HomeMy WebLinkAboutResolution No. 2014-14 RESOLUTION NO. R2014-14 A RESOLUTION ADOPTING A CAPITAL IMPROVEMENT PROJECTS MANUAL CONTAINING A SUMMARY OF ALL PROPOSED PROJECTS TO BE ACQUIRED DURING A FIVE YEAR PERIOD, COST ESTIMATES, METHOD OF FINANCING AND A RECOMMENDED TIMETABLE FOR CONSTRUCTING THE IMPROVEMENTS TO BE UNDERTAKEN IN THE CITY OF FRIENDSWOOD,TEXAS. % x X WHEREAS, the City of Friendswood ("City") has determined that there is a need for a comprehensive financial planning document detailing the City's infrastructure needs, priorities, method of financing and the costs and timing of the undertaking for those improvements to be made within the next five years within the City, and such is required by the Subsection (a) of Section 8.03 of Article VIII of the Charter and provided for in Section 395.014 of the Texas Local Government Code; and WHEREAS, the City of Friendswood has reviewed its existing ordinances and has determined and desires that this information should be contained in one document that is separate from the annual budget so as to allow for examination in greater detail, simplified modification to reflect the changing needs of the community at the direction of the Cormcil, and revision and updating annually; and WHEREAS, attached hereto is a manual containing a detailed list of infrastructure needs, priorities, methods of financing and detailed cost estimates programmed for undertaking over a five year period; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FRIENDSWOOD, TEXAS: Section 1. Pursuant to the Charter of the City, Section 8.03 (a) as amended, the City Council hereby adopts the attached, Exhibit A, "The City of Friendswood FY 2015 to 2019 Capital Improvement Projects Manual" as an official document of the City and directs that the information contained and referred to therein shall control and determine the Capital Improvement Project efforts undertaken by the City until such time as the document is amended as called for by this resolution and the City Charter. Section 2. The Director of Community Development is hereby directed to maintain copies of the "The City of Friendswood FY 2015 to 2019 Capital Improvement Proiects Manual' and related documents and make them available upon request, for a reasonable fee, to any individual who requests one. The Director is further directed to review and evaluate this data annually and make recommendations to the Council annually for additions and revisions to the plan contained herein. PASSED,APPROVED AND RESOLVED on this 2n1 day of June,2014. I NJ Kevin M. Hq and Mayor \\ ATTEST: Melinda Welsh, TRMC City Secretary °°°CAF OF 82014-14 2 Capita[Improvement (Program 2014 update 1�y II MackhawkBoulevard, OakVista, Fire Station #3 Wfnovations AndWWandering Trail Lift Station #61splacement WWaterPlant #5 Wsplacement �. r TDXq Grant Emergency Generators Melody Lane TSconstruction &sofutiou V014-14Approved by Oiendswood City Councifon June 2,2014. Table of Contents SECTION ONE—Table of Contents Tableof Contents.................................................................................................. 1 Executive Summary.............................................................................................. 3 Funding Totals (Table 1)................................................................................. 3 Capital Improvements Program Update ............................................................... 4 1.0 Introduction............................................................................................... 4 2.0 The Impact of Growth............................................................................... 4 3.0 The Planning Effort&the Evolution of the Document............................ 5 4.0 Changes to the Document......................................................................... 7 5.0 Bond Issue Costs....................................................................................... 7 6.0 The Challenge at a Glance........................................................................ 8 CIP FY 2015 Total Spending(Table 2).................................................... 8 7.0 Summary of the Program.......................................................................... 8 8.0 The Next Five Years................................................................................. 9 9.0 Projects Completed Since CIP Inception.................................................. 10 Completed Project Statistics and List(Table 3) ....................................... 10 SECTION TWO—Five Year General Government Pro beets 2015-2019 Capital Improvements Program(Table 4) Five Year Plan General Government Projects ......................................... 12 General Government Project Location Map......................................................... 13 General Government Project List......................................................................... 14 1776 Park Improvements (Dog Park, Disc Golf, Trails, etc.)............................... 15 Blackhawk Boulevard Phase 2.............................................................................. 16 Centennial Park Improvements............................................................................. 17 Fire Station#4 Expansion..................................................................................... 18 FireStation at PSB................................................................................................ 19 LakeFriendswood................................................................................................. 20 LibraryExpansion................................................................................................. 21 MaryAnn Drive.................................................................................................... 22 Mud Gully Detention and Conveyance................................................................. 23 ShadowbendAvenue ............................................................................................ 24 Sportspark Improvements..................................................................................... 25 Stevenson Park Improvements.............................................................................. 26 Stevenson Park/Old City Park Bridge .................................................................. 27 TownesRoad ........................................................................................................ 28 Whispering Pines/Friendswood Link Road.......................................................... 29 WindingRoad....................................................................................................... 30 WoodlawnDrive................................................................................................... 31 SECTION TUREE—Five Year Water& Sewer Projects 2015-2019 Capital Improvements Program (Table 5) Five Year Plan Water& Sewer Projects.................................................. 32 Water and Sewer Fund Project Location Map...................................................... 33 1 Water and Sewer Fund Project List...................................................................... 34 BlackhawkI&I.................................................................................................... 35 Blackhawk Wastewater Treatment Plant Rehabilitation...................................... 36 Central 16-Inch Interconnect................................................................................ 37 COH Forty-Two Inch Water Main Replacement.................................................. 38 East FM 528 Waterline......................................................................................... 39 Lift Station#3 Replacement................................................................................. 40 Lift Station 418 Replacement............................................................................... 41 SCADA System Upgrade Phase I......................................................................... 42 Second Elevated Storage Tank Rehabilitation...................................................... 