
9.7 Hazard Risk Ranking ................................................................................................................................. 9-9
9.8 Jurisdiction-Specific Vulnerabilities .......................................................................................................... 9-9
9.9 Status of Previous Plan Actions ............................................................................................................... 9-10
9.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 9-11
9.11 Review and Incorporation of Information for This Annex .................................................................... 9-13
10. City of Hilshire Village .................................................................................................. 10-1
10.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 10-1
10.2 Jurisdiction Profile ................................................................................................................................. 10-1
10.3 Current Trends ....................................................................................................................................... 10-2
10.4 Capability Assessment ........................................................................................................................... 10-2
10.5 Integration with Other Planning Initiatives ............................................................................................ 10-8
10.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 10-8
10.7 Hazard Risk Ranking ............................................................................................................................. 10-8
10.8 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 10-9
10.9 Status of Previous Plan Actions ............................................................................................................. 10-9
10.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 10-9
10.11 Review and Incorporation of Information for This Annex ................................................................ 10-15
11. City of Humble .............................................................................................................. 11-1
11.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 11-1
11.2 Jurisdiction Profile ................................................................................................................................. 11-1
11.3 Current Trends ....................................................................................................................................... 11-2
11.4 Capability Assessment ........................................................................................................................... 11-3
Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes
viii
11.5 Integration with Other Planning Initiatives ............................................................................................ 11-8
11.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 11-8
11.7 Hazard Risk Ranking ............................................................................................................................. 11-8
11.8 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 11-9
11.9 Status of Previous Plan Actions ............................................................................................................. 11-9
11.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 11-9
11.11 Review and Incorporation of Information for This Annex ................................................................ 11-12
12. City of Hunters Creek Village ...................................................................................... 12-1
12.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 12-1
12.2 Jurisdiction Profile ................................................................................................................................. 12-1
12.3 Current Trends ....................................................................................................................................... 12-2
12.4 Capability Assessment ........................................................................................................................... 12-2
12.5 Integration with Other Planning Initiatives ............................................................................................ 12-9
12.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 12-9
12.7 Hazard Risk Ranking ........................................................................................................................... 12-10
12.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 12-10
12.9 Status of Previous Plan Actions ........................................................................................................... 12-10
12.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 12-11
12.11 Review and Incorporation of Information for This Annex ................................................................ 12-14
13. City of Jersey Village .................................................................................................... 13-1
13.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 13-1
13.2 Jurisdiction Profile ................................................................................................................................. 13-1
13.3 Current Trends ....................................................................................................................................... 13-2
13.4 Capability Assessment ........................................................................................................................... 13-3
13.5 Integration with Other Planning Initiatives ............................................................................................ 13-9
13.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 13-9
13.7 Hazard Risk Ranking ........................................................................................................................... 13-10
13.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 13-10
13.9 Status of Previous Plan Actions ........................................................................................................... 13-11
13.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 13-12
13.11 Review and Incorporation of Information for This Annex ................................................................ 13-16
14. City of Katy .................................................................................................................... 14-1
14.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 14-1
14.2 Jurisdiction Profile ................................................................................................................................. 14-1
14.3 Current Trends ....................................................................................................................................... 14-2
14.4 Capability Assessment ........................................................................................................................... 14-3
14.5 Integration with Other Planning Initiatives ............................................................................................ 14-9
14.6 Jurisdiction-Specific Natural Hazard Event History ............................................................................ 14-10
14.7 Hazard Risk Ranking ........................................................................................................................... 14-10
14.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 14-11
14.9 Status of Previous Plan Actions ........................................................................................................... 14-11
14.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 14-13
14.11 Review and Incorporation of Information for This Annex ................................................................ 14-17
15. City of La Porte ............................................................................................................. 15-1
15.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 15-1
15.2 Jurisdiction Profile ................................................................................................................................. 15-1
Contents
ix
15.3 Current Trends ....................................................................................................................................... 15-2
15.4 Capability Assessment ........................................................................................................................... 15-4
15.5 Integration with Other Planning Initiatives ............................................................................................ 15-9
15.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 15-9
15.7 Hazard Risk Ranking ............................................................................................................................. 15-9
15.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 15-11
15.9 Status of Previous Plan Actions ........................................................................................................... 15-11
15.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 15-13
15.11 Review and Incorporation of Information for This Annex ................................................................ 15-17
16. City of Missouri City ..................................................................................................... 16-1
16.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 16-1
16.2 Jurisdiction Profile ................................................................................................................................. 16-1
16.3 Current Trends ....................................................................................................................................... 16-2
16.4 Capability Assessment ........................................................................................................................... 16-3
16.5 Integration with Other Planning Initiatives ............................................................................................ 16-9
16.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 16-9
16.7 Hazard Risk Ranking ............................................................................................................................. 16-9
16.8 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 16-9
16.9 Status of Previous Plan Actions ........................................................................................................... 16-11
16.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 16-12
16.11 Review and Incorporation of Information for This Annex ................................................................ 16-16
17. City of Morgan’s Point .................................................................................................. 17-1
17.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 17-1
17.2 Jurisdiction Profile ................................................................................................................................. 17-1
17.3 Current Trends ....................................................................................................................................... 17-2
17.4 Capability Assessment ........................................................................................................................... 17-2
17.5 Integration with Other Planning Initiatives ............................................................................................ 17-9
17.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 17-9
17.7 Hazard Risk Ranking ........................................................................................................................... 17-10
17.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 17-10
17.9 Status of Previous Plan Actions ........................................................................................................... 17-11
17.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 17-12
17.11 Review and Incorporation of Information for This Annex ................................................................ 17-15
18. City of Nassau Bay ....................................................................................................... 18-1
18.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 18-1
18.2 Jurisdiction Profile ................................................................................................................................. 18-1
18.3 Current Trends ....................................................................................................................................... 18-2
18.4 Capability Assessment ........................................................................................................................... 18-3
18.5 Integration with Other Planning Initiatives ............................................................................................ 18-8
18.6 Jurisdiction-Specific Natural Hazard Event History ............................................................................ 18-10
18.7 Hazard Risk Ranking ........................................................................................................................... 18-10
18.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 18-11
18.9 Status of Previous Plan Actions ........................................................................................................... 18-11
18.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 18-13
18.11 Review and Incorporation of Information for This Annex ................................................................ 18-17
19. City of Pasadena ........................................................................................................... 19-1
Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes
x
19.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 19-1
19.2 Jurisdiction Profile ................................................................................................................................. 19-1
19.3 Current Trends ....................................................................................................................................... 19-2
19.4 Capability Assessment ........................................................................................................................... 19-2
19.5 Integration with Other Planning Initiatives ............................................................................................ 19-9
19.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 19-9
19.7 Hazard Risk Ranking ........................................................................................................................... 19-11
19.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 19-12
19.9 Status of Previous Plan Actions ........................................................................................................... 19-12
19.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 19-15
19.11 Review and Incorporation of Information for This Annex ................................................................ 19-18
20. City of Piney Point Village ........................................................................................... 20-1
20.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 20-1
20.2 Jurisdiction Profile ................................................................................................................................. 20-1
20.3 Current Trends ....................................................................................................................................... 20-2
20.4 Capability Assessment ........................................................................................................................... 20-2
20.5 Integration with Other Planning Initiatives ............................................................................................ 20-8
20.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 20-8
20.7 Hazard Risk Ranking ............................................................................................................................. 20-8
20.8 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 20-9
20.9 Status of Previous Plan Actions ............................................................................................................. 20-9
20.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 20-9
20.11 Review and Incorporation of Information for This Annex ................................................................ 20-11
21. City of Seabrook ........................................................................................................... 21-1
21.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 21-1
21.2 Jurisdiction Profile ................................................................................................................................. 21-1
21.3 Current Trends ....................................................................................................................................... 21-2
21.4 Capability Assessment ........................................................................................................................... 21-4
21.5 Integration with Other Planning Initiatives ............................................................................................ 21-9
21.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 21-9
21.7 Hazard Risk Ranking ........................................................................................................................... 21-10
21.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 21-10
21.9 Status of Previous Plan Actions ........................................................................................................... 21-11
21.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 21-14
21.11 Review and Incorporation of Information for This Annex ................................................................ 21-17
21.12 Future Needs to Better Understand Risk/Vulnerability ..................................................................... 21-18
22. City of Shoreacres ........................................................................................................ 22-1
22.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 22-1
22.2 Jurisdiction Profile ................................................................................................................................. 22-1
22.3 Current Trends ....................................................................................................................................... 22-2
22.4 Capability Assessment ........................................................................................................................... 22-3
22.5 Integration with Other Planning Initiatives ............................................................................................ 22-8
22.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 22-8
22.7 Hazard Risk Ranking ............................................................................................................................. 22-8
22.8 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 22-9
22.9 Status of Previous Plan Actions ............................................................................................................. 22-9
22.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 22-12
Contents
xi
22.11 Review and Incorporation of Information for This Annex ................................................................ 22-16
23. City of Spring Valley Village ........................................................................................ 23-1
23.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 23-1
23.2 Jurisdiction Profile ................................................................................................................................. 23-1
23.3 Current Trends ....................................................................................................................................... 23-2
23.4 Capability Assessment ........................................................................................................................... 23-3
23.5 Integration with Other Planning Initiatives ............................................................................................ 23-9
23.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 23-9
23.7 Hazard Risk Ranking ........................................................................................................................... 23-10
23.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 23-11
23.9 Status of Previous Plan Actions ........................................................................................................... 23-11
23.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 23-14
23.11 Review and Incorporation of Information for This Annex ................................................................ 23-17
24. City of Stafford .............................................................................................................. 24-1
24.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 24-1
24.2 Jurisdiction Profile ................................................................................................................................. 24-1
24.3 Current Trends ....................................................................................................................................... 24-2
24.4 Capability Assessment ........................................................................................................................... 24-3
24.5 Integration with Other Planning Initiatives ............................................................................................ 24-9
24.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 24-9
24.7 Hazard Risk Ranking ........................................................................................................................... 24-10
24.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 24-11
24.9 Status of Previous Plan Actions ........................................................................................................... 24-11
24.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 24-12
24.11 Review and Incorporation of Information for This Annex ................................................................ 24-15
25. City of Taylor Lake Village ........................................................................................... 25-1
25.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 25-1
25.2 Jurisdiction Profile ................................................................................................................................. 25-1
25.3 Current Trends ....................................................................................................................................... 25-2
25.4 Capability Assessment ........................................................................................................................... 25-2
25.5 Integration with Other Planning Initiatives ............................................................................................ 25-8
25.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 25-8
25.7 Hazard Risk Ranking ............................................................................................................................. 25-9
25.8 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 25-9
25.9 Status of Previous Plan Actions ........................................................................................................... 25-10
25.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 25-10
25.11 Review and Incorporation of Information for This Annex ................................................................ 25-12
26. City of Tomball .............................................................................................................. 26-1
26.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 26-1
26.2 Jurisdiction Profile ................................................................................................................................. 26-1
26.3 Current Trends ....................................................................................................................................... 26-2
26.4 Capability Assessment ........................................................................................................................... 26-3
26.5 Integration with Other Planning Initiatives ............................................................................................ 26-9
26.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 26-9
26.7 Hazard Risk Ranking ........................................................................................................................... 26-10
26.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 26-10
Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes
xii
26.9 Status of Previous Plan Actions ........................................................................................................... 26-11
26.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 26-11
26.11 Review and Incorporation of Information for This Annex ................................................................ 26-14
26.12 Future Needs to Better Understand Risk/Vulnerability ..................................................................... 26-15
27. City of Webster ............................................................................................................. 27-1
27.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 27-1
27.2 Jurisdiction Profile ................................................................................................................................. 27-1
27.3 Current Trends ....................................................................................................................................... 27-2
27.4 Capability Assessment ........................................................................................................................... 27-3
27.5 Integration with Other Planning Initiatives ............................................................................................ 27-9
27.6 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 27-9
27.7 Hazard Risk Ranking ............................................................................................................................. 27-9
27.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 27-10
27.9 Status of Previous Plan Actions ........................................................................................................... 27-10
27.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 27-10
27.11 Review and Incorporation of Information for This Annex ................................................................ 27-13
28. City of West University Place ...................................................................................... 28-1
28.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 28-1
28.2 Jurisdiction Profile ................................................................................................................................. 28-1
28.3 Current Trends ....................................................................................................................................... 28-3
28.4 Capability Assessment ........................................................................................................................... 28-4
28.5 Integration with Other Planning Initiatives .......................................................................................... 28-10
28.6 Jurisdiction-Specific Natural Hazard Event History ............................................................................ 28-10
28.7 Hazard Risk Ranking ........................................................................................................................... 28-10
28.8 Jurisdiction-Specific Vulnerabilities .................................................................................................... 28-10
28.9 Status of Previous Plan Actions ........................................................................................................... 28-12
28.10 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ....................................... 28-13
28.11 Review and Incorporation of Information for This Annex ................................................................ 28-17
29. Houston Independent School District ......................................................................... 29-1
29.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 29-1
29.2 Jurisdiction Profile ................................................................................................................................. 29-1
29.3 Capability Assessment ........................................................................................................................... 29-2
29.4 Integration with Other Planning Initiatives ............................................................................................ 29-6
29.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 29-6
29.6 Hazard Risk Ranking ............................................................................................................................. 29-7
29.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 29-7
29.8 Status of Previous Plan Actions ............................................................................................................. 29-8
29.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 29-8
29.10 Review and Incorporation of Resources for This Annex ................................................................... 29-10
29.11 Future Needs to Better Understand Risk/Vulnerability ..................................................................... 29-11
29.12 Additional Comments ........................................................................................................................ 29-11
30. Huffman Independent School District ......................................................................... 30-1
30.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 30-1
30.2 Jurisdiction Profile ................................................................................................................................. 30-1
30.3 Capability Assessment ........................................................................................................................... 30-2
30.4 Integration with Other Planning Initiatives ............................................................................................ 30-6
Contents
xiii
30.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 30-6
30.6 Hazard Risk Ranking ............................................................................................................................. 30-7
30.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 30-7
30.8 Status of Previous Plan Actions ............................................................................................................. 30-7
30.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 30-8
30.10 Review and Incorporation of Resources for This Annex ..................................................................... 30-9
31. Pasadena Independent School District ...................................................................... 31-1
31.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 31-1
31.2 Jurisdiction Profile ................................................................................................................................. 31-1
31.3 Capability Assessment ........................................................................................................................... 31-2
31.4 Integration with Other Planning Initiatives ............................................................................................ 31-5
31.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 31-5
31.6 Hazard Risk Ranking ............................................................................................................................. 31-5
31.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 31-5
31.8 Status of Previous Plan Actions ............................................................................................................. 31-5
31.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 31-6
31.10 Review and Incorporation of Resources for This Annex ..................................................................... 31-7
31.11 Future Needs to Better Understand Risk/Vulnerability ....................................................................... 31-7
32. Houston Community College ...................................................................................... 32-1
32.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 32-1
32.2 Jurisdiction Profile ................................................................................................................................. 32-1
32.3 Capability Assessment ........................................................................................................................... 32-3
32.4 Integration with Other Planning Initiatives ............................................................................................ 32-6
32.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 32-7
32.6 Hazard Risk Ranking ............................................................................................................................. 32-7
32.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 32-8
32.8 Status of Previous Plan Actions ............................................................................................................. 32-8
32.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 32-8
32.10 Review and Incorporation of Resources for This Annex ................................................................... 32-11
33. Lone Star College ......................................................................................................... 33-1
33.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 33-1
33.2 Jurisdiction Profile ................................................................................................................................. 33-1
33.3 Capability Assessment ........................................................................................................................... 33-2
33.4 Integration with Other Planning Initiatives ............................................................................................ 33-4
33.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 33-6
33.6 Hazard Risk Ranking ............................................................................................................................. 33-6
33.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 33-7
33.8 Status of Previous Plan Actions ............................................................................................................. 33-7
33.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 33-10
33.10 Review and Incorporation of Resources for This Annex ................................................................... 33-14
34. University of Houston .................................................................................................. 34-1
34.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 34-1
34.2 Jurisdiction Profile ................................................................................................................................. 34-1
34.3 Capability Assessment ........................................................................................................................... 34-4
34.4 Integration With Other Planning Initiatives ........................................................................................... 34-6
34.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 34-7
Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes
xiv
34.6 Hazard Risk Ranking ............................................................................................................................. 34-7
34.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 34-8
34.8 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 34-8
34.9 Review and Incorporation of Resources for This Annex ..................................................................... 34-11
35. Harris County Flood Control District .......................................................................... 35-1
35.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 35-1
35.2 Jurisdiction Profile ................................................................................................................................. 35-1
35.3 Capability Assessment ........................................................................................................................... 35-2
35.4 Integration with Other Planning Initiatives ............................................................................................ 35-7
35.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 35-9
35.6 Hazard Risk Ranking ............................................................................................................................. 35-9
35.7 Jurisdiction-Specific Vulnerabilities .................................................................................................... 35-10
35.8 Status of Previous Plan Actions ........................................................................................................... 35-10
35.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 35-21
35.10 Review and Incorporation of Resources for This Annex ................................................................... 35-46
36. Harris County Emergency Service District No. 12 ..................................................... 36-1
36.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 36-1
36.2 Jurisdiction Profile ................................................................................................................................. 36-1
36.3 Capability Assessment ........................................................................................................................... 36-2
36.4 Integration with Other Planning Initiatives ............................................................................................ 36-5
36.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 36-6
36.6 Hazard Risk Ranking ............................................................................................................................. 36-6
36.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 36-6
36.8 Status of Previous Plan Actions ............................................................................................................. 36-7
36.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ........................................... 36-7
36.10 Review and Incorporation of Resources for This Annex ..................................................................... 36-9
37. Harris Health System .................................................................................................... 37-1
37.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 37-1
37.2 Jurisdiction Profile ................................................................................................................................. 37-1
37.3 Capability Assessment ........................................................................................................................... 37-4
37.4 Integration with Other Planning Initiatives ............................................................................................ 37-7
37.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 37-7
37.6 Hazard Risk Ranking ............................................................................................................................. 37-7
37.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 37-8
37.8 Status of Previous Plan Actions ............................................................................................................. 37-8
37.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 37-11
37.10 Review and Incorporation of Resources for This Annex ................................................................... 37-14
38. Texas Medical Center ................................................................................................... 38-1
38.1 Hazard Mitigation Plan Point of Contact ............................................................................................... 38-1
38.2 Jurisdiction Profile ................................................................................................................................. 38-1
38.3 Capability Assessment ........................................................................................................................... 38-3
38.4 Integration with Other Planning Initiatives ............................................................................................ 38-7
38.5 Jurisdiction-Specific Natural Hazard Event History .............................................................................. 38-8
38.6 Hazard Risk Ranking ............................................................................................................................. 38-8
38.7 Jurisdiction-Specific Vulnerabilities ...................................................................................................... 38-9
38.8 Status of Previous Plan Actions ........................................................................................................... 38-10
Contents
xv
38.9 Hazard Mitigation Action Plan and Evaluation of Recommended Actions ......................................... 38-10
38.10 Review and Incorporation of Resources for This Annex ................................................................... 38-12
38.11 Future Needs to Better Understand Risk/Vulnerability ..................................................................... 38-13
38.12 Additional Comments ........................................................................................................................ 38-13
Appendices
Appendix A. Planning Partner Expectations
Appendix B. Procedures for Linking to Hazard Mitigation Plan
Appendix C. Annex Instructions and Templates
xvii
INTRODUCTION
BACKGROUND
The Federal Emergency Management Agency (FEMA) encourages multi-jurisdictional planning for hazard
mitigation. All participating jurisdictions must meet the requirements of Chapter 44 of the Code of Federal
Regulations (44 CFR):
“Multi-jurisdictional plans (e.g. watershed plans) may be accepted, as appropriate, as long as each
jurisdiction has participated in the process and has officially adopted the plan.” (Section 201.6(a)(4)).
For the Harris County Multi-Hazard Mitigation Action Plan, a planning partnership was formed to leverage
resources and to meet requirements of the federal Disaster Mitigation Act for as many eligible local governments
as possible. The Disaster Mitigation Act defines a local government as follows:
“Any county, municipality, city, town, township, public authority, school district, special district,
intrastate district, council of governments (regardless of whether the council of governments is
incorporated as a nonprofit corporation under State law), regional or interstate government entity, or
agency or instrumentality of a local government; any Indian tribe or authorized tribal organization, or
Alaska Native village or organization; and any rural community, unincorporated town or village, or other
public entity.”
Two types of planning partners participated in this process for the Harris County Multi-Hazard Mitigation Action
Plan, with distinct needs and capabilities:
• Incorporated municipalities (Cities and the County)
• Special purpose districts who have junior taxing authority
Each participating planning partner prepared a jurisdiction-specific annex to this plan. These annexes, as well as
information on the process by which they were created, are contained in this volume.
THE PLANNING PARTNERSHIP
Initial Solicitation and Letters of Intent
The planning team solicited the participation of all eligible municipalities and special purpose districts at the
outset of this project. A kickoff meeting was held on September 18, 2018 to identify potential stakeholders and
planning partners for this process. The purpose of the meeting was to introduce the planning process to
jurisdictions in the County that could have a stake in the outcome of the planning effort. All eligible local
governments in the planning area — 54 in total including prior and potential planning partners — were invited to
attend. The goals of the meeting were as follows:
• Provide an overview of the Disaster Mitigation Act
• Review the Harris County Hazard Mitigation Plan and planning partnership
Introduction
xviii
• Outline the work plan for this hazard mitigation plan
• Describe the benefits of multi-jurisdictional planning
• Outline planning partner expectations
• Solicit planning partners
• Solicit volunteers/recommendations for the steering committee
Local governments wishing to join the planning effort were asked to provide the planning team with a “letter of
intent to participate” that agreed to the planning partner expectations (see Appendix A) and designated a point of
contact for their jurisdiction. In all, the core planning team (CPT) received formal commitment from 42 planning
partners including the County. Eleven of the letters were from new planning partners not covered under the
County’s previous hazard mitigation plan, approved in 2015:
• City of Friendswood
• Cypress Fairbanks Independent School District
• Houston Independent School District
• Huffman Independent School District
• Pasadena Independent School District
• Texas Southern University
• Lone Star College
• Texas Medical Center/Texas Children’s Hospital
• Houston Community College
• Harris County ESD 12
• University of Houston
Maps for each fully participating city are provided in the individual annex for that city in this volume. Maps
showing the location of participating special purpose districts by district type are provided at the end of this
introduction.
Planning Partner Expectations
The planning team developed the following list of planning partner expectations, which were provided and
discussed at the kickoff meeting (see Appendix A for details):
• Complete a “letter of intent to participate.”
• Designate a lead point of contact for this effort.
• Support and participate in the selection and function of the Steering Committee.
• Provide support required to implement the public involvement strategy.
• Participate in the process through opportunities such as:
Steering Committee meetings
Public meetings or open houses
Workshops and planning partner specific training sessions
Public review and comment periods prior to adoption.
• Attend the mandatory jurisdictional annex workshop.
• Complete the jurisdictional annex.
• Perform a “consistency review” of all technical studies, plans and ordinances specific to hazards.
• Review the risk assessment and identify hazards and vulnerabilities specific to the jurisdiction.
• Review and determine if the mitigation recommendations chosen in Volume 1 will meet the needs of the
jurisdiction.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes
xix
• Create an action plan that identifies each project, who will oversee the task, how it will be financed, and
when it is estimated to occur.
• Formally adopt the hazard mitigation plan.
By adopting this plan, each planning partner also agrees to the plan implementation and maintenance protocol
established in Volume 1. Failure to meet these criteria may result in a partner being dropped from the partnership
by the Steering Committee, and thus losing eligibility under the scope of this plan.
Linkage Procedures
Eligible local jurisdictions that did not participate in development of this multi-jurisdictional plan may comply
with Disaster Mitigation Act requirements by linking to this plan following procedures outlined in Appendix B.
ANNEX-PREPARATION PROCESS
Templates
Templates were created to help the planning partners prepare their jurisdiction-specific annexes. Separate
templates were created for both types of jurisdictions participating in this plan, municipalities and districts. The
templates were created so that all criteria of Section 201.6 of 44 CFR would be, based on the partners’ capabilities
and mode of operation. Separate templates were available for partners updating a previous hazard mitigation plan
and those developing a first-time hazard mitigation plan. These templates were deployed in three phases during
the course of this plan update process. These phases are described as follows:
• Phase 1 — Profile, Trends, Previous Plan Status, and Information Sources
Deploy: November 26, 2018
Due: December 31, 2018
• Phase 2 — Capability Assessment and Information Sources
Deployed: Mid-January 2019
Due: End of February 2019
• Phase 3 — Risk Ranking, Action Plan, and Information Sources
Deployed: Mandatory Phase 3 Workshops, July 16-18, 2019
Due: August 9, 2019
The templates were set up to lead all partner through steps to generate Disaster Mitigation Act-required elements
specific to their jurisdictions. The templates and their instructions are included in Appendix C of this volume.
Tool Kit
Each planning partner was provided with a tool kit to assist in completing the annex template and developing an
action plan. The tool kits contained the following:
• 2015 Plan
• Action Plan
Mitigation Best Practices Catalog
Mission Statement, Goals and Objectives
Introduction
xx
Action identification resources
• Grant Information
General HMA Guidance
Climate Resilient Guidance
• Hazard Maps
• Hazard Event History
• Phase 3 Annexes, including templates and instructions
• Plan Integration Guidance from FEMA
• Risk Assessment Results
Loss estimate matrix — includes hazard risk assessment information broken down by jurisdiction and
hazard type, with risk ranking results.
• Survey Results
• Workshop Presentation
Phase 3 Workshop
All partners were required to participate in a technical assistance workshop, where key elements of the template
were discussed, and the templates were subsequently completed by a designated point of contact for each partner
and a member of the planning team. Six workshops were held during the week of July 16-18, 2019. Attendance to
at least one of these workshops by each planning partners was mandatory, to meet “participation” as defined by
this planning process. These workshops addressed the following topics:
• The templates and the tool kit
• Natural events history
• Jurisdiction-specific issues
• Risk ranking
• Status of prior actions
• Developing your action plan
• Cost/benefit review
• Prioritization protocol
• Next steps.
MITIGATION ACTION PLAN DEVELOPMENT
Risk Ranking
In the risk-ranking exercise, each planning partner was asked to review the ranked risk specifically for its
jurisdiction, based on the impact on its population and/or facilities. Municipalities based this ranking on
probability of occurrence and the potential impact on people, property and the economy. Special purpose districts
based this ranking on probability of occurrence and the potential impact on their constituency, their vital facilities
and the facilities’ functionality after an event. The methodology followed that used for the countywide risk
ranking presented in Volume 1. The objectives of this exercise were to familiarize the partnership with how to use
the risk assessment as a tool to support other planning and hazard mitigation processes and to help prioritize types
of mitigation actions that should be considered. Hazards that were ranked as “high” and “medium” for each
Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes
xxi
jurisdiction as a result of this exercise were considered to be priorities for identifying mitigation actions, although
jurisdictions also identified actions to mitigate “low” ranked hazards, as appropriate.
Information Reviewed to Develop Action Plan
The tool kits were used during the workshops and in follow-up work conducted by the planning partners. A large
portion of the workshop focused on how the tool kit should be used to develop the mitigation action plan.
Planning partners were specifically asked to review the following to assist in the identification of actions:
• The Jurisdiction’s Capability Assessment — reviewed to identify capabilities that the jurisdiction does
not currently have but should consider pursuing or capabilities that should be revisited and updated to
include best available information; also reviewed to determine how existing capabilities can be leveraged
to increase or improve hazard mitigation in the jurisdiction.
• The Jurisdiction’s National Flood Insurance Program Compliance Table — reviewed to identify
opportunities to increase floodplain management capabilities.
• The Jurisdiction’s Review of Its Adaptive Capacity for Climate Change — reviewed to identify ways
to leverage or continue to improve existing capacities and to improve understanding of other capacities.
• The Jurisdiction’s Identified Opportunities for Future Integration — reviewed to identify specific
integration actions to be included in the mitigation strategy.
• Jurisdiction-Specific Vulnerabilities — reviewed to identify actions that will help reduce known
vulnerabilities.
• The Mitigation Best Practices Catalog — reviewed to identify actions that the jurisdiction should
consider including in its action plan.
• Public Input — reviewed to identify potential actions and community priorities.
Selection of Recommended Actions
The Planning Partners reviewed the catalogs of hazard mitigation alternatives presented in Volume 1 and selected
actions to be included in a hazard mitigation action plan. The selection of actions was based on the risk
assessment of identified hazards of concern and the defined hazard mitigation goals and objectives. Each annex
lists the recommended hazard mitigation actions that make up the action plan. The timeframe indicated in the
tables is defined as follows:
• Short Term = to be completed in 1 to 5 years
• Long Term = to be completed in greater than 5 years
• Ongoing = currently being funded and implemented under existing programs.
Prioritization
44 CFR requires actions identified in the action plan to be prioritized (Sections 201.6(c)(3)(iii)). The planning
team and steering committee developed a methodology for prioritizing the action plans that meets the needs of the
partnership and the requirements of 44 CFR. All identified actions were prioritized in two
categories — implementation and grant pursuit — as defined by the following criteria:
• Implementation priority
High Priority — an action that meets multiple objectives, has benefits that exceed costs, and has a
secured source of funding. Action can be completed in the short term (1 to 5 years).
Medium Priority — an action that meets multiple objectives, has benefits that exceed costs, and is
eligible for funding though no funding has yet been secured for it. Action can be completed in the
Introduction
xxii
short term (1 to 5 years), once funding is secured. Medium-priority actions become high-priority
actions once funding is secured.
Low Priority — an action that will mitigate the risk of a hazard, has benefits that do not exceed the
costs or are difficult to quantify, has no secured source of funding, and is not eligible for any known
grant funding. Action can be completed in the long term (1 to 10 years). Low-priority actions are
generally “wish-list” actions. They may be eligible for grant funding from programs that have not yet
been identified.
• Grant pursuit priority
High Priority — an action that meets identified grant eligibility requirements, has high benefits, and
is listed as high or medium implementation priority; local funding options are unavailable or available
local funds could be used instead for actions that are not eligible for grant funding.
Medium Priority — an action that meets identified grant eligibility requirements, has medium or low
benefits, and is listed as medium or low implementation priority; local funding options are
unavailable.
Low Priority — an action that has not been identified as meeting any grant eligibility requirements.
These priority definitions are dynamic and can change from one category to another based on changes to a
parameter such as availability of funding. For example, a project might be assigned a medium priority because of
the uncertainty of a funding source, but be changed to high priority once a funding source has been identified. The
2010 plan used the same method of prioritization for implementation priority as was used in this plan update. The
grant pursuit priority is a newly added prioritization schedule. The prioritization schedule for this plan will be
reviewed and updated as needed annually through the plan maintenance strategy.
Benefit/Cost Review
44 CFR requires the prioritization of the action plan to emphasize a benefit/cost analysis of the proposed actions.
Because some actions may not be implemented for up to 10 years, benefit/cost analysis was qualitative and not of
the detail required by FEMA for project grant eligibility under the Hazard Mitigation Assistance (HMA) grant
program. A review of the apparent benefits versus the apparent cost of each project was performed. Parameters
were established for assigning subjective ratings (high, medium, and low) to benefits and costs as follows:
• Benefit ratings:
High — the action will have an immediate impact on the reduction of risk exposure to life and
property.
Medium — the action will have a long-term impact on the reduction of risk exposure to life and
property or will provide an immediate reduction in the risk exposure to property.
Low — long-term benefits of the action are difficult to quantify in the short-term.
• Cost ratings:
High — existing funding levels are not adequate to cover the costs of the proposed action;
implementation would require an increase in revenue through an alternative source (for example,
bonds, grants, and fee increases).
Medium — the action could be implemented with existing funding but would require a re-
apportionment of the budget or a budget amendment, or the cost of the action would have to be spread
over multiple years.
Low — the action could be funded under the existing budget. The action is part of or can be part of
an existing, ongoing program.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes
xxiii
Using this approach, projects with positive benefit versus cost ratios (such as high over high, high over medium,
medium over low, etc.) are considered cost-beneficial and are prioritized accordingly.
For many of the strategies identified in this action plan, funding might be sought under FEMA’s HMA program.
This program requires detailed benefit/cost analysis as part of the application process. These analyses will be
performed on projects at the time of application preparation. The FEMA benefit-cost model will be used to
perform this review. For projects not seeking financial assistance from grant programs that require this sort of
analysis, the Partners reserve the right to define “benefits” according to parameters that meet their needs and the
goals and objectives of this plan.
Analysis of Mitigation Actions
All planning partners reviewed their recommended actions to classify each action based on the hazard it addresses
and the type of mitigation it involves. Mitigation types used for this categorization are as follows:
• Prevention — government, administrative or regulatory actions that influence the way land and buildings
are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital
improvement programs, open space preservation, and stormwater management regulations.
• Property Protection — modification of buildings or structures to protect them from a hazard or removal
of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm
shutters, and shatter-resistant glass.
• Public Education and Awareness — actions to inform citizens and elected officials about hazards and
ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and
school-age and adult education.
• Natural Resource Protection — actions that minimize hazard loss and preserve or restore the functions
of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed
management, forest and vegetation management, and wetland restoration and preservation.
• Emergency Services — actions that protect people and property during and immediately after a hazard
event. Includes warning systems, emergency response services, and the protection of essential facilities.
• Structural Projects — actions that involve the construction of structures to reduce the impact of a
hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms.
• Climate Resilient — actions that incorporate methods to mitigate and/or adapt to the impacts of climate
change. Includes aquifer storage and recovery activities, incorporating future-conditions projections in
project design or planning, or actions that specifically address jurisdiction-specific climate change risks,
such as sea level rise or urban heat island effect.
• Community Capacity Building — actions that increase or enhance local capabilities to adjust to
potential damage, to take advantage of opportunities, or to respond to consequences. Includes staff
training, memorandums of understanding, development of plans and studies, and monitoring programs.
These categories include categories identified in the Community Rating System (CRS) 2017 CRS Coordinators
Manual (OMB No. 1660-0022, Figure 510-4). The CRS categories expand on the four categories in FEMA’s
2013 Local Mitigation Handbook. They provide a more comprehensive range of options, thus increasing
integration opportunities.
COMPATIBILITY WITH PREVIOUS APPROVED PLANS
Thirty-three of the planning partners who participated in this plan were previously covered under the 2015 Harris
County Multi-Hazard Mitigation Plan. Table 1 lists all the initial partners and the role this multi-jurisdictional
plan will play in achieving compliance and the CRS status, if applicable.
Introduction
xxiv
Table 1. Prior Plan and Planning Partner Status
Covered by 2015
Plan?
FEMA Approval
Date
Letter of
Intent Date
Attended
Workshop?
Completed
Template?
CRS Community
(Yes or No)
Covered by this Hazard
Mitigation Plan?
Harris County Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes
City of Baytown Yes 7/26/2015 9/21/2018 Yes Yes Yes Yes
City of Bellaire Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes
City of Bunker Hill Village Yes 7/26/2015 10/18/2018 Yes Yes No Yes
City of Deer Park Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes
City of El Lago Yes 7/26/2015 3/8/2019 Yes Yes No Yes
City of Friendswood No N/A 9/14/2018 Yes Yes Yes Yes
City of Galena Park Yes 7/26/2015 10/18/2018 Yes Yes No Yes
City of Hedwig Village Yes 7/26/2015 10/18/2018 Yes Yes No Yes
City of Hilshire Village Yes 7/26/2015 10/18/2018 Yes Yes No Yes
City of Humble Yes 7/26/2015 9/6/2018 Yes Yes No Yes
City of Hunters Creek Village Yes 7/26/2015 10/18/2018 Yes Yes No Yes
City of Jacinto City Yes 7/26/2015 10/18/2018 Yes No No No
City of Jersey Village Yes 7/26/2015 10/16/2018 Yes Yes No Yes
City of Katy Yes 7/26/2015 10/18/2018 Yes Yes No Yes
City of La Porte Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes
City of Missouri City Yes 7/26/2015 8/16/2018 Yes Yes Yes Yes
City of Morgan’s Point Yes 7/26/2015 10/18/2018 Yes Yes No Yes
City of Nassau Bay Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes
City of Pasadena Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes
City of Piney Point Village Yes 7/26/2015 10/18/2018 Yes Yes No Yes
City of Seabrook Yes 7/26/2015 10/18/2018 Yes Yes Yes Yes
City of Shoreacres Yes 7/26/2015 10/17/2018 Yes Yes Yes Yes
City of Southside Place Yes 7/26/2015 N/A No No No No
City of Spring Valley Yes 7/26/2015 10/18/2018 Yes Yes No Yes
City of Stafford Yes 7/26/2015 10/17/2018 Yes Yes No Yes
City of Taylor Lake Village Yes 7/26/2015 2/21/2019 Yes Yes Yes Yes
City of Tomball Yes 7/26/2015 10/18/2018 Yes Yes No Yes
City of Webster Yes 7/26/2015 10/18/2018 Yes Yes No Yes
Cypress Fairbanks ISD No N/A 9/26/2018 Yes No No No
City of West University Place Yes 7/26/2015 9/29/2018 Yes Yes Yes Yes
Harris County Flood Control District Yes 7/26/2015 9/19/2018 Yes Yes No Yes
Harris County ESD #12 No N/A 9/20/2018 Yes Yes No Yes
Harris County Hospital District dba Harris
Health System
Yes 7/26/2015 10/9/2018 Yes Yes No Yes
Houston Community College No N/A 11/6/2018 Yes Yes No Yes
Houston ISD No N/A 10/9/2018 Yes Yes No Yes
Huffman ISD No N/A 10/18/2018 Yes Yes No Yes
Pasadena ISD No N/A 10/9/2018 Yes Yes No Yes
Lone Star College Yes 7/26/2015 10/17/2018 Yes Yes No Yes
Texas Medical Center No N/A 10/19/2018 Yes Yes No Yes
Texas Southern University No N/A 10/18/2018 Yes Yes No Yes
University of Houston No N/A 10/18/2018 Yes Yes No Yes
Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes
xxv
FINAL COVERAGE UNDER THE PLAN
Of the 42 local governments that submitted letters of intent to participate, 39 fully met the participation
requirements specified by the Steering Committee. The principal requirement not met by the other partners was
completion of the jurisdictional annex template following the workshops. Only the 39 partners that submitted
completed templates are included in this volume and will seek DMA compliance under this plan. The remaining
jurisdictions will need to follow the linkage procedures described in Appendix B of this volume. Table 1 lists the
jurisdictions that submitted letters of intent and their ultimate status in this plan.
Harris County HMP Project Area
Planning Partners - Special Districts
Independent School Districts
Cypress Fairbanks ISD
Houston ISD
Huffman ISD
Pasadena ISD
College Districts
Houston Community College District
Lone Star College System District
Emergency Service Districts
Har ris County ESD 12
Harris County
0 4 82Miles
±
Harris County Multi-Hazard Mitigation Action Plan; Volume 2 — Planning Partner Annexes
xxvii
ACRONYMS
The following acronyms are used throughout the annexes in this volume:
• BAWA — Baytown Area Water Authority
• BBFFDRP — Buffalo Bayou Flood Damage Reduction Project
• BFE — base flood elevation
• CDBG — Community Development Block Grant
• CFM — Certified Floodplain Manager
• CLOMR — Conditional Letter of Map Revision
• CRS — Community Rating System
• CWOP — Citizen Weather Observer Program
• CWPP — Community Wildfire Protection Plan
• EAS/iPAWS — Emergency Alert System/Integrated Public Alert and Warning System
• EHLS — Environmental Health and Life Safety
• EMC — Emergency Management Coordinator
• EMCID — East Montgomery County Improvement District
• ENG — Engineering Department
• EOC — emergency operations center
• EOP — emergency operations plan
• EPA — U.S. Environmental Protection Agency
• ETJ — extraterritorial jurisdiction
• FDC — fire department connection
• FDPO — flood damage prevention ordinance
• FDRP — flood damage reduction project
• FEMA — Federal Emergency Management Agency
• FF&E — furniture, fixtures and equipment
• FIRM — Flood Insurance Rate Map
• FIS — Flood Insurance Study
• FMA — Flood Mitigation Assistance Grant Program
• GCWA — Gulf Coast Water Authority
• HCED — Harris County Engineering Department
• HCFCD — Harris County Flood Control District
• HCP — Habitat Conservation Plan
• H-GAC — Houston-Galveston Area Council
• HGSD — Harris-Galveston Subsidence District
• HMA — Hazard Mitigation Assistance
• HMGP — Hazard Mitigation Grant Program
• HMP — hazard mitigation plan
• IBC — International Building Code
• IECC — International Energy Conservation Code
• ISD — independent school district
• IT — information technology department
• KBDI — Keetch-Byram Drought Index
• LEPC — local emergency planning committee
• LERRD — land, easements, rights-of-way, relocation, and disposal areas
• LiMWA — limit of moderate wave action
• LMI — low to moderate income
Introduction
xxviii
• LOMA — letter of map amendment
• LOMR — letter of map revision
• MEP — mechanical, engineering and plumbing
• MSDS — material safety data sheets
• MVPD — Memorial Villages Police Department
• NFIP — National Flood Insurance Program
• NOAA — National Oceanic and Atmospheric Administration
• O&M — operations and maintenance
• OHSEM — Office of Homeland Security and Emergency Management
• OHWM — ordinary high-water mark
• PA — Public Assistance
• PDM — Pre-Disaster Mitigation
• PHES — Harris County Public Health and Environmental Services
• PLNG — Planning Department
• PW — public works department
• RL — repetitive loss
• SBFDRP — Sims Bayou Flood Damage Reduction Project
• SDS — State Dam Safety
• SERLEPC — Southeast Regional Local Emergency Planning Committee
• SETRAC — Southeast Texas Regional Advisory Council
• SFHA — special flood hazard area
• SJRA — San Jacinto River Authority
• SMP — shoreline management plan
• SRL — severe repetitive loss
• SWQMP — surface water quality master plan
• TCEQ — Texas Commission on Environmental Quality
• TDECU — Texas Dow Employees Credit Union
• TDEM — Texas Division of Emergency Management
• THIRA — threat & hazard identification & risk
• TIRZ — tax increment reinvestment zone
• UASI — urban area security initiative
• ULDC — Unified Land Development Code
• WCID — water control and improvement district
• WTP — Water treatment plant
• WWTP — Wastewater treatment plant
1-1
1. HARRIS COUNTY
1.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Brian Murray, Public Information Officer
6922 Katy Road
Houston, TX 77024
Telephone: 713-881-3100
E-mail Address: brian.murray@oem.hctx.net
Bill Wheeler, Deputy EMC
6922 Katy Road
Houston, TX 77024
Telephone: 713-881-3100
E-mail Address: bill.wheeler@oem.hctx.net
1.2 JURISDICTION PROFILE
1.2.1 Location
Harris County, which covers 1,703 square miles (U.S. Census Bureau, 2014), is located on the upper Gulf Coast
in Southeast Texas. It is bordered by Waller County on the northwest side, Montgomery County on the north side,
Liberty and Chambers Counties on the eastside, Galveston and Brazoria Counties on the south side, and Fort
Bend County on the west side.
Harris County’s southern half is level coastal prairie and the northern half touches the rolling East Texas
timberlands. Central Harris County is 55 feet above sea level (The Handbook of Texas Online). The land rises
gradually to higher than 200 feet on the northern border (The Handbook of Texas Online). Small bluffs around
upper Galveston Bay descend to sea level. The soil is heavy black coastal clay in the south and sandy loam north
of Buffalo Bayou (The Handbook of Texas Online). Native trees include pine and hardwoods such as oak, ash,
and hickory (The Handbook of Texas Online). The average annual rainfall in Harris County is 48.19 inches (The
Handbook of Texas Online), and the mean temperature is 69.1 Fahrenheit. (The Handbook of Texas Online).
1.2.2 History
According to the Handbook of Texas Online, Archeological sites in Harris County reveal the presence of human
beings 6,000 years ago. The oldest contains a previously undisturbed deposit of bone remains and dart points
dating from 4000 to 1000 B.C. A site on Clear Lake features a shell midden and cemetery with early ceramics
dating between 1400 B.C. and A.D. 950.
The first Anglo-Americans to explore Harris County were members of the various filibustering expeditions
launched from New Orleans between 1815 and 1820 to aid the Mexican Republicans rebelling against Spain.
Using Galveston Island and Bolivar Peninsula as a base, the men belonging to the expeditions and encampments
of Louis Michel Aury, Francisco Xavier Mina, Jean Laffite, and James Long looked around the San Jacinto
estuary for future homesites, their expected reward for freeing Mexico from Spain. Some of these men were
among the pioneer settlers arriving by boat from Louisiana in early 1822, just after the Mexican War of
Independence.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
1-2
Responding to Stephen F. Austin’s advertisements, the families wrongly assumed that the San Jacinto estuary was
part of his empresario grant. Some moved to the Brazos River in 1824, but merchants and boatmen remained to
exploit what turned out to be the best transportation system in Texas and to petition successfully for inclusion in
the Austin grant. Since Galveston Island and the Gulf shore were forbidden to Anglo settlement, Harris County
was the southeastern border of the colony. The pioneers found no Indians living in the future Harris County. In
July 1824 a state land commissioner, the Baron de Bastrop, arrived and spent two months issuing twenty-nine
titles to settlers, even though surveys were incomplete. The pioneers, including Nathaniel Lynch, William Scott,
and John R. Harris, chose sites along Buffalo Bayou, the San Jacinto River, and the San Jacinto estuary. Between
1828 and 1833, when Austin’s colonization effort virtually ended, twenty-three more families secured titles
elsewhere in the county, usually along watercourses. In 1826, John R. Harris laid out Harrisburg on his league
where Brays Bayou joined Buffalo Bayou, the head of navigation.
Harrisburg County was formed by the First Congress on December 22, 1836. The lawmakers also named Andrew
Briscoe chief justice and the infant city of Houston the county seat and national capital. The county encompassed
the territory of the old municipality plus Galveston Island (the mainland was attached to Brazoria County) until
May 1838, when its modern boundaries were established. In December 1839, Congress changed the name to
Harris County, in honor of John R. Harris.
Between 1903 and 1907 oil was discovered on the eastern shore of the San Jacinto estuary at Goose Creek and
Tabbs Bay. Migrant roughnecks and their families moved to the area and established a temporary boomtown amid
the derricks between 1915 and 1917.
The development of Harris County as an industrial power began in 1911, when voters approved the formation of
the Harris County Ship Channel Navigation District. In 1914 the United States Army Corps of Engineers finished
deepening the existing fifty-mile-long channel to twenty-five feet from the Gulf through Galveston Bay and up
the San Jacinto River and Buffalo Bayou to the district’s turning basin at the Port of Houston. By 1918 petroleum
refineries began locating along Buffalo Bayou and the San Jacinto River, as did various other industries. Since
that time, the channel has been deepened to fifty feet and widened to accommodate larger vessels. Exports from
the port include rice, wheat, grain sorghums, cotton, caustic soda, cement, and petroleum products. Imports
include crude oil, iron ore, molasses, coffee, gypsum, and automobiles.
Though the area was increasingly urbanized, in 2002 the county had 2,452 farms and ranches covering 304,868
acres, 51 percent of which were devoted to pasture, 41 percent to crops, and six percent to woodlands.
1.2.3 Climate
The climate of Harris County is described as humid subtropical. The general temperature range, according to the
National Oceanic and Atmospheric Agency is 84.6 F in August and 53.1 F in January. Annual rainfall averages
49.77 inches on 104 days. Accumulating snow events are unusual; freezing rain or sleet are more common in the
winter months. The most common weather related threat is flooding but the Gulf Coast region is susceptible to
tropical cyclones and tornadoes.
1.2.4 Governing Body Format
Texas cities of more than 5,000 citizens adopt home-rule charters and are governed by city councils and either
city managers, city administrators, or mayors.
Cities having fewer than 5,000 residents, or “general law” cities, have powers and duties specifically granted by
the Texas Constitution and state law. A city manager or city administrator plan can be adopted in any general law
city. Some home rules cities now have fewer than 5,000 residents because their population has declined since they
adopted their home rule charters.
Harris County
1-3
Counties’ powers and duties are specifically granted and limited by the Texas Constitution and state law. Each
county has a commissioner’s court, which consists of four commissioners, each elected from the Commissioner’s
Precinct, and the County Judge elected from the entire county. In smaller counties, the County Judge retains
judicial responsibilities in probate and insanity cases. Special Districts are created to perform a specific function.
1.2.5 Local Mitigation Planning Team Members
This annex was developed over the course of several months with input from many county departments including
the Office of Homeland Security and Emergency Management, County Engineer, Building Management, Budget
Management, Public Health, and other county departments. All departments were asked to contribute to the annex
development through reviewing and contributing to the capability assessment, reporting on the status of
previously identified actions, and participating in action identification and prioritization. An action development
meeting was held on February 20, 2019 and was attended by representatives from all previously listed
departments. Once actions had been identified and compiled in the annex, a draft was internally circulated for
comment.
1.3 CURRENT TRENDS
1.3.1 Population
According to U.S. Census Bureau 2017 Population Estimate, the population of Harris County was 4,652,980.
Since 2010, the population has grown by 13.7 percent. It is the third largest county by population in the United
States; the population exceeds that of 24 states.
1.3.2 Development
Table 1-1 summarizes development trends in the performance period since the preparation of the previous hazard
mitigation plan, as well as expected future development trends.
1.4 CAPABILITY ASSESSMENT
Harris County performed an assessment of its existing capabilities for implementing hazard mitigation strategies.
The introduction at the beginning of this volume of the hazard mitigation plan describes the components included
in the capability assessment and their significance for hazard mitigation planning. This section summarizes the
following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 1-2.
• Development and permitting capabilities are presented in Table 1-3.
• An assessment of fiscal capabilities is presented in Table 1-4.
• An assessment of administrative and technical capabilities is presented in Table 1-5.
• An assessment of education and outreach capabilities is presented in Table 1-6.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 1-7.
• Classifications under various community mitigation programs are presented in Table 1-8.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 1-9.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
1-4
Table 1-1. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
N/A
Is your jurisdiction expected to annex any areas during the performance period of this plan?
No
• If yes, describe land areas and dominant uses.
N/A
• If yes, who currently has permitting
authority over these areas?
N/A
Are any areas targeted for development or major redevelopment in the next five years? No
• If yes, briefly describe, including whether any of the areas are in known hazard risk
areas
N/A
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 12,090 10,571 10,235 10,430 10,710
Multi-Family 273 222 61 60 250
Other (commercial, mixed use, etc.) 1092 965 957 767 939
Total 13,455 11,758 11,253 11,257 11,899
Provide the number of new-construction
permits for each hazard area or provide a qualitative description of where development
has occurred.
• Special Flood Hazard Areas: Approximately 6% of permits issued are in the SFHA
• Landslide: N/A
• High Liquefaction Areas: N/A
• Tsunami Inundation Area: N/A
• Wildfire Risk Areas: N/A
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory
exists, provide a qualitative description.
Unincorporated Harris County is growing rapidly with residential and commercial
development, but there is still a large percentage of agricultural and undeveloped
properties.
Harris County
1-5
Table 1-2. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code No No No No
Comment:
Zoning Code No No No No
Comment:
Subdivisions Yes Yes Yes Yes
Comment: Regulations of Harris County, Texas for the Approval and Acceptance of Infrastructure, July 9, 2019
Stormwater Management Yes Yes Yes Yes
Comment: Regulations of Harris County, Texas for Stormwater Quality Management, September 1, 2016
Post-Disaster Recovery Yes Yes Yes Yes
Comment: Annex J of the Harris County’s Basic Plan, 2014
Real Estate Disclosure No Yes Yes Yes
Comment:
Growth Management No No No Yes
Comment:
Site Plan Review Yes Yes Yes Yes
Comment: Regulations of Harris County, Texas for the Approval and Acceptance of Infrastructure, July 9, 2019
Environmental Protection Yes Yes Yes Yes
Comment: Regulations of Harris County, Texas for Stormwater Quality Management, September 1, 2016
Flood Damage Prevention Yes Yes Yes Yes
Comment: Regulations of Harris County, Texas for Floodplain Management, July 9, 2019
Emergency Management Yes Yes Yes Yes
Comment: Texas Gov Code, Title 4. Chapter 418. Emergency Management, 1975
Climate Change No No No Yes
Comment:
Planning Documents
General Plan Yes No Yes Yes Comment: Harris County Basic Plan, 2015
Capital Improvement Plan Yes No Yes Yes
How often is the plan updated? each fiscal year
Comment: FY 2019 Interim Capital Improvements Program, February 26, 1019
Disaster Debris Management Plan Yes Yes Yes Yes
Comment: Annex K of the Harris County Basic Plan, 2015
Floodplain or Watershed Plan Yes Yes Yes Yes
Comment: Policy, Criteria & Procedure Manual, July 9, 2019
Stormwater Plan Yes Yes Yes Yes
Comment: Policy, Criteria & Procedure Manual, July 9, 2019
Urban Water Management Plan No No No Yes
Comment:
Habitat Conservation Plan No No No Yes
Comment:
Economic Development Plan No No No Yes
Comment:
Shoreline Management Plan No Yes No Yes
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
1-6
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Community Wildfire Protection Plan Yes Yes Yes Yes
Comment: Harris County Community Wildfire Protection Plan, August 2011
Forest Management Plan No No No Yes
Comment:
Climate Action Plan No Yes No Yes
Comment:
Comprehensive Emergency Management Plan Yes Yes Yes Yes
Comment: Harris County Basic Plan, 2015
Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes Yes Yes
Comment: A regional THIRA is conducted on annually for UASI and HGAC.
Post-Disaster Recovery Plan Yes Yes Yes Yes
Comment: Annex J of the Harris County Basic Plan, 2014, Also, Harris County Public Health (HCPH), Recovery Plan, Appendix 20.0,
July 2019
Continuity of Operations Plan Yes Yes Yes Yes
Comment: Continuity of Operations Plans are developed and maintained by county departments
Public Health Plan Yes Yes Yes Yes
Comment: Annex H of the Harris County Basic Plan, 2018. Also, Harris County Public Health has completed Texas public health risk
assessment which details the top hazards looking at health and medical affects.
Table 1-3. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Harris County Permits Office
Does your jurisdiction have the ability to track permits by hazard area? Yes
Does your jurisdiction have a buildable lands inventory? No
Table 1-4. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Harris County
1-7
Table 1-5. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Harris County Engineering, and others
Engineers or professionals trained in building or infrastructure construction practices Yes Harris County Engineering, and others
Planners or engineers with an understanding of natural hazards Yes Multiple county departments
Staff with training in benefit/cost analysis Yes Multiple county departments
Surveyors Yes Harris County Engineering, and others
Personnel skilled or trained in GIS applications Yes Multiple county departments
Scientist familiar with natural hazards in local area Yes Multiple county departments
Emergency manager Yes Harris County OHSEM
Grant writers Yes Multiple county departments
Table 1-6. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. Current local hazard mitigation plan is online
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. Publicizing previous plan; future dedicated website
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. Public outreach events, Ready Harris website
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. EPI notification system
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
1-8
Table 1-7. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? HC Engineering Department
Who is your floodplain administrator? (department/position) Jonathan Steiber / HCED, Floodplain
Administrator
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? January 1, 2018
Does your floodplain management program meet or exceed minimum requirements? Exceeds
• If exceeds, in what ways? Regulate 500-yr floodplain, exceed
minimum freeboard
When was the most recent Community Assistance Visit or Community Assistance Contact? 2003
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? Yes
• If so, state what they are. Preliminary Flood Maps
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why.
Does your floodplain management staff need any assistance or training to support its
floodplain management program?
No
• If so, what type of assistance/training is needed?
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification? Yes – unlikely to occur
• If no, is your jurisdiction interested in joining the CRS program?
How many flood insurance policies are in force in your jurisdiction?a 120,396
• What is the insurance in force? $36,024,666,100
• What is the premium in force? $54,432,470
How many total loss claims have been filed in your jurisdiction?a 46,830
• How many claims are still open or were closed without payment? 7,151
• What were the total payments for losses? $2,462,159,673
a. According to FEMA statistics as of March 31, 2019
Table 1-8. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes 7 10/1/2017
Building Code Effectiveness Grading Schedule No N/A N/A
Public Protection No N/A Date
Storm Ready Yes N/A 2016
Firewise Yes N/A Date
Harris County
1-9
Table 1-9. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Medium
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
1-10
1.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
1.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Disaster Recovery Plan
• Floodplain Management Plan
• Stormwater Management Plan
• Basic Plan and Annexes
• Continuity of Operations Plan
• Radiological Emergency Plan
• Transportation Plan
• Community Rating System
• Regional Planning
1.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Capital Improvements Plan
• Historic Preservation Plan
1.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 1-11 lists past occurrences of natural hazards for which specific damage was recorded in Harris County.
Other hazard events that broadly affected the entire planning area, including Harris County, are listed in the risk
assessments in Volume 1 of this hazard mitigation plan.
Table 1-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 $3 Billion
Severe Storms and Flooding 4269 DR 2016 $35 Million
Severe Storms and Flooding 4272 DR 2016 $25 Million
Severe Storms, Tornadoes, Straight Line Winds and Flooding 4245 DR 2015 $12 Million
Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR 2015 $5 Million
Harris County
1-11
1.7 HAZARD RISK RANKING
Table 1-12 presents a local ranking for Harris County of all hazards of concern for which this hazard mitigation
plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As
described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for
each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target
hazards with high and medium rankings.
Table 1-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
5 Coastal Erosion 6 Low
5 Dam Failure 6 Low
5 Drought 6 Low
4 Earthquake 16 Medium
2 Flooding 36 High
5 Mass Movement 6 Low
1 Severe Weather 51 High
1 Hurricane 51 High
5 Tsunami 6 Low
3 Wildfire 24 Medium
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
1.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
1.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 5,316
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 702
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated:
1,102
1.8.2 Other Noted Vulnerabilities
No additional vulnerabilities specific to this jurisdiction have been identified.
1.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 1-12 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
1-12
Table 1-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update
Install generators for critical county facilities in order to sustain
essential services and critical operations during and after a
disaster.
x HC-1
Comment: Not Started
Harden critical County Facilities and Offices with hurricane
shutters.
x HC-2
Comment: Not started
Install landscaping with drought resistant plants and trees for
shading around County facilities to reduce exposure from
extreme heat.
x HC-3
Comment: Not Started
Implement a Clear cut dead brush and tree limbs program
around county facilities that could be a burn agent to wildfires. x HC-4
Comment: Not started
Develop, improve and implement an enhanced mass public
warning and alert system (iPAWS) within the Harris County
Joint Information Center to provide warning capability
throughout unincorporated Harris County to mitigate the risk of
natural hazards and disasters impacting critical infrastructure
and residents.
x
Comment: Not started
Install enhanced and improved lightning and surge protection
devices/systems in the Harris County Emergency Operations
Center
x
Comment: Not started
Develop a mitigation strategy to acquire personnel and funding
to revise the Harris County Multi-jurisdictional Local Mitigation
Plan.
x
Comment: Not started
Develop/construct shelter for critical vehicles/equipment to
minimize damage
x HC-5
Comment: Not started
Identify new studies and improved assessment methods for
analysis of High Risk dams and assess possible risk of other
low or moderate risk dams/levees.
x HC-6
Comment: Not started
Develop, enhance and implement mitigation strategies with
Emergency Service Districts and local jurisdictions to limit the
adverse impact of Toxic Releases/HAZMAT and Energy
Pipeline Failures. (Fire Marshall)
x HC-7
Comment: Not started
Enhance the total CRS rating/score for the next three years
through various CRS activities, such as flood risk reduction
and drainage improvements.
x
Comment: Complete
Harris County
1-13
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
Develop a mitigation strategy to install and implement a
Wildfire/Drought Warning System to determine KBDI and
provide the County and residents with advance warning of
severe drought conditions and wildfire hazards. (Fire Marshall)
Comment: Initialed studies in a portion of these Subdivision.
x HC-8
Modify or replace critical County buildings prone to flooding
with resilient technologies
Comment: FEMA Mitigation (Sec 406) is currently being
pursued for some County buildings Comment: Not started
x HC-9
Study for future Evacuation Routes for various areas in Harris County
Comment: Not started
x HC-10
1.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 1-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 1-15
identifies the priority for each action. Table 1-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 1-14. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing
Assets Objectives Met Lead Agency Support Agency
Estimated
Cost Sources of Funding Timelinea
Action HC-1 — Install generators for critical county facilities in order to sustain essential services and critical operations during and after
a disaster.
Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass
movement, Severe weather, Tsunami and Wildfire
New and Existing 1, 3, 10, 11, 12, 13,
14, 15
Emergency
Management
Engineering Medium HMGP, PDM Short-term
Action HC-2 — Harden critical county facilities and offices with hurricane shutters.
Hazards Mitigated: Sever Weather, Hurricane
New and Existing 1, 3, 6, 8, 10, 13, 15 Emergency
Management
Engineering Low Staff Time, General Funds Short-term
Action HC-3 — Install landscaping with drought resistant plants and trees for shading around County facilities to reduce exposure from
extreme heat.
Hazards Mitigated: Drought, Wildfire
New and Existing 2, 3, 5, 6, 8, 11 Engineering Fire Marshall Low Staff Time, General Funds Short-term
Action HC-4 — Implement a clear cut dead brush and tree limbs program around county facilities that could be a burn agent to wildfires.
Hazards Mitigated: Drought, Wildfire
New and Existing 2, 3, 5, 6, 8, 11 Engineering Fire Marshall Low Staff Time, General Funds Short-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
1-14
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action HC-5 — Develop/construct shelter for critical vehicles/equipment to minimize damage
Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass
movement, Severe weather, Tsunami and Wildfire
New 3, 6, 9, 11, 12, 13, 15 Engineering Emergency
Management
Medium HMGP, PDM, FMA Short-term
Action HC-6 — Identify new studies and improved assessment methods for analysis of High Risk dams and assess possible risk of other
low or moderate risk dams/levees.
Hazards Mitigated: Dam Failure, Flooding, Severe Weather, Hurricane
New 1, 3, 5, 7, 8, 9, 10,
11, 12, 13, 14, 15
Emergency
Management
As Required Medium HMGP Short-term
Action HC-7 — Develop, enhance and implement mitigation strategies with Emergency Service Districts and local jurisdictions to limit the
adverse impact of Toxic Releases/HAZMAT and Energy Pipeline Failures.
Hazards Mitigated: Earthquake, Flooding, Mass Movement, Hurricane, Severe Weather
New 1, 3, 5, 6, 7, 8, 9 Fire Marshall Emergency
Management
Low Staff Time, General Funds Short-term
Action HC-8 — Develop a mitigation strategy to install and implement a Wildfire/Drought Warning System to determine KBDI and provide
the County and residents with advance warning of severe drought conditions and wildfire hazards.
Hazards Mitigated: Drought, Wildfire
Existing 1, 2, 3, 4, 6, 7, 9, 10,
11, 12
Fire Marshall Emergency
Management
Medium HMGP, PDM, FMA Short-term
Action HC-9 — Modify or replace critical County buildings prone to flooding with resilient technologies
Hazards Mitigated: Flooding, Severe Weather, Hurricane
New and Existing 3, 6, 8, 10, 11, 12, 15 Engineering Emergency
Management
Medium HMGP, PDM, FMA Short-term
Action HC-10 — Study for future Evacuation Routes for various areas in Harris County
Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass
movement, Severe weather, Tsunami and Wildfire
New and Existing 3, 10 Emergency
Management
As Required Low HMGP, PDM, FMA Short-term
Action HC-11 — Develop and implement technological solutions to provide efficient emergency public information in up to six spoken
languages and American Sign Language.
Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass
movement, Severe weather, Tsunami and Wildfire
Existing 1, 3, 4, 11, 14 Emergency
Management
As Required Low Staff Time, General
Funds, or HMGP
Short-term
Action HC-12 — Obtain funding to hire a contractor to annually sustain the Harris County Local Hazard Mitigation Plan through the 2025
update.
Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass
movement, Severe weather, Tsunami and Wildfire
Existing 2, 3, 4, 5, 7, 8, 9, 10,
11, 13, 14, 15
Emergency
Management
As Required Low Staff Time, General
Funds, or HMGP
Short-term
Action HC-13 — EOC Expansion
Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement,
Severe weather, Tsunami and Wildfire
New and Existing 14 Emergency
Management
As Required Medium General Funds, HMGP,
PDM, FMA
Long-term
Harris County
1-15
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action HC-14 — Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement,
Severe weather, Tsunami and Wildfire
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
Harris County HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 1-15. Mitigation Action Priority
Action #
# of
Objectives Met Benefits Costs
Do Benefits
Equal or
Exceed Costs?
Is Project
Grant-Eligible?
Can Project Be Funded Under
Existing
Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
HC-1 8 Medium Medium Yes Yes No Medium High
HC-2 7 Medium Low Yes No Yes Medium Low
HC-3 6 Low Low Yes No Yes Medium Low
HC-4 6 Medium Low Yes No Yes Medium Low
HC-5 7 High Medium Yes Yes No Medium Medium
HC-6 13 Medium Medium Yes Yes No Medium Medium
HC-7 7 Medium Medium Yes No Yes Medium Low
HC-8 10 Medium Medium Yes Yes No Medium Medium
HC-9 7 High High Yes Yes No Medium Medium
HC-10 2 Medium Low Yes Yes No Medium Medium
HC-11 5 High Low Yes Yes No High High
HC-12 12 Medium Low Yes Yes No Medium Medium
HC-13 1 Medium Medium Yes Yes No Medium Medium
HC-14 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 1-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public Education &
Awareness
Natural Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilient
Community Capacity
Building
High-Risk Hazards
Severe Weather HC-5, HC-14 HC-2, HC-8 HC-5, HC-14 HC-1, HC-2, HC-6,
HC-8, HC-10,
HC-12, HC-14
HC-2, HC-6,
HC-8, HC-12
HC-7, HC-13
Hurricane HC-5, HC-9,
HC-14
HC-2, HC-8,
HC-9
HC-5, HC-14 HC-9 HC-1, HC-2, HC-6,
HC-8, HC-12, HC-14
HC-2, HC-6,
HC-8, HC-12
HC-7, HC-13
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
1-16
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public Education &
Awareness
Natural Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilient
Community Capacity
Building
Flood HC-5, HC-9,
HC-12, HC-14
HC-9 HC-5, HC-14 HC-9 HC-1, HC-12, HC-14 HC-12 HC-7, HC-13
Medium-Risk Hazards
Wildfire HC-3, HC-4,
HC-5, HC-14
HC-3, HC-4,
HC-11
HC-5, HC-11,
HC-14
HC-3, HC-4 HC-1, HC-11, HC-14 HC-3,
HC-4
HC-7, HC-13
Low-Risk Hazards
Earthquake HC-5, HC-14 HC-5, HC-14 HC-1, CH-6, HC-10,
HC-14
HC-7, HC-13,
HC-14
Tsunami HC-5, HC-14 HC-5, HC-14 HC-1, HC-14 HC-7, HC-13,
HC-14
Drought HC-3, HC-5,
HC-14
HC-3, HC-11 HC-5, HC-11,
HC-14
HC-1, HC-11, HC-14 HC-3 HC-7, HC-13,
HC-14
Mass
Movement
HC-5, HC-14 HC-5, HC-14 HC-1, HC-14 HC-7, HC-13,
HC-14
Dam Failure HC-5, HC-9,
HC-14
HC-9 HC-5, HC-14 HC-9 HC-1, HC-14 HC-7, HC-13,
HC-14
a. See the introduction to this volume for explanation of mitigation types.
1.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed for this annex.
• Regulations of Harris County, Texas for Floodplain Management Flood Damage Prevention
Ordinance — the flood damage prevention ordinance was reviewed for compliance with the National
Flood Insurance Program.
• FEMA Flood Insurance Study for Harris County, TX (FEMA 2017). This outlined the principal flood
problems and floodplains in Harris County
• Harris County Fire Code (March 2015). These regulations adopt the latest edition of the uniform fire
code.
• Regulations of Harris County, Texas for the Approval and Acceptance of Infrastructure (January 2019).
These regulations require stormwater and detention system design.
• Regulations of Harris County, Texas for Stormwater Quality Management (September 2016). These
regulation require minimum standards for prevent pollution in stormwater discharge.
• Harris County Community Wildfire Protection Plan (August 2011). This plan provides recommendations
for mitigating the threat to property from wildland fires.
• Harris County Flood Control District Policy Criteria & Procedure Manual for Approval and Acceptance
of Infrastructure (October 2018). Provide policies and criteria for land development and infrastructure
projects that are effective, consistent and practical.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• State of Texas Hazard Mitigation Plan (October 2018) — This plan, prepared by the Texas Department of
Public Safety, was used to ensure that the County’s HMP was consistent with the State’s Plan.
Harris County
1-17
Hazard maps for Harris County are provided in Volume 1 of this hazard mitigation plan
2-1
2. CITY OF BAYTOWN
2.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Jamie Galloway, Emergency Management
Coordinator
205 E. Wye Drive
Baytown, TX 77521
Telephone: 2810-422-1129
e-mail Address: Jamie.Galloway@baytown.org
David Alamia, Deputy Emergency Management
Coordinator
205 E. Wye Drive
Baytown, TX 77521
Telephone: 281-422-1168
e-mail Address: David.Alamia@baytown.org
2.2 JURISDICTION PROFILE
2.2.1 Location
The City of Baytown is located just 30 miles east of downtown Houston, Baytown is the third largest city in
Harris County, and is easily accessible via Interstate 10, Highway 146, and the Grand Parkway (Hwy 99).
Baytown is also located in both Harris County and partially in Chambers County.
The current boundaries generally extend along Interstate 10 from the mouth of the San Jacinto River to Cedar
Bayou with Goose Creek running through the middle of the city. The city is roughly bordered along the north by
Interstate 10. Baytown is also bordered by water on three sides. Along the south and west is Galveston Bay. On
the east is Cedar Bayou. Portions of the city to the east of Cedar Bayou lie in Chambers County.
Baytown currently encompassing an area of approximately 34 square miles
2.2.2 History
Originally three separate towns, the City of Baytown combined Goose Creek (dating back to before 1850), and oil
boom towns Pelly (established in the late 1910s), and East Baytown (early 1920s) when it incorporated in 1948.
The City of Baytown’s strategic location has encouraged a successful and diverse blend of employment
opportunities and recreational activities centered near the area’s waterways. Located in the Texas Independence
Trail region, Baytown is rich in history. General Sam Houston was an early resident, and the area played a
significant role in the Battle of San Jacinto in 1836. The region was also home to the Karankawa Indians; their
artifacts can still be found at the Baytown Nature Center. The following is a timeline of Baytown’s history:
• 1822 — Nathaniel Lynch sets up the Lynch Ferry at the junction of the San Jacinto River with Buffalo
Bayou.
• 1824 — William Scott receives land grant of over 9,000 acres covering much of what is now present day
Baytown.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
2-2
• 1847 — Ashbel Smith purchased a plantation, known as Evergreen, on Tabbs Bay (outbreak of Civil
War, he organized the Bayland Guards for confederate service).
• 1864 — A shipyard established at the mouth of Goose Creek in the early 1850s by John and Thomas S.
Chubb built one ship, the Bagdad, which was launched in 1864 and had to run a Yankee blockade at
Galveston to escape.
• 1866 – 1867 — Ashbel Smith and several associates founded the Bayland Orphans’ Home for Children of
Confederate soldiers.
• June 2, 1908 — Successful oil strike near Tabbs bay by Goose Creek Production Company.
• August 23, 1916 — Opening of Goose Creek Oilfield when contractor Charles Mitchell brought in a
10,000-barrel gusher at 2,017 feet.
• 1917 — Humble Oil and Refining Company founded by Ross S. Sterling.
• August 17, 1917 — The largest well of the field was Sweet 16 of the Simms-Sinclair Company gushing
35,000 barrels a day from a depth of 3,050 feet. This well stayed out of control for three days before the
crew could close it.
• January 1919 — Goose Creek residents vote to consolidate.
• 1919 — Construction beings of Humble Oil and Refining Company.
• 1920 — Pelly residents vote to consolidate.
• April 21, 1921 — Humble Oil and Refinery construction completed.
• 1923 — Humble laid out the streets, provided utilities and sold lots for the community development.
• December 1945 — Pelly annexes the area known as Baytown which had never incorporated.
• February 1946 — Pelly and Goose Creek vote to consolidate and choose the name “Baytown”.
• January 24, 1948 — ”Tri-Cities” Unite as Baytown (Baytown Goose Creek and Pelly) when a city charter
is approved.
2.2.3 Climate
Baytown’s climate is classified as humid subtropical. Prevailing winds from the south and southeast bring heat
from the deserts of Mexico and moisture from the Gulf of Mexico.
Summer temperatures typically have highs near 90 °F (32 °C) though higher temperatures are not uncommon. The
city’s proximity to the bay and the winds that it generates moderate the area’s temperatures and ease the effects of
the humidity, creating a more pleasant climate than inland communities like Houston.
Winters in the area are temperate with typical January high of 61 °F (16 °C) and lows are near 42 °F (6 °C).
Snowfall is rare. Annual rainfall averages exceed 49 inches (124 cm), with an annual average of 82 precipitation
days.
The average elevation of Baytown is approximately 34 feet above sea level.
2.2.4 Governing Body Format
The City of Baytown is a Home Rule City operating under the Council-Manager form of government, with a City
Council composed of a Mayor (elected at large) and six single district Council members. The City Council
appoints a City Manager to act as the chief administrative and executive officer of the City.
The City Council assumes responsibility for the adoption of this plan; the Baytown Fire Department, Emergency
Management Division will oversee its implementation. Development of this annex was carried out by the
members of the City of Baytown Local Mitigation Planning Team, whose members are listed in Table 2-1.
City of Baytown
2-3
Table 2-1. Local Mitigation Planning Team Members
Name Title
Jamie Galloway Emergency Management Coordinator
David Alamia Deputy Emergency Management Coordinator
Ronald Roberts Assistant Fire Chief – Planning
Ajay Shakyaver Director Engineering / Floodplain Administrator
Tiffany Foster Director, Planning
Russell Davidson Chief Building Official
Frank Simoneaux Director, Public Works
Dana Dalbey Assistant Fire Chief – Administration
Tony Gray Director, Health
2.3 CURRENT TRENDS
2.3.1 Population
According to Texas Home Town Locator, the population of Baytown as of July 2018 was 81,229. Since 2015, the
population has grown at an average annual rate of 2.4 percent.
2.3.2 Development
The economic impact of continued expansion in the industrial, logistic, and wholesale distribution sectors in and
around Baytown has translated into significant valuation growth in the City’s tax roll. In spite of negative
appraisals resultant from some 4,500 homes flooded by Hurricane Harvey, the Harris County Appraisal District’s
preliminary 2018 appraisal roll data indicate roll values have increased 6% over the prior year. Much of this is
from residential home values, resultant from incremental appraised values recognized in the prior year but subject
to a ten percent annual limit under State code restrictions.
Private sector investment within the City of Baytown has increased significantly over the past few years, with
substantial investment in areas such as health care centers, grocery stores, restaurants, and other large scale retail
developments, including the multi-million dollar redevelopment of the San Jacinto Mall. Additionally, the City of
Baytown, in partnership with a private development company, is in the preliminary stages of developing a large-
scale hotel/convention center on Bayland Island.
Major road projects recently completed or in progress include: ongoing construction of the 1.6 mile, four lane San
Jacinto Boulevard; expansion of Hunt Road from two lanes to four lanes beyond the new H-E-B grocery super
center, and extending it west to John Martin Road; extending Santavy Road both east and west; design and
widening of Garth Road to six lanes from its current four lane configuration; entrance and exit ramp rebuilds at I-
10 and Garth Road; the complete reconstruction of the two lane, 2.3 mile Evergreen Road; and the ongoing
installation of sidewalks throughout the City.
One of the most noticeable effects of the ongoing expansions in the industrial, logistic and wholesale distribution
enterprises in and around Baytown is the remarkable growth in residential, multi-family and commercial
development. New residential and commercial permit activity continues to be strong year-over-year. Over 2,000
multi-family units in seven new complexes, and nearly 2,000 single- family homes included as part of four new
neighborhoods is expected over the next two years. Population and associated ancillary economic expansion is
anticipated to increase steadily for some time.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
2-4
Table 2-2 summarizes development trends in the performance period since the preparation of the previous hazard
mitigation plan, as well as expected future development trends.
Table 2-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous
hazard mitigation plan?
Yes
• If yes, give the estimated area annexed and estimated number of parcels or structures.
2,612 acres, 350 parcels
Is your jurisdiction expected to annex any areas during the performance
period of this plan?
No
• If yes, describe land areas and dominant uses.
NA
• If yes, who currently has permitting authority over these areas?
NA
Are any areas targeted for development or major redevelopment in the next five years?
Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
• San Jacinto Marketplace (~111 acres) — redeveloped commercial, not in hazard risk area
• John Martin & I-10 (~45 acres) — new commercial and housing, not in hazard risk area
• San Jacinto Boulevard (~400 acres) new commercial and housing, some in hazard risk
area
• Evergreen & Trinity Oaks (~200 acres) — new commercial and housing, some in hazard
risk area
• Chambers Commons (~146 acres) — new commercial, multifamily, some in hazard risk
area
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 193 187 293 251 291
Multi-Family 1 1 1 0 0
Other (commercial, mixed use, etc.) 186 277 252 278 339
Total 380 465 546 529 630
Provide the number of new-
construction permits for each hazard
area or provide a qualitative
description of where development has
occurred.
• Special Flood Hazard Areas: Unable to accurately provide
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands
inventory. If no such inventory exists,
provide a qualitative description.
The city is a place with two identities — ”Old Baytown” and “New Baytown”. Thus, there is an
aged building stock and a newer building stock. Within the city limits of Baytown, there is a
medium density suburban development character with some large rural pockets. There are
several commercial corridors developed with strips of retail that serve the many
neighborhoods. The neighborhoods normally have lot sizes between 5,000 and 10,000 square
feet. Additionally, Baytown has a significant industrial presence and those uses are on larger
tracts of land with fewer addressed buildings.
Although the data does not give an acreage assessment, there are approximately 34,800 out
of 38,900 parcels with addresses have vertical development on them. A visual assessment
indicates that there is significant building opportunity within the city limits of Baytown.
Please Figure 2-1.
City of Baytown
2-5
Figure 2-1. Developed and Vacant Lots
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
2-6
2.4 CAPABILITY ASSESSMENT
The City of Baytown performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 2-3.
• Development and permitting capabilities are presented in Table 2-4.
• An assessment of fiscal capabilities is presented in Table 2-5.
• An assessment of administrative and technical capabilities is presented in Table 2-6.
• An assessment of education and outreach capabilities is presented in Table 2-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 2-8.
• Classifications under various community mitigation programs are presented in Table 2-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 2-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Table 2-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes Yes
Comment: Code of Ordinances, Chapter 18 Buildings and Building Regulations
Zoning Code Yes No No Yes
Comment: Unified Land Development Code, Article II Use Districts, Division 2 Zoning Districts
Subdivisions Yes No No Yes
Comment: Code of Ordinances, Subpart B Land Development Code, Chapter 126 Subdivisions
Stormwater Management Yes Yes Yes Yes
Comment: Code of Ordinances, Chapter 98 Utilities, Article VI. Stormwater
Post-Disaster Recovery Yes Yes No Yes
Comment: Annex J — Recovery and post-disaster permitting and code enforcement regulations.
Real Estate Disclosure No No No No
Comment:
Growth Management Yes No Yes Yes
Comment: Code of Ordinances Ch. 126 & ULDC
Site Plan Review Yes No No Yes
Comment: Code Ch. 18 & ULDC
Environmental Protection Yes Yes No Yes
Comment: Code of Ordinances, Chapter 34 — Environment
Flood Damage Prevention Yes No Yes Yes
Comment: Code of Ordinances, Subpart B Land Development Code, Chapter 110 “Floods
Emergency Management Yes No Yes Yes
Comment: Code of Ordinances, Chapter 22 — Civil Emergencies, Texas Government Code 418
Climate Change No Yes No Yes
Comment:
City of Baytown
2-7
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Planning Documents
General Plan Yes No Yes Yes
Comment: Comprehensive Plan, May 2007
Capital Improvement Plan Yes No No Yes
How often is the plan updated? Annual basis.
Comment:
Disaster Debris Management Plan Yes Yes No Yes
Comment: Contracts are reviewed on an annual basis and the plan is updated every five years.
Floodplain or Watershed Plan Yes Yes No Yes
Comment: The City of Baytown adopted a Flood Mitigation Plan in 2005 meeting the CRS Floodplain Management Planning criteria.
Stormwater Plan Yes Yes Yes Yes
Comment: Stormwater Management Plan prepared by the Baytown Health Department in 2014.
Drainage Plan Yes No No Yes
Comment: The City of Baytown adopted a Master Drainage Plan in 2010.
Habitat Conservation Plan No Yes No Yes
Comment: The City of Baytown does not have an HCP implemented. However, there is a Gulf-Houston Regional Conservation Plan that
implements nature-based infrastructure projects and components of flood mitigation/resiliency.
Economic Development Plan No No No Yes
Comment: The Baytown and West Chambers County Economic Development Foundation coordinates economic development.
Shoreline Management Plan No Yes No No
Comment: SMPs are required for power generating entities operating under a FERC license and is not applicable to the City of
Baytown.
Community Wildfire Protection Plan Yes Yes No Yes
Comment: The City of Baytown does not have its own CWPP implemented. Harris County has completed a county-wide CWPP; which
includes all incorporated jurisdictions within Harris County.
Forest Management Plan No Yes No No
Comment:
Climate Action Plan No Yes No Yes
Comment:
Emergency Operations Plan and Annexes Yes Yes Yes Yes
Comment: Annex P — Hazard Mitigation and Hazard Summaries in Basic Plan.
Threat & Hazard Identification & Risk Assessment (THIRA) No Yes Yes Yes
Comment: A regional THIRA is conducted on annually for UASI and HGAC. The City participates in the development of the THIRA.
Post-Disaster Recovery Plan Yes Yes No Yes
Comment: Annex J — Recovery is required for local jurisdictions to address local recovery programs, damage assessments, Public
Assistance and Individual Assistance programs. The City of Baytown is in the process of developing a Pre-Disaster Recovery
Plan to assist in the transition from response to recovery for future incidents.
Continuity of Operations Plan Yes No No Yes
Comment: Government Code 418 grants political subdivisions the option to adopt plans for continuity of functions but is not mandated.
The City of Baytown does have department Continuity of Operations Plans.
Public Health Plan Yes Yes Yes Yes
Comment: Annex H — Health and Medical is a component of the Emergency Operations Plan and addresses public health,
environmental health, and medical response capabilities. The City does not maintain a standalone Public Health Plan.
Parks Plan Yes No No Yes
Comment: Playbook 2020: The Strategic Parks and Recreation Master Plan was adopted in 2010. The plan creates a vision for the
Parks over ten years by providing recommendations that encompass the many varied components of Baytown’s park
systems, from parks, athletic and aquatic facilities, to trails, nature facilities, and the preservation of open space.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
2-8
Table 2-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Planning and Development
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? No (Can create)
Table 2-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes – Water and Sewer
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Table 2-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Planning and Development
Engineers or professionals trained in building or infrastructure
construction practices
Yes Planning and Development
Planners or engineers with an understanding of natural hazards Yes Planning and Development
Staff with training in benefit/cost analysis Yes BFD-EMD/ EMC and Deputy EMC
Surveyors No City Engineering has staff that have the
ability to conduct surveys, but are not
licensed. These services are contracted.
Personnel skilled or trained in GIS applications Yes PW, ENG, PLNG, and IT
Scientist familiar with natural hazards in local area Yes Several local research institutes,
colleges, and universities have research
scientist available to the City as a
resource.
Emergency Management Coordinator Yes EMC and Deputy EMC
Grant writers Yes CMO – Grant Coordinator
City of Baytown
2-9
Table 2-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your
website?
Yes
• If yes, briefly describe. Engineering Department is responsible for floodplain
management and public outreach efforts regarding flooding
hazards for CRS participation. The BFD-EM Division also
provides public outreach regarding hazard information.
Do you use social media for hazard mitigation education and
outreach?
Yes
• If yes, briefly describe. BFD EM Division hosts Skywarn and Floodaware courses
and shares events on social media. City also provides
updates on weather information and hazard information facts.
Do you have any citizen boards or commissions that address issues
related to hazard mitigation?
No
• If yes, briefly describe. n/a
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. Community Rating System, utility bill pamphlets, Social Media
accounts, and Engineering/Emergency Management
websites. City Hall and Library can be a source of printed
material on hazard mitigation and flooding.
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Outdoor Warning Sirens, Mass Notification System, Alertus
Beacons, and AM Radio System.
Table 2-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Engineering Department
Who is your floodplain administrator? (department/position) City Engineer
Are any certified floodplain managers on staff in your jurisdiction? Yes
Engineering maintains a CFM on staff.
What is the date that your flood damage prevention ordinance was last amended?
4/9/2015
Does your floodplain management program meet or exceed minimum requirements? Meets and Exceeds FEMA minimum requirements.
• If exceeds, in what ways? FDPO currently requires freeboard – 2 feet above BFE. City
is exploring options to adopt similar standards required by
Harris County; i.e. 2 feet above the 500 year.
When was the most recent Community Assistance Visit or Community Assistance Contact? 9-15-2015
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No
• If so, state what they are.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
2-10
Criterion Response
Are any RiskMAP projects currently underway in your jurisdiction? Yes
• If so, state what they are. Chambers County – Lower Trinity Flood Risk Report 2013.
Harris County – Flood Insurance Study, revised preliminary
November 13, 2018. Coastal flood mapping – TXCHART,
Preliminary March 29, 2013.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why. Map revisions will be made based on the most recent
precipitation frequencies in Texas through the NOAA Atlas
14 study.
Does your floodplain management staff need any assistance or training to support its floodplain management program? No
• If so, what type of assistance/training is needed? n/a
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification?
Yes
• If no, is your jurisdiction interested in joining the CRS program? N/A
How many flood insurance policies are in force in your jurisdiction?a 4,683
• What is the insurance in force? $1,393,324,000
• What is the premium in force? $2,364,402
How many total loss claims have been filed in your jurisdiction?a 3,343
• How many claims are still open or were closed without payment? Opened Losses: 6
CWOP Losses: 705
• What were the total payments for losses? $148,338,730.27
a. According to FEMA statistics as of September 30, 2018
Table 2-9. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes 6 5/1/2006
Building Code Effectiveness Grading Schedule Yes Class 5 – Residential Class 4- Commercial 12/20/2017
Public Protection Yes Class 1 2018
Storm Ready Yes Storm Ready 2019
Firewise No N/A N/A
City of Baytown
2-11
Table 2-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
2-12
2.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
2.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Basic Plan — The Basic Plan provides a summary on the hazards and threats in the community.
• Annex P — Hazard Mitigation is assigned to the Engineering Department and addresses the hazards
and threats in the community. The Annex also identifies the various hazard mitigation related programs
implemented in the City of Baytown and which agencies are responsible for administration.
• Master Drainage Plan — The City of Baytown developed a drainage plan in 2010 that identifies several
drainage projects related to flood mitigation and the identified projects have been integrated into prior
Hazard Mitigation Action Plans.
• Flood Mitigation Plan — The City of Baytown developed a flood mitigation plan in 2005 that followed
the CRS floodplain management planning process and several of the identified projects have been
integrated into prior Hazard Mitigation Action Plans.
2.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Capital Improvement Plan — The City of Baytown updates the CIP on an annual basis and can
integrate the goals, objectives, and projects identified in the Hazard Mitigation Action Plan into the CIP
process.
• Comprehensive Plan — The Planning and Development Department will develop a new overall plan to
document existing conditions and establish goals to replace the existing plan. In 2007, the City Council
adopted the 2025 Comprehensive Plan which includes base studies, vision and goals, growth capacity,
mobility, land use, economic opportunity, quality of life, and implementation strategies.
• Downtown Master Plan — The Downtown Master Plan was adopted by City Council on September 9,
2004, to capture the overall vision for Baytown’s downtown area.
• Mobility Plan — The Baytown Mobility Plan was adopted by City Council on January 24, 2013 to
capture the City’s goals as expressed in the 2007 Comprehensive Plan and 2008 Vision Statement. This
document contains infrastructure improvement projects, funding strategies and mechanisms, and mobility
policies, plans and maps to help mold our future.
• Master Parks Plan — The parks plan creates a vision for the city’s park system and makes
recommendations for improvements and open-space preservation.
2.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 2-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Baytown.
Other hazard events that broadly affected the entire planning area, including City of Baytown, are listed in the risk
assessments in Volume 1 of this hazard mitigation plan.
City of Baytown
2-13
Table 2-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Thunderstorm Wind, Hail, Flood N/A May 9 – 11, 2019 $65,000.00
Hurricane Harvey 4332 DR 2017 $26,000,000.00
Flood N/A March 29, 2017 Not Available
Flood N/A January 19-20, 2017 Not Available
Severe Storm & Flooding 4272 DR 2016 Not Available
Severe Storm & Flooding 4269 DR 2016 Not Available
Flood N/A June 1, 2016 Not Available
Severe Storm & Flooding 4223 DR 2015 $35,000.00
Tornado N/A October 31, 2015 $20,000
Flood N/A July 14, 2015 Not Available
Hail N/A February 20, 2014 $1,000
Flood N/A October 31, 2013 Not Available
Flood N/A January 9, 2009 Not Available
Flood N/A April 18, 2009 Not Available
Hurricane Ike 1791 DR September 2008 $ 50,800,000.00
Flood N/A June 17, 2008 Not Available
Funnel Cloud N/A June 16, 2007 Not Available
Flash Flood N/A October 26, 2006 $ 50,000
Funnel Cloud N/A May 4, 2006 Not Available
Tornado N/A April 30, 2006 Not Available
Hurricane Rita 1606 DR 2005 Not Available
Hail N/A July 6, 2005 $ 15,000
Thunderstorm Wind N/A November 23, 2004 $ 50,000
Thunderstorm Wind N/A April 10, 2004 $ 75,000
Tornado N/A November 17, 2003 $ 50,000
Funnel Cloud N/A June 26, 2003 Not Available
Hail N/A April 3, 2003 $ 5,000
Flood N/A September 7-8, 2002 Not Available
TS Allison 1379 DR 2001 Not Available
Hurricane Alicia 689 DR 1983 Not Available
Tornado N/A October 29, 1974 Not Available
2.7 HAZARD RISK RANKING
Table 2-12 presents a local ranking for City of Baytown of all hazards of concern for which this hazard mitigation
plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As
described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for
each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target
hazards with high and medium rankings.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
2-14
Table 2-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
2 Hurricane 34 and 32 High
3 Flooding 12 and 28a High
4 Wildfire 30b Medium
5 Dam Failure 12 Low
6 Coastal Erosion 6 Low
6 Drought 6 Low
6 Mass Movement N/A Low
6 Earthquake 14c N/A
6 Tsunami N/A N/A
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
a. flooding is the city’s primary natural hazard and the methodology utilized does not adequately reflect actual risk outside the floodplain
from sheet-flow, run-off, and limited drainage capacity caused from flash flooding and urban flooding.
b. Development within Baytown has eliminated many areas once highly vegetated and the wildland-urban interface has been reduced. In
addition, Texas Forest Service TXWARP Fire Intensity Scale indicates most of the area in Baytown is considered to be in Class 1:
Very Low and Class 2: Low range for small wildfires.
c. Minimal impacts and negligible level of risk from this hazard in the community
2.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
2.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: None
• Number of FEMA-identified Severe-Repetitive-Loss Properties: None
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated:
None
2.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• The City of Baytown is vulnerable to maritime threats and hazards since it is located along the Port of
Houston and the Houston Ship Channel.
• The City of Baytown is vulnerable to hazardous material incidents and chemical accidents from
surrounding petrochemical industries, chemical manufacturers, and chemical storage facilities.
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
City of Baytown
2-15
2.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 2-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 2-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item Completed No longer Feasible Check if Yes Action # in Update
2014BAYTWN001 — Create Regional 75 Stormwater Retention Ponds X BAY5
Comment: 2 regional ponds are in-process of being constructed within the city due to new development. Combine MAI
2010BAYTWN005.
2014BAYTWN002 — Upgrade City Code Chapter 110 to Require Increased Freeboard (500-year + 2 feet) for Construction in Floodplain X X BAY6
Comment: The City updated codes requiring a 2-foot freeboard for new construction and included higher standards, LOMA and LiMWA.
2014BAYTWN003 — Elevate Electronic Controls for Sewer Lift Stations 24” above 500-year NFIP Floodplain X BAY7
Comment: This project is approximately 30% complete. The City has 87 lift stations, with 23 completed. Additional projects are currently
ongoing during 2017.
2014BAYTWN004 — Establish Single Family Home Wind Retrofit Assistance Grant Program X
Comment: Not Started and dependent upon future grant opportunities.
2014BAYTWN005 — Establish low-to-moderate income Multi-family Home Wind Retrofit Assistance Grant Program X
Comment: Not Started and dependent upon future grant opportunities.
2014BAYTWN006 — Public Education Program for Safe Room Determination and Awareness and appropriate actions to reduce residential property damages from high-wind impacts
X
Comment: Not Started and dependent upon future grant opportunities.
2014BAYTWN007 — Upgrade to City Code Requiring Community Safe Rooms to be Constructed in every New Recreational Vehicle Park. X
Comment: No update at this time. The action item is not feasible.
2014BAYTWN008 — Update City Code of Ordinances to Require Emergency Generators at Local Gas Stations X
Comment: Action Item is Completed.
2014BAYTWN009 — Install Early Warning lightning detection system for critical infrastructure (EOC, 911 Communications, and Pirates Bay Water Park).
X BAY8
Comment: Action Item is in-process with EOC and 911 Communications Center weather stations. Pirates Bay Weather Station is
installed.
2014BAYTWN010 — Establish low-to-moderate income Single-family Home Cooling System Retrofit Assistance Grant Program X
Comment: Not Started and dependent upon future grant opportunities.
2014BAYTWN011 — Modify Chapter 126 of City Code to encourage the use of Texas Native, Xeriscaping materials for Landscaping. X
Comment: City has adopted landscaping requirements, but not sure if Xeriscaping is included.
2014BAYTWN012 — Improve Building Code to protect Buildings from hail
damages
X
Comment: Remove Action Item. No longer feasible. City already has a requirement addressing wind-borne debris protection.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
2-16
Removed; Carried Over to Plan Update
Action Item Completed No longer Feasible Check if Yes Action # in Update
2014BAYTWN013 — Amend City Policy to require city carports and city
vehicle shelters to be constructed of materials and processes to mitigate against hail damages to equipment currently parked in the open.
X BAY9
Comment: Modify action item description to specify city carports and city vehicles. This action item is not intended to address residential
structures.
2014BAYTWN014 — Develop defensible space for protection around existing and future natural/man-made water bodies. X
Comment: No update at this time.
2014BAYTWN015 — Develop a Community Urban Wildfire Prevention Program to educate citizens on how to reduce damages to residential property from wildfires.
X BAY10
Comment: No update at this time.
2014BAYTWN016 — Develop Community Warming Centers X
Comment: Combine with Cooling Center Action Item and complete with Library as location.
2014BAYTWN017 — Establish low- to moderate-income Single family Home Heating Retrofit Assistance Grant Program X
Comment: Not Started and dependent upon future grant opportunities.
2014BAYTWN018 — Conduct dam/levee failure flood inundation study and GIS mapping. X
Comment: REMOVE action item. This item is not feasible since the City is not directly at risk from dam/levee failures. Lake Houston and
Trinity River structures and other levees are managed by SJRA or other entities.
2014BAYTWN019 — Conduct a Hazardous Materials Commodity Flow Study X
Comment:
2014BAYTWN020 — Determine the Need and Standards for a buffer zone around large scale Tier II Facilities
X
Comment: At this time industry is regulated by Texas Rail Road Commission and industry already acquires lands to create buffers as a
way to minimize risks and meet other regulatory standards. City Code does require structures in the Industrial Districts to
meet certain setback requirements.
2014BAYTWN021 — Conduct a Community Emergency Communications
Survey to Determine Effectiveness of Haz Mat Release Emergency Warning Sirens.
X
Comment: No update at this time.
2014BAYTWN022 — Update City Code Chapter 62 to Require Transfer Pipes
from Oil Wellheads to Storage Tanks to be buried at least three feet underground.
X
Comment: Work on this project began 18 months ago, but the requirement to bury will need to be reviewed
2014BAYTWN023 — Update City Haz Mat Underground Pipeline Regulations Ordinance X
Comment: Remove Action Item. No longer feasible and regulated by State and Federal agencies.
2014BAYTWN024 — Harden 9‐1‐1 Communication Center X
Comment: Action Item is Complete. New 911 Dispatch Center was built and hardened.
2014BAYTWN025 — Develop public education program for home owners on flood hazards and flood mitigation techniques to reduce flood damages to property.
X BAY11
Comment: No update at this time. Dependent upon grant funding.
City of Baytown
2-17
Removed; Carried Over to Plan Update
Action Item Completed No longer Feasible Check if Yes Action # in Update
2014BAYTWN026 — Improve Area Stormwater Retention Ponds to increase
storage capacity.
X BAY5
Comment: Area or individual retention ponds are developed as required. Regional and sub-regional ponds are practical, but expensive
projects to implement. Combine with other Retention Pond projects.
2014BAYTWN027 — Improve Underperforming Stormwater System Collection/Conveyance Components to ensure system functions in accordance with design to mitigate flooding.
X BAY12
Comment: Several projects have been completed and are scheduled on an on‐going basis. Installation of submersible pumps for
facilities susceptible to flooding.
2014BAYTWN027 — Acquisition of Repetitive Flood Loss Property identified in the Regional Stormwater Master Plan. X BAY13
Comment: City coordinates with HCFCD and Chambers County on acquisition of properties.
2014BAYTWN029 — Install Emergency Power Generators for Pumping At All Sewer Lift Stations X
Comment: In‐Process. Back generator power is installed during major repair to lift stations
2014BAYTWN030 — Improve City of Baytown CRS Classification from Class 7
to Class 6 by end of 2018
X BAY14
Comment: City is waiting for CRS score and findings from verification visit.
2014BAYTWN031 — Develop a hardened Potable Water Treatment Plant to provide an alternate water source during drought conditions. X BAY15
Comment: Design is complete and being reviewed by TCEQ and should be online by 2018. Cost of project has increased to $40 million.
2014BAYTWN032 — Convert Water Treatment Plant From Surface Water to
Desalination Source
X BAY16
Comment: WTP is set‐up to convert to desalination, if necessary
2010BAYTWN001 — Structural Mitigation Remove existing culverts and increase the size of the culverts to allow for more stormwater flow. X
Comment: Action Item is Complete.
2010BAYTWN003 — Elevate Repetitive Flood Properties X
Comment: The Floodplain Administrator is working on reducing the numbers of SRL properties with approximately 47. REMOVE action
item. Elevation is not a feasible mitigation measure for Baytown.
2010BAYTWN005 — Develop 60 regional detention ponds as identified in the
Community‐Wide Master Drainage Plan
X BAY5
Comment: Combine this action item with the action item # 2014BAYTWN001.
2010BAYTWN006 — Expand Community Warning System (sirens, reverse 911,
EAS/iPAWS, radio) to increase coverage to residents in flood‐prone areas of
the community.
X BAY17
Comment: Siren Project near completion with approximately $200,000 of the project cost remaining. COMBINE into a single all‐hazards
warning and alert projects.
2010BAYTWN007 — Hardening of critical public infrastructure against hurricane wind hazards. X
Comment: Action Item Completed. Shutters installed at critical facilities.
2010BAYTWN009 — Installation of generators/power back‐up systems on
Critical Public Infrastructure
X BAY18
Comment: Action Item Completed with generators installed at all critical facilities.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
2-18
Removed; Carried Over to Plan Update
Action Item Completed No longer Feasible Check if Yes Action # in Update
2010BAYTWN011 — Expand Community Warning System (sirens, reverse 911,
EAS/iPAWS, radio) to increase coverage of the community’s population. [tornado]
X BAY17
Comment: COMBINE into a single all‐hazards warning and alert project.
2010BAYTWN012 — Expand Community Warning System (sirens, reverse 911,
EAS/iPAWS, radio) to increase coverage of the community’s population. [thunderstorm]
X BAY17
Comment: COMBINE into a single all‐hazards warning and alert projects.
2010BAYTWN013 — Install lightning and surge protection measures for
critical infrastructure.
X BAY19
Comment: Some city facilities, such as OEM, PW, and City Hall, have lightening arresting systems installed, but may not be certified due
to expense of certifying. PW will add this as a project. Combine with other project.
2010BAYTWN014 — Develop/implement Public Cooling Shelter program. X
Comment: Combine with Warning Center Action Item. Library acts as location.
2010BAYTWN019 — Expand Community Warning System (sirens, reverse 911,
EAS/iPAWS, radio) to increase coverage of the community’s population. [hail]
X BAY17
Comment: COMBINE into a single all‐hazards warning and alert project.
2010BAYTWN021 — Clean‐up of heavy wildfire fuel areas (abandoned
buildings, abandoned lands, etc.).
X BAY20
Comment: 38 structures were demolished in 2015 and 57 in 2016.
2010BAYTWN022 — Develop/implement home heating safety public
education/outreach program to inform citizens on how to reduce damages
from winter storms to residential property.
X BAY21
Comment: No update at this time.
2010BAYTWN023 — Expand Community Warning System (sirens, reverse 911,
EAS/iPAWS, radio) to increase coverage of the community’s population. [winter storm]
X BAY17
Comment: COMBINE into a single all‐hazards warning and alert project.
2010BAYTWN025 — Expand Community Warning System (sirens, reverse 911,
EAS/iPAWS, radio) to increase coverage to the community’s population. [dam/levee failure]
X BAY17
Comment: COMBINE into a single all‐hazards warning and alert project.
2010BAYTWN026 — Upgrade and test Hazmat emergency plan X
Comment: The action should remain on the list.
2010BAYTWN027 — Expand Haz Mat Release Community Warning System
(sirens, reverse 9‐1‐1, EAS/iPAWS, radio) to increase coverage to the
community’s population.
X BAY17
Comment: COMBINE into a single all‐hazards warning and alert project.
2010BAYTWN028 — Establish/Expand GIS Mapping/Identification of Pipeline Risk Areas. X BAY22
Comment: The City has an ongoing process to update maps.
2010BAYTWN029 — Expand Community Warning System (sirens, reverse 911,
EAS/iPAWS, radio) to increase coverage to the community’s population.
[energy pipeline failure]
X BAY17
Comment: COMBINE into a single all‐hazards warning and alert project.
2005BAYTWN001 — Increase hazards information at public library X
Comment: The City distributes information at public library and this is an on‐going action item.
City of Baytown
2-19
2.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 2-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 2-15
identifies the priority for each action. Table 2-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 2-14. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action BAY1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Flooding, Hurricane, Severe Weather, Dam Failure
Existing 12, 13, 14, 15 ENG EM, PLNG, PW High HMGP, PDM, FMA,
CDBG-DR
Long-term
Action BAY2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including Capital Improvement Programs, Master Plans, and Strategic Plans.
Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass
movement, Severe weather, and Wildfire
New and Existing 3, 5, 7, 9, 10 EM ENG, PLNG, PW Low Staff Time, General
Funds
Ongoing
Action BAY3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass
movement, Severe weather, and Wildfire
New and Existing 3, 5, 7, 9, 10 EM ENG, PLNG, PW Low Staff Time, General
Funds
Short-term
Action BAY4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Flooding, Hurricane, Severe Weather, Dam Failure
New and Existing 2, 8, 9, 11, 14 ENG EM, PLNG, PW Low Staff Time, General
Funds
Ongoing
Action BAY5 — Create 75 Stormwater Retention Ponds to increase storage capacity as identified in Master Drainage Plan.
Hazards Mitigated: Flooding, Hurricane, Severe Weather
New and Existing 12, 13, 14, 15 ENG PW, PLNG Med General Funds,
Bonds, and HMA
Long-Term
Action BAY6 — Upgrade City Code Chapter 110 to Require Increased Freeboard (500-year + 2 feet) for Construction in Floodplain
Hazards Mitigated: Flooding, Hurricane, Severe Weather, Dam Failure
New and Existing 12, 13, 14, 15 ENG PW, PLNG Low General Funds Short-Term
Action BAY7 — Elevate Electronic Controls for Sewer Lift Stations 24” above 500-year NFIP Floodplain
Hazards Mitigated: Flooding, Hurricane, Severe Weather
New and Existing 13 PW ENG High General Funds,
Bonds, HMA, PA
Short-Term
Action BAY8 — Install Early Warning lightning detection system for critical infrastructure (EOC, 911 Communications, and Pirates Bay
Water Park).
Hazards Mitigated: Flooding, Hurricane, Severe Weather
New and Existing 1, 13 City Departments PW, ENG, FM Med General Funds Long-Term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
2-20
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action BAY9 — Amend City Policy to require city carports and city vehicle shelters to be constructed of materials and processes to
mitigate against hail damages to equipment currently parked in the open.
Hazards Mitigated: Hurricane, Severe Weather
New and Existing 13, 15 City Departments PW, ENG, FM Med General Funds Long-Term
Action BAY10 — Develop a Community Urban Wildfire Prevention Program to educate citizens on how to reduce damages to residential
property from wildfires.
Hazards Mitigated: Wildfire
New and Existing 1, 3, 4, 6, 10 BFD EM, PLNG Low General Funds, HMA Short-Term
Action BAY11 – Develop public education program for home owners on flood hazards and flood mitigation techniques to reduce flood
damages to property.
Hazards Mitigated: Flooding, Hurricane, Severe Weather, Dam Failure
New and Existing 1, 2, 3, 4, 10 EM and ENG PLNG Low General Funds, HMA Short-Term
Action BAY12 – Improve Underperforming Stormwater System Collection/Conveyance Components to ensure system functions in
accordance with design to mitigate flooding; including installation of submersible pumps.
Hazards Mitigated: Flooding, Hurricane, Severe Weather
New and Existing 2, 13, 15
Action BAY13 – Acquisition of Repetitive Flood Loss Property identified in the Regional Stormwater Master Plan.
Hazards Mitigated: Flooding, Hurricane, Severe Weather
New and Existing 12, 13, 14, 15 ENG PLNG, EM High General Funds,
Bonds, HMA,
CDBG-DR
Long-Term
Action Bay 14 – Improve City of Baytown CRS Classification from Class 7 to Class 6
Hazards Mitigated: Flooding, Hurricane, Severe Weather, Dam Failure
New and Existing 12, 13, 14, 15 ENG PLNG, EM, PW Low General Funds, HMA Short-Term
Action BAY15 – Develop a hardened Potable Water Treatment Plant to provide an alternate water source during drought conditions.
Hazards Mitigated: Drought, Mass Movement
New and Existing 13 PW ENG High General Funds,
Bonds, HMA
Long-Term
Action BAY16 – Convert Water Treatment Plant from Surface Water to Desalination Source
Hazards Mitigated: Drought, Mass Movement
New and Existing 13 PW ENG High General Funds,
Bonds, HMA
Long-Term
Action BAY17 – Expand Community Warning System (sirens, reverse 911, Mass Notification, EAS, iPAWS, radio) to increase coverage
to residents in hazard‐prone areas of the community.
Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement,
Severe weather, and Wildfire
New and Existing 1, 3, 4 EM Communications, Information
Technology Services
Med General Funds Short-Term
Action BAY18 – Installation of generators/power back‐up systems on Critical Public Infrastructure
Hazards Mitigated: Flooding, Hurricane, Severe Weather, Dam Failure
New and Existing 11, 13, 15 City Departments PW, FM Med General Funds, HMA Short-Term
Action BAY19 – Install lightning and surge protection measures for critical infrastructure.
Hazards Mitigated: Severe Weather
New and Existing 11, 13, 15 City Departments PW, FM Med General Funds Short-Term
City of Baytown
2-21
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action BAY20 – Implement hazard fuel reduction and fire prevention measures such as clean-up and debris removal of abandoned
buildings, abandoned lands, etc.
Hazards Mitigated: Wildfire
New and Existing 2, 13, 14, 15 BFD and PLNG PW, ENG, EM Low General Funds, HMA Short-Term
Action BAY21 – Develop/implement home heating safety public education/outreach program to inform residents on how to reduce
damages from winter storms to residential property.
Hazards Mitigated: Severe Weather
New and Existing 1, 3, 4 EM BFD Low General Funds Short-Term
Action BAY22 – Create and establish a hazard risk profile database and GIS mapping of Pipeline Risk Areas.
Hazards Mitigated: Pipeline Failure, HAZMAT
New and Existing 1, 6, 13 EM BFD Low General Funds,
LEPC
Short-Term
Action BAY23 – Enhance air monitoring capabilities to mitigate chemical releases and exposures.
Hazards Mitigated: Pipeline Failure, HAZMAT
New and Existing 1, 6, 13 EM BFD Low General Funds,
LEPC
Short-Term
Action BAY24 – Develop an updated Commodity Flow Study and inventory of chemical facilities within the community to understand risk
profile and implement appropriate mitigation measures.
Hazards Mitigated: Pipeline Failure, HAZMAT
New and Existing 1, 6, 13 EM BFD Low General Funds,
LEPC
Short-Term
Action BAY25 – Implement appropriate Water Conservation and Drought Contingency measures to mitigate drought and subsidence.
Hazards Mitigated: Drought and Mass Movements
New and Existing 7, 8, 9, 14 BAWA PW, ENG, PLNG, EM Low General Funds Short-Term
Action BAY26 – Implement drainage and infrastructure improvement projects to mitigate flooding and protect residential property through
the CDBG-DR Program. (Julia Ann Villa, Lincoln Cedars, East WWTP, and South Main Street, etc.)
Hazards Mitigated: Flooding, Hurricanes, Severe Weather.
New and Existing 12, 13, 14, 15 PLNG PW, ENG, EM High CDBG-DR, HMA, PA Long-Term
Action BAY27 — Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Coastal erosion, Dam/levee failure, Drought, Earthquakes, Flooding, Hurricanes and coastal storms, Mass movement,
Severe weather, and Wildfire
New and Existing 1, 3, 4, 5, 9, 10,
11, 15
Baytown HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
Acronyms: EM-Emergency Management, BAWA-Baytown Area Water Authority, PLNG-Planning, PW-Public Works, ENG-Engineering,
BFD-Baytown Fire Dept., FM-Facilities Maintenance
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
2-22
Table 2-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
BAY1 4 High High Yes Yes No Medium High
BAY2 5 Medium Low Yes Yes Yes Medium Low
BAY3 5 Medium Low Yes Yes Yes Medium Low
BAY4 5 High Medium Yes No Yes High Low
BAY5 4 High High Yes Yes No Medium Medium
BAY6 4 High Low Yes No Yes High Low
BAY7 1 High High Yes Yes No High High
BAY8 2 Medium Medium Yes Yes No High High
BAY9 2 High High Yes Yes No Low Low
BAY10 5 Medium Low Yes No Yes Low Low
BAY11 5 Medium Low Yes Yes Yes Medium Low
BAY12 3 High High Yes Yes No High High
BAY13 4 High High Yes Yes No Medium Low
BAY14 4 Medium Medium Yes No Yes Medium Medium
BAY15 1 High High Yes No Yes High Low
BAY16 1 High High Yes No Yes High Low
BAY17 3 Medium Medium Yes No Yes High Low
BAY18 3 High Medium Yes Yes Yes High Medium
BAY19 3 Medium Medium Yes No Yes Low Low
BAY20 4 High High Yes Yes No Low Low
BAY21 3 Low Low Yes No Yes Low Low
BAY22 3 High Low Yes No Yes Medium Medium
BAY23 3 High Medium Yes No Yes High High
BAY24 3 High Low Yes Yes Yes Medium Low
BAY25 4 Medium Low Yes No Yes Low Low
BAY26 4 High High Yes Yes No High High
BAY27 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
City of Baytown
2-23
Table 2-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Flooding BAY 2, 3, 4,
6, 11, 14, 27
BAY 1, 6, 13,
18
BAY 4, 11, 27 BAY 1 BAY 8, 17,
27
BAY 5, 7,
12, 26
BAY 2, 27
Hurricane BAY 2, 3, 4,
6, 11, 14, 27
BAY 1, 6, 13,
18
BAY 4, 11, 27 BAY 1 BAY 8, 17,
27
BAY 5, 7, 9,
12, 26
BAY 2, 27
Severe Weather BAY 2, 3, 4,
6, 11, 14, 27
BAY 1, 6, 13,
18, 19
BAY 4, 11, 21,
27
BAY 1 BAY 8, 17,
27
BAY 5, 7, 9,
12, 26
BAY 2, 27
Medium-Risk Hazards
Wildfire BAY 2, 3, 10,
14, 20, 27
BAY 20 BAY 10, 27 BAY 17, 27 BAY 10, 20 BAY 2, 27
Low-Risk Hazards
Dam Failure BAY 2, 3, 4,
11, 14, 27
BAY 1, 18 BAY 4, 11, 27 BAY 1 BAY 17, 27 BAY 2, 27
Drought BAY 2, 3, 27 BAY27 BAY 17, 27 BAY 15, 16 BAY 15, 16,
25
BAY 2, 27
Earthquake BAY 27 N/A BAY27 N/A BAY27 N/A N/A BAY27
Mass Movement BAY 2, 3, 27 BAY27 BAY 17, 27 BAY 15, 16 BAY 15, 16,
25
BAY 2, 27
Tsunami N/A N/A N/A N/A N/A N/A N/A N/A
a. See the introduction to this volume for explanation of mitigation types.
2.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
2.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• City of Baytown Code of Ordinances — The municipal code was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
• City of Baytown Flood Damage Prevention Ordinance — The flood damage prevention ordinance was
reviewed for compliance with the National Flood Insurance Program.
• Lower Trinity Flood Risk Report — The FEMA RiskMAP program conducted several workshops and
produced a technical report on key flood risk analysis data for the lower Trinity River area including a
small portion of the City of Baytown.
• TXCHART and Coastal Physical Map Revision — Areas in Harris County impacted by coastal
flooding were included in the Coastal Physical Map Revision update to the FIRM, which includes the
City of Baytown.
• Cedar Bayou Flood Risk Reduction Study – The Harris County Flood Control District is conducting a
report that will recommend flood risk reduction projects throughout the Cedar Bayou watershed and
provide associated cost estimates for the recommended projects.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
2-24
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
2.11.2 Staff and Local Stakeholder Involvement in Annex Development
This annex was developed over the course of several months with input from many city departments
including Engineering, Emergency Management, Fire, Health, Planning and Development and Public Works.
All departments were asked to contribute to the annex development through reviewing and contributing to
the capability assessment, reporting on the status of previously identified actions, and participating in action
identification and prioritization. An action development meeting was held on December 12, 2018 and March
12, 2019 and was attended by representatives from all previously listed department as well as the City
Manager’s office. Once actions had been identified and compiled in the annex, a draft was internally
circulated for comment.
2.12 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY
The City of Baytown needs the following to better understand future risks and vulnerabilities from natural hazards
and to better plan for the future:
• Updated and revised flood maps and flood hazard areas.
• Develop an updated Drainage Plan and Study to better understand local drainage issues, run-off, sheet-
flow, and ponding.
• Develop an enhanced outreach program on flood insurance and wind insurance.
• Build capacity and strategies for resilience to cope with future impacts from natural hazards.
• Develop local community planning, development, and building design standards that address impacts
from natural hazards to build a safer and stronger city.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«146¬«225¬«146¬«146§¨¦10§¨¦10§¨¦10§¨¦10HoustonHoustonMont BelvieuDeerParkPasadenaLa PorteMorgan'sPointCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County0120.5Miles±Baytown
¬«146
¬«225 ¬«146
¬«146
§¨¦10 §¨¦10
§¨¦10
§¨¦10
Houston
Houston
Mont Belvieu
Deer Park
Pasadena
La Porte
Morgan's
Point
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 1 20.5 Miles
±
Baytown
¬«146
¬«225 ¬«146
¬«146
§¨¦10 §¨¦10
§¨¦10
§¨¦10
Houston
Houston
Mont Belvieu
Deer Park
Pasadena
La Porte
Morgan's
Point
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 1 20.5 Miles
±
Baytown
¬«146
¬«225 ¬«146
¬«146
§¨¦10 §¨¦10
§¨¦10
§¨¦10
Houston
Houston
Mont Belvieu
Deer Park
Pasadena
La Porte
Morgan's
Point
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 1 20.5 Miles
±
Baytown
¬«146
¬«225 ¬«146
¬«146
§¨¦10 §¨¦10
§¨¦10
§¨¦10
Houston
Houston
Mont Belvieu
Deer Park
Pasadena
La Porte
Morgan's
Point
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 1 20.5 Miles
±
Baytown
¬«146
¬«225 ¬«146
¬«146
§¨¦10 §¨¦10
§¨¦10
§¨¦10
Houston
Houston
Mont Belvieu
Deer Park
Pasadena
La Porte
Morgan's
Point
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 1 20.5 Miles
±
Baytown
¬«146
¬«225 ¬«146
¬«146
§¨¦10 §¨¦10
§¨¦10
§¨¦10
Houston
Houston
Mont Belvieu
Deer Park
Pasadena
La Porte
Morgan's
Point
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 1 20.5 Miles
±
Baytown
3-1
3. CITY OF BELLAIRE
3.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Deacon Tittel, Fire Chief/EMC
7008 S. Rice
Bellaire, TX 77401
Telephone: 713-662-8201
e-mail Address: dtittel@bellairetx.gov
ChaVonne Sampson
7008 S. Rice
Bellaire, TX 77401
Telephone: 713-662-8243
e-mail Address: csampson@bellairetx.gov
3.2 JURISDICTION PROFILE
3.2.1 Location
The City of Bellaire is located in the southwest portion of the Harris County, surrounded by the Cities of Houston,
West University Place, and Southside Place. The city covers 3.6 square miles, with borders consisting of West
Park to the north, Beechnut to the south, railroad tracks to the east and Chimney Rock to the west. I-610 runs
directly through the middle of the City. Bellaire Boulevard and Bissonnet travel east and west through the City as
well. Bellaire is primarily residential but has some commercial along with 17 mid- to high-rise structures.
3.2.2 History
Bellaire, on Interstate Loop 610, is surrounded by Houston, West University Place, and Southside Place in
southwest Harris County. William Wright Baldwin, acting as president of the South End Land Company, founded
Bellaire and Westmoreland Farms after purchasing the 9,449-acre Rice Ranch in 1908. Baldwin was a native of
Iowa and nationally known as vice president of the Burlington Railroad. The development was six miles from
Houston on the eastern edge of the Rice Ranch, so named for former owner William Marsh Rice. Promotional
advertising in 1909 explained that Bellaire was named for the area’s Gulf breezes, but Baldwin may have named
it for Bellaire, Ohio, a town served by his railroad. By 1910 Baldwin had invested over $150,000 in capital
improvements to turn the treeless prairie into an attractive location for residences and small truck farms. From the
site to Main Street in Houston he constructed Bellaire Boulevard. He also incorporated the Westmoreland
Railroad Company to build an electric streetcar line down the center of the boulevard. The streetcar, known as the
“Toonerville Trolley,” operated from December 12, 1910, until bus service replaced it on September 26, 1927. In
1910 horticulturist Edward Teas was induced to move his nursery from Missouri to Bellaire Boulevard to
implement landscaping plans drawn by landscape architect Sid Hare. A Bellaire post office opened in 1911.
The South End Land Company advertised nationwide to attract Midwestern farmers and others who were eager to
escape harsh winters. Bellaire was promoted as an exclusive residential neighborhood and agricultural trading
center with the conveniences of city living and reliable access to Houston. On June 24, 1918, with a population of
about 200, Bellaire obtained a general-law city charter. The population reached 1,124 by 1940. Houston’s
expansion after World War II transformed Bellaire into a popular suburb, but geographical growth was halted
when Houston annexed the surrounding land on December 31, 1948. In April 1949 Bellaire adopted a home-rule
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
3-2
charter with a council-manager government. The city had 10,173 residents in 1950. The Swedish general consul’s
office opened in Bellaire in 1953. At one point, the city was also home to the consulate general of Honduras.
However, both offices had relocated to Houston by 2009.
Bellaire is zoned for residential, commercial, and light industrial sections. High-rise office buildings are located
along Loop 610, but Bellaire is largely known as a residential city. Zoning and land-use controversies, long the
stuff of Bellaire politics, led to a recall of the mayor and three councilmen in 1977. A resurgence in new
residential construction began in the late 1980s following a liberalization of the city’s traditionally strict zoning
policies. By 1968 Bellaire had fifteen churches and one synagogue. Leading community organizations included
the Bellaire-Southwest Houston Chamber of Commerce (now part of the Houston Metropolitan Chamber of
Commerce), the Bellaire Historical Society, Friends of the Bellaire Library, Friends of Bellaire Parks (now
Patrons for Bellaire Parks), and the Bellaire Women’s Civic Club. In 2017 there were three private schools and
several public schools operated by the Houston Independent School District. Local publications included the
Bellaire Examiner, the Village & Southwest News, and Bellaire Buzz magazine. City management is noted for its
police and fire protection, library, public works, parks and recreation facilities, and an office for senior services.
The population was 19,872 in 1960, 13,842 in 1990, and 16,855 in 2010. (by Jeffery Dunn)
3.2.3 Climate
The climate of the City of Bellaire is your typical Southeast Texas weather. Winters do not truly start until
January when consist cold temperatures are normal. Snow and ice are hit or miss for the area. The spring brings
beautiful weather but also strong thunderstorms. Summers are typically hot with high humidity. The area
experiences humidity throughout the year. Autumn is nice, with average temperatures in the mid 60s. Tropical
weather occurs, but not typically until September.
3.2.4 Governing Body Format
Bellaire is city charter and calls for a council-manager form of government. There is a seven-member City
Council, which includes a Mayor. The City Managers is responsible for the daily operations of the City. The City
consists of nine different departments – Fire, Police, Finance, Development Services, Human Resources, Public
Works, Library, Parks, Recreation, Facilities, and Information Technology.
The City Council will assume responsibility for the adoption of this plan; The City Manager and the Fire
Chief/Emergency Manager will oversee its implementation. Development of this annex was carried out by the
members of the local mitigation planning team, whose members are listed in Table 3-1.
Table 3-1. Local Mitigation Planning Team Members
Name Title
Deacon Tittel Fire Chief/EMC
ChaVonne Sampson Director of Development Services
Paul Hofmann City Manager
Paula Ryan Assistant City Manager
Mike Leech Director of Public Works
Terrence Beaman Chief Financial Officer
William Davidson Building Official
Karl Miller Director of Parks and Recreation
Cheryl Bright Community Relations Administrator
City of Bellaire
3-3
3.3 CURRENT TRENDS
3.3.1 Population
According to Census Bureau, the population of the City of Bellaire as of 2016 was 18,140 Since 2015, the
population has grown at an average annual rate of 1.52 percent.
3.3.2 Development
The City of Bellaire continues to have new residential construction taking place. The majority of the residential
construction consists of tearing down the old single story structures and replacing them with new 2 story single
family dwellings. Some limited redevelopment in the commercial area mainly consists of renovations to existing
structures.
Table 3-2 summarizes development trends in the performance period since the preparation of the previous hazard
mitigation plan, as well as expected future development trends.
Table 3-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard
mitigation plan?
NO
• If yes, give the estimated area annexed and estimated number of parcels or structures.
N/A
Is your jurisdiction expected to annex any areas during the performance period of this plan?
NO
• If yes, describe land areas and dominant uses.
N/A
• If yes, who currently has permitting authority over these areas?
N/A
Are any areas targeted for development or
major redevelopment in the next five years?
NO
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
N/A
How many permits for new construction were
issued in your jurisdiction since the
preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 125 98 73 87 76
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.) 4 3 1 3 2
Total 129 101 74 90 78
Provide the number of new-construction permits for each hazard area or provide a
qualitative description of where development
has occurred.
• Special Flood Hazard Areas: 472
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description.
City of Bellaire is 100% built out
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
3-4
3.4 CAPABILITY ASSESSMENT
The City of Bellaire performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 3-3.
• Development and permitting capabilities are presented in Table 3-4.
• An assessment of fiscal capabilities is presented in Table 3-5.
• An assessment of administrative and technical capabilities is presented in Table 3-6.
• An assessment of education and outreach capabilities is presented in Table 3-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 3-8.
• Classifications under various community mitigation programs are presented in Table 3-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 3-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Table 3-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes Yes
Comment: Chapter 9, Article 2 adopts the current version of the IBC, 10/6/2014
Zoning Code Yes No No Yes
Comment: Chapter 24, Article 1, Planning and Zoning, 11/16/2009
Subdivisions Yes No Yes Yes
Comment: Chapter 25, Articles I, II and II, 10/8/2001
Stormwater Management No No No No
Comment:
Post-Disaster Recovery No No No No
Comment:
Real Estate Disclosure No No Yes No
Comment:
Growth Management No No No No
Comment:
Site Plan Review Yes No No Yes
Comment: Chapter 23.5, Article II, 7/2/2012
Environmental Protection No No Yes No
Comment:
Flood Damage Prevention Yes No No Yes
Comment: Chapter 9, Article 2A, 10/6/2014
Emergency Management Yes Yes Yes Yes
Comment: Chapter 11, 3/5/1984
Climate Change No No No No
Comment:
City of Bellaire
3-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Planning Documents
General Plan Yes No Yes Yes
Comment: Chapter 24, Article 1, section 24-104, 11/16/2019
Capital Improvement Plan Yes No Yes Yes
How often is the plan updated? Yearly
Comment:
Disaster Debris Management Plan Yes No No Yes
Comment:
Floodplain or Watershed Plan Yes No No Yes
Comment: The Flood Hazard Mitigation Plan was finalized and then approved by Council on March 19, 2018.
Stormwater Plan Yes Yes No Yes
Comment:
Urban Water Management Plan No No No No
Comment:
Habitat Conservation Plan No No No No
Comment:
Economic Development Plan No No No No
Comment:
Shoreline Management Plan No No No No
Comment: We do not have any shorelines in our jurisdiction
Community Wildfire Protection Plan No No No No
Comment: No areas in need of this type of plan
Forest Management Plan No No No No
Comment: We have no forest in our jurisdiction
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes No Yes Yes
Comment:
Threat & Hazard Identification & Risk
Assessment (THIRA)
Yes No Yes Yes
Comment:
Post-Disaster Recovery Plan No No No No
Comment:
Continuity of Operations Plan No No No No
Comment:
Public Health Plan No No No No
Comment:
Other No No No No
Comment:
Table 3-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Development Services
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
3-6
Table 3-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants No
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes No
User Fees for Water, Sewer, Gas or Electric Service Yes
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs No
Development Impact Fees for Homebuyers or Developers No
Other No
Table 3-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land
management practices
Yes Development Services
Engineers or professionals trained in building or infrastructure construction practices No Development Services
Planners or engineers with an understanding of natural hazards Yes Development Services
Staff with training in benefit/cost analysis Yes Development Services
Surveyors No N/A
Personnel skilled or trained in GIS applications Yes Development Services
Scientist familiar with natural hazards in local area No N/A
Emergency manager Yes Fire Department / Fire Chief
Grant writers Yes Development Services
Other No N/A
Table 3-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. Documents Center Page
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. Updated Information as to what he City is doing
Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes
• If yes, briefly describe. Flood Hazard Board
Do you have any other programs already in place that could be used to communicate hazard-related information? No
• If yes, briefly describe. N/A
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Everbridge
City of Bellaire
3-7
Table 3-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Development Services
Who is your floodplain administrator? (department/position) Development Services Director
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? 3-18-2019
Does your floodplain management program meet or exceed minimum requirements? Exceeds
• If exceeds, in what ways? 1 foot above BFE
When was the most recent Community Assistance Visit or Community Assistance Contact? 12-15-19
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are. N/A
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are. N/A
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why.
Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes
• If so, what type of assistance/training is needed? Ongoing Training
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification? Yes
• If no, is your jurisdiction interested in joining the CRS program? N/A
How many flood insurance policies are in force in your jurisdiction?a 5,070
• What is the insurance in force? $ N/A
• What is the premium in force? $4,461,572.00
How many total loss claims have been filed in your jurisdiction?a 3099
• How many claims are still open or were closed without payment? N/A
• What were the total payments for losses? $249,117,073.00
a. According to FEMA statistics as of July 19, 2018
Table 3-9. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes 7 10-01-2014
Building Code Effectiveness Grading Schedule Yes 4 1-31-2019
Public Protection Yes 2 04/10/2017
Storm Ready No
Firewise No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
3-8
Table 3-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Bellaire
3-9
3.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
3.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• City of Bellaire Flood Mitigation Plan March 2018- A plan that outlines the implementation of activities
that will efficiently use public and private resources to reduce flood losses and encourage support for
hazard mitigation activities among the public.
3.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Comprehensive Plan — The City of Bellaire is conducting a comprehensive plan update. The
opportunity to incorporate additional mitigation and abatement measures will be contemplated for
inclusion into the Code.
3.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 3-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Bellaire.
Other hazard events that broadly affected the entire planning area, including City of Bellaire, are listed in the risk
assessments in Volume 1 of this hazard mitigation plan.
Table 3-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 N/A
Severe Storms and Flooding 4269 DR 2016 N/A
Severe Storms and Flooding 4272 DR 2016 N/A
Hurricane Ike N/A 2008 N/A
Tropical Storm Allison 1379 DR 2001 N/A
3.7 HAZARD RISK RANKING
Table 3-12 presents a local ranking for City of Bellaire of all hazards of concern for which this hazard mitigation
plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As
described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for
each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target
hazards with high and medium rankings.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
3-10
Table 3-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Flooding 51 High
2 Severe Weather 48 High
2 Hurricane 48 High
3 Earthquake 14 Low
4 Wildfire 11 Low
5 Drought 6 Low
5 Mass Movements 6 Low
6 Coastal Erosion 0 (No Exposure) None
6 Tsunami 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
3.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
3.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 183
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 9
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 10
3.8.2 Other Noted Vulnerabilities
No additional vulnerabilities specific to this jurisdiction have been identified.
3.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 3-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
3.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 3-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 3-15
identifies the priority for each action. Table 3-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
City of Bellaire
3-11
Table 3-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item Completed No longer Feasible Check if Yes Action # in Update
2014BELARE001 — Tree Trimming Program X BEL5
Comment: Still a Work in progress
2014BELARE002 — Hardening new City Hall and Police Department X
Comment: Will be completed in January of 2019
2014BELARE003 — Develop new drainage ordinance to require on-site detention for future development and redevelopment X
Comment:
2014BELARE004 — Adopting Community Canopy Action Plan (C-Cap) to
reduce sick and diseased trees that impact roadways and vehicles under that
canopy
X BEL8
Comment: Investigating to see the status
2014BELARE005 — Create and enforce ordinance to reduce fuel loads and ignition sources by unmaintained and delinquent private right of way.
X BEL9
Comment: Investigating to see the status
2014BELARE006 — Harden water supply piping with non-corrosive, drought resistant material to prevent loss of water due to breaks X BEL6
Comment: Investigating to see the status
2014BELARE007 — Expand Mass Notification Warning System increase coverage and to communicate hazard potential with Citizens
X
Comment:
2014BELARE008 — Install a backup generator for the emergency cooling center in the event of loss of power
X BEL10
Comment: Investigating to see the status
2014BELARE009 — Create Ordinance to mandate safe zone around any new
commercial site having reportable quantities of a Hazardous Material
X BEL11
Comment: Energy Pipeline needs to be removed from previous action item verbiage
2014BELARE010 — Implement a Public Education Program to educate residents on drought trigger-points that will cause water restrictions to be enforced and to reduce water shortages.
X BEL7
Comment: Investigating to see the status
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
3-12
Table 3-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action BEL1 — Where appropriate, support retrofitting, or relocation of structures located in hazard areas, prioritizing those that have
experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Dam Failure, Flooding, Hurricane and Severe Weather
New 3, 10 City of Bellaire TX Water Board /
TDEM
High HMGP, PDM, FMA Short-term
Action BEL2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including comprehensive plan, and zoning ordinance.
Hazards Mitigated: Drought, earthquake, flooding, severe weather, hurricanes,
New 3, 6, 7, 9, 10, 11, 12,
13, 14, 15
City of Bellaire TBD Low Staff Time, General Funds Ongoing
Action BEL3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Flooding, Severe Weather, Hurricane, Earthquake, Wildfire, Drought and Mass Movements
New All Objectives City of Bellaire TBD Low Staff Time, General Funds Ongoing
Action BEL4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirement
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Flooding, severe weather, and hurricanes
New and Existing 1, 3, 7, 9, 10, 11, 12,
13, 14, 15
City of Bellaire TBD Low Staff Time, General Funds Ongoing
Action BEL5 — Tree Trimming Program
Hazards Mitigated: Flooding, severe weather, hurricanes, and Drought
Existing 8, 9, 11 City of Bellaire TBD Low Staff Time, General Funds Seasonal
Action BEL6 — Harden water supply piping with non-corrosive, drought resistant material to prevent loss of water due to breaks
Hazards Mitigated: Drought
Existing 3, 6, 7, 11 City of Bellaire TBD Medium Staff Time, CIP Funds Ongoing
Action BEL7 — Implement a Public Education Program to educate residents on flooding, severe weather, hurricanes, and drought
trigger-points that will cause potential restrictions to be enforced and to reduce resource shortages
Hazards Mitigated: Flooding, severe weather, hurricanes, and drought
New and Existing 1, 3, 4, 9, 10 City of Bellaire TBD Low Staff time, general Funds Ongoing
Action BEL8 — Adopting Community Canopy Action Plan (C-Cap) to reduce sick and diseased trees that impact roadways and vehicles
under that canopy
Hazards Mitigated: Severe weather, hurricanes, wildfire and drought
Existing 2, 8, 11 City of Bellaire TBD Medium General and grant funds Ongoing
Action BEL9 — Create and enforce ordinance to reduce fuel loads and ignition sources by unmaintained and delinquent private right of
way.
Hazards Mitigated: Wildfire
Existing 2, 8, 11 City of Bellaire TBD Low General funds Ongoing
Action BEL10 — Install a backup generator for the emergency cooling center in the event of loss of power
Hazards Mitigated: Severe weather, hurricanes, earthquake
New 4, 10 City of Bellaire TBD Medium Grant funds Short term
City of Bellaire
3-13
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action BEL11 — Create Ordinance to mandate safe zone around any new commercial site having reportable quantities of a Hazardous
Material
Hazards Mitigated: Flooding, severe weather, hurricane, wildfire
New 6, 10, 11, 12, 13, 14,
15
City of Bellaire TBD Low Staff time, general funds Short term
Action BEL12— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Flooding, Severe Weather, Hurricane, Earthquake, Wildfire, Drought and Mass Movements
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
Bellaire HCOHSEM Low General Funds Ongoing
Action BEL13 — Evaluate the conversion of Bellaire’s wastewater treatment plant, dog park, and soccer fields along Edith into detention
areas. Evaluate the conversion of the trash transfer station at Beltway 8 to a reservoir for Brays Bayou.
Hazards Mitigated: Flooding, severe weather, hurricane
New and Existing 3, 7, 9 City of Bellaire City of Houston, Harris
County Flood Control
High Staff funds, CIP funds, and
grant funds
Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 3-15. Mitigation Action Priority
Action #
# of
Objectives
Met Benefits Costs
Do Benefits Equal or
Exceed
Costs?
Is Project
Grant-
Eligible?
Can Project Be Funded Under Existing
Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
BEL1 2 High High Yes Yes No Medium High
BEL2 10 High Low Yes No Yes High Low
BEL3 15 Medium Low Yes No Yes Medium Low
BEL4 10 High Medium Yes No Yes High Low
BEL5 3 Low Low Yes No No Low Low
BEL6 4 High Medium Yes Yes Yes High Medium
BEL7 5 High Low Yes Yes Yes Medium Low
BEL8 3 Medium Low Yes No Yes Medium Medium
BEL9 3 Medium Low Yes No Yes Medium Medium
BEL10 2 High High Yes Yes No High High
BEL11 7 Medium Low Yes No Yes Medium Medium
BEL12 8 Medium Low Yes Yes Yes High High
BEL13 3 High High Yes Yes No High High
a. See the introduction to this volume for explanation of priorities.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
3-14
Table 3-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Flooding BEL1, 2, 4,
5, 7, 11, 12,
13
BEL1, 5,
11, 13
BEL4, 7, 12 BEL4, 5, 8 BEL3, 4, 10,
12
BEL1 BEL1 BEL1, 2, 4,
10, 12
Severe Weather BEL1, 2, 4,
5, 7, 11, 12,
13
BEL1, 4,
11, 13
BEL4, 7, 12 BEL4, 5, 8 BEL3, 4, 10,
12
BEL1 BEL 8 BEL1, 2, 4,
10, 12
Hurricane BEL1, 2, 4,
5, 11, 12,
13
BEL1, 5,
11, 13
BEL4, 7, 12 BEL4, 5, 8 BEL3, 4, 10,
12
BEL1 BEL8 BEL1, 2, 4,
10, 12
Medium-Risk Hazards
N/A
Low-Risk Hazards
Earthquake BEL2, 11,
12
NO BELK12 BEL5 BEL3, 12 NO NO BEL1, 2, 12
Wildfire BEL1, 2, 5,
9, 11, 12
BEL5, 9 BEL9, 12 BEL5, 8, 9 BEL9, 12 NO BEL8, 9 BEL1, 2, 12
Drought BEL1, 2, 5,
6, 7, 12
BEL5, 6, 11 BEL7, 12 BEL5, 8 BEL3, 12 BEL6 BEL6, 8 BEL1, 2, 6,
12
Mass Movements BEL12 BEL12 BEL12 BEL12
a. See the introduction to this volume for explanation of mitigation types.
3.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• City of Bellaire Municipal Code — The municipal code was reviewed for the full capability assessment
and for identifying opportunities for action plan integration.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(§¨¦610§¨¦610§¨¦69§¨¦69HoustonWestUniversityPlaceSouthsidePlaceCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.250.50.125Miles±Bellaire
§¨¦610
§¨¦610
§¨¦69
§¨¦69
Houston
West
University
Place
Southside
Place
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.25 0.50.125 Miles
±
Bellaire
§¨¦610
§¨¦610
§¨¦69
§¨¦69
Houston
West
University
Place
Southside
Place
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.25 0.50.125 Miles
±
Bellaire
§¨¦610
§¨¦610
§¨¦69
§¨¦69
Houston
West
University
Place
Southside
Place
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.25 0.50.125 Miles
±
Bellaire
§¨¦610
§¨¦610
§¨¦69
§¨¦69
Houston
West
University
Place
Southside
Place
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.25 0.50.125 Miles
±
Bellaire
§¨¦610
§¨¦610
§¨¦69
§¨¦69
Houston
West
University
Place
Southside
Place
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.25 0.50.125 Miles
±
Bellaire
§¨¦610
§¨¦610
§¨¦69
§¨¦69
Houston
West
University
Place
Southside
Place
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.25 0.50.125 Miles
±
Bellaire
4-1
4. CITY OF BUNKER HILL VILLAGE
4.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Karen H. Glynn, P.E., City Administrator
11977 Memorial Drive
Houston, Texas 77024
Telephone: 713-467-9762
e-mail Address: kglynn@bunkerhilltx.gov
Steve Smith, Director of Public Works
11977 Memorial Drive
Houston, Texas 77024
Telephone: 713-467-9762
e-mail Address: ssmith@bunkerhilltx.gov
4.2 JURISDICTION PROFILE
4.2.1 Location
The City of Bunker Hill Village is a municipality in southwestern Harris County. The current boundaries generally
are Blalock Road on the east, Memorial Drive on the south, Taylorcrest Road on the north, and, on the west, a part
of the Tealwood area west of Gessner Road. The City encompasses an area of 1.5 square miles.
4.2.2 History
The City of Bunker Hill Village was incorporated in 1954. The City consists of approximately 1,250 single-family
dwellings; one privately owned recreational center, two elementary schools, four churches, and one retreat center.
Through the years, the City has adopted ordinances establishing zoning regulations to preserve the characteristics
of Bunker Hill Village and the five other surrounding “Memorial Villages.” The six Memorial Villages are
independent cities that operate autonomously of Houston. All are served by the Village Fire Department. The
Memorial Villages Police Department serves Bunker Hill Village, Piney Point Village, and Hunters Creek; the other
Memorial Villages have independent police agencies. The six villages have executed an inter-local agreement and
developed an emergency management guide for emergency needs.
4.2.3 Climate
The climate of the City of Bunker Hill Village is characterized by relatively high temperatures and
evenly distributed precipitation throughout the year with high humidity.
4.2.4 Governing Body Format
The City of Bunker Hill Village is a Type-A General Law City governed by a Mayor and five Council Members
elected at large. A Type-A General Law City is one that had 600 or more inhabitants at the time of its incorporation.
General Law Cities have a population less than 5,000 and are authorized to do only what the state constitution or
Legislature has authorized.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
4-2
The City Council assumes responsibility for the adoption of this plan; the City Administrator will oversee its
implementation. Table 4-1 lists members of the joint local mitigation planning team. Howard Miller, emergency
management coordinator for the Village Fire Department, also participated in planning for the six Memorial
Villages.
Table 4-1. Local Mitigation Planning Team Members
Jurisdiction Name / Title Phone Email
City of Bunker Hill Village Karen Glynn, City Admin.
Steve Smith, PW Director/Building
Official
713-467-9762 KGlynn@bunkerhilltx.gov
ssmith@bunkerhilltx.gov
City of Hedwig Village Kelly Johnson, City Admin./Secretary 713-465-6009 kjohnson@hedwigtx.gov
City of Hilshire Village Susan Blevins, City Admin/Secretary
Efrain Him, City Engineer
713-973-1779 Susan.blevins@hilshirevillagetexas.com
Efrain.him@hdrine.com
City of Hunters Creek Village Tom Fullen, City Admin. 713-465-2150 tfullen@cityofhunterscreek.org
City of Piney Point Village Roger Nelson, City Admin. 713-230-8703 cityadmin@pineypt.org
City of Spring Valley Village Julie Robinson, City Admin.
Arthur Faiello, PW Director
713-465-5306
832-910-8576
jrobinson@springvalleytx.com
afaiello@springvalleytx.com
Memorial Villages Police Department Ray Schultz, Chief of Police Rschultz@mvpdtx.org
Village Fire Department Howard Miller, Emergency
Management Coordinator
David Foster, Fire Chief
4.3 CURRENT TRENDS
4.3.1 Population
According to the 2010 Census Data, the population of the City of Bunker Hill Village was 3,633. Since the 1990
Census, the population has been relatively stable.
4.3.2 Development
The City of Bunker Hill Village is continuing to experience residential redevelopment of new, larger homes. City
of Bunker Hill is landlocked by other municipalities; therefore there is no growth opportunity.
Table 4-2 summarizes development trends in the performance period since the preparation of the previous hazard
mitigation plan, as well as expected future development trends.
Table 4-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since
the preparation of the previous hazard
mitigation plan?
NO
• If yes, give the estimated area annexed and estimated number of parcels or structures.
N/A
Is your jurisdiction expected to annex any
areas during the performance period of this
plan?
NO
• If yes, describe land areas and dominant uses.
N/A
• If yes, who currently has permitting authority over these areas?
N/A
City of Bunker Hill Village
4-3
Criterion Response
Are any areas targeted for development or major redevelopment in the next five years? yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk
areas
The City of Bunker Hill Village is continuing to experience residential redevelopment
of new, larger homes.
How many permits for new construction were issued in your jurisdiction since the
preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 20 12 27 19 21
Multi-Family N/A N/A N/A N/A N/A
Other (commercial, mixed use, etc.) N/A N/A N/A N/A N/A
Total 20 12 27 19 21
Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development
has occurred.
• Special Flood Hazard Areas: #N/A
• Landslide: # N/A
• High Liquefaction Areas: # N/A
• Tsunami Inundation Area: # N/A
• Wildfire Risk Areas: # N/A
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description.
Bunker Hill Village continues to experience redevelopment of their residential lots;
older homes are demolished and new homes constructed.
4.4 CAPABILITY ASSESSMENT
The City of Bunker Hill Village performed an assessment of its existing capabilities for implementing hazard
mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 4-3.
• Development and permitting capabilities are presented in Table 4-4.
• An assessment of fiscal capabilities is presented in Table 4-5.
• An assessment of administrative and technical capabilities is presented in Table 4-6.
• An assessment of education and outreach capabilities is presented in Table 4-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 4-8.
• Classifications under various community mitigation programs are presented in Table 4-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 4-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
4-4
Table 4-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes Yes
Comment: Chapter 4 Development, Building and Construction
Zoning Code Yes No Yes Yes
Comment: Appendix A – Zoning
Subdivisions Yes No Yes Yes
Comment: Chapter 14 – Subdivision
Stormwater Management Yes No Yes Yes
Comment: Chapter 4 Development, Building and Construction; TCEQ
Post-Disaster Recovery Yes Yes Yes No
Comment: Harris County; FEMA
Real Estate Disclosure No No No No
Comment:
Growth Management Yes Yes Yes Yes
Comment: Harris Co. Flood Control
Site Plan Review Yes Yes Yes No
Comment: Chapter 4 Development, Building and Construction; Village Fire Dept – Fire Marshall
Environmental Protection No Yes Yes No
Comment: TCEQ; EPA
Flood Damage Prevention Yes No Yes Yes
Comment: Chapter 4 Development, Building and Construction
Emergency Management Yes Yes Yes No
Comment: Harris Co; Village FD; Memorial Villages PD
Climate Change No No No No
Comment:
Other No No No No
Comment:
Planning Documents
General Plan – City’s Zoning Ordinance Yes No Yes Yes
Comment: N/A
Capital Improvement Plan Yes No No Yes
How often is the plan updated? Annually
Comment: The City maintains a rolling 5 year CIP (Water, Wastewater, Water Production, Streets and Drainage Updated annually)
Disaster Debris Management Plan Yes Yes No No
Comment: By Contract with Harris County
Floodplain or Watershed Plan No Yes No No
Comment: Harris Co Flood Control
Stormwater Plan Yes Yes Yes Yes
Comment: TCEQ – MS4 Permit
Urban Water Management Plan Yes Yes Yes No
Comment: Harris – Galveston Subsidence District – Ground Water Reduction Plan
Habitat Conservation Plan No Yes No No
Comment: TX Parks & Wildlife; TCEQ; EPA
Economic Development Plan Yes No Yes No
Comment: The City is 100% Zoned Residential
City of Bunker Hill Village
4-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Shoreline Management Plan No No No No
Comment:
Community Wildfire Protection Plan No No No No
Comment:
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes Yes Yes No
Comment: Harris County
Threat & Hazard Identification & Risk
Assessment (THIRA)
Yes Yes Yes No
Comment: Harris County Hazard Mitigation Plan
Post-Disaster Recovery Plan Yes Yes Yes No
Comment: Harris County Emergency Management Plan
Continuity of Operations Plan No No No No
Comment:
Public Health Plan No No No No
Comment: Harris Co. Public Health
Other No No No No
Comment:
Table 4-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? City’s Building Official
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? No
Table 4-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants No
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes -- Water and Sewer
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Other N/A
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
4-6
Table 4-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes City Admin; Building Official; By Contract
Engineers or professionals trained in building or infrastructure construction practices Yes City Admin; Building Official; Contract
Inspectors; Fire Marshall
Planners or engineers with an understanding of natural hazards Yes By Contract
Staff with training in benefit/cost analysis Yes By Contract
Surveyors Yes By Contract
Personnel skilled or trained in GIS applications Yes By Contract
Scientist familiar with natural hazards in local area No
Emergency manager Yes Village Fire Dept; Memorial Villages PD
Grant writers Yes By Contract
Other N/A
Table 4-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? No
• If yes, briefly describe.
Do you use social media for hazard mitigation education and outreach? No
• If yes, briefly describe.
Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes
• If yes, briefly describe. City’s Drainage Committee
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. Email notification system (vlinc)
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Email notification system (vlinc)
Table 4-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? City’s Building Official
Who is your floodplain administrator? (department/position) City’s Building Official
Are any certified floodplain managers on staff in your jurisdiction? No – By Contract
What is the date that your flood damage prevention ordinance was last amended?
