HomeMy WebLinkAboutResolution No. 2017-13 o �
A RESOLITTION ADOPTING A CAPITAL
II��'RO`VEl�E1�T�' PRO�CTS 19�[A1��JAL COl�T'TAIl�Il�TG A
SUMMARY OF ALL PROPOSED PROJECTS TO BE
ACQIJIRED DURING A FIVE YEAR PERIOD, COST
ESTIMATES, METH4D OF FINANCING AND A
RECOMMENDED TIMETABLE FOR CONSTRIJCTING
THE IMPROVEMENTS TO BE UNDERTAKEN IN THE
CITY OF FRIENDSWO�D, TEXAS.
� � � � �
WHEREAS, the City of Friendswood ("City") has determined that there is a need for a
comprehensive financial planning document detailing the City's infrastructure needs, priorities,
method of financing and the costs and tlming of the undertaking for those improvements to be
made within the next five years within the City, and such is required by the Subsection (a) of
Section �.03 of Article VIII of the Charter and provided for in Section 395.014 of the Texas
Local Gover��nent Code; and
WHEREAS, the City of Friendswood has reviewed its existing ordinances and has
determined and desires that this information should be contained in one document that is separate
from the arinual budget sa as to allow for examination in greater detail, simplified modification
to reflect the changing needs of the community at the direction of the Council, and revision and
updating annually; and
WHEREAS, attached hereto is a manual containing a detailed list of infrastructure
needs, priorities, methods of financing and detailed cost estimates programmed for undertaking
over a five year period;
7 9
� � .
Section 1. Pursuant to the Charter of the City, Section 8.03 (a) as amended, the City
Council hereby adopts the attached, Exhibit A, "The Ci of Friendswood FY 2017 to 2021
Capital Improvement Proiects Manual" as an official document of the City and directs that
the information contained and referred to therein shall control and determine the Capital
Improvement Proj ect efforts undertaken by the City until such time as the document is amended
as called for by this resolution and the City Charter.
Section 2. The Director of Public Works is hereby directed to maintain copies of the
"The City of Friendswood FY 2017 to 2021 Capital Improvement Projects Manual" and
related documents and make them available upon request, for a reasonable fee, to any individual
who requests one. The Director is further directed to review and evaluate this data annuall and
y
make recommendations to the Council an�ually for additions and revisions to the lan contained
.
p
ereln. .
PASSED, APPROVED AND�RESOLVED on this lst day of Mav, 2017.
. ��...
: ���
- -����._._�r
� �{ ����._�.�_��_ -
Kevin M. Hollarid
Mayor
ATTEST:
�����•���•
� ��' �,�
• ,�/ ,�
,�i �••°°•p.�1► �►
� � �o �
� ' � �
� � � �� e� •� �
�� "� ,►� �,� �r_ �m �$ � � �`°� �a �
_ �� � � �.�,a'Nw''r�r��-_.1� �:a�..`y` � 1 `b ,�I��__""_� �. . __ ' '-i $
� -�� '
.
� '"=�- � �.�`�`+'��-`.. o
� � _
Melinda Welsh, T�C � ; : �
o • * �+
City Secretary � :P •; �
� � .
. o• ,�
�/
•e ,/o `•. a
� o o r��a• •
♦ �
•e• ���� ♦�♦
•. •
� i .o 0
R2017-13 2
RZO�7-�3
ExhibitA
.
� __ _�o-' , _ �-�_. �.. - :�, -°'�.�
� ��;-*g � g y. � ��� �+(��� , ',
� S' '�k �Ty �;��'d'��� ���� �Y �„ .
� f �.r..1� .a�'. Ya��.e r � y��j .
n�(`'!.' r ; � � ��,,:�. �. .:� . . � .. 'vK4 :.� . -
` '�` ,� "�s L `� �-,� ^r ` rs %
t `. , �..,n„ °�'�.,..,�.� /�i. �..��f -�s
��".,�4. �''�.�F�I�.�=�� +!!�. s...�„1 �� �� ` '.`x� .
I 4.
4 h�_ 'p•� �•f�c'�fi � � /� 91l" '��� p a��,i �. •.�..-
�:. W`! � -��..� `� �.�,.J ; ,�� �..
:'s " �"�y....,,,, .r '`' i ,. �` A � � 1!�„p�,�:�
��*R - �� � # f �± �
.� � -..�.. . ���''m y.�,n��'$-''y� :. { 'E- '�� ���. I� I f .
-.�,s�, � ^�+��r�.'��++' r s''`� -:i 'ar� � .
4 j_k� `} ` ��::.,,�...R�'�;Q�� .`.a.. _ .��3��. � . � . ��.y� . , ,� ,�.
1,y1���t: :' - .. � � ..e..�� t .i. . •1�.��t- �.. -1., �; e
as��i}i'� � ` rin� �� � '�Z `�c� e t " .rr ,n�, j����
t h � - .- - - . M.., �� ,� ,,,,. �R,� i �
`, ��k3` -a .. -"- -`-��-��',}� �"" �� , .y _ y .:'.. ; i .� .� ..r1�t��E..e
...w.R.�. � k� f':x� � { ,7C�'��+ �'�.
f . ��� '�..� ��., � ,�„ k•�•--Y'�,,."'bsy..-� :4�x ,Y, ��- . _. _...__. ___ .
>;� f� �-a. y�" 4 �,;�-�'e��'ctic s'�t.rexw%'��. ^,x�� �. .� .:�'r.+l ..S=' .�t
�, j'^ Y" i`�.b a�'` �:W��-"`�V.—t- "�a.'�.'�.K'�C'_i1Yt.,_„c.,.�}�":�afM`+ly, .� ' :. '� . . .... ` . 1
fr S., f� t,. w.�....,a � d�:T•, y 1 * !
.� �, � `4 ..�f.� ��`pp.: � CyF�T" -Wt.�� ..� f:� Y �.4YkcLCD /�,,�Y�i�l 1
� �4 . "�,��r�♦, � ���� "'���53..1 . j .. � `Ji�` ..�� ^ � :�
� `, �(�t� ; ���� �.}. ����.-.�- � A� � ..`� ���' ��F�����...,,.. ��.e.!
4 :� � �cc i
� `�<�`
,i'k° ���'t.� . .�.ii - � • Q,^."CR.� � . ... ��w F . : ��`;; {�t��+.zX ��� �•�.- �� ���
',`€� w � i� F,�" F rao' �s';` �; .a�, s �a i
.ti+. - 1� . A�s .
n' -:�.;�. 5- 1•:'P°a+r- Y ` . �rr �:., .. �i
: �'� ��';,;,.r� ��' ,r ' �a.�"���`( ' M`� �I
�Y ��� �'NF it ,� 4_ `.0�.1
..����'�..�� _,._.....�.� . > "`� t yt � "`�� � � �x �i
� ; �, .
��� ..' .. ..Y.K..i_....,_.,.�....._..�.. ..t.._o.a4ucSA...:;..... .. 3.._,.�.,..>._,..��.,_....�._J...:.__,tl..a.,.:
.�Gi6rary �o�vnto�vn St�eet�Sca e
p
.
_ _ _
__ _ _ _ . :.__ _.; �6
!?'�'„ � , 'P �e ,�r
[ .Y 4«'.
��� #�� . �.''f` '� w6=
.Y ; � �r �'4 &�..
. "F >'IC., t` �,. '�
�` R �� z ���,.
r !,� +�� � i RN3 ti
.}�� N `" +��t F �`'ry.� � ��: �r+;r: +.�:
.. , . �
,, . � r � -
^ -A , -• �.: .
. . <
> ,' ' .
.r...,R_ ° -r- • Y,..:......_�..--x... '� � . .. � ,..� +.�^y�`aC'. .r �, �b ik
�"' .Y.�.�. .. . �.• "`<.��a.i,� �.vna ��� � 1
1&,_ t _ . . '� ��.P�iM2ry,`"�c . � ...�.
,�
,
: , � .w . Fr".
.: < .
.
y�.., . . . .. ,...,�. . ..: -
��� �r ��
� xy;�� 3
y . j . . . -, . •.
J',_.�� . �� tioM'.-�.� ��: .�• �,.,�'. :�''� rt+wr••�. . �`, �j.
.. ....._. . -� .
t,_ ��� r�" <.,r.:
" ;.;..wr' S�.�,i ' ._ _ � '
. s � - ;, . . � ..
_ �� .... �.. . �� ..
_
T-'
C._ ., ..a .-,.... .. . « .:: ... ... '�.,t. ' .
. ��.... � ..
� '1 ..,� � j�+�y .. � .. . ..... . .. �rt.'�,,t,}.4 �A .. . ��cr� .�.�1
j.;�� .. ,x �-i x� '� . � . . . . �- . .
. ., ,#.. 1-'� . — . . ., . . ; � .,,«F'.a''�� .
��' j t � � F � � �� m� � :
,
"....._ . .;,.. � . . ,
.y. N��....�.�»....�.
'!�.1 '+�,X` .},, x
� ` v �
vx'_ ��� • � � c
_ ,; ; k�'t�,xy s ';�`w''�' °: d
�} w�::.' '; � '�� , ��
��., ' rtYa. ` ''" •, �
+ � _ . .
,
.
._,.:... : x ,.�
;:
, .,. � . „.« . , �._.,":. .. ...:
, . . .,.
,
«. __, ..,_..
,�-.a.,..,.<......._._,..........w..�...._._..__......._._..._�____..._....._�..�.W.�....�.,o...__.............._��.._.._..�.�_._. �
�vater�'lant #T �I'o�vnes�,oad
r� >_-_� .T-;w:,;�cR'�-+�+r��^ �s« ,,.�. ...�A,�_.•.,.�.s,�' �"��a.
�� ;s. ,z .���
�
. . �' ir?c.�.�r� ��Fs�rf,e � . � ',
�� � F����ukC+ � �� ��.
. e�@�„AJ z�.�F .
� ^
t �., .;. P�'-a`+''g#��:�'��r:� �. , .. ... � ,� �. .. . .. , . .. . . . , .�� . ..
. . . .�:� f`�g,m�i� . .
. � ..��� ������ �M"� � . . .
. . . . � ��f�l� �b � . � . . �
. ', ��+gy:.M i���'�� X�.�� . . . .. .
- �. � �...gi� �y.�- ,�e�r .
a. �° , ��„+a��
.. y�. . �q;.�� ,s�,�",.� .s!�'M :
�. .e..zSA�R. t�� � .T3. � t ` .'�.. . . .. . � � ;� . ; ....... ..... ... ....
t,'. 3 . . . � •yp� .
� a s� ,� �� � . y� � i ,
.' '"l" , '� v��"' j
� ,' ` ` y
` �� A..Nr � � � �. , .__.__. .. � t .. ' .
����1:`a. ��..f�`�'�,��'- #��e!'.ffT°`y>;ci� a � ".i .�}: - .:e ,,.a+��
,.r �, . . - � �. � �
*'��{ziyY�y a '�'� �--��w�' � :¢ ....__ 'MWk,a� `Y *,i
w
;.s ,�_•� �?sstr �<X xwr*1� � -. � .--� � , h ..F.-,��MI�^"'� � . i��...'..7 ... .. _ .. ..
� ,..,t. ' ?�6:c��..,. , '4 . � � . . � .����, .. � , . . .. ... _. ,..-._ ..» ._
„�..�-� �� - �
_ ; .
