1 BLACKHAWK REGIONAL WASTEWATER
TREATMENT PLANT AND COLLECTION SYSTEM
WPC-TEX-1121
1 FIRST YEAR
OPERATION AND MAINTENANCE COST
1 PROJECTIONS
1
1
11 F
PREPARED FOR
CITY OF FRIENDSWOOD/GULF COAST WASTE DISPOSAL AUTHORITY
1
i
1
1
1
1 BY
1 ENGINEERING-SCIENCE, INC.
MARCH 1980
I
ES
ENGINES ING- IENCE
R SC
111 16915 ELCAMINO REAL • HOUSTON,TEXAS 77058 • 713/488-2944
CABLE ADDRESS: ENGINSCI
TELEX: 77-5381
March 4, 1980
Gulf Coast Waste Disposal Authority
190 Bay Area Boulevard
Houston, TX. 77058
Subject: First Year 0 and M Cost Projections
' Blackhawk Regional Wastewater Plant &
Collection System - WPC-TEX-1121 .
Attention: Mr. Jim Thornton,
Deputy General Manager
Dear Jim:
Pursuant to 40 CFR para,. 35.929, "Requirements for the User Charge
System", the attached "First Year 0 and M Cost Projections" is submitted
11 for your use in establishing 0 and M cost recovery charges.
These costs and proposed allocation should provide the basis for an
p P
equitable distribution among the participating entities. Sufficient de-
' tail has been presented to facilitate adjustments that may be required.
Appropriate cost escalations have been included to provide 1981 operation
costs as realistic as possible.
Please contact me if you have any questions or require additional
information.
Sincerely,
)t-S1-1
S ephen C. Hartman
Project Engineer
SCH:bls
cc: Mr. James C. Morgan
1
I
ARCADIA•ATLANTA•AUSTIN • BERKELEY•CLEVELAND• HOUSTON •McLEAN •SAN DIEGO•WASHINGTON, D.C.
r
I
1
TABLE OF CONTENTS
I
Section I - Introduction I-1
Section II - Summary and Conclusions II-1
Section III - Variable 0 and M Costs - Table 1 III-1
- Fixed 0 and M Costs - Table 2 III-2
- Total 0 and M Costs - Table 3 III-3
' - Notes on 0 and M Cost Tables III-4
Appendix A - Chemical Costs A-1
Appendix B - Power Costs B-1
Appendix C - Labor Costs C-1
11
I
1
1
1
11
1
SECTION I
INTRODUCTION
Municipal wastewater treatment works funded under the Environmental
' Protection Agency Construction Grants Program are required, through a
user charge system, to recover the operational and maintenance costs
incurred. The first year projected 0 and M costs, presented here are to
assist the Gulf Coast Waste Disposal Authority in determining and allocat-
' ing these costs among the user entities participating in the Blackhawk
' Treatment Plant and various E.P.A. funded components of the collection
system.
' The E. P.A. funded components are identified in the Tables by Contract
Number and subdivided by elements. Variable 0 and M Costs are estimated for
each applicable element on Table 1 and fixed 0 and M Costs are estimated for
11 each element on Table 2. Costs are allocated among the entities on a ratio
of an entity' s flow rate (based onplant capacity reserved) to the total flow
Y p Y
rate of the entities using that element.
Total Estimated First Year 0 and M Costs are shown on Table 3 as totals
per entity and per contract element. Unit 0 and M cost per 1000 gallons is
also shown for each entity.
1
1
1
1
I-1
II
1
IISECTION II
IISUMMARY AND CONCLUSIONS
II
IIEstimated first year operation and maintenance costs for the Blackhawk
IIRegional Wastewater Treatment Plant and E.P.A. funded components of the Col-
lection System are $757,839, based on an average daily flow of 3.25 MGD.
IICharges to each of the used entities required to recover the first year
0 and M costs for both the treatment plant (including the access read and the
IIwater line) and the collection system are estimated to be:
II Entity Capacity Treatment Plant Collection System
MGD $/1000 gal . $/1000 gal .
City of Friendswood 1 .415 0.571 0.094
IIWCID-108 0.46 0.571 0.059
IIClearwoods I.D. 0.5 0.571 0.118
MUD-55 0.625 0.571 0.000
IMUD-142 0.25 0.571 0.000
I
These charges should provide for an equitable recovery of first year
IIoperation and maintenance costs. Charges for subsequent yeqrs will be ad-
justed by the actual 0 and M Costs incurred.