2017
Does your floodplain management program meet or exceed minimum requirements? Exceeds
• If exceeds, in what ways? Added minimum foundation elevation
based on sanitary sewer and calculate
hydraulic grade line for 100 year event
When was the most recent Community Assistance Visit or Community Assistance
Contact?
2017
City of Bunker Hill Village
4-7
Criterion Response
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? N/A
• If no, state why.
Does your floodplain management staff need any assistance or training to support its floodplain management program? No
• If so, what type of assistance/training is needed?
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification? No
• If no, is your jurisdiction interested in joining the CRS program? No
How many flood insurance policies are in force in your jurisdiction?a 756
• What is the insurance in force? $ 257,767,500
• What is the premium in force? $ 312,000
How many total loss claims have been filed in your jurisdiction?a 276
• How many claims are still open or were closed without payment? 58
• What were the total payments for losses? $8,115,100.66
a. According to FEMA statistics as of December 2018
Table 4-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No Date
Building Code Effectiveness Grading Schedule (ISO) Yes 4 2019
Public Protection Village Fire Dept (ISO) Yes 1 2015
Storm Ready No Date
Firewise No Date
Table 4-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
4-8
Criterion Jurisdiction Ratinga
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
4.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
4.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• City of Bunker Hill Village Stormwater Management Plan
• City of Bunker Hill Finance and Infrastructure Management Plan
• City of Bunker Hill Code of Ordinances – Building Codes, Drainage Ordinance, etc.
City of Bunker Hill Village
4-9
• Bunker Hill Village Code of Ordinances Chapter 4 – Development, Building, and Construction
(City’s Drainage Ordinance)
• City of Bunker Hill Village – Drainage Master Plan Update 2017
• Harris County Hazard Mitigation Plan
4.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
4.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 4-11 lists past occurrences of natural hazards for which specific damage was recorded in Bunker Hill
Village. Other hazard events that broadly affected the entire planning area, including Bunker Hill Village, are
listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 4-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Severe Weather /Flooding N/A 2009 N/A
Hurricane Ike EM3294 September 2008 N/A
Severe Weather/Memorial Day Flood DR4223 May 2015 N/A
Severe Weather/Tax Day Flood DR4269 April 2016 N/A
Hurricane Harvey DR4332 August 2017 N/A
4.7 HAZARD RISK RANKING
Table 4-12 presents a local ranking for Bunker Hill Village of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Table 4-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
2 Hurricane 32 High
3 Earthquake 14 Low
4 Drought 6 Low
4 Flooding 6 Low
4 Wildfires 6 Low
5 Dam Failure 0 (No Exposure) None
5 Mass Movement 0 (No Exposure) None
5 Coastal Erosion 0 (No Exposure) None
5 Tsunami 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
4-10
4.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
4.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 53
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 3
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 4
4.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issue has been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Local Flooding – Homes and Streets
Mitigation actions addressing this issue were prioritized for consideration in the action plan in this annex.
4.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 4-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
4.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 4-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 4-15
identifies the priority for each action. Table 4-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
4.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed for this annex.
• City of Bunker Hill Village Code of Ordinances — The municipal code was reviewed for the full
capability assessment and for identifying opportunities for action plan integration.
• City of Bunker Hill Village Building Code and Flood Damage Prevention Ordinance — The flood
damage prevention ordinance was reviewed for compliance with the National Flood Insurance Program.
• City of Bunker Hill Village Master Drainage Plan
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• Memorial Villages Emergency Manage Plan and Mayors Guide
City of Bunker Hill Village
4-11
Table 4-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item Completed No longer Feasible Check if Yes Action # in Update
Expand Early Warning/Alert System – Collaborative Community
Communication & Mass Notification for Warning/Information sharing with residential and non-residential areas – Phase 1 and Phase 2
Phase 1 Phase 2 BNK5
Comment: Phase 1 has been completed; Phase 2 to continue – plans for text messaging and social media. Continued effort to reach
100 % of residents
Develop Tree Management Program to better manage and keep clear the
public right-of-way; to promote stronger, healthier trees and to reduce the impact of debris
Yes BNK9
Comment: The City has been budgeting funds for trimming trees along major thoroughfares; however, This needs to be developed into a
formal program
Approval of Drainage Ordinance for New Development and Re-development
to require new development to put in drainage systems to reduce flooding.
2015
Updated
2017
Comment:
Implement a regional program to build a tertiary water source to ensure and address public water supply during drought conditions. Yes BNK7
Comment:
Develop a Dam/Levee failure flood inundation study to determine risk area within Bunker Hill Village Remove
Comment:
Implement an Extreme Heat Public Education/Outreach Program to inform
residents of extreme heat hazards and actions to take to minimize health
impacts and property damage from extreme heat.
Remove – part
of notification
project
Comment:
Implement a Clean-up Program of heavy wildfire fuel areas (abandoned
buildings, abandoned lands, etc.)
Yes BNK6
Comment: The City Council has directed staff to develop a vacant house ordinance; This is planned for 2019. This description should be
reworded.
Develop relationship with local LEPC Yes BNK10
Comment:
Implementation of the City of Bunker Hill Village – Drainage Master Plan
Update (Approved 2017)
Yes BNK8
Comment: This action was added during the planning timeframe and should be carried over.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
4-12
Table 4-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing
Assets Objectives Met
Lead
Agency Support Agency
Estimated
Cost Sources of Funding Timelinea
Action BNK1 — Where appropriate, support retrofitting or reconstruction of structures located in hazard areas, prioritizing those that
have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Severe Weather, Hurricane, Flooding
Existing 1, 2, 5 City TBD High HMGP, PDM, FMA Short-term
Action BNK2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including the Drainage Ordinance for New Development and Re-development; the City’s Building Codes in accordance with
ISO Recommendations; the City of Bunker Hill Village – Drainage Master Plan Update (Approved 2017)
Hazards Mitigated: Severe Weather, Drought, Huuricane, Erathquake and Flooding and Wildfire
New and Existing 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 City TBD Low Staff Time, General Funds Ongoing
Action BNK3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Drought, Huuricane, Erathquake and Flooding, and Wildfire
New and Existing 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 City TBD Low Staff Time, General Funds Short-term
Action BNK4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Dam failure, flooding, severe weather,
New and Existing 1, 3, 5, 7, 8, 10 City TBD Low Staff Time, General Funds Ongoing
Action BNK5 — Expand Early Warning/Alert System – Collaborative Community Communication & Notification for Warning/Information
sharing with residential and non-residential ( with Memorial Villages Police Department)
Hazards Mitigated: Severe Weather, Drought, Huuricane, Erathquake and Flooding and wildfire
1, 2, 3, 4, 5, 6, 7, 8, 9, 10 City TBD Low Staff Time, General Funds for
Memorial Villages Police Dept.
Ongoing
Action BNK6 — Implement the City’s Vacant Property Ordinance to Identify and Monitor Properties for potential hazards such as fire,
flooding, nuisance, etc. (abandoned buildings, empty lots, etc.)
Hazards Mitigated: Severe Weather, Drought, Wildfires
1, 4, 6 City TBD Low Staff Time Short-term
Action BNK7 — Implementation of the City’s Infrastructure Management Plan for replacement of the City’s aging water system including
a plan (with other agencies) to ensure and address public water supply during drought conditions.
Hazards Mitigated: Severe Weather, Hurricane, Drought, Wildfires
1, 2, 4, 6 City TBD High Staff Time, City’s Capital
Improvement Plan
Short-term
Action BNK8 — Implementation of the City of Bunker Hill Village – Drainage Master Plan Update (Approved 2017)
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Tsunami
1, 2, 5, 10 City TBD High Staff Time, City’s Capital
Improvement Plan
Long-
Term
Action BNK9 — Develop a Tree Management Program to better manage and keep clear the public rights-of-way; to promote stronger,
healthier trees and to reduce the impact of debris
Hazards Mitigated: Severe Weather, Hurricane, Earthquake, Drought, Flooding, Wildfires, Coastal Erosion, Tsunami
1, 2, 3, 4, 5, 6, 9, 10 City TBD Low Staff Time, City’s General
Fund
Short-term
City of Bunker Hill Village
4-13
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action BNK10 — Develop relationship with local LEPC
Hazards Mitigated: Severe Weather, Drought, Huuricane, Erathquake and Flooding and wildfire
New and Existing 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 City LEPC Low Staff Time Ongoing
Action BNK11— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Drought, Huuricane, Erathquake and Flooding and wildfire
New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Bunker Hill
Village
HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 4-15. Mitigation Action Priority
Action #
# of
Objectives Met Benefits Costs
Do Benefits Equal or
Exceed Costs?
Is Project
Grant-Eligible?
Can Project Be Funded Under
Existing Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
BNK1 3 High High Yes Yes No Medium High
BNK2 10 High Low Yes No Yes High Low
BNK3 10 High Low Yes No Yes High Low
BNK4 6 High Low Yes No Yes High Low
BNK5 10 High Low Yes N/A Yes Medium Low
BNK6 3 Medium Low Yes N/A Yes High Low
BNK7 4 High High Yes Yes In Long Range Plan High High
BNK8 4 High High Yes Yes In Long Range Plan High High
BNK9 8 Medium Low Yes N/A Yes Medium Low
BNK10 10 Medium Low Yes No Yes High Low
BNK11 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
4-14
Table 4-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public
Education & Awareness
Natural
Resource Protection Emergency Services Structural Projects Climate Resilient
Community
Capacity Building
High-Risk Hazards
Severe Weather 1, 2, 3, 4, 5, 6, 7, 8,
9, 11
1, 2, 3, 4, 5, 6, 7, 8, 9 2, 5, 6, 7, 8,
9, 11
6, 9 2, 5, 7, 8, 9,
10, 11
1, 2 11
Hurricane 1, 2, 3, 4, 5, 6, 7, 8,
9, 11
1, 2, 3, 4, 5, 6, 7, 8, 9 2, 5, 6, 7, 8,
9, 11
6, 9 2, 5, 7, 8, 9,
10, 11
1, 2 11
Earthquake 1, 2, 3, 4, 5, 6, 7, 8,
9, 11
1, 2, 3, 4, 5, 6, 7, 8, 9 2, 5, 6, 7, 8,
9, 11
6, 9 2, 5, 7, 8, 9,
10, 11
1, 2 11
Drought 1, 2, 3, 4, 5, 6, 7, 8,
9, 11
1, 2, 3, 4, 5, 6, 7, 8, 9 2, 5, 6, 7, 8,
9, 11
6, 9 2, 5, 7, 8, 9,
10, 11
1, 2 11
Medium-Risk Hazards
N/A
Low-Risk Hazards
Flooding 1, 2, 3, 4, 5, 6, 7, 8,
9, 11
1, 2, 3, 4, 5, 6, 7, 8, 9 2, 5, 6, 7, 8,
9, 11
6, 9 2, 5, 7, 8, 9,
10, 11
1, 2 11
Wildfires 1, 2, 3, 4, 5, 6, 7, 8,
9, 11
1, 2, 3, 4, 5, 6, 7, 8, 9 2, 5, 6, 7, 8,
9, 11
6, 9 2, 5, 7, 8, 9,
10, 11
1, 2 11
a. See the introduction to this volume for explanation of mitigation types.
!(!(!(!(!(!(!(!(!(!(HoustonHedwigVillagePiney PointVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.150.30.075Miles±Bunker Hill Village
Houston
Hedwig
Village
Piney Point
Village
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Bunker Hill Village
Houston
Hedwig
Village
Piney Point
Village
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Bunker Hill Village
Houston
Hedwig
Village
Piney Point
Village
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Bunker Hill Village
Houston
Hedwig
Village
Piney Point
Village
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Bunker Hill Village
Houston
Hedwig
Village
Piney Point
Village
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Bunker Hill Village
Houston
Hedwig
Village
Piney Point
Village
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Bunker Hill Village
5-1
5. CITY OF DEER PARK
5.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Robert Hemminger, Director of Emergency Services
2211 East X Street
Deer Park, TX 77536
Telephone: 281-478-7284
e-mail Address: rhemminger@deerparktx.org
Buddy Rice, Fire Marshal
2211 East X Street
Deer Park, TX 77536
Telephone: 281-478-7291
e-mail Address: brice@deerparktx.org
5.2 JURISDICTION PROFILE
5.2.1 Location
The city of Deer Park, Texas is located in southeastern Harris County and is in the highly industrialized ship
channel area of the county. It is approximately 22 miles east of downtown Houston.
The current boundaries generally extend by the city of Pasadena, Texas to the south and west, by the city of La
Porte, Texas to the south and east and by the Houston Ship Channel (dredged out Buffalo Bayou) to the north.
5.2.2 History
The City was founded by Simeon West in 1892 and was incorporated December 12, 1948 when the population
was 700. As of the 2010 U.S. Census, the population of Deer Park, Texas was 32,010.
5.2.3 Climate
Deer Park’s climate is classified as humid subtropical and is characterized by hot, humid summers and generally
mild to cool winters.
5.2.4 Governing Body Format
The City of Deer Park, Texas is a Home Rule City adopted in December 1960 which provides for a Mayor-
Council from of government. The Mayor and six (6) members of Council are elected at large and establish goals
and priorities that are executed and implemented through the appointed City Manager.
The City Council assumes responsibility for the adoption of this plan; the Office of Emergency Management will
oversee its implementation. Development of this annex was carried out by the members of the City of Deer Park
Local Mitigation Planning Team, whose members are listed in Table 5-1.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
5-2
Table 5-1. Local Mitigation Planning Team Members
Name Title
Robert Hemminger Emergency Services Director
Buddy Rice Fire Marshal
Bill Pedersen Public Works Director
James Stokes City Manager
Gary Jackson Assistant City Manager
Kathy Holcomb Operations Coordinator / Floodplain Manager
Adam Ballasteros City Engineer
Larry Brotherton Chief Building Official
5.3 CURRENT TRENDS
5.3.1 Population
According to 2010 U.S. Census, the population of Deer Park, Texas was 32,010. According to the Texas Home
Town Locator the population of Deer Park, Texas was 35,139 as of July 1, 2018. Since 2010, the population has
grown at an average annual rate of 1.14%.
5.3.2 Development
Table 5-2 summarizes development trends in the performance period since the preparation of the previous hazard
mitigation plan, as well as expected future development trends.
Table 5-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since
the preparation of the previous hazard
mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
N/A
Is your jurisdiction expected to annex any
areas during the performance period of this
plan?
No
• If yes, describe land areas and dominant uses.
N/A
• If yes, who currently has permitting authority over these areas?
N/A
Are any areas targeted for development or major redevelopment in the next five years? Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
The city of Deer Park has annexed 32 acres for commercial development
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation
plan?
2014 2015 2016 2017 2018
Single Family 59 94 55 51 8
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.) 15 10 19 15 13
Total 74 104 74 56 21
City of Deer Park
5-3
Criterion Response
Provide the number of new-construction permits for each hazard area or provide a
qualitative description of where development
has occurred.
• Special Flood Hazard Areas: 26 commercial properties built within a flood hazard
area between 2014 and June 2019
• Landslide: -0-
• High Liquefaction Areas: -0-
• Tsunami Inundation Area: -0-
• Wildfire Risk Areas: -0-
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory
exists, provide a qualitative description.
As of July 2019, the estimate is the city of Deer Park, Texas is approximately 90%
built out.
5.4 CAPABILITY ASSESSMENT
The City of Deer Park performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 5-3.
• Development and permitting capabilities are presented in Table 5-4.
• An assessment of fiscal capabilities is presented in Table 5-5.
• An assessment of administrative and technical capabilities is presented in Table 5-6.
• An assessment of education and outreach capabilities is presented in Table 5-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 5-8.
• Classifications under various community mitigation programs are presented in Table 5-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 5-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
5-4
Table 5-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes Yes
Comment: Code of Ordinances, Chapter 18 Buildings and Building Regulations
Zoning Code Yes No No Yes
Comment: Code of Ordinances, Appendix A Zoning
Subdivisions Yes No No Yes
Comment: Code of Ordinances, Chapter 98 Subdivisions
Stormwater Management Yes Yes Yes Yes
Comment: Code of Ordinances, Chapter 106 Utilities
Post-Disaster Recovery Yes No No Yes
Comment: Code of Ordinances, Chapter 18 Buildings and Building Regulations Division 3 Disaster Recovery Contractors
Real Estate Disclosure No No No No
Comment:
Growth Management Yes No Yes Yes
Comment: Code of Ordinances, Chapter 98 Subdivisions and Chapter 102 Taxation
Site Plan Review Yes No No Yes
Comment: Code of Ordinances, Chapter 106 Utilities, Chapter 98 Subdivisions and Appendix A Zoning
Environmental Protection Yes Yes No Yes
Comment: Code of Ordinances, Chapter 106 Utilities, Chapter 18 Buildings and Building Requirements and Appendix A Zoning
Flood Damage Prevention Yes No Yes Yes
Comment: Code of Ordinances, Chapter 46 Floods, Chapter 98 Subdivisions and Chapter 18 Buildings and Building Regulations
Emergency Management Yes No Yes Yes
Comment: Code of Ordinances, Chapter 26 Civil Emergencies
Climate Change No Yes No Yes
Comment:
Planning Documents
General Plan Yes No Yes Yes Comment: Comprehensive Plan
Capital Improvement Plan Yes No No Yes
How often is the plan updated? Annual during the budget process
Comment:
Disaster Debris Management Plan Yes Yes No Yes
Comment: Contracts are reviewed annually and the contracts are renewed every five (5) years
Floodplain or Watershed Plan Yes Yes No Yes
Comment: Code of Ordinances, Chapter 46 Floods
Stormwater Plan Yes Yes Yes Yes
Comment: Code of Ordinances, Chapter 106 Utilities
Urban Water Management Plan No No No No
Comment:
Habitat Conservation Plan No Yes No Yes
Comment: The City of Deer Park does not have an HCP but habitat impact is addressed in Code of Ordinances, Chapter 106 Utilities
and Chapter 98 Subdivisions
Economic Development Plan No No No No
Comment: City of Deer Park does have an Economic Development Coordinator
Shoreline Management Plan No Yes No No
Comment: City of Deer Park is not required to have an SMP
City of Deer Park
5-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Community Wildfire Protection Plan No Yes No Yes
Comment: City of Deer Park is included in Harris County CWPP
Forest Management Plan No Yes No No
Comment:
Climate Action Plan No Yes No Yes
Comment:
Comprehensive Emergency Management Plan Yes Yes Yes Yes
Comment: Annex P – Hazard Mitigation of the Emergency Operations Plan
Threat & Hazard Identification & Risk Assessment (THIRA) No Yes Yes Yes
Comment:
Post-Disaster Recovery Plan Yes Yes No Yes
Comment: Annex J – Disaster Recovery Plan of the Emergency Operations Plan
Continuity of Operations Plan Yes No No Yes
Comment:
Public Health Plan Yes Yes Yes Yes
Comment: Annex H – Health and Medical of the Emergency Operations Plan
Table 5-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Public Works/Planning and Development
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? No
Table 5-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes – Water and Sewer
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
5-6
Table 5-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Planning and Development
Engineers or professionals trained in building or infrastructure construction practices Yes Planning and Development
Planners or engineers with an understanding of natural hazards Yes Planning and Development
Staff with training in benefit/cost analysis Yes Finance and OEM Directors
Surveyors Yes Planning & Development
Personnel skilled or trained in GIS applications Yes Planning & Development and IT
Scientist familiar with natural hazards in local area Yes Local research institutes, colleges and
universities
Emergency manager Yes OEM Director and EOC Manager
Grant writers Yes OEM Director and City Manager’s Office
Table 5-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. Public Works disseminates the information
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. Website, Instagram, Facebook and Twitter
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe. N/A
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. Printed material handouts at all city facilities, social
media and utility billing insert
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Code Red, Outdoor Warning Sirens (Whelen), social
media outlets, Alertus, Municipal TV Station
City of Deer Park
5-7
Table 5-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Public Works
Who is your floodplain administrator? (department/position) Public Works Project Coordinator
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? January 2017
Does your floodplain management program meet or exceed minimum requirements? Meets
• If exceeds, in what ways? N/A
When was the most recent Community Assistance Visit or Community Assistance Contact? Insert appropriate information
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are. N/A
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are. N/A
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why. N/A
Does your floodplain management staff need any assistance or training to support its floodplain management program? No
• If so, what type of assistance/training is needed? N/A
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification? Yes
• If no, is your jurisdiction interested in joining the CRS program? N/A
How many flood insurance policies are in force in your jurisdiction?a 4,285
• What is the insurance in force? $1,283,462,500
• What is the premium in force? Unknown
How many total loss claims have been filed in your jurisdiction?a 306
• How many claims are still open or were closed without payment? Unknown
• What were the total payments for losses? $7,759,475.49
a. According to FEMA statistics as of February 2017
Table 5-9. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes 7 05/01/2017
Building Code Effectiveness Grading Schedule Yes 4 02/24/2010
Public Protection Yes ISO 2 2016
Storm Ready No N/A N/A
Firewise No N/A N/A
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
5-8
Table 5-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Deer Park
5-9
5.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
5.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Basic Plan – The Basic Plan provides a summary on the hazards and threats in the community.
• Annex P – Hazard Mitigation is assigned to the Public Works Department and addresses the hazards
and threats in the community. The Annex also identifies the various hazard mitigation related programs
implemented in the City of Deer Park and which agencies are responsible for administration.
5.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Master Drainage Plan – The City of Deer Park may incorporate a Master Drainage Plan and identify
projects to include in the Hazard Mitigation Action Plans.
• Flood Mitigation Plan – The City of Deer Park may consider a Flood Mitigation Plan to specifically
identify flood mitigation projects for the Mitigation Action Plan.
• Capital Improvement Plan – The City of Deer Park updates the CIP on an annual basis and can
integrate the goals, objectives, and projects identified in the Hazard Mitigation Action Plan into the CIP
process.
5.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 5-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of Deer
Park. Other hazard events that broadly affected the entire planning area, including City of Deer Park, are listed in
the risk assessments in Volume 1 of this hazard mitigation plan.
5.7 HAZARD RISK RANKING
Table 5-12 presents a local ranking for City of Deer Park of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
5-10
Table 5-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey DR-1791 2017 Ongoing
Severe Storms, Tornadoes, Straight Line Winds and Flooding DR-4223 2015 $850,000
Hurricane Ike DR-1791 2008 N/A
Hurricane Ike EM-3294 2008 N/A
Tropical Storm Erin DR-1730 2007 N/A
Hurricane Rita DR-1606 2005 N/A
Hurricane Rita EM-3261 2005 N/A
Hurricane Katrina Evacuation EM-3216 2005 N/A
Severe Storms, Tornadoes and Flooding DR-1439 2002 N/A
Tropical Storm Allison DR-1379 2001 N/A
Extreme Fire Hazards EM-3142 1999 N/A
Flooding DR-1257 1998 N/A
Tropical Storm Frances DR-1245 1998 N/A
Severe Thunderstorms and Flooding DR-1041 1994 N/A
Severe Thunderstorms and Flooding DR-970 1992 N/A
Severe Thunderstorms and Flooding DR-937 1992 N/A
Tropical Storm Allison DR-836 1989 N/A
Severe Storms, Tornadoes and Flooding DR-828 1989 N/A
Severe Storms and Flooding DR-727 1984 N/A
Hurricane Alicia DR-689 1983 N/A
Severe Storms, Tornadoes and Flooding DR-580 1979 N/A
Severe Storms and Flooding DR-603 1979 N/A
Severe Storms and Flooding DR-510 1976 N/A
Severe Storms and Flooding DR-398 1973 N/A
Table 5-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane and Coastal Storms 48 High
2 Wildfire 13 High
3 Flooding 24 Medium
4 Toxic Chemical Release NA Medium
5 Earthquake 14 Low
6 Drought 6 Low
6 Dam Failure 6 Low
6 Mass Movement 6 Low
6 Energy Pipeline Failures 6 Low
7 Tsunami 0 (No Exposure) None
7 Coastal Erosion 0 (No Exposure) None
7 Tsunami 0 ( No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
City of Deer Park
5-11
5.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
5.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: None
• Number of FEMA-identified Severe-Repetitive-Loss Properties: None
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated:
None
5.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issue has been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Due to the City’s proximity to the chemical plants and refineries along the Ship Channel, Deer Park has a
high risk to environmental and hazardous materials incidents due to impacts caused by natural and human
caused hazards
Mitigation actions addressing this issue were prioritized for consideration in the action plan in this annex.
5.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 5-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 5-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
2014DERPRK001-Adopt a City Ordinance to require emergency power generation for fueling stations during new construction X
Comment:
2014DERPRK002-Retrofit critical infrastructure/public buildings/facilities
with generator power systems
X
Comment:
2014DERPRK003-Install Alertus (mass notification) early warning systems for public buildings X
Comment: Partially completed, adding to additional buildings
2014DERPRK004-Install new lightning warning systems at outdoor sporting venues X
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
5-12
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
2014DERPRK005-Update drainage ordinance to require detention future development and redevelopment for detention and within the AO (sheet flow) zones
X
Comment:
2014DERPRK006-Widening and deepening all drainage channels within the
city limits
X
Comment:
2014DERPRK007- Buyout flood prone properties and create detention ponds X
Comment:
2014DERPRK008-Retrofit and harden critical infrastructure and/or shelters
with impact and wind resistant glass and shutter systems to withstand
effects of hurricanes, hail and high-winds
X
Comment:
2014DERPRK009-Protect VHF Radio System and other emergency communications infrastructure components through hardening and
protective structures
X
Comment:
2014DERPRK010-Retrofit and improve gravel roofing to limit loose debris and high wind damage X
Comment:
2014DERPRK011-Center Street Revitalization Project – Utility Relocation X
Comment:
2014DERPRK012-Construct protective shelters for critical equipment and vehicles X
Comment:
2014DERPRK013-Improve/Retrofit air filtration systems for critical
infrastructure/public buildings/school facilities with improved filtration and air purifying capacity to minimize health risks associated with low air quality and to minimize equipment damage due to smoke
X
Comment: Higher quality system, improved filtration, higher capacity air purification, etc.
2014DERPRK014-Improve code/ordinance to require removal of dead
vegetation/dry fuel sources in high risk areas
X
Comment:
2014DERPRK015-Harden water piping lines and systems to prevent loss of water due to breaks and to mitigate drought X
Comment:
2014DERPRK016-Develop a Public Education/Outreach Program to inform
the public on water conservation mitigation measures
X
Comment:
2014DERPRK017- Install emergency power at cooling center X
Comment:
2014DERPRK018-Improve existing site to be utilized as a cooling zone
(Community Center, Library, sporting fields) with enhanced cooling capabilities, to include misting systems and additional HVAC cooling capacity
X
Comment:
City of Deer Park
5-13
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
2014DERPRK019-Install generator to provide adequate heating for use as a warming center X
Comment:
2014DERPRK020-Upgrade public facility heating systems to allow utilization of warming centers through improved insulation and energy efficient heating
systems, and educate public on actions to mitigate property losses from the hazards of winter storms
X
Comment:
2014DERPRK021-Install detection systems to monitor and warn of chemical
releases
X
Comment:
2014DERPRK022-Improve code/ordinance for pipeline signage X
Comment:
2014DERPRK023-Mapping/identification of inundation risk area for high risk dams/levees X
Comment:
2014DERPRK024-Install automated public alert warning system, such as outdoor sirens or automated messaging/telephone notification systems, to provide advance warning for dam failure flood
X
Comment:
2010DERPRK004-Storm Sewer enlargement and storm sewer additions in
different parts of city as part of the Master Drainage Plan that was developed
X
Comment: These projects will be placed on future Council agendas and follow the process for engineering and bidding of the projects.
Design is 90% complete. Enlargement of existing infrastructure would be determined at time of funded project and would be
calculated to be the most cost effective size at the time
2010DERPRK005-Widening and deepening of HC Flood Control Channel
B112-02-00
X
Comment: This would be a joint venture between the City and HC Flood Control District with the exact size and scope of the project
still being evaluated and engineered by HCFCD.
2010DERPRK019-Develop/implement tree management program and
mitigation measures to reduce high wind damages
X
Comment: Due to issues of trees in yards being on private property the City must do an awareness program to encourage
homeowners to trim their trees around their house
2010DERPRK024-Establish/Expand GIS Mapping/Identification of Pipeline Risk Areas in flood areas X
Comment: This project is updated annually with new pipelines or new owners or products
2010DERPRK025-Develop/implement pipeline safety program X
Comment:
5.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 5-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 5-15
identifies the priority for each action. Table 5-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
5-14
Table 5-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing
Assets Objectives Met Lead Agency Support Agency
Estimated
Cost Sources of Funding Timelinea
Action DP1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that
have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire
Existing 3, 4, 10 City
Administration
TBD High HMGP, PDM, FMA Short-term
Action DP2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including the City of Deer Park
Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire
New and Existing 1, 3, 4, 5, 7, 8, 10 City
Administration
TBD Low Staff Time, General Funds Ongoing
Action DP3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane and Coastal Storms, Flooding, Earthquake, Wildfire, Drought, Dam Failure, Mass
Movement, Energy Pipeline Failures, Toxic Chemical Release
New and Existing 1, 5, 8 City
Administration
TBD Low Staff Time, General Funds Short-term
Action DP4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Flooding
New and Existing 1, 3, 5, 7, 8, 10 City
Administration
TBD Low Staff Time, General Funds Ongoing
Action DP5 — Adopt a City Ordinance to require emergency power generation for fueling stations during new construction
Hazards Mitigated: Severe Weather; Flooding; Hurricanes
Existing 11, 12, 14 Public Works TBD Low General Fund Short term
Action DP6 — Retrofit critical infrastructure/public buildings/facilities with generator power systems
Hazards Mitigated: Severe Weather; Flooding; Hurricanes
Existing 10, 11 Public Works TBD High Grant Funds Short term
Action DP7 — Install Alertus (mass notification) early warning systems for public buildings
Hazards Mitigated: Severe Weather-Tornadoes
New 1, 4, 11 Information
Technology
TBD Medium General or Grant Funds Short term
Action DP8 — Install new lightning warning systems at outdoor sporting venues
Hazards Mitigated: Severe Weather
New 1, 10, 11 Parks TBD Low General and Grant Funds Short term
Action DP9 — Update drainage ordinance to require detention future development and redevelopment for detention and within the AO
(sheet flow) zones
Hazards Mitigated: Flooding; Hurricanes, Dam Failure
New 8, 9, 11, 12, 14, 15 Public Works TBD Low Staff time Short term
Action DP10 — Widening and deepening all drainage channels within the city limits
Hazards Mitigated: Flooding; Dam/Levee Failure
Existing 7, 8, 10, 11, 12, 15 Public Works TBD High General and Grant Funds Short term
Action DP11 — Buyout flood prone properties and create detention ponds
Hazards Mitigated: Flooding
Existing 6, 7, 8, 9, 10, 11 Public Works TBD High Grant Funds Long term
City of Deer Park
5-15
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action DP12 — Retrofit and harden critical infrastructure and/or shelters with impact and wind resistant glass and shutter systems to
withstand effects of hurricanes, hail and high-winds
Hazards Mitigated: Hurricanes; Tornadoes; Severe Weather
Existing 9, 10, 11, 13, 15 Public Works TBD High General and grant funds Long term
Action DP13 — Protect VHF Radio System and other emergency communications infrastructure components through hardening and
protective structures
Hazards Mitigated: Hurricanes; Tornadoes; Severe Weather; Flooding; Wildfires
Existing 1, 10, 11, 13 Information
Technology
TBD Medium General and grant funds Long term
Action DP14 — Retrofit and improve gravel roofing to limit loose debris and high wind damage
Hazards Mitigated: Hurricanes; Severe Weather
Existing 10, 11, 13, 15 Public Works TBD High General and grant funds Short term
Action DP15 — Center Street Revitalization Project – Utility Relocation
Hazards Mitigated: Hurricanes; Severe Weather
Existing 6, 9, 10, 11, 13 Public Works TBD Medium General and grant funds Short term
Action DP16 — Construct protective shelters for critical equipment and vehicles
Hazards Mitigated: Severe Weather
New 9, 10, 11, 13 Public Works TBD Medium General and grant funds Short term
Action DP17 — Improve/Retrofit air filtration systems for critical infrastructure/public buildings/school facilities with improved filtration and
air purifying capacity to minimize health risks associated with low air quality and to minimize equipment damage due to smoke
Hazards Mitigated: Wildfire; Hazmat; Pipeline Failure
Existing 4, 9, 10, 11, 13,14 Public Works TBD Medium General and grant funds Short term
Action DP18 — Improve code/ordinance to require removal of dead vegetation/dry fuel sources in high risk areas
Hazards Mitigated: Wildfire
Existing 2, 6, 7, 8, 9, 10, 11,
14
Public Works TBD Low General and grant funds Short term
Action DP19 — Harden water piping lines and systems to prevent loss of water due to breaks and to mitigate drought
Hazards Mitigated: Drought
Existing 9, 10, 11, 13,15 Public Works TBD Medium General and grant funds Short term
Action DP20 — Develop a Public Education/Outreach Program to inform the public on water conservation mitigation measures
Hazards Mitigated: Drought
Existing 7, 8, 10, 11 Public Works TBD Low General funds Short term
Action DP21 — Install emergency power at cooling center
Hazards Mitigated: Severe weather – extreme heat
New 4, 9, 10, 11 Public Works TBD Medium General and grant funds Short term
Action DP22 — Improve existing site to be utilized as a cooling zone (Community Center, Library, sporting fields) with enhanced cooling
capabilities, to include misting systems and additional HVAC cooling capacity
Hazards Mitigated: Severe weather – extreme heat
Existing 4, 9, 10, 11 Public Works TBD Medium General and grant funds Short term
Action DP23 — Install generator to provide adequate heating for use as a warming center
Hazards Mitigated: Severe weather – winter storms
New 4, 9, 10, 11 Public Works TBD Medium General and grant funds Short term
Action DP24 — Upgrade public facility heating systems to allow utilization of warming centers through improved insulation and energy
efficient heating systems, and educate public on actions to mitigate property losses from the hazards of winter storms
Hazards Mitigated: Severe weather – winter storms
Existing 4, 9, 10, 11 Public Works TBD Medium General and grant funds Short term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
5-16
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action DP25 — Install detection systems to monitor and warn of chemical releases
Hazards Mitigated: Hazmat; Pipeline Failure
Existing 1, 3, 8, 9, 10, 11 Information
Technology
TBD Medium General and grant funds Short term
Action DP26 — Improve code/ordinance for pipeline signage
Hazards Mitigated: Energy Pipeline Failures
Existing 1, 3, 6, 9, 10, 11 Emergency
Management
TBD Low General funds Short term
Action DP27 — Mapping/identification of inundation risk area for high risk dams/levees
Hazards Mitigated: Dam/Levee Failure; Flooding
Existing 3, 10 Information
Technology
TBD Medium General and grant funds Short term
Action DP28 — Install automated public alert warning system, such as outdoor sirens or automated messaging/telephone notification
systems, to provide advance warning for dam failure or flood
Hazards Mitigated: Dam/Levee Failure; Flooding
Existing 1, 3, 6, 9, 10, 11 Information
Technology
TBD Medium General and grant funds Short term
Action DP29 — Storm Sewer enlargement and storm sewer additions in different parts of city as part of the Master Drainage Plan that
was developed
Hazards Mitigated: Flooding
New 7, 9, 10, 11, 13 Public Works TBD High General and grant funds Long term
Action DP30 — Widening and deepening of HC Flood Control Channel B112-02-00
Hazards Mitigated: Flooding
Existing 7, 9, 10, 11, 13 Engineering TBD High General and grant funds Long term
Action DP31 — Develop/implement tree management program and mitigation measures to reduce high wind damages
Hazards Mitigated: Hurricane and Severe Weather
Existing 2, 6, 7, 8, 9, 10, 11,
14
Public Works TBD Medium General funds Short term
Action DP32 — Establish/Expand GIS Mapping/Identification of Pipeline Risk Areas in flood areas
Hazards Mitigated: Energy Pipeline Failures; Flooding
Existing 3, 7, 8, 9, 10, 11,13 Emergency
Management
TBD Low General funds Short term
Action DP33 — Develop/implement pipeline safety program
Hazards Mitigated: Energy Pipeline Failure
Existing 3, 7, 8, 9, 10, 11,13 Emergency
Management
TBD Low General funds Short term
Action DP34— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane and Coastal Storms, Flooding, Earthquake, Wildfire, Drought, Dam Failure, Mass
Movement,
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
Deer Park HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
City of Deer Park
5-17
Table 5-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
DP1 3 High High Yes Yes No Medium High
DP2 7 Medium Low Yes No Yes High Low
DP3 3 Low Low Yes No Yes High Low
DP4 6 Medium Low Yes No Yes High Low
DP5 3 High Low Yes No Yes High Low
DP6 2 High High Yes Yes No High High
DP7 3 Medium Medium Yes Yes No Medium High
DP8 3 High Low Yes Yes No Medium Medium
DP9 6 Medium Low Yes No Yes High Low
DP10 6 High High Yes Yes No Medium High
DP11 6 High High Yes Yes No High High
DP12 5 High High Yes Yes No Medium Medium
DP13 4 Medium Medium Yes Yes No Medium Medium
DP14 4 High High Yes Yes No Medium Medium
DP15 5 Medium Medium Yes Yes No Medium Medium
DP16 4 High Medium Yes Yes No Medium Medium
DP17 6 Medium Medium Yes Yes No Medium Medium
DP18 8 Medium Low Yes No Yes High Low
DP19 5 High High Yes Yes Yes Medium Medium
DP20 4 Medium Low Yes No Yes Medium Low
DP21 4 High Medium Yes Yes No High High
DP22 4 High Medium Yes Yes No High High
DP23 4 High Medium Yes Yes No High High
DP24 4 High Medium Yes Yes No High High
DP25 6 High Medium Yes Yes No High High
DP26 6 Medium Low Yes No Yes Medium Low
DP27 2 Medium Low Yes No Yes Medium Low
DP28 6 High Medium Yes Yes No Medium Medium
DP29 5 High High Yes Yes No High High
DP30 5 High High Yes Yes No High High
DP31 8 Medium Low Yes No Yes Medium Low
DP32 7 High Low Yes No Yes Medium Low
DP33 7 High Low Yes No Yes Medium Low
DP34 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
5-18
Table 5-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather DP1, 12 , 8,
14, 15, 16,
28, 22, 24,
34
DP1, 12, 16 DP7, 8, 34 DP5, 6, 13,
34
DP1, 12, 14,
16
DP21, 24 DP3, 5, 6,
12, 15, 21,
34
Hurricane DP9, 12,
14, 15, 34
DP9, 12 DP34 DP5, 6, 13,
34
DP9, 12, 14 DP9 DP2, 3, 5, 6,
9, 12, 15, 34
Medium-Risk Hazards
Flooding DP1, 4, 9,
10, 27, 28,
29, 3031,
32, 34
DP1, 4, 9,
10, 11, 27,
29, 30, 31,
32
DP4, 28, 34 DP10, 27 DP5, 6, 13,
27, 34
DP1, 9, 29,
31
DP9 DP3, 4, 5, 6,
9, 15, 29, 30,
31, 34
Low-Risk Hazards
Earthquake DP1, 34 DP1 DP34 DP34 DP1 DP2, 3, 34
Wildfire DP1, 17,
18, 34
DP1 DP34 DP18 DP13, 34 DP1, 17 DP18 DP2, 3, 18,
34
Drought DP19, 21,
22, 23, 34
DP19 DP20, 34 DP34 DP21, 22 DP19, 21,
22, 23
DP2, 3, 22,
23, 34
Dam Failure DP9, 10,
27, 34
DP9, 10 DP34 DP27, 34 DP9, 10 DP2, 3, 9,
27, 34
Mass Movement DP34 DP34 DP34 DP34
Energy Pipeline Failure DP17, 25,
26, 32
DP32 DP25, 26, 33 DP17 DP3, 25
Toxic Chemical Release DP17, 25 DP25 DP17 DP3, 25
a. See the introduction to this volume for explanation of mitigation types.
5.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• City of Deer Park Code of Ordinances — The municipal code was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«225¬«225HoustonHoustonBaytownPasadenaLaPorteLa PorteCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.551.10.275Miles±Deer Park
¬«225
¬«225
Houston
Houston
Baytown
Pasadena
La
Porte
La Porte
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.55 1.10.275 Miles
±
Deer Park
¬«225
¬«225
Houston
Houston
Baytown
Pasadena
La
Porte
La Porte
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.55 1.10.275 Miles
±
Deer Park
¬«225
¬«225
Houston
Houston
Baytown
Pasadena
La
Porte
La Porte
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.55 1.10.275 Miles
±
Deer Park
¬«225
¬«225
Houston
Houston
Baytown
Pasadena
La
Porte
La Porte
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.55 1.10.275 Miles
±
Deer Park
¬«225
¬«225
Houston
Houston
Baytown
Pasadena
La
Porte
La Porte
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.55 1.10.275 Miles
±
Deer Park
¬«225
¬«225
Houston
Houston
Baytown
Pasadena
La
Porte
La Porte
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.55 1.10.275 Miles
±
Deer Park
6-1
6. CITY OF EL LAGO
6.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Thomas Merchant, EMC
315 Oak View Circle
El Lago, Texas 77586
Telephone: 281-682-3670
e-mail Address: tmerchant2@comcast.net
Art Richard, Assistant EMC
622 Bayview
El Lago, Texas 77586
Telephone: 281-326-3348
e-mail Address: zartadd@aol.com
6.2 JURISDICTION PROFILE
6.2.1 Location
The City of El Lago, Texas is in the southeast part of Harris County. The current boundaries generally extend
from Taylor Lake on the west to the City of Seabrook on the east, and from Clear Lake on the south to Seabrook
on the north. According to the United States Census Bureau, the city encompasses an area of 0.7 square miles
(0.6 square miles of land and 0.1 square miles of water).
City emergency services are provided under contract by the Lakeview Police Department, Seabrook Volunteer
Fire Department and the Nassau Bay Emergency Medical Service. Water and sewer services are provided by
Water Control and Improvement District #50 (WCID 50).
6.2.2 History
The City of El Lago was incorporated in March of 1961 as a Type-A-General Law city operation under a Mayor-
City Council form of government. Residential growth was largely due to the aerospace industry, where many
astronauts resided. The growth occurred in four sections and now includes an estimated population of 2700, with
approximately 1100 single family dwellings, some duplexes and apartment buildings. Within the city limits there
are several small businesses mostly retail and food, one boat yard, two elementary schools and one assisted living
center.
6.2.3 Climate
The climate of the City of El Lago is typical of southeast Texas, hot humid summers with cool and wet winters.
Freezing weather can occur. Average annual rain fall is 45”. Prevailing winds are from the southeast.
6.2.4 Governing Body Format
The City of El Lago is governed by a Mayor and five-member City Council (all of which are part time
volunteers). City employees include a City Secretary, City Clerk, Court Administrator, and Maintenance Director
and an additional maintenance employee.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
6-2
The Mayor and City Council assumes responsibility for the adoption of this plan; The Mayor and City Council
also will oversee its implementation. Development of this annex was carried out by the members of the local
mitigation planning team, whose members are listed in Table 6-1.
Table 6-1. Local Mitigation Planning Team Members
Name Title
Darin Clark Member City council
Bob Kosar Flood Plain Administrator
Jarret LaRochelle Planning Team Member
Doris DeVries Planning Team Member
6.3 CURRENT TRENDS
6.3.1 Population
According to the U.S. Census Bureau, the population of the city of El Lago as of December of 2016 was 2,751.
Since 1970, the population has grown at an average annual rate of 1.7%. Between those years the population in
1980 had grown by 35.6%, in 1990 an additional 4.5% with declines of 5.9% in 2000 and 12.0% 2010. This last
decline can be attributed to the demolition of the Landing Condos, which were heavily damaged by Hurricane Ike.
6.3.2 Development
There is minimal anticipated residential development due to the City’s residential space being 99+% already built
out. A low to moderate increase in commercial development is expected with a few commercial properties
available for new construction. Table 6-2 summarizes development trends in the performance period since the
preparation of the previous hazard mitigation plan, as well as expected future development trends.
6.4 CAPABILITY ASSESSMENT
The City of El Lago, Texas has performed an assessment of its existing capabilities for implementing hazard
mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 6-3.
• Development and permitting capabilities are presented in Table 6-4.
• An assessment of fiscal capabilities is presented in Table 6-5.
• An assessment of administrative and technical capabilities is presented in Table 6-6.
• An assessment of education and outreach capabilities is presented in Table 6-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 6-8.
• Classifications under various community mitigation programs are presented in Table 6-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 6-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
City of El Lago
6-3
Table 6-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
Is your jurisdiction expected to annex any areas during the performance period of this plan? No
• If yes, describe land areas and dominant uses.
• If yes, who currently has permitting authority over these areas?
Are any areas targeted for development or major
redevelopment in the next five years?
Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
The following are in known hazard risk areas:
• Condominium development previously called The Landing
• Northwest corner of Bayou View/Nasa 1 (currently vacant)
• Five-to ten homes to be elevated in the repetitive loss category
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 2 1 1 4 2
Multi-Family
Other (commercial, mixed use, etc.) 1
Total 2 1 1 5 2
Provide the number of new-construction permits for each
hazard area or provide a qualitative description of where
development has occurred.
Approximately half of the new construction permits were in a special flood
hazard area.
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description.
Buildout most occurred on residential properties and one occurred on a
commercial property.
Table 6-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No No No
Comment: Building Ordinance of the City of El Lago Ordinance # 146 adopted 8/21/78 with sections modified through 6/5/2013
Zoning Code Yes No No No
Comment: City ordinances Appendix A with references to multiple ordinances dealing with residential and commercial zones with
multiple adoption dates
Subdivisions Yes No No No
Comment: Appendix B, Ordinance 131 adopted 11/1/76. The city is also divided into several homeowner associations, each with their
individual covenants and bylaws.
Stormwater Management Yes Yes No No
Comment: WCID 50 controlled. MS4 permit renewed every 5 years.
Post-Disaster Recovery Yes Yes Yes No
Comment: Post disaster recovery activities are outlined in the City’s Emergency Management Procedures. Currently being reviewed.
Real Estate Disclosure No No No No
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
6-4
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Growth Management No No No No
Comment:
Site Plan Review Yes No No No
Comment: Building code and Ordinance #425
Environmental Protection Yes Yes No No
Comment: Sanitary and stormwater is under the jurisdiction of WCID 50. Recognized as a renewable energy city. Drought water
rationing plans and year-round water conservation plan..
Flood Damage Prevention Yes No No No
Comment: Flood Damage Prevention Ordinance # 425 adopted 2/20/15
Emergency Management Yes Yes Yes Yes
Comment: Ordinance # 327 adopted 1/8/2001 and Ordinance # 378 adopted 11/21/2009
Climate Change No No No No
Comment:
Planning Documents
General Plan No No No No Comment:
Capital Improvement Plan No No No No
How often is the plan updated?
Comment:
Disaster Debris Management Plan Yes No No No
Comment: Contracted
Floodplain or Watershed Plan No No No No
Comment:
Stormwater Plan No Yes No No
Comment: WCID 50 Stormwater drainage improvement plan
Urban Water Management Plan No Yes No No
Comment: WCID 50 with TWDB 50 year water plan
Habitat Conservation Plan Yes No No No
Comment: The city is a bird sanctuary community with several butterfly habitats.
Economic Development Plan No No No No
Comment:
Shoreline Management Plan No Yes Yes No
Comment: Texas GLO
Community Wildfire Protection Plan No No No No
Comment:
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes Yes Yes No
Comment: Ordinance # 327 adopted 1/8/2001 and Ordinance # 378 adopted 11/21/2009
Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes Yes No
Comment: Ordinance # 327 adopted 1/8/2001 and Ordinance # 378 adopted 11/21/2009
City of El Lago
6-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Post-Disaster Recovery Plan Yes Yes Yes No
Comment: Post disaster recovery activities are outlined in the City’s Emergency Management Procedures, Currently being reviewed.
Continuity of Operations Plan Yes Yes No No
Comment: Essential records are backed up to the cloud plus Standard Operating Procedures / interlocal agreements,
Public Health Plan Yes Yes No No
Comment: Health and Sanitation Ordinance # 272 adopted 5/4/92
Table 6-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Building Inspector and Floodplain Administrator
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? No
Table 6-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Other No
Table 6-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices No
Engineers or professionals trained in building or infrastructure construction
practices
No
Planners or engineers with an understanding of natural hazards No
Staff with training in benefit/cost analysis No
Surveyors No
Personnel skilled or trained in GIS applications No
Scientist familiar with natural hazards in local area No
Emergency manager Yes Voluntary Emergency Management
Coordinator
Grant writers Yes City Secretary
Other No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
6-6
Table 6-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes, the mayor is the PIO
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. Hazard Mitigation Plan
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. NextDoor and Facebook
Do you have any citizen boards or commissions that address issues
related to hazard mitigation?
Yes
• If yes, briefly describe. The local Mitigation Planning Team and the city Emergency
Management Committee
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. Blackboard CTY Connect and LaVentana News Publication
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Blackboard CTY Connect
Table 6-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Floodplain Administrator
Who is your floodplain administrator? (department/position) Bob Kosar
Are any certified floodplain managers on staff in your jurisdiction? No
What is the date that your flood damage prevention ordinance was last amended? February 20, 2015
Does your floodplain management program meet or exceed minimum requirements? Meets
• If exceeds, in what ways?
When was the most recent Community Assistance Visit or Community Assistance Contact? May 24, 2019
Does your jurisdiction have any outstanding NFIP compliance violations that need to be
addressed?
No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? Yes
• If so, state what they are. HCFCD MAAPNext Project
Do your flood hazard maps adequately address the flood risk within your jurisdiction? No
• If no, state why. Does not include risk due to drainage
system capacity
Does your floodplain management staff need any assistance or training to support its
floodplain management program?
Yes
• If so, what type of assistance/training is needed? Texas Floodplain Management
Association-sponsored training and
conferences
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification? N/A
• If no, is your jurisdiction interested in joining the CRS program? Yes
How many flood insurance policies are in force in your jurisdiction?a 884
• What is the insurance in force? $246,562,600.00
• What is the premium in force? $513,571.00
How many total loss claims have been filed in your jurisdiction?a 397
• How many claims are still open or were closed without payment? 0
• What were the total payments for losses? $15,317,515.04
a. According to FEMA statistics as of April 26, 2019
City of El Lago
6-7
Table 6-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule No N/A N/A
Public Protection No N/A N/A
Storm Ready No N/A N/A
Firewise No N/A N/A
Table 6-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
6-8
Criterion Jurisdiction Ratinga
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
6.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
6.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• There is no existing integration.
6.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• The city has not addressed future integration plans.
6.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 6-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of El
Lago. Other hazard events that broadly affected the entire planning area, including the City of El Lago, are listed
in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 6-11. Past Natural Hazard Events
Type of Event
FEMA
Disaster # Date Damage Assessment
Heavy Rain N/A 5/9/2019 4.2” of rain in two hours flooded Loch Lake, Bayview
and Whitecap Streets with 18+ inches of water
Heavy Rain N/A 12/8/2018 Nearly 5” of rain over 9 hours left 6-10” of water on
many streets throughout the city
Heavy Rain N/A 1/27/2018 2.5” of rain in two hours flooded Loch Lake and
Whitecap Streets with 12-18 inches of water
Hurricane Harvey 4332 DR 8/23/2017 – 9/15/2017 $7,755,415
Severe weather, Flooding 4272 DR 5/22/2016 – 6/24/2016 $16,113
Severe weather, Tornadoes, Flooding 4245 DR 10/22/2015 – 10/31/2015 $18,789
City of El Lago
6-9
Type of Event FEMA Disaster # Date Damage Assessment
Severe weather, Flooding N/A 4/17/2015 $4,192
Severe weather N/A 4/24/2009 $3,619
Severe weather, Hail N/A 4/15/2009 – 4/18/2009 $151,584
Hurricane Ike 1791 DR 9/7/2008 – 10/2/2008 $5,620,010
Coastal Flooding N/A 10/16/2006 $104,419
Flash Flooding N/A 6/13/2004 – 6/16/2004 $5,103
Hurricane Claudette N/A 7/15/2003 $102,759
Tropical Storm Allison 1379 DR 6/5/2001 – 6/20/2001 $274,404
Hurricane Georges 1245 DR 9/9/1998 – 10/5/1998 $216,597
Severe weather, Flooding 1041 DR 10/14/1994 – 11/8/1994 $3,010
Tropical Storm Allison 836 DR 6/25/1989 – 7/7/1989 $13,608
6.7 HAZARD RISK RANKING
Table 6-12 presents a local ranking for the City of El Lago of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Table 6-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Flooding 54 High
2 Severe Weather 48 High
2 Hurricane 48 High
3 Earthquake 14 Low
4 Drought 6 Low
4 Wildfire 6a Low
4 Mass Movement 6 Low
5 Dam Failure 2b Low
6 Tsunami 0 (No exposure) None
6 Coastal Erosion 0 (No Exposure None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
a. Wildfire incidents in the area have occurred within the past 5 years and the adjacent cities of La Porte and Pasadena.
b. Proximity to the surface water storage reservoir that would flow down Armand Bayou and to Clear Lake upon failure.
6.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
6.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
6-10
• Number of FEMA-identified Repetitive-Loss Properties: 43
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 21
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 13
6.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Sea level rise.
• Subsidence.
• School access: All ingress/egress to the public and charter schools is cut-off by significant street flooding
during any heavy rains.
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
6.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 6-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 6-13. Status of Previous Plan Actions
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check
if Yes
Action #
in Update
Improve code/ordinances to require vegetation management and install drought resistant landscape Yes
Comment: ID #2014ELLAGO001 Completed in 2017
Harden water piping lines and systems to prevent loss of water due to breaks in coordination with Water Control and Improvement District #50 (WCID 50)
Yes LAG5
Comment: ID #2014ELLAGO002
Improve code/ordinances to require minimum burial depth below 6 feet. Yes
Comment: ID #2014ELLAGO003 No longer relevant; the City is 98% built out.
Establish code/ordinance to require shutoff valves at entry and exit point of
city limits for new construction.
Yes
Comment: ID #2014ELLAGO004 No longer relevant; no new pipelines will be constructed in the City
Install new emergency generator at city hall Yes LAG6
Comment: ID #2014ELLAGO005
Expand mass communication warning system to include notifications and alerts for all-hazards to provide automated landline and cellular calling,
email notification as well as automatic posting to the city website.
Yes
Comment: ID #2014ELLAGO006 Completed over a period of years
Acquisition of flood prone properties Yes Yes LAG1
Comment: ID #2014ELLAGO007 Some property has been acquired; Additional acquisitions anticipated
Expand city warning system to include flood stage warning Yes LAG7
Comment: ID #2014ELLAGO008
City of El Lago
6-11
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check
if Yes
Action #
in Update
Harden protective structures to minimize damage to critical structures Yes LAG8
Comment: ID #2014ELLAGO009 Improvements for 98 Lakeshore, current courthouse & LPD headquarters
Harden existing city building to mitigate damages by installing protective
barriers and shatter resistant glass
Yes LAG9
Comment: ID #2014ELLAGO010 Improvements to current City Hall
Improve detection systems for monitoring alerts Yes
Comment: ID #2014ELLAGO011 Completed in 2016
Elevate new public safety building above base flood elevation and harden to withstand high-winds and flooding. Yes LAG10
Comment: ID #2014ELLAGO012
Provide electrical surge protection for electrical systems in critical facilities Yes LAG11
Comment: ID2014ELLAGO013
Establish buffer zones/defensible space around critical infrastructure Yes
Comment: 2014ELLAGO014 Completed 2016
Develop ordinance requiring underground utilities on new structures or
replacement of existing utilities.
Yes LAG12
Comment: ID #2014ELLAGO015
Inflow prevention utilizing a back-flow preventer Yes LAG13
Comment ID #2010ELLAGO001 Also investigating physical barriers
Weather Head Reduction Partial Reimbursement Program adopting ordinance requiring all power service lines to residences and businesses be
routed underground and cooperative effort to re-route existing power services.
Yes LAG12
Comment: ID #2010ELLAGO006
Harden city infrastructure to protect against damages caused by lightning and power surges Yes LAG11
Comment ID #2010ELLAGO009
Implement program to relocate and shelter vulnerable populations during
extreme heat events at designated facilities.
Yes
Comment: ID #2010ELLAGO011 Handled by CERT and other agencies.
Develop and establish community wide water smart program Yes
Comment ID#2010ELLAGO014 WCID 50 maintains a water conservation system during draughts
Ordinances for burning restrictions and storage/disposal of flammable materials. Yes
Comment: ID #2010ELLAGO015 Ordinances 184 & 263
Construct shelter for critical city vehicles and equipment Yes
Comment ID #2010ELLAGO025 Critical vehicles and equipment can be relocated to a safe location
6.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 6-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 6-15
identifies the priority for each action. Table 6-16 summarizes the actions by hazard and mitigation type.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
6-12
Table 6-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing
Assets Objectives Met
Lead
Agency
Support
Agency
Estimated
Cost Sources of Funding Timelinea
Action LAG1 — Where appropriate, support elevating, flood proofing (retrofitting), purchase or relocation of structures located in hazard
areas, prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Hurricanes, flooding, severe weather
Existing 3, 4, 5, 7, 10, 12 City N/A High HMGP, PDM, FMA Short-term
Action LAG2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including emergency air evacuation and response from McNair Park
Hazards Mitigated: Hurricanes, flooding, severe weather, earthquake, draught, wildfire
New and Existing 1, 3, 4, 5, 7, 8, 10 City N/A Medium Staff Time, General Funds Ongoing
Action LAG3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Hurricanes, flooding, severe weather, earthquake, drought, wildfire
New and Existing 1, 5, 8 City N/A Medium Staff Time, General Funds Short-term
Action LAG4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Flooding, severe weather, hurricanes, Dam Failuer
New and Existing 3, 4, 7, 9, 10 City HCFCD Medium Staff Time, General Funds Ongoing
Action LAG5 — Harden water piping lines and systems to prevent loss of water due to breaks in coordination with Water Control and
Improvement District #50 (WCID 50) (formerly ID #2014ELLAGO002)
Hazards Mitigated: Drought, Wildfires
Existing 3, 4, 8, 9, 11 WCID 50 City High HMGP, WCID 50 Bonds, WCID 50
General Funds
Long-term
Action LAG6 — Install new emergency generator at city hall (formerly ID #2014ELLAGO005)
Hazards Mitigated: Severe weather, hurricanes, flooding, drought, earthquakes, wildfires
New 1, 11, 13 City N/A High PDM, HMGP, Staff time, General Funds Short-term
Action LAG7 — Expand city warning system to include flood stage warning – signs or water level indicators at three boat launches,
Boondoggles restaurant and boat repair yard (formerly ID #2014ELLAGO008)
Hazards Mitigated: Flooding, severe weather, hurricanes, dam failure, Mass movement (subsidence), Dam Failure
New 1, 3, 4, 9, 10, 11, 15 City N/A Medium PDM, HMGP, Staff time, General Funds Short-term
Action LAG8 — Harden courthouse/LVPD headquarters structure to minimize damage to a critical structure – (formerly
ID#2014ELLAGO009)
Hazards Mitigated: Severe weather, hurricanes
Existing 1, 6, 11, 13 City LVPD High PDM, HMGP, Staff time, General Funds Short-term
Action LAG9 — Harden existing City Hall building to mitigate damages by installing protective barriers and shatter resistant glass
(formerly ID #2014ELLAGO010)
Hazards Mitigated: Severe weather, hurricanes
Existing 1, 6, 11, 13 City N/A High PDM, HMGP, Staff time, General Funds Short-term
Action LAG10 — Replace courthouse/LVPD headquarters structure with a new emergency operations facility designed to withstand
multiple hazards and electrical outages. (formerly ID #2014ELLAGO012)
Hazards Mitigated: Flooding, hurricanes, severe weather, earthquakes, dam failure, Mass movement (subsidence), Dam Failure
New 10, 11, 13, 14 City LVPD High PDM, HMGP, Staff time, General Funds Long-term
Action LAG11 — Provide electrical surge protection and lightning rods for electrical systems in critical facilities (formerly
ID2014ELLAGO013) including harden city infrastructure to protect against damages caused by lightning and power surges (formerly ID
#2010ELLAGO009)
Hazards Mitigated: Hurricanes, severe weather
Existing 1, 6, 11, 13 City N/A High PDM, HMGP, Staff time, General Funds Short-term
City of El Lago
6-13
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action LAG12 — Develop ordinance requiring underground utilities on new structures or replacement of existing utilities. (formerly ID
#2014ELLAGO015) and Weather Head Reduction Partial Reimbursement Program adopting ordinance requiring all power service lines to
residences and businesses be routed underground and cooperative effort to re-route existing power services. (formerly ID
#2010ELLAGO006)
Hazards Mitigated: Hurricanes, severe weather, wildfires
New and Existing 6, 9, 10, 11 City N/A Medium Staff time, General Funds Short-term
Action LAG13 — Inflow prevention utilizing back-flow preventers and/or physical barriers (formerly ID #2010ELLAGO001)
Hazards Mitigated: Hurricanes, flooding, severe weather, dam failure, , Mass Movement (subsidence)
Existing 6, 7, 8, 9, 10, 11, 15 City WCID 50 High PDM, HMGP, Bonds, General Funds Long-term
Action LAG14 — Investigate and install active pumped storm drainage systems.
Hazards Mitigated: Hurricanes, flooding, severe weather, school access, Mass movement (subsidence)
New 3, 4, 7, 8, 10, 11 City WCID 50 High PDM, FMA, HMGP, Bonds, General
Funds
Long-term
Action LAG15 — Increase fire water system capacity; piping, pumps, hydrants etc. to provide increased water flow in emergencies.
Hazards Mitigated: Wildfires, drought
Existing 3, 4, 8, 9, 11 WCID 50 City High HMGP, WCID 50 Bonds, WCID 50
General Funds
Long-term
Action LAG16 — Review and update as needed, city ordinances and building codes to ensure compliance with current Federal, State
and local regulatory agencies.
Hazards Mitigated: Flooding, severe weather, hurricanes, wildfires, drought
Existing 1, 3, 4, 7, 8, 9, 15 City N/A Medium Staff time, General Funds Short-term
Action LAG17 — Complete WCID 50 project to improve storm water drainage capabilities involving many south side lines and the main
headers on Whitecap and Crestwood.
Hazards Mitigated: Hurricanes, flooding, severe weather, school access
Existing 3, 4, 7, 8, 10, 11, 12 WCID 50 HCFCD High HCFCD Bonds, WCID 50 Bonds, WCID
50 General Funds
Long-term
Action LAG18 — Track natural hazard events and the damage caused, including substantially damaged properties.
Hazards Mitigated: Hurricanes, flooding, severe weather, wildfires
Existing 3, 4, 9, 11 City N/A Medium Staff time, General Funds Short-term
Action LAG19 — Remediate home owner’s sanitary sewer lines to prevent storm water from entering the system.
Hazards Mitigated: Flooding, hurricanes, severe weather
Existing 3, 4, 9, 11 WCID 50 Home
owners
High HMGP, General Funds Short-term
Action LAG20— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane and Coastal Storms, Flooding, Earthquake, Wildfire, Drought, Dam Failure, Mass
Movement,
New and Existing 1, 3, 4, 5, 9, 10, 11, 15 El Lago HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
6-14
Table 6-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
LAG1 6 High High Yes Yes No Medium High
LAG2 7 Medium Medium Yes No No Low Low
LAG3 3 Medium Medium Yes No No High Low
LAG4 5 Medium Medium Yes No No High Low
LAG5 5 Low High Yes Yes No Medium Low
LAG6 3 High High Yes Yes No Medium High
LAG7 7 High Medium Yes Yes No Medium Medium
LAG8 4 High High Yes Yes No Medium High
LAG9 4 High High Yes Yes No Medium High
LAG10 4 Low High Yes Yes No Low Low
LAG11 4 High High Yes Yes No Medium High
LAG12 4 Low Medium Yes No No Low Low
LAG13 7 High High Yes Yes No Medium High
LAG14 6 High High Yes Yes No Medium High
LAG15 5 Low High Yes Yes No Low Medium
LAG16 7 Medium Medium Yes No No Medium Low
LAG17 7 High High Yes No No High High
LAG18 4 Low Medium Yes No No Low Low
LAG19 4 High High Yes Yes No Medium Low
LAG20 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 6-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather LAG2, 4, 12, 16, 18,
20
LAG1, 8, 9, 10, 11 LAG18, 20 LAG19 LAG6, 7, 20 LAG13 LAG14, 17 LAG3, 20
Flooding LAG2, 4, 16, 18, 20 LAG1, 10 LAG18, 20 LAG19 LAG6, 7, 20 LAG13 LAG14, 17 LAG3, 20
Hurricane LAG2, 4, 12, 16, 18,
20
LAG1, 8, 9, 10, 11 LAG18, 20 LAG19 LAG6, 7, 20 LAG13 LAG14, 17 LAG3, 20
Medium-Risk Hazards
School Access LAG14, 17
Mass Movement LAG20 LAG10 LAG20 LAG7, 20 LAG13 LAG14 LAG20
City of El Lago
6-15
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
Low-Risk Hazards
Earthquake LAG2, 20 LAG10 LAG20 LAG6, 20 LAG3, 20
Drought LAG2, 16, 20 LAG20 LAG5, 15 LAG6, 15,
20
LAG3, 20
Wildfire LAG2, 12, 16, 18,
20
LAG18, 20 LAG5, 15 LAG6, 15,
20
LAG3, 20
Dam Failure LAG20 LAG10 LAG20 LAG7, 20 LAG13 LAG20
a. See the introduction to this volume for explanation of mitigation types.
6.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
6.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• The City of El Lago, Texas Municipal Code — The municipal code was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
• The City of El Lago, Flood Damage Prevention Ordinance — The flood damage prevention ordinance
was reviewed for compliance with the National Flood Insurance Program.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
6.11.2 Staff and Local Stakeholder Involvement in Annex Development
This annex was developed over the course of several months with input from the city’s Emergency Management
Committee, City Secretary, City Council representative, Floodplain Administrator, CERT Team Coordinator,
Special Needs Coordinator and local Mitigation Planning Team members. All persons were asked to contribute to
the annex development through reviewing and contributing to the capability assessment, reporting on the status of
previously identified actions, and participating in action identification and prioritization. An action development
meeting was held on multiple dates from February through August 2019 and was attended by representatives from
previously listed groups. Once actions had been identified and compiled in the annex, a draft was internally
circulated for comment.
!(!(!(!(PasadenaPasadenaSeabrookTaylor LakeVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.10.20.05Miles±El Lago
Pasadena
Pasadena
Seabrook
Taylor Lake
Village
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.1 0.20.05 Miles
±
El Lago
Pasadena
Pasadena
Seabrook
Taylor Lake
Village
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.1 0.20.05 Miles
±
El Lago
Pasadena
Pasadena
Seabrook
Taylor Lake
Village
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.1 0.20.05 Miles
±
El Lago
Pasadena
Pasadena
Seabrook
Taylor Lake
Village
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.1 0.20.05 Miles
±
El Lago
Pasadena
Pasadena
Seabrook
Taylor Lake
Village
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.1 0.20.05 Miles
±
El Lago
Pasadena
Pasadena
Seabrook
Taylor Lake
Village
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.1 0.20.05 Miles
±
El Lago
7-1
7. CITY OF FRIENDSWOOD
7.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Brian Mansfield, Fire Marshal/EMC
910 S. Friendswood Drive
Friendswood, TX 77546
Telephone: 281-996-3335
e-mail Address: tybrd@friendswood.com
Steven Simmons, Deputy Fire Marshal
910 S. Friendswood Drive
Friendswood, TX 77546
Telephone: 281-996-3335
e-mail Address: bmansfield@friendswood.com
7.2 JURISDICTION PROFILE
7.2.1 Location
The City of Friendswood in northwest Galveston County and a portion lies in southeast Harris County, divided by
Clear Creek. Friendswood lies in an area described on the Physiographic Map of Texas the “Gulf Coastal Plan”.
The city is located three miles west of IH-45, halfway between Houston and Galveston. It is bordered on the
northwest by the City of Houston, the west by Brazoria County and City of Pearland, southwest by the City of
Alvin, on the east by the City of League City. The city’ encompasses 20.9 square miles, of which 20.7 square
miles is land area and 0.15 square miles is water.
7.2.2 History
Friendswood was founded in 1895 by members of the Religious Society of Friends (Quakers). The colony was
originally a farming community of fig and Satsuma orange orchards, and rice fields. Starting Quaker colonies was
a common practice of the religious sect called Quakers or Friends, as they were part of the westward movement
across the nation in the middle to late 1800s. After the colony survived the Galveston Storm of 1900 with no loss
of life, they used their sawmill to convert the swaths of trees felled by the storm into lumber for the construction
of a two story building they called the Academy. It served them as church, school, and community meeting place
until it was replaced by the present stone church building in 1949. The Academy (high school) operated by the
Quakers offered a classical curriculum through 1928, and attracted students, in its earliest years, from surrounding
towns that had no high school.
From 1895 to 1915, most of the newcomers were Quakers who came to be a part of the Quaker colony. Through
1920, the population was swollen by an influx of farmers, lured by Houston developers who advertised the Gulf
Coast as a Garden of Eden where figs, oranges, and rice grew practically wild. By the early 1920s, there were
17,000 to 18,000 acres of figs from Winnie to San Leon, and 17 fig preserving plants. Two of those plants were in
Friendswood. Support personnel for the farms brought more people to Friendswood, and the early 1930s brought
families dispossessed by the Depression looking for a new chance in life. Late in the decade, the newly
developing oil fields east and west of the community provided jobs for more newcomers. The war slowed the
growth in the 1940s, but the decade still saw the beginning of a trend of wealthy business and professional people
from Houston buying up property along the creeks.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
7-2
The city was officially incorporated in 1960. Major employers in the city are Friendswood ISD, H.E. Butt
Grocery Company and Kroger Texas, LP.
Today the once small agricultural community is part of the greater Houston Metropolitan area.
7.2.3 Climate
The climate of the area is sub-tropical. Mild winters and warm summers best characterize the climate. The
average summer temperature ranges from a high of 90 ºF to a low of 74 °F. The average winter temperature
ranges from a high of 62 °F to a low of 42 °F. The area receives an average of two hundred seventy-five (275)
days per year of sunshine. Average rainfall per year is thirty-eight (38”) inches. Rainfall is abundant and evenly
distributed throughout the year. Hurricane season, spanning from June through November, usually produces the
heaviest rainfall events.
7.2.4 Governing Body Format
The City of Friendswood is governed by a Mayor and six (6) member city council. The Mayor and council
members are elected from the city at large to serve three-year terms, with a limit of four terms. The Mayor and
council members are volunteers who serve without compensation.
The city consists of the following positions and departments: City Manager, Assistant City Manager, City
Secretary, Administrative Services, Parks and Recreation, Library, Community Development, Public Works,
Police Department, Fire Marshal/Emergency Management. All departmental directors report to either the City
Manager or Assistant City Manager depending on the department. The City Manager, City Secretary and City
Attorney report to the Mayor and City Council. The city contracts fire and EMS services.
The City Council assumes responsibility for the adoption of this plan; the City Manager will oversee its
implementation. Development of this annex was carried out by the members of the local mitigation planning
team, whose members are listed in Table 7-1.
Table 7-1. Local Mitigation Planning Team Members
Name Title
Brian Mansfield Fire Marshal/Emergency Management Coordinator
Steven Simmons Deputy Fire Marshal
Morad Kabiri City Manager
Steve Rhea Assistant City Manager
Aubrey Harbin Community Development Director/Planner
Brian Rouane Chief Building Official/Floodplain Manager
Rene Ibarra Director of Public Works
James Toney Director of Parks and Recreation
7.3 CURRENT TRENDS
7.3.1 Population
According to the City of Friendswood’s Community Development Department, the estimated October 2018
population is 41,020. U.S. Census for 2000 showed the city’s population at 29,037 and the city’s 2010 population
at 35,805 which is a 23.3% increase. The percentage of increase between the 2010 U.S. Census and the October
2018 estimated population is 14.6%. However, the percentage of increase between the 2000 U.S. Census and the
October 2018 estimate shows a 41.3% increase, which averages 665.7 annual population increase.
City of Friendswood
7-3
7.3.2 Development
Table 7-2 summarizes development trends in the performance period since the preparation of the previous hazard
mitigation plan, as well as expected future development trends.
Table 7-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since
the preparation of the previous hazard mitigation plan? No
• If yes, give the estimated area annexed and estimated number of parcels or structures. N/A
Is your jurisdiction expected to annex any areas during the performance period of this plan? No
• If yes, describe land areas and dominant uses. N/A
• If yes, who currently has permitting authority over these areas? N/A
Are any areas targeted for development or
major redevelopment in the next five years? Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
Georgetown Subdivision – Southernmost southeast corner of city limits; 352 Acres
with 573 single family residential lots; borders with City of Alvin and City of League
City; not in known hazard risk area
Avalon at Friendswood Lakes – Southeastern portion of the south and West of
West Ranch; borders with City of League City; 114 Acres with 203 Residential Lots;
will connect League City Parkway with Friendswood Lakes Blvd.; not in known
hazard risk area
How many permits for new construction were issued in your jurisdiction since the
preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 189 141 173 182 122
Multi-Family 0 0 0 20 0
Other (commercial, mixed use, etc.) 4 8 15 13 6*
Total 193 149 188 215 128
Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development
has occurred.
Special Flood Hazard Areas: 4 SF Residential; SHX
8 SF Residential; AE Flood Zone
1 Commercial; Not in SFHA
Landslide: N/A
High Liquefaction Areas: N/A
Tsunami Inundation Area: N/A
Wildfire Risk Areas: N/A
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s
buildable lands inventory. If no such inventory exists, provide a qualitative description.
Total acreage within the City is 11,777 (excludes property owned by school districts,
city parks, drainage district and government entities). As of October 2013 8,485 acres
were developed, with 3,292 undeveloped acres. Residential structures comprise
6,375 acres with commercial comprising 1,416 acres, and industrial comprising 530
acres. Buildout is expected in 2020 with proposed population totaling 57,400.
7.4 CAPABILITY ASSESSMENT
The City of Friendswood performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
7-4
• An assessment of legal and regulatory capabilities is presented in Table 7-3.
• Development and permitting capabilities are presented in Table 7-4.
• An assessment of fiscal capabilities is presented in Table 7-5.
• An assessment of administrative and technical capabilities is presented in Table 7-6.
• An assessment of education and outreach capabilities is presented in Table 7-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 7-8.
• Classifications under various community mitigation programs are presented in Table 7-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 7-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Table 7-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes Yes
Comment: Code of Ordinances, Chapter 14 – Buildings and Building Regulations
Zoning Code Yes No No Yes
Comment: Code of Ordinances, Appendix C – Zoning
Subdivisions Yes No No Yes
Comment: Code of Ordinances, Appendix B – Subdivisions
Storm Water Management Yes Yes Yes Yes
Comment: Code of Ordinances, Chapter 34 – Floods, Article II. – Flood Damage Prevention, Section 34-34 Stormwater Management;
Chapter 86 – Utilities, Article V. – Regulation of Stormwater Runoff; Design Criteria Manual, March 2019;
Post-Disaster Recovery Yes Yes No Yes
Comment: Emergency Operations Plan, Annex J – Recovery
Real Estate Disclosure No No No No
Comment:
Growth Management Yes No Yes Yes
Comment: Code of Ordinances, Appendix B – Subdivisions & Appendix C – Zoning
Site Plan Review Yes No No Yes
Comment: Code of Ordinances, Chapter 30 – Fire Protection & Prevention & Appendix C – Zoning
Environmental Protection Yes Yes No Yes
Comment: Code of Ordnances, Chapter 26 – Environment
Flood Damage Prevention Yes No Yes Yes
Comment: Code of Ordinances, Chapter 34 – Floods, Article II. – Flood Damage Prevention
Emergency Management Yes No Yes Yes
Comment: Code of Ordinances, Chapter 22 – Civil Emergencies, Texas Government Code – Chapters 418 & 433
Climate Change No Yes No Yes
Comment:
Planning Documents
General Plan Yes No Yes Yes
Comment: Comprehensive Plan, July 1998; with updates: Future Land Use Map (2008); Major Thoroughfare Plan (2018), Parks Master
Plan (2010)
Capital Improvement Plan Yes No No Yes
How often is the plan updated? Periodically; Historically every 2-4 years.
Comment: Capital Improvement Plan, 2017.
City of Friendswood
7-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Disaster Debris Management Plan Yes Yes No Yes
Comment: Disaster Debris Management Plan, 2014; Contracts are reviewed on an annual basis.
Floodplain or Watershed Plan Yes No No Yes
Comment: Code of Ordinances, Chapter 34 – Floods, Article II. – Flood Damage Prevention, Division II. Flood Hazard Reduction
Storm Water Plan Yes Yes Yes Yes
Comment: Storm Water Management Program; Master Drainage Plan – Phase II, 2007
Urban Water Management Plan No No No No
Comment:
Habitat Conservation Plan No No No No
Comment: The City of Friendswood does not have an HCP implemented. However, there is a Gulf-Houston Regional Conservation Plan
that implements nature-based infrastructure projects and components of flood mitigation/resiliency.
Economic Development Plan No No No Yes
Comment: Vision 2020; Downtown Improvement Plan; Policy of Economic Development
Shoreline Management Plan No Yes No No
Comment: SMPs are required for power generating entities operating under a FERC license and is not applicable to the City of
Friendswood.
Community Wildfire Protection Plan No Yes No Yes
Comment: The City of Friendswood does not have its own CWPP implemented. Harris County has completed a county-wide CWPP;
which includes all incorporated jurisdictions within Harris County.
Forest Management Plan No Yes No No
Comment:
Climate Action Plan No Yes No Yes
Comment:
Comprehensive Emergency Management Plan Yes Yes Yes Yes
Comment:
Threat & Hazard Identification & Risk
Assessment (THIRA)
No Yes Yes Yes
Comment: A regional THIRA is conducted on an annual basis for UASI and HGAC. The City participates in the development of the
THIRA.
Post-Disaster Recovery Plan Yes Yes No Yes
Comment: Annex J – Recovery is required for local jurisdictions to address local recovery programs, damage assessments, Public
Assistance and Individual Assistance programs.
Continuity of Operations Plan Yes No No Yes
Comment:
Public Health Plan Yes Yes Yes Yes
Comment: Annex H – Health and Medical is a component of the Emergency Operations Plan and addresses public health,
environmental health, and medical response capabilities. The City does not maintain a standalone Public Health Plan.
Drought Contingency Plan Yes Yes Yes Yes
Comment:
Table 7-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department?
Does your jurisdiction have the ability to track permits by hazard area? Yes
Does your jurisdiction have a buildable lands inventory? Yes
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
7-6
Table 7-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Table 7-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Community Development / Projects and
Engineering
Engineers or professionals trained in building or infrastructure
construction practices
Yes Community Development / Projects and
Engineering
Planners or engineers with an understanding of natural hazards Yes Community Development / Projects and
Engineering / Office of Emergency
Management
Staff with training in benefit/cost analysis No NA
Surveyors No NA
Personnel skilled or trained in GIS applications Yes Community Development
Scientist familiar with natural hazards in local area No NA
Emergency manager Yes Office of Emergency Management
Grant writers Yes Office of Emergency Management
Table 7-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. The City’s Hazard Mitigation Plan is posted online
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. Facebook and Twitter are used by the City to
communicate with residents.
Do you have any citizen boards or commissions that address issues related
to hazard mitigation?
Yes
• If yes, briefly describe. Committee examining flooding issues within the City
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. City website, email, and mass notification system
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Mass notification, siren system, social media,
website, am radio.
City of Friendswood
7-7
Table 7-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Projects and Engineering
Who is your floodplain administrator? (department/position) Projects and Engineering / Flood Plain Manager
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? September 10, 2018
Does your floodplain management program meet or exceed minimum requirements? Exceeds
• If exceeds, in what ways? City requires 24 inches of Freeboard above
Base Flood Elevation
When was the most recent Community Assistance Visit or Community Assistance Contact? April 2018
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No
• If so, state what they are. NA
Are any RiskMAP projects currently underway in your jurisdiction? Yes
• If so, state what they are. Galveston County – revised preliminary will
become effective August 15, 2019.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? No
• If no, state why. Current Maps do not, but revised preliminary
maps will become effective August 15, 2019 for
Galveston County, which includes the Harris
County portion of Friendswood.
Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes
• If so, what type of assistance/training is needed? Assistance with public notification and education
of the new maps that will affect insurance rates
and possible new insurance requirements from
their mortgage companies.
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification? Yes
• If no, is your jurisdiction interested in joining the CRS program? NA
How many flood insurance policies are in force in your jurisdiction?a 8,352
• What is the insurance in force? $ 2,643,916,500
• What is the premium in force? $ 3,439,799
How many total loss claims have been filed in your jurisdiction?a Unknown
• How many claims are still open or were closed without payment?
• What were the total payments for losses?
a. According to FEMA statistics as of September 30, 2018
Table 7-9. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes 7 May 1, 2015
Building Code Effectiveness Grading Schedule Yes Class 5- Residential
Class 4- Commercial
February 10, 2017
Public Protection Yes Class- 3/3Y 2012
Storm Ready Yes NA 2018
Firewise No NA NA
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
7-8
Table 7-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Medium
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts High
Comment:
Local economy current capacity to adapt to climate impacts Medium
Comment:
Local ecosystems capacity to adapt to climate impacts High
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Friendswood
7-9
7.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
7.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• City of Friendswood Basic Plan. The Basic Plan provides a summary on the hazards and threats in the
community.
• City of Friendswood Annex P – Hazard Mitigation is assigned to the Community Development
department. It addresses the hazards and threats in the community.
• City of Friendswood Capital Improvements Plan (CIP), 2017 Update. The CIP is utilized to
document the status of current and proposed improvements to city facilities and infrastructure to
emphasize protection measures designed to alleviate the effects of future hazards.
• City of Friendswood Drought Contingency Plan. This plan details strategies to ensure continued water
access and preservation.
• City of Friendswood Master Drainage Plan – Phase II, 2007. The Master Drainage Plan details the
protection measures to be put into place to alleviate flooding hazards during minor and major weather
events.
• City of Friendswood Mitigation Plan, 2018 Update.
• Galveston County Multi-Jurisdiction Mitigation Plan, 2017.
• Galveston County Consolidated Drainage District Hazard Mitigation Plan, September 24, 2013.
(Galveston County Consolidated Drainage District is a partnering agency with the city assisting with
drainage projects and mitigation efforts.
• State of Texas, Hazard Mitigation Plan, 2018 Update. This document was used as a reference to ensure
that the city’s mitigation planning process was compliant with the state example.
7.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• City of Friendswood Park & Open Space Master Plan — The parks plan creates a vision for the city’s
park system and makes recommendations for improvements and open-space preservation.
• Library Long-Range Strategic Plan
• Utility Master Plan, 2008 Update — Provides service maps of the City’s water and sewer systems.
7.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 7-11 lists past occurrences of natural hazards for which specific damage was recorded in City of
Friendswood. Other hazard events that broadly affected the entire planning area, City of Friendswood, are listed
in the risk assessments in Volume 1 of this hazard mitigation plan.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
7-10
Table 7-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 N/A
Severe Storms, Tornadoes, Straight Line Winds and Flooding 4245 DR 2015 N/A
Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR 2015 N/A
7.7 HAZARD RISK RANKING
Table 7-12 presents a local ranking for City of Friendswood of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Table 7-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe weather 48 High
1 Hurricane 48 High
2 Flooding 18 Medium
3 Wildfire 17 Medium
4 Earthquake 14 Low
5 Drought 6 Low
6 Mass Movement 0 (No exposure) None
6 Tsunami 0 (No exposure) None
6 Coastal Erosion 0 (No Exposure) None
6 Dam Failure 0 (No exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
7.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
7.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 327
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 93
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 119
7.8.2 Other Noted Vulnerabilities
No additional vulnerabilities specific to this jurisdiction have been identified.
City of Friendswood
7-11
7.9 STATUS OF PREVIOUS PLAN ACTIONS
This is the City of Friendswood’s initial participation for inclusion in the Harris County Mitigation Plan.
However, the City previously developed its own hazard mitigation plan, which expires in 2020, and is a
participant in the Galveston County Mitigation Plan, which expires in 2022. Table 7-13 summarizes the actions
that were recommended in those plans and their implementation status at the time this update was prepared.
Table 7-13. Status of Previous Plan Actions
Removed;
Carried Over to Plan
Update
Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update
Severe Thunderstorms/Hail/Lightning #1: Develop A Public Education Campaign With Information Regarding Property & People Protection X
Severe Thunderstorms/Hail/Lightning #2: Develop And Initiate A Public
Information Campaign Regarding The Location Of Trees In Relation To Power Lines & Utility Easements
X
Severe Thunderstorms/Hail/Lightning #3: Thunderstorm & Lightning Sensors For City Parks X FRD5
Flood Events #1: Develop A Comprehensive Flood Mitigation Plan X FRD6
Flood Events #2: Database Development & Maintenance For Rl/SRL
Properties; Database Development For Elevation, Relocation And Acquisition
X
Flood Events #3: Drainage Projects X FRD7
Comment: This Item Is Under Revision To Include Additional Projects, (E.G. Clear Creek, Frenchman’s Creek, And Deepwood) And
Remove Completed Projects (e.g., Tributary 2 Drainage/Outfall Improvements).
Flood Events #4: Tiger Dam; Protection Of Critical Infrastructure X
Hurricane – Wind #1: Public Information Education Program X
Hurricane – Wind #2: Protect Power Lines X FRD8
Hurricane – Storm Surge #1: Adopt The 2012 International Building Code (IBC) To Include Asce-24-10 X
Hurricane – Storm Surge #2: UPGRADE & RENOVATE CURRENT PUBLIC WORKS BUILDING X FRD9
Comment: This Item Will Be Modified To Remove Reference To Deepwood Location That Was Destroyed During Harvey.
Hurricane – Storm Surge #3: Update City Storm Surge Maps To Reflect The National Weather Service Predictions X
Tornado #1: Develop Construction Standards And Techniques X
Tornado #2: Develop & Conduct Tornado Awareness Activities X
Drought #1: Monitor Drought Conditions X
Drought #2: Water Conservation X
Winter Storms #1: Establish A Warming Center At The Public Library For The General Public X
Winter Storms #2: Establish A Warming Station At The Senior Activity Center For Senior Citizens X
Subsidence #1: Adopt The 2012 International Building Code (IBC) To Include
Asce-24-10
X
Subsidence #2: Develop And Conduct Public Education Programs To Inform The Public Of The Effects Of Subsidence X
Hazardous Materials #1: Cooperate In Maintaining The Pipeline Integrity Management Resource Reporting In High Consequence Areas X
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
7-12
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
Hazardous Materials #2: Develop A Commodity Flow Study Of All Hazardous Materials Transportation Routes X
Additional Mitigation Action Items #: Hurricane Severe Thunderstorms/Hail/Lightning X
Additional Mitigation Action Item #6: Develop A Research Program To Study
The Effects Of Climate Change
X
Comment: This Item Will Be Modified To Effect Flood-Proofing Of The Lift Station.
Supplemental Action Items #19: Flood/Hurricane/Hurricane Storm Surge/Flood Events X FRD10
Comment: This Item Will Be Modified To Effect Flood-Proofing of the Lift Station.
Supplemental Action Items #23: Flood/Hurricane/Hurricane Storm
Surge/Flood Events
X
Supplemental Action Items #24: Flood/Hurricane/Hurricane Storm Surge/Flood Events X
Supplemental Action Items #25: Flood/Hurricane/Hurricane Storm Surge/Flood Events X
7.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 7-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 7-15
identifies the priority for each action. Table 7-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 7-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing
Assets Objectives Met Lead Agency Support Agency
Estimated
Cost Sources of Funding Timelinea
Action FRD1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire
Existing 3, 4, 10 City
Administration
TBD High HMGP, PDM, FMA Short-term
Action FRD2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community
Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire
New and Existing 1, 3, 4, 5, 7, 8, 10 City
Administration
TBD Low Staff Time, General Funds Ongoing
Action FRD3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe weather, Hurricane and Coastal Storms, Flooding, Wildfire, Earthquake and Drought
New and Existing 1, 5, 8 City
Administration
TBD Low Staff Time, General Funds Short-term
City of Friendswood
7-13
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action FRD4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise
New and Existing 1, 3, 5, 7, 8, 10 City
Administration
TBD Low Staff Time, General Funds Ongoing
Action FRD5 — Severe Thunderstorms/Hail/Lightning #3: Thunderstorm & Lightning Sensors For City Parks
Hazards Mitigated: Severe Weather
New and Existing 1,3,14 COF High General Fund, Grants Short
Term
Action FRD6 — Develop A Comprehensive Flood Mitigation Plan
Hazards Mitigated: Flood, Hurricane, Severe Weather
New and Existing 3,7,8,9,10,11,12 COF High General Fund, Grants Short
Term
Action FRD7 — Drainage Improvement projects. This Item Is Under Revision To Include Additional Projects, (E.G. Clear Creek,
Frenchman’s Creek, And Deepwood) And Remove Completed Projects (e.g., Tributary 2 Drainage/Outfall Improvements).
Hazards Mitigated: Severe Weather, Flood
New and Existing 11,12,15 COF High CIP, Grant Funding Short
Term
Action FRD8 — Protect Power Lines from wind sensitive exposures such as trees, bush and overhead obstacles.
Hazards Mitigated: Severe Weather, Hurricane
Existing 9,11,13,15 COF High General Fund, CIP, Grant
Funding
Short
Term
Action FRD9 — UPGRADE & retrofit CURRENT PUBLIC WORKS BUILDING
Hazards Mitigated: Hurricane, Coast Storms
Existing 9,11,13,15 COF High General Fund, CIP, Grant
Funding
Short
Term
Action FRD10 — Flood-Proof vulnerable lift Stations within the City
Hazards Mitigated: Flood Severe Weather
Existing 11,12,15 COF High General Fund, CIP, Grant
Funding
Short
Term
Action FRD11— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane and Coastal Storms, Flooding, Earthquake, Wildfire, Drought, Dam Failure, Mass
Movement,
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
COF HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
7-14
Table 7-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
FRD1 3 High High Yes Yes No Medium High
FRD2 7 Medium Low Yes No Yes High Low
FRD3 3 Low Low Yes No Yes High Low
FRD4 6 Medium Low Yes No Yes High Low
FRD5 3 High High Yes Yes No Medium High
FRD6 7 High High Yes Yes No Medium High
FRD7 3 High High Yes Yes No Medium High
FRD8 4 High High Yes Yes No Medium High
FRD9 4 High High Yes Yes No Medium High
FRD10 3 High High Yes Yes No Medium High
FRD11 8 Medium Low Yes Yes Yes Hiagh High
a. See the introduction to this volume for explanation of priorities.
Table 7-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather 2,3,6, 11 1,8,10 11 5, 11 7 11
Hurricane 2,3, 11 1,8,9 11 11 11
Medium-Risk Hazards
Flood 2,3,4,6, 11 1,4,10 4, 11 4 4, 11 4,7 4 4, 11
Wildfire 2,3, 11 1 11 11 11
Low-Risk Hazards
Earthquake 2,3, 11 1 11 11 11
Drought 2,3, 11 11 11 11
a. See the introduction to this volume for explanation of mitigation types.
7.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
7.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• City of Friendswood Municipal Code — The municipal code was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
• City of Friendswood Flood Damage Prevention Ordinance — The flood damage prevention ordinance
was reviewed for compliance with the National Flood Insurance Program.
City of Friendswood
7-15
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
7.11.2 Staff and Local Stakeholder Involvement in Annex Development
This annex was developed over the course of several months with input from many city departments including
Administrative Services, Community Development, Fire Marshal’s Office and Office of Emergency
Management, Parks and Recreation, and Public Works. All departments were asked to contribute to the annex
development through reviewing and contributing to the capability assessment, reporting on the status of
previously identified actions, and participating in action identification and prioritization. An action development
meeting was held on December 12, 2018 and March 12, 2019 and was attended by representatives from all
previously listed department as well as the City Manager’s office. Once actions had been identified and compiled
in the annex, a draft was internally circulated for comment.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«35¬«3§¨¦45§¨¦45HoustonHoustonHoustonPasadenaPearlandPearlandLeague CityLeague CityNassau BayWebsterCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.81.60.4Miles±Friendswood
¬«35
¬«3
§¨¦45
§¨¦45
Houston Houston
Houston
Pasadena
Pearland
Pearland
League City
League City
Nassau
Bay
Webster
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.8 1.60.4 Miles
±
Friendswood
¬«35
¬«3
§¨¦45
§¨¦45
Houston Houston
Houston
Pasadena
Pearland
Pearland
League City
League City
Nassau
Bay
Webster
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.8 1.60.4 Miles
±
Friendswood
¬«35
¬«3
§¨¦45
§¨¦45
Houston Houston
Houston
Pasadena
Pearland
Pearland
League City
League City
Nassau
Bay
Webster
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.8 1.60.4 Miles
±
Friendswood
¬«35
¬«3
§¨¦45
§¨¦45
Houston Houston
Houston
Pasadena
Pearland
Pearland
League City
League City
Nassau
Bay
Webster
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.8 1.60.4 Miles
±
Friendswood
¬«35
¬«3
§¨¦45
§¨¦45
Houston Houston
Houston
Pasadena
Pearland
Pearland
League City
League City
Nassau
Bay
Webster
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.8 1.60.4 Miles
±
Friendswood
¬«35
¬«3
§¨¦45
§¨¦45
Houston Houston
Houston
Pasadena
Pearland
Pearland
League City
League City
Nassau
Bay
Webster
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.8 1.60.4 Miles
±
Friendswood
8-1
8. CITY OF GALENA PARK
8.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Jorge Flores, Emergency Management Coordinator
2000 Clinton Drive
Galena Park, TX 77547
Telephone: 7136722556
e-mail Address: Jorge.flores@cityofgalenapark-tx.gov
Tom Ehlers, Fire Chief
1713 2nd Street
Galena Park, TX 77547
Telephone: 832-755-0181
e-mail Address: tehlers@cityofgalenapark-tx.gov
8.2 JURISDICTION PROFILE
8.2.1 Location
City of Galena Park is in Harris County, TX. The current boundaries generally extend from just east of Federal
Road south to 2,500 feet north of the Houston Ship Channel, west to the city limits of Houston near Fidelity Road,
north to the Southern Limit of Jacinto City and east to Federal Road, encompassing an area of 5 square miles.
8.2.2 History
City of Galena Park was incorporated in 1935. The City of Galena Park was incorporated on September 21, 1935
and is located in Harris County on the north bank of the Houston Ship Channel (formerly Buffalo Bayou) just east
of the Houston City limits. The City is located in the Ezekiel Thomas Survey and has a population of 10,592. The
first settler in the area was Ezekiel Thomas of South Carolina, who received a grant on one league of land from
the Mexican government in 1824 as one of Stephen F. Austin’s colonists. In 1833, Isaac Batterson and his family
settled in the area and named the settlement “Clinton.” Batterson subsequently purchased 1 000 acres from the
Ezekiel Thomas estate, a tract located in the center of present day Galena Park. For almost 100 years, the
settlement was known as Clinton, and in 1928, when the U.S. Post Office Department refused to grant the town a
post office because another post office bearing the name Clinton already existed in Texas, the name of the town
was changed to Galena Park, after the Galena-Signal Oil Company, the town’s leading industry at the time.
8.2.3 Climate
The climate of City of Galena Park is classified as humid subtropical (Cfa in the Köppen climate classification
system), typical of the Southern United States. The city experiences hot, long, and humid summers, and mild
winters. While not located in Tornado Alley, like much of northern Texas, spring supercell
thunderstorms sometimes bring tornadoes to the area.
Prevailing winds are from the south and southeast during most of the year, which bring heat and moisture from
the nearby Gulf of Mexico and Galveston Bay.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
8-2
During the summer, temperatures in Galena Park commonly reach over 90 °F. The city reaches or surpasses this
temperature on an average of 106.5 days per year, including a majority of days from June to September;
additionally, an average of 4.6 days per year reach or exceed 100 °F. Galena Park’s characteristic subtropical
humidity often results in a higher apparent temperature, and summer mornings average over 90% relative
humidity.
Galena Park has mild winters. In January, the normal mean temperature at George Bush Intercontinental Airport
is 53.1 °F, with an average of 13 days per year with a low at or below 32 °F, occurring on average between
December 3 and February 20, allowing for a growing season of 286 days.
Galena Park generally receives ample rainfall, averaging about 49.8 inches annually based on records between
1981 and 2010. Many parts of the city have a high risk of localized flooding due to flat topography, ubiquitous
low-permeability clay-silt prairie soils, and inadequate infrastructure. During the mid-2010s, Greater Houston
experienced consecutive major flood events in 2015 (“Memorial Day”), 2016 (“Tax Day”), and 2017 (Hurricane
Harvey)
8.2.4 Governing Body Format
The city operates under a Mayor/Council type government with the city’s Mayor acting as the Chief Executive.
The City Council assumes responsibility for the adoption of this plan; The City of Galena Park Office of
Emergency Management will oversee its implementation. Development of this annex was carried out by the
members of the local mitigation planning team, whose members are listed in Table 8-1.
Table 8-1. Local Mitigation Planning Team Members
Name Title
Jorge Flores Emergency Management Coordinator
Tom Ehlers Fire Chief
Mayra Gonzales City Secretary
8.3 CURRENT TRENDS
8.3.1 Population
According to the United States Census Bureau, the population of City of Galena Park as of 2010 was 10,887.
Since 2010 the population has remained all most stagnant.
8.3.2 Development
The City of Galena Park has not seen major development since the 1960s. The city is nearly built out with only a
36-acre tract remaining undeveloped. Table 8-2 summarizes development trends in the performance period since
the preparation of the previous hazard mitigation plan, as well as expected future development trends.
City of Galena Park
8-3
Table 8-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan? No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
Is your jurisdiction expected to annex any areas during the performance period of this plan? No
• If yes, describe land areas and dominant uses.
• If yes, who currently has permitting authority over these areas?
Are any areas targeted for development or major
redevelopment in the next five years?
No
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2016 2017 2018
Single Family 2 1 2
Multi-Family 2 3 2
Other (commercial, mixed use, etc.) 0 0 0
Total 4 4 4
Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred.
• Special Flood Hazard Areas: 0
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the jurisdiction, based on
your jurisdiction’s buildable lands inventory. If no such
inventory exists, provide a qualitative description.
The city is mostly built out with a tract of 36 acres near Hunting Bayou
that is not developed.
8.4 CAPABILITY ASSESSMENT
City of Galena Park performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 8-3.
• Development and permitting capabilities are presented in Table 8-4.
• An assessment of fiscal capabilities is presented in Table 8-5.
• An assessment of administrative and technical capabilities is presented in Table 8-6.
• An assessment of education and outreach capabilities is presented in Table 8-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 8-8.
• Classifications under various community mitigation programs are presented in Table 8-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 8-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in
Section 8.10 identifies these as community capacity building mitigation actions.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
8-4
Table 8-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code yes no yes yes
Comment: Chapter 10 City Code 2012
Zoning Code yes no no no
Comment: Chapter 10 2018 City Ordinance
Subdivisions yes no no no
Comment: Chapter 10 1996 City Ordinance
Stormwater Management yes yes yes yes
Comment: Clean Water Act
Post-Disaster Recovery yes yes yes yes
Comment: Chapter 18 City Code 1996
Real Estate Disclosure no no no no
Comment: Federal law
Growth Management yes no no no
Comment: City Plan reviewed every 5 years
Site Plan Review yes no no no
Comment: Chapter 10 City Code 2012
Environmental Protection yes yes yes yes
Comment:
Flood Damage Prevention yes yes no yes
Comment: Chapter 18 City Code 1996
Emergency Management yes yes yes yes
Comment: Chapter 18 City Code 1996
Climate Change no yes yes yes
Comment: None
Planning Documents
General Plan yes yes yes yes Comment: Reviewed yearly
Capital Improvement Plan yes no no yes
How often is the plan updated? 3 years
Comment:
Disaster Debris Management Plan yes no no yes
Comment: Reviewed every year
Floodplain or Watershed Plan yes yes yes yes
Comment: Reviewed every 3 years
Stormwater Plan yes yes yes yes
Comment: Reviewed every 3 years
Urban Water Management Plan no no no yes
Comment: N/A
Habitat Conservation Plan no no no yes
Comment: N/A
Economic Development Plan yes no no yes
Comment: Reviewed yearly
Shoreline Management Plan no no no no
Comment:
City of Galena Park
8-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Community Wildfire Protection Plan no no no no
Comment:
Forest Management Plan no no no no
Comment:
Climate Action Plan no no no no
Comment:
Comprehensive Emergency Management Plan yes yes yes yes
Comment: Reviewed Yearly
Threat & Hazard Identification & Risk Assessment (THIRA) yes yes yes yes
Comment: Reviewed January 2018
Post-Disaster Recovery Plan yes yes yes yes
Comment: Reviewed yearly
Continuity of Operations Plan yes yes yes yes
Comment: Reviewed every 5 years
Public Health Plan yes yes yes yes
Comment: Reviewed every 3 years
Other N/A N/A N/A N/A
Comment:
Table 8-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Building Department
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? Yes
Table 8-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes yes
User Fees for Water, Sewer, Gas or Electric Service Yes Water and Sewer
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds yes
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas yes
State-Sponsored Grant Programs yes
Development Impact Fees for Homebuyers or Developers no
Other N/A
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
8-6
Table 8-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices yes Building
Engineers or professionals trained in building or infrastructure construction practices yes Building and Fire Department
Planners or engineers with an understanding of natural hazards yes Building
Staff with training in benefit/cost analysis yes Accounting
Surveyors No N/A
Personnel skilled or trained in GIS applications No N/A
Scientist familiar with natural hazards in local area no N/A
Emergency manager Yes OEM
Grant writers yes OEM, Fire, Police
Other N/A N/A
Table 8-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? No
• If yes, briefly describe.
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. Notifications on Facebook and Twitter
Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes
• If yes, briefly describe. Dangerous Buildings and Zoning
Do you have any other programs already in place that could be used to communicate hazard-related information? No
• If yes, briefly describe.
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Swift 911 Notification and Social Media
City of Galena Park
8-7
Table 8-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Fire Department
Who is your floodplain administrator? (department/position) Tom Ehlers Fire Chief
Are any certified floodplain managers on staff in your jurisdiction? No
What is the date that your flood damage prevention ordinance was last amended? 5/2019
Does your floodplain management program meet or exceed minimum requirements? Meets
• If exceeds, in what ways?
When was the most recent Community Assistance Visit or Community Assistance Contact? Insert appropriate information
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are. Insert appropriate information
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are. Insert appropriate information
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why.
Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes
• If so, what type of assistance/training is needed? Any training is appreciated
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification? N/A
• If no, is your jurisdiction interested in joining the CRS program? Yes
How many flood insurance policies are in force in your jurisdiction?a 276
• What is the insurance in force? $67,926,100
• What is the premium in force? $149,503
How many total loss claims have been filed in your jurisdiction?a
• How many claims are still open or were closed without payment?
• What were the total payments for losses?
a. According to FEMA statistics as of September 30, 2018
Table 8-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule No N/A N/A
Public Protection No N/A N/A
Storm Ready No N/A N/A
Firewise No N/A N/A
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
8-8
Table 8-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Medium
Comment:
Jurisdiction-level monitoring of climate change impacts Medium
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Medium
Comment:
Champions for climate action in local government departments Medium
Comment:
Political support for implementing climate change adaptation strategies Medium
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Medium
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Medium
Comment:
Local ecosystems capacity to adapt to climate impacts low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Galena Park
8-9
8.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed at the end of this annex were
used to provide information on integration. The progress reporting process described in Volume 1 will document
the progress of hazard mitigation actions related to integration and identify new opportunities for integration.
8.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Building Codes
• The National Flood Insurance Program
• The City’s Emergency Plan
• Harris County’s Basic Plan
• Storm water management
• State and federal regulations.
8.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Real Estate Disclosure
• Environmental Protection
• Climate Change.
8.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 8-11 lists past occurrences of natural hazards for which specific damage was recorded in Galena Park, TX.
Other hazard events that broadly affected the entire planning area, including Harris County, TX, are listed in the
risk assessments in Volume 1 of this hazard mitigation plan.
Table 8-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey DR4332 8/23/2017 $1,000.000
Hurricane Ike DR1791 9/7/2008 Unknown
Hurricane Rita DR1606 10/14/2005 Unknown
8.7 HAZARD RISK RANKING
Table 8-12 presents a local ranking for Galena Park, TX of all hazards of concern for which this hazard mitigation
plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As
described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for
each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target
hazards with high and medium rankings.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
8-10
Table 8-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Flooding 18 Medium
3 Earthquake 14 Low
3 Wildfire 14 Low
4 Drought 6 Low
4 Dam Failure 6 Low
4 Mass Movement 6 Low
5 Tsunami 0 (No exposure) None
5 Coastal Erosion 0 (No exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
8.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides risk assessments for each hazard of concern. This section
describes key vulnerabilities for the City. Jurisdiction-specific risk maps are provided at the end of this annex.
8.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 12
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 2
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0
8.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Houses near Panther Creek located in flood plain
• Age of bridges in city over Panther Creek
• Large number of underground pipelines and Chemical Storage tanks
• Woodland Acres Police Substation located in flood plain
Mitigation actions addressing these issues were prioritized for consideration in the action plan for this annex.
8.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 8-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
8.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 8-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 8-15
identifies the priority for each action. Table 8-16 summarizes the actions by hazard and mitigation type.
City of Galena Park
8-11
Table 8-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update
Retrofit critical infrastructure facilities with lightning and surge protection
measures.
No X GP2019-5
Comment: Police Station needs additional lightning protection
Retrofit public facilities and radio communication systems with lightning protection rods. No
Comment: Police Station Dispatch Center needs updates lightning protection
Implement a Flooding Public Education/Outreach Program to inform residents of flooding hazards and actions to take to minimize health impacts
and property damage from flooding.
No X GP2019-6
Comment:
Develop City warning mass notification system to include alerts for flood risk
areas.
yes
Comment: Swift 911
Install/ Improve roofing of public buildings to industry accepted high-wind guidelines. yes
Comment: Complete
Retrofit critical infrastructure and/ or shelters with shutter systems. Removed
Comment: Cost prohibitive
Adopt higher-standard/latest edition building codes for critical facilities to withstand high-wind damage from severe thunderstorms, hurricanes, and hail.
X GP2019-7
Comment: Building Codes currently under review for update
Harden public shelters or public buildings that provide inadequate protection. yes
Comment:
Construct shelters for critical equipment and vehicles. yes
Comment:
Install protective structure to minimize damage to critical assets and equipment. yes
Comment:
Adopt code/ ordinance to require removal of dead vegetation/ dry fuel sources in risk areas. yes
Comment:
Join Firewise to implement a Public Education/Outreach program for wildfire hazards and actions for residents to minimize fire/smoke damage to property. Removed
Comment: Wildfire threat is minimal in city
Expand warning system to provide drought warnings and alerts to increase
coverage of community population. (mass notification, outdoor warning
systems, etc.).
yes
Comment: Swift 911 system
Implement a regional drought contingency program to provide an alternate emergency water source during severe drought to minimize water shortage. X GP2019-8
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
8-12
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
Implement/ establish grant program to provide cooling systems for Low to Moderate income populations. Not feasible
Comment: Installed generators at cooling centers
Install public facility emergency power generators to provide adequate cooling for use as a cooling center. yes
Comment:
Implement/ establish grant program to provide heating systems to LMI populations. Not feasible
Comment: Warming Centers available
Install public facility emergency power generators to provide adequate
heating for use as a heating center.
yes
Comment:
Implement or establish code/ ordinance to require hazards materials transportation corridor. No X GP2019-9
Comment: HM routes needs to be established
Identify exposed/ above ground pipelines in flood hazard area. yes
Comment: Area near Panther Creek and Hunting Bayou
Improve fire protection infrastructure locations. yes
Comment:
Table 8-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action GP2019-1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing
those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, landslide, Severe Weather, , wildfire, Mass Movement, Dam Failure
Existing 3, 4, 10 City Administration TBD High HMGP, PDM, FMA Short-term
Action GP2019-2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including Flood Plain Management, Zoning, City Ordinances and Building Codes.
Hazards Mitigated: Dam failure, drought, earthquake, flooding, tsunami, wildfire
New and Existing 1, 3, 4, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing
Action GP2019-3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire, Drought, Dam Failure, Mass Movement
New and Existing 1, 5, 8 City Administration TBD Low Staff Time, General Funds Short-term
Action GP2019-4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain
management programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise
New and Existing 1, 3, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing
City of Galena Park
8-13
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action GP2019-5 — Retrofit critical infrastructure facilities with lightning and surge protection measures.
Hazards Mitigated: Severe Weather, Hurricane
Existing 10,11,13 City Administration TBD Medium General and grant funds, Short term
Action GP2019-6 — Implement a Flooding Public Education/Outreach Program to inform residents of flooding hazards and actions to
take to minimize health impacts and property damage from flooding.
Hazards Mitigated: Flooding
Existing 3,10,11 City Administration TBD Low Staff Time Short term
Action GP2019-7 — Adopt higher-standard/latest edition building codes for critical facilities to withstand high-wind damage from severe
thunderstorms, hurricanes, and hail.
Hazards Mitigated: Severe Weather, Hurricane
New 9,10,11,14,15 City Administration TBD Low Staff Time Short term
Action GP2019-8 — Implement a regional drought contingency program to provide an alternate emergency water source during severe
drought to minimize water shortage.
Hazards Mitigated: Drought
Existing 7,9,10,11 City Administration TBD Low Staff Time Short term
Action GP2019-9 — Implement or establish code/ ordinance to require hazardous materials transportation corridor.
Hazards Mitigated: Hazardous Materials Incidents
Existing 3,6,8,9,10,11,14 City Administration TBD Low Staff Time Short term
Action GP2019-10— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this
plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire, Drought, Dam Failure, Mass Movement
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
Galena Park HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 8-15. Mitigation Action Priority
Action #
# of
Objectives Met Benefits Costs
Do Benefits
Equal or
Exceed Costs?
Is Project
Grant-Eligible?
Can Project Be
Funded Under
Existing Programs/ Budgets?
Implementatio
n Prioritya
Grant
Pursuit
Prioritya
GP2019-1 3 High High Yes Yes No High High
GP2019-2 7 Medium Low Yes No Yes High Low
GP2019-3 3 Low Low Yes No Yes High Low
GP2019-4 6 Medium Low Yes No Yes High Low
GP2019-5 3 Medium Medium Yes Yes No Medium Medium
GP2019-6 3 Medium Low Yes No Yes Medium Low
GP2019-7 5 High Low Yes No Yes High Low
GP2019-8 4 High Low Yes No Yes Medium Low
GP2019-9 7 Medium Low Yes No Yes Medium Low
GP2019-10 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
8-14
Table 8-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather GP2019-1,
3, 7, 10
GP2019-1 GP2019-10 GP2019-10 GP2019-1,
5, 7
GP2019-4,
10
Hurricane GP2019-3,
7, 10
GP2019-1 GP2019-10 GP2019-10 GP2019-5, 7 GP2019-10
Flooding GP2019-3,
10
GP2019-1 GP2019-6, 10 GP2019-2 GP2019-10 GP2019-1 GP2019-2,
4, 10
Medium-Risk Hazards
Earthquake GP2019-3,
10
GP2019-1 GP2019-10 GP2019-2 GP2019-10 GP2019-1 GP2019-2,
10
Wildfire GP2019-3,
10
GP2019-1 GP2019-10 GP2019-2 GP2019-10 GP2019-1 GP2019-2,
10
Drought GP2019-3,
10
GP2019-10 GP2019-2 GP2019-10 GP2019-8 GP2019-2,
8, 10
Low-Risk Hazards
Dam Failure GP2019-3,
10
GP2019-10 GP2019-2 GP2019-10 GP2019-2,
4, 10
Mass Movement GP2019-3,
10
GP2019-1 GP2019-10 GP2019-10 GP2019-1 GP2019-2,
10
Hazardous Materials GP2019-9 GP2019-9
a. See the introduction to this volume for explanation of mitigation types.
8.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• Galena Park Municipal Code — The municipal code was reviewed for the full capability assessment
and for identifying opportunities for action plan integration.
• Galena Park Flood Damage Prevention Ordinance — The flood damage prevention ordinance was
reviewed for compliance with the National Flood Insurance Program.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• 2017 Houston UASI THIRA Stakeholder Preparedness Review Regional Stake Holder Report
January 2018 – The report was used to support the identification of past hazard events and noted
vulnerabilities, the risk ranking, and the development of the mitigation action plan.
City of Galena Park
8-15
8.12 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY
A study is needed to better understand the potential for a chemical spill related to flooding rains. The use of above
ground tanks for chemical storage in diked areas that hold water during flooding events may cause the tanks to
float, potentially leading to a large scale chemical spill as experienced during Hurricane Harvey at a tank farm on
American Petroleum Road. It resulted in 100,000 of gallons of gasoline to be released into the ship channel.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(HoustonHoustonHoustonJacinto CityPasadenaCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.250.50.125Miles±Galena Park
Houston
Houston
Houston
Jacinto City
Pasadena
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.25 0.50.125 Miles
±
Galena Park
Houston
Houston
Houston
Jacinto City
Pasadena
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.25 0.50.125 Miles
±
Galena Park
Houston
Houston
Houston
Jacinto City
Pasadena
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.25 0.50.125 Miles
±
Galena Park
Houston
Houston
Houston
Jacinto City
Pasadena
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.25 0.50.125 Miles
±
Galena Park
Houston
Houston
Houston
Jacinto City
Pasadena
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.25 0.50.125 Miles
±
Galena Park
Houston
Houston
Houston
Jacinto City
Pasadena
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.25 0.50.125 Miles
±
Galena Park
9-1
9. CITY OF HEDWIG VILLAGE
9.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Kelly Johnson, City Administrator
955 Piney Point Road
Houston, TX 77024
Telephone: 713-465-6009
e-mail Address: KJohnson@hedwigtx.gov
Brian T. Muecke
955 Piney Point Road
Houston, TX 77024
Telephone: 713-465-6009
e-mail Address: BMuecke@hedwigtx.gov
9.2 JURISDICTION PROFILE
9.2.1 Location
The City of Hedwig Village is located in Harris County and is bound on the east by the City of Hunters Creek
Village, the south by the City of Piney Point Village and the City of Bunker Hill Village, the north by the City of
Houston and the City of Spring Valley Village, and the west by the City of Houston. The City of Hedwig Village
is approximately 0.9 square miles or 544 acres.
9.2.2 History
The City of Hedwig Village, a Type-A General Law City, was incorporated in 1954. The City of Hedwig Village
consists of approximately 572 single family homes, 244 condominium units, two apartment complexes, two public
schools, two churches, and many restaurants and retail stores. The City of Hedwig Village provides police protection
through their own police department and fire and emergency services through the Village Fire Department. The
Village Fire Department, through an interlocal agreement, provides services to the “Memorial Villages” which
include the City of Bunker Hill Village, the City of Hedwig Village, the City of Hilshire Village, the City of Hunters
Creek Village, the City of Piney Point Village, and the City of Spring Valley Village.
9.2.3 Climate
The City of Hedwig Village has a year-round average high temperature around 80 ºF, year-round average low
temperature around 60 ºF, and average annual precipitation of about 50 inches.
9.2.4 Governing Body Format
The City of Hedwig Village is considered a Type-A General Law City and is governed by a Mayor and five Council
Members elected at large. A Type-A General Law City is one that had at the time of its incorporation 600 or more
inhabitants. General Law Cities have a population less than 5,000 and are authorized to do only what the State
Constitution or Legislature has authorized.
The City Council assumes responsibility for the adoption of this plan; the City Administrator will oversee its
implementation.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
9-2
Table 9-1 lists members of the jurisdiction’s joint local mitigation planning team. Howard Miller, emergency
management coordinator for the Village Fire Department, also participated in planning for the six Memorial
Villages.
Table 9-1. Local Mitigation Planning Team Members
Jurisdiction Name / Title Phone Email
City of Bunker Hill Village Karen Glynn, City Admin. 713-467-9762 KGlynn@bunkerhilltx.gov
City of Hedwig Village Kelly Johnson, City Admin./Secretary 713-465-6009 KJohnson@hedwigtx.gov
City of Hilshire Village Susan Blevins, City Admin/Secretary
Efrain Him
713-973-1779 Susan.blevins@hilshirevillagetexas.com
Efrain.him@hdrinc.com
City of Hunters Creek Village Tom Fullen, City Admin. 713-465-2150 tfullen@cityofhunterscreek.org
City of Piney Point Village Roger Nelson, City Admin. 713-230-8703 cityadmin@pineypt.org
City of Spring Valley Village Julie Robinson, City Admin.
Arthur Faiello, PW Director
713-465-5306
832-910-8576
jrobinson@springvalleytx.com
afaiello@springvalleytx.com
9.3 CURRENT TRENDS
9.3.1 Population
According to the 2010 Census, the population of the City of Hedwig Village was 2,557. Hedwig Village’s
population has remained consistent for many years.
9.3.2 Development
The City of Hedwig Village is continuing to experience residential redevelopment of new, larger homes. The City
is also seeing the redevelopment of commercial property along the I-10 corridor. The City of Hedwig Village is
landlocked by other municipalities; therefore there is no growth opportunity.
Table 9-2 summarizes development trends in the performance period since the preparation of the previous hazard
mitigation plan, as well as expected future development trends.
9.4 CAPABILITY ASSESSMENT
The City of Hedwig Village performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the components
included in the capability assessment and their significance for hazard mitigation planning. This section summarizes
the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 9-3.
• Development and permitting capabilities are presented in Table 9-4.
• An assessment of fiscal capabilities is presented in Table 9-5.
• An assessment of administrative and technical capabilities is presented in Table 9-6.
• An assessment of education and outreach capabilities is presented in Table 9-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 9-8.
• Classifications under various community mitigation programs are presented in Table 9-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 9-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table included
in the action plan for this annex identifies these as community capacity building mitigation actions.
City of Hedwig Village
9-3
Table 9-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the
preparation of the previous hazard mitigation
plan?
NO
• If yes, give the estimated area annexed and
estimated number of parcels or structures.
N/A
Is your jurisdiction expected to annex any areas
during the performance period of this plan?
NO
• If yes, describe land areas and dominant uses. N/A
• If yes, who currently has permitting authority
over these areas?
N/A
Are any areas targeted for development or major
redevelopment in the next five years?
YES
• If yes, briefly describe, including whether any of
the areas are in known hazard risk areas The City of Hedwig Village is starting to see the redevelopment of their commercial
areas along I-10 and the continued redevelopment of their residential homes with new,
larger homes.
How many permits for new construction were
issued in your jurisdiction since the preparation of
the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 11 6 7 5 4
Multi-Family N/A N/A N/A N/A N/A
Other (commercial, mixed use, etc.) 2 1 0 1 4
Total 13 7 7 6 8
Provide the number of new-construction permits for
each hazard area or provide a qualitative
description of where development has occurred.
• Special Flood Hazard Areas: # N/A
• Landslide: # N/A
• High Liquefaction Areas: # N/A
• Tsunami Inundation Area: # N/A
• Wildfire Risk Areas: # N/A
Describe the level of buildout in the jurisdiction,
based on your jurisdiction’s buildable lands
inventory. If no such inventory exists, provide a
qualitative description.
Hedwig Village continues to experience redevelopment of older residential homes
being demolished and new homes constructed. Hedwig Village is also slowly seeing
redevelopment of their commercial area’s along I-10.
Table 9-3. Legal and Regulatory Capability
Local Authority
Other Jurisdiction
Authority State Mandated
Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes Yes Yes Yes
Comment: Chapter 14 of City Code of Ordinances, 1991
Zoning Code Yes Yes Yes Yes
Comment: Appendix A of City Code of Ordinances, 1961
Subdivisions Yes Yes Yes Yes
Comment: Chapter 74 of City Code of Ordinances, 2001
Stormwater Management Yes Yes Yes Yes
Comment: Chapter 14 of City Code of Ordinances, (1991) and TCEQ
Post-Disaster Recovery Yes Yes Yes No
Comment: TDEM, Harris County Interlocal Mutual Aid Agreement, FEMA
Real Estate Disclosure No No No No
Comment:
Growth Management Yes Yes Yes Yes
Comment: Through Harris County Flood Control District (HCFCD)
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
9-4
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Site Plan Review Yes Yes Yes No
Comment: Village Fire Department (VFD), City Ordinances, and Harris County Flood Control
Environmental Protection No Yes Yes No
Comment: Texas Commission on Environmental Quality (TCEQ) & EPA
Flood Damage Prevention Yes No Yes Yes
Comment: Floodplain Ordinance
Emergency Management Yes Yes Yes No
Comment: VFD, Harris County Emergency Management
Climate Change No No No No
Comment:
Planning Documents
General Plan Yes No Yes Yes
Comment: Zoning Ordinance
Capital Improvement Plan Yes No No Yes How often is the plan updated? Annually w/Budget
Comment:
Disaster Debris Management Plan Yes Yes No No
Comment: Interlocal with Harris County for Debris removal and Ceres Environmental Services
Floodplain or Watershed Plan No Yes No No
Comment: HCFCD
Stormwater Plan Yes Yes No Yes
Comment: TCEQ
Urban Water Management Plan No No No No
Comment:
Habitat Conservation Plan No Yes No No
Comment: TCEQ and EPA
Economic Development Plan Yes No Yes No
Comment: City has the ability
Shoreline Management Plan No No No No
Comment:
Community Wildfire Protection Plan No No No No
Comment:
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes Yes Yes No
Comment: Harris County Emergency Management
Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes Yes No
Comment: Harris County Hazard Mitigation Plan
Post-Disaster Recovery Plan Yes Yes Yes No
Comment: Harris County Emergency Management
Continuity of Operations Plan No No No No
Comment:
Public Health Plan No Yes No No
Comment: Harris County Public Health
City of Hedwig Village
9-5
Table 9-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Permit Department
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? No
Table 9-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants – low income No
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Other No
Table 9-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land
management practices
Yes BBG Contract Building Official
Engineers or professionals trained in building or infrastructure
construction practices
Yes Contract Building Official, Contract City
Engineer, and VFD Marshall
Planners or engineers with an understanding of natural hazards Yes Contract Building Official and Contract
City Engineer
Staff with training in benefit/cost analysis Yes City Treasurer
Surveyors Yes Contract
Personnel skilled or trained in GIS applications Yes Contract
Scientist familiar with natural hazards in local area Yes Contract
Emergency manager Yes Mayor and VFD
Grant writers Yes Contract
Other No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
9-6
Table 9-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? No
• If yes, briefly describe.
Do you use social media for hazard mitigation education and outreach? No
• If yes, briefly describe.
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. Reverse 911/website/ENotification
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Reverse 911/website/ENotification
Table 9-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Permit Dept.
Who is your floodplain administrator? (department/position) City Secretary
Are any certified floodplain managers on staff in your jurisdiction? No
What is the date that your flood damage prevention ordinance was last amended? Dec 2004
Does your floodplain management program meet or exceed minimum requirements? Meets
• If exceeds, in what ways?
When was the most recent Community Assistance Visit or Community Assistance Contact? May 2019
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? No
• Areas have flooded that are not within a flood risk area.
Does your floodplain management staff need any assistance or training to support its floodplain management program? No
• If so, what type of assistance/training is needed?
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification?
• If no, is your jurisdiction interested in joining the CRS program? No
How many flood insurance policies are in force in your jurisdiction?a 385
• What is the insurance in force? $130,960,000
• What is the premium in force? $195,280
How many total loss claims have been filed in your jurisdiction?a 121
• How many claims are still open or were closed without payment? 18
• What were the total payments for losses? $3,457,558.39
a. According to FEMA statistics as of March 28, 2019
City of Hedwig Village
9-7
Table 9-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No
Building Code Effectiveness Grading Schedule No
Public Protection Yes ISO 2015
Storm Ready No
Firewise No
Table 9-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
9-8
Criterion Jurisdiction Ratinga
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
9.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to provide
information on integration. The progress reporting process described in Volume 1 will document the progress of
hazard mitigation actions related to integration and identify new opportunities for integration.
9.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the following
other local plans and programs:
• MS4 Storm Water Plan — Storm Water Protection Plan as required by TCEQ.
• All Hazard Mitigation Plan with Harris County
9.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not currently
integrate hazard mitigation information but provide opportunities to do so in the future:
• MS4 Storm Water Plan — Storm Water Protection Plan as required by TCEQ.
• All Hazard Mitigation Plan with Harris County
9.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 9-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Hedwig
Village. Other hazard events that broadly affected the entire planning area, including City of Hedwig Village, are
listed in the risk assessments in Volume 1 of this hazard mitigation plan.
City of Hedwig Village
9-9
Table 9-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 $ 18,945,021
Weather Event (rain) ------ 4/18/2016 Unknown
Weather Event (rain) ------ 5/25/2015 Unknown
Weather Event (rain) ------ 4/28/2009 Unknown
Weather Event (hail) & Flash Flood 32615 & 32616 5/30/2007 $0
Hurricane Alicia 689 DR 1983 $12,130,470
9.7 HAZARD RISK RANKING
Table 9-12 presents a local ranking for City of Hedwig Village of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction.
As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for
each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target hazards
with high and medium rankings.
Table 9-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
2 Hurricane 32 High
3 Earthquake 14 Low
4 Drought 6 Low
4 Fire 6 Low
4 Mass Movement 6 Low
5 Flooding 0 None
5 Dam Failure 0 (no exposure) None
5 Coastal Erosion 0 (No exposure) None
5 Tsunami 0 (No exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
9.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
9.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 22
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 4
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 1
9.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
9-10
• Aging infrastructure (sink holes)
• Above ground power lines
Mitigation actions addressing these issues were prioritized for consideration in the action plan for this annex.
9.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 9-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 9-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item Completed No longer Feasible Check if Yes Action # in Update
Install drought-resistant landscaping around facilities as part of water conservation plan Ongoing Yes HED 8
Comment: Carry Over
Improve codes/ordinances allowing xeriscape. Not-Started Yes HED 11
Comment: Carry Over
Expand warning system using City-wide Emergency Notification System to enhance coverage of the community’s population. Ongoing Yes HED 5
Comment: The City designed and implemented a new website in 2016 which enables residents to sign up to receive up-to-date
emergency notices. This was used during Hurricane Harvey. Completed in Phase I.
Establish codes/ordinances for buffer zones Yes
Comment: Remove/Delete
Harden air handling and air conditioning systems. Yes
Comment: Both city hall and the police station have been updates with control systems. Completed in Phase I.
Install protective structures for city vehicles Yes
Comment: Carport installed at police station. Completed in Phase I.
Implement a tree management program to limit debris damage to critical infrastructure, public facilities from falling tree canopy. Ongoing Yes HED 6
Comment: This is an ongoing activity to maintain canopy. The City does have a debris contract for major tree damages.
Retrofit Maintenance Building with lightning and surge protection
measures.
Yes
Comment: The City completed the implementation with the police station was complete in 2017. Completed in Phase I.
Retrofit backup generator at Police Department with new automatic switching equipment. Yes
Comment: Both city hall and the police station generators have an automated transfer switch. Completed in Phase I.
Retrofit Police Department facility to withstand high-wind damages from
severe thunderstorms, hurricanes and hail.
Yes
Comment: Completed with the new police station in 2017. Completed in Phase I.
Install cover and freeze insulation protection of above ground public irrigation equipment and FDC connections Yes
Comment: Completed in Phase I.
Insulate exposed fire protection equipment/system components Yes
Comment: Completed in Phase I.
City of Hedwig Village
9-11
Removed; Carried Over to Plan Update
Action Item Completed
No longer
Feasible Check if Yes
Action # in
Update
Develop/implement outreach/public awareness/warning programs and meet with local providers on how they will handle extreme power demands.
Not-Started Yes HED 7
Comment: Carry Over
Strengthen Building Codes/Ordinances relative to job site
(Construction) debris management and removal of dead trees.
Yes
Comment: Updated the Building Codes the last few years. Completed in Phase I.
Install and improve Storm Sewer System by increasing drainage to mitigate flooding. Ongoing Yes HED 9
Comment: The City has spent close to $500K in a master drainage plan with the anticipation to go to voters in late 2019 or sometime in
2020 in a bond election to decide if residents want to pay to improve streets and drainage.
Develop community outreach program to educate the public on flooding risk and actions they can take to protect their homes from flooding. Ongoing Yes HED 10
Comment: Some outreach has been done through the City’s website.
Hardening of critical infrastructure facilities. Yes
Comment: Completed in Phase I.
Update and strengthen ordinances on burning restrictions with local Fire Marshal. Yes
Comment: No outside burning is allowed in Hedwig Village. Completed in Phase I.
9.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 9-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 9-15 identifies
the priority for each action. Table 9-16 summarizes the mitigation actions by hazard of concern and mitigation type.
Table 9-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action HED1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, WildFire, Mass Movement, Earthquake
Existing 3, 4, 10 City
Administration
TBD High Hazard Mitigation Grant
Program, Pre-Disaster
Mitigation, Flood Mitigation
Assistance
Short-term
Action HED 2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including development and drainage.
Hazards Mitigated: drought, earthquake, flooding, landslide, tsunami, wildfire
New and Existing 1, 3, 4, 5, 7, 8, 10 City
Administration
TBD Low Staff Time, General Funds Ongoing
Action HED 3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, WildFire, Mass Movement, Earthquake, Drought
New and Existing 1, 5, 8 City
Administration
TBD Low Staff Time, General Funds Short-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
9-12
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action HED 4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise
New and Existing 1, 3, 5, 7, 8, 10 City
Administration
TBD Low Staff Time, General Funds Ongoing
Action HED 5 — Expand warning system using City-wide Emergency Notification System to enhance coverage of the community’s
population.
Hazards Mitigated:
New and Existing 1, 3 Public works TBD Low Staff Time, General Funds Ongoing
Action HED 6 — Implement a tree management program to limit debris damage to critical infrastructure, public facilities from falling tree
canopy.
Hazards Mitigated: Severe weather, flooding, wildfire
Existing 8, 10, 12 Public Works TBD Low Staff Time, General Funds, Ongoing
Action HED 7 — Develop/implement outreach/public awareness/warning programs and meet with local providers on how they will handle
extreme power demands
Hazards Mitigated: Drought, severe weather
New 1, 3 Administration Center-point Energy Low Staff Time, General Funds Ongoing
Action HED 8 — Install drought-resistant landscaping around facilities as part of water conservation plan
Hazards Mitigated: Drought
Existing 11 Public Works TBD Low Staff time, general funds Short-term
Action HED 9 — Install and improve Storm Sewer System by increasing drainage to mitigate flooding.
Hazards Mitigated: Severe weather, hurricane, flooding
Existing and New 7, 11, 12 Public Works TBD High Staff time, bond election,
Hazard Mitigation Grant
Program, Pre-Disaster
Mitigation, Flood Mitigation
Assistance
Ongoing
Action HED 10 — Develop community outreach program to educate the public on flooding risk and actions they can take to protect their
homes from flooding.
Hazards Mitigated: Severe weather, hurricane, flooding
Existing 1, 3 Administration Harris County, State,
Federal
Low Staff time, general fund Short
Action HED 11 — Improve codes/ordinances allowing xeriscape.
Hazards Mitigated: Drought
Existing 11 Building
Department
TBD Low Staff time, general fund Short
Action HED12— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire, Drought, Mass Movement
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
Galena Park HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
City of Hedwig Village
9-13
Table 9-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
HED 1 3 High High Yes Yes No Medium High
HED 2 7 Medium Low Yes No Yes High Low
HED 3 3 Low Low Yes No Yes High Low
HED 4 6 Medium Low Yes No Yes High Low
HED 5 2 High Low Yes No Yes High High
HED 6 3 High Medium Yes No No High Medium
HED 7 2 High Low Yes No Yes High Low
HED 8 1 Low High No Yes No Low Low
HED 9 3 High High Yes Yes NO High High
HED 10 2 Medium Low Yes No Yes Medium Medium
HED 11 1 Low Low Yes No Yes Low Low
HED12 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 9-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather HED 3, 12 HED 1, 6 HED 5, 7, 10,
12
HED 6 HED 5, 10,
12
HED 1, 9 HED 3, 9, 12
Hurricane HED 3, 12 HED 1, 6 HED 5, 7, 10,
12
HED 6 HED 5, 10,
12
HED 1, 9 HED 3, 9, 12
Medium-Risk Hazards
Flooding HED 2, 3, 4, 6,
12
HED 1, 4, 6 HED 5, 7, 10,
12
HED 6 HED 5, 10,
12
HED 1, 9 HIL 4 HED 3, 9, 12
Low-Risk Hazards
Drought HED 3, 11, 8,
12
HED 1, 6 HED 11, 12 HED 8, 11 HED 5, 12 HED 8, 11 HED 7, 12
Fire HED 2, 3, 12 HED 1, 6 HED12 HED 6 HED 5, 12 HED 3, 12
Mass Movement HED 2, 3, 12 HED 1, 6 HED12 HED 5, 12 HED 9 HED 3, 12
Earthquake HED 2, 3, 12 HED 1, 6 HED12 HED 5, 12 HED 3, 12
a. See the introduction to this volume for explanation of mitigation types.
9.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
9-14
• The City of Hedwig Village Municipal Code — The municipal code was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
• The City of Hedwig Village Flood Damage Prevention Ordinance — The flood damage prevention
ordinance was reviewed for compliance with the National Flood Insurance Program.
• The City of Hedwig Village MS4 Storm Water Plan-- The MS4 Storm Water Plan was reviewed by
TCEQ and is compliance.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
!(!(!(!(!(!(!(!(!(§¨¦10§¨¦10HoustonSpring ValleyHunters CreekVillagePiney PointVillageBunker HillVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.150.30.075Miles±Hedwig Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hunters
Creek
Village
Piney Point
Village
Bunker Hill
Village
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Hedwig Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hunters
Creek
Village
Piney Point
Village
Bunker Hill
Village
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Hedwig Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hunters
Creek
Village
Piney Point
Village
Bunker Hill
Village
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Hedwig Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hunters
Creek
Village
Piney Point
Village
Bunker Hill
Village
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Hedwig Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hunters
Creek
Village
Piney Point
Village
Bunker Hill
Village
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Hedwig Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hunters
Creek
Village
Piney Point
Village
Bunker Hill
Village
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Hedwig Village
10-1
10. CITY OF HILSHIRE VILLAGE
10.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Name, Title: Susan Blevins, City Administrator
Street Address: 8301 Westview
City, State ZIP: Houston, Texas 77055
Telephone: 713-973-1779
e-mail Address: susan.blevins@hilshirevillagetexas.com
Name, Title: Efrain Him, City Engineer
Street Address: 4828 Loop Central Drive, Ste. 800
City, State ZIP: Houston, Texas 77081
Telephone: 713-622-9264
e-mail Address: efrain.him@hdrinc.com
10.2 JURISDICTION PROFILE
10.2.1 Location
The City of Hilshire Village is located in the southwestern area of Harris County. The current boundaries generally
extend from Westview Drive on the north to I-10 on the south, and from Wirt Road on the east to the City of Spring
Valley on the west. The City encompasses an area of one-third of a square mile.
10.2.2 History
The City of Hilshire Village was incorporated in 1955. The City today consists of 312 single-family dwellings; two
private schools, one preschool/after-school facility, four churches, one small Harris County pocket park, and a small
commercial area. Through the years, the City has adopted ordinances establishing zoning regulations to preserve
the character of the “Memorial Villages.” The six Memorial Villages are independent cities that operate
autonomously of Houston. All six are served by the Village Fire Department. Spring Valley Police Department
serves the City of Hilshire Village along with the City of Spring Valley. The six villages have executed an inter-
local agreement and developed an emergency management guide for emergency needs.
10.2.3 Climate
The climate of the City of Hilshire Village is characterized by relatively high temperatures and evenly distributed
precipitation throughout the year with high humidity.
10.2.4 Governing Body Format
The City of Hilshire Village is considered a Type-A General Law City and is governed by a Mayor and five Council
Members elected at large. A Type-A General Law City is one that had at the time of its incorporation 600 or more
inhabitants. General Law Cities have a population less than 5,000 and are authorized to do only what the State
Constitution or Legislature has authorized.
The City Council assumes responsibility for the adoption of this plan; the City Administrator will oversee its
implementation.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
10-2
Table 10-1 lists members of the jurisdiction’s joint local mitigation planning team. Howard Miller, emergency
management coordinator for the Village Fire Department, also participated in planning for the six Memorial
Villages.
Table 10-1. Local Mitigation Planning Team Members
Jurisdiction Name / Title Phone Email
City of Bunker Hill Village Karen Glynn, City Admin. 713-467-9762 KGlynn@bunkerhilltx.gov
City of Hedwig Village Kelly Johnson, City Admin./Secretary 713-465-6009 kjohnson@hedwigtx.gov
City of Hilshire Village Susan Blevins, City Admin/Secretary.
Efrain Him
713-973-1779 Susan.blevins@hilshirevillagetexas.com
Efrain.him@hdrinc.com
City of Hunters Creek Village Tom Fullen, City Admin. 713-465-2150 tfullen@cityofhunterscreek.org
City of Piney Point Village Roger Nelson, City Admin. 713-230-8703 cityadmin@pineypt.org
City of Spring Valley Village Julie Robinson, City Admin.
Arthur Faiello, PW Director
713-465-5306
832-910-8576
jrobinson@springvalleytx.com
afaiello@springvalleytx.com
10.3 CURRENT TRENDS
10.3.1 Population
According to the 2010 Census Data, the population of the City of Hilshire Village was 310. Since the 1990
Census, the population has slightly increased.
10.3.2 Development
The City of Hilshire Village is continuing to experience residential redevelopment of new, larger homes. The city
is landlocked by other municipalities; therefore there is no growth opportunity. Table 10-2 summarizes development
trends in the period since the preparation of the previous hazard mitigation plan, as well as expected future
development trends.
10.4 CAPABILITY ASSESSMENT
The City of Hilshire Village performed an assessment of its existing capabilities for implementing hazard
mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 10-3.
• Development and permitting capabilities are presented in Table 10-4.
• An assessment of fiscal capabilities is presented in Table 10-5.
• An assessment of administrative and technical capabilities is presented in Table 10-6.
• An assessment of education and outreach capabilities is presented in Table 10-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 10-8.
• Classifications under various community mitigation programs are presented in Table 10-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 10-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
City of Hilshire Village
10-3
Table 10-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
NO
• If yes, give the estimated area annexed and estimated number of parcels or structures.
N/A
Is your jurisdiction expected to annex any areas during the performance period of this plan?
NO
• If yes, describe land areas and dominant uses.
N/A
• If yes, who currently has permitting
authority over these areas?
N/A
Are any areas targeted for development or major redevelopment in the next five years? yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk
areas
The City of Hilshire Village is continuing to experience
residential redevelopment of new, larger homes. A developer recently subdivided a
track of land into 10 lots.
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 8 4 3 7 3
Multi-Family N/A N/A N/A N/A N/A
Other (commercial, mixed use, etc.) N/A N/A 1 2 N/A
Total 10 4 4 9 3
Provide the number of new-construction
permits for each hazard area or provide a qualitative description of where development
has occurred.
• Special Flood Hazard Areas: #N/A
• Landslide: # N/A
• High Liquefaction Areas: # N/A
• Tsunami Inundation Area: # N/A
• Wildfire Risk Areas: # N/A
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory
exists, provide a qualitative description.
City of Hilshire Village continues to experience redevelopment of their residential lots;
older homes are demolished and new homes constructed.
Table 10-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction
Authority
State Mandated Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes Yes Yes Yes
Comment: Ord # 719
Zoning Code Yes Yes Yes Yes
Comment: Chapter 12 code of ordinances
Subdivisions Yes Yes Yes Yes
Comment: Chapter 9, Article 9.100, 6/28/2016
Stormwater Management Yes Yes Yes Yes
Comment: Ordinance and TCEQ
Post-Disaster Recovery Yes Yes Yes No
Comment: Mutual Aid Agreement with Harris County , FEMA, TDEM
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
10-4
Local Authority Other Jurisdiction
Authority
State Mandated Integration
Opportunity?
Real Estate Disclosure No No No No
Comment:
Growth Management Yes Yes Yes Yes
Comment:
Site Plan Review Yes Yes Yes No
Comment: Building Official, City Engineer, Village Fire Department and HCFCD
Environmental Protection No Yes Yes No
Comment: TCEQ, EPA
Flood Damage Prevention Yes No Yes/ /No
Comment:
Emergency Management Yes Yes Yes Yes
Comment: Harris County Emergency Management, Village Fire Department
Climate Change No No No /No
Comment: N/a
Planning Documents
General Plan Yes /No Yes Yes
Comment: Zoning Ordinance
Capital Improvement Plan Yes No No Yes
How often is the plan updated? Comment: We have a 5 year plan but we review yearly during the budget process
Disaster Debris Management Plan Yes Yes Yes No
Comment: Interlocal with Harris County
Floodplain or Watershed Plan No Yes No No
Comment: Harris County Flood Control Agreement
Stormwater Plan Yes Yes No Yes
Comment: TCEQ
Urban Water Management Plan No Yes Yes No
Comment: City of Houston
Habitat Conservation Plan No Yes/ No No
Comment: Wild Life Protection Services
Economic Development Plan Yes No Yes No
Comment: Do not have a plan
Shoreline Management Plan No No No No
Comment:
Community Wildfire Protection Plan No No No No
Comment:
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes Yes Yes No
Comment: Harris County Emergency Management
Threat & Hazard Identification & Risk Assessment (THIRA) No No No No
Comment: Harris County Hazard Mitigation Plan
Post-Disaster Recovery Plan Yes Yes Yes No
Comment: Harris County Emergency Management
City of Hilshire Village
10-5
Local Authority Other Jurisdiction
Authority
State Mandated Integration
Opportunity?
Continuity of Operations Plan No No No No
Comment:
Public Health Plan No Yes No No
Comment: Interlocal with Harris County
Table 10-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department?
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? No
Table 10-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants No
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Yes
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Other Infrastructure is required before City assumes the ownership No
Table 10-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land
management practices
Yes City Engineer – Under contract
Engineers or professionals trained in building or infrastructure construction
practices
Yes City Engineer and Building Official under
contract – Also Fire Marshal
Planners or engineers with an understanding of natural hazards Yes City Engineer – Under contract
Staff with training in benefit/cost analysis Yes City Engineer – Under contract
Surveyors Yes City Engineer – Under contract
Personnel skilled or trained in GIS applications Yes City Engineering Firm – Under contract
Scientist familiar with natural hazards in local area Yes City Engineering Firm – Under contract
Emergency manager Yes Village Fire Department
Grant writers Yes City Engineering Firm – Under contract
Other Yes/No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
10-6
Table 10-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes the Mayor
Do you have personnel skilled or trained in website development? Yes – under contract
Do you have hazard mitigation information available on your website? No
• If yes, briefly describe.
Do you use social media for hazard mitigation education and outreach? No
• If yes, briefly describe.
Do you have any citizen boards or commissions that address issues related to
hazard mitigation?
No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to
communicate hazard-related information?
Yes
• If yes, briefly describe. Website, email and reverse 911
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Website, email and reverse 911
Table 10-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? City Engineering Under contract
Who is your floodplain administrator? (department/position) Mayor who then assigns to City Engineer
Are any certified floodplain managers on staff in your jurisdiction? City Engineering Under contract
What is the date that your flood damage prevention ordinance was last amended? March 18, 2014
Does your floodplain management program meet or exceed minimum requirements? Meets
• If exceeds, in what ways?
When was the most recent Community Assistance Visit or Community Assistance Contact?
Does your jurisdiction have any outstanding NFIP compliance violations that need to be
addressed?
No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why.
Does your floodplain management staff need any assistance or training to support its
floodplain management program?
No
• If so, what type of assistance/training is needed? City Engineer is contracted
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification? No
• If no, is your jurisdiction interested in joining the CRS program? Yes/No
How many flood insurance policies are in force in your jurisdiction?a 143
• What is the insurance in force? $48,642,200
• What is the premium in force? $58,006
How many total loss claims have been filed in your jurisdiction? Total closed paid policies 33 Insert appropriate information
• How many claims are still open or were closed without payment? Insert appropriate information
• What were the total payments for losses? $1,223,649
a. According to FEMA statistics as of MONTH XX, 201X
City of Hilshire Village
10-7
Table 10-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No Date
Building Code Effectiveness Grading Schedule Yes Personal Class 5 and Commercial Class 5 8/2015
Public Protection Yes 1 2015
Storm Ready No
Firewise No
Table 10-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
10-8
Criterion Jurisdiction Ratinga
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
10.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
10.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• MS4 Stormwater Plan in Progress
• All Hazard Mitigation Plan
10.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified no plans or programs that do not currently integrate
hazard mitigation information but provide opportunities to do so in the future.
10.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 10-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Hilshire
Village. Other hazard events that broadly affected the entire planning area, including City of Hilshire Village are
listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 10-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Alicia 689 DR 1983 $2,299,792
Severe Weather (Wind) 36254 6/5/2011 $15,000
Hurricane Harvey 4332 DR 2017 $36,938,741
10.7 HAZARD RISK RANKING
Table 10-12 presents a local ranking for City of Hilshire Village of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
City of Hilshire Village
10-9
Table 10-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
2 Hurricane 32 High
3 Flooding 18 Medium
4 Earthquake 14 Low
5 Wild Fire 6 Low
5 Drought 6 Low
5 Hazardous materials 6 Low
6 Coastal Erosion 0 (No Exposure) None
6 Tsunami 0 (No Exposure) None
6 Mass Movements 0 (No exposure) None
6 Dam Failure 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
10.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
10.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 1
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 1
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0
10.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issue has been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Age and type of the tree canopy.
Mitigation actions addressing this issue were prioritized for consideration in the action plan in this annex.
10.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 10-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
10.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 10-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 10-15
identifies the priority for each action. Table 10-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
10-10
Table 10-13. Status of Previous Plan Actions
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
2014HILVIL001 — Revise drainage ordinance to require detention for future development and redevelopment yes
Comment: The City has a new development coming in off Westview. They are installing underground detention and will tie into the City of
Houston’s drainage system. City has adopted an ordinance that states the maximum coverage of any lot with any non-
constructed surface shall not exceed 55 percent of the lot area located behind the required front building line and shall not
exceed 50 percent of the lot area located in front of the required front building line. Also, the City amended its drainage
guidelines to not allow rain gutter downspouts to be tied into existing or proposed underground storm sewer lines that drain
directly into the City’s ditches on the front and/or side of the owner’s property, nor shall they be extended to tie directly into the
City’s ditches. Rain gutter downspouts, however, may be tied into: (a) on-site (below ground) retention features that would
allow storm water to percolate into the ground; or (b) on-site (below ground) retention features to re-use storm water runoff for
“green” applications such as irrigation.
2014HILVIL002 — Update and adopt higher standards to enhance floodplain management and incorporate into the local FDPO.
yes
Comment: The City recently approved an ordinance that requires the maximum coverage of any lot with any non-constructed surface shall
not exceed 55 percent of the lot area located behind the required front building line and shall not exceed 50 percent of the lot
area located in front of the required front building line. Also, the City amended its drainage guidelines to not allow rain gutter
downspouts to be tied into existing or proposed underground storm sewer lines that drain directly into the City’s ditches on the
front and/or side of the owner’s property, nor shall they be extended to tie directly into the City’s ditches. Rain gutter
downspouts, however, may be tied into: (a) on-site (below ground) retention features that would allow storm water to percolate
into the ground; or (b) on-site (below ground) retention features to re-use storm water runoff for “green” applications such as
irrigation.
2014HILVIL003 — Retrofit critical infrastructure (City Hall – Emergency Command Center) with impact and wind resistant glass no Yes HIL5
Comment: Project started – Did research on building. The roof is rated for 110 mph Class B. Need to have windows and building inspected
2014HILVIL004 — Retrofit and harden roofing of critical infrastructure (City Hall – Emergency Command Center) to industry accepted high-wind building standards.
yes
Comment: Inspected roof to make sure it was met Hurricane standards and was in good shape – It was.