.r �^>' � j
' �r+��"�' _ "-
� c �
' . .� �a1 d., ..., . .. .. ..`._"` . �.� ,. . .
{� N� ^,�
.--^,�'^„y•t—°.- -r __ _ � —g. .. -
.�� � r . ..... . . .. � . .. "�- „�y -. o tt4i�'y;��� r.���r.�, .. . ._. .... .-�
Fa ,,,} 'b,...
. a, .�y3-�ci-f��� x��a i'�+ t ."�� r � .Pe v����� j t �� �-.•.r�Yifo"'(. . ��
.A� �..i 4� � . � �ry.�, p:�T� ��`..�;k�.. . . .. �.
. . 1 �.:�F� . � L ....1.C7°K' l� A..ta" \. .. ��� " Y�:.�'..'�
' z ,r[it A?��? � .�.1 3,�..:"'�`•�.w�t� .:"01.� .. . . . . +' }�y �r.f.%�.,,
J� li � S '' .,yi'Kj �! ��',� 0.i�
� ��� f
� .. � ���,`f k?�+ ����.�`�` <°��`-at .�ca.�� �� °��`y*,x�'y t fkk,�'a�`.1.J �„`£.�.�„�it,,..�Y¢ .. � ,- _ .�.,' I��� .�.. ��s". �.
. .. . .:.".,.:."'_.._.,._.;._,:..v:_�:..'.:_� �- �" �...:tY,:Y.�:sL3..:s.ii..��yir t�a..,.{�,6 S.,"7ti#:.�;r�'ti„k.YV,'y:'::.�d �.�!'��.��9�...x � _ ......__..._' _.__'_.. .____..______.e,v-wju.��'. �,�. ,. „�
�ake �Fr�ien�'s�u�ood �enneth Camp �'ire,�tation
Table of Contents
SECTION ONE—Table of Contents
Tableof Contents.................................................................................................. 1
Esecutive Summarv.............................................................................................. 3
FundingTotals (Table 1)................................................................................. 3
Capital I�nprovements Prograin Update ............................................................... 5
1.0 Introduction............................................................................................... 5
2.0 The Impact of Gro�vth............................................................................... 5
3.0 The Plamiing Effort &the EvO1L1Y1011 Of YIlZ DOCL1111ZI1Y............................ E)
4.0 Changes to the Document......................................................................... 8
5.0 Bond Issue Costs....................................................................................... 8
6.0 The Challenge at a Glauce........................................................................ 9
CIP FI" 2017 Total Spending (Table 2).................................................... 9
7.0 Summarv ofthe Program.......................................................................... 9
8.0 The Nest Five I�ears................................................................................. 10
9.0 Projects Completed Since CIP Inception.................................................. 10
Completed Project Statistics and List (Table 3) ....................................... 10
SECTION T�VO—FIVE I"E�R GENER�L GOVERNnIENT PROJECTS
2017—2021 Capital I�nprovements Program (Table 4)
Five I�ear Plan—General Govenunent Projects ............................. 13
1776 Park................................................................................................................ 14
Blackhawk Boulevard Phase IL.............................................................................. 15
Dlud Gullv Detention and Convevance................................................................... 16
OldCitv Park.......................................................................................................... 17
W egner Ditch—Tributarv 2.................................................................................... 18
Woodlawn _�venue.................................................................................................. 19
Brittanv Bav Boulevard Phase L.............................................................................20
_�ctivities Center.....................................................................................................21
Corporal Weslev J. Camiing Sportspark.................................................................22
Fire Department Training Fields.............................................................................23
Fire Station #2 Reconstnution................................................................................24
Parks and Recreation Building................................................................................25
Park Trail Dlaster Plan............................................................................................26
Pedestrian Bridge at Brookside Intennediate .........................................................27
Public Safetv Building Phase II..............................................................................28
SidewalkDlaster Plan .............................................................................................29
Stevenson Park Reclauiation...................................................................................30
Stevenson Park aud Swimming Pool Restrooms....................................................31
Street Dlaintenance Dlaster Plan.............................................................................32
Sub-regional Park—Lundv Lane............................................................................33
1
SECTION THREE—FIVE I"E�R�V�TER�ND SE�VER PROJECTS
2017—2021 Capital I�nprovements Program (Table 5)
Five I�ear Plan—Water and Sewer Projects ................................... 34
COHRaw Water Buv-I�i.........................................................................................35
Lift Station #22 Reconstnution..............................................................................36
Water Plaut #1 Tauk Rehabilitations......................................................................37
Fortv-Two Inch Water Dlain Replacement.............................................................38
Lift Station #1 Reconstnution................................................................................39
Lift Station #4 Reconstnution................................................................................40
Lift Station #17 Reconstnution..............................................................................41
Lift Station #23 Reconstniction..............................................................................42
Sauitarv Sewer Svstem _�ssessment Phase IV - Constnution................................43
Sauitarv Sewer Svstem _�ssessment Phase V - Design...........................................44
Second Elevated Storage Taiil:Rehabilitation........................................................45
Water Plaut #3 Tauk Rehabilitation........................................................................46
Water Plaut #4 Tauk Rehabilitation........................................................................47
West Water I�itercomiect.........................................................................................48
Sauitarv Sewer Svstem _�ssessment Phase VI - Design.........................................49
Sauitarv Sewer Svstem _�ssessment Phase VII - Design........................................50
Sauitarv Sewer Svstem _�ssessment Phase VIII - Constniction.............................51
SECTION FOIIR—BEI"OND FIVE I"E�R GENER�L GOVERNnIENT PROJECTS
2022 —2032 Capital I�nprovements Program (Table 6)
Ten to Fifteen I�ear Plan—General Govenunent Projects ............. 52
SECTION FIVE—BEI"OND FIVE I"E�R�V�TER�ND SE�VER PROJECTS
2022 —2032 Capital I�nprovements Program (Table 7)
Ten to Fifteen I�ear Plan—Water aud Sewer Projects .................... 53
2
Executive Summarv
Submitted for City Council's information is the FY 2017 to FY 2021 Capital Improvement
Program (CIP) for the City of Friendswood. Currently, there are thirty-three (33) General
Government and forty-one (41) Water and Sewer bond identified CIP projects. This submittal
represents the siath update of the CIP since its creation in 1999. City Staff has committed to
updating the projects and manual every year.
Once adopted by the City Council, this document will provide Staff a clear direction on the
funding and scheduling of remaining projects, which will be a part of long range budgeting plan
subject to approval by the City Council. Staff will meet with the City Council in work sessions
to seek approval of funding sources, updating project schedules and to seek guidance for every
Fiscal Year regarding subsequent implementation phases.
Estimated total funding for individual funding sources and their cumulative totals are given
below for the neat five-year Capital Improvement Program as well as projects beyond that period
(ten to fifteen years). Included in these estimates are two (2) large drainage projects (North
Panhandle Detention — 8.2 Million and South Panhandle Detention 23.0 Million) as well as
estimates for Brittany Bay Boulevard (15.2 Million) which are part of the Capital Improvements
Program, but should be Developer driven.
FUNDING TOTALS FOR FIVE YEAR AND BEYOND CIP
Table 1
F'I'2017 - F'I'2021 CIP 5-Year Program
General Government Funds $ 39,979,000 - $ 44,203,000
Water and Sewer Funds $ 34,370,000 - $ 35,990,000
FYve Year Total $ 74,349,000 - $ 80,193,000
General Government Funds* $ 67,595,000 - $ 67,595,000
Water and Sewer Funds* $ 46,909,000 - $ 46,909,000
Be ond FYve Year Total $ 114,504,000 - $ 114,504,000
GRAND TOTALS $ 188,853,000 - $ 194,697,000
*In 2017 Dollars
The five-year CIP identified with this update is spread among all categories, with water
improvements having a majority of projects scheduled. The driving force for utility projects are
generated by population growth requiring more new infrastructure and an existing utility
infrastructure that requires maintenance or replacement. Community Development and Public
Warks focus on implementing the preventive maintenance programs to prolong life of streets.
3
Friendswood is a Cit�� with aging infrastnichire. The infrastnichire installed b�� the Cit�� or
dedicated to the Cit�� as a condition of development has a usefiil life that depreciates aumiall��.
Via Govenunental _�ccounting Standards Board (G_�SB) #34. Staff has detennined the value of
these fised assets, their average usefiil life, the stahis of depreciation, and estimated the firture
replacement.
Long range planning and scheduling remains a critical issue at all times. These projects have
been identified in various studies aud master plans as projects needing attention b�� the Cit��.
Cit�� Council and Cit�� Staff is currentl�� working diligentl�� on all possible fiuiding sources aud
plamiing on these projects.
4
CITY OF FRIENDSWOOD
CAPITAL IMPROVEMENTS PROGRAM
UPDATE
1.0 INTRODUCTION
Pursuant to Cit�� Charter, the Cit�� l�Ianager is required to submit a Capital I�nprovements
Program (CIP) to the Cit�� Council. B�� agreement, this prograui is to be updated periodicall��to
reflect the completion of projects, the addition of new projects, and to update project costs for
financial projection and management efforts. This is the sisth CIP document, the original being
created in 1999 aud updated in 2003. 2007. 2009. 2012, aud 2014.
The intent of the updated program is to identif��, describe, aud prioritize the infrastnichire
needs of the communit�� as it grows and evolves. This task inchides au effort to increase the
accurac�� of the program's cost estimate for all prospective projects, but more specificall�� within
the initial five-��ear period. The overall goal of the CIP is to maintain the sauie high qualit�� of
life for all citizens tlu-ough the timel�� anticipation of the Cit��'s needs, plamiing of improvement
projects aud detennining fiuiding sources as the conununit��grows.
The program is also intended to depict finaucial challenges of the Cit��'s gro�vth and
maintenance of infrastruchire that characterize the Cit��'s firture aud the associated fiuiding
requirements to meet these objectives. The programming portion inchides fonmilating
preliminary plans, projecting estimated project costs, setting priorities, identif��ing fiuiding
sources, and scheduling the implementation of the plaus.
2.0 THE IMPACT OF GROWTH
In the 2000 Census, the population of the Cit�� of Friendswood was listed as 29.037.
_�ccording to current staff estimates, the population has increased to 38.469 as of _�pril 2014.
Indications are the Cit�� will likel�� reach its build-out population of 55.000 between 2020 aud
2030. Population gro�vth contimies to be a primar�� driving factor in the CIP process, particularl��
as it relates to utilities.
During the 2003-05 period, capital project focus was primaril�� on drainage issues, with
the completion of four (4) projects which addressed eleven (11) of the rivent�� (20) identified
problem areas from the 1993 l�Iaster Drainage Plan. Four (4) others are currentl�� in various
stages of resolution. Contimied population growth and development pressures shifted the focus
for the 2005-06 period to improvements in utilit�� infrastnichire. I�i the 2009-2010 period there
were four (4) water and sewer projects in constniction, as two (2) sewer projects were completed
and one (1) facilit��was completed. In the 2011-2012 period there were five (5) water and sewer
projects in constniction. During the 2013 to 2014 period there were seven (7) street projects.
three (3) facilit�� projects, sis (6) parks projects, one (1) drainage project, and twelve (12) water
and sewer projects. Currentl�� there are three (3) drainage projects, four (4) street projects, five
5
(5) facilit�� projects, eight (8) park projects, seven (7) water projects, and eleven (11) sewer
proj ects.