II
II
II-1
® M 1 1 11111 OLEO 1111 1 1 1 UM
- - - ® 1
(1 � u Coast Was a-Disposal Authority
1111
ESTIMATED FIRST YEAR VARIABLE 0 & M COSTS Blackhawk Regional Wastewater Treat-
IBER 1980 - SEPTEMBER 1981 ment Plant and Collection System -
WPC-TEX-1121
sed On Capacity Reserved (5)
act No. 2 Contract No. 3 Contract No. 4 Total
Blackhawk
N.I. 6"H2-0 Plant No.1 L.S. CID L.S. N.I . Access Road
- $ - $ - $ - $ - $ - $195,209
- - 3,450 3,153 - - 91 ,462
- $ - $ 3,450 $ 3,153 $ - $ - $286,671
- - 1 .415 - _
1 .415
$ 3,450 $127,799
$ 40,424
- - - 0.50 - -
0.50 -
- - - $ 3,153 - - $ 47,093
- - - - - - $ 50,968
1
$ 20,387
NE 11111 NM MIMI LEA 11111 11111 11111 I EN 111111 MN M ® NM
ESTIMATED FIRST YEAR FIXED 0 & M COSTS
- SEPTEMBER 1981
acity Reserved
ct No. 2 Contract No. 3 Contract No. 4 Total
Blackhawk WTP
N.I . 66"H0 Plant No.1 L.S. CID L.S. N.I. Access Road
837,779 _ $1 ,287,075 $510,945
timated) (Estimated) (Estimated)
43,658 $63,000 $65,000 $148,022 $1 ,074,053 $510,945 $11 ,229, 799
- FM LS FM LS
15,000 50,000 78,022 70,000
1% 1% 1% 3% 1% 3% 1% 2.5%
7,437 $ 630 $150 $1 ,500 $ 780 $2,100 $ -10,740 $ 12,773 $ 471 ,168
• 1 .415 1 .415 1 .415 1 .415 - - 1 .415 1 .415
1 .915 3.25 .415 1 .415 1 .915 3.25
5,495 $ 274 $ 150 1 ,500 $ 7,936 $ 5,561 $ 216,032 •
- 0.46 - _ _ - - 0.46
3.25 3.25
$ 90 $ 1 ,808 $ 65,328
0.50 0.50 - - 0.50 0.50 . 0.50 0.50
1 .915 3.25 0.50 � -r5 3.25
' 1 ,942 $ 97 $ 780 $2,100 $ 2,804 $ 1 ,965 $ 78,633
- 0.50 - - - - - 0.625
3.25 5
$ 121 $ 2,456 $ 79,410
0.25 0.25
3.25 5
$ 48 $ 983 $ 31 ,764
Mil 11.11 Ilia MI In 1111. ail lin MI lir ty k-iel!woortitlf glist Mit DIFIsalthoM Pue
TABLE 3 ,,,1 Blackhawk Regional Wastewater Treatment Plant and
"TIMATC11 'MST YEAR I 01 AL 0- & M COSTS k41 Collection System - WPC-TEX-1121
ER 1980 - SEPTEMBER 1981
)n Capacity Reserved (5)
t
:ONTRACT NO. 2 CONTRACT NO. 3 CONTRACT NO. 4 TOTALS '
Blackhawk
N. I. 6" H20 Plant #1 L.S. CID L.S. N. I. Access Road
$1 ,837,779 $1,287,075 $510,945 I
;,
(Estimated) (Estimated) -(Estimated) :
FM LS FM LS
1 743,658 $63,000 $157000 $50,,000 $78022 $70000 $1 ,074,053 $510,945 $11 ,229,799
$ - $ - - $ 3,450 $ - $ 3,153 $ - $ - $ 286,671
1 7,437 630 *150 1.,500 780 2,100 10,740 12,773 471 ,168
r $ 7,437, $ 630 $--5-6 $ 4,950- $ 780 $ 5,253 $10,740 $12,773 $ 757,8391
1
ii
$ - $ - . $ - $3,450 - - $ - $ - $ 127,799
3 5,495 274 150 1 ,500 - - 7,936 5,561 i
216 032
,
r $ 5,495 $274 $150 $4,950 - - $ 7,936 -$ 5,561 343,831
i
$ - $ - - _ - - - - $ 40,424 !
90 - - - - - 1 ,808 65,328
' $ - T90 - - - - 1 ,808 105,752
$ - $ - - - $ - $3,153 $ - $ -
$ 47,093
1 ,942 97 780 2,100 12 804 1 ,965 78,633
$1 ,942 $ 97 - - T786 $5,253 $2,804 r1 ,965 125,726 !