2014HILVIL005 — Develop/Implement tree management program and
mitigation measures
Yes
Comment: The City is pro-active with notifying residence of dead trees and asking them to remove. CenterPoint comes through the City
and trims trees that might cause damage to their infrastructure. The City has signed an Inter-Local Agreement with Harris
County for debris mitigation after a disaster
2014HILVIL006 — Expand early warning alarm system (Code Red Mass
Notification System) to increase coverage of the Community’s population.
Yes
Comment: The City utilizes the Nixle Mass Notification System provided by the Police Department. The Nixle system is established and
reaches the City’s community. The Police Department also has the capability to use Harris County Reverse 911 for Hilshire
Village
2014HILVIL007 — Join FireWise to educate community on wildfire risks and
provide actions to take to protect property and equipment from wildfire
damages.
No Yes HIL8
Comment: Started – Working with the Fire Department on ordering material and scheduling a safety awareness meeting. Fire
Department has had several awareness meeting and the City is scheduling to have a City Hall after material arrives
2014HILVIL008 — Install drought-resistant landscaping (xeriscaping) in common and public areas as part of the water conservation program No Yes HIL9
Comment: Started – Working on replacing landscaping in common areas that are drought resistant. The City has also adopted a
Draught Contingency Plan
City of Hilshire Village
10-11
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
2014HILVIL009 — Installation of a rainwater collection system for irrigation/sprinkler systems to mitigate drought conditions at City Hall No Yes HIL10
Comment: Have not started
2014HILVIL010 — Install/Improve lighter color roofing of critical infrastructure (City Hall – Emergency Command Center) No Removed,
not feasible
Comment: Have not started
2014HILVIL011 — Install cover and freeze insulation protection of above
ground public irrigation systems/equipment to mitigate damage from freezing temperatures.
No Yes HIL12
Comment: started
2014HILVIL012 — Installation of signs prohibiting/banning the commercial transportation of hazardous materials through the City
No Yes HIL13
Comment: Started Added no thru truck signs in several locations – ordered signs for additional locations
2014HILVIL013 — Identify exposed/above ground energy pipelines in flood hazard area
yes
Comment: Completed – The City has no pipelines running through the City
2010HILVIL001 — Expand early Warning Community Notification system
(Code Red Mass Notification System) to provide coverage to residents that
would be impacted by flooding.
yes
Comment: The City utilizes the Nixle Mass Notification System provided by the Police Department. The Nixle system is established and
reaches the City’s community. The Police Department also has the capability to use Harris County Reverse 911 for Hilshire
Village
2010HILVIL003 — Non Structural Mitigation Measure – Buried power lines,
and generators Install generators at critical facilities to sustain critical operations from power outages due to damages from hazards.
No Yes HIL7
Comment: CenterPoint will not bury power lines because this is cost prohibitive and there is limited access due to the area being
wooded. The City Hall has a generator installed, but the City still needs a generator at its Lift Station.
2010HILVIL004 — Develop a Residential debris and tree management
program to reduce damages from high-winds
No Yes HIL14
Comment: This is an ongoing activity. The City maintains ravines and gullies to minimize flooding. The City will implement this activity
every other year and is before City Council in 2016. The City is proactive in managing tree/wooded areas of the community.
CenterPoint also maintains tree line to prevent damage to over-head power lines.
2010HILVIL005 — Implement Non Structural Mitigation Measures by burying
power lines to reduce damages to electrical lines from high-winds.
No Yes
Comment: CenterPoint will not bury power lines because this is cost prohibitive and there is limited access due to the area being
wooded.
2010HILVIL006 — Develop a Residential debris and tree management program to reduce damages from high-winds
No Yes HIL14
Comment: This is an ongoing activity. The City maintains ravines and gullies to minimize flooding. The City will implement this activity
every other year and is before City Council in 2016. The City is proactive in managing tree/wooded areas of the community.
CenterPoint also maintains tree line to prevent damage to over-head power lines.
2010HILVIL007 — Install/expand community early warning system (Code Red Mass Notification System) to increase coverage to the community’s population
yes
Comment: The City utilizes the Nixle Mass Notification System provided by the Police Department. The Nixle system is established and
reaches the City’s community.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
10-12
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
2010HILVIL008 — Install lightning and surge protection measures for critical infrastructure
yes
Comment: Lift Station and City Hall has surge protection.
2010HILVIL012 — Develop/implement groundwater contingency planning/measures for Critical Infrastructure and Fire Protection deleted
Comment: Not Started. This action is no longer feasible. TCEQ requires cities to install pressure boosters for fire protection. However,
the City does not have a water facility and received a waiver and exemption. The Project Cost was estimated in the millions
and was considered an undue hardship.
2010HILVIL0014 — Install/Expand a Community early warning system (Code
Red Mass Notification System) to increase coverage to the community’s population
yes
Comment: The City utilizes the Nixle Mass Notification System provided by the Police Department. The Nixle system is established
and reaches the City’s community.
2010HILVIL016 — Clean-up of heavy wildfire fuel areas (abandoned buildings, abandoned lands, etc.). yes
Comment: Renovated and cleaned up. The commercial area has been cleaned up
2010HILVIL018 — Develop/implement tree management planning and
mitigation measures. Bury Power lines
yes
Comment: Completed – New ordinance approved and it has become an ongoing policy now to keep trees trimmed in the right of way.
CenterPoint will not bury transmission power lines. However, some residents have self-funded their service lines being buried
2010HILVIL020 — Develop relationship with local LEPC. yes
Comment: The six Memorial Villages in conjunction with the Village Fire Department have developed a plan to pull resources and have a unified EOC. The plan has
been tested and will be an ongoing development.
2010HILVIL022 — Develop relationship with local LEPC yes
Comment: Started Added no thru truck signs in several locations – ordered signs for additional locations
Table 10-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action HIL1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that
have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Severe weather, drought, earthquake, flooding, wildfire, flooding, hurricane
Existing 3, 4, 10 Public
Works
TBD High HMGP, PDM, FMA Short-term
Action HIL2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including development and drainage.
Hazards Mitigated: Severe weather, drought, earthquake, flooding, wildfire, flooding, hurricane
New and Existing 1, 3, 4, 5, 7,
8, 10
Building Harris County, Houston-
Galveston Council of
Governments
Low Staff Time, General Funds Ongoing
Action HIL3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe weather, hurricane, flooding, wild fire, drought, earthquake
New and Existing 1, 5, 8 Public
Works
Harris County Low Staff Time, General Funds Short-term
City of Hilshire Village
10-13
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action HIL4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: flooding, severe weather, tsunami, sea level rise
New and Existing 1, 3, 5, 7, 8,
10
Public
Works
Building Department,
Harris County, Houston
Galveston Council of
Governments
Low Staff Time, General Funds Ongoing
Action HIL5 — Retrofit critical infrastructure (City Hall – Emergency Command Center) with impact and wind resistant glass
Hazards Mitigated: Severe weather, Hurricane
Existing 10, 11, 13,
15
Public
Works
TBD Medium Staff time, General Funds, Hazard
Mitigation Grant Program, Pre-
Disaster Mitigation, Flood Mitigation
Assistance, other grant opportunities
Short
Term
Action HIL6 — The City maintains ravines and gullies to minimize flooding. The City will implement this activity every other year. The City
is proactive in managing tree/wooded areas of the community. CenterPoint also maintains tree line to prevent damage to over-head
power lines.
Hazards Mitigated: Severe weather, hurricane, flooding.
Existing 2, 8, 11, 13,
15
Public
Works
TBD Medium Staff time, general fund, Hazard
Mitigation Grant Program, Pre-
Disaster Mitigation, Flood Mitigation
Assistance, other grant opportunities
Ongoing
Action HIL7 — Install generators at critical facilities to sustain critical operations from power outages due to damages from hazards.
Hazards Mitigated: Severe weather, hurricane, flooding
Existing 2, 11, 13, 15 Public
Works
TBD $100,000 Staff time, general fund, Hazard
Mitigation Grant Program, Pre-
Disaster Mitigation, other grant
opportunities
Short
Term
Action HIL8 — Join FireWise to educate community on wildfire risks and provide actions to take to protect property and equipment from
wildfire damages.
Hazards Mitigated: Wild fire
Existing 1, 2 Administrati
on
Harris County, Houston
Galveston Area Council of
Governments
Low Staff time, general fund Short
Term
Action HIL9 — Install drought-resistant landscaping (xeriscaping) in common and public areas as part of the water conservation program
Hazards Mitigated: Drought
Existing 2, 8, 11, 15 Public
Works
Harris County, Houston
Galveston Area Council of
Governments
Medium Staff time, general fund. Long
Term
Action HIL10 — Installation of a rainwater collection system for irrigation/sprinkler systems to mitigate drought conditions at City Hall
Hazards Mitigated: Drought
New 7, 8, 10 Public
Works
TBD Medium Staff time, general fund, grant
opportunities
Ongoing
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
10-14
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action HIL11 — Maintenance and improvement of the Harris County drainage channel #W 140-04-00, to mitigate severe weather
hazards.
Hazards Mitigated: Severe weather, flooding, hurricane
Existing 2, 8, 11 Public
Works
Harris County Flood
Control, Harris County,
Galveston Area Council of
Governments
Medium general fund, Hazard Mitigation Grant
Program, Pre-Disaster Mitigation
Long
Term
Action HIL12 — Install cover and freeze insulation protection of above ground public irrigation systems/equipment to mitigate damage
from freezing temperatures.
Hazards Mitigated: Severe weather
Existing 11, 13 Public
Works
TBD Medium Staff time, general fund Short
Term
Action HIL13 — Installation of signs prohibiting/banning the commercial transportation of hazardous materials through the City
Hazards Mitigated: Hazardous material
Existing 6, 11 Public
Works
Low Staff time, General Fund Short
Term
Action HIL14 — Develop a Residential debris and tree management program to reduce damages from high-winds
Hazards Mitigated: Severe weather, hurricane
Existing 4, 8, 11, 15 Public
Works
CenterPoint Energy,
Building Department
Harris County
Medium Staff time, general fund, Hazard
Mitigation Grant Program.
Ongoing
Action HIL15— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wild Fire, Drought, Earthquake
New and Existing 1, 3, 4, 5, 9,
10, 11, 15
Hilshire
Village
HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 10-15. Mitigation Action Priority
Action #
# of
Objectives
Met Benefits Costs
Do Benefits Equal or
Exceed
Costs?
Is Project
Grant-
Eligible?
Can Project Be Funded Under Existing
Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
HIL1 3 High High Yes Yes No Medium High
HIL2 7 Medium Low Yes No Yes High Low
HIL3 3 Low Low Yes No Yes High Low
HIL4 6 Medium Low Yes No Yes High Low
HIL5 4 Medium Medium Yes Yes No Medium High
HIL6 5 High Medium Yes Yes Yes High Medium
HIL7 4 High Medium Yes Yes No High High
HIL8 2 Low Low Yes No Yes Low Low
HIL9 4 Low Medium Yes No No Low Low
HIL10 3 Low Medium Yes Yes Yes Low Low
City of Hilshire Village
10-15
Action #
# of
Objectives
Met Benefits Costs
Do Benefits Equal or
Exceed
Costs?
Is Project
Grant-
Eligible?
Can Project Be Funded Under Existing
Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
HIL11 3 Medium Medium Yes Yes No Medium Medium
HIL12 2 Medium Medium Yes No No Medium Low
HIL13 2 High Low Yes No Yes High Low
HIL14 4 High Medium Yes Yes No Medium Medium
HIL15 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 10-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather HIL 2, 3, 4, 15 HIL 1, 6 HIL 4, 15 HIL 3, 6, 11 HIL 7, 14, 15 HIL 5, 12 HIL 3, 15
Hurricane HIL 2, 3, 4, 15 HIL 1, 6 HIL 4, 15 HIL 3, 6, 11 HIL 7, 14, 15 HIL 5 HIL 3, 15
Medium-Risk Hazards
Flooding HIL 2, 3, 4, 15 HIL 4, 15 HIL 3, 6, 11 HIL 7, 14, 15 HIL 5 HIL 4 HIL 3, 15
Low-Risk Hazards
Wild Fire HIL 2, 3, 15 HIL 1, 6 HIL 8, 14, 15 HIL 3, 14 HIL 7, 14, 15 HIL 3, 15
Drought HIL 2, 3, 15 HIL 1 HIL15 HIL 3 HIL15 HIL 10 HIL 9, 10 HIL 3, 15
Earthquake HIL 2, 3, 15 HIL 1 HIl15 HIL 3 HIL15 HIL 3, 15
Hazardous Materials HIL 2, 3, 15 HIL 1 HIL 13, 15 HIL 3 HIL15 HIL 3, 15
a. See the introduction to this volume for explanation of mitigation types.
10.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed for this annex.
• Municipal Code — The municipal code was reviewed for the full capability assessment and for
identifying opportunities for action plan integration.
• Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for
compliance with the National Flood Insurance Program.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
!(!(!(!(!(§¨¦10§¨¦10HoustonSpring ValleyHuntersCreekVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.070.140.035Miles±Hilshire Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hunters
Creek
Village
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.07 0.140.035 Miles
±
Hilshire Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hunters
Creek
Village
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.07 0.140.035 Miles
±
Hilshire Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hunters
Creek
Village
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.07 0.140.035 Miles
±
Hilshire Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hunters
Creek
Village
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.07 0.140.035 Miles
±
Hilshire Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hunters
Creek
Village
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.07 0.140.035 Miles
±
Hilshire Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hunters
Creek
Village
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.07 0.140.035 Miles
±
Hilshire Village
11-1
11. CITY OF HUMBLE
11.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
James Nykaza, Emergency Management Coordinator
110 W. Main Street
Humble, Texas, 77338
Telephone: 281-446-4928
e-mail Address: jnykaza@cityofhumble.net
Stephen Forbes
110 W. Main Street
Humble, Texas, 77338
Telephone: 281-446-4928
e-mail Address: sforbes@cityofhumble.net
11.2 JURISDICTION PROFILE
11.2.1 Location
The City of Humble is in Harris County, Texas. It is located within the Houston metropolitan area. The current
boundaries generally extend from San Jacinto River to north of Greens Road, encompassing an area of 10 square
miles.
11.2.2 History
Humble became an oil boomtown in the early 20th century after oil was discovered there in 1903. By 1905 the
Humble oilfield was the largest producing oilfield in Texas. Humble was home of Humble Oil, a predecessor of
Exxon. The City of Humble was incorporated in 1933.
11.2.3 Climate
The climate of City of Humble is characterized by hot, humid summers and generally mild to cool winters.
11.2.4 Governing Body Format
The City government is a council-manager form. It consists of a mayor, five council members and a city manager.
The City of Humble assumes responsibility for the adoption of this plan; Harris County will oversee its
implementation. Development of this annex was carried out by the members of the local mitigation planning
team, whose members are listed in Table 11-1.
Table 11-1. Local Mitigation Planning Team Members
Name Title
James Nykaza EMC
Stephen Forbes Asst. EMC
Mark Smith Deputy Building Official
Mark Arnold Asst. Director Public Works
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
11-2
11.3 CURRENT TRENDS
11.3.1 Population
According to United States Census Bureau, the population of City of Humble as of April 2010 was 15,133. Since
2010, the population has grown at an average annual rate of 5.8 percent.
11.3.2 Development
The anticipated development of the City of Humble is moderate to high. The City of Humble has seen a high
growth in commercial development and a low growth in residential development. The City of Humble is adopting
a Strategic Plan in January 2019 and will focus on the growth and development of the City of Humble.
Table 11-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
Table 11-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard
mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
Is your jurisdiction expected to annex any
areas during the performance period of this
plan?
No
• If yes, describe land areas and dominant uses.
• If yes, who currently has permitting authority over these areas?
Are any areas targeted for development or major redevelopment in the next five years? Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
Townsen Blvd area west of US 59. This area is in the 100 -500 year flood plain.
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation
plan?
2014 2015 2016 2017 2018
Single Family 16 23 22 25 15
Multi-Family 0 0 1 1 0
Other (commercial, mixed use, etc.) 13 12 15 19 23
Total 29 35 37 44 38
Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development
has occurred.
• Special Flood Hazard Areas: 0
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the
jurisdiction, based on your jurisdiction’s
buildable lands inventory. If no such inventory exists, provide a qualitative description.
The buildout of the City of Humble is at 75%.
City of Humble
11-3
11.4 CAPABILITY ASSESSMENT
City of Humble performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 11-3.
• Development and permitting capabilities are presented in Table 11-4.
• An assessment of fiscal capabilities is presented in Table 11-5.
• An assessment of administrative and technical capabilities is presented in Table 11-6.
• An assessment of education and outreach capabilities is presented in Table 11-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 11-8.
• Classifications under various community mitigation programs are presented in Table 11-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 11-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Table 11-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No No No
Comment: Ord. 19-836, Adopted 2/14/2019, ICC 2018
Zoning Code No No No No
Comment:
Subdivisions No No No No
Comment:
Stormwater Management Yes No Yes No
Comment:
Post-Disaster Recovery Yes No Yes No
Comment:
Real Estate Disclosure No No No No
Comment:
Growth Management No No No No
Comment:
Site Plan Review Yes No No No
Comment: Ord. 18-816, Adopted 2/22/2018
Environmental Protection No Yes No Yes
Comment:
Flood Damage Prevention Yes No No No
Comment: Ord. 18-816, Adopted 2/18/2018
Emergency Management Yes No No No
Comment: Ord. 19-841, Adopted rev.- 04/11/2019
Climate Change No Yes No Yes
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
11-4
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Planning Documents
General Plan Yes No Yes No
Comment:
Capital Improvement Plan Yes No Yes No
How often is the plan updated? Yearly
Comment: Water, sewer and roads
Disaster Debris Management Plan Yes No Yes Yes
Comment: FEMA approved July 2019
Floodplain or Watershed Plan Yes No Yes Yes
Comment:
Stormwater Plan Yes No Yes No
Comment:
Urban Water Management Plan Yes No Yes No
Comment:
Habitat Conservation Plan No Yes No No
Comment:
Economic Development Plan Yes Yes No No
Comment:
Shoreline Management Plan No Yes No No
Comment:
Community Wildfire Protection Plan No Yes No No
Comment:
Forest Management Plan No Yes No No
Comment:
Climate Action Plan No Yes No No
Comment:
Comprehensive Emergency Management Plan Yes No Yes Yes
Comment: Partner with Harris County
Threat & Hazard Identification & Risk
Assessment (THIRA)
Yes No Yes Yes
Comment:
Post-Disaster Recovery Plan Yes No Yes Yes
Comment:
Continuity of Operations Plan Yes No Yes Yes
Comment:
Public Health Plan No Yes Yes No
Comment:
Other No No No No
Comment:
Table 11-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Building Dept.
Does your jurisdiction have the ability to track permits by hazard area? Yes
Does your jurisdiction have a buildable lands inventory? Yes
City of Humble
11-5
Table 11-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes
Incur Debt through General Obligation Bonds No
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Other No
Table 11-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land
management practices
Yes Public Works and Building Department
Engineers or professionals trained in building or infrastructure construction practices Yes Public Works
Planners or engineers with an understanding of natural hazards Yes Public Works
Staff with training in benefit/cost analysis Yes Emergency Management
Surveyors Yes Can Contract
Personnel skilled or trained in GIS applications Yes Public Works
Scientist familiar with natural hazards in local area Yes Can Contract
Emergency manager Yes Emergency Management
Grant writers Yes Can Contract
Other No
Table 11-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? No
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. Emergency Management website
Do you use social media for hazard mitigation education and outreach? No
• If yes, briefly describe.
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. Swift 911
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Swift 911
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
11-6
Table 11-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Humble Building Department
Who is your floodplain administrator? (department/position) Building Official
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? January 2019
Does your floodplain management program meet or exceed minimum requirements? Meets
• If exceeds, in what ways?
When was the most recent Community Assistance Visit or Community Assistance Contact? Unknown
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why.
Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes
• If so, what type of assistance/training is needed? Training
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification?
• If no, is your jurisdiction interested in joining the CRS program? Yes
How many flood insurance policies are in force in your jurisdiction?a 927
• What is the insurance in force? $275183900
• What is the premium in force? $604760
How many total loss claims have been filed in your jurisdiction?a 829
• How many claims are still open or were closed without payment? 92
• What were the total payments for losses? $55176554.06
a. According to FEMA statistics as of September 30, 2018
Table 11-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No N/A Date
Building Code Effectiveness Grading Schedule Yes 7 Jan 23, 2019
Public Protection Yes 2 2014
Storm Ready No N/A Date
Firewise No N/A Date
City of Humble
11-7
Table 11-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts High
Comment: Due to numerous years of flooding
Jurisdiction-level monitoring of climate change impacts Medium
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Medium
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Unsure
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
11-8
11.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
11.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Harris County All Hazards Mitigation Plan
11.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified no plans or programs that do not currently integrate
hazard mitigation information but provide opportunities to do so in the future.
11.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 11-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Humble.
Other hazard events that broadly affected the entire planning area, including City of Humble, are listed in the risk
assessments in Volume 1 of this hazard mitigation plan.
Table 11-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey DR4332 2017 N/A
Flooding DR 4269 2016 N/A
Flooding DR 4272 2016 N/A
Hurricane Ike 1791 DR 2008 N/A
Hurricane Rita 1606 DR 2005 N/A
Tropical Storm Allison 1379 DR 2001 N/A
11.7 HAZARD RISK RANKING
Table 11-12 presents a local ranking for City of Humble of all hazards of concern for which this hazard mitigation
plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As
described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for
each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target
hazards with high and medium rankings.
City of Humble
11-9
Table 11-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Dam Failure 26 Medium
3 Flood 18 Medium
4 Wildfire 17 Medium
5 Earthquake 14 Low
6 Drought 6 Low
7 Mass Movement 0 (No Exposure) None
7 Tsunami 0 (No Exposure) None
7 Coastal Erosion 0 (No Exposure None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
11.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
11.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 48
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 4
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 1
11.8.2 Other Noted Vulnerabilities
No jurisdiction-specific issues were identified through review of the results of the risk assessment, public
involvement strategy, and other available resources.
11.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 11-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
11.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 11-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 11-15
identifies the priority for each action. Table 11-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
11-10
Table 11-13. Status of Previous Plan Actions
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
Retrofit and harden critical infrastructure facilities to withstand severe thunderstorms, hurricane winds and hail X HUM9
Comment: Not Started
Harden and retrofit communications tower to withstand high winds. X
Comment: Removed due to changing radio systems
Develop a public education/outreach program to educate the public on thunderstorms and wildfire hazards and the appropriate actions to take to
protect property and equipment.
X HUM10
Comment:
Develop a public education/outreach program to inform the public on wildfire/drought/extreme heat hazards and appropriate actions to take to
protect personal property and equipment during wildfire/drought/extreme
heat conditions.
X
Comment: Remove no longer needed
Adopt latest and higher Development/Modification of building standard building codes for, zoning/ city/storm water ordinances for mitigation of Riverine flood hazards to manage development in flood areas and reduce
property damage.
X
Comment: Not Started
Development/Modification of Adopt latest and higher standard building codes / ordinances for to harden and retrofit city buildings to withstand mitigation of hurricane wind hazards. High-wind damages.
X
Comment: Phase 1 Consisted of working with administration to improve code/ordinance. A proposal was submitted to adopt 2012
building codes. Complete
Phase 2: Adopt buildings codes for all city buildings. Research new standard and impact upon building affordability,
insurability and compliance with such existing requirements as accessibility under ADA, etc.
Increase Expand early warning system- Mass Notification alert capabilities for to increase coverage of community’s public/private schools and colleges X
Comment:
Develop/expand community early warning system Mass Notification to enhance coverage to the community’s population/general public. X
Comment: Purchase the use of a communications software for notification. Swift911
Develop/implement tree management planning and mitigation measures. X
Comment: Phase 1 – In May 2012, Public Works utilized contractors to remove all dead or damaged trees and foliage on City
maintained property (utilizing existing funds).
Phase 2 – Implement and improve tree management program to limit debris damage to critical infrastructure and public
facilities from falling tree canopy.
City of Humble
11-11
Table 11-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing
Assets Objectives Met Lead Agency Support Agency
Estimated
Cost Sources of Funding Timelinea
Action HUM1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, wildfire, Hurricane, Severe Weather
New 3, 4, 10 City Administration TBD High HMGP, PDM, FMA Short-term
Action HUM2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including all new construction.
Hazards Mitigated: Dam failure, drought, earthquake, flooding, wildfire
New and Existing 1, 2, 3, 4, 5, 6, 7 City Administration TBD Low Staff Time, General Funds Ongoing
Action HUM3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Dam Failure, Flood, Wildfire, Earthquake, Drought
New and Existing 3,7,9,10 City Administration TBD Low Staff Time, General Funds Short-term
Action HUM4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Dam failure, flooding, severe weather
New and Existing 3,7,10 City Administration TBD Low Staff Time, General Funds Ongoing
Action HUM5 — Implement Non-Structural Mitigation Measures by burying power lines to reduce damages to electrical lines from high-
winds.
Hazards Mitigated: Severe Weather, Hurricane
New 6,11 City Administration TBD low HMGP, PDM, FMA Short-term
Action HUM6 — Install Backup power system generators to enable critical facilities to continue basic services, which can be used by
critical facilities to ensure security and protect refrigerated goods.
Hazards Mitigated: Severe Weather, Hurricane, Dam Failure, Flood, Wildfire, Earthquake, Drought
New and Existing 11 City Administration TBD Low HMGP, PDM Short-term
Action HUM7 — Improve drainage channels to increase flow rate and increased retention areas.
Hazards Mitigated: Flooding, Severe Weather, Hurricane
New and Existing 7,8,9,10,11, City Administration TBD Moderate HMGP, PDM Long-term
Action HUM8- Harden 911 Communications Center
Hazards Mitigated: Severe Weather, Hurricane, Dam Failure, Flood, Wildfire, Earthquake, Drought
New and Existing 10,11 City Administration TBD Low PDM, HMGP Short-term
Action HUM9 — Retrofit and harden critical infrastructure facilities to withstand severe thunderstorms, hurricane winds and hail
Hazards Mitigated: Severe Weather, Hurricane
New and Existing 10,11,13 City Administration TBD High Grant funds Long-term
Action HUM10 — Develop a public education/outreach program to educate the public on thunderstorms and wildfire hazards and the
appropriate actions to take to protect property and equipment.
Hazards Mitigated: Severe Weather, Wildfire
Existing 1 City Administration TBD Low Staff time, General funds Short term
Action HUM11— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Dam Failure, Flood, Wildfire, Earthquake, Drought
New and Existing 1, 3, 4, 5, 9, 10, 11, 15 Humble HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
11-12
Table 11-15. Mitigation Action Priority
Action #
# of
Objectives
Met Benefits Costs
Do Benefits Equal
or Exceed Costs?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
HUM1 3 Low Medium Yes Yes No Medium Low
HUM2 7 Medium Low Yes No Yes High Low
HUM3 4 Low Low Yes No Yes High Low
HUM4 3 Medium Low Yes No Yes High Low
HUM5 2 High High Yes Yes No Medium Low
HUM6 1 Low Low Yes Yes Yes Low High
HUM7 5 High Medium Yes Yes No High High
HUM8 2 Medium Low Yes Yes Yes Medium High
HUM9 3 High High Yes Yes No High High
HUM10 1 Medium Low Yes No Yes Medium Low
HUM11 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 11-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilient
Community
Capacity
Building
High-Risk Hazards
Severe Weather 1,5,9, 11 1,9 10, 11 7 8, 11 1,6,7,8,9 7 3, 11
Hurricane 1, 5, 9, 11 1, 9 11 7 8, 11 1,6,7,8,9 7 3, 11
Medium-Risk Hazards
Dam Failure 2,4,9, 11 2,4,9 11 8, 11 2,6,8,8 7 2,3,4, 11
Flooding 1,2,4,5,9, 11 1,2,4,9 11 7 8, 11 1,2,6,7,8,9 7 2,3,4, 11
Wildfires 1,2,5,9, 11 1,2,9 10, 11 8, 11 1,2,6,8,9 2,3, 11
Low-Risk Hazards
Earthquake 2,5,9, 11 2,9 11 8, 11 2,6,8,9 2,3, 11
Drought 2,5,9, 11 2,9 11 11 2,9 2,3, 11
a. See the introduction to this volume for explanation of mitigation types.
11.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed for this annex.
• City of Humble Municipal Code — The municipal code was reviewed for the full capability assessment
and for identifying opportunities for action plan integration.
• City of Humble Flood Damage Prevention Ordinance — The flood damage prevention ordinance was
reviewed for compliance with the National Flood Insurance Program.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(§¨¦69§¨¦69HoustonCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.510.25Miles±Humble
§¨¦69
§¨¦69
Houston
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.5 10.25 Miles
±
Humble
§¨¦69
§¨¦69
Houston
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.5 10.25 Miles
±
Humble
§¨¦69
§¨¦69
Houston
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.5 10.25 Miles
±
Humble
§¨¦69
§¨¦69
Houston
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.5 10.25 Miles
±
Humble
§¨¦69
§¨¦69
Houston
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.5 10.25 Miles
±
Humble
§¨¦69
§¨¦69
Houston
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.5 10.25 Miles
±
Humble
12-1
12. CITY OF HUNTERS CREEK VILLAGE
12.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Tom Fullen, City Administrator
1 Hunters Creek Place
Houston, TX 77024
(713) 465-2150
tfullen@cityofhunterscreek.org
James Stewart, Building Official / Director of Public Works.
1 Hunters Creek Place
Houston, TX 77024
(713) 465-2150
jstewart@cityofhunterscreek.org
12.2 JURISDICTION PROFILE
12.2.1 Location
The City of Hunters Creek Village is a municipality in the southwestern area of Harris County. The current
boundaries are generally Lindenwood Drive on the east, Buffalo Bayou and Voss Road on the south, I-10 on the
north, and Hedwig Road on the west. The City encompasses an area of 1.9 square miles.
12.2.2 History
The City of Hunters Creek Village was incorporated in 1954 as a Type-A General Law City. The City of Hunters
Creek Village consists of approximately 1,500 single-family dwellings; one privately owned and members only
social, recreational, and fitness club, one elementary school, two churches, one gas station, one funeral home, one
medical imaging center, and other lots with a variety of independently operated businesses. Through the years the
City has adopted ordinances establishing zoning regulations that have very effectively preserved the characteristics
that are so well known as “the Memorial Villages.” The six Memorial Villages are independent cities that operate
autonomously of Houston. All six of the villages are served by the Village Fire Department. The Memorial Villages
Police Department serves provided Hunters Creek Village, Piney Point Village, and Bunker Hill Village. The other
Villages are served independently. The six villages have executed an inter-local agreement and developed an
emergency management guide for emergency needs.
12.2.3 Climate
The climate of the City of Hunters Creek Village is characterized by relatively high temperatures and
evenly distributed precipitation throughout the year with legendary humidity.
12.2.4 Governing Body Format
The City of Hunters Creek Village is considered a Type-A General Law City and is governed by a Mayor and five
Council Members elected at large. A Type-A General Law City is one that had at the time of its incorporation 600
or more inhabitants. General Law Cities have a population less than 5,000 and are authorized to do only what the
State Constitution or Legislature has authorized.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
12-2
The City Council assumes responsibility for the adoption of this plan; the City Administrator will oversee its
implementation. Table 12-1 lists members of the jurisdiction’s joint local mitigation planning team. Howard Miller,
emergency management coordinator for the Village Fire Department, also participated in planning for the six
Memorial Villages.
Table 12-1. Local Mitigation Planning Team Members
Jurisdiction Name / Title Phone Email
City of Hunters Creek Village Tom Fullen, City Admin. 713-465-2150 tfullen@cityofhunterscreek.org
City of Bunker Hill Village Karen Glynn, City Admin. 713-467-9762 KGlynn@bunkerhilltx.gov
City of Hedwig Village Kelly Johnson, City Admin./Secretary 713-465-6009 kjohnson@hedwigtx.gov
City of Hilshire Village Susan Blevins, City Admin/Secretary.
Efrain Him
713-973-1779 Susan.blevins@hilshirevillagetexas.com
Efrain.him@hdrinc.com
City of Piney Point Village Roger Nelson, City Admin. 713-230-8703 cityadmin@pineypt.org
City of Spring Valley Village Julie Robinson, City Admin.
Arthur Faiello, PW Director
713-465-5306
832-910-8576
jrobinson@springvalleytx.com
afaiello@springvalleytx.com
12.3 CURRENT TRENDS
12.3.1 Population
According to the 2010 Census Data, the population of the City of Hunters Creek Village was 4,367. Since the
1990 Census, the population has been relatively stable.
12.3.2 Development
The City of Hunters Creek Village is continuing to experience residential redevelopment of new, larger homes. City
of Hunters Creek Village is landlocked by other municipalities; therefore there is no growth opportunity.
Table 12-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
12.4 CAPABILITY ASSESSMENT
The City of Hunters Creek Village performed an assessment of its existing capabilities for implementing hazard
mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 12-3.
• Development and permitting capabilities are presented in Table 12-4.
• An assessment of fiscal capabilities is presented in Table 12-5.
• An assessment of administrative and technical capabilities is presented in Table 12-6.
• An assessment of education and outreach capabilities is presented in Table 12-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 12-8.
• Classifications under various community mitigation programs are presented in Table 12-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 12-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
City of Hunters Creek Village
12-3
Table 12-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
N/A
Is your jurisdiction expected to annex any areas during the performance period of this plan?
No
• If yes, describe land areas and dominant uses.
N/A
• If yes, who currently has permitting
authority over these areas?
N/A
Are any areas targeted for development or major redevelopment in the next five years? Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk
areas
The City of Hunters Creek Village is continuing to experience
residential redevelopment of new, larger homes.
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 29 24 10 20 26
Multi-Family N/A N/A N/A N/A N/A
Other (commercial, mixed use, etc.) N/A N/A N/A N/A N/A
Total 29 24 10 20 26
Provide the number of new-construction
permits for each hazard area or provide a qualitative description of where development
has occurred.
• Special Flood Hazard Areas: #N/A
• Landslide: # N/A
• High Liquefaction Areas: # N/A
• Tsunami Inundation Area: # N/A
• Wildfire Risk Areas: # N/A
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory
exists, provide a qualitative description.
The City Hunters Creek Village continues to experience redevelopment of their
residential lots; older homes are demolished and new homes constructed.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
12-4
Table 12-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes Yes Yes No
Comment: International Bldg. Codes / Residential Codes are a State mandate
Zoning Code Yes Yes Yes No
Comment: General Law City
Subdivisions Yes Yes Yes No
Comment: Zoning Ordinance
Stormwater Management Yes Yes Yes No
Comment: TCEQ
Post-Disaster Recovery Yes Yes Yes No
Comment:
Real Estate Disclosure No No No No
Comment:
Growth Management Yes No No No
Comment: Zoning Ordinance
Site Plan Review Yes Yes NO No
Comment: Harris County Flood Control District
Environmental Protection Yes Yes Yes Yes
Comment: TCEQ and EPA
Flood Damage Prevention Yes Yes No No
Comment: Harris County Flood Control District
Emergency Management Yes Yes No No
Comment: Village Fire Department / Harris County
Climate Change No No No No
Comment:
Planning Documents
General Plan NA NA NA NA Comment:
Capital Improvement Plan Yes No No Yes
How often is the plan updated? Annually
Comment:
Disaster Debris Management Plan Yes Yes No Yes
Comment: Harris County
Floodplain or Watershed Plan Yes Yes No Yes
Comment: Harris County Flood Control District
Stormwater Plan Yes Yes Yes Yes
Comment: Harris County Flood Control District
Urban Water Management Plan Yes No No No
Comment: Harris County Flood Control District
Habitat Conservation Plan No Yes Yes No
Comment: TCEQ and EPA
Economic Development Plan No No No No
Comment:
Shoreline Management Plan No No No No
Comment:
City of Hunters Creek Village
12-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Community Wildfire Protection Plan Yes No No Yes
Comment: Village Fire Department
Forest Management Plan Yes No No Yes
Comment: City Ordinance
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes Yes No Yes
Comment: Village Fire Department
Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes No Yes
Comment: Village Fire Department
Post-Disaster Recovery Plan Yes Yes No Yes
Comment: Harris County
Continuity of Operations Plan No No No No
Comment:
Public Health Plan Yes Yes Yes Yes
Comment: City Ordinance and Texas Department of Health
Table 12-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Building Department
Does your jurisdiction have the ability to track permits by hazard area? Yes
Does your jurisdiction have a buildable lands inventory? Yes
Table 12-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants No
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
12-6
Table 12-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes CobbFendley Associates
Engineers or professionals trained in building or infrastructure construction practices Yes Building Official
Planners or engineers with an understanding of natural hazards Yes CobbFendley Associates
Staff with training in benefit/cost analysis Yes City Administrator
Surveyors Yes CobbFendley Associates
Personnel skilled or trained in GIS applications Yes CobbFendley Associates
Scientist familiar with natural hazards in local area No n/a
Emergency manager Yes City Administrator
Grant writers Yes CobbFendley Associates
Table 12-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. Links to County Agencies
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. Email / Text Alerts
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe. N/A
Do you have any other programs already in place that could be used to
communicate hazard-related information?
Yes
• If yes, briefly describe. Mayor / Council
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Vlinc Email / Text Alerts
City of Hunters Creek Village
12-7
Table 12-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Building Depart / City Engineer
Who is your floodplain administrator? (department/position) City Engineer
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? 2001
Does your floodplain management program meet or exceed minimum requirements? Meets
• If exceeds, in what ways? N/A
When was the most recent Community Assistance Visit or Community Assistance Contact? N/A
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are. N/A
Are any RiskMAP projects currently underway in your jurisdiction? Yes
• If so, state what they are. Outfall Rehabilitation
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why. N/A
Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes
• If so, what type of assistance/training is needed? CFM
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification? N/A
• If no, is your jurisdiction interested in joining the CRS program? Yes
How many flood insurance policies are in force in your jurisdiction?a 788
• What is the insurance in force? $270,932,500
• What is the premium in force? $336,552
How many total loss claims have been filed in your jurisdiction?a Unknown
• How many claims are still open or were closed without payment? Unknown
• What were the total payments for losses? $17,794,549
a. According to FEMA statistics as of March 28, 2019
Table 12-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule Yes 5 2017
Public Protection No N/A N/A
Storm Ready No N/A N/A
Firewise Yes 1 2017
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
12-8
Table 12-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted High
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Unknown
Comment:
Local residents support of adaptation efforts Unknown
Comment:
Local residents’ capacity to adapt to climate impacts Unknown
Comment:
Local economy current capacity to adapt to climate impacts Unknown
Comment:
Local ecosystems capacity to adapt to climate impacts Unknown
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Hunters Creek Village
12-9
12.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
12.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Capital Improvement Plan – Studies existing infrastructure and allows planning of activities and
projects to improve that infrastructure to mitigate identified hazards.
• Disaster Debris Management Plan – Outlines actions to quickly remove hazards associated with
disaster debris.
• Floodplain or Watershed Plan – Ensures compliance with Federal Guidelines and Building Codes to
eliminate potential hazards associated with flooding.
• Storm Water Plan – Identification and repair of potential hazards associated with Storm water
Infrastructure
12.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Building and Zoning Codes – Allows the review and mitigation of potential hazards during the planning
and construction process.
• Site Plan Review – Gives the City the ability to review potential hazards and have them corrected before
permitting.
• Flood Damage Prevention – Review and update the City’s Flood Damage Prevention Ordinance to
include more stringent guidelines to reduce flood losses.
12.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 12-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of
Hunters Creek Village. Other hazard events that broadly affected the entire planning area, including the City of
Hunters Creek Village, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 12-11. Past Natural Hazard Events
Date Damage Assessment
Hurricane Harvey DR4332 2017 N/A
Flooding DR 4269 2016 N/A
Flooding DR 4272 2016 N/A
Hurricane Ike 1791 DR 2008 N/A
Hurricane Rita 1606 DR 2005 N/A
Tropical Storm Allison 1379 DR 2001 N/A
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
12-10
12.7 HAZARD RISK RANKING
Table 12-12 presents a local ranking for the City of Hunters Creek Village of all hazards of concern for which this
hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Table 12-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Hurricane/Coastal Storm 48 High
1 Severe Weather 48 High
2 Flooding 18 Medium
3 Earthquake 14 Low
4 Drought 6 Low
4 Dam/Levee Failure 6 Low
4 Mass Movements 6 Low
5 Wildfire 0 (No Exposure) None
5 Coastal Erosion 0 (No Exposure) None
5 Tsunami 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
12.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
12.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 30
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 1
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 3
12.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Flooding potential from close proximity to Buffalo Bayou
• Severe tree damage potential from Hurricanes/Tornadoes
Mitigation actions addressing these issues were prioritized for consideration in the action plan for this annex.
12.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 12-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
City of Hunters Creek Village
12-11
Table 12-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update
2014HNTCRK001 Implement a Public Outreach Program on Flooding to
Educate residents on actions to reduce residential property damage.
No
2014HNTCRK002 Develop new drainage ordinance to require detention for
future development and redevelopment for detention.
No
2014HNTCRK003 Strengthen Building Codes/Ordinances relative to job site (construction), debris removal management & removal of dead trees. No
2014HNTCRK004 Develop a tree management program to limit debris damage
to critical infrastructure, public facilities from falling tree canopy due to high winds.
Yes HNT9
2014HNTCRK005 Harden and retrofit critical infrastructure facilities to
withstand high wind damages.
No
2014HNTCRK006 Improve and enhance regulations with higher-
standards/attest building codes for facilities to withstand severe
thunderstorms, high winds and hail.
No
2014 HNTCRK007 Retrofit City Hall and Public Works Maintenance Building with lightning and surge protection measures. Yes HNT8
2014HNTCRK014 Enhance use if upgraded warning system CodeRED using citywide mass notification system to enhance coverage of the community’s
population.
No
2014HNTCRK015 Install cover and freeze insulation protection of above ground irrigation and FDC connections in public facilities. Yes
2014HNTCRK020 Develop and adopt higher-standard/latest edition construction codes and ordinances to protect structures from severe wind
damage.
Yes HNT5
2014HNTCRK009 Implement a Public Education/Outreach Program on Extreme Heat to educate residents on actions to reduce property damage and health impacts within the community.
NO
2014HNTCRK010 Improve public facility emergency power (by installing generators) to provide adequate cooling for use as a cooling center. No
12.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 12-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 12-15
identifies the priority for each action. Table 12-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
12-12
Table 12-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action HNT1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire
Existing 3, 4, 10 Hunters Creek FEMA High HMGP, PDM, FMA Short-term
Action HNT2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including Capital Improvements Plan, Zoning Ordinances
Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire
New and Existing 1, 3, 4, 5, 7, 8, 10 Hunters Creek Harris County Low Staff Time, General Funds Ongoing
Action HNT3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Hurricane/Coastal Storm, Severe Weather, Flooding, Earthquake, Drought, Dam/Levee Failure, Mass Movements
New and Existing 1, 5, 8 Harris County Hunters Creek Low Staff Time, General Funds Short-term
Action HNT4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise
New and Existing 1, 3, 5, 7, 8, 10 Hunters Creek FEMA Low Staff Time, General Funds Ongoing
Action HNT5 — Strengthen existing Building Codes and Ordinances by adoption of updated/current Model Codes
Hazards Mitigated: Hurricane/Coastal Storm, Earthquake, Flood, Wildfire
New and Existing 4, 12, 14, 15 Hunters Creek Low Staff Time/General Funds Short-term
Action HNT6 — Video inspection of City’s Storm Sewer System to identify and correct potential hazards.
Hazards Mitigated: Flooding, Coastal Erosion, Mass Movements
Existing 8, 10, 11 Hunters Creek Medium Staff Time/General Funds Ongoing
Action HNT7 — Enhance the dissemination of Public Information with the use of the City’s V Link program.
Hazards Mitigated: Hurricane/Coastal Storm, Severe Weather, Flooding, Earthquake, Drought, Dam/Levee Failure, Mass MovementsAll
hazards
New and Existing 1, 3, 9 Hunters Creek Police Department Low Staff Time/General Funds Ongoing
Action HNT8 — Retrofit Public Works Maintenance Building with Back-Up Power Generator
Hazards Mitigated: Hurricane/Coastal Storm, Earthquake, Flood
New 1, 9, 11, 13 Hunters Creek Medium General Funds Short-term
Action HNT9 — Development of a Tree Management Program to limit potential damage to critical infrastructure from falling trees or
limbs.
Hazards Mitigated: Hurricane/Coastal Storm, Earthquake, Wildfire
New 5, 6, 7, 8 Hunters Creek Low Staff Time Short-term
Action HNT10— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Hurricane/Coastal Storm, Severe Weather, Flooding, Earthquake, Drought, Dam/Levee Failure, Mass Movements
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
Hunters Creek HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
City of Hunters Creek Village
12-13
Table 12-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits
Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under
Existing Programs/
Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
HNT1 3 High High Yes Yes No Medium High
HNT2 7 Medium Low Yes No Yes High Low
HNT3 3 Low Low Yes No Yes High Low
HNT4 6 Medium Low Yes No Yes High Low
HNT5 4 High Low Yes No Yes High Low
HNT6 3 High High Yes Yes Yes High Low
HNT7 3 High Low Yes No Yes High Low
HNT8 4 Medium Medium Yes No Yes Medium Low
HNT9 4 Medium Low Yes No Yes Medium Low
HNT10 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 12-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Hurricane/
Coastal Storm
HNT1, HNT3,
HNT4, HNT5,
HNT9, HNT10
HNT1, HNT3,
HNT4, HNT5,
HNT8, HNT9
HNT3, HNT4,
HNT7, HNT10
HNT1, HNT3,
HNT4, HNT5,
HNT9
HNT3, HNT7,
HNT8,
HNT10
HNT1, HNT3,
HNT5, HNT8
HNT3 HNT3,
HNT7,
HNT10
Severe Weather HNT1, HNT3,
HNT4, HNT5,
HNT9, HNT10
HNT1, HNT3,
HNT4, HNT5,
HNT8, HNT9
HNT3, HNT4,
HNT7, HNT10
HNT1, HNT3,
HNT4, HNT5,
HNT9
HNT3, HNT7,
HNT8,
HNT10
HNT1, HNT3,
HNT5, HNT8
HNT3 HNT3,
HNT7,
HNT10
Medium Risk Hazards
Flooding HNT1, HNT2,
HNT3, HNT4,
HNT5, HNT6,
HNT10
HNT1, HNT2,
HNT3, HNT4,
HNT5, HNT6,
HNT8
HNT3, HNT4,
HNT7, HNT10
HNT1, HNT2,
HNT3, HNT4,
HNT5, HNT6
HNT 3,
HNT7, HNT8
HNT10,
HNT1, HNT2,
HNT3, HNT5,
HNT6, HNT8
HNT3 HNT3,
HNT7,
HNT10
Low-Risk Hazards
Mass Movements HNT1, HNT2,
HNT3, HNT6,
HNT10
HNT1, HNT2,
HNT3, HNT6
HNT3, HNT7,
HNT10
HNT1, HNT2,
HNT3, HNT6
HNT3, HNT7,
HNT10
HNT1, HNT2,
HNT3, HNT6
HNT3 HNT3,
HNT7,
HNT10
Earthquake HNT1, HNT2,
HNT3, HNT5,
HNT9, HNT10
HNT1, HNT2,
HNT3, HNT5,
HNT8, HNT9
HNT3, HNT7,
HNT10
HNT1, HNT2,
HNT3, HNT5,
HNT9
HNT3, HNT7,
HNT8,
HNT10
HNT1, HNT2,
HNT3, HNT5,
HNT8
HNT3 HNT3,
HNT7,
HNT10
Drought HNT2, HNT3,
HNT10
HNT2, HNT3 HNT3, HNT7,
HNT10
HNT2, HNT3 HNT3, HNT7,
HNT10
HNT2, HNT3 HNT3 HNT3,
HNT7,
HNT10
Dam/Levee
Failure
HNT2, HNT3,
HNT10
HNT2, HNT3 HNT3, HNT7,
HNT10
HNT2, HNT3 HNT3, HNT7,
HNT10
HNT2, HNT3 HNT3 HNT3,
HNT7,
HNT10
a. See the introduction to this volume for explanation of mitigation types.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
12-14
12.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• The City of Hunters Creek Village Municipal Code — The municipal code was reviewed for the full
capability assessment and for identifying opportunities for action plan integration.
• The City of Hunters Creek Village Flood Damage Prevention Ordinance — The flood damage
prevention ordinance was reviewed for compliance with the National Flood Insurance Program.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
!(!(!(!(!(§¨¦10§¨¦10HoustonSpring ValleyHilshireVillageHedwigVillagePiney PointVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.20.40.1Miles±Hunters Creek Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hilshire
Village
Hedwig
Village
Piney Point
Village
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Hunters Creek Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hilshire
Village
Hedwig
Village
Piney Point
Village
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Hunters Creek Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hilshire
Village
Hedwig
Village
Piney Point
Village
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Hunters Creek Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hilshire
Village
Hedwig
Village
Piney Point
Village
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Hunters Creek Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hilshire
Village
Hedwig
Village
Piney Point
Village
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Hunters Creek Village
§¨¦10 §¨¦10
Houston
Spring Valley
Hilshire
Village
Hedwig
Village
Piney Point
Village
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Hunters Creek Village
13-1
13. CITY OF JERSEY VILLAGE
13.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Mark Bitz, Fire Chief / EMC
16501 Jersey Drive
Jersey Village, Texas 77040
Telephone: 713-466-2130
e-mail Address: mbitz@jerseyvillagetx.com
Austin Bleess, City Manager
16501 Jersey Drive
Jersey Village, TX 77040
Telephone: 713-466-2109
e-mail Address: Ableess@jerseyvillagetx.com
13.2 JURISDICTION PROFILE
13.2.1 Location
Jersey Village is in Northwest Harris County. The current boundaries generally extend from Highway 290 at Sam
Houston Tollway West to Eldridge Parkway from FM 529 North up Jones Road to the 8800 block, from the Sam
Houston Tollway to Eldridge Parkway, encompassing an area of 3.5 square miles.
13.2.2 History
City of Jersey Village was incorporated in April 16, 1956. The 1936 Harris County highway map indicated
several residences in the area. Clark W. Henry owned 1,236 acres of land on which he operated F&M Dairy and
raised Jersey cattle. Henry discontinued his dairy when his health declined, and he gave the land up so a
residential community could be built in 1953. Henry and LeRoy Kennedy, members of the Garden Oaks Baptist
Church, began developing the community in February 1954. At first the city had 5 miles of streets and drainage,
gas, sewage, and water services. Several houses were established along Jersey Drive. The first family moved to
the subdivision in late October 1954. The community developed a school, a park, and an 18-hole golf course.
When Jersey Village incorporated on April 16, 1956, all 58 votes were in favor of incorporation and a volunteer
police force. Because of the incorporation, Houston did not incorporate Jersey Village’s territory into its city
limits.
13.2.3 Climate
The climate of Jersey Village is humid subtropical.
13.2.4 Governing Body Format
Jersey Village has a home rule charter and a council manager form of government. The city manager acts as the
city’s chief executive officer. The council, consisting of the mayor and five elected members, serves as the city’s
legislative body and votes on matters related to city government. The mayor and each council member have two
year terms. Each member is limited to four terms as mayor, council member, or both. The mayor votes if the city
council has a tie vote. The city manager has no voice in the city council; the city manager attends all council
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
13-2
meetings and provides advice. The city manager manages all city affairs assigned to the city manager by the
charter, implements city council directives, and ordinances. The city manager also manages and directs the city
organization and employees.
The City of Jersey Village assumes responsibility for the adoption of this plan; City of Jersey Village will oversee
its implementation. Development of this annex was carried out by the members of the local mitigation planning
team, whose members are listed in Table 13-1.
Table 13-1. Local Mitigation Planning Team Members
Name Title
Mark Bitz Fire Chief / EMC
Austin Bleess City Manager
Eric Foerster Police Chief / Deputy EMC
Jason Alfaro Parks and Recreation Director
Isabel Kato Finance Director
13.3 CURRENT TRENDS
13.3.1 Population
According to United States Census Bureau the population of The City of Jersey Village as of January 2010 was
7620. Since 2010, the population has grown at an average annual rate of 11 percent. The population was 7,620 at
the 2010 Census. The 2018 Population Estimate is 7,962.
1.3.2 Development
The City of Jersey Village has become more aggressive in the last few years to diversify the local economy. By
utilizing tax incentives the city has attracted two new employers to the community that have diversified and
expanded our local tax base. This has helped to shift some of the burden away from property taxes.
Over the last few years the residential property tax base has increased at an average rate of 5% since 2016. We
have seen a marked decrease in industrial personal property value. Back in 2016 the city lost a major
manufacturing operation which removed nearly $200,000,000 in valuation from our community.
In 2017 the City created a Tax Increment Reinvestment Zone to help spur new development in an underdeveloped
area. This development is just taking root and will be two years before the city sees the benefits from this.
Overall the city is on an upward trajectory and is positioning itself well for an increase in economic development
in the coming years.
Table 13-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
City of Jersey Village
13-3
Table 13-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
Is your jurisdiction expected to annex any areas during the performance period of this plan?
No
• If yes, describe land areas and dominant uses.
• If yes, who currently has permitting
authority over these areas?
Are any areas targeted for development or major redevelopment in the next five years? Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk
areas
Jones Road area south of 290
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 4 32 30 29 11
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.) 4 – Co
m
2-com 1-com 7-com 1-com
Total 8 34 31 36 12
Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development
has occurred.
• Special Flood Hazard Areas: 43
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s
buildable lands inventory. If no such inventory exists, provide a qualitative description.
93%
13.4 CAPABILITY ASSESSMENT
The City of Jersey Village performed an assessment of its existing capabilities for implementing hazard
mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 13-3.
• Development and permitting capabilities are presented in Table 13-4.
• An assessment of fiscal capabilities is presented in Table 13-5.
• An assessment of administrative and technical capabilities is presented in Table 13-6.
• An assessment of education and outreach capabilities is presented in Table 13-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 13-8.
• Classifications under various community mitigation programs are presented in Table 13-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 13-10.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
13-4
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Table 13-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes Yes
Comment: International Building Code, Code of Ordinances Chapter 14 Article VIII
Zoning Code Yes No Yes Yes
Comment: Code of Ordinances – Chapter 14 Article IV
Subdivisions Yes Yes Yes Yes
Comment: Chapter 14 Article III and Article IX
Stormwater Management Yes Yes Yes Yes
Comment: Code of Ordinances Chapter 14 Article XXI
Post-Disaster Recovery Yes Yes Yes Yes
Comment: Annex J – Harris County Basic Plan – Recovery and post-disaster permitting and code enforcement regulations.
Real Estate Disclosure N/A N/A N/A N/A
Comment:
Growth Management Yes Yes No Yes
Comment: Code of Ordinances Chapter 14 Article I Section 14-3
Site Plan Review Yes Yes No Yes
Comment: Code of Ordinances Chapter 14 Article 1 Section 14-6
Environmental Protection Yes Yes Yes Yes
Comment: Chapter 14 Article IX
Flood Damage Prevention Yes Yes Yes Yes
Comment: Code of Ordinances Chapter 14 Article IX
Emergency Management Yes Yes Yes Yes
Comment: Code of Ordinances Chapter 22 Article II
Climate Change N/A N/A N/A N/A
Comment:
Planning Documents
General Plan Yes Yes No Yes
Comment: Comprehensive Plan adopted February 15, 2016
Capital Improvement Plan Yes Yes No Yes
How often is the plan updated? Annual Basis Comment:
Disaster Debris Management Plan Yes Yes No Yes
Comment: Contracts and memorandums of understanding are reviewed on an annual basis
Floodplain or Watershed Plan Yes Yes No Yes
Comment: Chapter 14 Article IX
Stormwater Plan Yes Yes No Yes
Comment: Chapter 14 Article IX and Article XXI
Urban Water Management Plan Yes Yes No Yes
Comment: Chapter 14 Article XXI
Economic Development Plan Yes Yes No Yes
Comment: TIRZ – June 2017
City of Jersey Village
13-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Shoreline Management Plan N/A N/A N/A N/A
Comment:
Community Wildfire Protection Plan No Yes No Yes
Comment: The City of Jersey Village does not have its own CWPP implemented. Harris County has completed a county-wide CWPP;
which includes all incorporated jurisdictions within Harris County.
Forest Management Plan N/A N/A N/A N/A
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes Yes No Yes
Comment: Annex P – Hazard Mitigation and Hazard Summaries in Basic Plan.
Threat & Hazard Identification & Risk Assessment (THIRA) No Yes Yes Yes
Comment: A regional THIRA is conducted on an annual basis for UASI and HGAC.
Post-Disaster Recovery Plan Yes No No Yes
Comment: Annex J – Recovery is required for local jurisdictions to address local recovery programs, damage assessments, Public
Assistance and Individual Assistance programs.
Continuity of Operations Plan Yes No No Yes
Comment: Government Code 418 grants political subdivisions the option to adopt plans for continuity of functions but is not mandated.
The City of Jersey Village does have department Continuity of Operations Plans.
Public Health Plan Yes Yes Yes Yes
Comment: Annex H – Health and Medical is a component of the Emergency Operations Plan and addresses public health,
environmental health, and medical response capabilities. The City does not maintain a standalone Public Health Plan.
Table 13-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Community Development / Public Works
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? Yes
Table 13-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants No
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes Water and Sewer
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
13-6
Table 13-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Community Development / Public Works
Engineers or professionals trained in building or infrastructure construction practices Yes Permits and Inspections / Community
Development / Public Works
Planners or engineers with an understanding of natural hazards Yes Community Development / Public Works
Staff with training in benefit/cost analysis Yes City Manager’s Office / Public Works /
Finance
Surveyors No
Personnel skilled or trained in GIS applications No
Scientist familiar with natural hazards in local area No
Emergency manager Yes Emergency Manager’s Office
Grant writers Yes Multiple Departments
Table 13-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. The website provides links to all of our plans
including flood plan and comprehensive plan just to
name two.
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. We posted recently the Hazard Mitigation Process
for public remarks on Facebook and Twitter
Do you have any citizen boards or commissions that address issues related
to hazard mitigation?
No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. Website and Social Media
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Social Media and Storm Siren
City of Jersey Village
13-7
Table 13-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Permits / Inspections / Public Works /
Community Development
Who is your floodplain administrator? (department/position) Administration and Public Works
City Manager and Public Works Director
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? February 2019
Does your floodplain management program meet or exceed minimum requirements? Exceeds
• If exceeds, in what ways? Higher than base flood requirements / 18”
higher than base.
When was the most recent Community Assistance Visit or Community Assistance
Contact?
March 2019
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? No
• If no, state why. FEMA has not updated the maps in years
Does your floodplain management staff need any assistance or training to support its
floodplain management program?
Yes
• If so, what type of assistance/training is needed? Communication to start. No one will return
calls for assistance
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification?
• If no, is your jurisdiction interested in joining the CRS program? Yes
How many flood insurance policies are in force in your jurisdiction? 1352
• What is the insurance in force? $414,351,300
• What is the premium in force? $1,094,188
How many total loss claims have been filed in your jurisdiction?a 856
• How many claims are still open or were closed without payment? 82
• What were the total payments for losses? $46,383,754
Table 13-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No
Building Code Effectiveness Grading Schedule Yes 4 October 23, 2018
Public Protection Yes 2 November 2015
Storm Ready No
Firewise No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
13-8
Table 13-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Jersey Village
13-9
13.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
13.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• We have started flood mitigation efforts in our city by working to install a BERM around portions of our
golf course to prevent water runoff into the storm system.
• We are working to improve storm sewer upgrades to one main street in our city as part of the flood
mitigation.
• We have received Federal Funding to elevate 18 homes in our city. RFP’s have been received from
potential contractors and three contractors have been chosen to oversee this project. Residence have been
chosen to have their homes elevated. They now have the option of choosing one of the three selected
contractors to begin the work.
13.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• We plan to apply for more federal funding on an annual basis to elevate homes and for other related flood
mitigation projects.
13.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 13-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Jersey
Village. Other hazard events that broadly affected the entire planning area, including City of Jersey Village are
listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 13-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Alicia DR-689 March 18-20 Declared August 19, 1983 N/A
Major Storm DR-937 March 4-30 – Declared March 20, 1992 N/A
Major Storm DR – 1041 October 17, 1994 N/A
Tropical Storm Frances DR – 1245 September 22, 1998 N/A
Tropical Storm Allison DR – 1379 June 5-20 Declared June 9, 2001 N/A
Hurricane Ike EM – 3294 /
DR – 1791
September 9, 2008 / September 12, 2008 $3,159,150
Tax Day Floods R – 4269 April 17-30 Declared April 25, 2016 N/A
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
13-10
13.7 HAZARD RISK RANKING
Table 13-12 presents a local ranking for City of Jersey Village of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Table 13-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Flooding 42 High
3 Earthquake 14 Low
4 Drought 6 Low
4 Wildfire 6 Low
5 Mass Movement 0 (No Exposure) None
5 Tsunami 0 (No Exposure) None
5 Dam Failure 0 (No Exposure) None
5 Coastal Erosion 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
13.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
13.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 155
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 10
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 4
13.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Homes in flood prone areas are vulnerable to repetitive flooding. We are working to elevate multiple
homes
• Homes in flood prone areas have also had repetitive flooding. Homes with repetitive flooding are being
review now to potentially buy out and then rebuild to our current flood plain management plan to elevate
new hones when built.
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
City of Jersey Village
13-11
13.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 13-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 13-13. Status of Previous Plan Actions
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
Retrofit Critical Infrastructure with Backup Generation X
Comment: Two Water Plants require backup generators
Electric Surge Protection on Public Infrastructure X
Comment: City Facilities and Critical Infrastructure should be protected from severe storms that produce lightning
Community Rating System Participation X
Comment: We are actively working on this item.
Golf Course Water Detention Upgrade X
Comment:
Add Impact Glazing to the International Electrical Conservation Code X
Comment:
Implement a Tree Management Program X
Comment: This program will help during times of Hurricanes to prevent trees from falling in city streets
Add an Ordinance to add Safe Rooms in Homes X
Comment: The addition of safe rooms in homes would be an ideal way to protect residents from unexpected occurrence of Tornadic
Activity
Review Current City Infrastructure for Tornadic Impact X
Comment: Review Current city facilities to determine if they can handle impact from a Tornado
Identify and Protect vulnerable city assets from Hail X
Comment: This mostly would be vehicles an equipment outside and not under protective covers. Vehicles etc.
Installation of water supply to area without current water X
Comment: The area south of our city in our ETJ and an area we could eventually annex, has 85% of the area without city water.
Install Wind Monitoring Equipment X
Comment: In an effort to monitor wind conditions conducive to wildfires, we would look to install wind monitoring stations throughout
the city.
Implement waste water reuse program to water golf course X
Comment: We are actively working on this item
Improve water lines X
Comment: This ongoing project will review current water lines and replace them as we replace other infrastructure like streets and
sewer
Heat Index on Website X
Comment: After updating the city website, we will look at ways to like National Weather Service and other easy links to help the
community during storm conditions. We have this on our flood information page:
https://www.jerseyvillagetx.com/page/city.flood_control
Install Cooling area during times of power loss X
Comment: We will look at current city facilities to identify areas where we could implement cooling areas during power loss
Develop a Winter Storm Protocol for response during winter storms X
Comment: This would be to work with other agencies to develop a common protocol of response during winter emergencies.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
13-12
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
Purchase a trailer with road barricades and cones for traffic control X
Comment: During Icy conditions, it is very difficult to block roadways. This trailer would help to implement safety zones on freeways
and roadways and keep vehicles out of the path of moving traffic during icy conditions.
Develop Ordinance for Hazardous Material Storage on Residential Property X
Comment: This would provide direction to residents on how they should store Gasoline and other chemicals used around the home to
prevent Hazardous or toxic release.
Upgrade and move all business pre-plans to computer X
Comment: Business Pre-plans are currently in paper form. The goal is to move all these to computer.
Develop a Detailed Pipeline Risk Map X
Comment: To have a better understanding of all pipelines running through the city and what hazards they are. We have GIS data for
all of the pipeline easements through JV.
Develop a yearly inspection of pipelines X
Comment: To work with pipeline companies to develop an inspection program which will help us to monitor the pipelines running
through our city.
13.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 13-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 13-15
identifies the priority for each action. Table 13-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 13-14. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action JRV1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Severe Weather, Hurricane, flooding
Existing 9, 10,11, 12, 15 City Administration TBD High HMGP, PDM, FMA Short-term
Action JRV2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community
Hazards Mitigated: Severe Weather, Hurricane, drought, earthquake, flooding, wildfire
New and Existing 10 City Administration TBD Low Staff Time, General
Funds
Ongoing
Action JRV3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire
New and Existing 1, 5, 8 City Administration TBD Low Staff Time, General
Funds
Short-term
City of Jersey Village
13-13
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action JRV4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Severe Weather, Hurricane, Flooding
New and Existing 1, 3, 5, 7, 8, 10 City Administration TBD Low Staff Time, General
Funds
Ongoing
Action JRV5 — Elevation of Pre-Existing Homes that are prone to repetitive flooding
Pre-Disaster Mitigation, Hazard Mitigation Grant Program, Flood Mitigation Assistance Program
National Flood Insurance Program (Increased Cost of Compliance), Housing and Urban
Development – Disaster Recovery Initiative
Project Schedule/Completion Timeframe: 10 Years
Hazards Mitigated: Flooding, Severe Weather, Hurricane
New 11, 12 Jersey Village TBD High Grant Funding 10 years
Action JRV6 — Demolition of existing homes that are prone to repetitive flooding.
Pre-Disaster Mitigation, Hazard Mitigation Grant Program, Flood Mitigation Assistance Program
National Flood Insurance Program (Increased Cost of Compliance), Housing and Urban
Development – Disaster Recovery Initiative
Project Schedule/Completion Timeframe: 10 years
Hazards Mitigated: Flooding, Severe Weather, Hurricane
New 11, 12 Jersey Village TBD High Grant Funding 10 years
Action JRV7 – Retrofit Critical Infrastructure with Backup Generation
Hazards Mitigated: Severe Weather, Hurricane, Earthquake
Existing 10,11,13 Jersey Village TBD High Grant funding Long term
Action JRV8 – Electric Surge Protection on Public Infrastructure
Hazards Mitigated: Severe Weather
Existing 10,11,13 Jersey Village TBD Medium Grant funding Short term
Action JRV9 – Community Rating System Participation
Hazards Mitigated: Flooding
Existing 9,14 Jersey Village TBD Staff time General funds Short term
Action JRV10 – Golf Course Water Detention Upgrade
Hazards Mitigated: Drought
Existing 7,8,10,11 Jersey Village TBD Medium General and grant funding Short term
Action JRV11 – Add Impact Glazing to the International Electrical Conservation Code
Hazards Mitigated: Severe Weather, Hurricane
New and Existing 3,9,12,13 Jersey Village TBD Low General funds Short term
Action JRV12 – Implement a Tree Management Program
Hazards Mitigated: Severe Weather, Hurricane, Wildfire
New and Existing 2,7 Jersey Village TBD Low General funds Short term
Action JRV13 – Add an Ordinance to add Safe Rooms in Homes
Hazards Mitigated: Severe Weather, Hurricane, Earthquake
New and existing 4, 9, 10, 11,12, 15 Jersey Village TBD Low General funds Short term
Action JRV14 – Identify and Protect vulnerable city assets from Hail
Hazards Mitigated: Severe Weather
Existing 13 Jersey Village TBD Medium General and grant funds Long term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
13-14
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action JRV15 – Installation of water supply to area without current water
Hazards Mitigated: Drought
Existing 2,7 Jersey Village TBD High General funds Long term
Action JRV16 – Install Wind Monitoring Equipment
Hazards Mitigated: Severe Weather, Hurricane
Existing 9, 11 Jersey Village TBD Medium General Short term
Action JRV17 – Implement waste water reuse program to water golf course
Hazards Mitigated: Drought
Existing 2, 5, 7 Jersey Village TBD Medium General and grant funds Short term
Action JRV18 – Heat Index on Website
Hazards Mitigated: Severe Weather
Existing 1,4, 11 Jersey Village TBD Low Staff time Short term
Action JRV19 – Install Cooling area during times of power loss
Hazards Mitigated: Severe Weather, Hurricane
Existing 4, 10 Jersey Village TBD Medium General and grant funds Short term
Action JRV20 – Develop a Winter Storm Protocol for response during winter storms
Hazards Mitigated: Severe Weather
Existing 3, 4, 9 Jersey Village TBD Low Staff time Short term
Action JRV21 – Purchase a trailer with road barricades and cones for traffic control
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire
New 6, 9 Jersey Village TBD Medium General or grant funds Short term
Action JRV22 – Develop Ordinance for Hazardous Material Storage on Residential Property
Hazards Mitigated: Hazardous material incidences, flooding
Existing 2, 3, 7,8 Jersey Village TBD Low Staff time Short term
Action JRV23 – Upgrade and move all business pre-plans to computer
Hazards Mitigated: Severe Weather, Hurricane, Earthquake
Existing 10 Jersey Village TBD Low Staff time Short term
Action JRV24 – Develop a Detailed Pipeline Risk Map
Hazards Mitigated: Pipeline incident
Existing 3, 9 10, 11 Jersey Village TBD Low General funds Short term
Action JRV25 – Develop a yearly inspection of pipelines
Hazards Mitigated: Pipeline incident
Existing 3, 9 10, 11 Jersey Village TBD Low General funds Short term
Action JRV26— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
Jersey Village HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
City of Jersey Village
13-15
Table 13-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
JRV1 5 High High Yes Yes No Medium High
JRV2 1 Medium Low Yes No Yes High Low
JRV3 3 Low Low Yes No Yes High Low
JRV4 3 Medium Low Yes No Yes High Low
JRV5 2 High High Yes Yes No High High
JRV6 2 High High Yes Yes No High High
JRV7 3 High High Yes Yes No High High
JRV8 3 High Medium Yes Yes No High High
JRV9 2 Medium Low Yes No Yes Medium Low
JRV10 4 Medium Medium Yes No Yes Low Low
JRV11 4 Medium Low Yes No Yes Medium Low
JRV12 2 Medium Low Yes No Yes Medium Low
JRV13 6 Medium Low Yes No Yes Low Low
JRV14 1 Medium Medium Yes Yes Yes Medium Medium
JRV15 2 High High Yes Yes Yes High High
JRV16 2 Medium Medium Yes Yes No Medium Medium
JRV17 3 Medium Medium Yes No Yes Medium Low
JRV18 3 Medium Low Yes No Yes Medium Low
JRV19 2 Medium Medium Yes Yes No Medium Medium
JRV20 3 Medium Low Yes No Yes Medium Low
JRV21 2 Medium Medium Yes Yes No Medium Medium
JRV22 4 Medium Low Yes No Yes Medium Low
JRV23 1 High Low Yes No Yes High Low
JRV24 4 High Low Yes No Yes High Low
JRV25 4 High Low Yes No Yes High Low
JRV26 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
13-16
Table 13-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather JV5, 6, 7, 8, 12,
14, 16, 18, 19,
20, 22, 26
JV1, 4, 5, 6,
14
JV16, 18, 26 JV14, 16,
20, 21, 26
JV1, 5, 6, 7,
8
JV7, 13, 19 JV2, 3, 14,
20, 23, 26
Hurricane JV5, 6, 7, 8, 16,
19, 26
JV1, 4, 5, 6 JV16, 26 JV21, 26 JV1, 5, 6, 7,
8
JV7, 19 JV2, 3, 23,
26
Flooding JV5, 6, 7, 26 JV1, 4, 5, 6 JV26 JV10, 22 JV21, 26 JV1, 5, 6, 7,
8, 10
JV7, 9, 10 JV2, 3, 9, 26
Low-Risk Hazards
Earthquake JV7, 8, 26 JV26 JV21, 26 JV2, 3, 23,
26
Drought JV26 JV26 JV15, 17 JV26 JV15 JV15 JV2, 3, 26
Wildfire JV12, 26 JV26 JV12 JV1, 26 JV1 JV12 JV2, 3, 26
ta. See the introduction to this volume for explanation of mitigation types.
13.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
13.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• Jersey Village Municipal Code of Ordinances — The municipal code was reviewed for the full
capability assessment and for identifying opportunities for action plan integration.
• Jersey Village Flood Damage Prevention Ordinance — The flood damage prevention ordinance was
reviewed for compliance with the National Flood Insurance Program.
• Jersey Village International Building, Electrical, Fire, Mechanical, Residential codes – The city
adopted codes were used to identify specific regulatory capabilities.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• The Internet was used for fact gathering n specific city information for this report. Specifically for
population, census, area of city etc.
Staff and Local Stakeholder Involvement in Annex Development
Jersey Village has been in discussion with Harris County and Tetra Tech since mid 2018 in preparation of the
updated all Hazard Mitigation Plan. We have attended several planning meetings. We have worked together with
Harris County to review our existing 2015 plan and determine what action items listed were completed or still
ongoing. We have met all deadlines for Harris County to review the plan and are confident it meets or exceeds the
requirements outlined.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(£¤290£¤290HoustonCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.30.60.15Miles±Jersey Village
£¤290
£¤290
Houston
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.3 0.60.15 Miles
±
Jersey Village
£¤290
£¤290
Houston
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.3 0.60.15 Miles
±
Jersey Village
£¤290
£¤290
Houston
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.3 0.60.15 Miles
±
Jersey Village
£¤290
£¤290
Houston
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.3 0.60.15 Miles
±
Jersey Village
£¤290
£¤290
Houston
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.3 0.60.15 Miles
±
Jersey Village
£¤290
£¤290
Houston
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.3 0.60.15 Miles
±
Jersey Village
14-1
14. CITY OF KATY
14.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Greg Goedecker, Emergency Management Coordinator
Street Address
Katy, TX 77493
Telephone: 281-574-8633
e-mail Address: ggoedecker@cityofkaty.com
Jason Rivera Asst. Public Works Director
Street Address
Katy, TX 77493
Telephone: 281-391-4796
e-mail Address: jrivera@cityofkaty.com
14.2 JURISDICTION PROFILE
14.2.1 Location
The City of Katy is the Hub City of Three Counties. Katy lies in the western portion of Harris County, the far
southeastern portion of Waller County, and the northern most portion of Fort Bend County.
The actual city limits of Katy are north and south of Interstate 10, and roughly between Katy Fort Bend Road on
the east and Pederson Road on the west. The historic downtown area is north of Highway 90, near the landmark
grain elevators. This is the original Katy from before the 1970s when Houston’s Energy Corridor (and the
development that came with it) made its way west on I-10. The city’s total area is 15.1 square miles.
14.2.2 History
Katy was incorporated in 1945. In the beginning Katy was only a wide open prairie, the hunting ground of the
Karankawa Indian tribes, the winter feeding grounds of great herds of buffalo and large flocks of wild ducks,
geese, sandhill and whooping cranes, and numerous other game birds, and home to longhorn cattle, deer, and
wolves.
Earliest settlement of the community known as Cane Island, for Cane Island Creek that runs through it, was in
1872. The townsite of Katy was laid out and platted by J. O. Thomas, L. C. Luckel, and R. M. Cash in 1895,
supposedly named for the M-K-T Railroad that runs through it. Katy has always been a traditional family style
community; however, it also played a major role as a rail hub, a rice farming and agricultural center, and one of
the largest gas fields in this part of Texas.
14.2.3 Climate
The climate of Katy is warm and temperate. The rainfall in Katy is significant, with precipitation even during the
driest month. The average annual temperature is 68 °F in Katy. The average annual rainfall is 42.28 inches. July is
the warmest month of the year. The temperature in July averages 83.1 °F. At 50.4 °F on average, January is the
coldest month of the year.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
14-2
14.2.4 Governing Body Format
The City of Katy is a home rule city with a mayor-councilmember-administrator type of government. City
Council consists of five City Councilmembers. The City consists of 20 departments: Administration, Municipal
Court, City Secretary, Finance, Social Services, Human Resources, Police, Fire, Animal Control, Library, Parks,
Streets, Public Works, Sanitation, Permits-Inspections, Building Maintenance, Marketing & Tourism, Water,
Sewer and Utility Billing. The City has 12 boards and commissions, which are appointed by City Council.
The City Council assumes responsibility for the adoption of this plan; the City Administrator will oversee its
implementation. Development of this annex was carried out by the members of the local mitigation planning
team, whose members are listed in Table 14-1.
Table 14-1. Local Mitigation Planning Team Members
Name Title
Greg Goedecker Emergency Management Coordinator
Jason Rivera Asst. Public Works Director
Elaine Lutringer Public Works Director
Cindy Kuykendall Code Enforcement Officer
Anas Garfaoui City Planner
David Leyendecker City Engineer
14.3 CURRENT TRENDS
14.3.1 Population
According to U.S. Census Bureau, the population of Katy as of July 2017 was 18,282. Since 2010, the population
has grown at an average annual rate of 4.2 percent.
14.3.2 Development
Since 2015, there has been an increase in single-family residential housing in the City of Katy. The city has also
experienced an increase in commercial development, primarily in large scale office/warehouse/distribution
projects between US Highway 90 and Interstate 10.
Table 14-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
City of Katy
14-3
Table 14-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
Yes/No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
953 Acres
14 Parcels
Is your jurisdiction expected to annex any areas during the performance period of this plan?
Yes
• If yes, describe land areas and dominant uses.
Commercial/Industrial
• If yes, who currently has permitting
authority over these areas?
County (Waller, Harris, Fort Bend
Are any areas targeted for development or major redevelopment in the next five years? Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk
areas
Area between US HWY 90 and I-10 (No known hazard risk areas)
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 186 343 370 418 607
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.) 37 60 57 13 58
Total 223 403 427 431 665
Provide the number of new-construction
permits for each hazard area or provide a qualitative description of where development
has occurred.
• Special Flood Hazard Areas: 11 AE Zones
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory
exists, provide a qualitative description.
Approximate City of Katy size: 15.1 Sq. Miles or 9,664 acres
Approximate City of Katy available land: 2.05 Sq. Miles or 1,312 acres
Approximately 86% buildout as of January 2019
14.4 CAPABILITY ASSESSMENT
The City of Katy performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 14-3.
• Development and permitting capabilities are presented in Table 14-4.
• An assessment of fiscal capabilities is presented in Table 14-5.
• An assessment of administrative and technical capabilities is presented in Table 14-6.
• An assessment of education and outreach capabilities is presented in Table 14-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 14-8.
• Classifications under various community mitigation programs are presented in Table 14-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 14-10.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
14-4
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Table 14-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No No No
Comment: 2874 IBC 2015, City Ordinance. 2874; sect. 3.02.053; 10-22-18
Zoning Code Yes No No No
Comment: City Ordinance. 621; sect. 14.02.001; 3-24-18
Subdivisions Yes No No No
Comment: City Ordinance. 2595 & 2595a; Chapter 10; 10-28-13
Stormwater Management Yes Yes Yes Yes
Comment: TCEQ, City Ordinance. 2893; 3.11.003 & 3.11.004; 1-28-19
Post-Disaster Recovery Yes Yes No Yes
Comment: City of Katy EOP Annex J – Recovery and post-disaster permitting and code enforcement regulations. 9-28-16
Real Estate Disclosure No No No No
Comment:
Growth Management No No Yes Yes
Comment:
Site Plan Review Yes No No Yes
Comment: City Ordinance. 2874; sect. 3.08.003 ;10-22-18
Environmental Protection Yes No No Yes
Comment: TCEQ, EPA
Flood Damage Prevention Yes No Yes Yes
Comment: City Ordinance 2417 Sect. 3.04 1-26-09
Emergency Management Yes No No Yes
Comment: City Ordinance 0695 1-20-19, Texas Government Code 418
Climate Change No No No Yes
Comment:
Planning Documents
General Plan Yes No Yes Yes
Comment: Comprehensive Plan 6-11-2001
Capital Improvement Plan No Bo No Yes
How often is the plan updated? N/A Comment:
Disaster Debris Management Plan No No No Yes
Comment:
Floodplain or Watershed Plan Yes Yes No Yes
Comment: Harris Co Flood Con Dist. Res 430, City Ordinance 2626; sect. 3.04.041 & 3.04.042 or 3.01.007, 3.04.042; 3-10-14
Stormwater Plan Yes Yes Yes Yes
Comment: City Ordinance. 2893; section 3.11.003 & 3.11.004; 1-28-19
Urban Water Management Plan No No No No
Comment:
Habitat Conservation Plan No No No No
Comment:
City of Katy
14-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Economic Development Plan No No No No
Comment:
Shoreline Management Plan No No No No
Comment:
Community Wildfire Protection Plan No No No No
Comment: The City of Katy does not have its own CWPP implemented. Harris County has completed a county-wide CWPP; which
includes all incorporated jurisdictions within Harris County.
Forest Management Plan No No No Yes
Comment:
Climate Action Plan No No No Yes
Comment:
Comprehensive Emergency Management Plan Yes No No Yes
Comment: City Ordinance 0695 2-8-16
Threat & Hazard Identification & Risk Assessment (THIRA) No No Yes Yes
Comment:
Post-Disaster Recovery Plan Yes Yes No Yes
Comment: City of Katy EOP Annex J – Recovery is required for local jurisdictions to address local recovery programs, damage
assessments, Public Assistance and Individual Assistance programs. The City of Katy is in the process of developing a Pre-
Disaster Recovery Plan to assist in the transition from response to recovery for future incidents. 9-28-16
Continuity of Operations Plan Yes No No Yes
Comment: Government Code 418 grants political subdivisions the option to adopt plans for continuity of functions but is not mandated.
The City of Katy does have department Continuity of Operations Plans.
Public Health Plan Yes Yes Yes Yes
Comment: City of Katy EOP Annex H – Health and Medical is a component of the Emergency Operations Plan and addresses public
health, environmental health, and medical response capabilities. The City does not maintain a standalone Public Health Plan.
10-27-16
Table 14-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Building Department
Does your jurisdiction have the ability to track permits by hazard area? Yes
Does your jurisdiction have a buildable lands inventory? Yes
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
14-6
Table 14-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Other No
Table 14-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Public Works
Engineers or professionals trained in building or infrastructure construction practices Yes City Engineer
Planners or engineers with an understanding of natural hazards Yes Public Works, City Engineer
Staff with training in benefit/cost analysis Yes Public Works, City Engineer
Surveyors Yes City Engineer
Personnel skilled or trained in GIS applications Yes N/A
Scientist familiar with natural hazards in local area No N/A
Emergency manager Yes Fire Dept.
Grant writers No N/A
Other No N/A
Table 14-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? No
• If yes, briefly describe.
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. Post educational material on Facebook and Twitter
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to communicate hazard-related information? No
• If yes, briefly describe.
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Everbridge Mass Notification System – KTALERT
City of Katy
14-7
Table 14-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Building Dept
Who is your floodplain administrator? (department/position) Floodplain Manager
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? Check
Does your floodplain management program meet or exceed minimum requirements? Meet
• If exceeds, in what ways? N/A
When was the most recent Community Assistance Visit or Community Assistance Contact? June 19, 2007
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are. N/A
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are. N/A
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why. N/A
Does your floodplain management staff need any assistance or training to support its floodplain management program? No
• If so, what type of assistance/training is needed?
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification? No
• If no, is your jurisdiction interested in joining the CRS program? Yes
How many flood insurance policies are in force in your jurisdiction?a 2149
• What is the insurance in force? $664,828,300
• What is the premium in force? $1,017,481
How many total loss claims have been filed in your jurisdiction?a 466
• How many claims are still open or were closed without payment? Unknown
• What were the total payments for losses? $38,432,381
a. According to FEMA statistics as of July 31, 2019
Table 14-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule Yes 4
Public Protection Yes ISO 1 10/1/2019
Storm Ready Yes Storm Ready
Community
8/1/2016
Firewise No N/A N/A
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
14-8
Table 14-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Medium
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Medium
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Unsure
Comment:
Identified strategies for adaptation to impacts Unsure
Comment:
Champions for climate action in local government departments Unsure
Comment:
Political support for implementing climate change adaptation strategies Unsure
Comment:
Financial resources devoted to climate change adaptation Unsure
Comment:
Local authority over sectors likely to be negative impacted Unsure
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Unsure
Comment:
Local residents support of adaptation efforts Unsure
Comment:
Local residents’ capacity to adapt to climate impacts Unsure
Comment:
Local economy current capacity to adapt to climate impacts Unsure
Comment:
Local ecosystems capacity to adapt to climate impacts Unsure
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Katy
14-9
14.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
14.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• City of Katy Emergency Operations Basic Plan — The Basic Plan provides a summary on the hazards
and threats in the community.
• City of Katy Water Conservation and Drought Contingency Plan. This plan details strategies to
ensure continued water access and preservation.
• City of Katy Flood Damage Prevention Plan. The Flood Damage Prevention Plan details the protection
measures to be put into place to alleviate flooding hazards during minor and major weather events.
14.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Post-Disaster Recovery Plan — The City does not have a post disaster recovery plan and intends to
develop one as a mitigation planning action during the next five years. The plan will build on the goals
and objectives identified in the hazard mitigation plan.
• Stormwater Management — The City currently integrates hazard mitigation information into
Stormwater Management but, this plan provides opportunities and information to upgrade the plan. The
additional mitigation information and measures will be considered for inclusion into the plan.
• Emergency Operations Plan — The City currently integrates hazard mitigation information into the
Emergency Operations plan but, this plan provides opportunities and information to upgrade the plan. The
additional mitigation information and measures will be considered for inclusion into the plan.
• Flood Damage Prevention — Flood Damage Prevention project proposals may take into consideration
hazard mitigation potential as a means of evaluating project prioritization.
• Debris Management Plan — The City does not have a Debris Management plan and intends to develop
one as a mitigation planning action during the next five years. The plan will build on the goals and
objectives identified in the hazard mitigation plan.
• Floodplain Plan — The City currently integrates hazard mitigation information into Floodplain
Management but, this plan provides opportunities and information to upgrade the plan. The additional
mitigation information and measures will be considered for inclusion into the plan.
• Public Health Plan — The City does not have a Public Health plan and intends to develop one as a
mitigation planning action during the next five years. The plan will build on the goals and objectives
identified in the hazard mitigation plan.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
14-10
14.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 14-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of Katy
Other hazard events that broadly affected the entire planning area, including the City of Katy, are listed in the risk
assessments in Volume 1 of this hazard mitigation plan.
Table 14-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Severe Weather, Tornado January 14, 1991 $ 40,000
Severe Weather, Tornado 970 DR November 21, 1992 $ 350,525,000
Severe Weather, Tornado 1993 $ N/A
Severe Weather, Hail 1993 $ N/A
Severe Weather, Hail 1995 $ N/A
Severe Weather, Hail 1996 $ N/A
Severe Weather, Hail 1998 $ N/A
Severe Weather, Hail February 2, 2003 $ 5,000
Severe Weather, Hail April 24, 2003 $ 6,000
Severe Weather, Tornado August 16, 2003 $ N/A
Severe Weather, Tornado September 1, 2003 $ N/A
Severe Weather, Tornado & Hail April 10, 2004 $80,000
Severe Weather, Hail December 21, 2006 $ 4,000
Severe Weather, Hail March 13, 2007 $ 3,000
Severe Weather, Hail May 30, 2007 $ N/A
Severe Weather, Tornado August 4, 2007 $ N/A
Wildfire January 1, 2008 $ N/A
Wildfire January 9, 2008 $ N/A
Wildfire July 30, 2008 $ N/A
Severe Weather, Wind July 10, 2012 $ 5,000
Severe Weather, Heavy Rain July 7, 2014 $ N/A
Severe Weather, Wind August 25, 2015 $ N/A
Flooding 4245 DR October 24, 2015 $ N/A
14.7 HAZARD RISK RANKING
Table 14-12 presents a local ranking for the City of Katy of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
City of Katy
14-11
Table 14-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Flooding 32 High
3 Wildfire 16 Medium
4 Mass Movement 15 Medium
5 Earthquake 14 Low
6 Drought 6 Low
6 Dam Failure 6 Low
7 Tsunami 0 (No Exposure) None
7 Coastal Erosion 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
14.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
14.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 80
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 0
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0
14.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Land Development- considering the City and adjacent development which directly impact impervious
surface/stormwater run-off. In addition, the stormwater conveyance has significant impact to the
downstream and associated waterway and drainage structures
• New construction standards and storm water design criteria challenge or conflicts with aged infrastructure
design and capacity for stormwater and flood protection.
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
14.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 14-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
14-12
Table 14-13. Status of Previous Plan Actions
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
Improve and adopt higher-standard/latest edition manufactured homes standards/codes to include tie-downs or anchorage 2015
Comment: Existing Ordinance address manufactured homes standards codes/ and tie-downs or anchorage
Electric surge protection and shielding for electronic systems in public facilities or critical infrastructure 2015
Comment: All 5 Water Plants have surge protection installed
Elevate generator above freeboard to mitigate flooding risk
Comment: No specific generator was ever targeted for this action. Public Works Officials were never informed of this action item.
Develop and adopt a drainage ordinance to require detention for future
development and redevelopment for detention
2018
Comment: City Council adopted Harris County Flood Control development plans, which is more restrictive
Improve critical infrastructure/public buildings to harden against hurricane related effect 2018
Comment: Water Plant #6 27515 Hwy Blvd., Upgraded Roof to reinforced concrete.
Implement a tree management program to limit debris damage to critical
infrastructure, public facilities from falling tree canopy due to high-winds, freezing conditions, and burning debris.
2015
Comment: Implemented a “Best Management Practices” for tree management.
Improve and enhance requirements for critical facilities to withstand severe thunderstorms, hurricane winds and hail 2018
Comment: Wastewater Plant, 25839 I-10 Freeway – Elevated transfer switch, and soft starts electronic components; and replaced 2
pumps to dry-submersible pumps
Construct protective structure/shelter for critical equipment and vehicles to minimize damage from high-winds and freezing conditions. 2016
Comment: Addition to Fleet Maintenance – Added roof extension for storage of equipment and material. Built to withstand 140 mph wind
load.
Implement a Public Education/Outreach Program on Hail-hazards to inform residents on actions to reduce hail damage to property and equipment. KTY5
Comment: No program was ever implemented.
Improve code/ordinance to require removal of dead vegetation/dry fuel
sources in risk areas
Comment: No ordinance was ever developed or brought to City Council to approve.
Implement and join FireWise Program to educate residents and businesses on actions to reduce property loss and damages from wildfire. KTY7
Comment: The City never joined or looked into the program
Expand warning system, to a mass notification system, to provide hazard
awareness and alerts to mitigate all-hazards and to increase coverage of the
community utilizing mobile/cellular devices.
2015
Comment: A mass notification system was implemented, but the City of Katy chose not to renew its contract for it. A new web based
mass notification system was purchased in 2018.
Install drought resistant landscaping as part of a water conservations
program
KTY6
Comment: Continuing on working on this through the City’s Water Conservation Plan
City of Katy
14-13
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
Improve public facility emergency power by installing generators/alternate power sources to provide adequate cooling for use as cooling center
Comment: Generators will be or only installed on critical infrastructure. There was no plan developed to add alternate power sources to
other City owned public facilities.
Implement a Public Education/Outreach Program on extreme heat to educate residents and businesses on actions to reduce health impacts and property losses.
KTY5
Comment: No program was ever implemented.
Insulate exposed/above ground domestic water components
Comment: This practice was already occurring at the time the plan was written
Improve chemical storage and waste disposal facilities
Comment: The City eliminated the Oil Recycle Center off of East Avenue
Establish/improve code/ordinance to require secondary containment structures for all above ground storage tanks for new construction
Comment: No ordinance was ever developed or brought to City Council to approve.
Identify exposed/above ground pipelines in flood hazard area
Comment: No plans or procedures were ever developed to capture this data.
14.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 14-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 14-15
identifies the priority for each action. Table 14-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 14-14. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing
Assets Objectives Met Lead Agency Support Agency
Estimated
Cost Sources of Funding Timelinea
Action KTY1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, mass movement, wildfire
Existing 3, 4, 10 Public Works OEM High HMGP, PDM, FMA Short-term
Action KTY2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including the City of Katy
Hazards Mitigated: Drought, earthquake, flooding, mass movement, wildfire
New and Existing 1, 3, 4, 5, 7, 8, 10 Planning Public Works, OEM Low Staff Time, General Funds Ongoing
Action KTY3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wildfire, Mass Movement, Earthquake, Drought, Dam Failure
New and Existing 1, 5, 8 OEM Public Works Low Staff Time, General Funds Short-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
14-14
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action KTY4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Flooding, severe weather
New and Existing 1, 3, 5, 7, 8, 10 Public Works OEM Low Staff Time, General Funds Ongoing
Action KTY5 — Implement a Public Education/Outreach Program on all-hazards to inform residents on actions to reduce severe weather
damage to property and equipment.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wildfire, Mass Movement, Earthquake, Drought, Dam Failure
New and Existing 3, 4, 10, 15 OEM National Weather
Service, HCFCD
Low Staff Time, General Funds Ongoing
Action KTY6 — Incorporate drought tolerant or xeriscape practices into landscape ordinances to reduce dependence on irrigation around
city facilities
Hazards Mitigated: Drought, Mass Movement
New and Existing 7, 8, 15 City
Administration
Public Works Medium General Funds Ongoing
Action KTY7 — Implement and join FireWise Program to educate residents and businesses on actions to reduce property loss and
damages from wildfire.
Hazards Mitigated: Wildfire
New and Existing 2, 3 Fire OEM High Short-term
Action KTY8 — Install a new emergency generator and elevate it above flood 500 year flood level at Kingsland Water Plant. Kingsland
Water Plant is a critical facility
Hazards Mitigated: Flooding, severe weather, hurricane
Existing 10, 11, 13 OEM Public Works High HMGP, PDM, General
Funds
Short-term
Action KTY9 — Install a new emergency generator and elevate it above flood 500 year flood level at Fire Station 1 Fire Station 1 is a
critical facility
Hazards Mitigated: Flooding, severe weather, hurricane
Existing 10, 11, 13 OEM Fire High HMGP, PDM, General
Funds
Short-term
Action KTY10 — Install a new emergency generator at Fire Station 3. Fire Station 3 is a critical facility
Hazards Mitigated: Flooding, severe weather, hurricane
Existing 10, 11, 13 OEM Fire High HMGP, PDM, General
Funds
Short-term
Action KTY11 — Add quick emergency generator quick connect capabilities to all city owned critical facilities
Hazards Mitigated: Flooding, severe weather, hurricane
New and Existing 10, 11, 13 OEM Public Works Medium HMGP, PDM, General
Funds
Long-term
Action KTY12 — Provide incentives to private industry and contractors, for using permeable driveways and surfaces to reduce runoff
and promote groundwater recharge.
Hazards Mitigated: Drought, Mass Movement
New and Existing 7, 8, 15 City
Administration
Public Works Low General Funds Ongoing
City of Katy
14-15
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action KTY13 — Implement a Fuels Management Program to reduce hazardous vegetative fuels on public lands, near
critical infrastructure
Hazards Mitigated: Wildfire
New and Existing 2, 13 OEM Fire Low General Funds Ongoing
Action KTY14 — Using GIS to map areas that are at risk to the wind hazard associated with different hurricane and severe weather
wind conditions and to identify concentrations of at-risk structures and populations..
Hazards Mitigated: Severe weather, hurricane
New and Existing 1, 2, 4, 12 OEM IT, Harris County
OHSEM
Low General Funds Short-
Term
Action KTY15 — Create defensible space around all City of Katy critical infrastructure
Hazards Mitigated: Wildfire
New and Existing 2, 6 Public Works Fire, OEM Low General Funds Ongoing
Action KTY16 — Implement a Tree Management Program/Ordinance
Hazards Mitigated: Severe weather, hurricane
New and Existing 6, 11 Public Works OEM Low General Funds Ongoing
Action KTY17 — Install a new emergency generator and elevate it above flood 500 year flood level at the Katy Wastewater Plant. Katy
Wastewater Plant is a critical facility
Hazards Mitigated: Flooding, severe weather, hurricane
Existing 10, 11, 13 Public Works OEM High HMGP, PDM, General
Funds
Short-term
Action KTY18 — Construct a berm around the Katy Wastewater Treatment Plant to prevent flooding
Hazards Mitigated: Flooding, severe weather
New and Existing 10, 11, 13 Public Works OEM High HMGP, PDM, General
Funds
Long-term
Action KTY19 — • Patna/Fortuna/Rexora public roadway projects- to address flood prone neighborhood- the roadway elevation and
stormwater conveyance system will be redesigned to manage stormwater and property protection for the area.
Hazards Mitigated: Flooding, severe weather
New and Existing 10, 11, 13 City
Administration
Public Works High City Sourced Funding Short-term
Action KTY20 — Pitts Rd detention pond expansion- this is a significant detention pond improvement implement a 14 acres addition to
stormwater detention and flood protection for the City.
Hazards Mitigated: Flooding, severe weather
New and Existing 10, 11, 13 City
Administration
Public Works High City Sourced Funding Short-term
Action KTY21— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wildfire, Mass Movement, Earthquake, Drought, Dam Failure
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
City
Administration
HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
14-16
Table 14-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
KTY1 3 High High Yes Yes No Medium High
KTY2 7 Medium Low Yes No Yes High Low
KTY3 3 Low Low Yes No Yes High Low
KTY4 6 Medium Low Yes No Yes High Low
KTY5 4 High Low Yes No Yes High Low
KTY6 3 Medium Medium Yes Yes No Medium Low
KTY7 2 Low Low Yes No Yes High Low
KTY8 2 High High Yes Yes No Medium High
KTY9 3 High High Yes Yes No Medium High
KTY10 3 High High Yes Yes No Medium High
KTY11 3 Medium Medium Yes Yes No Medium Medium
KTY12 3 Low Low Yes No Yes High Low
KTY13 2 Low Low Yes No Yes High Low
KTY14 4 Low Low Yes No Yes High Low
KTY15 2 Low Low Yes No Yes High Low
KTY16 2 Low Low Yes No Yes High Low
KTY17 3 High High Yes Yes No Medium High
KTY18 3 High High Yes Yes No Low Low
KTY19 3 High Low Yes Yes Yes High Low
KTY20 3 High Low Yes Yes Yes High Low
KTY21 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
City of Katy
14-17
Table 14-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather KTY-1, 2, 4,
21
KTY-1, 2, 4,
8, 9, 10, 11,
16, 18
KTY-4, 5, 21 KTY-2 KTY-8, 9,
10, 11, 15,
16, 17, 21
KTY-1, 18,
19
KTY-2 KTY-2, 3,
14, 16, 21
Hurricane KTY-16, 21 KTY-8, 9,
10, 11, 16,
17
KTY-5, 16, 21 KTY-8, 9,
10, 11, 15,
16, 17, 21
KTY-3, 14,
16, 21
Flooding KTY-2,4, 21 KTY-4, 8, 9,
10, 11, 17,
18
KTY-4, 5, 21 KTY-8, 9,
10, 11, 17,
21
KTY-18, 19 KTY-3, 21
Medium-Risk Hazards
Wildfire KTY-1,2,7,
21
KTY-1, 2, 7,
13
KTY-5, 7, 21 KTY-7, 13,
15, 21
KTY-3, 21
Mass Movement KTY-1,2, 21 KTY-1, 2 KTY-5, 21 KTY-6, 12 KTY21 KTY-6, 12 KTY-3, 21
Low-Risk Hazards
Earthquake KTY-1,2, 21 KTY-5, 21 KTY21 KTY-3, 21
Drought KTY-1,2, 21 KTY-5, 21 KTY-6, 12 KTY21 KTY-6, 12 KTY-3, 21
Dam Failure KTY21 KTY21 KTY21 KTY21
a. See the introduction to this volume for explanation of mitigation types.
14.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
14.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• City of Katy Code of Ordinances — The municipal code was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
• City of Katy Flood Damage Prevention Ordinance — The flood damage prevention ordinance was
reviewed for compliance with the National Flood Insurance Program.
• City of Katy Stormwater Management Ordinance — The municipal code was reviewed for the full
capability assessment and for identifying opportunities for action plan integration.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
14.11.2 Staff and Local Stakeholder Involvement in Annex Development
This annex was developed over the course of several months with input from many city departments including
Public Works, Fire, Police, Finance, and City Secretary office. All departments were asked to contribute to the
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
14-18
annex development through reviewing and contributing to the capability assessment, reporting on the status of
previously identified actions, and participating in action identification and prioritization. An action development
meeting was held on March 5, 2019 and was attended by representatives from all previously listed department as
well as the City Administrator’s office. Once actions had been identified and compiled in the annex, a draft was
internally circulated for comment.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(§¨¦10§¨¦10HoustonCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.450.90.225Miles±Katy
§¨¦10
§¨¦10
Houston FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.45 0.90.225 Miles
±
Katy
§¨¦10
§¨¦10
Houston Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.45 0.90.225 Miles
±
Katy
§¨¦10
§¨¦10
Houston 20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.45 0.90.225 Miles
±
Katy
§¨¦10
§¨¦10
Houston 100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.45 0.90.225 Miles
±
Katy
§¨¦10
§¨¦10
Houston Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.45 0.90.225 Miles
±
Katy
§¨¦10
§¨¦10
Houston Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.45 0.90.225 Miles
±
Katy
15-1
15. CITY OF LA PORTE
15.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Kristin Gauthier, Emergency Management Coordinator
3001 N. 23rd St.
La Porte, TX 77571
Telephone: 281-470-0009
e-mail Address: gauthierk@laportetx.gov
Johnny Morales, Assistant EMC
3001 N. 23rd St.
La Porte, TX 77571
Telephone: 281-470-0011
e-mail Address: moralesj@laportetx.gov
15.2 JURISDICTION PROFILE
15.2.1 Location
The City of La Porte is located in southeast Harris County, about 30 minutes southeast of Houston. It is accessible
by State Highways 225 and 146. La Porte is located at the entrance to the Houston Ship Channel, and is home to
two major Port Houston terminals: Barbours Cut and Bayport. La Porte’s location along the Houston Ship
Channel makes it home to numerous petrochemical facilities.
The current boundaries generally extend from the city boundaries of Deer Park and Pasadena to the west,
Galveston Bay to the east, State Highway 225 to the north, and the Port of Houston Bayport Terminal to the
south. The city encompasses an area of approximately 18.6 square miles.
15.2.2 History
The City of La Porte was incorporated in 1892. In the early 1900s, La Porte was a popular tourist destination due
to its location on Galveston Bay. Originally named Sylvan Grove Park, Sylvan Beach became a nationally
recognized tourist destination, and remains one of La Porte’s biggest attractions. Several hurricanes impacted La
Porte in the early part of the 20th century, causing tourism in the area to diminish. Following World War II,
shipyards and industrial plants began to be developed in the region, resulting in the large petrochemical presence
that still exists to this day.
15.2.3 Climate
La Porte’s climate is classified as humid subtropical. Prevailing winds from the south and southeast bring heat
from the deserts of Mexico and moisture from the Gulf of Mexico.
Summer temperatures typically have highs near 90 °F (32 °C), though higher temperatures are not uncommon.
The city’s proximity to the bay, and winds that it generates, moderate the area’s temperatures and ease the effects
of the humidity, creating a more pleasant climate than inland communities like Houston.
Winters in the area are temperate with typical January high of 61 °F (16 °C) and lows are near 42 °F (6 °C).
Snowfall is rare.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
15-2
Annual rainfall averages exceed 50 inches, with an annual average of 91 precipitation days. The average elevation
of La Porte is approximately 20 feet above sea level.
15.2.4 Governing Body Format
The City of La Porte is a Home Rule City, operating under the Council-Manager form of government, with a City
Council composed of a Mayor and eight Council members. The Mayor and 2 councilpersons-at-large are elected
by a majority vote of the qualified voters of the city at large. The city is divided into 6 districts, Districts 1, 2, 3, 4,
5, and 6; and 1 councilperson is elected from each district by majority vote of the resident voters of such district.
The City Council appoints a City Manager to act as the chief administrative and executive officer of the City.
The La Porte City Council assumes responsibility for the adoption of this plan; the La Porte Office of Emergency
Management will oversee its implementation. Development of this annex was carried out by the members of the
local mitigation planning team, whose members are listed in Table 15-1.
Table 15-1. Local Mitigation Planning Team Members
Name Title
Kristin Gauthier Emergency Management Coordinator
Jason Weeks Assistant City Manager
Teresa Evans Director of Planning
Lorenzo Wingate City Engineer
Alfonso Acosta Deputy Building Official
Richard Glass Plans Examiner
Ian Clowes City Planner
Abrin Brooks GIS Manager
15.3 CURRENT TRENDS
15.3.1 Population
According to the U.S. Census, the population of the City of La Porte as of July 2017 was 35,371. Since April
2010, the population has grown by 4.6 percent.
15.3.2 Development
Anticipated development levels for La Porte are moderate, consisting primarily of single family and multi-family
development with complementary commercial construction. Additional industrial and warehousing construction
are also expected.
Table 15-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
City of La Porte
15-3
Table 15-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
N/A
Is your jurisdiction expected to annex any areas during the performance period of this plan?
No
• If yes, describe land areas and dominant uses.
N/A
• If yes, who currently has permitting
authority over these areas?
N/A
Are any areas targeted for development or major redevelopment in the next five years? Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk
areas
1) New construction of 640 single-family homes and 350 multi-family units being built
in the Morgan’s Landing Subdivision located along Bay Area Blvd., between Spencer
Hwy. and Fairmont Pkwy. A portion of this development is located within the
floodplain.
2) New construction of 82 single-family homes and 350 multi-family units being built in
the Artesia Village/Hawthorne La Porte development located along the east side of
SH 146, between Wharton Weems and Fairmont Pkwy. This development is located
within the floodplain.
3) Preliminary proposal for Creekhaven Estates, a development consisting of 45
single – family residential homes located along McCabe Rd., between SH 146 and S.
Broadway. This proposed development is located within the floodplain.
How many permits for new construction were issued in your jurisdiction since the
preparation of the previous hazard mitigation
plan?
2014 2015 2016 2017 2018
Single Family
All Permits 68 87 88 54 76
Special Flood Hazard Area Permits 16 9 13 12 15
Multi-Family
All Permits 0 4 1 0 0
Special Flood Hazard Area Permits 1 0 0 0 0
Other (commercial, mixed use, etc.)
All Permits 13 24 25 29 22
Special Flood Hazard Area Permits 3 2 3 5 8
Total
All Permits 81 115 114 83 98
Special Flood Hazard Area Permits 20 11 16 17 23
Provide the number of new-construction
permits for each hazard area or provide a qualitative description of where development
has occurred.
• Special Flood Hazard Areas: 87 (Total for 2014 – 2018)
• Landslide: N/A
• High Liquefaction Areas: N/A
• Tsunami Inundation Area: N/A
• Wildfire Risk Areas: N/A
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s
buildable lands inventory. If no such inventory
exists, provide a qualitative description.
Based on aerial imagery combined with current zoning and knowledge of upcoming
projects, it is estimated that approximately 75-80% of buildable land is currently
developed. A large portion of our northern city limits is designated as single family
large lot. The majority of these lots are developed but the overall density is much less
than that of traditional single family subdivisions.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
15-4
15.4 CAPABILITY ASSESSMENT
The City of La Porte performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 15-3.
• Development and permitting capabilities are presented in Table 15-4.
• An assessment of fiscal capabilities is presented in Table 15-5.
• An assessment of administrative and technical capabilities is presented in Table 15-6.
• An assessment of education and outreach capabilities is presented in Table 15-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 15-8.
• Classifications under various community mitigation programs are presented in Table 15-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 15-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Table 15-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes Yes Yes Yes
Comment: Code of Ordinances, Subpart B, Chapter 82 – Buildings and Building Regulations; Adoption: 2012 International Residential
Code and International Business Code
Zoning Code Yes No No Yes
Comment: Code of Ordinances, Subpart B, Chapter 106 – Zoning
Subdivisions Yes No No No
Comment: Code of Ordinances, Subpart B, Chapter 86 – General Plans, Sec. 86-15 – General standards for subdivision &
developments
Stormwater Management Yes Yes Yes Yes
Comment: Code of Ordinances, Subpart A, Chapter 34 – Environment, Article VI – Stormwater Discharges
Post-Disaster Recovery Yes Yes No Yes
Comment: Annex J – Recovery and post-disaster permitting and code enforcement regulations.
Real Estate Disclosure No No Yes No
Comment:
Growth Management No No No Yes
Comment:
Site Plan Review Yes Yes No Yes
Comment: Code of Ordinances, Chapter 86, Sec. 86-7
Environmental Protection Yes Yes Yes Yes
Comment: Code of Ordinances, Subpart A, Chapter 34 – Environment
Flood Damage Prevention Yes Yes Yes Yes
Comment: Code of Ordinances, Subpart B, Chapter 94 – Floods
Emergency Management Yes No Yes Yes
Comment: Code of Ordinances, Subpart A, Chapter 26 – Emergency Management; Local Ordinance No. 1498-A
Climate Change No Yes No Yes
Comment:
City of La Porte
15-5
Local Authority
Other Jurisdiction
Authority State Mandated
Integration
Opportunity?
Planning Documents
General Plan Yes No No Yes
Comment: La Porte Comprehensive Plan; Adopted on December 10, 2012; 5-year updated adopted on June 11, 2018
Capital Improvement Plan No No No Yes How often is the plan updated?
Comment:
Disaster Debris Management Plan Yes No No No
Comment: Last updated on June 26, 2014, and Approved by FEMA on August 6, 2014
Floodplain or Watershed Plan No No No Yes
Comment:
Stormwater Plan Yes No Yes Yes
Comment: Last adopted in 2014
Urban Water Management Plan No No No No
Comment:
Habitat Conservation Plan No Yes Yes No
Comment:
Economic Development Plan Yes No No No
Comment: Chapter 5 of the Comprehensive Plan
Shoreline Management Plan No Yes No No
Comment:
Community Wildfire Protection Plan No Yes No Yes
Comment: The City of La Porte does not have its own CWPP implemented. Harris County has completed a county-wide CWPP; which
includes all incorporated jurisdictions within Harris County.
Forest Management Plan No Yes No No
Comment:
Climate Action Plan No Yes No Yes
Comment:
Comprehensive Emergency Management Plan Yes No Yes Yes
Comment: Emergency Operations Plan; all annexes last reviewed and approved by the State in June – August 2016
Threat & Hazard Identification & Risk Assessment (THIRA) No Yes Yes Yes
Comment: A regional THIRA is conducted on an annual basis for UASI and HGAC. The City participates in the development of the
THIRA.
Post-Disaster Recovery Plan Yes Yes No Yes
Comment: Annex J – Recovery to the City’s Emergency Operations Plan; approved by the State on July 18, 2016
Continuity of Operations Plan Yes No No Yes
Comment: Basic Plan and all department plans updated in April – June 2019
Public Health Plan Yes Yes Yes Yes
Comment: Annex H – Health and Medical is a component of the City’s Emergency Operations Plan and addresses public health,
environmental health, and medical response capabilities. The City does not maintain a standalone Public Health Plan.
Pandemic Plan Yes No No Yes
Comment: Pandemic Influenza Plan last revised on August 7, 2012
Table 15-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Planning
Does your jurisdiction have the ability to track permits by hazard area? Yes
Does your jurisdiction have a buildable lands inventory? No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
15-6
Table 15-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes – Water and Sewer
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Table 15-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land
management practices
Yes Planning/Public Works
Engineers or professionals trained in building or infrastructure construction
practices
Yes Public Works
Planners or engineers with an understanding of natural hazards Yes Planning/Public Works
Staff with training in benefit/cost analysis Yes City Manager’s Office/Finance
Surveyors Yes Can contract for service
Personnel skilled or trained in GIS applications Yes Planning GIS Division
Scientist familiar with natural hazards in local area Yes Can contract for service
Emergency manager Yes Emergency Management
Grant writers Yes Can contract for service
Table 15-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. Floodplain information managed by Public Works/Mapping
managed by GIS/Preparedness info managed by
Emergency Management
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. La Porte Emergency Management page used to promote
preparedness information and events
Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes
• If yes, briefly describe. Planning & Zoning Commission,
Drainage & Flooding Committee
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. Phone notification system, sirens, social media, Ready LP
app, community events
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Phone notification system, sirens, alerts, Ready LP App
City of La Porte
15-7
Table 15-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Public Works
Who is your floodplain administrator? (department/position) Public Works/City Engineer
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? April 26, 2010
Does your floodplain management program meet or exceed minimum requirements? Exceeds
• If exceeds, in what ways? Various
When was the most recent Community Assistance Visit or Community Assistance Contact? May 31, 2018
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? No
• If no, state why. Do not address impacts of flash flooding
Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes
• If so, what type of assistance/training is needed? Floodplain Development
Inspections Training
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification? Yes
• If no, is your jurisdiction interested in joining the CRS program?
How many flood insurance policies are in force in your jurisdiction?a 4,961
• What is the insurance in force? $1,371,066,800
• What is the premium in force? $2,946,020
How many total loss claims have been filed in your jurisdiction?a 3,086
• How many claims are still open or were closed without payment? 583
• What were the total payments for losses? $94,819,110.60
a. According to FEMA statistics as of September 30, 2018
Table 15-9. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes 7 10/1/2017
Building Code Effectiveness Grading Schedule Yes Residential – 5
Commercial – 5
May 26, 2014
Public Protection Yes 2 2018
Storm Ready Yes 12/27/2017
Firewise No N/A N/A
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
15-8
Table 15-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of La Porte
15-9
15.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
15.5.1 Existing Integration
This was not a metric in the 2015 Plan. Therefore, integration with other plans and programs was not measured.
15.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Comprehensive Plan – The City’s Comprehensive Plan is the most forward thinking plan the City has in
place to identify opportunities for the future. It guides future policy decisions relating to the physical and
economic development of the city. Better incorporating mitigation activities into this plan is one of the
greatest opportunities for future integration.
• Building and Zoning Codes – There is an opportunity for the City to review building and zoning codes,
and identify mitigation measures as a priority for existing and future codes.
• Capital Improvement Plan – There are opportunities to better structure the City’s Capital Improvement
Plan to allow the City to identify and plan for future mitigation projects.
• Comprehensive Emergency Management Plan – Annex P to the City’s Emergency Management Plan
provides a broad overview of hazard mitigation and structure for conducting mitigation planning
activities. During the next review, the City will assess the same 10 hazards that are identified in the
Hazard Mitigation Plan.
• Citywide Drainage Plan – The Plan looks at the current integrity of the City’s drainage system and
provides recommendations for improvement that will be considered in the future. During the next review,
the City will review both plans to ensure consistency and inclusion of each identified action item from the
Hazard Mitigation Plan.
15.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 15-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of La
Porte. Other hazard events that broadly affected the entire planning area, including the City of La Porte are listed
in the risk assessments in Volume 1 of this hazard mitigation plan.
15.7 HAZARD RISK RANKING
Table 15-12 presents a local ranking for the City of La Porte of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
15-10
Table 15-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Winter Storm 0 1/16/2018 Not Available
Flash Flood 0 1/20/2017 Not Available
Tornado 0 3/29/2017 Not Available
Tropical Storm 4332 DR 8/26/2017 $25,000,000.00
Tornado 4245 DR 10/31/2015 $4,000,000.00
Flash Flood 0 4/17/2015 Not Available
Thunderstorm/Wind 0 5/27/2014 Not Available
Flash Flood 0 10/22/2009 Not Available
Thunderstorm/Wind 0 4/24/2009 Not Available
Winter Storm 0 12/10/2008 Not Available
Hurricane 1791 DR 9/12/2008 $50,000,000.00
Tropical Storm 1730 DR 8/16/2007 $5,000,000.00
Flash Flood 0 10/16/2006 Not Available
Hurricane 1606 DR 9/23/2005 $5,000,000.00
Thunderstorm/Wind 0 7/6/2005 Not Available
Tornado 0 10/9/2003 Not Available
Tornado 0 3/30/2002 Not Available
Tornado 0 10/11/2001 Not Available
Tropical Storm 1379 DR 6/11/2001 $21,000,000.00
Tornado 0 9/11/1998 Not Available
Tornado 0 4/20/1995 Not Available
Table 15-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Flooding 18 High
3 Wildfire 16 Low
4 Earthquake 14 Low
5 Dam Failure 6 Low
5 Drought 6 Low
5 Mass Movement 6 Low
5 Coastal Erosion 6 Low
6 Tsunami 0 (No Exposure) None
Notes
The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
Based on local knowledge and substantiated data and documentation of previous flooding in La Porte, we believe this category should be
ranked as “High”.
Based on local knowledge and substantiated data and documentation of previous wildfires in La Porte, we believe this category should be
ranked as “Low”.
City of La Porte
15-11
15.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
15.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 307
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 70
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 57
15.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issue has been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• The jurisdiction has a high risk of severe weather, flooding, and hurricanes. This includes the threat of
strong winds, hail, tornadoes, and storm surge. Based on the jurisdiction’s natural event history, these
hazards account for the greatest amount of historical damage in La Porte. Due to the geography of La
Porte, the population is most at risk of these three hazard categories.
Mitigation actions addressing this issue were prioritized for consideration in the action plan in this annex.
15.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 15-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 15-13. Status of Previous Plan Actions
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
Installation of a large trunked drainage system within the 3rd Street right-of-way Yes
Comment: Project Complete
Construct Gladwyne Detention Pond No X LPT5
Comment:
Implement a Winter Storm Public Education Program to focus on home heating
methods and reduction of fire/structure damage or loss and appropriate insulation
techniques.
No X
Comment:
Implement/establish grant program to provide heating systems to LMI populations No X
Comment:
Improve Air Filtration Systems for CI/public/healthcare/school facilities by increasing capacity or quality to remove more particulates in order to minimize health risks associated with low air quality and to minimize equipment damage due to smoke
No X
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
15-12
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
Improve or develop a fire buffer zone around critical infrastructure No X
Comment:
Improve existing site to be utilized as a cooling zone (i.e. – tennis court, shading
with mist cooling systems)
No X
Comment:
Install generators/emergency power systems to provide cooling at critical/healthcare facilities
No X
Comment:
Mapping/identification of inundation risk area for high-risk dams/levees No X
Comment:
Install additional Flood Alert Gauges No X LPT13
Comment: In Progress
Acquisition/Buyout program No X LPT14
Comment: In Progress
Channel Improvement & Inline Detention Pond (F216-00-00) No X LPT15
Comment: In Progress
One Regional Detention Pond for Pinegrove Valley & residents along L St. and P St.
(F101-06-00)
No X LPT16
Comment: In Progress
Backup power for public buildings and utilities currently without generators No X
Comment:
Install wind load proof window coverings on city buildings Yes
Comment: Project Complete
Implement Debris Management Program No X LPT18
Comment:
Construct safe rooms in vulnerable public areas (ex: parks & various public
buildings)
No X LPT19
Comment:
Install a Weather/Lightning alert system to minimize damage and risk to local athletic facilities and other public events.
Yes
Comment: A lightning warning system has been added to our weather subscription
Install a covered parking area (protective structure) at Public Works and/or the
Police Department for City vehicles and equipment in order to decrease the potential for damage as a result of hail.
No X LPT20
Comment:
Conduct a Risk Management Program to examine the potential hazards, as well as the various sources of these hazards within the city.
No X
Comment: In Progress – a fixed industrial facility study was completed for La Porte and can serve as a component of this project
Enhance and expand the City’s current outdoor warning sirens to provide coverage to areas not in audible range at this time.
No X LPT22
Comment: In Progress – all sirens have been upgraded to add solar panels. No additional sirens have been added.
Develop a Pipeline Response and Safety Program No X
Comment:
Development/modification of ordinances for mitigation of drought related hazards
by restricting or limiting water use during drought conditions and water shortages.
No X LPT24
City of La Porte
15-13
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
Comment:
Develop/implement water smart program to educate the public on how to conserve water, especially during drought conditions.
No X LPT25
Comment:
Install a Mass Notification system that can warn the public of impending flooding
due to dam failure.
No X
Comment: There are County notification systems, so this project is no longer needed.
15.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 15-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 15-15
identifies the priority for each action. Table 15-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 15-14. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing
Assets Objectives Met Lead Agency Support Agency
Estimated
Cost Sources of Funding Timelinea
Action LPT1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Flooding, Hurricane
Existing 3, 4, 10 Public Works Planning High HMGP, PDM, FMA Short-term
Action LPT2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including the Comprehensive Plan, Building and Zoning Codes, Capital Improvement Plan, Citywide Drainage Plan, etc.
Hazards Mitigated: Dam Failure, Drought, Earthquake, Flooding, Mass Movement, Severe Weather, Hurricane, Wildfire, Coastal Erosion
New and Existing 3, 6, 9, 10, 11, 12, 15 OEM Planning/Public
Works
Low Staff Time, General Funds Ongoing
Action LPT3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: All hazards
New and Existing 3, 9, 10, 11 OEM Planning Low Staff Time, General Funds Short-term
Action LPT4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Flooding, Severe Weather
New and Existing 1, 3, 5, 7, 8, 10 Public Works Planning Low Staff Time, General Funds Ongoing
Action LPT5 — Construct Gladwyne Detention Pond
Hazards Mitigated: Flooding
New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP,
PDM, FMA
Short-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
15-14
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action LPT6 — Purchase generators for critical facilities and infrastructure that lack adequate back-up power.
Hazards Mitigated: Severe Weather, Hurricane
New and Existing 4, 10, 13 Public Works Parks and Recreation Medium General Funds, HMGP,
PDM, FMA
Short-term
Action LPT7 — Brookglen Flooding Mitigation Analysis
Hazards Mitigated: Flooding
New and Existing 4, 8, 10, 11, 12 Public Works Planning Medium Staff Time, General Funds,
Water Development Grant
Short-term
Action LPT8 — Bayside Terrace Drainage Improvements
Hazards Mitigated: Flooding, Hurricane
New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP,
PDM, FMA
Short-term
Action LPT9 — Lomax/F101-06-00 – Drainage Channel Improvements
Hazards Mitigated: Flooding
New and Existing 4, 8, 10, 11, 12 Public Works Planning Medium General Funds, HMGP,
PDM, FMA
Short-term
Action LPT10 — Little Cedar Bayou/F216 Phase III Improvements
Hazards Mitigated: Flooding
New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP,
PDM, FMA
Short-term
Action LPT11- 6th Street (Madison to Main) Paving and Drainage
Hazards Mitigated: Flooding
New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP,
PDM, FMA, CDBG
Short-term
Action LPT12 – 8th St and D St Storm Water and Conveyance Improvements
Hazards Mitigated: Flooding
New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP,
PDM, FMA
Short-term
Action LPT13 – Install additional Flood Alert Gauges
Hazards Mitigated: Flooding
New and Existing 1, 4, 8, 10, 11, 12 OEM Public Works Low General Funds, HMGP,
PDM, FMA
Short-term
Action LPT14 – Acquisition/Buyout Program
Hazards Mitigated: Flooding, Hurricane
Existing 4, 10, 11, 12 Planning Public Works High HMGP, PDM, FMA Ongoing
Action LPT15 – Channel Improvement & Inline Detention Pond (F216-00-00)
Hazards Mitigated: Flooding
New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP,
PDM, FMA
Short-term
Action LPT16 – One Regional Detention Pond for Pinegrove Valley & residents along L St. and P St. (F101-06-00)
Hazards Mitigated: Flooding
New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP,
PDM, FMA
Short-term
City of La Porte
15-15
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action LPT17 – Construct new Public Works facility
Hazards Mitigated: Severe Weather, Hurricane
Existing 10, 11, 13, 15 Public Works Parks and Recreation High General Funds, HMGP,
PDM, FMA
Short-term
Action LPT18 – Implement Debris Management Program
Hazards Mitigated: Earthquake, Flooding, Severe Weather, Hurricane, Tsunami, Wildfire
Existing 7, 9, 10, 13 Public Works OEM Low Staff Time, General Funds Ongoing
Action LPT19 – Construct safe rooms in vulnerable public areas (Ex: parks and various public buildings)
Hazards Mitigated: Severe Weather
New and Existing 3, 10, 11, 13 Parks and
Recreation
OEM High General Funds, HMGP,
PDM
Short-term
Action LPT20 – Install a covered parking area (protective structure) at Public Works and/or the Police Department for City vehicles and
equipment in order to decrease the potential for damage as a result of hail.
Hazards Mitigated: Severe Weather, Hurricane
Existing 11, 12, 13 Police
Department
OEM Low General Funds, HMGP,
PDM, FMA
Short-term
Action LPT21 – Bob’s Gully Drainage Improvements
Hazards Mitigated: Flooding
New and Existing 4, 8, 10, 11, 12 Public Works Planning High General Funds, HMGP,
PDM, FMA
Short-term
Action LPT22 – Enhance and expand the City’s current outdoor warning sirens to provide coverage to areas not in audible range at this
time.
Hazards Mitigated: Severe Weather
New 1, 10 OEM Police Department Low General Funds Ongoing
Action LPT23 – Battleground Estates Phase II Drainage Improvements
Hazards Mitigated: Flooding
New and Existing 4, 8, 10, 11, 12 Public Works Planning Medium General Funds, HMGP,
PDM, FMA
Short-term
Action LPT24 – Development/modification of ordinances for mitigation of drought related hazards by restricting or limiting water use
during drought conditions and water shortages.
Hazards Mitigated: Drought
New and Existing 8, 9, 10, 11, 14 Public Works Finance Low Staff Time Short-term
Action LPT25 – Develop/implement water smart program to educate the public on how to conserve water, especially during drought
conditions.
Hazards Mitigated: Drought
New and Existing 8, 9, 10, 11, 14 Public Works Finance Low Staff Time, General Funds Ongoing
Action LPT26— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Dam Failure, Drought, Earthquake, Flooding, Mass Movement, Severe Weather, Hurricane, Wildfire, Coastal Erosion
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
City
Administration
HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
15-16
Table 15-15. Mitigation Action Priority
Action #
# of Objectives Met Benefits Costs
Do Benefits Equal or Exceed Costs?
Is Project Grant-Eligible?
Can Project Be Funded Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
LPT1 3 High High Yes Yes No Medium High
LPT2 7 Medium Low Yes No Yes High Low
LPT3 4 Low Low Yes No Yes High Low
LPT4 6 Medium Low Yes No Yes High Low
LPT5 5 Medium High No Yes No High High
LPT6 3 High Medium Yes Yes No Medium Medium
LPT7 5 High Medium Yes Yes No High High
LPT8 5 Medium High No Yes No High Medium
LPT9 5 Medium Medium Yes Yes No High Medium
LPT10 5 High High Yes Yes No High High
LPT11 5 High High Yes Yes Yes High High
LPT12 5 High High, Yes Yes No High High
LPT13 6 High Low Yes Yes No Low Low
LPT14 4 High High Yes Yes No Low Low
LPT15 5 High High Yes Yes Yes High High
LPT16 5 High High Yes Yes No Medium Medium
LPT17 4 High High Yes Yes No Low Low
LPT18 4 Low Low Yes No Yes Low Low
LPT19 4 Low High No Yes No Low Low
LPT20 3 Medium Low Yes Yes No Medium Medium
LPT21 5 Medium High No Yes No High Medium
LPT22 2 Low Low Yes No No Low Low
LPT23 5 Medium Medium Yes Yes No Medium Medium
LPT24 5 Low Low Yes No Yes Low Low
LPT25 5 Low Low Yes No Yes Low Low
LPT26 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
City of La Porte
15-17
Table 15-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather LPT-2, 4, 18,
26
LPT-6, 17, 19,
20
LPT4, 18, 26 LPT-6, 20,
22, 26
LPT-17, 19, 20 LPT-2, 3, 4, 22,
18, 26
Hurricane LPT-1, 2, 14,
18, 26
LPT-1, 6, 14,
17, 20
LPT-18, 26 LPT-6, 20,
26
LPT-8, 17, 20 LPT-2, 3, 18, 26
Flooding LPT-1, 2, 4,
7, 14, 18, 26
LPT-1, 14 LPT-4, 13,
18, 26
LPT-13, 26 LPT-5, 8, 9, 10,
11, 15, 16, 21, 23
LPT-2, 3, 4, 7,
18, 26
Low-Risk Hazards
Dam Failure LPT-2, 26 LP{T26 LPT26 LPT-2, 3, 26
Drought LPT-2, 24,
25, 26
LPT-25, 26 LPT26 LPT-2, 3, 24,
25, 26
Earthquake LPT-2, 18, 26 LPT-18, 26 LPT26 LPT-2, 3, 18, 26
Mass Movement LPT-2, 26 LPT26 LPT26 LPT-2, 3, 26
Tsunami LPT-2, 18, 26 LPT-18, 26 LPT26 LPT-2, 3, 18, 26
Wildfire LPT-2, 18, 26 LPT-18, 26 LPT26 LPT-2, 3, 18, 26
a. See the introduction to this volume for explanation of mitigation types.
15.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• La Porte Municipal Code — The municipal code/code of ordinances was reviewed for the full
capability assessment and for identifying opportunities for action plan integration.
• La Porte Flood Damage Prevention Ordinance — The flood damage prevention ordinance was
reviewed for compliance with the National Flood Insurance Program.
• La Porte Comprehensive Plan – The comprehensive plan was used to answer various questions related
to future growth in the city, building and zoning practices, and existing plans related to mitigation
activities.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«225¬«225¬«146¬«146HoustonHoustonBaytownDeer ParkPasadenaMorgan'sPointShoreacresPasadenaPasadenaCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.71.40.35Miles±La Porte
¬«225
¬«225
¬«146
¬«146
Houston
Houston
Baytown
Deer Park
Pasadena
Morgan's
Point
Shoreacres
Pasadena
Pasadena
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.7 1.40.35 Miles
±
La Porte
¬«225
¬«225
¬«146
¬«146
Houston
Houston
Baytown
Deer Park
Pasadena
Morgan's
Point
Shoreacres
Pasadena
Pasadena
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.7 1.40.35 Miles
±
La Porte
¬«225
¬«225
¬«146
¬«146
Houston
Houston
Baytown
Deer Park
Pasadena
Morgan's
Point
Shoreacres
Pasadena
Pasadena
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.7 1.40.35 Miles
±
La Porte
¬«225
¬«225
¬«146
¬«146
Houston
Houston
Baytown
Deer Park
Pasadena
Morgan's
Point
Shoreacres
Pasadena
Pasadena
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.7 1.40.35 Miles
±
La Porte
¬«225
¬«225
¬«146
¬«146
Houston
Houston
Baytown
Deer Park
Pasadena
Morgan's
Point
Shoreacres
Pasadena
Pasadena
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.7 1.40.35 Miles
±
La Porte
¬«225
¬«225
¬«146
¬«146
Houston
Houston
Baytown
Deer Park
Pasadena
Morgan's
Point
Shoreacres
Pasadena
Pasadena
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.7 1.40.35 Miles
±
La Porte
16-1
16. CITY OF MISSOURI CITY
16.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Trameka Jewett, Emergency Management Coordinator
3849 Cartwright Road
Missouri City, Texas 77459
Telephone: 281-403-4370
email address:trameka.jewett@missouricitytx.gov
Matt Rios, Assistant Chief- Fire Marshal
3849 Cartwright Road
Missouri City, Texas 77459
Telephone: 281-403-4309
email address:mrios@missouricitytx.gov
16.2 JURISDICTION PROFILE
16.2.1 Location
The City of Missouri City is located on the east side of Fort Bend County, and a small portion of the city is
located within the southern portion of Harris County. The total square miles located within the city limits is 30.3.
The City of Missouri City’s Fire and Rescue Services also responds to a portion of our Extra-Territorial
Jurisdiction, located within Fort Bend County, which is the city’s unincorporated limits.
The current boundaries generally extend west of the eastern City of Sugar Land’s city limits along Hwy 6 to the
western city limit of Arcola. The City of Missouri City’s northern borders abut the southern edges of the City of
Stafford and portions of Harris County. The southern portion of our city limits currently abuts the Fort Bend
County limits encompassing an area of approximately 30 square miles.
16.2.2 History
The City of Missouri City was incorporated in February of 1956 and had an approximate city population of
75,000 as of 2017. In October of 1894, Missouri City was officially registered in the records of Harris County
clerk and September of 1895 in Fort Bend County, thus marking the first beginnings of Missouri City. Since this
time, Missouri City has grown, not only in its small 600 citizen population at the time of registration but also in its
land use. Long gone are the days of farmers and ranchers that settled the land in the early 1800s, the city now
boasts 488 miles of streets and roads, 35 parks and undeveloped areas that cover almost 920 acres, as well as an
above the state average for median household income.
16.2.3 Climate
The climate in the City of Missouri City typically have summers that are long, hot, and oppressive; the winters are
short, cold, and windy; and it is wet and partly cloudy year-round. Over the year, the temperature typically varies
from 45°F to 93°F and is rarely below 33°F or above 98°F.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
16-2
16.2.4 Governing Body Format
The City of Missouri City is governed as a general law city with a Mayor, Mayor Pro-Tem, and five City Council
Members. These elected officials are supported by a City Manager, Assistant City Managers, City Secretary, Fire
and Police Chiefs, Human Resources Director, Municipal Court Director, and Public Works Director.
The City Council assumes responsibility for the adoption of this plan; City Manager will oversee its
implementation. Development of this annex was carried out by the members of the local mitigation planning
team, whose members are listed in Table 1-1.
Table 16-1. Local Mitigation Planning Team Members
Name Title
Eugene Campbell, Jr. Fire Chief
Shashi Kumar Public Works Director
Matt Rios Assistant Chief- Fire Marshal
16.3 CURRENT TRENDS
16.3.1 Population
According to the U.S. Census, the population of the City of Missouri City as of July 2017 was 74,497. Since April
2010, the population has grown at an average annual rate of 11.7 percent.
1.3.2 Development
Table 16-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
Table 16-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
NO
• If yes, give the estimated area annexed and estimated number of parcels or structures.
Is your jurisdiction expected to annex any areas during the performance period of this plan?
NO
• If yes, describe land areas and dominant uses.
• If yes, who currently has permitting authority over these areas?
Are any areas targeted for development or major redevelopment in the next five years? Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk
areas
The Texas Parkway corridor is undergoing revitalization efforts and is not in any
known hazard risk areas
City of Missouri City
16-3
Criterion Response
How many permits for new construction were issued in your jurisdiction since the
preparation of the previous hazard mitigation
plan?
2014 2015 2016 2017 2018
Single Family 333 303 251 331 501
Multi-Family 312 29 215 0 0
Other (commercial, mixed use, etc.) 307 448 315 385 692
Total 952 753 781 716 1193
Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred.
• Special Flood Hazard Areas: # 0
• Landslide: # 0
• High Liquefaction Areas: # 0
• Tsunami Inundation Area: # 0
• Wildfire Risk Areas: # 0
Describe the level of buildout in the
jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description.
Currently, there several areas of land that are being developed for commercial use as
well as residential construction. The Hwy 90A and Beltway 8 area are scheduled to
build an estimated 1.5 to 3 million square feet of warehouse/ office building in the
next two years alone. Hwy 6 south is also developing additional commercial retail
areas with the majority of the new construction near the Fort Bend Toll road area.
Along the Fort Bend Toll Road area, a large amount of new residential construction is
developing along with a new 270,000 sf power center and mixture of commercial
small retail shops intermingled within the new subdivisions and commercial space..
16.4 CAPABILITY ASSESSMENT
The City of Missouri City performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 16-3.
• Development and permitting capabilities are presented in Table 16-4.
• An assessment of fiscal capabilities is presented in Table 16-5.
• An assessment of administrative and technical capabilities is presented in Table 16-6.
• An assessment of education and outreach capabilities is presented in Table 16-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 16-8.
• Classifications under various community mitigation programs are presented in Table 16-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 16-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
16-4
Table 16-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No No No
Comment: International Building Code (03-02-2015, Ordinance O-15-08)
Zoning Code Yes No Yes No
Comment: Zoning Ordinance (01-19-1981, Ordinance O-81-1)
Subdivisions Yes No Yes Yes
Comment: Subdivision Ordinance (03-18-1974, Ordinance No. 158)
Stormwater Management Yes Yes Yes Yes
Comment: Updated May 2014
Post-Disaster Recovery No No No No
Comment:
Real Estate Disclosure No No No No
Comment:
Growth Management Yes Yes No Yes
Comment:
Site Plan Review Yes Yes Yes Yes
Comment: See Building Code, Zoning Ordinance, Subdivision Ordinance above
Environmental Protection No No No No
Comment:
Flood Damage Prevention Yes Yes Yes Yes
Comment:
Emergency Management Yes Yes Yes Yes
Comment:
Climate Change No No No No
Comment:
Planning Documents
General Plan Yes No Yes Yes Comment: 2017 Missouri City Comprehensive Plan (06-19-2017, Ordinance O-17-16)
Capital Improvement Plan Yes No No Yes
How often is the plan updated? Annually
Comment:
Disaster Debris Management Plan No No No No
Comment:
Floodplain or Watershed Plan Yes Yes No Yes
Comment:
Stormwater Plan Yes Yes Yes Yes
Comment:
Urban Water Management Plan No No No No
Comment:
Habitat Conservation Plan No No No No
Comment:
Economic Development Plan Yes No No No
Comment:
City plan
Shoreline Management Plan No No No No
Comment:
City of Missouri City
16-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Community Wildfire Protection Plan Yes Yes No No
Comment:
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes Yes No No
Comment: Annex in Fort Bend Co. Plan
Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes No No
Comment:
Post-Disaster Recovery Plan Yes Yes No No
Comment:
Fort Bend
Co. Annex
Continuity of Operations Plan Yes Yes No No
Comment:
Public Health Plan Yes Yes No No
Comment: Fort Bend Co. Annex
Table 16-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Development Services
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? Yes
Table 16-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes (water and sewer)
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
16-6
Table 16-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Development Services; Public
Works/City of Missouri City/Director,
Assistant Director, Manager
Engineers or professionals trained in building or infrastructure construction practices Yes Public Works Director and Building
Officials office
Planners or engineers with an understanding of natural hazards No
Staff with training in benefit/cost analysis Yes Finance Director/ Department
Surveyors No Contracted out
Personnel skilled or trained in GIS applications Yes Public Works/City of Missouri City/GIS
Division
Scientist familiar with natural hazards in local area No
Emergency manager Yes Fire Department/ EMC
Grant writers No
Table 16-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
The Fort Bend County Hazard mitigation plan that
our city has an annex in is available on the city’s
website.
• If yes, briefly describe.
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. Through messages and information on our, City
maintained website
Do you have any citizen boards or commissions that address issues related
to hazard mitigation?
No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
We have a “Missouri City Ready” website,
specifically for Emergency Management
communications.
• If yes, briefly describe.
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Alert Center through City website through email and
cell phone options.
City of Missouri City
16-7
Table 16-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Public Works
Who is your floodplain administrator? (department/position) Public Works/ Director
Are any certified floodplain managers on staff in your jurisdiction? Public Works/ City Engineer
What is the date that your flood damage prevention ordinance was last amended? March 3rd, 2014
Does your floodplain management program meet or exceed minimum requirements? Exceeds
• If exceeds, in what ways? the requirement that lowest finished flows
be elevated 12 inches above base flood
elevation
When was the most recent Community Assistance Visit or Community Assistance
Contact?
Scheduled August 15th, 2019
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
However, backwater impacts are not
mapped
• If no, state why.
Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes
• If so, what type of assistance/training is needed? Financial Assistance
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification? Yes
• If no, is your jurisdiction interested in joining the CRS program?
How many flood insurance policies are in force in your jurisdiction?a Approximately 4,000
• What is the insurance in force? $Unknown
• What is the premium in force? $Unknown
How many total loss claims have been filed in your jurisdiction?a 120
• How many claims are still open or were closed without payment? 116
• What were the total payments for losses? $1,992,728
a. According to FEMA statistics as of December 2018
Table 16-9. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes 7 October 1st, 2017
Building Code Effectiveness Grading Schedule Yes ISO 1 August 1st, 2016
Public Protection No N/A
Storm Ready No N/A
Firewise No N/A
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
16-8
Table 16-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Rating
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Missouri City
16-9
16.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
16.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Fort Bend County Hazard Mitigation Plan
16.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• City of Missouri City Comprehensive Plan: As the City continues to grow, issues such as an aging
infrastructure, the preservation of neighborhoods, encouraging economic development and strategic
investments continue to emerge as challenges which the community must address. This Plan is provided
to assist all members of the community in responding to these challenges ahead and to build upon the
City’s reputation as an inclusive, beautiful, safe, enjoyable and overall great place to live.
• City of Missouri City Subdivision Ordinance: All subdivisions in the city and in its extraterritorial
jurisdiction shall be platted in conformance with the comprehensive plan of the city.
16.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 16-11 lists past occurrences of natural hazards for which specific damage was recorded in Missouri City.
Other hazard events that broadly affected the entire planning area, including Missouri City, are listed in the risk
assessments in Volume 1 of this hazard mitigation plan.
16.7 HAZARD RISK RANKING
Table 16-12 presents a local ranking for Missouri City of all hazards of concern for which this hazard mitigation
plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As
described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for
each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target
hazards with high and medium rankings.
16.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
16-10
Table 16-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Rain event/ flooding N/A 5-7-19 Unknown, street flooding in multiple areas
Hurricane Harvey DR-4332 8/23/17 $Unknown
Rain/ Flooding event DR-4269 4/18/16 $Unknown
Wind/ Thunderstorm DR-4272 5/29/15 $2,000
Wind/ Thunderstorm N/A 5/18/15 $50,000
Rain/ Flooding N/A 4/28/09 Unknown
Wildfire N/A 5/26/06 303 Acres burned
Hail N/A 4/11/04 $15,000
Hail N/A 4/7/03 $5,000
Hail N/A 3/30/02 $Unknown
Rain/ Tropical Storm N/A 6/7/01 $Unknown
Hail N/A 4/16/01 $2,000,000
Hail N/A 7/17/98 $5,000
Rain/ Tropical Storm N/A 7/29/95 Unknown
Tornado N/A 4/7/93 $50,000
Table 16-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
2 Hurricane 35 High
3 Flood 32 High
4 Dam/Levee Failure 18 Medium
5 Drought 15 Medium
6 Earthquake 14 Low
7 Wildfire 6 Low
7 Mass Movements 6 Low
8 Coastal Erosion 0 (No Exposure) None
8 Tsunami 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
16.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 48
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 5
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 2
16.8.2 Other Noted Vulnerabilities
No jurisdiction-specific issues were identified from a review of the results of the risk assessment and other
available resources.
City of Missouri City
16-11
16.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 16-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 16-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update
1. Detention Area Outfall and Levee Improvements No x MSS16
Comment: At Kitty Hollow Lake, Vicksburg Diversion Channel, Weir Enlargement, and channel improvements for the Vicksburg
Diversion Channel
2. Channel Improvements No x MSS17
Comment: Along Mustang Bayou Diversion Channel from the confluence with the old channel to Kitty Hollow Lake Detention area
3. Replace Culvert No x MSS18
Comment: Replacement of the Watts-Plantation Road Culvert with appropriately sized box culverts
4. Channel Improvements Ongoing x MSS19
Comment: Mustang Bayou Channel from the GCWA Canal thru Thunderbird North Subdivision including the reconstruction of the bridge
at Turtle Creek Dr.
5. Channel Improvements Yes x MSS20
Comment: Along Mustang Bayou from the Thunderbird North Subdivision to the confluence with old channel; including pipeline
relocations and a sheet pile structure.
6. Extend Canal Flume No x MSS21
Comment: Extend Briscoe Canal Flume over Lower Oyster Creek
7. Channel Improvements No x MSS22
Comment: Along Long Point Creek Overflow Channel upstream of the Brisco Canal Flume
8. Promote Flood Insurance Ongoing x MSS23
Comment: Providing information about the National Flood Insurance Program
9. Improve NFIP CRS Rating Ongoing x MSS24
Comment: Evaluate ways to improve the City’s Community Rating System (CRS) to reduce the Flood Insurance Premium
10. Understanding Dam/Levee Failure Risks No x MSS25
Comment: Engage with County and State Floodplain Managers, Engineers and Emergency Managers to ensure that local officials have
a detailed understanding of potential risks to the community from dam and/or levee failures
11. Evacuation Plans Ongoing x MSS26
Comment: Engage with County and State Floodplain Managers, Engineers and Emergency Managers to ensure that local officials have
a detailed understanding of potential risks to the community from dam and/or levee failures. This will allow for a more
comprehensive evacuation plan, routes, and at-risk areas that will need to be focused on in the event of an evacuation
notice.
12. Upgrades to At-Risk Public Structures No x MSS27
Comment: Initiate upgrades to at-risk public facilities that includes structurally fortifying facilities, impact resistant film or glass, surge
protection systems, mandate freeboard for new development, etc. Mitigates specific risks to structures, people, and
operations.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
16-12
16.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 16-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 16-15
identifies the priority for each action. Table 16-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 16-14. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action MSS1 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions within the
community of Missouri City.
Hazards Mitigated: Levee failure, drought, flooding, wildfire
New 9, 10, 11,14 City Administration TBD Low Staff Time, General Funds Ongoing
Action MSS2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Flood, Dam/Levee Failure, Drought, Earthquake, Wildfire, Mass Movements
New and Existing 9, 10, 11,14 City Administration TBD Low Staff Time, General Funds Short-term
Action MSS3 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Levee failure, flooding, severe weather, hurricane
New and Existing 3, 10, 11,14 City Administration TBD Low Staff Time, General Funds Ongoing
Action MSS4 — Detention Area Outfall and Levee Improvements (At Kitty Hollow Lake, Vicksburg Diversion Channel, Weir Enlargement,
and channel improvements for the Vicksburg Diversion Channel)
Hazards Mitigated: Flooding, Severe Weather, Hurricane
Existing 7,11 City Administration TBD High General and/or Grant funds Long term
Action MSS5 — Channel Improvements along Mustang Bayou Diversion Channel from the confluence with the old channel to Kitty
Hollow Lake Detention area
Hazards Mitigated: Flooding, Severe Weather, Hurricane
Existing 7,11 City Administration TBD High General and/or Grant funds Long term
Action MSS6 — Replacement of the Watts-Plantation Road Culvert with appropriately sized box culverts
Hazards Mitigated: Flooding, Severe Weather, Hurricane
New 7,11 City Administration TBD High General and/or Grant funds Long term
Action MSS7 — Channel improvements along Mustang Bayou Channel from the GCWA Canal thru Thunderbird North Subdivision
including the reconstruction of the bridge at Turtle Creek Dr.
Hazards Mitigated: Flooding, Severe Weather, Hurricane
New and Existing 7,11 City Administration TBD High General and/or Grant funds Long term
Action MSS8 — Channel improvements along Mustang Bayou from the Thunderbird North Subdivision to the confluence with old
channel; including pipeline relocations and a sheet pile structure.
Hazards Mitigated: Flooding, Severe Weather, Hurricane
New and Existing 7,11 City Administration TBD High General and/or Grant funds Long term
Action MSS9 — Extend Briscoe Canal Flume over Lower Oyster Creek
Hazards Mitigated: Flooding, Severe Weather, Hurricane
New and Existing 7,11 City Administration TBD High General and/or Grant funds Long term
Action MSS10 — Channel improvements along Long Point Creek Overflow Channel upstream of the Briscoe Canal Flume
Hazards Mitigated: Flooding, Severe Weather, Hurricane
New and Existing 7,11 City Administration TBD High General and/or Grant funds Long term
City of Missouri City
16-13
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action MSS11 — Promote Flood Insurance
Hazards Mitigated: Flooding
New and Existing 9 City Administration TBD Low Staff Time, General Funds Short term
Action MSS12 — Improve NFIP CRS Rating
Hazards Mitigated: Flooding
New and Existing 9 City Administration TBD Low Staff Time, General Funds Short term
Action MSS13 — Engage with County and State Floodplain Managers, Engineers and Emergency Managers to ensure that local officials
have a detailed understanding of potential risks to the community from dam and/or levee failures
Hazards Mitigated: Dam and Levee Failure
Existing 3,7,9,11 City Administration High Low Staff Time, General Funds Short term
Action MSS14 — Develop evacuation plans in the event of dam and/or levee failures
Hazards Mitigated: Dam and Levee Failure
Existing 9,10 City Administration TBD Low Staff Time, General Funds Short term
Action MSS15 — Initiate upgrades to at-risk public facilities that includes structurally fortifying facilities, impact resistant film or glass,
surge protection systems, mandate freeboard for new development, etc. Mitigates specific risks to structures, people, and operations
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire
Existing 11,13 City Administration TBD High General and/or Grant funds Long term
Action MSS16 — Detention Area Outfall and Levee Improvements. At Kitty Hollow Lake, Vicksburg Diversion Channel, Weir
Enlargement, and channel improvements for the Vicksburg Diversion Channel
Hazards Mitigated: Flood, Severe Weather
Existing 11,13,15 City Administration TBD High General and/or Grant funds Short
Term
Action MSS17 — Channel Improvements. Along Mustang Bayou Diversion Channel from the confluence with the old channel to Kitty
Hollow Lake Detention area
Hazards Mitigated: Flood, Severe Weather
Existing 11,13,15 City Administration TBD High General and/or Grant funds Short
Term
Action MSS18 — Culvert Replacement. Replacement of the Watts-Plantation Road Culvert with appropriately sized box culverts
Hazards Mitigated: Flood, Severe Weather
Existing 11,13,15 City Administration TBD High General and/or Grant funds Short
Term
Action MSS19 — Channel Improvements. Mustang Bayou Channel from the GCWA Canal thru Thunderbird North Subdivision including
the reconstruction of the bridge at Turtle Creek Dr.