43 Water Plant#2 Replacement................................................................................. 44 Water Plant#7 Repl acement................................................................................. 45 Western Loop 16-Inch Waterline.......................................................................... 46 SECTION FOUR—Beyond Five Year Projects 2015-2019 Capital Improvements Program (Table 6) Beyond Five Year Plan General Government Projects............................ 47 2015-2019 Capital Improvements Program (Table 7) Beyond Five Year Plan Water& Sewer Projects..................................... 47 2 Executive Summary Submitted for City Council's information is the FY 2015 to FY 2019 Capital Improvement Program (CIP) for the City of Friendswood. Currently, there are seventeen (17) General Government and twelve (12) Water and Sewer bond identified CIP projects for the next five (5) fiscal years. This submittal represents the fifth update of the CIP since its creation in 1999. City Staff has committed to updating the projects and manual every year. Once adopted by the City Council, this document will provide Staff a clear direction on the funding and scheduling of remaining projects, which will be a part of long range budgeting plan subject to approval by the City Council. Staff will meet with the City Council in work sessions to seek approval of fimding sources, updating project schedules and to seek guidance for every Fiscal Year regarding subsequent implementation phases. Estimated total funding for individual funding sources and their cumulative totals are given below for the next five-year Capital Improvement Program as well as projects beyond that period. FUNDING TOTALS FOR FIVE YEAR AND BEYOND CIP Table 1 Period Total Estimated Cost Available Funds Funds Needed FY 2015-2019 $ 44,967,365 $ 35,222,884 $ 9,744,481 Beyond Five Years* $ 70,320,431 $ - $ 70320,431 Totals $ 115,287,796 $ 35,222,884 $ 80,064,912 *Costs are in 2014 Dollars. The five-year CIP identified with this update is spread among all categories, with water improvements having a majority of projects scheduled. The driving force for utility projects is generated by population growth requiring more new infrastructure and an existing utility infrastructure that requires maintenance or replacement. Community Development and Public Works focus on implementing the preventive maintenance programs to prolong life of streets. Friendswood is a City with aging infrastructure. The infrastructure installed by the City or dedicated to the City as a condition of development has a useful life that depreciates annually. Via Governmental Accounting Standards Board (GASB) #34, Staff has determined the value of these fixed assets, their average useful life, the status of depreciation, and estimated the future replacement. Long range planning and scheduling remains a critical issue at all times. This CIP Manual Update acknowledges eleven (11) General Government Projects and fifteen (15) Water and Sewer Revenue Projects beyond the five-year CIP Program. These projects have been identified in various studies and master plans as projects needing attention by the City. City Council and City Staff is currently working diligently on all possible funding sources and planning on these projects. 3 CITY OF FRIENDSWOOD CAPITAL IMPROVEMENTS PROGRAM UPDATE 1.0 INTRODUCTION Pursuant to City Charter, the City Manager is required to submit a Capital Improvements Program (CIP) to the City Council. By agreement, this program is to be updated periodically to reflect the completion of projects, the addition of new projects, and to update project costs for financial projection and management efforts. This is the sixth CIP document, the original being created in 1999 and updated in 2003, 2007, 2009, and 2012. The intent of the updated program is to identify, describe, and prioritize the infrastructure needs of the community as it grows and evolves. This task includes an effort to increase the accuracy of the program's cost estimate for all prospective projects, but more specifically within the initial five-year period. The overall goal of the CIP is to maintain the same high quality of life for all citizens through the timely anticipation of the City's needs, planning of improvement projects and determining funding sources as the community grows. The program is also intended to depict financial challenges of the City's growth and maintenance of infrastructure that characterize the City's future and the associated funding requirements to meet these objectives. The programming portion includes formulating preliminary plans, projecting estimated project costs, setting priorities, identifying funding sources, and scheduling the implementation of the plans. 2.0 THE IMPACT OF GROWTH In the 2000 Census, the population of the City of Friendswood was listed as 29,037. According to current staff estimates, the population has increased to 38,469 as of April 2014. Indications are the City will likely reach its build-out population of 55,000 between 2020 and 2030. Population growth continues to be a primary driving factor in the CIP process,particularly as it relates to utilities. During the 2003-05 period, capital project focus was primarily on drainage issues, with the completion of four (4) projects which addressed eleven (11) of the twenty (20) identified problem areas from the 1993 Master Drainage Plan. Four (4) others are currently in various stages of resolution. Continued population growth and development pressures shifted the focus for the 2005-06 period to improvements in utility infrastructure. In the 2009-2010 period there were four (4)water and sewer projects in construction, as two (2) sewer projects were completed and one (1)facility was completed. In the 2011-2012 period there were five (5) water and sewer projects in construction. Currently for the 2015-2019 period, there are seven (7) street projects, three (3) facility projects, six (2) parks projects, one (1) drainage project, and twelve (12) water and sewer projects. 4 3.0 THE PLANNING EFFORT & EVOLUTION OF THE DOCUMENT In Fiscal Year 1999, a Capital Improvements Program was presented to City Council that described the infrastructure growth and maintenance needs of the City through a ten (10) year period. This was the first time that such an extensive and comprehensive plan had been developed. As was noted at that time, the City was facing its heaviest burden of maintaining existing infrastructure, and planning for the construction of new growth-related infrastructure. This remains true today. In 2002, program categories were determined by the requirements set forth in several of the City's planning documents, most notably the City's Comprehensive Plan and Vision 2020, the City's Strategic Plan. During that same time, the City's CIP was centralized under the Community Development and Public Works Department. Under this centralization, projects sponsored by individual departments were passed to the new Capital Projects Division for incorporation into the new planning document for eventual implementation. With the voter's approval of the General Obligation Bond election in February 2003 the City embarked on the 2003-2008 five-year program guided by Council's reaffirmation of project priorities with drainage issues topping the list. In implementing the initial projects from the 2003-08, Drainage Program, Staff discovered that preliminary planning documents used to estimate both the scope of work and its costs had not accurately anticipated physical and market conditions for some of the projects. During design phase, engineering additions to the scope of work were required to provide for the unanticipated impact on private properties surrounding a project. For example, if detailed surveying done during the design phase of a drainage project revealed additional areas of concern, the impact of the additional work to the overall scope of work and the affected areas had to be addressed. All of the initial projects fell victim to unprecedented material and labor cost increases experienced throughout the region as a result of market forces. Staff responded to these issues with a procedure to prioritize the objectives within each project and construct the infrastructure required to achieve those prioritized objectives first. This approach has allowed each project to go forward and provide the central core improvement sought, and to add as many additional secondary and tertiary objectives as approved funding allowed. Thus far, this approach has proven a valid means for meeting the affected project's objectives while coping with rising costs and expanded scope; however, it falls short of the intention of both City Council and Staff for the bond funded projects. These conditions have forced several changes in the process as well as the document. 