HomeMy WebLinkAboutResolution No. 98-38 RESOLUTION NO. R98=38
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FRIENDSWOOD,
GALVESTON/HARRIS COUNTIES, TEXAS, AUTHORIZING APPLICATION
FOR FUNDING FOR A PRELIMINARY ENGINEERING STUDY AND AN
ENVIRONMENTAL ANALYSIS FOR BRITTANY BAY BOULEVARD BETWEEN
F.M. 528 AND F.M. 2351, THROUGH THE TEXAS DEPARTMENT OF
TRANSPORTATION 2000-2005 IMPROVEMENT PROGRAM (TIP).
* * * * *
WHEREAS, the City of Friendswood desires to apply to the Texas Department of
Transportation for a grant to fund the Preliminary Engineering and Environmental Analysis for the
street project through the Department's 2000-2005 Transportation Improvement Program (TIP);
and
WHEREAS,the studies are forthe construction of a new majorthoroughfare between F.M.
528 and F.M. 2351 with a total cost estimated of$144,000 for the Preliminary Engineering and
Environmental Analysis, with a local matching share of$28,800; and
WHEREAS, the City of Friendswood intends to include this project in future planning and
budgetary processes; now therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FRIENDSWOOD, TEXAS:
Section 1. The Mayor is hereby authorized and directed, for and on behalf of the City,
to make application to the Texas Department of Transportation for funding for the above-described
studies, through the Department's 2000-2005 Transportation Improvement Program.
PASSED, APPROVED AND RESOLVED this the �� day of ��r 1998.
Mayor Harold L. Whitaker
City of Friendswood
ATTEST:
. '�
.
Deloris McKenzie, T MC
City Secretary
ATTACHMENT II
Certification of Funding Commitment
(Resolution R98-38 attached)
. , � .., .
RESOLUTION NO. R98
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FRIENDSWOOD,
GALVESTON/HARRIS COUNTIES, TEXAS, AUTHORIZING APPLICATION
FOR FUNDING FOR A PRELIMINARY ENGINEERING STUDY AND AN
ENVIRONMENTAL ANALYSIS FOR BRITTANY BAY BOULEVARD BETWEEN
F.M. 528 AND F.M. 2351, THROUGH THE TEXAS DEPARTMENT OF
TRANSPORTATION 2000-2005 IMPROVEMENT PROGRAM (TIP).
* * * * *
WHEREAS, the City of Friendswood desires to apply to the Texas Department of
Transportation for a grant to fund the Preliminary Engineering and Environmental Analysis for the
street project through the Department's 2000-2005 Transportation Improvement Program (TIP);
and
WHEREAS,the studies are for the construction of a new majorthoroughfare between F.M.
528 and F.M. 2351 with a total cost estimated of$144,000 for the Preliminary Engineering and
Environmental Analysis, with a local matching share of$28,800; and
WHEREAS, the City of Friendswood intends to include this project in future planning and
budgetary processes; now therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CtTY OF FRIENDSWOOD, TEXAS:
Section 1. The Mayor is hereby authorized and directed, for and on behalf of the City,
to make application to the Texas Department of Transportation for funding for the above-described
studies, through the Department's 2000-2005 Transportation Improvement Program.
PASSED, APPROVED AND RESOLVED this the day of . 1998.
Mayor Harold l.. Whitaker
City of Friendswood
ATTEST:
Deloris McKenzie, TRMC
City Secretary
d y,�
' Z t
� � �
yr, 4 �4
-... a
eo '�p N �
� � �
�
t�+l
N
� m
Q
r
1 �^"'
W W
d �
� � J
N 'W �,, 1 iD
J � {`
O � 1
K
d �
1
p- W
1 � _
� � N �,�� � z
< ��} W o
I —
"' � N�} W �
" � F �t "'° O
� W � ���� �
� �, ,,� N
O ' Q � YXb �
� , O .= �x� � �
� °��o 0 3
Zauz ; 0
� w��� mr „Q
� � ���� �� 0
� » Z � �o�Z ?� �
N = .. u v' � u d G,� n�' 1�l
W.�+ ° �' ' � �g'Z z . o J
y .� ,p � mJ NWGj�j 1�' m
�.i t� OO � a��d �m '�
N 7 W
6 � a �� �5 � �
� ��� �
� $ ; zsw �g�T,� �� ,�
�� ���� �� J s
� �"� �� p W W m W� a N . _.
,..mo� � V a
1 ''� ZLrQSp r � r
4 { <o <d� riw a.
r r � N�a • r O
�:a
i " 1 t-- -
Q ! J W N
W � � �
�a ' � z
o� 1 �
o , �
W
N
7
N � (9
'�1 4
L.. 1 V�
� � � i
N � n � �
W 1 �
J
O �
� ' �
� J
•�1
Z X
<
S2
� �r
\1 ��,,,,�
m�„� �.,,..r
��
-` ,...�-,,,...---"__. .