Hazards Mitigated: Flood, Severe Weather
Existing 11,13,15 City Administration TBD High General and/or Grant funds Short
Term
Action MSS20 — Channel improvements. Along Mustang Bayou from the Thunderbird North Subdivision to the confluence with old
channel; including pipeline relocations and a sheet pile structure.
Hazards Mitigated: Flood Severe weather
Existing 11,13,15 City Administration TBD High General and/or Grant funds Short
Term
Action MSS21 — Extend Briscoe Canal Flume over Lower Oyster Creek
Hazards Mitigated: Flood, Severe Weather
New 11,13,15 City Administration TBD High General and/or Grant funds Short
Term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
16-14
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action MSS22 — Channel Improvements. Along Long Point Creek Overflow Channel upstream of the Brisco Canal Flume
Hazards Mitigated: Flood, Severe Weather
Existing 11,13,15 City Administration TBD High General and/or Grant funds Short
Term
Action MSS23 — Promote Flood Insurance. Providing information about the National Flood Insurance Program
Hazards Mitigated: Flood, Severe Weather
New and Existing 3,9,10 Public Works HCFCD Low General Fund Ongoing
Action MSS24 — Improve CRS rating. Evaluate ways to improve the City’s Community Rating System (CRS) to reduce the Flood
Insurance Premium
Hazards Mitigated: Flood, Severe Weather
New and Existing 3,9,10 Public Works TBD Low General Fund )n-going
Action MSS25 — Engage with County and State Floodplain Managers, Engineers and Emergency Managers to ensure that local officials
have a detailed understanding of potential risks to the community from dam and/or levee failures
Hazards Mitigated: Dam/Levee failure Flood , Severe Weather
Existing 11,13,15 Public Works HCFCD High General and/or Grant funds Short
Term
Action MSS26 — Engage with County and State Floodplain Managers, Engineers and Emergency Managers to ensure that local officials
have a detailed understanding of potential risks to the community from dam and/or levee failures. This will allow for a more
comprehensive evacuation plan, routes, and at-risk areas that will need to be focused on in the event of an evacuation notice.
Hazards Mitigated: Dam/Levee failure Flood , Severe Weather
New and Existing 1,3,7,9,10,15 Emergency
Management
Public Works High General and/or Grant funds Short
Term
Action MSS27 — Initiate upgrades to at-risk public facilities that includes structurally fortifying facilities, impact resistant film or glass,
surge protection systems, mandate freeboard for new development, etc. Mitigates specific risks to structures, people, and operations
Hazards Mitigated: Hurricane, Severe Weather, Flood
Existing 13,15 City Administration TBD High General and/or Grant funds Short
Term
Action MSS28— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flood, Dam/Levee Failure, Drought, Earthquake, Wildfire, Mass Movements
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
City Administration HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
City of Missouri City
16-15
Table 16-15. Mitigation Action Priority
Action #
# of Objectives Met Benefits Costs
Do Benefits Equal or Exceed Costs?
Is Project Grant-Eligible?
Can Project Be
Funded Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
MSS1 4 High Low Yes No Yes High Low
MSS2 4 Medium Low Yes No Yes High Low
MSS3 4 Low Low Yes No Yes High Low
MSS4 2 High High Yes Yes No High High
MSS5 2 High High Yes Yes No High High
MSS6 2 High High Yes Yes No High High
MSS7 2 High High Yes Yes No High High
MSS8 2 High High Yes Yes No High High
MSS9 2 High High Yes Yes No High High
MSS10 2 High High Yes Yes No High High
MSS11 1 Medium Low Yes No Yes Medium Low
MSS12 1 Medium Low Yes No Yes Medium Low
MSS13 4 Medium Low Yes No Yes Medium Low
MSS14 2 Medium Low Yes No Yes Medium Low
MSS15 2 High High Yes Yes No High High
MSS16 3 High High Yes Yes No Medium High
MSS17 3 High High Yes Yes No Medium High
MSS18 3 High High Yes Yes No Medium High
MSS19 3 High High Yes Yes No Medium High
MSS20 3 High High Yes Yes No Medium High
MSS21 3 High High Yes Yes No Medium High
MSS22 3 High High Yes Yes No Medium High
MSS23 3 Medium Low Yes No Yes High None
MSS24 3 Medium Low Yes No Yes High None
MSS25 3 High High Yes Yes No Medium High
MSS26 6 High High Yes Yes No Medium High
MSS27 2 High High Yes Yes No Medium High
MSS28 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
16-16
Table 16-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Hurricanes/ Coastal
Storms
MSS4,5,6,7
,8,9,15, 28
MSS3,15,27 MSS28 MSS25, 28 MSS4,5,6,7,
8,9,10,15
MSS2,3,25,
28
Flood MSS1,4,5,6
,7,8,9,10,15
,24, 28
MSS3,15,23,
24,27
MSS11,23,24,
28
MSS1,24 MSS24,25,
28
MSS4,5,6,7,
8,9,10,15,16,
17,18,19,20,
21,22,24
MSS11,24 MSS1,2,3,11
,12,24,25, 28
Severe Weather MSS4,5,6,7
,8,9,10,15,
28
MSS3,15,27 MSS28 MSS25, 28 MSS4,5,6,7,
8,9,10,15,16,
17,18,19,20,
21,22
MSS2,3,25,
28
Medium-Risk Hazards
Dam/ Levee Failure MSS1,13,1
4, 238
MSS3 MSS13, 28 MSS1 MSS28 MSS1,2,3,13
,14, 28
Drought MSS1, 28 MSS28 MSS1 MSS28 MSS1,2, 289
Low-Risk Hazards
Wildfire MSS1,15,
28
MSS15 MSS28 MSS1 MSS28 MSS15 MSS1,2, 28
Mass Movements MSS28 MSS28 MSS28 MSS2, 28
Earthquake MSS15, 28 MSS15 MSS28 MSS15 MSS2, 28
a. See the introduction to this volume for explanation of mitigation types.
16.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• Municipal Code — The municipal code was reviewed for the full capability assessment and for
identifying opportunities for action plan integration.
• Flood Damage Prevention Ordinance — The flood damage prevention ordinance was reviewed for
compliance with the National Flood Insurance Program.
• Fort Bend County Hazard Mitigation Plan- Reviewed Missouri City’s Annex for data to complete
Phase 2 document
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«6¬«6¬«6§¨¦69£¤90£¤90HoustonMeadowsPlaceStaffordPearlandPearlandCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.951.90.475Miles±Missouri City
¬«6
¬«6
¬«6
§¨¦69
£¤90
£¤90
Houston
Meadows
Place
Stafford
Pearland
Pearland
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.95 1.90.475 Miles
±
Missouri City
¬«6
¬«6
¬«6
§¨¦69
£¤90
£¤90
Houston
Meadows
Place
Stafford
Pearland
Pearland
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.95 1.90.475 Miles
±
Missouri City
¬«6
¬«6
¬«6
§¨¦69
£¤90
£¤90
Houston
Meadows
Place
Stafford
Pearland
Pearland
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.95 1.90.475 Miles
±
Missouri City
¬«6
¬«6
¬«6
§¨¦69
£¤90
£¤90
Houston
Meadows
Place
Stafford
Pearland
Pearland
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.95 1.90.475 Miles
±
Missouri City
¬«6
¬«6
¬«6
§¨¦69
£¤90
£¤90
Houston
Meadows
Place
Stafford
Pearland
Pearland
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.95 1.90.475 Miles
±
Missouri City
¬«6
¬«6
¬«6
§¨¦69
£¤90
£¤90
Houston
Meadows
Place
Stafford
Pearland
Pearland
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.95 1.90.475 Miles
±
Missouri City
17-1
17. CITY OF MORGAN’S POINT
17.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Chief Sherri Ditrich
510 Bayridge
Morgan’s Point, TX. 77571
281-471-2171
sditrich@morganspoint-tx.com
Brian Schneider
510 Bayridge
Morgan’s Point, TX. 77571
281-471-2171
bschneider@morganspoint-tx.com
17.2 JURISDICTION PROFILE
17.2.1 Location
City of Morgan’s Point is located 30 miles east of Houston in Harris County adjacent to Galveston Bay at the inlet
to the Houston Ship Channel.
17.2.2 History
Located at the junction of Buffalo Bayou and San Jacinto Bay, the townsite of New Washington was settled by
Col. James Morgan (1786-1866), who bought 1600 acres of land in the area in 1835. A native of Philadelphia,
Morgan had come to Texas in 1830 and served at various times and places as merchant, civic leader, and land
agent. While away from his home, serving as a colonel during the Texas Revolution, Mexican troops burned the
town of New Washington. After the war, Morgan and others rebuilt New Washington, and the townsite began to
flourish. Morgan realized, however, that it could never compete with the growth of nearby Houston, and during
the 1850s he began to promote plans for a channel along Buffalo Bayou that would increase the region’s trade
potential. That dream was completed in 1876 with the dredging of the Houston Ship Channel by steamship tycoon
Charles Morgan. As Houston continued to grow, New Washington was recognized only as a major bend for the
ship traffic along the bayou. Now known as Morgan’s Point, the townsite was incorporated in 1949 and stands as
a reminder of the early commercial history of Harris County.
The peninsula on Galveston Bay known as Morgan’s Point was named for early landowner Colonel James
Morgan. Later the area became a favorite summer retreat for wealthy Houston residents who sought refuge from
the oppressive heat and humidity of the city. The bluff attracted Gulf breezes and boasted spectacular views and
recreational potential. In 1893, twelve prominent Houston families formed the Bay Ridge Park Association and
acquired 40 acres of land on which they constructed a resort community for summer residency. To allow each
family beachfront property the land was platted into long narrow lots chosen by ballots. The first houses built
were modest one-and two-story frame dwellings with verandas; most featured Eastlake and Queen Anne style
detailing. Homes built in the early 20th century were designed by renowned architects and reflected various styles
including Mediterranean revival, colonial revival, and prairie school. Among the many grand houses is one
patterned after the White House built for Texas Governor Ross Sterling and his wife Maude. Listed on the
National register of Historic Places, the area is one of Texas’ most significant seaside residential developments.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
17-2
17.2.3 Climate
The climate of City of Morgan’s Point is warm with mild winters.
17.2.4 Governing Body Format
City of Morgan’s Point is a Type-B General Law, Council form of government. The City assumes responsibility
for the adoption of this plan; Harris County will oversee its implementation. Development of this annex was
carried out by the members of the local mitigation planning team, whose members are listed in Table 17-1.
Table 17-1. Local Mitigation Planning Team Members
Name Title
Sherri Ditrich Chief of Police/EMC
Brian Schneider City Administrator
17.3 CURRENT TRENDS
17.3.1 Population
According to United States Census Bureau, the population of the City of Morgan’s Point, as of 2010, was 339.
Since 2010, the population has grown at an average annual rate of 0 percent.
17.3.2 Development
The City of Morgan’s Point commercial and industrial zoned land is built out. There is approximately seventy
acres available for residential development. On average, one home is built every five years.
Table 17-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
17.4 CAPABILITY ASSESSMENT
The City of Morgan’s Point performed an assessment of its existing capabilities for implementing hazard
mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 17-3.
• Development and permitting capabilities are presented in Table 17-4.
• An assessment of fiscal capabilities is presented in Table 17-5.
• An assessment of administrative and technical capabilities is presented in Table 17-6.
• An assessment of education and outreach capabilities is presented in Table 17-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 17-8.
• Classifications under various community mitigation programs are presented in Table 17-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 17-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
City of Morgan’s Point
17-3
Table 17-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
Is your jurisdiction expected to annex any areas during the performance period of this plan?
No
• If yes, describe land areas and dominant uses.
• If yes, who currently has permitting authority over these areas?
Are any areas targeted for development or major redevelopment in the next five years? No
• If yes, briefly describe, including whether any of the areas are in known hazard risk
areas
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 0 0 0 0 1
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.) 0 0 0 0 0
Total 0 0 0 0 1
Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development
has occurred.
• Special Flood Hazard Areas: 0
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s
buildable lands inventory. If no such inventory exists, provide a qualitative description.
60%
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
17-4
Table 17-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes Yes
Comment: Adopted the 218 IBC in 02/2012, Ord# 19-762
Zoning Code Yes No No Yes
Comment: Adopted 08/2000, Ord#00-432
Subdivisions Yes No No Yes
Comment: Adopted 08/2000, Ord#00-432
Stormwater Management Yes Yes No Yes
Comment: Adopted 08/2000, Ord#00-432,
Post-Disaster Recovery Yes Yes No No
Comment: Ord #13-641, Harris County Annex J
Real Estate Disclosure No No No No
Comment:
Growth Management Yes No No Yes
Comment: Adopted 05/2018, Ord# 18-749
Site Plan Review Yes No No No
Comment: Adopted 08/2000, Ord#00-432
Environmental Protection Yes No No Yes
Comment: Adopted 08/2000, Ord#00-432
Flood Damage Prevention Yes No Yes Yes
Comment: Updated 09/2016, Ord#16-722
Emergency Management Yes Yes No Yes
Comment: Updated 07/2015, Rod# 15-681, Harris County Annex N
Climate Change No No No No
Comment:
Planning Documents
General Plan Yes No No Yes Comment: Comprehensive Plan
Capital Improvement Plan Yes No No Yes
How often is the plan updated?
Comment: As needed
Disaster Debris Management Plan Yes No No Yes
Comment: Contract approved 12/2017; Monitoring Contract approved 09/2016; Contracts are reviewed on an annual basis and the
plans are updated every four & five years
Floodplain or Watershed Plan No Yes No Yes
Comment: HARRIS COUNTY FLOOD CONTROL
Storm water Plan No Yes No Yes
Comment: HARRIS COUNTY FLOOD CONTROL
Urban Water Management Plan No No No No
Comment:
Habitat Conservation Plan No No No No
Comment:
Economic Development Plan Yes No No Yes
Comment: Resolution 1059, 03/2010
Shoreline Management Plan No No No No
Comment:
City of Morgan’s Point
17-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Community Wildfire Protection Plan No Yes No No
Comment: The City of Morgan’s Point does not have its own CWPP implemented. Harris County has completed a county-wide CWPP;
which includes all incorporated jurisdictions within Harris County.
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan No Yes No Yes
Comment: Harris County Annex P
Threat & Hazard Identification & Risk
Assessment (THIRA)
No No No No
Comment:
Post-Disaster Recovery Plan Yes Yes No Yes
Comment: Ord #13-641
Harris County Annex J
Continuity of Operations Plan No No No No
Comment:
Public Health Plan No Yes Yes Yes
Comment: Annex H — Health and Medical is a component of the Emergency Operations Plan and addresses public health,
environmental health, and medical response capabilities. The City does not maintain a standalone Public Health Plan.
Table 17-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Administrative
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? No
Table 17-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes/Through Harris County
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes No
User Fees for Water, Sewer, Gas or Electric Service Yes Water & Waste Water
Incur Debt through General Obligation Bonds No
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs No
Development Impact Fees for Homebuyers or Developers No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
17-6
Table 17-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Contracted/Administration
Engineers or professionals trained in building or infrastructure construction practices Yes Contracted/Administration
Planners or engineers with an understanding of natural hazards Yes Contracted/Administration
Staff with training in benefit/cost analysis Yes City Administrator
Surveyors No
Personnel skilled or trained in GIS applications No
Scientist familiar with natural hazards in local area No
Emergency manager Yes Chief of Police
Grant writers Yes City Administrator
Table 17-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? No
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe.
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. We use our City website and Facebook
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to
communicate hazard-related information?
Yes
• If yes, briefly describe. We have a CTY/Blackboard Messaging services. We
have two (2) digital messaging boards at the
entrances to the city displaying messages if needed.
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Whelan Warning System
City of Morgan’s Point
17-7
Table 17-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Administration
Who is your floodplain administrator? (department/position) KSA Engineering
Are any certified floodplain managers on staff in your jurisdiction? No
What is the date that your flood damage prevention ordinance was last amended? 9/13/2016
Does your floodplain management program meet or exceed minimum requirements? Meets
• If exceeds, in what ways?
When was the most recent Community Assistance Visit or Community Assistance Contact? N/A
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are.
Are any Risk MAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why.
Does your floodplain management staff need any assistance or training to support its floodplain management program? No
• If so, what type of assistance/training is needed?
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification? No
• If no, is your jurisdiction interested in joining the CRS program? Yes
How many flood insurance policies are in force in your jurisdiction? Unknown
• What is the insurance in force? Unknown
• What is the premium in force? Unknown
How many total loss claims have been filed in your jurisdiction? Unknown
• How many claims are still open or were closed without payment? Unknown
• What were the total payments for losses? Unknown
Table 17-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No Date
Building Code Effectiveness Grading Schedule Yes 2 08/14/2014
Public Protection No Date
Storm Ready No Date
Fire wise No Date
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
17-8
Table 17-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents’ knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Morgan’s Point
17-9
17.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
The information on hazards, risk, vulnerability and mitigation contained in this hazard mitigation plan is based on
the best available data. Plan integration is the incorporation of this information into other relevant planning
mechanisms, such as general planning and capital facilities planning. It includes the integration of natural hazard
information and mitigation policies, principles and actions into local planning mechanisms and vice versa.
Additionally, plan integration is achieved though the involvement of key staff and community officials in
collaboratively planning for hazard mitigation.
17.5.1 Existing Integration
In the performance period since adoption of the previous hazard mitigation plan, made progress on integrating
hazard mitigation goals, objectives and actions into other planning initiatives. The following plans and programs
currently integrate components of the hazard mitigation strategy:
• The City of Morgan’s Point adopted a new section (10.41) amending the Building Code with the desire to
adopt regulations for the health, safety, and general welfare of the City.
• Basic Plan — The Basic Plan provides a summary on the hazards and threats in the community.
• Revised and Updated our Comprehensive Plan in 2018, to include Land Use/Growth Management,
Environmental Quality.
Resources listed in this annex were used to provide information for this annex on integration of hazard mitigation
information into other jurisdiction plans or programs.
17.5.2 Opportunities for Future Integration
As this hazard mitigation plan is implemented, City of Morgan’s Point will use information from the plan as the
best available science and data on natural hazards. The capability assessment presented in this annex identifies
codes, plans and programs that provide opportunities for integration. The progress reporting process described in
Volume 1 will outline the progress of area-wide and local hazard mitigation actions related to plan integration.
The annual progress report also will identify new opportunities for integration. The capability assessment
identified the following plans and programs that do not currently integrate goals or recommendations of the
hazard mitigation plan but provide opportunities to do so in the future:
• Capital Improvement Plan — The City of Morgan’s Point can develop a five-year CIP and review it on
a yearly basis as well as integrate the goals, objectives, and projects identified in the Hazard Mitigation
Action Plan into the CIP process.
• Building and Zoning Codes – There is an opportunity for the City to review building and zoning codes
and identify mitigation measures as a priority for existing and future codes.
• Thorough GIS mapping of the City in order to understand the different types of geographical data
currently within the City, then incorporate that information into future hazard mitigation opportunities.
• Completing a stormwater drainage study for known problem areas.
17.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 17-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of
Morgan’s Point. Other hazard events that broadly affected the entire planning area, including City of Morgan’s
Point, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
17-10
Table 17-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 $ Not available/flooding, streets closed, residents without electricity and
displaced, down trees and power lines
Tornado N/A 2017 $ Not available/flooding, streets closed, residents without electricity and
displaced, down trees and power lines
Hurricane Ike 1791 DR 2008 $ Not available/flooding, streets closed, residents without electricity and
displaced, down trees and power lines
Tropical Storm Allison
1379 DR 2001 $ Not available/flooding, streets closed, residents without electricity and
displaced, down trees and power lines
Hurricane Alicia 689 DR 1983 $ Not available/flooding, streets closed, residents without electricity and
displaced, down trees and power lines
17.7 HAZARD RISK RANKING
Table 17-12 presents a local ranking for the City of Morgan’s Point of all hazards of concern for which this
hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Table 17-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Flooding 27 Medium
3 Earthquake 14 Low
4 Drought 6 Low
4 Mass Movement 6 Low
4 Dam Failure 6 Low
4 Wild Fire 6 Low
4 Coastal Erosion 6 Low
5 Tsunami 0 (no Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
17.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
17.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 1
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 0
City of Morgan’s Point
17-11
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0
17.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Flooding from heavy rains/severe storms. Performing a comprehensive stormwater drainage study would
assist in locating any deficiencies in drainage in the City after a severe rain storm or hurricane.
• It is noted that the City has not completed a GIS mapping of the City. This would be beneficial to obtain
hazard data and to map risk for various hazards.
• The City does not currently have an emergency generator for our community center to serve as a
short-term shelter after a natural disaster or heat event.
• The City currently has one (1) Whelan siren system in the city which is erected on the very north part of
the city. In order to assure the residents on the south/east/west sides of the City can hear the siren in case
of an emergency, the City would need to have another one more centrally located towards the south of the
City.
Mitigation actions addressing these issues were prioritized for consideration in the action plan for this annex.
17.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 17-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 17-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
MRG5 — Expand outdoor siren warning system to increase coverage within the community’s population where the existing sirens are currently difficult to hear.
X MRG5
2014MORGPT002 — Protective Covering for Three Generators X MRG10
2014MORGPT003 — Implement a tree management program to limit debris
damage to critical infrastructure and public facilities from falling tree canopy due to hail, high-winds, freezing/icing, and crown fires.
X MRG11
MRG9 — Install a New Generator for Cooling and Heating Center at Community Center X MRG9
2014MORGPT005 — Implement waste water reuse system for non-potable
water at City Park
X MRG12
2014MORGPT006 — Establish rainwater collection/capture systems for city infrastructure to provide alternative water supplies limiting effects of water shortages caused by drought or other hazards.
X MRG13
2014MORGPT007 — Mapping of all hazardous material facilities that may be
an increased risk for flood event
X MRG14
2014MORGPT008 — Extension of fire protection infrastructure locations X MRG15
2010MORGPT009 — Install wind load proof window coverings on City buildings X MRG16
2010MORGPT014 — Drainage improvements – Increase drainage channel flow rate on South Oak Street YES
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
17-12
17.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 17-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 17-15
identifies the priority for each action. Table 17-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 17-14. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action MRG1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, landslide, tsunami, hurricane, Coastal Erosion
Existing 3, 4, 10, 13 City Administration TBD High HMGP, PDM, FMA Short-term
Action MRG2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including City of Morgan’s Point.
Hazards Mitigated: Drought, earthquake, flooding, tsunami, hurricane, Coastal Erosion
New and Existing 1, 3, 4, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing
Action MRG3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Flooding, severe weather, tsunami, sea level rise, hurricane, Coastal Erosion
New and Existing 1, 5, 8 City Administration TBD Low Staff Time, General Funds Short-term
Action MRG4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Flooding, severe weather, tsunami, , hurricane, Coastal Erosion
New and Existing 1, 3, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing
Action MRG5 — Expand outdoor siren warning system to increase coverage within the community’s population where the existing sirens
are currently difficult to hear.
Hazards Mitigated: Flooding, severe weather, tsunami, , drought, hurricane, Coastal Erosion
New and Existing 1, 3, 4, City Administration TBD Staff Time, General Funds Short-term
Action MRG6 — Map Community Risk by Developing a coordinated GIS Department. Find out who uses GIS, determine how it is used,
and identify other potential uses.
• Incorporating a GIS system/management plan for tracking permitting, land use patterns, etc.
• Obtaining hazard data and using GIS to map risk for various hazards
Hazards Mitigated: Flooding, severe weather, tsunami, , drought, Coastal Erosion
Existing 1, 3, 5, 7, 8, 10, 11 City Administration TBD Low Staff Time, General Funds Ongoing
Action MRG7 — Conduct Regular Maintenance for Drainage Systems and Flood Control Structures by Performing regular drainage
system maintenance, such as sediment and debris clearance, as well as detection and prevention of discharges into stormwater and
sewer systems from home footing drains, downspouts, or sewer pumps.
• Implementing an inspection, maintenance, and enforcement program to help ensure continued structural integrity of dams and levees.
• Routinely cleaning debris from support bracing underneath low-lying bridges.
• Routinely cleaning and repairing stormwater drains.
• Regularly clearing sediment build-up on riverbanks near aerial lines.
• Inspecting bridges and identifying if any repairs or retrofits are needed to prevent scour.
Hazards Mitigated: Flooding, severe weather, tsunami, , hurricane, Coastal Erosion
Existing 3, 4, 6, 8, 10, 11 City Administration TBD Medium Staff Time, General Funds Ongoing
City of Morgan’s Point
17-13
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action MRG8 — Improve Stormwater Management Planning by Completing a stormwater drainage study for known problem areas.
• Preparing and adopting a stormwater drainage plan and ordinance.
• Preparing and adopting a community-wide stormwater management master plan.
• Regulating development in upland areas in order to reduce stormwater run-off through a stormwater ordinance.
• Linking flood hazard mitigation objectives with EPA Stormwater Phase II initiatives.
• Developing engineering guidelines for drainage from new development.
• Requiring a drainage study with new development
• Encouraging the use of Low Impact Development techniques
Hazards Mitigated: Flooding, severe weather, tsunami, , hurricane
Existing 3, 4, 6, 8, 10, 11 City Administration TBD Low Staff Time, General Funds Ongoing
Action MRG9 Install a New Generator for Cooling, Heating Center, temporary emergency center after natural disaster at Community
Center
Hazards Mitigated: Flooding, severe weather, tsunami, , , hurricane, Coastal Erosion
Existing 3, 4, 8, 10, 11 City Administration TBD High HMGP, PDM Short
Term
Action MRG10 — Protective Covering for Three Generators
Hazards Mitigated: Severe weather, hurricane
New 11 City Administration TBD Medium Grant funds Short term
Action MRG11 — Implement a tree management program to limit debris damage to critical infrastructure and public facilities from falling
tree canopy due to hail, high-winds, freezing/icing, and crown fires.
Hazards Mitigated: Severe weather, hurricane, wildfire
Existing 2, 8, 11 City Administration TBD Low Staff Time, General Funds Short term
Action MRG12 — Implement waste water reuse system for non-potable water at City Park
Hazards Mitigated: Drought
Existing 7, 8 City Administration TBD Low Staff Time, General Funds Short term
Action MRG13 — Establish rainwater collection/capture systems for city infrastructure to provide alternative water supplies limiting
effects of water shortages caused by drought or other hazards.
Hazards Mitigated: Drought
Existing 7, 8 City Administration TBD Low Staff Time, General Funds Short term
Action MRG14 — Mapping of all hazardous material facilities that may be an increased risk for flood event
Hazards Mitigated: Flooding
Existing 3, 8 City Administration TBD Low Staff Time, General Funds Short term
Action MRG15 — Extension of fire protection infrastructure locations
Hazards Mitigated: Wildfire
Existing 13, 14 City Administration TBD Medium General and/or grant funds Short term
Action MRG16 — Install wind load proof window coverings on City buildings
Hazards Mitigated: Severe weather, hurricane
Existing 11, 13 City Administration TBD High Grant funds Short term
Action MRG17— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flood, Dam/Levee Failure, Drought, Earthquake, Wildfire, Mass Movements
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
City Administration HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
17-14
Table 17-15. Mitigation Action Priority
Action #
# of
Objectives Met Benefits Costs
Do Benefits Equal or
Exceed Costs?
Is Project
Grant-Eligible?
Can Project Be Funded Under
Existing Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
MRG1 4 High High Yes Yes No Medium High
MRG 2 7 Medium High Yes No No High Low
MRG 3 3 Low High No No No High Low
MRG 4 6 Medium High Yes No No High Low
MRG 5 3 Medium High Yes No No Low Low
MRG 6 7 Medium High Yes No No Low Low
MRG 7 6 High High Yes No No Low Low
MRG 8 6 Low High No No No Low Low
MRG 9 5 Medium High Yes Yes No Medium High
MRG10 1 High Medium Yes No No Medium Medium
MRG11 3 Medium Low Yes No No Low Low
MRG12 2 Medium Low Yes No No Low Low
MRG13 2 Medium Low Yes No No Low Low
MRG14 2 Medium Low Yes No No Low Low
MRG15 2 Medium Medium Yes No No Medium Medium
MRG16 2 High High Yes Yes No High High
MRG17 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 17-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilient
Community
Capacity
Building
High-Risk Hazards
Severe Weather MRG 1, 2, 3, 4, 6,
7, 8, 11, 16, 17
MRG 1, 10,
11, 16
MRG 1, 2, 3,
4, 5, 9, 17
MRG 6, 7, 8,
11
MRG 5, 9,
17
MRG 10, 16 MRG 1, 2, 3, 4, 5,
6, 7, 8, 9, 17
Hurricane MRG 1, 4, 7, 8,
11, 16,17
MRG 1, 4, 7,
10, 11, 16
MRG 5. 17 MRG 11 MRG17 MRG 1, 7,
8, 10, 16
MRG 8 MRG 2,3, 17
Medium-Risk Hazards
Flooding
MRG 1, 2, 3, 4, 6,
7, 8, 14, 17
MRG 1, 14 MRG 1, 2, 3,
4, 5, 9, 17
MRG 6, 7, 8 MRG 5, 9,
14, 17
MRG 1, 2, 3, 4, 5,
6, 7, 8, 9, 14, 17
Low-Ranked Hazards
Earthquake MRG 17 MRG17 MRG17 MRG17
Drought MRG 3, 5, 6, 9,
17
MRG 1, 2, 3,
5, 9, 17
MRG 12, 13 MRG 5, 9,
17
MRG 12,13 MRG
12,13
MRG 1, 2, 3, 4, 5,
6, 7, 8, 9, 17
Mass Movement MRG17 MRG17 MRG17 MRG17
Dam Failure MRG17 MRG17 MRG17 MRG17
Coastal
Erosion
MRG 1, 2, 3, 4, 6,
7, 8, 17
MRG 1, MRG 1, 2, 3,
4, 5, 9, 17
MRG 6, 7, 8 MRG 5, 9,
17
MRG 1, 2, 3, 4, 5,
6, 7, 8, 9, 17
Wildfire MRG 11, 15,17 MRG 11, 15 MRG17 MRG 11 MRG17 MRG 15 MRG17
a. See the introduction to this volume for explanation of mitigation types.
City of Morgan’s Point
17-15
17.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
17.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• City of Morgan’s Point Municipal Code — The municipal code was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
• City of Morgan’s Point Flood Damage Prevention Ordinance — The flood damage prevention
ordinance was reviewed for compliance with the National Flood Insurance Program.
• City of Morgan’s Comprehensive Plan — The Comprehensive Plan was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• FEMA — Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards to obtain a better
understanding of potential unthought-of actions/mitigations that could be used to reduce or eliminate long
term risk to people and property from natural disasters in the City of Morgan’s Point.
!(!(!(!(!(!(!(!(!(La PorteCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.150.30.075Miles±Morgan's Point
La Porte
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Morgan's Point
La Porte
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Morgan's Point
La Porte
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Morgan's Point
La Porte
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Morgan's Point
La Porte
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Morgan's Point
La Porte
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Morgan's Point
18-1
18. CITY OF NASSAU BAY
18.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Dena Mahan/EMC
1800 Space Park Drive, Ste. 200
Nassau Bay, TX 77058
Telephone: 281-333-7373
e-mail Address: dena.mahan@nassaubay.com
Tom George, Fire Chief/Deputy EMC
18295 Upper Bay Road
Nassau Bay, TX 77058
Telephone: 281-336-6295
e-mail Address: tom.george@nassaubay.com
18.2 JURISDICTION PROFILE
18.2.1 Location
The City of Nassau Bay is in the Clear Lake region of southeast Harris County, along Clear Creek and the western
portion of Clear Lake. It is located across the street from Johnson Space Center; a peninsula encompassing 1.7
square miles.
The current boundaries generally extend from NASA Johnson Space Center to the north, Clear Lake to the east,
the injunction of Clear Creek and Clear Lake to the south, and Cow Bayou to the west. The City of Webster is to
the west, League City to the south, Houston to the north, and Clear Lake to the east.
18.2.2 History
The City of Nassau Bay was incorporated in 1978. The Nassau Bay community was originally developed to
provide housing opportunities for NASA employees. Being across the street from NASA Lyndon B. Johnson
Space Center, it continues to maintain a strong relationship with the space industry. Additionally, the City’s
economy is directly impacted by Houston Methodist St. John Hospital, which is located inside the City, as well as
tourism and recreation activities along the Texas coast. Nassau Bay is a triangular peninsula that juts into Clear
Lake and is surrounded by water on its west, south and east boundaries. It is a charming and intimate community
with a population of approximately 4,099 residents who enjoy the water front possibilities and lush green spaces
the City offers.
18.2.3 Climate
The climate of Nassau Bay is typical of the upper Texas Gulf Coast, with hot and humid summers, and mild
winters. There are approximately 207 sunny days per year, with the dry season consuming eight months, the wet
season four. The annual rainfall in Nassau Bay is above average with 56 inches per year. The summer high is
about 91 degrees and the winter low is close to 44. The dominant wind is from the south, with wind speeds
varying throughout the year.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
18-2
18.2.4 Governing Body Format
The City of Nassau Bay is a Texas Home Rule City which operates in a Council-Manager form of government.
The board is led by the mayor and six councilmembers. There are eight departments in the City: Community
Development & Planning, Police, Fire, Emergency Management, Public Works, Finance, Tourism, Human
Resources and the City Manager’s Office.
The City Council assumes responsibility for the adoption of this plan; the City Manager will oversee its
implementation. Development of this annex was carried out by the members of the local mitigation planning
team, whose members are listed in Table 18-1.
Table 18-1. Local Mitigation Planning Team Members
Name Title
Jason E. Reynolds City Manager
Tom George Fire Chief/Deputy EMC
Dena Mahan EMC
Paul Lopez Public Works Director
Mark Stelly Floodplain Administrator/Building Official
18.3 CURRENT TRENDS
18.3.1 Population
According to US Census the population of Nassau Bay as of July 2017 was 4,052. Since 2010, the population has
remained constant.
18.3.2 Development
Nassau Bay is experiencing a renaissance of commercial development due to the growth in the Clear Lake region,
the success of the space industry, and the insurgence of a medical hub along the I-45/Gulf Freeway. The
development is comprised of infill and rehabilitation, with a moderate outlook for future commercial infill.
Residential expansion is low in the City, but the demand for additional multi-family housing opportunities
continues to grow.
The City is updating its comprehensive plan in 2019 and 2020. The plan will refocus the vision of the community
with the changing environment while staying true to the needs of the community. In addition, the plan will
address land use allocations, zoning, redevelopment, waterways, tourism, and capital improvements. Future
growth and development in the City will be managed as identified in the comprehensive plan.
Table 18-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
City of Nassau Bay
18-3
Table 18-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
N/A
Is your jurisdiction expected to annex any areas during the performance period of this plan?
No
• If yes, describe land areas and dominant uses.
N/A
• If yes, who currently has permitting
authority over these areas?
N/A
Are any areas targeted for development or major redevelopment in the next five years? Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk
areas
There is a multi-family/business complex scheduled to be built on a waterfront lot that
is susceptible to storm surge during high wind events.
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 2 1 1 1 3
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.) 3 0 0 3 2
Total 5 1 1 3 4
Provide the number of new-construction
permits for each hazard area or provide a qualitative description of where development
has occurred.
• Special Flood Hazard Areas: 0
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory
exists, provide a qualitative description.
The City is on the verge of a complete buildout; only three lots are available to build
on in the commercial corridor. One of those lots are highly susceptible to flooding and
surge, which deters from future buildout. There are 20 residential lots available for
construction, but are vacant because of repetitive flooding which is a negative
consideration for new home builds.
18.4 CAPABILITY ASSESSMENT
The City of Nassau Bay performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 18-3.
• Development and permitting capabilities are presented in Table 18-4.
• An assessment of fiscal capabilities is presented in Table 18-5.
• An assessment of administrative and technical capabilities is presented in Table 18-6.
• An assessment of education and outreach capabilities is presented in Table 18-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 18-8.
• Classifications under various community mitigation programs are presented in Table 18-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 18-10.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
18-4
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in
Section 18.10 identifies these as community capacity building mitigation actions.
Table 18-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No No No
Comment: Ord. No. O2013-708, §§ 1, 2 2012 International Building Codes adopted 06/10/13
Zoning Code Yes No No No
Comment: Ord. No. 94-435, adopted 09-12-94 Amended 8-12-13
Subdivisions Yes No No No
Comment: Ord. No. 83-298, Art. I, § 1, adopted 04-11-83 The Land Subdivision Regulations of the City of Nassau Bay, State of Texas
Stormwater Management No No No No
Comment:
Post-Disaster Recovery No No No No
Comment:
Real Estate Disclosure No No No No
Comment:
Growth Management No No No No
Comment:
Site Plan Review Yes No No No
Comment: Ord. No. O2013-712, Exhibit B, adopted 8-12-13 Article 5 Administrative Procedures
Environmental Protection No No No No
Comment:
Flood Damage Prevention Yes Yes No Yes
Comment: Ord. No. 2000-511, Art. I, § A, adopted 05-08-2000; State of Texas Water Code section 16.318
Emergency Management Yes Yes Yes Yes
Comment: Ord. No. 2010-660, § 1, 1-11-10 Civil Defense and Emergency Management; Texas Gov. Code Title 4 Chapter 418
Climate Change No No No No
Comment:
Energy Conservation Yes Yes No No
Comment: International Energy Conservation Code 2015
Planning Documents
General Plan Yes No No Yes
Comment: Comprehensive Plan is currently being updated. Expected adoption date is early 2020. Current plan is dated 2015.
Capital Improvement Plan Yes No No No How often is the plan updated? Annually
Comment: Current plan date: September 17, 2018
Disaster Debris Management Plan Yes No No No
Comment: Debris Management Plan, June 14, 2018
Floodplain or Watershed Plan No No No No
Comment:
Stormwater Plan Yes Yes No Yes
Comment: Storm Water Management Plan date – February 2008 (revised March 2009)
Urban Water Management Plan No No No No
Comment:
City of Nassau Bay
18-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Habitat Conservation Plan No No No No
Comment:
Economic Development Plan No No No No
Comment:
Shoreline Management Plan No No No No
Comment:
Community Wildfire Protection Plan No No No No
Comment:
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes No No Yes
Comment: Emergency Operations Plan, 12/2015
Threat & Hazard Identification & Risk Assessment (THIRA) No Yes Yes Yes
Comment: A regional THIRA is conducted on an annual basis for UASI and HGAC. The City participates in the development of the
THIRA.
Post-Disaster Recovery Plan Yes Yes No Yes
Comment: Annex J – Recovery to the City’s Emergency Operations Plan
Continuity of Operations Plan No No No No
Comment:
Public Health Plan No No No No
Comment:
Table 18-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Building Department
Does your jurisdiction have the ability to track permits by hazard area? Yes
Does your jurisdiction have a buildable lands inventory? No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
18-6
Table 18-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants No
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers N/A
Table 18-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Community Development & Planning
Engineers or professionals trained in building or infrastructure
construction practices
Yes Building Official & City Engineer
Planners or engineers with an understanding of natural hazards Yes Community Development & Planning
Staff with training in benefit/cost analysis Yes OEM
Surveyors Yes Can contract for this service
Personnel skilled or trained in GIS applications Yes Water, Building Official
Scientist familiar with natural hazards in local area Yes Fire Chief & FPA/Building Official
Emergency manager Yes OEM EMC/Deputy EMC
Grant writers Yes EMC and can contract for this service
Table 18-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. Emergency Preparedness
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. The City’s Facebook page is used to promote
preparedness information and events
Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes
• If yes, briefly describe. Nassau Bay Planning Commission
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. Nextdoor.com/Facebook/Swift911
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Swift 911
City of Nassau Bay
18-7
Table 18-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Building Official/FPA
Who is your floodplain administrator? (department/position) CD&P/Building Official/FPA
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? 5/8/2000
Does your floodplain management program meet or exceed minimum requirements? Exceeds
• If exceeds, in what ways? Various
When was the most recent Community Assistance Visit or Community Assistance Contact? 2018
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? No
• If no, state why. Do not address impacts of flash flooding
Does your floodplain management staff need any assistance or training to support its floodplain management program? No
• If so, what type of assistance/training is needed?
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification? Yes
• If no, is your jurisdiction interested in joining the CRS program?
How many flood insurance policies are in force in your jurisdiction?a 1389
• What is the insurance in force? $412,242,800
• What is the premium in force? $1,148,385
How many total loss claims have been filed in your jurisdiction?a 1544
• How many claims are still open or were closed without payment? 370
• What were the total payments for losses? $57,671,386.09
a. According to FEMA statistics as of September 30, 2018
Table 18-9. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes 7 05/01/2009
Building Code Effectiveness Grading Schedule Yes 4 Unknown
Public Protection Yes 2 Unknown
Storm Ready Yes N/A 01/2017
Firewise No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
18-8
Table 18-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
18.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
City of Nassau Bay
18-9
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
18.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• City of Nassau Bay Emergency Operations Plan/Emergency Management Ordinance — The
Emergency Operations Plan addresses the City’s responsibilities in emergencies associated with
natural disaster, human-caused emergencies and technological incidents. It provides a framework for
coordination of response and recovery efforts within the City in coordination and with local, State, and
federal agencies. The Plan establishes an emergency organization to direct and control operations
during a period of emergency by assigning responsibilities to specific personnel. Information from the
hazard mitigation plan is incorporated as appropriate.
• Capital Improvements Plan — The capital improvement plan includes projects can help mitigate
potential hazards. The city will act to ensure consistency between the hazard mitigation plan and the
current and future capital improvement plans. The hazard mitigation plan may identify new possible
funding sources for capital improvement projects and may result in modifications to proposed projects
based on results of the risk assessment.
• Nassau Bay Volunteer Fire Department Emergency Operations Plan — The NBVFD Emergency
Operations Plan addresses the Fire Department’s responsibilities in emergencies associated with
natural disaster, human-caused emergencies and technological incidents. It provides a framework for
coordination of response and recovery efforts within the City of Nassau Bay in coordination and with
local, State, and federal agencies.
• Functional and Access Needs Plans — The city addresses the needs of individuals with disabilities and
the elderly during an emergency or disaster situation, and provides safe, sanitary, secure shelter and care
for all residents including those residents with functional needs.
• Flood Damage Prevention Ordinance – The city’s Flood Damage Prevention ordinance covers the
entire community, includes numerous methods of reducing flood losses, defines floodplain administration
for the city, and outlines standards for development. Because the ordinance was last updated in 2000, it
does need to be updated. With that update, additional integration opportunities may be available.
• Threat & Hazard Identification & Risk Assessment – Nassau Bay is a participant in the development
of Harris County’s THIRA, and findings of this assessment have been and will continue to be integrated
into mitigation and emergency management plans.
18.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Comprehensive Plan – Comprehensive Plans provide a framework for the physical design and
development of a city over a long-term planning horizon. They address social, economic, and
environmental issues by the manner in which they guide overall growth and development. The vision,
goals, and policies of the comprehensive plan are routinely implemented through other local planning
instruments such as zoning ordinances, subdivision regulations, and capital improvement programs.
Integrating hazard mitigation into the local comprehensive plan thereby establishes resilience as an
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
18-10
overarching value of a community and provides the opportunity to continuously manage development in a
way that does not lead to increased hazard vulnerability
• Post-Disaster Recovery Plan – The City of Nassau Bay will be developing a standalone Post-Disaster
Recovery Plan to expand on what is currently in the Recovery Annex of the Emergency Operations Plan.
Incorporating mitigation actions into disaster recovery can be an extremely cost-effective means of
mitigation future damage.
• Stormwater Management Plan and Ordinance – The City of Nassau Bay will update its stormwater
management plan and consider low impact development techniques to manage storm water by
incorporating techniques such as bio-retention areas, dry wells, infiltration trenches, filter/buffer strips,
vegetated swales, rain barrels, and cisterns. This could reduce the impact of flooding in flood-prone areas
within the community.
18.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 18-11 lists past occurrences of natural hazards for which specific damage was recorded in Nassau Bay.
Other hazard events that broadly affected the entire planning area, including Nassau Bay, are listed in the risk
assessments in Volume 1 of this hazard mitigation plan.
Table 18-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 2017 $10,000,000
Severe Storms and Flooding 4272 2016 Unknown
Severe Storms and Flooding 4269 2016 Unknown
Hurricane Ike 1791 2008 $24,000,000
Hurricane Rita 1606 2005 $375,000
Tropical Storm Allison 1379 2001 Unknown
18.7 HAZARD RISK RANKING
Table 18-12 presents a local ranking for Nassau Bay of all hazards of concern for which this hazard mitigation
plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As
described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for
each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target
hazards with high and medium rankings.
Table 18-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
2 Flooding 36 High
2 Hurricane 36 High
3 Mass Movement N/A Medium
4 Earthquake 14 Low
5 Wildfire 12 Low
6 Drought 6 Low
6 Coastal Erosion 6 Low
7 Dam Failure 0 None
7 Tsunami 0 None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
City of Nassau Bay
18-11
18.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
18.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 160
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 37
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 17
18.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• The majority of city properties are in the 1% annual chance flood hazard area, and the rest are within the
0.2 percent chance flood hazard area
• The City of Nassau Bay is in close proximity to NASA’s Johnson Space Center
• The City of Nassau Bay is located near the Houston Ship Channel and numerous chemical and oil
refining facilities
• Houston Methodist Hospital Clear Lake resides in the City of Nassau Bay
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
18.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 18-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 18-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action # in
Update
Adopt new and updated coastal flood mapping once available. Ongoing Yes NAS8
Comment: Adopted January 2017; ongoing effort as new maps are produced
Implement acquisition, elevation and flood proofing for SRL and/or RL
structures by elevating existing structures to 2’ above BFE.
No Yes NAS1
Comment: Continue to work on this project as the SRL/RL list contains 10% of the housing stock
Adopt latest and higher standard floodplain regulations to minimize damage to residential/critical infrastructure properties located within storm surge areas and LIMWA areas.
No Yes NAS6
Comment: Nothing recent but a continued action item for the City
Improve and enhance requirements for critical facilities to withstand severe thunderstorms, hurricane winds and hail. No Yes NAS7
Comment: Completed work for the Fire & EMS Station, Emergency Operation Center, and further strengthen the WWWTP facilities.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
18-12
Removed; Carried Over to Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action # in
Update
Construct Protective Structures to minimize damage to critical assets & equipment. No Yes NAS7
Comment: Elevated generator and the grit king at WWWTP. Constructed Fire Station at Cat 5 storm rating. Moved Public Works to new
facility in wind rated facility. Continue to plan and implement small.
Review & update existing city codes to require installation of materials to
harden residential & commercial structures to lessen the effects of hail & tornadoes.
No Yes NAS8
Comment: Continue to adopt the latest codes & operate by the spirit of the objective. Planning and operations continue to be geared
around this.
Improve code/ordinance to require removal of dead vegetation/dry fuel
sources in fire risk areas.
No Yes NAS9
Comment: .
Improve/Retrofit Air Filtration Systems with higher capacity and higher quality filtration/purification system to remove particulates for CI/Public/Healthcare facilities to minimize health risks associated with low air
quality and to minimize equipment damage due to smoke.
No Yes NAS10
Comment: Work with Hospital as they renovate the facility.
Mapping of all hazardous material facilities that may be an increased risk within the city limits. No Yes NAS11
Comment: Continue to work on.
Identify & map exposed/aboveground pipelines in the city limits. Yes Yes NAS9
Comment:
Establish/improve code/ordinance to require shutoff valves at entry and exit
points of city limits for new pipeline construction.
No X
Comment: This project is no longer feasible
Insulate exposed/aboveground domestic water system components, water
pipes, irrigation systems and sprinkler systems on municipal facilities.
Ongoing Yes NAS12
Comment: Ongoing effort that is completed each year.
Develop and implement a Winter Storm Public Education/Outreach Program to educate residents on winter hazards and actions to reduce damage to
property from cold/freezing winter weather conditions.
No Yes NAS13
Comment: Change to social media/public outreach instead of class.
Expand warning system (Mass Notification) to provide hazard awareness and alerts by increasing coverage of the community’s population to mitigate drought and extreme heat. (SMS, iPAWS, and mass notification).
Yes No
Comment: The city is now using a reverse 911 system, social media, website and other means to provide warnings to residents.
Harden nonflexible water supply piping during line replacement projects with
drought resistant piping materials.
Ongoing Yes NAS14
Comment: City is replacing all water and sewer lines over the next 15 years with polyvinyl chloride pipe.
Establish a cooling center at identified site to limit the effects of extreme heat upon vulnerable populations. Yes Yes NAS15
Comment:
Flood remediation – Raise concrete walls around present sand filter unit. No Yes NAS10
Comment: Applied for grant through FEMA after Hurricane Harvey to complete.
City of Nassau Bay
18-13
Removed; Carried Over to Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action # in
Update
Install new chemical feed disinfection and de-chlorination system at the City’s wastewater treatment plant. No Yes NAS12
Comment: Applied for grant through FEMA after Hurricane Harvey to complete.
Replace the Chlorine storage and supply system and bring facility up to current codes. No Yes NAS20
Comment: Applied for grant through FEMA after Hurricane Harvey to complete.
Reduce street and residential flooding by installing new storm sewers. [Saxony Ln and Nassau Bay Drive] No Yes NAS16
Comment: Ongoing effort on the planned capital improvement list.
18.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 18-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 18-15
identifies the priority for each action. Table 18-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 18-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action NAS1 — Where appropriate, support elevation, retrofitting, purchase, or relocation of structures located in hazard areas,
prioritizing those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Flooding
Existing 3, 4, 10 Nassau Bay High HMGP, PDM, FMA Short-term
Action NAS2 — Integrate the hazard mitigation plan into other plans, ordinances, and programs that dictate land use decisions in the
community.
Hazards Mitigated: Dam failure, drought, earthquake, flooding, mass movement, tsunami, wildfire
New and Existing 1, 3, 4, 5, 7, 8, 10 Nassau Bay Low Staff Time, General Funds Ongoing
Action NAS3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: All hazards
New and Existing 1, 8, 10 Nassau Bay Low Staff Time, General Funds Short-term
Action NAS4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Dam failure, flooding, severe weather, tsunami
New and Existing 12, 14, 15 Nassau Bay Low Staff Time, General Funds Ongoing
Action NAS5 — Develop a post-disaster recovery plan that includes methods of integrating mitigation measures into recovery.
Hazards Mitigated: All hazards
New and Existing 3, 8, 9, 11 Nassau Bay Medium Staff Time, General Funds Short-term
Action NAS6 — Adopt latest and higher standard floodplain regulations to minimize damage to residential/critical infrastructure properties
located within storm surge areas and LIMWA areas
Hazards Mitigated: Flooding
New and Existing 9, 12, 13, 15 Nassau Bay Low Staff Time Ongoing
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
18-14
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action NAS7 — Improve existing city-owned structures and enhance requirements for new critical facilities, assets, and equipment to
withstand severe thunderstorms, hurricane winds, and hail.
Hazards Mitigated: Severe weather, hurricane
New and Existing 11, 12, 13 Nassau Bay High HMGP, PDM, General Funds Long-term
Action NAS8 — Adopt new and updated flood maps as they become available.
Hazards Mitigated: Flooding
New and Existing 3, 9 Nassau Bay Low Staff Time Ongoing
Action NAS9 — Identify and map exposed/above ground pipeline infrastructure within the city limits.
Hazards Mitigated: Human-caused/technological, Severe Weather, Hurricane
Existing 3 Nassau Bay Medium Staff Time, Contractor/GIS Short-term
Action NAS10 — Raise concrete walls around the sand filter at the wastewater treatment plant.
Hazards Mitigated: Flooding, hurricane, severe weather
Existing 11, 13 Nassau Bay High 406 Mitigation Funds, HMGP, FMA,
PDM
Short-term
Action NAS11- Elevate water and wastewater pumps, motors, and electrical controls.
Hazards Mitigated: Flooding
Existing 13 Nassau Bay Medium 406 Mitigation Funds, HMGP, FMA,
PDM, CIP
Short-term
Action NAS12 – Install new chemical feed disinfection and de-chlorination system at the wastewater treatment plant.
Hazards Mitigated: Flooding, Technological
Existing 8, 13 Nassau Bay Medium General Funds, CIP Long-term
Action NAS13 – Install structured covers for existing generators to protect them from severe weather hazards.
Hazards Mitigated: Severe weather, hurricane
Existing 6, 13 Nassau Bay High Bonds, Fee Increases, HMGP, PDM Long-term
Action NAS14 – Harden nonflexible water supply piping during line replacement projects with drought resistant piping materials.
Hazards Mitigated: Drought
Existing 13 Nassau Bay Medium General Funds/CIP, HMGP, PDM Ongoing
Action NAS15 – Establish a cooling center at identified site to limit the effects of extreme heat upon vulnerable populations.
Hazards Mitigated: Drought/Extreme Heat
New and Existing 4 Nassau Bay Low Staff Time, General Funds Short-term
Action NAS16 – Reduce street and residential flooding by installing new storm sewers. [Saxony Ln and Nassau Bay Drive]
Hazards Mitigated: Flooding
New and Existing 13 Nassau Bay Medium General Funds/CIP, HMGP, FMA,
PDM
Short-term
Action NAS17 – Conduct geological mapping of the area to determine risk areas for subsidence or sinkholes.
Hazards Mitigated: Mass Movement
New and Existing 3 Nassau Bay Contract
Engineer/ Firm
Medium General Funds, CIP Long-term
Action NAS18 – Develop a new stormwater management plan (to include a hydrological study of the Nassau Bay area).
Hazards Mitigated: Flooding
New and Existing 9, 10 Nassau Bay Contract Firm Medium HMGP, FMA, PDM Short-term
Action NAS19 – Develop a Continuity of Operations/Government Plan for the City of Nassau Bay.
Hazards Mitigated: All hazards
New and Existing 9, 10 Nassau Bay Low Staff Time, Grants Short-term
City of Nassau Bay
18-15
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action NAS20 – . Elevate and/or replace the chlorine and sulfur dioxide storage and supply system at the wastewater treatment plant,
and bring it up to current code.
Hazards Mitigated: Flooding, hurricane, severe weather, tsunami
Existing 13 Nassau Bay Medium 406 Mitigation funds, HMGP, FMA,
PDM
Short-term
Action NAS21 – Install backup power systems for public buildings, utilities, and critical infrastructure currently without generators or with
undersized generators
Hazards Mitigated: Flooding, severe weather, hurricane
Existing 13 Nassau Bay High HMGP, FMA, PDM Short-term
Action NAS22 – Install additional Flood Alert Gauges and a velocity meter in sections of Clear Creek near/within Nassau Bay.
Hazards Mitigated: Flooding
New and Existing 1, 3 Harris
County Flood
Control
Nassau Bay Medium HMGP, FMA, PDM Short-term
Action NAS23 – Bring water treatment plant facility up to homeland security standards for drinking water.
Hazards Mitigated: Flooding, terrorism
Existing 4, 13 Nassau Bay High UASI Grant, Long-term
Action NAS24 – Install wind load proof window coverings on city buildings
Hazards Mitigated: Hurricane, severe weather
Existing 13 Nassau Bay Medium HMGP, PDM, General Fund/CIP Short-term
Action NAS25 – Develop/implement water smart program to educate the public on how to conserve water, especially during drought
conditions.
Hazards Mitigated: Drought
New and Existing 3 Nassau Bay Low Staff Time Short-term
Action NAS26 – Develop and implement a program to capture perishable data after significant events/incidents (e.g. high water marks,
preliminary damage estimates, damage photos) to support future mitigation efforts including the implementation and maintenance of the
hazard mitigation plan.
Hazards Mitigated: Flooding, Severe Weather, Hurricane, Mass Movement, Earthquake, Wildfire, Drought, Coastal Erosion
New and Existing 3 Nassau Bay Low Staff Time Ongoing
Action NAS27 – Install a Weather/Lightning alert system to minimize damage and risk to local athletic facilities and other public events
and purchase a loudspeaker to warn public of severe weather.
Hazards Mitigated: Severe Weather
New and Existing 1 Nassau Bay Med
Action NAS28 – Develop a Shoreline Management Plan.
Hazards Mitigated: Coastal Erosion, Mass Movement, Flooding, Tsunami
New and Existing 10 Nassau Bay Medium HMGP, FMA, PDM, CIP Short-term
Action NAS29 – Elevate Upper Bay Road to alleviate significant street flooding and high-velocity flows.
Hazards Mitigated: Flooding
New and Existing 11, 13 Nassau Bay High HMGP, FMA, PDM Long-term
Action NAS30— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Flooding, Severe Weather, Hurricane, Mass Movement, Earthquake, Wildfire, Drought, Coastal Erosion
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
Nassau Bay HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
18-16
Table 18-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
NAS1 3 High High Yes Yes No Medium High
NAS2 7 Medium Low Yes No Yes High Low
NAS 3 3 Low Low Yes No Yes High Low
NAS4 3 Medium Low Yes No Yes High Low
NAS5 4 Medium Medium Yes Yes Yes High High
NAS6 4 Medium Low Yes No Yes High Low
NAS7 3 High High Yes Yes No Medium High
NAS8 2 Medium Low Yes No Yes High Low
NAS9 1 Low Medium No No No Low Low
NAS10 2 High High Yes Yes No Medium High
NAS11 1 High Medium Yes Yes No Medium High
NAS12 2 Medium Medium Yes No No Low Low
NAS13 2 High High Yes Yes No Medium High
NAS14 1 Medium Medium Yes Yes No Medium Medium
NAS15 1 High Low Yes No No Medium Low
NAS16 1 High Medium Yes Yes No Medium High
NAS17 1 Low Medium No No No Low Low
NAS18 2 Medium Medium Yes Yes No Medium High
NAS19 2 Low Low Yes Yes Yes High Medium
NAS20 1 High Medium Yes Yes No Medium High
NAS21 1 High High Yes Yes No Medium High
NAS22 2 High Medium Yes Yes No Medium High
NAS23 2 High High Yes Yes No Medium High
NAS24 1 High Medium Yes Yes No Medium High
NAS25 1 Low Low Yes No Yes High Low
NAS26 1 Medium Low Yes No Yes High Low
NAS27 1 High Medium Yes No No Medium Low
NAS28 1 Medium Medium Yes Yes No Medium High
NAS29 2 High High Yes Yes No Medium High
NAS30 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
City of Nassau Bay
18-17
Table 18-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather NAS4, 30 NAS7, 10,
13, 20, 24
NAS22, 30 NAS10 NAS21, 27,
30
NAS13 NAS3, 5, 9,
19, 22, 26,
30
Flooding NAS2, 4, 6,
8, 30
NAS1, 10,
11, 12, 20,
23
NAS30 NAS10 NAS21, 30 NAS10, 16,
29
NAS3, 5, 18,
19, 26, 28,
30
Hurricane NAS2, 30 NAS7, 10,
13, 20, 24
NAS30 NAS10 NAS21, 30 NAS13 NAS3, 5, 9,
19, 26, 30
Medium-Risk Hazards
Mass Movement NAS30 NAS30 NAS30 NAS3, 5, 17,
19, 26, 28,
30
Low-Risk Hazards
Earthquake NAS2, 30 NAS30 NAS30 NAS3, 5, 19,
26, 30
Wildfire NAS2, 30 NAS30 NAS30 NAS3, 5, 19,
26, 30
Drought NAS2, 30 NAS14 NAS25 NAS15 NAS3, 5, 19,
26, 30
Coastal Erosion NAS30 NAS30 NAS30 NAS3, 5, 19,
26, 28, 30
a. See the introduction to this volume for explanation of mitigation types.
18.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• Nassau Bay Municipal Code — The municipal code was reviewed for the full capability assessment and
for identifying opportunities for action plan integration.
• Nassau Bay Flood Damage Prevention Ordinance — The flood damage prevention ordinance was
reviewed for compliance with the National Flood Insurance Program.
• Texas Water Development Board – Repetitive Loss property report
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«3HoustonPasadenaLeague CityWebsterCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.20.40.1Miles±Nassau Bay
¬«3
Houston
Pasadena
League City
Webster
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Nassau Bay
¬«3
Houston
Pasadena
League City
Webster
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Nassau Bay
¬«3
Houston
Pasadena
League City
Webster
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Nassau Bay
¬«3
Houston
Pasadena
League City
Webster
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Nassau Bay
¬«3
Houston
Pasadena
League City
Webster
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Nassau Bay
¬«3
Houston
Pasadena
League City
Webster
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Nassau Bay
19-1
19. CITY OF PASADENA
19.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Frank Bengochea, EMC
1201 Davis Street
Pasadena, Texas 77506
Telephone: 713-475-5588
e-mail Address: fbengochea@pasadenatx.gov
Azell Carter, Deputy EMC
1201 Davis Street
Pasadena, Texas 77506
Telephone: 713-475-5588
e-mail Address: acarter@pasadenatx.gov
19.2 JURISDICTION PROFILE
19.2.1 Location
The City of Pasadena is located in southeast Harris County and has a population of 153,520, making it the second-
largest city in the region. The City encompasses an area of 55 square miles.
19.2.2 History
Pasadena was founded in 1893 by John H. Burnett of Galveston, who named the area after Pasadena, California,
because of the perceived lush vegetation. The La Porte, Houston and Northern Railroad was built through the
town site in 1894 and opened the area for development as a farming community. Transition from a farming
economy to an industrial one did not occur until the late 1930s, when the war in Europe spurred a major increase
in the ship-channel industries.
19.2.3 Climate
The climate of the City of Pasadena is characterized by hot, humid summers and mild to cool winters.
19.2.4 Governing Body Format
The City of Pasadena operates under a Strong Mayor-Council form of government with a mayor and eight council
members. The City of Pasadena assumes responsibility for the adoption of this plan; the Office of Emergency
Management will oversee its implementation. Development of this annex was carried out by the members of the
local mitigation planning team, whose members are listed in Table 19-1.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
19-2
Table 19-1. Local Mitigation Planning Team Members
Name Title
Frank Bengochea Emergency Management Coordinator
Azell Carter Deputy Emergency Management Coordinator
Erik Sweet Emergency Management Planner
Sarah Benavidez Sr Assistant City Engineer
Deanna Schmidt Director of Planning
Michelle Janise Building Official
19.3 CURRENT TRENDS
19.3.1 Population
According to US Census July 1, 2017, (V2017), the population of Pasadena as of July 1, 2017 was 153,520. Since
April 1, 2010, the population has grown at an average annual rate of 2.8 percent.
19.3.2 Development
Pasadena has experienced significant growth along Sam Houston Parkway in the last decade. Growth in new
development is expected to slow as Pasadena nears buildout. The remaining large parcels are located in the
Industrial Districts. These parcels will likely develop as port-related warehousing. Future economic growth will be
driven by redevelopment of older neighborhoods and commercial centers.
Table 19-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
19.4 CAPABILITY ASSESSMENT
The City of Pasadena performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 19-3.
• Development and permitting capabilities are presented in Table 19-4.
• An assessment of fiscal capabilities is presented in Table 19-5.
• An assessment of administrative and technical capabilities is presented in Table 19-6.
• An assessment of education and outreach capabilities is presented in Table 19-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 19-8.
• Classifications under various community mitigation programs are presented in Table 19-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 19-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
City of Pasadena
19-3
Table 19-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
Yes
• If yes, give the estimated area annexed and estimated number of parcels or structures.
270 acres
Is your jurisdiction expected to annex any areas during the performance period of this plan?
Yes
• If yes, describe land areas and dominant uses.
107 acres – commercial development
• If yes, who currently has permitting
authority over these areas?
Harris County
Are any areas targeted for development or major redevelopment in the next five years? Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk
areas
(1) Areas recently and planned to be annexed are with the 100-year flood plain. These
areas will be developed as large industrial warehousing. (2) Approximately, 100-acres
targeted for redevelopment in Historic Pasadena near City Hall Is not in a known hazard
risk area. (3) Approximately 200 acres are targeted for redevelopment near the
Convention Center. Approximately one-half of the area to be developed is in the 500-
year flood plain.
How many permits for new construction were issued in your jurisdiction since the
preparation of the previous hazard mitigation
plan?
2014 2015 2016 2017 2018
Single Family 77 119 99 54 129
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.) 69 75 89 71 57
Total 146 194 188 125 186
Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred.
• Special Flood Hazard Areas: Single family: 80 (2014-2018), Multi-family: 29 (2014-
2018), Other: 46 (2014-2018)
• Landslide: N/A
• High Liquefaction Areas: N/A
• Tsunami Inundation Area: N/A
• Wildfire Risk Areas: N/A
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory
exists, provide a qualitative description.
The City does not maintain a buildable lands inventory. Parcels available for
development are dispersed throughout the City and most are less than 10 acres in size
and of outside of the Industrial Districts. Within the Industrial Districts, larger parcels
will likely develop as port- or petrochemical related industry.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
19-4
Table 19-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No No No
Comment: Pasadena Code of Ordinances – Chapter 9 – Buildings and General Building
Zoning Code No No No No
Comment: The City of Pasadena does not have zoning but regulates some land uses
Subdivisions Yes No Yes No
Comment: State of Texas/Subdivision regulations conform to Texas State law
Stormwater Management Yes No Yes No
Comment: State of Texas and FEMA/All storm water management city ordinances meet or exceed local, state, and federal requirements
Post-Disaster Recovery No No No No
Comment:
Real Estate Disclosure No No No No
Comment:
Growth Management No No No No
Comment:
Site Plan Review Yes No No No
Comment: The review is limited to being a part of the building permit process
Environmental Protection Yes Yes Yes No
Comment: Local ordinances, TCEQ, and EPA
Flood Damage Prevention Yes Yes Yes No
Comment: Local flood damage prevention ordinance, Texas water Development Board, and FEMA
Emergency Management Yes Yes Yes No
Comment: Texas Local Government Code 418
Climate Change No No No No
Comment:
Other No No No No
Comment:
Planning Documents
General Plan No No No No
Comment: N/A
Capital Improvement Plan Yes No No No
How often is the plan updated? Annually
Comment: This is a 5-year plan
Disaster Debris Management Plan Yes No No No
Comment: Contracts are reviewed on an annual basis and the plan is updated every five years, last Updated 5/13/2018
Floodplain or Watershed Plan Yes Yes No No
Comment: FEMA. The city has a floodplain management which is updated as necessary
Stormwater Plan Yes No No No
Comment: Pasadena Code of Ordinances – Chapter 37
Urban Water Management Plan No No No No
Comment:
Habitat Conservation Plan No No No No
Comment:
Economic Development Plan Yes No No No
Comment: The Pasadena Economic Development Corporation coordinates economic development.
City of Pasadena
19-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Shoreline Management Plan No No No No
Comment:
Community Wildfire Protection Plan No No No No
Comment:
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes No Yes No
Comment: The State of Texas and The Department of Homeland Security. The city has a THIRA. It is mandated that the city has a
THIRA since we accept UASI and Homeland Security grant funds.
Threat & Hazard Identification & Risk
Assessment (THIRA)
Yes Yes Yes No
Comment: Department of Homeland Security. The city has a THIRA. It is mandated that the city has a THIRA since we accept UASI and
Homeland Security grant funds.
Post-Disaster Recovery Plan No No No No
Comment:
Continuity of Operations Plan Yes Yes Yes No
Comment: Department of Homeland Security. The city has a THIRA. It is mandated that the city has a THIRA since we accept UASI and
Homeland Security grant funds.
Public Health Plan Yes Yes Yes No
Comment: Harris County Public Health Department. The state of Texas mandates that the city has a public Health Plan.
Table 19-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Permit Department
Does your jurisdiction have the ability to track permits by hazard area? Yes
Does your jurisdiction have a buildable lands inventory? No
Table 19-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes – (If yes, specify) Water and Sewer: Connection and
Usage fees. Gas and Electric: private utility company (N/A)
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
19-6
Table 19-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Public Works /Engineering
Engineers or professionals trained in building or infrastructure construction practices Yes Public Works /Engineering
Planners or engineers with an understanding of natural hazards Yes Public Works /Engineering
Staff with training in benefit/cost analysis Yes Public Works /Engineering
Surveyors No N/A
Personnel skilled or trained in GIS applications Yes Public Works /Engineering
Scientist familiar with natural hazards in local area No N/A
Emergency manager Yes Office of Emergency Management
Grant writers Yes Multiple City Debarments
Other No N/A
Table 19-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. https://www.pasadenatx.gov/185/Emergency-
Management
Do you use social media for hazard mitigation education and outreach? No
• If yes, briefly describe. The OEM has a social media account that is used for
outreach but is not used for education.
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe. N/A
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. The city annually host a Hurricane Workshop for the
citizens of Pasadena.
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. The city has 15 sirens that will be activated if a
hazard event/incident occurs or is detected.
City of Pasadena
19-7
Table 19-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Public Works/Engineering
Who is your floodplain administrator? (department/position) Public Works Director
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? 2017
Does your floodplain management program meet or exceed minimum requirements? Exceeds
• If exceeds, in what ways? 1ft free board requirement
When was the most recent Community Assistance Visit or Community Assistance Contact? 2017
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are. N/A
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are. N/A
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why.
Does your floodplain management staff need any assistance or training to support its floodplain management program? No
• If so, what type of assistance/training is needed?
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification? Yes
• If no, is your jurisdiction interested in joining the CRS program? N/A
How many flood insurance policies are in force in your jurisdiction?a 9,819
• What is the insurance in force? $2,836,961,900
• What is the premium in force? Varies
How many total loss claims have been filed in your jurisdiction?a 7,122
• How many claims are still open or were closed without payment? 1,597
• What were the total payments for losses? $190,750,863.00
a. According to FEMA statistics as of September 2018
Table 19-9. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes Class 5 10/1/14
Building Code Effectiveness Grading Schedule Yes 9 2016
Public Protection Yes Class 1 1/1/19
Storm Ready Yes Storm Ready 12/22/05
Firewise No N/A N/A
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
19-8
Table 19-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Pasadena
19-9
19.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
19.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Basic Plan — The Basic Plan provides a summary on the hazards and threats in the community.
• Annex P — Hazard Mitigation is assigned to the Engineering Department and addresses the hazards
and threats in the community. The Annex also identifies the various hazard mitigation related programs
implemented in the City of Pasadena and which agencies are responsible for administration.
• Master Drainage Plan — The City of Pasadena developed a drainage plan in 2018 that identifies several
drainage projects related to flood mitigation and the identified projects have been integrated into the
Hazard Mitigation Action Plan.
• Flood Mitigation Plan — The City of Pasadena developed a flood mitigation plan in 2016 that followed
the CRS floodplain management planning process and several of the identified projects have been
integrated into the Hazard Mitigation Action Plan.
19.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Capital Improvement Plan — The City of Pasadena updates the CIP on an annual basis and can
integrate the goals, objectives, and projects identified in the Hazard Mitigation Action Plan into the CIP
process.
• Comprehensive Plan — The Pasadena Planning Department and the Pasadena Economic Development
Corporation will develop a new overall plan to document existing conditions and establish goals for the
future.
• Master Parks Plan — The parks plan creates a vision for the city’s park system and makes
recommendations for improvements and open-space preservation.
19.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 19-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of
Pasadena. Other hazard events that broadly affected the entire planning area, including the City of Pasadena, are
listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 19-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Severe Storms & Street Flooding N/A May 7-11. 2019 Not Available
Tornado (F1) N/A April 7, 2019 $500,000
Severe Storms & Street Flooding N/A January 3, 2019 Not Available
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
19-10
Type of Event FEMA Disaster # Date Damage Assessment
Severe Storms & Street Flooding N/A December 6-7, 2018 Not Available
Severe Storms & Street Flooding N/A October 31,2018 Not Available
Severe Storms & Street Flooding N/A July 3, 2018 Not Available
Severe Storms & Street Flooding N/A March 28, 2018 Not Available
Ice and Snow Storm N/A January 16-17-2018 Not Available
Hurricane (Harvey) 4332 DR August 22- September 4, 2017 $50,000,000
Heat N/A July 28, 2017 Not Available
Tornado (F2) N/A March 29 , 2017 $1,000,000
Severe Storms & Street Flooding N/A February 14, 2017 Not Available
Severe Storms & Street Flooding N/A June 2, 2016 Not Available
Severe Storms & Street Flooding 4272 DR May 27, 2016 Not Available
Severe Storms & Street Flooding 4269 DR April 18, 2016 Not Available
Hail N/A March 18, 2016 Not Available
Severe Storms & Street Flooding N/A March 8, 2016 Not Available
Tornado (F2) 4245 DR October 31, 2015 $5,000,000
Severe Storms & Street Flooding N/A August 11, 2015 Not Available
Heat N/A August 7, 2015 Not Available
Severe Storms & Street Flooding 4223 DR May 25-26, 2015 Not Available
Severe Storms & Street Flooding 4223 DR May 12, 2015 Not Available
Severe Storms & Street Flooding N/A April 16-17, 2015 Not Available
Severe Storms & Street Flooding N/A September 16, 2014 Not Available
Severe Storms & Street Flooding N/A August 01, 2014 $100,000
Severe Storms & Street Flooding N/A May 28, /2014 Not Available
Severe Storms & Street Flooding N/A October 31, 2013 Not Available
Severe Storms & Street Flooding N/A May 10, 2013 $5,000
Severe Storms & Street Flooding N/A April 27, 2013 Not Available
Severe Storms & Street Flooding N/A May 12, 2012 Not Available
Severe Storms & Street Flooding N/A January 25, 2012 Not Available
Severe Storms & Street Flooding N/A January 09, 2012 Not Available
Severe Storms & Street Flooding N/A July 02, 2010 Not Available
Severe Storms & Street Flooding N/A October 22, 2009 $4,000
Severe Storms & Street Flooding N/A April 28, 2009 $1,000,000
Severe Storms & Street Flooding N/A April 24, 2009 $1,000,000
Severe Storms & Street Flooding N/A April 18, 2009 $3,500,000
Hurricane (Ike) 1791 DR September 12-14, 2008 $150,000,000
Hurricane (TS Erin) N/A August 16, 2007 $750,000
Severe Storms & Street Flooding N/A June 19, 2006 $3,300,000
Hurricane (Rita) 1606 DR September 24-25, 2005 $5,000,000
Severe Storms & Street Flooding N/A December 14, 2005 $40,000
Severe Storms & Street Flooding N/A July 14, 2005 Not Available
Severe Storms & Street Flooding N/A November 17, 2003 $3,000,000
Severe Storms & Street Flooding N/A August 31, 2003 $3,000
Severe Storms & Street Flooding N/A October 28, 2002 $775,000
Severe Storms & Street Flooding N/A October 24, 2002 Not Available
City of Pasadena
19-11
Type of Event FEMA Disaster # Date Damage Assessment
Severe Storms & Street Flooding N/A September 08, 2002 $15,000
Severe Storms & Street Flooding N/A August 15, 2002 Not Available
Severe Storms & Street Flooding N/A April 08, 2002 $70,000
Severe Storms & Street Flooding N/A August 28-31, 2001 Not Available
Hurricane (TS Allison) N/A June 06, 2001 $5,000,000
Severe Storms & Street Flooding N/A September 13, 2000 Not Available
Severe Storms & Street Flooding N/A October 04, 1998 $5,000
Severe Storms & Street Flooding N/A September 14, 1998 $5,000
Hurricane (TS Frances) N/A September 11, 1998 $5,000,000
Severe Storms & Street Flooding N/A January 04, 1998 $3,000
Severe Storms & Street Flooding N/A December 20, 1997 $20,000
Severe Storms & Street Flooding N/A May 30, 1997 Not Available
Severe Storms & Street Flooding N/A May 24, 1997 Not Available
Severe Storms & Street Flooding N/A April 04, 1997 Not Available
Severe Storms & Street Flooding N/A January 27, 1997 Not Available
Severe Storms & Street Flooding N/A September 27, 1996 Not Available
Severe Storms & Street Flooding N/A September 18, 1996 $1,500,000
Severe Storms & Street Flooding 1041 DR October 16-18, 1994 $50,000,000
Severe Storms & Street Flooding N/A March 1992 Not Available
19.7 HAZARD RISK RANKING
Table 19-12 presents a local ranking for City of Pasadena of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Table 19-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Flooding 48 High
2 Hurricane 34 High
3 Wildfire 29 Medium
3 Drought 29 Medium
4 Earthquake 14 Low
4 Tsunami 14 Low
5 Dam Failure 2 Low
5 Mass Movement 2 Low
6 Coastal Erosion 0 (No Exposure) None
6 Tsunamio 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
19-12
19.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
19.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 402
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 108
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 94
19.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• One of the City’s wastewater treatment plants is located in an area that is likely to be inundated by a
Hurricane Storm Surge and or flooding on Armand Bayou.
• Due to the City’s proximity to chemical plants and refineries along the Ship Channel, Pasadena has a high
risk to environmental and hazardous materials incidents due to impacts cause by natural and human-
caused hazards.
Mitigation actions addressing these issues were prioritized for consideration in the action plan for this annex.
19.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 19-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 19-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
2018PASDNA001 Right of Way Mitigation Projects X PAS8
Comments: Started in 2018 – Some projects are dependent upon future grant opportunities.
2018 PASDNA002 Golden Acres Wastewater Treatment Plant Elimination X PAS8
Comments: Not Started and dependent upon future grant opportunities.
2014PASDNA001 Improve critical infrastructure/public buildings and /or shelters to
harden against hurricanes effects, retrofit with impact and wind resistant glass and
shutter systems, surge protectors and lightening protection.
X PAS5
Comments: Ongoing project – hardening of facilities will be combined into a single action item in the 2020 update.
2014PASDNA002 Improve manufactured homes standards/codes to include tie-
downs or anchorage.
X PAS5
Comments: Ongoing project – dependent upon future grant opportunities
City of Pasadena
19-13
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
2014PASDNA003 Develop a Wildfire Public Education/Outreach Program to
educate residents on wildfire hazards and actions to minimize fire/smoke damage to
property.
X PAS9
Comments: Ongoing project – dependent upon future grant opportunities
2014PASDNA004 Expand warning system (sirens, mass notification and reverse
911) to provide hazard awareness and alerts to mitigate all hazards and increase
coverage of the community’s population.
X PAS6
Comment: Ongoing project – will combine into a single all‐hazards warning and alert project in 2020 update.
2014PASDNA005 Improve safe room shelters to meet wind specifications X PAS5
Comments: Not Started and dependent upon future grant opportunities.
2014PASDNA006 Install retention ponds at selected facilities and geographic
locations to collect non-potable water for irrigation and sprinkler system usage.
X PAS10
Comments: Not Started and dependent upon future grant opportunities.
2014PASDNA007 Improve public facility emergency power to provide adequate
cooling for use as cooling centers.
X PAS7
Comments: Ongoing project – will combine heating and cooling centers projects in 2020 update into a single action Item
2014PASDNA008 Establish grant program to provide cooling equipment (fans,
window A/C’s, etc.) to low to- moderate income (LMI) population.
X PAS7
Comments: Ongoing project – will combine heating and cooling centers projects in 2020 update into a single action Item
2014PASDNA009 Upgrade heating systems and emergency power capacity at
public facilities for use as warming centers.
X PAS7
Comments: Ongoing project – will combine heating and cooling centers projects in 2020 update into a single action Item
2014PASDNA010 Establish grant program to provide heating equipment to low-to-
moderate income (LMI) population.
X PAS7
Comments: Ongoing project – will combine heating and cooling centers projects in 2020 update into a single action Item
2014PASDNA011 Expand community warning system to include direct notification to
local business community during hazardous materials incidents.
X PAS6
Comments: Ongoing project – will combine into a single all‐hazards warning and alert project in 2020 update.
2014PASDNA012 Retrofit critical infrastructure facilities with positive pressure
ventilation systems and HVAC emergency shutdown mechanism for shelter-in-place
capability.
X PAS5
Comments: Ongoing project – dependent upon future grant opportunities
2014PASDNA013 Establish ordinance to require shutoff valves at entry and exit
points of city limits.
X
Comment: Remove Action Item. No longer feasible and regulated by State and Federal agencies.
2014PASDNA014 Improve ordinances requiring fortified spill containment and
engineered anchoring systems on aboveground storage tanks (AST). X PAS10
Comments: Ongoing project – dependent upon future grant opportunities
2014PASDNA015 Expand community warning system like mass notification, reverse
911, sirens, etc. to include coverage to warn flood-prone areas during dam/levee
failure.
X PAS6
Comments: Ongoing project – will combine into a single all‐hazards warning and alert project in 2020 update.
2014PASDNA016 Create mapping/identification of inundation risk areas from
dam/levee failure.
X PAS9
Comments: Remove Item Pasadena is not in a risk area for a Dam failure.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
19-14
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
2010PASDNA002 Improve drainage easements by expanding the slopes, banks and
drainage structures.
X PAS8
Comments: Ongoing project – dependent upon future grant opportunities.
2010PASDNA004 Develop a Public Education Program on flood risk and Community
Rating System (CRS) to educate public on action to minimize damage to human life
and personal property from floods.
X PAS4
Comments: Ongoing project – dependent upon future grant opportunities
2010PASDNA005 Expand and protect current bayou environment associated with
riverine flood to mitigate city’s threat from flooding.
X PAS8
Comments: Ongoing project – dependent upon future grant opportunities
2010PASDNA006 Construction of floodwalls, detention and retention basins,
spillways and other related Structures
X PAS8
Comments: : Ongoing project – dependent upon future grant opportunities.
2010PASDNA008 Burying power lines X
Comments: On going, dependent upon future grant opportunities
2010PASDNA009 Construction of safe rooms PAS5
Comments: Not Started and dependent upon future grant opportunities.
2010PASDNA014 Heating and cooling requirements Implement and adopt city code
to require housing landlords to ensure minimum and maximum temperatures be
sustained for a minimum period of time to limit the effects of extreme heat and
extreme cold.
X
Comments: No Longer Feasible
2010PASDNA015 Establish and harden Heating and cooling centers to reduce
exposure and the effects of extreme heat and winter storms.
X PAS7
Comments: Comments: Ongoing project – will combine heating and cooling centers projects in 2020 update into a single action Item
2010PASDNA016 Develop Buffer Zones/defensible space by GIS Mapping of areas
to reduce impact of wildfires.
X PAS9
Comments: Ongoing project – dependent upon future grant opportunities
2010PASDNA019 Establish facilities to serve as winter heating centers for
animal/livestock.
X PAS7
Comments: Comments: Ongoing project – will combine heating and cooling centers projects in 2020 update into a single action Item
2010PASDNA020 Hazardous material disposal X PAS10
Comments: Ongoing project – dependent upon future grant opportunities
2010PASDNA021 Security provisions and plans for man-made threats to facilities X PAS10
Comments: Ongoing project – dependent upon future grant opportunities
2010PASDNA022 Develop and practice an emergency plan for handling
transportation accidents involving radiological materials
X PAS10
Comments: Ongoing project – dependent upon future grant opportunities
2010PASDNA023 Procure and utilize responder personal protective equipment and
detection instruments
X PAS10
Comments: Ongoing project – dependent upon future grant opportunities
2010PASDNA027 Digging Hotlines X
Comments: 811 Dig Lines is fully implemented in the City of Pasadena
2010PASDNA028 Protective shelters for Response vehicles X PAS5
Comments: Ongoing project – hardening of city facilities will be combined into a single action item in the 2020 update.
City of Pasadena
19-15
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
2010PASDNA029 Hardening roofs of vulnerable City buildings X PAS5
Comments: Ongoing project – hardening of facilities will be combined into a single action item in the 2020 update.
2010PASDNA030 Install Backup power system generators to enable critical facilities
to continue basic services, which can be used by critical facilities to ensure security
and protect refrigerated goods.
X PAS5
Comments: Ongoing project – hardening of facilities will be combined into a single action item in the 2020 update.
2010PASDNA031 Fuel Facility Hardening – Harden and protect the City’s fueling
center against severe weather events and power outages
X PAS5
Comments: Ongoing project – hardening of facilities will be combined into a single action item in the 2020 update.
2010PASDNA032 Install generators for Major Intersections X PAS5
Comments: Ongoing project – dependent upon future grant opportunities
2010PASDNA033 Hydrological routing X PAS8
Comments: On going, dependent upon future grant opportunities
2005PASDN001 Improve and expand the community’s Hurricane public
education/outreach program, the annual hurricane workshop, to educate residents on
appropriate actions to minimize damage from hurricanes and to reach more of the
community over the next five years.
X PAS11
Comments: On going
2005PASDNA005 Adopt and enhance higher-standard windstorm building
requirements to minimize property damage from high-winds
X PAS5
Comments: On going, dependent upon future grant opportunities
2005PASDNA011 Harden critical city facilities to lessen the impacts of natural and
human-caused hazards.
X PAS5
Comments: Ongoing project – hardening of facilities will be combined into a single action item in the 2020 update.
2005PASDNA012 Implement Capital Improvement Projects to reduce flood-related
impacts by installing back-up generators at key water and wastewater facilities.
X PAS5
Comments: Ongoing, dependent upon future grant opportunities
19.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 19-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 19-15
identifies the priority for each action. Table 19-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
19-16
Table 19-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action PAS1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire, hurricane, severe weather
Existing 3, 4, 10 Public Works Emergency
Management
High HMGP, PDM, FMA Short-term
Action PAS2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including the City of Pasadena
Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire
New and Existing 1, 3, 4, 5, 7, 8, 10 Public Works Planning Low Staff Time, General Funds
Ongoing
Action PAS3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Flooding, Hurricane, Wildfire, Drought, Earthquake, Tsunami, Dam Failure, Mass Movement
New and Existing 1, 5, 8 Emergency
Management
Public Works Low Staff Time, General Funds
Short-term
Action PAS4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise
New and Existing 1, 3, 5, 7, 8, 10 Public Works Emergency
Management
Low Staff Time, General Funds
Ongoing
Action PAS5 — The hardening of critical infrastructure, public and private buildings and shelters in order to lessen the impacts of natural
and human-caused hazards:
• Improve critical infrastructure, public and private buildings and shelters to harden against the effects of natural and human-caused
hazards including wind, flood lightning, earthquakes, fire, hazardous materials and environmental hazards.
• Install backup power system generators at critical infrastructure sites including traffic intersections, water and wastewater facilities.
• Improve manufactured homes standards/codes to include tie-downs or anchorage.
• Critical response vehicle storage & fuel facility hardening – Build, harden and or protect the City’s vehicle storage and fueling centers
against severe weather events and power outages.
• Improve safe room shelters to meet wind specifications.
• Retrofit critical infrastructure facilities with positive pressure ventilation systems and HVAC emergency shutdown mechanism for
shelter-in-place capability.
• Adopt and enhance higher-standard windstorm building requirements to minimize property damage from high-winds
Hazards Mitigated: Drought, Earthquake, Flooding, Mass Movement, Severe Weather, Hurricane, Tsunami, Wildfire
New and Existing 1, 2, 3, 7, 8, 9, 10, 13 Public Works Emergency
Management
High HMGP, PDM, FMA Ongoing
Action PAS6 — Expand all hazards warning and alerting systems.
• Expand warning system (sirens, mass notification and reverse 911) to provide hazard awareness and alerts to mitigate all hazards
and increase coverage of the community’s population.
• Expand community warning system to include direct notification to local business community during hazardous materials incidents.
Hazards Mitigated: Drought, Earthquake, Flooding, Mass Movement, Severe Weather, Hurricane, Tsunami, Wildfire
New and Existing 1, 3, 10 Emergency
Management
SERLEPC Medium HMGP, PDM, FMA, Local Short
Term
City of Pasadena
19-17
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action PAS7 — Establish heating and cooling centers to reduce exposure and the effects of extreme heat and winter storms.
• Improve public facility emergency power to provide adequate cooling for use as cooling centers.
• Establish grant program to provide cooling and heating equipment to low- to moderate-income (LMI) population.
• Upgrade heating systems and emergency power capacity at public facilities for use as warming centers.
• Establish facilities to serve as winter heating centers for animal/livestock.
Hazards Mitigated: Drought, Earthquake, Flooding, Mass Movement, Severe Weather, Hurricane, Tsunami, Wildfire
New and Existing 3, 10, 15 Public Works Emergency
Management
High HMGP, PDM Long
Term
Action PAS8 — Flood control and drainage improvements.
• Improve drainage easements by expanding the slopes, banks and drainage structures.
• Expand and protect current bayou environment associated with riverine flood to mitigate city’s threat from flooding.
• Construction of floodwalls, detention and retention basins, spillways and other related structures.
• Hydrological routing
• Right of Way Flood Mitigation
• Projects Golden Acres Wastewater Treatment Plant Elimination
Hazards Mitigated: Flooding, Severe Weather, Hurricane, Tsunami
New and Existing 1, 2, 7, 8, 10, 12, 13 Public Works Emergency
Management
High HMGP, PDM, FMA Ongoing
Action PAS9 — Wildfire Prevention & Mitigation Projects by developing buffer zones/defensible space to reduce impact of wildfires.
Hazards Mitigated: Drought, Wildfire
New and Existing 2, 3, 6, 7, 10, 12 Planning Emergency
Management
Low HMGP, PDM Short
Term
Action PAS10 — Man-Made and Technological Disasters Prevention and Mitigation
• Security provisions and plans for man-made threats to facilities.
• Develop and practice an emergency plan for handling transportation accidents involving radiological materials
• Procure and utilize responder personal protective equipment and detection instruments
• Improve ordinances requiring fortified spill containment and engineered anchoring systems on aboveground storage tanks (AST).
• Install retention ponds at selected facilities and geographic locations to collect non-potable water for irrigation and sprinkler system
usage
Hazards Mitigated: Drought, Hazardous Materials
New and Existing 1, 3 , 6, 10, 12 Police & Fire Emergency
Management
Medium HMGP, PDM, FMA, Local Short
Term
Action PAS11 — Public Education and Outreach for natural and human-caused hazards.
• Improve and expand the community’s Hurricane public education/outreach program, the annual hurricane workshop, to educate
residents on appropriate actions to minimize damage from hurricanes.
• Develop a Wildfire Public Education/Outreach Program to educate residents on wildfire hazards and actions to minimize fire/smoke
damage to property.
• Drought, Earthquake, Flooding, Mass Movement, Severe Weather, Hurricane, Tsunami, Wildfire
New and Existing 2, 3, 10, 12 Emergency
Management
Fire Low HMGP, PDM, FMA, Local Short
Term
Action PAS12— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Flooding, Hurricane, Wildfire, Drought, Earthquake, Tsunami, Dam Failure, Mass Movement
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
Pasadena HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
19-18
Table 19-15. Mitigation Action Priority
Action #
# of Objectives Met Benefits Costs
Do Benefits Equal or Exceed Costs?
Is Project Grant-Eligible?
Can Project Be Funded Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
PAS1 3 High High Yes Yes No Medium High
PAS2 7 Medium Low Yes No Yes High Low
PAS3 3 Low Low Yes No Yes High Low
PAS4 6 Medium Low Yes No Yes High Low
PAS5 8 High High Yes Yes No High High
PAS6 3 Medium Low Yes Yes No High Medium
PAS7 3 High High Yes Yes No High High
PAS8 7 High High Yes Yes No High High
PAS9 6 Medium Medium Yes Yes No Medium Medium
PAS10 5 Medium Medium Yes Yes No Medium Medium
PAS11 4 Medium Medium Yes Yes No Medium Medium
PAS12 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 19-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Sever Weather PAS2, 12 PAS1, PAS5 PAS4, PAS11, 12 PAS8 PAS6, 12 PAS5 PAS7 PAS3, 12
Flooding PAS2, 12 PAS1, PAS5 PAS4, PAS11, 12 PAS8 PAS6, 12 PAS5 PAS7 PAS3, 12
Hurricane PAS2, 12 PAS1, PAS5 PAS4, PAS11, 12 PAS8 PAS6, 12 PAS5 PAS7 PAS3, 12
Medium-Risk Hazards
Wildfire PAS2, 12 PAS1, PAS5 PAS4, PAS11, 12 PAS9 PAS6, 12 PAS7 PAS3, 12
Drought PAS2, 12 PAS5 PAS4, PAS11, 12 PAS9 PAS6,
PAS10, 12 PAS7 PAS3, 12
Low-Risk HazardsPAS11
Earthquake PAS2, 12 PAS1, PAS5 PAS11, 12 PAS6, 12 PAS5 PAS3, 12
Tsunami PAS2, 12 PAS1, PAS5 PAS4, PAS11, 12 PAS8 PAS6, 12 PAS5 PAS7 PAS3, 12
Dam Failure PAS2, 12 PAS5 PAS4, PAS11, 12 PAS6, 12 PAS5 PAS7 PAS3, 12
Mass Movement PAS2, 12 PAS5 PAS11, 12 PAS6, 12 PAS5 PAS3, 12
a. See the introduction to this volume for explanation of mitigation types.
19.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• City of Pasadena Municipal Ordinance — The municipal code was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
City of Pasadena
19-19
• City of Pasadena Flood Control & Drainage Ordinance — The flood damage prevention ordinance
was reviewed for compliance with the National Flood Insurance Program.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«96¬«96¬«35¬«225¬«225¬«3¬«3¬«146¬«146§¨¦10§¨¦45§¨¦45£¤90HoustonBaytownJacinto CityGalena ParkDeer ParkLa PorteMorgan'sPointSouth HoustonShoreacresLa PortePearlandSeabrookTaylor LakeVillageEl LagoFriendswoodPearlandLeague CityLeague CityNassauBayWebsterClear LakeShoresKemahCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County01.530.75Miles±Pasadena
¬«96
¬«96¬«35
¬«225
¬«225
¬«3
¬«3
¬«146
¬«146
§¨¦10
§¨¦45
§¨¦45
£¤90
Houston
Baytown
Jacinto City
Galena Park
Deer Park
La Porte
Morgan's
Point
South Houston
Shoreacres
La Porte
Pearland
SeabrookTaylor Lake
Village
El Lago
Friendswood
Pearland
League City
League City
Nassau
Bay
Webster
Clear Lake
Shores
Kemah
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 1.5 30.75 Miles
±
Pasadena
¬«96
¬«96¬«35
¬«225
¬«225
¬«3
¬«3
¬«146
¬«146
§¨¦10
§¨¦45
§¨¦45
£¤90
Houston
Baytown
Jacinto City
Galena Park
Deer Park
La Porte
Morgan's
Point
South Houston
Shoreacres
La Porte
Pearland
SeabrookTaylor Lake
Village
El Lago
Friendswood
Pearland
League City
League City
Nassau
Bay
Webster
Clear Lake
Shores
Kemah
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 1.5 30.75 Miles
±
Pasadena
¬«96
¬«96¬«35
¬«225
¬«225
¬«3
¬«3
¬«146
¬«146
§¨¦10
§¨¦45
§¨¦45
£¤90
Houston
Baytown
Jacinto City
Galena Park
Deer Park
La Porte
Morgan's
Point
South Houston
Shoreacres
La Porte
Pearland
SeabrookTaylor Lake
Village
El Lago
Friendswood
Pearland
League City
League City
Nassau
Bay
Webster
Clear Lake
Shores
Kemah
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 1.5 30.75 Miles
±
Pasadena
¬«96
¬«96¬«35
¬«225
¬«225
¬«3
¬«3
¬«146
¬«146
§¨¦10
§¨¦45
§¨¦45
£¤90
Houston
Baytown
Jacinto City
Galena Park
Deer Park
La Porte
Morgan's
Point
South Houston
Shoreacres
La Porte
Pearland
SeabrookTaylor Lake
Village
El Lago
Friendswood
Pearland
League City
League City
Nassau
Bay
Webster
Clear Lake
Shores
Kemah
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 1.5 30.75 Miles
±
Pasadena
¬«96
¬«96¬«35
¬«225
¬«225
¬«3
¬«3
¬«146
¬«146
§¨¦10
§¨¦45
§¨¦45
£¤90
Houston
Baytown
Jacinto City
Galena Park
Deer Park
La Porte
Morgan's
Point
South Houston
Shoreacres
La Porte
Pearland
SeabrookTaylor Lake
Village
El Lago
Friendswood
Pearland
League City
League City
Nassau
Bay
Webster
Clear Lake
Shores
Kemah
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 1.5 30.75 Miles
±
Pasadena
¬«96
¬«96¬«35
¬«225
¬«225
¬«3
¬«3
¬«146
¬«146
§¨¦10
§¨¦45
§¨¦45
£¤90
Houston
Baytown
Jacinto City
Galena Park
Deer Park
La Porte
Morgan's
Point
South Houston
Shoreacres
La Porte
Pearland
SeabrookTaylor Lake
Village
El Lago
Friendswood
Pearland
League City
League City
Nassau
Bay
Webster
Clear Lake
Shores
Kemah
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 1.5 30.75 Miles
±
Pasadena
20-1
20. CITY OF PINEY POINT VILLAGE
20.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Roger Nelson, City Administrator
7676 Woodway Drive, Suite 300
Houston, Texas 77063
713-230-8703
e-mail: cityadmin@pineypt.org
Annette Arriaga, Building Official
7676 Woodway Drive, Suite 300
Houston, Texas 77063
Telephone: 713-782-3178
e-mail: bldgofficial@pineypt.org
20.2 JURISDICTION PROFILE
20.2.1 Location
The City of Piney Point Village is a municipality in southwestern Harris County. Piney Point’s boundary on the
north is generally Beinhorn Taylorcrest. To the west, Blalock and Memorial Point. To the south Arrowwood
Circle, Windemere Lane and Buffalo Bayou. The eastern boundary is Buffalo Bayou, Memorial Drive and
Hedwig Road. The City encompasses an area of 2.1 square miles.
20.2.2 History
Piney Point Village was incorporated in 1954. There are 1,064 houses in Piney Point and 3,125 residents. There
are three churches and four schools (one public elementary school, two church schools and one private school.
20.2.3 Climate
The climate of Piney Point is typically warm with significant annual rainfall.
20.2.4 Governing Body Format
The City of Piney Point Village is a Type-A General Law City and is governed by a Mayor and five Aldermen.
All Council positions are elected at large for two year terms. The Piney Point Village City Council assumes
responsibility for the adoption of this plan; Roger Nelson, City Administrator will oversee its implementation.
Development of this annex was carried out by the members of the local mitigation planning team, whose
members are listed in Table 20-1.
Table 20-1. Local Mitigation Planning Team Members
Name Title
Howard Miller Emergency Management Coordinator – VFD
Roger Nelson City Administrator – Piney Point Village
Annette Arriaga Building Official – Piney Point Village
Karen Farris City Secretary – Piney Point Village
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
20-2
20.3 CURRENT TRENDS
20.3.1 Population
According to 2010 Census, the population of Piney Point Village was 3,125. Since 2010, the population has
remained the same.
20.3.2 Development
Table 20-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
Table 20-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since
the preparation of the previous hazard mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
Is your jurisdiction expected to annex any
areas during the performance period of this plan?
No
• If yes, describe land areas and dominant uses.
• If yes, who currently has permitting authority over these areas?
Are any areas targeted for development or major redevelopment in the next five years? No
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
The City of Piney Point Village continues to see redevelopment of existing houses.
This development is occurring throughout the Village
How many permits for new construction were issued in your jurisdiction since the
preparation of the previous hazard mitigation
plan?
2014 2015 2016 2017 2018
Single Family 16 11 8 4 10
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.) 0 0 0 0 0
Total 16 11 8 4 10
Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred.
• Special Flood Hazard Areas: 0
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the
jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description.
The City of Piney Point Village continues to see redevelopment of existing houses.
This development is occurring throughout the Village
20.4 CAPABILITY ASSESSMENT
The City of Piney Point Village performed an assessment of its existing capabilities for implementing hazard
mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
City of Piney Point Village
20-3
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 20-3.
• Development and permitting capabilities are presented in Table 20-4.
• An assessment of fiscal capabilities is presented in Table 20-5.
• An assessment of administrative and technical capabilities is presented in Table 20-6.
• An assessment of education and outreach capabilities is presented in Table 20-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 20-8.
• Classifications under various community mitigation programs are presented in Table 20-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 20-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Table 20-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No No No
Comment: PPV Development Services
Zoning Code Yes No No No
Comment: PPV Development Services
Subdivisions Yes No No No
Comment:
Stormwater Management Yes Yes Yes Yes
Comment: HCFCD
Post-Disaster Recovery Yes Yes No Yes
Comment: Harris County
Real Estate Disclosure No No No No
Comment:
Growth Management No No No No
Comment:
Site Plan Review Yes No No No
Comment:
Environmental Protection Yes Yes No Yes
Comment: HCFCD
Flood Damage Prevention Yes Yes No No
Comment: HCFCD
Emergency Management Yes Yes No Yes
Comment: Hedwig, Spring Valley, Hunters Creek, Hilshire, VFD
Climate Change No No No No
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
20-4
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Planning Documents
General Plan Yes No No No Comment:
Capital Improvement Plan No No No No
How often is the plan updated? N/A
Comment:
Disaster Debris Management Plan Yes Yes No Yes
Comment: Harris County
Floodplain or Watershed Plan Yes Yes No Yes
Comment: HCFCD
Stormwater Plan Yes Yes No Yes
Comment: HCFCD
Urban Water Management Plan No No No No
Comment:
Habitat Conservation Plan No No No No
Comment:
Economic Development Plan No No No No
Comment:
Shoreline Management Plan No No No No
Comment:
Community Wildfire Protection Plan No No No No
Comment:
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes Yes No Yes
Comment: VFD
Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes No Yes
Comment: VFD
Post-Disaster Recovery Plan Yes Yes No Yes/No
Comment: Harris County
Continuity of Operations Plan Yes No No No
Comment:
Public Health Plan No No No No
Comment:
Other Yes/No Yes/No Yes/No Yes/No
Comment:
Table 20-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Development Services
Does your jurisdiction have the ability to track permits by hazard area? Yes
Does your jurisdiction have a buildable lands inventory? Yes
City of Piney Point Village
20-5
Table 20-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Table 20-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Combination of City employees and the
City’s engineering firm – HDR
Engineers or professionals trained in building or infrastructure
construction practices
Yes City’s engineering firm – HDR
Planners or engineers with an understanding of natural hazards Yes City’s engineering firm – HDR
Staff with training in benefit/cost analysis Yes City Administrator
Surveyors Yes City’s engineering firm – HDR
Personnel skilled or trained in GIS applications No City’s engineering firm – HDR
Scientist familiar with natural hazards in local area No
Emergency manager Yes Emergency Management
Coordinator – VFD
Grant writers No
Table 20-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? No
Do you have hazard mitigation information available on your website? No
• If yes, briefly describe.
Do you use social media for hazard mitigation education and outreach? No
• If yes, briefly describe.
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. We use the MVPD’s “V-Link” system which is a
community wide, internet based system
Do you have any established warning systems for hazard events? No
• If yes, briefly describe.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
20-6
Table 20-8. National Flood Insurance Program Compliance
Criterion
What local department is responsible for floodplain management? Harris County Flood Control District
Who is your floodplain administrator? (department/position) Annette Arriaga – Development Services
Are any certified floodplain managers on staff in your jurisdiction? No
What is the date that your flood damage prevention ordinance was last amended? March 26, 2019
Does your floodplain management program meet or exceed minimum requirements? Yes
• If exceeds, in what ways?
When was the most recent Community Assistance Visit or Community Assistance Contact? 2018
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why.
Does your floodplain management staff need any assistance or training to support its floodplain management program? No
• If so, what type of assistance/training is needed?
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification?
• If no, is your jurisdiction interested in joining the CRS program? Yes
How many flood insurance policies are in force in your jurisdiction?a 620
• What is the insurance in force? $207,040,600
• What is the premium in force? $347,337
How many total loss claims have been filed in your jurisdiction?a 338
• How many claims are still open or were closed without payment? Unknown
• What were the total payments for losses? $20,537,774
a. According to FEMA statistics as of MONTH XX, 201X
Table 20-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No
Building Code Effectiveness Grading Schedule No
Public Protection No
Storm Ready No
Firewise No
City of Piney Point Village
20-7
Table 20-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
20-8
20.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in Section 20.11 were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
20.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• The Cities of Piney Point, Hedwig, Bunker Hill and Hunters Creek share engineering plans, specifically
related to drainage projects so that we all know what the other is doing and how we are potentially
impacting each other.
• The Cities of Piney Point, Bunker Hill and Hunters Creek share a Police Department
• The Cities of Piney Point, Bunker Hill, Hunters Creek, Hedwig, Spring Valley and Hilshire share a Fire
Department. The Fire Department serves as the lead hazard mitigation entity.
20.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future: unknown
20.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 20-11 lists past occurrences of natural hazards for which specific damage was recorded in Piney Point
Village. Other hazard events that broadly affected the entire planning area, including Piney Point Village, are
listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 20-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 $19,325,155
Memorial Day Flood 4269 DR 2016 Not Available
Tax Day Flood 4227DR 2016 Not Available
Hurricane Ike 1791 DR 2008 Not Available
Hurricane Rita 1606 DR 2005 Not Available
Hurricane Alicia 1379 DR 1983 Not Available
20.7 HAZARD RISK RANKING
Table 20-12 presents a local ranking for Piney Point Village of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
City of Piney Point Village
20-9
Table 20-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Flooding 18 Medium
3 Earthquake 14 (negligible level of risk from this hazard) Low
4 Drought 6 Low
4 Mass Movement 6 Low
4 Wildfire 6 Low
5 Tsunami 0 (No exposure) None
5 Dam Failure 0 (No exposure) None
5 Coastal Erosion 0 (No exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
20.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
20.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 52
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 3
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 0
20.8.2 Other Noted Vulnerabilities
No additional vulnerabilities specific to this jurisdiction have been identified.
20.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 20-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
20.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 20-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 20-15
identifies the priority for each action. Table 20-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
20-10
Table 20-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update
Expand Early Warning/Alert System – Collaborative Community Alert & Notification (Code Red Mass Notification) for information sharing to increase mobile coverage of residential and non-residential areas
X PPV5
Comment: Under consideration in FY 2020 budget
Develop Tree Management Program to better manage and keep clear the public right-of-way; to promote stronger, healthier trees and to reduce the impact of debris
X
Comment:
Table 20-14. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action PPV1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Severe weather, hurricane, flooding, earthquake
Existing 11, 13 City Administration TBD High HMGP, PDM, FMA Short-term
Action PPV2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community
Hazards Mitigated: Severe weather, hurricane, flooding, earthquake, drought
New and Existing 9, 10, 11 City Administration TBD Low Staff Time, General Funds Ongoing
Action PPV3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Mass Movement, Wildfire
New and Existing 9, 10, 11 City Administration TBD Low Staff Time, General Funds Short-term
Action PPV4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Flooding, severe weather, hurricane
New and Existing 1, 3, 5, 7, 8, 10, 14 City Administration TBD Low Staff Time, General Funds Ongoing
Action PPV5 — Expand Early Warning/Alert System – Collaborative Community Alert & Notification (Code Red Mass Notification) for
information sharing to increase mobile coverage of residential and non-residential areas
Hazards Mitigated: Al Hazards
New and Existing 1,3,15 City Administration TBD Medium General Fund. Grants Ongoing
Action PPV6— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Mass Movement, Wildfire
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
City Admistration HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
City of Piney Point Village
20-11
Table 20-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
PPV1 3 High High Yes Yes No Medium High
PPV2 7 Medium Low Yes No Yes High Low
PPV3 3 Low Low Yes No Yes High Low
PPV4 6 Medium Low Yes No Yes High Low
PPV5 3 Medium Medium Yes Yes Yes High Medium
PPV6 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 20-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather PPV1, 4, 6 PPV1, 4 PPV 4, 6 PPV6 PPV 1, PPV5 PPV 2, 3, 4, 6
Hurricane PPV1, 4, 6 PPV1, 4 PPV 4, 6 PPV6 PPV 1, PPV5 PPV 2, 3, 4, 6
Medium-Risk Hazards
Flooding PPV1, 4, 6 PPV1, 4 PPV 4, 6 PPV6 PPV 1, PPV5 PPV 2, 3, 4, 6
Low-Risk Hazards
Earthquake PPV 1, 6 PPV 1 PPV6 PPV6 PPV 1, PPV5 PPV 2, 3, 4, 6
Drought PPV6 PPV6 PPV6 PPV 2, 3, 4, 6
Mass Movement PPV6 PPV6 PPV6 PPV 2, 3, 4, 6
Wildfire PPV6 PPV6 PPV6 PPV 2, 3, 4, 6
a. See the introduction to this volume for explanation of mitigation types.
20.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• City of Piney Point Village Municipal Code — The municipal code was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
• City of Piney Point Village Flood Damage Prevention Ordinance — The flood damage prevention
ordinance was reviewed for compliance with the National Flood Insurance Program.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(HoustonHuntersCreek VillageHedwigVillageBunker HillVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.20.40.1Miles±Piney Point Village
Houston
Hunters
Creek Village
Hedwig
Village
Bunker Hill
Village
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Piney Point Village
Houston
Hunters
Creek Village
Hedwig
Village
Bunker Hill
Village
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Piney Point Village
Houston
Hunters
Creek Village
Hedwig
Village
Bunker Hill
Village
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Piney Point Village
Houston
Hunters
Creek Village
Hedwig
Village
Bunker Hill
Village
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Piney Point Village
Houston
Hunters
Creek Village
Hedwig
Village
Bunker Hill
Village
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Piney Point Village
Houston
Hunters
Creek Village
Hedwig
Village
Bunker Hill
Village
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Piney Point Village
21-1
21. CITY OF SEABROOK
21.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Nick Kondejewski
1100 Red Bluff
Seabrook, Texas 77586
Telephone: 281-291-5638
e-mail Address: nickk@seabrooktx.gov
Brian Craig
1100 Red Bluff
Seabrook, Texas 77586
Telephone: 281-291-5719
Email Address: bcraig@seabrooktx.gov
21.2 JURISDICTION PROFILE
21.2.1 Location
The City of Seabrook is located just 30 minutes south of downtown Houston, Seabrook is the southernmost city
Harris County along State Highway 146. Located on Galveston Bay, Clear Lake, and Taylor Lake. Seabrook has
water on Eastern Side, South western side and the North West side of the City.
State Highway 146 divides the City into two halves. To the south of Seabrook is Kemah, Texas which is
connected by the Seabrook/Kemah Bridge, which cross the Clear Creek Channel. To the north of Seabrook is
Pasadena and Port of Houston Bayport Terminal. To the west of Seabrook is El Lago. Seabrook with El Lago and
a portion of Pasadena is actually an Island in the southernmost portion of Harris County.
Seabrook currently encompasses an area of approximately 5 square miles of land not including several square
miles of Galveston Bay.
21.2.2 History
The City of Seabrook was incorporated in October 23, 1961. Historic records date back to 1832, when Ritson
Morris, a native Virginian, obtained a league of land from the Mexican government. A portion of the land was
purchased by Seabrook W. Sydnor in 1895 and a plat was filed with the Harris County Courthouse the following
year.
In March 1903, the Seabrook Company of Houston filed a revised layout of the proposed Seabrook town site,
which appealed to local farmers, fishermen and merchants. Some years later, in 1961, local leaders had the city
incorporated.
In 1964, not long after the city became incorporated, a bridge was built between Kemah and Seabrook plus State
Highway 146 was established as a four-lane highway. The bridge and highway allowed easy access to Seabrook
along Galveston Bay and the small town began to grow considerably. A youth center named for astronaut Edward
H. White II, America’s first space walker, opened in 1971.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
21-2
Through the years the City has gone through many growing pains as the widening of Nasa Parkway, State High
146 and again the current widening of State High 146. Other growing pains of Natural Disasters strike home with
Hurricane Carla, Hurricane Alicia, Hurricane Ike and Hurricane Harvey.
21.2.3 Climate
Seabrook’s climate is classified as humid subtropical. Prevailing winds from the south and southeast bring heat
from the deserts of Mexico and moisture from the Gulf of Mexico.
Summer temperatures typically have highs near 91 °F though higher temperatures are not uncommon. The city’s
proximity to the bay and the winds that it generates moderate the area’s temperatures and ease the effects of the
humidity, creating a more pleasant climate than inland communities like Houston.
Winters in the area are temperate with typical January 61 °F and lows are near 45 °F. Snowfall is rare. Annual
rainfall averages exceed 56 inches, with an annual average of 69 precipitation days.
The average elevation of Seabrook is approximately 11 ft. above sea level.
21.2.4 Governing Body Format
The City of Seabrook is a Home Rule City operating under the Council-Manager form of government, with a City
Council composed of a Mayor (elected at large) and six at large Council members. The City Council appoints a
City Manager to act as the chief administrative and executive officer of the City.
The City of Seabrook City Council assumes responsibility for the adoption of this plan; The Office of Emergency
Management will oversee its implementation. Development of this annex was carried out by the members of the
local mitigation planning team, whose members are listed in Table 21-1.
Table 21-1. Local Mitigation Planning Team Members
Name Title
Charles J. Galyean OEM Director
Nick Kondejewski Building Official, FPM
Sean Landis Deputy City Manager
Kevin Padgett Public Works Director
Brian Craig Assistant Public Works Dir
Brad Goudie Director of Emergency Services
Amanda Alvarado Communication
21.3 CURRENT TRENDS
21.3.1 Population
According to U.S. Census, the population of City of Seabrook, as of July 1, 2017 was 13,693. Since 2010, the
population has grown at an average annual rate of 3 percent. Over the last year the population growth has leveled
off due to a lack of development and lack of buildable land space.
21.3.2 Development
The City of Seabrook is zoned community with large residential base with commercial throughout the major
roadways in the city. Major construction by the State of Texas on a Roadway expansion project will and has had a
City of Seabrook
21-3
very large impact to the community. There were over 60 business that were affected by this expansion and many
did not relocate within the city and some have chosen to not to reopen anywhere after the buyout by TxDOT.
With the multi-year long construction project by TxDOT development along this corridor is slow and slow city
wide due to the impact of construction. During this time construction is primarily in fill in the residential areas of
the city.
Table 21-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
Table 21-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since
the preparation of the previous hazard mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
N/A
Is your jurisdiction expected to annex any areas during the performance period of this plan?
No
• If yes, describe land areas and dominant uses.
N/A
• If yes, who currently has permitting authority over these areas?
N/A
Are any areas targeted for development or
major redevelopment in the next five years?
Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
The areas for development over the next 5 years are as follows:
• S.H. 146 corridor -- This will be commercial development consisting on mainly
retail.
• Repsdorph and Lakeside (Town Center) -- will consist of commercial development
that will mainly contain retail.
• Water Front Drive – Will consist of commercial with retail, restaurant,
entertainment.
• North end of the City East of State Hwy 146 – Commercial, Light industrial and
residential
How many permits for new construction were issued in your jurisdiction since the
preparation of the previous hazard mitigation
plan?
2014 2015 2016 2017 2018
Single Family 19 20 23 27 30
Multi-Family 1 0 1 0 0
Other (commercial, mixed use, etc.) 4 1 4 5 2
Total 24 21 28 32 32
Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred.
• Special Flood Hazard Areas: 110
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the
jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description.
Currently the City is about at 85% buildout with limited areas for development. Fill in
areas with in the residential areas and fill in area through the Commercially Zoned
areas.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
21-4
21.4 CAPABILITY ASSESSMENT
The City of Seabrook performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 21-3.
• Development and permitting capabilities are presented in Table 21-4.
• An assessment of fiscal capabilities is presented in Table 21-5.
• An assessment of administrative and technical capabilities is presented in Table 21-6.
• An assessment of education and outreach capabilities is presented in Table 21-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 21-8.
• Classifications under various community mitigation programs are presented in Table 21-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 21-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Table 21-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No No No
Comment: Seabrook has adopted the 2015 ICC Code complement and the 20117 NEC
Zoning Code Yes No No No
Comment: Seabrook, Texas Code of Ordinance, Chapter80
Subdivisions Yes No No No
Comment: Seabrook, Texas Code of Ordinance, Chapter80
Stormwater Management Yes Yes Yes No
Comment: Seabrook, Texas Charter Article II – Flood Damage Prevention
Post-Disaster Recovery No No no NO
Comment:
Real Estate Disclosure Yes No Yes Yes
Comment:
Growth Management Yes No No No
Comment:
Site Plan Review Yes Yes No No
Comment: Both the city and county review commercial development plans storm water requirements
Environmental Protection Yes Yes Yes Yes
Comment:
Flood Damage Prevention Yes No Yes Yes
Comment: Harris County
Emergency Management Yes Yes Yes Yes
Comment: Emergency Operations Plan with Basic Plan with 22 Annexes updated every fifth year
Climate Change No No No No
Comment: Seabrook Currently has no specific regulations related to change but may consider in the future.
City of Seabrook
21-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Planning Documents
General Plan Yes No Yes Yes
Comment: City of Seabrook Comprehensive Master Plan
Capital Improvement Plan Yes No No Yes
How often is the plan updated? Annually
Comment:
Disaster Debris Management Plan No No No NO
Comment:
Floodplain or Watershed Plan No Yes No No
Comment: Harris County Flood Control
Stormwater Plan Yes No Yes No
Comment: MS4 permit and SWQMP
Urban Water Management Plan No No No No
Comment:
Habitat Conservation Plan No Yes No No
Comment: Gulf / Houston regional conservation plan.
Economic Development Plan No No No No
Comment:
Shoreline Management Plan No Yes Yes No
Comment: Gulf / Houston regional conservation plan.
Community Wildfire Protection Plan No Yes No No
Comment: Gulf / Houston regional conservation plan.
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No Yes
Comment:
Emergency Management Plan Yes Yes Yes Yes
Comment: Annex P — Hazard Mitigation and Hazard Summaries in Basic Plan
Threat & Hazard Identification & Risk
Assessment (THIRA)
No Yes yes yes
Comment: State and Harris County
Post-Disaster Recovery Plan Yes No No Yes
Comment: Currently in the works
Continuity of Operations Plan Yes No No No
Comment: Currently in the works
Public Health Plan No Yes No NO
Comment:
Park Plan Yes No No Yes
Comment: Park Trails Master Plan
Table 21-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? (Building Department)
Does your jurisdiction have the ability to track permits by hazard area? Yes (Flood Only)
Does your jurisdiction have a buildable lands inventory? No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
21-6
Table 21-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes – Water and Sewer
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Table 21-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Public Work/Seabrook/City Engineer
Engineers or professionals trained in building or infrastructure construction practices Yes Public Work/Seabrook/City Engineer
Planners or engineers with an understanding of natural hazards Yes Public Work/Seabrook/City Engineer
Staff with training in benefit/cost analysis Yes Emergency Management
Surveyors No (Reliance on licensed consultant)
Personnel skilled or trained in GIS applications Yes Public Works/Seabrook/GIS Tech
Scientist familiar with natural hazards in local area No (Reliance on licensed professional)
Emergency manager Yes Emergency Management
Grant writers No Everyone No professional
Other Yes/No Insert appropriate information
Table 21-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. Links to the Harris County Plan
Building Department is responsible for floodplain
management and public outreach efforts regarding flooding
hazards for CRS participation.
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. Link to Harris County Sites
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to
communicate hazard-related information?
Yes
• If yes, briefly describe. Community Rating System, Social Media accounts, and
Emergency Management websites. City Hall and Library
can be a source of printed material on hazard mitigation
and flooding.
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Telephone Call down & TEXT, Email, Social Media
City of Seabrook
21-7
Table 21-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Building Department
Who is your floodplain administrator? (department/position) Building Department/Building Official
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? November 1, 2016
Does your floodplain management program meet or exceed minimum requirements? Exceeds
• If exceeds, in what ways? Higher regulatory standards enforced
across the entire city (beyond the SFHA)
When was the most recent Community Assistance Visit or Community Assistance
Contact? Fall 2018
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No
• If so, state what they are. N/A
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are. Harris County – Flood Insurance Study,
revised preliminary November 13, 2018.
Coastal flood mapping – TXCHART,
Preliminary March 29, 2013.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why. Map revisions will be made based on the
most recent precipitation frequencies in
Texas through the NOAA Atlas 14 study.
Does your floodplain management staff need any assistance or training to support its
floodplain management program? Yes
• If so, what type of assistance/training is needed? Any and all training is never enough
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification? Yes
• If no, is your jurisdiction interested in joining the CRS program? N/A
How many flood insurance policies are in force in your jurisdiction? 3383a
• What is the insurance in force? $1,004,594,000a
• What is the premium in force? $3,163,902a
How many total loss claims have been filed in your jurisdiction? 2,505a
• How many claims are still open or were closed without payment? 0a
• What were the total payments for losses? $119,384,447a
a. According to FEMA statistics as of March 3, 2019
Table 21-9. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes 7 Oct. 1, 2011
Building Code Effectiveness Grading Schedule Yes 4/4 Oct. 2, 2017
Public Protection Yes 3 March 1, 2016
Storm Ready No N/A N/A
Firewise No N/A N/A
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
21-8
Table 21-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Seabrook
21-9
21.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
21.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Capital Improvement Plan — Looking to make sure improvements are made with the Mitigation Plan
needs
• Basic Plan — The Basic Plan provides a summary on the hazards and threats in the community.
• Annex P — Hazard Mitigation is assigned to the Engineering Department and addresses the hazards
and threats in the community. The Annex also identifies the various hazard mitigation related programs
implemented in the City of Seabrook and which agencies are responsible for administration.
21.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
21.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 21-11 lists past occurrences of natural hazards for which specific damage was recorded in City of Seabrook.
Other hazard events that broadly affected the entire planning area, including City of Seabrook, are listed in the
risk assessments in Volume 1 of this hazard mitigation plan.
Table 21-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 2017 $1,000,000
Serve Storms and Flooding 4269 2016 Not Available
Serve Storms and Flooding 4272 2016 Not Available
Tropical Storm Bill N/A 2015 Not Available
Hurricane IKE 1791 2008 $15,000,000
Thunder Strom N/A 1/31/2008 $5,000
Tropical Storm Erin 1730 2007 Not Available
Hail N/A 07/11/2003 $8000
Thunderstorm Wind N/A 07/11/2003 $11000
Hail N/A 04/07/2003 $2000
Tornado N/A 12/30/2002 $5000
Tropical Storm Allison 1379 2001 $10,000
Hurricane Alicia 689 1983 $5,000,000
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
21-10
21.7 HAZARD RISK RANKING
Table 21-12 presents a local ranking for City of Seabrook, of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Table 21-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Flooding 51 High
2 Severe Weather 48 High
2 Hurricane 48 High
3 Earthquake 14 Low
3 Hazardous Materials 14 Low
3 Tsunami 14 Low
4 Wildfire 11 Low
5 Drought 6 Low
5 Mass Movement 6 Low
6 Dam Failure 0 (No exposure) None
6 Coastal Erosion 0 (No exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
21.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
21.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 209
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 26
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 90
21.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• The City of Seabrook is vulnerable to maritime threats and hazards since it is located along the Port of
Houston and the Houston Ship Channel.
• The City of Seabrook is vulnerable to hazardous material incidents and chemical accidents from
surrounding petrochemical industries, chemical manufacturers, and chemical storage facilities.
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
City of Seabrook
21-11
21.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 21-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 21-13. Status of Previous Plan Actions
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
Install early warning systems for public buildings X SBK10
Comment: Currently the emergency notification is relied on by a telephone communication system. Providing alerting systems in Critical
facilities will help contain hazardous incident when they arise.
Buyout/acquisition/demobilization of Severe Repetitive Loss properties and Repetitive Loss properties X SBK1
Comment: Severe Repetitive Loss and Repetitive loss structures throughout the city can be reduced by taking care of these structures
when the owners cannot.
Install flood barrier systems, i.e. modular flood panels designed to withstand
high velocity water loads and high impact forces to enhance flood protection
at critical care and/or public infrastructure
X SBK11
Comment: Currently the city has no protection in place for this time of the hazard. Facilities did receive water during a flooding event but
funds were not in place to mitigate any further.
Relocate critical infrastructure out of flood hazard area X SBK1,
SBK5,
SBK7
Comment: Improving the productivity of the city staff and city services by moving these structures out of the flood plain will be huge.
Currently Waste water treatment and Public works facilities are out dated and reside in the flood prone areas.
Implement a tree management program to limit debris damage to critical infrastructure, public facilities from falling tree canopy X SBK13
Comment: Currently the City of Seabrook has 20 parks with trails and trees. A clearing process is needed to harvest dead trees and
protect the critical infrastructure of the city.
Adopt higher standards/latest edition of 2015 IBC – Construction Standards, which provide high-wind requirements for critical facilities to withstand severe thunderstorms, hurricane winds, tornadoes and hail.
X
Comment: Codes have changed since the structures were built and upgrades need to be made. Buildings are smaller and the staff has
grown. Codes Have been updated
Install protective structures to minimize damage to critical assets and equipment from hail, snow loads/freezing and high-winds. X
Comment: Assists obtained by the city need to be protected to insure a longer life of the assets. Completed with the Building of the New
Public Works Facility
Improve code/ordinance to require removal of dead vegetation/dry fuel sources in risk areas X SBK9
Comment: 20 parks and trail and tree systems provides for a large area of potential fire fuel. Keeping the area clean and free of dead
trees can help prevent accidental fires which can lead to disaster.
Harden water piping lines and systems with non-corrosive linings/coatings
(drought resistant materials) to prevent loss of water due to breaks caused by dry ground conditions from drought
X SBK12
Comment: This has been put into place with a new replacement system
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
21-12
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
Establish emergency water supply lines and infrastructure to provide alternate emergency pathways during water breaks/shortages by installing
more valves to shut-off or re-route water.
X SBK8
Comment: Providing more valves to shut off water and reroute water in the event of a water breakage/shortages caused by drought.
Improve or install lighter color roofing materials or cooler paving materials X SBK19
Comment: Enhancing the building and surrounding parking lots to make the buildings cooler and providing a more energy efficient
building.
Improve and enhance cover and freeze protection of above (insulate pipes above) ground water pipes, public irrigation systems and fire sprinkler
systems, FDC connections
X
Comment: New public awareness campaign kicked off and maintenance has improved on city equipment
Implement or establish code/ordinance to require hazardous materials
transportation corridor
X
Comment: Traffic Plan was adopted by the City that reflects this item
Establish/improve code/ordinance to require shutoff valves at entry and exit point of city limits for new construction X
Comment: Pipeline ordinance adopted and addressed this
Identify exposed/above ground pipelines in flood hazard area X SBK20
Comment: This is an ongoing process
Implement a GIS System to Create a map of Emergency Routes to be used by emergency vehicles in flooding conditions. X
Comment: GIS department has been established
Add 2-foot freeboard requirement to Flood Damage Prevention Ordinance. X
Comment: The City agreed on 18 inch
Replace the three existing water flow culverts with bridges; Second Street, Elmar and Meyer and Pine Gully X SBK21
Comment: The city has completed one of the Three
Investigate the impact of the new Flood Hazard Recovery Data and how it
effects the City and residents.
X
Comment: New maps adopted
Relocate the current Emergency operations Center (EOC) and Police Department to a higher elevation site within the City of Seabrook X SBK7
Comment: Still needing to be done. Relocating out of the flood hazard area
Harden critical city facilities to lessen the impacts of natural and human-
caused hazards.
X
Comment: Ballistic Material added to the Lobby of City Hall
Develop reliable fiber-optic communications network to maintain communications during disasters, and facilitate disaster preparedness and
recovery for data network.
X SBK6
Comment: In process
Identify vulnerable populations to extreme heat hazards. X SBK22
Comment: Continued process through outreach
City of Seabrook
21-13
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
Develop/implement cooling center program to educate the public on the hazards of extreme heat and actions they can take to limit the effects of
extreme heat upon health and property.
X
Comment: Worked with Harris County and use of Library
Develop/implement groundwater contingency measures for Critical Infrastructure X
Comment: New above ground tank added for more capacity for the City
Develop/implement water smart program to educate the public on drought hazards and actions to minimize the impacts of drought upon property X
Comment: Ongoing campaign of outreach
Construct shelter for critical equipment and vehicles. X
Comment Completed with New Construction of Public Works Facility
Investigate the impact of the new Flood Hazard Recovery Data and how it
effects the City and residents.
X
Comment: New maps adopted
Clean-up of heavy wildfire fuel areas (abandoned buildings, abandoned lands, etc.). X
Comment: Ongoing with Code Enforcement
Develop/implement a Winter Storm Public Education Program for home heating, to educate the public on winter hazards and personal actions to mitigate winter damages to property and to safely heat homes
X SBK23
Comment: In Process; The City continues to distribute FLASH Materials on natural hazards at City Hall.
Increase Haz-Mat training/equipment for local responders. X SBK14
Comment: Continue Training
Develop/implement Haz-Mat Safety Program. X
Comment: Completed with Traffic Plan and out reach
Send appropriate local officials to FEMA’s Emergency Management Institute for continuing education and training X SBK24
Comment: Some have gone others need to go
Develop/implement pipeline program. X
Comment: Information has been presented in open meetings and safety fairs on pipelines and pipeline safety. Also information has
been placed in the City of Seabrook Website and local Television Channel. Staff has been to training with the Pipeline
Group. Staff attending annual training.
Relocate the current Waste Water Treatment facility from the location on
Galveston Bay to a high location in the City
X SBK5
Comment: In process, Have applied for grants with no luck so far part of CIP
Re-level the City Benchmark System to the new FEMA datum to accurately correlate the new flood zone maps X
Comment: Part of CRS Annual Inspection
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
21-14
21.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 21-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 21-15
identifies the priority for each action. Table 21-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 21-14. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action SBK 1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Flooding, Hurricane, Severe Weather
Existing 12, 13, 14, 15 Building
Department
EM, Com Dev High HMGP, PDM, FMA Long-term
Action SBK 2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including Capital Improvement Programs, Master Plans, and Strategic Plans
Hazards Mitigated: Flooding, Severe Weather, Hurricane, Earthquake, Hazardous Materials, Wildfire, Drought, Tsunami , Mass
Movement,
New and Existing 3, 5, 7, 9, 10 EM ENG, PLNG, PW Low Staff Time, General Funds Ongoing
Action SBK 3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: All hazards
New and Existing 3, 5, 7, 9, 10 EM ENG, PLNG, PW Low Staff Time, General Funds Short-term
Action SBK 4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Flooding, Hurricane, Severe Weather
New and Existing 2, 8, 9, 11, 14 EM ENG, PLNG, PW Low Staff Time, General Funds Ongoing
Action SBK 5 – Relocate the current Waste Water Treatment facility from the location on Galveston Bay to a high location in the City
Hazards Mitigated: Flooding, Hurricane
3, 7, 9, 11, 13 PW EM, ENG High HMGP Short-term
Action SBK 6 — Develop reliable fiber-optic communications network to maintain communications during disasters, and facilitate
disaster preparedness and recovery for data network.
Hazards Mitigated: Severe Weather, Hurricanes
New and Existing 6, 7, 10, 13 IT EM, PW High Staff Time, General Funds Short-term
Action SBK 7 — Relocate the current Emergency operations Center (EOC) and Police Department to a higher elevation site within the
City of Seabrook
Hazards Mitigated: Serve Weather, Flooding, Hurricanes
New and Existing 1, 7, 9, 11, 12, 13, 15 PD EM, ENG, COM DEV High HMGP, FMA Long-term
Action SBK 8 — Establish emergency water supply lines and infrastructure to provide alternate emergency pathways during water
breaks/shortages by installing more connections and valves to shut-off or re-route water.
Hazards Mitigated: Drought
New and Existing 3, 4, 7, 9, 11, 13 PW ENG High Staff Time, General Funds Ongoing
Action SBK 9 — Improve code/ordinance to require removal of dead vegetation/dry fuel sources in risk areas
Hazards Mitigated: Wild Fires
New and Existing 2, 2, 4, 6, 8, 15 COM DEV EM, PW Low Staff Time, General Funds Short-term
City of Seabrook
21-15
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action SBK 10 — Install early warning systems for public buildings
Hazards Mitigated: Flooding, Severe Weather, Hurricane, Earthquake, Hazardous Materials, Wildfire, Drought, Tsunami , Mass
Movement,
New and Existing 1, 3, 4, 9 EM PW Low Staff Time, General Funds Short-term
Action SBK 11 — Install flood barrier systems, i.e. modular flood panels designed to withstand high velocity water loads and high impact
forces to enhance flood protection at critical care and/or public infrastructure
Hazards Mitigated: Flooding
New and Existing 9, 10, 11, 12 EM PW, COM DEV, ENG High HMGP, FMA Long-term
Action SBK 12 — Harden water piping lines and systems with non-corrosive linings/coatings (drought resistant materials) to prevent loss
of water due to breaks caused by dry ground conditions from drought
Hazards Mitigated: Drought
New and Existing 3, 4, 7, 9, 11, 13 PW ENG High Staff Time, General Funds Short-term
Action SBK 13 — Implement a tree management program to limit debris damage to critical infrastructure, public facilities from falling tree
canopy
Hazards Mitigated: Wild Fires
New and Existing 2, 3, 4, 6, 8, 15 COM DEV EM, PW low Staff Time, General Funds Short-term
Action SBK 14 — Increase Haz-Mat training/equipment for local responders
Hazards Mitigated: Hazardous Materials Incident
New and Existing 3, 6, 9, 14 EM PD, FD, PW low Staff Time, General Funds Short-term
Action SBK 15 — Continue on building the relationships with local essential personnel throughout the neighboring communities and
communications to the Public
Hazards Mitigated: Flooding, Severe Weather, Hurricane, Earthquake, Hazardous Materials, Wildfire, Drought, Tsunami , Mass
Movement,
New and Existing 1, 3, 4, 9, 11 EM Communications Low Staff Time, General Funds Ongoing
Action SBK 16 — Harden waste water piping lines and systems with non-corrosive linings/coatings (drought resistant materials) to
prevent loss of water due to breaks caused by dry ground conditions from drought
Hazards Mitigated: Drought
New and Existing 3, 4, 7, 9, 11, 13 PW ENG High Staff Time, General Funds Long-term
Action SBK 17 — Conform to NOAA ATLAS 14 standards in all Repetitive Loss areas impacted by 100-year storm event.
Hazards Mitigated: Flooding, Severe Weather
New and Existing 3, 4, 10, 11, 12, 13 ENG COM DEV, PW Low Staff Time, General Funds Ongoing
Action SBK 18 — Eliminate low lying areas that prohibit emergency access during flooding events. Remove to NOAA ATLAS 14
Guidelines
Hazards Mitigated: Flooding, Serve Weather
New and Existing 3, 4, 10, 11, 12, 13 ENG PW, COM DEV High HMGP, CDBG, FMA Long-term
Action SBK 19 — Improve or install lighter color roofing materials or cooler paving materials
Hazards Mitigated: Severe Weather
Existing 5, 7, 13 PW ENG Medium Staff Time, General Funds Long-term
Action SBK 20 — Identify exposed/above ground pipelines in flood hazard area
Hazards Mitigated: Severe weather, flooding, hurricane
Existing 3, 4, 7, 9, 11, 13 PW ENG Low Staff Time, General Funds Long-term
Action SBK 21 — Replace the three existing water flow culverts with bridges; Second Street, Elmar and Meyer and Pine Gully
Hazards Mitigated: Flooding, Severe weather, hurricane
3, 4, 7, 9, 11, 13 PW ENG High General and/or grant funds Long-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
21-16
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action SBK 22 — Identify vulnerable populations to extreme heat hazards.
Hazards Mitigated: Severe weather
Existing 3, 4, EM COM DEV Low Staff Time, General Funds Short term
Action SBK 23 — Develop/implement a Winter Storm Public Education Program for home heating, to educate the public on winter
hazards and personal actions to mitigate winter damages to property and to safely heat homes
Hazards Mitigated: Severe weather
Existing 1, 4, 10, 11 EM COMM Low Staff Time, General Funds Short term
Action SBK24— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Flooding, Severe Weather, Hurricane, Earthquake, Hazardous Materials, Wildfire, Drought, Tsunami , Mass
Movement
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
City Admistration HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 21-15. Mitigation Action Priority
Action #
# of Objectives Met Benefits Costs
Do Benefits Equal or Exceed Costs?
Is Project Grant-Eligible?
Can Project Be
Funded Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
SBK 1 4 High High Yes Yes No Medium High
SBK 2 5 Medium Low Yes No Yes High Low
SBK 3 5 Low Low Yes No Yes High Low
SBK 4 5 Medium Low Yes No Yes High Low
SBK 5 5 High High Yes Yes Yes High High
SBK 6 4 Medium Medium Yes No Yes High Low
SBK 7 7 High High Yes No No Medium High
SBK 8 6 High High Yes Yes Yes High Low
SBK 9 6 Medium Low Yes No No Medium Low
SBK 10 4 High Low Yes Yes No Medium Low
SBK 11 4 High High Yes Yes No High High
SBK 12 6 High High Yes Yes Yes High High
SBK 13 6 High Low Yes No Yes High Low
SBK 14 4 High Low Yes No No High Low
SBK 15 5 High Low Yes No Yes High Low
SBK 16 6 High High Yes Yes Yes High High
SBK 17 6 High Low Yes Yes Yes Low Low
SBK 18 6 High High Yes Yes No High High
SBK 19 3 Medium Medium Yes No Yes Medium Low
SBK 20 6 Medium Low Yes No Yes Medium Low
SBK 21 6 High High Yes Yes No High High
City of Seabrook
21-17
Action #
# of
Objectives
Met Benefits Costs
Do Benefits Equal or
Exceed
Costs?
Is Project
Grant-
Eligible?
Can Project Be Funded Under Existing
Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
SBK 22 2 High Low Yes No Yes High Low
SBK 23 4 High Low Yes No Yes High Low
SBK24 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 21-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Flooding SBK 2, 3, 4, 5,
10, 11, 15, 17, 18,
20, 21,24
SBK 1, 4, 5,
7, 11, 17, 18,
20, 21
SBK 4, 10,
15, 24
SBK 1 SBK 5, 7,
11, 15, 20,
24
SBK 5, 7,
11, 17, 18,
20, 21
SBK 2, 24
Severe Weather SBK 2, 3, 6, 10,
15, 17, 18, 20, 21,
24
SBK 1, 5, 7,
17, 18, 20,
21
SBK 4, 10,
15, 23, 24
SBK 1 SBK 6, 7,
15, 20, 24
SBK 7, 17,
18, 19, 20,
21
SBK 22 SBK 2, 22,
24
Hurricane SBK 2, 3, 5, 6,
10, 15, 20, 21, 24
SBK 1, 5, 7,
20, 21
SBK 4, 10,
15, 24
SBK 1 SBK 5, 6, 7,
15, 24
SBK 5, 7,
20, 21
SBK 2, 24
Low-Risk Hazards
Earthquake SBK24 N/A SBK24 N/A SBK24 N/A N/A SBK24
Hazardous Material SBK 2, 3, 10, 15,
24
SBK 1 SBK 4, 10,
15, 24
SBK 1 SBK 14, 15,
24
SBK 2, 24
Wildfire SBK 2, 3, 9, 10,
13, 15, 24
SBK 9, 13 SBK 9, 10,
13, 15, 24
SBK 1, 9, 13 SBK 15, 24 SBK 9, 13 SBK 2, 24
Drought SBK 2, 3, 8, 10,
12, 15, 16, 24
SBK 8, 10,
12, 16
SBK 15, 24 SBK 8, 10,
12, 16
SBK 15, 24 SBK 8, 10 SBK 8, 10,
12, 16
SBK 2, 24
Tsunami SBK24 SBK24 SBK24 SBK24
Mass Movement SBK24 SBK24 SBK24 SBK24
a. See the introduction to this volume for explanation of mitigation types.
21.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• City of Seabrook Municipal Code — The municipal code was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
• City of Seabrook Flood Damage Prevention Ordinance Chapter 38 Article II Flood Damage
Prevention — The flood damage prevention ordinance was reviewed for compliance with the National
Flood Insurance Program.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
21-18
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• Capital Improvement Plan – The CIP was used to in the development in Hazard Mitigation Action
Items.
21.12 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY
The City of Seabrook needs the following to better understand future risks and vulnerabilities from natural
hazards and to better plan for the future:
• Updated and revised flood maps and flood hazard areas.
• Develop an updated Drainage Plan and Study to better understand local drainage issues, run-off, sheet-
flow, and ponding.
• Develop an enhanced outreach program on flood insurance and wind insurance.
• Build capacity and strategies for resilience to cope with future impacts from natural hazards.
• Develop local community planning, development, and building design standards that address impacts
from natural hazards to build a safer and stronger city.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«146¬«146PasadenaPasadenaTaylorLakeVillageEl LagoLeague CityClear LakeShoresKemahCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.350.70.175Miles±Seabrook
¬«146
¬«146
Pasadena
Pasadena
Taylor
Lake
Village El Lago
League City
Clear
Lake
Shores
Kemah
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.35 0.70.175 Miles
±
Seabrook
¬«146
¬«146
Pasadena
Pasadena
Taylor
Lake
Village El Lago
League City
Clear
Lake
Shores
Kemah
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.35 0.70.175 Miles
±
Seabrook
¬«146
¬«146
Pasadena
Pasadena
Taylor
Lake
Village El Lago
League City
Clear
Lake
Shores
Kemah
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.35 0.70.175 Miles
±
Seabrook
¬«146
¬«146
Pasadena
Pasadena
Taylor
Lake
Village El Lago
League City
Clear
Lake
Shores
Kemah
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.35 0.70.175 Miles
±
Seabrook
¬«146
¬«146
Pasadena
Pasadena
Taylor
Lake
Village El Lago
League City
Clear
Lake
Shores
Kemah
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.35 0.70.175 Miles
±
Seabrook
¬«146
¬«146
Pasadena
Pasadena
Taylor
Lake
Village El Lago
League City
Clear
Lake
Shores
Kemah
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.35 0.70.175 Miles
±
Seabrook
22-1
22. CITY OF SHOREACRES
22.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Troy D. Harrison/City Manager-Police Chief
601 Shore Acres Blvd.
Shoreacres, Texas 77571
Telephone: 281-307-1959
e-mail Address: THarrison@cityofshoreacres.us
Ray Dodd/Public Works Director
601 Shore Acres Blvd.
City, State ZIP
Telephone:281-471-2244
e-mail Address: ldodd@cityofshoreacres.us
22.2 JURISDICTION PROFILE
22.2.1 Location
Shoreacres is located in Harris County, Texas alongside State Highway 146 and extends to Galveston Bay. The
City encompasses less than 2 square miles.
22.2.2 History
The City of Shoreacres was incorporated in 1949.
22.2.3 Climate
The climate of Shoreacres is considered sub-tropical.
22.2.4 Governing Body Format
Shoreacres is governed by a five-member City Council under the city manager form of government as adopted
under Ordinance No. 2017-266 that was approved by city council June 12, 2017. The current City Manager is
Troy D. Harrison, Sr. The current Mayor is David Jennings (term ends 2020). Council consists of five at-large
Alderpersons including Mayor Pro-Tempore Ricky Bowles (term ends 2020), Karen Harris (term ends 2019),
Jerome McKown (term ends 2019), Neil Moyer (term ends 2020) and Felicia Ramos (term ends 2019). Council
members serve staggered two-year terms.
The city provides police, recycling, parks, planning, zoning, floodplain management, and building code
inspections among its services. The city provides fire, sanitation, and emergency medical services by contract.
The City of Shoreacres assumes responsibility for the adoption of this plan; the City of Shoreacres will oversee its
implementation. Development of this annex was carried out by the members of the local mitigation planning
team, whose members are listed in Table 22-1.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
22-2
Table 22-1. Local Mitigation Planning Team Members
Name Title
Troy D. Harrison City Manager-Chief of Police
Ray Dodd Public Works Director
22.3 CURRENT TRENDS
22.3.1 Population
According to U.S. Census, the population of Shoreacres as of March 2010 was 1,493.
22.3.2 Development
Table 22-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
Table 22-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
N/A
Is your jurisdiction expected to annex any areas during the performance period of this plan?
No
• If yes, describe land areas and dominant uses.
N/A
• If yes, who currently has permitting authority over these areas?
N/A
Are any areas targeted for development or
major redevelopment in the next five years?
No
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
How many permits for new construction were
issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 6 5 4 3 2
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.) 0 0 0 0 0
Total 6 5 4 3 2
Provide the number of new-construction permits for each hazard area or provide a
qualitative description of where development
has occurred.
• Special Flood Hazard Areas: 20
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the
jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description.
Very few empty lots remain
City of Shoreacres
22-3
22.4 CAPABILITY ASSESSMENT
The City of Shoreacres performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 22-3.
• Development and permitting capabilities are presented in Table 22-4.
• An assessment of fiscal capabilities is presented in Table 22-5.
• An assessment of administrative and technical capabilities is presented in Table 22-6.
• An assessment of education and outreach capabilities is presented in Table 22-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 22-8.
• Classifications under various community mitigation programs are presented in Table 22-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 22-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Table 22-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No No No
Comment: Chapter 10, Article III, adopts The International Building Code, 2015 Edition and amendments, 7/14/2014
Zoning Code Yes No No No
Comment: Chapter 50, Article II, 10/13/2003
Subdivisions Yes No No No
Comment: Chapter 74, Appendix A,
Stormwater Management Yes No No No
Comment: Chapter 66, Article II,
Post-Disaster Recovery No No No No
Comment:
Real Estate Disclosure No No No No
Comment:
Growth Management Yes No No No
Comment:
Site Plan Review Yes No No No
Comment:
Environmental Protection Yes No No No
Comment:
Flood Damage Prevention Yes No No No
Comment: Chapter 30, 10/10/2016
Emergency Management Yes No No No
Comment: Chapter 14, Article II, 11/9/2009
Climate Change No No No No
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
22-4
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Planning Documents
General Plan No No No No
Comment: N/A
Capital Improvement Plan No No No No
How often is the plan updated? N/A
Comment:
Disaster Debris Management Plan Yes No No No
Comment:
Floodplain or Watershed Plan No Yes No No
Comment: HCFCD
Stormwater Plan Yes Yes No No
Comment: HCFCD
Urban Water Management Plan No No No No
Comment:
Habitat Conservation Plan No No No No
Comment:
Economic Development Plan No No No No
Comment:
Shoreline Management Plan No No No No
Comment:
Community Wildfire Protection Plan No No No No
Comment:
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive EM Plan No Yes No No
Comment: Harris County
Threat & Hazard Identification & Risk
Assessment (THIRA)
No Yes No No
Comment:
Post-Disaster Recovery Plan No No No No
Comment:
Continuity of Operations Plan No No No No
Comment:
Public Health Plan No No No No
Comment:
Table 22-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Administrative
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? No
City of Shoreacres
22-5
Table 22-5. Fiscal Capability
Financial Resource
Community Development Block Grants No
Capital Improvements Project Funding No
Authority to Levy Taxes for Specific Purposes Yes Water and Sewer
User Fees for Water, Sewer, Gas or Electric Service Yes
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs No
Development Impact Fees for Homebuyers or Developers No
Table 22-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Contracted
Engineers or professionals trained in building or infrastructure construction practices Yes Contracted
Planners or engineers with an understanding of natural hazards Yes Contracted
Staff with training in benefit/cost analysis Yes Contracted
Surveyors Yes Contracted
Personnel skilled or trained in GIS applications Yes Contracted
Scientist familiar with natural hazards in local area No
Emergency manager Yes City EMC
Grant writers No
Table 22-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. Several links to information provided
Do you use social media for hazard mitigation education and outreach? No
• If yes, briefly describe.
Do you have any citizen boards or commissions that address issues related
to hazard mitigation?
No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to communicate hazard-related information? No
• If yes, briefly describe.
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Constant Contact/Alarms
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
22-6
Table 22-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Contracted
Who is your floodplain administrator? (department/position) Contracted (Jerry Grainer)
Are any certified floodplain managers on staff in your jurisdiction? No
What is the date that your flood damage prevention ordinance was last amended? October 10, 2016
Does your floodplain management program meet or exceed minimum requirements? Exceeds
• If exceeds, in what ways? Stronger building codes
When was the most recent Community Assistance Visit or Community Assistance Contact? November 2018
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why.