3.0 THE PLANNING EFFORT & EVOLUTION OF THE DOCUMENT
In Fiscal I�ear 1999, a Capital Improvements Program was presented to Cit�� Council that
described the infrastnichire gro�vth and maintenauce needs of the Cit�� through a ten (10) ��ear
period. This was the first time that such an estensive and comprehensive plau had been
developed. _�s was noted at that time, the Cit�� was facing its heaviest burden of maintaining
esisting infrastnichire, and plauning for the constniction of new gro�vth-related infrastnichire.
This remains tnie todav.
In 2002, prograin categories were detennined b�� the requirements set forth in several of
the Cit��'s planning documents, most notabl�� the Cit��'s Comprehensive Plan and Vision 2020.
the Cit��'s Strategic Plan. During that sauie time, the Cit��'s CIP was centralized under the
Communit�� Development and Public Warks Department Under this centralization, projects
sponsored b�� individual departments were passed to the new Capital Projects Division for
incorporation into the new plamiing document for evenhial implementation. With the voter's
approval of the General Obligation Bond election in Febniar�� 2003 the Cit�� embarked on the
2003-2008 five-��ear program guided b�� Council's reaffinnation of project priorities with
drainage issues topping the list.
In implementing the initial projects from the 2003-08. Drainage Program. Staff
discovered that preliminar�� plauning documents used to estimate both the scope of work and its
costs had not accuratel�� anticipated ph��sical and market conditions for some of the projects.
During design phase, engineering additions to the scope of work were required to provide for the
unanticipated impact on private properties surrounding a project. For esample, if detailed
sun�e��ing done during the design phase of a drainage project revealed additional areas of
conceni, the impact of the additional work to the overall scope of wark and the affected areas
had to be addressed. _�11 of the initial projects fell victim to unprecedented material and labor
cost increases esperienced throughout the region as a result of market forces.
Staff responded to these issues with a procedure to prioritize the objectives within each
project and constnut the infrastnuture required to achieve those prioritized objectives first This
approach has allowed each project to go for�vard and provide the central core improvement
souglrt, aud to add as mau�� additional secondar�� and tertiar�� objectives as approved fiuiding
allowed. Thus far, this approach has proven a valid means for meeting the affected project's
objectives while coping with rising costs and espanded scope: however, it falls short of the
intention of both Cit�� Council and Staff for the bond fiuided projects. These conditions have
forced several changes in the process as well as the document.
3. 1 Project En«ronment: Development pressure contimies to drive the schedule of man��
projects aud frequentl�� impacts the scope as well. Opportunities to shape and influence private
development activities are considered in the plamiing and estimating phases of the effort. CIP
staff is involved in Development Reviews and frequentl�� interface with developer plans at earl��
stages to coordinate efforts and reduce costs that might other�vise be bonie solel�� b�� the Cit��.
This effort helps stabilize and quautif�� the scope of the project at earlier stages providing
6
increased confidence in the cost estimates. Staff has successfiill�� integrated developer provided
additions to the Cit��'s infrastnichire to reduce the scope of Cit��fiuided improvements.
3. 2 Strategic Planning: Strategic plamiing is a part of the above processes and the
Preliminar�� Engineering Reports (PER) for projects. I�i instauces where the scope of a PER cau
reasonabl�� be espanded to include a strategic esainination of a s��stem, or au area to provide
guidance for specific plamiing aud programming of recognized needs is being addressed with
budgetar�� constraints in perspective, staff will recommend espanding the scope. This small
effort assists in the development aud refinement of project scope, and helps to identif��
opportunities to co-participate with private developers to provide needed infrastnuture at a lower
or no cost to the Cit��. This infonnation is also fed back into the development review process to
assist plamiing staff in guiding developers as the�� assess their needs and requirements. The
combination of the l�Iaster Drainage Plan Phase II, the Pavement l�Iauagement l�Iaster Plau, and
the Utilit�� l�Iaster Plau has been an inunense help in identif��ing the aging infrastnuture and
receiving general pricing on constniction.
3. 3 Project Prioritization: The original CIP l�Iamial, generated in 1999, consisted of fort��
(40) General Govenunent (GG) bond projects aud twelve (12) Revemie (Utilit��) bond projects.
_�11 projects identified were drawn from departmental needs assessments and the Cit��'s series of
l�Iaster Plans. (Vision 2020, l�Iaster Drainage Plan Phase I. Parks l�Iaster Plan. Streets l�Iaster
Plan, and the Ground Water Reduction Plan). Initiall��, these projects were ranked within the
sponsoring departments and then Senior Staff ranked those lists to produce a final prioritization
of the projects. l�Iuch of the original prioritization remained with eight (8) of the original 2003
GO bond projects and seven (7) of the original Utilit��projects which have been completed, with
another two (2) pending bid a�id two (2) under constniction. The 2006 Utilit�� Bond identified
eight (8)projects, five (5) of which have been completed and three (3) are under constnution.
New projects entering the list are fed into this prograin stnicture and the final location among
other projects remains a product of departmental needs aud "forces at work." Forces at work are
increased maintenance requirements aud breakdown frequencies aud developmental pressures.
_�final factor influencing the ultimate location of a project in the prograui is the effort to balauce
the munber and dollar value of the projects within a mauageable time frame for the sponsoring
department.
Drainage projects have been top priorit�� since Tropical Stonn _�llison, and with the advent of
Hurricaues I�atrina. Rita, aud Ae have brought these t��pes of projects to the forefront of all
capital projects. In the past, aud contimiing on to this current CIP l�Iamial, hindrauces to
effective drainage have been established in the engineering criterion. First and foremost, the
Design Criteria for drainage in Friendswood accounts for a five (5) ��ear event within the
roadside s��stem, and with an overall development designed to account for a one hundred (100)
��ear event. _�lthough this is optimal for new constniction. Friendswood has aimesed areas that
have been sub-par in drainage standards. I�i efforts to prioritize area flooding, projects were
divided into three categories. Priorit�� drainage projects address flooding where there is danger
or alread�� have been flooding in or near homes. Secondar�� drainage projects address flooding
that denies access to areas but is not a threat to propert��. Tertiar�� drainage projects address areas
where the street floods, but no water ever goes over the curb: streets are designed to hold estra
capacit��of stonn water during estreme events.
7
4.0 CHANGES TO THIS DOCUMENT
41 Like its predecessor from 2012, the 2017 CIP incorporates significant changes. Every
effort has been made to make this the most useful planning tool available for Council and Staff.
This update incorporates Water and Sewer bond projects, and General Government bond
proj ects.
4.2 Project Scope: This update includes a complete re-work of the Description/ Justification
discussion for each project. The accuracy of long-range estimates is directly proportional to the
completeness of the scope at the time the estimate is performed. An eatensive effort to improve
scope definition for all projects has been made as a component of this update. The enhanced
level of project information directly improves the accuracy of the estimate and helps to guard
against "scope creep". This provides the sponsor department and the planner a better concept of
what the project will and will not provide. For these reasons, the estimate will identify if a study
was available and, what level of study the estimate is based on. If easements are required for the
project, they are roughly quantified and a figure is included for their acquisition. Likewise,
survey and other professional services are considered specifically when estimating professional
service fees. For these reasons, there are likely to be several different percentage factors used in
the estimate for this cost category. It is the intent of staffthat when a project becomes part of the
five (5) year plan, a more definitive scope will be utilized by contracting Engineering or
Architectural Services to provide a Preliminary Report on the project that will include estimated
quantities, project, and engineering/architectural costs.
4.3 Organization: The document has been reorganized in an effort to improve user
friendliness. Previously, the contents were arranged only by their relative priority providing no
intuitive link to the location of the project description and estimate within the General
Government Fund section, or the Water & Sewer Fund section. The revised document is
organized by fund type, either a General Government or Water & Sewer. The projects beyond
the Five-Year Plan are also separated into these two categories and sorted by projected year of
the project. The Five Year planned projects have details, scope, justification, and locations for
them. The Beyond Five Year Projects also have these features, but to keep this manual to a
manageable size, only project name and a location map are included. As the Projects from the
Beyond Five Year Plan fall into the Five Year Plan, they will be added in full.
5.0 BOND ISSUANCE COSTS:
This document DOES include Bond Issuance Costs in the listed project estimates. Actual
and final bond sale amounts may vary depending on the number of projects being funded and the
timing of the cash requirements; therefore it is impractical far the CIP to estimate bond issuance
costs.
8
6.0 THE CHALLENGE AT A GLANCE
Due to increasing construction costs and an aggressive CIP, the greatest challenge to the
City is funding. The following tables present a summary far the plan (Current Five-Year and
Five-Year Plus divided into projecttypes):
CIP FY 2017 TOTAL SPENDING
Table 2
Current Five Year Program
2017—2021
Drainage $ 1,000,000 - $ 1,000,000
Facilities $ 9,749,000 - $ 10,657,000
Parks $ 7,518,000 - $ 8,309,000
Streets $ 19,485,000 - $ 20,845,000
Sewer $ 418,000 - $ 461,000
Water $ - - $ -
$ 38,170,000 - $ 41,272,000
Beyond Five Year Program (2022 -2032)*
Drainage $ 39,258,000
Facihties $ 8,449,000
Parks $ 14,888,000
Streets $ 5,000,000
Sewer $ 24,812,000
Water $ 22,097,000
$ 114,504,000
*In 2017 Dollars
7.0 A SUMMARY OF THE PROGRAM
An analysis of the preceding tables provides a number of quick observations that require
specific mention. Approximately forty-nine (49) percent (73.3 million dollars) is planned for
improvements to General Government Projects. General Government Projects form the single
largest spending category in the Five-Year Plan 2015-2019. The General Governments category
includes Drainage, Facilities, Parks, and Streets infrastructure replacement, and upgrades. The
spending requirements are based on needs to accommodate growth and maintain the current level
of services to neighborhoods where existing streets and drainage are aged and in need of
replacement. Utilities, especially water projects, are the second largest category.
9
Finally, the financial commitment to drainage has lowered to 3.6 percent of the
total seventy-three (73) million dollars in spending. This level of commitment has changed with
the Master Drainage Plan Phase II and the addition of the previous projects that have not been
completed due to depletion of funding. These constitute the Secondary and Tertiary Drainage
Proj ects.
8.0 THE NEXT FIVE YEARS
The Five-Year Plan identified with this update shifts the emphasis to the Water & Sewer
category, especially sewer projects which are 28.8 percent of all projects included within the five
year plan. As previously discussed, the driving force for spending on water and sewer is
generated by growth and an aging utility infrastructure. Long term emphasis has shifted to the
aging water and sewer facilities and lines network as the Public Works Department focuses on
implementing the preventative maintenance programs (assessment, line, and equipment repairs,
etc.) to prolong the life of those utility services. This will require a consistent financial
commitment to pre-empt the need for large scale replacement efforts later.
By quick observation, the effort levels in the Five-Year Plan are as balanced as ea�ternal
forces will allow. In addition, City Staff is involved in the accountability of identifying possible
needed easements and relocations of public utilities. City Staff recommends that the processes
of easement acquisition and/or utility relocations begin two (2) years priar to the design of each
proj ect.
