HomeMy WebLinkAboutResolution No. 2000-07 RESOLUTION NO. R200_0-07
A RESOLUTION OF THE ClTY OF FRIENDSWOOD, GALVESTON/HARIRIS COUNTIES, TExAS,
AUTHORIZING APPL1CATlON FOR FUNDS FOR A PRELIMINARY ENGINE�RING STUDY AND AN
ENVIRONMENTAL ANA�YSIS FOR BRITTANY BAY BOULEVARD BETWEEN THE
FRtEiVDSWOOD/LEAGUE ClTY CORPORATE LIMITS TO F.M. 528 AND FROM F.M. 528 TO F.M. ,
2351, THROUGH THE HOUSTON-GALVESTON AREA COUNCIL 2000-2002 TRANSPORTATION
IMPROVEMENT PROGRAM. •
WHEREAS, the City of Friendswood desires to apply to the Houston-Galveston Area Councii fo�a grant
to fund the Preliminary Engineering and Engineering Anaiysis for the street project through the DepartmenYs
2000-2002 Transpo�tation Improvement Program (TIP); and
WHEREAS, the study is for the construction of a new major thoroughfare from the Friendswood/League
City Corporate limits to F.M. 528 with a total cost estimated of$458,650 for the Preliminary Engineering and
Environmentai Analysis, with a local matching share of$91,730 to be provided by the City; and
WHEREAS, the study is for the construction of a new major thoroughfare from F.M. 528 to F.M. 2351
with a totai cast estimated of$440,670 for the Preiiminary Engineering and Environmental Analysis, with a local
mafching share of$88,135 to be provided by the City; and
WHEREAS, the City of Friendswood intends to inciuded this project in fvture planning and budgetary
processes: now therefore
BE IT A RESOLVED BY TNE ClTY COUNCIL OF THE C1TY OF FRIENDSWOOD, TEXAS:
Section 1. The Mayor is hereby authorized and directed, for and on behalf of the City, to make
application to the Houston-Galveston Area Council for funding fo�the above-described studies, through the
Departments 2Q00-2002 Transportation Improvement Program.
PASSED AND APPROVED AND RESOLVED this the 17th day of Jan. , 2000.
, �k�
=c..v
Mayor Harold L. Whitaker
City of Friendswood
ATTEST:
.
a
Deloris McfCenzie, MC
City Secretary