Does your floodplain management staff need any assistance or training to support its floodplain management program? No
• If so, what type of assistance/training is needed?
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification? Yes
• If no, is your jurisdiction interested in joining the CRS program? n/a
How many flood insurance policies are in force in your jurisdiction?a 526
• What is the insurance in force? $139,390,900
• What is the premium in force? $711,869
How many total loss claims have been filed in your jurisdiction?a 1020
• How many claims are still open or were closed without payment? Unknown
• What were the total payments for losses? $57,079,468
Table 22-9. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes 8 Ongoing
Building Code Effectiveness Grading Schedule Yes 2016
Public Protection No Date
Storm Ready No Date
Firewise No Date
City of Shoreacres
22-7
Table 22-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
22-8
22.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
22.5.1 Existing Integration
No integration has yet been established between local hazard mitigation planning and other local plans and
programs.
22.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified no plans or programs that provide opportunities to
integrate hazard mitigation information in the future.
22.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 22-11 lists past occurrences of natural hazards for which specific damage was recorded in the City of
Shoreacres. Other hazard events that broadly affected the entire planning area, including the City of Shoreacres,
are listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 22-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 Monies not available, most damage was from down trees and other vegetation,
failure of power lines and street and home flooding
Hurricane Ike 1791 DR 2008 Monies not available, street flooding, homes flooded, residents displaced, no
electricity, downed trees and power lines
Tropical Storm Allison 1379 DR 2001 Monies not available, flooding in streets and homes, no electricity, down trees and
power lines
Hurricane Alicia 689 DR 1983 Monies not available, street flooding, homes flooded, residents displaced, no
electricity, downed trees and power lines, streets closed for extended period
22.7 HAZARD RISK RANKING
Table 22-12 presents a local ranking for the City of Shoreacres of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
City of Shoreacres
22-9
Table 22-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Flooding 54 High
2 Severe Weather 48 High
2 Hurricane 48 High
3 Wildfire 16 Medium
4 Earthquake 14 Low
4 Tsunami 14 Low
5 Drought 6 Low
5 Mass Movement 6 Low
6 Dam Failure 0 (No Exposure) None
6 Coastal Erosion 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
22.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
22.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 117
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 21
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 47
22.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Flooding from heavy rains/severe storms. Performing a comprehensive storm-water drainage study would
assist in locating any deficiencies in drainage in the City after a severe rain storm or hurricane.
• It is noted that the City has not completed a GIS mapping of the City, This would beneficial to obtain
hazard data and to map risk for various hazards.
• The City does not currently have a building to serve as a short term shelter after a natural disaster or heat
event.
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
22.9 Status of Previous Plan Actions
Table 22-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
22-10
Table 22-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update
2014SHORAC001 Install new stand-by power (generator) for critical facilities:
Police Station and Public Works Building
X
Comment:
2014SHORAC002 New public safe room / structure / shelter located at Circle Park. X
Comment:
2014SHORAC003 Join FireWise Program. X
Comment:
2014SHORAC004 New tower mounted FLIR PTZ video camera for detection and early warning of chemical releases from Bayport Ship Channel chemical industrial facilities, rail tank cars, ships and pipelines (to be installed on
existing 40-foot tower located at EOC).
X
Comment:
2014SHORAC005 New tower mounted PTZ video camera for detection and early warning of chemical releases from Bayport Industrial district facilities, rail tank cars, pipelines and tank trucks (to be installed on new 40-foot tower located at
city wastewater lift station #1 adjacent to railroad and State Highway 146).
X
Comment:
2014SHORAC006 Establish weather sensors (wind speed, wind direction, air temperature, and humidity) for enhanced warning of chemical release threat (plume determination)
• In central residential district adjacent to Bayport Ship Channel to be installed on existing 40-foot tower located at EOC).
• In Bayport Industrial district (to be installed on new 40-foot tower located at city wastewater lift station #1).
X
Comment:
2014SHORAC007 Establish a Cooling Center and install misting systems to limit the effects of extreme heat upon vulnerable populations. Locations:
• City Hall Meeting Center
• Public Works Building
X
Comment:
2010SHORAC001 Adoption of flood surge zone regulations to harden and increase stability of new structures. X
Comment:
2010SHORAC002 Expand current flood warning system(s) by including an additional outdoor siren, digital signage, automated calling system, flood gauges, and loudspeaker warning announcement system to increase coverage within the community’s population and improve automation.
X SA19
Comment:
2010SHORAC003 Conduct study for updating local inundation risk areas and mapping. X SA20
Comment:
2010SHORAC004 Harden manhole access points to prevent entrance of flood water or hazardous fluids into sanitary sewer system.
Comment:
X
City of Shoreacres
22-11
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
2010SHORAC005 Elevate utility equipment storage building. Comment: X SA21
2010SHORAC010 Construct revetment at shoreline of Galveston Bay Comment: X
2010SHORAC012 Development Adoption of latest edition/higher standard of
building codes / ordinances for mitigation of hurricane wind hazards.
Comment:
X SA22
2010SHORAC014 Harden and retrofit records storage to withstand high-wind damage. Comment:
X SA23
2010SHORAC018 Install lightning and surge protection systems to harden
facility and equipment of public service buildings. Comment:
X SA24
2010SHORAC022 Develop/implement water smart public education program to inform the public on actions that can be taken to conserve water and reduce the impact of drought.
Comment:
X SA25
2010SHORAC024 Proposed Mitigation Action (describe): Construct shelter for critical equipment and vehicles. Comment:
X
2010SHORAC025 Develop/implement hail safety public education program to educate the public on hail hazards and actions to minimize hail damage to
property and equipment.
Comment:
X SA26
2010SHORAC027 Clean-up of heavy wildfire fuel areas (abandoned buildings, abandoned lands, etc.). Comment:
X SA27
2010SHORAC028 Develop/implement home heating public education program
to address winter storm hazards and provide personal actions to minimize winter damages to property and equipment. Comment:
X SA28
2010SHORAC029 Develop/implement tree management planning and mitigation measures.
Comment:
X SA29
2010SHORAC032 Develop/implement Haz-Mat Safety Program. Comment: X SA30
2010SHORAC033 Conduct HVAC assessment/study/mitigations to ventilation systems for Critical Infrastructure. Comment:
X SA31
2010SHORAC035 Develop/update Risk Management Plan/mitigation measures
for Haz-Mat transportation (road/water) within the Special Flood Hazard Area. Comment:
X SA32
2010SHORAC037 Develop/implement pipeline safety program. Comment: X
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
22-12
22.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 22-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 22-15
identifies the priority for each action. Table 22-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 22-14. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action SA1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that
have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Flooding, severe weather, hurricane, wildfire, Earthquake, flooding,
Existing 3, 4, 10 City Administration TBD High HMGP, PDM, FMA Short-term
Action SA2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including the City of Shoreacres
Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire
New and Existing 1, 3, 4, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing
Action SA3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Flooding, Severe Weather, Hurricane, Wildfire, Earthquake, Drought, Tsunami, Mass Movement
New and Existing 1, 5, 8 City Administration TBD Low Staff Time, General Funds Short-term
Action SA4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Dam failure, flooding, severe weather, tsunami,
New and Existing 1, 3, 5, 7, 8, 10 City Administration TBD Low Staff Time, General Funds Ongoing
Action SA5 — Expand current flood warning system(s) by including an additional outdoor siren, digital signage, automated calling
system, flood gauges, and loudspeaker warning announcement system to increase coverage within the community’s population and
improve automation
Hazards Mitigated: Flooding, severe weather, hurricane
New 1, 4, 10, 11 City Administration TBD Medium General and/or grant fund Short term
Action SA6 — Conduct study for updating local inundation risk areas and mapping.
Hazards Mitigated: Flooding, severe weather, hurricane
Existing 3, 7, 9, 11 City Administration TBD Low General and/or grant fund Short term
Action SA7 — Elevate utility equipment storage building
Hazards Mitigated: Flooding, severe weather, hurricane
Existing 11, 13 City Administration TBD Medium General and/or grant fund Short term
Action SA8 — Development Adoption of latest edition/higher standard of building codes / ordinances for mitigation of hurricane wind
hazards
Hazards Mitigated: Hurricane
Existing 9, 14 City Administration TBD Low General and/or grant fund Short term
City of Shoreacres
22-13
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action SA9 — Harden and retrofit records storage to withstand high-wind damage
Hazards Mitigated: Severe weather, hurricane
Existing 13 City Administration TBD Medium General and/or grant fund Short term
Action SA10 — Install lightning and surge protection systems to harden facility and equipment of public service buildings
Hazards Mitigated: Severe weather, hurricanes
Existing 13 City Administration TBD Medium General and/or grant fund Short term
Action SA11 — Develop/implement water smart public education program to inform the public on actions that can be taken to conserve
water and reduce the impact of drought.
Hazards Mitigated: Drought
Existing 7, 8, 10 City Administration TBD Low Staff Time, General Funds Short-term
Action SA12 — Develop/implement hail safety public education program to educate the public on hail hazards and actions to minimize
hail damage to property and equipment
Hazards Mitigated: Severe weather
Existing 1,3 City Administration TBD Low Staff Time, General Funds Short-term
Action SA13 — Clean-up of heavy wildfire fuel areas (abandoned buildings, abandoned lands, etc.).
Hazards Mitigated: Wildfire
Existing 2, 6, 8 City Administration TBD Low Staff Time, General Funds Short-term
Action SA14 — Develop/implement home heating public education program to address winter storm hazards and provide personal
actions to minimize winter damages to property and equipment
Hazards Mitigated: Severe weather
Existing 1, 4, 10 City Administration TBD Low Staff Time, General Funds Ongoing
Action SA15 — Develop/implement tree management planning and mitigation measures.
Hazards Mitigated: Severe weather, hurricane, wildfire
Existing 2, 6, 8 City Administration TBD Low Staff Time, General Funds Short-term
Action SA16 — Develop/implement Haz-Mat Safety Program
Hazards Mitigated: Hazardous materials incidents
Existing 3, 11 City Administration TBD Low Staff Time, General Funds Short-term
Action SA17 — Conduct HVAC assessment/study/mitigations to ventilation systems for Critical Infrastructure
Hazards Mitigated: Wildfire, hazardous materials incidents
Existing 3, 8, 11, 13 City Administration TBD Medium General and/or grant fund Short term
Action SA18 — Develop/update Risk Management Plan/mitigation measures for Haz-Mat transportation (road/water) within the Special
Flood Hazard Area
Hazards Mitigated: hazardous materials incidents
Existing 3, 11 City Administration TBD Low Staff Time, General Funds Short-term
Action SA19 — Expand current flood warning system(s) by including an additional outdoor siren, digital signage, automated calling
system, flood gauges, and loudspeaker warning announcement system to increase coverage within the community’s population and
improve automation.
Hazards Mitigated: Flood, Severe Weather, Hurricane
New and Existing 1,3,10,15 City Administration TBD High General Fund, Grants Short-term
Action SA20 — Conduct study for updating local inundation risk areas and mapping.
Hazards Mitigated: Flood, Severe Weather
New and Existing 3,10,15 City Administration TBD High General Fund, RiskMAP Short-term
Action SA21 — Elevate utility equipment storage building.
Hazards Mitigated: Flood, severe weather
Existing 13,15 City Administration TBD High General Fund, Grants Short-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
22-14
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action SA22 — Development Adoption of latest edition/higher standard of building codes / ordinances for mitigation of hurricane wind
hazards.
Hazards Mitigated: Flood, Severe weather, Hurricane
New and Existing 3,9,12,15 Planning City Council Low General Fund Short-term
Action SA23 — Harden and retrofit records storage to withstand high-wind damage.
Hazards Mitigated: Hurricane, Severe weather
Existing 13,15 City Administration TBD High General Fund, Grants Short-term
Action SA24 — Install lightning and surge protection systems to harden facility and equipment of public service buildings.
Hazards Mitigated: Severe Weather
New and Existing 1,3,15 City Administration RBD High General Fund, Grants Short-term
Action SA25 — Develop/implement water smart public education program to inform the public on actions that can be taken to conserve
water and reduce the impact of drought.
Hazards Mitigated: Drought
New and Existing 3,7,15 City Administration TBD High General, Fund Short-term
Action SA26 — Develop/implement hail safety public education program to educate the public on hail hazards and actions to minimize
hail damage to property and equipment.
Hazards Mitigated: Severe Weather
New and Existing 3,9,10,15 City Administration TBD Low General Fund Short-term
Action SA27 — Clean-up of heavy wildfire fuel areas (abandoned buildings, abandoned lands, etc.).
Hazards Mitigated: Wildfire
New and Existing 13,15 City Administration TBD Low General Fund Ongoing
Action SA28 — Develop/implement home heating public education program to address winter storm hazards and provide personal
actions to minimize winter damages to property and equipment.
Hazards Mitigated: Severe weather
New and Existing 3,7,15 City Administration TBD Low General Fund Short-term
Action SA29 — Develop/implement tree management planning and mitigation measures.
Hazards Mitigated: Severe Weather
New and Existing 13,15 City Administration TBD Low General Fund Short-term
Action SA30 — Develop/implement Haz-Mat Safety Program.
Hazards Mitigated: Hazardous Materials
New and Existing 3,7,15 City Administration TBD Medium General Fund Short-term
Action SA31 — Conduct HVAC assessment/study/mitigations to ventilation systems for Critical Infrastructure.
Hazards Mitigated: All Hazards
Existing 13,15 City Administration TBD High General Fund, Grants Short-term
Action SA32 — Develop/update Risk Management Plan/mitigation measures for Haz-Mat transportation (road/water) within the Special
Flood Hazard Area.
Hazards Mitigated: Hazardous Materials, Flood
New and Existing 3,7,15 City Administration TBD High General Fund Short-term
Action SA33— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Flooding, Severe Weather, Hurricane, Wildfire, Earthquake, Drought, Tsunami, Mass Movement
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
City Admistration HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
City of Shoreacres
22-15
Table 22-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
1 3 High High Yes Yes No Medium High
2 7 Medium Low Yes No Yes High Low
3 3 Low Low Yes No Yes High Low
4 6 Medium Low Yes No Yes High Low
5 5 High Medium Yes Yes No High High
6 4 Medium Low Yes No Yes Medium Medium
7 2 High Medium Yes Yes No High High
8 2 Medium Low Yes No Yes Medium Low
9 1 High Medium Yes Yes No High High
10 1 High Medium Yes Yes No High High
11 3 Medium Low Yes No Yes Medium Low
12 2 Medium Low Yes No Yes Medium Low
13 3 Medium Low Yes No Yes Medium Low
14 3 Medium Low Yes No Yes Medium Low
15 3 Medium Low Yes No Yes Medium Low
16 2 Medium Low Yes No Yes Medium Low
17 4 Medium Medium Yes Yes Yes Medium Medium
18 2 Medium Low Yes No Yes Medium Low
19 2 High High Yes Yes No Medium High
20 4 High High Yes Yes No Medium High
21 3 High High Yes Yes No Medium High
22 4 Medium Low Yes No Yes High Low
23 2 High High Yes Yes No Medium High
24 3 High High Yes Yes No Medium High
25 3 High High Yes Yes No Medium High
26 4 Medium Low Yes No Yes High Low
27 2 Medium Low Yes No Yes High Low
28 3 Medium Low Yes No Yes High Low
29 2 Medium Low Yes No Yes High Low
30 3 High Medium Yes Yes No Medium High
31 2 High High Yes Yes No Medium High
32 3 High High Yes Yes No Medium high
33 8 Medium Low Yes Yess Yes High High
a. See the introduction to this volume for explanation of priorities.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
22-16
Table 22-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Flooding 1, 2, 3, 4, 5, 6, 7,
8, 20, 22, 33
1, 7, 21, 31 1, 2, 3, 4, 5, 9 6, 7, 8 5, 9, 19, 32 7 7 1, 2, 3, 4, 5,
6, 7, 8, 9
Severe Weather 1, 2, 3, 4, 5, 6, 7,
8, 9, 10, 12, 15,
20, 22, 29, 33
1, 7 9, 10,
21, 23, 24,
31
1, 2, 3, 4, 5, 9,
12, 15, 26, 28
6.7.8 5, 9, 19 7, 9, 10 1, 2, 3, 4, 5,
6, 7, 8, 9
Hurricane 5, 6, 7, 8, 9, 22,
33
7, 8, 9, 23,
31
5 19 7, 9
Medium-Risk Hazards
Wildfire 13, 27, 33 13, 17, 31 13 17
Low-Risk Hazards
Earthquake 33 31
Drought 3.5.6.9, 33 31 1, 2, 3, 5, 9,
11, 25
5.9 11 1, 2, 3, 4, 5,
6, 7, 8, 9
Tsunami 33
Mass Movement 33
Hazardous Materials 31 30 32
a. See the introduction to this volume for explanation of mitigation types.
22.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• The City of Shoreacres Municipal Code — The municipal code was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
• The City of Shoreacres Flood Damage Prevention Ordinance — The flood damage prevention
ordinance was reviewed for compliance with the National Flood Insurance Program.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• FEMA- Mitigation Ideas: A Resource for Reducing Risk to Natural Hazards to obtain a better
understanding of potential of actions/mitigations that have not been prepared for that could be used to
reduce or eliminate long term risk to people and property from natural disasters in the City of Shoreacres.
!(!(!(!(!(!(!(¬«146¬«146PasadenaLa PorteLa PortePasadenaPasadenaCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.20.40.1Miles±Shoreacres
¬«146
¬«146
Pasadena
La Porte
La Porte
Pasadena
Pasadena
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Shoreacres
¬«146
¬«146
Pasadena
La Porte
La Porte
Pasadena
Pasadena
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Shoreacres
¬«146
¬«146
Pasadena
La Porte
La Porte
Pasadena
Pasadena
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Shoreacres
¬«146
¬«146
Pasadena
La Porte
La Porte
Pasadena
Pasadena
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Shoreacres
¬«146
¬«146
Pasadena
La Porte
La Porte
Pasadena
Pasadena
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Shoreacres
¬«146
¬«146
Pasadena
La Porte
La Porte
Pasadena
Pasadena
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Shoreacres
23-1
23. CITY OF SPRING VALLEY VILLAGE
23.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Julie M. Robinson, City Administrator
1025 Campbell Road
Houston, TX 77055
Telephone: 713-465-5306
e-mail Address: jrobinson@springvalleytx.com
Pat Riley, Public Works Director
1025 Campbell Road
Houston, TX 77055
Telephone: 713-465-5306
e-mail Address: priley@springvalleytx.com
23.2 JURISDICTION PROFILE
23.2.1 Location
The City of Spring Valley Village is a municipality in southwestern Harris County. The current boundaries generally
extend from Spring Branch Creek on the east, Katy Freeway on the south, Spring Branch Creek on the north, and
on the west by Adkins and Campbell Roads. The City encompasses a total area of approximately 1.3 square miles.
23.2.2 History
In 1936 state highway maps indicated a cemetery and a church. Initially the settlement consisted of one and one-
half square miles. In the mid-1950s, effort to form a Spring Branch municipality (proposed to be called the city of
Spring Branch in roughly the area known today as the Memorial Villages) failed. The city incorporated in 1955 as
Spring Valley. There had been two elections for incorporation. The first result was against incorporation, and state
law mandated that the next election for incorporation of the same boundary would have to be held at least one year
later. Some advocates of incorporation convinced Robert R. Casey, then Harris county judge, to modify the
boundary of the proposed area by removing the Campbell Place area and therefore many voters who opposed
incorporating. The following election, held on April 9, 1955, was in favor of incorporation. Because of the 1955
incorporation, Houston did not incorporate Spring Valley’s territory into its city limits, while Houston annexed
surrounding areas that were unincorporated. In 2007, the name of the city was officially changed from Spring Valley
to Spring Valley Village.
23.2.3 Climate
The City of Spring Valley Village’s weather is typical of the Texas Gulf Coast – mainly humid subtropical climate,
with tropical influences. August is normally the warmest month with a daily average temperature of 84.6 °F. January
is typically the coldest month with a daily average temperature of 53.1 °F. The normal annual precipitation measures
49.77 inches.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
23-2
23.2.4 Governing Body Format
The City of Spring Valley Village is a Type-A General Law City governed by a Mayor and five Council Members
all of whom are elected at large. The City consists of 7 departments: Police, Public Works/Utilities, Building and
Development, Municipal Court, Finance, the City Secretary’s Office, and the City Administrator’s Office. Fire and
EMS Services are provided by the Village Fire Department, a separate entity created and funded by the six Memorial
Villages.
The City Council assumes responsibility for the adoption of this plan, and the City Administrator will oversee its
implementation. Development of this annex was carried out by the members of the local mitigation planning team,
whose members are listed in Table 1-1.
Table 23-1. Local Mitigation Planning Team Members
Jurisdiction Name / Title Phone Email
City of Spring Valley Village Julie Robinson, City Admin.
Matthew Hitt, Assistant to City Admin.
713-465-5306
832-910-8586
jrobinson@springvalleytx.com
mhitt@springvalleytx.com
City of Bunker Hill Village Karen Glynn, City Admin. 713-467-9762 KGlynn@bunkerhilltx.gov
City of Hedwig Village Kelly Johnson, City Admin./Secretary 713-465-6009 kjohnson@hedwigtx.gov
City of Hilshire Village Susan Blevins, City Admin/Secretary.
Efrain Him
713-973-1779 Susan.blevins@hilshirevillagetexas.com
Efrain.him@hdrinc.com
City of Hunters Creek Village Tom Fullen, City Admin. 713-465-2150 tfullen@cityofhunterscreek.org
City of Piney Point Village Roger Nelson, City Admin. 713-230-8703 cityadmin@pineypt.org
23.3 CURRENT TRENDS
23.3.1 Population
According to the 2010 Census Data, the population of the City of Spring Valley Village was 3,715. The Census
Bureau 2016 population estimate was 4,224. Since the 1990 Census, the population has increased by approximately
24.5%.
23.3.2 Development
While availability of undeveloped residential lots is limited, the City of Spring Valley Village continues to
experience residential redevelopment of existing homes whereby smaller homes are demolished and new, larger
homes are built. The City of Spring Valley Village is landlocked by other municipalities; however, there are several
large undeveloped tracts of land that border I-10 and are available for commercial and/or mixed use development.
Table 23-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
City of Spring Valley Village
23-3
Table 23-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
NO
• If yes, give the estimated area annexed and estimated number of parcels or structures.
N/A
Is your jurisdiction expected to annex any areas during the performance period of this plan?
NO
• If yes, describe land areas and dominant uses.
N/A
• If yes, who currently has permitting
authority over these areas?
N/A
Are any areas targeted for development or major redevelopment in the next five years? YES
• If yes, briefly describe, including whether any of the areas are in known hazard risk
areas
There are several large undeveloped tracts of land that border I-10 and are available
for commercial and/or mixed use development.
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 23 21 27 27 24
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.) 2 3 3 2 1
Total 25 24 30 29 25
Provide the number of new-construction
permits for each hazard area or provide a qualitative description of where development
has occurred.
• Special Flood Hazard Areas: 0
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory
exists, provide a qualitative description.
With the exception of a few large tracts along I-10 that may be
developed for commercial and/or mixed use development, City of
Spring Valley Village is essentially built out.
23.4 CAPABILITY ASSESSMENT
The City of Spring Valley Village performed an assessment of its existing capabilities for implementing hazard
mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 23-3.
• Development and permitting capabilities are presented in Table 23-4.
• An assessment of fiscal capabilities is presented in Table 23-5.
• An assessment of administrative and technical capabilities is presented in Table 23-6.
• An assessment of education and outreach capabilities is presented in Table 23-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 23-8.
• Classifications under various community mitigation programs are presented in Table 23-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 23-10.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
23-4
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Table 23-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes Yes
Comment: City adopted the International Building Code (IBC) 2015 Edition on February 24, 2015 by Ordinance No. 2015-03. This
Ordinance has been codified in Chapter 3 of the City’s Code of Ordinances.
Zoning Code Yes No Yes Yes
Comment: The City adopted its original zoning regulations on December 15, 1981 by Ordinance No. 115, Book I, and it has been
amended throughout the years. The current zoning regulations may be found in Chapter 12 of the City’s Code of Ordinances.
Subdivisions Yes No Yes No
Comment: The City adopted its original subdivision regulations on October 10, 1955, by Ordinance No. 5, Book 1, and it has been
amended throughout the years. On November 25, 2008 by Ordinance No. 2008-23, the City repealed and reenacted the
subdivision regulations in their entirety. The current subdivision regulations may be found in Chapter 9 of the City’s Code
of Ordinances.
Stormwater Management Yes Yes Yes Yes
Comment: Texas Commission on Environmental Quality, SVV Storm Water Management Plan
Post-Disaster Recovery Yes Yes Yes No
Comment: Harris County, Texas Department of Emergency Management, FEMA
Real Estate Disclosure No No No No
Comment:
Growth Management Yes Yes Yes Yes
Comment: Harris County Flood Control District
Site Plan Review Yes Yes Yes No
Comment: Harris County Flood Control District, Village Fire Department, SVV Code of Ordinances Chapter 3
Environmental Protection No Yes No No
Comment: Texas Commission on Environmental Quality, EPA, Harris County Public Health
Flood Damage Prevention Yes No Yes Yes
Comment: The City adopted its current flood prevention regulations on May 22, 2007 by Ordinance No. 2007-12. The current flood
damage prevention regulations may be found in Article 3.1600 of Chapter 3 of the City’s Code of Ordinances.
Emergency Management Yes Yes Yes No
Comment: Harris County, Village Fire Department
Climate Change No No No No
Comment:
City of Spring Valley Village
23-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Planning Documents
General Plan (Comprehensive Plan) Yes No Yes Yes
Comment: The City’s zoning regulations constitute its Comprehensive Plan
Capital Improvement Plan Yes No No Yes
How often is the plan updated? Reviewed annually and updated as needed
Comment: The City maintains a 5-year rolling CIP
Disaster Debris Management Plan Yes Yes No No
Comment: The City participates in the Harris County Emergency Management Plan
Floodplain or Watershed Plan No Yes No No
Comment: Harris County Flood Control District
Stormwater Plan Yes Yes Yes Yes
Comment: The City was granted an MS4 permit from Texas Commission on Environmental Quality and files its annual reports with
TCEQ as required by the permit.
Urban Water Management Plan Yes Yes Yes No
Comment: Houston-Galveston Subsidence District Groundwater Reduction Plan, Drought Contingency Plan
Habitat Conservation Plan No Yes No No
Comment: Texas Parks and Wildlife, Texas Commission on Environmental Quality, EPA
Economic Development Plan Yes No Yes No
Comment: While the City has legal authority to develop an economic development plan, it currently does not have one
Shoreline Management Plan No No No No
Comment:
Community Wildfire Protection Plan No No No No
Comment:
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes Yes Yes No
Comment: The City participates in the Harris County Emergency Management Plan
Threat & Hazard Identification & Risk Assessment (THIRA) Yes Yes Yes No
Comment: The City participates in the Harris County Hazard Mitigation Plan
Post-Disaster Recovery Plan Yes Yes Yes No
Comment: The City participates in the Harris County Emergency Management Plan
Continuity of Operations Plan No No No No
Comment:
Public Health Plan No Yes No No
Comment: Harris County Public Health Authority
Table 23-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department?
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
23-6
Table 23-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants No
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Table 23-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes City Administrator, City of Spring Valley Village
Building Official, City of Spring Valley Village
Director of Public Works, City of Spring Valley Village
Contract Engineering Firm
Contract Planning Firm
Engineers or professionals trained in building or
infrastructure construction practices
Yes Building Official, City of Spring Valley Village
Fire Marshal, Village Fire Department
Director of Public Works, City of Spring Valley Village
Contract Engineering Firm
Planners or engineers with an understanding of natural hazards Yes City Administrator, City of Spring Valley Village
Building Official, City of Spring Valley Village
Director of Public Works, City of Spring Valley Village
Contract Engineering Firm
Staff with training in benefit/cost analysis Yes Contract Engineering Firm
Surveyors Yes Contract Surveying Firm
Personnel skilled or trained in GIS applications No
Scientist familiar with natural hazards in local area No
Emergency manager Yes Emergency Management Coordinator, Village Fire Department
City Administrator, City of Spring Valley Village
Grant writers Yes Contract Grant Writer
Other
City of Spring Valley Village
23-7
Table 23-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? No
Do you have personnel skilled or trained in website development? No
Do you have hazard mitigation information available on your website? No
• If yes, briefly describe.
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. City Website and Social Media Alerts are posted
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. Constant Contact, City website, City social media platforms
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Constant Contact, City website, City social media platforms
Table 23-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Building Official – City Management
Who is your floodplain administrator? (department/position) Building Official
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? May 22, 2007
Does your floodplain management program meet or exceed minimum requirements? Meets
• If exceeds, in what ways?
When was the most recent Community Assistance Visit or Community Assistance Contact? Unknown
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? Unknown
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why.
Does your floodplain management staff need any assistance or training to support its floodplain management program? No
• If so, what type of assistance/training is needed?
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification?
• If no, is your jurisdiction interested in joining the CRS program? No
How many flood insurance policies are in force in your jurisdiction?a 797
• What is the insurance in force? $ 272,270,900.00
• What is the premium in force? $313,168
How many total loss claims have been filed in your jurisdiction?a Unknown
• How many claims are still open or were closed without payment? Total of closed paid losses: 82
• What were the total payments for losses? $2,103,028
a. According to FEMA statistics as of March 26, 2019
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
23-8
Table 23-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No
Building Code Effectiveness Grading Schedule Yes 4 for 1 and 2 family dwellings
3 for all other construction
01/27/2010
Public Protection Yes (ISO) 1 2015
Storm Ready No
Firewise No
Table 23-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
City of Spring Valley Village
23-9
Criterion Jurisdiction Ratinga
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
23.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
23.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• City of Spring Valley Village’s MS4 Permit
• City of Spring Valley Village’s Flood Damage Prevention regulations
• City of Spring Valley Village’s Adopted 5-Year Rolling Capital Improvement Program
23.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Future updates to the adopted Building Codes
• Future revisions to the City’s zoning regulations
• Future revisions to the City’s flood damage prevention regulations
23.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 23-11 lists past occurrences of natural hazards for which specific damage was recorded in Spring Valley
Village. Other hazard events that broadly affected the entire planning area, including Spring Valley Village, are
listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
23-10
Table 23-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 NA
Severe Storms and Flooding 4269 DR 2016 NA
Severe Storms and Flooding 4272 DR 2016 NA
Severe Storms, Tornadoes, Straight Line Winds and Flooding 4245 DR 2015 NA
Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR 2015 NA
Forest Brook Fire 2924 FM 2011 NA
Hurricane Ike 1791 DR 2008 NA
Hurricane Ike 3294 EM 2008 NA
Hurricane Gustav 3290 EM 2008 NA
Hurricane Dean 3277 EM 2007 NA
Tropical Storm Erin 1730 DR 2007 NA
Extreme Wildfire Threat 1624 DR 2006 NA
Hurricane Rita 1606 DR 2005 NA
Hurricane Rita 3261 EM 2005 NA
Hurricane Katrina Evacuation 3216 EM 2005 NA
Severe Storms, Tornadoes and Flooding 1439 DR 2002 NA
Tropical Storm Allison 1379 DR 2001 NA
Extreme Fire Hazards 3142 EM 1999 NA
Flooding 1257 DR 1998 NA
Tropical Storm Charley 1239 DR 1998 NA
Hurricane Georges 1245 DR 1998 NA
Severe Thunderstorms and Flooding 1041 DR 1994 NA
Severe Thunderstorms and Tornadoes 970 DR 1992 NA
Severe Storms and Flooding 937 DR 1992 NA
Tropical Storm Allison 836 DR 1989 NA
Severe Storms, Tornadoes and Flooding 828 DR 1989 NA
23.7 HAZARD RISK RANKING
Table 23-12 presents a local ranking for Spring Valley Village of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
City of Spring Valley Village
23-11
Table 23-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
2 Hurricane 32 High
3 Earthquake 14 Low
4 Flooding 12 Low
5 Drought 6 Low
5 Mass Movement 6 Low
5 Wildfire 6 Low
6 Dam Failure 0 (No Exposure) None
6 Tsunami 0 (No Exposure) None
6 Coastal Erosion 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
23.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
23.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 7
• Number of FEMA-identified Severe-Repetitive-Loss Properties: None
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 1
23.8.2 Other Noted Vulnerabilities
No jurisdiction-specific issues were identified from review of the results of the risk assessment and other
available resources.
23.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 23-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
23-12
Table 23-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update
Conduct HVAC Assessment/Mitigation to Ventilation Systems for Critical
Infrastructure
X SVV5
Comment: In progress. The City constructed a new City Hall and Police Building with a new ventilation system, and the new facility
opened in May of 2017. The City has committed to renovating the Public Works Facility (also Critical Infrastructure) including
its current ventilation system as part of its 5-Year Capital Improvement Program with the project to be undertaken in FY 2021
Expand community early warning system, reverse 911 to enhance coverage
within the community’s population
X
Comment: In 2012, the City implemented a reverse 911 system that notifies all telephone numbers in the City. During Hurricane Harvey,
the City found that the reverse 911 system that was implemented went down. Consequently, the City is evaluating other
reverse 911 options to implement. The City currently utilizes Constant Contact, its website, and different social media
platforms to quickly notify residents and businesses about hazards that may affect the City. During Hurricane Harvey, it was
clear that these forms of communication were more effective and efficient, and the City will continue to utilize and improve
upon these forms of communication.
Expand early warning system, reverse 911 alert capabilities to increase coverage to public/private schools. x
Comment: In 2012, the City implemented a reverse 911 system that notifies all telephone numbers, including public and private schools,
in the City. During Hurricane Harvey, the City found that the reverse 911 system that was implemented went down.
Consequently, the City is evaluating other reverse 911 options to implement. The City currently utilizes Constant Contact, its
website, and different social media platforms to quickly notify residents and businesses about hazards that may affect the
City. During Hurricane Harvey, it was clear that these forms of communication were more effective and efficient, and the City
will continue to utilize and improve upon these forms of communication.
Adoption of higher standard/latest edition of building codes for jobsite debris
management to minimize damages from debris during high winds
X
Comment: The City adopted the International Building Code (IBC) 2015 Edition on February 24, 2015.
Briar Branch Bypass project and contrast a detention pond to mitigate flood-related impacts. X
Comment: Several years ago, the City met with Harris County Flood Control District (HCFCD) to discuss the installation of a real-time
monitoring gauge on Briar Branch at Campbell Road to provide notification to the residents about potential flooding. The real-
time flood gauge was installed by HCFCD on March 31, 2017. Due to the size of the rest of the original project and the
number of governmental and non-governmental entities that would be involved, action is no longer considered feasible. The
City has completed the only part it could complete.
Develop/implement water smart program to educate the public on drought
hazards and potential individual actions to minimize damages to property
and equipment
X X SVV6
Comment: The City has water conservation and drought contingency regulations in place that include a goal of reducing water
consumption by 10% through conservation measures and a graduated drought contingency plan. Additionally, the City’s
regulations include savings on water rates for customers who implement conservation measures such as retrofitting high-use
fixtures with low-flow fixtures, low-flow design irrigation systems, and xeriscaping features. Information on water conservation
measures is provided in the City’s new resident welcome packet as well as on the City’s website. The City would like to carry
this measure forward and change the wording of the Action Item to: Develop and implement public outreach program to
educate the public on drought hazards and water conservation measures that may be implemented by individuals to reduce
water usage and minimize damages to property and equipment.
City of Spring Valley Village
23-13
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
Implement a Debris Removal Program to minimize flooding due to obstructions along channel to increase flow along Briar Branch and minimize damages to residential properties.
X X SVV7
Comment: Since Briar Branch is under the jurisdiction of Harris County Flood Control District (HCFCD), the extent of the Debris
Removal Program has been to monitor Briar Branch continuously and notify HCFCD of the need for debris removal and/or
de-snagging as needed. Throughout the City limits, the City monitors and removes possible obstructions such as trees, trash
cans, debris washed into ditches and storm sewers prior to and during all storm incidents, and residents and businesses are
notified via Constant Contact and all City social media platforms to continuously monitor and remove any possible
obstructions. The City would like to carry this measure forward and change the wording of the Action Item to: Develop and
implement a public outreach program designed to educate the public about debris removal and other ways to minimize
damages to residential properties.
Develop/implement tree management program to minimize damage from debris due to high winds and icing/freezing temperatures X
Comment: The City adopted tree preservation and management regulations in 2017 that include provisions for addressing diseased
and/or dead trees, and the City enforces such regulations throughout the year. Additionally, in accordance with the tree
preservation regulations, the City requires a permit for removal of trees. City staff also monitors trees on City property and in
public rights-of-way and addresses trees that could cause damage.
Develop/implement a home heating safety public education program to educate the public on winter storm hazards and action to minimize damage to residential property and equipment caused by winter hazards and home
heating.
X X SVV12
Comment: This is an ongoing program. On behalf of the City, the Village Fire Department conducts a fire safety and prevention program
throughout the year to different public and private schools, reaching approximately 1,500 students each year. Through public
education, the City and VFD hope to reduce fire hazards caused by individuals. The City would like to carry this measure
forward and change the wording of the Action Item to: Conduct a fire safety and prevention program in conjunction with the
Village Fire Department.
Bank re-stabilization with slope stabilization along portions of Briar Branch to increase flow to minimize flood damages. X
Comment: The portions of the bank of Briar Branch that would be good candidates for a re-stabilization project are privately owned
property and areas that are not maintained by Harris County Flood Control District. Action is no longer feasible since the City
has no control over these areas.
Clean-up of heavy wildfire fuel areas (abandoned buildings, abandoned
lands, etc.)
X X SVV9
Comment: The City monitors heavy wildfire fuel areas throughout the year and addresses any area of concern with the appropriate
individual, entity or agency. The City removes dead trees and/or other vegetation and maintains underbrush on City property
and public rights-of-way throughout the year. In September of 2017, the City adopted the 2015 International Property
Maintenance Code which provides additional tools for the City to use in addressing residential properties that may become
substandard and prevent such properties from developing into heavy wildfire fuel areas. The City would like to carry this
measure forward and change the wording of the Action Item to: Continuously monitor and mitigate heavy wildfire fuel areas
such as abandoned buildings, abandoned lands, etc.
Establish local supplemental benchmark program X
Comment: The exact purpose of this particular Action Item is unknown and it does not appear to do anything to mitigate flood damage to
structures. The City adopted flood damage prevention regulations in 2007 including a provision that new residential and non-
residential construction must meet base flood elevation + 1 foot.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
23-14
23.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 23-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 23-15
identifies the priority for each action. Table 23-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 23-14. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action SVV1 — Where appropriate, support retrofitting of structures located in hazard areas, prioritizing those that have experienced
repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire
Existing 3, 4, 10 Spring Valley Village Spring Valley
Village – Public Works
High HMGP, PDM, FMA Long-term
Action SVV2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including Spring Valley Village
Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire
New and Existing 1, 3, 4, 5, 7, 8, 10 Spring Valley Village
Spring Valley
Village – Public Works
Low Staff Time, General
Funds
Ongoing
Action SVV3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Earthquake, Flooding, Drought, Mass Mopvement, Wildfire
New and Existing 1, 5, 8 Spring Valley Village The Memorial Villages Low Staff Time, General
Funds
Short-term
Action SVV4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise
New and Existing 1, 3, 5, 7, 8, 10 Spring Valley
Village – Public
Works and Building
Official
TBD Low Staff Time, General
Funds
Ongoing
Action SVV5 — Conduct HVAC Assessment/Mitigation to Ventilation Systems for Critical Infrastructure
Hazards Mitigated: Toxic/Haz-Mat, Energy Pipeline Failures
Existing 3, 7, 13 Spring Valley Village TBD Medium CIP Short-term
Action SVV6 — Develop and implement public outreach program to educate the public on drought hazards and water conservation
measures that may be implemented by individuals to reduce water usage and minimize damages to property and equipment.
Hazards Mitigated: Drought
New and Existing 4, 6, 7, 8, 11 Spring Valley
Village – Public
Works
TCEQ, HGSD Low CIP, Utilities Fund,
Fed Water SMART
grant
Ongoing
ActionSVV7 — Develop and implement a public outreach program designed to educate the public about debris removal and other ways
to minimize damage to residential properties..
Hazards Mitigated: Flooding
Existing 4, 7, 8 Spring Valley Village Harris County Flood
Control
Medium General Fund Ongoing
City of Spring Valley Village
23-15
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
ActionSVV8 — Conduct a fire safety and prevention program in conjunction with the Village Fire Department.
Hazards Mitigated: Wildfire
Existing 2, 3, 4 Spring Valley Village Villages Fire Department Low General Fund Ongoing
ActionSVV9 — Continuously monitor and mitigate heavy wildfire fuel areas such as abandoned buildings, abandoned lands, etc.
Hazards Mitigated: Wild Fire
Existing 2, 3, 4 Spring Valley Village Villages Fire Department Low General Fund Ongoing
Action SVV10 — Improve storm drainage on street projects in accordance with 5 year CIP -
Hazards Mitigated: Flooding
New 4, 7, 9 Spring Valley Village TBD Medium Bonds, CIP Ongoing
Action SVV11 — Provide Public Education and outreach program to businesses, citizens, employees and the general public about
hazards associated with illegal discharge and improper disposal of waste and the impacts storm water can have on the quality of water as
described in the City’s Storm Water Management Plan.
Hazards Mitigated: Flooding
New and Existing 3, 4, 6, 8, 11 Spring Valley Village TBD Low General Fund Ongoing
Action SVV12 — Briar Branch Bypass project and contrast a detention pond to mitigate flood-related impacts.
Hazards Mitigated: Flooding
New 4, 7, 9 Spring Valley Village Harris County Flood
Control, Other Memorial
Villages
High General Fund,
Bonds, CIP, Grants
Long-Term
Action SVV13 — Bank re-stabilization with slope stabilization along portions of Briar Branch and Spring Branch to improve/increase flow
and minimize flood damage.
Hazards Mitigated: Flooding
New 4, 7, 9 Spring Valley Village Harris County Flood
Control
High General Fund,
Bonds, CIP, Grants
Long-Term
ActionSVV14 — Replace bridges in Spring Valley Village with improved hardened bridges to withstand flooding and debris.
Hazards Mitigated: Hurricane, Flooding
New 4, 7, 9, 10 Spring Valley Village Harris County Flood
Control
High General Fund,
Bonds, CIP, Grants
Long-Term
ActionSVV15 — Develop and implement master drainage plan and drainage model, including analysis of existing drainage system.
Hazards Mitigated: Flooding
New 2, 3, 7, 9, 10 Spring Valley Village Harris County Flood
Control
Medium General Fund Short-Term
Action SVV16 — Develop Critical Infrastructure and Key Resources database
Hazards Mitigated: Hurricane, Severe Weather, Flooding, Tornado, Drought, Earthquake, Wildfire, Tsunami, and Mass Movement
New 2, 3, 7, 9, 10, 13 Spring Valley Village TBD Medium General Fund,
Grants
Short-Term
Action SVV17 — Implement updates for drought contingency plan
Hazards Mitigated: Drought
New and Existing 5, 7, 8, 9, 10 Spring Valley Village TBD Low General Fund Short-Term
Action SVV18 — Develop Partnership Projects with Harris County Flood Control District for the purpose of optimizing drainage systems
in Spring Valley Village
Hazards Mitigated: Flooding, Dam Failure
New 7, 9 Spring Valley Village Harris County Flood
Control, Other Memorial
Villages
High Bonds, CIP, Grants Long-Term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
23-16
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action SVV19 — Generators for water and wastewater infrastructure.
Hazards Mitigated: Flooding, Sever Weather, Hurricane, Earthquake, Mass Movement, Wildfire,
New 4, 7, 9 Spring Valley Village TBD Medium CIP, Grants,
General Fund
Short-Term
Action SVV20— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Earthquake, Flooding, Drought, Mass Mopvement, Wildfire
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
City Admistration HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 23-15. Mitigation Action Priority
Action #
# of
Objectives
Met Benefits Costs
Do Benefits
Equal or
Exceed Costs?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
SVV1 3 Low High No Yes No Low Low
SVV2 7 Medium Low Yes No Yes High Low
SVV3 3 Low Low Yes No Yes High Low
SVV4 6 Medium Low Yes No Yes High Low
SVV5 3 Low Medium No No No Low Low
SVV6 5 High Low Yes No Yes High Low
SVV7 3 Medium Low Yes Yes No Medium Medium
SVV8 3 Medium Low Yes Yes No Medium Low
SVV9 3 Medium Low Yes Yes No Medium Low
SVV10 3 High High Yes Yes No High High
SVV11 5 Low Low Yes No Yes Medium Low
SVV12 3 High High Yes Yes No Medium High
SVV13 3 High High Yes Yes No Medium High
SVV14 4 Medium High No Yes No Medium Medium
SVV15 5 High Medium Yes Yes No Medium Medium
SVV16 6 High Medium Yes Yes No Medium Medium
SVV17 5 Medium Low Yes Yes Yes High Medium
SVV18 2 High Medium Yes Yes No Medium High
SVV19 3 Medium Medium Yes Yes No Medium Medium
SVV20 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
City of Spring Valley Village
23-17
Table 23-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Pro-tection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe
Weather
SVV-3, SVV-4, 20 SVV-4 SVV-4,
SW-20
SVV-20
Hurricane SVV-1, SVV-3,
SVV-4, SVV-20
SVV-1, SVV-4 SVV-4,
SW-20
SVV-14, SVV-16
SVV-19, SVV-20
SVV-1, SVV-14 SVV-20
Low-Risk Hazards
Earthquake SVV-1, SVV-3,
SVV-20
SVV-1 SVV-20 SVV-16,
SVV-19, SVV-20
SVV-1 SVV-2,
SVV-20
Flooding SVV-1, SVV-3,
SVV-4, SVV-7,
SVV-10, SVV-12,
SVV-13, SVV-15,
SVV-20
SVV-1, SVV-4,
SVV-7, SVV-10,
SVV-12,
SVV-13 SVV-18
SVV-4,
SVV-11,
SWW-20
SVV-11 SVV-14,
SVV-16,
SVV-19, SVV-20
SVV-1, SVV-12,
SVV-13,
SVV-14 SVV-18
SVV-20
Drought SVV-3, 20 SVV-6,
SVV-17,
SVV-20
SVV-6 SVV20 SVV-6,
SVV-17
SVV-2,
SVV-17,
SVV20
Wildfire SVV-1, SVV-3,
SVV-9, SWW-20
SVV-1 SVV-8,
SWW-20
SVV-16,
SVV-19, SVV-20
SVV-1 SVV-2,
SVV-20
Mass
Movement
SVV-1, SVV-3,
SVV-20
SVV-1 SVV-20 SVV-16,
SVV-19, SVV-20
SVV-1 SVV-2,
SVV-20
a. See the introduction to this volume for explanation of mitigation types.
23.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
23.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• City of Spring Valley Village Municipal Code — The municipal code was reviewed for the full
capability assessment and for identifying opportunities for action plan integration.
• City of Spring Valley Village Flood Damage Prevention Ordinance — The flood damage prevention
ordinance was reviewed for compliance with the National Flood Insurance Program.
• City of Spring Valley Village MS4 Permit – The MS4 Permit was review for determining existing
integration of current action plan items and for identifying opportunities for future action plan integration.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• Texas Water Development Board Flood Outreach – Community Assistance Program – Flood
insurance and total loss claims information was obtained through this Program.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
23-18
23.11.2 Staff and Local Stakeholder Involvement in Annex Development
This annex was developed over the course of one month with input from various City departments including
Public Works, Community Development, Finance, and City Administration, as well as a representative from the
Village Fire Department.
!(!(!(!(!(!(!(!(!(!(!(!(§¨¦10§¨¦10HoustonHilshireVillageHuntersCreekVillageHedwigVillagePiney PointVillageBunkerHillVillageCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.20.40.1Miles±Spring Valley
§¨¦10 §¨¦10
Houston
Hilshire
Village
Hunters
Creek Village
Hedwig
Village
Piney
Point
VillageBunker
Hill
Village
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Spring Valley
§¨¦10 §¨¦10
Houston
Hilshire
Village
Hunters
Creek Village
Hedwig
Village
Piney
Point
VillageBunker
Hill
Village
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Spring Valley
§¨¦10 §¨¦10
Houston
Hilshire
Village
Hunters
Creek Village
Hedwig
Village
Piney
Point
VillageBunker
Hill
Village
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Spring Valley
§¨¦10 §¨¦10
Houston
Hilshire
Village
Hunters
Creek Village
Hedwig
Village
Piney
Point
VillageBunker
Hill
Village
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Spring Valley
§¨¦10 §¨¦10
Houston
Hilshire
Village
Hunters
Creek Village
Hedwig
Village
Piney
Point
VillageBunker
Hill
Village
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Spring Valley
§¨¦10 §¨¦10
Houston
Hilshire
Village
Hunters
Creek Village
Hedwig
Village
Piney
Point
VillageBunker
Hill
Village
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.2 0.40.1 Miles
±
Spring Valley
24-1
24. CITY OF STAFFORD
24.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Ashley Merchant, Grant Manager
2610 South Main St.
Stafford, TX 77477
Telephone: 281-261-3993
e-mail Address: AMerchant@staffordtx.gov
Peter E. Alvarado, Emergency Management Coordinator
2610 South Main St.
Stafford, TX 77477
Telephone: 281-261-3947
e-mail Address: PAlvarado@staffordtx.gov
24.2 JURISDICTION PROFILE
24.2.1 Location
The City of Stafford is in the southwest portion of Harris County and the northeast portion of Fort Bend County.
The City of Houston is to the north, the city of Meadows place to the northwest, the City of Sugar Land to the
west, and Missouri City to the south and east. Stafford is located approximately 50 miles from the Gulf of Mexico
in southeast Texas. The current boundaries generally extend from West Airport Blvd. to Highway 90 north-south
and Texas Parkway to Dairy Ashford Rd. east-west, encompassing an area of approximately 7 square miles.
Stafford is home to Houston Community College-Stafford Campus, a UPS distribution center and the state’s only
municipal school district.
24.2.2 History
The City of Stafford was incorporated in 1956. In 1824, William J. Stafford was granted a league-and-a-half of
land, which became known as Stafford’s Point, and aided by a horse-powered cotton gin, began farming on his
plantation and operating the gin to bale his and other farmers’ crops in the area. It marked the business friendly
climate that remains a trademark of Stafford today. In 1836, during the Texas Revolution, General Santa Ana and
his troops stopped in Stafford’s Point for the night on their way to San Jacinto. Before departing, they pillaged
and burned the community. By 1840, settlers had returned to begin rebuilding, and their preferred economic
product shifted from cotton to sugar cane as the primary source of income for revitalizing the community’s
economy. Attracted by this expanding community, Stafford’s Point became the terminal point of the first railroad
tracks built in Texas which became a robust system over the next century. Since Stafford’s incorporation, it has
stood out by promoting commerce instead of concentrating solely on residential development.
24.2.3 Climate
The climate of the City of Stafford is typical of the upper Texas coast, humid subtropical, with hot and humid
summers and mild winters. The average annual temperature is around 69°F and average annual rainfall is
approximately 50 inches.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
24-2
24.2.4 Governing Body Format
As a home rule city, Stafford established a “mayor-council” form of municipal government. The city is governed
by the mayor and six council members. The city consists of 10 departments: Fire, Police, Finance, Human
Resources, Public Works, Municipal Court, Information Technology, Municipal Educational Television,
Recreation and City Administration. The Stafford Economic Development Corporation is a nonprofit which
pursues the economic development expansion of the city and reports to City Council.
The City Council assumes responsibility for the adoption of this plan; the Mayor will oversee its implementation.
Development of this annex was carried out by the members of the local mitigation planning team, whose
members are listed in Table 24-1.
Table 24-1. Local Mitigation Planning Team Members
Name Title
Peter Alvarado Emergency Management Coordinator
Efrem Burns Fire Marshal
Cassandra Fair Administrative Assistant
Jeff Johnson City Planner
Ashley Merchant Grant Manager
Chris Riggs Director of Public Works
24.3 CURRENT TRENDS
24.3.1 Population
According to the United States Census Bureau, the population of the City of Stafford as of April 2010 was
17,693. Since 2010, the population has grown at an average annual rate of 0.61 percent, though in 2017 it is
estimated that the population decreased by 0.66 percent from 2016.
24.3.2 Development
Anticipated redevelopment/development levels are low to moderate, consisting primarily of commercial
redevelopment. Approximately 93 percent of the City is built-out, with the most recent development being infill.
Residentially, there has been a focus on increased density and compact urban uses through planned developments.
The City of Stafford updated its Comprehensive Plan in 2015. The plan focuses on issues of the greatest concern
to the community. City actions, such as those relating to land use allocations, annexations, zoning, subdivision
and design review, redevelopment and capital improvements, must be consistent with the plan. Future growth and
development in the City will be managed as identified in the general plan.
Table 24-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
Table 24-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
N/A
City of Stafford
24-3
Criterion Response
Is your jurisdiction expected to annex any areas during the performance
period of this plan?
No
• If yes, describe land areas and dominant uses.
N/A
• If yes, who currently has permitting authority over these areas?
N/A
Are any areas targeted for development or major redevelopment in the next five years?
Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
There is a Master Planned 200 acre mixed use (residential/commercial) project called the
“Grid” at the northwest corner of the intersection of I-59 and Kirkwood Road that is under
construction. There are no known hazard risks in this area.
How many permits for new
construction were issued in your jurisdiction since the preparation of the
previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 33 12 39 4 6
Multi-Family 0 0 0 0 7
Other (commercial, mixed use, etc.) 11 17 15 13 11
Total 44 29 54 17 24
Provide the number of new-construction permits for each hazard area or provide a qualitative
description of where development has occurred.
• Special Flood Hazard Areas: 0
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the
jurisdiction, based on your
jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description.
• The City of Stafford has a current population of approximately 19,000. It is anticipated at
the time of build out in 2030 that a minimum of 3,000 residential dwelling units will be
added to the existing approximately 180 acres of vacant residential property.
• Population of the City will be approximately 27,500 in 2030. With an increased demand in
compact urban dwelling units, the population will continue to rise in the future.
• There is approximately 150 acres of vacant commercial/industrial property. Buildout is
anticipated by 2030. There will be an increased demand to mixed use developments
(residential/commercial/industrial) in the future to make these developments viable.
24.4 CAPABILITY ASSESSMENT
The City of Stafford performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 24-3.
• Development and permitting capabilities are presented in Table 24-4.
• An assessment of fiscal capabilities is presented in Table 24-5.
• An assessment of administrative and technical capabilities is presented in Table 24-6.
• An assessment of education and outreach capabilities is presented in Table 24-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 24-8.
• Classifications under various community mitigation programs are presented in Table 24-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 24-10.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
24-4
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Table 24-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No No Yes
Comment: International Building Code 2015
Zoning Code Yes No No Yes
Comment: Comprehensive Zoning Ordinance 102
Subdivisions Yes No No Yes
Comment: Subdivision Ordinance 82
Stormwater Management Yes No Yes Yes
Comment: Stormwater Pollution Protection Ordinance: Subdivision Ordinance Chapter 35 Section 205-208; TCEQ
Post-Disaster Recovery Yes Yes Yes Yes
Comment: Fort Bend County Plan
Real Estate Disclosure No Yes No No
Comment: Fort Bend County
Growth Management Yes No No Yes
Comment: Code of Ordinance Article III Section 62
Site Plan Review Yes No No Yes
Comment: Comprehensive Zoning Ordinance 102
Environmental Protection No Yes Yes No
Comment: TCEQ and EPA
Flood Damage Prevention Yes No No Yes
Comment: Code of Ordinance Article IV Section 26
Emergency Management Yes No Yes Yes
Comment: Code of Ordinance Article II Section 22
Climate Change No No No No
Comment:
Planning Documents
General Plan Yes Yes Yes Yes
Comment: Fort Bend County
Capital Improvement Plan Yes No No Yes
How often is the plan updated? 1 year Comment: City of Stafford Capital Improvement Plan Revised 2018
Disaster Debris Management Plan No Yes Yes No
Comment: Fort Bend County Debris Management Plan
Floodplain or Watershed Plan Yes Yes No Yes
Comment: Code of Ordinance Article IV Section 26
Stormwater Plan Yes Yes Yes Yes
Comment: Stormwater Pollution Protection Ordinance: Subdivision Ordinance Chapter 35 Section 205-208; State Mandate via Texas
Commission on Environmental Quality
Urban Water Management Plan No Yes No No
Comment: Water Control Improvement District #2 (Fort Bend County)
Habitat Conservation Plan No No No No
Comment:
City of Stafford
24-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Economic Development Plan Yes No No No
Comment: City of Stafford Comprehensive Plan 2015
Shoreline Management Plan No No No No
Comment:
Community Wildfire Protection Plan No No No No
Comment:
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes Yes Yes Yes
Comment: Fort Bend County Emergency Management Plan
Threat & Hazard Identification & Risk Assessment (THIRA) No Yes Yes Yes
Comment: 2017 Houston Regional Threat and Hazard Identification and Risk Assessment
Post-Disaster Recovery Plan Yes Yes Yes Yes
Comment: Fort Bend County Plan
Continuity of Operations Plan Yes No No Yes
Comment: City of Stafford Continuity of Operations Plan
Public Health Plan Yes Yes No Yes
Comment: Code Enforcement Health Inspection
Table 24-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Public Works- Development Services
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? No
Table 24-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
24-6
Table 24-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Public Works- City Planner
Engineers or professionals trained in building or infrastructure construction practices Yes Contract Support
Planners or engineers with an understanding of natural hazards Yes Contract Support
Staff with training in benefit/cost analysis No N/A
Surveyors No N/A
Personnel skilled or trained in GIS applications Yes Public Works- GIS Applications Specialist
Scientist familiar with natural hazards in local area No N/A
Emergency manager Yes Fire Department- Emergency Management
Coordinator
Grant writers Yes Grant Manager
Table 24-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, briefly describe. There is a link in the Emergency Management section
and occasionally information will be posted on the flash
screen of the home page.
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. Information is posted through Facebook, Twitter and
NextDoor.
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe. N/A
Do you have any other programs already in place that could be used to
communicate hazard-related information?
Yes
• If yes, briefly describe. Stafford Municipal Educational Television
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Warnings are posted on electronic billboards in the city
and broadcast over an AM radio station.
City of Stafford
24-7
Table 24-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Public Works
Who is your floodplain administrator? (department/position) Contract Support
Are any certified floodplain managers on staff in your jurisdiction? No
What is the date that your flood damage prevention ordinance was last amended? 2/13/2008
Does your floodplain management program meet or exceed minimum requirements? Meets
• If exceeds, in what ways? N/A
When was the most recent Community Assistance Visit or Community Assistance Contact? Insert appropriate information
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are. N/A
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are. N/A
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why. N/A
Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes
• If so, what type of assistance/training is needed? Basic training.
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification? N/A
• If no, is your jurisdiction interested in joining the CRS program? Yes
How many flood insurance policies are in force in your jurisdiction?a 635
• What is the insurance in force? $201,754,900
• What is the premium in force? $301,180
How many total loss claims have been filed in your jurisdiction?a 106
• How many claims are still open or were closed without payment? 31
• What were the total payments for losses? $1,754,301
a. According to FEMA statistics as of OCTOBER 31, 2018
Table 24-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No N/A N/A
Building Code Effectiveness Grading Schedule No N/A N/A
Public Protection No N/A N/A
Storm Ready No N/A N/A
Firewise No N/A N/A
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
24-8
Table 24-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Medium
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Medium
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Medium
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Stafford
24-9
24.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
24.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Municipal Codes and Ordinances — The City’s Municipal Codes were reviewed for the full capacity
assessment and for identifying opportunities for action plan integration, including Section 26 – Drainage
and Flood Control.
• Capital Improvement Plan — The Capital Improvement Plan includes projects that can help mitigate
potential hazards. The City will act to ensure consistency between the hazard mitigation plan and the
current and future capital improvement plans. The hazard mitigation plan may identify new possible
funding sources for capital improvement projects may result in modifications to proposed projects based
on results of the risk assessment
• Building Code and Fire Code — The City’s adoption of the 2015 International Building and Fire Code
incorporate local modifications to account for climatic, topographic and geographic conditions that exists
in the City
• Comprehensive Plan — The City’s 2015 Comprehensive Plan includes an “Infrastructure Assessment”
element to protect the community from unreasonable risk by establishing policies and actions to avoid or
minimize infrastructure hazards pertaining to flooding.
24.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Zoning Ordinance — In the future, the City will be conducting a comprehensive update to the zoning
ordinance. The opportunity to incorporate additional mitigation and abatement measures will be
considered for inclusion into the ordinance
• Capital Improvement Projects — The City will continue to place a higher rank or score when
evaluating capital projects that take into consideration hazard mitigation potential.
• Economic Development Corporation — The City will continue to work with the Economic
Development Corporation to incorporate hazard mitigation planning in future development within the
City.
24.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 24-11 lists past occurrences of natural hazards for which specific damage was recorded in [City of
Stafford]. Other hazard events that broadly affected the entire planning area, including [City of Stafford], are
listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
24-10
Table 24-11. Past Natural Hazard Events
Type of Event
FEMA Disaster # Date Damage Assessment
Hurricane DR-4332 8/23/2017-9/15/2017 $795,610.33
Flash Flood 8/26/2017 $0
Tornado 2/14/2017 $200,000
Severe Storms and Flooding DR-4272 5/22/2016-6/24/2016
Severe Storms and Flooding DR-4269 4/17/2016-4/30/2016
Severe Weather, Tornadoes, Straight Line Winds and Flooding DR-4223 5/4/2015-6/22/2015
Thunderstorm Winds 4/17/2015 $0
Flooding 2014 Portions of FM 1092 flooded.
Thunderstorm Winds 8/13/2009 $15,000
Hurricane Ike DR-1791 9/7/2008-10/2/2008 $269,276.27
Hurricane Gustav EM-3290 8/27/2008-9/7/2008
Hurricane Dean EM-3277 8/17/2008-9/5/2008
Lightning 6/18/2008 $10,000
Extreme Wildfire Threat DR-1624 11/27/2006-5/14/2006
Lightning 7/18/2006 $4,000
Lightning 7/4/2006 $25,000
Hurricane Rita DR-1606 9/23/2005-10/14/2005
Hurricane Rita EM-3261 9/20/2005-10/14/2005
Hurricane Katrina Evacuation EM-3216 8/29/2005-10/1/2005
Hail 2/24/2005 $4,000
Tornado 11/17/2003 $300,000
Hail 10/28/2002 $5,000
Severe Storms, Tornadoes and Flooding DR-1439 10/24/2002-11/15/2002
Hail 5/30/2002 $2,000
Tropical Storm Allison DR-1379 6/5/2001-6/20/2001
Thunderstorm Winds 4/16/2001 $150,000
Extreme Fire Hazards EM-3142 8/1/1999-12/10/1999
Texas Tropical Storm Frances DR-1245 9/9/1998-10/5/1998
Lightning 6/3/1996 One fatality
Severe Thunderstorms and Flooding DR-1041 10/14/1994-11/8/1994
Texas Severe Storm, Thunderstorms DR-930 12/20/1991-1/14/1992
Tropical Storm Allison DR-836 6/25/1989-7/7/1989
Hurricane Alicia DR-689 8/18/1983-8/20/1983
24.7 HAZARD RISK RANKING
Table 24-12 presents a local ranking for [City of Stafford] of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
City of Stafford
24-11
Table 24-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Earthquake 14 Low
3 Drought 6 Low
3 Wildfire 6 Low
3 Flooding 6 Low
4 Dam Failure 0 (No exposure) None
4 Mass Movement 0 (No Exposure) None
4 Tsunami 0 (No exposure) None
4 Coastal Erosion 0 (No exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
24.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
24.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 11
• Number of FEMA-identified Severe-Repetitive-Loss Properties: None
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated:
None
24.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• There are areas in the City with urban drainage issues that result in localized flooding during heavy rain.
• Fire Station 1, a critical facility which also houses Emergency Medical Service (EMS), has a generator in
poor condition and in need of replacement.
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
24.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 24-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
24-12
Table 24-13. Status of Previous Plan Actions
Removed;
Carried Over to
Plan Update
Action Item Completed
No longer
Feasible
Check if
Yes
Action #
in Update
Install generators/emergency power at the Stafford Centre and Civic Center. X STF5
Comment: Not started.
Expand city’s emergency warning system to increase coverage within the
community’s population.
X STF6
Comment: Ongoing
Install protective structures to minimize damage to critical assets and equipment. X
Comment: Shed covers were installed to cover equipment in 2015.
Improve drainage channels to increase flow rate and increased retention areas. X STF7
Comment: In progress. Work began in 2017. One of three projects has been completed and the remaining two are underway.
Improve storm sewer to lower hydraulic grade line in Sugar Creek subdivision. X
Comment: This project was completed on September 12, 2018.
Implement drainage improvements in Missouri City Estates- replace open ditches by- installing storm sewers and level ground to reduce overland and sheet flow flooding within neighborhoods.
X STF8
Comment: In progress. Drainage improvement is currently underway in Missouri City Estates, the project started on September 1, 2018.
A new detention pond will be installed and there will be partial curb and gutter installed in the subdivision.
Electric Surge protection and shielding for electronic systems in public facilities or critical infrastructure. X
Comment: Back-up systems approved in October of 2017.
Harden air filtration system and critical infrastructure/public buildings to
support high efficiency particulate air resistance filters in order to minimize
health risks and property damage due to air particulate hazards and minimize equipment damage due to smoke.
X STF9
Comment: Not started.
Hardening of critical infrastructure facilities for hurricane wind hazards. X STF10
Comment: Not started.
Development/Modification of building codes/ordinances for mitigation of hurricane wind hazards. X
Comment: 2015 International Building Codes adopted by Council on May 2, 2018.
24.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 24-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 24-15
identifies the priority for each action. Table 24-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
City of Stafford
24-13
Table 24-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action STF1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, landslide, wildfire
Existing 3, 4, 10 Public Works Emergency Management High HMGP, PDM, FMA Short-term
Action STF2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including Zoning Ordinance, Capital Improvement projects and Economic Development Corporation planning
Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, wildfire
New and Existing 1, 3, 4, 5, 7,
8, 10
Planning and Zoning Stafford Economic
Development Corporation
Low Staff Time, General
Funds
Ongoing
Action STF3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Earthquake, Drought, Wildfire, Flooding
New and Existing 1, 5, 8 Emergency
Management
Public Works Low Staff Time, General
Funds
Short-term
Action STF4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Dam failure, flooding, severe weather,
New and Existing 1, 3, 5, 7, 8,
10
Public Works Emergency Management Low Staff Time, General
Funds
Ongoing
Action STF5 — Install generators/emergency power at the Stafford Centre for use as an emergency shelter.
Hazards Mitigated: Hurricane, severe weather, wind, flooding
Existing 3, 4, 6, 10,
11
Economic Development
Corporation
Emergency Management Low HMGP, PDM; EDC
Funds
Short-
Term
Action STF6 — Expand city’s emergency warning system to increase coverage within the community’s population.
Hazards Mitigated: Hurricane, flooding, severe weather, wildfire, drought,
New 1, 3, 11 Emergency
Management
Police/Fire Medium Grant funding; General
Funds
Ongoing
Action STF7 — Improve drainage channels to increase flow rate and increased retention areas.
Hazards Mitigated: Hurricane, flooding, severe weather
Existing 6, 8, 9, 11,
14, 15
Stafford Public Works Fort Bend County
Drainage/Stafford
Economic Development
Corporation
Medium Staff Time, General
Funds
Ongoing
Action STF8 — Implement drainage improvements in Missouri City Estates- replace open ditches by installing storm sewers and level
ground to reduce overland and sheet flow flooding within neighborhoods.
Hazards Mitigated: Hurricane, flooding, severe weather
New and Existing 6, 8, 9, 11,
14, 15
Public Works Low Staff Time, General
Funds
Short-
Term
Action STF9 — Harden air infiltration system and critical infrastructure/public buildings to support high efficiency particulate air resistance
filters in order to minimize health risks and property damage due to air particulate hazards and minimize equipment damage due to
smoke.
Hazards Mitigated: Severe weather, wind, hurricane, tornado, wildfire, non-natural
Existing 11, 13 Public Works Medium HMGP, PDM, FMA; Staff
Time, General Funds
Short-
Term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
24-14
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action STF10 — Hardening of critical infrastructure facilities for hurricane wind hazards.
Hazards Mitigated: Hurricane, wind, severe weather, tornado
Existing 11, 13 Public Works Emergency Management Medium HMGP, PDM, FMA;
General Funds
Short-
Term
Action STF11 — Purchase generator for Fire/EMS Station 1.
Hazards Mitigated: Hurricane, severe weather, wind, flooding
New 3, 4, 6, 10,
11
Public Works Emergency Management Low Staff Time, General
Funds
Short-
Term
Action STF12 — Purchase/install generators at critical facilities and infrastructure that lack adequate back-up power or are in need of
replacement.
Hazards Mitigated: Hurricane, severe weather, wind, flooding
New 3, 4, 6, 10,
11
Public Works Emergency Management Medium HMGP, PDM; General
Funds
Ongoing
Action STF13— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Earthquake, Drought, Wildfire, Flooding
New and Existing 1, 3, 4, 5, 9,
10, 11, 15
City Admistration HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 24-15. Mitigation Action Priority
Action #
# of Objectives Met Benefits Costs
Do Benefits
Equal or Exceed Costs?
Is Project Grant-Eligible?
Can Project Be
Funded Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
1 3 High High Yes Yes No Medium High
2 7 Medium Low Yes No Yes High Low
3 3 Low Low Yes No Yes High Low
4 6 Medium Low Yes No Yes High Low
5 5 Medium Low Yes Yes No Low High
6 3 High Medium Yes Maybe No Low High
7 6 Medium Medium Yes Yes Yes Medium Low
8 6 Medium Low Yes Yes Yes High Low
9 2 Low Medium No Yes No Low Low
10 2 Low Medium No Yes No Low Low
11 5 High Low Yes Yes Yes High Low
12 5 High Medium Yes Yes No Medium Medium
13 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
City of Stafford
24-15
Table 24-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather STF-4, 13 STF-9, 10 STF-6, 13 STF-5, 6, 11, 12,
13
STF-7, 8 STF-3, 4, 13
Hurricane STF13 STF-9, 10 STF-6, 13 STF-5, 6, 11, 12,
13
STF-7, 8 STF-3, 13
Low-Risk Hazards
Earthquake STF-2, 13 STF13 STF13 STF-1 STF-3, 13
Drought STF-2, 13 STF-6, 13 STF-5, 6, 11, 12,
13
STF-3, 13
Wildfire STF-2, 13 STF-9 STF-6, 13 STF-5, 6, 11, 12,
13
STF-1 STF-3, 13
Flooding STF-2, 4,
13
STF-6, 13 STF-5, 6, 11, 12,
13
STF-1, 7, 8 STF-3, 4, 13
a. See the introduction to this volume for explanation of mitigation types.
24.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
24.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• City of Stafford Municipal Code — The municipal code was reviewed for the full capability assessment
and for identifying opportunities for action plan integration.
• City of Stafford Flood Damage Prevention Ordinance — The flood damage prevention ordinance was
reviewed for compliance with the National Flood Insurance Program.
• City of Stafford Comprehensive Plan — The City of Stafford Comprehensive Plan was reviewed for
the full capability assessment and for identifying opportunities for action plan integration.
• City of Stafford Capital Improvement Plan — The City of Stafford’s Capital Improvement Plan was
reviewed for the full capability assessment and for identifying opportunities for action plan integration.
• Fort Bend County Debris Management Plan — The Fort Bend County Debris Management Plan was
reviewed for the full capability assessment and for identifying opportunities for action plan integration.
• City of Stafford Continuity of Operations Plan — The City of Stafford’s Continuity of Operations Plan
was reviewed for the full capability assessment and for identifying opportunities for action plan
integration.
• 2017 Houston Regional Threat and Hazard Identification Risk and Assessment — The 2017
Houston Regional Threat and Hazard Identification Risk and Assessment was reviewed for the full
capability assessment and for identifying opportunities for action plan integration.
• Fort Bend County Emergency Management Plan — The Fort Bend County Emergency Management
Plan was reviewed for the full capability assessment and for identifying opportunities for action plan
integration.
The following outside resources and references were reviewed:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
24-16
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
24.11.2 Staff and Local Stakeholder Involvement in Annex Development
This annex was developed over the course of several months with input from many city departments including
public works, planning, finance and emergency management. All departments were asked to contribute to the
annex development through reviewing and contributing to the capability assessment, reporting on the status of
previously identified actions, and participating in action identification and prioritization. An action development
meeting was held on March 25, 2019 and was attended by representatives from the previously listed departments
as well as the City Administrative office. Once action had been identified and compiled in Phase II of the annex, a
draft was internally circulated for comment. Representatives from the Fire Marshal’s Office, planning and
emergency management department attended a mandatory workshop on July 17, 2019 covering Phase III of the
annex development process. On July 31, 2019, an interdepartmental meeting covering Phase III of the City’s
annex was conducted with department representatives from emergency management, the Fire Marshal’s Office,
planning, and public works. A draft of the annex was internally circulated for comment and reviewed by the
Mayor before a final draft was submitted to the Core Planning Team representing Harris County.
!(!(!(!(!(!(§¨¦69£¤90£¤90HoustonHoustonHoustonMeadows PlaceMissouri CityCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.40.80.2Miles±Stafford
§¨¦69
£¤90
£¤90
Houston
Houston
Houston
Meadows Place
Missouri City
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.4 0.80.2 Miles
±
Stafford
§¨¦69
£¤90
£¤90
Houston
Houston
Houston
Meadows Place
Missouri City
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.4 0.80.2 Miles
±
Stafford
§¨¦69
£¤90
£¤90
Houston
Houston
Houston
Meadows Place
Missouri City
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.4 0.80.2 Miles
±
Stafford
§¨¦69
£¤90
£¤90
Houston
Houston
Houston
Meadows Place
Missouri City
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.4 0.80.2 Miles
±
Stafford
§¨¦69
£¤90
£¤90
Houston
Houston
Houston
Meadows Place
Missouri City
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.4 0.80.2 Miles
±
Stafford
§¨¦69
£¤90
£¤90
Houston
Houston
Houston
Meadows Place
Missouri City
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.4 0.80.2 Miles
±
Stafford
25-1
25. CITY OF TAYLOR LAKE VILLAGE
25.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Jon Keeney, Mayor
500 Kirby
Taylor Lake Village, TX 77586
Telephone: 2813262843
email Address: mayor@tlv-tx.us
Jon Powell, Councilman
500 Kirby
Taylor Lake Village, TX 77586
Telephone: 2813262843
email Address: jpowell@tlv-tx.us
25.2 JURISDICTION PROFILE
25.2.1 Location
City of Taylor Lake Village is in southeast Harris County just north of Clear Lake and between Lake Pasadena
and Taylor Lake. The current boundaries generally extend from Pasadena to El Lago, encompassing an area of
1.3 square miles, of which 1.1 square miles is land and 0.19 square miles is water.
25.2.2 History
The City of Taylor Lake Village was incorporated in 1962. The City was home to four of the original seven
NASA Mercury program astronauts. Many residents work for NASA, and a number of current and former
astronauts still live here.
25.2.3 Climate
The climate of Taylor Lake Village is Texas Gulf Coastal.
25.2.4 Governing Body Format
Taylor Lake Village is a General Law Type-A city. It has a mayor and city council with each of the council
members being elected at-large. The Taylor Lake Village City Council assumes responsibility for the adoption of
this plan; the City Council will oversee its implementation. Development of this annex was carried out by the
members of the local mitigation planning team, whose members are listed in Table 25-1.
Table 25-1. Local Mitigation Planning Team Members
Name Title
Jon Keeney Mayor
Jon Powell Coty Council Pos. 2
Jack Fryday City Building Official
Jesse Ryholt Emergency Management Coordinator
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
25-2
25.3 CURRENT TRENDS
25.3.1 Population
According to the United States Census Bureau, the population of Taylor Lake Village as of the 2010 census was
3,544. Since 1980, the population has remained fairly constant.
25.3.2 Development
Table 25-2 summarizes development trends in the period since the preparation of the previous hazard mitigation
plan, as well as expected future development trends.
Table 25-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the
preparation of the previous hazard mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
Is your jurisdiction expected to annex any areas
during the performance period of this plan?
No
• If yes, describe land areas and dominant uses.
• If yes, who currently has permitting authority over these areas?
Are any areas targeted for development or major redevelopment in the next five years? Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
Located in flood hazard risk area
How many permits for new construction were
issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 4 3 1 1 3
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.) 0 0 0 0 0
Total 4 3 1 1 3
Provide the number of new-construction permits for each hazard area or provide a qualitative
description of where development has occurred.
Special Flood Hazard Areas: Most of Taylor Lake Village is a flood hazard area
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description.
Kingston Harbor area of Taylor Lake Village was recently purchased by an
entity that indicates that it plans to build single family homes. As this area is
currently in the flood plain of Taylor Lake, the homes will have to be built with
the lowest floor at the current elevation above Mean Flood Elevation level.
25.4 CAPABILITY ASSESSMENT
The City of Taylor Lake Village is currently undertaking an assessment of its existing capabilities for
implementing hazard mitigation strategies. The introduction at the beginning of this volume of the hazard
mitigation plan describes the components included in the capability assessment and their significance for hazard
mitigation planning. This section summarizes the following interim findings of the assessment to date:
• An assessment of legal and regulatory capabilities is presented in Table 25-3.
City of Taylor Lake Village
25-3
• Development and permitting capabilities are presented in Table 25-4.
• An assessment of fiscal capabilities is presented in Table 25-5.
• An assessment of administrative and technical capabilities is presented in Table 25-6.
• An assessment of education and outreach capabilities is presented in Table 25-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 25-8.
• Classifications under various community mitigation programs are presented in Table 25-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 25-10.
Findings of the capability assessment will be reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities are identified and
determined to be feasible, they will be included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Table 25-3. Legal and Regulatory Capability
Local
Authority Other Jurisdiction
Authority State Mandated Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes Yes
Comment: Chapter 10, Article II, section 10-31 of the TLVMC adopts the 2018 Edition of International Code Council Codes and the 2017
National Electrical Code, (Ord. No. 18-689, § 2, 5-30-18)
Zoning Code Yes No No Yes
Comment: Appendix A of the TLVMC is known as and may be cited as “The City of Taylor Lake Village Zoning Ordinance (Ord. No. 10-
600, § 1, 8-4-2010).
Subdivisions Yes Yes No Yes
Comment: The City works closely with individual subdivision and the homeowner associations to ensure compliance.
Chapter 66 of the TLVMC, (Ord. No. 84-226, § 1.04, 10-17-84)
Stormwater Management Yes Yes Yes Yes
Comment: Chapter 66, Article III, section Sec. 66-115. – Drainage. (Ord. No. 84-226, § 3.21, 10-17-84)
Post-Disaster Recovery Yes Yes No Yes
Comment: Historically worked with Harris County. Changes to county policy now prohibits. Would like to coordinate with county
Real Estate Disclosure No No No No
Comment:
Growth Management Yes No No Yes
Comment: Few opportunities for growth of land use, but will coordinate with county and other entities
Site Plan Review Yes No No Yes
Comment:
Environmental Protection No Yes Yes Yes
Comment: Rely on State and local regulatory authority
Flood Damage Prevention Yes Yes Yes Yes
Comment: Chapter 34, Article II, TLVMC. (Ord. No. 17-683, § 1, 12-6-17)
Emergency Management No Yes Yes Yes
Comment: Policing and emergency response is addressed by contract with nearby municipalities.
Chapter 22, TLVMC (Ord. No. 09-579, § 10, 10-21-09)
Climate Change No Yes No Yes
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
25-4
Local
Authority Other Jurisdiction
Authority State Mandated Integration
Opportunity?
Planning Documents
General Plan Yes No Yes Yes
Comment: Currently under review
Capital Improvement Plan No No No Yes
Comment:
Disaster Debris Management Plan No No No Yes
Comment: Historically worked with Harris County. Changes to county policy now prohibits. Would like to coordinate with county again
Floodplain or Watershed Plan Yes Yes Yes Yes
Comment: https://www.taylorlakevillage.us/index.asp?SEC=EDE25814-2435-4435-8090-73EEF66EA51B&Type=B_BASIC
Stormwater Plan Yes Yes Yes Yes
Comment: Currently under review for update
Urban Water Management Plan No No No Yes
Comment:
Habitat Conservation Plan No No No Yes
Comment:
Economic Development Plan No No No Yes
Comment:
Shoreline Management Plan Yes Yes Yes Yes
Comment: Complying with existing city, and state codes.
Community Wildfire Protection Plan No No No Yes
Comment:
Forest Management Plan No No No Yes
Comment:
Climate Action Plan No No No Yes
Comment:
Comprehensive Emergency Management Plan Yes Yes No Yes
Comment: Currently in development
Threat & Hazard Identification & Risk Assessment (THIRA) No No No Yes
Comment:
Post-Disaster Recovery Plan No No No Yes
Comment:
Continuity of Operations Plan No No No Yes
Comment:
Public Health Plan No No No No
Comment:
Table 25-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
If no, who does? If yes, which department? City Building Department
Does your jurisdiction have the ability to track permits by hazard area? Yes
Does your jurisdiction have a buildable lands inventory? Yes
City of Taylor Lake Village
25-5
Table 25-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants No
Capital Improvements Project Funding Yes but limited
Authority to Levy Taxes for Specific Purposes Yes, but subject to state and local requirements
User Fees for Water, Sewer, Gas or Electric Service No, City does not supply utilities
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs No
Development Impact Fees for Homebuyers or Developers No
Table 25-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices No Can Contract for this service
Engineers or professionals trained in building or infrastructure construction practices Yes Not on staff. Obtain as necessary
Planners or engineers with an understanding of natural hazards Yes Not on staff. Obtain as necessary
Staff with training in benefit/cost analysis Yes Elected officials, not staff
Surveyors No Can Contract for this service
Personnel skilled or trained in GIS applications No Can contract for this service
Scientist familiar with natural hazards in local area Yes Not on staff. Obtain as necessary
Emergency manager Yes Emergency Management Coordinator
Grant writers Yes Not on staff. Obtain as necessary
Other Yes City has had success relying on resident
volunteers with specific knowledge
Table 25-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Elected officials and City Administrator function
Do you have personnel skilled or trained in website development? Limited
Do you have hazard mitigation information available on your
website?
Yes
• If yes, briefly describe. Limited, but with links to information providers
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. Information is posted on the TLV website, the TLV Facebook
page, and other social media such as NextDoor.
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe.
Do you have any other programs already in place that could be
used to communicate hazard-related information?
No
• If yes, briefly describe.
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Blackboard Connect, mass email, text system, and utilization of
the TLV website and social media sites as best as possible.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
25-6
Table 25-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Building Department
Who is your floodplain administrator? (department/position) Mayor
Are any certified floodplain managers on staff in your jurisdiction? No
What is the date that your flood damage prevention ordinance was last amended? 1996
Does your floodplain management program meet or exceed minimum requirements? Meets
• If exceeds, in what ways?
When was the most recent Community Assistance Visit or Community Assistance Contact? Unknown
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why. Rely on State and County maps
Does your floodplain management staff need any assistance or training to support its floodplain management program? Yes
• If so, what type of assistance/training is needed? Coordination with other local entities
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification? Yes
• If no, is your jurisdiction interested in joining the CRS program? N/A
How many flood insurance policies are in force in your jurisdiction?a 1,091
What is the insurance in force? $361,039,200
What is the premium in force? $604,650
How many total loss claims have been filed in your jurisdiction?a 692
How many claims are still open or were closed without payment? 1
What were the total payments for losses? $16,840,710
a. According to FEMA statistics as of September 30, 2018
Table 25-9. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes 8 05/01/2014
Building Code Effectiveness Grading Schedule Unknown
Public Protection Unknown
Storm Ready No N/A N/A
Firewise No N/A N/A
City of Taylor Lake Village
25-7
Table 25-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Medium
Comment: Not addressed formally
Jurisdiction-level monitoring of climate change impacts Low
Comment: Individual residents are available to provide input
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment: City is small, primarily residential and relies on estimates from County and State
Capital planning and land use decisions informed by potential climate impacts Low
Comment: Has not come up
Participation in regional groups addressing climate risks Low
Comment: Individual residents and elected officials participate as individuals and periodically report to the City
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Unknown
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Unknown
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Medium
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Unknown
Comment:
Local residents support of adaptation efforts Unknown
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Unknown
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
25-8
25.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in Section 1.11 were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
25.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Participation in County and Precinct efforts
25.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Participation in County and Precinct efforts
25.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 25-11 lists past occurrences of natural hazards for which specific damage was recorded in Taylor Lake
Village. Other hazard events that broadly affected the entire planning area, including Taylor Lake Village, are
listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 25-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 $50,404.71
Severe Storms and Flooding 4269 DR 2016 $0.00
Severe Storms and Flooding 4272 DR 2016 $0.00
Severe Storms, Tornadoes, Straight Line Winds and Flooding 4245 DR 2015 $0.00
Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR 2015 $0.00
Hurricane Ike 1791 DR 2008 $750,254.91
Hurricane Ike 3294 EM 2008 $11,790.02
Hurricane Gustav 3290 EM 2008 $0.00
Hurricane Dean 3277 EM 2007 $0.00
Tropical Storm Erin 1730 DR 2007 $0.00
Hurricane Rita 1606 DR 2005 $66,348.69
Severe Storms, Tornadoes and Flooding 1439 DR 2002 $0.00
Tropical Storm Allison 1379 DR 2001 No data available
Flooding 1257 DR 1998 No data available
Hurricane Georges 1245 DR 1998 No data available
City of Taylor Lake Village
25-9
25.7 HAZARD RISK RANKING
Table 25-12 presents a local ranking for Taylor Lake Village of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Table 25-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Flooding 51 High
2 Severe Weather 48 High
2 Hurricane 48 High
3 Wildfire 16 Medium
4 Earthquake 14 Low
5 Drought 6 Low
5 Mas Movement 6 Low
6 Dam Failure 0 (No Exposure) None
6 Tsunami 0 (No exposure) None
6 Coastal Erosion 0 (No Exposure None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
25.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
25.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 55
• Number of FEMA-identified Severe-Repetitive-Loss Properties: None
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 26
25.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issue has been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• The city is vulnerable on almost all sides as barges that carry chemicals traverse the bay, and countless
numbers of tankers travers the local roads transporting all kinds of materials. We are an almost all
volunteer city with limited resources and limited capability for receiving and passing timely information.
The volume of traffic the transports chemicals around our immediate area makes us very vulnerable.
Mitigation actions addressing this issue were prioritized for consideration in the action plan in this annex.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
25-10
25.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 25-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 25-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item Completed No longer Feasible Check if Yes Action # in Update
Developed emergency action education program and plan x
Comment: Plan requires updating. Need to continue public information program
Joined Community Rating System x
Comment: City continues to have building requirements to be +3 feet above base flood elevation
Continue flood and storm hazard mitigation program Ongoing x TLV6
Comment:
Develop awareness and communication with industry for emergency prep Ongoing x TLV7
Comment: Participate in community advisory panels and report to residents
Establish city warning signage program to notify community residents of Clear Lake Water Authority drought water restrictions – warnings to be posted on primary city egress routes.
Yes
Comment: City continues to be able to accomplish this action item with relative ease.
Install generators with fuel capacity at city hall Yes
Comment:
Expand siren warning system to increase coverage within the community’s population where the siren(s) are currently difficult to hear. Yes
Comment: System was upgraded and is maintained to be able to meet peek performance if/when need be.
Install lightening and surge protective measures on City Hall. Yes
Comment:
Harden and retrofit City Hall facilities to withstand high winds, thunderstorms, tornadoes, hurricanes and hail. No x
Comment:
25.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 25-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 25-15
identifies the priority for each action. Table 25-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
City of Taylor Lake Village
25-11
Table 25-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing
Assets Objectives Met
Lead
Agency Support Agency
Estimated
Cost Sources of Funding Timelinea
Action TLV1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Flooding, hurricane, severe weather
Existing 3, 4, 10 City of TLV Harris County, Available Resources High HMGP, PDM, FMA Short-term
Action TLV2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including any opportunity to include in city ordinances as authorize/applicable.
Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire
New and
Existing
1, 3, 4, 5, 7, 8,
10
City of TLV Harris County, Available Resources Low Staff Time, General Funds Ongoing
Action TLV3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Flooding, Severe Weather, Hurricane, Wildfire, Earthquake, Drought, Mas Movement
New and
Existing
1, 5, 8 City of TLV Harris County, Available Resources Low Staff Time, General Funds Short-term
Action TLV4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Flooding, severe weather, hurricane, sea level rise
New and
Existing
1, 3, 5, 7, 8, 10 City of TLV Harris County, Available Resources Low Staff Time, General Funds Ongoing
Action TLV5 — Continue to advocate and coordinate for local outreach programs to include town hall meetings and other social
gatherings with the city and local and surrounding city’s residents. The objective of this outreach program will be to:
• Bring together subject matter experts in weather, law enforcement, emergency management, and city leadership to speak on their
respective subjects to local residents
• Provide an interactive environment where local residents can initiate dialogue and ask questions to the subject matter experts
• Ensure these events address concerns whether on a seasonal basis (i.e. hurricane season), or based on a need that is understood by
the city
• Posting visual aids and sending mass notifications for information on events, resources, and immediate inputs
Hazards Mitigated: Flooding, severe weather, hurricane, sea level rise
New and
Existing
3, 4, 10 City of TLV Harris County, Available Resources Low Staff Time, General Funds Ongoing
Action TLV6 — Flood and storm hazard mitigation program
Hazards Mitigated: Flood. Severe weather
Existing 3,7,8,9,15 City of TLV Harris County, Available Resources Low Staff Time, General Funds Ongoing
Action TLV7 — Develop awareness and communication with industry for emergency preparation. Participate in community advisory
panels and report to residents
Hazards Mitigated: Flooding, Severe Weather, Hurricane, Wildfire, Earthquake, Drought, Mas Movement
New and
Existing
3,10,15 City of TLV Harris County, Available Resources Low Staff Time, General Funds Ongoing
Action TLV8— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Earthquake, Drought, Wildfire, Flooding
New and
Existing
1, 3, 4, 5, 9, 10,
11, 15
City of TLV HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
25-12
Table 25-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
TLV1 3 High High Yes Yes No Medium High
TLV2 7 Medium Low Yes No Yes High Low
TLV3 3 Low Low Yes No Yes High Low
TLV4 6 Medium Low Yes No Yes High Low
TLV5 3 High Low Yes No No High Low
TLV6 5 Medium Low Yes No Yes High Low
TLV7 3 Medium Low Yes No Yes High Low
TLV8 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 25-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather TLV5, TLV6,
TLV8
TLV2, TLV6 TLV5, TLLV6,
TLV7, TLV8
TLV2 TLV5, TLV6,
TLV8
TLV1, TLV6 TLV1, TLV6,
TLV8
Hurricane TLV5, TLV8 TLV2 TLV5,
TLV7,TLV8
TLV2 TLV5, TLV8 TLV1 TLV1, TLV8
Flooding TLV5, TLV6,
TLV8
TLV2, TLV6 TLV5, TLV6,
TLV7, TLV8
TLV2 TLV5, TLV,
TLV86
TLV1, TLV6 TLV1, TLV6,
TLV8
Medium-Risk Hazards
Wildfire TLV8 TLV5, TLV7,
TLV8
TLV8 TLV8
Low-Risk Hazards
Earthquake TLV8 TLV7, TLV8 TLV8 TLV8
Drought TLV8 TLV5, TLV7,
TLV8
TLV8 TLV8
a. See the introduction to this volume for explanation of mitigation types.
25.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• City of Taylor Lake Village Municipal Code — The municipal code is undergoing review for the full
capability assessment and for identifying opportunities for action plan integration.
City of Taylor Lake Village
25-13
• City of Taylor Lake Village Flood Damage Prevention Ordinance — The flood damage prevention
ordinance is undergoing review for compliance with changes to the National Flood Insurance Program
implemented since the ordinance was adopted.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit is being used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
updates to a mitigation action plan.
!(!(!(!(PasadenaPasadenaSeabrookSeabrookEl LagoCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.150.30.075Miles±Taylor Lake Village
Pasadena
Pasadena
Seabrook
Seabrook
El Lago
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Taylor Lake Village
Pasadena
Pasadena
Seabrook
Seabrook
El Lago
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Taylor Lake Village
Pasadena
Pasadena
Seabrook
Seabrook
El Lago
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Taylor Lake Village
Pasadena
Pasadena
Seabrook
Seabrook
El Lago
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Taylor Lake Village
Pasadena
Pasadena
Seabrook
Seabrook
El Lago
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Taylor Lake Village
Pasadena
Pasadena
Seabrook
Seabrook
El Lago
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
Taylor Lake Village
26-1
26. CITY OF TOMBALL
26.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
David Esquivel, PE
Assistant City Manager
City of Tomball
501 James St.
Tomball, Texas 77375
Telephone: 281-290-1415
e-mail Address: desquivel@tomballtx.gov
Joe Sykora, FSCEO FEMT
Fire Marshal / Deputy EMC
City of Tomball
1200 Rudel Rd
Tomball, Texas 77375
Telephone: 281-290-1440
e-mail Address: jsykora@tomballtx.gov
26.2 JURISDICTION PROFILE
26.2.1 Location and Description
The City of Tomball is located in northwest Harris County, Texas, approximately 28 miles from downtown
Houston. The city is approximately 12 square miles with an additional 5 square miles of extraterritorial
jurisdiction. Tomball is one of 24 municipalities within Harris County and the only municipality located in
northwestern Harris County. Located just south of the Montgomery County Line, the City has a dynamic and
expanding economy and functions as a commercial center for the area. Tomball boasts a wide variety commercial
developments including, Baker Hughes, Wal-Mart, Packers Plus, Suez and more. The City has seen a number of
new residential subdivisions developed since 2014 with a wide-range of prices. With a population of over 11,500
residents, & daily visitor traffic of 30,000, Tomball does not consider itself “merely a suburb”, rather a
destination.
26.2.2 Brief History
Tomball is a historic city that honors the past & embraces its future. First known as Peck, an agricultural
community, the city was renamed after Thomas Henry Ball, a member of the U.S. House of Representatives.
Ball’s leadership in 1907 established Tomball as a major railroad center for the transport of agricultural products.
The City of Tomball assumed its name on December 2, 1907, however it was not until 1933 that the city was
officially incorporated. In the 1930s, the City became known as “Oil Town USA” as Humble Oil discovered a
major oil and gas field beneath the city.
26.2.3 Climate
The City of Tomball is located 92.7 miles inland from the Gulf Coast in Southeastern Texas. The principal
characteristics of the local climate are hot and humid summers with cool and relatively rainy winters. The average
annual temperature is 78.6ºF and the annual average rainfall is 48 inches.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
26-2
26.2.4 Governing Body Format
The City of Tomball is a “Home Rule” municipality, as established by the City of Tomball’s Charter and operates
a “Council-Manager” form of government. All powers of the City and the determination of all matters of policy
are vested in the Council, subject to the provisions of the Charter and Constitution of the State of Texas. As
regards to the Tomball Annex to the Harris County Local Hazard Mitigation Plan dated 2018, City Council
assumes responsibility for adoption of the Plan, and the City Manager will oversee its implementation.
The members of the local mitigation planning team, whose members are listed in Table 26-1, developed this
annex.
Table 26-1. Local Mitigation Planning Team Members
Name Title
David Esquivel Assistant City Manager
Beth Jones Director of Public Works
Randall Parr Fire Chief/EMC
Joe Sykora Fire Marshal/Deputy EMC
Craig Meyers Director of Community Development
26.3 CURRENT TRENDS
26.3.1 Population
As of the 2010, United States Census Tomball’s population was 10,753. The overall population has increased 8.8
percent between January 1, 2010 (10,753) and January 1, 2017 (11,707).
26.3.2 Development
Development in Tomball has steadily increased in the 2000’s. Between October 2008 and September 2017,
Tomball issued building permits for construction of 356 new housing units and 163 new commercial buildings.
The Tomball Comprehensive Plan, Vision 2030, (the “Plan”) estimates that City of Tomball’s population will
grow to nearly 20,000 by the year 2030. The Plan also outlines 13 land use and development goals, including the
need to preserve the Downtown area as a “sense of place” and promote high quality, safe, cohesive and attractive
developments that meet the needs of present and future residents of Tomball.
Table 26-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
City of Tomball
26-3
Table 26-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the development of the previous hazard
mitigation plan? If yes, give the estimated area annexed and
estimated number of parcels or structures.
Yes
Approximately 70 acres, including right-of-way
Retail development tract at SH 249/SH 99
Caterpillar facility on Holderrieth Road and a multiple building complex on Brown Road
Is your jurisdiction expected to annex any areas during the performance period of this plan?
• If yes, please describe land areas
and dominant uses.
• If yes, who currently has permitting authority over these areas?
Yes
The City of Tomball will consider annexation of properties in the unincorporated areas
adjacent to the City. The City of Tomball does not annex properties without the request
of the property owner. This will limit the number of properties and land area annexed
over the timeframe of the hazard mitigation plan.
Harris County
Are any areas targeted for development or major redevelopment in the next five years?
• If yes, please briefly describe, including whether any of the areas are in known hazard risk areas
Yes
Development and redevelopment projects could be located in areas prone to
flooding. However, all City Codes will need to be met in regards to elevating new and
substantially improved structures above determined flood inundation elevations.
How many building permits were issued in
your jurisdiction since the development of the
previous hazard mitigation plan?
2013 2014 2015 2016 2017
Single Family 73 99 59 25 45
Commercial (other) 19 11 36 14 10
Please provide the number of permits for each
hazard area or provide a qualitative description of where development has occurred.
Permits for construction in flood hazard areas are required to be elevated above
determined flood inundation elevations.
Please describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory
exists, provide a qualitative description.
A buildable lands inventory does not exist, however much of the City remains
undeveloped.
26.4 CAPABILITY ASSESSMENT
The City of Tomball performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 26-3.
• Development and permitting capabilities are presented in Table 26-4.
• An assessment of fiscal capabilities is presented in Table 26-5.
• An assessment of administrative and technical capabilities is presented in Table 26-6.
• An assessment of education and outreach capabilities is presented in Table 26-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 26-8.
• Classifications under various community mitigation programs are presented in Table 26-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 26-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table
included in the action plan for this annex identifies these as community capacity building mitigation actions.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
26-4
Table 26-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes No
Comment: 2012 International Residential Code, 2012 International Building Code, 2012 International Mechanical Code, 2012
International Plumbing Code, 2011 National Electrical Code, 2015 International Energy Conservation Code, 2012
International Fire Code
Zoning Code Yes No No No
Comment: Municipal Code, Chapter 50
Subdivisions Yes No No No
Comment: Municipal Code, Chapter 40
Storm water Management Yes No Yes Yes
Comment: Municipal Code, Chapter 18
Post-Disaster Recovery No No No Yes
Comment:
Real Estate Disclosure No No No No
Comment:
Growth Management No No No No
Comment:
Site Plan Review Yes No No No
Comment: Municipal Code, Chapter 10, 18, 40 and 50
Environmental Protection Yes No Yes No
Comment: Municipal Code, Chapter 18
Flood Damage Prevention Yes Yes No No
Comment: Municipal Code, Chapter 10
Emergency Management Yes No No Yes
Comment: Municipal Code, Chapter 14
Climate Change No No No No
Comment:
Planning Documents
General Plan Yes No No No
Comment: Comprehensive Plan, Vision 2030, Strategic Plan
Capital Improvement Plan Yes No No Yes
How often is the plan updated? Annually
Comment:
Disaster Debris Management Plan Yes No No Yes
Comment:
Floodplain or Watershed Plan Yes No No Yes
Comment:
Storm water Plan Yes No No Yes
Comment: Master Drainage Plan 2012-2020
Water Master Plan Yes No No Yes
Comment: Tomball Water Master Plan – 2018
Habitat Conservation Plan Yes No No No
Comment:
Economic Development Plan No No No Yes
Comment: Tomball Economic Development Corporation Strategic Plan
City of Tomball
26-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Shoreline Management Plan No No No No
Comment:
Community Wildfire Protection Plan Yes No No Yes
Comment: In process
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No Yes
Comment:
Comprehensive Emergency Management Plan Yes Yes No Yes
Comment: Tomball is a signatory to the Harris County Plan
Threat & Hazard Identification & Risk
Assessment (THIRA)
No No No Yes
Comment: None located
Post-Disaster Recovery Plan No No No Yes
Comment: None located
Continuity of Operations Plan Yes No No No
Comment: In process
Public Health Plan No Yes No Yes
Comment: The City utilizes the services of Harris County PHES
Table 26-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Community Development Department
Does your jurisdiction have the ability to track permits by hazard area? Yes
Does your jurisdiction have a buildable lands inventory? No
Table 26-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes (water and sanitary sewer)
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds Yes
Withhold Public Expenditures in Hazard-Prone Areas Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Other Yes
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
26-6
Table 26-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Community Development Department
Engineers or professionals trained in building or infrastructure construction practices Yes Community Development Department
Planners or engineers with an understanding of natural hazards Yes Community Development Department
Staff with training in benefit/cost analysis Yes Multiple City departments
Surveyors Yes Available through on-call
Personnel skilled or trained in GIS applications Yes Community Development Department,
IT Department, Public Works Department,
Fire Department
Scientist familiar with natural hazards in local area Yes Multiple City departments
Emergency manager Yes The Mayor is the Director of Emergency
Management but appoints the Emergency
Management Coordinator
Grant writers Yes Multiple City departments
Table 26-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? No
• If yes, briefly describe.
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, briefly describe. The City uses its “Constant Contact” program to provide relevant information to the community.
Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes
• If yes, briefly describe. Tomball Area Local Emergency Planning Committee
Do you have any other programs already in place that could be used to
communicate hazard-related information?
Yes
• If yes, briefly describe. Tomball Fire Department operates a low power FM
radio station that has been used to broadcast local
conditions related to wide-spread. Additionally
information is provided via CivicReady (Text/Email)
and Social Media
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. KTTF-FM (low power FM radio) and Civic Ready
community contact system
City of Tomball
26-7
Table 26-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Community Development
Who is your floodplain administrator? (department/position) Craig T. Meyers, PE, CFM, Community
Development Director
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? 11/19/2007
Does your floodplain management program meet or exceed minimum requirements? Exceeds NFIP minimum standards
• If exceeds, in what ways?
When was the most recent Community Assistance Visit or Community Assistance Contact? Post Hurricane Harvey
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction?
• If so, state what they are. No
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why.
Does your floodplain management staff need any assistance or training to support its floodplain management program? No
• If so, what type of assistance/training is needed?
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification?
• If no, is your jurisdiction interested in joining the CRS program? No
How many flood insurance policies are in force in your jurisdiction?a Unknown
• What is the insurance in force?
• What is the premium in force?
How many total loss claims have been filed in your jurisdiction?a Unknown
• How many claims are still open or were closed without payment?
• What were the total payments for losses?
Table 26-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No
Building Code Effectiveness Grading Schedule Yes 4 5/29/2014
Public Protection Yes 1 7/1/2003
Storm Ready No
Fire Wise No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
26-8
Table 26-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Medium
Comment:
Jurisdiction-level monitoring of climate change impacts Medium
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Medium
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Medium
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Medium
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Tomball
26-9
26.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
26.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Tomball Comprehensive Plan – Vision 2030 – Land use and development goals
• Major Thoroughfare Plan – Mobility Planning
• Municipal Code – includes flood damage prevention requirements
• Tomball Economic Development Corporation Strategic Plan – Job creating economic development
guidelines for new business development
• City of Tomball Building and Fire Codes
• City Facilities Needs Assessment – current and future facilities recommendations
• City of Tomball Infrastructure, Water, Wastewater and Drainage Master Plans – citywide infrastructure
development plans
• City of Tomball Strategic Plan – goals and objectives related to growth and providing services to meet the
growth of the city
26.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Community Rating System
• Storm Ready
• Fire Wise
26.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 26-11 lists past occurrences of natural hazards for which specific damage was recorded in The City of
Tomball. Other hazard events that broadly affected the entire planning area, including The City of Tomball, are
listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
26-10
Table 26-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332DR 2017 N/A
Severe storms and flooding (tax day) 4269 DR 2016 N/A
Severe storms and flooding (Memorial Day) 4272 DR 2016 N/A
Wildfire (Riley Road) FMAG 2964-FM 2011 N/A
Hurricane Ike 1791 DR 2008 N/A
Hurricane Rita 1606 DR 2005 N/A
Hurricane Katrina Evacuation 3216 EM 2005 N/A
Wildfire (Local impacts) N/A 2011 N/A
26.7 HAZARD RISK RANKING
Table 26-12 presents a local ranking for The City of Tomball of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Table 26-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Flooding 18 Medium
3 Wildfire 17 Medium
4 Earthquake 14 Low
5 Drought 6 Low
6 Dam Failure 0 (No Exposure) None
6 Mass Movement 0 (No exposure) None
6 Tsunami 0 (No exposure) None
6 Coastal Erosion 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
26.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
26.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 14
• Number of FEMA-identified Severe-Repetitive-Loss Properties: None
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 2
City of Tomball
26-11
26.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Several areas of the city suffer from an urban drainage issue that results in localized flooding from
minimal rain incidents.
• The City Hall and Police Station share a generator that is not properly sized to support all operations of
both facilities.
• Several Neighborhoods may potentially experience little to no ingress/egress as a result of severe weather
accompanied by a significant rain incident
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex:
• Continue to seek grant opportunities to design, acquire right-of-way and construct expanded drainage
facilities
• Develop specifications and seek funding for a replacement generator
• Continue to seek grant opportunities to design, acquire right-of-way and construct expanded drainage
facilities. Continue to partner with Harris County on flood control projects
26.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 26-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
26.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 26-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 26-15
identifies the priority for each action. Table 26-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
26-12
Table 26-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update
Implement a Community Fire Wise Program to educate people about the
threat of wildfire; develop defensible space/buffer zones; remove fuel sources.
X TOM1
Comment:
Expand City Warning System, (Civic Ready Emergency Notification System), to include Alerts for the community’s population located within Flood Risk
Areas; citizens will be able to sign into the system and include cell phone numbers and other methods of contact
X
Comment:
Install flood-proofing to mitigate flood risk to critical infrastructure and public facilities. X
Comment:
Establish a site to be utilized as a Cooling Zone (Center). X
Comment: City of Tomball Community Center
Retrofit/Improve critical infrastructure facilities with positive ventilation systems X
Comment:
Protection of City Facilities windows and doors X
Comment: Pre-cut plywood
Expand early warning system, (Civic Plus Emergency Notification System), to increase alert capabilities and coverage for the public; the residents may
enter their alternate contact information into the system to be alerted when
away from home/businesses.
X
Comment:
Develop/implement tree management program to minimize damages from potential debris X TOM5
Comment:
Establish/Expand GIS Mapping/Identification of Pipeline Risk Areas in flood area. X TOM6
Comment:
City of Tomball
26-13
Table 26-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action TOM1 — Implement a Community Fire Wise Program to educate people about the threat of wildfire in the Tomball area, develop
defensible space/buffer zones; remove fuel sources.
Hazards Mitigated: Wildfire
Existing 9 Fire Department Public Works Low Staff Time, General Funds Short-term
Action TOM2 — Complete the City’s Storm Water Drainage Plan to minimize the impact of future events by identifying efficient pathways
to transport storm water away from the areas prone to flooding.
Hazards Mitigated: Severe weather, Hurricane, Flood, Dam failure
New and Existing 1, 4, 6, 7 Community
Development
Public Works High HMGP, CDBG, Staff Time,
General Funds
Ongoing
Action TOM3 — Acquire rights-of-way necessary to construct the drainage channels identified in Action TOM2.
Hazards Mitigated: Severe weather, Hurricane, Flood, Dam failure
New and Existing 1, 4, 6, 7 Public Works Community
Development
High HMGP, CDBG, Staff Time,
General Funds
Ongoing
Action TOM4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Severe weather, Hurricane, Flood, Dam failure
New and Existing 1, 4, 6, 7 Community
Development
Public Works Low Staff Time, General Funds,
HMGP
Ongoing
Action TOM5 — Develop/implement tree management program to minimize damages from potential debris. Tree trimming in public right-
of-way to keep streets clear; coordinate with utility companies to remove tree limbs/trees from potential contact with power lines.
Hazards Mitigated: Severe weather, Hurricane, Wildfire
New and existing 6, 7, 9 Public Works Community
Development
Moderate Staff time, General Funds,
HMGP
Ongoing
Action TOM6 — Expand the city’s GIS capabilities and mapping capacity to provide information from which to make better, more
informed decisions. This would apply to flood hazard mapping and wildland urban interface projects.
Hazards Mitigated: Severe weather, wildfire, hurricane, flooding
New and Existing 4, 6, 7, 9 IT Public Works Low Staff time, general funds,
HMGP
Ongoing
Action TOM7— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wildfire, Earthquake, Drought
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
City of Tomball HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
26-14
Table 26-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
TOM1 1 High Low Yes Yes Yes Low Medium
TOM2 4 Medium High Yes Yes No Medium High
TOM3 4 Medium High Yes Yes No High High
TOM4 4 High Low Yes Yes Yes High Low
TOM5 3 High Medium Yes Yes No Medium Medium
TOM6 4 High Medium Yes Yes Yes High High
TOM7 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 26-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather TOM1, 2, 3,
4, 5, 6, 7
TOM1, TOM1, 2, 3, 4,
5, 6, 7
TOM1, 2, 3,
4, 5, 6
TOM1, 2, 3,
4, 5, 6, 7
TOM1, 2, 3,
4
TOM1, 2, 3,
4, 5, 6, 7
Hurricane TOM1, 2, 3,
4, 5, 6, 7
TOM1, TOM1, 2, 3, 4,
5, 6, 7
TOM1, 2, 3,
4, 5, 6
TOM1, 2, 3,
4, 5, 6, 7
TOM1, 2, 3,
4
TOM1, 2, 3,
4, 5, 6, 7
Medium-Risk Hazards
Flooding TOM1, 2, 3,
4, 5, 6, 7
TOM1, TOM1, 2, 3, 4,
5, 6, 7
TOM1, 2, 3,
4, 5, 6
TOM1, 2, 3,
4, 5, 6, 7
TOM1, 2, 3,
4
TOM1, 2, 3,
4, 5, 6, 7
Wildfire TOM1, 6, 7 TOM1 TOM1, 6, 7 TOM1, 6 TOM1, 6, 7 TOM1, 6, 7
Low-Risk Hazards
Drought TOM7 TOM1 TOM1, 7 TOM1 TOM1, 7 TOM1, 7
Earthquake TOM7 TOM1, 7 TOM1, 7 TOM1, 7
a. See the introduction to this volume for explanation of mitigation types.
26.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for
inclusion into the 2017 Multi-Jurisdiction Hazard Mitigation Plan. All of the below items were additionally
reviewed as part of the full capability assessment for the City of Tomball.
• Comprehensive Plan, Vision 2030
• Major Thoroughfare Plan
• Municipal Code-includes flood damage prevention requirements
• Capital Improvements Plan
• Infrastructure Master Plan 2012-2022
• Water Master Plan
City of Tomball
26-15
• Wastewater Master Plan
• Master Drainage Plan 2012-2030
• FEMA FIRM
• City of Tomball Strategic Plan
26.12 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY
An active fault line crosses through the city on an east/west pathway north of Main Street (FM 2920). This
geological anomaly has previously resulted in roadway and building damage. While not a priority, the potential of
this phenomenon should be further explored to better understand the City and its resident’s exposure.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«249¬«249HoustonCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.450.90.225Miles±Tomball
¬«249
¬«249
Houston
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.45 0.90.225 Miles
±
Tomball
¬«249
¬«249
Houston
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.45 0.90.225 Miles
±
Tomball
¬«249
¬«249
Houston
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.45 0.90.225 Miles
±
Tomball
¬«249
¬«249
Houston
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.45 0.90.225 Miles
±
Tomball
¬«249
¬«249
Houston
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.45 0.90.225 Miles
±
Tomball
¬«249
¬«249
Houston
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.45 0.90.225 Miles
±
Tomball
27-1
27. CITY OF WEBSTER
27.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Dean Spencer, Acting Fire Chief/EMC
18300 Highway 3
Webster, Texas 77598
Telephone: 281-316-3744
E-mail Address: dspencer@websterfd.com
Jason Myers, Shift Commander/ Deputy EMC
18300 Highway 3
Webster, Texas 77598
Telephone: 281-316-3751
e-mail Address: jmyers@websterfd.com
27.2 JURISDICTION PROFILE
27.2.1 Location
Webster, a small city in terms of its square miles – just 6.7, but mighty in terms of commercial vibrancy – home
to more than 2,200 businesses. Webster is positioned midway between downtown Houston and Galveston, and the
last city in Harris County on the south end.
27.2.2 History
In the early 1900s, a small farming community comprised of Japanese immigrants established rice farming as a
key crop for the region. In addition to rice and fruit, dairies and livestock ranches abounded. In the 1930s,
petroleum was discovered at the Webster-Friendswood Oilfield. Webster was incorporated in 1958, shortly before
NASA (National Aeronautics and Space Administration) announced that it would build the Johnson Space Center
(formerly called the Manned Space Center) in 1961. Naturally, NASA served as a catalyst to grow the City of
Webster and the region. Webster has been home to many aerospace companies, including Ad Astra Rocket
Company and Lockheed Martin’s Exploration Development Laboratory. Two of Webster’s growth industries
have always been aerospace and medical. Webster became the “medical center of the south” with Houston as the
“medical center of the north” beginning in 1972 with Clear Lake Regional Medical Center. Webster’s medical
center accommodates a service area population exceeding more than 1,800,000 patients annually. With the
opening of Bay Area Regional Medical Center in 2014, that number is anticipated to continually escalate.
27.2.3 Climate
The climate of The City of Webster is classified as humid subtropical. Prevailing winds from the south and
southeast bring heat from the deserts of Mexico and moisture from the Gulf of Mexico.
Summer temperatures typically have highs near 90 °F (32 °C) though higher temperatures are not uncommon. The
city’s proximity to the bay and the winds that it generates moderate the area’s temperatures and ease the effects of
the humidity, creating a more pleasant climate than inland communities like Houston.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
27-2
Winters in the area are temperate with typical January high of 61 °F (16 °C) and lows near 42 °F (6 °C). Snowfall
is rare. Annual rainfall averages exceed 49 inches (124 cm), with an annual average of 82 precipitation days.
27.2.4 Governing Body Format
The City of Webster is governed by a seven-member city council. The City consists of 4 departments:
Administration, Public Safety, Public Works, and Community Development.
The City Council assumes responsibility for the adoption of this plan; the City Manager will oversee its
implementation. Development of this annex was carried out by the members of the local mitigation planning
team, whose members are listed in Table 27-1.
Table 27-1. Local Mitigation Planning Team Members
Name Title
Dean Spencer Acting Fire Chief – EMC
Jason Myers Shift Commander – Deputy EMC
Donna Rogers Mayor
Danny Presley City Manager
Shannon Hicks Public Works Director
Derhyl Hebert Community Development Director
27.3 CURRENT TRENDS
27.3.1 Population
According to the U.S. Census, the population of Webster as of 2017 was 11,123. Since 2010, the population has
grown at an average annual rate of 1.2 percent, though that rate is declining, with an annual average of only
0.8 percent since 2015.
27.3.2 Development
Significant new development within Webster’s 6.7 square miles is transpiring within Project Genesis, the City’s
northwest quadrant (Costco, Odyssey Park, Baybrook Commons), Project Destination Development, the City’s
southeast quadrant (Academy, Top Golf, American Furniture Warehouse), and Edgewater (new commercial
development that will begin in late 2019 amid 30 acres).
Significant road projects include new arteries in Destination Development, along with Myrtle, Old Galveston
Road, and the NASA One Bypass Extension.
Webster features over 150 restaurants and entertainment venues — new entertainment and recreation venues that
will open shortly include Urban Air Adventure Park, D-Bat, The Game Preserve — and underway in late 2019,
AVA and Point Blank.
Webster’s medical center and aerospace sectors are flourishing, as is the hospitality sector with the City’s 20th
hotel poised to open in late 2109.
Table 27-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
City of Webster
27-3
Table 27-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
Is your jurisdiction expected to annex any areas during the performance period of this plan?
No
• If yes, describe land areas and dominant uses.
• If yes, who currently has permitting
authority over these areas?
Are any areas targeted for development or major redevelopment in the next five years? Yes
• If yes, briefly describe, including whether any of the areas are in known hazard risk
areas
Destination development
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 21 19 38 53 70
Multi-Family 0 1 0 1 1
Other (commercial, mixed use, etc.) 22 30 39 36 49
Total 43 50 77 90 120
Provide the number of new-construction
permits for each hazard area or provide a qualitative description of where development
has occurred.
• Special Flood Hazard Areas: # 0
• Landslide: # 0
• High Liquefaction Areas: # 0
• Tsunami Inundation Area: # 0
• Wildfire Risk Areas: # 0
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory
exists, provide a qualitative description.
Commercial
27.4 CAPABILITY ASSESSMENT
The City of Webster performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 27-3.
• Development and permitting capabilities are presented in Table 27-4.
• An assessment of fiscal capabilities is presented in Table 27-5.
• An assessment of administrative and technical capabilities is presented in Table 27-6.
• An assessment of education and outreach capabilities is presented in Table 27-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 27-8.
• Classifications under various community mitigation programs are presented in Table 27-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 27-10.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
27-4
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in
Section 27.10 identifies these as community capacity building mitigation actions.
Table 27-3. Legal and Regulatory Capability
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes Yes
Comment: Code of Ordinances, Ch. 18 Buildings and Building regulations.
Zoning Code Yes No No Yes
Comment: Code of Ordinances, Ch. 98 Zoning
Subdivisions Yes No No Yes
Comment: Code of Ordinances, Ch. 78 Subdivisions
Stormwater Management Yes Yes Yes Yes
Comment: Code of Ordinances, Ch. 18 Div. 4 Storm water
Post-Disaster Recovery Yes Yes No Yes
Comment: Annex J – Recovery and post disaster permitting and code enforcement regulations.
Real Estate Disclosure No No No No
Comment:
Growth Management Yes No Yes Yes
Comment:
Site Plan Review Yes No No Yes
Comment: Code of Ordinances, Ch. Sec. 98-123. – Site plans requirements
Environmental Protection Yes Yes No Yes
Comment: Code of Ordinances, Ch.34 Environment
Flood Damage Prevention Yes No Yes Yes
Comment: Code of Ordinances, Ch. 42 – Floods article II
Emergency Management Yes No Yes Yes
Comment: Code of Ordinances, Ch. 2 Div. 10 – Civil Emergencies, Texas Government Code 418
Climate Change No Yes No Yes
Comment:
Planning Documents
General Plan Yes No Yes Yes
Comment: Comprehensive Plan 2015
Capital Improvement Plan Yes No No Yes
How often is the plan updated? Comment: Annual
Disaster Debris Management Plan Yes Yes No Yes
Comment: Contract are review on an annual basis and the plan is reviewed every 5 years.
Floodplain or Watershed Plan Yes Yes No Yes
Comment: Code of Ordinances, Ch. 42 Div. 2
Stormwater Plan Yes Yes Yes Yes
Comment:
Habitat Conservation Plan No Yes No Yes
Comment:
Economic Development Plan Yes No No No
Comment: Webster Economic Development Committee
City of Webster
27-5
Local Authority Other Jurisdiction Authority State Mandated Integration Opportunity?
Shoreline Management Plan No Yes No No
Comment:
Community Wildfire Protection Plan No Yes No No
Comment:
Forest Management Plan No Yes No Yes
Comment:
Climate Action Plan No No Yes No
Comment:
Comprehensive Emergency Management Plan Yes Yes No Yes
Comment:
Threat & Hazard Identification & Risk
Assessment (THIRA)
Yes Yes Yes Yes
Comment: Annex P
Post-Disaster Recovery Plan No Yes Yes Yes
Comment:
Continuity of Operations Plan No No Yes Yes
Comment:
Public Health Plan Yes No No Yes
Comment:
Table 27-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Building Department
Does your jurisdiction have the ability to track permits by hazard area? Yes
Does your jurisdiction have a buildable lands inventory? No
Table 27-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants No
Capital Improvements Project Funding No
Authority to Levy Taxes for Specific Purposes No
User Fees for Water, Sewer, Gas or Electric Service Yes
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs No
Development Impact Fees for Homebuyers or Developers Yes
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
27-6
Table 27-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Community Development/City Planner
Engineers or professionals trained in building or infrastructure construction practices Yes Public Works
Planners or engineers with an understanding of natural hazards Yes Public Works
Staff with training in benefit/cost analysis Yes Finance Department
Surveyors No City contracts this out
Personnel skilled or trained in GIS applications Yes Community Development/GIS
Scientist familiar with natural hazards in local area No
Emergency manager Yes Fire Dept./ OEM
Grant writers No
Table 27-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Not at this time
• If yes, briefly describe.
Do you use social media for hazard mitigation education and outreach? Yes,
• If yes, briefly describe. We have an active Social media account managed
by the PIO
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to
communicate hazard-related information?
Yes
• If yes, briefly describe. Social media, Swift 911
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Swift 911
City of Webster
27-7
Table 27-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Building Department
Who is your floodplain administrator? (department/position) Erich Penn/Building Official
Are any certified floodplain managers on staff in your jurisdiction? Yes 2
What is the date that your flood damage prevention ordinance was last amended? 2007
Does your floodplain management program meet or exceed minimum requirements? Exceeds
• If exceeds, in what ways? 1’ Freeboard Residential & Commercial 1’
above BFE
When was the most recent Community Assistance Visit or Community Assistance
Contact?
2017
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? No
• If no, state why.
Does your floodplain management staff need any assistance or training to support its
floodplain management program?
Yes/No
• If so, what type of assistance/training is needed? Insert appropriate information
Does your jurisdiction participate in the Community Rating System (CRS)? No
• If yes, is your jurisdiction interested in improving its CRS Classification? No
• If no, is your jurisdiction interested in joining the CRS program? Yes
How many flood insurance policies are in force in your jurisdiction?a 1227
• What is the insurance in force? $605,836
• What is the premium in force? $494 (average)
How many total loss claims have been filed in your jurisdiction?a
• How many claims are still open or were closed without payment?
• What were the total payments for losses? $0
a. According to FEMA statistics as of September 25, 2018
Table 27-9. Community Classifications
Participating? Classification Date Classified
Community Rating System No
Building Code Effectiveness Grading Schedule Yes 4 1/19
Public Protection Yes ISO1 2017
Storm Ready Yes 2017
Firewise No
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
27-8
Table 27-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
City of Webster
27-9
27.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
27.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Basic Plan – The Basic Plan provides a summary on the hazards and threats in the community.
• Annex P – Hazard Mitigation is assigned to the Community Development Department and addresses
the hazards and threats in the community. The Annex also identifies the various hazard mitigation related
programs implemented in the City of Webster and which agencies are responsible for administration.
27.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Capital Improvement Plan – The City of Webster updates the CIP on an annual basis and can integrate
the goals, objectives, and projects identified in the Hazard Mitigation Action Plan into the CIP process.
• Comprehensive Plan — The Planning and Development Department will develop a new overall plan to
document existing conditions and establish goals to replace the existing plan.
• Downtown Revitalization Plan – The NASA Parkway Revitalization Plan provides a vision and a series
of recommendations that are consistent with the principles of the updated Comprehensive Plan. The
recommendations focus on amendments to the City’s development ordinances, but also include potential
incentives that can be built into a revised code, and a list of City-initiated action items. Together, these
tools provide a well-rounded approach to facilitate continued economic growth, aesthetic enhancement,
and civic pride in the NASA Parkway corridor.
27.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 27-11 lists past occurrences of natural hazards for which specific damage was recorded in The City of
Webster. Other hazard events that broadly affected the entire planning area, including The City of Webster, are
listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 27-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 $2,326,000.00
Hurricane Ike 1791 DR 2008 $12,000,000.00
27.7 HAZARD RISK RANKING
Table 27-12 presents a local ranking for The City of Webster of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
27-10
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Table 27-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Flooding 36 High
3 Wildfire 14 Low
3 Earthquake 14 Low
4 Drought 6 Low
4 Mass Movement 6 Low
5 Dam Failure 0 (No exposure) None
5 Tsunami 0 (No exposure) None
5 Coastal Erosion 0 (No exposurte) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
27.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
27.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 25
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 1
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated:1
27.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 27-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
27.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 27-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 27-15
identifies the priority for each action. Table 27-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
City of Webster
27-11
Table 27-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update
2010WEBSTR001. Adoption of higher standards/latest edition of building
codes, zoning/city/storm water ordinances to limit development in flood area for mitigation of flood hazards.
X WB005
Comment: In Process
2010WEBSTR002. Expand current flood warning system(s), Blackboard Connect CTY Mass Notification, to provide coverage to the community’s
population located in flood areas.
X WB06
Comment: Phase I Complete Phase II in progress
2010WEBSTR004. Adoption of higher standards/latest edition of building codes, zoning/city/storm water ordinances for mitigation of Coastal flood hazards.
X
Comment: Complete
2010WEBSTR005. Harden critical infrastructure facilities to withstand high wind and hail damage. X WB07
Comment: Phase I complete, moved EOC to new fire station, Phase II in progress
2010WEBSTR006. Implement tree management program to limit debris
damage to critical infrastructure, public facilities from falling tree canopy.
X
Comment: Complete
2010WEBSTR007. Installation of generators / power back-up systems at critical facilities. X
Comment: Complete
2010WEBSTR008. Adoption of higher standard/latest edition building codes
to require tie-downs for manufactured homes to reduce damages to mobile
homes
X
Comment:
2010WEBSTR009. Expand early warning system alert capabilities, Blackboard Connect CTY Mass Notification System, to include IPAWS and expand coverage to public/private schools and colleges.
X
Comment: Adopted new mass communication system, Swift911. No longer use Blackboard Connect CTY. IPAWS is included in
Swift911.
2010WEBSTR010. Expand community early warning system, Connect CTY Mass Notification System, to integrate IPAWS and increase coverage to the general public.
X
Comment: Adopted new mass communication system, Swift911. No longer use Blackboard Connect CTY. Swift911 includes IPAWS.
2010WEBSTR011. Install lightning and surge protection systems for critical infrastructure. X
Comment: Complete
2010WEBSTR012 X
Comment: In Process
2010WEBSTR013 X
Comment: Complete – The city civic center will serve as cooling center with backup power
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
27-12
Table 27-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action WB01 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: flooding, severe weather, hurricane
Existing 3, 4, 10 EM Planning High HMGP, PDM, FMA Short-term
Action WB02 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including the surrounding areas
Hazards Mitigated: flooding, hurricane, severe weather
New and Existing 1, 3, 4, 5, 7, 8, 10 Planning EM Low Staff Time, General Funds Ongoing
Action WB03 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wildfire, Earthquake, Drought, Mass Movement
New and Existing 1, 5, 8 EM Head of Departments Low Staff Time, General Funds Short-term
Action WB04 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: flooding, severe weather, hurricane
New and Existing 1, 3, 5, 7, 8, 10 EM Planning Low Staff Time, General Funds Ongoing
Action WB05 — Adoption of higher standards/latest edition of building codes, zoning/city/storm water ordinances to limit development in
flood area for mitigation of flood hazards.
Hazards Mitigated: Flooding
Existing 12,14 Planning EM Low Staff Time, General Funds Short term
Action WB06 — Expand current flood warning system(s), Blackboard Connect CTY Mass Notification, to provide coverage to the
community’s population located in flood areas.
Hazards Mitigated: Flooding, Hurricane, Severe weather
Existing 1 EM TBD Low Staff Time, General Funds Short term
Action WB07 — Harden critical infrastructure facilities to withstand high wind and hail damage.
Hazards Mitigated: Severe weather, hurricane
Existing 6, 11, 13 PW EM High General and Grant Funds Long term
Action WB08— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Wildfire, Earthquake, Drought, Mass Movement
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
City of Tomball HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
City of Webster
27-13
Table 27-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
WB01 3 High High Yes Yes No Medium High
WB02 7 Medium Low Yes No Yes High Low
WB03 3 Low Low Yes No Yes High Low
WB04 6 Medium Low Yes No Yes High Low
WB05 2 Medium Low Yes No Yes Medium Low
WB06 1 High Low Yes No Yes High Low
WB07 3 High High Yes Yes No High High
WB08 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 27-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public Education &
Awareness
Natural Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilient
Community Capacity
Building
High-Risk Hazards
Severe weather WB1, 8 WB1 WB4, 6, 8 WB08 WB1,7 WB2, 3, 4, 8
Hurricane WB1, 8 WB1 WB4, 6, 8 WB08 WB1,7 WB2, 3, 4, 8
Flooding WB1,5, 8 WB1,5 WB4, 6, 8 WB08 WB1,5 WB2, 3, 4, 5, 8
Low-Risk Hazards
Wildfire WB08 WB08 WB08 WB 3, 8
Earthquake WB08 WB08 WB08 WB 3, 8
Drought WB08 WB08 WB08 WB 3, 8
Mass Movement WB08 WB08 WB08 WB 3, 8
a. See the introduction to this volume for explanation of mitigation types.
27.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
27.11.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• The City of Webster Municipal Code — The municipal code was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
• The City of Webster Flood Damage Prevention Ordinance — The flood damage prevention ordinance
was reviewed for compliance with the National Flood Insurance Program.
• City of Webster Code of Ordinances Chapter 42
The following outside resources and references were reviewed:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
27-14
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
27.11.2 Staff and Local Stakeholder Involvement in Annex Development
This annex was developed over the course of several months with input from many city departments
including Public Works, Community Development, Emergency Management, Fire, and Finance. All
departments were asked to contribute to the annex development through reviewing and contributing to the
capability assessment, reporting on the status of previously identified actions, and participating in action
identification and prioritization. Additional Comments
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(¬«3¬«3¬«3§¨¦45§¨¦45HoustonHoustonFriendswoodFriendswoodLeague CityNassau BayCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.30.60.15Miles±Webster
¬«3
¬«3
¬«3
§¨¦45
§¨¦45
Houston
Houston
Friendswood
Friendswood
League City
Nassau Bay
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.3 0.60.15 Miles
±
Webster
¬«3
¬«3
¬«3
§¨¦45
§¨¦45
Houston
Houston
Friendswood
Friendswood
League City
Nassau Bay
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.3 0.60.15 Miles
±
Webster
¬«3
¬«3
¬«3
§¨¦45
§¨¦45
Houston
Houston
Friendswood
Friendswood
League City
Nassau Bay
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.3 0.60.15 Miles
±
Webster
¬«3
¬«3
¬«3
§¨¦45
§¨¦45
Houston
Houston
Friendswood
Friendswood
League City
Nassau Bay
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.3 0.60.15 Miles
±
Webster
¬«3
¬«3
¬«3
§¨¦45
§¨¦45
Houston
Houston
Friendswood
Friendswood
League City
Nassau Bay
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.3 0.60.15 Miles
±
Webster
¬«3
¬«3
¬«3
§¨¦45
§¨¦45
Houston
Houston
Friendswood
Friendswood
League City
Nassau Bay
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.3 0.60.15 Miles
±
Webster
28-1
28. CITY OF WEST UNIVERSITY PLACE
28.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Aaron Taylor, Fire Chief/ EMC
3800 University Blvd.
West University Pl., TX 77005
Telephone: 713-662-5836
e-mail Address: ataylor@westutx.gov
James Novak, Fire Marshal
3800 University Blvd.
West University Pl., TX 77005
Telephone: 713-662-5837
e-mail Address: jnovak@westutx.gov
28.2 JURISDICTION PROFILE
28.2.1 Location
West University Place is located in Harris County, Texas within the Houston metropolitan area. The City of West
University Borders the City of Houston, The City of Bellaire and The City of Southside Place. The City
boundaries generally extend from Bellaire Blvd./ W. Holcombe north to Bissonnet and from Kirby Drive west to
Community Dr. encompassing an area of 2.2 Sq. Miles.
28.2.2 History
City of West University Place was incorporated in 1924.
Origins
The idea for a community of country homes in the area that is now West University Place was conceived in 1910
by Ben W. Hooper, then Governor of Tennessee. That year, Governor Hooper bought a tract of land southwest of
Houston out of an old Spanish land grant, which had been surveyed by A.C. Reynolds.
Lots for Sale
The Houston West End Realty Company, A.D. Foreman, President, developed today’s West University Place 1st
addition and put the 1st lots up for sale on April 1, 1917.
Naming the Area
The area’s proximity to Rice University led to the name West University Place.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
28-2
Early Problems
Utilities
When the City of Houston decided not to invest in utility lines to service the tiny community with an uncertain
future, Foreman spent $100,000 of his own earnings to bring electrical, water and telephone service to West
University Place. Still, in 1923 there were only 40 families living in the muddy, poorly drained swamp.
Housing Costs
In those early days, a 100 foot by 200 foot lot cost $1,000 and houses were required to cost a minimum of $2,500.
Homes facing Buffalo Speedway and Bellaire Boulevard were required to cost $4,000 and $5,000 respectively.
Infrastructure Improvements
Residents dissatisfied with muddy streets, poor drainage, and the absence of schools and fire protection joined in a
series of town meetings, resulting in the incorporation of the City in 1924. For 6 years, city fathers put the
creation of an infrastructure above all other conveniences by building streets and providing various services such
as:
• Garbage collection
• Natural gas supply
• Police and fire protection
• Postal delivery
• Sewage disposal
• Water supply
Wier Park
The pragmatism of the city’s early residents resulted in the development of our 1st park, Wier Park, at Belmont
and Sunset, in 1930. With most of our park land donated to the city by early residents and developers, West U
continues to take pride in the greenery and open recreational space offered at 6 developed parks in existence
today. Expansion of our largest park, Colonial Park, continues with the acquisition of surrounding lots.
City Charter
In 1939, the City exhibited confidence in its own political maturity and the character of its citizens by refusing to
consolidate with its larger, powerful neighbor, the City of Houston. The confidence was solidified in adoption of
the 1st City Charter in 1940.
Progress
Over the years, the City has progressed steadily toward its present position as one of the area’s most desirable
neighborhoods. Civic-minded citizens and small-town government, combined with a proximity to major business,
educational, cultural, and scientific centers, have contributed to a steady increase in property values.
28.2.3 Climate
West University Place, Texas gets 52 inches of rain, on average, per year. The US average is 39 inches of rain per
year. West University Place averages 0 inches of snow per year. The US average is 26 inches of snow per year.
On average, there are 205 sunny days per year in West University Place. The US average is 205 sunny days.
• Summer High: the July high is around 92 degrees
• Winter Low: the January low is 45
City of West University Place
28-3
Sperling’s Comfort Index for West University Place is a 76 out of 100. A higher score indicates a more
comfortable year-round climate. The US average for the comfort index is 54. Our index is based on the total
number of days annually within the comfort range of 70-80 degrees, and we also applied a penalty for days of
excessive humidity.
West University Place gets some kind of precipitation, on average, 66 days per year.
28.2.4 Governing Body Format
The City of West University Place is a home rule City with a Council-Manager form of government. The City
Council consist of a Mayor and four council members. The City Council appoints a City Manager to oversee the
daily operations of the City. The City consist of 6 departments: Administration, Finance, Fire, Police, Public
Works, Parks and Recreation. The City Council assumes responsibility for the adoption of this plan; the City
Manager will oversee its implementation. Development of this annex was carried out by the members of the local
mitigation planning team, whose members are listed in Table 28-1. Appropriate staff members were instructed to
fill out the sections that applied to them.
Table 28-1. Local Mitigation Planning Team Members
Name Title
Aaron Taylor Fire Chief/ EMC
James Novak Fire Marshal/ Asst. Chief
Dave Beach Public Works Director/ ACM
Clay Chew Chief Building Official
28.3 CURRENT TRENDS
28.3.1 Population
According to The U.S. Census Bureau, the population of West University Place, Texas as of July 1, 2017 was
15,608. Since 2010, the population has grown at an average annual rate of 7.2% percent.
28.3.2 Development
Anticipated development levels for West University Place are low to moderate, consisting of primarily residential
development. The vast majority of recent development has been infill. Residentially, there has been a focus on
upscale housing units with large increases in square footage. The number of residential new construction permits
are:
• November 2018 YTD: 59
• 2017 Totals: 47
• 2016 Totals: 38
• 2015 Totals: 58
• 2014 Totals: 67
• 2013 Totals: 63
Table 28-2 summarizes development trends in the performance period since the preparation of the previous
hazard mitigation plan, as well as expected future development trends.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
28-4
Table 28-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since the preparation of the previous hazard mitigation plan?
No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
Is your jurisdiction expected to annex any areas during the performance period of this plan?
No
• If yes, describe land areas and dominant uses.
• If yes, who currently has permitting
authority over these areas?
Are any areas targeted for development or
major redevelopment in the next five years?
No
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
How many permits for new construction were
issued in your jurisdiction since the preparation of the previous hazard mitigation plan?
2014 2015 2016 2017 2018
Single Family 67 58 38 47 59
Multi-Family 0 0 0 0 0
Other (commercial, mixed use, etc.) 1 1 0 0 0
Total 68 59 38 47 59
Provide the number of new-construction
permits for each hazard area or provide a
qualitative description of where development
has occurred.
• Special Flood Hazard Areas: 33
• Landslide: 0
• High Liquefaction Areas: 0
• Tsunami Inundation Area: 0
• Wildfire Risk Areas: 0
Describe the level of buildout in the jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory
exists, provide a qualitative description.
West University Place is fully developed
28.4 CAPABILITY ASSESSMENT
The City of West University Place performed an assessment of its existing capabilities for implementing hazard
mitigation strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 28-3.
• Development and permitting capabilities are presented in Table 28-4.
• An assessment of fiscal capabilities is presented in Table 28-5.
• An assessment of administrative and technical capabilities is presented in Table 28-6.
• An assessment of education and outreach capabilities is presented in Table 28-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 28-8.
• Classifications under various community mitigation programs are presented in Table 28-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 28-10.
City of West University Place
28-5
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in
Section 28.10 identifies these as community capacity building mitigation actions.
Table 28-3. Legal and Regulatory Capability
Local Authority
Other Jurisdiction
Authority State Mandated
Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes No Yes Yes
Comment: Appendix C of the Code of Ordinances
Zoning Code Yes No No Yes
Comment: Appendix A of the Code of Ordinances
Subdivisions Yes No No Yes
Comment: Chapter 74 of the Code of Ordinances
Stormwater Management Yes Yes Yes Yes
Comment: Stormwater Management Plan is completed every 5 year and submitted to the TCEQ.
Post-Disaster Recovery Yes No Yes No
Comment: Debris Hauling and Debris Monitoring contracts are in place.
Real Estate Disclosure No No Yes No
Comment: Don’t have a local requirement for it but the state does and that affects the realtors here.
Growth Management No No No No
Comment: No Growth in West U
Site Plan Review Yes No No No
Comment: Chapter 18 of the Code of Ordinances
Environmental Protection No Yes Yes No
Comment: Harris County Public Health
Flood Damage Prevention Yes Yes Yes Yes
Comment: Integration opportunity with HCFCD
Emergency Management Yes No Yes Yes
Comment: (Ord. No. 1850, § 6, 8-13-07) Signatory city under the Harris County EM Plan
Climate Change No No No No
Comment:
Planning Documents
General Plan No No No No
Comment:
Capital Improvement Plan Yes No No Yes
How often is the plan updated?
Comment: Annually
Disaster Debris Management Plan Yes No No No
Comment: Contract is in place to handle debris
Floodplain or Watershed Plan No Yes Yes Yes
Comment: Braes Bayou Watershed managed by HCFCD
Stormwater Plan Yes Yes Yes Yes
Comment: Stormwater Management Plan and SWPPP
Urban Water Management Plan No No Yes No
Comment:
Habitat Conservation Plan No No No No
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
28-6
Local Authority
Other Jurisdiction
Authority State Mandated
Integration
Opportunity?
Economic Development Plan No No No No
Comment: City is built out
Shoreline Management Plan No No No No
Comment: No shoreline here
Community Wildfire Protection Plan No No No No
Comment: No forests
Forest Management Plan No No No No
Comment:
Climate Action Plan No No No No
Comment:
Comprehensive Emergency Management Plan Yes Yes Yes Yes
Comment: (Ord. No. 1850, § 6, 8-13-07) Signatory city under the Harris County EM Plan
Threat & Hazard Identification & Risk
Assessment (THIRA)
No No No No
Comment:
Post-Disaster Recovery Plan Yes No Yes Yes
Comment: Contracts in place for debris hauling and debris monitoring. Plan reviewed annually
Continuity of Operations Plan Yes No No No
Comment: Updated March 2019
Public Health Plan No No No No
Comment:
Table 28-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes
• If no, who does? If yes, which department? Public Works – Development Services Division
Does your jurisdiction have the ability to track permits by hazard area? No
Does your jurisdiction have a buildable lands inventory? No
Table 28-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service Yes (Water, Sewer, Solid Waste Collection, Permits)
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds No
Withhold Public Expenditures in Hazard-Prone Areas No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
City of West University Place
28-7
Table 28-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes City Planner/Building Official
Engineers or professionals trained in building or infrastructure construction practices Yes PW Director, Asst. PW Director,
Operations Superintendent, Chief
Building Official, Planner
Planners or engineers with an understanding of natural hazards Yes (outsourced)
Staff with training in benefit/cost analysis Yes Assistant Public Works Director
Surveyors Yes (outsourced)
Personnel skilled or trained in GIS applications Yes City Information Technology Department
Scientist familiar with natural hazards in local area No
Emergency manager Yes Fire Chief
Grant writers Yes Contracted with DCMC Partners for
mitigation grant writing and management
Table 28-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? No
• If yes, briefly describe.
Do you use social media for hazard mitigation education and outreach? Yes – Issue dependent
• If yes, briefly describe.
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, briefly describe.
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, briefly describe. Swift911 Mass Notification System
Do you have any established warning systems for hazard events? Yes
• If yes, briefly describe. Swift911 Mass Notification System
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
28-8
Table 28-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Public Works – Development Services
Who is your floodplain administrator? (department/position) Clay Chew – Chief Building Official
Are any certified floodplain managers on staff in your jurisdiction? Yes
What is the date that your flood damage prevention ordinance was last amended? 2018
Does your floodplain management program meet or exceed minimum requirements? Exceeds
• If exceeds, in what ways? 24 inch Freeboard Requirement
Article IX Flood Damage Prevention
When was the most recent Community Assistance Visit or Community Assistance Contact? CAV November 13, 2018
Does your jurisdiction have any outstanding NFIP compliance violations that need to
be addressed?
No
• If so, state what they are.
Are any RiskMAP projects currently underway in your jurisdiction? No
• If so, state what they are.
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes
• If no, state why.
Does your floodplain management staff need any assistance or training to support its floodplain management program? No
• If so, what type of assistance/training is needed?
Does your jurisdiction participate in the Community Rating System (CRS)? Yes
• If yes, is your jurisdiction interested in improving its CRS Classification? Yes
• If no, is your jurisdiction interested in joining the CRS program?
How many flood insurance policies are in force in your jurisdiction?a 3358
• What is the insurance in force? $1,644,530
• What is the premium in force? $490.00
How many total loss claims have been filed in your jurisdiction?a Zero
• How many claims are still open or were closed without payment? Zero
• What were the total payments for losses? $3,441,439
a. According to FEMA statistics as of June 30, 2018
Table 28-9. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes 7 2019
Building Code Effectiveness Grading Schedule Yes 4/4 2014
Public Protection Yes Class 1 02/01/2015
Storm Ready No
Firewise No
City of West University Place
28-9
Table 28-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Medium
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
28-10
28.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. This section identifies where such integration is already in place, and
where there are opportunities for further integration in the future. Resources listed in this annex were used to
provide information on integration. The progress reporting process described in Volume 1 will document the
progress of hazard mitigation actions related to integration and identify new opportunities for integration.
28.5.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Harris County Flood Control District — Floodplain/Watershed Management
• Harris County Office of Emergency Management and Homeland Security – Emergency Management
Program
• City of West University – Community Improvement Plan(Capital Improvement Plan)
28.5.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Zoning Code – To integrate mitigation measures identified in the plan into future zoning considerations.
28.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 28-11 lists past occurrences of natural hazards for which specific damage was recorded in The City of West
University Place. Other hazard events that broadly affected the entire planning area, including West University
Place, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.
28.7 HAZARD RISK RANKING
Table 28-12 presents a local ranking for The City of West University Place of all hazards of concern for which
this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for
this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood
of occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
28.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
City of West University Place
28-11
Table 28-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Severe Storms N/A April 7 2019 Severe Storms and high winds damaged several residential properties
and required activation of debris hauler to clear vegetation from public
right of way. Damage estimated at $100,000
Hurricane Harvey DR 4332 2017 Estimated $500,000 in Public Assistance, Damage assessment cost to
private property unknown.
Severe Storms/Flooding DR 4269 2016 N/A
Severe Storms/Flooding DR 4223 2015 N/A
Hurricane Ike EM 3294 2008 N/A
Hurricane Gustav EM 3290 2008 N/A
Tropical Storm Erin DR 1730 2007 N/A
Hurricane Dean EM 3277 2007 N/A
Hurricane Rita EM 3261 2005 N/A
Hurricane Katrina EM 3216 2005 N/A
Tropical Storm Allison DR 1379 2001 N/A
Severe Storms/Flooding SBA 3259 2000 N/A
Severe Storms/ Flooding DR 1257 1998 N/A
Tropical Storm Frances DR 1245 1998 N/A
Severe Storms/Flooding DR 1041 1994 N/A
Severe Storms/Tornado SBA 8253 1994 N/A
Severe Storms/Tornado DR 970 1992 N/A
Table 28-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
2 Hurricane 32 High
3 Flooding 22 Medium
4 Earthquake 14 Low
5 Drought 6 Low
5 Mass Movement 6 Low
6 Dam Failure 0 (No Exposure) None
6 Wildfire 0 (No Exposure None
6 Tsunami 0 (No Exposure) None
6 Coastal Erosion 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
28.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: 35
• Number of FEMA-identified Severe-Repetitive-Loss Properties: 3
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: 1
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
28-12
28.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 28-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 28-13. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item Completed No longer Feasible Check if Yes Action # in Update
Improvements to storm water drainage system in the 3800 block from University
Blvd. south to Bellaire Blvd. The Auden Street Drainage Improvements limits are on Auden Street from University Blvd. to Bellaire Blvd. The improvements consist of
storm sewer improvements ranging from 42” RCP to 72” RCP and the replacement of 1/2 curb and gutter concrete street.
No X WUP-11
Comment:
Raising concrete walls around head works at the wastewater treatment plant to
mitigate future flood water inundation. Currently the headworks is below base flood elevation allowing flood water to overtop the walls and inundate the headworks, raising the walls would reduce the likelihood of shut down due to flood waters.
No X
Comment: This action item has been revised to allow additional mitigation options for the facility. The new action item is WUP-6.
Ruffino Hills Flood Detention – The City owns approximately 75 acres of land near
the I-69 South/BW 8 interchange (adjacent to approximately another 75 acre tract owned by the City of Bellaire) that could be used for flood control detention space. The site operated as a landfill from 1959 to Jan 1992. This site is adjacent to Keegans Bayou which is one of the largest contributors of water to the Brays Bayou. Both cities are proposing to use their 75 acres toward flood mitigation for a total of
150 acres. The proposed regional detention facility will provide up to 1,770 acre-feet of storage, allowing storm water to be diverted out of Keegans Bayou and reducing
storm flow rates in the lower reaches of that stream and along Brays Bayou downstream of the Keegans Bayou confluence. Preliminary modeling results indicate that 100-year (1% chance) flow rates along Keegans may be reduced by as
much as 1,800 cubic feet per second, while Brays Bayou flow rates may be reduced by as much as 1,500 cubic feet per second. This project represents a regional drainage solution that will benefit the City of West University Place, the City of Bellaire, the City of Houston, and unincorporated areas within Harris County. Potential stakeholders and project participants include those entities as well as the
Harris County Flood Control District.