- $121. - - - - - $ - $ 50,968
_ - - - 2,456 79,410
- $121 - - - - - $ 2,456 130,378
_ $ - - - - - $ - $ 20,387
- 48 - - - - 983 31 ,764
- $ 48 - - - - - 983 $ 52,151 i
1
1 MIN 1 — V _ M I MIN — — 1 r M — M ® M sm.!
thority
;lu
j ;1
%j
ion of volume treated or conveyed, and include chemical ,' :
Appendix 13).
of installed capacity and include costs for labor,
ative services. i''i
111)1
are distributed by system component as a percentage of
Annual fixed 0 & M costs will vary widely over the life
aken as one percent for force mains and gravity sewers,
tion of capacity range and type of treatment for plants. 1 '
d to be 20 years. � }
ulated in Appendix C and are escalated at an annual rate
.ies is based on the contracted capacity distribution of
I
In is that the entities will require the full 3.25 R1GD at fu
,cted distribution. �E
I .
ti j
1
1
1 APPENDIX A —
CHEMICAL COSTS @ 3.25 1-1-0
1
Slaked lime - 8,828 lb/day at $61/ton plus
$36/20 ton delivery surcharge $ 277/day
Liquid Polymer - 47 lb/day at $2.50/lb. $ 118/day
1 Chlorine - 216 lb/day at $0.125/lb. $ 27/day
City Water - 20,000 gal ./day at $1 .00/1000 gal . $ 20/day
1
Total $ 472/day
1
Chemical Costs at 10% escalation for 2 years $ 195,209/yr.
1
1
1
1
1
1
i
1
1
1
1
APPENDIX R (Continued)
POWER COSTS
3. Plant No. 1 Lift Station Power Requirements
' Service: 120/240 V, 3 phase, 4 Watts
I
Load Description: 25 HP Service Pump 25 HP Standby Pump
50 A. , 125 Volt L-P
' Estimated Demand: Lighting: 7 KVA
Pumps: 40 KVA
47 KVA on line
I1 Pump @ 1000 gpm = 1 .4 RGD
Average Daily Flow = 1 MGD
ipump Demand Factor: 114 = 0.72
(27 KVA) (p.72) (24 hr/day) = 467 KWH/day
' (467)(30) = 13,996 KWH
Calculate Power Costs:
Ref: HL&P Miscellaneous General Services Rate (MGS)
Rate Charge: 800 KWH @ :3.4t = $ 27.20
1 ,500 KWH @ 2.35¢ = 35.25
11 ,696 KWH @ 2.88t = 102.92
$165.37
tSystem Demand Charge:
Assummed Peak Demand = 27 KUA 1
20 - 10 = 10 KVA
10 KVA x 100 = 1 ,000 KWH
1 ,000 KWH @ 3.4 = $ 34.00/mo
Rate Charge $165.37
Demand Charge 34.00
1 $199.37/mo
($199.37/mo) (12) (1 .44) = $3,450 (1981 )
6-3
!' APPENDIX B
i
POWER COSTS
' 1 . Blackhawk RWTP Estimated Power Consumption/Cost (1981) @ 3.25 MGD.
BRWTP Service: 277/480 volt, 3 phase, 4 watt
1200 amp service, 600 KVA
Drawing E-102
Load Description: 771 HP, 325 A. @ 277 V. lighting circuits
12 percent reserve capacity.
Estimated Demand: Lighting Load (277 V) (300)A = 83 KVA
Motor Load 771 x 746 W/HP = 575 KVA
658 KVA
11 Assume 60% demand factor: 395 KVA
Calculate Power Costs
11 Ref: HL&P Miscellaneous General Service Rate (MGS)
11 Rate Charge: 395 KVA x 24 hrs/day x 30 days/mo. = 284,000 KWH/mo.
0-800 KVA at 3.4t/KWH = $ 27.70
800-2300 KWH at 2.35t/KWH = 35.25
' 282,100 KWH at 0.88t/KWH = 2,482.48
$2,544.93/mo.
' System Demand Charge
Assume peak demand @ 450 KVA
450-10 = 440 KVA
440 x 100 = 44,000 KWH
44,000 x 3.4¢ = $1 ,496/mo. demand charge.
' Rate Charge: $2,544.93
Demand Charge: 1 ,496.00
' $4,040.93/mo.
Assume 20 percent escalation for two years (1 .44) .