9.0 PROJECTS COMPLETED SINCE THE CIP INCEPTION
Citv of Friendswood
Table 3
Capital Improvement Program- Completed Projects Statistics
PROJECT NPE #OF PROJECTS
Drainage 6
Facility 10
Parks 12
Streets 13
Sewer 16
Water 20
General Gwzrnment Funds 41
Water&Sewer Funds 36
Total ofAll Capital Impro�ement Prqects 77
10
DRAINAGE PROJECTS
PROJECT NAME COMPLEfED
Annalea/Whitehall/Kings Park Dreinage Phase 1 2004
Closer Acres Dminage 2007
FM 518 Dreinage Phase 1 2010
Glenshannon Dminage Phase 1 2008
Sunmeatlow Dreinage Phase 1 2005
W Shatlowbend/WOOtllawn Dminage Phase 1 2004
FACILITY PROJECTS
Animal Conirol Facility 2011
Emergency Genemtors-Fires Stations#1&2 2012
Fire Station#3 Rehabilitation 2012
Fire Station ri4 2008
Librery Lantl Acquisition 2000
Librery Expansion
Municipal Court Reno�ations 2003
Public Safety Builtling 2006
Public Works Atltlition 2001
Public Works Security Gate 2010
Public Works Vehicle Stomge Builtling 2004
PARK PROJECTS
BakerROatl 2016
Centennial Park Phase 1 2002
Centennial Park Phase 2&3 2006
DowMOwn Sireet Pasers 2016
FM 2351 Imigation 2014
Fnentlswnotl Sporis Park 2000
Jogging Treil Stesenson Park 2002
Lake Fnentlswootl Phasel 2015
Lake Fnentlswootl Phasell 2016
Renv�nck Park LigMing 2016
Sporlspark 2016
Stesenson Park Bntlge 2016
Stesenson Park Treils 2016
STREET PROJECTS
ActiNty Builtling Parking 2003
Atltlitional Qty Hall Parking 2009
Blackhawk BIW -Phase 1 2012
Fnentlswnotl Link Roatl Extension 2008
Fnentlswnotl Link Roatl Phase II 2016
Public Librery Parking 2011
Melotly Lane 2012
SunnyHew/SkyNew 2011
Sunset Drne 2003
Statlium Lane Parking 2011
Trel�c Signal at Blackhawk 2012
W Shatlowbend/WOOtllawn 2004
W hitaker Drne 2004
11
Capital Improvements Program- Completed Projects to Date
Water and Sewer Working Capital Projects
SEN/ER PROJECTS
Autumn C7eek Sewer Line 2000
Beamer Road Lift Station 2011
Beamer Road Sewer 2011
Deepwood Face Main 2009
Deepwood Lift Station 2009
E Hentage 8"Sanitary Sewer 2001
Emergency Generetors Water Plants#1 &Surtace Water#2 2012
Friendswood LinkNVhittier Oaks FM Replacement 2004
Lift Station#3 2016
Lift Station#6 2014
Longwood Park Sewer 2003
San Joaquin Estates Sewer 2003
SCADA System 2016
South Fnendswood Face Main 2009
Sun Meadow Lift Station 2008
WATER PROJECTS
16"Transmission Water Line(Sunset to WW#4) 2009
16"Watetline(Melody to Sunset) 2001
24"Trunk Line 2003
2nd Surtace Water Take Pant-Phase 1 2003
2nd Surtace Water Take Pant-Phase 2 2003
2nd Surtace Water Take Pant-Tank Addition 2003
Additional Water Purchase 2008
Bay Area BIW Water Line 2007
Beamer Road Water Line 2011
Blackhawk FM 2351 Watetline 1999
Blackhawk Water Line 2008
Emergency Generetors-Lift Stations 2012
Longwood Park Water Line 2004
Neighbahood Water Line Replacements 2006
Water Plant#1 Rehab 2002
Water Plant#2 Rehab 2017
Water Plant#3 Rehab 2003
Water Plant#4 Rehab 2003
Water Plant#5 Rehab 2013
Water Plant#6 Rehab 2012
Water Plant#7 Rehab 2016
WWTP Water Line Loop 8" 2006
12
General Government Projects - Five Year CIP Plan
TABLE 4
Funded Pro'ects 5 Year Plan FY2017 - FY2021
1776 Park Improvements $ 430,000 - $ 473,000
Blackhawk Boulevard Phase II $ 7,067,000 - $ 7,651,000
Mud Gully Detenrion and Coxiveyance $ 1,000,000 - $ 1,000,000
O1dCityPark $ 1,102,000 - $ 1,206,000
Wegper Ditch- Tributary II
Woodlawn Avenue $ 777,000 - $ 865,000
TOTAL $ 10,376,000 - $ 11,195,000
Unfunded Pro'ects 5 Year Plan FY2017 - FY2021
Brittaxry Bay Boulevard Phase I $ 6,141,000 - $ 6,829,000
Acrivities Center $ 2,394,000 - $ 2,615,000
Corporal Wesley J. Canning Sportspark $ 1,294,000 - $ 1,417,000
Fire Deparhnent Traixring Field Upgrades $ 550,000 - $ 605,000
FireStarion#2Reconstrucrion $ 1,871,000 - $ 2,045,000
Parks andRecrearionBuilding $ 1,159,000 - $ 1,271,000
Park Trail Master Plan $ 100,000 - $ 100,000
Pedestrian Bridge at Brookside Intermediate School $ 770,000 - $ 925,000
Public Safety Building, Phase II $ 5,675,000 - $ 6,762,000
Sidewalk Master Plan $ 500,000 - $ 500,000
StevensonParkReclaxnation $ 50,000 - $ 55,000
Stevenson Park and Swixmning Pool Restrooxns $ 971,000 - $ 1,158,000
Street Nlaintenance Nlaster Plan $ 5,000,000 - $ 5,000,000
Sub-regjonal -Park Lundy Lane Development $ 3,128,000 - $ 3,726,000
TOTAL $ 29,603,000 - $ 33,008,000
13
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
1776 Park Im roeements Parks and Recreation
COUNCIL GO_�L: #6 l�Iaintain High Level of Public Sen�ice
Plamiing Document: N_�
TI"PE: Park Facilities I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
In an effort to upgrade area parks, and make them more usable to the residents, there are
different items being used around the City to enhance esisting Parks. Nest door to 1776
Park in the Imperial Estates is a new Frisbee Golf course. This project will add a I�ayak
Launch.Dog Park, and 6'wide trails to the esisting amenities at this park.
JIISTIFIC�TION:
The demand for�•ersatile Parks for all ages and all types of acti�•ities, require the City to
add and enhance the esisting City fields.
Estimated 2017 Costs
Construction Costs: $�Od.000
Professional Sercices: $90.000
10°o Contingency: $�0.000
Testing Sercices $6.000
Total Projected Project Cost: $-130,000
14
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Blackha�vk Bled Reconstruction Phase II Public Works
COUNCIL GO_�L: #13 Improve Transportation
Plamiing Document: N_�
TI"PE: Streets I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
This project replaces approsimatel�� 7.150 linear feet of esisting concrete roadwa��
(25-feet wide) that was constnicted nearl�� 35 ��ears ago. The project contimies
work that was started 3 ��ears before, replacing deteriorated sections of roadwa��
that have succumb to heav�� traffic loads aud high vohunes of vehicles. In
addition, the project will also address failed inlet aprons and sidewalk issues
throughout the corridor.
JIISTIFIC�TION:
The Cit�� currentl�� maintains this road, but its age and condition warrant
significaut repair and replacement of specific sections. While this is not a
wholesale replacement of the facilit��, it will estend the life of the facilit�� and put-
off replacing the entire road for a munber of��ears.
FIINDING SOIIRCE:
The identified fiuiding source for this project is the voter approved 2013 Street
Bonds.
Estimated 2017 Costs
Construction Costs: $5.097.000
Easement Costs:
Easement Acquisition Sercices:
20°oContingency $1.019.000
Professional Sercices $8d9.000
Testing Sercices $102.000
Total Projected Project Cost: $7,067,000
15
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Mud Gullv Detention and Coneevance Public Works
COUNCIL GO_�L: #5 Improve Drainage
TI"PE: Drainage I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
The City of Friendswood, in participation with the Gal�•eston County Consolidated
Drainage District. Harris County Flood Control District. Harris County, and Gah•eston
County are undertaking clearing and de-snagging acti�•ities along Clear Creek that were
made possible by the 1�1ud Gully project that was led by HCFCD.
JIISTIFIC�TION:
The abo�•e impro�•ements would drop the surface ele�•ation of Clear Creek and the 1�1ud
Gully and pro�•ide benefits to o�•er 700 structures that are within the 100-year flood plain.
This is a component of the Clear Creek Federal Flood Control project which is being re-
e�•aluated by the U.S. Arxny Corps of Engineers.
FIINDING SOIIRCE:
The funding for this project is from the General Fund Balance.
City of Friendswood Participation: $1,000,000
16
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Old Citv Park Parks and Recreation
COUNCIL GO_�L: #14 Develop _�dditional Parks
Plamiing Document: N_�
TI"PE: Parks I"E_�R PL_�NNED: 2017
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
The proposed plan has identified the requirement to renovate and update Old Cit��
Park. The park has been connected to Stevenson Park via a footbridge.
_�dditional auienities include a dog park. 10' wide sidewalk, paved parking for 75
vehicles, new entr�� road from Brianneadow and l�Ierriewood, new picnic
pavilion, new restroom building, pla��ground equipment, and improved drainage
throughout the site.
JIISTIFIC�TION:
Since 1993, the Parks and Recreation Board have recommended the comiection of
Old Cit�� Park to Stevenson Park via a footbridge. Once comiected, additional
parking for special events such as, the ammal Fourth of Jul�� Celebration.
Concerts-I�i-The-Parks, the Halloween Festival, and the Car Show can be
accommodated. During the spring and summer soccer seasons, the esisting
gravel entr�� road generates estensive amounts of dust and debris that settle on
nearb�� resident's homes and vehicles. Paving the entr�� wa�� aud providing paved
parking at the site will resolve this issue aud will create a safe enviromnent.
FIINDING SOIIRCE:
The identified fiuiding source for this project is the voter approved 2013 Park
Bods.
Estimated 2017 Costs
Construction Costs: $801.000
25°o Contingency: $200.000
Professional Sercices: $8d.000
Testing Sercices: $17.000
Total Projected Project Cost: $1,102,000
17
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
We ner Ditch — Tributarv 2 Public Works
COUNCIL GO_�L: #5 Improve Drainage
Plamiing Document l�Iaster Drainage Plau Phase I
TI"PE: Drainage I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
In 200d, the Tesas Departrnent of Transportation (T_�OT) prepared a comprehensi�•e
Drainage Plan for the F.1�Z 2�51 corridor behceen F.1�Z 518 and the proposed Brittany
Bay Boule�•ard. The purposes of the study was identify critical drainage issues that
would affect the widening of the roadway to 5 lanes and then propose solutions that could
be addressed by the�•arious agencies affected by the project Three problem areas were
identified. This project addresses problem area 2 and is joint project behceen the City.
Gal�•eston Consolidated Drainage District, and TSDOT. The project calls for the
construction of outfall (bos cuh•ert or ditch) located bericeen Garden Street and Sunset
Dri�•e. The outfall facility would estend from F.1�1. 2�51 all the way to Cowards Creek,
for a distance of��00 feet.
JIISTIFIC�TION:
The proposed outfall would address se�•eral drainage areas along the F.1�1 2�51 corridor
that currently do not ha�•e outfall drainage. The benefits would be realized on both sides
of F.1�Z 2�51, from Stadium Dri�•e to Oak Dri�•e. In addition, the proposed project would
facilitate the de�•elopment of the roadway and relie�•e traffic congestion along the corridor
within the city limits of Friendswood.