No X
Comment: This action item is being removed and replaced with a broader action item to allow pursuit of detention space in more than
one location. The new related action item is WUP-7.
Reduce the potential for wildfires along the Union Pacific rail line through improved control of vegetation adjacent to the railroad tracks. No X
Comment: Existing action item removed due to a change in community priorities.
Expand mass notification warning systems to notify residents of impending dangers and increase coverage of the community’s population. Yes X
Comment: Completed in 2015
Installation of emergency generator at the West University/Harris County Public
Library to ensure continuity of operation for warming/cooling center.
No X
Comment: Existing action item removed due to a change in community priorities.
City of West University Place
28-13
Removed; Carried Over to Plan Update
Action Item Completed
No longer
Feasible
Check
if Yes
Action #
in Update
Home Elevations – 10 homes or less; raise elevation of repetitive loss structures above base flood elevation. The City is interested in assisting interested residents in mitigating flood risk of existing structures by raising the foundation above base flood elevation. Specific mitigation sites have not yet been identified.
No X
Comment: Existing action item removed due to Action Item WUP-1 addressing retrofitting to include home elevations.
Improvements to storm water drainage along the Buffalo Speedway Corridor from Bellefontaine Street in Houston north through West University Place and continuing up to the south ROW for the Interstate 69 corridor at Buffalo Speedway and
including areas east and west of this described corridor to extend the drainage area by adding a 2nd 66 inch monolithic concrete pipe in addition to replacing the
existing 66 in monolithic concrete pipe.
No X WUP-10
Comment: Carried over to plan update. The City has applied for HMGP and CDBG-DR grant funding for the project. Engineering
contract has been awarded.
Improve Ruskin Street storm water drainage infrastructure by installing new roadway with improved curb and gutters. Install underground piping to increase
underground detention capacity. Will include installation of additional inlets and
catch basins.
Yes X
Comment: Completed in 2015
Adopt latest edition and higher standard Building Codes, Zoning / City / Storm Water Ordinances for Mitigation of Riverine Flood Hazards. Yes X
Comment: Completed in 2018. Ongoing. This action item has been modified and titled WUP-9 in the plan update.
Develop/implement and harden an alternative ground-water source to limit the damages of water shortages caused by drought Yes X
Comment: Completed in 2016;
Develop/implement tree management program to reduce potential debris damages from high-wind and canopy crown-fires. Yes X
Comment: Completed in 2018. Tree Management and Debris reduction are also addressed in WUP-2 in the plan update.
Develop/implement hail public education program to educate the public on hail hazards and appropriate actions to take to reduce hail damages to property. No X
Comment: Not currently a priority for the City.
Establish / Expand GIS Mapping / Identification of Pipeline Risk Areas. No X
Comment: Existing action item removed due to a change in community priorities.
Conduct Pipeline Awareness Training & Pre-Planning for Local Responders. Yes X
Comment: Completed
28.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 28-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 28-15
identifies the priority for each action. Table 28-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
28-14
Table 28-14. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action WUP1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Severe Weather, Hurricane, Flooding
Existing 3, 4, 10, 11,
12
West University
Place – EMC
West University Place – Public
Works
High HMGP, PDM, FMA Short-
term
Action WUP2 — Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including Zoning Ordinances.
Hazards Mitigated: Severe Weather, Hurricane, Flooding
New and Existing 1, 3, 4, 5, 7, 8,
9, 10
West University
Place – Public Works
West University Place – EMC Low Staff Time, General
Funds
Ongoing
Action WUP3 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Mass Movement
New and Existing 1, 5, 8 West University
Place – EMC
West University
Place – Hazard Mitigation
Planning Team
Low Staff Time, General
Funds
Short-
term
Action WUP4 — Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Severe Weather, Hurricane, Flooding
New and Existing 1, 3, 5, 7, 10,
15
West University
Place – Public Works
Chief Building Official
Low Staff Time, General
Funds
Ongoing
Action WUP5 — Improvements to storm water drainage system in planning areas 1-12 as outlined in the 2019 Citywide Drainage Study
to increase capacity and reduce flood hazard.
Hazards Mitigated: Severe Weather, Hurricane, Flooding
New and Existing 3, 4, 7, 11, 12 West University
Place – Public Works
High HMGP, PDM, FMA Long
Term
Action WUP6 — Enhance flood water protection for the City’s Wastewater Treatment Plant to reduce the likelihood of shut down due to
flood waters.
Hazards Mitigated: Severe Weather, Hurricane, Flooding
New and Existing 3, 4, 7, 9, 10,
11, 13, 15
West University
Place – Public Works
Medium HMGP, PDM, FMA Short
Term
Action WUP7 — Coordinate with Harris Flood Control District to obtain flood water detention space within the Brays Watershed to reduce
the likelihood of flooding.
Hazards Mitigated: Severe Weather, Hurricane, Flooding
New 3, 4, 11, 12,
14, 15
West University
Place – Public Works
High HMGP, PDM, FMA Short
Term
Action WUP8 — Seek opportunities to relocate above ground utilities to harden infrastructure and reduce impacts of severe weather
events and/or disruption of City services.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake
New and Existing 4, 11, 13 West University
Place – Public Works
High HMGP, PDM, FMA Long
Term
City of West University Place
28-15
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action WUP9 — Adopt latest edition and higher standard Building Codes, Zoning / City / Storm Water Ordinances for Mitigation of Flood
Hazards.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake
New and Existing 3, 4, 7, 9, 10,
11, 12, 14, 15
West University Place-
Public Works
Low Staff Time, General
Funds
Ongoing
Action WUP10 — Improvements to storm water drainage along the Buffalo Speedway Corridor from Bellefontaine Street in Houston
north through West University Place and continuing up to the south ROW for the Interstate 69 corridor at Buffalo Speedway and including
areas east and west of this described corridor to extend the drainage area by adding a 2nd 66 inch monolithic concrete pipe in addition to
replacing the existing 66 in monolithic concrete pipe
Hazards Mitigated: Severe Weather, Hurricane, Flooding
New and Existing 3, 4, 9, 10, 11,
13
West University
Place – Public Works
High HMGP, PDM, FMA,
CDBG-DR,
Municipal Bonds
Short
Term
Action WUP11 — Improvements to storm water drainage system in the 3800 block from University Blvd. south to Bellaire Blvd. The
Auden Street Drainage Improvements limits are on Auden Street from University Blvd. to Bellaire Blvd. The improvements consist of
storm sewer improvements ranging from 42” RCP to 72” RCP and the replacement of 1/2 curb and gutter concrete street.
Hazards Mitigated: Severe Weather, Hurricane, Flooding
New and Existing 3, 4, 9, 10, 11,
13
West University
Place – Public Works
High HMGP, PDM, FMA,
CDBG-DR,
Municipal Bonds
Short
Term
Action WUP12 — Academy Street Drainage – Improvements to storm water drainage system in the 4100 block from Bissonnet St. south
to the discharge for Academy trunk line to reduce the likelihood of flooding.
Hazards Mitigated: Severe Weather, Hurricane, Flooding
New and Existing 3, 4, 9, 10, 11,
13
West University
Place – Public Works
High HMGP, PDM, FMA,
CDBG-DR,
Municipal Bonds
Long
Term
Action WUP13 – Coordinate with Harris County Flood Control District and the City of Southside Place to improve storm water drainage
and increase capacity along the drainage easement containing Poor Farm Ditch to reduce the likelihood of flooding.
Hazards Mitigated: Severe Weather, Hurricane, Flooding
New and Existing 3, 4, 7, 10, 11,
15
Harris County Flood
Control District
West University Place,
Southside Place
High HMGP, PDM, FMA,
CDBG-DR,
Municipal Bonds
Short
Term
Action WUP14— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Mass Movement
New and Existing 1, 3, 4, 5, 9,
10, 11, 15
City Administration HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
28-16
Table 28-15. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
WUP1 5 High High Yes Yes No Medium High
WUP2 8 Medium Low Yes No Yes High Low
WUP3 3 Low Low Yes No Yes High Low
WUP4 6 Medium Low Yes No Yes High Low
WUP5 5 High High Yes Yes No Medium High
WUP6 8 High Medium Yes Yes No Medium High
WUP7 6 High High Yes Yes No Medium High
WUP8 3 High High Yes Yes No Low Medium
WUP9 9 Medium Low Yes No Yes High Low
WUP10 6 High High Yes Yes No Medium High
WUP11 6 High High Yes Yes No Medium High
WUP12 6 High High Yes Yes No Medium High
WUP13 6 High High Yes Yes No Medium High
WUP14 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 28-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public
Education
& Awareness
Natural
Resource Protection Emergency Services Structural Projects Climate Resilient
Community
Capacity Building
High-Risk Hazards
Severe Weather WUP-1, 3, 4,
9, 14
WUP-1, 5, 6,
7, 8, 10, 11,
12, 13
WUP-2, 3, 4,
5, 14
WUP-6 WUP-5, 6, 7,
8, 10, 11, 12,
13, 14
WUP-5, 6, 7,
10, 11, 12, 13
WUP-9 WUP-2, 3, 9,
14
Hurricane WUP-1, 3, 4,
9, 14
WUP-1, 5, 6,
7, 8, 10, 11,
12, 13
WUP-2, 3, 4,
5, 14
WUP-6 WUP-5, 6, 7,
8, 10, 11, 12,
13, 14
WUP-5, 6, 7,
10, 11, 12, 13
WUP-9 WUP-2, 3, 9,
14
Medium-Risk Hazards
Flood WUP-1, 3, 4,
9, 14
WUP-1, 5, 6,
7, 8, 10, 11,
12, 13
WUP-2, 3, 4,
5, 14
WUP-6 WUP-5, 6, 7,
8, 10, 11, 12,
13, 14
WUP-5, 6, 7,
10, 11, 12, 13
WUP-9 WUP-2, 3, 9,
14
Low-Risk Hazards
Mass Movement WUP-1, 3, 4,
9, 14
WUP-1, 5, 6,
7, 8, 10, 11,
12, 13
WUP-2, 3, 4,
5, 14
WUP-6 WUP-5, 6, 7,
8, 10, 11, 12,
13, 14
WUP-5, 6, 7,
10, 11, 12, 13
WUP-9 WUP-2, 3, 9,
14
Earthquake WUP14 WUP14 WUP14 WUP14
Drought WUP14 WUP14 WUP14 WUP14
a. See the introduction to this volume for explanation of mitigation types.
City of West University Place
28-17
28.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• City of West University Place Municipal Code — The municipal code was reviewed for the full
capability assessment and for identifying opportunities for action plan integration.
• City of West University Place Flood Damage Prevention Ordinance — The flood damage prevention
ordinance was reviewed for compliance with the National Flood Insurance Program.
• City of West University Place – Citywide Drainage Study
• City of West University Place – Community Improvement Plan
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• FEMA Disaster History Data, CRS & NFIP requirements.
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(§¨¦69§¨¦69HoustonBellaireSouthsidePlaceCritical Facilities!(Education Facilities!(Emergency Services!(Government Facilities!(Hazardous Material Sites!(Health and Medical Facilities!(Historical and Cultural Sites!(Transportation Systems!(Utility SystemsIncorporated CitiesHarris County00.150.30.075Miles±West University Place
§¨¦69
§¨¦69
Houston
Bellaire
Southside
Place
FEMA Flood Hazard
1% Annual Chance Flood (100-yr)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
West University Place
§¨¦69
§¨¦69
Houston
Bellaire
Southside
Place
Hurricane Alicia (1983)
Peak WInd Gust (mph)
87 - 94
95 - 98
99 - 101
102 - 104
105 - 110
Storm Track
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
West University Place
§¨¦69
§¨¦69
Houston
Bellaire
Southside
Place
20-year ProbabilisticHurricane
Peak Wind Gust (mph)
63 - 71
72 - 76
77 - 80
81 - 84
85 - 92
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
West University Place
§¨¦69
§¨¦69
Houston
Bellaire
Southside
Place
100-year ProbabilisticHurricane
Peak Wind Gust (mph)
89 - 101
102 - 106
107 - 111
112 - 117
118 - 128
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
West University Place
§¨¦69
§¨¦69
Houston
Bellaire
Southside
Place
Wildfire Ignition Density
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
West University Place
§¨¦69
§¨¦69
Houston
Bellaire
Southside
Place
Wildfire Threat
1 (Low)
2
3 (Moderate)
4
5 (High)
6
7 (Very High)
Incorporated Cities
Harris County
0 0.15 0.30.075 Miles
±
West University Place
29-1
29. HOUSTON INDEPENDENT SCHOOL DISTRICT
29.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Wm. Earl Finley
6351 Pinemont Street
Houston, Texas 77092
Telephone: 713-556-9225
email Address: wfinley@houstonisd.org or
email Address: RiskManagement@houstonisd.org
Robert Cage
6351 Pinemont Street
Houston, Texas 77092
Telephone: 713-556-9225
email Address: RCageJr@houstonisd.org or
email Address: RiskManagement@houstonisd.org
29.2 JURISDICTION PROFILE
29.2.1 Overview
The Houston Independent School District (HISD) is the largest school district in Texas and the seventh largest
school district in America. HISD was established in 1923 by the Texas Legislature. HISD encompasses 333 square
miles within greater Houston. Over 209,000 students attend HISD’s 280 schools, and over 27,000 employees work
for the district. HISD has the lowest property taxes of all the school districts in Harris County. The sources of district
funding are the state of Texas, local property taxes, bonds, and grants. The district has 53 dual-language schools
and 44 schools listed on U.S. News and World Reports Best High Schools in America; 92 percent of HISD’s schools
received a met standard rating on the state’s accountability system, and 90.7 percent of HISD’s highly effective
teachers have been retained. HISD has the highest credit rating — AAA — from Moody’s rating service, and is
rated AA+ by Standard and Poor’s.
The Houston Independent School District assumes responsibility for the adoption of this plan; the HISD Board or
its designee will oversee the plan’s implementation. Development of this annex was carried out by the members
of the local mitigation planning team, whose members are listed in Table 29-1.
Table 29-1. Local Mitigation Planning Team Members
Name Title
Wm Earl Finley HISD Senior Manager of Risk Management
Robert Cage HISD Field Safety Team Leader
1.2.2 Service Area and Trends
HISD’s service area covers 333 square miles within greater Houston, serving a population of 209,000 students with
over 27,000 employees. The districts customers are our students, our parents, and our community where all our
schools reside. After Hurricane Harvey the number of students attending HISD declined. The number of students
attending will likely remain level or the same due to there are many families that are still displaced from their homes
working with FEMA and other sources of funding to have their homes rebuilt.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
29-2
29.2.2 Assets
Table 29-2 summarizes the critical assets of the district and their value.
Table 29-2. Special Purpose District Assets
Asset Value
Property
All – School, Non-School Buildings, and Property $5,154,473,535
Equipment
1200 Buses $96,448,308
SUVS $2,135,291
Trucks, Various Types – Bobtail (Dry & Ref), Box, Flatbed, Stahl Body, Pick-up, Stake
Bed, Welding, Wrecker, etc.
$14,057,484
Vans – Various – Cargo, Crew, Cutaway, Passenger, Stahl Body $9,425,594
Other – 53 Generators (+3 very large mounted generators) $1,436,552*
Other – 25 Trailers, Flatbed and 44 Trailers, Enclosed $1,258,629*
Other – 8 Backhoes $358,912*
Other – 15 Tractors $544,830*
Other – 29 Forklifts $681,529*
Other – 2 Bulldozers —
Total: $5,263,899,258
Critical Facilities and Infrastructure for Response
Transportation Department Included Above
Nutrition Services Department Included Above
Facility Services Department Included Above
Hattie Mae White Administration Bldg. Included Above
Senior Staff Included Above
Communications Department Included Above
IT Department Included Above
Police Department Included Above
* Averaged Value for Total $ Entered
29.3 CAPABILITY ASSESSMENT
An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or
integrate capabilities in order to facilitate hazard mitigation goals and objectives. Where such opportunities were
identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions”
table in Section 29.9 identifies these as community capacity building mitigation actions.
29.3.1 Planning and Regulatory Capabilities
Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents. When
effectively prepared and administered, these plans, programs and regulations can support the implementation of
mitigation actions. Table 29-3 summarizes existing codes, ordinances, policies, programs or plans that are
applicable to this hazard mitigation plan.
Houston Independent School District
29-3
Table 29-3. Planning and Regulatory Capability
Plan, Study or Program Date of Most Recent Update Comment
Emergency Operations Plan (EOP) July 2018
Each School or Non-School location must also have
their own Emergency Operations Plan.
National Incident Management System (NIMS)
Hurricane Preparedness Guide Protocols and
Procedures – Districtwide May 2019 Pre-storm, During Storm, After Storm Recovery
National Incident Management System (NIMS)
District Design Standards Nov 2018
District Facility Assessment 2016
District Capital Improvement Plan 2012
Refuge of Last Resort 2019-2020
Agreement with City of Houston to Make Available
Seven Schools to use as a refuge of last resort in an
emergency.
NFIP Policies in Place for flood zone properties April 2019 Elevation Certificates on File for All Properties in the
Flood Zone Covered by NFIP
Applicable City/County/State/Federal Codes or Standards: Various Must include any and all Americans with Disabilities Act
(ADA) related codes and regulations.
>Detention Ponds As or When Applicable City/County Codes
>Elevating Property at Four Elementary Schools,
Located in the Flood Zone Substantially
Damaged as a Result of Hurricane Harvey.
In Progress
Braeburn Elem.., Kolter Elem., Mitchell, Elem., and
Scarborough Elem. are the four schools being rebuilt
and elevated per city code.
Addition of and/or Replacement of Generators at Key Support Facilities Within the District Requiring Emergency Power. 2016
Planned addition/replacement or when unforeseen
damage or breakdown occurs supporting replacement
rather than repair.
Applicable Houston ISD Board Policies Related to Safety, Health, and Environmental Various
29.3.2 Fiscal, Administrative and Technical Capabilities
Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard
mitigation projects. An assessment of fiscal capabilities is presented in Table 29-4. Administrative and technical
capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of
administrative and technical capabilities is presented in Table 29-5.
Table 29-4. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Capital Improvements Project Funding No
Authority to Levy Taxes for Specific Purposes No
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Federal Grant Programs Yes
Other – 1. Limited Tax Bonds; 2. Tax Anticipation Notes and Revenue
Anticipation Notes; 3. Delinquent Tax Notes; 4. Time Warrants; 5.
Maintenance Tax Notes and Contractual Obligations; 6. Lease Purchase
Agreements; and 7. Revenue Bonds
Yes
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
29-4
Table 29-5. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Bond/Construction Department
Engineers or professionals trained in building or infrastructure construction practices Yes Bond/Construction Department
Planners or engineers with an understanding of natural hazards Yes Bond/Construction Department
Staff with training in benefit/cost analysis Yes Finance & Budget Department
Surveyors Yes Under Contract
Personnel skilled or trained in GIS applications Yes Bond/Construction Department
Scientist familiar with natural hazards in local area Yes Not Under Contract
Safety and Emergency Manager Yes Risk Management Department
Grant Writers Yes Grant Development Department
29.3.3 Education and Outreach Capabilities
Outreach and education capability identifies the connection between government and community members, which
opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is
presented in Table 29-6.
Table 29-6. Education and Outreach
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, please briefly describe Facility Maintenance Department – Submitting a Repair Request
Risk Management Department – Submitting an Insurable Claim
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, please briefly describe Emergency Operation Procedure Phone App
What to Do in Bad Weather – Posted on Internet Main Page
Use of Robo Phone Call System; Twitter, HISD News Blog
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, please briefly specify
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, please briefly describe Use of Robo Phone Call System; Twitter, HISD News Blog, Post
Message on Internet Main Page; Local Media – Radio & TV
Do you have any established warning systems for hazard events? Yes
• If yes, please briefly describe Manager of Safety and Emergency Management receives and
monitors alerts communicates via chain of command of an
emergency, and provides information and recommendations to
be relayed up the chain of command to Senior Staff.
29.3.4 Adaptive Capacity for Climate Change
Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s ability
to track such changes and adapt as needed is an important component of the mitigation strategy. Table 29-7
summarizes the jurisdiction’s adaptive capacity for climate change.
Houston Independent School District
29-5
Table 29-7. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Medium
Comment:
Jurisdiction-level monitoring of climate change impacts Medium
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Medium
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Medium to High
Comment: Flood Zones are Changing Due to Harvey. Rebuilding may Require Elevation of Structure
Participation in regional groups addressing climate risks Medium
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Medium to High
Comment: New LEED Schools, Energy Efficient; Flood Mitigation Planning; Energy Management
Identified strategies for greenhouse gas mitigation efforts Medium to High
Comment: New LEED Schools – Bond Program; Energy Management
Identified strategies for adaptation to impacts Medium to High
Comment: New Construction – Bond Program
Champions for climate action in local government departments Unsure
Comment:
Political support for implementing climate change adaptation strategies High
Comment: New LEED Buildings; Flood Mitigation Planning; Energy Management
Financial resources devoted to climate change adaptation Medium – High
Comment: New Construction – Bond Program
Local authority over sectors likely to be negative impacted Unsure
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Unsure
Comment:
Local residents support of adaptation efforts Medium to High
Comment:
Local residents’ capacity to adapt to climate impacts Unsure
Comment:
Local economy current capacity to adapt to climate impacts Unsure
Comment:
Local ecosystems capacity to adapt to climate impacts Unsure
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
29-6
29.4 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used
in hazard mitigation. This section identifies where such integration is already in place, and where there are
opportunities for further integration in the future. Resources listed in this annex were used to provide information
on integration. The progress reporting process described in Volume 1 will document the progress of hazard
mitigation actions related to integration and identify new opportunities for integration.
29.4.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the following
other local plans and programs:
• Houston ISD Facilities Assessment
• Houston ISD has a Long Term Capital Improvement Plan
• Houston ISD Hurricane Preparedness Guide – Protocols and Procedures – Districtwide. The plan has
defined 1) pre-storm, 2) during Storm, and 3) after storm recovery – checklists that can and may mitigate
potential for damage.
• Houston ISD has a Refuge of Last Resort Agreement in place with the City of Houston for seven Houston
ISD schools to be used as places of refuge in an emergency.
• Obtained elevation certificates and purchased NFIP insurance for schools in the flood zone.
29.4.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not currently
integrate hazard mitigation information but provide opportunities to do so in the future:
• The New FEMA Flood Zone Map(s) for Houston Area are due out in 2023. This may require adjustments
to HISD’s long term capital improvement plan.
• Future Bond/Construction Programs
• Adopt or Develop a Climate Action Plan
29.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 29-8 lists past occurrences of natural hazards for which specific damage was recorded in the Houston
Independent School District. Other hazard events that broadly affected the entire planning area, including the
Houston Independent School District, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 29-8. Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey DR 4332 2017 Active, Ongoing Claim
Severe Storms & Flooding DR 4269 2016 $1,433,755.45
Severe Storms & Flooding DR 4223 2015 $1,045,522.42
Hurricane IKE DR 1791 2008 $21,023,715.29
Hurricane Rita DR 1606 2005 Minimal Damage
Houston Independent School District
29-7
29.6 HAZARD RISK RANKING
Table 29-9 presents a local ranking for the Houston Independent School District of all hazards of concern for which
this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation actions
target hazards with high and medium rankings.
Table 29-9. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Flooding 27 Medium
3 Earthquake 14 Low
3 Tsunamia 14 Low
4 Dam Failure 12 Low
5 Wildfire 9 Low
6 Drought 6 Low
6 Mass Movementb 6 Low
7 Coastal Erosion 0 (No exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
a. No Data Available – Utilized earthquake statistics, because earthquakes can cause tsunamis.
b. No Data Available – Utilized drought statistics, because drought leads to mass movement (subsidence, sinkholes, landslide)
29.7 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
The following jurisdiction-specific issues have been identified based on a review of the results from the
Houston/Harris County’s risk assessment (Loss/Matrix Report), public involvement strategy, and other available
resources:
• The natural hazards below historically for Houston ISD are the highest risk and occurred more frequently.
Severe Weather — Extreme Heat, Hail, Tornadoes, Severe Thunderstorms, Winter Storms and
Freezes
Hurricane — Coastal Storms/Tropical Systems, Named Storms, Named Hurricanes, and Tornadoes.
Flooding — Resulting from either Severe Weather or Hurricane above
• The next six natural hazards below are of lower risk for Houston ISD. Drought and Mass Movement have
historically caused damage to Houston ISD property.
Wildfire
Earthquake
Tsunami
Dam Failure
Drought (Damage to sewer and water lines, gas lines, foundations, walls, sidewalks, parking lots,
driveways, etc.)
Mass Movement – (subsidence, sinkholes, landslide)
• Non-Natural Hazards of risk to Houston ISD include:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
29-8
Toxic Release/Hazardous Materials
Energy Pipeline Failures
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
29.8 STATUS OF PREVIOUS PLAN ACTIONS
Houston Independent School District has not participated before with the Harris County All Hazard Mitigation
Plan. There are no previous plan actions to review.
29.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 29-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 29-11
identifies the priority for each action. Table 29-12 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 29-10. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing
Assets Objectives Met Lead Agency
Support
Agency
Estimated
Cost Sources of Funding Timelinea
Action HOUISD1 — Where appropriate, support retrofitting, relocation, or rebuilding of structures that have experienced repetitive losses
and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: For Medium to High Risk Hazards – Severe Weather*, Hurricane*, Flooding*
Existing 1-15 Business Operations Support N/A High Staff Time, General Funds Short-term
Action HOUISD2 — Where appropriate, support retrofitting, relocation, or rebuilding of structures that have experienced repetitive losses
and/or are located in high- or medium-risk hazard areas..
Hazards Mitigated: For Low to Medium Risk Hazards – Wildfire, Earthquake, Tsunami, Dam Failure, Drought, Mass Movement
Existing 1-15 Business Operations Support N/A Low to
Medium Staff Time, General Funds Short-term
Action HOUISD3 — Partner with Harris County and the City of Houston for mutual disaster preparedness, training, response and support
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Tsunami, Wildfire, Dam Failure, Drought, Mass Movement
Existing 1, 3 6, 7, 8, 9, 10, 11,
12, 13, 14, 15
Risk Management and
Business Operations Support
County &
City
Low Staff Time, General Funds Ongoing
Action HOUISD4 — Trimming or Removal of Trees Close to Buildings or Playgrounds; and, Planting of More Drought Resistant Type
Plants and Shrubs
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Tsunami, Wildfire, Dam Failure, Drought, Mass Movement
Existing 2, 7, 11 Business Operations Support N/A Low Staff Time, General Funds Ongoing
Action HOUISD5 — Flood Mitigation – Code Required by City/County
Hazards Mitigated: Detention Ponds / Irrigation-Drainage Modifications / Flood Mitigation
Existing
3, 7, 9, 10, 11, 15 Bond /
Construction
N/A Medium to
High
Staff Time, General Funds
Bond Funds
Long-term
and When
Required
Action HOUISD6 — Flood Mitigation
Hazards Mitigated: Property Elevation (code required) – For the Rebuilding of a School/Non-School Building in Flood Zone
Existing 3, 6, 7, 8, 9, 10, 11,
12, 13, 14, 15
Bond /
Construction
N/A High General Funds
or Bond Funds
Long-term
Houston Independent School District
29-9
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action HOUISD7 — Hazard Response Preparedness
Hazards Mitigated: Acquire / Replace / Have Ready – Response equipment including portable fencing, sand bags, portable generators,
portable pumps, other tools & equipment needed for and used for response.
Existing 3, 4, 6, 7, 8, 9, 10, 11,
12, 13, 14
Business Operations Support N/A Medium Staff Time, General Funds
Ongoing
Action HOUISD8 — CERT Training – Ensure appropriate, key staff is trained to support District functions when the (EOC) Emergency
Operation Center is activated.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Tsunami, Wildfire, Dam Failure, Drought, Mass Movement
New 1, 3, 4, 6, 7, 8, 9, 10,
13, 14
Risk Management and
Business Operations Support
N/A Low Staff Time, General Funds
Ongoing
Action HOUISD9 — Plan, instruct, and equip campuses with procedures/protocols for a toxic hazardous materials event or a hazardous
energy pipeline event.
Hazards Mitigated: Non-Natural Hazards – Toxic Release/Hazardous Materials and Energy Pipeline Failures
New 1, 3, 4, 6, 7, 8, 9, 10,
13, 14
Risk Management and
Business Operations Support
N/A Low Staff Time, General Funds
Ongoing
Action HOUISD10 — Performing preventative maintenance and repair protocols, which mitigate natural hazards.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Tsunami, Wildfire, Dam Failure, Drought, Mass Movement
Existing 1-15 Risk Management and
Business Operations Support
N/A High Staff Time, General Funds
Ongoing
Action HOUISD11— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Tsunami, Wildfire, Dam Failure, Drought, Mass Movement
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
Risk Management and
Business Operations Support
HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 29-11. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
HOUISD1 15 High High Yes Yes Yes High High
HOUISD2 15 Medium Low to Medium Yes Yes Yes Low to Medium Low to Medium
HOUISD3 12 High Low Yes Yes Yes High Low
HOUISD4 3 High Low Yes Yes Yes High Low
HOUISD5 6 High Medium to High Yes Yes Yes High Medium to High
HOUISD6 11 High High Yes Yes Yes High High
HOUISD7 11 Medium Medium Yes Yes Yes Medium Medium
HOUISD8 9 Medium Low Yes Yes Yes medium Low
HOUISD9 10 High Low Yes Yes Yes High Low
HOUISD10 15 High High Yes Yes Yes High High
HOUISD11 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
29-10
Table 29-12. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe
Weather
HOUISD 1-7, 9,
10,11
HOUISD 1, 2,
4, 5, 6, 7, 10
HOUISD 3, 11 HOUISD 3,
7, 8, 11
HOUISD 1,
2, 6, 10
HOUISD 1,
2, 5, 6, 10
HOUISD 3,
8, 11
Hurricane HOUISD 1-7, 9,
10,11
HOUISD 1, 2,
4, 5, 6, 7, 10
HOUISD 3, 11 HOUISD 3,
7, 8, 11
HOUISD 1,
2, 6, 10
HOUISD 1,
2, 5, 6, 10
HOUISD 3,
8, 11
Medium-Risk Hazards
Flooding HOUISD 1-7, 9,
10,11
HOUISD 1, 2,
4, 5, 6, 7, 10
HOUISD 3, 11 HOUISD 3,
7, 8, 11
HOUISD 1,
2, 6, 10
HOUISD 1,
2, 5, 6, 10
HOUISD 3,
8, 11
Low-Risk Hazards
Drought HOUISD 1-7, 9,
10,11
HOUISD 1, 2,
4, 5, 6, 7, 10
HOUISD 3, 11 HOUISD11 HOUISD 1,
2, 6, 10
HOUISD11
Mass Movement HOUISD 1-7, 9,
10,11
HOUISD 1, 2,
4, 5, 6, 7, 10
HOUISD 3, 11 HOUISD11 HOUISD 1,
2, 6, 10
HOUISD11
Wildfire HOUISD 1-7, 9,
10, 11
HOUISD 1, 2,
4, 5, 6, 7, 10
HOUISD 3, 11 HOUISD 3,
7, 8
HOU1, 2, 6,
10
HOUISD 1,
2, 5, 6, 10
HOUISD 3, 8
Earthquake HOUISD11 HOUISD11 HOUISD11 HOUISD11
Tsunami HOUISD11 HOUISD11 HOUISD11 HOUISD11
Dam Failure HOUISD11 HOUISD11 HOUISD11 HOUISD11
a. See the introduction to this volume for explanation of mitigation types.
29.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX
29.10.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• General information available on HISD’s website
• HISD Risk Management Department – Asset Information
• HISD Finance Department – Financial Question/Answers
• HISD Facilities Department information available on HISD’s website
• HISD Bond/Construction 2012 Bond Program information available on HISD’s Website
• District Design Standards
• District Facilities Assessment
• District Capital Improvement Plan
• Applicable District Policies
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
Houston Independent School District
29-11
29.10.2 Staff and Local Stakeholder Involvement in Annex Development
Utilized information available on HISD’s website, information on file with HISD Risk Management, HISD
Finance Department for financial questions, and HISD Facilities Department and HISD Bond/Construction
Department information on HISD’s website at www.houstonisd.org.
29.11 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY
• A new district capital improvement plan (CIP) will replace the current capital improvement plan.
• A new district facility assessment plan (FAP) will replace the current facility assessment plan.
• The new flood zone maps, when issued by FEMA for Houston, may require adjustments to CIP and FAP
above and adjustments to insurance coverage as well.
• The new flood zone maps, when issued by FEMA, may require adjustments to current insurance coverage
like NFIP insurance.
29.12 ADDITIONAL COMMENTS
The new flood zone maps, when issued by FEMA, are going to be critical to future plans and types of insurance
coverage.
30-1
30. HUFFMAN INDEPENDENT SCHOOL DISTRICT
30.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Tim Brittain, Chief Financial Officer
24302 FM 2100
Huffman, TX 77336
Telephone: 281-324-7623
e-mail Address: tbrittain@huffmanisd.net
David Carpenter, Emergency Management
Coordinator
24302 FM 2100
Huffman, TX 77336
Telephone: 281-324-7659
e-mail Address: dcarpenter@huffmanisd.net
30.2 JURISDICTION PROFILE
30.2.1 Overview
Huffman ISD is a public school district in Texas that serves approximately 3,600 students and has 445 staff
members. Through the efforts of our staff, our students flourish in academics, the fine arts, and athletics. Our
Falcons excel from our pre-K program to the time they graduate. Through our programs we provide character
education and promote pride in being a part of our school community. Importantly, our district succeeds because
of the high standards for achievement in our community. There is no place that supports their public schools like
Huffman. It is a great place to raise a family.
Our district enrollment is approximately 3,400 students. We have four campuses: Huffman Elementary School,
Falcon Ridge Elementary School, Huffman Middle School, and Hargrave High School.
Huffman ISD receives funding from three sources: the state (54%), property taxes and other local sources (44%),
and the federal government (2%). The proportion of funding from each source varies across Texas school
districts.
The Huffman Independent School District assumes responsibility for the adoption of this plan; Harris County will
oversee its implementation. Development of this annex was carried out by the members of the local mitigation
planning team, whose members are listed in Table 30-1.
30.2.2 Service Area and Trends
Huffman ISD is an unincorporated community thirty miles northeast of Houston in Harris County. The district
service area covers 52 square miles, serving a population of 8,678. Huffman is a unique community comprised
largely of residential subdivisions, scattered farms, apartments, and small businesses. The area is showing steady
medium growth. The main subdivisions include; The Commons of Lake Houston, Fairway Crossing, Lochshire,
Lakewood Heights, Spanish Cove, Saddle Creek Farms, and Indian Shores. Most residents commute to Houston,
Humble, Baytown, and surrounding communities for employment.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
30-2
Table 30-1. Local Mitigation Planning Team Members
Name Title
Tim Brittain Huffman ISD, Chief Financial Officer
David Carpenter Huffman ISD, Director of Safety & Security
Tom Trial Bond Program Management Services, Program Manager
Jason McCright Rostan Solutions, Senior Consultant
Dinh Ho Adico, LLC, Engineer
Martin Brennan Joiner Architects, Architect
Jim Moore Rostan Solutions, Consultant
Jonathan Dotch Rostan Solutions, Consultant
30.2.3 Assets
Table 30-2 summarizes the critical assets of the district and their value.
Table 30-2. Special Purpose District Assets
Asset Value
Property
125 acres of land $5,125,000
Equipment
Buses – 38 $3,914,000
Maintenance Vehicles $325,000
Total: $4,239,000
Critical Facilities and Infrastructure
Administration – 24302 FM 2100, Huffman, TX 77336 $4,104,500
Huffman Elementary School – 24403 East Lake Houston Pkwy, Huffman, TX 77336 $44,865,000
Falcon Ridge Elementary – 26503 FM 2100, Huffman, TX 77336 $23,500,000
Huffman Middle School – 3407 Huffman Eastgate Rd., Huffman, TX 77336 $30,291,100
Hargrave High School – 25400 Willy Lane, Huffman, TX 77336 $45,736,725
Athletic Complex – 25400 Willy Lane, Huffman, TX 77336 $6,758,000
Maintenance and Warehouse – 421 Swift Current, Huffman, TX 77336 $712,000
Water Plant – 3407 Huffman Eastgate, Rd., Huffman, TX 77336 $650,000
Sewer Plant – 3407 Huffman Eastgate, Rd., Huffman, TX 77336 $1,205,000
Total: $157,822,825
30.3 CAPABILITY ASSESSMENT
An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or
integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were
identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation
Actions” table in Section 29.9 identifies these as community capacity building mitigation actions.
30.3.1 Planning and Regulatory Capabilities
Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents.
When effectively prepared and administered, these plans, programs and regulations can support the
implementation of mitigation actions. Table 30-3 summarizes existing codes, ordinances, policies, programs or
plans that are applicable to this hazard mitigation plan.
Huffman Independent School District
30-3
Table 30-3. Planning and Regulatory Capability
Plan, Study or Program Date of Most Recent Update Comment
District Design Standards 2017
Capital Improvement Plan Annually 5 year plan
Emergency Operations Plan 2018
District Facility Assessment 2014
Harris County Building Codes
City of Houston Building Codes
30.3.2 Fiscal, Administrative and Technical Capabilities
Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard
mitigation projects. An assessment of fiscal capabilities is presented in Table 30-4. Administrative and technical
capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of
administrative and technical capabilities is presented in Table 30-5.
Table 30-4. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Federal Grant Programs Yes
Other
Table 30-5. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land
management practices
Yes Contract Support
Engineers or professionals trained in building or infrastructure construction practices Yes Contract Support
Planners or engineers with an understanding of natural hazards Yes Contract Support
Staff with training in benefit/cost analysis Yes Chief Financial Officer
Surveyors Yes Contract Support
Personnel skilled or trained in GIS applications Yes Technology Director
Scientist familiar with natural hazards in local area No
Emergency manager Yes Emergency Management Coordinator
Grant writers No
Other
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
30-4
30.3.3 Education and Outreach Capabilities
Outreach and education capability identify the connection between government and community members, which
opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is
presented in Table 30-6.
Table 30-6. Education and Outreach
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? No
• If yes, please briefly describe
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, please briefly describe Share
Partner
Content
Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes
• If yes, please briefly specify School
Safety and
Security
Committee
Do you have any other programs already in place that could be used to communicate hazard-related information? No
• If yes, please briefly describe
Do you have any established warning systems for hazard events? No
• If yes, please briefly describe
30.3.4 Adaptive Capacity for Climate Change
Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s
ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 30-7
summarizes the jurisdiction’s adaptive capacity for climate change.
Huffman Independent School District
30-5
Table 30-7. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Medium
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Medium
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
30-6
30.4 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used
in hazard mitigation. This section identifies where such integration is already in place, and where there are
opportunities for further integration in the future. Resources listed in this annex were used to provide information
on integration. The progress reporting process described in Volume 1 will document the progress of hazard
mitigation actions related to integration and identify new opportunities for integration.
30.4.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Capital Improvement Plan — The hazard mitigation plan may identify new possible funding sources
for capital improvement projects and may result in modifications to proposed projects based on results of
the risk assessment.
• Emergency Operations Plan — The results of the risk assessment may identify modifications to the
emergency operations plan.
30.4.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Capital Improvement Projects — Capital improvement project proposals may take into consideration
hazard mitigation potential as a means of evaluating project prioritization.
• Post-Disaster Recovery Plan — The District does not have a recovery plan and intends to develop one
as a mitigation planning action during the next five years. The plan will build on the mitigation goals and
objectives identified in the mitigation plan.
30.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 30-8 lists past occurrences of natural hazards for which specific damage was recorded in Huffman ISD.
Other hazard events that broadly affected the entire planning area, including Huffman ISD, are listed in the risk
assessments in Volume 1 of this hazard mitigation plan.
Table 30-8. Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey DR-4332 8/25/17 $17,000,000
Tornado 4/18/16 Information Not Available
Tornado 11/8/11 Information Not Available
Hurricane Ike DR-1791 9/7/08 $61,476
Tornado 12/14/05 Information Not Available
Hail 2/14/03 Information Not Available
Flood 5/27/16 Information Not Available
Huffman Independent School District
30-7
30.6 HAZARD RISK RANKING
Table 30-9 presents a local ranking for Huffman ISD of all hazards of concern for which this hazard mitigation
plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As
described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for
each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target
hazards with high and medium rankings.
Table 30-9. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Hurricanes and Costal Storms 27 High
1 Flooding 27 High
2 Severe Thunderstorms 21 Medium
3 Tornados 16 Medium
4 Hail 10 Low
5 Extreme Heat 6 Low
5 Drought 6 Low
6 Coastal Erosion 0 (No Exposure) None
6 Dam Failure 0 (No Exposure) None
6 Mass Movements 0 (No Exposure) None
6 Tsunami 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
30.7 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• The eastern part of the district is in the floodway. The transportation facility was located in this part of the
district and we are determining mitigation currently. The sewer plant that serves Huffman Middle School
and Hargrave High School is located in the floodway.
• Parts of Huffman Middle and Hargrave High School campuses are located in a high hazard flood zone.
• The water and sewer plants that serves Huffman Middle School and Hargrave High School are in a high
hazard flood zone.
• District elementary schools are located in an area of terrain transition and may be at increased risk for
tornados
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
30.8 STATUS OF PREVIOUS PLAN ACTIONS
The Huffman Independent School District has not previously completed any hazard mitigation planning effort.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
30-8
30.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 30-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 30-11
identifies the priority for each action. Table 30-12 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 30-10. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action HUF1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Flooding, Hurricanes, Tornados, Severe Thunderstorms, Hail
Existing 3, 4, 10 District Administration TBD High HMGP, PDM, FMA Short-term
Action HUF2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Hurricanes and Costal Storms, Flooding, Severe Thunderstorms, Tornados, Hail, Extreme Heat, Drought
New and Existing 1, 5, 8 District Administration TBD Low Staff Time, General
Funds
Short-term
Action HUF3 — Integrate the hazard mitigation plan into other plans, ordinances and programs within the community
Hazards Mitigated: Dam failure, earthquake, flooding, landslide, severe weather, tsunami, wildfire
Existing 2, 6, 9 District Administration TBD
Action HUF4 — Expand generator capability for critical facilities lacking sufficient backup power
Hazards Mitigated: Hurricanes, Tornados, Severe Thunderstorms
Existing 3, 4, 10 District Administration TBD High HMGP, PDM, FMA Short-term
Action HUF5— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Hurricanes and Costal Storms, Flooding, Severe Thunderstorms, Tornados, Hail, Extreme Heat, Drought
New and Existing 1, 3, 4, 5, 9, 10, 11, 15 District Administration HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 30-11. Mitigation Action Priority
Action #
# of Objectives Met Benefits Costs
Do Benefits Equal or Exceed Costs?
Is Project Grant-Eligible?
Can Project Be
Funded Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
HUF1 3 High High Yes Yes No Medium High
HUF2 3 Low Low Yes No Yes High Low
HUF3 3 High Medium Yes Yes No Medium High
HUF4 3 High Medium Yes Yes No Medium High
HUF5 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Huffman Independent School District
30-9
Table 30-12. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Flooding HUF2, 3, 5 HUF1 HUF5 HUF1, 5 HUF1 HUF2, 3, 5
Hurricanes and
Costal Storms
HUF2, 3, 5 HUF1, 4 HUF5 HUF1, 4, 5 HUF1 HUF2, 3, 5
Medium-Risk Hazards
Severe
Thunderstorms
HUF2, 3, 5 HUF1, 4 HUF5 HUF1, 4, 5 HUF2, 3, 5
Tornados HUF2, 3, 5 HUF1, 4 HUF5 HUF1, 4, 5 HUF2, 3, 5
Low-Risk Hazards
Drought HUF2, 3, 5 HUF5 HUF5 HUF2, 3, 5
Extreme Heat HUF2, 3, 5 HUF5 HUF5 HUF2, 3, 5
Hail HUF2, 3, 5 HUF1 HUF5 HUF5 HUF2, 3, 5
a. See the introduction to this volume for explanation of mitigation types.
30.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• Huffman ISD emergency Operations Plan
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
31-1
31. PASADENA INDEPENDENT SCHOOL DISTRICT
31.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Kevin Fornof, Associate Superintendent Facilities
& Construction
1814 E. Sam Houston Parkway South
Pasadena, TX 77503
Telephone: 713-740-5350
e-mail Address: kfornof@pasadenaisd.org
Carla Merka, CFO
1515 Cherrybrook Lane
Pasadena, TX 77502
Telephone: 713-740-0023
e-mail Address: cmerka@pasadenaisd.org
31.2 JURISDICTION PROFILE
31.2.1 Overview
The Pasadena Independent School District was created in 1893. The district serves 54,000 students. It currently
has 8,800 employees. A seven-member elected Board of Trustee governs the District. The district is funded with
local tax dollars, state revenue and federal grants.
The Board of Trustees assumes responsibility for the adoption of this plan; the superintendent, associate
superintendent and CFO will oversee its implementation. Development of this annex was carried out by the
members of the local mitigation planning team, whose members are listed in Table 31-1.
Table 31-1. Local Mitigation Planning Team Members
Name Title
Dr. DeeAnn Powell Superintendent
Kevin Fornof Associate Superintendent Facilities & Construction
Carla Merka Chief Financial Officer
31.2.2 Service Area and Trends
The District is a fiscally independent, political subdivision of the State of Texas located in Harris County and
serving a population of 54,000 students. The District service area covers 85.5 square miles.
31.2.3 Assets
Table 31-2 summarizes the critical assets of the district and their value.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
31-2
Table 31-2. Special Purpose District Assets
Asset Value
Property
80 building sites spread over the district
Equipment
FF&E spread over the district $138,057,020
Vehicles $37,655,595
Library Book & Media $13,623,515
Critical Facilities and Infrastructure
80 building spread over the district $1,168,329,961
Total: $1,168,329,961
31.3 CAPABILITY ASSESSMENT
An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or
integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were
identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation
Actions” table identifies these as community capacity building mitigation actions.
31.3.1 Planning and Regulatory Capabilities
Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents.
When effectively prepared and administered, these plans, programs and regulations can support the
implementation of mitigation actions. PISD follows the currently adopted codes and ordinances of the U.S.
federal governmental agencies, the state of Texas, the city of Houston, the city of south Houston, the city of
Pasadena, and the city of Pearland. Current PISD planned projects include the following:
• Add detention to various facilities to benefit the school and the community
• Add emergency generator to various facilities to ensure that electrical, and data and phone
communications are available and food coolers and freezers maintain proper temperatures during power
outages.
• Demolish and rebuild Thompson Intermediate to elevations that raise the facility out of the flood zone.
31.3.2 Fiscal, Administrative and Technical Capabilities
Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard
mitigation projects. An assessment of fiscal capabilities is presented in Table 31-3. Administrative and technical
capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of
administrative and technical capabilities is presented in Table 31-4.
31.3.3 Education and Outreach Capabilities
Outreach and education capability identifies the connection between government and community members, which
opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is
presented in Table 31-5.
Pasadena Independent School District
31-3
Table 31-3. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes No
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Federal Grant Programs Yes
Table 31-4. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Civil consultants
Engineers or professionals trained in building or infrastructure
construction practices
Yes Civil and MEP consultants
Planners or engineers with an understanding of natural hazards Yes Civil and MEP consultants
Staff with training in benefit/cost analysis Yes PISD facilities and construction
Surveyors Yes PISD has a unit price agreement with West Belt
Surveying
Personnel skilled or trained in GIS applications No
Scientist familiar with natural hazards in local area Yes Civil engineering, surveyor, geotechnical engineers,
and landscape consultants
Emergency manager Yes Varies by event
Grant writers Yes PISD Grants Dept.
Table 31-5. Education and Outreach
Criterion Response
Do you have a public information officer or communications office? YES
Do you have personnel skilled or trained in website development? YES
Do you have hazard mitigation information available on your website? No
• If yes, please briefly describe
Do you use social media for hazard mitigation education and outreach? No
• If yes, please briefly describe
Do you have any citizen boards or commissions that address issues
related to hazard mitigation?
No
• If yes, please briefly specify
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, please briefly describe Automated Phone Messaging / Email / Text / Social
Media/ Local News Channels
Do you have any established warning systems for hazard events? Yes
• If yes, please briefly describe Automated Phone Messaging / Email / Text / Social
Media/ Local News Channels
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
31-4
31.3.4 Adaptive Capacity for Climate Change
Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s
ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 31-6
summarizes the jurisdiction’s adaptive capacity for climate change.
Table 31-6. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts High
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts High
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts High
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Medium
Comment:
Local authority over sectors likely to be negative impacted Medium
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Medium
Comment:
Local residents’ capacity to adapt to climate impacts High
Comment:
Local economy current capacity to adapt to climate impacts High
Comment:
Local ecosystems capacity to adapt to climate impacts High
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
Pasadena Independent School District
31-5
31.4 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used
in hazard mitigation. This section identifies where such integration is already in place, and where there are
opportunities for further integration in the future. Resources listed in this annex were used to provide information
on integration. The progress reporting process described in Volume 1 will document the progress of hazard
mitigation actions related to integration and identify new opportunities for integration.
31.4.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Use of energy management practices, meet or exceed IECC code, and material and equipment selections
31.4.2 Opportunities for Future Integration
The capability assessment presented in this annex identified no plans or programs that provide opportunities to
integrate hazard mitigation information in the future.
31.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 31-8 lists past occurrences of natural hazards for which specific damage was recorded in Pasadena ISD.
Other hazard events that broadly affected the entire planning area, including Pasadena ISD, are listed in the risk
assessments in Volume 1 of this hazard mitigation plan.
Table 31-8. Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
TORNADO N/A April 8, 2019 $190,000
HURRICANE HARVEY 4332 DR August 17, 2017 $15,379,690
HURRICANE IKE 1791 DR / 3294 EM September 13, 2008 $16,764,211.76
31.6 HAZARD RISK RANKING
Table 31-9 presents a local ranking for Pasadena ISD of all hazards of concern for which this hazard mitigation
plan provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As
described in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for
each hazard, along with its potential impacts on people, property and the economy. Mitigation actions target
hazards with high and medium rankings.
31.7 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
No additional vulnerabilities specific to this jurisdiction have been identified.
31.8 STATUS OF PREVIOUS PLAN ACTIONS
The Pasadena Independent School District has not previously completed any hazard mitigation planning effort.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
31-6
Table 31-9. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Flooding 24 Medium
3 Earthquake 14 Low
4 Wildfire 6 Low
4 Drought 6 Low
5 Dam Failure 0 (No Exposure) None
5 Mass Movement 0 (No Exposure) None
5 Tsunami 0 (No Exposure) None
5 Coastal Erosion 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
31.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 31-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 31-11
identifies the priority for each action. Table 31-12 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 31-10. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action PSD1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Severe weather, hurricane, Earthquake, flooding, wildfire
Existing 11, 13 District Administration TBD High HMGP, PDM, FMA Short-term
Action PSD2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire, Drought
New and Existing 9, 10 District Administration TBD Low Staff Time, General Funds Short-term
Action PSD3 — Integrate the hazard mitigation plan into other plans, ordinances and programs within the community
Hazards Mitigated: Hurricane, earthquake, flooding, severe weather wildfire
Existing 2, 6, 9 District Administration TBD Low Staff Time, General Funds Short-term
Action PSD4— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Wildfire, Drought
New and Existing 1, 3, 4, 5, 9, 10, 11, 15 District Administration HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Pasadena Independent School District
31-7
Table 31-11. Mitigation Action Priority
Action #
# of
Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs?
Is Project
Grant-Eligible?
Can Project Be Funded
Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
PSD1 3 High High Yes Yes No High High
PSD2 3 Medium Low Yes No Yes Medium Low
PSD3 3 Medium Low Yes No Yes Medium Low
PSD4 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 31-12. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather PSD1, 4 PSD1 PSD4 PSD4 PSD1 PSD2, 3, 4
Hurricane PSD1, 4 PSD1 PSD4 PSD4 PSD1 PSD2, 3, 4
Medium-Risk Hazards
Flooding PSD1, 4 PSD1 PSD4 PSD4 PSD1 PSD2, 3, 4
Low-Risk Hazards
Earthquake PSD1, 4 PSD1 PSD4 PSD4 PSD1 PSD2, 3, 4
Wildfire PSD1, 4 PSD1 PSD4 PSD4 PSD1 PSD2, 3, 4
Drought PSD4 PSD4 PSD4 PSD2, 3, 4
a. See the introduction to this volume for explanation of mitigation types.
31.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• Discussions with staff and administrations
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
Building requests were developed from need assessments to better respond to catastrophes through better
communications and by better protecting district resources
31.11 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY
Our detention ponds will give relieve to our neighborhoods from flooding. We also have two schools in a flood
zone that backs up to the flood district. If we could move those schools that area could be turned into a larger
detention pond for the flood district.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
31-8
32-1
32. HOUSTON COMMUNITY COLLEGE
32.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Robert McCracken,
Executive Director, Risk Management
3200 Main St
Houston, TX 77459
Telephone: 713-718-7520
e-mail Address: Robert.McCracken@hccs.edu
Brian Owoseni,
Manager, Emergency Management.
3200 Main St
Houston, TX 77459
Telephone: 713-718-2591
e-mail Address: Oludoyin.Owoseni@hccs.edu
32.2 JURISDICTION PROFILE
32.2.1 Overview
Since its opening in 1971, millions of students have improved their lives through education and training obtained
from Houston Community College (HCC). An open admission public institution, HCC awards associate degrees
and certificates in academic studies and career and technology programs. HCC is committed to meeting the needs
of its diverse communities, providing academic courses for transfer to four-year institutions; associates degrees
and certificates in more than 70 fields of work; as well as continuing education, corporate training, literacy, adult
education, and lifelong learning and enrichment programs. HCC provides comprehensive educational services to
the greater Houston region.
The Houston Community College District was created under the governance of the Houston Independent School
District (HISD) as the result of a public referendum on May 18, 1971. HCC separated from HISD in 1989,
establishing its own Board of Trustees and taxing authority. HCC restructured in 1991, creating five regional
colleges, as well as the College Without Walls and selected six college presidents. The president of HCC then
became the HCC System Chancellor. The Coleman College for Health Sciences was established in 2004. Through
the process of transformation initiated in 2014, instructional programs were organized into Centers of Excellence
and Instructional Divisions, providing increased focus for credit programs. In spring 2018, HCC established the
Online College to meet the 21st century educational needs of our students, especially those with full-time jobs.
HCC employs 2,600 full-time faculty and staff and 3,800 adjunct faculty and part-time staff. Operations are
funded primarily through local property tax, state appropriations, and tuition and fees. The Board of Trustees is
composed of nine members elected from single-member districts. The Board of Trustees is the official governing
body of HCC and is responsible for the adoption of this plan. The Office of Emergency Management will oversee
its implementation. Development of this annex was carried out by the members of the local mitigation planning
team, whose members are listed in Table 32-1.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
32-2
Table 32-1. Local Mitigation Planning Team Members
Name Title
Robert McCracken Executive Director, Risk Management
Brian Owoseni Manager, Emergency Management
Marshall Heins Chief Facilities Officer
Carin Hutchins Associate Vice Chancellor, Finance & Accounting
Greg Cunningham Chief of Police
Darin Baskin Faculty Senate President
Dr. Monique Umphrey President, Northeast College
32.2.2 Service Area and Trends
The HCC Service District Area (SDA) includes Houston, Katy, Spring Branch, and Alief Independent School
Districts (ISDs); Stafford Municipal District; and the portions of Fort Bend ISD located in Missouri City, the City
of Pearland, and the City of Houston (see Figure 32-1). The SDA encompasses 631.3 square miles and serves a
population of over 2.4 million people. HCC has an unduplicated enrollment of over 114,000 students annually.
Figure 32-1. Houston Community College 2018 Service Area
The HCC SDA is economically, educationally and ethnically diverse. While the average household income is
$96,707, more that 22.3% of the households in the SDA have an income less than $25,000. While 41.0% of the
population has a college degree, 19.5% of the population has no high school degree. The population’s ethnicity is
40.9% Hispanic, 26.1% white, 22.7% African American and 10.3% Asian/Other. There is a relatively large young
Houston Community College
32-3
population — 24.5% under the age of 18 years old. These factors give HCC the potential of providing a large
workforce pool for the service delivery area, the state and the nation’s economic growth, particularly in the energy
and healthcare sectors. In fall 2018 the semester credit hour student population’s ethnicity was 38% Hispanic,
29% African American, 15% Asian, 13% white, and 5% Other.
32.2.3 Assets
Table 32-2 summarizes the critical assets of the district and their value.
Table 32-2. Special Purpose District Assets
Asset Value
Property
436 acres of land undetermined
Equipment
25 Permanently Installed Emergency Generators undetermined
5 Mobile Generators $50,000
Total: undetermined
Critical Facilities and Infrastructure
Administrative Buildings (multiple buildings) – 3100 Main St. $181,000,000
NE College (multiple campuses) – 555 Community College Dr. $178,000,000
Central College (multiple campuses) – 1300 Holman St. $229,000,000
SE College (multiple campuses) – 6815 Rustic St. $144,000,000
Coleman College (multiple buildings) – 1900 Pressler St. $122,000,000
SW College (multiple campuses) – 10041 Cash Rd. $231,000,000
NW College (multiple campuses) – 2811 Hayes Rd. $203,000,000
Total: $1,288,000,000
32.3 CAPABILITY ASSESSMENT
An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or
integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were
identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation
Actions” table in Section 29.9 identifies these as community capacity building mitigation actions.
32.3.1 Planning and Regulatory Capabilities
Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents.
When effectively prepared and administered, these plans, programs and regulations can support the
implementation of mitigation actions. Table 32-3 summarizes existing codes, ordinances, policies, programs or
plans that are applicable to this hazard mitigation plan.
32.3.2 Fiscal, Administrative and Technical Capabilities
Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard
mitigation projects. An assessment of fiscal capabilities is presented in Table 32-4. Administrative and technical
capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of
administrative and technical capabilities is presented in Table 32-5.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
32-4
Table 32-3. Planning and Regulatory Capability
Plan, Study or Program Date of Most Recent Update Comment
HCC Institutional Emergency Operations Plan 2018
HCC Strategic Plan 2019
HCC Capital Improvements Program 2013
HCC Facilities Condition Assessment 2019
International Building Code 2018
NFPA 1, Fire Code 2015 Edition 2015
NFPA 101, Life Safety Code 2015 Edition 2015
Various Federal/State regulations relating to Environmental, Health & Safety Various
Table 32-4. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Federal Grant Programs Yes
Other Yes- miscellaneous revenues
Table 32-5. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Facilities Department / Contracted
Services
Engineers or professionals trained in building or infrastructure
construction practices
Yes Facilities Department / Contracted
Services
Planners or engineers with an understanding of natural hazards Yes Environmental Health & Safety, HCC
Emergency Management
Staff with training in benefit/cost analysis Yes Finance & Accounting
Surveyors Yes Contracted Services
Personnel skilled or trained in GIS applications No
Scientist familiar with natural hazards in local area No
Emergency manager Yes Emergency Management
Grant writers Yes Grants Department
32.3.3 Education and Outreach Capabilities
Outreach and education capability identifies the connection between government and community members, which
opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is
presented in Table 32-6.
Houston Community College
32-5
Table 32-6. Education and Outreach
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? No
• If yes, please briefly describe
Do you use social media for hazard mitigation education and outreach? No
• If yes, please briefly describe
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, please briefly specify
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, please briefly describe In addition to a comprehensive website, social media,
marketing, and communications capacity HCC operates
HCC TV which includes studios, television and video
production capacity.
Do you have any established warning systems for hazard events? Yes
• If yes, please briefly describe Emergency Notification System mass notification tool for
HCC students, staff, and faculty. Additional warning
systems/channels include website, social media, local
television and radio stations, Harris County Joint
Information Center, and local systems for HCC
campuses. Additionally, HCC police utilize radios and a
dispatch center.
32.3.4 Adaptive Capacity for Climate Change
Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s
ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 32-7
summarizes the jurisdiction’s adaptive capacity for climate change.
Table 32-7. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Medium
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Medium
Comment:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
32-6
Criterion Jurisdiction Ratinga
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Medium
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents’ knowledge of and understanding of climate risk Low
Comment:
Local residents’ support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
32.4 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used
in hazard mitigation. This section identifies where such integration is already in place, and where there are
opportunities for further integration in the future. Resources listed in this annex were used to provide information
on integration. The progress reporting process described in Volume 1 will document the progress of hazard
mitigation actions related to integration and identify new opportunities for integration.
32.4.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Emergency Operations Plan — The results of the risk assessment were used in the development of the
emergency operations plan.
Houston Community College
32-7
• Facilities Plan — The results of the risk assessment and mapped hazard areas are used in facility
planning for the district. Potential sites are reviewed for hazard risks and appropriate mitigation measures
are considered in building and site design.
• Junior College Audit Report – The required review of campus safety and security includes extensive
review of emergency preparedness, response, recovery, prevention and mitigation. Results of the review
are utilized to guide hazard mitigation activities and projects.
• Facility Condition Assessment – The assessment details the current condition of major building systems
and identifies needed capital improvements and established a long-term projection for necessary capital
spending to maintain the facilities. Many of the identified needs relate to major system upgrades and
renovations that can increase facility resiliency and mitigate damages incurred as the result of a hazard.
• Facilities Maintenance Plan – The facilities maintenance plan focuses resources on maintaining the
facility grounds, parking lots, landscaping, and structures in a manner that minimizes damages from
natural hazards to reduce the impact of high winds, flooding, and power disruptions.
• Information Systems Business Continuity Plan – The District Information Systems are designed with
redundancies to minimize the risk of loss of data due to damaged District buildings or regional
infrastructure.
32.4.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Facility Master Plan- Integration of hazard data into planning process can provide insight into the costs
and benefits of renovations to existing facilities, consideration of new facilities/sites, and potential
changes to workforce training needs.
• Capital Improvement Plan- Capital improvement project proposals may take into consideration hazard
mitigation potential as a means of evaluating project prioritization.
32.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 32-8 lists past occurrences of natural hazards for which specific damage was recorded on HCC campuses or
facilities in the past 10 years. Other hazard events that broadly affected the entire planning area, including HCC,
are listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 32-8. Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Severe Weather / Flooding 2019 Significant Operational Impact
Winter Freeze 2018 Significant Operational Impact
Hurricane Harvey 4332DR 2017 Significant Operational Impact $1,700,000
Severe Weather / Flooding 2017 Significant Operational Impact
Severe Weather / Tornado 2017 $15,000
Tax Day Flood 4272DR 2016 Significant Operational Impact
Memorial Day Flood 4223DR 2015 Significant Operational Impact
Hurricane Ike 1791DR 2008 Significant Operational Impact $4,700,000
32.6 HAZARD RISK RANKING
Table 32-9 presents a local ranking for HCC of all hazards of concern for which this hazard mitigation plan
provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
32-8
in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard,
along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high
and medium rankings.
Table 32-9. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Hurricane 54 (3 x (9+6+3)) High
2 Flood 45 (3 x (6+6+3)) High
3 Severe Weather 36 (3 x (9+2+1)) High
4 Dam Failure 20 (2 x (3+4+3)) Medium
5 Earthquake 14 (1 x (9+4+1)) Low
6 Wildfire 6 (1 x (3+2+1)) Low
6 Drought 6 (3 x (0+1+1)) Low
6 Landslide 6 (1 x (3+2+1)) Low
7 Tsunami 3 (1 x (3+0+0)) Low
7 Coastal Erosion 3 (1x (3+0+0)) Low
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
32.7 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
The following jurisdiction-specific issue has been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• HCC Police Department building is not equipped with a generator but houses police personnel during
ride-out situations.
Mitigation actions addressing this issue were prioritized for consideration in the action plan in this annex.
32.8 STATUS OF PREVIOUS PLAN ACTIONS
Houston Community College has not previously completed a formally adopted hazard mitigation plan.
32.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 32-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 32-11
identifies the priority for each action. Table 32-12 summarizes the mitigation actions by hazard of concern and
mitigation type.
Houston Community College
32-9
Table 32-10. Hazard Mitigation Action Plan Matrix
Applies to New or Existing
Assets Objectives Met Lead Agency Support Agency
Estimated
Cost Sources of Funding Timelinea
Action HCC 1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are in high- or medium-risk hazard areas.
Hazards Mitigated: Hurricane, flooding, severe weather, dam failure, earthquake, landslide, wildfire
Existing 3, 4, 5, 6, 8, 9, 10, 11,
12, 13,
Facilities Finance High HMGP, PDM, FMA,
General Funds, CIP, Bonds
Long
Term
Action HCC 2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Hurricane, Flood, Severe Weather, Dam Failure, Earthquake, Wildfire, Drought, Landslide, Tsunami, Coastal Erosion
New and Existing 1, 3, 5, 9, 10 Risk Management Facilities Low Staff Time, General Funds Ongoing
Action HCC 3 — • Develop and/or update plans that support or enhance continuity of operations following disasters.
Hazards Mitigated: All Hazards
New and Existing 1, 3, 4, 10, 13 Risk Management IT, Facilities Medium HMGP, PDM, Staff Time,
General Funds, Technology
Fee, CIP
Ongoing
Action HCC 4 — Integrate the hazard mitigation plan into other plans and programs within the College.
Hazards Mitigated: All Hazards
New and Existing 3, 4, 6, 7, 8, 9, 10, 11,
12, 13, 15
Risk Management Facilities, Finance &
Administration
Low Staff Time, General Funds,
Technology Fee, CIP
Ongoing
Action HCC 5 — • Develop a post-disaster recovery plan and a debris management plan.
Hazards Mitigated: All Hazards
Existing 6, 8, 9, 10, 13, 14 Facilities Procurement Low HMGP, PDM, FMA,
General Funds, Insurance
Short
Term
Action HCC 6 – Purchase generators for critical facilities and infrastructure that lack adequate back-up power and install quick connect
emergency generator hook ups for non-permanently installed generators.
Hazards Mitigated: Flooding, Hurricane, Severe Weather, Earthquake, Dam Failure, Wildfire, Landslide, Tsunami
Existing 1, 4, 9, 10, 11 HCC Facilities Procurement High HMGP, PDM, General
Funds, CIP, Bonds
Long
Term
Action HCC 7 — Build and operationalize the Regional Emergency Response Training Center to increase regional capabilities during
flood events.
Hazards Mitigated: Hurricane, Flooding, Severe Weather, Dam Failure, Tsunami
New and Existing 3, 4, 5, 10, 13 HCC Facilities President’s Office,
Finance, Procurement
High HMGP, PDM, FMA,
General Funds, CIP,
Bonds, State Appropriation,
Partnership Agreements,
HCC Foundation
Short
Term
Action HCC 8 — Dry-proof the Stafford Campus Fine Arts Center to increase resistance to water intrusion.
Hazards Mitigated: Hurricane, Flooding, Dam Failure
Existing 4, 11, 12, 13, 15 HCC Facilities Risk Management,
Procurement
$150k HMGP, General Funds, PA
Grant, Insurance
Short
Term
Action HCC 9 — Retrofit smoke exhaust louvers to prevent water intrusion by wind driven rain at Alief Hayes Campus.
Hazards Mitigated: Severe Weather, Hurricane
Existing 4, 11, 12, 13, 15 HCC Facilities Risk Management,
Procurement
$30k HMGP, General Funds, PA
Grant
Short
Term
Action HCC 10 — Increase resiliency to electrical system failures with appropriate upgrades / retrofits of lightning protection,
uninterruptable power supplies, switch gear, transfer switches, transformers, and emergency generator replacement.
Hazards Mitigated: Hurricane, Flooding, Severe Weather, Dam Failure, Earthquake, Wildfire, Landslide, Tsunami
New and Existing 1, 4, 9, 10, 11, 13 HCC Facilities Finance, Procurement $2.5 M HMGP, PDM, FMA,
General Funds, CIP, Bond
Long
Term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
32-10
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action HCC 11 — Complete appropriate structural retrofits of existing building to improve the integrity of the building envelope and roof
systems.
Hazards Mitigated: Hurricane, Flooding, Severe Weather, Dam Failure
New and Existing 4, 9. 10, 11, 13 HCC Facilities Finance, Procurement $10.0 M HMGP, PDM, FMA,
General Funds, CIP, Bond
Long
Term
Action HCC 12 — Where appropriate Improve site drainage to minimize risk of urban flash flooding.
Hazards Mitigated: Hurricane, Flooding, Dam Failure
Existing 1, 4, 9, 10, 11, 12 HCC Facilities $1.0 M HMGP, PDM, FMA,
General Funds, CIP, Bond
Short
Term
Action HCC 13— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Hurricane, Flood, Severe Weather, Dam Failure, Earthquake, Wildfire, Drought, Landslide, Tsunami, Coastal Erosion
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
HCC Facilities HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 32-11. Mitigation Action Priority
Action #
# of
Objectives Met Benefits Costs
Do Benefits Equal or
Exceed Costs?
Is Project
Grant-Eligible?
Can Project Be Funded Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
HCC1 10 High High Yes Yes No Low Medium
HCC2 5 Low Low Yes No Yes High Low
HCC3 5 High Medium Yes Yes No High High
HCC4 11 Low Low Yes No Yes High Low
HCC5 6 High Low Yes Yes Yes High High
HCC6 5 High High Yes Yes No Low Medium
HCC7 5 High High Yes Yes No Medium High
HCC8 5 High Low Yes Yes Yes High High
HCC9 5 High Low Yes Yes Yes High High
HCC10 6 High High Yes Yes No Low Medium
HCC11 4 High High Yes Yes No Low Medium
HCC12 5 High Medium Yes Yes No Medium High
HCC13 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Houston Community College
32-11
Table 32-12. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Hurricane HCC1, 12, 13 HCC1, 6, 8, 9,
10, 11
HCC2, 4, 7,
13
HCC12 HCC3, 4, 5, 6,
7, 9, 10, 13
HCC8, 12 HCC3, 12 HCC2, 3, 4,
5, 13
Flood HCC1, 12, 13 HCC1, 6, 8,
10, 11
HCC2, 4, 7,
13
HCC12 HCC3, 4, 5, 6,
7, 10, 13
HCC8, 12 HCC3, 12 HCC2, 3, 4,
5, 13
Severe Weather HCC1, 12, 13 HCC1, 6, 9,
10, 11
HCC2, 4, 7,
13
HCC3, 4, 5, 6,
7, 9, 10, 13
HCC3, 12 HCC2, 3, 4,
5, 13
Medium-Risk Hazards
Dam Failure HCC1, 12 , 13 HCC1, 6, 8,
10, 11
HCC2, 4, 7,
13
HCC12 HCC3, 4, 5, 6,
7, 10, 13
HCC8, 12 HCC3 HCC2, 3, 4,
5, 13
Low-Risk Hazards
Earthquake HCC1, 13 HCC1, 6, 10 HCC2, 4, 13 HCC3, 4, 5, 6,
10, 13
HCC2, 3, 4,
5, 13
Wildfire HCC1, 13 HCC1, 6, 10 HCC2, 4, 13 HCC3, 4, 5, 6,
10, 13
HCC3 HCC2, 3, 4,
5, 13
Drought HCC13 HCC11 HCC2, 4, 13 HCC3, 4, 5, 13 HCC3 HCC2, 3, 4,
5, 13
Landslide HCC1, 13 HCC1, 6, 10 HCC2, 4, 13 HCC3, 4, 5, 6,
10, 13
HCC2, 3, 4,
5, 13
Tsunami HCC13 HCC10 HCC2, 4, 7,
13
HCC3, 4, 5, 6,
7, 10, 13
HCC2, 3, 4,
5, 13
Coastal Erosion HCC13 HCC2, 4, 13 HCC3, 4, 5, 13 HCC3 HCC2, 3, 4,
5, 13
a. See the introduction to this volume for explanation of mitigation types.
32.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX
32.10.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• HCC Hazard Vulnerability Assessment — This tool scores and ranks potential hazards or threats to
HCC staff, operations, or property, and is used in EOP development.
• HCC Property Insurance Loss Runs – The historical data regarding losses during past disasters was
utilized in the analysis of hazards and the development of the hazard mitigation action plan.
• HCC Institutional Emergency Operations Plan and HCC Business Continuity Plan were reviewed
during the capability assessment and determining the level of integration with existing plans.
• HCC Strategic Plan was reviewed during the capability assessment and in determining the level of
integration with existing plans.
• HCC Facilities Condition Assessment provides a detailed assessment of the condition of HCC facilities
and identifies specific actions that can be taken to increase the resilience of the facilities to natural
hazards. The assessment also includes projected capital expenditure required to maintain existing
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
32-12
buildings over time. The assessment was utilized as a primary driver for the selection of facilities related
mitigation actions.
• HCC Property Insurance Statement of Values was utilized to establish the critical facilities and assets
and the associated values.
• HCC Comprehensive Annual Financial Report was utilized during the capability assessment and the
completion of the mitigation action plan matrix and the establishment of mitigation priorities.
• HCC Capital Improvements Program was utilized during the capability assessment.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• FEMA Flood Maps were utilized in the hazard ranking and the selection of hazard mitigation action plan
items.
• NFPA 101, Life Safety Code 2015 Edition was utilized during the capability assessment.
• Robert T. Stafford Disaster Relief and Emergency Assistance Act, (as amended), 42 U.S.C. 5121 was
utilized to in the completion of the hazard mitigation action plan.
• FEMA, Continuity Guidance Circular 1, July 2013 and FEMA, Continuity Guidance Circular 2,
October2013 were utilized in the completion of the capability assessment.
• FEMA, Guide for Developing High‐Quality Emergency Operations Plans for Institutions of Higher
Education was utilized in the completion of the capability assessment.
• Junior College Audit Reporting Tool is provided by the Texas School Safety Center and provides a
comprehensive checklist utilized to facilitate the capability assessment.
32.10.2 Staff and Local Stakeholder Involvement in Annex Development
The annex was developed by a committee involving HCC Office of Emergency Management, Risk Management,
Facilities, HCC Police, Northeast College Office of the President, and Finance. Committee meetings were held as
each phase was released, and relevant departments were consulted for related sections of the annex. Updates were
internally circulated and vetted for accuracy.
33-1
33. LONE STAR COLLEGE
33.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Derrick Harris, Senior Business Analyst
20515 SH 249
Houston, TX 77070
Telephone: 281-290-3667
e-mail Address: Derrick.D.Harris@lonestar.edu
Cheryl Cepeda, Manager
20515 SH 249
Houston, TX 77070
Telephone: 281-290-2891
e-mail Address: Cheryl.Cepeda@lonestar.edu
33.2 JURISDICTION PROFILE
33.2.1 Overview
The Lone Star College (LSC) was established in 1972 as a public junior college district providing post-secondary
educational opportunities. LSC is governed by a nine-member Board of Trustees. The Chancellor serves as the
Chief Executive Officer and oversees the daily operations of LSC. The Chancellor assumes responsibility for the
adoption of this plan; the Department of Emergency Preparedness will oversee its implementation. LSC currently
has approximately 7,800 full-time and part-time employees. Funding comes primarily through ad valorem taxes,
tuition and fees, and state appropriations. Development of this annex was carried out by the members of the local
mitigation planning team, whose members are listed in Table 33-1.
Table 33-1. Local Mitigation Planning Team Members
Name Title
Derrick Harris Senior Business Analyst, Department of Emergency Preparedness
Cheryl Cepeda Manager, Department of Emergency Preparedness
Paul Willingham Senior Associate Vice-Chancellor/Police Chief
Mark Pemberton Captain, Police Department
Sandra Joachim Chief of Staff, Police Department
33.2.2 Service Area and Trends
The Lone Star College (LSC) currently has a student enrollment of 95,000 with a service area covering more than
1,400 square miles in Harris, Montgomery, San Jacinto, and Walker counties, including multiple school districts:
Aldine, Cleveland, Conroe, Cypress-Fairbanks, Humble, Huntsville, Klein, Magnolia, Montgomery, New Caney,
New Waverly, Splendora, Spring, Tarkington, Tomball, Waller, and Willis. Lone Star College is the largest
institution of higher education in the Houston area and is one of the top three largest colleges in the nation. LSC is
composed of seven colleges, two university centers, and ten centers. LSC continues to grow with plans to build
additional centers and complete building expansion at various locations to accommodate the growth demand in
the LSC service area.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
33-2
33.2.3 Assets
Table 33-2 summarizes the critical assets of the district and their value.
Table 33-2. Special Purpose District Assets
Asset Value
Property
Land -Property addresses listed below under critical facilities and infrastructure $86,978,392
Construction-in-Progress $47,692,568
Equipment
Furniture, Machinery, Vehicles $100,186,178
Total:
Critical Facilities and Infrastructure $906,495,848
LSC-Cyfair – 9191 Barker Cypress Road, Cypress, TX 77433
LSC-Cypress Center – 19710 Clay Road, Katy, Texas 77449
LSC-Westway Park Technology Center – 5060 Westway Park Boulevard, Houston, Texas 77041
LSC-Kingwood – 20000 Kingwood Drive, Kingwood, TX 77339-3801
LSC-Atascocita Center – 15903 West Lake Houston, Houston, TX 77044
LSC-EMCID Center, 21575 Highway 59 N, New Caney, TX 77357
LSC-Process Technology Center, 14001 Lockwood Rd, Houston, Texas 77044
LSC-Houston North Fairbanks – 14955 Northwest Freeway, Houston, Texas 77040
LSC-Houston North Greenspoint – 250 N. Sam Houston Pkwy E., Houston, Texas 77060
LSC-Houston North Victory – 4141 Victory Drive, Houston, Texas 77088
LSC-Montgomery – 3200 College Park Drive, Conroe, TX 77384
LSC-Conroe Center – 777 Conroe Park North Drive, Conroe, TX 77303
LSC-North Harris – 2700 W.W. Thorne Drive, Houston, TX 77073
CHI LSC-North Harris – 910 E Richey Rd., Houston, TX 77073
LSC-Health Professions Building – 17200/17202 Red Oak Dr., Houston, TX 77090
LSC-Transportation Institute – 24037 W Hardy Rd., Spring, TX 77373
LSC-East Aldine Center (Opening Fall 2019) – 2500 Aldine Mail Route Road, Houston, Texas 77039
LSC-Tomball – 30555 Tomball Parkway, Tomball, TX 77375
LSC-Tomball Health Science Building – 700 Graham Dr., Tomball, Texas 77375
LSC-Creekside Center – 8747 West New Harmony Trail., The Woodlands 77375
LSC-University Park – 20515 SH 249, Houston, 77070
LSC-Energy & Manufacturing Institute – 11521 Compaq Center West Drive, Houston, TX 77070
LSC-Center for Science & Innovation – 919 University Park Campus Drive, Houston, TX 77070
LSC-Central Plant – 20555 SH 249, Houston, TX 77070
Visitors Center/YMCA Child Care – 11144 Compaq Center W Dr., Houston, TX 77070
Total: $1,141,352,986
33.3 CAPABILITY ASSESSMENT
An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or
integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were
identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation
Actions” table in Section 29.9 identifies these as community capacity building mitigation actions.
Lone Star College
33-3
33.3.1 Planning and Regulatory Capabilities
Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents.
When effectively prepared and administered, these plans, programs and regulations can support the
implementation of mitigation actions. Table 33-3 summarizes existing codes, ordinances, policies, programs or
plans that are applicable to this hazard mitigation plan.
Table 33-3. Planning and Regulatory Capability
Plan, Study or Program
Date of Most
Recent Update Comment
Emergency Operations Plan/Emergency Management Plan 2015 Currently being updated
Continuity of Operations Plan 2015 Currently being updated
Evacuation Plan 2018 Some locations undergoing revisions
33.3.2 Fiscal, Administrative and Technical Capabilities
Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard
mitigation projects. An assessment of fiscal capabilities is presented in Table 33-4. Administrative and technical
capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of
administrative and technical capabilities is presented in Table 33-5.
Table 33-4. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Capital Improvements Project Funding No
Authority to Levy Taxes for Specific Purposes No
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds No
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
State-Sponsored Grant Programs Yes, Hazard Mitigation Grant Program
Development Impact Fees for Homebuyers or Developers No
Federal Grant Programs Yes, Hazard Mitigation Grant Program
Table 33-5. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land
management practices
No
Engineers or professionals trained in building or infrastructure construction practices Yes Facilities & Construction
Planners or engineers with an understanding of natural hazards Yes Department of Emergency Preparedness
Staff with training in benefit/cost analysis Yes Department of Emergency Preparedness
Surveyors Yes Contractor
Personnel skilled or trained in GIS applications No
Scientist familiar with natural hazards in local area No
Emergency manager Yes Department of Emergency Preparedness
Grant writers Yes Resource Development & Administration/
Department of Emergency Preparedness
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
33-4
33.3.3 Education and Outreach Capabilities
Outreach and education capability identifies the connection between government and community members, which
opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is
presented in Table 33-6.
Table 33-6. Education and Outreach
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? No
• If yes, please briefly describe
Do you use social media for hazard mitigation education and outreach? No
• If yes, please briefly describe
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, please briefly specify
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, please briefly describe Emergency Preparedness website is currently being
developed and will include hazard-related information.
Do you have any established warning systems for hazard events? Yes
• If yes, please briefly describe LoneStarCollegeAlert/RAVE is the emergency
notification system used to inform the LSC community of
hazard events.
33.3.4 Adaptive Capacity for Climate Change
Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s
ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 33-7
summarizes the jurisdiction’s adaptive capacity for climate change.
33.4 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used
in hazard mitigation. This section identifies where such integration is already in place, and where there are
opportunities for further integration in the future. Resources listed in this annex were used to provide information
on integration. The progress reporting process described in Volume 1 will document the progress of hazard
mitigation actions related to integration and identify new opportunities for integration.
33.4.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Emergency Operations Plan/Emergency Management Plan: The results of the risk assessment were
used in the development of the LSC Emergency Management Plan.
Lone Star College
33-5
Table 33-7. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Medium
Comment:
Jurisdiction-level monitoring of climate change impacts Medium
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks High
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Medium
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Medium
Comment:
Champions for climate action in local government departments Medium
Comment:
Political support for implementing climate change adaptation strategies Medium
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
33-6
33.4.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• LSC Emergency Management Plan Annexes – The LSC-Department of Emergency Preparedness will
be integrating hazard mitigation information on its annexes, such as, communications, public information,
recovery, hazardous materials & chemical spills, and campus/department emergency operations plans.
33.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 33-8 lists past occurrences of natural hazards for which specific damage was recorded in Lone Star College.
Other hazard events that broadly affected the entire planning area, including Lone Star College are listed in the
risk assessments in Volume 1 of this hazard mitigation plan.
Table 33-8. Natural Hazard Events
Type of Event
FEMA
Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 LSC-Kingwood suffered major damages due to flooding
Severe Storms and Flooding 4269 DR 2016 Not Available
Severe Storms and Flooding 4272 DR 2016 Not Available
Severe Storms, Tornadoes, Straight Line Winds and Flooding 4245 DR 2015 Not Available
Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR 2015 Not Available
Hurricane Ike 1791 DR 2008 LSC-North Harris had power outage for 2 weeks
Hurricane Ike 3294 EM 2008 LSC-North Harris had power outage for 2 weeks
Hurricane Rita 1606 DR 2005 LSC-North Harris closed for a week due to electrical
issues and high water
Hurricane Rita 3261 EM 2005 LSC-North Harris closed for a week due to electrical
issues and high water
Hurricane Katrina Evacuation 3216 EM 2005 Not Available
Tropical Storm Allison 1379 DR 2001 Not Available
33.6 HAZARD RISK RANKING
Table 33-9 presents a local ranking for Lone Star College of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Lone Star College
33-7
Table 33-9. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Flooding 27 Medium
3 Earthquake 14 Low
4 Dam Failure 12 Low
5 Wildfire 9 Low
6 Drought 6 Low
7 Coastal Erosion 0 (No exposure) None
7 Mass Movement 0 (No exposure) None
7 Tsunami 0 (No exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
33.7 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• LSC-Kingwood suffered tremendous flood damage caused by Hurricane Harvey, damaging 6 of 9
buildings.
• LSC-University Park’s Center for Science Innovation also sustained some flood damage, pushing back
the original opening date.
• A critical facility used by ride-out teams not equipped with a generator.
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
33.8 STATUS OF PREVIOUS PLAN ACTIONS
Table 33-10 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 33-10. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update
2014LONSTR001: Reduce the buildup of fuel areas to mitigate the risk of wildfire
and provide public awareness to LSC community to further aid in the reduction of
fuel areas.
X LSC4
Comment: Ongoing – Action item carried over to plan update due t to departmental reorganization.
2014LONSTR002: Increase the effectiveness of exterior warning systems by
increasing the number of systems/devices provided through a network connected
system-wide exterior speaker array system) installed at LSC facilities that will result
in improved public information and warnings on wildfire hazards and threats.
X LSC5
Comment: In Progress – Initial planning started
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
33-8
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
2014LONSTR003: Create a sustainable balance that will allow the LSC community
to operate safely while maintaining environmental harmony in a wildland/urban
interface setting through implementation of the Firewise Program. Phase I: (a)
enlist a specialist to complete a community assessment and create a plan that
identifies agreed-upon achievable solutions to be implemented by the LSC
community and (b) sponsor a local Firewise Task Force Committee which
maintains the Firewise Community/USA program, then in Phase II submit an
annual report to Firewise Communities/USA that documents continuing compliance
with the program.
X
Comment: Removed – Intent of previously identified action is unclear; adequate personnel not available due to department
reorganization.
2014LONSTR004: Increase the effectiveness of warning systems by increasing the
number of LSC workspaces with NOAA weather alert radios. X LSC6
Comment: On Going – NOAA weather alert radios distributed within LSC-Police Department. Plans to distribute more to other
departments if funding becomes available.
2014LONSTR005: Assist LSC with funding to provide the proper design criteria for
“tornado safe rooms” or shelters for areas without a safe area for shelter, such as
libraries with two or more walls that are 80% or more glass.
X
Comment: Removed – change in priorities; most facilities have safe areas in interior rooms with no windows/glass.
2014LONSTR006: Expand LSC warning systems to include audio and visual
warnings and supporting literature as a means of providing timely public warning
and information that includes individuals with functional and access needs while at
an LSC campus in the event of a tornado or threat.
X
Comment: Removed – intent of previously identified action is unclear; action item similar to 2014LONSTR011 and 2014LONSTR012.
2014LONSTR007: Create a chemical safety/hazmat emergency management
program to include associated materials specifically for use by educational facilities
in partnership with Harris County first responder agencies. This program would
include a consolidated database of MSDS/SDS sheet for the top 700+ chemicals
tracked by the Environmental Protection Agency and the program would be used to
increase the number of Tier II report submissions to the Department of State Health
Services, local fire departments and Local Emergency Planning Committees
(LEPCs) by members of the LSC community.
X
Comment: In Progress – The Environmental Health & Life Safety department established and chemical inventories along with SDS are
stored in V Drive. Chemical inventories are also included in the intranet site and Digital Sandbox.
2014LONSTR008: Provide proper labeling, secure storage, and appropriate
disposal of hazardous materials to avoid spillage and breakage during a hazard
event. This program will mitigate risk of hazardous materials accidents within the
Lone Star community and aid in increasing the number of entities submitting the
appropriate TIER II reports to the Department of State Health Services, local fire
departments and Local Emergency Planning Committees (LEPCs).
X
Comment: In Progress – Awareness program implemented; information available online under www.lonestar.edu/oem, Environmental
Health & Safety, Waste Management Guidelines.
Lone Star College
33-9
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
2014LONSTR009: Install flood protection measures to reduce the adverse effects
of flood events by reducing the number of low water crossings at LSC facilities.
Public crossings will be elevated by using an articulated concrete block mattress
solution (interlocking mats) to form a mattress in the low water. The interlocking
mats will elevate grounds allowing for improved stability at crossings for
pedestrians while not impeding the passage of vehicles and animals.
X
Comment: Removed – The LSC department tasked with such activity was not properly consulted; intent of action item was unclear.
2014LONSTR010: Implement an effective flood mitigation program that includes
(a) the use of flood controls during construction, (b) the development of a riverine-
erosion protection program for riverine-erosion prone areas caused by flooding,
and (c) the implementation of a flood awareness program by providing FEMA/NFIP
materials to patrons of LSC campus public libraries including those managed by
the Harris County Libraries.
X LSC7
Comment: Ongoing – All new construction now includes flood controls during the design phase. Flood awareness materials and
information will be included in LSC Department of Emergency Preparedness website.
2014LONSTR011: Reduce the loss of property damage resulting from severe
weather events by improving external warning systems used to alert/warn the LSC
community about severe weather including severe thunderstorms and enhance
warning concerning severe weather preparedness.
X
Comment: Removed – intent of previously identified action is unclear; action item similar to 2014LONSTR006 and 2014LONSTR012.
2014LONSTR012: Expand warning systems by adding sirens and exterior mass
notification at all LSC facilities by installing hardware such as speaker arrays,
sirens, strobes, and horns to reach LSC occupants in a timely manner that are on
or near campus in parking lots and remote areas of campus who may require
functional needs support services and/or limited English proficiency.
X LSC8
Comment: Ongoing – Exterior mass notification plans have been developed as part of the Safety and Security Bond.
2014LONSTR013: Develop an LSC system wide Drought Contingency Program to
include a plan and mitigation actions to identify additional potential impacts of
drought on the community to include utilities such as power, drinking water, health
and safety (including special needs), and emergency response such as fire and
medical services. This action will aid in reducing loss of life and property damage
resulting from severe weather events in the LSC community.
X LSC9
Comment: Project not started – department undergoing reorganization and will carry over this action item to plan update.
2014LONSTR015: Expand LSC emergency management public education
campaigns as a means of extending the reach to those with limited English
proficiency and others requiring functional needs support services so that more
receive timely warning and information.
X LSC10
Comment: In Progress – Pre-scripted messages are available in English and Spanish. Updates to literature materials are currently being
reviewed.
2014LONSTR016: Develop and enhance alternate sources for additional feed and
adequate shelter for livestock and other animals to mitigate the adverse impact of
an energy pipeline failure and to update the LSC-Tomball evacuation plan.
X LSC11
Comment: Project not started – department undergoing reorganization and will carry over this action item to plan update.
2014LONSTR017: Harden the LSC Emergency Operations Center by improving
its’ technological capabilities for monitoring, warning, and mitigating natural
disasters and energy pipeline accidents
X
Comment: Removed – LSC will be utilizing web EOC and will rely on Harris County EOC for support if needed during natural disasters.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
33-10
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
2014LONSTR018: Develop a tree trimming program to prevent limb breakage and
safeguard nearby utility lines by working with utilities to identify critical areas of
concern involving communication and transmission lines.
X
Comment: Removed – Tree trimming has occurred however coordination with location utilities unknown at this time.
2014LONSTR020: Enhance the warning of populations at risk from extreme heat
when on campus and when participating in outdoor activities and using the
information to provide viable options to minimize their risk of extended exposure.
X
Comment: Removed – Action item similar to 2014LONSTR002.
2014LONSTR021: Increase public awareness through the creation and distribution
of materials and provide warning and alerts on the dangers of excessive heat to
include persons with functional and access needs while at an LSC facility.
X LSC12
Comment: Project not started – department undergoing reorganization and will carry over this action item to plan update.
2014LONSTR022: Install hail resistant roofing and window coverings, determined
by a feasibility study, by hardening LSC buildings and critical infrastructure such as
Police Offices, server rooms, and shelters for remote areas such as soccer fields,
tennis courts that are not adjacent to any structures.
X
Comment: Removed – intent of previously identified action is unclear.
2014LONSTR024: Evaluate LSC buildings to determine how to mitigate storm
damage through hardening measures then educate the LSC community on lessons
learned.
X
Comment: Project not started – department undergoing reorganization and will carry over this action item to plan update.
2014LONSTR025: Harden critical facilities on campuses that would be used by
ride-out teams and first responders such as police offices that include rehabilitation
facilities, refrigerator, cooling, microwave/stove, water, food, generator, and other
essential services.
X LSC13
Comment: In Progress – LSC Department of Emergency Preparedness will continue working with the Police Department and Facilities
to harden critical facilities used by ride-out teams.
33.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 33-11 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 33-12
identifies the priority for each action. Table 33-13 summarizes the mitigation actions by hazard of concern and
mitigation type.
Lone Star College
33-11
Table 33-11. Hazard Mitigation Action Plan Matrix
Applies to New or Existing
Assets Objectives Met Lead Agency Support Agency
Estimated
Cost Sources of Funding Timelinea
LSC1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that have
experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire
Existing 3, 4, 10, 12 College
Administration
TBD High HMGP, PDM, FMA Short-term
LSC2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Dam Failure, Wildfire, Drought
New and Existing 1, 5, 8 College
Administration
TBD Low Staff Time, General Funds Short-term
LSC3 — Integrate the hazard mitigation plan into other plans, ordinances and programs within the community.
Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire
Existing 2, 6, 9 College
Administration
TBD Low Staff Time Short-term
LSC4 — Reduce the buildup of fuel areas to mitigate the risk of wildfire and provide public awareness to LSC community to further aid in
the reduction of fuel areas.
Hazards Mitigated: Wildfire
Existing 2, 3, 8 DEP EHLS, Facilities Low HMGP Ongoing
LSC5 — Increase the effectiveness of exterior warning systems by increasing the number of systems/devices provided through a network
connected system-wide exterior speaker array system) installed at LSC facilities that will result in improved public information and
warnings on wildfire hazards and threats.
Hazards Mitigated: Dam failure, earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire
New and Existing 1, 6, 15 TBD TBD High HMGP, Bond Ongoing
LSC6 — Increase the effectiveness of warning systems by increasing the number of LSC workspaces with NOAA weather alert radios.
Hazards Mitigated: Earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire
Existing 1, 3, 11 DEP PD Medium HMGP, PDM, FMA Short-term
LSC7 — Implement an effective flood mitigation program that includes (a) the use of flood controls during construction, (b) the
development of a riverine-erosion protection program for riverine-erosion prone areas caused by flooding, and (c) the implementation of a
flood awareness program by providing FEMA/NFIP materials to patrons of LSC campus public libraries including those managed by the
Harris County Libraries.
Hazards Mitigated: Flooding, severe weather, hurricane
New and Existing 3, 4, 10 College
Administration
TBD High HMGP, PDM, FMA Ongoing
LSC8 — Expand warning systems by adding sirens and exterior mass notification at all LSC facilities by installing hardware such as
speaker arrays, sirens, strobes, and horns to reach LSC occupants in a timely manner that are on or near campus in parking lots and
remote areas of campus who may require functional needs support services and/or limited English proficiency.
Hazards Mitigated: Dam failure, earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire
New and Existing 1, 4, 11 College
Administration
TBD High HMGP, Bond
LSC9 — Develop an LSC system wide Drought Contingency Program to include a plan and mitigation actions to identify additional
potential impacts of drought on the community to include utilities such as power, drinking water, health and safety (including special
needs), and emergency response such as fire and medical services. This action will aid in reducing loss of life and property damage
resulting from severe weather events in the LSC community.
Hazards Mitigated: Drought, severe weather
Existing 3, 4, 14 DEP TBD Low HMGP, Staff Time Ongoing
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
33-12
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
LSC10 — Expand LSC emergency management public education campaigns as a means of extending the reach to those with limited
English proficiency and others requiring functional needs support services so that more receive timely warning and information.
Hazards Mitigated: Dam failure, drought, earthquake, flooding, land slide, severe weather, hurricane, tsunami, wildfire
New and Existing 1, 4, 15 DEP TBD Low HMGP, PDM, FMA Ongoing
LSC11 — Develop and enhance alternate sources for additional feed and adequate shelter for livestock and other animals to mitigate the
adverse impact of an energy pipeline failure and to update the LSC-Tomball evacuation plan.
Hazards Mitigated: Earthquake, flooding, severe weather, hurricane, tsunami, wildfire
Existing 8, 11, 15 College
Administration
TBD Medium HMGP Ongoing
LSC12 — Increase public awareness through the creation and distribution of materials and provide warning and alerts on the dangers of
excessive heat to include persons with functional and access needs while at an LSC facility.
Hazards Mitigated: Drought, severe weather, wildfire
New and Existing 1, 2, 4 DEP TBD Low HMGP, Staff Time Ongoing
LSC13 — Harden critical facilities on campuses that would be used by ride-out teams and first responders such as police offices that
include rehabilitation facilities, refrigerator, cooling, microwave/stove, water, food, generator, and other essential services.
Hazards Mitigated: Drought, earthquake, flooding, severe weather, hurricane
New and Existing 1, 3, 7, 13 College
Administration
TBD High HMGP, PDM, FMA Long-term
LSC14 — Develop and/or update plans that support or enhance continuity of operations following disasters.
Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire
Existing 3, 8, 10, 13, 14 DEP TBD Low Staff Time, HMGP Short-term
LSC15 — Purchase generators for critical facilities and infrastructure that lack adequate back-up power.
Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, severe weather, hurricane, tsunami, wildfire
New and Existing 1, 13 College
Administration
TBD High HMGP, PDM Long-term
Action LSC16— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Dam Failure, Wildfire, Drought
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
College
Administration
HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Lone Star College
33-13
Table 33-12. Mitigation Action Priority
Action #
# of
Objectives Met Benefits Costs
Do Benefits
Equal or Exceed Costs? Is Project Grant-Eligible?
Can Project Be Funded
Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
LSC1 4 High High Yes Yes No Medium High
LSC2 3 Low Low Yes No Yes High Low
LSC3 3 High Medium Yes Yes No Medium High
LSC4 3 Medium Medium Yes Yes No Medium Medium
LSC5 3 High High Yes Yes Yes Low Low
LSC6 3 High Medium Yes Yes Yes Medium Medium
LSC7 3 High High Yes Yes No Medium High
LSC8 3 High High Yes Yes Yes Low Low
LSC9 3 Medium Medium Yes Yes No Medium Medium
LSC10 3 Medium Medium Yes Yes Yes Low Low
LSC11 3 Medium Medium Yes Yes No Medium Low
LSC12 3 Medium Medium Yes Yes Yes Low Low
LSC13 4 High High Yes Yes No Medium High
LSC14 5 High Medium Yes Yes Yes Medium High
LSC15 2 High High Yes Yes No Medium High
LSC16 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 33-13. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe
Weather
LSC-1, 7, 16 LSC-1, 7 LSC-7, 10, 12, 16 LSC-7 LSC-5, 6, 8, 11,
13, 15, 16
LSC-1 LSC-2, 3, 9, 14,
16
Hurricane LSC-1, 16 LSC-7 LSC-7, 10, 16 LSC-7 LSC-5, 6, 8, 11,
13, 15, 16
LSC-7 LSC-2, 3, 14, 16
Medium-Risk Hazards
Flooding LSC-1, 16 LSC-1, 7, LSC-7, 10, 16 LSC-5, 6, 8, 11,
13, 15, 16
LSC-1 LSC-2, 3, 14, 16
Low-Risk Hazards
Earthquake LSC-1, 16 LSC-10, 16 LSC-5, 6, 8, 11,
13, 15, 16
LSC-2, 3, 14, 16
Dam Failure LSC16 LSC-10, 16 LSC-5, 6, 8, 15, 16 LSC-2, 3, 14, 16
Wildfire LSC-1, 4, 16 LSC-1, LSC-4, 10, 12, 16 LSC-5, 6, 8, 11,
15, 16
LSC-1 LSC-2, 3, 14, 16
Drought LSC16 LSC-10, 12, 16 LSC-13, 15, 16 LSC-2, 3, 9, 16
a. See the introduction to this volume for explanation of mitigation types.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
33-14
33.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX
33.10.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• LSC Hazard Mitigation Plan 2018 Annual Evaluation and Monitoring Report – Reviewed last report
submitted and used information to update existing action items.
• LSC Approved Budget Report Fiscal Year 2019
• LSC Comprehensive Annual Report, August 31, 2018
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
33.10.2 Staff and Local Stakeholder Involvement in Annex Development
This annex was developed with input from the LSC Police Department and Department of Emergency
Preparedness (DEP). All departments were asked to contribute to the annex development through reviewing
and contributing to the capability assessment, reporting on the status of previously identified actions, and
participating in action identification and prioritization. The LSC DEP, formerly known as LSC Office of
Emergency Management, has gone through a reorganization earlier this year and will further reevaluate the
departments that will be represented on the Hazard Mitigation Team to ensure all key stakeholders are
included.
34-1
34. UNIVERSITY OF HOUSTON
34.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Kelly Boysen,
Director of Emergency Management
4343 Elgin St.
Houston, TX 77204-0008
Telephone: 713-743-2841
e-mail Address: krboysen@uh.edu
Brian Hall,
Emergency Management Specialist
4343 Elgin St.
Houston, TX 77204-0008
Telephone: 713-743-6082
e-mail Address: bhall@central.uh.edu
34.2 JURISDICTION PROFILE
34.2.1 Overview
Established in 1927, the University of Houston is an institution of higher education whose mission is to offer
nationally competitive and internationally recognized opportunities for learning, discovery and engagement to a
diverse population of students in a real-world setting. The University has 166 buildings and currently employs
approximately 10,000 staff and faculty. Funding for the University comes primarily through Tuition/Fees,
Contracts & Grants, State Appropriations, Other Operating, and Endowment Income.
Table 34-1. Local Mitigation Planning Team Members
Name Title
Kelly Boysen Director, Emergency Management
Jeff Benjamin Executive Director, Facilities Services
Wayne Brown Director, Risk Management
Bret Collier/Andrea Black Captain, Police Department
Chris McDonald Director, Fire and Life Safety
Christa Rieck Executive Director, Facilities, Planning & Construction
Mike Rosen Executive Director, Media Relations
34.2.2 Service Area and Trends
The University of Houston campus covers 574 acres, serving a population of more than 55,000 students, faculty
and staff with approximately 8,000 student residents living on campus. The majority of students are from Harris
and adjacent counties, however 1,200 are from out of state and over 3,600 are international students, making the
University one of the most diverse student populations in the nation. Student enrollment has increased 13.2% in
the last five years.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
34-2
34.2.3 Assets
Table 34-2 summarizes the critical assets of the district and their value.
Table 34-2. Special Purpose District Assets
Asset Value
Property
574 acres of land $939,915,900.00
Equipment
69 Generators $20,265,648.00
Pipelines $10,000,000.00
Fleet (153 vehicles) $4,881,465.00
Radio Equipment (150 Police radios/264 Facilities Radios) $360,000.00
Chillers and Boilers $31,831,500.00
Facilities Equipment $1,717,640.00
Total: $69,056,253.00
Critical Facilities and Infrastructure
UH Police Department – 4051 Wheeler St, Houston, TX, 77204 $5,396,471.37
Central Plant – 4738 Calhoun Rd, Houston, TX, 77204 $4,458,428.01
Center for Public Broadcasting building (includes Emergency Operations Center & EAS LP 2 at KUHF) – 4343 Elgin St, Houston, TX, 77204 $49,508,554.75
General Services Building – 4267 Elgin St, Houston, TX, 77204 $15,734,759.16
Bulk Fueling Diesel Tank Farm – 4267 Elgin St, Houston, TX, 77204 $2,500,000.00
Computing Center – 4221 Elgin St, Houston, TX, 77204 $20,054,948.53
Ezekiel Cullen Building – 4302 University Dr, Houston, TX, 77204 $42,395,830.27
Cougar Sub-Station – 2200 Schlumberger, Houston, TX, 77023 $14,183,424.00
Health 1 – 4849 Calhoun Rd, Houston, TX, 77204 $65,991,467.94
Science and Research 2 – 3455 Cullen Blvd, Houston, TX, 77204 $44,215,511.04
J. Davis Armistead – 4901 Calhoun Rd, Houston, TX, 77204 $32,245,751.81
Sci. & Eng. Research Center – 3517 Cullen Blvd, Houston, TX, 77204 $66,251,298.82
College of Pharmacy (Texas Medical Center) – 1441 Moursund St, Houston, TX, 77204 $17,771,304.96
Child Care Center – 4139 Wheeler St, Houston, TX, 77204 $365,728.13
Isabel C. Cameron – 4235 Cullen Blvd, Houston, TX, 77204 $4,609,979.80
Moody Towers Residence Hall – 4401 Cougar Village Dr, Houston, TX, 77204 $50,773,506.05
Cougar Village I – 4385 Cougar Village Dr, Houston, TX, 77204 $58,414,694.40
Cougar Village II – 4373 Cougar Village Dr, Houston, TX, 77204 $53,865,000.00
Cougar Place – 4016 Cullen Blvd, Houston, TX, 77204 $42,200,625.56
Conrad Hilton College of Hotel & Restaurant Management – 4450 University Dr, Houston, TX, 77204 $76,875,208.70
University Lofts Apartments – 4700 Calhoun Rd, Houston, TX, 77204 $104,403,658.75
Bayou Oaks Apartments – 5063 Calhoun Rd, Houston, TX, 77204 $25,792,819.20
Cullen Oaks Apartments – 4600 Cullen Blvd, Houston, TX, 77204 $102,952.18
Science and Research 1 – 3507 Cullen Blvd, Houston, TX, 77204 $63,574,308.86
Science Teaching Lab – 3589 Cullen Blvd, Houston, TX, 77204 $35,522,664.87
Cullen College of Engineering 1 – 4726 Calhoun Rd, Houston, TX, 77204 $66,589,599.74
Cullen College of Engineering 2 – 4722 Calhoun Rd, Houston, TX, 77204 $31,421,011.97
Lamar Fleming, Jr – 3585 Cullen Blvd, Houston, TX, 77204 $36,556,462.08
Science Building – 3581 Cullen Blvd, Houston, TX, 77204 $15,562,022.63
Univ of Houston Science Center -3369 Cullen Blvd, Houston, TX, 77204 $44,630,507.52
Campus Recreation & Wellness Center – 4500 University Dr, Houston, TX, 77204 $62,088,726.53
University of Houston
34-3
Asset Value
Fertitta Center – 3422 Cullen Blvd, Houston, TX, 77204 $62,745,230.00
Football Indoor Practice Facility – 3820 Holman St., Houston, TX, 77204 $20,000,000.00
Health 2 – 4733 Wheeler St., Houston, TX, 77204 $136,000,000.00
Charles F. McElhinney Hall – 3623 Cullen Blvd, Houston, TX, 77204 $11,940,393.03
Guy V. Lewis Basketball Development Facility – 3480 Cullen Blvd, Houston, TX, 77204 $23,000,000.00
Engineering Research Building – 4718 Calhoun Rd., Houston, TX, 77204 $61,000,000.00
Wortham House – 1505 South Blvd. Houston, TX, 77006 $3,194,912.85
University Center – 4455 University Dr, Houston, TX, 77204 $66,562,000.00
University Center Satellite – 3457 Cullen Blvd, Houston, TX, 77204 $6,210,840.38
Cougar Woods Dining – 4277 Cougar Village Dr, Houston, TX, 77204 $9,560,678.40
UH Health Center – 4367 Cougar Village Dr, Houston, TX, 77204 $2,097,845.66
Philip Guthrie Hoffman Hall – 3551 Cullen Blvd, Houston, TX, 77204 $31,874,030.93
Bates Law – 4604 Calhoun Rd, Houston, TX, 77204 $20,686,786.56
Leroy and Lucile Melcher Hall – 4750 Calhoun Rd, Houston, TX, 77204 $40,136,988.67
M.D. Anderson Library – 4333 University Dr, Houston, TX, 77204 $198,948,261.89
Reb.& John Moores Schools of Music – 3333 Cullen Blvd, Houston, TX, 77204 $46,693,933.06
John M. O’Quinn Law Library – 4604 Calhoun Rd, Houston, TX, 77204 $47,258,779.26
Justin Dart Jr. Center for Students w/ DisAbilties – 4369 Cougar Village Dr, Houston, TX, 77204 $800,092.20
Melcher Gym/Charter School – 3871 Holman St, Houston, TX, 77204 $5,131,607.52
Susanna Garrison Gymnasium – 3875 Holman St, Houston, TX, 77204 $6,446,637.72
Cullen Performance Hall – 4300 University Dr, Houston, TX, 77204 $11,841,688.39
UH ERP 1 – 5000 Gulf Fwy, Houston, TX, 77204 $14,424,016.90
UH ERP 2 – 5000 Gulf Fwy, Houston, TX, 77204 $7,143,590.76
UH ERP 3 – 5000 Gulf Fwy, Houston, TX, 77204 $11,664,027.65
UH ERP 4 – 5000 Gulf Fwy, Houston, TX, 77204 $9,438,895.28
UH ERP 5 – 5000 Gulf Fwy, Houston, TX, 77204 $8,313,957.53
UH ERP 6 – 5000 Gulf Fwy, Houston, TX, 77204 $3,546,077.68
UH ERP 7 – 5000 Gulf Fwy, Houston, TX, 77204 $14,523,927.04
UH ERP 8 – 5000 Gulf Fwy, Houston, TX, 77204 $11,075,678.21
UH ERP 9 – 5000 Gulf Fwy, Houston, TX, 77204 $11,863,481.26
UH ERP 10 – 5000 Gulf Fwy, Houston, TX, 77204 $1,528,973.11
UH ERP 11 – 5000 Gulf Fwy, Houston, TX, 77204 $7,422,911.76
UH ERP 13 – 5000 Gulf Fwy, Houston, TX, 77204 $5,250,832.79
UH ERP 14 – 5000 Gulf Fwy, Houston, TX, 77204 $17,072,934.14
UH ERP 15 – 5000 Gulf Fwy, Houston, TX, 77204 $4,136,768.96
UH ERP 19 – 5000 Gulf Fwy, Houston, TX, 77204 $7,879,680.00
UH ERP 20 – 5000 Gulf Fwy, Houston, TX, 77204 $26,265.60
C.W. Mitchell Center for the Arts – 3351 Cullen Blvd, Houston, TX, 77204 $13,400,433.65
College of Technology Building – 4730 Calhoun Rd, Houston, TX, 77204 $12,896,409.60
Technology Annex – 4902 Gulf Fwy, Houston, TX, 77204 $4,195,053.29
Fine Arts Building – 4188 Elgin St, Houston, TX, 77204 $33,559,031.81
G.D. Hines Coll of Architecture – 4200 Elgin St, Houston, TX, 77204 $36,971,458.56
Teaching Unit 2 Building – 4604 Calhoun Rd, Houston, TX, 77204 $8,209,276.21
Fred J. Heyne – 3695 Cullen Blvd, Houston, TX, 77204 $13,737,538.64
Max Krost Hall – 4604 Calhoun Rd, Houston, TX, 77204 $15,937,497.32
Agnes Arnold Hall – 3553 Cullen Blvd, Houston, TX, 77204 $31,820,249.09
Stephen Power Farish Hall – 3657 Cullen Blvd, Houston, TX, 77204 $25,917,843.46
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
34-4
Asset Value
Graduate School of Social Work – 3511 Cullen Blvd, Houston, TX, 77204 $9,039,947.13
Jack J. Valenti School of Comm. – 3347 Cullen Blvd, Houston, TX, 77204 $7,329,529.01
Science & Engineering Classroom Building – 3487 Cullen Blvd, Houston, TX, 77204 $9,613,209.60
Roy G. Cullen – 3687 Cullen Blvd, Houston, TX, 77204 $10,160,247.55
Classroom and Business Building – 4742 Calhoun Rd, Houston, TX, 77204 $33,261,705.22
Michael J. Cemo Hall – 4746 Calhoun Rd, Houston, TX, 77204 $8,510,054.40
Science & Engineering Annex – 4712 Calhoun Rd, Houston, TX, 77204 $2,123,342.26
Engineering Lecture Hall – 4726 Calhoun Rd, Houston, TX, 77204 $553,005.40
B. Keeland Jr. Design.& Expl Ctr – 4222 Elgin St, Houston, TX, 77204 $660,648.13
Athletic Center – 3204 Cullen Blvd, Houston, TX, 77204 $40,340,447.26
A.D. Bruce Religion Center – 3841 Cullen Blvd, Houston, TX, 77204 $3,377,678.50
TDECU Stadium – 3700 Cullen Blvd, Houston, TX, 77204 $115,014,600.00
Alumni Center – 3204 Cullen Blvd, Houston, TX, 77204 $2,265,060.39
UH-DPS Parking Enforcement – 4055 Wheeler St, Houston, TX, 77204 $1,050,624.00
Student Service Center 1 – 4365 Cougar Village Dr, Houston, TX, 77204 $8,601,868.86
Student Service Center 2 – 4367 Cougar Village Dr, Houston, TX, 77204 $608,737.66
Fire & Life Safety Storage – 4739 Cullen Blvd, Houston, TX, 77204 $1,050,624.00
Visitor Information Booth 1 – 4422 University Dr, Houston, TX, 77204 $105,952.18
KUHT Fiber Optics Building – 4515 Cullen Blvd, Houston, TX, 77204 $364,087.39
KUHT Telephone Equipment – 4515 Cullen Blvd, Houston, TX, 77204 $821,170.41
Tex. Learn & Comp. Ctr. Annex – 4513 Cullen Blvd, Houston, TX, 77204 $718,921.52
Cullen Annex Laboratory – 4519 Cullen Blvd, Houston, TX, 77204 $595,477.68
Dynamometer Test Laboratory – 4505 Cullen Blvd, Houston, TX, 77204 $1,710,650.90
Safety, Human Factors & Ergo. Lab – 4517 Cullen Blvd, Houston, TX, 77204 $213,035.95
South Park Annex – 5011 Calhoun Rd, Houston, TX, 77204 $6,430,346.09
Health and Biomedical – 4733 Wheeler Ave, Houston, TX 77004 $65,991,467.94
Clinical Research Services Ctr – 4455 Cullen Blvd, Houston, TX, 77204 $2,828,080.92
Total: $2,631,485,264.80
34.3 CAPABILITY ASSESSMENT
An assessment of the University’s current capabilities was conducted to identify opportunities to expand, initiate
or integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were
identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation
Actions” table identifies these as community capacity building mitigation actions.
34.3.1 Planning and Regulatory Capabilities
The University develops plans and programs and implements rules and regulations to protect and serve the
campus community. When effectively prepared and administered, these plans, programs and regulations can
support the implementation of mitigation actions. Table 34-3 summarizes existing codes, ordinances, policies,
programs or plans that are applicable to this hazard mitigation plan.
University of Houston
34-5
Table 34-3. Planning and Regulatory Capability
Plan, Study or Program Date of Most Recent Update
Texas Facilities Commission Uniform General Conditions (and Supplementary General Conditions) 2015 (Supplementary: 2018)
Campus Design Guidelines and Standards 2018
International Building Code 2018
NFPA 1, Fire Code 2015 Edition 2015
NFPA 101, Life Safety Code 2015 Edition 2015
Various Federal/State regulations relating to Environmental, Health & Safety Various
Texas Food Establishment Rules 2015
University of Houston (UH) Manual of Administrative Policies and Procedures (MAPP) Emergency Management Policy (06.01.01) 2017
UH MAPP Continuity of Operations Planning (06.01.02) 2019
UH MAPP Laboratory Safety Program and Corresponding Safety Manuals (06.02.03) 2018
UH MAPP Fire and Life Safety Code (06.03.01) 2015
University of Houston System Administrative Memorandum (SAM) 01.C.01- Risk Management Policy 2017
University of Houston Emergency Management Plan 2018
University of Houston Continuity of Operations Plan 2018
Various UH policies, procedures relating to Environmental, Health & Safety Various
34.3.2 Fiscal, Administrative and Technical Capabilities
Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard
mitigation projects. An assessment of fiscal capabilities is presented in Table 34-4. Administrative and technical
capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of
administrative and technical capabilities is presented in Table 34-5.
34.3.3 Education and Outreach Capabilities
Outreach and education capability identifies the connection between the University and community members,
which opens a dialogue needed for a more resilient community. An assessment of education and outreach
capabilities is presented in Table 34-6.
Table 34-4. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes No
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds Yes
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Federal Grant Programs Yes
Other Yes (Private Donors; Funding from State Legislature)
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
34-6
Table 34-5. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Contract for service
Engineers or professionals trained in building or infrastructure
construction practices
Yes Contract for service
Planners or engineers with an understanding of natural hazards Yes Contract for service
Staff with training in benefit/cost analysis Yes Facilities Planning, Space Management
and Campus Architect
Surveyors Yes Contract for service
Personnel skilled or trained in GIS applications Yes Contract for service
Scientist familiar with natural hazards in local area Yes Various University Instructors
Emergency manager Yes UH Office of Emergency Management
Grant writers Yes University Division of Research / Office
of Contracts and Grants
Other No
Table 34-6. Education and Outreach
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, please briefly describe UH Office of Emergency Management Website
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, please briefly describe Facebook and Twitter Accounts
Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes
• If yes, please briefly specify University Emergency Planning Committee
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes
• If yes, please briefly describe UH Emergency Management Plan, Various Community
Outreach and Training Programs
Do you have any established warning systems for hazard events? Yes
• If yes, please briefly describe University’s Emergency Notification System, UH ALERT
34.4 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used
in hazard mitigation. This section identifies where such integration is already in place, and where there are
opportunities for further integration in the future. Resources listed in Section 1.9 were used to provide information
on integration. The progress reporting process described in Volume 1 will document the progress of hazard
mitigation actions related to integration and identify new opportunities for integration.
34.4.1 Existing Integration
The University of Houston is a new Planning Partner and will report on this at the five-year review period.
University of Houston
34-7
34.4.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Capital Improvement Plan — The University will work to integrate projects outlined in the hazard
mitigation plan with the Capital Improvement Plan in order to help mitigate potential hazards.
• UH Recovery Plan — The University does not have a formal, written recovery plan and intends to
develop one as a mitigation planning action during the next five years.
34.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 34-8 lists past occurrences of natural hazards for which specific damage was recorded for the University of
Houston. Other hazard events that broadly affected the entire planning area, including University of Houston, are
listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 34-8. Natural Hazard Events
Type of Event
FEMA
Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR Aug/Sept 2017 $28,000,000
Severe Storms and Flooding 4269 DR April 2016 N/A (1 day University closure occurred)
Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR May 2015 $25,000
Hurricane Ike 1791 DR Sept 2008 $23,000,000
Tropical Storm Allison 1379 DR June 2001 $76,000,000
34.6 HAZARD RISK RANKING
Table 34-9 presents a local ranking for University of Houston of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Table 34-9. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather (3X16) = 48 High
2 Hurricane (3X15)= 45 High
3 Flooding (3X13)= 39 High
4 Drought (3X4) = 12 Low
5 Earthquake (1X11) = 11 Low
6 Wildfire (1X6) = 6 Low
7 Mass Movement (1X4) = 4 Low
8 Dam Failure (2X0) = 0 None
8 Tsunami (1X0) = 0 None
8 Coastal Erosion (0X0) = 0 None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
34-8
34.7 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• A number of University buildings possess a flood risk and have experienced repetitive loss.
• Majority of University buildings have hurricane and severe weather risk where power loss may be caused
due to high winds. This includes some residence halls, research, and other critical facilities which do not
have generators or full-emergency back-up power. In addition, University’s electrical grid is vulnerable
due to limited redundancies.
• Campus roadways experience frequent flooding and become impassable often due to brief, intense rainfall
events.
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
34.8 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 34-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 34-11
identifies the priority for each action. Table 34-12 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 34-10. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action UOH1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Severe weather, hurricane, flooding, drought
Existing 7, 10, 11, 12, 13, 15 Facilities Services Facilities Planning &
Construction
High HMGP, PDM, FMA,
General Funds
Long-term
Action UOH2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami
New and Existing 3, 9, 10 UH Office of
Emergency
Management
(OEM)
UH Campus Safety Low Staff Time, General Funds Short-term
Action UOH3 — Integrate the hazard mitigation plan into other plans, guidelines, standards, university policies and programs (including
the University Capital Improvement Plan) within the campus community.
Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami
New and Existing 9, 10, 12, 13, 15 Facilities Planning
& Construction
Facilities Services Low Staff Time, General Funds Short-term
Action UOH4 — Develop a disaster recovery plan.
Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami
New and Existing 3, 6, 7, 9, 10, 11, 13 UH OEM UH Campus Safety Low Staff Time, General Funds Short-term
Action UOH5 — Develop and/or update plans that support or enhance continuity of operations during/following disasters.
Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami
New and Existing 3, 11, 13 UH OEM UH Campus Safety Low Staff Time, General Funds Ongoing
University of Houston
34-9
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action UOH6 — Conduct an assessment and purchase generators for critical facilities and infrastructure that lack adequate back-up
power.
Hazards Mitigated: Severe weather, hurricane, flooding, earthquake
Existing 4, 6, 7, 10, 11, 13 Facilities Services Facilities Planning &
Construction
Medium HMGP, PDM, General
Funds
Long-term
Action UOH7 — Expand the University’s emergency alert system by adding additional mass notification channels, capabilities and/or
coverage.
Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami
New and Existing 1, 4 UH OEM IT, University
Communications,
UHPD, Campus
Safety Systems
Medium HMGP, General funds Short-term
Action UOH8 — Enhance the University’s weather preparedness programs in order to meet the requirements and receive the National
Weather Service’s StormReady designation.
Hazards Mitigated: Severe weather, hurricane, flooding
New and Existing 1, 3 UH OEM UH Police
Department
Low Staff Time, General Funds Short-term
Action UOH9 — Assess and develop a stand-alone UH Hazard Mitigation Plan or pursue better integration into the State Hazard
Mitigation Plan.
Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami
New and Existing 3, 4, 5, 6, 7, 8, 9, 10,
11, 13, 15
UH OEM TDEM Medium Staff Time, HMGP, PDM,
FMA, General Funds
Short-term
Action UOH10 — Assess additional insurance coverages.
Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami
Existing 3, 10, 13 UH Risk
Management
UH Finance Medium Staff Time, General Funds Ongoing
Action UOH11 — Retrofit/Replace roofs based on recent assessment.
Hazards Mitigated: Severe weather, hurricane, flooding, earthquake
Existing 10, 11, 13 Facilities Services Facilities Planning &
Construction
High HMGP, PDM, FMA,
General Funds
Ongoing
Action UOH12 — Investigate and implement redundancies for the campus electrical grid to improve resiliency of University power supply.
Hazards Mitigated: Severe weather, hurricane, flooding, drought, earthquake, mass movement, dam failure, wildfire, tsunami
Existing 7, 10, 11, 13 Facilities Services Facilities Planning &
Construction
High HMGP, PDM, FMA,
General Funds
Long-term
Action UOH13 — Conduct drainage study of campus and based on the study, implement recommended actions to improve drainage on
campus.
Hazards Mitigated: Severe Weather, Hurricane, Flooding
Existing 3, 6, 7, 9, 10, 11, 15 Facilities Planning
& Construction
Facilities Services Medium HMGP, PDM, FMA,
General Funds
Short-term
Action UOH14— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Drought, Earthquake, Wildfire, Mass Movement
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
UH Risk
Management
HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
34-10
Table 34-11. Mitigation Action Priority
Action #
# of
Objectives
Met Benefits Costs
Do Benefits Equal or
Exceed
Costs?
Is Project
Grant-
Eligible?
Can Project Be Funded Under Existing
Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
UOH1 6 High High Yes Yes No High High
UOH2 3 Low Low Yes No Yes High Low
UOH3 5 Medium Low Yes No Yes High Low
UOH4 7 Low Low Yes Yes Yes High Low
UOH5 3 Low Low Yes No Yes High Low
UOH6 6 High Medium Yes Yes No High High
UOH7 2 High Medium Yes Yes No Medium Medium
UOH8 2 Low Low Yes No Yes High Low
UOH9 11 Medium Medium Yes Yes No Medium Medium
UOH10 3 Low Medium No No No Low Low
UOH11 3 High High Yes Yes No Medium High
UOH12 4 High High Yes Yes No High High
UOH13 7 Low Medium No Yes Yes Medium Medium
UOH14 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 34-12. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilient
Community
Capacity Building
High-Risk Hazards
Severe Weather UOH3, 13,
14
UOH1, 11 UOH8, 14 UOH6, 7, 12,
14
UOH1, 11,
13
UOH3, 13 UOH2, 4, 5, 9, 10,
13, 14
Hurricane UOH3, 13,
14
UOH1, 11 UOH8, 14 UOH6, 7, 12,
14
UOH1, 11,
13
UOH3, 13 UOH2, 4, 5, 9, 10,
13, 14
Flooding UOH3, 13,
14
UOH1, 11 UOH8, 14 UOH6, 7, 12,
14
UOH1, 11,
13
UOH3, 13 UOH2, 4, 5, 9, 10,
13, 14
Low-Risk Hazards
Drought UOH3, 14 UOH1 UOH14 UOH7, 12, 14 UOH1 UOH3 UOH2, 4, 5, 9, 10, 14
Earthquake UOH3, 14 UOH1, 11 UOH14 UOH6, 7, 12,
14
UOH11 UOH3 UOH2, 4, 5, 9, 10, 14
Wildfire UOH3, 14 UOH14 UOH7, 12, 14 UOH3 UOH2, 4, 5, 9, 10, 14
Mass Movement UOH3, 14 UOH14 UOH7, 12, 14 UOH3 UOH2, 4, 5, 9, 10, 14
a. See the introduction to this volume for explanation of mitigation types.
University of Houston
34-11
34.9 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• Campus Design Guidelines and Standards – This was used during the Capability Assessment.
• University of Houston (UH) Manual of Administrative Policies and Procedures (MAPP)
06.01.01 – Emergency Management Policy – This was used during the Capability Assessment.
• UH MAPP 06.01.02 – Continuity of Operations Planning – This was used during the Capability
Assessment
• UH MAPP 06.02.03 Laboratory Safety Program and Corresponding Safety Manuals – This was
used during the Capability Assessment.
• UH MAPP 06.03.01 Fire and Life Safety Code – This was used during the Capability Assessment.
• University of Houston System Administrative Memorandum (SAM) 01.C.01- Risk Management
Policy – This was used during the Capability Assessment.
• University of Houston Emergency Management Plan – This was used during the Capability
Assessment, and reviewed to determine potential for integration with mitigation planning.
• University of Houston Continuity of Operations Plan – This was used during the Capability
Assessment.
• UH Department Continuity of Operations Plan Template – This was used during the Capability
Assessment, and reviewed to determine potential for integration with mitigation planning.
• Physical Recovery Emergency Plan – This was used during the Capability Assessment, and reviewed to
determine potential for integration with mitigation planning.
• Ride Out Team Program – This was used during the Capability Assessment, and reviewing to
determine potential for integration with mitigation planning.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• Texas Facilities Commission Uniform General Conditions – This was used during the Capability
Assessment.
• International Building Code – This was used during the Capability Assessment.
• NFPA 1, Fire Code (2015 Edition) – This was used during the Capability Assessment because this Code
is adopted by the State of Texas for State owned/leased buildings.
• NFPA 101, Life Safety Code (2015 Edition) – This was used during the Capability Assessment because
this Code is adopted by the State of Texas for State owned/leased buildings.
• Texas Food Establishment Rules – This was used during the Capability Assessment because these
Rules must be followed by every food establishment that serves the public in the State of Texas
35-1
35. HARRIS COUNTY FLOOD CONTROL DISTRICT
35.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Todd Ward, Risk Mitigation Department Manager
9900 Northwest Freeway
Houston, TX 77092
Telephone: 346-286-4858
e-mail Address: Todd.Ward@HCFCD.hctx.net
James Wade, Property Acquisition Services
Department Manager
9900 Northwest Freeway
Houston, TX 77092
Telephone: 346-286-4036
e-mail Address: James.Wade@HCFCD.hctx.net
35.2 JURISDICTION PROFILE
35.2.1 Overview
The Harris County Flood Control District (the District) is a special purpose district created by the Texas
Legislature in 1937 in response to devastating floods that struck the region in 1929 and 1935. The mission of the
Harris County Flood Control District is to provide flood damage reduction projects that work , with appropriate
regard for community and natural values. Funding comes primarily through property taxes and revenue bonds,
much of which is leveraged to secure additional grant funds.
The Harris County Commissioners Court assumes responsibility for the adoption of this plan; the County Judge
will oversee its implementation. Development of this annex was carried out by the members of the local
mitigation planning team, whose members are listed in Table 35-1.
Table 35-1. Local Mitigation Planning Team Members
Name Title
Todd Ward Risk Mitigation Department Manager
James Wade Property Acquisition Department Manager
35.2.1 Service Area and Trends
The District’s jurisdictional boundaries are set to coincide with Harris County, a community that includes the City
of Houston. The district service area covers 1,756 square miles serving a population of approximately 4.7 million
people. The District’s drainage and flood control infrastructure is extensive, including more than 1,500 channels
totaling about 2,500 miles in length.
35.2.2 Assets
Table 35-2 summarizes the critical assets of the district and their value.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-2
Table 35-2. Special Purpose District Assets
Asset Value
Property
39,949 acres (44% easements, 56% fee simple ownership) $1,649,735,796
Equipment
Primarily back-up generators, District Fleet (vehicles, tractors & heavy duty), & misc. equipment $12,132,213.00
Total: $12,132,213.00
Critical Facilities and Infrastructure
Administration/Buyout Office $6,221,741.19
Service Center #1 Canopy $167,500.00
Service Center #2 Wash Facility $63,525.33
Service Center #2 Maintenance $568,200.00
Service Center #3 Office $301,200.00
Mike Talbott Service Center Pavilion $648,600.00
Mike Talbott Service Center Canopy $237,500.00
Mike Talbott Service Center Maintenance Bldg. $838,600.00
Mike Talbott Service Center Fuel Facility $78,100.00
Mike Talbott Service Center Garage $278,000.00
Mike Talbott Service Center Administration Bldg. $1,816,200.00
Mike Talbott Service Center Storage Bldg. $154,705.64
Mike Talbott Service Center Wash Facility $67,089.23
Mike Talbott Service Center Canopy #2 $152,361.61
Mike Talbott Service Center Distribution Center $564,900.00
Total: $12,158,223.00
35.3 CAPABILITY ASSESSMENT
An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or
integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were
identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation
Actions” table in Section 29.9 identifies these as community capacity building mitigation actions.
35.3.1 Planning and Regulatory Capabilities
Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents.
When effectively prepared and administered, these plans, programs and regulations can support the
implementation of mitigation actions. Table 35-3 summarizes existing codes, ordinances, policies, programs or
plans that are applicable to this hazard mitigation plan.
Harris County Flood Control District
35-3
Table 35-3. Planning and Regulatory Capability
Plan, Study or Program Date of Most Recent Update Comment
Capital Improvement Program Updated and
approved annually
Covers 5 year timeframe. This CIP encompasses all of the estimated capital
improvement activities the District will initiate throughout Harris County this fiscal
year.
Bond Program 2018 2018 On August 14, 2018, Harris County Commissioners Court approved a list of flood
risk reduction projects that would meet the goal of the 2018 bond election, which
is to both assist with recovery after previous flooding events (including Harvey)
and to make our county more resilient for the future.
Flood Operations & Hurricane Response Plan 2018 For use by HCFCD employees as a guide for conducting Flood Operations and to
address the actions to be taken for the successful function of HCFCD operations
during each phase of a hurricane threat, landfall, and recovery.
Property Acquisition Program Continuous Responsible for voluntary buyout and project Right-of-Way acquisition for
HCFCD.
Property Management Program Continuous Primary responsibilities are to identify deficiencies of the District’s channel and
detention basin infrastructure, to define the scope of operations to be performed,
and to prioritize repairs and cyclical maintenance within the available budget.
Vegetation Management Program Continuous Responsible for debris removal & de-snag operations, herbicide applications,
selective clearing, and vegetation establishment including turf and native grass,
wildflowers, and trees.
System Repair Plan Continuous Covers 5 year timeframe. Constantly monitors and assesses the potential repair
sites to ensure HCFCD facilities retain their functions.
Stormwater Quality Program 2019 Supports the Flood Control District’s mission by ensuring compliance with all
storm water permits and supporting other divisions through design of
environmental enhancements and site stabilization and revegetation. Updated
annually during Annual Report to TCEQ.
Watershed Environmental
Baseline Program
2019 Documents the baseline environmental conditions, including natural, cultural, and
physical resources deemed necessary to evaluate potential project alternatives in
Harris County’s watersheds and proposed project areas Updated annually with
new environmental database records
LOMR Review Program 2019 This partnership program between FEMA and HCFCD allows for HCFCD to
perform LOMR and CLOMR reviews for those requests submitted in Harris
County. Mapping Activity Statements are developed annually.
Model and Map Management System Continuous This system helps maintain current and reliable effective hydrology and hydraulic
models, FIRMs, and FIS data.
Greens Bayou Wetland Mitigation Bank Provides opportunities for federally permitted government and private
developments to mitigate for the unavoidable loss of wetlands elsewhere in Harris
County by preserving, restoring and creating wetlands.
HCFCD Frontier Program 2019 The purpose of this program is to plan for and implement orderly drainage
infrastructure in advance of future land development in specific areas to more
effectively mitigate increased stormwater runoff while offering opportunities to
provide community amenities and enhance & preserve the area’s natural
resources through development of recreation and open space areas.
Upper Langham Creek Frontier Program 2012 Exists to implement certain common elements of a regional detention plan that
embraces concepts from the HCFCD Frontier Program and uses funding from
existing impact fees.
Little Cypress Creek Frontier
Program
2018 HCFCD initiated the Little Cypress Creek Frontier Program as part of a strategic
effort to efficiently and methodically plan for and implement effective flood risk
reduction projects, both for existing flooding issues and in anticipation of future
development within the watershed
Little Cypress Creek Master Drainage Plan 2019 A plan for effective flood risk reduction projects, both for existing flooding issues
and in anticipation of future development within the watershed.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-4
Plan, Study or Program Date of Most Recent Update Comment
Cypress Creek Overflow Management Plan 2016 Established a set of policies, technical criteria and guidelines that will allow the
Flood Control District and Harris County to plan for and implement programs that
reduce flood risks that are reflective of the unique hydrologic conditions in upper
Cypress Creek and the drainage areas upstream of Addicks and Barker
reservoirs.
Policy, Criteria, and Procedures Manual 2019 Provides written policies and criteria for the engineering community and HCFCD
staff to use for land development and infrastructure projects that are effective,
consistent, and practical.
Provides a written review and acceptance procedure to efficiently coordinate land
development and infrastructure projects with the HCFCD.
Harris County Low Impact Development & Green Infrastructure Design Criteria for Storm Water Management
2011 This document is intended to provide a set of interim guidelines for the use of Low
Impact Development (LID) and Green Infrastructure (GI) techniques.
Little Cypress Creek Interim
Guidelines
2014 These guidelines are intended to promote the implementation of the Interim
Drainage Plan until such time that the HCFCD adopts a final Regional Drainage
Plan for Little Cypress Creek watershed.
Supplemental Guidelines And Criteria For Developing In The Addicks Reservoir Watershed, Barker Reservoir Watershed
And The Cypress Creek Watershed Upstream Of US 290
2016 Provides direction for the engineering community and HCFCD staff to comply with
the HCFCD no adverse impact policy associated with management of stormwater
runoff from land development and infrastructure projects in the Cypress Creek
watershed upstream of US 290 (upper Cypress Creek), Addicks Reservoir and
Barker Reservoir watersheds within Harris County.
Upper Langham Creek Development Guidelines 2012 Provides a clear understanding of the roles and responsibilities for constructing
new development in the Upper Langham Creek Service Area
Hydrology and Hydraulics Guidance Manual 2019 HCFCD prepared this Hydrology and Hydraulics Guidance Manual to document
hydrologic and hydraulic methodologies for the analysis of watersheds and open
channel projects in Harris County. Updated in 2019 to include additional guidance
on 1D Unsteady and 2D flow modeling.
Ordinary High Water Mark Delineation Manual 2005 For use as a guide in executing future OHWM delineations for HCFCD.
Land Surveying Guidelines 2019 Intended to identify and create land surveying standards applicable to all HCFCD
related work. Helps ensure clarity and consistency of survey data.
Design Manual for Articulating
Concrete Block Systems
2001 This Design Manual provides guidelines and procedures for the design and
installation of articulating concrete block revetment systems.
Design Guidelines for HCFCD
Wet Bottom Detention Basins with Water Quality Features
2014 These Design Guidelines identify criteria, considerations, and procedures for wet
bottom detention basins with water quality features that are planned, designed,
constructed, operated, and maintained by HCFCD.
Detention Basin Pump Operation & Maintenance Manual
2012 The focus of this document is to identify specific content requirements associated
with the O&M Manual identified in Section 6.15 of the HCFCD’s Policy Criteria
and Procedures Manual
35.3.2 Fiscal, Administrative and Technical Capabilities
Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard
mitigation projects. An assessment of fiscal capabilities is presented in Table 35-4. Administrative and technical
capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of
administrative and technical capabilities is presented in Table 35-5.
Harris County Flood Control District
35-5
Table 35-4. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes No
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers Yes
Federal Grant Programs Yes
Other: Rent on owned property (less than 1% of District revenue) Yes
Table 35-5. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Planning Division; Watershed Management
Department
Engineers or professionals trained in building or infrastructure
construction practices
Yes Construction Division
Planners or engineers with an understanding of natural hazards Yes Planning Division; Engineering Division
Staff with training in benefit/cost analysis Yes Planning Division; Engineering Division
Surveyors Yes Surveying Department
Personnel skilled or trained in GIS applications Yes GIS Services
Scientist familiar with natural hazards in local area Yes Hydrologic Operations Division
Emergency manager Yes Hydrologic Operations Division
Grant writers Yes Many HCFCD divisions prepare grant applications
with in-house staff. Consultant support for grant
writing also utilized.
35.3.3 Education and Outreach Capabilities
Outreach and education capability identifies the connection between government and community members, which
opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is
presented in Table 35-6.
35.3.4 Adaptive Capacity for Climate Change
Given the uncertainties associated with how risk may change with a changing climate, a jurisdiction’s ability to
track such changes and adapt as needed is an important component of the mitigation strategy. Table 35-7
summarizes the jurisdiction’s adaptive capacity for climate change.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-6
Table 35-6. Education and Outreach
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, please briefly describe The information on the website is project specific
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, please briefly describe Twitter, Facebook, and NextDoor are used for hazard
alerts, general education, and safety tips
Do you have any citizen boards or commissions that address issues
related to hazard mitigation?
Yes
• If yes, please briefly specify The Harris County Flood Control Task Force was
created by the Commissioners Court in 1972 to advise
and make recommendations to Harris County
government
Do you have any other programs already in place that could be used to
communicate hazard-related information?
Yes
• If yes, please briefly describe Annual outreach/educational events throughout the
county
Do you have any established warning systems for hazard events? Yes
• If yes, please briefly describe An interactive flood warning system utilizes an extensive
gage network to provide near real-time rainfall, stream
level, and inundation extent information
Table 35-7. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts High
Comment: HCFCD has done a review of 2014 IPCC data regarding the observed and projected impacts to the frequency and severity
of precipitation, floods, hurricanes, to sea level rise, and to water quality. HCFCD has a contract with the Texas State
Climatologist to study climate change patterns.
Jurisdiction-level monitoring of climate change impacts High
Comment: HCFCD has an extensive rain and flood stage gage network across the county and the areas that drain into the county, and
also has many water quality monitoring sites.
Technical resources to assess proposed strategies for feasibility and externalities High
Comment: The District has many technical resources, both in house and with consulting support, to evaluate the effectiveness of
mitigation strategies
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment: This is not an inventory that the District currently keeps, although we would have record of kilowatt hours purchased for our
buildings, fuel purchased for our vehicles and tools, and could potentially seek to determine fuel costs for our construction
and maintenance contractors vehicles and tools.
Capital planning and land use decisions informed by potential climate impacts High
Comment: This capacity exists and is in use, and the District is considering improvements. The District currently implements several
strategies, and is considering additional strategies, to increase ecosystem resilience and protect critical ecosystem
services, thereby minimizing vulnerability of human and natural systems to climate change. Additionally, the District is
considering the newly released NOAA Atlas 14 rainfall study results in the planning of future flood reduction projects.
Participation in regional groups addressing climate risks Medium
Comment: The District participates with HGAC
Harris County Flood Control District
35-7
Criterion Jurisdiction Ratinga
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes High
Comment: The District is reviewing a plan aimed at reducing emissions and preparing for climate change.
Identified strategies for greenhouse gas mitigation efforts High
Comment: Since 2001, the District has planted a total of 264,422 trees. These trees remove carbon dioxide from the air, and slow the
growth of grasses, reducing the need for and emissions from mowing.
Identified strategies for adaptation to impacts High
Comment: The District has identified a number of strategies, both ongoing and proposed, to reduce or mitigate climate change
impacts. A plan aimed at reducing emissions and preparing for climate change is under review.
Champions for climate action in local government departments Medium
Comment: Harris County Commissioners Court
Political support for implementing climate change adaptation strategies High
Comment: Judge Lina Hidalgo is strongly in support of climate change adaptation being a part of The District’s efforts.
Financial resources devoted to climate change adaptation High
Comment: Related to the capital planning and land use decisions.
Local authority over sectors likely to be negative impacted High
Comment: The District has local authority to execute structural and non-structural projects which can reduce flood risks for Harris
County property owners, as well as projects to improve water quality.
Public Capacity
Local residents knowledge of and understanding of climate risk Medium
Comment: The District is publishing information regarding newly increased rainfall estimates
Local residents support of adaptation efforts Unsure
Comment: Residents supported the bond program, and have largely voiced support for updating Flood Insurance Rate Maps to reflect
the increased rainfall risk estimates, which are influenced by climate change.
Local residents’ capacity to adapt to climate impacts Unsure
Comment:
Local economy current capacity to adapt to climate impacts Unsure
Comment:
Local ecosystems capacity to adapt to climate impacts Unsure
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
35.4 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used
in hazard mitigation. This section identifies where such integration is already in place, and where there are
opportunities for further integration in the future. Resources listed in this annex were used to provide information
on integration. The progress reporting process described in Volume 1 will document the progress of hazard
mitigation actions related to integration and identify new opportunities for integration.
35.4.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-8
• Capital Improvement Program — The capital improvement program includes projects that can help
mitigate potential hazards and studies that can identify recommended projects or inform watershed
management criteria. The District will act to ensure consistency between the hazard mitigation plan and
the current and future capital improvement plans. The hazard mitigation plan may identify new possible
funding sources for capital improvement projects and may result in modifications to proposed projects
based on results of the risk assessment.
• Bond Program — The bond improvement program includes projects that can help mitigate potential
hazards. The District will act to ensure consistency between the hazard mitigation plan and the projects in
the bond program. The hazard mitigation plan may identify new possible funding sources for bond
projects and may result in modifications to proposed projects based on results of the risk assessment.
• Flood Operations & Hurricane Response Plan — The Hurricane Response Plan addresses the actions
to be taken for the successful function of the District operations during each phase of a hurricane threat,
landfall, and recovery. The primary purpose of the Harris County Flood Control District (HCFCD) Flood
Operations is to better serve the citizens of Harris County and our core partners before, during, and after
floods and near-floods. The hazard mitigation plan may provide information to help The District identify,
and thus respond to, imminent risks during severe weather events. The hazard mitigation plan may
identify new possible funding sources for equipment to help the District monitor and respond to severe
weather.
• LOMR Review Program & Model and Map Maintenance System — The LOMR Review program
and Model and Map Maintenance System help maintain up-to date and reliable FEMA effective
hydrology and hydraulic models, Flood Insurance Rate Maps, and Flood Insurance Study documentation.
Keeping this data up to date and reliable helps with identification of hazards considered in risk
assessment, and thus informs efforts to mitigate flood risk.
• Property Acquisition Program — The Property Acquisition program is responsible for voluntary
property acquisitions which remove structures at high risk of flooding so that they never flood again,
Right-of-Way property acquisitions which can be used to acquire land necessary for construction of flood
risk reduction projects. The hazard mitigation plan risk assessment may help inform the prioritization of
property acquisition efforts, and may identify new possible sources of funding for voluntary acquisition
and project right-of-way acquisition based on the results of the risk assessment.
• Little Cypress Creek Frontier Program — The Little Cypress Creek Frontier Program is part of a
strategic effort to economically incentivize, plan for, and implement effective and holistic flood risk
management solutions in advance of anticipated future development.
• Upper Langham Creek Frontier Program — The Upper Langham Creek Frontier Program identifies
strategies to more effectively mitigate increased stormwater runoff and replace natural resource functions
for new development in the upper Langham Creek area.
35.4.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Adapting Infrastructure for Climate Change — This plan is under development but not yet approved.
The plan will recommend actions to reduce net carbon emissions and mitigate hazards associated with
climate change. The plan will build on mitigation goals and objectives identified in the mitigation plan.
• Vegetation Management Program — The goals and objectives identified in the hazard mitigation plan
may be utilized to refine the practices in the Vegetation Management Program. The hazard mitigation
plan may identify new possible sources of funding for vegetation management efforts.
• Stormwater Quality Program — The goals and objectives identified in the hazard mitigation plan may
be utilized to refine the practices in the Stormwater Quality Program. The hazard mitigation plan may
Harris County Flood Control District
35-9
identify new possible sources of funding for activities such as natural channel design and other
environmental enhancements.
• Watershed Environmental Baseline Program — The goals and objectives identified in the hazard
mitigation plan may be utilized to identify new datasets it would be desirable to include or develop for
inclusion on the Watershed Environmental Baseline Program.
35.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 35-8 lists past occurrences of natural hazards for which specific damage was recorded in the Harris County
Flood Control District. Other hazard events that broadly affected the entire planning area, including the Harris
County Flood Control District, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 35-8. Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 Over 300,000 flooded vehicles & 154,170 flooded homes
Severe Storms and Flooding 4269 DR 2016 9,840 flooded homes
Severe Storms and Flooding 4272 DR 2016 425 homes and 22 businesses flooded
Severe Storms, Tornadoes, Straight Line Winds and Flooding 4245 DR 2015 394 flooded homes
Severe Storms, Tornadoes, Straight Line Winds and Flooding 4223 DR 2015 6,335 flooded homes
Severe Storms and Flooding 2014 109 flooded homes
Severe Storms and Flooding 2012 71 flooded homes
Severe Storms and Flooding 2010 40-45 flooded homes
Severe Storms and Flooding April 28, 2009 3,370 flooded homes
Severe Storms and Flooding April 18, 2009 170-180 flooded homes
Hurricane Ike 1791 DR 2008 3,700-3,900 flooded homes
Tropical Storm Erin 1730 DR 2007 508 homes, 601 apartment units, and 55 businesses flooded
Severe Storms and Flooding June 2006 3,370 homes, 561 apartments, and 1 nursing home flooded
Severe Storms and Flooding October 16, 2006 115-125 flooded homes
Severe Storms and Flooding October 26, 2006 26-36 flooded homes
Severe Storms and Flooding 2003 300 flooded homes
Severe Storms and Flooding 2002 1,225 flooded homes
Tropical Storm Allison 1379 DR 2001 73,000 Affected houses
35.6 HAZARD RISK RANKING
Table 35-9 presents a local ranking for the Harris County Flood Control District of all hazards of concern for
which this hazard mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary
for this jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the
likelihood of occurrence for each hazard, along with its potential impacts on people, property and the economy.
Mitigation actions target hazards with high and medium rankings.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-10
Table 35-9. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Hurricane 48 High
1 Severe Weather 48 High
2 Flooding 30 High
3 Earthquake 14 Low
4 Dam Failure 12 Low
5 Wildfire 11 Low
6 Mass Movement 6 Low
6 Drought 6 Low
6 Tsunami 6 Low
7 Coastal Erosion 0 (No exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
35.7 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• The District’s Brookhollow office may become inoperable in the event of a Category 3 or higher
hurricane.
• The District’s infrastructure is subject to erosion during flood events, which can reduce the flood carrying
capacity of the infrastructure for events to follow.
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
35.8 STATUS OF PREVIOUS PLAN ACTIONS
Table 35-10 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 35-10. Status of Previous Plan Actions
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update
1 Aldine Estates residential acquisition/demolition (23 homes) X FCD180
Comment: Gatewood, Aldine Estates & Greenbranch buyouts are to include 482 parcels. 254 parcels remain to be purchased.
2 Arbor Oaks residential acquisition/demolition (37 homes) X FCD180
Comment: Arbor Oaks buyouts are to include 231 parcels. 23 parcels remain to be purchased.
3 Blue Bell residential acquisition/demolition (28 homes) X FCD180
Comment: Blue Bell buyouts are to include 152 parcels. 33 parcels remain to be purchased.