.....----°'°""...+"'
��
.... �....w�.""
..---'
.�„aM" �—�,
. �� '\/J ��I
Y
�\,� , �
�� � �`J
I v„/_
Y �' \�
1
a� i, \�
3
d 4, � �\
u ��
��" t��„ �✓=
� � o
'N � $ y� �^�
� LL � � ��
�',�I y� `�W W uW. %
�"e� a j �%
� � ��
�
�i �/ �
/
. �
y� �
2O � �b
�j W � \ i% ''o�� 3a t
/ ac �� 3
Q� \ /�
k,
� N
� 4'� S
/ s
/
a� ,����
b // r >�
d 1
/ y S
y � / ` �/� � �
'`� $' / �� t� cg� `�
� � %�T��` �7��' _
� . i � ���
3.� �f _ � ��.� �-- - - - - - - - - - - -
s��� %-- - - - - — - -
�-"�
Z
�
'�L .
Z
�
Q
�
1-- z
z w w
�' � i o
a �
� a m
�
0
r
u�
w
�
� Q a°c
. o°c � 4-
a.
.�--
.�-��
,�-
�-
__— .•►
� 2000-2005 TIP PROJECT READINESS 5
C. Cost Estimates - Because of increases in materials costs and to more fu(ly anticipate
entire project costs, we request that you provide a(I components of project costs, where
applicable, as indicated in th� following table. in addition, if you wish to seek federal
assistance for any of these components, please provide the level of assistance sought.
Federa) funds may only be sought for future expenditures and not on "sunk" costs.
Local matchin� funds must support at least 20% of eti�ible proiect costs. No more
than 80% of the cost for a proiect- component will be funded throuQh federal
fundinQ assistance. Also see Part [, Section A of this attachment for project
commitment and local match details.
Please be advised that in past T�s, projects have been selected conventionally according
to a methodology based on estimated benefits and on the federal portion of the project
cost. Projects may be made more "competitive" by minimizing the amount of federal
reimbursement sought, although most sponsors in the past have sought 80% of project
construction costs.
Federal Assistance
Project Component Cost Sought
(as % of Com onent Cost)
Prefiminar En ineerin 85�
Environmental Anal sis 59k
Ri ht-of-Wa
Utilit Relocation
Construction , 2 M
Other Road*
Vehicle Purchase/L,ease(Transit)
Maintenance/O eration(Transit)
Feasibilit Stud /Plannin
Marketin
Other(S eci : final desiQn ) 190k 80.07
Other(S ecr �: )
TOTAL 4.4�2M
Indicate Month/Year of Cost Cstimate Calcu(ation 6/1997
*OTHER ROAD INCLUDES: Final Engineering; Signing & Striping, Bridge/Connectors,
Mobilization, Traffic Management, TxDOT Review/Construction Engineering and
Contingency. Please note that if federal assistance is being requested for TxDOT
Review/Construction Engineering and Contingency, cost estimates must be provided. TxDO"C
Review/Construction Engineering and Contingency Cost = Approximately 20% of Total Project
Cost.
^I�:\dc��t\ti�\OOti�\ti�� rcadincss clocun�cnt I .cloc
. _ _
„ ,: _ �- ...: - .._, .,_ _. _ _ _ � _
`� 2000-2005`TIP PROJEC'T READINESS 6
D. Environmental Analvses - In the following tabte, indicate if the proposed project wi(i
need any of the following studies or special permits. If the work has already been
completed or obtained, indicate this in the completed column with an X.
Type of Environmental Study or Yes No Completed
� Permit �
Environmentai Assessment (EA) g
Environmental Im act Statement (EIS) x
Co s of En ineers Permit (404) g
Coast Guard Permit x
Historical 106 Process x
Noise Walls and Noise Worksho s g
Endan ered S ecies Section 7 Process R
Is the Pro'ect in a Flood lain? x
Is the Pro'ect in a Section 4F Parkland?
Landfill Site x �
Cate orical Exctusion
Hazardous Material x
Congestion Mitigation Analysis �
(if an added ca acit ro'ect)
Environmental CertiCcation — To be completed by a represen[ative or agent of the
sponsoring agency, who is knowledgeable in the area of environmental compliance, and
who can reasonably guarantee that the environmental information provided here is both
true and correct.
CcrtiCed I3y:
Name: Mickiel G. Hodge, P.E. , R.P.L.S.
Title: Co�unity Development Director
Address: 910 S. Friendswood Dr.