FIINDING SOIIRCE:
The identified funding source for this project is from the General Fund Balance.
The Gah•eston County Consolidated Drainage District(GCCDD) is currently constructing this
project through a grant with CDBG. The City's cost share was in the amount of$75.000 for
Engineering and Surceying, which was paid in FI"2010.
18
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Woodla�vn Aeenue Public Works
COUNCIL GO_�L: #13 Improve Transportation
Plamiing Document: Pavement l�Ianagement l�Iaster Plau
TI"PE: Streets I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
Currentl��, the roadwa�� esists from Laurel Drive to F.l�L 518 and is approsimatel��
650 feet long. The esisting road is 2 lanes of asphalt with au average width of 28
feet and concrete curb and gutter and au associated stonn sewer. The ultimate
cross-section proposed for this street is a 2-laue, undivided concrete roadwa�� (28-
feet wide)with curb and gutter.
JIISTIFIC�TION:
In 2002, the Cit�� perfonned an inventor�� of esisting asphalt roads tlu-oughout the
Cit�� in au effort to determine which of these roads, based upon their age, esisting
condition and traffic loads and volumes and other factors would warrant
conversion to concrete. Woodlawn _�vemie evolved, based upon these criteria, as
a prime candidate for conversion. Finall��, the conversion of this street to concrete
will reduce the maintenance costs, the scope of maintenance activit��, and the
frequenc��of maintenance on this highl��traveled Collector Street.
FIINDING SOIIRCE:
The identified fiuiding source for this project is the voter approved 2013 Street
Bonds.
Estimated 2017 Costs
Construction Costs: $569.000
Easement Costs:
Easement Acquisition Sercices:
20°oContingency $11d.000
Professional Sercices $8�.000
Testing Sercices $11.000
Total Projected Project Cost: $777,000
19
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Brittanv Bav Bouleeard Phase I Public Works
COUNCIL GO_�L: #13 Improve Transportation
Plamiing Document l�Iajor Thoroughfare Plau
TI"PE: Thoroughfares I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: ST0017
PROJECT DESCRIPTION:
This project would constnut a four-lane concrete curb aud gutter boulevard
section from the Friendswood/League Cit�� corporate limits to F.l�L 528. I�i
addition, the project includes the constniction of an associated underground stonn
sewer s��stem. The thoroughfare would traverse tlu-ough the West Ranch and
Friendswood Lakes developments on the east side of F.l�L 528. Ultimatel��, this
roadwav would comiect Pearland Parkwav in Pearland with Brittanv Bav
Boulevard in League Cit��.
JIISTIFIC�TION:
The project will provide an additional north/south corridor tlu-ough the Cit��.
which will help decrease the congestion along both F.l�L 518 and Sunset
Boulevard. The constniction of the Brittan�� Ba�� Corridor will also prepare the
Cit�� for the firture development of this section of the Cit��. In addition, the
proposed stonn sewer should provide improved drainage in the area along the
Brittanv Bav Boulevard Corridor.
Estimated 2017 Costs
Construction Costs: $d.6d6.000
Easement Costs:
Easement Acquisition Sercices:
15°oContingency $697.000
Professional Sercices $708.000
Testing Sercices $91.000
Total Projected Project Cost: $6,1-11,000
20
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Actieitv Center Renoeation Parks and Recreation
COUNCIL GO_�L: #9 Develop Civic Center
Plamiing Document: Parks and Open Space master Plan
TI"PE: Facilities I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
The 199� Parks and Open Space 1�laster Plan identified the need to pro�•ide a modern
state of the art facility to handle the recreation needs of a population of 55.000 citizens.
A more detailed scope is espected to be identified during the preliminary study phase of
the project The scope outlined abo�•e was based on currently identified needs of the
Sponsor Departxnent.
JIISTIFIC�TION:
The Parks and Open Space Plan identified the need for a Civic Center to meet the
needs of a diverse communitv of 55.000 citizens. The current _�ctivities Center
provides a public facilit��where residents of all ages will be able to come together
and socialize, recreate aud participate in a wide variet�� of conununit�� events and
activities. Currentl��, the _�ctivities Center is undersized for the population. The
Cit�� is currentl�� in a feasibilit�� shid�� for options on espansion. The Cit�� is
looking to renovate the esisting building and add another 8.800 SF onto the site
and install more parking.
Estimated 2017 Costs
Construction Costs: $1.7dd.000
25°o Contingency: $d�6.000
Professional Sercices: $178.000
Testing Sercices: $�6.000
Total Projected Project Cost: $2,39-1,000
21
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Corporal Wesley� J Canning Parks and
Sportspark Recreation
COUNCIL GO_�L: #6 l�Iaintain High Level of Public Sen�ice
Plamiing Document: N_�
TI"PE: Park Facilities I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
In an effort to obtain additional acreage for much needed ball fields, the City has been
working with Gal�•eston County Consolidated Drainage District (GCCDD) to utilize a
dry detention for lacrosse fields. GCCDD has graded the Baker Road detention pond for
the de�•elopment of secen (7) lacrosse fields. In order for the fields to be utilized, the
City will de�•elop restroom facilities and lighting for the fields
JIISTIFIC�TION:
The demand for youth ball fields within the City is growing at an alarming rate.
Accordingly, this is an opportunity to utilize thirty (�0) plus acres that would otherwise
sit dormant,for lacrosse fields.
Estimated 2017 Costs
Construction Costs: $9d2.000
25°oContingency $2�6.000
Professional Sercices $96.000
Testing Sercices $20.000
Total Projected Project Cost: $1,29-1,000
22
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Fire De artment Trainin Field U rades Fire De artment
COUNCIL GO_�L: #6 l�Iaintain High Level of Public Sen�ice
PL_�NNING DOCUDIENT: None
TI"PE: Facilities I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
The project would utilize the esisting 1.0 acre site at Fire Station #2 (2601 West
Parkwood) in the Sun l�Ieadow area. The project would constnut a fire evolution
training stnuture aud ancillar�� facilit�� with a ground level footprint of
approsimatel�� 1070 sq. ft. and inchides a 265 sq. ft. tower stnichire 30 feet high
with 4 decks, steel doors and multiple window openings and open stairwa��s and a
residential training section consisting of approsimatel�� 500 sq. ft. two stor��
building with steel doors multiple window openings steel shutters and a 2°d floor
buni room based on a prepackaged, purpose built stnichire.
Site improvements include installation of an 8-inch water main aud provision of
gas main aud electrical site upgrades. Requires installation of additional access
pavement of approsimatel�� 16.200 sq. ft.
_� more detailed scope is espected to be identified during the preliminar�� stud��
phase of the project The scope outlined above was based on currentl�� identified
needs ofthe Sponsor Department.
JIISTIFIC�TION:
_�ppropriate training facilities become more important to maintaining the current
level of sen�ice provided b��the vohuiteer fire department The new Headquarters
facilit�� will provide classroom facilities but practical field training is a
requirement for providing this sen�ice. Providing needed training facilities in the
Cit��keeps the vohurteers here, training in the cit��, and available to respond to au��
emergencies aud minimize training espenses required to send vohurteers outside
the cit�� for the training. Current training locations include: La Porte. College
Station, and Beaumont.
Estimated 2017 Costs
Construction Costs: $d50.000
10°o Contingency: $d5.000
Professional Sercices: $50.000
Testing Sercices: $5.000
Total Projected Project Cost: $550,000
23
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Fire Station #2 Reconstruction Fire De artment
COUNCIL GO_�L: #6 l�Iaintain High Level of Public Sen�ice
PL_�NNING DOCUDIENT: N_�
TI"PE: Facilities I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
The current project consists of a sub-Station sized facilit�� of approsimatel�� 2800
sq. ft. sihiated on approsimatel�� 1 acre at 2601 West Parkwood (Fl�I 528). The
proposed sub-Station project contains about 2020 square feet of living/
administrative/ workspace and approsimatel�� 4625 square feet of apparahis and
support space. Stnicture is plauned as a pre-engineered metal building frame and
roof designed to current wind-load requirements of 120mph with pennauent walls
constnicted from Cl�IU/ brick veneer aud temporar�� walls from metal pauel or
composite materials. Site improvements inchide approsimatel��24 parking spaces
along the perimeters of the access and equipment drivewa��s. The station contains
two double-loaded equipment ba��s, storage, aud a utilit�� room. Inside is a da��
room, dispatch office, small kitchen, locker-room and donn room for three
volunteers. Provisions have been made to include emergenc�� power for the
station.
JIISTIFIC�TION:
The current station is a metal frauied building and past its life use. It is not
feasible for the building to be brought up to code and useable during emergenc��
sen�ices in all t��pes of weather. The decision is to demolish the esisting building
and constnict a new fire station like the Fire Station 4.
Estimated 2017 Costs
ConstructionCosts: $1.�6�.000
25°o Contingency: $�d1.000
ProfessionalSercices: $1�9000
Testing Sercices: $28.000
Total Projected Project Cost: $1,871,000
24
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Parks & Recreation Buildin Renoeation Parks and Recreation
COUNCIL GO_�L: #6 l�Iaintain High Level of Public Sen�ice
Plamiing Document: N_�
TI"PE: Facilities I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
The esisting Parks aud Recreation Building, located at 220 Shadwell, will need
major renovation to bring the stnicture up to current building codes for public use
from a single famil��residential stnicture.
JIISTIFIC�TION:
The Building will need renovations to set up as the headquarters for Parks aud
Recreation to house 5 — 8 emplo��ees. The esterior and interior doors will need to
be modified. The esisting electrical would have to be upgraded. The facilit��
would need to be made _�D_�accessible.
The first task will require a sun�e�� to detennine implications of the current and
proposed flood zone maps. The adjushnents to the stnicture will necessitate
hiring au appropriate professional Sun�e��. Design, and Engineering team.
Estimated 2017 Costs
Construction Costs: $750.000
25°o Contingency: $192.000
Professional Sercices: $16�.000
Testing Sercices: $�7.000
Total Projected Project Cost: $1,159,000
25
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Park Trails Master Plan Public Works
COUNCIL GO_�L: N/_�
Plamiing Document: N/_�
TI"PE: Sidewalks I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: N/_�
PROJECT DESCRIPTION:
This project would constnict a series of trails comiect all the Cit�� parks. The
project would use esisting routes where possible and constnict new routes in the
drainage areas.
JIISTIFIC�TION:
This project is part ofthe Parks l�Iaster Plan.
Estimated 2017 Costs
Construction Costs: $100.000
Easement Costs:
Easement Acquisition Sercices:
25°o Contingency
Professional Sercices
Testing Sercices
Total Projected Project Cost: $100,000
26
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Pedestrian Brid e at Brookside Intermediate Public Works
COUNCIL GO_�L: N/_�
Plamiing Document: N/_�
TI"PE: Sidewalks I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: N/_�
PROJECT DESCRIPTION:
This project would constnict a 169 linear Foot pedestrian bridge across the
drainage chamiel from Brookside Intennediate School to the back side of the
Gallowa�� school, along the drainage chamiel.
JIISTIFIC�TION:
The Cit�� was approached b�� Clear Creek I�idependent School District (CCISD)
about the possibilit�� of installing a pedestrian bridge to make access from the
_�uhumi Creek Subdivisions easier and safer for the children, instead of walking
along Ba�� _�-ea Boulevard to Fl�I 528 and then crossing Ba�� _�rea Boulevard and
walking along Fl�I 528 to get to Brookside Elementar�� School.