3. 1 Project Environment: Development pressure continues to drive the schedule of many projects and frequently impacts the scope as well. Opportunities to shape and influence private development activities are considered in the planning and estimating phases of the effort. CIP staff is involved in Development Reviews and frequently interface with developer plans at early stages to coordinate efforts and reduce costs that might otherwise be borne solely by the City. This effort helps stabilize and quantify the scope of the project at earlier stages providing increased confidence in the cost estimates. Staff has successfully integrated developer provided additions to the City's infrastructure to reduce the scope of City funded improvements. 5 3.2 Strategic Planning: Strategic planning is a part of the above processes and the Preliminary Engineering Reports (PER) for projects. In instances where the scope of a PER can reasonably be expanded to include a strategic examination of a system, or an area to provide guidance for specific planning and programming of recognized needs is being addressed with budgetary constraints in perspective, staff will recommend expanding the scope. This small effort assists in the development and refinement of project scope, and helps to identify opportunities to co-participate with private developers to provide needed infrastructure at a lower or no cost to the City. This information is also fed back into the development review process to assist planning staff in guiding developers as they assess their needs and requirements. The combination of the Master Drainage Plan Phase II, the Pavement Management Master Plan, and the Utility Master Plan has been an immense help in identifying the aging infrastructure and receiving general pricing on construction. 3. 3 Project Prioritization: The original CIP Manual, generated in 1999, consisted of forty (40) General Government (GG) bond projects and twelve (12) Revenue (Utility) bond projects. All projects identified were drawn from departmental needs assessments and the City's series of Master Plans, (Vision 2020, Master Drainage Plan Phase I, Parks Master Plan, Streets Master Plan, and the Ground Water Reduction Plan). Initially, these projects were ranked within the sponsoring departments and then Senior Staff ranked those lists to produce a final prioritization of the projects. Much of the original prioritization remained with eight (8) of the original 2003 GO bond projects and seven (7) of the original Utility projects which have been completed, with another two (2) pending bid and two (2) under construction. The 2006 Utility Bond identified eight(8)projects, five(5) of which have been completed and three (3) are under construction. New projects entering the list are fed into this program structure and the final location among other projects remains a product of departmental needs and "forces at work." Forces at work are increased maintenance requirements and breakdown frequencies and developmental pressures. A final factor influencing the ultimate location of a project in the program is the effort to balance the number and dollar value of the projects within a manageable time frame for the sponsoring department. Drainage projects have been top priority since Tropical Storm Allison, and with the advent of Hurricanes Katrina, Rita, and Ike have brought these types of projects to the forefront of all capital projects. In the past, and continuing on to this current CIP Manual, hindrances to effective drainage have been established in the engineering criterion. First and foremost, the Design Criteria for drainage in Friendswood accounts for a five (5) year event within the roadside system, and with an overall development designed to account for a one hundred (100) year event. Although this is optimal for new construction, Friendswood has annexed areas that have been sub-par in drainage standards. In efforts to prioritize area flooding, projects were divided into three categories. Priority drainage projects address flooding where there is danger or already have been flooding in or near homes. Secondary drainage projects address flooding that denies access to areas but is not a threat to property. Tertiary drainage projects address areas where the street floods, but no water ever goes over the curb; streets are designed to hold extra capacity of storm water during extreme events. 6 4.0 CHANGES TO THIS DOCUMENT 4.1 Like its predecessor from 2012, the 2015 to 2019 CIP incorporates significant changes. Every effort has been made to make this the most useful planning tool available for Council and Staff. This update incorporates Water and Sewer bond projects, and General Government bond projects. 4.2 Project Scope: This update includes a complete re-work of the Description/Justification discussion for each project. The accuracy of long-range estimates is directly proportional to the completeness of the scope at the time the estimate is performed. An extensive effort to improve scope definition for all projects has been made as a component of this update. The enhanced level of project information directly improves the accuracy of the estimate and helps to guard against "scope creep". This provides the sponsor department and the planner a better concept of what the project will and will not provide. For these reasons, the estimate will identify if a study was available and, what level of study the estimate is based on. If easements are required for the project, they are roughly quantified and a figure is included for their acquisition. Likewise, survey and other professional services are considered specifically when estimating professional service fees. For these reasons, there are likely to be several different percentage factors used in the estimate for this cost category. It is the intent of staff that when a project becomes part of the five (5) year plan, a more definitive scope will be utilized by contracting Engineering or Architectural Services to provide a Preliminary Report on the project that will include estimated quantities, project, and engineering/architectural costs. 4.3 Organization: The document has been reorganized in an effort to improve user friendliness. Previously, the contents were arranged only by their relative priority providing no intuitive link to the location of the project description and estimate within the General Govermnent Fund section, or the Water & Sewer Fund section. The revised document is organized by fund type, either a General Government or Water & Sewer. The projects beyond the Five-Year Plan are also separated into these two categories and sorted by projected year of the project. The Five Year planned projects have details, scope,justification, and locations for them. The Beyond Five Year Projects also have these features, but to keep this manual to a manageable size, only project name and a location snap are included. As the Projects from the Beyond Five Year Plan fall into the Five Year Plan,they will be added in full. 5.0 BOND ISSUANCE COSTS: In previous CIP Manuals Bond Issuance Costs were not included in the project cost estimates contained within those documents. This document DOES include Bond Issuance Costs in the listed project estimates. Actual and final bond sale amounts may vary depending on the number of projects being funded and the timing of the cash requirements; therefore it is impractical for the CIP to estimate bond issuance costs. 