4 Brookglen residential acquisition/demolition (27 homes) X FCD180
Comment: Brookglen buyouts are to include 56 parcels. 13 parcels remain to be purchased.
5 Castlewood residential acquisition/demolition (36 homes) X
Comment: This voluntary buyout project was replaced with a flood reduction capital project.
Harris County Flood Control District
35-11
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
6 Creekside-Ted Burger residential acquisition/demolition (10 homes) X FCD180
Comment: Creekside-Ted Burger buyouts are to include 134 parcels. 18 parcels remain to be purchased.
7 Gatewood residential acquisition/demolition (188 homes) X FCD180
Comment: Gatewood, Aldine Estates & Greenbranch buyouts are to include 482 parcels. 254 parcels remain to be purchased.
8 Gatewood residential acquisition/demolition (12 homes) X FCD180
Comment: Gatewood, Aldine Estates & Greenbranch buyouts are to include 482 parcels. 254 parcels remain to be purchased.
9 Greenbranch residential acquisition/demolition (20 homes) X FCD180
Comment: Gatewood, Aldine Estates & Greenbranch buyouts are to include 482 parcels. 254 parcels remain to be purchased.
10 Homeowned Estates residential acquisition/demolition (58 homes) X FCD180
Comment: Homeowned estates buyouts are to include 111 parcels. 67 parcels remain to be purchased.
11 Lake Forest residential acquisition/demolition (48 homes) X
Comment: Depth of structures did not meet the criteria for buyouts
12 Lakewood residential acquisition/demolition (53 homes) X FCD180
Comment: Lakewood buyouts are to include 141 parcels. 125 parcels remain to be purchased.
13 Langley Road Place residential acquisition/demolition (12 homes) X FCD180
Comment: Langley Road Place (Farrington) buyouts are to include 103 parcels. 84 parcels remain to be purchased.
14 Langwood residential acquisition/demolition (23 homes) X FCD180
Comment: Langwood buyouts are to include 143 parcels. 99 parcels remain to be purchased.
15 Ramona residential acquisition/demolition (10 homes) X FCD180
Comment: Ramona buyouts are to include 17 parcels. 15 parcels remain to be purchased.
16 Woodland Trail and Woodland Oaks residential acquisition/demolition (196
homes)
X FCD180
Comment: Woodland Trail and Woodland Oaks buyouts are to include 547 parcels. 71 parcels remain to be purchased.
17 Woodshadows residential acquisition/demolition (90 homes) X FCD180
Comment: Woodshadows buyouts are to include 158 parcels. 92 parcels remain to be purchased.
18 The Brays Bayou Flood Damage Reduction Project X FCD29
Comment: Eldridge Road Basin, Old Westheimer Basin, Arthur Storey Park Basin, and Willow Waterhole Basins are complete. 10 of 12
channel modifications reaches are complete, as well as 16 of 32 bridge modifications.
19 The Clear Creek Flood Damage Reduction Project X FCD58
Comment: In 2013, the Corps completed a General Reevaluation Report (GRR), which presents an alternative to the Clear Creek
Federal Project that was being implemented by the Corps, Flood Control District and Galveston County based on a 1986
agreement.
20 Cypress Creek Watershed damage reduction projects X FCD71
Comment: A feasibility study is underway to develop a drainage plan to reduce for major tributaries in Cypress Creek, and to investigate
detention options along the main stem of the channel. Additionally, the District is buying land for floodplain preservation.
21 The Greens Bayou Federal Flood Damage Reduction Project X FCD84
Comment: Phase II construction of the project began in late 2016 and is expected to take approximately three years to complete. Phase
II work includes completion of the north cell of the basin, located north of West Greens Road; excavation of the south cell,
which is located south of West Greens Road; and construction of the channel conveyance improvements from Cutten Road
to Veterans Memorial Drive. Phase I of the project, which included excavation of the north cell and construction of an outfall
structure to Greens Bayou, was completed in 2016.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-12
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
22 Hunting Bayou Flood Damage Reduction Project X FCD102
Comment: Construction began in August 2017 on the final phase of excavation for H500-01-00. 784,000 cy of soil will be removed
during this phase. The first two phases removed 265,000 cy and 648,000 of soil, respectively. Also in August 2017,
construction began on channel improvements between H500-01-00 and Liberty Road. Channel improvements have been
completed between North Loop 610 near North Gorge Street to Dabney Street. The project will include replacing a pedestrian
bridge, and lengthening UPRR and Loop 610 bridges over Hunting Bayou.
23 Poor Farm Ditch Conveyance Improvements Project X FCD32
Comment: The plans are at 90%. The District is working on interlocal agreements with West University and the City of Southside Place.
Lack of funding has slowed progress.
24 The Sims Bayou Federal Flood Reduction Project X
Comment: 10/10/2015
25 White Oak Bayou Flood Reduction Project X FCD148
Comment: Channel work from E122-00-00 to Beltway 8 is complete, as are basins E500-01-00, E500-02-00, E500-03-00, E500-10-00,
E500-11-00, E500-12-00 and bypass channel E200-00-00. Delay in reimbursements from USACE stalled progress on
additional construction.
26 Buffalo Bayou & Lower White Oak Bayou Federal Flood Damage
Reduction and Ecosystem Restoration Study
X
Comment: 4/17/2017
27 Halls Bayou Federal Feasibility Study X
Comment: 9/12/2013
28 Increase flood predictive capability for streams and creeks that affect the
District (stream gages).
X FCD165
Comment: The district currently has 176 stream gages, and intends to add more.
29 Develop and adopt master drainage plans in order for HCFCD to exercise the authority granted to districts under Chapter 49.211 of the Texas Water Code. Changes to Chapter 49.211, made via House Bill 919, require HCFCD
review and approval of subdivision drainage plans
X FCD186
Comment: Ongoing. The District has developed and adopted a master plan and does update and modify it.
30 Periodic informational mailings to SFHA property owners (flood insurance, importance of maintaining drainage, flood safety easy mitigation measures,
permit requirements).
X
Comment: 12/31/2012
31 Obtain generators for District facilities due to be able to work during and after an event X FCD187
Comment: The District owns 5 backup generators to serve its various facilities, but may rent additional generators during an event if
warranted.
32 Harden the District’s Office with Hurricane Shutters X
Comment: It is planned that the District’s Office will relocate in a few years.
33 Educating the employees on hazards including HCFCD evacuation plan and emergency plan and precautions that need to be taken for facilities. X FCD188
Comment: Evacuation plan is posted around Brookhollow and intranet. An updated evacuation plan is needed for the Mike Talbott
Service Center. The District last updated its hurricane response plan in 2018, but that plan requires occasional updates.
Harris County Flood Control District
35-13
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
34 Due to the data deficiency identified in Section 6 [of the HCFCD HMP adopted in 2014] relative to the current RL non-residential data (RL list does not differentiate non-residential buildings as commercial or industrial) HCFCD will attempt to further identify Non-residential properties between the approval of this plan and the next update.
X
Comment: Differentiating between types of non-residential repetitive loss buildings does not seem to serve any purpose that supports
The District’s mission.
35 Utilize public information capabilities, including social media and printed media, to inform public of the importance of water conservation and water rationing during drought conditions by installing flow restrictors, low-flow
toilets, replacing showerheads and xeriscaping
X
Comment: These activities would not fall under the Harris County Flood Control District’s responsibilities.
36 Replace landscaping with drought resistant plants and trees around HCFCD facilities X FCD189
Comment: Ongoing. The District plants drought resistant species where appropriate as a part of our ongoing tree planting and
maintenance program
37 Clear out dead brush and tree limbs around HCFCD facilities that could be a burn agent to wildfires X FCD190
Comment: Ongoing. It is part of our regular infrastructure maintenance that we clear brush and tree limbs from around HCFCD facilities.
38 Obtain the data necessary to complete and improve future vulnerability
analysis on HCFCD’s facilities for certain hazards
X FCD173
Comment: Ongoing
U100-00-00-E007 Upper Langham Creek Frontier Program X FCD195
Comment: 10/23/2013
U100-00-00-P003 Addicks Reservoir Watershed Master Plan X
Comment: 9/29/2010
U100-00-00-P004 Upper Langham Creek Frontier Study X
Comment: 4/13/2010
U101-00-00-P001 S Mayde Creek Sub-Reg Frontier X
Comment: 3/24/2016
U502-02-00-E001 John Paul’s Landing Park Basin X
Comment: 10/26/2017
U502-02-00-E002 E & R Agreement-Sprint (JPL) X
Comment: 3/10/2014
U506-05-00-E001 E & R Contract-Sprint X
Comment: 4/5/2012
U506-05-00-E002 E & R Contract-Sprint X
Comment: 5/23/2011
B100-00-00-H002 City of Pasadena Interlocal X
Comment: 7/21/2010
B109-00-00-C001 Conveyance Improvements X
Comment: 3/10/2017
B500-02-00-W001 Fairmont Basin Environmental Enhancement X
Comment: 5/3/2017
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-14
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
B500-04-00-E002 E&R Agreement X
Comment: 4/12/2016
B509-03-00-E001 E&R Agreement X FCD25
Comment: This project has just kicked off
T100-00-00-P001 Barker Reservoir Watershed Master Plan X
Comment: 1/11/2011
T501-01-00-E001 Basin Master Plan X
Comment: 3/14/2017
D100-00-00-B006 South 75th Street Bridge X FCD29
Comment: Scheduled for construction to begin 3rd Quarter 2019 and finish 2nd Quarter 2021.
D100-00-00-B007 Forest Hill Street Bridge X FCD29
Comment: Began construction July 23, 2018. Scheduled to finish 3rd Quarter 2019.
D100-00-00-B008 Lawndale Street Bridge X FCD29
Comment: Scheduled for construction to begin 3rd Quarter 2019 and finish 2nd Quarter 2021.
D100-00-00-B009 Telephone Road Bridge X FCD29
Comment: Scheduled for construction to begin 3rd Quarter 2019 and finish 2nd Quarter 2021.
D100-00-00-B010 Old Spanish Trail Bridge X
Comment: 3/8/2016
D100-00-00-B011 Calhoun Street Bridge X FCD29
Comment: Scheduled for construction to begin 2nd Quarter 2019 and finish 2nd Quarter 2020.
D100-00-00-B015 Almeda Road Bridge X FCD29
Comment: Scheduled for construction to begin 3rd Quarter 2019 and finish 2nd Quarter 2021.
D100-00-00-B038 Galveston Sub Railroad Bridge X FCD29
Comment: Scheduled for construction to begin 1st Quarter 2019 and finish 3rd Quarter 2019.
D100-00-00-B040 Wheeler Street Bridge X
Comment: 3/1/2017
D100-00-00-E002 Conveyance Improvements, DS 101 X
Comment: 3/30/2016
D100-00-00-E003 Conveyance Improvements, DS 102 X
Comment: 4/11/2014
D100-00-00-E004 Conveyance Improvements, DS 103 X
Comment: 3/30/2017
D100-00-00-E006 Conveyance Improvements, DS 105 X
Comment: 3/8/2016
D100-00-00-E007 Conveyance Improvements, DS 106 X
Comment: 3/14/2016
D100-00-00-E008 DS107 – Braeswood to S Main X
Comment: 3/8/2016
D100-00-00-E009 DS108 – S Main to Buffalo Speedway X
Comment: 11/01/2017
D100-00-00-G002 BBFFDRP – Development X FCD29
Comment: On-call engineering in support of Project Brays, to be held open through the completion of Project Brays
Harris County Flood Control District
35-15
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
D100-00-00-G003 BBFFDRP – Bridge Survey X
Comment: 11/4/2013
D100-00-00-G005 BBFFDRP – H & H Support X FCD29
Comment: Hydrology and Hydraulics modeling support for no-rise letters for elements of Project Brays to be held open through the
completion of Project Brays
D100-00-00-G006 BBFFDRP – DDR Engineering X
Comment: 11/4/2013
D100-00-00-G007 BBFFDRP – Control Survey X FCD29
Comment: Surveying services to establish horizontal and vertical control for design survey in support of Project Brays, to be held open
through the completion of Project Brays
D100-00-00-G009 BBFFDRP – Architectural & Tree Survey X FCD29
Comment: Development of architectural guidelines as well as tree location survey and preservation plan in support of Project Brays, to
be held open through the completion of Project Brays
D100-00-00-G011 BBFFDRP – UPRR Engineering X
Comment: 7/18/2016
D100-00-00-G0013 BBFFDRP – Evaluation of TxDot Bridges X
Comment: 3/14/2016
D100-00-00-G0015 BBFFDRP – Public Awareness X
Comment: 11/4/2013
D100-00-00-G0017 BBFFDRP – Recreation Feasibility Study X FCD29
Comment: HCFCD sponsored feasibility study to identify recreational elements that may qualify for federal funding. To be held open
through the completion of Project Brays
D100-00-00-Y005 Brays Bayou Federal Feasibility Study X
Comment: 4/09/2009
D111-00-00-Y003 Project Dev. Report for Poor Farm Ditch X
Comment: 12/16/2015
D500-04-00-E016 Basin Improvements, DS16 X
Comment: 5/25/2012
D500-04-00-E023 Eldridge Detention Basin Comp 1, DS 23 X
Comment: 4/7/2016
D500-04-00-E025 Eldridge Detention Basin DS25 X
Comment: 4/7/2016
D500-06-00-E002 Basin Improvements, DS12 X
Comment: 12/27/2018
D500-06-00-E022 Basin Improvements, DS22 X
Comment: 7/25/2013
D500-06-00-V071 Brays Bayou Federal Flood Control Project X
Comment: 3/14/2016
D512-01-00-E201 Basin Improvements, DS201 X
Comment: 11/7/2016
D512-01-00-E202 Basin Improvements, DS202 X
Comment: 12/14/2018
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-16
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
D512-01-00-E209 Basin Improvements, DS209 X
Comment: 5/25/2016
D512-01-00-R001 ROW Acquisition – Basin X FCD29
Comment: Additional sites may be investigated and acquired for expansion of the D512-01-00 detention basin.
W100-00-00-P006 Buffalo Bayou Federal Feasibility Study X
Comment: 4/17/2017
W100-00-00-R002 Buffalo Bayou Acquisition Downtown X
Comment: 4/13/2017
W129-00-00-C001 Conveyance Improvements, Phase 1 X
Comment: 10/21/2008
W129-00-00-C002 Conveyance Improvements, Phase 2 X
Comment: 3/14/2016
W140-04-00-Y001 Interlocal Agreement with City of Hilshire Village X
Comment: 1/12/2010
W151-00-00-P001 Drainage & Flood Control Study X
Comment: 11/27/2012
K100-00-00-H013 FMA-1 X
Comment: 6/11/2010
K100-00-00-P003 Upper Cypress Creek Watershed Master Plan X
Comment: 3/10/2011
K100-00-00-R001 ROW Acquisition – Floodplain X
Comment: 4/19/2013
K100-00-00-R002 ROW Acquisition – Maintenance X
Comment: 2/7/2005
K161-00-00-R001 ROW Acquisition – Channel X
Comment: 6/18/2009
K500-01-00-E001 E & R Contract – Sprint X
Comment: 4/5/2012
K500-01-00-FP001 Basin Improvements X
Comment: 12/31/2014
L100-00-00-P002 Little Cypress Frontier Program X FCD108
Comment: The Master Plan has been adopted by Commissioners Court. Implementation of the
L500-01-00-R001 ROW Acquisition – Basin X
Comment: 7/13/2010
L500-02-00-E001 Conveyance Improvements, DS 102 X
Comment: 12/29/2017
L514-01-00-E001 Conveyance Improvements, DS 103 X
Comment: 8/10/2009
L514-01-00-E002 Conveyance Improvements, DS 103 X
Comment: 3/18/2019
F101-06-00-C001 Channel Conveyance Exxon Mobil X
Comment: 4/13/2018
Harris County Flood Control District
35-17
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
F101-06-00-E001 Replacement of Transition Control Structure X
Comment: 8/16/2012
P118-00-00-P003 Halls Bayou Federal Feasibility Study X
Comment: 9/12/2013
P118-00-00-P004 Halls Bayou Federal Feasibility Study X
Comment: 2/8/2018
P118-00-00-R002 Halls Bayou ROW Acquisition X
Comment: ROW for Halls Bayou is being acquired under project IDs.
P118-14-00-FP000 HMGP 1791 P118-14-00 Halls Bayou X FCD99
Comment: This effort includes excavation of 2 basins and channel conveyance improvements which are currently under design.
P518-02-00-B001 Pedestrian Bridges Keith-Weiss Park X
Comment: 6/10/2010
P518-02-00-Y001 Detention Basin Improvements at Keith-Weiss Park X
Comment: 8/3/2010
P518-03-00-E001 Street Closure X
Comment: 4/4/2012
P518-03-00-FP000 Hall Park Detention Basin X
Comment: 2/15/2019
P518-04-00-E001 Utility Adjustment/Street Closure X
Comment: 4/6/2009
P518-04-00-E002 Bretshire Basin – Recreational Amenities X
Comment: 3/15/2010
P518-04-00-E003 Bretshire Stormwater Detention Basin Final X
Comment: 2/10/2014
P518-04-00-W001 Bretshire Stormwater Basin Env. Enhance X
Comment: 3/8/2016
P100-00-00-FP005 U.S. Army Corps of Engineers Veterans MEM to BAMMEL X FCD184
Comment: P100-00-00-FP005, P100-00-00-FP006, and P500-05-00-FP000 are under construction. Construction is 45% complete
(channel and basin combined); 86% complete at the basin.
P100-00-00-FP006 U.S. Army Corps of Engineers BAMMEL N HOU. To CUTTEN X FCD184
Comment: P100-00-00-FP005, P100-00-00-FP006, and P500-05-00-FP000 are under construction. Construction is 45% complete
(channel and basin combined); 86% complete at the basin.
P100-00-00-P004 Greens Bayou Watershed Master Plan X
Comment: 1/11/2011
P100-00-00-R001 ROW Acquisition – Floodplain X FCD180
Comment: Project to be held open for when floodplain ROW becomes necessary or available.
P100-00-00-Y018 Greens Bayou Bid Reach FDRP X
Comment: 8/11/2009
P500-02-00-E008 E & R Contract – Sprint X
Comment: 1/8/2010
P500-02-00-E009 Harris County Interlocal Agreement/ Hollister X
Comment: 11/23/2011
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-18
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
P500-03-00-E001 Basin Improvements, Phase 1 X
Comment: 2/4/2010
P500-03-00-E002 Basin Improvements, Phase 2 X FCD191
Comment: Basin excavation is underway. 15% excavated as of now.
P500-04-00-R001 ROW Acquisition – Basin X
Comment: 4/6/2009
P500-05-00-FP000 U.S. Army Corps of Engineers Antoine Basin X FCD184
Comment: P100-00-00-FP005, P100-00-00-FP006, and P500-05-00-FP000 are under construction. Construction is 45% complete
(channel and basin combined); 86% complete at the basin.
P500-06-00-R002 Castlewood Buyout X
Comment: 3/8/2016
P500-08-00-E001 Basin Improvements, Phase 1 X FCD192
Comment: Excavation and removal approximately 87% complete; Installed access ramps to each cell; Began repairs to adjacent trail
system; Began concrete work for weir on basin A
P500-08-00-FP000 HMGP 1791 Greens Bayou Mid Reach X
Comment: This was rolled into P500-08-00-E001
P500-08-00-R001 ROW Acquisition – Basin X
Comment: 2/1/2011
P545-01-00-E005 Kuykendahl Stormwater Detention Basin X FCD193
Comment: Excavation and removal approximately 97% complete; Installed 2-54” outfalls, 48” CMP, and 10x6 and 12x6 RCBs; Installed
the P145-03-00 and P145-00-00 weirs; Began concrete/grading along P145 channel; Completed the channel slope repairs
P545-01-00-Y008 E & R Contract – Weatherford X
Comment: 1/15/2010
P700-01-00-Y001 GB Wetlands Mitigation Project X
Comment: Construction is completed, but the management of the mitigation bank is ongoing.
H100-00-00-P003 Project Hunting – Hydrology and Hydraulics Support X
Comment: 9/11/2017
H100-00-00-R001 ROW Acquisition – Channel X FCD102
Comment: All but 2 tracts necessary for the Hunting Bayou Project have been obtained.
H100-00-00-Y001 Hunting Bayou Federal Feasibility Study X
Comment: 11/7/2016
H100-00-00-Y005 Project Dev. Report for Project Hunting X
Comment: 10/27/2017
H500-01-00-E001 Basin Improvements, Phase 1 X
Comment: 4/4/2012
H500-01-00-E002 Homestead Stormwater Detention Basin X
Comment: 8/10/2017
G103-00-00-H002 Home Buyout X
Comment: 11/16/2009
G103-05-02-R001 ROW Acquisition – Maintenance X
Comment: 4/6/2009
G103-27-00-E001 Lake Houston to Cuba Libra Drive X
Comment: 9/4/2015
Harris County Flood Control District
35-19
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
G504-01-00-R001 Deer Park Interlocal for G504-01-00 X
Comment: 11/26/2018
C100-00-00-B016 MLK Boulevard Bridge X
Comment: 10/4/2010
C100-00-00-B022 Almeda Road Bridge X
Comment: 1/11/2011
C100-00-00-B023 Buffalo Speedway Bridge X
Comment: 9/1/2011
C100-00-00-B024 Whiteheather Road Bridge X
Comment: 12/3/2012
C100-00-00-B025 Hiram Clark Street Bridge X
Comment: 5/17/2017
C100-00-00-B026 South Post Oak Street Bridge X
Comment: 9/19/2017
C100-00-00-B027 Heatherbrook Street Bridge X
Comment: 2/22/2016
C100-00-00-B039 Law Park Pedestrian Bridge X
Comment: 12/19/2013
C100-00-00-B040 Buxley Pedestrian Bridge X
Comment: 7/3/2013
C100-00-00-E012 SBFFDRP – LERRD X
Comment: 7/1/2013
C100-00-00-E013 SBFFDRP – LERRD X
Comment: 11/7/2016
C100-00-00-E014 SBFFDRP – LERRD X
Comment: 11/7/2016
C100-00-00-G001 SBFFDRP – Overall Support X
Comment: 10/10/2015
C100-00-00-G003 SBFFDRP – Bridge Management X
Comment: 4/9/2013
C106-00-00-P003 Channel Improvements Impact Analysis X
Comment: 6/11/2013
C106-03-00-C002 Channel Improvements Phase 2 X
Comment: 1/13/2019
C106-03-00-C003 Channel Improvements Phase 3 X
Comment: 4/20/2010
C106-03-00-FP01 Mitigation Project – Basin X
Comment: 11/21/2016
C106-08-00-C003 Conveyance Improvements Phase 2 X
Comment: 8/30/2012
C200-00-00-Y001 Sims Bayou Conditions Assessment X
Comment: 8/14/2015
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-20
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
C500-03-00-Y001 The Hill at Sims Greenway X
Comment: 8/3/2010
C500-03-00-Y003 The Hill Site Stabilization Project X
Comment: 2/26/2014
C500-03-00-Y004 The Hill Site Stabilization Project Phase 2 X
Comment: 2/26/2014
C508-02-00-E003 E&R Agreement X
Comment: 9/9/2013
J100-00-00-R001 ROW Acquisition – Floodplain X FCD144
Comment: Some ROW acquired. Project to be held open for when floodplain ROW becomes necessary or available.
O100-00-00-E001 Goose Creek Flood Damage Reduction Project X
Comment: 12/16/2014
O100-00-00-E002 Channel Improvements X
Comment: 3/29/2004
E100-00-00-R002 Arbor Oaks Buyout X FCD179
Comment: 20 remaining structures to be purchased
E100-00-00-Y001 White Oak Bayou Federal Study Support X
Comment: 12/19/2016
E100-00-00-Y003 White Oak Bayou Federal Study X
Comment: 3/15/2016
E100-00-00-Y009 White Oak Bayou Lawsuit X
Comment: 2/8/2018
E121-00-00-E001 Vogel Creek Conveyance Improvement Project X
Comment: 3/8/2011
E121-00-00-E003 Vogel Creek Project, Phase 3 X
Comment: 8/16/2010
E200-00-00-E003 Jersey Village Channel Project, Phase 3 X
Comment: 4/5/2012
E500-00-00-FP001 Inwood Golf Course Acquisition X
Comment: The City of Houston purchased this land instead of the District
E500-03-00-E001 Basin Improvements, Phase 3 X
Comment: 11/4/2013
E500-03-00-W001 Environmental Enhancements X FCD148
Comment: Recent nutria rat colonization of the site has slowed progress
E500-11-00-E001 Ranchstone Stormwater Detention Basin X
Comment: 8/3/2010
E500-11-00-W001 Environmental Enhancements X
Comment: 10/16/2017
E500-12-00-E001 Fallbrook Stormwater Detention Basin X
Comment: 5/7/2009
E515-01-00-E001 Brickhouse Gully Stormwater Detention Basin X
Comment: 3/15/2010
Harris County Flood Control District
35-21
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
E515-01-00-W001 Environmental Enhancements X
Comment: 4/28/2017
E535-01-00-E004 PER for Stormwater Detention Basin X
Comment: 10/27/2017
E535-01-00-FP001 HMGP1791 Jersey Village Basin X
Comment: 10/27/2017
M125-00-00-E001 Conveyance Improvements X
Comment: 1/18/2019
M500-01-00-E001 E & R Contract – Morris Tractor X
Comment: 9/22/2017
35.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 35-11 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 35-12
identifies the priority for each action. Table 35-13 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 35-11. Hazard Mitigation Action Plan Matrix
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing
those that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire
Existing 3, 4, 10 HCFCD TBD High HMGP, PDM, FMA Short-term
Action FCD2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: All hazards
New and Existing 1, 5, 8 HCFCD TBD Low Staff Time, General Funds Short-term
Action FCD3 — Integrate the hazard mitigation plan into other plans, ordinances and programs within the community
Hazards Mitigated: Dam failure, earthquake, flooding, landslide, severe weather, tsunami, wildfire
Existing 2, 6, 9 HCFCD TBD High TBD Ongoing
Action FCD4 — C-40, AB Res SECTION-216, Corps of Engineers Section 216 Study – Addicks and Barker Reservoirs
Hazards Mitigated: Dam failure, flooding
New and Existing 8, 10, 11 USACE HCFCD Low Congressional Appropriation Short-term
Action FCD5 — F-53, U100-00-00-CONV, Rehabilitation of Channels Upstream of Addicks Reservoir to Restore Channel
Conveyance Capacity
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-22
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD6 — F-54, U100-00-00-E008, Right-Of-Way Acquisition, Design and Construction of Control Structures and
Stormwater Quality Features for the Upper Langham Creek Program
Hazards Mitigated: Flooding
New 2, 10, 11, 12, 15 HCFCD N/A Low 2018 HCFCD BOND, Private
Participants
Short-term
Action FCD7 — C-36, U101-00-00-FP001, Right-Of-Way Acquisition, Design and Construction of Channel Conveyance
Improvements and Bypass Channel for South Mayde Creek
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term
Action FCD8 — C-46, U101-00-00-FP002, Right-Of-Way Acquisition, Design and Construction of a Stormwater Detention Basin
on South Mayde Creek
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term
Action FCD9 — C-47, U101-00-00-FP003, Design and Construction of a Bridge Replacement for Greenhouse Road at South
Mayde Creek
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD HCED High 2018 HCFCD BOND Short-term
Action FCD10 — C-48, U101-00-00-FP004, Right-Of-Way Acquisition, Design and Construction of a Stormwater Detention Basin
on South Mayde Creek near the Grand Parkway
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term
Action FCD11 — F-55, U102-00-00-FP001, Planning, Right-Of-Way Acquisition, Design, and Construction for Ultimate
Conveyance on Bear Creek
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD12 — F-84, U102-12-00-FP, Design and Construction of Secondary Outfall for John Pauls Landing for the Upper
Langham Creek Program
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD13 — F-56, U500-00-00-FP002, Right-Of-Way Acquisition, Design, and Construction of a Retention Area
Hazards Mitigated: Dam failure, flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD14 — C-37, U500-01-CON, Design and Construction of Little York Stormwater Detention Basin
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Short-term
Harris County Flood Control District
35-23
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD15 — F-83, U500-North-JPL, Right-Of-Way Acquisition, Design and Construction of a Stormwater Detention Basin
North of John Pauls Landing for the Upper Langham Creek Program
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD16 — C-38, U520-01-CON, Design and Construction of Dinner Creek Stormwater Detention Basin
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Short-term
Action FCD17 — F-112, U700-00-00-FP001, Right-Of-Way Acquisition, Design, and Construction of Wetland Mitigation Bank
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD18 — C-52, U-USACE-CONV, Rehabilitation of Channels Inside of Addicks Reservoir to Restore Channel Conveyance Capacity
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND Short-term
Action FCD19 — F-99, B100-CON, Right-Of-Way, Design and Construction of Conveyance Improvements along Armand Bayou
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD20 — F-96, B100-GEN, Investigations of General Drainage Improvements in Armand Bayou Watershed
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD21 — C-44, B100-RESTORE, Armand Bayou Right-of-Way Acquisition and Floodplain Preservation
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11, 15 HCFCD TBD Medium 2018 HCFCD BOND Ongoing
Action FCD22 — CI-023, B104-00-00-FP, Right-Of-Way, Design and Construction of Conveyance Improvements along Horsepen
Bayou
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD23 — C-06, B112-00-00-404, Right-Of-Way Acquisition, Design and Construction of B112-00-00 and Tributaries
Conveyance Improvements
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term
Action FCD24 — CI-021, B112-BGLEN, Brookglen Flooding Mitigation Analysis
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD TBD Low 2018 HCFCD BOND Short-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-24
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD25 — C-07, B509-0304-CON, Design and Construction of the B509-03-00 and B509-04-00 Stormwater Detention
Basins
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Short-term
Action FCD26 — F-72, B513-02-00-FP, Design and Construction of the Baywood Stormwater Detention Basin
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD27 — F-52, T100-00-00-CONV, Rehabilitation of Approximately 20 Miles of Channels Upstream of Barker Reservoir to
Restore Channel Conveyance Capacity
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD28 — C-53, T-USACE-CONV, Rehabilitation of Channels Inside of Barker Reservoir to Restore Channel Conveyance
Capacity
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND Short-term
Action FCD29 — C-11, D100-00-00-USACE, Design and Construction of Project Brays Corps of Engineers (Section 211(f)
Project)
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND Short-term
Action FCD30 — CI-025, D100-AddDet, Investigation of Additional Stormwater Detention Basins in the Brays Bayou Watershed
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD31 — CI-034, D100-USFondren, Investigation of Channel Improvements Upstream of Fondren Road on Brays Bayou
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD32 — C-12, D111-00-00-404, Right-Of-Way, Design and Construction of Conveyance Improvements along Poor Farm Ditch
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD City of Southside
Place and City of
West University Place
High 2018 HCFCD BOND Long-term
Action FCD33 — CI-038, D115-00-00-FP, Restore Channel Conveyance Capacity Along D115-00-00
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD City of Houston Medium 2018 HCFCD BOND Short-term
Action FCD34 — F-07, D118-00-00-FP001, Planning, Right-Of-Way Acquisition, Design, and Construction of Channel Conveyance Improvements on Keegans Bayou
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Harris County Flood Control District
35-25
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD35 — C-13, D133-00-00-404, Planning, Right-Of-Way, Design and Construction of Conveyance Improvements along
Bintliff Ditch
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Long-term
Action FCD36 — F-08, D140-00-00-FP001, Planning, Right-Of-Way Acquisition, Design, and Construction of Channel
Conveyance Improvements on Fondren Diversion Channel
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD37 — F-58, W100-00-00-LIN, Construction of Linear Detention on Buffalo Bayou
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD38 — CI-017, W100-BCON, Design & Construction of Replacement Bridges Along Buffalo Bayou
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD39 — CI-016, W100-Bstudy, Investigations of Bridges and Potential Channel Bypasses over Buffalo Bayou
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD40 — F-82, W100-COMMERCE, Demolition of 1119 Commerce Street and Slope Stabilization Along Buffalo Bayou
Hazards Mitigated: Flooding
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD41 — CI-018, W140-00-00-GEN, Rehabilitation of W140-00-00 to Restore Channel Conveyance Capacity
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD42 — F-59, W140-CON, Spring Branch Creek Stabilization
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD43 — F-80, W141-00-00-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along Soldiers Creek
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD44 — F-81, W151-153-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along W151-00-00 and W153-00-00
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD45 — F-79, W157-00-00-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along W157-00-00
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-26
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD46 — CI-009, W190-JOINT, Partnership Project with Fort Bend County on Right-of-Way Acquisition, Design, and
Construction of General Drainage Improvements along Clodine Ditch
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD Fort Bend County Medium 2018 HCFCD BOND Long-term
Action FCD47 — CI-024, W500-Micro, Investigation of Effectiveness of Micro-Detention in the Buffalo Bayou Watershed
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD48 — F-70, Q100-00-00-FP, Upstream Cedar Bayou Project – Right-Of-Way Acquisition, Design and Construction of
Channel Conveyance Improvements and Stormwater Detention Basin Upstream of FM 1960
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD49 — F-42, Q114-00-00-FP, Right-of-Way Acquisition, Design and Construction of Channel Conveyance
Improvements along Magee Gully
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD50 — F-41, Q122-00-00-FP, Right-of-Way Acquisition, Design and Construction of Channel Conveyance
Improvements along Clawson Ditch and Q124-00-00
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD51 — F-43, Q128-00-00-FP, Right-of-Way Acquisition, Design and Construction of Channel Conveyance
Improvements along Adlong Ditch
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD52 — F-44, Q130-00-00-FP, Right-of-Way Acquisition, Design and Construction of Channel Conveyance Improvements along Q130-00-00
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD53 — F-45, Q134-00-00-FP, Planning, Right-Of-Way Acquisition, Design and Construction of Channel Conveyance Improvements on Q134-00-00 and Q134-00-01
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD54 — F-69, Q136-00-00-FP, Right-Of-Way Acquisition, Design and Construction of channel conveyance improvements on Q136-00-00 – Part of the Upstream Cedar Bayou Project
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Harris County Flood Control District
35-27
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD55 — F-46, Q500-01-00-FP, Right-Of-Way Acquisition, Design and Construction of the Q500-01 Stormwater Detention
Basin
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD56 — F-47, Q500-CWA, Right-Of-Way Acquisition, Design and Construction of Stormwater Detention Basins near
Coastal Water Authority canals and IH 10
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD57 — F-48, Q700-01-CON, Design and Construction of Crosby Eastgate Environmental Mitigation Bank
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD58 — C-03, A100-00-00-USACE, Design and Construction of Corps of Engineers Clear Creek Federal Flood Risk
Management Project
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND,
Congressional Appropriation
Long-term
Action FCD59 — CI-001, A100-CONV, Rehabilitation of the Clear Creek channel to Restore Channel Conveyance Capacity
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD60 — CI-039, A100-Nassau, Partnership Project with Nassau Bay to Reduce the Risk of Flooding
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD City of Nassau Bay Low 2018 HCFCD BOND, Nassau
Bay
Short-term
Action FCD61 — CI-013, A104-CONV, Restore Channel Conveyance Capacity on A104-00-00
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD62 — F-01, A135-00-00-FP001, Right-Of-Way Acquisition, Design, and Construction of Channel Conveyance Improvements on A135-00-00
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD63 — CI-003, A214-CONV, Rehabilitation of the A214-00-00 channel to Restore Channel Conveyance Capacity
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD TBD Medium 2018 HCFCD BOND Short-term
Action FCD64 — F-02, A500-04-CON, Right-Of-Way Acquisition, Design and Construction of Hughes Stormwater Detention
Basin on Clear Creek
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-28
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD65 — F-03, A500-08-CON, Design and Construction of Dagg Road Stormwater Detention Basin on Clear Creek
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD66 — CI-62, A500-528-Dixie, Construction of Stormwater Detention Basins Near FM 528 and Dixie Farm Road in
Friendswood
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD USACE High 2018 HCFCD BOND Short-term
Action FCD67 — C-05, A520-03-00-FP, Construction of South Belt Stormwater Detention Basin and Channel Conveyance
Improvements Along Beamer Road Ditch (A120-00-00)
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND Short-term
Action FCD68 — F-76, A700-01-WMB, Identification, Design and Construction of the A700-01 Environmental Mitigation Bank
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD69 — CI-012, K100-CONV, Major Maintenance of Cypress Creek and Tributaries
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD70 — F-20, K100-ROW, Cypress Creek Right-of-Way Acquisition and Floodplain Preservation
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11, 15 HCFCD N/A Low 2018 HCFCD BOND Ongoing
Action FCD71 — CI-035, K100-TRIBS-DET, Update to 2003 Texas Water Development Board Cypress Creek Tributary Study and Investigate Expanding Stormwater Detention Basins in Cypress Creek Watershed
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD72 — F-21, K129-00-00-X007, Restore Channel Conveyance Capacity on K129-00-00
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD73 — F-22, K140-MAINT, Restore Channel Conveyance Capacity Along Pillot Gully
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD74 — F-23, K163-CON, Construction of Channel Conveyance Improvements Along K163-00-00
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND
Harris County Flood Control District
35-29
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD75 — F-24, K700-01-WMB, Identification, Design and Construction of the K700-01 Environmental Mitigation Bank
Hazards Mitigated: Flooding
New and Existing 2, 6, 7, 8 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD76 — F-98, F100-00-00-CON, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements
in Galveston Bay Watershed
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD77 — F-101, F100-00-00-GEN, Investigations of General Drainage Improvements in Galveston Bay Watershed
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD78 — C-58, F101-06-00-E002, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements Along F101-06-00
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD City of La Porte Low 2018 HCFCD BOND Long-term
Action FCD79 — C-57, F216-00-CONV, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements Along F216-00-00
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD TBD Low 2018 HCFCD BOND Long-term
Action FCD80 — F-120, O100-00-00-CON, Right-Of-Way Acquisition, Design, and Construction of General Drainage Improvements in Goose Creek watershed
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD81 — F-121, O100-00-00-GEN, Investigations of General Drainage Improvements in Goose Creek watershed
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD82 — F-109, O200-00-00-CON, Right-Of-Way Acquisition, Design, and Construction of General Drainage Improvements on Spring Gully
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD83 — F-39, O200-00-00-GEN, Investigations of General Drainage Improvements on Spring Gully
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD84 — C-20, P100-00-00-FP, Mid-Reach Greens Bayou Project – Design and Construction of Channel Conveyance Improvements along Greens Bayou
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD USACE High 2018 HCFCD BOND Short-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-30
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD85 — CI-006, P118-BROCK, Design and Construction of a Stormwater Detention Basin in Brock Park
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term
Action FCD86 — CI-022, P130-05-01-DET, ROW, Design, and Construction of Stormwater Detention Basin Near P130-05
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD87 — C-31, P133-CON, Design and Construction of the Smith Road Channel Diversion
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Short-term
Action FCD88 — C-43, P138-01-01-FP, Planning, Right-of-Way Acquisition, Design and Construction of Channel Conveyance Improvements along P138-01-01
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD HUD High 2018 HCFCD BOND, CDBG Long-term
Action FCD89 — F-40, P500-01-CON, Repairs and Enhancements to the Lower Greens Bayou Regional Detention Embankment and Control Structure
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD90 — C-32, P500-02-00-FP001, Design and Construction of the Cutten Road Stormwater Detention Basin Improvements
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Short-term
Action FCD91 — C-33, P500-04-00-FP, Design and Construction of Aldine-Westfield Stormwater Detention Basin Improvements
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Short-term
Action FCD92 — C-34, P500-06-00-E003/4, Design and Construction of Lauder Stormwater Detention Basin Improvements
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD HUD High 2018 HCFCD BOND, CDBG Short-term
Action FCD93 — C-23, P118-08-00-FP, Right-Of-Way, Design, and Construction of Channel Conveyance Improvements on P118-
08-00
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term
Action FCD94 — C-24, P118-09-00-FP, Right-Of-Way, Design, and Construction of Channel Conveyance Improvements on P118-
09-00
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term
Harris County Flood Control District
35-31
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD95 — C-25, P118-21-00-FP, Right-Of-Way, Design, and Construction of Channel Conveyance Improvements on P118-
21-00
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD HUD High 2018 HCFCD BOND, CDBG Long-term
Action FCD96 — C-26, P118-23-00-FP, Right-Of-Way, Design, and Construction of Channel Conveyance Improvements on P118-
23-00 and P118-23-02
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD City of Houston;
Harris County
High 2018 HCFCD BOND, City of
Houston, Harris County
Long-term
Action FCD97 — C-28, P118-25-00-FP, Right-Of-Way, Design, and Construction of Channel Conveyance Improvements on P118-
25-00 & P118-25-01
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD City of Houston;
Harris County
High 2018 HCFCD BOND, City of
Houston, Harris County
Long-term
Action FCD98 — C-30, P118-27-00-FP, Right-Of-Way, Design, and Construction of Channel Conveyance Improvements on P118-
27-00
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term
Action FCD99 — C-35, P518-10-00-FP001, Design and Construction of Stormwater Detention Basin and Associated Channel
Improvements
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD HUD High 2018 HCFCD BOND, CDBG Short-term
Action FCD100 — C-01, P518-26-00-FP, Construction of P518-26 Stormwater Detention Basin
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD HUD High 2018 HCFCD BOND, CDBG Short-term
Action FCD101 — C-02, P518-ALDINE-CDBG, Aldine Westfield Stormwater Detention Basin and Channel Improvements
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Long-term
Action FCD102 — C-18, H100-00-00-USACE, Design and Construction of Corps of Engineers Hunting Bayou, Section 211(f) Project
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND Short-term
Action FCD103 — CI-59, H102-DIV, Planning, Right-Of-Way, Design and Construction of a Diversion Channel from H102-00-00 to
H100-00-00 through Galena Park
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD104 — CI-031, H103-00-00-FP001, HCFCD Cost Share of Study with the City of Houston on Wallisville Outfall
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD City of Houston Low 2018 HCFCD BOND Short-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-32
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD105 — F-17, H103-00-00-FP002, Right-Of-Way Acquisition, Design and Construction of Wallisville Outfall
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD106 — F-107, R100-00-00-CON, Right-of-Way Acquisition, Design and Construction of General Drainage
Improvements in Jackson Bayou Watershed
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD107 — F-73, R100-00-00-GEN, Investigations of General Drainage Improvements in Jackson Bayou Watershed
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD108 — F-26, L100-00-00-MNG, Management, Right-of-Way Acquisition, Design and Construction of the Little Cypress Creek Frontier Program
Hazards Mitigated: Flooding
New 2, 10, 11, 12, 15 HCFCD N/A Medium 2018 HCFCD BOND Long-term
Action FCD109 — F-27, L500-01-CON, Design and Construction of Zube Park Stormwater Detention Basin
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD110 — F-28, L500-02-CON, Right-Of-Way Acquisition, Design, and Construction of Kluge Stormwater Detention Basin
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD111 — F-29, L500-06-CON, Right-Of-Way Acquisition, Design, and Construction of Mueschke East Stormwater
Detention Basin
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD112 — F-30, L500-09-CON, Right-Of-Way Acquisition, Design, and Construction of Schiel Stormwater Detention
Basin
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD113 — F-31, L500-10-CON, Construction of Mueschke West Stormwater Detention Basin Improvements
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD114 — F-32, L500-11-CON, Construction of Hegar Stormwater Detention Basin Improvements
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Harris County Flood Control District
35-33
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD115 — F-89, L500-INC, Design and Construction of Additional Volume in Little Cypress Creek Stormwater Detention
Basins
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD116 — F-33, L512-01-CON, Construction of Kleb Woods Stormwater Detention Basin Improvements
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD117 — F-34, L512-03-CON, ROW, Design, and Construction of Mason Stormwater Detention Basin in Little Cypress
Creek watershed
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD118 — F-35, L514-01-CON, Construction of Bauer-Hockley Stormwater Detention Basin Improvements
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD119 — F-108, S100-00-00-CON, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements in Luce Bayou Watershed
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD120 — F-85, S100-00-00-GEN, Investigations of General Drainage Improvements along Luce Bayou
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD121 — F-51, S100-00-00-ROW, Luce Bayou Right-of-Way Acquisition and Floodplain Preservation
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11, 15 HCFCD N/A Low 2018 HCFCD BOND Ongoing
Action FCD122 — C-50, G103-00-00-JOINT, Funding for Future Partnership Projects Based on Results of Study – for Right-of-Way Acquisition, Design, and Construction of General Drainage Improvements in San Jacinto River Watershed Study
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD TBD High 2018 HCFCD BOND Long-term
Action FCD123 — C-17, G103-00-00-STUDY, San Jacinto River Watershed Study
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD SJRA, City of
Houston, Montgomery
County, FEMA
Low 2018 HCFCD BOND, HMGP Short-term
Action FCD124 — F-15, G103-Atascocita, Planning , Right-Of-Way Acquisition, design and Construction of General Drainage Improvements Near Atascocita
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-34
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD125 — CI-61, G103-Dredge, East Fork, West Fork and Lake Houston Dredging
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 USACE HCFCD, City of
Houston
High HMGP Short-term
Action FCD126 — F-110, G103-ELH, Planning , Right-Of-Way Acquisition, design and Construction of General Drainage
Improvements East of Lake Houston
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD127 — CI-028, G103-GATES, Design and Construction of Additional Gates on Lake Houston in Partnership with the
City of Houston
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term
Action FCD128 — CI-019, G103-GlenDaleDet, Investigations of Potential Detention Sites Around Glendale Dredge Site in
Partnership with the City of Houston
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term
Action FCD129 — F-110, G103-Huffman, Planning , Right-Of-Way Acquisition, design and Construction of General Drainage
Improvements Near Huffman
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD130 — F-14, G103-Kingwood, Planning , Right-Of-Way Acquisition, design and Construction of General Drainage
Improvements Near Kingwood
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD131 — CI-60, G112-CON, Planning, Right-Of-Way, Design and Construction of Conveyance Improvements along Panther Creek
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD TBD Low 2018 HCFCD BOND Long-term
Action FCD132 — CI-029, C102-00-00-FP, Restore Channel Conveyance Capacity Along C102-00-00
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term
Action FCD133 — CI-027, C106-00-00-FP, Planning, Right-Of-Way Acquisition, Design, and Construction of Improvements for
the Tributaries of C106-00-00
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD City of Houston; City
of South Houston
Low 2018 HCFCD BOND Long-term
Action FCD134 — F-92, C116-00-00-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along C116-00-00
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Harris County Flood Control District
35-35
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD135 — C-08, C118-00-00-FP001, Right-Of-Way Acquisition, Design, and Construction of Stormwater Detention Basin
and Channel Conveyance Improvements along Salt Water Ditch
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Long-term
Action FCD136 — F-93, C124-00-00-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along C124-00-00
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD137 — F-94, C143-00-00-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along C143-00-00
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD138 — F-95, C144-00-00-GEN, Planning, Right-Of-Way Acquisition, Design and Construction Along C144-00-00
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD139 — CI-037, C146-00-00-FP, Restore Channel Conveyance Capacity Along C146-00-00
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD City of Houston Medium 2018 HCFCD BOND Short-term
Action FCD140 — C-09, C147-00-00-FP001, Right-Of-Way Acquisition, Design, and Construction of South Post Oak Stormwater Detention Basin and Channel Conveyance Improvements along C147-00-00
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD FEMA High 2018 HCFCD BOND, HMGP Long-term
Action FCD141 — C-10, C506-01-CON, Design and Construction of South Shaver Stormwater Detention Basin
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term
Action FCD142 — F-119, J100-00-00-CON, Right-of-Way Acquisition, Design and Construction of General Drainage
Improvements along Spring Creek
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD143 — F-75, J100-00-00-GEN, Investigations of General Drainage Improvements along Spring Creek
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD144 — F-19, J100-00-00-ROW, Spring Creek Right-of-Way Acquisition and Floodplain Preservation
Hazards Mitigated: Flooding
New and Existing 8, 10, 11, 15 HCFCD N/A Low 2018 HCFCD BOND Ongoing
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-36
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD145 — C-118, J100-RES, Planning, Right-of-Way Acquisition, Design and Construction of a Reservoir along Spring
Creek
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD TBD Medium 2018 HCFCD BOND Long-term
Action FCD146 — F-104, I100-00-00-CON, Right-of-Way Acquisition, Design and Construction of General Drainage
Improvements in Vince Bayou Watershed
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD147 — F-78, I100-00-00-GEN, Investigations of General Drainage Improvements in Vince Bayou Watershed
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD148 — C-14, E100-00-00-USACE, Design and Construction of Corps of Engineers White Oak Bayou Section 211(f)
Project
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD USACE Low 2018 HCFCD BOND Short-term
Action FCD149 — CI-011, E100-HIDDEN, Partnership Project with the City of Houston for Feasibility Study of General Drainage
Improvements around Hidden Lake Townhomes
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD City of Houston Medium 2018 HCFCD BOND Short-term
Action FCD150 — F-09, E101-00-00-FP001, Planning, Right-Of-Way Acquisition, Design and Construction of Little White Oak
Bayou Channel Conveyance Improvements
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD151 — CI-033, E105-JOINT, Partnership Project with City of Houston on Planning, Right-of-Way Acquisition, Design, and Construction of General Drainage Improvements along E105-00-00
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD City of Houston Medium 2018 HCFCD BOND Long-term
Action FCD152 — CI-030, E106-00-00-GEN, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements along Turkey Gully
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Long-term
Action FCD153 — F-10, E115-00-00-FP001, Right-Of-Way Acquisition, Design, and Construction of Channel Conveyance Improvements on Brickhouse Gully
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD154 — CI-010, E127-JOINT, Partnership Project with Jersey Village on Right-of-Way Acquisition, Design, and Construction of General Drainage Improvements along E127-00-00
Hazards Mitigated: Flooding
Harris County Flood Control District
35-37
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
New and Existing 8, 10, 11 HCFCD City of Jersey Village Medium 2018 HCFCD BOND Long-term
Action FCD155 — C-39, E200-02-00-NC, Right-of-Way Acquisition, Design and Construction of the North Canal
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD TXDoT High 2018 HCFCD BOND Long-term
Action FCD156 — C-59, E500-21-CON, Construction of Inwood Forest West Stormwater Detention Basin
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term
Action FCD157 — CI-032, E500-AddDet, Investigation of Additional Stormwater Detention Basins in the White Oak Bayou
Watershed
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD City of Houston Medium 2018 HCFCD BOND Short-term
Action FCD158 — C-15, E500-ARBOROAKS-404, Design and Construction of Arbor Oaks Stormwater Detention Basin
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD City of Houston High 2018 HCFCD BOND Short-term
Action FCD159 — C-16, E500-WDLNDTRL-404, Design and Construction of Woodland Trails Stormwater Detention Basin
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD USACE High 2018 HCFCD BOND Short-term
Action FCD160 — F-106, M100-00-00-CON, Right-of-Way Acquisition, Design and Construction of General Drainage Improvements in Willow Creek Watershed
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Long-term
Action FCD161 — F-71, M100-00-00-GEN, Investigations of General Drainage Improvements in Willow Creek Watershed
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD162 — F-36, M100-00-00-ROW, Willow Creek Right-of-Way Acquisition and Floodplain Preservation
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11, 15 HCFCD N/A Low 2018 HCFCD BOND Ongoing
Action FCD163 — F-37, M124-00-00-FP001, Design and Construction of Channel Conveyance Improvements on M124-00-00 Downstream of SH 249
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-38
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD164 — F-38, M528-01-CON, Design and Construction of Cypress Rosehill Stormwater Detention Basin
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD165 — Z-09, Z.FWS, Upgrades and Expansion of the Harris County Flood Warning System
Hazards Mitigated: Flooding
Existing 1, 3 HCFCD N/A Low 2018 HCFCD BOND Ongoing
Action FCD166 — Z-10, Z.REMAP, Harris County Floodplain Mapping Updates
Hazards Mitigated: Flooding
New and
Existing
3, 12, 14, 15 HCFCD FEMA Low 2018 HCFCD BOND, FEMA
CTP Grant
Short-term
Action FCD167 — Z-02, D100-00-00-P011, City of Bellaire Master Drainage Concept Plan
Hazards Mitigated: Flooding
New and Existing 2, 10, 11, 12, 15 HCFCD City of Bellaire Low 2018 HCFCD BOND Short-term
Action FCD168 — Z-02, D112-00-00-E001, Flood Risk Reduction Project
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD City of Houston Low 2018 HCFCD BOND Long-term
Action FCD169 — Z-02, D100-00-00-E016, Detention on City of Houston ROW at S Braewood and W 610 Loop
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD City of Houston Low 2018 HCFCD BOND Short-term
Action FCD170 — Z-02, U106-00-00-E004, Partnership Project with Spencer Road PUD
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD Spencer Road PUD Low 2018 HCFCD BOND Short-term
Action FCD171 — Z-02, P152-00-00-E002, Partnership with WCID 109 for Local Flood Damage Reduction
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD WCID 109 Low 2018 HCFCD BOND Short-term
Action FCD172 — Z-02, W100-00-00-P011, St. George Place and Surrounding Area Feasibility Study
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD St. George
Redevelopment
Authority/TIRZ 1
Low 2018 HCFCD BOND Short-term
Action FCD173 — Z-03, Z100-00-00-PLAN, Countywide Ongoing Planning
Hazards Mitigated: Flooding
New and Existing 3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Ongoing
Action FCD174 — Z-05, Z100-00-00-P029, Drainage Reuse Initiative Feasibility Study
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD HCED Low 2018 HCFCD BOND Short-term
Harris County Flood Control District
35-39
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD175 — Z-05, Z100-00-00-Y106, Ecosystem Services Study
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD KPC, Rice SSPEED
Center, Texas A&M
Agrilife, Prairie View
A&M, Simfero, Cibor,
Walter P. Moore
Low 2018 HCFCD BOND Short-term
Action FCD176 — Z-05, W100-00-00-Y002, Fluvial Geomorphic Assessment to Improve the Stability and Resiliency of Buffalo Bayou
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD Buffalo Bayou
Partnership
Low 2018 HCFCD BOND Short-term
Action FCD177 — CI-026, Z100-COH, Investigation of City of Houston Properties for Conversion to Stormwater Detention Basins
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD City of Houston Low 2018 HCFCD BOND Short-term
Action FCD178 — Z-04, U502-02-00-E007, John Paul Landing Central Cell Excavation
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD HCED Low 2018 HCFCD BOND Short-term
Action FCD179 — Z-Buyout, Z100-HMGP, Countywide Federal Grant Funded Volunteer Home Buyouts
Hazards Mitigated: Flooding
Existing 8, 10, 11, 15 HCFCD TBD Low 2018 HCFCD BOND, HMGP,
PDM, FMA
Ongoing
Action FCD180 — Z-01, Z100-ROW, Countywide Floodplain Preservation and Right of Way Acquisition
Hazards Mitigated: Flooding
New and Existing 8, 10, 11, 15 HCFCD TBD Low 2018 HCFCD BOND, HMGP,
PDM, FMA
Ongoing
Action FCD181 — Z-08, Z100-TUNNEL, Preliminary Engineering for Large Diameter Tunnels for Stormwater Conveyance
Hazards Mitigated: Flooding
New and
Existing
3, 8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Short-term
Action FCD182 — F-88, Z500-CONV, ROW Acquisition, Design and Construction of Stormwater Detention Basins in Large Buyout Areas
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low 2018 HCFCD BOND Ongoing
Action FCD183 — Z-StormRep, Z-StormRep, Countywide Storm Repairs in Harris County
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD TBD Low 2018 HCFCD BOND Ongoing
Action FCD184 — The Greens Bayou Federal Flood Damage Reduction Project
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 USACE HCFCD Low Congressional Appropriation Short-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-40
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD185 — Implement the recommendations of the “HCFCD Adapting Infrastructure for Climate Change” presentation.
Hazards Mitigated: Dam Failure, Drought, Flooding, Hurricane, Wildfire
New and Existing 1, 3, 5, 8, 11 HCFCD N/A Low Operations & Maintenance
Budget
Ongoing
Action FCD186 — Develop and adopt master drainage plans in order for HCFCD to exercise the authority granted to districts
under Chapter 49.211 of the Texas Water Code. Changes to Chapter 49.211, made via House Bill 919, require HCFCD review and
approval of subdivision drainage plans
Hazards Mitigated: Flooding
New and Existing 2, 10, 11, 12, 15 HCFCD N/A Low Operations & Maintenance
Budget
Ongoing
Action FCD187 — Obtain generators for District facilities due to be able to work during and after an event
Hazards Mitigated: Earthquake, Flooding, Landslide, Severe Weather, Hurricane, Tsunami, Wildfire
Existing 11, 13 HCFCD N/A Low Operations & Maintenance
Budget
Short-term
Action FCD188 — Educating the employees on hazards including HCFCD evacuation plan and emergency plan and precautions
that need to be taken for facilities.
Hazards Mitigated: Earthquake, Flooding, Landslide, Severe Weather, Hurricane, Tsunami, Wildfire
Existing 3, 10 HCFCD N/A Low Operations & Maintenance
Budget
Ongoing
Action FCD189 — Replace landscaping with drought resistant plants and trees around HCFCD facilities
Hazards Mitigated: Drought
Existing 7, 8, 11 HCFCD N/A Low Operations & Maintenance
Budget
Ongoing
Action FCD190 — Clear out dead brush and tree limbs around HCFCD facilities that could be a burn agent to wildfires
Hazards Mitigated: Wildfire
Existing 2, 7, 8, 10, 11 HCFCD N/A Low Operations & Maintenance
Budget
Ongoing
Action FCD191 — P500-03-00-E002 Basin Improvements, Phase 2
Hazards Mitigated: Flooding
New and
Existing
8, 10, 11 HCFCD N/A Low CIP Budget Short-term
Action FCD192 — P500-08-00-E001 Basin Improvements, Phase 1
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low CIP Budget Short-term
Action FCD193 — P545-01-00-E005 Kuykendahl Stormwater Detention Basin
Hazards Mitigated: Flooding
New and Existing 8, 10, 11 HCFCD N/A Low CIP Budget Short-term
Action FCD194 — Prepare a backup facility from which to conduct Flood Watch activities in the event of a Category 3 or higher
hurricane, and train staff to access and utilize that facility
Hazards Mitigated: Hurricane
Existing 1, 13 HCFCD N/A Low Operations & Maintenance
Budget
Ongoing
Harris County Flood Control District
35-41
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timeline
Action FCD195 — F-54, U100-00-00-E008 Upper Langham Frontier Program
Hazards Mitigated: Flooding
New 2, 10, 11, 12, 15 HCFCD N/A Low 2018 HCFCD Bond Long-term
Action FCD196— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Hurricane, Severe Weather, Flooding, Earthquake, Dam Failure, Wildfire, Mass Movement, Drought, Tsunami
New and
Existing
1, 3, 4, 5, 9, 10,
11, 15
HCFCD HCOHSEM Low General Funds Ongoing
Action FCD197—Pursue the use of green stormwater infrastructure on buyout properties with the best management practices determined at the time of design.
Hazards Mitigated: Flooding
New and Existing 2, 5, 6, 7, 8, 10,
11
HCFCD N/A Low Operations & Maintenance
Budget
Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 35-12. Mitigation Action Priority
Action #
# of
Objectives
Met Benefits Costs
Do Benefits Equal
or Exceed Costs?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
FCD1 3 High High Yes Yes No Medium High
FCD2 3 Low Low Yes No Yes High Low
FCD3 3 High Medium Yes Yes No Medium High
FCD4 3 Medium Low Yes No Yes High Low
FCD5 3 High Low Yes Yes Yes High High
FCD6 5 High Low Yes Yes Yes High High
FCD7 3 High High Yes Yes Yes Medium High
FCD8 3 High High Yes Yes Yes Medium High
FCD9 3 High High Yes Yes Yes High High
FCD10 3 High High Yes Yes Yes Medium High
FCD11 4 High Low Yes Yes Yes Medium High
FCD12 3 High Low Yes Yes Yes High High
FCD13 3 High Low Yes Yes Yes Medium High
FCD14 3 High High Yes Yes Yes High High
FCD15 3 High Low Yes Yes Yes Medium High
FCD16 3 High High Yes Yes Yes High High
FCD17 3 High Low Yes Yes Yes Medium High
FCD18 3 High Low Yes No Yes High Low
FCD19 3 High Low Yes Yes Yes Medium High
FCD20 4 High Low Yes Yes Yes High High
FCD21 4 High Medium Yes Yes Yes High High
FCD22 3 High Low Yes Yes Yes High High
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-42
Action #
# of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs?
Is Project Grant-Eligible?
Can Project Be Funded Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
FCD23 3 High High Yes Yes Yes Medium High
FCD24 4 Medium Low Yes Yes Yes High High
FCD25 3 High High Yes Yes Yes High High
FCD26 3 High Low Yes Yes Yes High High
FCD27 3 High Low Yes Yes Yes High High
FCD28 3 High Low Yes No Yes High Low
FCD29 3 High Low Yes No Yes High Low
FCD30 3 Medium Low Yes Yes Yes High High
FCD31 3 High Low Yes Yes Yes High High
FCD32 3 High High Yes Yes Yes Medium High
FCD33 3 High Medium Yes Yes Yes High High
FCD34 3 High Low Yes Yes Yes Medium High
FCD35 4 High High Yes Yes Yes Medium High
FCD36 4 High Low Yes Yes Yes Medium High
FCD37 3 High Low Yes Yes Yes High High
FCD38 3 High Low Yes Yes Yes High High
FCD39 4 Medium Low Yes Yes Yes Medium Medium
FCD40 3 High Low Yes Yes Yes High High
FCD41 3 High Low Yes Yes Yes High High
FCD42 3 High Low Yes Yes Yes High High
FCD43 3 High Low Yes Yes Yes Medium High
FCD44 4 High Low Yes Yes Yes Medium High
FCD45 4 High Low Yes Yes Yes Medium High
FCD46 3 High Medium Yes Yes Yes Medium High
FCD47 4 Medium Low Yes Yes Yes High High
FCD48 3 High Low Yes Yes Yes Medium High
FCD49 3 High Low Yes Yes Yes Medium High
FCD50 3 High Low Yes Yes Yes Medium High
FCD51 3 High Low Yes Yes Yes Medium High
FCD52 4 High Low Yes Yes Yes Medium High
FCD53 3 High Low Yes Yes Yes Medium High
FCD54 3 High Low Yes Yes Yes Medium High
FCD55 3 High Low Yes Yes Yes Medium High
FCD56 3 High Low Yes Yes Yes Medium High
FCD57 3 High Low Yes Yes Yes High High
FCD58 3 High Low Yes No Yes Medium Low
FCD59 3 High Low Yes Yes Yes High High
FCD60 4 High Low Yes Yes Yes High High
FCD61 3 High Low Yes Yes Yes High High
FCD62 3 High Low Yes Yes Yes Medium High
FCD63 3 High Medium Yes Yes Yes High High
FCD64 3 High Low Yes Yes Yes Medium High
FCD65 3 High Low Yes Yes Yes High High
Harris County Flood Control District
35-43
Action #
# of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs?
Is Project Grant-Eligible?
Can Project Be Funded Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
FCD66 3 High High Yes No Yes High Low
FCD67 3 High Low Yes No Yes High Low
FCD68 4 Medium Low Yes Yes Yes Medium Medium
FCD69 3 High Low Yes Yes Yes High High
FCD70 4 High Low Yes Yes Yes High High
FCD71 4 Medium Low Yes Yes Yes High High
FCD72 3 High Low Yes Yes Yes High High
FCD73 3 High Low Yes Yes Yes High High
FCD74 3 High Low Yes Yes Yes High High
FCD75 4 Medium Low Yes Yes Yes Medium Medium
FCD76 3 High Low Yes Yes Yes Medium High
FCD77 4 Medium Low Yes Yes Yes High High
FCD78 3 High Low Yes Yes Yes Medium High
FCD79 3 High Low Yes Yes Yes Medium High
FCD80 3 High Low Yes Yes Yes Medium High
FCD81 4 Medium Low Yes Yes Yes High High
FCD82 3 High Low Yes Yes Yes Medium High
FCD83 4 High Low Yes Yes Yes High High
FCD84 3 High High Yes No Yes High Low
FCD85 3 High Medium Yes Yes Yes High High
FCD86 3 High Low Yes Yes Yes Medium High
FCD87 3 High High Yes Yes Yes High High
FCD88 4 High High Yes Yes Yes Medium High
FCD89 3 High Low Yes Yes Yes High High
FCD90 3 High High Yes Yes Yes High High
FCD91 3 High High Yes Yes Yes High High
FCD92 3 High High Yes Yes Yes High High
FCD93 3 High High Yes Yes Yes Medium High
FCD94 3 High High Yes Yes Yes Medium High
FCD95 3 High High Yes Yes Yes Medium High
FCD96 3 High High Yes Yes Yes Medium High
FCD97 3 High High Yes Yes Yes Medium High
FCD98 3 High High Yes Yes Yes Medium High
FCD99 3 High High Yes Yes Yes High High
FCD100 3 High High Yes Yes Yes High High
FCD101 3 High Medium Yes Yes Yes Medium High
FCD102 3 High Low Yes No Yes High Low
FCD103 4 High Low Yes Yes Yes Medium High
FCD104 4 Medium Low Yes Yes Yes High High
FCD105 3 High Low Yes Yes Yes High High
FCD106 3 High Low Yes Yes Yes Medium High
FCD107 4 Medium Low Yes Yes Yes High High
FCD108 5 High Medium Yes Yes Yes Medium High
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-44
Action #
# of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs?
Is Project Grant-Eligible?
Can Project Be Funded Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
FCD109 3 High Low Yes Yes Yes High High
FCD110 3 High Low Yes Yes Yes Medium High
FCD111 3 High Low Yes Yes Yes Medium High
FCD112 3 High Low Yes Yes Yes Medium High
FCD113 3 High Low Yes Yes Yes High High
FCD114 3 High Low Yes Yes Yes High High
FCD115 3 High Low Yes Yes Yes High High
FCD116 3 High Low Yes Yes Yes High High
FCD117 3 High Low Yes Yes Yes Medium High
FCD118 3 High Low Yes Yes Yes Medium High
FCD119 3 High Low Yes Yes Yes Medium High
FCD120 4 Medium Low Yes Yes Yes High High
FCD121 4 High Low Yes Yes Yes High High
FCD122 4 Medium High No Yes Yes Medium Medium
FCD123 4 Medium Low Yes Yes Yes High High
FCD124 4 High Low Yes Yes Yes Medium High
FCD125 3 High High Yes Yes Yes High High
FCD126 4 High Low Yes No Yes Medium Low
FCD127 3 High High Yes Yes Yes High High
FCD128 4 Medium Medium Yes Yes Yes High High
FCD129 4 High Low Yes Yes Yes Medium High
FCD130 4 High Low Yes Yes Yes Medium High
FCD131 4 High Low Yes Yes Yes Medium High
FCD132 3 High Medium Yes Yes Yes High High
FCD133 4 High Low Yes Yes Yes Medium High
FCD134 4 High Low Yes Yes Yes Medium High
FCD135 3 High High Yes Yes Yes Medium High
FCD136 4 High Low Yes Yes Yes Medium High
FCD137 4 High Low Yes Yes Yes Medium High
FCD138 4 High Low Yes Yes Yes Medium High
FCD139 3 High Medium Yes Yes Yes High High
FCD140 3 High High Yes Yes Yes Medium High
FCD141 3 High High Yes Yes Yes High High
FCD142 3 High Low Yes Yes Yes Medium High
FCD143 4 Medium Low Yes Yes Yes High High
FCD144 4 High Low Yes Yes Yes High High
FCD145 4 High Medium Yes Yes Yes Medium High
FCD146 3 High Low Yes Yes Yes Medium High
FCD147 4 High Low Yes Yes Yes High High
FCD148 3 High Low Yes No Yes High Low
FCD149 4 High Medium Yes Yes Yes High High
FCD150 4 High Low Yes Yes Yes High High
FCD151 4 High Medium Yes Yes Yes Medium High
Harris County Flood Control District
35-45
Action #
# of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs?
Is Project Grant-Eligible?
Can Project Be Funded Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
FCD152 3 High High Yes Yes Yes Medium High
FCD153 3 High Low Yes Yes Yes Medium High
FCD154 3 High Medium Yes Yes Yes Medium High
FCD155 3 High High Yes Yes Yes Medium High
FCD156 3 High High Yes Yes Yes High High
FCD157 4 High Medium Yes Yes Yes High High
FCD158 3 High High Yes Yes Yes High High
FCD159 3 High High Yes No Yes High Low
FCD160 3 High Low Yes Yes Yes Medium High
FCD161 4 High Low Yes Yes Yes High High
FCD162 4 High Low Yes Yes Yes High High
FCD163 3 High Low Yes Yes Yes High High
FCD164 3 High Low Yes Yes Yes High High
FCD165 2 High Low Yes Yes Yes High High
FCD166 4 Medium Low Yes Yes Yes High High
FCD167 5 Medium Low Yes Yes Yes High High
FCD168 3 High Low Yes Yes Yes Medium High
FCD169 3 High Low Yes Yes Yes High High
FCD170 3 High Low Yes Yes Yes High High
FCD171 3 High Low Yes Yes Yes High High
FCD172 3 Medium Low Yes Yes Yes High High
FCD173 4 Medium Low Yes Yes Yes High High
FCD174 3 Low Low Yes Yes Yes High High
FCD175 3 Low Low Yes Yes Yes High High
FCD176 3 Medium Low Yes Yes Yes High High
FCD177 4 Medium Low Yes Yes Yes High High
FCD178 3 High Low Yes Yes Yes High High
FCD179 4 High Low Yes Yes Yes High High
FCD180 4 High Low Yes Yes Yes High High
FCD181 4 Medium Low Yes Yes Yes High High
FCD182 3 High Low Yes Yes Yes High High
FCD183 3 High Low Yes Yes Yes High High
FCD184 3 High Low Yes No Yes High Low
FCD185 5 Medium Low Yes Yes Yes High High
FCD186 5 Medium Low Yes Yes Yes High High
FCD187 2 Medium Low Yes Yes Yes High High
FCD188 2 High Low Yes No Yes High Low
FCD189 3 Medium Low Yes No Yes High Low
FCD190 5 High Low Yes Yes Yes High High
FCD191 3 High Low Yes Yes Yes High High
FCD192 3 High Low Yes Yes Yes High High
FCD193 3 High Low Yes Yes Yes High High
FCD194 2 High Low Yes No Yes High Low
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-46
Action #
# of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs?
Is Project Grant-Eligible?
Can Project Be Funded Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
FCD195 5 High Low Yes Yes Yes Medium High
FCD196 8 Medium Low Yes Yes Yes High High
FCD197 7 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 35-13. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Hurricane FCD196 FCD194 FCD196 FCD187,
FCD194, 196
FCD185 FCD2, 3, 188,
FCD194, 196
Severe
Weather
FCD196 FCD196 FCD187, 196 FCD2, 3, 188, 196
Flooding FCD21, 70,
108, 121, 144, 162,
166, 167,
180, 195,
196
FCD1, 21,
70, 121, 144, 162,
180
FCD166, 196 FCD5, 6, 17,
18, 21, 27, 28, 33, 40, 41, 42,
57, 59, 61, 63,
68, 69, 70, 72,
73, 75, 89,
121, 132, 139,
144, 162, 175,
176, 180, 183,
195
FCD165,
187, 196
FCD6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16,
19, 22, 23, 25, 26, 29, 32, 34, 35, 36, 37, 38, 40, 43, 44, 45, 46, 48, 49, 50,
51, 52, 53, 54, 55, 56, 58, 62, 64, 65,
66, 67, 74, 76, 78, 79, 80, 82, 84, 85,
86, 87, 88, 90, 91, 92, 93, 94, 95, 96,
94, 98, 99, 100, 101, 102, 103, 105,
106, 108, 109, 110, 111, 112, 113, 114,
115, 116, 117, 118, 119, 122, 124, 125,
126, 127, 129, 130, 131, 133, 134, 135,
136, 137, 138, 140, 141, 142, 145, 146,
148, 150, 151, 152, 153, 154, 155, 156,
158, 159, 160, 163, 164, 168, 169, 170,
171, 178, 182, 184, 191, 192, 193, 195
FCD174,
185
FCD2, 3, 4, 11, 20,
24, 30, 31, 34, 35, 36, 39, 43, 44, 45,
47, 53, 60, 71, 77,
81, 83, 88, 103,
104, 107, 120, 123, 124, 126, 128, 129,
130, 131, 133, 134,
136, 137, 138, 143,
145, 147, 149, 150, 151, 157, 161, 172,
173, 174, 175, 176,
177, 181, 186, 188,
196
Low-Risk Hazards
Earthquake FCD196 FCD196 FCD187, 196 FCD2, 3, 188, 196
Dam Failure FCD196 FCD196 FCD196 FCD185 FCD2, 3, 196
Wildfire FCD196 FCD196 FCD190 FCD187, 196 FCD185 FCD2, 3, 188, 196
Mass Movement
FCD196 FCD196 FCD187, 196 FCD2, 3, 188, 196
Drought FCD196 FCD196 FCD189 FCD196 FCD185 FCD2, 3, 196
Tsunami FCD196 FCD196 FCD187, 196 FCD2, 3, 188, 196
a. See the introduction to this volume for explanation of mitigation types.
35.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX
35.10.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
Harris County Flood Control District
35-47
• Harris County Flood Control District Hazard Mitigation Plan (2014) — This plan was reviewed to
identify action items from the plan, and to help identify areas of existing integration with relevant
planning mechanisms.
• Flood Operations & Hurricane Response Plan — This plan was reviewed to provide information for
the Planning and Regulatory Capabilities section of this annex and to help identify areas of existing
integration with relevant planning mechanisms.
• Harris County Flood Control District Policy, Criteria & Procedure Manual — This manual was
reviewed to provide information for the Planning and Regulatory Capabilities section of this annex.
• Harris County Flood Control District Hydrology and Hydraulics Guidance Manual — This manual
was reviewed to provide information for the Planning and Regulatory Capabilities section of this annex.
• Harris County Flood Control District Land Surveying Guidelines — These guidelines were reviewed
to provide information for the Planning and Regulatory Capabilities section of this annex.
• Design Guidelines for HCFCD Wet Bottom Detention Basins with Water Quality Features — These
guidelines were reviewed to provide information for the Planning and Regulatory Capabilities section of
this annex.
• Design Manual for Articulating Concrete Block Systems — This manual was reviewed to provide
information for the Planning and Regulatory Capabilities section of this annex.
• Harris County Low Impact Development & Green Infrastructure Design Criteria for Storm Water
Management Manual — This manual was reviewed to provide information for the Planning and
Regulatory Capabilities section of this annex.
• Ordinary High Water Mark Delineation Manual — This manual was reviewed to provide information
for the Planning and Regulatory Capabilities section of this annex.
• Detention Basin Pump Operation & Maintenance Manual — This manual was reviewed to provide
information for the Planning and Regulatory Capabilities section of this annex.
• Little Cypress Creek Interim Guidelines — These guidelines were reviewed to provide information for
the Planning and Regulatory Capabilities section of this annex.
• Little Cypress Creek Master Drainage Plan — This plan was reviewed to identify action items from
the plan, and to help identify areas of existing integration with relevant planning mechanisms.
• Cypress Creek Overflow Management Plan — This plan was reviewed to provide information for the
Planning and Regulatory Capabilities section of this annex and to help identify areas of existing
integration with relevant planning mechanisms.
• Supplemental Guidelines and Criteria for Developing in the Addicks Reservoir Watershed, Barker
Reservoir Watershed, and the Cypress Creek Watershed Upstream of US 290 — These guidelines
were reviewed to provide information for the Planning and Regulatory Capabilities section of this annex
and to help identify areas of existing integration with relevant planning mechanisms.
• Upper Langham Creek Development Guidelines — These guidelines were reviewed to provide
information for the Planning and Regulatory Capabilities section of this annex and to help identify areas
of existing integration with relevant planning mechanisms.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• Integrated Management Application — This is an application used by the District to track project
information, including status updates and financial information. This was used to help report on the status
of previously identified actions.
• HCFCD.org — The District’s main website has many pages describing District projects, plans, studies,
and programs.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
35-48
• Immediate Flood Reports — The District’s reports summarizing impacts after flooding events were
used to inform the Jurisdiction-Specific Natural Hazard Event History.
35.10.2 Staff and Local Stakeholder Involvement in Annex Development
This annex was developed over the course of several months with input from many district divisions and
departments including Financial Services, the Communications Department, the Engineering Division, and the
Planning Division. These divisions and departments were asked to contribute to the annex development through
reviewing and contributing to the capability assessment, reporting on the status of previously identified actions,
and participating in action identification and prioritization.
36-1
36. HARRIS COUNTY EMERGENCY SERVICE DISTRICT
NO. 12
36.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
James Novick, Battalion Chief
911 Hollywood Street
Houston, Texas 77015
Telephone:713-453-1811
e-mail Address: jnovick@cloverleaf-fire.org
Edward M. Russell, Fire Chief/Business Administrator
911 Hollywood Street
Houston, Texas 77015
Telephone: 713-453-1811
e-mail Address: emrussell@cloverleaf-fire.org
36.2 JURISDICTION PROFILE
36.2.1 Overview
The Harris County Emergency Service District No. 12 Fire Department (HCESD12) provides fire prevention,
suppression, and emergency medical response for basic life support services to an unincorporated area located on
the east side of Harris County. HCESD12 was formed on December 12, 2001 as a rural fire protection district;
however, on March 3, 2014 the organization transitioned to an Emergency Service District based on the
consolidation of laws and regulations governing special districts. The laws that govern the political subdivision of
HCESD12 is the Texas Health and Safety Code, Chapter 775, 2011. The department has a career staff that
maintains a minimum staffing level of 9 fire firefighters on duty 24 hours-a-day; a total staff of 38 personnel. A
five-member elected Board of Commissioners governs the district. Funding for HCESD12 is accomplished by the
collection of property tax and sales tax generated within its boundaries.
The Emergency Service District Board of Commissioners assumes responsibility for the adoption of this plan; the
Fire Chief will oversee its implementation. Development of this annex was carried out by the members of the
local mitigation planning team, whose members are listed in Table 36-1.
Table 36-1. Local Mitigation Planning Team Members
Name Title
Edward M. Russell Fire Chief/Business Administrator
James Novick Battalion Chief
The District participates in the Public Protection Class Rating System and currently has a rating of 4.
36.2.2 Service Area and Trends
The district service area covers 9.9 square miles, serving a population of 55,000 residents. The Harris County
Emergency Service District No. 12 Fire Department was formed to provide fire protection to the residents of the
unincorporated area of east Harris County known as Cloverleaf. The response district consists
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
36-2
of commercial, educational, industrial, marine, multi-family dwellings, residential dwellings, office buildings
warehousing occupancies, and chemical plants. In addition, the district contains sections of Interstate 10, the Sam
Houston Toll Road-Beltway 8, and several railroads. The district extends south to the Houston Ship Channel,
north to Crosby Freeway-Highway 90, east to Beltway 8, and west to Greens Bayou; included in the district are
the Northshore, Pine Trails, Newforest, Woodforest and Cloverleaf additions. The Cloverleaf and Woodforest
additions are densely populated. The economic growth of the area still trends upwards yearly even though the
unemployment rate in the district is 8 percent.
In 2018, HCESD12 became a first responder organization licensed by the Texas Department of State Health
Services; working in cooperation with the licensed medical provider North Channel Emergency Medical Service.
As the transition continues, HCESD12 is expected to experience an increase of medical responses to assist the
public; our rescue/medical responses has increase 52 percent since the emergency medical service operations
started. As of 2019, the department has had a 48 percent increase of call volume since 2013 and the projected
annual percentage increase is around 10.5 percent yearly.
36.2.3 Assets
Table 36-2 summarizes the critical assets of the district and their value.
Table 36-2. Special Purpose District Assets
Asset Value
Property
3 acres of land $216,775
Equipment
Fire Apparatus $4,920,290
Response Equipment $953,576
Total: $5,873,866
Critical Facilities and Infrastructure
Station 1 — 911 Hollywood Street, Houston, TX 77015 $2,301,163
Station 2 — 14222 Wallisville Road, Houston, TX 77049 $1,986,757
Communication Center $1,200,000
Total: $5,487,920
36.3 CAPABILITY ASSESSMENT
An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or
integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were
identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation
Actions” table in Section 29.9 identifies these as community capacity building mitigation actions.
36.3.1 Planning and Regulatory Capabilities
Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents.
When effectively prepared and administered, these plans, programs and regulations can support the
implementation of mitigation actions. Table 36-3 summarizes existing codes, ordinances, policies, programs or
plans that are applicable to this hazard mitigation plan.
Harris County Emergency Service District No. 12
36-3
Table 36-3. Planning and Regulatory Capability
Plan, Study or Program Date of Most Recent Update Comment
Harris County Fire Code 2012 Adopted in December 2014 to be effective on March 1, 2015.
Texas Commission of Fire Protection 2009 Texas Government Code Chapter 419
HCESD No. 12 Employee Handbook 2018
Harris County Emergency Response Plan 2015
36.3.2 Fiscal, Administrative and Technical Capabilities
Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard
mitigation projects. An assessment of fiscal capabilities is presented in Table 36-4. Administrative and technical
capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of
administrative and technical capabilities is presented in Table 36-5.
Table 36-4. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds Yes
Incur Debt through Private Activity Bonds No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Federal Grant Programs Yes
Table 36-5. Administrative and Technical Capability
Staff/Personnel Resource Available?
Department/Agency/
Position
Planners or engineers with knowledge of land development and land management practices Yes Harris County
Engineers or professionals trained in building or infrastructure construction practices Yes Harris County
Planners or engineers with an understanding of natural hazards Yes Harris County
Staff with training in benefit/cost analysis Yes Fire Administration
Surveyors No
Personnel skilled or trained in GIS applications Yes IT
Scientist familiar with natural hazards in local area No
Emergency manager Yes Fire Administration
Grant writers Yes Fire Administration
36.3.3 Education and Outreach Capabilities
Outreach and education capability identifies the connection between government and community members, which
opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is
presented in Table 36-6.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
36-4
Table 36-6. Education and Outreach
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? No
• If yes, please briefly describe
Do you use social media for hazard mitigation education and outreach? No
• If yes, please briefly describe
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, please briefly specify
Do you have any other programs already in place that could be used to communicate hazard-related information? No
• If yes, please briefly describe
Do you have any established warning systems for hazard events? No
• If yes, please briefly describe Industrial Emergency Notification, Harris Co. Emergency
Alerting
36.3.4 Adaptive Capacity for Climate Change
Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s
ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 36-7
summarizes the jurisdiction’s adaptive capacity for climate change.
Table 36-7. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts High
Comment: Related to hurricanes and the result of flooding hazards
Jurisdiction-level monitoring of climate change impacts Medium
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment: No regulatory ability to affect carbon emissions.
Capital planning and land use decisions informed by potential climate impacts Low
Comment: Handled by the county and not the district.
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment: No authority
Identified strategies for greenhouse gas mitigation efforts Low
Comment: No authority
Identified strategies for adaptation to impacts Medium
Comment: Changes in response due to hazard impacts.
Champions for climate action in local government departments Low
Comment: Non-existent for response agency
Harris County Emergency Service District No. 12
36-5
Criterion Jurisdiction Ratinga
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment: Impacts pertain to response
Local authority over sectors likely to be negative impacted Low
Comment: No authority
Public Capacity
Local residents knowledge of and understanding of climate risk Low
Comment:
Local residents support of adaptation efforts Low
Comment:
Local residents’ capacity to adapt to climate impacts Low
Comment:
Local economy current capacity to adapt to climate impacts Low
Comment:
Local ecosystems capacity to adapt to climate impacts Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
36.4 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used
in hazard mitigation. This section identifies where such integration is already in place, and where there are
opportunities for further integration in the future. Resources listed in this annex were used to provide information
on integration. The progress reporting process described in Volume 1 will document the progress of hazard
mitigation actions related to integration and identify new opportunities for integration.
36.4.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Capital Improvement Plan — Provides the plan for capital improvements. Within the plan, projects can
be identified to assist in hazard mitigation. The hazard mitigation plan can provide funding support for
proposed projects based on a risk assessment.
36.4.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Capital Improvement Projects — Capital improvement project proposals may take into consideration
hazard mitigation potential as a means of evaluation project prioritization.
• Emergency Operations Plan — The District does not have an Emergency Operations Plan and intends
to develop one as a mitigation planning action during the next five years.
• Continuity of Operations Plan — The District does not have a Continuity of Operations Plan and
intends to develop one as a mitigation planning action during the next five years.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
36-6
36.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 36-8 lists past occurrences of natural hazards for which specific damage was recorded in HCESD12. Other
hazard events that broadly affected the entire planning area, including HCESD12, are listed in the risk
assessments in Volume 1 of this hazard mitigation plan.
Table 36-8. Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 240,000
Hurricane Ike 1791 DR 2008 NA
Hurricane Rita 1606 DR 2005 NA
Hurricane Katrina Evac. 3216 EM 2005 NA
Hail NA 2005 NA
Tropical Storm Allison 1379 DR 2001 NA
Flood/River Fire NA 1994 NA
Severe Weather 970 DR 1992 NA
Hurricane Alicia 689 DR 1983 NA
36.6 HAZARD RISK RANKING
Table 36-9 presents a local ranking for HCESD12 of all hazards of concern for which this hazard mitigation plan
provides complete risk assessments. This ranking summarizes how hazards vary for this jurisdiction. As described
in detail in Volume 1, the ranking process involves an assessment of the likelihood of occurrence for each hazard,
along with its potential impacts on people, property and the economy. Mitigation actions target hazards with high
and medium rankings.
Table 36-9. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
2 Hurricane 32 High
3 Flooding 28 Medium
4 Earthquake 14 Low
5 Drought 6 Low
5 Wildfire 6 Low
6 Dam Failure 0 (No exposure) None
6 Mass Movement 0 (No Exposure) None
6 Tsunami 0 (No Exposure) None
6 Coastal Erosion 0 (No Exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
36.7 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Station fourteen’s district frequently loses power due to a lack of tree maintenance; this excludes the fire
station due to the department owned stand-by generator.
Harris County Emergency Service District No. 12
36-7
• One of the District’s two fire stations is located in a very high flood risk area.
• Several neighborhoods in Station twenty-four’s district has the potential to have ingress and egress cut
off as the result flooding.
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in this
annex.
36.8 STATUS OF PREVIOUS PLAN ACTIONS
The Harris County Emergency Service District No. 12 Fire Department has not previously completed any hazard
mitigation planning effort.
36.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 36-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 36-11
identifies the priority for each action. Table 36-12 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 36-10. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action ESD1 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Flooding
Existing 3, 4, 8, 10, 11, 13, 15 HCESD12 TBD High HMGP, PDM, FMA Long-term
Action ESD2 — Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire
New and Existing 1, 5, 8 HCESD12 TBD Low Staff Time, General Funds Short-term
Action ESD3 — Integrate the hazard mitigation plan into other plans, ordinances and programs within the community.
Hazards Mitigated: Earthquake, flooding, hurricane, severe weather, wildfire
Existing 1, 3, 6, 9 HCESD12 NA Low Staff Time, General Funds Ongoing
Action ESD4 — Participate in annual multi-agency training.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire,
New and Existing 3, 4 HCESD12 HCESD50, HCESD60 Low Staff Time, General Funds Short-term
Action ESD5 — Control low hanging, un-kept tree debris from making contact with electrical power sources.
Hazards Mitigated: Severe Weather
New and Existing 8, 10, 11 HCESD12 Harris County Precinct
2 & 3
Low General Funds Short-term
Action ESD6 — Utilize multiple avenues, including organization website, social media, and public education campaigns to disseminate
natural hazard information and methods to prepare for and mitigate those risks.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire,
New and Existing 3, 4, 10 HCESD12 TBD Low Staff Time, General Funds Ongoing
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
36-8
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action ESD7 — Participate in the development of further interoperability between multiple organizations to improve emergency
communications; upgrade mobile and portable radio units to new and current capabilities.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire, All Hazards
New and Existing 1, 3, 4, 9, 11, 15 ECOM HCESD12, HCESD50,
HCESD60, HCESD6,
HCESD4, HCESD5,
HCESD14
High Assistance to Firefighters
Grant Program
Short-term
Action ESD8 — Evaluate, analyze, and improve drainage of Big Gulch, a Greens Bayou tributary, to assist in minimizing flooding in
station 24’s district.
Hazards Mitigated: Hurricane, Flooding, Severe Weather
New and Existing 3, 4, 6, 8, 11 Harris County
Flood Control
District
HCESD12 High HMGP, PDM, FMA Long-term
Action ESD9 — Improve, expand, and develop new equipment, techniques, and abilities to respond to high water emergencies.
Hazards Mitigated: Hurricane, Flooding, Severe Weather
New and Existing 4, 11 HCESD12 NA Medium Staff Time, General Funds Short-term
Action ESD10 — Develop, implement, and evaluate an Emergency Operations and Continuity of Operations plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire, All Hazards
New and Existing 9, 11, 13 HCESD12 TBD Low Staff Time, General Funds;
HMGP, PDM, FMA
Short-term
Action ESD11— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Drought, Wildfire
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
HCESD12 HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 36-11. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
ESD1 7 High High Yes Yes No Medium High
ESD2 3 Low Low Yes No Yes High Low
ESD3 4 High Medium Yes Yes No Medium High
ESD4 2 High Medium Yes Yes Yes Medium Low
ESD5 3 High Low Yes No Yes Medium Low
ESD6 3 Low Low Yes No Yes Low Low
ESD7 6 High High Yes Yes No High High
ESD8 5 High High Yes Yes No High High
ESD9 2 High Medium Yes Yes Yes High Low
ESD10 3 Medium Low Yes Yes Yes Medium Medium
ESD11 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Harris County Emergency Service District No. 12
36-9
Table 36-12. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe Weather ESD5, 11 ESD5, 8 ESD6, 11 ESD 4, 7, 9, 10,
11
ESD1, 3 ESD1, 7, 11
Hurricane ESD5, 11 ESD5, 8 ESD6, 11 ESD4, 7, 9, 10,
11
ESD1, 3 ESD1, 7, 8,
11
Medium-Risk Hazards
Flooding ESD8, 11 ESD8 ESD6, 11 ESD8 ESD4, 7, 9, 10,
11
ESD1, 3 ESD1, 7, 8,
11
Low-Risk Hazards
Earthquake ESD11 ESD6, 11 ESD7, 10, 11 ESD11
Drought ESD11 ESD6, 11 ESD7, 10, 11 ESD11
Wildfire ESD11 ESD5 ESD6, 11 ESD7, 10, 11 ESD11
a. See the introduction to this volume for explanation of mitigation types.
36.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX
36.10.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• Fire Inventory (PSTrax) — Utilized to determine capabilities of response.
• Fire Data (Firehouse) — Used in the determination of previous incidents.
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• Safe-D ESD Handbook — Gathered information pertaining to the administration and operations of an
emergency service district.
36.10.2 Staff and Local Stakeholder Involvement in Annex Development
This annex was developed over the course of several months with a review of material from different areas of
tasks including operations, budgeting, and the planning sectors. Information was gathered to contribute to the
development of the annex, material was reviewed, and collaborated to use the most vital details for the annex.
Discussions were held to identify the capability assessment, planning initiatives, hazard assessment and ranking,
and future action plans. Once actions had been identified and complied in the annex, the draft was circulated for
review, comments, and adjustments.
37-1
37. HARRIS HEALTH SYSTEM
37.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Ray W. Higgins, Director of Emergency
Management
9240 Kirby
Houston, TX 77054
Telephone: (713) 634-1470
e-mail Address: Ray.Higgins@harrishealth.org
David Attard, Associate Administrator, Healthcare
Systems Engineering
9240 Kirby
Houston, TX 77054
Telephone: (713) 634-1451
e-mail Address: David.Attard@harrishealth.org
37.2 JURISDICTION PROFILE
37.2.1 Overview
The Harris Health System, previously the Harris County Hospital District, is a governmental entity with taxing
authority that owns and operates three hospitals, 18 community health centers, three large multi-specialty clinics,
five same-day clinics, five school-based clinics, one free-standing dental center, one dialysis center, one geriatric
center, and 10 homeless shelter clinics — including five homeless eligibility service locations, mobile
immunization and a medical outreach program throughout Harris County, Texas. The system administrative
offices are located in Houston.
The Harris County Hospital District was created by voter referendum in November 1965 and was formally
designated as a political subdivision with taxing authority on January 1, 1966. A hospital district is a
governmental entity in Texas, established pursuant to the Texas Constitution or the general statutes of Texas, and
its purpose is to provide medical care to the needy residents of a particular county.
The system’s two main hospitals serve approximately one million under-insured and uninsured people, nearly a
quarter of the entire population of Harris County, the third most-populous county in the United States. Harris
County includes Houston, the fourth largest city in the United States.
• Ben Taub Hospital is a Level 1 trauma center with 444 licensed beds. It is located in the Texas Medical
Center, the largest medical complex in the world, and is staffed by Harris Health employees, faculty,
residents, and students of Baylor College of Medicine.
• Lyndon B. Johnson Hospital is a 207-bed general hospital with a Level 3 trauma center located northeast
of downtown Houston. It is staffed by Harris Health employees, faculty, residents, and students of the
University of Texas Health Science Center at Houston and the University of Texas M. D. Anderson
Cancer Center.
• Quentin Mease Hospital ceased inpatient activities on February 28, 2019 and will be reconfigured to be
an outpatient facility.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
37-2
In January 2012, board members of Harris County Hospital District approved name rebranding to “Harris Health
System.” The rebranding became effective on September 6, 2012.
The Harris Health System Board of Trusties assumes responsibility for the adoption of this plan; the Chief
Executive Officer (CEO) will oversee its implementation. Development of this annex was carried out by the
members of the Harris Health System Mitigation Planning Team, whose members are listed in Table 37-1.
Table 37-1. Local Mitigation Planning Team Members
Name Title
Ray W. Higgins Director of Emergency Management
David Attard Associate Administrator, Healthcare Systems Engineering
Aaron Velasquez Emergency Management Specialist (LBJ)
Jason Kunnacherry VP, Operations (Ben Taub)
Christopher Okezie VP, Operations (System)
Benny Stansbury Director Facilities Management (Ben Taub)
Jake Goldstein Administrative Director, Ancillary Services (ACS)
Jose A. Lara Operations Manager Engineering (ACS)
Justin Adams Emergency Management Specialist (Ben Taub)
37.2.2 Service Area and Trends
Harris Health System serves Harris County residents. Harris County area covers 1,777 square miles. According to
the Census Bureau, the 2018 Harris County population was 4.7 million.
• Ben Taub Hospital — Ben Taub Hospital is planning on expanding surgical capacity by 18% in the
upcoming calendar year through the opening of 7 additional operating rooms in the hospital. This will
allow the facility to become more in-line with community standard wait times for urgent and elective
cases. In early 2019, Harris Health will complete the transition from four-bed rooms to semi-private
rooms. While this reduces the overall bed count in the facility, it provides for an improved care
environment not only for patients, but also for providers. At the same time, performance improvement
initiatives are being put in place to reduce length of stay, time from admission decision to arrival in the
nursing unit, and turnaround times from patient discharge to the room being ready for the next patient.
From a specialty clinic perspective, Harris Health is working on provider efficiencies by considering
potential mid-level providers to assist physicians in throughput and appointment availability. Lastly, as
the psychiatric needs in Harris County continue to rise, Harris Health is working with other entities to
improve access and venues for patients to seek treatment.
• Quentin Mease — Quentin Mease Hospital ceased inpatient activities on February 28, 2019 and will be
reconfigured to be an outpatient facility. While the need for rehab and skilled nursing facilities continues
and will be managed through outsourcing, the existing facility is no longer able to support based on aging
infrastructure and changes in code requirements. A master plan is in the works to consolidate to other
Harris Health outpatient facilities (Thomas Street Health Center and Riverside Dialysis) into a renovated
footprint at Quentin Mease.
• Lyndon B. Johnson Hospital — Lyndon B. Johnson Hospital is planning on expanding its ICU bed
capacity by adding a new surgical intensive care unit with 8 beds. Current ICU bed capacity at LBJ
Hospital is 16 beds, and this will increase the number of ICU beds by 50%. LBJ is also currently
analyzing the population’s needs and growth. Future trends show growth for the need of services in the
service area related to an Oncology Radiation Center, Higher Trauma level designation, and inpatient
services. LBJ is currently planning on expanding Oncology by planning to build a new facility on campus
specifically for oncology radiation treatment. Trends show a population growth in the area around LBJ.
Harris Health System
37-3
LBJ is in a medically underserved area. There will be a need for an additional 150-bed tower on campus
to serve the growing population. Also, there will be a push to have a Level 2 trauma center with helipad to
accommodate the growth of the city and its need.
• Ambulatory Community Services — Harris Health will continue to operate a range of clinics
throughout Harris County. Potential future expansions include managing more care for inmates and
collaborating with Harris County on the Riverside Mental Health Center proposed expansion. Service
trends will likely include more partnerships with community facilities, like food banks, exercise programs
and parks, and community clinics, as well as an increased use of new technology such as telemedicine
remote consults and at home patient monitoring and diagnostic tools.
37.2.3 Assets
Table 37-2 summarizes the critical assets of the district and their estimated values.
Table 37-2. Special Purpose District Assets
Asset Value
PROPERTY
141.757 acres of land $49,614,950
Equipment
Ben Taub Hospital $122,111,233
Quentin Mease $2,075,463
Lyndon B. Johnson Hospital $ 93,999,366
Ambulatory Community Services Equipment (45 locations) $234,637,672
Total: $452,823,734
Critical Facilities and Infrastructure
HOSPITALS
• Ben Taub Hospital, NPC, Tower, & Garage – 1504 Taub Loop $479,773,550
• Lyndon B. Johnson Hospital, OC, & Garage – 5656 Kelly Street $239,100,742
PRIMARY CARE & SPECIALTY CARE CLINICS (Does not include rental properties)
• Acres Home Health Center – 818 Ringold Street, Houston 77088 $9,412,000
• Aldine Health Center – 4755 Aldine Mail Route, Houston 77039 $6,233,900
• Baytown Health Center -1602 Garth Road, Baytown 77520 $6,580,650
• Casa de Amigos Health Center – 1615 North Main Street, Houston 77009 $5,451,300
• Danny Jackson Clinic – 5503 N. Fry Rd, Katy 77449 $5,662,700
• El Franco Lee Health Center – 8901 Boone Road, Houston 77099 $20,749,700
• Gulfgate Health Center – 7550 Office City Drive, Houston 77012 $8,587,000
• Martin Luther King Jr. Health Center – 3550 Swingle Road 77047 $23,471,100
• Northwest Health Center – 1100 West 34th Street, Houston 77018 $6,492,000
• Quentin Mease – 3601 North McGregor Way $31,618,529
• Smith Clinic – 2525-A Holly Hall, Houston 77054 $91,619,800
• Vallbona Health Center – 6630 De Moss Drive, Houston 77074 $5,717,900
ELIGIBILITY CENTERS, ADMINISTRATIVE FACILITY
• Lois J. Moore Eligibility Center – 8901-B Boone Rd, Houston 77099 $1,156,106
• Southeast Eligibility Center – 3550-A Swingle Rd, Houston 77047 $1,119,370
• Administration Building & Garage – 2525 Holly Hall, Houston 77054 $204,245,165
Total: $1,152,274,012
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
37-4
37.3 CAPABILITY ASSESSMENT
An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or
integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were
identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation
Actions” table in Section 37.9 identifies these as community capacity building mitigation actions.
37.3.1 Planning and Regulatory Capabilities
Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents.
When effectively prepared and administered, these plans, programs and regulations can support the
implementation of mitigation actions. Table 37-3 summarizes existing codes, ordinances, policies, programs or
plans that are applicable to this hazard mitigation plan.
Table 37-3. Planning and Regulatory Capability
Plan, Study or Program Date of Most Recent Update Comment
Texas Department of State Health Services Licensing & Regulation 2017 General and special hospitals to be licensed by the Department
of State Health Services.
City of Houston – Applicable Building, Fire, Health,
Food, & Enforcement Codes
2012 & 2017 Building approval & enforcement of COH codes.
Harris County Regulations – Applicable Building, Fire, and Enforcement Codes 2012 Building approval & enforcement of Harris County codes.
Centers for Medicare & Medicaid Services (CMS) 42 CFR § 482 2017 Hospitals must meet standards established by the federal
government in order to receive reimbursement from the
federally funded programs (e.g., Medicare and/or Medicaid).
National Integrated Accreditation for Healthcare Organizations (NIAHO) 2018 Hospitals participating in the Medicare and Medicaid program
are required to comply with current Conditions of Participation.
Complying with NIAHO standards ensure healthcare programs
are meeting or exceeding CMS standards of clinical readiness
and patient safety.
37.3.2 Fiscal, Administrative and Technical Capabilities
Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard
mitigation projects. An assessment of fiscal capabilities is presented in Table 37-4. Administrative and technical
capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of
administrative and technical capabilities is presented in Table 37-5.
Table 37-4. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes No
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds Yes
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Federal Grant Programs Yes
Harris Health System
37-5
Table 37-5. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes Healthcare Systems Engineering Administration
Engineers or professionals trained in building or
infrastructure construction practices
Yes Healthcare Systems Engineering Administration Department
& Hospital Facilities Management Directors
Planners or engineers with an understanding of natural hazards Yes Healthcare Systems Engineering Administration
Staff with training in benefit/cost analysis Yes Healthcare Systems Engineering Administration
Surveyors No
Personnel skilled or trained in GIS applications No
Scientist familiar with natural hazards in local area No
Emergency manager Yes Emergency Management Department
Grant writers Yes Harris County Hospital District Foundation Grant Writer &
Researcher
Other No
37.3.3 Education and Outreach Capabilities
Outreach and education capability identifies the connection between government and community members, which
opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is
presented in Table 37-6.
Table 37-6. Education and Outreach
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? No
• If yes, please briefly describe
Do you use social media for hazard mitigation education and outreach? No
• If yes, please briefly describe
Do you have any citizen boards or commissions that address issues related to hazard mitigation? No
• If yes, please briefly specify
Do you have any other programs already in place that could be used to
communicate hazard-related information?
Yes
• If yes, please briefly describe Mass Communication System (Internal); Twitter,
Facebook
Do you have any established warning systems for hazard events? Yes
• If yes, please briefly describe Site based emergency communication /
notification via text, e-mail, phone and overhead
paging.
37.3.4 Adaptive Capacity for Climate Change
Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s
ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 37-7
summarizes the jurisdiction’s adaptive capacity for climate change.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
37-6
Table 37-7. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Low
Comment:
Jurisdiction-level monitoring of climate change impacts Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment:
Capital planning and land use decisions informed by potential climate impacts Low
Comment:
Participation in regional groups addressing climate risks Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment:
Identified strategies for greenhouse gas mitigation efforts Low
Comment:
Identified strategies for adaptation to impacts Low
Comment:
Champions for climate action in local government departments Low
Comment:
Political support for implementing climate change adaptation strategies Low
Comment:
Financial resources devoted to climate change adaptation Low
Comment:
Local authority over sectors likely to be negative impacted Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk Medium
Comment:
Local residents support of adaptation efforts Medium
Comment:
Local residents’ capacity to adapt to climate impacts Medium
Comment:
Local economy current capacity to adapt to climate impacts Medium
Comment:
Local ecosystems capacity to adapt to climate impacts Medium
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
Harris Health System
37-7
37.4 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used
in hazard mitigation. This section identifies where such integration is already in place, and where there are
opportunities for further integration in the future. Resources listed in this annex were used to provide information
on integration. The progress reporting process described in Volume 1 will document the progress of hazard
mitigation actions related to integration and identify new opportunities for integration.
37.4.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• City of Houston Flood Mitigation required for new building projects and building plans for existing
facilities. Critical Access facilities (Hospitals) have to meet even stricter mitigation requirements.
37.4.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Capital Improvement Program — Capital improvement project proposals may take into consideration
hazard mitigation potential as a means of evaluating project prioritization.
37.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 37-8 lists past occurrences of natural hazards for which specific damage was recorded in Harris Health
System. Other hazard events that broadly affected the entire planning area, including Harris County, are listed in
the risk assessments in Volume 1 of this hazard mitigation plan.
Table 37-8. Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Texas Severe Storm &
Flooding / Allison
DR-1379 6/09/2001 No damage records found
Hurricane Ike DR-1791 9/12/2008 $950,270
Hurricane Harvey DR-4332 08/24/17 $15,742,260
37.6 HAZARD RISK RANKING
Table 37-9 presents a local ranking for Harris Health System of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
37-8
Table 37-9. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Severe Weather 48 High
1 Hurricane 48 High
2 Flooding 27 Medium
3 Earthquake 14 Low
4 Dam Failure 12 Low
5 Wildfire 9 Low
6 Drought 6 Low
7 Tsunami 0 (No exposure) None
7 Mass Movement 0 (No exposure) None
7 Coastal Erosion 0 (No exposure) None
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
37.7 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Flooding
• Hurricane
• Severe Weather
Mitigation actions addressing these issues were prioritized for consideration in the action plan in this annex.
37.8 STATUS OF PREVIOUS PLAN ACTIONS
Table 37-10 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 37-10. Status of Previous Plan Actions
Removed;
Carried Over to Plan
Update
Action Item from Previous Plan Completed No Longer Feasible Check if Yes Action # in Update
2014HCOHHS001 — Install flood barrier systems, such as flood panels, gates and
passive systems, to increase flood protection and minimize damage for critical care
facilities
X HH-019
Comment: Ben Taub Central Plant is undergoing dry flood proofing to ensure compliance with floodplain regulations and is replacing
existing generators located on ground level. Relocated inside Central Plant and behind flood proofing barrier to keep
generators from flooding.
2014HCOHHS002 — Expand flood warning system(s), i.e. a mass notification
system, to increase coverage to all the Hospital District’s hospitals, clinics and
support facilities.
X
Comment: Mass Notification System is implemented. Medical Center Flood Warning System and RICE Flood Alert System.
2014HCOHHS003 — Develop and install retention ponds to reduce flood damages
at the Hospital’s or District’s critical care facilities.
X HH-020
Comment: No update at this time.
Harris Health System
37-9
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
2014HCOHHS004 — Implement flood control measures (riverine erosion controls)
to minimize damage to critical care facilities within the flood hazard area.
X HH-005
Comment: No update at this time
2014HCOHHS005 — Implement project(s) to elevate emergency generators above
base flood elevation(s) at critical care facilities.
X
Comment: Ben Taub is replacing existing generators located on ground level. Relocated inside Central Plant and behind flood proofing
barrier to keep generators from flooding.
2014HCOHHS006 — Retrofit roofing of critical care facilities to meet industry-
accepted hurricane high-wind guidelines and retrofit gravel roofing to non-gravel
roofing at all locations near critical care facilities to limit damage from high winds
and loose debris.
X
Comment: Ben Taub is in-process. LBJ is complete with only a partial upgrade over annex needing to be retrofitted. LBJ and Ben Taub
are retrofitting existing built up roofs (asphalt) with a single ply membrane that meets high-wind guidelines.
2014HCOHHS007 — Bury primary service power lines. X
Comment: LBJ increased redundancy by replacing CenterPoint’s transformers and updated capacity and new automatic transfer
situations. Increased level of redundancy and additional capacity. Upgrading the main incoming distribution system.
2014HCOHHS008 — Installation of generators / power back-up systems. X
Comment: Smith Clinic installation of generator(s) is in progress.
2014HCOHHS009 — Install Roof Modifications necessary for critical care facilities
to better survive high wind damage.
X
Comment: Project is no longer feasible. Roofs will not be modified, but entirely replaced.
2014HCOHHS010 — Install early warning system, i.e. a mass notification system
to increase alert capabilities for the Hospital District and provide coverage to the
District’s hospitals, clinics and support facilities.
X
Comment: Mass Notification and warning systems implemented.
2014HCOHHS011 — Provide community early warning system i.e. a mass
notification system, to increase alert capabilities for the Hospital District to provide
coverage to all the District’s hospitals, clinics, support facilities and general public
X
Comment: Completed
2014HCOHHS012 — Install lightning and surge protection measures for critical
infrastructure.
X HH-006
Comment: Not started
2014HCOHHS013 — Develop and harden safe room areas in critical care facilities. X HH-007
Comment: Not started
2014HCOHHS014 — Develop/implement cooling center with emergency power to
provide critical life safety cooling during extreme heat events.
X HH-008
Comment: Not started
2014HCOHHS015 — Install back-up generators to increase capacity and coverage
of HVAC systems to all in-patient care areas.
X HH-009
Comment: Not started
2014HCOHHS016 — Install drought-tolerant landscaping to reduce potable water
use as part of a water conservation program.
X HH-010
Comment: Not started
2014HCOHHS017 — Install ground water well(s) as secondary potable water and
cooling water source to mitigate drought at critical care facilities.
X HH-011
Comment: Not started
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
37-10
Removed; Carried Over to Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action # in
Update
2014HCOHHS018 — Harden water supply piping with materials that can
accommodate dry ground conditions due to drought.
X HH-012
Comment: Not started
2014HCOHHS019 — Adopt groundwater drought contingency planning measures. X HH-013
Comment: Not started
2014HCOHHS020 — Retrofit existing roofs on critical care facilities to resist the
damaging effects of hail.
X HH-014
Comment: Not started
2014HCOHHS021 — Install protective structures to minimize damage to critical
assets and equipment.
X
Comment: Near completion. Ben Taub generators being relocated inside Central Plant.
2014HCOHHS022 — Install and improve intake air filtration with higher capacity
and higher quality filtration/purification system at critical care facilities to minimize
health risks and equipment damage associated with smoke and reduced air quality.
X HH-015
Comment: Not started
2014HCOHHS023 — Establish buffer zones cleared of vegetative fuel loads
around all critical care facilities. Implement a vegetative fuel load reduction
program.
X
Comment: Not necessary
2014HCOHHS024 — Provide adequate freeze-protection insulation for domestic
water supply piping and fire water supply piping where these systems are exposed
to the weather.
X HH-016
Comment: Not started
2014HCOHHS025 — Implement tree management program, especially where
trees abut electric power transmission lines.
X HH-017
Comment: Not started
2014HCOHHS026 — Upgrade and improve community warning system to provide
reliable HazMat situational awareness and response instruction (evacuation, stay-
at-home, seal doors and windows, etc.) Develop/implement HazMat Awareness
Safety Program.
X
Comment: Not started
2014HCOHHS027 — Improve intake air filtration at critical care facilities to
minimize health risks and equipment damage associated with reduced air quality
resulting from toxic material releases.
X
Comment: LBJ – replacement of outside air handling units with upgraded air filtration system.
2014HCOHHS028 — Identify all energy pipelines within ¼ mile of critical care
facilities. Develop and implement a pipeline awareness safety program for critical
care personnel, identifying all energy pipelines within ¼ mile of critical care facilities
and coordinating with community early-warning systems for rapid and reliable
information dissemination for critical care personnel and their patients.
X HH-018
Comment: Not started
2014HCOHHS029 — Improve intake air filtration at critical care facilities to
minimize health risks and equipment damage associated with possible smoke and
reduced air quality resulting from energy pipeline failure.
X
Comment: LBJ – replacement of outside air handling units with upgraded air filtration system.
Harris Health System
37-11
37.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 37-11 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 37-12
identifies the priority for each action. Table 37-13 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 37-11. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action HH-001 — Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those
that have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Hurricane, Flooding, Severe Weather
Existing 3, 4, 10 Harris Health Harris County High HMGP, PDM, FMA Short-term
Action HH-002 — Actively participates in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: All hazards
New and Existing 1, 5, 8 Harris Health Harris County Low Staff Time, General Funds Short-term
Action HH-003 — Integrate the hazard mitigation plan into other plans, ordinances and programs within the community,
Hazards Mitigated: Hurricane, Flooding, Severe Weather
Existing 2, 6, 9 Harris Health Harris County Low Staff Time, General Funds Short-term
Action HH-004 — Install back-up generators to increase capacity for the coverage of patient care/treatment and critical support facilities.
Hazards Mitigated: Hurricane, Flooding, Severe Weather
New 3, 4, 10 Harris Health Harris County High HMGP, PDM, FMA Short-term
Action HH-005 — Implement flood control measures (riverine erosion controls) to minimize damage to critical care facilities within the
flood hazard area.
Hazards Mitigated: Flood, Severe Weather, Hurricane
New and Existing 6, 9, 11, 13 Harris Health Harris County High Grant funding Short term
Action HH-006 — Install lightning and surge protection measures for critical infrastructure.
Hazards Mitigated: Severe Weather, Hurricane, Earthquake
Existing 9, 11, 13 Harris Health Harris County Medium General and/or Grant funds Short term
Action HH-007 — Develop and harden safe room areas in critical care facilities.
Hazards Mitigated: Severe Weather, Hurricane, Earthquake
New and Existing 4, 11, 13 Harris Health Harris County High Grant funding Short term
Action HH-008 — Develop/implement cooling center with emergency power to provide critical life safety cooling during extreme heat
events.
Hazards Mitigated: Severe Weather, Hurricane, Earthquake
New 4, 11, 13 Harris Health Harris County High Grant funding Short term
Action HH-009 — Install back-up generators to increase capacity and coverage of HVAC systems to all in-patient care areas.
Hazards Mitigated: Severe Weather, Hurricane, Earthquake
New 4, 11, 13 Harris Health Harris County High Grant funding Short term
Action HH-010 — Install drought-tolerant landscaping to reduce potable water use as part of a water conservation program.
Hazards Mitigated: Drought
New and Existing 5, 7, 8, 10, 15 Harris Health Harris County Low Staff Time, General Funds Short-term
Action HH-011 — Install ground water well(s) as secondary potable water and cooling water source to mitigate drought at critical care
facilities.
Hazards Mitigated: Drought
Existing 5, 7, 8, 10, 15 Harris Health Harris County Medium Staff Time, General Funds Short-term
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
37-12
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action HH-012 — Harden water supply piping with materials that can accommodate dry ground conditions due to drought.
Hazards Mitigated: Drought
Existing 5, 7, 11, 13 Harris Health Harris County Medium General and/or grant funds Short term
Action HH-013 — Adopt groundwater drought contingency planning measures.
Hazards Mitigated: Drought
Existing 5, 7, 8, 10, 15 Harris Health Harris County Low Staff Time, General Funds Short-term
Action HH-014 — Retrofit existing roofs on critical care facilities to resist the damaging effects of hail.
Hazards Mitigated: Severe Weather
Existing 11, 13 Harris Health Harris County High Grant funds Long term
Action HH-015 — Install and improve intake air filtration with higher capacity and higher quality filtration/purification system at critical care
facilities to minimize health risks and equipment damage associated with smoke and reduced air quality.
Hazards Mitigated: Wildfire
Existing 11, 13 Harris Health Harris County Medium Staff Time, General Funds Short term
Action HH-016 — Provide adequate freeze-protection insulation for domestic water supply piping and fire water supply piping where
these systems are exposed to the weather.
Hazards Mitigated: Severe Weather
Existing 11, 13 Harris Health Harris County Medium General and/or grant funds Short term
Action HH-017 — Implement tree management program, especially where trees abut electric power transmission lines.
Hazards Mitigated: Severe Weather, Hurricanes, Wildfire
Existing 6, 8, 11, 13 Harris Health Harris County Low Staff Time, General Funds Short term
Action HH-018 — Identify all energy pipelines within ¼ mile of critical care facilities. Develop and implement a pipeline awareness safety
program for critical care personnel, identifying all energy pipelines within ¼ mile of critical care facilities and coordinating with community
early-warning systems for rapid and reliable information dissemination for critical care personnel and their patients.
Hazards Mitigated: Earthquake
Existing 1, 3, 9, 11 Harris Health Harris County Low Staff Time, General Funds Short term
Action HH-019 — Install flood barrier systems, such as flood panels, gates and passive systems, to increase flood protection and
minimize damage for critical care facilities
Hazards Mitigated: Flood
Existing 11, 13 Harris Health Harris County High Grant funds Long term
Action HH-020 — Develop and install retention ponds to reduce flood damages at the Hospital’s or District’s critical care facilities.
Hazards Mitigated: Flood
Existing 6, 7, 8, 11, 13 Harris Health Harris County High Grant funds Long term
Action HH-021— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Severe Weather, Hurricane, Flooding, Earthquake, Dam Failure, Wildfire, Drought
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
HCESD12 HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Harris Health System
37-13
Table 37-12. Mitigation Action Priority
Action #
# of Objectives
Met Benefits Costs
Do Benefits Equal or Exceed
Costs?
Is Project Grant-
Eligible?
Can Project Be Funded Under Existing Programs/
Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
HH-001 3 High High Yes Yes No High High
HH-002 3 Low Low Yes Yes Yes Medium Low
HH-003 3 Low Low Yes Yes Yes Medium Low
HH-004 3 High High Yes Yes No High High
HH-005 5 High High Yes Yes No High High
HH-006 3 High Medium Yes Yes No High High
HH-007 3 High High Yes Yes No High High
HH-008 3 High High Yes Yes No High High
HH-009 3 High High Yes Yes No High High
HH-010 5 Medium Low Yes No Yes Medium Low
HH-011 5 Medium Medium Yes No Yes Medium Low
HH-012 5 Medium Medium Yes No Yes Medium Low
HH-013 5 Medium Low Yes No Yes Medium Low
HH-014 2 High High Yes Yes No High High
HH-015 2 Medium Medium Yes No Yes Medium Low
HH-016 2 High Medium Yes No Yes Medium Low
HH-017 4 Medium Low Yes No Yes Medium Low
HH-018 5 Medium Low Yes No Yes Medium Low
HH-019 2 High High Yes Yes No High High
HH-020 5 High High Yes Yes No High High
HH-021 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
37-14
Table 37-13. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Severe
Weather
HH-001, 004,
005,006, 007, 008,
009, 014, 016,
017, 21
HH-001, 004,
005, 006, 007,
008, 009, 014,
016
HH-003, 21 HH-017 HH-21 HH-004, 005,
006, 008, 009,
014, 016
HH-21
Hurricane HH-001, 004, 005,
006, 007, 008,
009, 017, 21
HH-001, 004,
005, 006, 007,
008, 009
HH-003, 21 HH-017 HH-21 HH_004, 005,
006, 008, 009,
HH-21
Medium-Risk Hazards
Flooding HH-001, 004, 005,
019, 020, 21
HH-001, 004,
005, 019
HH-003, 21 HH-21 HH-004, 005,
019, 020
HH-21
Low-Risk Hazards
Earthquake HH-006, 007, 008,
009, 018, 21
HH-006, 007,
008, 009
HH-018, 21 HH-21 HH-006, 008,
009
HH-21
Dam Failure HH-21 HH-21 HH-21 HH-21
Wildfire HH-015, 017, 21 HH-21 HH-017 HH-015 HH-015 HH-21
Drought HH-011, 012, 013,
21
HH 001, 011,
012, 013
HH-21 HH-010,
011, 013
HH-21 HH-011, 012,
013
HH-010,
011, 012,
013
HH-21
a. See the introduction to this volume for explanation of mitigation types.
37.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• Harris Health System Hazard Vulnerability Analysis -Risk Analysis of all Harris Health System Facilities
• Capital Improvement Plan – Capital improvement plan is updated annually and covers a 5 year span
• Emergency Operations Plan – Updated in 2019
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• South East Texas Regional Advisory Council Regional Hazard Vulnerability Assessment 2018 (Bi-annual
Report)
38-1
38. TEXAS MEDICAL CENTER
38.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Warren Porter
2450 Holcombe Blvd., Suite 1
Houston, TX 77021
Telephone: 713-791-8843
e-mail Address: wporter@tmc.edu
Ashley McPhail
2450 Holcombe Blvd., Suite 1
Houston, TX 77021
Telephone: 713-791-8825
e-mail Address: amcphail@tmc.edu
38.2 JURISDICTION PROFILE
38.2.1 Overview
Texas Medical Center (TMC) — the largest medical complex in the world — is at the forefront of advancing life
sciences. TMC is a 2.1-square-mile medical district and neighborhood in south-central Houston, Texas,
immediately south of the Museum District and west of Texas State Highway 288. Over sixty medical institutions,
largely concentrated in a triangular area between Brays Bayou, Rice University, and Hermann Park, are members
of the Texas Medical Center Corporation — a non-profit umbrella organization — which constitutes the largest
medical complex in the world. The TMC has an extremely high density of clinical facilities for patient care, basic
science, and translational research.
The Texas Medical Center contains over 60 medicine-related institutions, with 21 hospitals and eight specialty
institutions, eight academic and research institutions, four medical schools, seven nursing schools, three public
health organizations, two pharmacy schools and a dental school. All institutions are not-for-profit. Among the
affiliated medical schools are the University of Texas Health Science Center at Houston, Baylor College of
Medicine, University of Texas Medical Branch at Galveston and Texas A&M College of Medicine. Some
member institutions are located outside the city of Houston.
The Texas Medical Center employs over 106,000 people, hosts 10 million patient encounters annually, and has a
gross domestic product of US$25 billion. TMC foot print has expanded south of Brays Bayou towards NRG Park,
and the organization has developed ambitious plans for a new “innovation campus” south of the river. The 4.93-
square-mile Medical Center / Astrodome area, highly populated with medical workers, is home to over 20,000
people.
The TMC is serviced by the Metro Rail Red Line, a north-south light rail route which connects the district to
Downtown Houston and NRG Park.
The Texas Medical Center assumes responsibility for the adoption of this plan; Texas Medical Center will oversee
its implementation. Development of this annex was carried out by the members of the local mitigation planning
team, whose members are listed in Table 38-1.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
38-2
Table 38-1. Local Mitigation Planning Team Members
Name Title
Warren J. Porter Safety and Emergency Preparedness Manager
Ashley McPhail Vice President for Strategy
Abbey Roberson Vice President for Planning
David Pollard TMC PD Director
The District does not participate in the Public Protection Class Rating System.
38.2.2 Service Area and Trends
The district service area covers 2.1 Square Miles serving a population of 10 Million patient visits per year. With a
1,345-acre campus in downtown Houston, TMC serves as tertiary care centers for over 35 counties in Southeast
Texas. TMC is the world’s largest medical center campus, with 750,000 annual ER visits, 180,000 surgeries
annually, contains the world’s largest Children’s and Cancer hospitals, and has over $3 billion in current
construction. Additionally, more than 160,000 people visiting TMC every day, totaling over 8 million patient
visits annually.
TMC is developing a biomedical research hub that will cluster researchers and industry experts together on a
collaborative 30-acre campus. The TMC campus integrates leading researchers with a host of top-tier expertise
from the private sector. The TMC3 founding institutions are Texas Medical Center, Baylor College of Medicine,
Texas A&M University Health Science Center, The University of Texas Health Science Center (UTHealth) and
The University of Texas MD Anderson Cancer Center. TMC3 is set to break ground in early 2020.
The groundbreaking project will generate a $5.2 billion stimulus to Texas and create nearly 26,000 new jobs,
according to a third-party economic impact study by Silverlode Consulting conducted in November 2017. As a
center of innovation advancing life sciences through collaboration, education and research, TMC will expand its
50 million square feet of medical, research and office space with an additional 3 million square feet currently in
planning stages. TMC’s infrastructure must meet the changing demands for a more robust transportation system
by expanding mobility options to support existing development and future growth.
38.2.3 Assets
Table 38-2 summarizes the critical assets of the district and their value.
Table 38-2. Special Purpose District Assets
Asset Value
Property
Buildings and Improved property $405,170,000
Equipment
Police and security vehicles (Patrol vehicles) $288,000
Police specialty vehicles $215,000
Police Support vehicles $135,000
Security Vehicles $256,000
Other vehicles $135,00
Total: $8,029,000
Texas Medical Center
38-3
Asset Value
Critical Facilities and Infrastructure
TMC Police Department Generator
Garage 1 6519 Fannin Houston, TX 77030
Garage 2 1511 E. Holcombe Blvd. Houston, TX 77030
Garage 4 1406 Cambridge Houston, TX 77030
Garage 5 1001 Holcombe Blvd., Houston, TX 77030
Garage 7 1120 Freeman Blvd., Houston, TX 77030
Garage 8 2151 W. Holcombe Blvd., Houston, TX 77030
Garage 9 1100 Bates Houston, TX 77030
Garage 10 6700 M.D. Anderson Blvd., Houston, TX 77030
Executive Offices and Garage 15 6550 Bertner, Houston, TX 77030
Garage 17 1653 Braeswood Blvd., Houston, TX 77030
Garage 18 2450 Holcombe Blvd., Houston, TX 77021
J.P. McGovern Bldg. 2450 Holcombe Blvd., Houston, TX 77021
Garage 19 2010 S. Braeswood, Houston, TX 77030
Baylor College of Medicine 1 Baylor Plaza, Houston, TX 77030
M.D. Anderson Cancer Center 1300 Moursund St., Houston, TX 77030
Texas Children’s Hospital 1102 Bates, Houston, TX 77030
City of Houston Health and Human Services 1115 S. Braeswood Blvd., Houston, TX 77030
The Methodist Hospital 1130 Earle St., Houston, TX 77030
$75,000
$25,080,000
$39,642,000
$ 27,971,000
$9,955,000
$16, 452,000
$22,712,000
$5,664,000
$27,735,000
$34,257,000
$30,950,000
$8,339,000
$90,587,000
$32,844,000
$500,000,000
$900,000,000
$500,000,000
$250,000,000
$700,000,000
Univ. of Texas Health Science Ctr., 1200 Pressler, Houston, TX 77030
Memorial Hermann Hospital 1333 Moursund, Houston, TX 77030
Memorial Hermann TIRR Rehab Hospital 13333 Moursund, Houston, TX 77030
Harris County Hospital (Ben Taub) 1504 Taub Loop, Houston, TX 77030
Thermal Energy Corporation 1615 Braeswood, Houston, TX 77030
Harris County Forensic Institute 1885 Old Spanish Trail, Houston, TX 77030
Houston Hospice 1905 Holcombe Blvd., Houston, TX 77030
Ronald McDonald House 1907 Holcombe Blvd., Houston, TX 77030
Michael E. DeBakey Vet. Affairs Medical Center 2002 Holcombe Blvd., Houston, TX 77030
St. Luke’s Episcopal Hospital 6720 Bertner, Houston, TX 77030
Texas Women’s Hospital 7600 Fannin St., Houston, TX 77030
Texas Medical Center Police Station 1511 E. Holcombe Blvd. Houston, TX 77030
Shriner’s Hospital- Houston 6977 Main St., Houston, TX 77030
The Center for Hearing and Speech 3100 Shenandoah, Houston, TX 77021
$1,000,000,000
$1,000,000,000
$650,000,000
$1,000,000,000
$750,000,000
$500,000,000
$25,000,000
$30,000,000
$1,000,000,000
$800,000,000
$700,000,000
$5,000,000
$800,000,000
$250,000,000
38.3 CAPABILITY ASSESSMENT
An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or
integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were
identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation
Actions” table in Section 29.9 identifies these as community capacity building mitigation actions.
38.3.1 Planning and Regulatory Capabilities
Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents.
When effectively prepared and administered, these plans, programs and regulations can support the
implementation of mitigation actions. Table 38-3 summarizes existing codes, ordinances, policies, programs or
plans that are applicable to this hazard mitigation plan.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
38-4
Table 38-3. Planning and Regulatory Capability
Plan, Study or Program Date of Most Recent Update Comment
Business Continuity of Operations Plan 2018
Texas Medical Center Emergency Response Plan (Previous name: TMC Pandemic Influenza Plan) 2012 Currently under revision
Texas Medical Center Flood and High Water Response Plan
Catastrophic Medical Operations Center Regional Plan
2016
2019
Currently Under revision
38.3.2 Fiscal, Administrative and Technical Capabilities
Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard
mitigation projects. An assessment of fiscal capabilities is presented in Table 38-4. Administrative and technical
capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of
administrative and technical capabilities is presented in Table 38-5.
Table 38-4. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes No
User Fees for Water, Sewer, Gas or Electric Service No
Incur Debt through General Obligation Bonds No
Incur Debt through Special Tax Bonds No
Incur Debt through Private Activity Bonds No
State-Sponsored Grant Programs Yes
Development Impact Fees for Homebuyers or Developers No
Federal Grant Programs Yes
Table 38-5. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/ Agency/ Position
Planners or engineers with knowledge of land development and land management practices Yes Through Long Term Contracting Services
Engineers or professionals trained in building or infrastructure
construction practices
Yes Through Long Term Contracted Services
Planners or engineers with an understanding of natural hazards Yes Emergency Preparedness Manager and Through
Long Term Contracted Services
Staff with training in benefit/cost analysis Yes Emergency Preparedness Manager and Through
Long Term Contracted Services
Surveyors Yes Through Long Term Contracted Services
Personnel skilled or trained in GIS applications Yes Through Long Term Contracted Services
Scientist familiar with natural hazards in local area Yes Through Long Term Contracted Services
Emergency manager Yes Safety and Emergency Preparedness
Grant writers Yes Emergency Preparedness Manager or Corporate
support
Texas Medical Center
38-5
38.3.3 Education and Outreach Capabilities
Outreach and education capability identifies the connection between government and community members, which
opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is
presented in Table 38-6.
Table 38-6. Education and Outreach
Criterion Response
Do you have a public information officer or communications office? Yes
Do you have personnel skilled or trained in website development? Yes
Do you have hazard mitigation information available on your website? Yes
• If yes, please briefly describe TMC has an Emergency Preparedness website
Do you use social media for hazard mitigation education and outreach? Yes
• If yes, please briefly describe TMC utilizes two primary mechanisms for this. We utilize
Social Media platforms, as well as Everbridge notification
platform to outreach ad notification
Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes
• If yes, please briefly specify We primarily have two councils to address hazard
mitigation: Emergency Preparedness; and Police/Security
Councils- both are comprised of representatives from each
member institution.
Do you have any other programs already in place that could be used to
communicate hazard-related information?
Yes
• If yes, please briefly describe We utilize Everbridge notification system
Do you have any established warning systems for hazard events? Yes
• If yes, please briefly describe Everbridge notification system allows for notification of via
telephone, text and emails
38.3.4 Adaptive Capacity for Climate Change
Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s
ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 38-7
summarizes the jurisdiction’s adaptive capacity for climate change.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
38-6
Table 38-7. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts Medium
Comment
Jurisdiction-level monitoring of climate change impacts Low
Comment
Technical resources to assess proposed strategies for feasibility and externalities Medium
Comment
Jurisdiction-level capacity for development of greenhouse gas emissions inventory Low
Comment
Capital planning and land use decisions informed by potential climate impacts Low
Comment
Participation in regional groups addressing climate risks Medium
Comment: TMC works along with the City of Houston and Harris County and private partners to address climate change issues which
are expected to impact TMC campus
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes Low
Comment
Identified strategies for greenhouse gas mitigation efforts Low
Comment
Identified strategies for adaptation to impacts Low
Comment
Champions for climate action in local government departments Low
Comment
Political support for implementing climate change adaptation strategies Low
Comment
Financial resources devoted to climate change adaptation Low
Comment
Local authority over sectors likely to be negative impacted Low
Comment
Public Capacity
Local residents knowledge of and understanding of climate risk N/A
Comment
Local residents support of adaptation efforts N/A
Comment
Local residents’ capacity to adapt to climate impacts N/A
Comment
Local economy current capacity to adapt to climate impacts N/A
Comment
Local ecosystems capacity to adapt to climate impacts N/A
Comment
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
Texas Medical Center
38-7
38.4 INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as capital facilities planning, and that relevant information from those sources is used
in hazard mitigation. This section identifies where such integration is already in place, and where there are
opportunities for further integration in the future. Resources listed in Section 1.4.1 were used to provide
information on integration. The progress reporting process described in Volume 1 will document the progress of
hazard mitigation actions related to integration and identify new opportunities for integration.
38.4.1 Existing Integration
Some level of integration has already been established between local hazard mitigation planning and the
following other local plans and programs:
• Texas Medical Center Pandemic Influenza Plan — This document was used to review current plans,
support identification of hazards, processes, and development of the mitigation plan.
• Texas Medical Center Flood and High Water Response Plan — The plan was used to review current
plans and processes, support the identification of past hazard events and noted vulnerabilities, assist in
establishing priorities and risk ranking, and the development of the mitigation action plan.
• Southeast Texas Regional Advisory Council (SETRAC) Catastrophic Medical Operations Center
Regional Plan — The plan was used to review current plans and processes, support the identification of
past hazard events and noted vulnerabilities, assist in establishing priorities and risk ranking, and the
development of the mitigation action plan.
38.4.2 Opportunities for Future Integration
The capability assessment presented in this annex identified the following plans and programs that do not
currently integrate hazard mitigation information but provide opportunities to do so in the future:
• Texas Medical Center Emergency Access Study — TMC is currently in the initial stages of initiating a
study to evaluate emergency access into and throughout the TMC campus during severe weather
incidents. This will incorporate water table data, flood data, improvements in Brays Bayou and adjacent
water drainage activities, traffic flow and other factors. The resulting plan will coordinate emergency
access to several regional tertiary medical centers located on campus. TMC is Regional asset, with several
tertiary care medical facilities serving a 35-county area in SE Texas.
• Texas Medical Center Emergency Evacuation Plan — TMC (this district) does not have a coordinated
evacuation plan which incorporates all of the tertiary medical facilities, rehabilitation facilities, medical
support facilities and transportation needs into one coordinated plan. This was borne out during a FEMA
mandated evacuation drill where the major hospitals, rehabilitation centers, nursing homes, and support
facilities had 90 minutes to evacuate 10 % of the staffed beds. This drill identified several areas for
improvement. This plan will build a coordinated evacuation plan which addresses access, vehicular
movement within the campus, and identifies resources needed to support evacuation of medical facilities.
TMC intends to develop one as a mitigation planning action during the next five years.
• Texas Medical Center Emergency Response Plan — TMC (this district) does not have currently have a
coordinated emergency response plan and intends to develop one as a mitigation planning action during
the next five years. TMC intends on to develop such a plan in the next five years and the plan will build
on the mitigation goals and objectives identified in the mitigation plan. Since TMC is Regional asset, we
will also coordinate this plan with Harris County, City of Houston, as well as SETRAC which represents
hospitals in a 35-county area in SE Texas.
• Texas Medical Center Mitigation Plan — This plan address TMC Strategic priorities and identifies
areas which need specific mitigation efforts. TMC (this district) currently does not have a coordinated
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
38-8
mitigation plan. There are several individual hospital or healthcare facilities with individual plans on
campus, however those plans have been developed in isolation and do not contribute to an organized and
coordinated mitigation plan.
• Upgrade Brays Bayou flood prediction (remodeling) – The Brays Bayou, which flows though the
TMC Campus, is the primary waterborne threat to the TMC campus. This project will update the
modeling capability to predict and mitigate flood impact within the TMC campus and the several tertiary
care medical facilities on campus.
• Post-Disaster Recovery Plan — Texas Medical Center (this district) does not have a coordinated post-
disaster recovery plan and intends to develop one as a mitigation planning action during the next five
years.
38.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 38-8 lists past occurrences of natural hazards for which specific damage was recorded in Texas Medical
Center. Other hazard events that broadly affected the entire planning area, including Texas Medical Center, are
listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 38-8. Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Hurricane Harvey 4332 DR 2017 $1,400,000
Severe Storms and Flooding 4269 DR 2016 Not Available
Severe Storms and Flooding 4272 2016 Not Available
Severe Storms and Flooding 4245 DR 2015 Not Available
Severe Storms and Flooding 4223 DR 2015 Not Available
Hurricane Ike 1791 DR 2008 Not Available
Hurricane Ike 3294 EM 2008 Not Available
Hurricane Gustav 3290 EM 2008 Not Available
Hurricane Dean 3277 EM 2007 Not Available
Tropical Storm Erin 1730 DR 2007 Not Available
Hurricane Rita 1606 DR 2005 Not Available
Hurricane Rita 3261 EM 2005 Not Available
Severe Storms and Flooding 1439 DR 2002 Not Available
Tropical Storm Allison 1379 DR 2001 Not Available
38.6 HAZARD RISK RANKING
Table 38-9 presents a local ranking for the Texas Medical Center of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Texas Medical Center
38-9
Table 38-9. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 Flood 9 x 3 = 27 High
1 Hurricane/Coastal Storms 9 x 3= 27 High
1 Severe Weather 9 x 3= 27 High
2 Dam/Levee Failure 7 x 3= 21 Medium
3 Tsunami 8 x 2=16 Medium
4 Non-Natural 7 x 1= 7 Low
5 Earthquake 5 x 1= 5 Low
6 Mass Movement 4 x 1= 4 Low
7 Wildfire 3x1=3 Low
8 Coastal Erosion 2x1=2 Low
9 Drought 1x1=1 Low
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
38.7 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Access into and throughout the campus is significantly affected due to flooding with approximately 50%
of roads into medical campus impassable during severe flooding events. This impacts 35 counties as the
campus serves as the majority of the tertiary care centers for the region. Specific areas effected: limiting
to emergency access and evacuation for patients, trans-campus movement limited, limits patient access
and logistical support.
• Ten intersections within campus are prone to intermittent flooding during severe storms; as an example,
the TMC Police station is located adjacent to flood prone intersection
• The majority of internet and telephone communications come through one location which is not storm
resilient. Any interruption would impact ~75-80% communication for most of the facilities.
• There is a tunnel system which links several major medical facilities, should this be impacted, such as in
TS Allison, this would be a significant loss to those facilities.
• There is a dearth of institutional knowledge regarding severe weather impact with the various recent and
current construction projects within the campus. This lack of understanding is a barrier to ensuring
resiliency.
Mitigation actions addressing these issues were prioritized for consideration in the action plan for this annex:
• Conduct a detailed assessment of transportation access into and throughout the medical center campus.
Determine adaptive actions which can be implemented in the near, and long term.
• Conduct an assessment of the flood prone intersections and their impact on adjacent structures. Develop
resilient solutions to address this issue over the long term.
• Conduct as detailed assessment on critical communication infrastructure and develop a specific action
plan to ensure resiliency and redundancy to maintain critical communications.
• Conduct a detailed assessment of the tunnel network under the major medical facilities and develop
specific measures to ensure the uninterrupted utilization of the tunnels.
• Develop a tracking system which addresses resiliency of structures and updates the system when changes
are made. This would help move to a more resilient medical center campus.
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
38-10
38.8 STATUS OF PREVIOUS PLAN ACTIONS
TMC has not previously completed a formally adopted hazard mitigation plan.
38.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 38-10 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 38-11
identifies the priority for each action. Table 38-12 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 38-10. Hazard Mitigation Action Plan Matrix
Applies to New
or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action TMC1 — Study to evaluate and develop improved and resilient access into and throughout TMC Campus to include critical transportation
infrastructure, during severe weather events
Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms
Existing assets 3, 4, 6, 10, 11, 13, 15 TMC Harris County, City of
Houston
High HMGP Long-term
Action TMC2 — Study to evaluate and develop improved patient access and resilient evacuation capabilities during severe weather events
Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms
Existing assets 1, 4, 6, 13 TMC Harris County, City of
Houston, DSHS, TDEM
High HMGP Long-Term
Action TMC3 — Study to evaluate and develop the resiliency of aircraft landing points, as well as the establishment of a coordinated Air Corridor around
major medical campus, to support during severe weather events
Hazards Mitigated: Flood, Severe Weather, Hurricane/Coastal Storms
New Assets 4, 6, 9, 10, 13 TMC Harris County, City of
Houston, TDEM
High HMGP, TBD Long-Term
Action TMC4 — Study to evaluate and develop resilient of pedestrian and handicapped access within TMC Campus
Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms
Existing assets 3, 4, 9, 13, 15 TMC TBD ~$250,000 HMGP Short-term
Action TMC5 — Study to evaluate and develop an integrated and resilient logistical infrastructure, to support a major medical campus, during prolonged
severe weather events
Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms
Exiting Assets 3,4,6,10,13 TMC TBD ~$250,000 HMGP Short-term
Action TMC6 — Improve the resiliency of early warning notification and communication networks within TMC Campus during severe weather events
Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms
Existing assets 1, 3, 4, 6, 9,10,13 TMC TMC Campus Partners ~$500,000 HMGP Short-Term
Action TMC7 — Development of an integrated severe weather education program for patients, facility visitors and staff
Hazards Mitigated: Flood, Severe weather, Hurricane/Coastal Storms
Existing assets 1, 3, 4 TMC TMC Campus Partners ~$250,000 HMGP Short-term
Action TMC8 — Study and improve the resiliency of power supply, to include steam and chill water mechanisms, for critical infrastructure during severe
weather events
Hazards Mitigated: Flood, Severe weather, Hurricane/Coastal Storm
Existing 3, 6, 11, 13 TMC TECO, TMC Campus
Partners
High HMGP Long-Term
Action TMC9 — Study and development of resilient storm safe buildings for critical infrastructure medical facilities
Hazards Mitigated: Flood, Severe weather, Hurricane/Coastal Storms
Existing 3, 4, 6, 11, 13, 15 TMC TBD High HMGP Long-Term
Action TMC10 — Study and development of resilient water supply for critical infrastructure major medical campus, during severe weather events
Hazards Mitigated: Severe weather, Hurricane/Coastal Storms
Existing 3, 11, 13, 15 TMC TBD High HMGP Long-Term
Texas Medical Center
38-11
Applies to New or Existing Assets Objectives Met Lead Agency Support Agency Estimated Cost Sources of Funding Timelinea
Action TMC11 — Study and development of an integrated severe weather response plan, within major medical campus (critical infrastructure) during
severe weather events
Hazards Mitigated: Flood, Severe weather, Hurricane/Coastal Storms
Existing 3, 4, 6, 10, 13 TMC TMC Campus Partners High HMGP Short-Term
Action TMC12 — Study and development of an integrated family reunification plan and processes during a severe weather event
Hazards Mitigated: , Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms
Existing 3, 4, 9, 10, 13 TMC TMC Campus Partners ~$150,000 HMGP Short-Term
Action TMC13 — Development of an integrated Continuity of Operations Plan for major medical campus, with several tertiary care centers, covering
several counties, during a severe weather event
Hazards Mitigated: Flood, Severe weather, Hurricane/Coastal Storms
Existing 3, 4, 9, 10, 13 TMC TMC Campus Partners ~$250,000 HMGP Short-Term
Action TMC14 — Development of a coordinated structural resiliency and damage tracking system for the TMC campus
Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms
Existing 3, 10, 11, 12, 13, 15 TMC TMC Campus Partners ~$125,000 HMGP Short-Term
Action TMC15 — Development of a coordinated post-disaster resiliency plan for the TMC campus
Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms
Existing 3, 4, 6, 7, 9, 10, 13, 15 TMC TMC Campus Partners ~$150,000 HMGP Short-Term
Action TMC16 — Develop and implement a personnel benefit-cost process and software training program for mitigation planning
Hazards Mitigated: Flood, Severe weather, Non-natural, Earthquake, Hurricane/Coastal Storms
Existing 3, 4, 13, 15 TMC TMC Campus Partners ~$50,000 HMGP Short-Term
Action TMC17— Actively participate in and support the implementation of the six area-wide actions identified in Volume 1 of this plan.
Hazards Mitigated: Flood, Hurricane/Coastal Storms, Severe Weather, Dam/Levee Failure, Tsunami, Non-Natural, Earthquake, Mass
Movement, Wildfire, Coastal Erosion, Drought
New and Existing 1, 3, 4, 5, 9, 10, 11,
15
TMC HCOHSEM Low General Funds Ongoing
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 38-11. Mitigation Action Priority
Action #
# of Objectives Met Benefits Costs
Do Benefits Equal or Exceed Costs?
Is Project Grant-Eligible?
Can Project Be Funded Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
TMC1 7 High High Yes Yes No Medium High
TMC6 7 High Medium Yes Yes No Medium High
TMC11 5 High Medium Yes Yes No Medium High
TMC13 6 Medium Medium Yes Yes No Medium Medium
TMC16 8 High Medium Yes Yes No Medium Medium
TMC3 5 High High Yes Yes No Medium High
TMC5 5 High Medium Yes Yes No Medium High
TMC8 4 High High Yes Yes No Medium High
TMC9 6 High High Yes Yes No Medium High
TMC10 4 High High Yes Yes No Medium High
TMC14 5 Medium Medium Yes Yes No Medium Medium
TMC12 5 Medium Medium Yes Yes No Medium Medium
TMC8 3 Medium Medium Yes Yes No Medium Medium
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
38-12
Action #
# of Objectives Met Benefits Costs
Do Benefits Equal or Exceed Costs?
Is Project Grant-Eligible?
Can Project Be Funded Under Existing Programs/ Budgets?
Implementation
Prioritya
Grant Pursuit
Prioritya
TMC2 4 Medium Medium Yes Yes No Medium Medium
TMC4 5 Medium Medium Yes Yes No Medium Medium
TMC16 4 Medium Medium Yes Yes No Medium Medium
TMC17 8 Medium Low Yes Yes Yes High High
a. See the introduction to this volume for explanation of priorities.
Table 38-12. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention Property Protection
Public Education & Awareness
Natural Resource Protection Emergency Services Structural Projects Climate Resilient
Community Capacity Building
High-Risk Hazards
Flood TMC: 6, 7,
11, 13, 17
TMC: 1, 4, 5, 6, 8,
9, 10, 11, 13, 14,
15, 16
TMC: 6, 7,
12, 17
TMC: 1, 2, 3,
6, 11, 13, 15
TMC: 1, 4, 8,
9, 10, 127
TMC: 8, 10 TMC: 5, 6,
11, 17
Hurricane/Coastal
Storms
TMC: 6, 7,
11, 13, 17
TMC: 1, 4, 5, 6, 8,
9, 10, 11, 13, 14,
15, 16
TMC: 6, 7,
12, 17
TMC: 1, 2, 3,
6, 11, 13, 15
TMC: 1, 4, 8,
9, 10, 17
TMC: 8, 10 TMC: 5, 6,
11, 17
Severe Weather TMC: 6, 7,
11, 13, 17
TMC: 1, 4, 5, 6, 8,
9, 10, 11, 13, 14,
15, 16
TMC: 6, 7,
12, 17
TMC: 1, 2, 3,
6, 11, 13, 15
TMC: 1, 4, 8,
9, 10, 17
TMC: 8, 10 TMC: 5, 6,
11, 17
Medium-Risk Hazards
Dam/Levee Failure TMC127 TMC17 TMC17 TMC17
Tsunami TMC17 TMC17 TMC17 TMC17
Low-Risk Hazards
Non-Natural TMC: 6, 17 TMC: 1, 5, 14, 15,
16
TMC: 6, 12,
17
TMC: 1, 2, 6,
15
TMC: 1, 4,
17
TMC: 5, 6,
17
Earthquake TMC: 6, 17 TMC: 1, 5, 14, 15,
16
TMC: 6, 12,
17
TMC: 1, 2, 6,
15
TMC17 TMC17
Mass Movement TMC17 TMC17 TMC17 TMC17
Wildfire TMC17 TMC17 TMC17 TMC17
Coastal Erosion TMC17 TMC17 TMC17 TMC17
Drought TMC17 TMC17 TMC17 TMC17
a. See the introduction to this volume for explanation of mitigation types.
38.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX
38.10.1 Existing Reports, Plans, Regulatory Tools and Other Resources
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
Texas Medical Center
38-13
• Hazard Mitigation Plan Annex Development Toolkit — The toolkit was used to review current plans,
support the identification of past hazard events and noted vulnerabilities, assist in establishing priorities
and risk ranking, and the development of the mitigation action plan.
• Texas Medical Center Continuity of Operations Plan — This document was used to review current
plans, support identification of hazards, processes, and development of the mitigation plan.
• Texas Medical Center Pandemic Influenza Plan — This document was used to review current plans,
support identification of hazards, processes, and development of the mitigation plan.
• Texas Medical Center Flood and High Water Response Plan — The plan was used to review current
plans and processes, support the identification of past hazard events and noted vulnerabilities, assist in
establishing priorities and risk ranking, and the development of the mitigation action plan.
• Southeast Texas Regional Advisory Council (SETRAC) Catastrophic Medical Operations Center
Regional Plan — The plan was used to review current plans and processes, support the identification of
past hazard events and noted vulnerabilities, assist in establishing priorities and risk ranking, and the
development of the mitigation action plan.