Friendswood, Texas 77546
Signature: � � Datc:
T:\de��t\ti��\OOti��\ti�� readiness document l.doc
' 2000-2005 TIP PROJECT READINESS �
PA�RT III: TRAFFIC DATA
A. Traffic Volume — If applicable and if readily available, please provide the following
Traffic Volume Information.
Current Average Weekday Traftic: N/A (Roadway Nonexistent)
Month/Year Counted: N/A
Source: N/A
Current Average Daily Traffic: N/A
Month/Year Counted:
Source:
Future Average Weekday Traffic: x/A
Year Forecast:
Source:
Future Average Daily Traffic: N/A
Year Forecast:
Source:
T:\dept\tip\OOtip\tip readiness documentl.doc
, . . ,n+. ..w
� 2000-2005 TIP PROJECT READINESS $
B. Intersection Volumes — If applicable and if readily available, please provide the
following Intersection Volume information. If your proposal is a signalization project
affecting numerous intersections, please fill out for each applicable intersection. If
additional intersection tables are necessary, copy as needed and label as
"INTERSECTION ATTACHMENTS".
INTERSECTION 1
Ma'or Street Name: N A Roadwa nonegistent)
Minor Street Name:
Ma'or ADT (Avera e weekda traffic ma be used if hi her):
Minor ADT (Avera e weekda traffic ma be used if hi her):
Intersection S acin :
If a licable, rovide the number of train movements er da :
T e of intersection (See Fi ure I for intersection t es):
INTERSECTION 2
Ma�or Street Name: N/A •
Minor Street Name:
Ma'or ADT (Avera e weekda traffic ma be used if hi her):
Minor ADT (Avera e weekda traffic ma be used if hi her):
Intersection S acin :
If a licable, rovide the number of train movements er da :
T e of intersection (See Fi ure I for intersection t eS):
INTERSECTION 3
Ma�or Street Name: x/A
Minor Street Name:
Ma'or ADT (Avera e weekda traffic ma be used if hi her):
Minor ADT (Avera e weekda traffic ma be used if hi her):
Intersection S acin :
If a licable, rovide the number of train movements er da :
T e of intersection (See Fi ure I for intersection t es):
T:\dePt\tip\OOtip\tip readiness document l.doc
4 2000-2005 TIP PROJECT READINESS 9
C. Transit Proiect Data— If applicable, please provide the foilowing Transit Project Data.
1) Provide Current Totai Ridership (number of one-way trips).
N/A (Roadway Nonexistent)
Average Weekday:
Average Saturday:
Average Sunday:
Total Annual Trips:
2) Provide Future Total Ridership (number of one-way trips). N/A
Average Weekday:
Average Saturday:
Average Sunday:
Total Annual Trips:
3) Provide Hours of Operation (i.e. 6:00 AM— 3:00 PM). N/A
Weekday:
Saturday:
Sunday: ,
Total Hours of Operation:
4) Service Provided Number of Vehicles Vehicle Miles
Weekday N/A
Saturday
Sunday
5) Average Trip Length (linear miles): N/A
T:\dep[\tip\OOtip\tip readiness documentl.doc
, . � ,.�.�,, -
2000-2005 TIP PR03ECT READINESS 10
(Transit Project Data— Continued)
6) Current Fleet Size: N/A
7) Number of Vehicles to be Acquired: N/A
8) Describe the type of Vehicle to be Acquired (i.e. IS passenger van, mini bus,
full size bus-40 ft., etc.): NiA
9) Average Vehicle Occupancy: N/A •
T:\dept\tip\OOtip\tip readiness documentl.doc
=n Y- �_ _- -v - - - - �.�,. - _ - -
� ___ ; ,,..���-_ :,,� - - - _ - _
n i .. , -�S T.
,-�ti 'r� . y � p.. �,.. . t - .
:_ir ..-. '� .-. . "' �3�3�-h i P� �r �.. b? - :. .. .v�` ff �.��Y.^^ _
�...i-..: ��� . r,.�'��c ..'..t. _ _ . . ...... . �.�'F _ ...ZE..,
.� . _ .:�.. ., . :. ,�
... .. . . '
� ' �'° " _. - �.. . . . . �.� _.• . . .. . �� _
�:
� , .. _ � �� �: � -=�r '.:. _ .- ; �� .. - -� � ,- - - _ -:,
-: 2000 2005 TIP PRt�JECT READINESS - : 11
PART IV: CERTIFICATION — To be completed by a representative or agent of the
sponsoring agency, who can reasonably guarantee that the information provided here is both true
and correct. �
Certified By: -
Name: P'lickiel G. Hodge
Title: Co�unity Development Director
Address: 910 S. Friendswood Drive
Friendswood, Tegas 77546
�
Signature: � Date: �! 8