7 6.0 THE CHALLENGE AT A GLANCE Due to increasing construction costs and an aggressive CIP, the greatest challenge to the City is funding. The following tables present a summary for the plan (Current Five-Year and Five-Year Plus divided into project types): CIP FY 2015 TOTAL SPENDING Table 2 Current Mve Year Program 2015-2019 Drainage $ 1,000,000 Facilities $ 9,090,000 Parks $ 3,900,500 Streets $ 12,310,000 Sewer $ 3,570,237 Water $ 15,096,628 $ 44,967,365 Beyond rive Year Program** Drainage $ 7,064,400 Facilities $ 7,911,600 Parks $ - Streets $ 18,533,231 Sewer $ 21,897,600 Water $ 14,913,600 $ 70,320,431 * Figures represent total spending all sources for the time period for all planned projects ** Costs are estimated in 2014 Dollars. 7.0 A SUMMARY OF THE PROGRAM An analysis of the preceding tables provides a number of quick observations that require specific mention. Approximately thirty-nine (39) percent or forty-five (45) million dollars, of the one hundred sixteen (116) million dollars in total program requirements come in the Punt five-years. Of that, fifty-nine (59) percent (26.3 million dollars) is planned for improvements to General Government Projects. General Government Projects form the single largest spending 8 category in the Five-Year Plan 2015-2019. The General Governments category includes Drainage, Facilities, Parks, and Streets infrastructure replacement, and upgrades. The spending requirements are based on needs to accommodate growth and maintain the current level of services to neighborhoods where existing streets and drainage are aged and in need of replacement. Utilities, especially water projects, are the second largest category. In the Five-Year Plus Plan the emphasis is on streets, sewer, and water. The improvements will be required to maintain the quality of city services as the City approaches build out. Finally, the financial commitment to drainage has lowered to two (2) percent of the total forty-four (44) million dollars in spending coming in the Five-Year Plan. This level of commitment has changed with the Master Drainage Plan Phase II and the addition of the previous projects that have not been completed due to depletion of funding. These constitute the Secondary and Tertiary Drainage Projects. 8.0 THE NEXT FIVE YEARS The Five-Year Plan identified with this update clearly keeps emphasis to the General Government category, especially street projects which are twenty-seven (27) percent of all projects included within the five-year plan. As previously discussed, the driving force for spending on sheets is generated by growth and an aging utility infrastructure. Long term emphasis has shifted to the aging street network as the Community Development and Public Works Department focuses on implementing the preventative maintenance programs (i,e. joint sealing, concrete point repairs, etc.) to prolong the life of those streets. However, this will require a consistent financial commitment in the operations budget in order to delay or pre-empt the need for large scale replacement efforts latter. Staff currently believes this program has the ability to postpone the total replacement of those streets for a number of years. By quick observation,the effort levels in the Five-Year Plan are as balanced as external forces will allow. In addition, City Staff is involved in the accountability of identifying possible needed easements and relocations of public utilities. City Staff recommends that the processes of easement acquisition and/or utility relocations begin two(2) years prior to the design of each project. 9 9.0 PROJECTS COMPLETED SINCE THE CIP INCEPTION City of Friendswood Table 3 Capital Improvement Program -Completed Projects Statistics PROJECT TYPE #OF PROJECTS Drainage 6 Facility 10 Parks 4 Streets 10 Sew er 13 Water 20 General Government Funds 30 Water&Sewer Funds 33 Total of All Capital Improvement Projects 63 Capital Improvements Program -Completed Projects to Date DRAINAGE PROJECTS PROJECT NAME COMPLETED AnnaleaMhitehaNKings Park Drainage Phase 1 '2004 Clover Acres Drainage. 2007 FM 518 Drainage Phase 1 .2010 Glenshannon Drainage Phase 1 '2008 Sunneadow Drainage.Fhase 1 :2005 W.Shadow bend/VVoodlaw n Drainage Fhase 1 2004 FACILITY PROJECTS Animal Control Facility < '2011 Drergency Generators-Fires Stations#1&2 2012 Fire Station#3 Rehabilitation 2012 Fire Station#4 :2008 Library Land Acquisition 2000 Municipal Court Renovations 2003 Public Safety Building 2006 Public.Works Addition < `.2001 Public Works Security.Gate 2010 Public Works Vehicle Storage Building :2004 PARK PROJECTS Centennial Park Phase 1 2002 Centennial Park Phase 2&3 2006 Friendswood Sports Park 2000 Jogging Trail Stevenson Park NEE 10 STREET PROJECTS Activity Building Parking 2003 Additional City Hall Parking '2009 Blackhaw k Blvd. Fhase 1 2012 Friendsw ood Link Road Extension 2008 Public Library Parking 2011 Wlody.Lane 2012 Sunnyview/Skyview zz 2011 Sunset Drive 2003 Stadium Lane Parking 2011 W.Shadow bendlWoodlaw n 2004 WbilakecDrive 2004 SEWER PROJECTS Autumn Greek Sewer line "2000 Bearer Road Lift Station -2011 Beamer.Road Sewer :2011 Deepwood Force Main: 2009 Deepw ood Lift Station 2009 E Heritage 8"Sanitary 2001 Emergency Generators Water Plants#1 &Surface Water#2 2012 Friendsw ood Link(Whittier Oaks FM Replacement -2004 Lift Station#6 2014 Longwood Park Sewer 2003 San Joaquin Estates Sewer 2003 South Friendswood Force Main '.2009 Sun Meadow Lift Station 2008 WATER PROJECTS 16 Transaission Water Line(Sunsetto WWg4) 2009 16 Waterline(Melody to Sunset) 2001 24"Trunk Line 2003 2nd Surface Water Take Point-Phase 1 2003 2nd Surface Water Take Point Phase 2 2003 2nd Surface Water.Take Point Tank Addition 2003 Additional Water Purchase 2008 Bay Area Blvd Water Line 2007 Beamar Road Water.Line '2011 Blackhaw k FM 2351 Waterline .':1999 Blackhawk Water Line.: 2008 Emergency Generators Lift Stations 2012 Longwood Park Water Line 2004 Neighborhood Water Line Replacements 2006 Water Plant#1 Rehab 2002 Water Plant#3 Rehab '! 2003 Water Plant#4 Rehab` 2003 Water Rant#5 Rehab 2013 Water Plant#6 Rehab 2012 WJvTP Water Line Loop 8 2006 11 0 a w LL J C C C C c c c V c c c C� C c c LL O Y }O_+ uO_ }O_+ O_ O_ = �U 11 O_ O �O_+ @ O m O O V 0 (J Ci IJ IJ u ti @ U U U U p� LL UI N 01 N c0 � N U1 m U1 d N @ O1 O J @ UI: .O` C O O O O W@ 0 0 O O O C O c > 0 0 @ m m m m fL] m m m m J m J O m m c a � @ m m m m C 'O M 4- m c-I ci ci N ° c c-I c-I UI c-1 c-I c-1 LL rl =0 'U ci c-I O @ N (9 cNi N H f^-I c^i N N cmi m m m m m m m LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL O 0 0 0 0 O O O O O O O p 0 O 0 0 O O O O O O 0 0 0 0 0 ul O O O O O N m O w O O t!1 Ot O M 00 b N lrl O' N m V n �pll O m M O n N ^ N 1pD la0 V N O C7 a @ y O � u � @ Y L d y j m a m C C C Y O O @ U O @ > N E c m > E ° m o ° W @ > E a m a c > E O v m o 0 0 c C 3 c-1 m V LL LL 12 GENERAL �♦ GOVERNMENT ,0� ♦°♦♦ FUND PROJECTS n °♦♦ G1 GB ! G4 .. G7 G17 � G14 / G13 f � /J„i �'F^ G16 Ii :'03 r� / �J (rte / G6 ;1a... G 9 Mutl Gully Detention an Conveyance G11 ------------ �---.- _ 91 �� 1 Legentl \ 11� r•ra � _canoes Rstlymei]M1e gyplfA�rJtnaJmdeanore(reseNN•mw nana.Ay esl•IMecNlaaydlNa:na4 e-ppirn!emrauea na�lc ilt Mnett hvuu.Myuao dlNt nra?p,WreY en'¢{tX lne se:rr¢AS! INIX4LL FAVLiS anJxvtumos W ms(•nrG)AyblM1e usul/pm•/antlhuNC gga¢ilalMM1O'JIM1e CVfdR.•nJSac W IsMa M1[m any Jsmaq•,/a¢;wli•[aNy•hung lmm myus•ollM nrap m.::. 