Estimated 2017 Costs
Construction Costs: $520.000
Easement Costs:
Easement Acquisition Sercices:
25°oContingency $1�0.000
Professional Sercices $116.000
Testing Sercices $11.000
Total Projected Project Cost: $777,000
27
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Public Safetv Buildin , Phase II Police De artment
COUNCIL GO_�L: #6 l�Iaintain High Level of Public Sen�ice
Plamiing Document: Communit��Facilities Plan
TI"PE: Facilities I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
This project would espand Phase I of the PSB to accommodate the persomiel
space requirements for a total Police Force of approsimatel�� 117 officers and
civiliau personnel and up to 9 personnel in the Fl�IO. These figures are based on
percent gro�vth of the various divisions aud would be finalized b�� a programming
shid�� done at the time. The assumptions made b�� this projection are based on
available infonnation and inchide espansion in _�dministration areas, inchiding
the FDIO to total approsimatel�� 3.500 sq. ft., in Patrol of 4J00 sq. ft., in CID of
approsimatel�� 4.300 sq. ft., aud auother 3.500 sq. ft. in courts area. This estimate
inchides required espansion of Evidence storage and annor�� spaces. The
_�dministrative area is plamied to be stonn hardened to match the esisting
stnichire. No additions were foreseen for the Jail area. Records Storage areas at
this time. _�pprosimatel�� 100 parking spaces would be added: 40 in secure area
and 60 in public.
_� more detailed scope is espected to be identified during the preliminar�� stud��
phase of the project The scope outlined above was based on currentl�� identified
needs ofthe Sponsor Departments including l�Iunicipal Courts.
JIISTIFIC�TION:
_�t BL111CI-OL1Y the PD espects to have a total persomiel accompauiment of
approsimatel�� 117 officers and civilian persomiel. _�dditionall��, the Fire
l�Iarshal's Office can be espected to grow b�� nearl�� 100°o, from four to between
8 aud 10. Phase One of the facilit�� was designed with some room for gro�vth
through about 2014-16 based on current projections (assuming the departments
maintain a 1.5 officers to 1000 population ratio.) This facilit��will require a major
espansion to house these critical fiuictions and to contimie to sen�e as the Cit��'s
Emergenc�� Operations Center during severe weather events.
Estimated 2017 Costs
Construction Costs: $d.Odd.0000
25°oContingency $1.011.000
Professional Sercices $5�9.000
Testing Sercices $81.000
Total Projected Project Cost: $5,675,000
28
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Side�valk Master Plan Public Works
COUNCIL GO_�L: N/_�
Plamiing Document: N/_�
TI"PE: Sidewalks I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: N/_�
PROJECT DESCRIPTION:
This project would constnict sidewalks tlu-oughout the Cit�� starting at high
pedestrian areas. The Cit�� is proposing to spend $100.000 a ��ear to replace or
install new sidewalks. The priorit��would be near schools throughout both school
districts to make safe passage for children that walk to aud from the schools, then
it would shift focus to the needs of different subdivisions.
JIISTIFIC�TION:
The Cit�� staff and Cit�� Council has been approached b�� residents on the subject
of sidewalks, either new to be installed or fised or replaced. The Cit��has decided
to institute this Sidewalk l�Iaster Plan to start the process of t��ing in sidewalks
throughout the Cit��.
Estimated 2017 Costs
Construction Costs: $500.000
Easement Costs:
Easement Acquisition Sercices:
25°o Contingency
Professional Sercices
Testing Sercices
Total Projected Project Cost: $500,000
29
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Steeenson Park Reclamation Parks and Recreation
COUNCIL GO_�L: #6 l�Iaintain High Level of Public Sen�ice
Plamiing Document: N_�
TI"PE: Park Facilities I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
The esisting Fire Station Site will be unoccupied and the land will recert back to
Stecenson Park. In an effort to espand Ste�•enson Park, the esisting building and parking
will be demolished and the area will ha�•e grass installed.
JIISTIFIC�TION:
The new Fire Station on Harold R'hitaker Dri�•e will become the New Headquarters for
the Friendswood �%olunteer Fire Department The City has decided to re�•ert this land
that the esisting Fire Station 1 is on back to parkland.
Estimated 2017 Costs
Construction Costs: $d0.000
25°oContingency $10.000
Total Projected Project Cost: $50,000
30
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Steeenson Park and S�vimming Pool Parks and Recreation
Restroom Renoeations
COUNCIL GO_�L: #6 l�Iaintain High level of Public Sen�ices
Plamiing Document: Parks and Open Space master Plan
TI"PE: Facilities I"E_�R PL_�NNED: 2017
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
The Project requires the demolition of the esisting restrooms aud office area aud
constnict new restrooms and office space with new utilities and fistures. _�lso.
the esisting restrooms near the Gazebo will be removed aud the restrooms at the
Pavilion will be replaced aud espanded.
JIISTIFIC�TION:
Both esisting restrooms have had munerous operational problems. The main
utilities are undersized and are not known where thev are fed. New constnution.
after the demolition, would verif�� the conditions of the esisting utilities aud
recommended upgrades.
Estimated 2017 Costs
Construction Costs: $705.000
25°o Contingency: $176.000
Professional Sercices: $76.000
Testing Sercices: $1d.000
Total Projected Project Cost: $971,000
31
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Street Paeement Master Plan Public Works
COUNCIL GO_�L: #13 Improve Transportation
Plamiing Document: Pavement l�Iaster Plan 2008
TI"PE: Streets I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
Currentl�� a number of streets, using various t��pes of pavement, have been
identified as being at the end of their usefiil c��cle. Cit�� Staff is recommending
that a five ��ear plan on replacing the road surfaces identified be implemented.
JIISTIFIC�TION:
In 2008, the Cit�� perfonned an inventor�� of esisting roads throughout the Cit�� in
an effort to detennine which of these roads, based upon their age, esisting
condition and traffic loads and volumes and other factors would warrant
replacement The Cit�� is plamiing to complete a new shid�� in the 2017 Fiscal
I�ear.
Estimated 2017 Costs
Construction Costs: $5.000.000
Total Projected Project Cost: $5,000,000
32
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Sub-re ional Park— Lundv Lane Parks and Recreation
COUNCIL GO_�L: #14 Develop _�dditional Parks
Plamiing Document: Parks and Open Space l�Iaster Plau
TI"PE: Park I"E_�R PL_�NNED: NI"P
SUBTI"PE: Constniction PROJECT NUDIBER: NI"_�
PROJECT DESCRIPTION:
The proposed plau has identified the requirement to espand the park s��stem to
include the addition of one fifteen-_�cre Park conunonl��known as a Sub-Regional
Park. Using 2013 Park Bonds dedicated for Park Land Purchase, the Cit��
Purchased 24 _�cres at the conier of Lund�� Laue and W. Parkwood _�vemie (Fl�I
528). Improvements to this lot will be parking. Picnic Pavilion. Restrooms. 7
fields, liglrting, and fencing.
JIISTIFIC�TION:
The Parks a�id Open Space l�Iaster Plan aud the Park Dedication Ordinance
identifv the need for Communitv Parks within the citv limits of Friendswood at
Build Out The Cit��esperiences ever increasing demand for��outh sports fields.
Estimated 2017 Costs
Construction Costs: $1.d29.000
25°o Contingency: $�57.000
Professional Sercices: $15d.000
Testing Sercices: $29.000
Total Projected Project Cost: $1,969,000
33
Water & Sewer Projects - Five Year CIP Plan
TABLE 5
Pro'ects 5 Year Plan
COH Raw Water S stemB -In $ 3,SOQ000 - $ 3,500,000
Lift Station#22 Reconstruchon $ 2,372,000 - $ 2,637,000
Water P1antNumber One TankRehabilitation $ 1,207,000 - $ 1,339,000
For -Two Inch Water Main Re lacement $ 12,656,000 - $ 12,656,000
Lift Station#1 Reconstruchon $ 1,594,000 - $ 1,774,000
Lift Station#4 Reconstruchon $ 1,594,000 - $ 1,774,000
Lift Station#17 Reconstruchon $ 1,594,000 - $ 1,774,000
Lift Station#23 Reconstruchon $ 3,54Q000 - $ 3,935,000
Samtary Sewer SystemAssesment Phase IV- Conshuction $ 1,464,000 - $ 1,464,000
Samta Sewer S stemAssesment Phase V-Desi $ 1OQ000 - $ 100,000
Second Elevated Water Storage TankRehabilitation $ 954,000 - $ 1,059,000
Water P1antNumber Three Tank Rehabilitahon $ 636,000 - $ 706,000
Water P1antNumber Four Tank Rehabilitahon $ 636,000 - $ 706,000
West Water Interconnect $ 418,000 - $ 461,000
Samtary Sewer SystemAssesment Phase VI- Design $ 1OQ000 - $ 100,000
Samtary Sewer SystemAssesment Phase VII-Design $ 175,000 - $ 175,000
Samtary Sewer SystemAssesment Phase VIII- Conshuction $ 1,83Q000 - $ 1,830,000
TOTAL $ 34,370,000 - $ 35,990,000
34
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
COH Ra�v Water Svstem Buv-In Public Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N_�
TI"PE: Utilitv I"E_�R PL_�NNED: NI"P
SUBTI"PE: Water Distribution I�nprovements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
This is a purchase of raw water capacit�� from the Cit�� of Houston through their
centralization of the Raw Water feed svstem to the Southeast Water Purification
Plant The Cit�� of Houston has for��ears operated and maintained their raw water
collection aud distribution s��stem used for providing the water suppl�� to
treatment facilities individuallv. _� decision was taken recentiv to share the costs
of operations, maintenance, and improvements out among the municipal
customer-participants currentl�� acting as co-owners in the treatment and
transmission facilities. In order for Houston to contimie suppl��ing raw water in
firture and prevent the sole burden of the cost being shared onl�� b�� Houston all
firture co-participauts desire more capacit�� are to share the cost. I�i order to do
this fairl��, all raw water supplies are group to create a raw water s��stem with a
200 DIGD capacit��.
JIISTIFIC�TION:
This is a component of the Surface Water suppl��-treahnent aud distribution
s��stem that the Cit�� has bought into as an outgro�vth of the 2001 Ground Water
Reduction Plau. The Cit�� of Houston is sharing out the cost of this s��stem with
its co-participants.
FIINDING SOIIRCES:
The identified fiuiding source for this project is the Water & Sewer Working
Capital.
Total Projected Friendswood Participation Cost: $3,500,000
35
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Lift Station #22 Reconstruction Public Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N/_�
TI"PE: Utilitv I"E_�R PL_�NNED: 2018
SUBTI"PE: Sauitar�� Sewer Improvements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
Complete reconstniction of the Lift Station #22 facilit��. The facilit�� is located in
Forest Bend Park. Rehabilitation would include wet well, pumps and controls.
The reuse of esisting generator ma�� not be possible if the pumps are upgraded.
The new installation would replace a facilit�� 33 ��ears old and in deteriorating
condition. In general, the project would have within its definition the installation
of tlu-ee submersible sewage pumps of the 25 to 30 HP range, controls and
associated instnunentation all in stainless enclosures. Unless provision are to be
made for force main relocation, the pumps would have to have a high head
capabilit�� due to the fact that the�� discharge into the force main of lift station
number 2. This might also signal the use of variable speed drive technolog�� to
regulate flow. Controls and associated instnunentation should be in stainless
enclosures. _� new fence should also be inchided in this project The current 480
volts 3 phase 150 auip sen�ice aud natural gas for the generator is esistent at this
site.