38.10.2 Staff and Local Stakeholder Involvement in Annex Development
This annex was developed over the course of several months with input from several departments within TMC
including planning, finance, Police/Security, and Strategic planning as well as several (TMC Campus) member
institutions in open meeting. All stated departments and (TMC Campus) member institutions were asked to
contribute/comment en toto or in relevant parts to the development of this annex. We have met in different venues
covering various aspects of the plan. This is an ongoing process and we will continue to work as a team to ensure
this plan is completed.
38.11 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY
We (TMC) estimate that we will need additional studies on flooding in and around Houston (river delta),
structural stability in a flood zone, hydrology and actions of water in current and future water movement
structures (e.g. viaducts, water channels), climate change relative to long-term impacts on structures and ground
water/soil deterioration, identification of appropriate technologies to assist us in understanding and/or gathering
appropriate data.
38.12 ADDITIONAL COMMENTS
One area of note for the TMC Campus which will significantly impact mitigation efforts in the short term is the
addition of a large medical research facility set to begin breaking ground in early 2020. This new research facility
will include over an additional 1.5 million ft2 of space, 250,000 ft2 of collaborative space and 112,000 ft2 of shared
research space. This will increase the world’s largest medical center even more when it opens approximately in
2022.
Harris County Multi-Hazard Mitigation Action Plan
Appendix A. Planning Partner Expectations
A-1
A. PLANNING PARTNER EXPECTATIONS
GROUPS INVOLVED IN THE PLANNING PROCESS
One of the goals of the multi-jurisdictional approach to hazard mitigation planning is to achieve compliance with
the Disaster Mitigation Act (DMA) for all participating members in the planning effort. There are several distinct
groups who will be involved in this process at various levels. To provide clarity, the following is a general
breakdown of those groups:
• The Core Planning Team (CPT) — The Core Planning Team (CPT) includes the Hazard Mitigation
Planning Coordinator (HMPC) and appropriate personnel from HCOHSEM along with the Project
Manager and discipline leads from Harris County’s contract consultant, Tetra tech, Inc. The CPT will
ensure project management and the 5-year update process by scheduling meetings, distributing agendas,
preparing information/presentations, documenting meeting summaries, and generally seek to facilitate the
planning activities. In addition, the CPT will develop and organize the content of the Harris County
Multi-Hazard Mitigation Action Plan (MH-MAP). This content will be reviewed by each Local
Mitigation Planning Team (LMPT) and approved by the Multi-Jurisdictional Steering Committee (SC)
before being posted to the public website or recommended for adoption.
• The Multi-Jurisdictional Steering Committee (SC) — The SC serves as a “coordinating entity” to
assist with the development of the entire planning area of the MH-MAP. The origination of the SC is such
that interests of all planning partners is represented as well as those of identified stakeholders within the
planning area that are not participating as full planning partners. The organization of the SC will strive to
follow the guidance of FEMA’s Community Rating System (CRS) activity 510, step 2 protocol, but will
not be the total basis for the organization of the SC. The organization will strive for a balance between
planning partners that can commit time to the SC and non-governmental stakeholders that have a clearly
defined stake in the outcomes of this planning process. The size of the SC will be managed such that
quorums can be established that are achievable over a defined time frame for this planning process. At a
minimum, the makeup of the SC will strive to include the following representation:
At least 2 representatives from Harris County
Harris County Flood Control District
Each jurisdiction that is participating in the CRS program, or considering participation in the CRS
program will have a seat on the SC.
Representation of the interests for each non-municipal planning partner, (i.e. if there are 4 school
districts with the planning partnership, at least one representative from a school district)
Non-governmental stakeholder’s such as; academia, business interests, advocacy groups, private non-
profits, and residents.
The SC is responsible for building consensus and developing and approving key planning process
milestones that address that address the entire planning area. The SC is chaired by the Hazard Mitigation
Planning Coordinator (HMPC) and operate under a Charter approved at their 1st organizational meeting.
All SC meetings will be open to the public and advertised as such during the plan update process. The SC
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
A-2
will meet according to a defined schedule that will be posted on the www.readyharris.org website as part
of the public engagement strategy for this plan update process.
• The planning partners — those jurisdictions or special purpose districts that are developing an annex to
the county plan.
• The planning stakeholders — the individuals, groups, businesses, academia, private non-profits, etc.,
from which the planning team gains information to support the various elements of the plan. For this plan
update process, 2 types of stakeholders have been defined:
Participatory Stakeholders- These are identified stakeholders that are willing to participate in this
planning process as a member of the SC or LMPT.
Coordinating Stakeholders- These are stakeholders that will not actually participate in the process
but have requested to be kept apprised of plan development milestones and are provided the
opportunity to comment on key planning milestones.
DEFINITION OF PARTICIPATION
DMA compliance requires that participation be defined in order to maintain eligibility with respect to meeting the
requirements that allow a jurisdiction or special purpose district to develop an annex to the base plan. To achieve
compliance for all planning partners, the plan must clearly document how each planning partner that is seeking
linkage to the plan participated in the plan’s development. The best way to do this is to clearly define
“participation.” For this planning process, “participation” is defined by the following criteria:
Estimated Level of Effort
It is estimated that the total time commitment to meet these “participation” requirements for a planning partner
not participating on the steering committee would be approximately 36 to 46 hours over the 14-month period.
Most of this time will be devoted to completing the jurisdictional annex template described below. This time may
be reduced somewhat for special purpose districts.
Duration of the Planning Process
This process is expected to take 14 months to complete. It will be easy to become disconnected with the process
objectives if you do not participate in some of these meetings to some degree.
Participate in the Process
As indicated, it must be documented in the plan that each planning partner “participated” in the process to the best
of its capabilities. There is flexibility in defining “participation,” which can vary based on the type of planning
partner involved (i.e.: city or county vs. a special purpose district). However, the level of participation must be
defined at the on-set of the planning process, and we must demonstrate the extent to which this level of
participation has been met for each partner.
• Complete administrative tasks. Participation in this plan includes the following administrative tasks:
Complete a letter of intent. Provide a “Letter of Intent to participate” or a Resolution to participate
to the Core Planning Team (CPT). (See exhibit A).
Identification of a Local Mitigation Planning Team. Each participating jurisdiction will establish a
jurisdiction-specific Local Mitigation Planning Team (LMPT). The LMPT is responsible for the
development of a jurisdictional annex to the Mitigation Action Plan. LMPT membership should
consist of agencies with authority to regulate development and enforce local ordinances or regulatory
standards. This may include any of the following agencies involved in hazard mitigation activities,
Appendix A, Planning Partner Expectations
A-3
such as building/fire code enforcement, emergency management, emergency services, floodplain
management, parks and recreation, planning/community development, public information, public
works/engineering, stormwater management, transportation, or infrastructure. LMPTs will ensure
tasks and responsibilities are completed as required for each participating jurisdiction.
Designate points of contact. Designate a primary and secondary point of contact for this effort.
These designees will be listed as the hazard mitigation points of contact for your jurisdiction in the
plan.
Approve the Steering Committee. The Steering Committee will be approved via an email vote.
• Participate, as able, in additional opportunities. Attendance or participation in the following
opportunities will also be recorded. These records will be used to document participation for each
planning partner. No thresholds will be established as minimum levels of participation for these events.
However, each planning partner should attempt to attend all possible meetings and events:
Attend steering committee meetings.
Attend or host public meetings or open houses.
Participate in and advertise the public review and comment period prior to adoption.
• Support the steering committee. This planning process will utilize a Steering Committee that will
assume responsibility for many of the planning milestones prescribed for this process to help reduce the
burden of time required by each planning partner. This committee will be representative of the whole
body. This committee will meet periodically (frequency to be determined by the committee, but likely to
be monthly) throughout the process and provide direction and guidance to the planning team. Steering
Committee meetings are not mandatory meetings for all planning partners. If you are not on the Steering
Committee, your attendance is not required; however, it is our hope that all planning partners will remain
engaged with this process and attend meetings from time to time.
• Support the public involvement strategy. The Core Planning Team will also request support from the
partnership during the implementation of the public involvement strategy developed by the Steering
Committee. Support could be in the form of providing venues for public meetings, attending these
meetings as meeting participants, providing technical support, providing access to mailing lists, providing
existing public information materials, etc.
• Participate in the critical facility update. The primary source of building inventory is from the Harris
County Appraisal District’s (HCAD) Parcel Data and certified tax roll. Each planning partner will be
asked to update their facilities list for use during the risk assessment. If the list is not updated, HAZUS
default data will be utilized. Updating this list provides a much more detailed analysis.
• Complete the jurisdictional annex template. * Each planning partner must complete a jurisdictional
annex template. This template will be distributed to the planning partnership in a phased approach (3
Phases) to extend the level of effort over a series of months. Key components of the annex include the
following:
Attend three mandatory workshops. There will be three mandatory workshops that all planning
partners will be required to attend. These workshops will cover the proper completion of the
jurisdictional annex template, which is the basis for each partner’s jurisdictional chapter in the plan.
The three phase workshops are defined as follows:
o Phase 1 — Jurisdictional profile and the review of the status of prior action
o Phase 2 — Capability Assessment
o Phase 3 — Hazard Risk Ranking and action Plan development/Confirmation
Failure to have a representative at each of these workshops will result in one-on one outreach from
members of the CPT to assist the jurisdiction in the completion of that phase. The schedule for these
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
A-4
workshops will be such that all committed planning partners will be able to attend. After participation
in each of these mandatory workshops, each partner will be required to complete their template and
provide it to the CPT in the time frame established. Failure to complete the template in the required
time frame may lead to disqualification from the partnership.
Perform a capability assessment. All planning partners will conduct a capability assessment. This
assessment will require a review of existing documents (plans, studies and ordinances) as well as
technical and financial capabilities pertinent to each jurisdiction that can support hazard mitigation. It
should be noted that it is a viable mitigation action to increase a jurisdiction’s capability.
Review the risk assessment. Each partner will be asked to review the risk assessment and identify
hazards and vulnerabilities specific to its jurisdiction. The planning team will provide the jurisdiction
specific mapping and technical consultation to aid in this task, but the determination of risk and
vulnerability will be up to each partner (through a facilitated process during the mandatory
workshop).
Review county-wide mitigation recommendations. Each partner will be asked to review and
determine if the mitigation recommendations chosen in the base plan will meet the needs of its
jurisdiction.
Develop a mitigation action plan. All planning partners will develop an action plan that identifies
each project, who will oversee the task, how it will be financed and when it is estimated to occur.
Projects within each jurisdiction consistent with the base plan recommendations will need to be
identified and prioritized and reviewed to determine their benefits vs. costs.
• Adopt the plan. ** The hazard mitigation plan must be formally adopted by each jurisdiction.
*Note: Templates and instructions to aid in the compilation and development of this information will be provided
to all committed planning partners. Each partner will be asked to complete their templates in a timely manner
and according to the timeline specified by the steering committee and the planning team.
** Note: Once this plan is completed, and FEMA approval has been received for each partner, maintaining that
eligibility will be dependent upon each partner implementing the plan implementation-maintenance protocol
identified in the plan.
Appendix A, Planning Partner Expectations
A-5
EXHIBIT A — EXAMPLE LETTER OF INTENT TO PARTICIPATE
Harris County Hazard Mitigation Planning Partnership
Mr. David J. Alamia, Jr., MPA, CEM®
Mitigation Planner
Harris County
Office of Homeland Security and Emergency Management
6922 Katy Road
Houston, TX 77024
Harris County Hazard Mitigation Planning Partnership,
Please be advised that the ______ (insert City or district name) is committed to participating in the update of the
Harris County Multi-Hazard Mitigation Action Plan. As the ______ (title, e.g., Chief Administrative Official) for
this jurisdiction, I certify that I will commit all necessary resources in order to meet Partnership expectations as
outlined in the “Planning Partners expectations” document provided by the Core Planning Team (CPT), in order
to obtain Disaster Mitigation Act (DMA) compliance for our jurisdiction.
The following individuals will be our jurisdiction’s primary and alternate point of contact for the mitigation
planning process:
Name Title Phone Email
The following individuals will serve on the jurisdiction’s Local Mitigation Planning Team (LMPT):
Name Title Phone Email
Sincerely,
______
Harris County Multi-Hazard Mitigation Action Plan
Appendix B. Procedures for Linking to Hazard
Mitigation Plan
B-1
B. PROCEDURES FOR LINKING TO HAZARD MITIGATION
PLAN
Not all eligible local governments are included in the Harris County Multi-Hazard Mitigation Action Plan. Some
or all of these non-participating local governments may choose to “link” to the Plan at some point to gain
eligibility for programs under the federal Disaster Mitigation Act (DMA). The following “linkage” procedures
define the requirements established by the planning team for dealing with an increase in the number of planning
partners linked to this plan. No currently non-participating jurisdiction within the defined planning area is
obligated to link to this plan. These jurisdictions can choose to do their own “complete” plan that addresses all
required elements of Section 201.6 of Chapter 44 of the Code of Federal Regulations (44 CFR).
INCREASING THE PARTNERSHIP THROUGH LINKAGE
Eligibility
Eligible jurisdictions located in the planning area may link to this plan at any point during the plan’s performance
period (5 years after final approval). Eligibility will be determined by the following factors:
• The linking jurisdiction is a local or tribal government as defined by the Disaster Mitigation Act.
• The boundaries or service area of the linking jurisdiction is completely contained within the boundaries of
the planning area established for this hazard mitigation plan.
• The linking jurisdiction’s critical facilities were included in the critical facility and infrastructure risk
assessment completed for this hazard mitigation plan.
Requirements
It is expected that linking jurisdictions will complete the requirements outlined below and submit their completed
template to the Harris County Office of Homeland Security and Emergency Management for review within six
months of beginning the linkage process:
• The eligible jurisdiction requests a “Linkage Package” by contacting the Point of Contact (POC) for the
plan:
Benzon K John
Resilience Planner
Harris County Office of Homeland Security & Emergency Management
6922 Katy Rd. Houston, TX 77024
Office: (713) 881-3100 | Desk: (713) 426-9554 | Fax: (713) 437-8435
Planning Section Email: plans@hcoem.net
• The POC will provide a linkage procedure package that includes linkage information and a linkage tool-
kit:
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
B-2
Linkage Information
o Procedures for linking to the multi-jurisdictional hazard mitigation plan
o Planning partner’s expectations for linking jurisdictions
o A sample “letter of intent” to link to the multi-jurisdictional hazard mitigation plan
o A copy of Section 201.6 of 44 CFR, which defines the federal requirements for a local hazard
mitigation plan.
Linkage Tool-Kit
o Copy of Volume 1 and 2 of the plan
o A municipal or special purpose district template and instructions
o A catalog of hazard mitigation alternatives
o A sample resolution for plan adoption
• The new jurisdiction will be required to review both volumes of the Harris County Multi-Hazard
Mitigation Action Plan, which include the following key components for the planning area:
Goals and objectives
The planning area risk assessment
Comprehensive review of alternatives
Plan implementation and maintenance procedures.
Once this review is complete, the jurisdiction will complete its specific annex using the template and
instructions provided by the POC.
• The development of the new jurisdiction’s annex must not be completed by one individual in isolation.
The jurisdiction must develop, implement and describe a public involvement strategy and a methodology
to identify and vet jurisdiction-specific actions. The original partnership was covered under a uniform
public involvement strategy and a process to identify actions that covered the planning area described in
Volume 1 and Volume 2 of this plan. Since new partners were not addressed by these strategies, they will
have to initiate new strategies and describe them in their annex. For consistency, new partners are
encouraged to develop and implement strategies similar to those described in this plan.
• The public involvement strategy must ensure the public’s ability to participate in the plan development
process. At a minimum, the new jurisdiction must solicit public opinion on hazard mitigation at the onset
of the linkage process and hold one or more public meetings to present the draft jurisdiction-specific
annex for comment at least two weeks prior to adoption by the governing body. The POC will have
resources available to aid in the public involvement strategy, including:
The questionnaire utilized in the plan development
Presentations from public meeting workshops and the public comment period
Press releases used throughout the planning process
The plan website.
• The methodology to identify actions should include a comprehensive range of specific mitigation actions
and projects being considered to reduce the effects of each hazard and a description of the process by
which chosen actions were identified. As part of this process, linking jurisdictions should coordinate the
selection of actions among the jurisdiction’s various departments.
• Once their public involvement strategy and template are completed, the new jurisdiction will submit the
completed package to the POC for a pre-adoption review to ensure conformance with the multi-
jurisdictional plan format and linkage procedure requirements.
Appendix B, Procedures for Linking to Hazard Mitigation Plan
B-3
• The POC will review for the following:
Documentation of public involvement and action plan development strategies
Conformance of template entries with guidelines outlined in instructions
Chosen actions are consistent with goals, objectives and mitigation catalog of the Harris County
Multi-Hazard Mitigation Action Plan
A designated point of contact
A completed FEMA plan review crosswalk.
• Plans will be reviewed by the POC and submitted to Texas Division of Emergency Management (TDEM)
for review and approval.
• TDEM will review plans for state compliance. Non-compliant plans are returned to the lead agency for
correction. Compliant plans are forwarded to FEMA for review with annotation as to the adoption status.
• FEMA reviews the linking jurisdiction’s plan in association with the approved plan to ensure DMA
compliance. FEMA notifies the new jurisdiction of the results of review with copies to TDEM and the
approved plan lead agency.
• Linking jurisdiction corrects plan shortfalls (if necessary) and resubmits to TDEM through the approved
plan lead agency.
• For plans with no shortfalls from the FEMA review that have not been adopted, the new jurisdiction
governing authority adopts the plan and forwards adoption resolution to FEMA with copies to lead
agency and TDEM.
• FEMA regional director notifies the new jurisdiction’s governing authority of the plan’s approval.
The new jurisdiction plan is then included with the multi-jurisdiction hazard mitigation plan and the linking
jurisdiction is committed to participate in the ongoing plan maintenance strategy identified in Chapter 22, Volume
1 of the hazard mitigation plan.
DECREASING THE PARTNERSHIP
The eligibility afforded under this process to the planning partnership can be rescinded in two ways. First, a
participating planning partner can ask to be removed from the partnership. This may be done because the partner
has decided to develop its own plan or has identified a different planning process for which it can gain eligibility.
A partner that wishes to voluntarily leave the partnership shall inform the POC of this desire in writing. This
notification can occur any time during the calendar year. A jurisdiction wishing to pursue this avenue is advised to
make sure that it is eligible under the new planning effort, to avoid any period of being out of compliance with the
Disaster Mitigation Act.
After receiving this notification, the POC shall immediately notify both TDEM and FEMA in writing that the
partner in question is no longer covered by the Harris County Multi-Hazard Mitigation Action Plan, and that the
eligibility afforded that partner under this plan should be rescinded based on this notification.
The second way a partner can be removed from the partnership is by failure to meet the participation requirements
specified in the “Planning Partner Expectations” package provided to each partner at the beginning of the process,
or the plan maintenance and implementation procedures specified in Volume 1 of the plan. Each partner agreed to
these terms by adopting the plan.
Eligibility status of the planning partnership will be monitored by the POC. The determination of whether a
partner is meeting its participation requirements will be based on the following parameters:
• Are partners notifying the POC of changes in designated points of contact?
Harris County Multi-Hazard Mitigation Action Plan; Volume 2, Planning Partner Annexes
B-4
• Are the partners supporting the Steering Committee by attending designated meetings or responding to
needs identified by the body?
• Are the partners continuing to be supportive as specified in the planning partners expectations package
provided to them at the beginning of the process?
Participation in the plan does not end with plan approval. This partnership was formed on the premise that a group
of planning partners would pool resources and work together to strive to reduce risk within the planning area.
Failure to support this premise lessens the effectiveness of this effort. The following procedures will be followed
to remove a partner due to the lack of participation:
• The POC will advise the Steering Committee of this pending action and provide evidence or justification
for the action. Justification may include: failure to attend meetings determined to be mandatory by the
Steering Committee, failure to act on the partner’s action plan, or inability to reach designated point of
contact after a minimum of five attempts.
• The Steering Committee will review information provided by POC, and determine action by a vote. The
Steering Committee will invoke the voting process established in the ground rules established during the
formation of this body.
• Once the Steering Committee has approved an action, the POC will notify the planning partner of the
pending action in writing via certified mail. This notification will outline the grounds for the action, and
ask the partner if it is their desire to remain as a partner. This notification shall also clearly identify the
ramifications of removal from the partnership. The partner will be given 30 days to respond to the
notification.
• Confirmation by the partner that they no longer wish to participate or failure to respond to the notification
shall trigger the procedures for voluntary removal discussed above.
• Should the partner respond that they would like to continue participation in the partnership, they must
clearly articulate an action plan to address the deficiencies identified by the POC. This action plan shall
be reviewed by the Steering Committee to determine whether the actions are appropriate to rescind the
action. Those partners that satisfy the Steering Committee’s review will remain in the partnership, and no
further action is required.
• Automatic removal from the partnership will be implemented for partners where these actions have to be
initiated more than once in a 5-year planning cycle.
Harris County Multi-Hazard Mitigation Action Plan
Appendix C. Annex Instructions and Templates
1
INSTRUCTIONS FOR COMPLETING CITY/COUNTY ANNEX
TEMPLATE
The jurisdictional annex templates for the 2018 Harris County
Hazard Mitigation Plan update will be completed in three phases.
This document provides instructions for completing each phase of
the template for municipalities.
The target timeline for phase completion is as follows:
• Phase 1—Profile, Trends and Previous Plan Status
Deployed: November 26, 2018
Due: December 31, 2018
• Phase 2—Capability Assessment and Information Sources
Deployed: February 19, 2019
Due: March 29, 2019
• Phase 3—Risk Ranking, Action Plan, and Information
Sources
Deployed: Mandatory Phase 3 Workshops in mid-July
2019
Due: August 2019
Please direct any questions and return your completed Phase 3
template by August 9, 2019 to:
Brian Rutherford
Tetra Tech
Phone: (281) 414-6741
E-mail: Brian.Rutherford@tetratech.com
A Note About Formatting:
The template for the annex is a
Microsoft Word document in a
format that will be used in the final
plan. Partners are asked to use
this template so that a uniform
product will be completed for each
partner.
Content should be entered within
the yellow, highlighted text that is
currently in the template, rather
than creating text in another
document and pasting it into the
template. Text from another source
will alter the style and formatting of
the document.
The numbering in the document
will be updated when completed
annexes are combined into the
final document. Please do not
adjust any of this numbering.
Harris County HMP Instructions for Completing City/County Annex Template
2
IMPORTANT! READ THIS
Phase 1 and Phase 2 templates were previously provided to your jurisdiction for completion. If your
jurisdiction returned completed Phase 1 and Phase 2 templates:
• The Phase 1 and Phase 2 content you provided is already incorporated into your Phase 3
template.
• Please review the template to see if we have inserted any comments requesting further work
to be done on Phase 1 and Phase 2
o If any comments are included, please address them. Then, begin your work on
Phase 3 following the Phase 3 instructions beginning on page 10.
o If no comments are included, then you DO NOT need to do any further work on the
Phase 1 and Phase 2 content. Go directly to the instructions for Phase 3, beginning
on page 10.
If your jurisdiction has NOT yet done any work on the Phase 1 and Phase 2 templates, then follow
the instructions below for providing the Phase 1 and Phase 2 information.
If your jurisdiction started work on the Phase 1 or Phase 2 template but never completed and
submitted it, please copy the work you had completed so far into the new template you received for
Phase 3. Then complete Phases 1 and 2 following the instructions provided here.
PHASE 1 AND PHASE 2 INSTRUCTIONS
CHAPTER TITLE
You jurisdiction’s name has already been entered as the title of the chapter. Please review and correct if needed.
HAZARD MITIGATION PLAN POINT OF CONTACT
Provide the name, title, mailing address, telephone number, and e-mail address for the primary point of contact for
your jurisdiction. This should be the person responsible for monitoring, evaluating and updating the annex for
your jurisdiction. This person should also be the principle liaison between your jurisdiction and the Steering
Committee overseeing development of this plan.
In addition, designate an alternate point of contact. This would be a person to contact should the primary point of
contact be unavailable or no longer employed by the jurisdiction.
Note: Both of these contacts should match the contacts that were designated in your jurisdiction’s letter of intent
to participate in this planning process. If you have changed the primary or secondary contact, please let the
planning team know by inserting a comment into the document.
JURISDICTION PROFILE
Provide information specific to your jurisdiction as indicated, in a style similar to the examples provided below.
This should be information that will not be provided in the overall mitigation plan document.
Harris County HMP Instructions for Completing City/County Annex Template
3
Location
Describe the community’s location, size and prominent features, similarly to the example below
The City of Jones is in the northwest portion of Smith County, along the Pacific Coast in northern
California. It is almost 300 miles of San Francisco. The city’s total area is 4.2 square miles, with
boundaries generally extending north-south from State Highway 111 to the Johnson River and east-west
from Coast Road to East Frank Avenue. The City of Allen is to the north, unincorporated county is to the
west, the City of Bethany is to the south, and the Pacific Ocean is to the west.
Jones is home to the University of Arbor, Bickerson Manufacturing, and the western portion of Soosoo
National Park.
History
Describe the community’s history, focusing on economy and development, and note its year of incorporation,
similarly to the example below
The City of Jones was incorporated in 1858. The area was settled during the gold rush in the 1850s as a
supply center for miners. As the gold rush died down, timber and fishing became the area's major
economic resources. By 1913, the Jones Teachers College, a predecessor to today's University of Arbor,
was founded. Recently, the presence of the college has come to shape Jones’ population into a young and
educated demographic. In 1981 the City developed the Jones Marsh and Wildlife sanctuary, an
environmentally friendly sewage treatment enhancement system.
With numerous annexations since its original incorporation, the city’s area has almost doubled. Today it
features a commercial core in the center of the city, with mostly residential areas to the north and south,
the university to the west and the national park on the east.
Climate
Describe the community’s key climate characteristics, similarly to the example below
Jones’ weather is typical of the Northern California coast, with mild summers and cool, wet winters. It
rarely freezes in the winter and it is rarely hot in the summer. Annual average rainfall is over 40 inches,
with 80 percent of that falling from November through April. The average year-round temperature is
59ºF. Humidity averages 72 to 87 percent. Prevailing winds are from the north, and average 5 mph.
Governing Body Format
Describe the community’s key governance elements, similarly to the example below
The City of Jones is governed by a five-member city council. The City consists of six departments:
Finance, Environmental Services, Community Development, Public Works, Police and the City
Manager's Office. The City has 13 commissions and task forces, which report to the City Council.
The City Council assumes responsibility for the adoption of this plan; the City Manager will oversee its
implementation.
Complete the table providing the names and titles of members of the local mitigation planning team responsible
for completion of this annex. Team membership should consist of agencies with authority to regulate
development and enforce local ordinances or regulatory standards, such as building/fire code enforcement,
emergency management, emergency services, floodplain management, parks and recreation, planning/community
Harris County HMP Instructions for Completing City/County Annex Template
4
development, public information, public works/engineering, stormwater management, transportation, or
infrastructure.
CURRENT TRENDS
Population
For population data, use the most current population figure for your jurisdiction based on an official means of
tracking (e.g., the U.S. Census or state office of financial management).
According to California Department of Finance, the population of Jones as of July 2018 was 17,280.
Since 2010, the population has grown at an average annual rate of 1.2 percent, though that rate is
declining, with an annual average of only 0.8 percent since 2015.
Development
In the yellow-highlighted text that says “Describe trends in general,” provide a brief description of your
jurisdiction’s recent development trends similar to the following example:
Anticipated development levels for Jones are low to moderate, consisting primarily of residential
development. The majority of recent development has been infill. Residentially, there has been a focus on
affordable housing and a push for more secondary mother-in-law units on properties.
The City of Jones adopted its general plan in July 2000. The plan focuses on issues of the greatest concern
to the community. City actions, such as those relating to land use allocations, annexations, zoning,
subdivision and design review, redevelopment, and capital improvements, must be consistent with the
plan. Future growth and development in the city will be managed as identified in the general plan.
Complete the table titled “Recent and Expected Future Development Trends.” Please note:
• The portion of the table requesting the number of permits by year is specifically looking for development
permits for new construction. If your jurisdiction does not have the ability to differentiate between permit
types, please list the total number of permits and indicate “N/A” (not applicable) for the permit sub-types.
• If your jurisdiction does not have the ability to track the number of permits for each hazard area, please
delete the bullet list of hazard areas and insert a qualitative description of where development has
occurred.
• Examples of qualitative descriptions of buildout in the jurisdiction are as follows:
The Town is close to being built out. Most new projects involve the demolition of an existing
residence and construction of a new replacement residence. A few subdivisions are processed each
year.
There are five parcels of underdeveloped land within the city limits. According to the General Plan,
the total potential units for these parcels is 33 units.
CAPABILITY ASSESSMENT
Please note that it is unlikely that you will be able to complete all sections of the capability assessment on your
own. You will likely need to reach out to other departments within your local government, such as planning,
finance, public works, etc. It may be beneficial to provide these individuals with background information about
this planning process, as you will want input from them again during Phase 3 of your annex development.
Harris County HMP Instructions for Completing City/County Annex Template
5
Fill in your jurisdiction’s name where indicated on the first line of the first paragraph under the heading
“1.4 Capability Assessment.”
Legal and Regulatory Capability
In the table titled “Legal and Regulatory Capability,” indicate “Yes” or “No” for each listed code, ordinance,
requirement or planning document in each of the following columns:
• Local Authority—Enter “Yes” if your jurisdiction has prepared or adopted the identified item; otherwise,
enter “No.” If yes, then enter the code, ordinance number, or plan name and its date of adoption in the
comments column. Note: If you are entering yes, please be sure that you are providing a comment with
the appropriate code, ordinance or plan.
• Other Jurisdiction Authority—Enter “Yes” if there are any regulations that may impact your
jurisdiction that are enforced or administered by another agency (e.g., a state agency or special purpose
district) or if you know that there are any state or federal regulations or laws that would prohibit local
implementation of the identified item; otherwise, enter “No.” Note: If you answer yes, please indicate the
other agency in the comments.
• State Mandated—Enter “Yes” if state laws or other requirements enable or require the listed item to be
implemented at the local level; otherwise, enter “No.” Note: If you are entering yes, please be sure that
you are providing a comment.
• Integration Opportunity—Enter “Yes” if your jurisdiction has opportunities for integration of the code,
ordinance or plan with the hazard mitigation plan. Consider entering “Yes” in the Integration Opportunity
column if you answer “yes” to any of the following:
If you answered “Yes” in the Local Authority column for this code, ordinance or plan:
Does the code, ordinance or plan already address hazards and their potential impacts?
o If so, should it be updated or revised to reflect new information about risk?
o If not, will (or should) the code, ordinance or plan be updated over the performance
period of the hazard mitigation plan (5 years)?
Does the code, ordinance or plan include specific projects that should be reviewed to
incorporate hazard mitigation goals?
Does the code, ordinance or plan include specific projects that should be included as action
items in the hazard mitigation action plan?
If you answered “No” in the Local Authority column for this code, ordinance or plan:
Will your jurisdiction develop the code, ordinance or plan during the performance period of
the hazard mitigation plan?
Note: Each capability with a “Yes” answer to Integration Opportunity will be discussed in more detail
later in the annex. You may wish to keep notes when assessing the Integration Opportunity or review
the “Integration with Other Planning Initiatives” section below.
• Comments—Enter the code number and adoption date for any local code indicated as being in place;
provide other comments as appropriate to describe capabilities for each entry. PLEASE DO NOT
OVERLOOK THIS STEP
For the category “Capital Improvement Plan,” answer the specific question regarding plan update frequency, in
addition to completing the four columns indicating level of capability.
Harris County HMP Instructions for Completing City/County Annex Template
6
Development and Permit Capabilities
Complete the table titled “Development and Permitting Capabilities.”
Fiscal Capability
Complete the table titled “Fiscal Capability” by indicating whether each of the listed financial resources is
accessible to your jurisdiction. Enter “Yes” if the resource is fully accessible to your jurisdiction. Enter “No” if
there are limitations or prerequisites that may hinder your eligibility for this resource.
Administrative and Technical Capability
Complete the table titled “Administrative and Technical Capability” by indicating whether your jurisdiction has
access to each of the listed personnel resources. Enter “Yes” or “No” in the column labeled “Available?”. If yes,
then enter the department and position title in the right-hand column. If you have contract support staff with these
capabilities, you can still answer “Yes.” Indicate in the department column that this resource is provided through
contract support.
Education and Outreach Capabilities
Complete the table titled “Education and Outreach” to indicate your jurisdiction’s capabilities and existing efforts
regarding natural hazard mitigation education and outreach.
National Flood Insurance Program Compliance
Complete the table titled “National Flood Insurance Program Compliance” by indicating your jurisdiction’s
capabilities related to each question in the table.
Classification in Hazard Mitigation Programs
Complete the table titled “Community Classifications” to indicate your jurisdiction’s participation in various
national programs related to natural hazard mitigation. For each program enter “Yes” or “No” in the second
column to indicate whether your jurisdiction participates. If yes, then enter the classification that your jurisdiction
has earned under the program in the third column and the date on which that classification was issued in the
fourth column; enter “N/A” in the third and fourth columns if your jurisdiction is not participating. If you do not
know your current classification, information is available at the following websites:
• Community Rating System— https://www.fema.gov/media-library-data/1503240360683-
30b35cc754f462fe2c15d857519a71ec/20_crs_508_oct2017.pdf
• Storm Ready— https://www.weather.gov/stormready/communities
• Firewise— http://www.firewise.org/usa-recognition-program/map-of-active-participants.aspx
• Building Code Effectiveness Grading Schedule (BCEGS)— https://www.isomitigation.com/bcegs/iso-
s-building-code-effectiveness-grading-schedule-bcegs.html
• Public Protection Classification— https://firechief.iso.com/FCWWeb/mitigation/ppc0001.jsp
Adaptive Capacity for Climate Change
Consider the climate change impact concerns identified for the planning area:
• Reduced snowpack
• Increased wildfires
Harris County HMP Instructions for Completing City/County Annex Template
7
• Sea level rise and inland flooding
• Threats to sensitive species (e.g. coho salmon)
• Loss in agricultural productivity (e.g. forestry, wine grapes, nursery products, dairy)
• Public health and safety.
With those impacts in mind, complete the table titled “Adaptive Capacity for Climate Change” by indicating that
your jurisdiction’s capacity for each listed criterion as follows:
• High—The capacity exists and is in use.
• Medium—The capacity may exist, but is not used or could use some improvement.
• Low —The capacity does not exist or could use substantial improvement.
• Unsure—Not enough information is known to assign a rating.
This is a subjective assessment, but providing a few words of explanation is useful. It is highly recommended that
you complete this table with an internal planning team and that you review the results of the other capability
assessment tables before completing.
INTEGRATION WITH OTHER PLANNING INITIATIVES
For hazard mitigation planning, “integration” means that hazard mitigation information is used in other relevant
planning mechanisms, such as general planning and capital facilities planning, and that relevant information from
those sources is used in hazard mitigation. The goal of plan integration is to ensure that the potential impact of
hazards is considered in planning for future development. FEMA recommends integration as follows:
• Integrate hazard mitigation plan goals with community objectives (e.g. incorporate the goals for risk
reduction and safety into the policies of other plans).
• Use the risk assessment to inform plans and policies (e.g. incorporate risk assessment findings into land
use plans, site plan review, emergency operations plans).
• Implement mitigation actions through existing mechanisms (e.g. include mitigation projects in the capital
improvement plan).
• Think about mitigation before and after a disaster (e.g. build recovery planning on existing mitigation
plans and goals).
After reviewing the plans, programs and ordinances identified in the capability assessment tables, identify all
plans and programs that have already been integrated with the hazard mitigation plan, and those that offer
opportunities for future integration. The simplest way to do this is to review the Legal and Regulatory Capabilities
table to see which items were marked as “Yes” under the Integration Opportunity column.
Existing Integration
In the highlighted bullet list, list items for which you entered “Yes” under the Integration Opportunity column of
the “Legal and Regulatory Capability” table because the plan or ordinance already addresses potential impacts or
includes specific projects that should be included as action items in the mitigation action plan. Consider listing
items marked as Completed in the “Status of Previous Plan Actions” table if they were indicated as being ongoing
actions. Provide a brief description of how the plan or ordinance is integrated. Examples are as follows:
• Capital Improvement Plan—The capital improvement plan includes projects can help mitigate potential
hazards. The City will act to ensure consistency between the hazard mitigation plan and the current and
future capital improvement plans. The hazard mitigation plan may identify new possible funding sources
for capital improvement projects and may result in modifications to proposed projects based on results of
the risk assessment.
Harris County HMP Instructions for Completing City/County Annex Template
8
• Building Code and Fire Code—The City’s adoption of the 2016 California building and fire codes
incorporated local modifications to account for the climatic, topographic and geographic conditions that
exist in the City.
• General Plan—The general plan includes a “Safety, Services, and Infrastructure” element to protect the
community from unreasonable risk by establishing policies and actions to avoid or minimize the
following hazards:
Geologic and seismic hazards
Fire hazards
Hazardous materials
Flood control
Impacts from climate change.
• Climate Action Plan—The City’s Climate Action Plan includes projects for reducing greenhouse gas
emissions and adapting to likely impacts of climate change. These projects were reviewed to identify
cross-planning initiates that serve both adaptation and mitigation objectives.
Note: Any plans that fall into this category should be reviewed during the development of the mitigation
strategy in Phase 3 and included as appropriate.
Opportunities for Future Integration
List any remaining items that say “Yes” in the Integration Opportunity column in the Legal and Regulatory
Capabilities and explain the process by which integration will occur. Examples follow:
• Zoning Code—The City of Smithburg is conducting a comprehensive update to its zoning code. The
opportunity to incorporate additional mitigation and abatement measures will be contemplated for
inclusion into the Code.
• Capital Improvement Projects—Capital improvement project proposals may take into consideration
hazard mitigation potential as a means of evaluating project prioritization.
• Post-Disaster Recovery Plan—Smithburg does not have a recovery plan and intends to develop one as a
mitigation planning action during the next five years. The plan will build on the mitigation goals and
objectives identified in the mitigation plan.
After you have accounted for all items marked as “Yes” under the Integration Opportunity column, consider other
programs you may have in place in your jurisdiction that include routine consideration and management of hazard
risk. Examples of such programs may include: tree pruning programs, right-of-way mowing programs, erosion
control or stream maintenance programs, etc. Please add any such programs to the integration discussion and
provide a brief description of how these program manage (or could be adapted to manage) risk from hazards.
STATUS OF PREVIOUS PLAN ACTIONS
Please note that this section only applies to jurisdictions that are conducting updates to previously approved
hazard mitigation plans. If your jurisdiction has not previously participated in an approved plan, please enter a
note stating this, and we will remove this section in your final annex.
All action items identified in prior mitigation planning efforts must be reconciled in this plan update. Action items
must all be marked as ONE of the following; check the appropriate box (place an X) and provide the following
information:
Harris County HMP Instructions for Completing City/County Annex Template
9
• Completed—If an action has been completed since the prior plan was prepared, please check the
appropriate box and provide a date of completion in the comment section. If an action has been
initiated and is an ongoing program (e.g. annual outreach event), you may mark it as completed and
note that it is ongoing in the comments. If an action addresses an ongoing program you would like to
continue to include in your action plan, please see the Carried Over to Plan Update bullet below.
• Removed—If action items are to be removed because they are no longer feasible, a reason must be
given. Lack of funding does not mean that it is no longer feasible, unless the sole source of funding
for an action is no longer available. Place a comment in the comment section explaining why the
action is no longer feasible or barriers that prevented the action from being implemented (e.g.,
“Action no longer considered feasible due to lack of political support.”). If the wording and/or intent
of a previously identified action is unclear, this can be a reason for removal. A change in community
priorities may also be a reason for removal and should be discussed in the comments.
• Carried Over to Plan Update—If an action is in progress, is ongoing, or has not been initiated and
you would like to carry it over to the plan update, please check the “Check if Yes” column under
“Carried Over to Plan Update.” Selecting this option indicates that the action will be included in the
mitigation action plan for this update. If you are carrying over an action to the update, please include
a comment describing any action that has been taken or why the action was not taken (specifically,
any barriers or obstacles that prevented the action from moving forward or slowed progress). Leave
the last column, “Action # in Update,” blank at this point. This will be filled in after completing the
updated action plan in Phase 3.
Please ensure that you have provided a status and a comment for each action.
REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
Please note that this section will ultimately describe all information sources used to develop this annex, but
that only the sources used for Phases 1 and 2 will be listed at this point. Additional sources will be added with
the preparation of the Phase 3 annex template.
This section should describe what resources you used to complete the annex and how you used them. Several
items are started for you, but please be sure to update and enhance any descriptions. This may seem trivial or
unimportant, but it is a requirement to pass the state and FEMA review process.
THIS COMPLETES PHASES 1 AND 2
Harris County HMP Instructions for Completing City/County Annex Template
10
PHASE 3 INSTRUCTIONS
JURISDICTION-SPECIFIC NATURAL EVENT HISTORY
In the table titled “Past Natural Hazard Events,” list in chronological order (most recent first) any natural hazard
event that has caused damage to your jurisdiction. Include the date of the event and the estimated dollar amount of
damage it caused. You are welcome to include any events, but special attention should be made to include major
storms and federally declared disasters. Please refer to the table listing all Presidential Disaster Declarations for
the County that is included in the toolkit you received at the workshop. We recommend including most large-
scale disasters, unless you know that there were no impacts to your jurisdiction. Specifically, we recommend that
you include these events if you have damage estimate information or can provide a brief description of impacts
that occurred within your community. In addition to these events, please refer to the NOAA storm events database
included in the tool kit. We recommend conducting a search for the name of your jurisdiction in order to identify
events with known impacts. Other potential sources of damage information include:
• Preliminary damage estimates your jurisdiction filed with the county or state
• Insurance claims data
• Newspaper archives
• Other plans/documents that deal with emergency management (safety element of a comprehensive plan,
emergency response plan, etc.)
• Resident input.
If you do not have estimates for dollars of damage caused, please list “Not Available” in the appropriate column
or simply list a brief description of the damages (e.g. Main Street closed as a result of flooding, downed trees and
residential damages). Please note that tracking such damages is a valid and useful mitigation action if your
jurisdiction does not currently track such information.
HAZARD RISK RANKING
The risk ranking performed for the overall planning area is presented in the risk assessment section of the overall
hazard mitigation plan. However, each jurisdiction has differing degrees of risk exposure and vulnerability and,
therefore, needs to rank risk for its own area, using the same methodology as used for the overall planning area.
The risk-ranking exercise assesses two variables for each hazard: its probability of occurrence; and its potential
impact on people, property and the economy.
Enter Risk Rank Based on Loss Matrix Spreadsheet and Local Knowledge
Tetra Tech has developed a draft risk ranking for your jurisdiction. It is included in the “Loss Matrix” spreadsheet
provided in the toolkit distributed at the workshop. The hazard with the highest risk rating (probability x impact)
was given a rank of 1; the hazard with the second highest rating is listed with a rank of 2; and so on. Two hazards
with equal risk ratings were given the same rank. “High,” Medium,” and “Low” assignments were given for each
hazard of concern based on a total score. To complete this section of the annex template, you need to review the
risk ranking provided in the spreadsheet, and then do one of the following:
• If you agree with the results, copy them from the spreadsheet into the risk ranking table in your annex.
• If the results differ from what you know based on substantiated data and documentation, you may
alter the ranking based on this knowledge, and enter the revised ranking into the risk ranking table in your
annex.
Harris County HMP Instructions for Completing City/County Annex Template
11
If you modify the spreadsheet-generated risk ranking based on local knowledge, please note this fact in your
template and include what you believe the rank should be and why. For example, the spreadsheet may have
assigned a low risk rank to drought, but you know that the local economy is heavily reliant on water-using
industries, such as agriculture or manufacturing, so you believe it should be ranked as medium. Remember that
this exercise is about categorizing hazards into broad levels of risk (high, medium, low), not precise calculations.
In modifying any risk ratings, keep in mind that one of the purposes of this exercise is to support the selection and
prioritization of actions in your plan. You will need to have at least one true mitigation action for each hazard
rated as “high” or “medium.” This is discussed in more detail in the Hazard Mitigation Action Plan section of
these instructions.
Review Risk Ranking Process Used in the Loss Matrix
The sections below describe the methodology that was used to derive the risk ranking. They are provided for your
information in reviewing the risk ranking prepared for your jurisdiction.
Probability of Occurrence for Each Hazard
A probability factor is assigned based on how often a hazard is likely to occur. The probability of occurrence of a
hazard event is generally based on past hazard events in an area, although weight can be given to expected future
probability of occurrence based on established return intervals and changing climate conditions. For example, if
your jurisdiction has experienced two damaging floods in the last 25 years, the probability of occurrence is high
for flooding and scores a 3 under this category. If your jurisdiction has experienced no damage from landslides in
the last 100 years, your probability of occurrence for landslide is low, and scores a 1 under this category. Each
hazard was assigned a probability factor as follows:
• High—Hazard event is likely to occur within 25 years (Probability Factor = 3)
• Medium—Hazard event is likely to occur within 100 years (Probability Factor = 2)
• Low—Hazard event is not likely to occur within 100 years (Probability Factor = 1)
• None—If there is no exposure to a hazard, there is no probability of occurrence (Probability Factor = 0)
Potential Impacts of Each Hazard
The impact of each hazard is divided into three categories: impacts on people, impacts on property, and impacts
on the economy. These categories are also assigned weighted values. Impact on people was assigned a weighting
factor of 3, impact on property was assigned a weighting factor of 2 and impact on the economy was assigned a
weighting factor of 1. Impact factors for each category (people, property, economy) are described below.
Impacts on People
Values are assigned based on the percentage of the total population exposed to the hazard event. The degree of
impact on individuals will vary and is not measurable, so the calculation assumes for simplicity and consistency
that all people exposed to a hazard because they live in a hazard zone will be equally impacted when a hazard
event occurs. Impact factors were assigned as follows:
• High—25 percent or more of the population is exposed to a hazard (Impact Factor = 3)
• Medium—10 percent to 24 percent of the population is exposed to a hazard (Impact Factor = 2)
• Low—9 percent or less of the population is exposed to the hazard (Impact Factor = 1)
• No impact—None of the population is exposed to a hazard (Impact Factor = 0)
The percent of the total population exposed to each hazard of concern with a defined extent (e.g. floodplain) can
be found in the loss estimate matrix in the green highlighted column. For hazards that do not have a defined
Harris County HMP Instructions for Completing City/County Annex Template
12
extent, the entire population or a portion of the population is considered to be exposed, depending on the hazard.
For the drought hazard, it is common for jurisdictions to list “low” or “none,” because all people in the planning
area would be exposed to drought, but impacts to the health and safety of individuals are expected to be minimal.
Impacts on Property
Values are assigned based on the percentage of the total property value exposed to the hazard event:
• High—25 percent or more of the total replacement value is exposed to a hazard (Impact Factor = 3)
• Medium—10 percent to 24 percent of the total replacement value is exposed to a hazard (Impact
Factor = 2)
• Low—9 percent or less of the total replacement value is exposed to the hazard (Impact Factor = 1)
• No impact—None of the total replacement value is exposed to a hazard (Impact Factor = 0)
The percent of the total value exposed to each hazard of concern with a defined extent and location (e.g.
floodplain) can be found in the loss estimate matrix in the blue highlighted column. For those hazards that do not
have a defined extent and location (e.g. severe weather) the entire building stock is generally considered to be
exposed. For the drought hazard, it is common for jurisdictions to list “low” or “none,” because all structures in
the planning area would be exposed to drought, but impacts to structures are expected to be minimal.
Impacts on the Economy
Values were assigned based on the percentage of the total property value vulnerable to the hazard event. Values
represent estimates of the loss from a major event of each hazard in comparison to the total replacement value of
the property exposed to the hazard. For some hazards, such as wildland fire and landslide, vulnerability may be
considered to be the same or a portion of exposure due to the lack of loss estimation tools specific to those
hazards.
• High—Estimated loss from the hazard is 10 percent or more of the total replacement value (Impact
Factor = 3)
• Medium—Estimated loss from the hazard is 5 percent to 9 percent of the total replacement value (Impact
Factor = 2)
• Low—Estimated loss from the hazard is 4 percent or less of the total replacement value (Impact
Factor = 1)
• No impact—No loss is estimated from the hazard (Impact Factor = 0).
The loss estimates for each hazard of concern that was modeled (i.e. dam failure, flood, earthquake) can be found
in the loss estimate matrix in the purple highlighted column. For those hazards that have a defined extent and
location, but do not have modelled loss results, loss estimates can be the same as exposure or a portion thereof.
For example, a large percentage of the building stock may be exposed to landslide or wildland fire risk, but it
would not be expected that one event that resulted in loss to all exposed structures would occur. For those hazards
that do not have a defined extent and location, exposure is based on the hazard type.
Risk Rating for Each Hazard
A risk rating for each hazard was determined by multiplying the assigned probability factor by the sum of the
weighted impact factors for people, property and the economy:
Risk Rating = Probability Factor x Weighted Impact Factor {people + property + economy}
This is the number shown in the risk ranking table in your template. Generally, scores of 30 or greater are rated
“high”, scores between 15 and 30 are rated “medium”, and scores of less than 15 are rated “low”.
Harris County HMP Instructions for Completing City/County Annex Template
13
JURISDICTION-SPECIFIC VULNERABILITIES
Repetitive Loss Properties
A repetitive loss property is any property for which FEMA has paid two or more flood insurance claims in excess
of $1,000 in any rolling 10-year period since 1978. In the space provided, Tetra Tech has inserted the following
information based on data provided by FEMA:
• The number of any FEMA-identified repetitive-loss properties in your jurisdiction.
• The number of any FEMA-identified severe-repetitive-loss properties in your jurisdiction.
• The number (if any) of repetitive-loss or severe-repetitive-loss properties in your jurisdiction that have
been mitigated. Mitigated for this exercise means that flood protection has been provided to the structure.
Please note that if your jurisdiction has any repetitive loss properties, we would strongly encourage you to include
a mitigation action that addresses mitigating these properties.
Other Vulnerabilities
Review the results of the risk assessment included in the toolkit, your jurisdiction’s natural-events history, and
any relevant public comments/input, and based on that review, develop a few sentences that discuss specific risks.
You do not need to develop a sentence for every parameter, but review the results and identify a few issues you
would like to highlight. For example:
• Only about 2 percent of the jurisdiction’s population is estimated to reside in the 1 percent annual chance
flood hazard area; however, 45 percent of the population is estimated to reside in the 0.2 percent annual
chance flood hazard area where flood insurance is generally not required.
• A magnitude 7.5 earthquake on the Smithburg Fault may produce nearly 1 million tons of structure
debris.
• Over the past 10 years, the jurisdiction has experienced more than $6 million in estimated damages from
severe storm events.
• More than 50 buildings are located in areas that will be permanently inundated with 12 inches of sea
level rise.
• The results of the public survey indicated that 40 percent of Smithburg residents would not be able to be
self-sufficient for 5 days following a major event.
In addition, list any noted vulnerabilities in your jurisdiction related to hazard mitigation that may not be apparent
from the risk assessment and other information provided. This may include things such as the following:
• An urban drainage issue that results in localized flooding every time it rains.
• An area of the community that frequently loses power due to a lack of tree maintenance.
• A critical facility, such as a police station, that is not equipped with a generator.
• A neighborhood that has the potential to have ingress and egress cut off as the result of a hazard event,
such as a flood or earthquake (e.g. bridge only access).
• Substantial number of buildings in one area of the community are unreinforced masonry or soft-story
construction.
• An area along the river is eroding and threatening public and/or private property.
• A large visitor population that may not be aware of tsunami risk.
Spending some time thinking about the results of the risk assessment and other noted vulnerabilities will be a big
help in the development of your mitigation strategy. Tetra Tech has inserted a few items in this section to get you
started. In addition, two examples are shown in the table below.
Harris County HMP Instructions for Completing City/County Annex Template
14
Noted Vulnerability Example Mitigation Action
Only about 2 percent of the jurisdiction’s population is estimated to reside in the 1 percent annual chance flood hazard area; however, 45 percent of the population is estimated to
reside in the 0.2 percent annual chance flood hazard area where flood insurance is generally not required.
Develop and implement an annual public information initiative that
targets residents in the 0.2 percent annual chance flood hazard
area. Provide information on the availability of relatively low cost
flood insurance policies.
An urban drainage issue results in localized flooding every time it rains.
Replace undersized culverts that are contributing to localized
flooding. Priority areas include:
• The corner of Main Street and 1st Street
• Old Oak subdivision.
HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
This section is the heart of your jurisdictional annex. This is
where you will identify the actions your jurisdiction would like
to pursue with this plan. All of the work that you have done
thus far should provide you with a plethora of ideas for actions.
With this in mind, we recommend that you review the
following and develop a list of potential actions:
• Capability Assessment Section of Annex—Review
the Legal and Regulatory Capability table, the Fiscal
Capability table, the Administrative and Technical
Capability table, the Education and Outreach table,
and the Community Classification table.
For any capability that you indicated that you did
not have, ask yourself – should we have this
capability? If yes, consider including an action to
develop/acquire the capability.
Example: Ensure a staff person from public works
and planning are trained in the use of FEMA’s
benefit-cost analysis software.
Review the Legal and Regulatory capabilities. If any have not been reviewed and updated in more
than 10 years, consider an action to review and update the capability and, as appropriate, incorporate
hazard mitigation principles or information obtained in the risk assessment (Note: actions such as this
should also be identified in the opportunities for future integration section). Also, consider including
projects or actions that have been identified in other plans and programs such as Capital Improvement
Plans, Strategic Plans, etc. as actions in this plan.
For any capability that you indicated you do have, consider how this capability can be leveraged to
increase or improve hazard mitigation in the jurisdiction.
• National Flood Insurance Program Compliance Table of this Annex—Review the table and consider
the following:
If you have no certified floodplain managers and you have flood risk, consider adding an action to
provide key staff members with training appropriate to obtain certification.
If your flood damage prevention was last updated in or before 2004, you should identify an action to
update your ordinance to ensure it is compliant with NFIP requirements.
Wording Your Action Descriptions:
Descriptions of your actions need not provide
great detail. That will come when you apply for
a project grant. Provide enough information to
identify the project’s scope and impact. The
following are typical descriptions for an action
plan action:
•Action 1—Address repetitive-loss properties.
Through targeted mitigation, acquire, relocate or
retrofit the five repetitive loss structures in the
County as funding opportunities become
available.
•Action 2—Perform a non-structural, seismic
retrofit of City Hall.
•Action 3—Acquire floodplain property in the
Smith subdivision.
•Action 4—Enhance the County flood warning
capability by joining the NOAA "Storm Ready"
program.
Harris County HMP Instructions for Completing City/County Annex Template
15
If you have any outstanding NFIP compliance issues, be sure to add an action to address them.
If flood hazard maps do not adequately address the flood risk within your jurisdiction, consider
actions to request new mapping or conduct studies.
If you don’t participate in CRS or you would like to improve your classification, consider this as an
action.
If the number of flood insurance polices in your jurisdiction is low relative to the number of structures
in the floodplain, consider an action that will promote flood insurance in your jurisdiction.
• Adaptive Capacity for Climate Change Section of this Annex—Consider your responses to this
section. For those criteria that you listed as medium or low, think of ways you could improve this rating
(see adaptive capacity portion of the mitigation best practices catalog). For those criteria you listed as
high, think about how you can leverage this capacity to improve or enhance mitigation or continue to
improve this capacity. For those criteria that you were unable to provide responses for, consider ways you
could improve your understanding of this capacity (see mitigation best practices and adaptive capacity
catalog).
• Opportunities for Future Integration Section in this Annex—Review the items you identified in this
section. For items that address land use, include them in the prepopulated action in your template that
reads as follows: Integrate the hazard mitigation plan into other plans, ordinances and programs that
dictate land use decisions in the community, including ______________. For other items listed in this
section, consider an action that specifically says what the plan, code, ordinance etc. is and how it will be
integrated.
• Jurisdiction-Specific Vulnerabilities Section in this Annex—Review the items that you have identified
in this section and consider actions that will help reduce these vulnerabilities (see mitigation best
practices catalog).
• Mitigation Best Practices Catalog—A catalog that includes FEMA and other agency identified best
practices, steering committee and other stakeholder recommendations was developed as part of the plan
development process and included in your tool kit. Review the catalog and identify those actions that your
jurisdiction should consider including in its action plan.
• Public Input—Review input received during the process, specifically the public survey results included
in your toolkit.
• Prior Mitigation Planning Efforts—If your jurisdiction participated in a previous hazard mitigation
plan, please be sure to remember to include any actions that were identified as “carry over” actions. Once
you have carried them over, return to the Status of Previous Actions table and record the new action
number (see discussion below).
Be sure to consider the following factors in your selection of actions:
• Select actions that are consistent with the overall purpose, goals, and objectives of the hazard mitigation
plan.
• Identify actions where benefits exceed costs.
• Include any action that your jurisdiction has committed to pursuing regardless of grant eligibility.
• Know what is and is not grant-eligible under the Hazard Mitigation Grant Program (HMGP), Pre-Disaster
Mitigation (PDM) and Flood Mitigation Assistance (FMA) grants (see fact sheet provided in toolkit). If
you have actions that are not HMGP, PDM or FMA grant eligible, but do mitigate part or all of the hazard
and may be eligible for other grant programs sponsored by other agencies, include them in this section.
• You must identify at least one true mitigation action (i.e. not a preparedness or response action)
that is clearly defined and actionable for hazards ranked as “high” or “medium.”
Harris County HMP Instructions for Completing City/County Annex Template
16
Review Actions Recommended for All Partners
Four actions have been prepopulated in your annex template. These actions should be included in every annex and
should not be removed, although the specifics should be adjusted as needed for the particulars of each community.
• Where appropriate, support retrofitting, purchase or relocation of structures located in high hazard areas,
prioritizing those structures that have experienced repetitive losses and/or are located in high or medium
ranked hazard areas.
• Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use
decisions within the community.
• Actively participate in the plan maintenance protocols outlined in Volume 1 of the hazard mitigation plan.
• Continue to maintain good standing and compliance under the NFIP through implementation of
floodplain management programs that, at a minimum, meet the NFIP requirements:
Enforce the flood damage prevention ordinance.
Participate in floodplain identification and mapping updates.
Provide public assistance/information on floodplain requirements and impacts.
We also recommend that every planning partner strongly consider the following additional actions, adjusted as
needed for the particulars of each community:
• Develop and implement a program to capture perishable data after significant events (e.g. high water
marks, preliminary damage estimates, damage photos) to support future mitigation efforts including the
implementation and maintenance of the hazard mitigation plan.
• Develop a post-disaster recovery plan and a debris management plan.
• Develop and/or update plans that support or enhance continuity of operations following disasters.
• Purchase generators for critical facilities and infrastructure that lack adequate back-up power.
Complete the Table
Complete the table titled “Hazard Mitigation Action Plan Matrix” for all the actions you have identified and
would like to include in the plan:
• Enter the action number and description. Replace the “xxx” included in the template with the letter code
for your jurisdiction as follows:
Harris County—HAR1, HAR2, HAR3…
City of Baytown—BAY1, BAY2, BAY3…
City of Bellaire—BEL1, BEL2, BEL3…
City of Bunker Hill Village—BNK1, BNK2, BNK3…
City of Deer Park—DPK1, DPK2, DPK3…
City of El Lago—LAG1, LAG2, LAG3…
City of Friendswood—FRD1, FRD2, FRD3…
City of Galena Park—GAL1, GAL2, GAL3…
City of Hedwig Village—HED1, HED2, HED3…
City of Hilshire Village—HIL1, HIL2, HIL3…
City of Humble—HUM1, HUM2, HUM3…
City of Hunters Creek Village—HNT1, HNT2, HNT3…
City of Jacinto City—JAC1, JAC2, JAC3…
City of Jersey Village—JRV1, JRV2, JRV3…
City of Katy—KTY1, KTY2, KTY3…
City of LaPorte—LPT1, LPT2, LPT3…
City of Missouri City —MSS1, MSS2, MSS3…
City of Morgan’s Point—MRG1, MRG2, MRG3…
City of Nassau Bay—NAS1, NAS2, NAS3…
City of Pasadena—PAS1, PAS2, PAS3…
City of Piney Point Village—PPV1, PPV2, PPV3…
City of Seabrook—SBR1, SBR2, SBR3…
City of Shore Acres—SHR1, SHR2, SHR3…
City of Southside Place—SSP1, SSP2, SSP3…
City of Spring Valley—SPV1, SPV2, SPV3…
City of Stafford—STF1, STF2, STF3
City of Taylor Lake Village—TLV1, TLV2, TLV3
City of Tomball—TOM1, TOM2, TOM3…
City of Webster—WEB1, WEB2, WEB3…
City of West University Place—WUP1, WUP2, WUP3…
• If the action is carried over from your previous hazard mitigation plan, return to the “Status of Previous
Plan Actions” table you completed in Phase 1 and enter the new action number in the column labeled
Action # in Update.
Harris County HMP Instructions for Completing City/County Annex Template
17
• Indicate whether the action mitigates hazards for new and/or existing assets.
• Identify the specific hazards the action will mitigate (note: you must list the hazards, simply indicating all
hazards is not deemed acceptable).
• Identify by number the mitigation plan objectives that the action addresses (see toolkit).
• Indicate who will be the lead in administering the action. This will most likely be a department within
your jurisdiction (e.g. planning or public works). If you wish to indicate more than one department, please
ensure that it is clear who the lead agency will be and list supporting agencies in the appropriate column.
• Enter an estimated cost in dollars if known; otherwise, enter “High,” “Medium” or “Low” as determined
for the prioritization process described in the following section.
• Identify funding sources for the action. If it is a grant, include the funding sources for the cost share.
Refer to your fiscal capability assessment to identify possible sources of funding and refer to the table
below for project eligibility for FEMA’s hazard mitigation assistance grant programs.
• Indicate the time line as “short-term” (1 to 5 years) or “long-term” (5 years or greater) or “ongoing” (a
continual program)
Eligible Activities
Hazard Mitigation
Grant Program
Pre-Disaster
Mitigation
Flood Mitigation
Assistance
Property Acquisition and Structure Demolition √ √ √
Property Acquisition and Structure Relocation √ √ √
Structure Elevation √ √ √
Mitigation Reconstruction √ √ √
Dry Floodproofing of Historic Residential Structures √ √ √
Dry Floodproofing of Non-residential Structures √ √ √
Generators √ √
Localized Flood Risk Reduction Projects √ √ √
Non-Localized Flood Risk Reduction Projects √ √
Structural Retrofitting of Existing Buildings √ √ √
Non-Structural Retrofitting of Existing Buildings and Facilities √ √ √
Safe Room Construction √ √
Wind Retrofit for One- and Two-Family Residences √ √
Infrastructure Retrofit √ √ √
Soil Stabilization √ √ √
Wildland fire Mitigation √ √
Post-Disaster Code Enforcement √
Advance Assistance √
5 Percent Initiative Projects* √
Aquifer and Storage Recovery** √ √ √
Flood Diversion and Storage** √ √ √
Floodplain and Stream Restoration** √ √ √
Green Infrastructure** √ √ √
Miscellaneous/Other** √ √ √
Hazard Mitigation Planning √ √ √
Technical Assistance √
Management Costs √ √ √
* FEMA allows increasing the 5% Initiative amount up to 10% for a Presidential major disaster declaration under HMGP. The additional
5% can be used for activities that promote disaster-resistant codes for all hazards. As a condition of the award, a disaster-resistant
building code must be adopted or an improved Building Code Effectiveness Grading Schedule is required.
** Proposed actions will be evaluated against program requirements. Eligible projects will be approved if funding is available.
Harris County HMP Instructions for Completing City/County Annex Template
18
Prioritization of Mitigation Actions
Complete the information in the table titled “Mitigation Strategy Priority Schedule” as follows:
• Action #—Indicate the action number from the previous annex table (Hazard Mitigation Action Plan
Matrix).
• # of Objectives Met—Enter the number of objectives the action will meet.
• Benefits—Enter “High,” “Medium” or “Low” as follows:
High: Action will have an immediate impact on the reduction of risk exposure to life and property.
Medium: Action will have a long-term impact on the reduction of risk exposure to life and property,
or action will provide an immediate reduction in the risk exposure to property.
Low: Long-term benefits of the action are difficult to quantify in the short term.
• Costs—Enter “High,” “Medium” or “Low” as follows:
High: Would require an increase in revenue via an alternative source (i.e., bonds, grants, fee
increases) to implement. Existing funding levels are not adequate to cover the costs of the proposed
action.
Medium: Could budget for under existing work-plan, but would require a reapportionment of the
budget or a budget amendment, or the cost of the action would have to be spread over multiple years.
Low: Possible to fund under existing budget. Action is or can be part of an existing ongoing program.
If you know the estimated cost of an action because it is part of an existing, ongoing program,
indicate the amount.
• Do Benefits Exceed the Cost?—Enter “Yes” or “No.” This is a qualitative assessment. Enter “Yes” if the
benefit rating (high, medium or low) is the same as or higher than the cost rating (high benefit/high cost;
high benefit/medium cost; medium benefit/low cost; etc.). Enter “No” if the benefit rating is lower than
the cost rating (medium benefit/high cost, low benefit/medium cost; etc.)
• Is the Action Grant-Eligible?—Enter “Yes” or “No.” Refer to the fact sheet on HMGP, PDM and FMA
and the table above.
• Can Action Be Funded Under Existing Program Budgets?—Enter “Yes” or “No.” In other words, is
this action currently budgeted for, or would it require a new budget authorization or funding from another
source such as grants?
• Implementation Priority— Enter “High,” “Medium” or “Low” as follows:
High Priority—An action that meets multiple objectives, has benefits that exceed costs, and has a
secured source of funding. Action can be completed in the short term (1 to 5 years).
Medium Priority—An action that meets multiple objectives, has benefits that exceed costs, and is
eligible for funding though no funding has yet been secured for it. Action can be completed in the
short term (1 to 5 years), once funding is secured. Medium-priority actions become high-priority
actions once funding is secured.
Low Priority—An action that will mitigate the risk of a hazard, has benefits that do not exceed the
costs or are difficult to quantify, has no secured source of funding, and is not eligible for any known
grant funding. Action can be completed in the long term (1 to 10 years). Low-priority actions are
generally “wish-list” actions. They may be eligible for grant funding from programs that have not yet
been identified.
• Grant Pursuit Priority— Enter “High,” “Medium” or “Low” as follows:
Harris County HMP Instructions for Completing City/County Annex Template
19
High Priority—An action that meets identified grant eligibility requirements, has high benefits, and
is listed as high or medium implementation priority; local funding options are unavailable or available
local funds could be used instead for actions that are not eligible for grant funding.
Medium Priority—An action that meets identified grant eligibility requirements, has medium or low
benefits, and is listed as medium or low implementation priority; local funding options are
unavailable.
Low Priority—An action that has not been identified as meeting any grant eligibility requirements.
This prioritization is a simple way to determine that your identified actions meet one of the primary objectives of
the Disaster Mitigation Act. It is not the detailed benefit/cost analysis required for HMGP/PDM /FMA action
grants. The prioritization will identify any actions whose probable benefits will not exceed the probable costs.
Those actions identified as high-priority grant funding actions should be closely reviewed for consideration when
grant funding opportunities arise.
Note: If a jurisdiction wishes to identify an action as high priority that is outside of the prioritization scheme for
high priorities, a note indicating so should be inserted and a rationale should be provided.
An example completed table is provided below.
Table 1-9. Mitigation Strategy Priority Schedule
Action
#
# of
Objectives
Met Benefits Costs
Do Benefits
Equal or
Exceed
Costs?
Is Action
Grant-
Eligible?
Can Action Be
Funded Under
Existing
Programs/
Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
EX-1 3 High High Yes Yes No Medium High
EX-2 7 Medium Low Yes No Yes High Low
EX-3 2 Low Medium No No Maybe Low Low
EX-4 10 Low Low Yes No Yes High Low
EX-5 3 Low Low Yes No Yes High Low
EX-6 6 Medium Low Yes No Yes High Low
EX-7 3 Medium Low Yes No Yes High Low
EX-8 1 Medium Medium Yes Yes No Medium High
EX-9 2 Medium Low Yes No Yes High Low
EX-10 7 Medium Low Yes No Yes High Medium
EX-11 3 High Medium Yes Yes No Medium High
Analysis of Mitigation Actions
Complete the table titled “Analysis of Mitigation Actions” summarizing the mitigation actions by hazard of
concern and the following eight mitigation types. Please note that an action can be more than one mitigation type:
• Prevention—Government, administrative or regulatory actions that influence the way land and buildings
are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital
improvement programs, open space preservation, and stormwater management regulations.
• Property Protection—Modification of buildings or structures to protect them from a hazard or removal
of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm
shutters, and shatter-resistant glass.
Harris County HMP Instructions for Completing City/County Annex Template
20
• Public Education and Awareness—Actions to inform residents and elected officials about hazards and
ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and
school-age and adult education.
• Natural Resource Protection—Actions that minimize hazard loss and preserve or restore the functions
of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed
management, forest and vegetation management, wetland restoration and preservation, and green
infrastructure.
• Emergency Services—Actions that protect people and property during and immediately after a hazard
event. Includes warning systems, emergency response services, and the protection of essential facilities.
• Structural Projects—Actions that involve the construction of structures to reduce the impact of a hazard.
Includes dams, setback levees, floodwalls, retaining walls, and safe rooms.
• Climate Resilient—Actions that incorporate methods to mitigate and/or adapt to the impacts of climate
change. Includes aquifer storage and recovery activities, incorporating future conditions projections in
project design or planning, or actions that specifically address jurisdiction-specific climate change risks,
such as sea level rise or urban heat island effect.
• Community Capacity Building—Actions that increase or enhance local capabilities to adjust to
potential damage, to take advantage of opportunities, or to respond to consequences. Includes staff
training, memorandums of understanding, development of plans and studies, and monitoring programs.
This exercise demonstrates that the jurisdiction has selected a comprehensive range of actions. Planning partners
should aim to identify at least one action in each category (although this is not required) and should make sure
there is at least one action to address “high” and “medium” ranked hazards:
An example completed table is provided below.
Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Type
Hazard Type Prevention
Property
Protection
Public
Education and
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilient
Community
Capacity
Building
Dam Failure EX-2, 3, 4, 5 EX-1, 6 EX-4, 6 EX-8, 11 EX-3, 9, 10
Drought EX-2 EX-1 EX-4 EX-8, 9, 10
Earthquake EX-2, 3, 4, 5 EX-1, 7 EX-4 EX-8, 11 EX-3, 4, 8, 9
Flooding EX-2, 3, 4, 5 EX-1, 6, 7 EX-4, 6 EX-9 EX-8, 11 EX-4 EX-1, 7 EX-3, 4, 8, 9
Landslide EX-2, 3, 4, 5 EX-1, 7 EX-4 EX-8, 11 EX-4 EX-3, 4, 10
Severe Weather EX-2, 3, 4, 5 EX-1, 7, 9 EX-4 EX-8, 9, 11 EX-8, 9, 10
Wildland fire EX-2, 3, 4, 5 EX-1, 7, 9 EX-4, 9 EX-9 EX-8, 11 EX-1, 7, 9 EX-3, 9, 10
REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
Please note that this section will ultimately describe all information sources used to develop this annex. You
should have previously listed the sources used for Phases 1 and 2. You should now add any further sources
used for the preparation of Phase 3.
This section should describe what resources you used to complete the annex and how you used them. Several
items are started for you, but please be sure to update and enhance any descriptions. This may seem trivial or
unimportant, but it is a requirement to pass the state and FEMA review process.
Harris County HMP Instructions for Completing City/County Annex Template
21
FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY
In this section, identify any future studies, analyses, reports, or surveys your jurisdiction needs to better
understand its vulnerability to identified or currently unidentified risks. These could be needs based on federal or
state agency mandates. Please note that this section is optional.
ADDITIONAL COMMENTS
Use this section to add any additional information pertinent to hazard mitigation and your jurisdiction not covered
in this template. Please note that this section is optional.
Harris County HMP Instructions for Completing City/County Annex Template
22
NEXT STEPS
After all jurisdictions have submitted their annexes, the draft plan will be submitted for public comment.
Following the public comment period and any revisions responsive to public comment, the plan will be submitted
to state and federal review agencies. At that point planning partners will be asked to begin making preparations to
formally adopt the plan.
Once FEMA has reviewed the plan and issued an approved-pending-adoption (APA) notice, planning partners
will be asked to adopt the plan. Each planning partner must have its governing board adopt this plan via resolution
or ordinance. Once adopted, planning partners will submit adoption information to Tetra Tech, who will submit
the proof of adoption to FEMA. Once such adoption has been received, FEMA will issue final approval via a
letter for those planning partners who have adopted the plan.
It is important to understand that approval is not final until proof of adoption has been received by FEMA and
they have issued a letter specifically naming your jurisdiction. More information on the review and approval
process, along with adoption support materials, will be provided at a later date.
1-1
1. JURISDICTION NAME
1.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Name, Title
Street Address
City, State ZIP
Telephone: xxx-xxx-xxxx
e-mail Address: xxx@xxx.xxx
Name, Title
Street Address
City, State ZIP
Telephone: xxx-xxx-xxxx
e-mail Address: xxx@xxx.xxx
1.2 JURISDICTION PROFILE
1.2.1 Location
___[jurisdiction name]___ is in ___[general location description]___
The current boundaries generally extend from ___[describe]___, encompassing an area of ___[area in square
miles]___.
1.2.2 History
___[jurisdiction name]___ was incorporated in ___[date]___. ___[brief historical summary]___
1.2.3 Climate
The climate of ___[jurisdiction name]___ is ___[general description]___.
1.2.4 Governing Body Format
___[general description]___.
The __[name of adopting body]___ assumes responsibility for the adoption of this plan; __[name of oversight
agency]__ will oversee its implementation. Development of this annex was carried out by the members of the
local mitigation planning team, whose members are listed in Table 1-1.
Table 1-1. Local Mitigation Planning Team Members
Name Title
Report Title Jurisdiction Name
1-2
1.3 CURRENT TRENDS
1.3.1 Population
According to ___[identify data source]___, the population of ___[jurisdiction name]___ as of ___[month
year]___ was ___[population]___ Since ___[year]___, the population has grown at an average annual rate of
___[number]___ percent.
1.3.2 Development
_DESCRIBE TRENDS IN GENERAL__.
Table 1-2 summarizes development trends in the performance period since the preparation of the previous hazard
mitigation plan, as well as expected future development trends.
Table 1-2. Recent and Expected Future Development Trends
Criterion Response
Has your jurisdiction annexed any land since
the preparation of the previous hazard
mitigation plan?
Yes/No
• If yes, give the estimated area annexed and estimated number of parcels or structures.
____________
Is your jurisdiction expected to annex any
areas during the performance period of this
plan?
Yes/No
• If yes, describe land areas and dominant uses.
____________
• If yes, who currently has permitting authority over these areas?
____________
Are any areas targeted for development or major redevelopment in the next five years? Yes/No
• If yes, briefly describe, including whether any of the areas are in known hazard risk areas
____________
How many permits for new construction were issued in your jurisdiction since the preparation of the previous hazard mitigation
plan?
2014 2015 2016 2017 2018
Single Family __ __ __ __ __
Multi-Family __ __ __ __ __
Other (commercial, mixed use, etc.) __ __ __ __ __
Total __ __ __ __ __
Provide the number of new-construction permits for each hazard area or provide a qualitative description of where development has occurred.
• Special Flood Hazard Areas: #
• Landslide: #
• High Liquefaction Areas: #
• Tsunami Inundation Area: #
• Wildfire Risk Areas: #
Describe the level of buildout in the
jurisdiction, based on your jurisdiction’s buildable lands inventory. If no such inventory exists, provide a qualitative description.
____________
Report Title Jurisdiction Name
1-3
1.4 CAPABILITY ASSESSMENT
__[jurisdiction name]__ performed an assessment of its existing capabilities for implementing hazard mitigation
strategies. The introduction at the beginning of this volume of the hazard mitigation plan describes the
components included in the capability assessment and their significance for hazard mitigation planning. This
section summarizes the following findings of the assessment:
• An assessment of legal and regulatory capabilities is presented in Table 1-3.
• Development and permitting capabilities are presented in Table 1-4.
• An assessment of fiscal capabilities is presented in Table 1-5.
• An assessment of administrative and technical capabilities is presented in Table 1-6.
• An assessment of education and outreach capabilities is presented in Table 1-7.
• Information on National Flood Insurance Program (NFIP) compliance is presented in Table 1-8.
• Classifications under various community mitigation programs are presented in Table 1-9.
• The community’s adaptive capacity for the impacts of climate change is presented in Table 1-10.
Findings of the capability assessment were reviewed to identify opportunities to expand, initiate or integrate
capabilities to further hazard mitigation goals and objectives. Where such opportunities were identified and
determined to be feasible, they are included in the action plan. The “Analysis of Mitigation Actions” table in
Section 1.10 identifies these as community capacity building mitigation actions.
Report Title Jurisdiction Name
1-4
Table 1-3. Legal and Regulatory Capability
Local Authority
Other Jurisdiction
Authority State Mandated
Integration
Opportunity?
Codes, Ordinances, & Requirements
Building Code Yes/No Yes/No Yes/No Yes/No
Comment:
Zoning Code Yes/No Yes/No Yes/No Yes/No
Comment:
Subdivisions Yes/No Yes/No Yes/No Yes/No
Comment:
Stormwater Management Yes/No Yes/No Yes/No Yes/No
Comment:
Post-Disaster Recovery Yes/No Yes/No Yes/No Yes/No
Comment:
Real Estate Disclosure Yes/No Yes/No Yes/No Yes/No
Comment:
Growth Management Yes/No Yes/No Yes/No Yes/No
Comment:
Site Plan Review Yes/No Yes/No Yes/No Yes/No
Comment:
Environmental Protection Yes/No Yes/No Yes/No Yes/No
Comment:
Flood Damage Prevention Yes/No Yes/No Yes/No Yes/No
Comment:
Emergency Management Yes/No Yes/No Yes/No Yes/No
Comment:
Climate Change Yes/No Yes/No Yes/No Yes/No
Comment:
Other Yes/No Yes/No Yes/No Yes/No
Comment:
Planning Documents
General Plan Yes/No Yes/No Yes/No Yes/No Is the plan compliant with Assembly Bill 2140? Yes/No
Comment:
Capital Improvement Plan Yes/No Yes/No Yes/No Yes/No
How often is the plan updated? ____________
Comment:
Disaster Debris Management Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Floodplain or Watershed Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Stormwater Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Urban Water Management Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Habitat Conservation Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Economic Development Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Report Title Jurisdiction Name
1-5
Local Authority
Other Jurisdiction
Authority State Mandated
Integration
Opportunity?
Shoreline Management Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Community Wildfire Protection Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Forest Management Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Climate Action Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Comprehensive Emergency Management Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Threat & Hazard Identification & Risk
Assessment (THIRA)
Yes/No Yes/No Yes/No Yes/No
Comment:
Post-Disaster Recovery Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Continuity of Operations Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Public Health Plan Yes/No Yes/No Yes/No Yes/No
Comment:
Other Yes/No Yes/No Yes/No Yes/No
Comment:
Table 1-4. Development and Permitting Capability
Criterion Response
Does your jurisdiction issue development permits? Yes/No
• If no, who does? If yes, which department? ____________
Does your jurisdiction have the ability to track permits by hazard area? Yes/No
Does your jurisdiction have a buildable lands inventory? Yes/No
Table 1-5. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Community Development Block Grants Yes/No
Capital Improvements Project Funding Yes/No
Authority to Levy Taxes for Specific Purposes Yes/No
User Fees for Water, Sewer, Gas or Electric Service Yes/No (If yes, specify)
Incur Debt through General Obligation Bonds Yes/No
Incur Debt through Special Tax Bonds Yes/No
Incur Debt through Private Activity Bonds Yes/No
Withhold Public Expenditures in Hazard-Prone Areas Yes/No
State-Sponsored Grant Programs Yes/No
Development Impact Fees for Homebuyers or Developers Yes/No
Other Yes/No (if yes, specify)
Report Title Jurisdiction Name
1-6
Table 1-6. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes/No Insert appropriate information
Engineers or professionals trained in building or infrastructure construction practices Yes/No Insert appropriate information
Planners or engineers with an understanding of natural hazards Yes/No Insert appropriate information
Staff with training in benefit/cost analysis Yes/No Insert appropriate information
Surveyors Yes/No Insert appropriate information
Personnel skilled or trained in GIS applications Yes/No Insert appropriate information
Scientist familiar with natural hazards in local area Yes/No Insert appropriate information
Emergency manager Yes/No Insert appropriate information
Grant writers Yes/No Insert appropriate information
Other Yes/No Insert appropriate information
Table 1-7. Education and Outreach Capability
Criterion Response
Do you have a public information officer or communications office? Yes/No
Do you have personnel skilled or trained in website development? Yes/No
Do you have hazard mitigation information available on your website? Yes/No
• If yes, briefly describe. Insert appropriate information
Do you use social media for hazard mitigation education and outreach? Yes/No
• If yes, briefly describe. Insert appropriate information
Do you have any citizen boards or commissions that address issues related
to hazard mitigation?
Yes/No
• If yes, briefly describe. Insert appropriate information
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes/No
• If yes, briefly describe. Insert appropriate information
Do you have any established warning systems for hazard events? Yes/No
• If yes, briefly describe. Insert appropriate information
Table 1-8. National Flood Insurance Program Compliance
Criterion Response
What local department is responsible for floodplain management? Insert appropriate information
Who is your floodplain administrator? (department/position) Insert appropriate information
Are any certified floodplain managers on staff in your jurisdiction? Yes/No
What is the date that your flood damage prevention ordinance was last amended? Insert appropriate information
Does your floodplain management program meet or exceed minimum requirements? Meets/Exceeds
• If exceeds, in what ways? Insert appropriate information
When was the most recent Community Assistance Visit or Community Assistance Contact? Insert appropriate information
Does your jurisdiction have any outstanding NFIP compliance violations that need to be addressed? Yes/No
• If so, state what they are. Insert appropriate information
Are any RiskMAP projects currently underway in your jurisdiction? Yes/No
• If so, state what they are. Insert appropriate information
Report Title Jurisdiction Name
1-7
Criterion Response
Do your flood hazard maps adequately address the flood risk within your jurisdiction? Yes/No
• If no, state why. Insert appropriate information
Does your floodplain management staff need any assistance or training to support its
floodplain management program?
Yes/No
• If so, what type of assistance/training is needed? Insert appropriate information
Does your jurisdiction participate in the Community Rating System (CRS)? Yes/No
• If yes, is your jurisdiction interested in improving its CRS Classification? Yes/No
• If no, is your jurisdiction interested in joining the CRS program? Yes/No
How many flood insurance policies are in force in your jurisdiction?a Insert appropriate information
• What is the insurance in force? $_______
• What is the premium in force? $_______
How many total loss claims have been filed in your jurisdiction?a Insert appropriate information
• How many claims are still open or were closed without payment? Insert appropriate information
• What were the total payments for losses? $_______
a. According to FEMA statistics as of MONTH XX, 201X
Table 1-9. Community Classifications
Participating? Classification Date Classified
Community Rating System Yes/No _______ Date
Building Code Effectiveness Grading Schedule Yes/No _______ Date
Public Protection Yes/No _______ Date
Storm Ready Yes/No _______ Date
Firewise Yes/No _______ Date
Table 1-10. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts High/Medium/Low
Comment:
Jurisdiction-level monitoring of climate change impacts High/Medium/Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities High/Medium/Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory High/Medium/Low
Comment:
Capital planning and land use decisions informed by potential climate impacts High/Medium/Low
Comment:
Participation in regional groups addressing climate risks High/Medium/Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes High/Medium/Low
Comment:
Identified strategies for greenhouse gas mitigation efforts High/Medium/Low
Comment:
Report Title Jurisdiction Name
1-8
Criterion Jurisdiction Ratinga
Identified strategies for adaptation to impacts High/Medium/Low
Comment:
Champions for climate action in local government departments High/Medium/Low
Comment:
Political support for implementing climate change adaptation strategies High/Medium/Low
Comment:
Financial resources devoted to climate change adaptation High/Medium/Low
Comment:
Local authority over sectors likely to be negative impacted High/Medium/Low
Comment:
Public Capacity
Local residents knowledge of and understanding of climate risk High/Medium/Low
Comment:
Local residents support of adaptation efforts High/Medium/Low
Comment:
Local residents’ capacity to adapt to climate impacts High/Medium/Low
Comment:
Local economy current capacity to adapt to climate impacts High/Medium/Low
Comment:
Local ecosystems capacity to adapt to climate impacts High/Medium/Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
1.5 INTEGRATION WITH OTHER PLANNING INITIATIVES
The information on hazards, risk, vulnerability and mitigation contained in this hazard mitigation plan is based on
the best available data. Plan integration is the incorporation of this information into other relevant planning
mechanisms, such as general planning and capital facilities planning. It includes the integration of natural hazard
information and mitigation policies, principles and actions into local planning mechanisms and vice versa.
Additionally, plan integration is achieved though the involvement of key staff and community officials in
collaboratively planning for hazard mitigation.
1.5.1 Existing Integration
In the performance period since adoption of the previous hazard mitigation plan, ___[jurisdiction name]___ made
progress on integrating hazard mitigation goals, objectives and actions into other planning initiatives. The
following plans and programs currently integrate components of the hazard mitigation strategy:
• Plan or Program Name—Description
• Plan or Program Name—Description
• Plan or Program Name—Description
• Plan or Program Name—Description
• Plan or Program Name—Description
Resources listed in Section 1.11 were used to provide information for this annex on integration of hazard
mitigation information into other jurisdiction plans or programs.
Report Title Jurisdiction Name
1-9
1.5.2 Opportunities for Future Integration
As this hazard mitigation plan is implemented, ___[jurisdiction name]___ will use information from the plan as
the best available science and data on natural hazards. The capability assessment presented in this annex identifies
codes, plans and programs that provide opportunities for integration. The progress reporting process described in
Volume 1 will outline the progress of area-wide and local hazard mitigation actions related to plan integration.
The annual progress report also will identify new opportunities for integration. The capability assessment
identified the following plans and programs that do not currently integrate goals or recommendations of the
hazard mitigation plan but provide opportunities to do so in the future:
• Plan or Program Name—Description
• Plan or Program Name—Description
• Plan or Program Name—Description
• Plan or Program Name—Description
• Plan or Program Name—Description
1.6 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 1-11 lists past occurrences of natural hazards for which specific damage was recorded in ___[jurisdiction
name]___. Other hazard events that broadly affected the entire planning area, including ___[jurisdiction
name]___, are listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 1-11. Past Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
1.7 HAZARD RISK RANKING
Table 1-12 presents a local ranking for ___[jurisdiction name]___ of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Report Title Jurisdiction Name
1-10
Table 1-12. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 _______ _______ High/Medium/Low
2 _______ _______ High/Medium/Low
3 _______ _______ High/Medium/Low
4 _______ _______ High/Medium/Low
5 _______ _______ High/Medium/Low
6 _______ _______ High/Medium/Low
7 _______ _______ High/Medium/Low
8 _______ _______ High/Medium/Low
9 _______ _______ High/Medium/Low
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
1.8 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
This section provides information on a few key vulnerabilities for the jurisdiction. Available jurisdiction-specific
risk maps of the hazards are provided at the end of this annex.
1.8.1 Repetitive Loss Properties
Repetitive loss records are as follows:
• Number of FEMA-identified Repetitive-Loss Properties: XX
• Number of FEMA-identified Severe-Repetitive-Loss Properties: XX
• Number of Repetitive-Loss Properties or Severe-Repetitive-Loss Properties that have been mitigated: XX
1.8.2 Other Noted Vulnerabilities
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Insert as appropriate.
• Insert as appropriate.
• Insert as appropriate.
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in
Section 1.10.
1.9 STATUS OF PREVIOUS PLAN ACTIONS
Table 1-13 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Report Title Jurisdiction Name
1-11
Table 1-13. Status of Previous Plan Actions
Removed;
Carried Over to
Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action #
in Update
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
1.10 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 1-14 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 1-15
identifies the priority for each action. Table 1-16 summarizes the mitigation actions by hazard of concern and
mitigation type.
Report Title Jurisdiction Name
1-12
Table 1-14. Hazard Mitigation Action Plan Matrix
Applies to New or
Existing Assets Objectives Met Lead Agency Support Agency
Estimated
Cost Sources of Funding Timelinea
Action xxx1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that
have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire
Existing 3, 4, 10 TBD TBD High HMGP, PDM, FMA Short-term
Action xxx2— Integrate the hazard mitigation plan into other plans, ordinances and programs that dictate land use decisions in the
community, including ______________
Hazards Mitigated: Dam failure, drought, earthquake, flooding, landslide, tsunami, wildfire
New and Existing 1, 3, 4, 5, 7, 8, 10 TBD TBD Low Staff Time, General Funds Ongoing
Action xxx3—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: All hazards
New and Existing 1, 5, 8 TBD TBD Low Staff Time, General Funds Short-term
Action xxx4—Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management
programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates.
• Provide public assistance/information on floodplain requirements and impacts.
Hazards Mitigated: Dam failure, flooding, severe weather, tsunami, sea level rise
New and Existing 1, 3, 5, 7, 8, 10 TBD TBD Low Staff Time, General Funds Ongoing
Action xxx5—Description
Hazards Mitigated: TBD
Action xxx6—Description
Hazards Mitigated:
Action xxx7—Description
Hazards Mitigated: TBD
Action xxx8—Description
Hazards Mitigated: TBD
Action xxx9—Description
Hazards Mitigated: TBD
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Report Title Jurisdiction Name
1-13
Table 1-15. Mitigation Action Priority
Action
#
# of
Objectives
Met Benefits Costs
Do Benefits
Equal or
Exceed
Costs?
Is Project
Grant-
Eligible?
Can Project
Be Funded
Under Existing
Programs/
Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
xxx1 3 High High Yes Yes No Medium High
xxx2 7 Medium Low Yes No Yes High Low
xxx3 3 Low Low Yes No Yes High Low
xxx4 6 Medium Low Yes No Yes High Low
xxx5
xxx6
a. See the introduction to this volume for explanation of priorities.
Table 1-16. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public
Education and
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilient
Community
Capacity
Building
High-Risk Hazards
____________
____________
____________
Medium-Risk Hazards
____________
____________
____________
Low-Risk Hazards
____________
____________
____________
a. See the introduction to this volume for explanation of mitigation types.
Report Title Jurisdiction Name
1-14
1.11 REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• ___[jurisdiction name]___ Municipal Code—The municipal code was reviewed for the full capability
assessment and for identifying opportunities for action plan integration.
• ___[jurisdiction name]___ Flood Damage Prevention Ordinance—The flood damage prevention
ordinance was reviewed for compliance with the National Flood Insurance Program.
• <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED>
• <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED>
• <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED>
• <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED>
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• <INSERT DOCUMENT AND DESCRIPTION OF HOW IT WAS USED>
1.12 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY
Insert text, if any; otherwise, delete section
1.13 ADDITIONAL COMMENTS
Insert text, if any; otherwise, delete section
1
INSTRUCTIONS FOR COMPLETING SPECIAL PURPOSE
DISTRICT ANNEX TEMPLATE
The jurisdictional annex templates for the 2018 Harris County
Hazard Mitigation Plan update will be completed in three phases.
This document provides instructions for completing each phase of
the template for special purpose districts.
The target timeline for phase completion is as follows:
• Phase 1—Profile, Trends and Previous Plan Status
Deployed: November 26, 2018
Due: December 31, 2018
• Phase 2—Capability Assessment and Information Sources
Deployed: February 19, 2019
Due: March 29, 2019
• Phase 3—Risk Ranking, Action Plan, and Information
Sources
Deployed: Mandatory Phase 3 Workshops in mid-July
2019
Due: August 2019
Please direct any questions and return your completed Phase 3
template by August 9, 2019 to:
Brian Rutherford
Tetra Tech
Phone: (281) 414-6741
E-mail: Brian.Rutherford@tetratech.com
A Note About Formatting:
The template for the annex is a
Microsoft Word document in a
format that will be used in the final
plan. Partners are asked to use
this template so that a uniform
product will be completed for each
partner.
Content should be entered within
the yellow, highlighted text that is
currently in the template, rather
than creating text in another
document and pasting it into the
template. Text from another source
will alter the style and formatting of
the document.
The numbering in the document
will be updated when completed
annexes are combined into the
final document. Please do not
adjust any of this numbering.
Harris County HMP Instructions for Completing Special Purpose District Annex Template
2
IMPORTANT! READ THIS
Phase 1 and Phase 2 templates were previously provided to your jurisdiction for completion. If your
jurisdiction returned completed Phase 1 and Phase 2 templates:
• The Phase 1 and Phase 2 content you provided is already incorporated into your Phase 3
template.
• Please review the template to see if we have inserted any comments requesting further work
to be done on Phase 1 and Phase 2
o If any comments are included, please address them. Then, begin your work on
Phase 3 following the Phase 3 instructions beginning on page 10.
o If no comments are included, then you DO NOT need to do any further work on the
Phase 1 and Phase 2 content. Go directly to the instructions for Phase 3, beginning
on page 10.
If your jurisdiction has NOT yet done any work on the Phase 1 and Phase 2 templates, then follow
the instructions below for providing the Phase 1 and Phase 2 information.
If your jurisdiction started work on the Phase 1 or Phase 2 template but never completed and
submitted it, please copy the work you had completed so far into the new template you received for
Phase 3. Then complete Phases 1 and 2 following the instructions provided here.
PHASE 1 AND PHASE 2 INSTRUCTIONS
CHAPTER TITLE
You jurisdiction’s name has already been entered as the title of the chapter. Please review and correct if needed.
HAZARD MITIGATION PLAN POINT OF CONTACT
Please provide the name, title, mailing address, telephone number, and e-mail address for the primary point of
contact for your jurisdiction. This should be the person responsible for monitoring, evaluating and updating the
annex for your jurisdiction. This person should also be the principle liaison between your jurisdiction and the
Steering Committee overseeing development of this plan.
In addition, designate an alternate point of contact. This would be a person to contact should the primary point of
contact be unavailable or no longer employed by the jurisdiction.
Note: Both of these contacts should match the contacts that were designated in your jurisdiction’s letter of intent
to participate in this planning process. If you have changed the primary or secondary contact, please let the
planning team know by inserting a comment into the document.
JURISDICTION PROFILE
Overview
Please provide a brief summary description of the following:
• The purpose of the jurisdiction
Harris County HMP Instructions for Completing Special Purpose District Annex Template
3
• The date of inception
• The type of organization
• The number of employees
• The mode of operation (i.e., how operations are funded)
• The type of governing body, and who has adoptive authority.
This should be information that is specific to your jurisdiction and will not be provided in the overall, planning
area-wide mitigation plan document. Provide information similar to the following example:
The Johnsonville Community Services District is a special district created in 1952 to provide water and
sewer service. A five-member elected Board of Directors governs the District. The Board assumes
responsibility for the adoption of this plan; the General Manager will oversee its implementation. The
District currently employs a staff of 21. Funding comes primarily through rates and revenue bonds.
Complete the table providing the names and titles of members of the local mitigation planning team responsible
for completion of this annex. Team membership should consist of agencies with authority to regulate
development and enforce local ordinances or regulatory standards, such as building/fire code enforcement,
emergency management, emergency services, floodplain management, parks and recreation, planning/community
development, public information, public works/engineering, stormwater management, transportation, or
infrastructure.
Service Area and Trends
Please provide a brief summary description of the following:
• A description of who the district’s customers are
• An approximation of area served in square miles
• A geographical decription of the service area
• An overview of current service area trends, including an approximation of current users/subscribers,
• A summary description of previous growth trends in the service area and anticipated future
increase/decrease in services (if applicable)
This should be information that is specific to your jurisdiction and will not be provided in the overall, planning
area-wide mitigation plan document. Provide information similar to the following example:
The Johnsonville Community Services District originally was formed to serve the unincorporated area
east of the City of Smithburg known as Johnsonville. The District’s designated service area expanded
throughout the years to include other unincorporated areas of Jones County: Creeks Corner, Jones Hill,
Fields Landing, King Salmon, and Freshwater. As of April 30, 2016, the District serves 7,305 water
connections and 6,108 sewer connections, with a total service area of 3.3 square miles.
Assets
Please provide an approximate value for the noted areas within the table. Include the sum total value for identified
assets for each section in the “Total” line for the section.
Property
Provide an approximate value for the land owned by the District.
Harris County HMP Instructions for Completing Special Purpose District Annex Template
4
Equipment
List categories of equipment owned by the District that are used in times of emergency or that, if incapacitated,
have the potential to severely impact the service area. Provide an approximate aggregate replacement value for
each. For water and sewer, include mileage of pipeline under this category.
Critical Facilities and Infrastructure
List District facilities and infrastructgure vital to maintain services to the designated service area. Include the
address of each facility. Provide an approximate aggregate replacement value for each line. The Steering
Committee has decided upon the following definition of critical facilities for this planning process:
• A local (not state or federal) facility in either the public or private sector that is critical to the health and
welfare of the population and that is especially important following hazard events, including but not
limited to the following:
Structures or facilities that produce, use, or store highly volatile, flammable, explosive, toxic and/or
water-reactive materials
Hospitals, nursing homes, and housing facilities likely to contain occupants who may not be
sufficiently mobile to avoid death or injury during a natural hazard event
Mass gathering facilities that may be utilized as evacuation shelters
Infrastructure such as roads, bridges and airports that provide sources for evacuation before, during
and after natural hazard events
Police stations, fire stations, government facilities, vehicle equipment and storage facilities, hardware
stores and emergency operation centers that are needed for response activities before, during and after
a natural hazard event
Public and private utility facilities that are vital to maintaining and restoring normal services to
damaged areas before, during and after natural hazard events.
Please use this definition as a guideline when selecting critical facilities the District owns.
NOTE:
Placeholders in the table of assets request ADDRESSES for critical facilities. These addresses will not be
included in the final published annex, but are needed in order to perform risk mapping and risk analysis for the
hazard mitigation plan. Include the addresses in the table if convenient. If not, then provide a separate document
listing all critical facilities and addresses for use in development of the hazard mitigation plan.
Sample Completed Table – Special District Assets
Asset Value
Property
11.5 Acres $5,750,000
Equipment
Total length of pipe 40 miles ( $1.32 million per mile X 40 miles) $52,800,000
4 Emergency Generators $250,000
Total: $53,050,000
Critical Facilities and Infrastructure
Administrative Buildings – 357 S. Jones Street $2,750,000
Philips Pump Station – 111 Fifth Avenue N. $377,000
Total: $3,127,000
Harris County HMP Instructions for Completing Special Purpose District Annex Template
5
CAPABILITY ASSESSMENT
Planning and Regulatory Capability
List any federal, state, local or district laws, ordinances, codes and policies that govern your jurisdiction that
include elements related to hazard mitigation. List any other plans, studies or other documents that address hazard
mitigation issues for your jurisdiction. Please provide the date of last update and any comments as appropriate. A
few examples follow:
Plan, Study or Program
Date of Most Recent
Update Comment
District Design Standards 2010
Capital Improvement Program Updated and approved annually covers 5 year timeframe
Emergency Operations Plan 2000
Facility Maintenance Manual 1990
State Building Code 2016
Division of State Architects Review and approval of all building and site design features is
required prior to construction
Habitat Conservation Plan All development impacting critical habitat must meet federal and state
requirements pertaining to the protection of endangered species
Fiscal, Administrative and Technical Capabilities
Fiscal Capability
Complete the table titled “Fiscal Capability” by indicating whether each of the listed financial resources is
accessible to your jurisdiction. Enter “Yes” if the resource is fully accessible to your jurisdiction. Enter “No” if
there are limitations or prerequisites that may hinder your eligibility for this resource.
Administrative and Technical Capability
Complete the table titled “Administrative and Technical Capability” by indicating whether your jurisdiction has
access to each of the listed personnel resources. Enter “Yes” or “No” in the column labeled “Available?”. If yes,
then enter the department and position title in the right-hand column. If you have contract support staff with these
capabilities, you can still answer “Yes.” Indicate in the department column that this resource is provided through
contract support.
Education and Outreach Capabilities
Complete the table titled “Education and Outreach” to indicate your jurisdiction’s capabilities and existing efforts
regarding natural hazard mitigation education and outreach.
Adaptive Capacity for Climate Change
Consider the climate change impact concerns identified for the planning area:
• Reduced snowpack
• Increased wildfires
• Sea level rise and inland flooding
• Threats to sensitive species (e.g. coho salmon)
• Loss in agricultural productivity (e.g. forestry, wine grapes, nursery products, dairy)
Harris County HMP Instructions for Completing Special Purpose District Annex Template
6
• Public health and safety.
With those impacts in mind, complete the table titled “Adaptive Capacity for Climate Change” by indicating that
your jurisdiction’s capacity for each listed criterion as follows:
• High—The capacity exists and is in use.
• Medium—The capacity may exist, but is not used or could use some improvement.
• Low —The capacity does not exist or could use substantial improvement.
• Unsure—Not enough information is known to assign a rating.
This is a subjective assessment, but providing a few words of explanation is useful. It is highly recommended that
you complete this table with an internal planning team and that you review the results of the other capability
assessment tables before completing.
INTEGRATION WITH OTHER PLANNING INITIATIVES
The goal of plan integration is to ensure that the potential impact of hazards is considered in planning for future
development. FEMA recommends integration as follows:
• Integrate hazard mitigation plan goals with community objectives (e.g. incorporate the goals for risk
reduction and safety into the policies of other plans).
• Use the risk assessment to inform plans and policies (e.g. incorporate risk assessment findings into land
use plans, site plan review, emergency operations plans).
• Implement mitigation actions through existing mechanisms (e.g. include mitigation projects in the capital
improvement plan).
• Think about mitigation before and after a disaster (e.g. build recovery planning on existing mitigation
plans and goals).
After reviewing the plans, programs and ordinances identified in the capability assessment, identify all plans and
programs that have already been integrated with the goals and recommendations of the hazard mitigation plan,
and those that offer opportunities for future integration.
Existing Integration
Provide a brief description of integrated plans or ordinances and how each is integrated. Consider listing items
marked as Completed in the “Status of Previous Plan Actions” table if they were indicated as being ongoing
actions. Examples are as follows:
• Capital Improvement Plan—The capital improvement plan includes projects can help mitigate potential
hazards. The District will act to ensure consistency between the hazard mitigation plan and the current
and future capital improvement plans. The hazard mitigation plan may identify new possible funding
sources for capital improvement projects and may result in modifications to proposed projects based on
results of the risk assessment.
• Emergency Operations Plan—The results of the risk assessment were used in the development of the
emergency operations plan.
• Facilities Plan—The results of the risk assessment and mapped hazard areas are used in facility planning
for the district. Potential sites are reviewed for hazard risks and appropriate mitigation measures are
considered in building and site design.
Harris County HMP Instructions for Completing Special Purpose District Annex Template
7
Opportunities for Future Integration
List any plans or program that offer the potential for future integration and describe the process by which
integration will occur. Examples follow:
• Capital Improvement Projects—Capital improvement project proposals may take into consideration
hazard mitigation potential as a means of evaluating project prioritization.
• Post-Disaster Recovery Plan—The District does not have a recovery plan and intends to develop one as
a mitigation planning action during the next five years. The plan will build on the mitigation goals and
objectives identified in the mitigation plan.
Consider other programs you may have in place in your jurisdiction that include routine consideration and
management of hazard risk. Examples of such programs may include: tree pruning programs, right-of-way
mowing programs, erosion control or stream maintenance programs, etc. Please add any such programs to the
integration discussion and provide a brief description of how these program manage (or could be adapted to
manage) risk from hazards.
STATUS OF PREVIOUS PLAN ACTIONS
Please note that this section only applies to jurisdictions that are conducting updates to previously approved
hazard mitigation plans. If your jurisdiction has not previously participated in an approved plan, please enter a
note stating this, and we will remove this section in your final annex.
All action items identified in prior mitigation planning efforts must be reconciled in this plan update. Action items
must all be marked as ONE of the following; check the appropriate box (place an X) and provide the following
information:
• Completed—If an action has been completed since the prior plan was prepared, please check the
appropriate box and provide a date of completion in the comment section. If an action has been
initiated and is an ongoing program (e.g. annual outreach event), you may mark it as completed and
note that it is ongoing in the comments. If an action addresses an ongoing program you would like to
continue to include in your action plan, please see the Carried Over to Plan Update bullet below.
• Removed—If action items are to be removed because they are no longer feasible, a reason must be
given. Lack of funding does not mean that it is no longer feasible, unless the sole source of funding
for an action is no longer available. Place a comment in the comment section explaining why the
action is no longer feasible or barriers that prevented the action from being implemented (e.g.,
“Action no longer considered feasible due to lack of political support.”). If the wording and/or intent
of a previously identified action is unclear, this can be a reason for removal. A change in community
priorities may also be a reason for removal and should be discussed in the comments.
• Carried Over to Plan Update—If an action is in progress, is ongoing, or has not been initiated and
you would like to carry it over to the plan update, please check the “Check if Yes” column under
“Carried Over to Plan Update.” Selecting this option indicates that the action will be included in the
mitigation action plan for this update. If you are carrying over an action to the update, please include
a comment describing any action that has been taken or why the action was not taken (specifically,
any barriers or obstacles that prevented the action from moving forward or slowed progress). Leave
the last column, “Action # in Update,” blank at this point. This will be filled in after completing the
updated action plan in Phase 3.
Please ensure that you have provided a status and a comment for each action.
Harris County HMP Instructions for Completing Special Purpose District Annex Template
8
REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX
Please note that this section will ultimately describe all information sources used to develop this annex, but
that only the sources used for Phases 1 and 2 will be listed at this point. Additional sources will be added with
the preparation of the Phase 3 annex template.
This section should describe what resources you used to complete the annex and how you used them. Several
items are started for you, but please be sure to update and enhance any descriptions. This may seem trivial or
unimportant, but it is a requirement to pass the state and FEMA review process.
Harris County HMP Instructions for Completing Special Purpose District Annex Template
9
PHASE 3 INSTRUCTIONS
JURISDICTION-SPECIFIC NATURAL EVENT HISTORY
In the table titled “Past Natural Hazard Events,” list in chronological order (most recent first) any natural hazard
event that has caused damage to your jurisdiction. Include the date of the event and the estimated dollar amount of
damage it caused. You are welcome to include any events, but special attention should be made to include major
storms and federally declared disasters. Please refer to the table listing all Presidential Disaster Declarations for
the County that is included in the toolkit you received at the workshop. We recommend including most large-
scale disasters, unless you know that there were no impacts to your jurisdiction. Specifically, we recommend that
you include these events if you have damage estimate information or can provide a brief description of impacts
that occurred within your community. In addition to these events, please refer to the NOAA storm events database
included in the tool kit. We recommend conducting a search for the name of your jurisdiction in order to identify
events with known impacts. Other potential sources of damage information include:
• Preliminary damage estimates your jurisdiction filed with the county or state
• Insurance claims data
• Newspaper archives
• Other plans/documents that deal with emergency management (safety element of a comprehensive plan,
emergency response plan, etc.)
• Resident input.
If you do not have estimates for dollars of damage caused, please list “Not Available” in the appropriate column
or simply list a brief description of the damages (e.g. Power out to 35,000 customers for 24 hours). Please note
that tracking such damages, is a valid and useful mitigation action if your jurisdiction does not currently track
such information.
HAZARD RISK RANKING
The risk ranking performed for the overall planning area is presented in the risk assessment section of the overall
hazard mitigation plan. However, each jurisdiction has differing degrees of risk exposure and vulnerability and,
therefore, needs to rank risk for its own area, using the same methodology as used for the overall planning area.
The risk-ranking exercise assesses two variables for each hazard: its probability of occurrence; and its potential
impact on people, property and the economy.
Enter Risk Rank Based on Loss Matrix Spreadsheet and Local Knowledge
Tetra Tech has developed a draft risk ranking for your jurisdiction. It is included in the “Loss Matrix” spreadsheet
provided in the toolkit distributed at the workshop. The hazard with the highest risk rating (probability x impact)
was given a rank of 1; the hazard with the second highest rating is listed with a rank of 2; and so on. Two hazards
with equal risk ratings were given the same rank. “High,” Medium,” and “Low” assignments were given for each
hazard of concern based on a total score. To complete this section of the annex template, you need to review the
risk ranking provided in the spreadsheet, and then do one of the following:
• If you agree with the results, copy them from the spreadsheet into the risk ranking table in your annex.
• If the results differ from what you know based on substantiated data and documentation, you may
alter the ranking based on this knowledge, and enter the revised ranking into the risk ranking table in your
annex.
Harris County HMP Instructions for Completing Special Purpose District Annex Template
10
If you modify the spreadsheet-generated risk ranking based on local knowledge, please note this fact in your
template and include what you believe the rank should be and why. For example, the spreadsheet may have
assigned a low risk rank to drought, but you know that the local economy is heavily reliant on water-using
industries, such as agriculture or manufacturing, so you believe it should be ranked as medium. Remember that
this exercise is about categorizing hazards into broad levels of risk (high, medium, low), not precise calculations.
In modifying any risk ratings, keep in mind that one of the purposes of this exercise is to support the selection and
prioritization of actions in your plan. You will need to have at least one true mitigation action for each hazard
rated as “high” or “medium.” This is discussed in more detail in the Hazard Mitigation Action Plan section of
these instructions.
Review Risk Ranking Process Used in the Loss Matrix
The sections below describe the methodology that was used to derive the risk ranking. They are provided for your
information in reviewing the risk ranking prepared for your jurisdiction.
Probability of Occurrence for Each Hazard
A probability factor is assigned based on how often a hazard is likely to occur. The probability of occurrence of a
hazard event is generally based on past hazard events in an area, although weight can be given to expected future
probability of occurrence based on established return intervals and changing climate conditions. For example, if
your jurisdiction has experienced two damaging floods in the last 25 years, the probability of occurrence is high
for flooding and scores a 3 under this category. If your jurisdiction has experienced no damage from landslides in
the last 100 years, your probability of occurrence for landslide is low, and scores a 1 under this category. Each
hazard was assigned a probability factor as follows:
• High—Hazard event is likely to occur within 25 years (Probability Factor = 3)
• Medium—Hazard event is likely to occur within 100 years (Probability Factor = 2)
• Low—Hazard event is not likely to occur within 100 years (Probability Factor = 1)
• None—If there is no exposure to a hazard, there is no probability of occurrence (Probability Factor = 0)
Potential Impacts of Each Hazard
The impact of each hazard is divided into three categories: impacts on people, impacts on property, and impacts
on the economy. These categories are also assigned weighted values. Impact on people was assigned a weighting
factor of 3, impact on property was assigned a weighting factor of 2 and impact on the economy was assigned a
weighting factor of 1. Impact factors for each category (people, property, economy) are described below:
• People—Values are assigned based on the percentage of the total population exposed in your service area
to the hazard event. The degree of impact on individuals will vary and is not measurable, so the
calculation assumes for simplicity and consistency that all people exposed to a hazard because they live in
a hazard zone will be equally impacted when a hazard event occurs. Impact factors were assigned as
follows:
High—25 percent or more of the population is exposed to a hazard (Impact Factor = 3)
Medium—10 percent to 24 percent of the population is exposed to a hazard (Impact Factor = 2)
Low—9 percent or less of the population is exposed to the hazard (Impact Factor = 1)
No impact—None of the population is exposed to a hazard (Impact Factor = 0)
• Property—Values are assigned based on the percentage of the total district assets exposed to the hazard
event:
Harris County HMP Instructions for Completing Special Purpose District Annex Template
11
High—25 percent or more of the total replacement value of assets is exposed to a hazard (Impact
Factor = 3)
Medium—10 percent to 24 percent of the total replacement value of assets is exposed to a hazard
(Impact Factor = 2)
Low—9 percent or less of the total replacement value of assets is exposed to the hazard (Impact
Factor = 1)
No impact—None of the total replacement value is exposed to a hazard (Impact Factor = 0)
• Operations—Impact on operations is assessed based on estimates of how long it will take your
jurisdiction to become 100-percent operable after a hazard event. The estimated functional downtime for
critical facilities has been subjectively assigned an impact as follows:
High—Functional downtime of 365 days or more (Impact Factor = 3)
Medium—Functional downtime of 180 to 364 days (Impact Factor = 2)
Low—Functional downtime of 180 days or less (Impact Factor = 1)
No impact—No functional downtime is estimated from the hazard (Impact Factor = 0).
Risk Rating for Each Hazard
A risk rating for each hazard was determined by multiplying the assigned probability factor by the sum of the
weighted impact factors for people, property and the economy:
Risk Rating = Probability Factor x Weighted Impact Factor {people + property + operations}
This is the number that is shown in the risk ranking table in your template. Generally, scores of 30 or greater are
rated “high”, scores between 15 and 30 are rated “medium”, and scores of less than 15 are rated “low”.
JURISDICTION-SPECIFIC VULNERABILITIES
Review the results of the risk assessment included in the toolkit, your jurisdiction’s natural-events history, and
any relevant public comments/input, and based on that review, develop a few sentences that discuss specific risks.
You do not need to develop a sentence for every parameter, but review the results and identify a few issues you
would like to highlight. For example:
• One of the District’s wastewater treatment plants is located in an area likely to be permanently inundated
by sea level rise by 2030.
• Three of the District’s five fire stations are located in very high landslide risk areas.
• The vast majority of the service area for the district is located on high liquefaction potential soils, which
has the potential to severely disrupt service for an extended period following even a moderate earthquake
event.
• The District headquarters is more likely than not to be extensively damaged during a Smithburg fault
M7.0 event.
In addition, list any noted vulnerabilities in your jurisdiction related to hazard mitigation that may not be apparent
from the risk assessment and other information provided. This may include things such as the following:
• An area of the community that frequently loses power due to a lack of tree maintenance.
• A critical facility, such as a police station, that is not equipped with a generator.
• A neighborhood that has the potential to have ingress and egress cut off as the result of a hazard event,
such as a flood or earthquake (e.g. bridge only access).
Harris County HMP Instructions for Completing Special Purpose District Annex Template
12
Spending some time thinking about the results of the risk assessment and other noted vulnerabilities will be a big
help in the development of your mitigation strategy. Tetra Tech has inserted a few items in this section to get you
started. In addition, two examples are shown in the table below.
Noted Vulnerability Example Mitigation Action
One of the District’s wastewater treatment plants is located in an area likely to be permanently inundated by sea level rise by
2030.
Conduct a detailed assessment of the wastewater treatment plant
vulnerability to sea level rise. Determine adaptation actions that
can be implemented in the near- and long-term.
A critical facility, such as a police station, that is not equipped
with a generator.
Unsure all critical facilities within the District have backup power
generation capabilities. Priority facilities include:
• Main street pump station
• Old Oak subdivision pump station.
HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
This section is the heart of your jurisdictional annex. This is
where you will identify the actions your jurisdiction would like
to pursue with this plan. All of the work that you have done
thus far should provide you with a plethora of ideas for actions.
With this in mind, we recommend that you review the
following and develop a list of potential actions:
• Capability Assessment Section of Annex—Review
the Planning and Regulatory Capability table, the
Fiscal Capability table, the Administrative and
Technical Capability table, and the Education and
Outreach table.
For any capability that you indicated that you did
not have, ask yourself – should we have this
capability? If yes, consider including an action to
develop/acquire the capability.
Example: Ensure a staff person is trained in the use of FEMA’s benefit-cost analysis software.
Review the Legal and Regulatory capabilities. If you have not reviewed and updated a capability in
more than 10 years, consider an action to review and update the capability and, as appropriate,
incorporate hazard mitigation principles or information obtained in the risk assessment (Note: actions
such as this should also be identified in the opportunities for future integration section). Also,
consider including projects or actions that have been identified in other plans and programs such as
Capital Improvement Plans, Strategic Plans, etc. as actions in this plan.
For any capability that you indicated you do have, consider how this capability can be leveraged to
increase or improve hazard mitigation in the jurisdiction.
• Adaptive Capacity for Climate Change Section of this Annex—Consider your responses to this
section. For those criterion that you listed as medium or low, think of ways you could improve this rating
(see adaptive capacity portion of the mitigation best practices catalog). For those criterion you listed as
high, think about how you can leverage this capacity to improve or enhance mitigation or continue to
improve this capacity. For those criterion that you were unable to provide responses for, consider ways
you could improve your understanding of this capacity (see mitigation best practices).
Wording Your Action Descriptions:
Descriptions of your actions need not provide
great detail. That will come when you apply for
a project grant. Provide enough information to
identify the action’s scope and impact. The
following are typical descriptions for an action
plan action:
•Action 1—Address repetitive-loss issues.
Through targeted mitigation, acquire,
relocate or retrofit the nine pump stations
that have been repetitively damaged.
•Action 2—Perform a non-structural,
seismic retrofit of the administrative
building.
•Action 3—Develop a schedule to
underground overhead powerlines.
Harris County HMP Instructions for Completing Special Purpose District Annex Template
13
• Opportunities for Future Integration Section in this Annex—Review the items you identified in this
section. Consider an action that specifically says what the plan, code, ordinance etc. is and how it will be
integrated.
• Jurisdiction-Specific Vulnerabilities Section in this Annex—Review the items that you have identified
in this section and consider actions that will help reduce these vulnerabilities (see mitigation best
practices catalog).
• Mitigation Best Practices Catalog—A catalog that includes FEMA and other agency identified best
practices, steering committee and other stakeholder recommendations was developed as part of the plan
development process and included in your tool kit. Review the catalog and identify those actions that your
jurisdiction should consider including in its action plan.
• Public Input—Review input received during the process, specifically the public survey results included
in your toolkit.
• Prior Mitigation Planning Efforts—If your jurisdiction participated in a previous hazard mitigation
plan, please be sure to remember to include any actions that were identified as “carry over” actions. Once
you have carried them over, return to the Status of Previous Actions table and record the new action
number (see discussion below).
Be sure to consider the following factors in your selection of actions:
• Select actions that are consistent with the overall purpose, goals, and objectives of the hazard mitigation
plan.
• Identify actions where benefits exceed costs.
• Include any action that your jurisdiction has committed to pursuing regardless of grant eligibility.
• Know what is and is not grant-eligible under the Hazard Mitigation Grant Program (HMGP), Pre-Disaster
Mitigation (PDM) and Flood Mitigation Assistance (FMA) grants (see fact sheet provided in toolkit). If
you have actions that are not HMGP, PDM or FMA grant eligible, but do mitigate part or all of the hazard
and may be eligible for other grant programs sponsored by other agencies, include them in this section.
• You must identify at least one true mitigation action (i.e. not a preparedness or response action)
that is clearly defined and actionable for hazards ranked as “high” or medium.”
Review Actions Recommended for All Partners
Three actions have been prepopulated in your annex template. These actions should be included in every annex
and should not be removed, although the specifics should be adjusted as needed for the particulars of each
community.
• Where appropriate, support retro-fitting, purchase or relocation of structures located in high hazard areas,
prioritizing those structures that have experienced repetitive losses and/or are located in high or medium
ranked hazard areas.
• Actively participate in the plan maintenance protocols outlined in Volume I of the hazard mitigation plan.
• Integrate the hazard mitigation plan into other plans, ordinances and programs within the community.
We also recommend that every planning partner strongly consider the following additional actions, adjusted as
needed for the particulars of each community:
• Develop and implement a program to capture perishable data after significant events (e.g. high water
marks, preliminary damage estimates, damage photos) to support future mitigation efforts including the
implementation and maintenance of the hazard mitigation plan.
• Develop a post-disaster recovery plan and a debris management plan.
• Develop and/or update plans that support or enhance continuity of operations following disasters.
• Purchase generators for critical facilities and infrastructure that lack adequate back-up power.
Harris County HMP Instructions for Completing Special Purpose District Annex Template
14
Complete the Table
Complete the table titled “Hazard Mitigation Action Plan Matrix” for all the actions you have identified and
would like to include in the plan:
• Enter the action number and description. Replace the “xxx” included in the template with the letter code
for your jurisdiction as follows:
Cypress Fairbanks Independent School District—CYF1,
CYF2, CYF3…
Harris County Emergency Service District No. 12—ESD1,
ESD2, ESD3…
Harris County Flood Control District—FCD1, FCD2, FCD2…
Harris Health System—HHS1, HHS2, HHS3…
Houston Community College—HCC1, HCC2, HCC3…
Houston Independent School District—HOU1, HOU2, HOU3…
Huffman Independent School District—HUF1,
HUF2, HUF2…
Lone Star College—LSC1, LSC2, LSC3…
Pasadena Independent School District—PSD1,
PSD2, PSD3…
Texas Medical Center—TMC1, TMC2, TMC3…
Texas Southern University—TSU1, TSU2, TSU3…
University of Houston—UOH1, UOH2, UOH3…
• If the action is carried over from your previous hazard mitigation plan, return to the “Status of Previous
Plan Actions” table you completed in Phase 1 and enter the new action number in the column labeled
Action # in Update.
• Indicate whether the action mitigates hazards for new and/or existing assets.
• Identify the specific hazards the action will mitigate.
• Identify by number the mitigation plan objectives that the action addresses (see toolkit).
• Indicate who will be the lead in administering the action. This will most likely be a department within
your jurisdiction (e.g. planning or public works). If you wish to indicate more than one department, please
ensure that it is clear who the lead agency will be and list supporting agencies in the appropriate column.
• Enter an estimated cost in dollars if known; otherwise, enter “High,” “Medium” or “Low” as determined
for the prioritization process described in the following section.
• Identify funding sources for the action. If it is a grant, include the funding sources for the cost share.
Refer to your fiscal capability assessment to identify possible sources of funding and refer to the table
below for project eligibility for FEMA’s hazard mitigation assistance grant program.
• Indicate the time line as “short-term” (1 to 5 years) or “long-term” (5 years or greater) or ongoing (a
continual program)
Eligible Activities
Hazard Mitigation
Grant Program
Pre-Disaster
Mitigation
Flood Mitigation
Assistance
Property Acquisition and Structure Demolition √ √ √
Property Acquisition and Structure Relocation √ √ √
Structure Elevation √ √ √
Mitigation Reconstruction √ √ √
Dry Floodproofing of Historic Residential Structures √ √ √
Dry Floodproofing of Non-residential Structures √ √ √
Generators √ √
Localized Flood Risk Reduction Projects √ √ √
Non-Localized Flood Risk Reduction Projects √ √
Structural Retrofitting of Existing Buildings √ √ √
Non-Structural Retrofitting of Existing Buildings and Facilities √ √ √
Safe Room Construction √ √
Wind Retrofit for One- and Two-Family Residences √ √
Infrastructure Retrofit √ √ √
Harris County HMP Instructions for Completing Special Purpose District Annex Template
15
Eligible Activities
Hazard Mitigation
Grant Program
Pre-Disaster
Mitigation
Flood Mitigation
Assistance
Soil Stabilization √ √ √
Wildland fire Mitigation √ √
Post-Disaster Code Enforcement √
Advance Assistance √
5 Percent Initiative Projects* √
Aquifer and Storage Recovery** √ √ √
Flood Diversion and Storage** √ √ √
Floodplain and Stream Restoration** √ √ √
Green Infrastructure** √ √ √
Miscellaneous/Other** √ √ √
Hazard Mitigation Planning √ √ √
Technical Assistance √
Management Costs √ √ √
* FEMA allows increasing the 5% Initiative amount up to 10% for a Presidential major disaster declaration under HMGP.
The additional 5% can be used for activities that promote disaster-resistant codes for all hazards. As a condition of the
award, a disaster-resistant building code must be adopted or an improved Building Code Effectiveness Grading Schedule
is required.
** Proposed actions will be evaluated against program requirements. Eligible projects will be approved if funding is available.
Prioritization of Mitigation Actions
Complete the information in the table titled “Mitigation Strategy Priority Schedule” as follows:
• Action #—Indicate the action number from the previous annex table (Hazard Mitigation Action Plan
Matrix).
• # of Objectives Met—Enter the number of objectives the action will meet.
• Benefits—Enter “High,” “Medium” or “Low” as follows:
High: Action will have an immediate impact on the reduction of risk exposure to life and property.
Medium: Action will have a long-term impact on the reduction of risk exposure to life and property,
or action will provide an immediate reduction in the risk exposure to property.
Low: Long-term benefits of the action are difficult to quantify in the short term.
• Costs—Enter “High,” “Medium” or “Low” as follows:
High: Would require an increase in revenue via an alternative source (i.e., bonds, grants, fee
increases) to implement. Existing funding levels are not adequate to cover the costs of the proposed
action.
Medium: Could budget for under existing work-plan, but would require a reapportionment of the
budget or a budget amendment, or the cost of the action would have to be spread over multiple years.
Low: Possible to fund under existing budget. Action is or can be part of an existing ongoing program.
If you know the estimated cost of a action because it is part of an existing, ongoing program, indicate the
amount.
• Do Benefits Exceed the Cost?—Enter “Yes” or “No.” This is a qualitative assessment. Enter “Yes” if the
benefit rating (high, medium or low) is the same as or higher than the cost rating (high benefit/high cost;
high benefit/medium cost; medium benefit/low cost; etc.). Enter “No” if the benefit rating is lower than
the cost rating (medium benefit/high cost, low benefit/medium cost; etc.)
Harris County HMP Instructions for Completing Special Purpose District Annex Template
16
• Is the Action Grant-Eligible?—Enter “Yes” or “No.” Refer to the fact sheet on HMGP, PDM and FMA.
• Can Action Be Funded Under Existing Program Budgets?—Enter “Yes” or “No.” In other words, is
this action currently budgeted for, or would it require a new budget authorization or funding from another
source such as grants?
• Implementation Priority— Enter “High,” “Medium” or “Low” as follows:
High Priority—An action that meets multiple objectives, has benefits that exceed costs, and has a
secured source of funding. Action can be completed in the short term (1 to 5 years).
Medium Priority—An action that meets multiple objectives, has benefits that exceed costs, and is
eligible for funding though no funding has yet been secured for it. Action can be completed in the
short term (1 to 5 years), once funding is secured. Medium-priority actions become high-priority
actions once funding is secured.
Low Priority—An action that will mitigate the risk of a hazard, has benefits that do not exceed the
costs or are difficult to quantify, has no secured source of funding, and is not eligible for any known
grant funding. Action can be completed in the long term (1 to 10 years). Low-priority actions are
generally “wish-list” actions. They may be eligible for grant funding from programs that have not yet
been identified.
• Grant Pursuit Priority— Enter “High,” “Medium” or “Low” as follows:
High Priority—An action that meets identified grant eligibility requirements, has high benefits, and
is listed as high or medium implementation priority; local funding options are unavailable or available
local funds could be used instead for actions that are not eligible for grant funding.
Medium Priority—An action that meets identified grant eligibility requirements, has medium or low
benefits, and is listed as medium or low implementation priority; local funding options are
unavailable.
Low Priority—An action that has not been identified as meeting any grant eligibility requirements.
This prioritization is a simple way to determine that your identified actions meet one of the primary objectives of
the Disaster Mitigation Act. It is not the detailed benefit/cost analysis required for HMGP/PDM /FMA action
grants. The prioritization will identify any actions whose probable benefits will not exceed the probable costs.
Those actions identified as high-priority grant funding actions should be closely reviewed for consideration when
grant funding opportunities arise.
Note: If a jurisdiction wishes to identify an action as high priority that is outside of the prioritization scheme for
high priorities. A note indicting so should be inserted and a rationale should be provided.
An example completed table is provided below.
Table 1-9. Mitigation Strategy Priority Schedule
Action
#
# of
Objectives
Met Benefits Costs
Do Benefits
Equal or
Exceed
Costs?
Is Action
Grant-
Eligible?
Can Action Be
Funded Under
Existing
Programs/
Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
EX-1 3 High High Yes Yes No Medium High
EX-2 7 Medium Low Yes No Yes High Low
EX-3 2 Low Medium No No Maybe Low Low
EX-4 10 Low Low Yes No Yes High Low
EX-5 6 Medium Low Yes No Yes High Low
Harris County HMP Instructions for Completing Special Purpose District Annex Template
17
Analysis of Mitigation Actions
Complete the table titled “Analysis of Mitigation Actions” summarizing the mitigation actions by hazard of
concern and the following eight mitigation types. Please note that an action can be more than one mitigation type:
• Prevention—Government, administrative or regulatory actions that influence the way land and buildings
are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital
improvement programs, open space preservation, and stormwater management regulations.
• Property Protection—Modification of buildings or structures to protect them from a hazard or removal
of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm
shutters, and shatter-resistant glass.
• Public Education and Awareness—Actions to inform residents and elected officials about hazards and
ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and
school-age and adult education.
• Natural Resource Protection—Actions that minimize hazard loss and preserve or restore the functions
of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed
management, forest and vegetation management, wetland restoration and preservation, and green
infrastructure.
• Emergency Services—Actions that protect people and property during and immediately after a hazard
event. Includes warning systems, emergency response services, and the protection of essential facilities.
• Structural Projects—Actions that involve the construction of structures to reduce the impact of a hazard.
Includes dams, setback levees, floodwalls, retaining walls, and safe rooms.
• Climate Resilient—Actions that incorporate methods to mitigate and/or adapt to the impacts of climate
change. Includes aquifer storage and recovery activities, incorporating future conditions projections in
project design or planning, or actions that specifically address jurisdiction-specific climate change risks,
such as sea level rise or urban heat island effect.
• Community Capacity Building—Actions that increase or enhance local capabilities to adjust to
potential damage, to take advantage of opportunities, or to respond to consequences. Includes staff
training, memorandums of understanding, development of plans and studies, and monitoring programs.
This exercise demonstrates that the jurisdiction has selected a comprehensive range of actions. Planning partners
should aim to identify at least one action in each category (although this is not required) and should make sure
there is at least one action to address “high” and “medium” ranked hazards.
Please see the example below based off the recommended actions, but please note that these recommendations are
heavy on generalized actions on the prevention spectrum and light in other areas and specificity.
Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Type
Hazard Type Prevention
Property
Protection
Public
Education and
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilient
Community
Capacity
Building
Dam Failure EX-2, 3, 4, 5 EX-1, 6 EX-4, 6 EX-8, 11 EX-3, 9, 10
Drought EX-2 EX-1 EX-4 EX-8, 9, 10
Earthquake EX-2, 3, 4, 5 EX-1, 7 EX-4 EX-8, 11 EX-3, 4, 8, 9
Flooding EX-2, 3, 4, 5 EX-1, 6, 7 EX-4, 6 EX-9 EX-8, 11 EX-4 EX-1, 7 EX-3, 4, 8, 9
Landslide EX-2, 3, 4, 5 EX-1, 7 EX-4 EX-8, 11 EX-4 EX-3, 4, 10
Severe Weather EX-2, 3, 4, 5 EX-1, 7, 9 EX-4 EX-8, 9, 11 EX-8, 9, 10
Wildland fire EX-2, 3, 4, 5 EX-1, 7, 9 EX-4, 9 EX-9 EX-8, 11 EX-1, 7, 9 EX-3, 9, 10
Harris County HMP Instructions for Completing Special Purpose District Annex Template
18
REVIEW AND INCORPORATION OF INFORMATION FOR THIS ANNEX
Please note that this section will ultimately describe all information sources used to develop this annex. You
should have previously listed the sources used for Phases 1 and 2. You should now add any further sources
used for the preparation of Phase 3.
This section should describe what resources you used to complete the annex and how you used them. Several
items are started for you, but please be sure to update and enhance any descriptions. This may seem trivial or
unimportant, but it is a requirement to pass the state and FEMA review process.
FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY
In this section, identify any future studies, analyses, reports, or surveys your jurisdiction needs to better
understand its vulnerability to identified or currently unidentified risks. These could be needs based on federal or
state agency mandates. Please note that this section is optional.
ADDITIONAL COMMENTS
Use this section to add any additional information pertinent to hazard mitigation and your jurisdiction not covered
in this template. Please note that this section is optional.
Harris County HMP Instructions for Completing Special Purpose District Annex Template
19
NEXT STEPS
After all jurisdictions have submitted their annexes, the draft plan will be submitted for public comment.
Following the public comment period and any revisions responsive to public comment, the plan will be submitted
to the California Governor’s Office of Emergency Services (Cal OES) for review. After their review and
approval, Cal OES will submit the plan to FEMA Region IX for plan review and approval. At that point planning
partners will be asked to begin making preparations to formally adopt the plan. Each participating planning
partner must have the governing board of their jurisdiction adopt via resolution or ordinance. Once FEMA has
reviewed the plan and issued an approved pending adoption (APA) notice, planning partners will be asked to go
forth and adopt the plan. Once adopted, planning partners will submit adoption information to Tetra Tech, who
will submit the proof of adoption to FEMA. Once such adoption has been received, FEMA will issue final
approval via a letter for those planning partners who have adopted the plan. It is very important to understand that
approval is not final until proof of adoption has been received by FEMA and they have issued a letter specifically
naming your jurisdiction. More information on the review and approval process, along with adoption support
materials, will be provided at a later date.
1-1
1. DISTRICT NAME
1.1 HAZARD MITIGATION PLAN POINT OF CONTACT
Primary Point of Contact Alternate Point of Contact
Name, Title
Street Address
City, State ZIP
Telephone: xxx-xxx-xxxx
e-mail Address: xxx@xxx.xxx
Name, Title
Street Address
City, State ZIP
Telephone: xxx-xxx-xxxx
e-mail Address: xxx@xxx.xxx
1.2 JURISDICTION PROFILE
1.2.1 Overview
Insert Narrative Profile Information, per Instructions.
The __[name of adopting body]___ assumes responsibility for the adoption of this plan; __[name of oversight
agency]__ will oversee its implementation. Development of this annex was carried out by the members of the
local mitigation planning team, whose members are listed in Table 1-1.
Table 1-1. Local Mitigation Planning Team Members
Name Title
All fire districts should include the following sentence (non-fire special purpose districts may delete the sentence):
The District participates/does not participate in the Public Protection Class Rating System and currently has a
rating of #.
1.2.2 Service Area and Trends
The district service area covers ___[area in square miles]___, serving a population of _ population_.
Insert summary description of service trends.
1.2.3 Assets
Table 1-2 summarizes the critical assets of the district and their value.
Report Title District Name
1-2
Table 1-2. Special Purpose District Assets
Asset Value
Property
_number_ acres of land $_value_
Equipment
_description_ $_value_
_description_ $_value_
_description_ $_value_
_description_ $_value_
_description_ $_value_
Total: $_value_
Critical Facilities and Infrastructure
_description – Include Address_ $_value_
_description – Include Address_ $_value_
_description – Include Address_ $_value_
_description – Include Address_ $_value_
_description – Include Address_ $_value_
_description – Include Address_ $_value_
Total: $_value_
1.3 CAPABILITY ASSESSMENT
An assessment of the district’s current capabilities was conducted to identify opportunities to expand, initiate or
integrate capabilities in order to further hazard mitigation goals and objectives. Where such opportunities were
identified and determined to be feasible, they are included in the action plan. The “Analysis of Mitigation
Actions” table in Section 1.9 identifies these as community capacity building mitigation actions.
1.3.1 Planning and Regulatory Capabilities
Jurisdictions develop plans and programs and implement rules and regulations to protect and serve residents.
When effectively prepared and administered, these plans, programs and regulations can support the
implementation of mitigation actions. Table 1-3 summarizes existing codes, ordinances, policies, programs or
plans that are applicable to this hazard mitigation plan.
Table 1-3. Planning and Regulatory Capability
Date of Most
Recent Update Comment
Name of code, ordinance, policy, program or plan _____ _____
Name of code, ordinance, policy, program or plan _____ _____
Name of code, ordinance, policy, program or plan _____ _____
Name of code, ordinance, policy, program or plan _____ _____
Name of code, ordinance, policy, program or plan _____ _____
1.3.2 Fiscal, Administrative and Technical Capabilities
Fiscal capability is an indicator of a jurisdiction’s ability to fulfill the financial needs associated with hazard
mitigation projects. An assessment of fiscal capabilities is presented in Table 1-4. Administrative and technical
Report Title District Name
1-3
capabilities represent a jurisdiction’s staffing resources for carrying out the mitigation strategy. An assessment of
administrative and technical capabilities is presented in Table 1-5.
Table 1-4. Fiscal Capability
Financial Resource Accessible or Eligible to Use?
Capital Improvements Project Funding Yes/No
Authority to Levy Taxes for Specific Purposes Yes/No
User Fees for Water, Sewer, Gas or Electric Service Yes/No
Incur Debt through General Obligation Bonds Yes/No
Incur Debt through Special Tax Bonds Yes/No
Incur Debt through Private Activity Bonds Yes/No
State-Sponsored Grant Programs Yes/No
Development Impact Fees for Homebuyers or Developers Yes/No
Federal Grant Programs Yes/No
Other Yes/No (if yes, please specify)
Table 1-5. Administrative and Technical Capability
Staff/Personnel Resource Available? Department/Agency/Position
Planners or engineers with knowledge of land development and land management practices Yes/No Insert appropriate information
Engineers or professionals trained in building or infrastructure
construction practices
Yes/No Insert appropriate information
Planners or engineers with an understanding of natural hazards Yes/No Insert appropriate information
Staff with training in benefit/cost analysis Yes/No Insert appropriate information
Surveyors Yes/No Insert appropriate information
Personnel skilled or trained in GIS applications Yes/No Insert appropriate information
Scientist familiar with natural hazards in local area Yes/No Insert appropriate information
Emergency manager Yes/No Insert appropriate information
Grant writers Yes/No Insert appropriate information
Other Yes/No Insert appropriate information
1.3.3 Education and Outreach Capabilities
Outreach and education capability identifies the connection between government and community members, which
opens a dialogue needed for a more resilient community. An assessment of education and outreach capabilities is
presented in Table 1-6.
Table 1-6. Education and Outreach
Criterion Response
Do you have a public information officer or communications office? Yes/No
Do you have personnel skilled or trained in website development? Yes/No
Do you have hazard mitigation information available on your website? Yes/No
• If yes, please briefly describe Insert appropriate information
Do you use social media for hazard mitigation education and outreach? Yes/No
• If yes, please briefly describe Insert appropriate information
Report Title District Name
1-4
Criterion Response
Do you have any citizen boards or commissions that address issues related to hazard mitigation? Yes/No
• If yes, please briefly specify Insert appropriate information
Do you have any other programs already in place that could be used to communicate hazard-related information? Yes/No
• If yes, please briefly describe Insert appropriate information
Do you have any established warning systems for hazard events? Yes/No
• If yes, please briefly describe Insert appropriate information
1.3.4 Adaptive Capacity for Climate Change
Given the uncertainties associated with how hazard risk may change with a changing climate, a jurisdiction’s
ability to track such changes and adapt as needed is an important component of the mitigation strategy. Table 1-7
summarizes the jurisdiction’s adaptive capacity for climate change.
Table 1-7. Adaptive Capacity for Climate Change
Criterion Jurisdiction Ratinga
Technical Capacity
Jurisdiction-level understanding of potential climate change impacts High/Medium/Low
Comment:
Jurisdiction-level monitoring of climate change impacts High/Medium/Low
Comment:
Technical resources to assess proposed strategies for feasibility and externalities High/Medium/Low
Comment:
Jurisdiction-level capacity for development of greenhouse gas emissions inventory High/Medium/Low
Comment:
Capital planning and land use decisions informed by potential climate impacts High/Medium/Low
Comment:
Participation in regional groups addressing climate risks High/Medium/Low
Comment:
Implementation Capacity
Clear authority/mandate to consider climate change impacts during public decision-making processes High/Medium/Low
Comment:
Identified strategies for greenhouse gas mitigation efforts High/Medium/Low
Comment:
Identified strategies for adaptation to impacts High/Medium/Low
Comment:
Champions for climate action in local government departments High/Medium/Low
Comment:
Political support for implementing climate change adaptation strategies High/Medium/Low
Comment:
Financial resources devoted to climate change adaptation High/Medium/Low
Comment:
Local authority over sectors likely to be negative impacted High/Medium/Low
Comment:
Report Title District Name
1-5
Criterion Jurisdiction Ratinga
Public Capacity
Local residents knowledge of and understanding of climate risk High/Medium/Low
Comment:
Local residents support of adaptation efforts High/Medium/Low
Comment:
Local residents’ capacity to adapt to climate impacts High/Medium/Low
Comment:
Local economy current capacity to adapt to climate impacts High/Medium/Low
Comment:
Local ecosystems capacity to adapt to climate impacts High/Medium/Low
Comment:
a. High = Capacity exists and is in use; Medium = Capacity may exist, but is not used or could use some improvement;
Low = Capacity does not exist or could use substantial improvement; Unsure= Not enough information is known to assign a rating.
1.4 INTEGRATION WITH OTHER PLANNING INITIATIVES
The information on hazards, risk, vulnerability and mitigation contained in this hazard mitigation plan is based on
the best available data. Plan integration is the incorporation of this information into other relevant planning
mechanisms, such as general planning and capital facilities planning. It includes the integration of natural hazard
information and mitigation policies, principles and actions into local planning mechanisms and vice versa.
Additionally, plan integration is achieved though the involvement of key staff and community officials in
collaboratively planning for hazard mitigation.
1.4.1 Existing Integration
In the performance period since adoption of the previous hazard mitigation plan, ___[district name]___ made
progress on integrating hazard mitigation goals, objectives and actions into other planning initiatives. The
following plans and programs currently integrate components of the hazard mitigation strategy:
• Plan or Program Name—Description
• Plan or Program Name—Description
• Plan or Program Name—Description
• Plan or Program Name—Description
• Plan or Program Name—Description
Resources listed in Section 1.10 were used to provide information on integration of hazard mitigation information
into other jurisdiction plans or programs.
1.4.2 Opportunities for Future Integration
As this hazard mitigation plan is implemented, ___[district name]___ will use information from the plan as the
best available science and data on natural hazards. The capability assessment presented in this annex identifies
codes, plans and programs that provide opportunities for integration. The progress reporting process described in
Volume 1 will outline the progress of area-wide and local hazard mitigation actions related to plan integration.
The annual progress report also will identify new opportunities for integration. The capability assessment
identified the following plans and programs that do not currently integrate goals or recommendations of the
hazard mitigation plan but provide opportunities to do so in the future:
Report Title District Name
1-6
• Plan or Program Name—Description
• Plan or Program Name—Description
• Plan or Program Name—Description
• Plan or Program Name—Description
• Plan or Program Name—Description
1.5 JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY
Table 1-8 lists past occurrences of natural hazards for which specific damage was recorded in ___[district
name]___. Other hazard events that broadly affected the entire planning area, including ___[district name]___,
are listed in the risk assessments in Volume 1 of this hazard mitigation plan.
Table 1-8. Natural Hazard Events
Type of Event FEMA Disaster # Date Damage Assessment
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
Insert event type _______ Date $______
1.6 HAZARD RISK RANKING
Table 1-9 presents a local ranking for ___[district name]___ of all hazards of concern for which this hazard
mitigation plan provides complete risk assessments. This ranking summarizes how hazards vary for this
jurisdiction. As described in detail in Volume 1, the ranking process involves an assessment of the likelihood of
occurrence for each hazard, along with its potential impacts on people, property and the economy. Mitigation
actions target hazards with high and medium rankings.
Table 1-9. Hazard Risk Ranking
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
1 _______ _______ High/Medium/Low
2 _______ _______ High/Medium/Low
3 _______ _______ High/Medium/Low
4 _______ _______ High/Medium/Low
5 _______ _______ High/Medium/Low
6 _______ _______ High/Medium/Low
7 _______ _______ High/Medium/Low
Report Title District Name
1-7
Rank Hazard Type Risk Rating Score (Probability x Impact) Category
8 _______ _______ High/Medium/Low
9 _______ _______ High/Medium/Low
NOTE: The process used to assign risk ratings and rankings for each hazard is described in Volume 1 of this hazard mitigation plan.
1.7 JURISDICTION-SPECIFIC VULNERABILITIES
Volume 1 of this hazard mitigation plan provides complete risk assessments for each identified hazard of concern.
The following jurisdiction-specific issues have been identified based on a review of the results of the risk
assessment, public involvement strategy, and other available resources:
• Insert as appropriate.
• Insert as appropriate.
• Insert as appropriate.
Mitigation actions addressing these issues were prioritized for consideration in the action plan presented in
Section 1.9.
1.8 STATUS OF PREVIOUS PLAN ACTIONS
Table 1-10 summarizes the actions that were recommended in the previous version of the hazard mitigation plan
and their implementation status at the time this update was prepared.
Table 1-10. Status of Previous Plan Actions
Removed;
Carried Over to
Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action #
in Update
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
Report Title District Name
1-8
Removed;
Carried Over to
Plan Update
Action Item from Previous Plan Completed
No Longer
Feasible
Check if
Yes
Action #
in Update
Insert Action Number & Text
Comment:
Insert Action Number & Text
Comment:
1.9 HAZARD MITIGATION ACTION PLAN AND EVALUATION OF
RECOMMENDED ACTIONS
Table 1-11 lists the actions that make up the hazard mitigation action plan for this jurisdiction. Table 1-12
identifies the priority for each action. Table 1-13 summarizes the mitigation actions by hazard of concern and
mitigation type.
Table 1-11. Hazard Mitigation Action Plan Matrix
Applies to New or
Existing Assets Objectives Met Lead Agency Support Agency
Estimated
Cost Sources of Funding Timelinea
Action xxx1—Where appropriate, support retrofitting, purchase or relocation of structures located in hazard areas, prioritizing those that
have experienced repetitive losses and/or are located in high- or medium-risk hazard areas.
Hazards Mitigated: Earthquake, flooding, landslide, tsunami, wildfire
Existing 3, 4, 10 TBD TBD High HMGP, PDM, FMA Short-term
Action xxx2—Actively participate in the plan maintenance protocols outlined in Volume 1 of this hazard mitigation plan.
Hazards Mitigated: All hazards
New and Existing 1, 5, 8 TBD TBD Low Staff Time, General Funds Short-term
Action xxx3— Integrate the hazard mitigation plan into other plans, ordinances and programs within the community,
Hazards Mitigated: Dam failure, earthquake, flooding, landslide, severe weather, tsunami, wildfire
Existing 2, 6, 9 TBD TBD
Action xxx4—Description
Hazards Mitigated: TBD
Action xxx5—Description
Hazards Mitigated: TBD
Action xxx6—Description
Hazards Mitigated: TBD
Action xxx7—Description
Hazards Mitigated: TBD
Action xxx8—Description
Hazards Mitigated: TBD
Action xxx9—Description
Hazards Mitigated: TBD
Report Title District Name
1-9
a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
no completion date
See the introduction to this volume for list of acronyms used here.
Table 1-12. Mitigation Action Priority
Action
#
# of
Objectives
Met Benefits Costs
Do Benefits
Equal or
Exceed
Costs?
Is Project
Grant-
Eligible?
Can Project
Be Funded
Under Existing
Programs/
Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
xxx1 3 High High Yes Yes No Medium High
xxx2 3 Low Low Yes No Yes High Low
xxx3 3 High Medium Yes Yes No Medium High
a. See the introduction to this volume for explanation of priorities.
Table 1-13. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public
Education and
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilient
Community
Capacity
Building
High-Risk Hazards
____________
____________
____________
Medium-Risk Hazards
____________
____________
____________
Low-Risk Hazards
____________
Report Title District Name
1-10
Action Addressing Hazard, by Mitigation Typea
Hazard Type Prevention
Property
Protection
Public
Education and
Awareness
Natural
Resource
Protection
Emergency
Services
Structural
Projects
Climate
Resilient
Community
Capacity
Building
____________
____________
a. See the introduction to this volume for explanation of mitigation types.
1.10 REVIEW AND INCORPORATION OF RESOURCES FOR THIS ANNEX
The following technical reports, plans, and regulatory mechanisms were reviewed to provide information for this
annex.
• <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED>
• <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED>
• <INSERT PLAN/PROGRAM AND DESCRIPTION OF HOW IT WAS USED>
The following outside resources and references were reviewed:
• Hazard Mitigation Plan Annex Development Toolkit—The toolkit was used to support the
identification of past hazard events and noted vulnerabilities, the risk ranking, and the development of the
mitigation action plan.
• <INSERT DOCUMENT AND DESCRIPTION OF HOW IT WAS USED>
1.11 FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY
Insert text, if any; otherwise, delete section
1.12 ADDITIONAL COMMENTS
Insert text, if any; otherwise, delete section