4:J•gMwnsanApaYMdwllnlwmvlm wnfrnoEOn IAI¢msp th•tW M1e•pfanul A)'IA¢¢nJn¢•I 910SWhFNe.d eod e 910 So f F/iI endoo40/nn F� woa9,,y9s31M6 rien swoo Mapping 881)9963309 ' wxwdnremaroean.11, 1"equals 5,000' 13 GENERAL GOVERNMENT FUND PROJECTS PROJECT NAME PAGE G 1 1776 Park Improvements (Dog Park, Disc Golf, Trails, Etc.) 15 G 2 Blackhawk Boulevard - Phase 11 16 G 3 Centennial Park Improvements 17 G 4 Fire Station #4 Expansion 18 G 5 Fire Station at PSB 19 G 6 Lake Friendswood 20 G 7 Library Expansion 21 G 8 Mary Ann Drive 22 G 9 Mud Gukliy Detention and Conveyance 23 G 10 Shadowbend Avenue 24 G 11 Sportspark Improvements 25 G 12 Stevenson Park Improvements 26 G 13 Stevension Park/Old City Park Bridge 27 G 14 Townes Road 28 G 15 Whispering Pines/Friendswood Link Road 29 G 16 Winding Road 30 G 17 Woodlawn Drive 31 14 PROJECT NAME Sponsor Department 1776 Park Improvements Community Services COUNCIL GOAL: #14 Develop Additional Parks PLANNING DOCUMENT: None TYPE: Parks PLANNED YEAR: 2015 SUBTYPE: Construction PROJECT NUMBER: N/A PROJECT DESCRIPTION: The proposed plan will install a Dog Park, a Disc Golf Area, Walking Trails and other items to make this a better service park. JUSTIFICATION: The demand for parkland within the City is growing at an alarming rate. Accordingly, this is an opportunity to utilize vacant property, currently being maintained by the City, for additional parkland. In an effort to obtain additional acreage for much needed park facilities, the City has been working with floodplain managers in the region to utilize the City's buyout lots from Tropical Storm Allison for parkland. FUNDING: Funding has been allocated from the 1776 fund, General Government Fund Balance and Park Dedication Ordinance Fund. Estimated Project Costs $31,000 15 PROJECT NAME Sponsor Department Blackhawk Boulevard Phase 11 Public Works COUNCIL GOAL: #13 Improve Transportation PLANNING DOCUMENT: Major Thoroughfare Plan TYPE: Thoroughfare YEAR PLANNED: 2019 SUBTYPE: Construction PROJECT NUMBER: N/A PROJECT DESCRIPTION: The proposed improvements include rehabilitation of 7,200 linear feet of new concrete paving and curbs from El Dorado Boulevard to FM 2351. This road is past its life cycle and in 2011 Blackhawk Boulevard was reconstructed from El Dorado Boulevard to FM 2351. JUSTIFICATION: As identified in the Master Plan, replacing these roadways will help reduce on-going reducing operation & maintenance costs for both the City and motorists. FUNDING: Funding has been allocated for this project from remaining 2013 Bond Election. Estimated Project Costs $5,453,000 16 PROJECT NAME Sponsor Department Centennial Park Improvements Community Services COUNCIL GOAL: #14 Develop Additional Parks PLANNING DOCUMENT: Centennial Park Master Plan TYPE: Parks PLANNED YEAR: 2015 SUBTYPE: Construction PROJECT NUMBER: N/A PROJECT DESCRIPTION: The proposed plan has identified building a new Basketball Pavilion near the amphitheater and installing lighting at the two new multi-purpose fields, the tennis court, and the North Parking Area. JUSTIFICATION: The City Council approved the Centennial Park Master Plan in 1998. Since that time, Phases I, II & III have been completed which brings the City closer to the needed recreational facilities for the community size of Friendswood. FUNDING: Funding has been allocated for this project from the 2013 Bond Election. Estimated Project Costs $750,000 17 PROJECT NAME Sponsor Department Fire Station#4 Expansion Fire Department COUNCIL GOAL: #6 Maintain High Level of Public Service PLANNING DOCUMENT: Munson-Kennedy Study TYPE: Facilities YEAR PLANNED: 2017 SUBTYPE: Maintenance PROJECT NUMBER: N/A PROJECT DESCRIPTION: When Fire Station #4 was built, a number of factors did not allow for the full construction and a second phase was added so that in the future additional offices could be added to the new structure. Fire Station #1 has been the command HQ of FVFD since the beginning, yet the upkeep and age had set the shift for Fire Station #4 to become the new headquarters. The Project would add another 13,100 SF onto the existing building. JUSTIFICATION: The 2002 Munson-Kennedy study recommended improving Departmental response times by constructing a fourth station in the northwestern portion of the City currently served only by Station One. That fire station, Fire Station # 4 has been completed. It then stated that upon that completion, a new station would be recommended to replace Fire Station#1, which has outlived its usefulness. FUNDING: Funding has been allocated for this project from the 2013 Bond Election. Estimated Project Costs 4,065,000 18 PROJECT NAME Sponsor De ar1i t Fire Station at PSB Fire Department COUNCIL GOAL: #6 Maintain High Level of Public Service PLANNING DOCUMENT: Munson-Kennedy Study TYPE: Facilities YEAR PLANNED: N/A SUBTYPE: Maintenance PROJECT NUMBER: N/A PROJECT DESCRIPTION: Programming for this project came out of the Fire Station #4 planning effort to produce a design that was capable of being reproduced at any location. The new Fire Station would consist of a sub-station sized facility of approximately 6,650 square foot located on approximately 3 acres. The project contains about 2,025 square feet of living / administrative workspace, and approximately 4,625 square feet of apparatus and support space. The structure is planned as a pre-engineered metal building frame and roof, designed to withstand wind-load requirements of 120 mph. Site improvements include approximately 24 parking spaces along the perimeters of the access and equipment driveways. The apparatus bay portion of the station will contain two double- loaded equipment bays, storage, and utility rooms. The interior will consist of a day room, dispatch office, small kitchen, locker room, and dorm room for three volunteers. Provisions will be made to include emergency power for the station. JUSTIFICATION: The 2002 Munson-Kennedy study recommended improving Departmental response times by constructing a fourth station in the northwestern portion of the City currently served only by Station One. That fire station, Fire Station # 4 has been completed. It then stated that upon that completion, a new station would be recommended to replace Fire Station #1. FUNDING: Funding has been allocated for this project from the 2013 Bond Election. Estimated Project Costs $2,500,000 19 PROJECT NAME SPONSOR DEPARTMENT Lake Friendswood Community Services COUNCIL GOAL: #6 Maintain High Level of Public Service Planning Document: None TYPE: Park Facilities YEAR PLANNED: 2015 SUBTYPE: Construction PROJECT NUMBER: N/A PROJECT DESCRIPTION: In an effort to establish additional parks and recreational space, improvements to Lake Friendswood have been identified consisting of (1) a paved parking lot; (2) a restroom/pavilion; (3) trails around the lake; (4) an automatic gate; and (5) floating dock/fishing pier system. JUSTIFICATION: The demand for parkland within the City is growing at an alarming rate. Accordingly, this is an opportunity to utilize vacant property, currently being maintained by the City, for additional parkland. FUNDING: Funding has been allocated for this project from 2013 Bond Election, General Fund Balance, and Park Dedication Ordinance Fund. Estimated Project Costs $1,080,000 20 PROJECT NAME SPONSOR DEPARTMENT Library Expansion Library COUNCIL GOAL: #6 Maintain High Level of Public Service Planning Document: Community Facilities Plan TYPE: Facilities YEAR PLANNED: 2015 SUBTYPE: Construction PROJECT NUMBER: FLB001 PROJECT DESCRIPTION: This project provides for the renovation and addition to the existing Library in order to meet the growing needs of the community. The description is based on a March 2003 study. The existing 15,000 square foot facility will be expanded by 6,000 square foot to accommodate (1) an expansion of the children/teens areas, (2) an expansion of the meeting areas throughout the facility, (3) more books, (4) increased technological capabilities, (5) a snack bar, and (6) more parking. JUSTIFICATION: The New Library is in accordance with the Houston Area Library System's recommendations for facility requirements and is recommended by the Friendswood Public Library Board. FUNDING: Funding has been allocated for this project from the 2013 Bond Election. Estimated Project Costs $2,525,000 21 PROJECT NAME Sponsor Department Mary Ann Drive Public Works COUNCIL GOAL: #13 Improve Transportation PLANNING DOCUMENT: Pavement Improvement Master Plan TYPE: Street YEAR PLANNED: 2015 SUBTYPE: Construction PROJECT NUMBER: N/A PROJECT DESCRIPTION: The proposed improvement is the rehabilitation of approximately 1,700 Linear Feet of Concrete paving from FM 518 to Christina Lane. JUSTIFICATION: In February of 2008, a consulting firm commissioned by the City completed the inventory and categorization of the roadways within Friendswood. Subsequently, the Pavement Management Master Plan was presented to the City Council at their March 3, 2008 meeting. The Pavement