JIISTIFIC�TION:
This lift station sen�es the Forest Bend subdivision and is the third largest lift
station in tenns of flow in the cit��. This site is prone to being over�vorked in
heav�� rain events. Due to the condition of the lift station aud piping changes
made in 2009 to its force main, au upgrade of this site in critical. _� new facilit��
with an increased pumping capabilit�� would sen�ice the Forest Bend area with a
far greater degree of reliabilit��than the esisting site can offer.
Estimated 2017 Costs
Construction Costs: $1.800.000
Easement Costs:
Easement Acquisition Sercices:
20°oContingency $�60.000
Professional Sercices $176.000
Testing Sercices $�6.000
Total Projected Project Cost: $2,372,000
36
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Water Plant #1 Tank Rehabilitations Public Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N_�
TI"PE: Utilitv I"E_�R PL_�NNED: NI"P
SUBTI"PE: Water Distribution I�nprovements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
The project includes sand blasting and painting of both ground storage tanks and some
minor equipment repairs and replacements.
JIISTIFIC�TION:
A pre�•enti�•e maintenance program prolongs the life of the facilities. The ground storage
tanks require blasting and painting e�•ery 10 to 12 years to assure their integrity and
usefulness.
Estimated 2017 Costs
Construction Costs: $950.000
25°o Contingency: $2�8.000
Professional Sercices: $19.000
Testing Sercices:
Total Projected Project Cost: $1,207,000
37
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Fortv-T�vo Inch Water Main Re lacement Public Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N_�
TI"PE: Utilitv I"E_�R PL_�NNED: 2018
SUBTI"PE: Water Distribution I�nprovements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
This is a co-participation project with the Cit�� of Houston and other participants
in the upgrade of the main north / south surface water transmission pipeline from
the Southeast Water Purification Plaut along State Highwa�� 3. Tesas Department
of Transportation plaus to widen State Highwa�� 3 and it will be necessar�� to
remove the esisting pipeline from the State right-of-wa�� in preparation for that
project This presents an opportunit��to up-size this transmission line when it is
removed from the easement The removal / constniction project will be mauaged
b��the Cit�� of Houston and Participant's cost share will be based on a pro-rata use
according to their distribution allocation. There are three different scenarios
being discussed regarding additional capacit�� for League Cit��. The largest
proposed line is a 54-inch down to 48-inch from the current 42-inch line.
Friendswood's distribution allocation from this line is balanced bv its distribution
allocation from the 36-inch line on Beamer and potential increases of capacit��.
JIISTIFIC�TION:
The Cit�� of Friendswood is a participaut in the operation and maintenance of the
42 inch Water Line. That pro-rata participation is reduced b�� its participation in
the Beamer Road 36 inch transmission line. The Cit��is dependent on these as the
source of surface water required to meet the Ground Water Reduction Plan as
established in 2001, and to meet growing population requirements tlu-ough build-
out The original 42-inch line was installed in the earl�� 1970's and has been
esperiencing a larger increase (both size and munber) in leaks in recent ��ears.
Total Projected Friendswood 10.9%Shared Cost: $12,656,000
38
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Lift Station #1 Reconstruction Public Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N/_�
TI"PE: Utilitv I"E_�R PL_�NNED: 2020
SUBTI"PE: Sauitar�� Sewer Improvements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
Complete reconstniction of the Lift Station #1 facilit��. This is the last lift station
in the cit�� using above ground pumps. Reconstniction would inchide wet well.
pumps and controls. The reuse of esisting generator ma�� be possible. The new
installation would replace a facilit�� 40 ��ears old aud in poor condition. The
project should have within its definition the installation of two submersible
sewage pumps of the 15 to 20 HP range, controls aud associated instnunentation
should be in stainless enclosures and located above flood level. _� new fence
should also be inchided in this project The current 230 volts 3 phase 150 amp
sen�ice should be upgraded to 480V if possible and nahiral gas for the generator is
esistent at this site.
JIISTIFIC�TION:
The facilit�� is located in I�nperial Estates and serves that area and some areas on
the north side of F1�I2351. This is the last lift station in the cit�� using above
ground pumps. Replacement of these units which are now entering their 30�h ��ear
is advised. The wet well is begimiing to deteriorate. _� new facilit�� with an
increased pumping capabilit�� would sen�ice the above mentioned area with a far
greater degree of reliabilit�� thau the esisting site can offer and eliminate an old
and unsightl��facilit��.
Estimated 2017 Costs
Construction Costs: $1.200.000
Easement Costs:
Easement Acquisition Sercices:
20°oContingency $2d0.000
Professional Sercices $1�0.000
Testing Sercices $2d.000
Total Projected Project Cost: $1,59-1,000
39
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Lift Station #-4 Reconstruction Public Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N/_�
TI"PE: Utilitv I"E_�R PL_�NNED: 2019
SUBTI"PE: Sauitar�� Sewer Improvements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
Complete reconstniction of Lift Station #4 facilities would inchide wet well.
pumps aud controls. The reuse of esisting generator is possible. The new
installation would replace a facilit�� over 40 ��ears old and in deteriorating
condition. The project would have within its definition the installation of rivo
submersible sewage pumps of the 20 to 25 HP range. Unless provision are to be
made for force main relocation, the pumps would have to have a high head
capabilit�� due to the fact that the�� discharge into the force main of lift station
number 23. Controls aud associated instnunentation should be in stainless
enclosures and placed above the flood level. _�new fence should also be inchided
in this project The current 480 volts 3 phase open t��pe, which might limit it to
100 amp sen�ice, and nahiral gas for the generator is esistent at this site.
JIISTIFIC�TION:
This lift station sen�es the Poll�� Ranch Subdivision. Though not auiong the
largest facilities in tenns of flow, the site is in very poor condition. The facilit�� is
also prone to flooding aud was partiall�� destro��ed b��the floods of 2001. _� new
facilit��, built with the potential flooding dangers in mind aud using the efficienc��
of modeni design aud pumping techniques, would greatl�� increase the reliabilit��
of sen�ice to the area mentioned above aud eliminate an aging and unsightl��
facilitv.
Estimated 2017 Costs
Construction Costs: $1.200.000
Easement Costs:
Easement Acquisition Sercices:
20°oContingency $2d0.000
Professional Sercices $1�0.000
Testing Sercices $2d.000
Total Projected Project Cost: $1,59-1,000
40
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Lift Station #17 Reconstruction Public Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N/_�
TI"PE: Utilitv I"E_�R PL_�NNED: 2019
SUBTI"PE: Sauitar�� Sewer Improvements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
Complete reconstniction of the Lift Station #17 facilities would include wet well.
pumps aud controls. The reuse of esisting generator is possible. The new
installation would replace a facilit�� over 30 ��ears old and in deteriorating
condition. I�i general tenns, the project would have within its definition the
installation of three submersible sewage pumps of the 15 to 20 HP range, controls
and associated instnunentation should be in stainless enclosures and placed above
the flood level. _�new fence should also be inchided in this project The current
480 Volt. 3 Phase 150 amp sen�ice aud nahiral gas for the generator is esistent at
this site.
JIISTIFIC�TION:
This lift station sen�es the Wedgewood area bordered b�� Clear Creek to the west.
Blackhawk Boulevard to the east. F1�I2351 to the north, aud Shadv Oaks Drive to
the south. The facilit�� also receives sewage from lift station munber 37 located at
our surface water station munber 2 plant It is in tenns of flow, within the 10
largest lift station facilities in the cit��. The facilit�� is also prone to flooding aud
was partiall�� destro��ed b��the floods of 2001. _�new facilit��will need to be built
with the potential flooding dangers in mind would greatl�� increase the reliabilit��
of sen�ice to the areas mentioned above.
Estimated 2017 Costs
Construction Costs: $1.200.000
Easement Costs:
Easement Acquisition Sercices:
20°oContingency $2d0.000
Professional Sercices $1�0.000
Testing Sercices $2d.000
Total Projected Project Cost: $1,59-1,000
41
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Lift Station #23 Reconstruction Public Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N/_�
TI"PE: Utilitv I"E_�R PL_�NNED: 2017
SUBTI"PE: Sauitar�� Sewer Improvements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
Complete reconstniction of the Lift Station #23 facilit��. The facilit�� is located on
Fl�I 518. Reconstniction will inchide wet well, pumps and controls. The reuse of
esisting generator will not be possible. The new installation would replace a
facilit�� 23 ��ears old and in deteriorating condition. In general, the project would
have within its definition the installation of three submersible sewage pumps of
the 70 HP rauge, controls and associated instnunentation all in stainless
enclosures. The use of variable speed drive teclmolog�� to regulate flow will be
required on this station. _� new fence will be inchided in this project as the wet
well and control buildings will be relocated to the unoccupied area adjacent to the
station. Due to changes in TCEQ regulations, the esisting force main will have to
be downsized. The current 480 volts 3 phase 150 amp sen�ice and nahiral gas for
the generator is no at the site but is close.
JIISTIFIC�TION:
This lift station sen�es the westeni portion of the Cit��and is the second largest lift
station in tenns of flow in the cit��. This site is prone to being over�vorked in
heavv rain events. Due to the condition of the lift station and overflows, au
upgrade of this site in critical. _� new facilit�� with an increased pumping
capabilit�� would sen�ice the Cit�� with a far greater degree of reliabilit�� thau the
esisting site can offer.
Estimated 2017 Costs
Construction Costs: $2.600.000
Easement Costs:
Easement Acquisition Sercices:
20°oContingency $520.000
Professional Sercices $�68.000
Testing Sercices $52.000
Total Projected Project Cost: $3,5-10,000
42
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Sanitarv Se�ver Svstem Assessment Public
Phase IV Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N/_�
TI"PE: Utilitv I"E_�R PL_�NNED: 2018
SUBTI"PE: Sauitar�� Sewer Improvements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
Basins Eight aud Eighteen was part of the original group of areas esperiencing the
greatest inflow and inf'iltration. Basins Eight and Eiglrteen consist of
approsimatel�� 75.029 linear feet of gravit�� sanitar�� sewer lines and 179
maiilioles. Basin Eiglrt encompasses the westeni portion of Fl�I 2351 (Coward
Creek subdivision) from Sunset to Hackne�� aud from Falling Leaf to the cit��
limits across from Fl�I 2351. Basin Eighteen encompasses the eastern most
portion of the cit�� along Ba�� _�-ea Boulevard. The subdivisions of Friendswood
Oaks aud Terra Bella primar��areas.
Phase IV will be the constniction of the design plans from Phase III.
JIISTIFIC�TION:
_�s part of the Sanitar�� Sewer S��stem _�ssessment Phase I au overall master plau
was developed to fiirther investigate specific basins based on the original flow
monitoring data.
Estimated 2017 Costs
Construction Costs: $1.200.000
Easement Costs:
Easement Acquisition Sercices:
20°oContingency $2d0.000
Professional Sercices
Testing Sercices $2d.000
Total Projected Project Cost: $1,-16-1,000
43
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Sanitarv Se�ver Svstem Assessment Public
Phase V Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N/_�
TI"PE: Utilitv I"E_�R PL_�NNED: 2018
SUBTI"PE: Sauitar�� Sewer Improvements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
Basin One was part of the original group of areas esperiencing the greatest inflow
and infiltration. Basins Eight aud Eighteen were studied as part of Phase II.