($4040.93)(12 months/yr. )(1 .44) = $69,827 (1981)
= Average 2t/KWH
B-1
APPENDIX B (Continued)
POWER COSTS
2. Blackhawk Lift Station Estimated Power Consumption/Cost (1981).
B.L.S. Service: 277/480 V, 3 phase, 4 W.
600 A. service, 300 KVA
1 Drawing No. E-119
Load Description: 3 pumps at 150 HP
50 A. at 120/240, 1 phase, 3W L.P.
Estimated Demand: Lighting 50 x 240 = 12 KVA
' Pumps 150 HP Spare
150 HP Standby
150 HP Service= 112 KVA
124 KVA
Pump Demand Factor: 2000 gal/min x 60 min/hr x 24 hrs/day = 2.8 MGD
11 Average Daily Flow @ B.L.S. = 1.8 MGD
Demand Factor: 2.8 = 64%
' Estimated Daily Consumption: (120)(0.64)(24) = 1843 KWH or
(1843 KWH)(30 day/mo) = 55,290 KWH/mo.
11 Calculate Power Costs
Ref: HL&P Miscellaneous General Service Rate (MGS)
Rate Charge: 800 KWH @ 3.4¢ = $ 27.70
11 1100 KWH @ 2.354 = 25.85
54,190 KWH @ 0.88t = 476.90
• $529.95/mo.
System Demand Charge
Assumed Peak Demand = 110 KVA
110 - 10 = 100 KVA
' 100 KVA x 100 = 10,000 KWH
10,000 KWH @ 3.44 _ $340/mo.
' Rate Charge = $529.95
Demand Charge = 340.00
' $869.95/mo.
($869.95)(12)(1 .44) = $15,032.74 (1981)
= Average Cost 2.2t/KWH
B-2
i,
11 APPENDIX B (Continued)
POWER COSTS
4. Clearwoods Improvement District Lift Station Power Requirements
Service: 480 Volt, 3" Phase
Load Description: 1 - 10 HP Pump
3 - 25 HP Pump
50 Amp, 125 Volt L.P.
Estimated Demand: 1 - 10 HP Standby
1 - 25 HP Standby
2 - 25 HP Lead-Lag Service
11 2 x 25 = 50 HP = 37.3 KVA
50 Amp @ 125 V = 6.2 KVA •
43.5 KVA
Pump Demand Factor:
' Average Daily Flow: 0.42 MGD = 292 gpm
1 Pump @ 520 GPM: 520 = 0. 56
' (18.7 KVA)(0.56) = 10.47 KVA
Lighting = 3. 5
11 14 KVA
(14 KVA)(24)(30) = 10,080 KWH/mo.
Power Costs:
Rate Schedule: $121 .51
Demand Charge: 60.97
$182.48
' ($182.48)(12)(1 .44) = 3153/year (1981 )
' Average Cost: 2.6(t/KWH
I
1
B-4
I
I
•
APPENDIX C
FIXED 0 & M COSTS
LABOR
I4.7 Operators @ $10/hr. each - 40 hr/wk. $ 8,150/month
2.0 Maintenance Workers @ $12/hr. each - 40 hr/wk. 4,160/month
I0.1 Secretary @ $10/hr. - 40 hr/wk. 170/month
0.9 Lab Tech @ $10/hr. - 40 hr/wk. 1,560/month
I0.7 Supervisor @$18 /hr. - 40 hr/wk. 2,000/month
Subtotal
$ 16,240/month
MAINTENANCE
IMaterial and Supplies $ 3,400/month
One Pickup Truck (leased) 250/month
IElectric Cart ($3,000 over 5 years 10 percent) 66/month
Subtotal 3,715/nonth
1
SLUDGE DISPOSAL
One tandem diesel truck with hoist -
$68,000 over 5 years at 10 percent $ 1 ,500/month
I Five Dumpsters (22 cu. yd. each) -
$15,000 over 5 years at 10 percent 330/month
Diesel fuel - 5 mpg, 2500 mi/month, $1 .20 gal . 600/month
IDump fee - $1 .50/cu. yd. , 1400 cu. yd./month 2,100/month
Truck driver at $10/hour 1 ,730/month
Subtotal $ 6,260/month
I
I
I
APPENDIX C
FIXED 0 & M COSTS
ADMINISTRATIVE
' Management Fee $ 900/month
Accounting Fee 400/month
Subtotal $ 1 ,300/month
Total $27,516/month
' Fixed 0 & M Costs at 10% escalation for 2 years $399,532/yr.