Management Master Plan identified twenty-five areas that are in need of rehabilitation due to unacceptable conditions of the roadway. The suggested projects are anticipated to be completed over the next five to ten years. FUNDING: Funding has been allocated for this project from the 2013 Bond Election. Estimated Project Costs $549,000 22 PROJECT NAME SPONSOR DEPARTMENT Mud Gully Detention and Conveyance Public Works COUNCIL GOAL: #5 Improve Drainage TYPE: Drainage YEAR PLANNED: 2015 SUBTYPE: Construction PROJECT NUMBER: NYA PROJECT DESCRIPTION: The City of Friendswood, in participation with the Galveston County Consolidated Drainage District, Harris County Flood Control District, Harris County, and Galveston County will undertake the Mud Gully Detention and Channel Improvements. This will include 120-Acre Detention Basin providing 1,550 acre-feet of detention capacity and approximately 1 mile of conveyance improvements. JUSTIFICATION: The above improvements would drop the surface elevation of Clear Creek and the Mud Gully, and provide benefits to over 700 structures that are within the 100-year flood plain. This is a component of the Clear Creek Federal Flood Control project which is being re-evaluated by the U.S. Army Corps of Engineers. FUNDING: Funding for this project has been allocated from the General Fund Balance. Friendswood Share of Project Costs $1,000,000 23 PROJECT NAME Sponsor Department Shadowbend Avenue Public Works COUNCIL GOAL: #13 Improve Transportation PLANNING DOCUMENT: Pavement Improvement Master Plan TYPE: Street YEAR PLANNED: 2015 SUBTYPE: Construction PROJECT NUMBER: N/A PROJECT DESCRIPTION: The proposed improvement is the rehabilitation of approximately 1,300 Linear Feet of Concrete paving from Woodlawn to FM 518. JUSTIFICATION: In February of 2008, a consulting firm commissioned by the City completed the inventory and categorization of the roadways within Friendswood. Subsequently, the Pavement Management Master Plan was presented to the City Council at their March 3, 2008 meeting. The Pavement Management Master Plan identified twenty-five areas that are in need of rehabilitation due to unacceptable conditions of the roadway. The suggested projects are anticipated to be completed over the next five to ten years. FUNDING: Funding has been allocated for this project from the 2013 Bond Election. Estimated Project Costs $393,000 24 PROJECT NAME Sponsor Department S ortspark Improvements Community Services COUNCIL GOAL: #14 Develop Additional Parks PLANNING DOCUMENT: Centennial Park Master Plan TYPE: Parks PLANNED YEAR: 2015 SUBTYPE: Construction PROJECT NUMBER: N/A PROJECT DESCRIPTION: The proposed plan will upgrade the lighting at the softball and multipurpose fields add new concession stand and restroom facilities, 2 new youth softball fields, and addition of paved parking. JUSTIFICATION: The existing restroom concession building is inadequate and does not meet current building codes. Expansion and further development of the complex will truly transform Friendswood Sportspark into a Community Park. FUNDING: Funding has been allocated for this project from the 2013 Bond Election. Estimated Project Costs $1,718,000 25 PROJECT NAME Sponsor Department Stevenson Park Improvements Community Services COUNCIL GOAL: #l4 Develop Additional Parks PLANNING DOCUMENT: None TYPE: Parks PLANNED YEAR: N/A SUBTYPE: Construction PROJECT NUMBER: N/A PROJECT DESCRIPTION: The proposed plan identifies the installation of Phase II and III of the Splash Pad near the pool, improve the lighting at the tennis, and basketball courts. Project also provides additional lighting around the park to make it safer and a walking trail to/from the new proposed foot bridge. JUSTIFICATION: Proposed improvements are in accordance with the overall Parks and Open Space Master Plan for this area. JUSTIFICATION: Funding has been allocated for this project from the 2013 Bond Election. Estimated Project Costs $246,500 26 PROJECT NAME Sponsor Department Stevenson Park/Old City Park Bridge Community Services COUNCIL GOAL: #14 Develop Additional Parks PLANNING DOCUMENT: None TYPE: Parks PLANNED YEAR: 2015 SUBTYPE: Construction PROJECT NUMBER: N/A PROJECT DESCRIPTION: In an effort to connect our various parks via a trail system, a pedestrian bridge crossing Cowards Creek is proposed along the old Winding Way right-of-way. JUSTIFICATION: The proposed improvements are in accordance with the overall Parks and Open Space Master Plan for this area. JUSTIFICATION: Funding has been allocated for this project from the General Government Fund Balance and Park Dedication Ordinance Fund. Estimated Project Costs $75,000 27 PROJECT NAME Sponsor Department Townes Road Public Works COUNCIL GOAL: #13 Improve Transportation PLANNING DOCUMENT: Pavement Improvement Master Plan TYPE: Street YEAR PLANNED: 2015 SUBTYPE: Construction PROJECT NUMBER: N/A PROJECT DESCRIPTION: The proposed improvement is the rehabilitation of approximately 750 Linear Feet of Concrete paving from Lucian Lane to Crofterglen Drive. JUSTIFICATION: In February of 2008, a consulting firm commissioned by the City completed the inventory and categorization of the roadways within Friendswood. Subsequently, the Pavement Management Master Plan was presented to the City Council at their March 3, 2008 meeting. The Pavement Management Master Plan identified twenty-five areas that are in need of rehabilitation due to unacceptable conditions of the roadway. The suggested projects are anticipated to be completed over the next five to ten years. FUNDING: Funding has been allocated for this project from the 2013 Bond Election. Estimated Project Costs $273,000 28 PROJECT NAME SPONSOR DEPARTMENT Whispering Pines/Friendswood Link Road Public Works COUNCIL GOAL: Goal#and Goal Description Planning Document: Name of Planning Document TYPE: Type of Project, i.e. Drainage YEAR PLANNED: 2015 SUBTYPE: Construction PROJECT NUMBER: N/A PROJECT DESCRIPTION: This project is intended to expand Friendswood Link Blvd from Blackhawk Blvd to Hibiscus Lane to a four-lane curb and gutter section, and Hibiscus to FM 518 to a two- lane with a dedicated center turn lane curb and gutter section. A previous phase was recently completed as El Dorado Blvd by Harris County. In addition, the project includes the construction of an underground storm sewer system. JUSTIFICATION: This project is a part of the short-range transportation plan for the region. This project will help in the evacuation routes from the City and will provide an additional north to south corridor through the City, which will assist in improving the mobility of traffic congestion along both FM 528 and FM 2351. FUNDING: Funding for this project has been allocated from the General Land Office 2.2 Disaster Recovery Grant. Estimated Project Costs $4,600,000 29 PROJECT NAME Sponsor Department Winding Road Public Works COUNCIL GOAL: #13 Improve Transportation PLANNING DOCUMENT: Pavement Improvement Master Plan TYPE: Street YEAR PLANNED: 2015 SUBTYPE: Construction PROJECT NUMBER: N/A PROJECT DESCRIPTION: The proposed improvement is the rehabilitation of approximately 2,100 Linear Feet of Concrete paving from Melody Lane to Riverside Court. JUSTIFICATION: In February of 2008, a consulting firm commissioned by the City completed the inventory and categorization of the roadways within Friendswood. Subsequently, the Pavement Management Master Plan was presented to the City Council at their March 3, 2008 meeting. The Pavement Management Master Plan identified twenty-five areas that are in need of rehabilitation due to unacceptable conditions of the roadway. The suggested projects are anticipated to be completed over the next five to ten years. FUNDING: Funding has been allocated for this project from the 2013 Bond Election. Estimated Project Costs $642,000 30 PROJECT NAME Sponsor Department Woodlawn Drive Public Works COUNCIL GOAL: #13 Improve Transportation PLANNING DOCUMENT: Pavement Improvement Master Plan TYPE: Street YEAR PLANNED: 2019 SUBTYPE: Construction PROJECT NUMBER: N/A PROJECT DESCRIPTION: The proposed improvement is the rehabilitation of approximately 1,300 Linear Feet of Concrete paving from