Basin One consists of approsimatel�� 34.750 linear feet of gravit�� sauitar�� sewer
lines and 270 maiilioles. Basin One encompasses the northeni portion of
Blackhawk Boulevard (Wedgewood Village) from Cedar Gulle�-to Fl�I 2351 and
from Beamer Road to Clear Creek on Fl�I 2351.
JIISTIFIC�TION:
_�s part of the Sanitar�� Sewer S��stem _�ssessment Phase I au overall master plau
was developed to fiirther investigate specific basins based on the original flow
monitoring data. Phase V will be the second such in-depth investigation into
specific basins.
Estimated 2017 Costs
Construction Costs:
Easement Costs:
Easement Acquisition Sercices:
20°oContingency $10.000
Professional Sercices $90.000
Testing Sercices
Total Projected Project Cost: $100,000
44
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Second Eleeated Tank Rehabilitation Public Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N_�
TI"PE: Utilitv I"E_�R PL_�NNED: NI"P
SUBTI"PE: Water Distribution I�nprovements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
The rehabilitation of the esisting elevated storage tank will inchide the saud
blasting and painting of the storage tank aud some minor repairs to pumping
equipment.
JIISTIFIC�TION:
_� preventive maintenance prograui would prolong the life of the facilities. The
ground storage needs to be painted ever�� 10 to 12 ��ears to assure its integrit�� aud
L1SZfL1111ZSS.
Estimated 2017 Costs
Construction Costs: $750.000
25°o Contingency: $188.000
Professional Sercices: $16.000
Testing Sercices:
Total Projected Project Cost: $95-1,000
45
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Water Plant #3 Tank Rehabilitation Public Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N_�
TI"PE: Utilitv I"E_�R PL_�NNED: NI"P
SUBTI"PE: Water Distribution I�nprovements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
The project includes sand blasting and painting of the ground storage tank and some
minor equipment repairs and replacements.
JIISTIFIC�TION:
A pre�•enti�•e maintenance program prolongs the life of the facilities. The ground storage
tanks require blasting and painting e�•ery 10 to 12 years to assure their integrity and
usefulness.
Estimated 2017 Costs
Construction Costs: $500.000
25°o Contingency: $125.000
Professional Sercices: $11.000
Testing Sercices:
Total Projected Project Cost: $636,000
46
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Water Plant #-4 Tank Rehabilitation Public Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N_�
TI"PE: Utilitv I"E_�R PL_�NNED: NI"P
SUBTI"PE: Water Distribution I�nprovements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
The project includes sand blasting and painting of the ground storage tank and some
minor equipment repairs and replacements.
JIISTIFIC�TION:
A pre�•enti�•e maintenance program prolongs the life of the facilities. The ground storage
tanks require blasting and painting e�•ery 10 to 12 years to assure their integrity and
usefulness.
Estimated 2017 Costs
Construction Costs: $500.000
25°o Contingency: $125.000
Professional Sercices: $11.000
Testing Sercices:
Total Projected Project Cost: $636,000
47
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
West Water Interconnect Public Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N_�
TI"PE: Utilitv I"E_�R PL_�NNED: NI"P
SUBTI"PE: Water Distribution I�nprovements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
The proposed improvements would estend an independent 12" line to
intercomiect the esisting 16"transmission water main line on Wildeniess Trails to
the 12"main on Fl�I 528.
JIISTIFIC�TION:
Currentl��, limited un-looped water lines sen�ice various developments throughout
the southeni region of Friendswood, therefore limiting the availabilit�� of needed
constant water pressure on the farther westeni regions of Friendswood. The
proposed transmission water main would provide the needed direct constaut
suppl�� of water to this proposed area, ultimatel�� providing development
opportunities along the far westeni regions of Fl�I 528.
FIINDING SOIIRCES:
The identified fiuiding source for this project is the Water & Sewer Working
Capital.
Estimated 2017 Costs
ConstructionCosts: $�10.000
20°o Contingency: $62.000
Professional Sercices: $d0.000
Testing Sercices: $6.000
Total Projected Project Cost: $-118,000
48
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Sanitarv Se�ver Svstem Assessment Public
Phase VI Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N/_�
TI"PE: Utilitv I"E_�R PL_�NNED: 2019
SUBTI"PE: Sauitar�� Sewer Improvements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
Basins Five aud Twent�� are part of the second tier group of areas esperiencing the
greatest inflow aud infiltration. Basins Eight. Eighteen, aud One were studied as
part of Phase II and Phase V. Basins Five aud Twent�� consists of approsimatel��
67.770 linear feet of gravit�� sanitar�� sewer lines aud 352 maiilioles. Basin Five
encompasses the northern portion of the cit��from Fl�I 2351 to the cit�� limits west
of Fl�I 518 down to the drainage ditch east of North Sunset Drive. Basin Twent��
encompasses the southeni portion of Blackhawk Boulevard (Wedgewood Village)
from Cedar Gullev to Friendswood Liiil: Road and from the citv limits down to
Clear Creek.
JIISTIFIC�TION:
_�s part of the Sanitar�� Sewer S��stem _�ssessment Phase I au overall master plau
was developed to fiirther investigate specific basins based on the original flow
monitoring data. Phase VI will be the third such in-depth investigation into
specific basins.
Estimated 2017 Costs
Construction Costs:
Easement Costs:
Easement Acquisition Sercices:
20°oContingency $10.000
Professional Sercices $90.000
Testing Sercices
Total Projected Project Cost: $100,000
49
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Sanitarv Se�ver Svstem Assessment Public
Phase VII Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N/_�
TI"PE: Utilitv I"E_�R PL_�NNED: 2020
SUBTI"PE: Sauitar�� Sewer Improvements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
Basins One. Five, and Twent�� will have comprehensive shidies conducted on
their s��stems to detennine deficiencies. Based on the results, engineering will
need to be designed to correct the areas. Basins One. Five, and Twent�� consists
of approsimatel�� 100.000 linear feet of gravit�� sanitar�� sewer lines aud 625
maiilioles. Basin One encompasses the northeni portion of Blackhawk Boulevard
(Wedgewood Village) from Cedar Gulle�� to Fl�I 2351 and from Beamer Road to
Clear Creek on Fl�I 2351. Basin Five encompasses the northeni portion of the
cit�� from Fl�I 2351 to the cit�� limits west of Fl�I 518 down to the drainage ditch
east of North Sunset Drive. Basin Twent�� encompasses the southeni portion of
Blackhawk Boulevard (Wedgewood Village) from Cedar Gulle�� to Friendswood
Link Road aud from the citv limits down to Clear Creek.
The limits of the areas needed to be designed will become clearer after
completion of Phases V and VI.
JIISTIFIC�TION:
_�s part of the Sanitar�� Sewer S��stem _�ssessment Phase I au overall master plau
was developed to fiirther investigate specific basins based on the original flow
monitoring data. Phases V and VI will be the second and third such in-depth
investigations into specific basins. This will be the second engineering design
project for the assessment.
Estimated 2017 Costs
Construction Costs:
Easement Costs:
Easement Acquisition Sercices:
20°oContingency $25.000
Professional Sercices $150.000
Testing Sercices
Total Projected Project Cost: $175,000
50
PROJECT N_�DIE SPONSOR DEP_�RTDIENT
Sanitarv Se�ver Svstem Assessment Public
Phase VIII Works
COUNCIL GO_�L: #2 Improve Infrastnicture
Plamiing Document: N/_�
TI"PE: Utilitv I"E_�R PL_�NNED: 2021
SUBTI"PE: Sauitar�� Sewer Improvements PROJECT NUl�IBER: NI"_�
PROJECT DESCRIPTION:
Basins One. Five, and Twent�� will have comprehensive shidies conducted on
their s��stems to detennine deficiencies. Based on the results, engineering will
need to be designed to correct the areas. Basins One. Five, and Twent�� consists
of approsimatel�� 100.000 linear feet of gravit�� sanitar�� sewer lines aud 625
maiilioles. Basin One encompasses the northeni portion of Blackhawk Boulevard
(Wedgewood Village) from Cedar Gulle�� to Fl�I 2351 and from Beamer Road to
Clear Creek on Fl�I 2351. Basin Five encompasses the northeni portion of the
cit�� from Fl�I 2351 to the cit�� limits west of Fl�I 518 down to the drainage ditch
east of North Sunset Drive. Basin Twent�� encompasses the southeni portion of
Blackhawk Boulevard (Wedgewood Village) from Cedar Gulle�� to Friendswood
Link Road aud from the citv limits down to Clear Creek.
The limits of the areas needed to be designed will become clearer after
completion of Phases V and VL Phase VIII will be the constniction of the design
plans from Phase VII.
JIISTIFIC�TION:
_�s part of the Sanitar�� Sewer S��stem _�ssessment Phase I au overall master plau
was developed to fiirther investigate specific basins based on the original flow
monitoring data. Phases V and VI will be the second and third such in-depth
investigations into specific basins. This will be the second constniction project
for the assessment.
Estimated 2017 Costs
Construction Costs: $1.500.000
Easement Costs:
Easement Acquisition Sercices:
20°oContingency $�00.000
Professional Sercices
Testing Sercices $�0.000
Total Projected Project Cost: $1,830,000
51
TABLE 6
Pro'ects Be ond 5 Year Plan�
Annalea/Whitehall Drainage Improvements Future Phases $ 1,207,000
Brittany Bay Boulevard Phase II $ 9,084,000
F.M. 518 Drainage Improvements Phase II $ 3,871,000
Fire Station#4 3rd Ba $ 917,000
Hike and Bike Connecting Trails $ 5,804,000
Northern Panhandle Regional Detention $ 8,192,000
Parks Maintenance Building $ 2,377,000
Public Works Buildin $ 4,480,000
Records Retention Center $ 675,000
Shadowbend Drainage Improvements Future Phases $ 438,000
Southern Panhandle Regional Detention $ 22,967,000
Street Maintenance Master Plan $ 5,000,000
Sunmeadow Drainage Improvements Future Phases $ 2,583,000
TOTAL $ 67,595,000
*In2017 Dollars
52
TABLE 7
Pro'ects Be ond 5 Year Plan�
Automated Meter Reading System $ 3,030,000
Baker Road, Falling Leaf, Stable - Sewer $ 1,203,000
Beamer Road Sanita Sewer Future Phases $ 4,210,000
Beamer Road Water Line Future Phases $ 2,043,000
East Water Loop $ 1,354,000
El Dorado/Lundy L,ane Sanitary Sewer $ 3,880,000
FM 528 - Falcon Rid e to Windson Sanitar Sewer $ 1,005,000
FM 528 - Lundy L,ane to Tower Estates Sanitary Sewer $ 1,585,000
Friendswood Lakes Water Loop $ 358,000
San Joaquin Estates Water Line Replacement $ 1,913,000
San Joaquin Water Loop $ 358,000
Sanitary Sewer System Assesment 10 Year Plan $ 7,153,000
Siateen Inch Transmission Line Phase III $ 1,290,000
South FM 518 Water Line $ 878,000
South Friendswood Service Area Water Loop $ 955,000
Stable Road - Water $ 251,000
Water Plant Number Five Tank Rehabilitation $ 1,587,000
Water Plant Number Six TankRehabilitation $ 636,000
Water Plant Number Two Tank Rehabilitation $ 636,000
West Transmission Line $ 9,064,000
Wilderness Trails Water Loop $ 292,000
Windsong Lane - Water $ 167,000
Windsong Sanitary Sewer $ 3,061,000
TOTAL $ 46,909,000
*In2017 Dollars
53