Loading...
HomeMy WebLinkAboutBudgeted Projects Adopted Budget City of Friendswood 19-Jan.93 Budgeted Projects Fiscal Year Ending September 30, 1993 Project Total -Project. Description Budget Budgeted Street Improvements: Pay-As-You-Go Street Improvement Program: 1992 Street Improvement Program (County) $147,291 1992 Program, Undesignated 45,467 1993 Program, Undesignated 400,000 Street Repairs 21,896 Total i/) $614,654 Sidewalk Improvements: Friendswood Link Road 85,538 FM 518 50,000 Total 135,538 Street Lights, Harris County 7,000 Farm-to-Market Highway Improvements: FM 528 Right-of-Way Acquisition and Utility Relocation 300,000 FM 2351 Water and Sewer Line Relocations 213 ,061 FM 2351 Pipeline Relocations (Exxon, U.S.A. ) 33,000 FM 518 Force Main Relocation 932 Total 546,993 Drainage Improvements: Clover Acres Drainage 144,539 Drainage Master Plan 60,000 Greenbriar Storm Sewer 25,071 Mary's Creek at FM 2351 15,000 Briarmeadow Storm Sewer 10,929 Sun Meadow Drainage 10,000 Sunset Bridge Embankment 5,500 Dickinson Bayou Watershed Study 2,305 Total 273,344 Park Improvements: Stevenson Park Improvements 108,699 Shadwell Improvements: Street/Parking 56,528 Drainage 30,416 Water Line 14,675 Jogging Trail 2,800 Total Shadwell Improvements 104 ,419 l✓ C: \LOTUS\BUD93\FYRPTS\MAYOR\CAPITAL.WK1 1 I. City of Friendswood 19-Jan-93 Budgeted Projects Fiscal Year Ending September 30, 1993 Project Total Project. Description Budget. Budgeted Park Improvements: (continued) Parks Master Plan 40,000 Recoat Swimming Pool 35,750 Lake Friendswood Park 30,000 Wilderness Trails Field Construction 25,000 Renwick Park Parking Lot 20,000 Golf Course Consultant 20,000 Leavesley Park Building Renovation 5,000 Total 388,868 Water Distribution System Improvements: East Viejo Water Line 74,000 El Dorado Water Line 52, 118 Lundy Lane Water Line 37,447 Fire Hydrants Improvements (New Hydrants) 21,988 Blackhawk Blvd. Water Line 18,611 Windsong Water Line (Design Engineering) 10,000 Clover Ridge Water Line 8,472 Spreading Oaks Water Line 6,670 8" Water Line on Friendswood Link Road 5,000 Total 0 234,306 Wastewater Collection System Improvements: South Friendswood Interceptor: Construction 2,940,000 Engineering and Surveying 22,995 Total 2,962,995 0 Infiltration and Inflow Analysis 178,794 Sun Meadow Lift Station Improvements 37,926 8" Sewer Line in Kingsbury Easement 30,000 Cowart's Creek Sewer Line 15,000 Water Well 05 Improvements (Altitude Valve) 12,500 Deepwood Lift Station (Engineering Study) 7,500 Whittier Oaks Lift Station Improvements 6,684 8" Gravity Line in Arena Park 4 , 140 8" Sewer Line in Easement Behind Houses (Dawn) 3,073 System Service Taps Water 5,000 Sewer 4,068 Total 3 ,267,680 C: \LOTUS\BUD93\FYRPTS\MAYOR\CAPITAL.WK1 2 City of Friendswood 19-Jan-93 Budgeted Projects Fiscal Year Ending September 30, 1993 Project Total Project Description Budget Budgeted Municipal Building Improvements: City Hall Annex 9,000 Public Works Building 4,000 13,000 Grand Total $5,481 ,383 C: \LOTUS\BUD93\FYRPTS\MAYOR\CAPITAL.WK1 3 r City of Friendswood 19-Jan-93 Budgeted Projects Fiscal Year Ending September 30, 1993 Project Total Project Description Budget Budgeted Fund Totals: General Fund $60,000 Water and Sewer Construction Fund 668,621 Surface Water Constructon Fund 121,648 Central Service Area Construction Fund 2,962,995 Capital Projects Fund 1 ,655, 119 Capital Facility Construction Fund 13,000 Total All Funds $5,481 ,383 Check Variance $0 C: \LOTUS\BUD93\FYRPTS\MAYOR\CAPITAL.WK1 4 Post-It''brand fax transmittal memo 7671 #of pages ►From /�To` /y , /e�Ma Ol vO E C /e✓ co. een7 2/�� y co.O..LL4 F ie1dsozea Dept. Phone 4� _3323 DRAFT Fax# 72_/O/ Fax# 4,::2 I9/ PROJECT STATUS 1/18/93 South Friendswood Interceptor: Plans for the Force Main. Lift 2t.ation and Gravity System are all complete and have been submitted to the Texas Water Commission for review. We expect. to hear form the £WC any ® day on the Force Main and ;haft: Station and hope to able to advertise for bids during uebruery. There two contracts should be complete within sJ.x months . We expect the entire project to be complete by the end of 2993 . The estimated project cost for this project is $2 . 9 million. Shadwell Parking Lot at Stevenson Park: This project is under construction and is approximately (2) 10 °ice complete . Contract is for 90 days and will provide new asphalt roadway and parking spaces along Shadwell Drive . Friendswood Link Road Sidewalk: Recently completed. F.M. 518 Sidewalk, Shadwell to Spreading Oaks : . (;) Plans for this sidewalk are complete and advertising for bids will begin this week with construction slated for mid February. Water Line Extensions : Water line extensions are proposed for Rancho Viejo Sec. :k. I` and various locations on Blackhawk Blvd as the first contract 0 to be let for this year. Other extensions that are planned include Lundy Lane/Eldorado and . 1992-93 Street Program: Streets to be replaced this year include Winding Way from 528 0 to 518 . Stonesthrow, Cedarwood from Stonesthrow to Spreading Oaks . and Mary Ann from Avondale to Castleiake. The surveying for these projects has been recently completed and plans are to have the project. under construction by May of this year. Overlay projects to be performed by Galveston County include Rancho Viejo East, E. Castlewood/Quaker Bend, East Spreading O Oaks , Winding Way from Oak Drive to Leisure Lane , Melody Lane , Rustic Lane , Falling Leaf from Greenhriar to Wilderness Trails Subdivision, and Myrtiewood. Drainage Master Plan: Work on this plan , being prepared by Claunch and Miller, is approximately 50 complete. Work to 1111 date has been to inventory the entire storm sewer system within the City and compile this information in the computer mapping system. The next phase will be to identify problem areas and analyze for proposed solutions .