FM 2351 to Shadowbend Avenue. JUSTIFICATION: In February of 2008, a consulting firm commissioned by the City completed the inventory and categorization of the roadways within Friendswood. Subsequently, the Pavement Management Master Plan was presented to the City Council at their March 3, 2008 meeting. The Pavement Management Master Plan identified twenty-five areas that are in need of rehabilitation due to unacceptable conditions of the roadway. The suggested projects are anticipated to be completed over the next five to ten years. FUNDING: Funding has been allocated for this project from the 2013 Bond Election. Estimated Project Costs $400,000 31 NYN Y� � � a @ a m Y Y u u u o u 'Q m h0 hD hD Q] c LL U C C C Q Q N C N Q C U C V C C m tlCO v Se :rce S2 Q LO �i 2i 2i (7 p p N N N aW-1 eNi H N H H N cNi H N N �' N 0 0 0 0 0 0 O O O O O LL LL LL LL LL LL LL LL LL LL LL LL ' U tOit r O O O O O . O O O � N N O � C�/1 O N ll<} ttt O O) J LL 1� N i/T i/T t/1 Ul V1 VT i/T OF VT N 1/} i/} 01 01 O 4 @ a I- `w 3 v ut 06 v m 3 @ C L @ rc E Y U @ @ 2 n C K U1 C ri @ N Y G S C C m F. G y G N p. pl UI @ C ry U V V U 3 3 Ntf @ LYir Lyir " = Y N N Q o v a $ w 0] Q1 U OU 32 WATER ANJDSEWER �� FUNO RROJECiS F '^h us / 12 ulo-.., ,.rte . . . U1& 1 � a / / � 7 U9-CON dl loch Wale,Main Replomment 8 Us-SCAOA System Upgrade Phase 1 U9 �� LepeaO w. y' City o/Friendswood e L.. BIOSeN�Fren6MaMCrrve Friendswood GIS Mapping aaaa,.,�a ,xvumrnmsvmsarc.ur i"equals 5,000' 33 WATER AND SEWER FUND PROJECTS PROJECT NAME PAGE U 1 Blackhawk I & 1 35 U 2 Blackhawk Wastewater Treatment Plant Rehabilitation 36 U 3 COH Forty-Two Inch Water Main Replacement 37 U 4 East FM 528 Water Line 38 U 5 Lift Station#3 Replacement 39 U 6 Lift Station#3 Replacement 40 U 7 Lift Station#18 Replacement 41 U 8 SCADA System Upgrade Phase 1 42 U 9 Second EST Rehabilitation 43 U 10 Water Plant#2 Replacement 44 U 11 Water Plant#7 Replacement 45 U 12 Western Loop 16-Inch Waterline 46 34 PROJECT NAME Sponsor Department Blackhawk I &I Public Works COUNCIL GOALS: #2 Improve Infrastructure PLANNING DOCUMENT: Waste Water Flow Study TYPE: Utility YEAR PLANNED: 2014 SUBTYPE: Wastewater Treatment Improvements PROJECT NUMBER: NYA PROJECT DESCRIPTION: In early 2014, the Gulf Coast Waste Disposal Authority (GCWDA), owner and operator of the Blackhawk Regional Wastewater Treatment Plant, informed the City that additional enforcement efforts by the Texas Commission on Environmental Quality (TCEQ) are on their way related to Infiltration and Inflow problems the plant is currently experiencing. GCWDA's engineers are actively providing preliminary engineering services for evaluation and mitigation of high flows experienced by the Plant. According to the collected flow data, the plant occasionally experiences periods of sustained high flows exceeding the permitted amount. These high flows occur during high intensity rain events and apparently are caused by Infiltration/Inflow in the participant's collection systems. The sustained high flows adversely impact the treatment processes that probably result in exceeding the permitted parameters. JUSTIFICATION: The Blackhawk Wastewater Treatment Facility treats all of Friendswood's wastewater. Permit violations due to infiltration and inflow can result in fines to participants of the plant. FUNDING: Funding for this project has been allocated from the Water and Sewer Working Capital. Estimated Preliminary Engineering $52,500* Costs *Please note once a solution is identified to address the issue, additional information can be provided on the overall project costs. 35 PROJECT NAME Sponsor De artment Blackhawk Wastewater Treatment Plant Rehab Public Works COUNCIL GOALS: #2 Improve Infrastructure PLANNING DOCUMENT: Waste Water Flow Study TYPE: Utility YEAR PLANNED: 2015 SUBTYPE: Wastewater Treatment Improvements PROJECT NUMBER: NYA PROJECT DESCRIPTION: This project consists of the rehabilitation of (1) the head works structure; (2) mechanical bar screens; (3) aeration blowers, piping and valves; (4) fine bubble diffusers; (5) media filters; and (6) UV disinfectant system. JUSTIFICATION: The Blackhawk Wastewater Treatment Facility is a facility owned and operated by the Gulf Coast Waste Disposal Authority. In 2010, the GCWDA commissioned an assessment of the facility and identified areas needing repair. Friendswood is the majority capacity owner within the plant. FUNDING: Funding for this project has been allocated from the Water and Sewer Working Capital. Estimated Project Costs $2,782,737 36 PROJECT NAME SPONSOR DEPARTMENT Central 16-Inch Interconnect Public Works COUNCIL GOAL: #2 Improve Infrastructure Planning Document: None TYPE: Utility YEAR PLANNED: 2015 SUBTYPE: Water Distribution Improvements PROJECT NUMBER: NYA PROJECT DESCRIPTION: This project consists of the installation of approximately 3,000 linear feet of sixteen-inch waterline that would connect water service from the sixteen-inch transmission line along Wilderness Trails to the twelve-inch main line on FM 528. JUSTIFICATION: The Water Distribution System is stretched thin when it gets beyond Sunset Boulevard. There are also not enough loops back to sustain pressure in this area. This will give potable water to the southernmost area of the City and loop the FM 528 line to the 16"Transmission Line. FUNDING: Funding for this project has been allocated from the Water and Sewer Working Capital. Estimated Project Costs $110,000 37 PROJECT NAME SPONSOR DEPARTMENT COH 42 Inch Water Main Replacement Public Works COUNCIL GOAL: #2 Improve Infrastructure Planning Document: None TYPE: Utility YEAR PLANNED: 2015 SUBTYPE: Water Distribution Improvements PROJECT NUMBER: NYA PROJECT DESCRIPTION: This is a co-participation project with the City of Houston and other participants in the upgrade of the main north / south surface water transmission pipeline from the Southeast Water Purification Plant along State Highway 3. Texas Department of Transportation plans to widen State Highway 3 and it will be necessary to remove the existing pipeline from the State right-of-way in preparation for that project. This presents an opportunity to up-size this transmission line when it is removed from the easement. The removal / construction project will be managed by the City of Houston and Participant's cost share will be based on a pro-rata use according to their distribution allocation. Friendswood's distribution allocation from this line is balanced by its distribution allocation from the 36-inch line on Beamer. Replacement and movement of the 42-inch line to a location outside of the Highway 3 ROW is planned for completion by 2015 in order for TxDOT's project to proceed on schedule. JUSTIFICATION: The City of Friendswood is a participant in the operation and maintenance of the 42 inch Water Line. That pro-rata participation is reduced by its participation in the Beamer Road 36 inch transmission line. The City is dependent on these as the source of surface water required to meet the Ground Water Reduction Plan as established in 2001, and to meet growing population requirements through build-out. FUNDING: Funding for this project has not been allocated. Estimated Project Costs $7,000,000 38 PROJECT NAME SPONSOR DEPARTMENT East FM 528 Waterline Public Works COUNCIL GOAL: #2 Improve Infrastructure Planning Document: None TYPE: Utility YEAR PLANNED: 2015 SUBTYPE: Water Distribution Improvements PROJECT NUMBER: NYA PROJECT DESCRIPTION: This project consists of the installation of 2,850 linear feet of fourteen-inch waterline that would extend water service to the East Service Area, and then loop the line back into the existing system by installing 6,600 linear feet of twelve-inch waterline down to Bay Area Boulevard. JUSTIFICATION: The Water Distribution System is stretched thin when it gets beyond Bay Area Boulevard, south of FM 528. There are also not enough loops back to sustain pressure in this area. This will give potable water to the eastern most area of the City and loop the FM 528 line to the Bay Area Boulevard line. FUNDING: Funding for this project has not been allocated. Estimated Project Costs $1,828,000 39 PROJECT NAME SPONSOR DEPARTMENT Lift Station#3 Replacement Public Works COUNCIL GOAL: #2 Improve Infrastructure Planning Document: Utility Master Plan TYPE: Utility YEAR PLANNED: 2014 SUBTYPE: Lift Station Improvements PROJECT NUMBER: NYA PROJECT DESCRIPTION: This project would replace the existing lift station that serves the Annalea- Kingspark-Whitehall area. A new wet well would be poured, new pumps and controls for the lift station would be installed and new fencing will be erected. JUSTIFICATION: The existing lift station at Annalea/Kingspark/Whitehall has reached the end of its useful life span and is in need of replacement. Current estimates indicate that this system will be severely taxed and incapable of handling even normal combined flows in the next few years. FUNDING: Funding for this project has been allocated from the 2006 Water and Sewer Bonds. Estimated Project Costs $735,000 40 PROJECT NAME SPONSOR DEPARTMENT Lift Station#18 Replacement Public Works COUNCIL GOAL: #2 Improve Infrastructure Planning Document: Utility Master Plan TYPE: Utility YEAR PLANNED: 2015 SUBTYPE: Lift Station Improvements PROJECT NUMBER: NYA PROJECT DESCRIPTION: This project would replace the existing lift station that serves the Westwood Village Section 8. A new wet well would be poured, new pumps and controls for the lift station would be installed, and new fencing erected. JUSTIFICATION: The existing lift station at Wedgewood Village Section 8 has reached the end of its useful life span and is in need of replacement. Current estimates indicate that this system will be severely taxed and incapable of handling even normal combined flows in the next few years. FUNDING: Funding for this project has been allocated from the Water and Sewer Working Capital. Estimated Project Costs $500,000 41 PROJECT NAME SPONSOR DEPARTMENT SCADA System Upgrade Phase 1 Public Works COUNCIL GOAL: #2 Improve Infrastructure Planning Document: None TYPE: Utility YEAR PLANNED: 2015 SUBTYPE: Public Works Services PROJECT NUMBER: NYA PROJECT DESCRIPTION: The proposed SCADA System Upgrade would update the City's current utility communications system that sends vital data to the PW facility regarding the status of each of our facilities. JUSTIFICATION: The current is several years old are requires constant repair and upkeep. FUNDING: Funding has been allocated for this project from the General Land Office Round 1 Disaster Recovery Funds. Estimated Project Costs $378,909 42 PROJECT NAME SPONSOR DEPARTMENT Second Elevated Water Storage Tank Public Works Rehabilitation COUNCIL GOAL: #2 Improve Infrastructure PLANNING DOCUMENT: None TYPE: Utility YEAR PLANNED: 2015 SUBTYPE: Water Plant Improvements PROJECT NUMBER: NYA PROJECT DESCRIPTION: The rehabilitation of the existing elevated storage tank will include the sand blasting and painting of the storage tank and some minor repairs to pumping equipment. JUSTIFICATION: A preventive maintenance program would prolong the life of the facilities. The ground storage needs to be painted every 10 to 12 years to ensure its integrity and usefulness. FUNDING: Funding has not been allocated for this project. Estimated Project Costs $372,000 43 PROJECT NAME SPONSOR DEPARTMENT Water Plant Number Two Replacement Public Works COUNCIL GOAL: #2 Improve Infrastructure Planning Document: None TYPE: Utility YEAR PLANNED: 2015 SUBTYPE: Water Distribution Improvements PROJECT NUMBER: UW0017 PROJECT DESCRIPTION: The replacement of Plant #2 will include the replacement of control room, chemical room, conversion of pumps and the probable replacement of the ground storage tank as necessary. Replacement all valves and piping as necessary. The existing cyclone fence will be replaced with an 8 foot cedar wood fence. JUSTIFICATION: This well site is in need of a new control room. The existing controls are located outside and are showing the effects of that environment. The tank is 41 years old and made from galvanized steel with a capacity of only 210,000 gallons and is in need of total replacement. The vertical turbine pumps will be replaced with horizontal units to provide more efficient operation. FUNDING: Funding has been allocated for this project from the 2006 Water and Sewer Bonds, and Water and Sewer Working Capital. Estimated Project Costs $1,414,032 44 PROJECT NAME SPONSOR DEPARTMENT Water Plant Number Seven Replacement Public Works COUNCIL GOAL: #2 Improve Infrastructure Planning Document: None TYPE: Utility YEAR PLANNED: 2015 SUBTYPE: Water Distribution Improvements PROJECT NUMBER: UW0026 PROJECT DESCRIPTION: The project will include the replacement of the control room, chemical room, pumps, and ground storage tank. Replace all valves and piping as necessary. The existing cyclone fence will be replaced with 8 feet cedar wood. The existing tank is made of galvanized steel with a capacity of 210,000 gallons and should be replaced with a 500,000 gallon unit. JUSTIFICATION: This well site is in need of a new control room. The existing room is too small for safety when performing electrical repair work and no longer meets NEC Codes. The existing switchgear is at the end of its usable life. The room also floods when there is any rainfall. A new control room/chemical room will eliminate this situation. The replacement of the existing vertical turbine pumps with horizontal units would provide a more efficient operation. The ground storage tank should be replaced as necessary with half million gallon ground storage as dictated by the last ground storage tank inspection. At this time the replacement of all needed piping and accessories should be done. The existing automatic transfer switch at the site was hit by lightning and partially destroyed. A new switch would enable this site to automatically transfer power when needed. Reconditioning the existing generator set, including increasing the diesel tank capacity, would make this emergency power system more reliable. FUNDING: Funding has been allocated for this project from the 2006 Water and Sewer Bonds, and Water and Sewer Working Capital. Estimated Project Costs $2,293,687 45 PROJECT NAME SPONSOR DEPARTMENT Western Loop 16-Inch Waterline Public Works COUNCIL GOAL: #2 Improve Infrastructure Planning Document: None TYPE: Utility YEAR PLANNED: 2015 SUBTYPE: Water Distribution Improvements PROJECT NUMBER: NYA PROJECT DESCRIPTION: The proposed improvements would extend water-lines west from water plant #4 connecting to existing City water-lines in the western reaches of our service area. JUSTIFICATION: Currently, limited un-looped water lines service various developments throughout the southern region of Friendswood. The proposed water line loop would open up development opportunities along FM 528 and greatly improve water pressure. FUNDING: Funding has been allocated for this project from the Water and Sewer Revenue Bonds. Estimated Project Costs $1,200,000 46 General Government Projects-Beyond Five Year CIP Table 6 5 r Brittany Bay Blvd-Phase 1(East of FM 528) $ 7,443,720 Brittany Bay Blvd-Phase 2(West of FM 528) $ 9,912,311 Fire Dept.Training Field Upgrades $ 940,800 FM 518 Drainage Improvements-Phase 2 $ 3,296,400 Parks Maintenance Building-Both Phases $ 1,200,000 Public Safety Building Phase $ 3,578,400 Public Works Building Renovation $ 1,634,400 Records Retention $ 558,000 San Joaquin Pkwy Reconstruction $ 678,000 Shadowbend Drainage Improvements-Phase 2 $ 499,200 Sunmeadow Drainage Improvements-Phase 2 $ 3,768,000 a Water&Sewer Projects-Beyond Five Year CIP Table 7 Automated Meter Reading System $ 3,600,000 Reamer Road Sanitary Sewer-Future Phases $ 3,658,800 Beamer Road Waterline-Future Phases $ 1,779,600 Blackhawk Wastewater Treatment Plant Expansion $ 10,074,000 El Dorado-Lundy Lane Sanitary Sewer $ 3,404,400 FM 528-Falcon Ridge to Windsong Sanitary Sewer $ 847,200 FM 528-Lundy Lane to Tower Estates Sanitary Sewer $ 1,330,800 San Joaquin Estates Waterline Replacement $ 1,707,600 SCADA System Upgrade Phase 2 $ 240,000 South Friendswood Service Area Water Loop $ 858,000 Surface Water Plant IRehab $ 358,800 Water Distribution Replacement and Upgrades $ 6,000,000 Water Plant 3 Rehab $ 184,800 Water Plant 4Rehab $ 184,800 Windsong Sanitary Sewer $ 2,582,400 48